Target/Expected Yield: 1,437.

5 kg
Enterprise/Product: SWEET POTATO
Number of Plants: 5,750 tops

Location: DON BOSCO TRAINING


Area Covered: 1500m2
CENTER SJC NE INC.

Duration: 85-120 Days Planting Distance: 12-18 inches apart

Day Activities Requirements

Labor Non- Sprayable


Sprayable

Land Preparation

14days prior Plowing 2 mad


planting

7 days prior Harrowing 1 mad


planting

0 Furrowing 2. mad

Planting and Maintenance

0 Fertilizing – 1st 2.5 md 83 kilos VERMICAST

0 Planting 2 md

5 Watering* 2.5 md

8 Spraying – 1st 2.5 md 1 sprayload,


concoction

(FFJ,FPJ)

10 Watering 2.5 md

15 Spraying- 1st 2.5 md FPJ

15 Watering 2.5 md

6 Watering 2.5 md

5 Weeding- 1st 2.5 md

5 Fertilizing 2nd 2 md 83 kilos VERMICAST

5 Spraying- 2nd 2.5 md FFJ,FPJ

5 Fertilizing 1 md 83 kilos VERMICAST


10 Watering 2.5 md

10 Watering 2.5 md

Harvest and Postharvest

120 Harvesting 5 md

Sorting, Packing, 3 md
Hauling

Notes:
a. mad – man animal day
b. md – man day
c. * - watering done during the rainy season
Target/Expected Yield:
Enterprise/Product:
Number of Plants:

Location: Area Covered:

Duration: Planting Distance:

Day Activities Requirements

Labor Non-Sprayable Sprayable

Land Preparation

Planting and Maintenance

Harvest and Postharvest

You might also like