WORK AUTHORIZATION
WORK APROVAL No = Click here to enter
General Requirements (to be completed by
Section 01 work request originator) 2024315_DIFC_GB_2668
text.
(This will be allocated once relevant information supplied)
Attached
Click here to enter text. Click here to enter text. Click here to enter text. Click here to enter text.
Click here to enter text. Click here to enter text. Click here to enter text. Click here to enter text.
Click here to enter text. Click here to enter text. Click here to enter text. Click here to enter text.
Click here to enter text. Click here to enter text. Click here to enter text. Click here to enter text.
Click here to enter text. Click here to enter text. Click here to enter text. Click here to enter text.
Click here to enter text. Click here to enter text. Click here to enter text. Click here to enter text.
Reason for carrying out the task (brief description of works to be carried out)
Click here to enter text.
Removing of existing park benches and installing new granite benches with irrigation electrical and drainage connections.
Smelly Works (Painting, Carpeting, pest control etc.) ☐ Noisy Works (Drilling, cutting, hammering etc.,) ☐
15 - March - 2024 30 - March - 2024 6 : 00 PM 6 : 00 AM
Work Commencement Date
Start Date End Date Start Time End Time
All Safety Precautions & PPE must be followed 24hrs on weekends For Polishing Only.
Adequate Illumination levels and lighting must be available at all times during work
Any cutting and dusty, Smelly & Hot works are not allowed.
1. This Permit has been issued on the request of the Applicant and does not relieve the Business Partner or the Contractor appointed by them from any
legal and/or contractual obligations. All conditions mentioned in the permit/work authorization to be strictly adhered.
2. This permit is deemed to be cancelled and the works will be stopped immediately on any Health, Safety and Environment or other violations on site
noticed during the inspections or notified to the Facilities Management or DIFC security.
3. The applicant is fully liable for any penalties, rectification / cost implication of any damages and interruptions caused due to such violations by the
contractor and their subcontractors. The works can be resumed only after necessary corrective actions.
4. Any noisy or malodourous activities such as drilling, coring, painiting, drainage terminations etc. are permitted only after working hours and the
applicant to coordinate with the building security for the same to avoid stoppage of works.
5. Any works on existing building services and systems such as MDB/SMDB modifications/terminations, Fire Alarm & Fire Fighting, Emergency Lighting,
BMS, HVAC Controls etc must be carried out through the FM Service Provider only (IDAMA).
6. Applicant shall take adequate control measures & provide qualified fire watch(es) for monitoring affected areas in event of Fire Detection and/or
protection system impairment. Fire watch(es) shall be in place till impaired systems are re-instated to the origional state and impairment permit is
closed.
7. Applicant shall conduct HSE Induction, Tool Box Talks to their work force to brief work place and task related risk controls and building emergency
response. Such shall be recorded and evidenced to HSE/Security/Permit Issuer whenever required.
8. Kindly note this is Work Authorization Permit and not replacing any formal PTW for Work at Height, Isolation, Overriding of Fire and Life Safety
Systems, Hot Work, Lifting, Confined Space etc. A Separate Permit to be obtained.
9. The applicant/contractor/tenant is responsible to report all incidents and emergencies to DIFC/IDAMA/SECURITY and investigate/submit report as
applicable
10. If the job is not completed within the stipulated time, a fresh permit shall have to be raised and the copy of the permit marked “Applicant” shall be
handed over to the endorsee.
11. Common areas including elevators, fire systems and floor shall be protected against damages during mobilization, transportation of materials and
execution of works- any damages refer serial no. 3
13. DIFC PMD signature or email approval shall be required for works that have a PO issued directly from DIFC.
14. Requests from other DIFC departments will require prior notification to DIFC PMD for works to proceed.
APPROVAL SECTION :
Work Authorisation
Work Authorisation Name, Signature, Department, Date
Name, Signature, Date (alternatively attach email approval) Project In-Charge is the person who is managing/overseeing this activity