Professional Documents
Culture Documents
Group 5 Labor
Group 5 Labor
5 kg
Enterprise/Product: SWEET POTATO
Number of Plants: 5,750 tops
Land Preparation
0 Furrowing 2. mad
0 Planting 2 md
5 Watering* 2.5 md
(FFJ,FPJ)
10 Watering 2.5 md
15 Watering 2.5 md
6 Watering 2.5 md
10 Watering 2.5 md
120 Harvesting 5 md
Sorting, Packing, 3 md
Hauling
Notes:
a. mad – man animal day
b. md – man day
c. * - watering done during the rainy season
Target/Expected Yield:
Enterprise/Product:
Number of Plants:
Land Preparation