Construction Management: A. B. C. D. E. View Answer Discuss in Forum Workspace
Construction Management: A. B. C. D. E. View Answer Discuss in Forum Workspace
B. curing of concrete
D. preparation of breakfast
MANAGEMENT B. The tail of the arrow indicates the start of the activity
3. The technique for establishing and maintaining priorities among the various jobs of a project,
is known
A. Event flow scheduling technique
B. 1920
C. 1930
D. 1940
E. 1950
View Answer Discuss in Forum Workspace Report
A.
9. If D is the duration, ES and EF are the earliest start and finish, LS and LF are latest start and
latest finish time, then the following relation holds good
A. EF = ES + D
B. B. LS = LF - D
C. LF = LS + D
D. D = EF - ES
C.
E. all the above.
View Answer Discuss in Forum Workspace Report
D.
10. Final technical authority of a project lies with
A. Assistant Engineer
B. Executive Engineer
E.
C. Superintending Engineer
D. Chief Engineer.
View Answer Discuss in Forum Workspace Report
11. The performance of a specific task in CPM, is known
A. Dummy
7. In the given figure, the network of a project represents
B. Event
C. Activity
D. Contract.
A. activity of an excavation of a footing 12. Pick up the correct statement from the following:
A. The float may be positive, zero or negative
B. activity of an excavation which starts at event No. 1 and ends at even No. 2
If the float is positive and the activity is delayed by a period equal to its total float, the
C. activity of excavation which takes 8 units of time B.
completion of project is not delayed
D. none of these. If the float of an activity is negative, delay in its performance is bound to delay the
C.
View Answer Discuss in Forum Workspace Report completion of project
If the float of an activity is zero, the activity is critical and any delay in its performance
D.
will delay the whole project
8. Pick up the PERT event from the following:
A. Digging of foundation started E. All the above.
View Answer Discuss in Forum Workspace Report
13. A Milestone chart 18. Various activities of a project, are shown on bar charts by
A. shows the interdependencies of various jobs A. vertical lines
14. Completion of an activity on CPM network diagram, is generally known 19. Time and progress chart of a construction, is also known as
A. Event A. Bar chart
C. does not consume time B. to divert the resources from non-critical advanced activities to critical activities
D. all the above. to be cautious for avoiding any delay in the critical activities to avoid delay of the
C.
16. Military organisation is known as whole project
B. line and staff organisation 21. If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the
expected time of the activity, is
C. functional organisation
D. none of these. A.
B.
17. Pick up the incorrect statement from the following:
A. The activity is the time consuming part of a project
E. None of these. D.
View Answer Discuss in Forum Workspace Report
View Answer Discuss in Forum Workspace Report B. preparation of estimates
C. free float
28. The salient feature of functional organisation is
D. interfering float.
A. strict adherence to specifications
View Answer Discuss in Forum Workspace Report
B. separation of planning and design part
23. The artificial activity which indicates that an activity following it, cannot be started unless the C. each individual maintains functional efficiency
preceding activity is complete, is known as
D. work is properly planned and distributed
A. event
E. all the above.
B. free float
View Answer Discuss in Forum Workspace Report
C. dummy
B. construction measurements
32. Construction team means C. issue of store equipments
A. an engineer
D. names of the casual labour.
B. an architect
36. An Executive Engineer may have powers upto
C. an owner A. Rs. 25,000
E. Rs. 500,000
33. Pick up the correct network for the activities of pouring concrete, erection of form work, View Answer Discuss in Forum Workspace Report
removal of form work and curing of concrete from the following:
1. Pouring of Concrete
2. Erection of form work 37. The main principle of an organisation, is
A.
3. Curing of concrete
4. Removal of form work A. unity of command
1. Pouring of concrete 38. The estimated time required to perform an activity, is known as
2. Curing of concrete
D. A. event
3. Erection of form work
4. Removal of form work
B. dummy
View Answer Discuss in Forum Workspace Report
C. duration
C. CPM does not make any allowance for the uncertainties in the duration of time
D. none of these.
3. For the supply of materials for concrete, form work reinforcing and placing of concrete, View Answer Discuss in Forum Workspace Report
removal of form work and curing of concrete, number of bar(s) required on bar chart, is
A. 1
8. The main disadvantage of line organisation, is
B. 2
A. rigid structure
C. 3
B. extraordinary delay in communications
D. 4
C. top level executions over work
View Answer Discuss in Forum Workspace Report
D. all the above.
View Answer Discuss in Forum Workspace Report
9. Pick up the correct statement from the following: C. initiation of proposal
A. The difference of latest occurence time and earliest expected time, is called slack
D. preparation of tender
B. The activities connecting the events having zero slack, lie on the critical path
E. allotment of funds.
C. The critical path consumes the maximum time
View Answer Discuss in Forum Workspace Report
D. All the above.
View Answer Discuss in Forum Workspace Report
14. PERT is
A. an analytic in concept
10. Pre-tender stage requires B. limited of event oriented diagrams
A. acquisition of land
C. used for research and development projects
B. selection of site
D. based on three time estimates for activities linking up two events
C. formalisation of alignment of work
E. all the above.
D. formalisation of designs and preparation of estimate
View Answer Discuss in Forum Workspace Report
E. all the above.
11. The final selection of a construction site, is done by
15. Residential buildings are treated as
A. departmental representative or user
A. light construction
B. local civil authority representative
B. heavy construction
C. representative of engineer authority
C. industrial construction
D. representative of administration
D. private construction.
E. all the above. 16. The main advantage of line organisation, is :
View Answer Discuss in Forum Workspace Report A. effective command and control
The duration of time by which an activity can be delayed without affecting the E. all the above.
B.
succeeding activity, is called free float View Answer Discuss in Forum Workspace Report
The float which affects neither the processor nor the successor activities, is called
C.
independent float
17. PERT analysis is based on
D. The difference between total float and free float, is called interfering float A. optimistic time
E. All the above. B. pessimistic time
View Answer Discuss in Forum Workspace Report
C. most likely time
B. maximum time 23. Pick up the incorrect statement from the following:
C. maximum cost The difference between the earliest start time and latest finish time of any activity, is
A.
the maximum time available for the activity
D. minimum cost.
The difference between the maximum time available for the job and actual time it
View Answer Discuss in Forum Workspace Report B.
consumes, is called total float
The difference between the latest start time and earliest start time of an activity, is
C.
19. In CPM analysis, called total float
A. emphasis is given to activities The difference between the earliest finish time of an activity and the earliest start time
D.
of its successor activity, is called free float of the activity
B. uncertainties are not allowed
E. None of these.
C. activities are represented by arrows
View Answer Discuss in Forum Workspace Report
D. beginning and end of an activity, are denoted by nodes
E. none of these. 25. Pick up the correct statement from the following with regards to C.P.M. network analysis of
21. Power stations are generally treated as projects
A. light construction Earliest occurrence time of the event from which the activity arrow' originates, is called
A.
earliest start time of the activity
B. heavy construction
Earliest occurrence time of the event from which the activity arrow originates plus the
B.
C. industrial construction duration of the activity, is called earliest finish time of the activity
D. electrical construction. The latest occurrence time of the node of which the activity arrow terminates minus
C.
the duration of the activity, is called latest start time
The latest occurrence time for the node at which the activity arrow terminates, is
22. An event is indicated on the network by a number enclosed in D.
called latest finish time
A. a circle
E. All the above.
B. a square 26. Pick up the correct statement from the following:
D. an ellipse B. Backward pass is used for calculating the latest occurence time
27. Which one of the following represents an event ? D. Critical Path method is event oriented.
A. concrete cured View Answer Discuss in Forum Workspace Report
B. fixing of door
32. The three time estimates for the activities of the network shown in the given figure are shown
C. plastering of walls
above their arrows. The earliest expected time for the event 4, is
D. selecting sites
B. 14
28. Pick up the incorrect statement from the following:
C. 24
A. The various functions under each activity, are shown by one bar on Bar Charts
D. None of these.
B. Bar chart establishes the interdependency of one event on another
33. Optimistic time, most likely time and pessimistic times for the activities of a network in the
C. Only approximate percentage of the completed work is reported given figure are written above their arrows. If the contractual obligation time for the project is
75, the latest occurrence time for the event 2, is
D. None of these,
View Answer Discuss in Forum Workspace Report
A. 20
29. For the network shown in the given figure, the expected time for the activity
B. 25
C. 35
A. 1-2 is 4 D. 15
34. While filling the tender for any work, the contractor considers
B. 2-3 is 7
A. site survey
C. 3-4 is 8
B. availability of construction materials
D. all the above.
C. availability of labour
View Answer Discuss in Forum Workspace Report
D. study of specifications