Professional Documents
Culture Documents
STATIKA Rangka Baja 8x6 M
STATIKA Rangka Baja 8x6 M
Jembatan Temporary 1 of 7
Area : Date : Rev :
0
PERHITUNGAN STRUKTUR
JEMBATAN TEMPORARY 8X6 M
Jembatan Temporary 2 of 7
Area : Date : Rev :
0
I. TECHNICAL DATA
POTONGAN B - B
Diafraghm
Slab
Jembatan Temporary 3 of 7
Area : Date : Rev :
0
III. LOAD
Jembatan Temporary 4 of 7
Area : Date : Rev :
0
Distribution load
in each 0.5 m to
8m
2. Bending Moment
Jembatan Temporary 5 of 7
Area : Date : Rev :
0
3. Shear Force
Vu < Vn = OK
Jembatan Temporary 6 of 7
Area : Date : Rev :
0
4. Deflection
Jembatan Temporary 7 of 7
Area : Date : Rev :
0
⸫ Based on the results of the load calculation in each combination, it shows that the ratio of the forces that
occur to the capacity of the structure of all members is declared safe, because each member of the
structure has a ratio below 1.