Safaniyah & Manifa Crude Increment Program BI-10-17170 Safaniyah & Manifa Ah Development Terminal Onshore Facilties

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

SRA
ENGG

AAC

SAFANIYAH & MANIFA CRUDE INCREMENT


PROGRAM
BI-10-17170 ISSUED FOR PROPOSAL(D1)

BI-10-17170
DESCRIPTION

SAFANIYAH & MANIFA AH DEVELOPMENT


TERMINAL ONSHORE FACILTIES
JO/EWO

12/11/22
DATE
REV. NO.

PROJECT SPECIFICATION
A

DISCIPLINE
ENGINEER
ahmed.cholakkal
AAC______________

DATE 11-DEC-22
PROJECT
ENGINEER
SAYYED.RAFIULLAH
SRA_____________

DATE 11-DEC-22
CERTIFIED

________________

DATE ___________

PLUMBING SPECIFICATION
CONSTRUCTION
AGENCY

________________

DATE ___________
OPERATIONS

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

(DCC)NO. _______________________________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PLUMBING DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

PLUMBING SPECIFICATION DOC 1


965 S SM- 828208
TERMINAL ONSHORE FACILTIES INCL ISF OF A
RAS AL-KHAIR SAUDI ARABIA JO / EWO: 10-17170 7
965-K-SM-828208-001_Rev A8-001_Rev A DOC CLASS: 1 DSN: 56384
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

REVISION A B C
Signature Signature Signature
CERT

DATE 12/11/22
SRA

EXT APP. AAC


ENGG

AAC

TABLE OF CONTENTS

1. CODES AND STANDARDS 3


2. GENERAL 4
3. WATER SUPPLY SYSTEM 5
4. DRAINAGE SYSTEM 6
BI-10-17170 ISSUED FOR PROPOSAL(D1)

5. ROOF WATER DRAINAGE SYSTEM 7


DESCRIPTION
JO/EWO

12/11/22
DATE
REV. NO.

DISCIPLINE
ENGINEER

AAC______________

DATE 11-DEC-22
PROJECT
ENGINEER

SRA_____________

DATE 11-DEC-22
CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________
OPERATIONS

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

(DCC)NO. _______________________________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PLUMBING DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

PLUMBING SPECIFICATION DOC 2


965 S SM- 828208
TERMINAL ONSHORE FACILTIES INCL ISF OF A
RAS AL-KHAIR SAUDI ARABIA JO / EWO: 10-17170 7
965-K-SM-828208-001_Rev A8-001_Rev A DOC CLASS: 1 DSN: 56384
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

1. CODES AND STANDARDS


CERT

SRA
ENGG

AAC

SAES-A-004 General Requirements for Pressure Testing


SAES-L-105 Pipe Line Classes
SAES-L-460 Pipeline Crossings under Roads and Railroads
SAES-L-610 Nonmetallic Piping
SAES-S-010 Sanitary Sewers
SAES-S-020 Industrial Drainage and Sewers
SAES-S-040 Saudi Aramco Water Systems
BI-10-17170 ISSUED FOR PROPOSAL(D1)

SAES-S-060 Saudi Aramco Plumbing Code


ASHRAE American Society of Heating Refrigeration and Air-
DESCRIPTION

conditioning Engineers
IPC International Plumbing (Latest Version)
UPC Uniform Plumbing Code(Latest Version)
JO/EWO

ASME-B-31.9 Building Services Piping


12/11/22
DATE
REV. NO.

DISCIPLINE
ENGINEER

AAC______________

DATE 11-DEC-22
PROJECT
ENGINEER

SRA_____________

DATE 11-DEC-22
CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________
OPERATIONS

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

(DCC)NO. _______________________________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PLUMBING DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

PLUMBING SPECIFICATION DOC 3


965 S SM- 828208
TERMINAL ONSHORE FACILTIES INCL ISF OF A
RAS AL-KHAIR SAUDI ARABIA JO / EWO: 10-17170 7
965-K-SM-828208-001_Rev A8-001_Rev A DOC CLASS: 1 DSN: 56384
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

2. GENERAL
CERT

SRA

Complete functional plumbing system within the buildings shall be designed,


ENGG

supplied, and installed by CONTRACTOR and shall include, but not limited to
AAC

following:
CONTRACTOR shall be responsible to prepare detailed design and shop drawings
prior to start of any plumbing work activity with reference to the relevant project
drawings
CONTRACTOR shall provide detailed plumbing calculations for all
buildings/facilities based on the site location and final architecture drawings.
The plumbing system, consisting of sanitary drainage, storm drainage, and domestic
BI-10-17170 ISSUED FOR PROPOSAL(D1)

water supply shall be designed according to the Saudi Aramco standards in addition
to other applicable codes and standards listed in the specified section.
Electric water heater shall be provided for bath rooms, toilets and lavatories meeting
DESCRIPTION

the requirement of applicable plumbing codes. Safety and maintenance


requirements shall be met when locating the electric water heater and shall be
located in a room. Electric water heaters shall be UL listed and shall meet SASO
requirements.
JO/EWO

All materials shall conform to the requirements of applicable codes and standards.
Design, supply and install complete functional cold water and hot water system
12/11/22

including pipes, fittings and accessories for smooth operation of the building.
DATE

Design supply and install complete sanitary, waste and vent system including pipes,
REV. NO.

fittings, plumbing specialties and accessories for smooth operation of the building.
A

DISCIPLINE
ENGINEER
Design supply and install complete rainwater drain system including pipes, roof
drains, fittings, and accessories for smooth operation of the building.
AAC______________

DATE 11-DEC-22 All storm drainage from roofs shall be conveyed to the street via a system of roof
PROJECT
ENGINEER
drains/overflow drains and internal leaders. Storm water shall be discharged to
above grade
SRA_____________

DATE 11-DEC-22 Provide plumbing specialties like floor drains, gully traps and floor cleanouts as
CERTIFIED required.
________________
Provide condensate drain pipes for A/C units and drop into nearest floor drains or
DATE ___________
drain pits as required
CONSTRUCTION
AGENCY Supply and install central electric water heater complete with pipes, fittings and
________________ accessories to supply hot water to kitchen, toilets and applicable placed as required
DATE ___________ in the project
OPERATIONS

________________
Provide water hammer arrestors to suppress surge pressure in water supply system.
DATE ___________ Provide isolation valves on all branches of potable and hot water distribution
network.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Ablution hoses for water closets shall be provided with vacuum breakers to prevent
EDSD

backflow/back siphon-age
THIS INDICATES THAT REV. NO. ____________

(DCC)NO. _______________________________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PLUMBING DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

PLUMBING SPECIFICATION DOC 4


965 S SM- 828208
TERMINAL ONSHORE FACILTIES INCL ISF OF A
RAS AL-KHAIR SAUDI ARABIA JO / EWO: 10-17170 7
965-K-SM-828208-001_Rev A8-001_Rev A DOC CLASS: 1 DSN: 56384
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

3. WATER SUPPLY SYSTEM


CERT

SRA

Water supply pipe sizing shall be based on fixture unit method as recommended by
ENGG

SAES-S-060.
AAC

Water supply piping system shall be designed to serve various fixtures appliances
in the facility buildings.
Water distribution system shall be provided with necessary valves, backflow
preventers, pressure regulating valve, water hammer arresters, automatic vents and
strainers, as required. Toilet fittings shall have mechanism to prevent any back
pressure of water.
Water source serving each building shall tie-in to external water supply network.
BI-10-17170 ISSUED FOR PROPOSAL(D1)

Residual pressure at the highest and most remote fixture or outlet shall be 1.72 bars.
(25 psi) for flush valve mechanism water systems.
Hot water shall be provided by means of storage type electric water heaters or point
DESCRIPTION

of use electric water heaters, as required. Provide hot water piping system to all
plumbing fixtures and appliances which require hot water as per applicable plumbing
codes. Hot water re-circulating pumps shall be provided in areas that are more than
30 meters away from the location of the electric water heaters.
JO/EWO

Pipe material for cold and hot water piping, within the building, shall be Chlorinated
Polyvinyl Chloride (CPVC), Sch80 as per SAES-S-060. All fittings materials shall be
12/11/22

as per SAES-S-060 matching with the piping materials.


DATE

Potable water to each building shall be fed by tapping to external potable water
REV. NO.

network.
A

DISCIPLINE
ENGINEER
Water distribution system shall be designed with minimum bends to reduce pressure
losses in the system. There shall be sufficient pressure at the tie-in point to serve
AAC______________
the most remote plumbing fixtures residual pressure in the system.
DATE 11-DEC-22
PROJECT
ENGINEER
Hose bibs with vacuum breakers shall be provided near to HVAC equipment which
requires periodic cleaning.
SRA_____________

DATE 11-DEC-22 The flow and pressure requirements for plumbing fixtures of each building shall be
CERTIFIED calculated based on Water Supply Fixture Units (WSFU) and available water
________________ pressure at site water network (tie-in point) as per procedure adopted in IPC Chapter
DATE ___________ 6, Appendix E. Hot and Cold water pipe sizing will be done in accordance with IPC-
CONSTRUCTION 2015 Chapter 6.
AGENCY

________________
The hot water demand for plumbing fixtures shall be determined based on the hot
water demand (gallons per hour) per fixture for the various applications. Electric
DATE ___________
OPERATIONS Water heater capacity design shall be calculated based on ASHRAE Application
________________
Handbook.
DATE ___________ All electrical water heaters shall be installed in janitor or EWH rooms. Tank less
electric water heater can be used when there is no available space or room for floor
CONTROL NUMBER

DATE _____________
BY: ______________

mounted electrical heater. All electrical water heaters shall be UL Listed.


VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

(DCC)NO. _______________________________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PLUMBING DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

PLUMBING SPECIFICATION DOC 5


965 S SM- 828208
TERMINAL ONSHORE FACILTIES INCL ISF OF A
RAS AL-KHAIR SAUDI ARABIA JO / EWO: 10-17170 7
965-K-SM-828208-001_Rev A8-001_Rev A DOC CLASS: 1 DSN: 56384
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

SRA

4. DRAINAGE SYSTEM
ENGG

AAC

Sanitary and wastewater originating at domestic plumbing fixtures and appliances


shall be drained by gravity through a drainage piping network to the building exterior
sewer line system.
Horizontal drainage piping, within the building, shall be laid to a uniform slope as
recommended by the applicable plumbing code. A minimum slope of 2% will be
used for pipes of 100 mm dia. or larger. Cleanouts shall be provided according to
code requirements.
The building sanitary system shall be provided with a venting system consisting of
BI-10-17170 ISSUED FOR PROPOSAL(D1)

sanitary vent lines originating at fixture traps and ending at main vent lines leading
to the building roof. The vent line network shall be sized to allow air circulation in the
drainpipes to minimize atmospheric backpressure and to prevent traps siphonage
DESCRIPTION

in accordance with applicable plumbing standards. Individual vent shall be provided


for each plumbing fixture.
Pipe material for soil, waste, and vent piping, above and below grade within the
building, shall be PVC Sch40 or as recommended by applicable plumbing codes. All
JO/EWO

fittings’ materials shall be as per SAES and shall be matching with the piping
materials.
12/11/22

Sanitary drainage will be designed based on the one-pipe system where waste and
DATE

soil drainage will be collected together. The drainage of every building shall be
collected and then be connected to the manholes of the external site network.
REV. NO.

DISCIPLINE
ENGINEER
The drainage system shall include sanitary, oily water & condensate waste systems.
AAC______________
Drainage waste flow & pipe sizes shall be calculated based on Drainage Fixture
DATE 11-DEC-22
PROJECT
Units (DFU) of IPC 788. Drainage vent system shall be designed in accordance with
ENGINEER IPC 2015 edition and SBC-2018 edition.
SRA_____________
Sanitary drainage design shall be based on the fixture unit method in the
DATE 11-DEC-22
CERTIFIED computation of sewage flows and vent pipe sizes. The weight in fixture units will vary
________________
for different fixtures.
DATE ___________ Soil and waste water originating at domestic plumbing fixtures and appliances will
CONSTRUCTION be drained by gravity through a drainage piping network to the building exterior
AGENCY
sewer line system.
________________
The building's main sanitary lines, up to connections with the site utilities shall be
DATE ___________
OPERATIONS developed and shown on the plumbing detailed design drawings.
________________ Oil/grease interceptor will be provided to the buildings where there are kitchens or
DATE ___________ other buildings that oil and grease needs to be removed/ separated from the waste
water before entering the sewer manhole.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Lint interceptor will be provided for the Laundry where there is laundry to remove
EDSD

lint and other solids before entering sewer manhole.


THIS INDICATES THAT REV. NO. ____________

(DCC)NO. _______________________________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PLUMBING DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

PLUMBING SPECIFICATION DOC 6


965 S SM- 828208
TERMINAL ONSHORE FACILTIES INCL ISF OF A
RAS AL-KHAIR SAUDI ARABIA JO / EWO: 10-17170 7
965-K-SM-828208-001_Rev A8-001_Rev A DOC CLASS: 1 DSN: 56384
Saudi Aramco 2616-ENG (03/99)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

SRA

5. ROOF WATER DRAINAGE SYSTEM


ENGG

AAC

All roof areas shall be drained by means of scupper drains to surface drainage
system. Secondary roof drainage shall be provided in accordance with the
applicable plumbing and building codes.
Pipe material for storm water from roof areas, above and below grade within the
building, shall be Polyvinyl Chloride (PVC) Sch40 or as recommended by applicable
plumbing codes. All exposed storm PVC drainpipes shall be cladded or protected
by an approved and acceptable method from moisture and sunlight degradation.
BI-10-17170 ISSUED FOR PROPOSAL(D1)
DESCRIPTION
JO/EWO

12/11/22
DATE
REV. NO.

DISCIPLINE
ENGINEER

AAC______________

DATE 11-DEC-22
PROJECT
ENGINEER

SRA_____________

DATE 11-DEC-22
CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________
OPERATIONS

________________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

(DCC)NO. _______________________________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PLUMBING DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

PLUMBING SPECIFICATION DOC 7


965 S SM- 828208
TERMINAL ONSHORE FACILTIES INCL ISF OF A
RAS AL-KHAIR SAUDI ARABIA JO / EWO: 10-17170 7
965-K-SM-828208-001_Rev A8-001_Rev A DOC CLASS: 1 DSN: 56384