Professional Documents
Culture Documents
Rev.1 Ars-Budy Tan Oto
Rev.1 Ars-Budy Tan Oto
1906
302
736
AREA
GARASI
E= -0.40 AREA
TAMAN
1570
BLOCK AREA
KETERANGAN (WARNA)
LANTAI BANGUNAN
1066
AREA HIJAU
(VEGETASI) AREA
TAMAN
AREA PERKERASAN
2426
SWIMING POOL
+ DECKING AREA
300
PAGAR KELILING
BLOCK PLAN
SKALA 1 : 150
U
NO PEMBAGIAN RUANG LUAS ( M² )
4. LUAS LANTAI 3 80 M²
S
5. LUAS TOTAL LANTAI BANGUNAN 573 M²
1985
225
515
GUDANG
Naik Naik E = ±0.00
Masuk LT. 2 148
736 TOILET LT.2
E = -0.05
105
KORIDOR
E = ±0.00 MASTER
BEDROOM
E = ±0.00
1066 POOLDECKING
Keluar E = -0.20
855
350
MASTER
BEDROOM 805
E = ±0.00
AREA TOILET SWIMING POOL
E = -0.05 350 300 E = -1.50
TAMAN
CONTROL PLANEL
E = ±0.00
164
300
LAYOUT PLAN
SKALA 1 : 150
U NO PEMBAGIAN RUANG LUAS ( M² )
B T 80 M²
4. LUAS LANTAI 3
1906
302
736
GUDANG
Naik Naik E = ±0.00
Masuk LT. 2
TOILET LT.2
E = -0.05
ROOFTOP AREA
1570
E = ±7.60
TOILET
E = -0.05
KORIDOR
E = ±0.00 MASTER
BEDROOM
E = ±0.00
POOLDECKING
1066 Keluar E = -0.20
855
MASTER
BEDROOM 805
E = ±0.00
AREA TOILET SWIMING POOL
E = -0.05 350 300 E = -1.50
TAMAN
CONTROL PLANEL
E = ±0.00
2426
300
SITE PLAN
SKALA 1 : 150
B
001
2225
GUDANG
Naik Naik E = ±0.00
120 LT. 2 135
TOILET LT.2
E = -0.05
240
120 105
LIVING AREA
450 E = ±0.00
157 KORIDOR
E = ±0.00 MASTER
BEDROOM
287
E = ±0.00
129 POOLDECKING
E = -0.20
855
350
MASTER
BEDROOM 805
E = ±0.00
TOILET SWIMING POOL
385 385 350 300
E = -0.05 E = -1.50
CONTROL PLANEL
E = ±0.00
164
DENAH LT. 1
SKALA 1 : 90
B
001
2225
195
NAIK KE LT 3
242
350 TURUN KE LT 1 TURUN KE LT 1 350
NAIK
KE LT 3
108
BEDROOM BEDROOM
500 E = +3.80 E = +3.80 A
MINI BAR 001
E = ±0.00
1363 350 350 1363
BALKON
E = +3.80 TOILET
E = +3.75
350 350
E = +3.80
BALKON
BEDROOM
BEDROOM
E = +3.80
513 E = +3.80
TOILET
E = +3.75 CONTROL
163 PANEL 163
E = +3.80
2225
DENAH LT. 2
SKALA 1 : 90
B
001
120
258 255
Turun
LT. 2
100
245
A
ROOFTOP AREA 001
AREA KITCHEN
E = ±7.60 TERAS E = ±7.65
351 350
E = ±7.65
1006
332
350
218
369
TOILET
120 E = ±7.65 163
39
340 180
DENAH LT. 3
SKALA 1 : 90
107 243 250 555 555 350 165
murda paras
262 +1187
plat lantai 12 cm
pasangan bata merah
120 tiang pilar teras
+1067
212
relling balkon tinggi 1 m lantai keramik granit 60/60
317 dari lantai
plat lantai 12 cm
POTONGAN A-A
SKALA 1 : 100
MURDA PARAS
+1147
80
+1067
BATU PARAS
UKIRAN BALI
212
DINDING PASANGAN
BATA MERAH
+855
100 RELLING BESI HOLLO HITAM
TERAS ROOFTOP
E = +7.60
+755
70
plafon gypsum +685
1329 +3.00
DINDING FINISHING CAT
VINILEX SOFT CREAM
300
POOL
BEKISITING BATAKO 10 CM
DINDING TULANGAN 12 CM
URUGAN TANAH
1383
BUBUNGAN GENTENG
UKIRAN BALI
DINDING EKSTERIOR PASANGAN
202 BATA MERAH
UKIRAN PARAS BALI
ELEMEN DINDING TEMPEL PINTU GEBYOK KUPUTARUNG KAYU
FULL UKIRAN ARSITEKTUR BALI
+865
101
RELLING HOOLO GALVANIS HITAM
+764 2/4
TANAMAN HIAS AREA
BALKON ROOFTOP
135
+375
60
+315
PINTU ANGKUL
KHAS ARSITEKTUR BALI
315
+40
TAMAPAK DEPAN
SKALA 1 : 75
MURDA PARAS
BUBUNGAN GENTENG
+1329
KALISPLANK KAYU 2/20
IKUH CELEDUG
+1127
+1067
BATU CANDI
UKIRAN BALI UKIRAN BATU CANDI
ARSITEKTUR BALI
+865
+375
+40
TAMPAK SAMPING
SKALA 1 : 100
107 243 250 5
MURDA PARAS
505
BUBUNGAN GENTENG
+1067
212
BATU PARAS
relling balkon tingg
UKIRAN BALI 317 dari lantai
DINDING PASANGAN
BATA MERAH
105
+855
RELLING BESI HOLLO HITAM
75
+755 plafon gypsum
+6.75
plafon
+6.75
1369
+685
DINDING FINISHING CAT
VINILEX SOFT CREAM 370
relling kaca 5
295 rangka kayu
+300
380
300
DINDING BATU KARANG
POOLDECK ± 0.00
E = -0.20
POOL
BEKISITING BATAKO 10 CM
DINDING TULANGAN 12 CM
153 25 300 29
25
+1187
plat lantai 12 cm
bata merah
g pilar teras
+1067
plat lantai 12 cm
plafon gypsum
+3.00 +300
40
keramik dinding toilet 40 granit hitam
165
555 350
DETAIL PRINSIP ARSITEKTUR C-C
SKALA 1 : 60
BLOCK AREA
KETERANGAN (WARNA)
LANTAI BANGUNAN
LANTAI KOLAM
POLLDECKING KAYU ULIN
VEGETASI
AREA LANTAI
BATU ALAM
AREA PERKERASAN
GARASI
POOL
1906
302
736
GUDANG
Naik Naik E = ±0.00
Masuk LT. 2
TOILET LT.2
E = -0.05
TOILET
E = -0.05
KORIDOR
E = ±0.00 MASTER
BEDROOM
E = ±0.00
POOLDECKING
1066 Keluar E = -0.20
855
MASTER
BEDROOM 805
E = ±0.00
AREA TOILET SWIMING POOL
E = -0.05 350 300 E = -1.50
TAMAN
CONTROL PLANEL
E = ±0.00
2426
300
DENAH LANDSCAPE
SKALA 1 : 150
E LT 3
TURUN KE LT 1
LEBAR PIJAKAN 30 CM
TINGGI PIJAKKAN 20 CM
EV = +7.60
+760
EV = +5.80
380 +580
EV = +3.80
760 +380
LEBAR PIJAKAN 30 CM
TINGGI PIJAKKAN 20 CM
130
380 EV = +1.80
+180
100
EV = ±0.00
855
SWIMING POOL
350 E = -1.50 300
A
001
Lantai pinggiran
kolam batu palimanan
pool
bekisiting batako 10 cm
dinding tulangan 12 cm
tanah asli
lantai kerja 10 cm
POT. A-A
SKALA 1 : 50
Lantai pinggiran
kolam batu palimanan
pool
bekisiting batako 10 cm
dinding tulangan 12 cm
30 lantai kerja 10 cm
POT. B-B
SKALA 1 : 50
300
PENANDA/
KETERANGAN SIGNASE skemaa jalur singnase
jalur evakuasi
DIMENSI SIGNASE 12 CM X
9 CM
TINGGI DARI LANTAI 1.7 M
DIMENSI SIGNASE 18 CM X
24 CM
TEMPAT SAMPAH
TINGGI DARI LANTAI 1.5 M
PENANDA APAR
PENANDA LISTRIK
JALAN LINGKUNGAN 300
1985
225
GUDANG
Naik Naik E = ±0.00
Masuk LT. 2 148
736 TOILET LT.2
E = -0.05
105
KORIDOR
E = ±0.00 MASTER
BEDROOM
E = ±0.00
TITIK KUMPUL
1066 POOLDECKING
Keluar E = -0.20
855
350
MASTER
BEDROOM 805
E = ±0.00
AREA TOILET SWIMING POOL
E = -0.05 350 300 E = -1.50
TAMAN
CONTROL PLANEL
E = ±0.00
164
300
195
NAIK KE LT 3
242
350 TURUN KE LT 1 TURUN KE LT 1 350
NAIK
KE LT 3
108
BEDROOM BEDROOM
500 E = +3.80 E = +3.80
MINI BAR
E = ±0.00
1363 350 350 1363
BALKON
E = +3.80 TOILET
E = +3.75
350 350
E = +3.80
BALKON
BEDROOM
BEDROOM
E = +3.80
513 E = +3.80
TOILET
E = +3.75 CONTROL
163 PANEL 163
E = +3.80
2225
DIMENSI SIGNASE 12 CM X
9 CM
TINGGI DARI LANTAI 1.7 M
DIMENSI SIGNASE 18 CM X
24 CM
TINGGI DARI LANTAI 1.5 M
JALUR EVAKUASI
1350 520
120
Turun
258 255
LT. 2
100
245
ROOFTOP AREA
E = ±7.60 TERAS
AREA KITCHEN PENANDA APAR
E = ±7.65
351 350
E = ±7.65
1006
332
350
TOILET
E = ±7.65 163
340 180