U NO PEMBAGIAN RUANG LUAS ( M² )

1. TANAH LOKASI 400 M²

2. LUAS LANTAI DASAR 224 M²

3. LUAS LANTAI 2 269 M²


B T
4. LUAS LANTAI 3 80 M²

5. LUAS TOTAL LANTAI BANGUNAN 573 M²

JALAN LINGKUNGAN 300

1906
302

JALAN LINGKUNGAN AREA SELASAR


E= -0.20
AREA CUCI E= -0.20

736

AREA
GARASI
E= -0.40 AREA
TAMAN
1570

BLOCK AREA
KETERANGAN (WARNA)

LANTAI BANGUNAN
1066

AREA HIJAU
(VEGETASI) AREA
TAMAN

AREA PERKERASAN

2426

SWIMING POOL
+ DECKING AREA
300

PAGAR KELILING

BLOCK PLAN
SKALA 1 : 150
U
NO PEMBAGIAN RUANG LUAS ( M² )

1. TANAH LOKASI 400 M²

B T 2. LUAS LANTAI DASAR 224 M²

3. LUAS LANTAI 2 269 M²

4. LUAS LANTAI 3 80 M²
S
5. LUAS TOTAL LANTAI BANGUNAN 573 M²

JALAN LINGKUNGAN 300

1985
225
515

JALAN LINGKUNGAN 108


AREA
555 SELASAR
E= -0.20
555 148
AREA
350
CUCI E= -0.20
165 174

GUDANG
Naik Naik E = ±0.00
Masuk LT. 2 148
736 TOILET LT.2
E = -0.05

105

ART ART ROOM TOILET


E = ±0.00 E = -0.05 215
E = ±0.00
310
AREA LIVING AREA
GARASI E = ±0.00
E= -0.40 AREA KITCHEN LIVING AREA
TAMAN E = ±0.00 E = ±0.00
1570
392
TOILET
E = -0.05

KORIDOR
E = ±0.00 MASTER
BEDROOM
E = ±0.00

1066 POOLDECKING
Keluar E = -0.20
855
350
MASTER
BEDROOM 805
E = ±0.00
AREA TOILET SWIMING POOL
E = -0.05 350 300 E = -1.50
TAMAN
CONTROL PLANEL
E = ±0.00
164

171 185 415 555 555 350 165


2225
2426

300

LAYOUT PLAN
SKALA 1 : 150
U NO PEMBAGIAN RUANG LUAS ( M² )

1. TANAH LOKASI 400 M²

2. LUAS LANTAI DASAR 224 M²

3. LUAS LANTAI 2 269 M²

B T 80 M²
4. LUAS LANTAI 3

5. LUAS TOTAL LANTAI BANGUNAN 573 M²

JALAN LINGKUNGAN 300

1906
302

JALAN LINGKUNGAN AREA SELASAR


E= -0.20
AREA CUCI E= -0.20

736
GUDANG
Naik Naik E = ±0.00
Masuk LT. 2
TOILET LT.2
E = -0.05

ART ART ROOM TOILET


E = ±0.00 E = ±0.00 E = -0.05

AREA LIVING AREA


GARASI E = ±0.00
E= -0.40 AREA KITCHEN LIVING AREA
TAMAN E = ±0.00 E = ±0.00

ROOFTOP AREA
1570
E = ±7.60
TOILET
E = -0.05

KORIDOR
E = ±0.00 MASTER
BEDROOM
E = ±0.00

POOLDECKING
1066 Keluar E = -0.20
855

MASTER
BEDROOM 805
E = ±0.00
AREA TOILET SWIMING POOL
E = -0.05 350 300 E = -1.50
TAMAN
CONTROL PLANEL
E = ±0.00

2426

300

SITE PLAN
SKALA 1 : 150
B
001

2225

350 250 1110 515


100 85 165 115 135 555 555 350 165

GUDANG
Naik Naik E = ±0.00
120 LT. 2 135
TOILET LT.2
E = -0.05
240

120 105

ART ART ROOM TOILET


215 E = ±0.00 E = -0.05 215
E = ±0.00

LIVING AREA
450 E = ±0.00

KITCHEN LIVING AREA


235 AREA PEKARANGAN E = ±0.00 E = ±0.00
E = -0.60 A
001
392
1361 TOILET 1361
E = -0.05

157 KORIDOR
E = ±0.00 MASTER
BEDROOM
287
E = ±0.00

129 POOLDECKING
E = -0.20
855
350
MASTER
BEDROOM 805
E = ±0.00
TOILET SWIMING POOL
385 385 350 300
E = -0.05 E = -1.50

CONTROL PLANEL
E = ±0.00
164

185 415 555 555 350 165


2225

DENAH LT. 1
SKALA 1 : 90
B
001
2225

100 250 250 555 550 355 165

195

NAIK KE LT 3

242
350 TURUN KE LT 1 TURUN KE LT 1 350

NAIK
KE LT 3

108

TOILET LIVING AREA LIVING AREA TOILET


150 E = +3.75 E = +3.75
150
E = ±0.00 E = ±0.00
E = +3.80
BALKON

BEDROOM BEDROOM
500 E = +3.80 E = +3.80 A
MINI BAR 001
E = ±0.00
1363 350 350 1363

BALKON
E = +3.80 TOILET
E = +3.75
350 350
E = +3.80
BALKON

BEDROOM
BEDROOM
E = +3.80
513 E = +3.80

TOILET
E = +3.75 CONTROL
163 PANEL 163
E = +3.80

100 500 128 427 427 123 355 165


600 1105 520

2225

DENAH LT. 2
SKALA 1 : 90
B
001

93 150 108 1056 294 520

120

258 255
Turun
LT. 2

100

245

A
ROOFTOP AREA 001
AREA KITCHEN
E = ±7.60 TERAS E = ±7.65
351 350
E = ±7.65

1006

332

350

218

369

TOILET
120 E = ±7.65 163

39

340 180

711 879 111 520

DENAH LT. 3
SKALA 1 : 90
107 243 250 555 555 350 165
murda paras

kaki kuda kuda 8/12


genteng beton
Reng kayu 2/3 +1329
ringbalk 15/20
142 ikuh celedug

262 +1187
plat lantai 12 cm
pasangan bata merah
120 tiang pilar teras

+1067

212
relling balkon tinggi 1 m lantai keramik granit 60/60
317 dari lantai
plat lantai 12 cm

balok struktur 25/50


105
AREA ROOFTOP TERAS ROOFTOP AREA KITCHEN
E = +7.55 E = +7.55 E = +7.60
+755
75
plafon gypsum plafon gypsum plafon gypsum plafon gypsum
+6.75 +6.75 +6.75 +6.75 +675
1369
dinding finishing cat vinilex
Soft cream

370 lantai keramik granit 60/60


relling kaca 5 mm
295 rangka kayu

BEDROOM LIVING AREA LIVING AREA BEDROOM


BALKON
E = +3.80 E = +3.80 E = +3.80 E = +3.80
E = +3.80
+380
80
plafon gypsum
plafon plafon plafon gypsum drop celling +3.00 +300
kayu+3.00 kayu+3.00 +3.00 kayu +3.00
40
keramik dinding toilet 40 granit hitam

dinding pasangan bata merah


380
lantai keramik granit 60/60
300

KITCHEN LIVING AREA LIVING AREA MASTER BEDROOM TOILET


E = ±0.00 E = ±0.00 E = ±0.00 E = ±0.00 E = -0.05
± 0.00
40 PEKARANGAN
E = -0.40

107 243 250 555 165


555 350
2225

POTONGAN A-A
SKALA 1 : 100
MURDA PARAS

250 247 353 505


BUBUNGAN GENTENG

ATAP GENTENG KARANG PILANG


+1329

KALISPLANK KAYU 2/20


181 IKUH CELEDUG
PASANGAN BATU CANDI

+1147
80
+1067
BATU PARAS
UKIRAN BALI
212
DINDING PASANGAN
BATA MERAH

+855
100 RELLING BESI HOLLO HITAM
TERAS ROOFTOP
E = +7.60
+755
70
plafon gypsum +685
1329 +3.00
DINDING FINISHING CAT
VINILEX SOFT CREAM

KUSEN KAYU JATI 5/15


DAUN PINTU KAYU JATI 3/10
305
KUSEN KAYU PINTU SLIDING
KACA POLOS 6 MM

RELLING BESI HOLLO


LIVING AREA LIVING AREA BALKON HITAM
E = +3.80 E = +3.80 E = +3.80
+380
80
plafon gypsum +300
+3.00

DINDING BATU KARANG

300

LANTAI KERAMIK GRANIT 60/60

LIVING AREA LIVING AREA


SELASAR E = ±0.00 E = ±0.00 POOLDECK ± 0.00
E = -0.20 E = -0.20

POOL

BEKISITING BATAKO 10 CM
DINDING TULANGAN 12 CM

KERAMIK MOZAIL KOLAM 3 CM

URUGAN TANAH

497 353 153 25 300 29


25

1383

POTONGAN ARS B-B


SKALA 1 : 75
MURDA PARAS

BUBUNGAN GENTENG

ATAP GENTENG KARANG PILANG


+1329

KALISPLANK KAYU 2/20


181 IKUH CELEDUG

+1147 20 PASANGAN BATU CANDI


+1127
60
+1067 DEKORATIF UKIR BALI

UKIRAN BALI
DINDING EKSTERIOR PASANGAN
202 BATA MERAH
UKIRAN PARAS BALI
ELEMEN DINDING TEMPEL PINTU GEBYOK KUPUTARUNG KAYU
FULL UKIRAN ARSITEKTUR BALI

+865
101
RELLING HOOLO GALVANIS HITAM
+764 2/4
TANAMAN HIAS AREA
BALKON ROOFTOP

PASANGAN ROSTER 20/20


254 FULL DINDING

PATUNG HIAS PASANGAN BATA MERAH


CIRI KHAS BALI PADA PILAR

+520 FINISHING DINDING EKSTERIOR


SOFT CREAM VINILEX

135

+375
60
+315
PINTU ANGKUL
KHAS ARSITEKTUR BALI

315

+40

TAMAPAK DEPAN
SKALA 1 : 75
MURDA PARAS

BUBUNGAN GENTENG

ATAP GENTENG KARANG PILANG

+1329
KALISPLANK KAYU 2/20
IKUH CELEDUG

PASANGAN BATU CANDI

+1127

+1067
BATU CANDI
UKIRAN BALI UKIRAN BATU CANDI
ARSITEKTUR BALI

PASANGAN DINDING EKSTERIOR


BATA MERAH

+865

RELLING BALKON ROOFTOP


+764 BESI GALVANIS 2/4 WARNA HITAM
TANAMAN AREA PEMBATAS
RELLING

KUSEN KAYU JATI


KACA POLOS 5 MM

PASANGAN BATA MERAH


+520 PADA PILAR
FINISHING DINDING EKSTERIOR
SOFT CREAM VINILEX

+375

+40

TAMPAK SAMPING
SKALA 1 : 100
107 243 250 5
MURDA PARAS

505
BUBUNGAN GENTENG

ATAP GENTENG KARANG PILANG


+1329 142

KALISPLANK KAYU 2/20 262


IKUH CELEDUG
PASANGAN BATU CANDI 120
+1147

+1067
212
BATU PARAS
relling balkon tingg
UKIRAN BALI 317 dari lantai

DINDING PASANGAN
BATA MERAH

105
+855
RELLING BESI HOLLO HITAM
75
+755 plafon gypsum
+6.75
plafon
+6.75
1369
+685
DINDING FINISHING CAT
VINILEX SOFT CREAM 370
relling kaca 5
295 rangka kayu

KUSEN KAYU JATI 5/15


DAUN PINTU KAYU JATI 3/10
KUSEN KAYU PINTU SLIDING
KACA POLOS 6 MM LIVING AR
BEDROOM
BALKON
E = +3.80 E = +3.80 E = +3.80

RELLING BESI HOLLO


BALKON HITAM 80
E = +3.80
+380 plafon plafon plafon gypsum drop
kayu+3.00 kayu+3.00 +3.00 kayu +

+300
380
300
DINDING BATU KARANG

KITCHEN LIVING AREA


E = ±0.00 E = ±0.00
LANTAI KERAMIK GRANIT 60/60
40 PEKARANGAN
E = -0.40

POOLDECK ± 0.00
E = -0.20

POOL

BEKISITING BATAKO 10 CM
DINDING TULANGAN 12 CM

KERAMIK MOZAIL KOLAM 3 CM


107 243 250 5
URUGAN TANAH

153 25 300 29
25

DETAIL PRINSIP ARSITEKTUR A-A DETAIL PRINSIP ARSITEKTUR B-B


SKALA 1 : 60 SKALA 1 : 60
555 350 165
murda paras

kaki kuda kuda 8/12


genteng beton
Reng kayu 2/3 +1329
ringbalk 15/20
ikuh celedug

+1187
plat lantai 12 cm
bata merah
g pilar teras

+1067

lantai keramik granit 60/60

plat lantai 12 cm

balok struktur 25/50

TERAS ROOFTOP AREA KITCHEN


E = +7.55 E = +7.60
+755

plafon gypsum plafon gypsum


+6.75 +6.75 +675
dinding finishing cat vinilex
Soft cream

lantai keramik granit 60/60

LIVING AREA BEDROOM


E = +3.80 E = +3.80
+380

plafon gypsum
+3.00 +300
40
keramik dinding toilet 40 granit hitam

dinding pasangan bata merah

lantai keramik granit 60/60

LIVING AREA MASTER BEDROOM TOILET


E = ±0.00 E = ±0.00 E = -0.05
± 0.00

165
555 350
DETAIL PRINSIP ARSITEKTUR C-C
SKALA 1 : 60
BLOCK AREA
KETERANGAN (WARNA)

LANTAI BANGUNAN

LANTAI KOLAM
POLLDECKING KAYU ULIN

VEGETASI

AREA LANTAI
BATU ALAM

AREA PERKERASAN
GARASI

POOL

AREA PAGAR PEMBATAS


KELILING

AREA LANTAI ACIAN


OUTDOOR

AREA SETAPAK BATU ALAM


+ BATU LEPAS
JALAN LINGKUNGAN 300

1906
302

JALAN LINGKUNGAN AREA SELASAR


E= -0.20
AREA CUCI E= -0.20

736
GUDANG
Naik Naik E = ±0.00
Masuk LT. 2
TOILET LT.2
E = -0.05

ART ART ROOM TOILET


E = ±0.00 E = ±0.00 E = -0.05

AREA LIVING AREA


GARASI E = ±0.00
E= -0.40 AREA KITCHEN LIVING AREA
TAMAN E = ±0.00 E = ±0.00
1570

TOILET
E = -0.05

KORIDOR
E = ±0.00 MASTER
BEDROOM
E = ±0.00

POOLDECKING
1066 Keluar E = -0.20
855

MASTER
BEDROOM 805
E = ±0.00
AREA TOILET SWIMING POOL
E = -0.05 350 300 E = -1.50
TAMAN
CONTROL PLANEL
E = ±0.00

2426

300

DENAH LANDSCAPE
SKALA 1 : 150
E LT 3

TURUN KE LT 1

LEBAR PIJAKAN 30 CM
TINGGI PIJAKKAN 20 CM

EV = +7.60
+760

EV = +5.80
380 +580

EV = +3.80
760 +380

LEBAR PIJAKAN 30 CM
TINGGI PIJAKKAN 20 CM
130
380 EV = +1.80
+180

100
EV = ±0.00

DET. ARSITEKTUR TANGGA


SKALA 1 : 50
B
001

855

SWIMING POOL
350 E = -1.50 300
A
001

25 805 25 DENAH POOL


SKALA 1 : 50

TANGGA BESI HOLO BULAT


Ø 2 SILVER

Lantai pinggiran
kolam batu palimanan

pool

bekisiting batako 10 cm
dinding tulangan 12 cm

keramik mozail kolam 3 cm

tanah asli

+157 plat lantai kolam tb 12 cm

lantai kerja 10 cm

POT. A-A
SKALA 1 : 50

TANGGA BESI HOLO BULAT


Ø 2 SILVER

Lantai pinggiran
kolam batu palimanan

pool

bekisiting batako 10 cm
dinding tulangan 12 cm

keramik mozail kolam 3 cm

157 tanah asli

plat lantai kolam tb 12 cm

30 lantai kerja 10 cm

POT. B-B
SKALA 1 : 50
300
PENANDA/
KETERANGAN SIGNASE skemaa jalur singnase
jalur evakuasi

DIMENSI SIGNASE 18 CM X penempatan signase


jalaur evakuasi
24 CM
TINGGI DARI LANTAI 1.5 M penempatan posisi apar
dalam bangunan

akses titik kumpul pada


DIMENSI SIGNASE 10 CM X bangunan
25 CM
penempatan posisi titik
TINGGI DARI LANTAI 1.5 M kumpul

penempatan posisi tempat


DIMENSI SIGNASE 17 CM X sampah
20 CM X 17 CM
TINGGI DARI LANTAI 1.5 M

DIMENSI SIGNASE 12 CM X
9 CM
TINGGI DARI LANTAI 1.7 M

DIMENSI SIGNASE 18 CM X
24 CM
TEMPAT SAMPAH
TINGGI DARI LANTAI 1.5 M

PENANDA APAR

PENANDA LISTRIK
JALAN LINGKUNGAN 300

1985
225

JALAN LINGKUNGAN AREA SELASAR


E= -0.20
AREA CUCI E= -0.20 174

GUDANG
Naik Naik E = ±0.00
Masuk LT. 2 148
736 TOILET LT.2
E = -0.05

105

ART ART ROOM TOILET


E = ±0.00 E = -0.05 215
E = ±0.00

AREA LIVING AREA


GARASI E = ±0.00
E= -0.40 AREA KITCHEN LIVING AREA
E = ±0.00
TAMAN E = ±0.00
1570
392
TOILET
E = -0.05

KORIDOR
E = ±0.00 MASTER
BEDROOM
E = ±0.00
TITIK KUMPUL
1066 POOLDECKING
Keluar E = -0.20
855
350
MASTER
BEDROOM 805
E = ±0.00
AREA TOILET SWIMING POOL
E = -0.05 350 300 E = -1.50
TAMAN
CONTROL PLANEL
E = ±0.00
164

171 185 415 555 555 350 165


2225
2426

300

JALUR EVAKUASI DENAH SIGNASE LT. 1


SKALA 1 : 50
PENANDA/
KETERANGAN SIGNASE skemaa jalur singnase
jalur evakuasi

DIMENSI SIGNASE 18 CM X penempatan signase


jalaur evakuasi
24 CM
TINGGI DARI LANTAI 1.5 M penempatan posisi apar
dalam bangunan

akses titik kumpul pada


DIMENSI SIGNASE 10 CM X bangunan
25 CM
penempatan posisi titik
TINGGI DARI LANTAI 1.5 M kumpul

penempatan posisi tempat


DIMENSI SIGNASE 17 CM X sampah
20 CM X 17 CM
TINGGI DARI LANTAI 1.5 M JALUR EVAKUASI
DIMENSI SIGNASE 12 CM X
9 CM
TINGGI DARI LANTAI 1.7 M 2225

DIMENSI SIGNASE 18 CM X 100 250 250 555 550 355 165


24 CM
TINGGI DARI LANTAI 1.5 M

195

NAIK KE LT 3

242
350 TURUN KE LT 1 TURUN KE LT 1 350

NAIK
KE LT 3

108

TOILET LIVING AREA LIVING AREA TOILET


150 E = +3.75 E = +3.75
150
E = ±0.00 E = ±0.00
E = +3.80
BALKON

BEDROOM BEDROOM
500 E = +3.80 E = +3.80
MINI BAR
E = ±0.00
1363 350 350 1363

BALKON
E = +3.80 TOILET
E = +3.75
350 350
E = +3.80
BALKON

BEDROOM
BEDROOM
E = +3.80
513 E = +3.80

TOILET
E = +3.75 CONTROL
163 PANEL 163
E = +3.80

100 500 128 427 427 123 355 165


600 1105 520

2225

DENAH SIGNASE LT. 2


SKALA 1 : 100
PENANDA/
KETERANGAN SIGNASE skemaa jalur singnase
jalur evakuasi

DIMENSI SIGNASE 18 CM X penempatan signase


jalaur evakuasi
24 CM
TINGGI DARI LANTAI 1.5 M penempatan posisi apar
dalam bangunan

akses titik kumpul pada


DIMENSI SIGNASE 10 CM X bangunan
25 CM
penempatan posisi titik
TINGGI DARI LANTAI 1.5 M kumpul

penempatan posisi tempat


DIMENSI SIGNASE 17 CM X sampah
20 CM X 17 CM
TINGGI DARI LANTAI 1.5 M

DIMENSI SIGNASE 12 CM X
9 CM
TINGGI DARI LANTAI 1.7 M

DIMENSI SIGNASE 18 CM X
24 CM
TINGGI DARI LANTAI 1.5 M
JALUR EVAKUASI
1350 520

120

Turun
258 255
LT. 2

100

245

ROOFTOP AREA
E = ±7.60 TERAS
AREA KITCHEN PENANDA APAR
E = ±7.65
351 350
E = ±7.65

1006

332

350

TOILET
E = ±7.65 163

340 180

711 879 111 520

DENAH SIGNASE LT. 3


SKALA 1 : 100