Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Project : No Offer :

Proyek Peningkatan Irigasi D.I Rengrang -


Subject : Sheet no :

Jembatan Temporary 1 of 7
Area : Date : Rev :
0

PERHITUNGAN STRUKTUR
JEMBATAN TEMPORARY 12X6 M

Disahkan Oleh Dikoreksi Oleh Dikoreksi Oleh Diajukan Oleh

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Proyek Peningkatan Irigasi D.I Rengrang -


Subject : Sheet no :

Jembatan Temporary 2 of 7
Area : Date : Rev :
0

I. TECHNICAL DATA

POTONGAN B - B
II. MATERIAL PROPERTIES

Diafraghm

Slab

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Proyek Peningkatan Irigasi D.I Rengrang -


Subject : Sheet no :

Jembatan Temporary 3 of 7
Area : Date : Rev :
0

III. LOAD

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Proyek Peningkatan Irigasi D.I Rengrang -


Subject : Sheet no :

Jembatan Temporary 4 of 7
Area : Date : Rev :
0

IV. STRUCTURE ANALYSIS

Analysis result based on SAP2000 & STAAD PRO 2014 :

1. Load and support modelling on SAP2000 & STAAD PRO 2014


Distribution Load

Distribution load
in each 0.5 m to
12 m

2. Bending Moment

Due to Load Combinated ( Dead Load + Live Load + Selfweight) :

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Proyek Peningkatan Irigasi D.I Rengrang -


Subject : Sheet no :

Jembatan Temporary 5 of 7
Area : Date : Rev :
0

3. Shear Force

Due to Load Combinated ( Dead Load + Live Load + Selfweight) :

Vu < Vn = OK

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Proyek Peningkatan Irigasi D.I Rengrang -


Subject : Sheet no :

Jembatan Temporary 6 of 7
Area : Date : Rev :
0

4. Deflection

Due to Load Combinated ( Dead Load + Live Load + Selfweight) :

5. Results of Structural Analysis on combined loads :

Qu = 1,2 DL + 1,6 LL (Bridge Live Load) + 0,9 W

Concrete Forms Specialist in Indonesia since 1985


Project : No Offer :

Proyek Peningkatan Irigasi D.I Rengrang -


Subject : Sheet no :

Jembatan Temporary 7 of 7
Area : Date : Rev :
0

⸫ Based on the results of the load calculation in each combination, it shows that the ratio of the forces that
occur to the capacity of the structure of all members is declared safe, because each member of the
structure has a ratio below 1.

Concrete Forms Specialist in Indonesia since 1985

You might also like