CONTRACTOR INFORMATION GUIDE REVISION: 0.

1
PLATINUM PROCESSING DIVISION DATE: 03.03.2021

9.4 PPE Issuing Checklist

PPE ISSUING CHECKLIST


PPE DESCRIPTION REQUIRED? PROVIDED

1 Hard hat YES NO YES NO

2 Eye Protection YES NO YES NO

Overall
3  Heat Resistant blue overalls for Smelters, PMR, RBMR and ACP YES NO YES NO
 Acid Resistant for Acid Plant
 Other where prescribed

4 Steel tip safety boots YES NO YES NO

Ear plugs
5 YES NO YES NO
 Must be worn in designated noise areas

6 Gloves YES NO YES NO

Respirator
7 YES NO YES NO
 Must be worn in designation respirator areas

Safety Harness
8  Spider Web full body harness with elastic type (scaffold hooked) YES NO YES NO
double lanyards to be worn for working at heights

Other PPE
9 YES NO YES NO
 As identified by HIRA for the work to be carried out.

PPE IS NOT REQUIRED FOR VISITORS ENTERING THE MAIN OFFICE COMPLEX OF A SMELTER AND
OFFICES OUTSIDE THE HIGH-RISK AREAS OF A PLANT.

THE RESPONSIBLE SITE REPRESENTATIVE MUST ENSURE THAT THE VISITOR IS PROVIDED WITH
THE CORRECT PPE IF A VISITOR IS REQUIRED TO ENTER ANY HIGH-RISK AREA OF A PLANT.

Employee name Employee Signature Date received

Supervisor name Supervisor Signature Date issued

Smelters Standard Appendix


This document is maintained on an electronic database.
The printed version should be compared as it may be outdated. Date Printed: 10 March 2021
Page 62 of 94