Puente Avenida 19 Armenia

PTE_AV19
Description

1
Puente Avenida 19 Armenia

PTE_AV19
Summary (according to EN 13201:2015)

2
Puente Avenida 19 Armenia

PTE_AV19
Summary (according to EN 13201:2015)

Manufacturer ALUTRAFIC LED P 80.3 W

Article No. ALURBAN-S_64L- ΦLamp 10249 lm


SAMSUNG-5000K-
80W_C15034_XI100- ΦLuminaire 10248 lm
830mA
η 100.00 %
Article name ALURBAN-
S_64L_SAMSUNG-
5000K-
80W_C15034_XI100-
830mA

Fitting 1x ALURBAN-S_64L-
SAMSUNG-5000K-
80W_C15034_XI100-
830mA

3
Puente Avenida 19 Armenia

PTE_AV19
Summary (according to EN 13201:2015)

ALURBAN-S_64L_SAMSUNG-5000K-80W_C15034_XI100-830mA (Median, 2 per pole)

Pole distance 18.000 m

(1) Light spot height 10.000 m

(2) Light point overhang 1.000 m

(3) Boom inclination 0.0°

(4) Boom length 1.750 m

Annual operating hours 4000 h: 100.0 %, 160.6 W

Wattage / route 8993.6 W/km

ULR / ULOR 0.01 / 0.01

Max. luminous intensities ≥ 70°: 376 cd/klm


Any direction forming the specified angle from the ≥ 80°: 39.5 cd/klm
downward vertical, with the luminaire installed for use.
≥ 90°: 4.05 cd/klm

Luminous intensity class G*3


The luminous intensity values in [cd/klm] for calculation
of the luminous intensity class refer to the luminaire
luminous flux according to EN 13201:2015.

Glare index class D.4

MF 0.80

4
Puente Avenida 19 Armenia

PTE_AV19
Summary (according to EN 13201:2015)

Results for valuation fields


A maintenance factor of 0.80 was used for calculating for the installation.

Symbol Calculated Target Check

Peatonal izq (C5) Eav 22.12 lx ≥ 7.50 lx

Uo 0.58 ≥ 0.40

Calzada izq (M3) Lav 1.25 cd/m² ≥ 1.00 cd/m²

Uo 0.52 ≥ 0.40

Ul 0.64 ≥ 0.60

TI 1% ≤ 15 %

REI 1.04 ≥ 0.30

calzada der (M3) Lav 1.32 cd/m² ≥ 1.00 cd/m²

Uo 0.51 ≥ 0.40

Ul 0.63 ≥ 0.60

TI 1% ≤ 15 %

REI 0.73 ≥ 0.30

peatonal der (C5) Eav 21.01 lx ≥ 7.50 lx

Uo 0.59 ≥ 0.40

ciclovia (P1) Eav 16.19 lx [15.00 - 22.50] lx

Emin 9.84 lx ≥ 3.00 lx

5
Puente Avenida 19 Armenia

PTE_AV19
Summary (according to EN 13201:2015)

Results for energy efficiency indicators

Symbol Calculated Energy Consumption

PTE_AV19 Dp 0. 016 W/lx*m² –

ALURBAN-S_64L_SAMSUNG- De 1. 8 kWh/m² yr 642.4 kWh/yr


5000K-80W_C15034_XI100-
830mA (Median)

6
Puente Avenida 19 Armenia

PTE_AV19
Peatonal izq (C5)

Results for valuation field

Symbol Calculated Target Check

Peatonal izq (C5) Eav 22.12 lx ≥ 7.50 lx

Uo 0.58 ≥ 0.40

7
Puente Avenida 19 Armenia

PTE_AV19
Peatonal izq (C5)

Maintenance value, horizontal illuminance [lx] (Iso-illuminance curves)

8
Puente Avenida 19 Armenia

PTE_AV19
Peatonal izq (C5)

Maintenance value, horizontal illuminance [lx] (Value grid)

9
Puente Avenida 19 Armenia

PTE_AV19
Peatonal izq (C5)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

21.242 28.26 28.11 24.79 19.55 14.72 12.87 13.62 16.60 21.32 25.32

20.525 30.45 30.22 26.69 21.01 15.41 13.74 14.85 17.96 23.17 27.38

19.808 32.66 32.37 28.58 22.56 16.32 14.60 16.26 19.58 25.12 29.47

Maintenance value, horizontal illuminance [lx] (Value chart)

Eav Emin Emax Uo (g1 ) g2

Maintenance value, horizontal illuminance 22.1 lx 12.9 lx 32.7 lx 0.58 0.39

10
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

Results for valuation field

Symbol Calculated Target Check

Calzada izq (M3) Lav 1.25 cd/m² ≥ 1.00 cd/m²

Uo 0.52 ≥ 0.40

Ul 0.64 ≥ 0.60

TI 1% ≤ 15 %

REI 1.04 ≥ 0.30

Results for observer

Symbol Calculated Target Check

Observer 1 Lav 1.25 cd/m² ≥ 1.00 cd/m²


Position:
-60.000 m, 14.650 m, 1.500 m
Uo 0.52 ≥ 0.40

Ul 0.71 ≥ 0.60

TI 1% ≤ 15 %

Observer 2 Lav 1.29 cd/m² ≥ 1.00 cd/m²


Position:
-60.000 m, 17.850 m, 1.500 m
Uo 0.52 ≥ 0.40

Ul 0.64 ≥ 0.60

TI 1% ≤ 15 %

11
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

Maintenance value, horizontal illuminance [lx] (Iso-illuminance curves)

12
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

Maintenance value, horizontal illuminance [lx] (Value grid)

13
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

18.917 34.96 34.53 30.48 24.29 17.62 16.11 18.26 21.77 27.49 31.81

17.850 38.54 37.68 33.00 26.53 19.45 18.17 21.46 25.34 31.41 35.82

16.783 42.40 40.84 35.36 28.57 21.30 20.45 25.11 29.69 35.92 40.37

15.717 45.19 43.02 37.13 30.27 22.89 22.39 28.19 33.36 39.74 44.05

14.650 47.14 44.59 38.48 31.53 24.08 23.71 30.22 35.85 42.20 46.30

13.583 48.34 45.42 39.20 32.35 24.90 24.68 31.69 37.84 44.12 47.95

Maintenance value, horizontal illuminance [lx] (Value chart)

Eav Emin Emax Uo (g1 ) g2

Maintenance value, horizontal illuminance 32.5 lx 16.1 lx 48.3 lx 0.50 0.33

14
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Iso-illuminance curves)

15
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Value grid)

16
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

18.917 1.08 1.08 0.98 0.81 0.64 0.65 0.71 0.80 0.94 1.03

17.850 1.21 1.19 1.08 0.92 0.75 0.77 0.89 0.98 1.11 1.17

16.783 1.36 1.31 1.20 1.06 0.89 0.94 1.11 1.21 1.32 1.36

15.717 1.48 1.41 1.30 1.21 1.05 1.15 1.36 1.44 1.52 1.52

14.650 1.60 1.50 1.40 1.35 1.20 1.34 1.61 1.64 1.68 1.65

13.583 1.66 1.56 1.47 1.44 1.30 1.47 1.77 1.81 1.78 1.73

Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Value chart)

Lav Lmin Lmax Uo (g1 ) g2

Observer 1: Maintenance value, luminance with dry roadway 1.25 cd/m² 0.64 cd/m² 1.81 cd/m² 0.52 0.36

17
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

Observer 1: Luminance with new installation [cd/m²] (Iso-illuminance curves)

18
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

Observer 1: Luminance with new installation [cd/m²] (Value grid)

19
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

18.917 1.34 1.35 1.23 1.01 0.81 0.81 0.89 1.00 1.18 1.28

17.850 1.51 1.49 1.35 1.15 0.94 0.96 1.11 1.22 1.39 1.47

16.783 1.70 1.64 1.50 1.32 1.11 1.17 1.39 1.52 1.65 1.69

15.717 1.86 1.77 1.63 1.51 1.31 1.44 1.70 1.80 1.90 1.90

14.650 2.00 1.88 1.75 1.68 1.50 1.67 2.01 2.05 2.10 2.06

13.583 2.08 1.95 1.84 1.80 1.63 1.84 2.21 2.26 2.23 2.16

Observer 1: Luminance with new installation [cd/m²] (Value chart)

Lav Lmin Lmax Uo (g1 ) g2

Observer 1: Luminance with new installation 1.56 cd/m² 0.81 cd/m² 2.26 cd/m² 0.52 0.36

20
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Iso-illuminance curves)

21
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Value grid)

22
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

18.917 1.10 1.10 1.01 0.84 0.67 0.67 0.74 0.83 0.97 1.05

17.850 1.24 1.22 1.12 0.96 0.80 0.82 0.93 1.02 1.15 1.21

16.783 1.41 1.36 1.25 1.12 0.95 1.01 1.18 1.28 1.37 1.40

15.717 1.54 1.47 1.36 1.28 1.11 1.23 1.45 1.50 1.58 1.57

14.650 1.63 1.53 1.43 1.38 1.24 1.38 1.68 1.69 1.72 1.68

13.583 1.66 1.56 1.48 1.46 1.33 1.49 1.78 1.82 1.78 1.73

Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Value chart)

Lav Lmin Lmax Uo (g1 ) g2

Observer 2: Maintenance value, luminance with dry roadway 1.29 cd/m² 0.67 cd/m² 1.82 cd/m² 0.52 0.37

23
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

Observer 2: Luminance with new installation [cd/m²] (Iso-illuminance curves)

24
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

Observer 2: Luminance with new installation [cd/m²] (Value grid)

25
Puente Avenida 19 Armenia

PTE_AV19
Calzada izq (M3)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

18.917 1.38 1.37 1.26 1.05 0.84 0.84 0.93 1.04 1.22 1.31

17.850 1.55 1.53 1.40 1.20 1.00 1.02 1.16 1.28 1.44 1.51

16.783 1.76 1.69 1.57 1.40 1.18 1.27 1.47 1.59 1.71 1.75

15.717 1.92 1.83 1.71 1.60 1.39 1.54 1.81 1.88 1.97 1.96

14.650 2.03 1.91 1.79 1.73 1.55 1.73 2.09 2.11 2.15 2.10

13.583 2.07 1.95 1.85 1.82 1.66 1.86 2.23 2.28 2.23 2.17

Observer 2: Luminance with new installation [cd/m²] (Value chart)

Lav Lmin Lmax Uo (g1 ) g2

Observer 2: Luminance with new installation 1.61 cd/m² 0.84 cd/m² 2.28 cd/m² 0.52 0.37

26
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

Results for valuation field

Symbol Calculated Target Check

calzada der (M3) Lav 1.32 cd/m² ≥ 1.00 cd/m²

Uo 0.51 ≥ 0.40

Ul 0.63 ≥ 0.60

TI 1% ≤ 15 %

REI 0.73 ≥ 0.30

Results for observer

Symbol Calculated Target Check

Observer 1 Lav 1.36 cd/m² ≥ 1.00 cd/m²


Position:
-60.000 m, 6.750 m, 1.500 m
Uo 0.52 ≥ 0.40

Ul 0.63 ≥ 0.60

TI 1% ≤ 15 %

Observer 2 Lav 1.32 cd/m² ≥ 1.00 cd/m²


Position:
-60.000 m, 9.950 m, 1.500 m
Uo 0.51 ≥ 0.40

Ul 0.73 ≥ 0.60

TI 1% ≤ 15 %

27
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

Maintenance value, horizontal illuminance [lx] (Iso-illuminance curves)

28
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

Maintenance value, horizontal illuminance [lx] (Value grid)

29
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

11.017 47.95 44.12 37.84 31.69 24.68 24.90 32.35 39.20 45.42 48.34

9.950 46.30 42.20 35.85 30.22 23.71 24.08 31.53 38.48 44.59 47.14

8.883 44.05 39.74 33.36 28.19 22.39 22.89 30.27 37.13 43.02 45.19

7.817 40.37 35.92 29.69 25.11 20.45 21.30 28.57 35.36 40.84 42.40

6.750 35.82 31.41 25.34 21.46 18.17 19.45 26.53 33.00 37.68 38.54

5.683 31.81 27.49 21.77 18.26 16.11 17.62 24.29 30.48 34.53 34.96

Maintenance value, horizontal illuminance [lx] (Value chart)

Eav Emin Emax Uo (g1 ) g2

Maintenance value, horizontal illuminance 32.5 lx 16.1 lx 48.3 lx 0.50 0.33

30
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Iso-illuminance curves)

31
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Value grid)

32
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

11.017 1.66 1.56 1.50 1.47 1.40 1.60 1.87 1.92 1.85 1.75

9.950 1.60 1.51 1.45 1.40 1.36 1.56 1.83 1.86 1.81 1.69

8.883 1.50 1.42 1.34 1.29 1.24 1.43 1.68 1.73 1.69 1.58

7.817 1.35 1.25 1.15 1.08 1.03 1.22 1.50 1.58 1.53 1.44

6.750 1.16 1.07 0.95 0.86 0.86 1.03 1.31 1.38 1.36 1.27

5.683 1.01 0.91 0.78 0.71 0.72 0.87 1.09 1.19 1.20 1.13

Observer 1: Maintenance value, luminance with dry roadway [cd/m²] (Value chart)

Lav Lmin Lmax Uo (g1 ) g2

Observer 1: Maintenance value, luminance with dry roadway 1.36 cd/m² 0.71 cd/m² 1.92 cd/m² 0.52 0.37

33
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

Observer 1: Luminance with new installation [cd/m²] (Iso-illuminance curves)

34
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

Observer 1: Luminance with new installation [cd/m²] (Value grid)

35
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

11.017 2.07 1.95 1.88 1.84 1.75 1.99 2.34 2.40 2.31 2.18

9.950 2.00 1.89 1.81 1.75 1.71 1.95 2.29 2.32 2.26 2.11

8.883 1.88 1.78 1.67 1.61 1.55 1.79 2.10 2.16 2.11 1.97

7.817 1.68 1.57 1.44 1.35 1.29 1.52 1.87 1.97 1.91 1.80

6.750 1.45 1.34 1.19 1.08 1.08 1.29 1.64 1.72 1.70 1.58

5.683 1.26 1.14 0.97 0.88 0.91 1.08 1.37 1.49 1.50 1.41

Observer 1: Luminance with new installation [cd/m²] (Value chart)

Lav Lmin Lmax Uo (g1 ) g2

Observer 1: Luminance with new installation 1.70 cd/m² 0.88 cd/m² 2.40 cd/m² 0.52 0.37

36
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Iso-illuminance curves)

37
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Value grid)

38
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

11.017 1.65 1.56 1.50 1.46 1.40 1.60 1.87 1.90 1.84 1.74

9.950 1.57 1.49 1.42 1.36 1.33 1.53 1.79 1.83 1.77 1.66

8.883 1.45 1.37 1.27 1.21 1.18 1.35 1.62 1.68 1.64 1.53

7.817 1.30 1.21 1.10 1.01 0.97 1.15 1.44 1.52 1.48 1.40

6.750 1.13 1.04 0.91 0.82 0.82 0.98 1.25 1.32 1.32 1.24

5.683 0.99 0.89 0.75 0.68 0.69 0.82 1.04 1.16 1.17 1.11

Observer 2: Maintenance value, luminance with dry roadway [cd/m²] (Value chart)

Lav Lmin Lmax Uo (g1 ) g2

Observer 2: Maintenance value, luminance with dry roadway 1.32 cd/m² 0.68 cd/m² 1.90 cd/m² 0.51 0.36

39
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

Observer 2: Luminance with new installation [cd/m²] (Iso-illuminance curves)

40
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

Observer 2: Luminance with new installation [cd/m²] (Value grid)

41
Puente Avenida 19 Armenia

PTE_AV19
calzada der (M3)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

11.017 2.07 1.95 1.87 1.82 1.75 2.00 2.34 2.38 2.31 2.17

9.950 1.97 1.86 1.77 1.71 1.67 1.91 2.24 2.28 2.22 2.08

8.883 1.81 1.71 1.59 1.52 1.47 1.69 2.02 2.09 2.05 1.92

7.817 1.63 1.51 1.37 1.27 1.21 1.44 1.79 1.90 1.85 1.75

6.750 1.41 1.30 1.14 1.03 1.02 1.23 1.56 1.65 1.65 1.55

5.683 1.24 1.12 0.94 0.85 0.87 1.02 1.30 1.45 1.47 1.38

Observer 2: Luminance with new installation [cd/m²] (Value chart)

Lav Lmin Lmax Uo (g1 ) g2

Observer 2: Luminance with new installation 1.65 cd/m² 0.85 cd/m² 2.38 cd/m² 0.51 0.36

42
Puente Avenida 19 Armenia

PTE_AV19
peatonal der (C5)

Results for valuation field

Symbol Calculated Target Check

peatonal der (C5) Eav 21.01 lx ≥ 7.50 lx

Uo 0.59 ≥ 0.40

43
Puente Avenida 19 Armenia

PTE_AV19
peatonal der (C5)

Maintenance value, horizontal illuminance [lx] (Iso-illuminance curves)

44
Puente Avenida 19 Armenia

PTE_AV19
peatonal der (C5)

Maintenance value, horizontal illuminance [lx] (Value grid)

45
Puente Avenida 19 Armenia

PTE_AV19
peatonal der (C5)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

4.292 28.01 23.75 18.46 15.25 14.04 15.69 21.49 27.27 30.87 31.12

3.575 25.94 21.87 17.01 13.98 13.09 14.90 19.97 25.35 28.75 28.91

2.858 23.92 20.10 15.68 12.81 12.37 14.33 18.61 23.54 26.61 26.75

Maintenance value, horizontal illuminance [lx] (Value chart)

Eav Emin Emax Uo (g1 ) g2

Maintenance value, horizontal illuminance 21.0 lx 12.4 lx 31.1 lx 0.59 0.40

46
Puente Avenida 19 Armenia

PTE_AV19
ciclovia (P1)

Results for valuation field

Symbol Calculated Target Check

ciclovia (P1) Eav 16.19 lx [15.00 - 22.50] lx

Emin 9.84 lx ≥ 3.00 lx

47
Puente Avenida 19 Armenia

PTE_AV19
ciclovia (P1)

Maintenance value, horizontal illuminance [lx] (Iso-illuminance curves)

48
Puente Avenida 19 Armenia

PTE_AV19
ciclovia (P1)

Maintenance value, horizontal illuminance [lx] (Value grid)

49
Puente Avenida 19 Armenia

PTE_AV19
ciclovia (P1)

m 0.900 2.700 4.500 6.300 8.100 9.900 11.700 13.500 15.300 17.100

2.083 21.80 18.28 14.43 11.69 11.53 13.59 17.19 21.52 24.24 24.40

1.250 19.53 16.42 13.20 10.69 10.68 12.73 15.71 19.15 21.48 21.78

0.417 17.47 14.75 12.04 9.84 9.93 11.91 14.21 17.05 19.09 19.43

Maintenance value, horizontal illuminance [lx] (Value chart)

Eav Emin Emax Uo (g1 ) g2

Maintenance value, horizontal illuminance 16.2 lx 9.84 lx 24.4 lx 0.61 0.40

50
PLANO No.

ESPACIO PARA SELLOS

 
DETALLE SUBESTACIÓN EN
RED PRIMARIA 13200 V, 60Hz DETALLE SUBESTACIÓN EN
POSTE CONVENCIONES
TRES FASES ACSR 1/0 VISTA LATERAL
POSTE VISTA FRONTAL ELEMENTO EXISTENTE PROYECTADO
RED PRIMARIA 13200 V, 60Hz
TRES FASES
POSTE DE MT

ESTRIBO VERTICAL Y POSTE DE BT


CONECTOR AMOVIBLE ARMADO MT ALINEACION O
ANGULO
Cu No.2 DESNUDO ARMADO MT ANCLAJE

ARMADO MT FIN DE LINEA


CORTACIRCUITOS
15KV, 200A ARMADO BT ALINEACION O
ANGULO
Cu No.2 DESNUDO ARMADO BT ANCLAJE
NOTAS PARA ACLARAR CONVENCIONES EN LOS TIPOS DE APOYOS:
ARMADO BT FIN DE LINEA 1. _H: HORMIGÓN.
D.P.S POLIMERICOS 10KA, 15KV LINEA MT 13.2KV 2. _FL: APOYO FINAL DE LINEA.
3. _AL: APOYO DE ALINEACIÓN.
VER DETALLE LINEA BT TRENZADA
4. _AG: APOYO DE ANGULO.
X1 en detalle de LINEA BT DESNUDA 5. _AC: APOYO DE ESTRELLAMIENTO.
conexión a ACOMETIDA AEREA EXISTENTE
TRES CONDUCTORES 6. _12/750: ALTURA DEL APOYO (en m) Y SU ESFUERZO PRINCIPAL (en Kg).
transformador
ACOMETIDA AEREA NUEVA 7. _CS: AISLADOR TIPO CADENA DE SUSPENSIÓN
LINEA BT SUBTERRANEA
8. _PC: AISLADOR TIPO POSTE INSTALADO EN CRUCETA.
E
CORTACIRCUITO 9. _PD: AISLADOR TIPO POSTE INSTALADO EN CRUCETA DOBLE.
CENTROS DE TRANSFORMACION 10. _II: NIVEL DE AISLAMIENTO (13,2 KV)
PUESTA A TIERRA E 11. _N: AISLAMIENTO NORMAL.
E 12. _CTPC2B: CENTRO DE TRF TIPO POSTE CONVENCIONAL MONOFASICO.
PARARRAYOS
13. _45: POTENCIA NOMINAL.
ACOMETIDA SUBTERRANEA EN 3 X CAJA PARA TCs
#4AWG FASE + #4N, Al THHN/THW
TCs TCs 14. _13200: TENSIÓN NOMINAL DE SERVICIO EN EL PRIMARIO.
RED AEREA BT CONTADOR KWH KWH
14. _240/120: TENSIÓN NOMINAL DE SERVICIO EN EL SECUNDARIO.
Capacete 2"
EXISTENTE
TUBO GALVANIZADO (IMC)
116.4589

DE 2" cinta bandit


CABLE DE CONTROL
BAJANTE INTERNO
POSTE NORMALIZADO GABINETE MEDIDOR TRIFÁSICO
TIPO CONEXIÓN DIRECTA
100A, 60 Hz.

VER DETALLE
CAJA, DPS Y
MEDIDOR

2.0

POSTE DE 12mX1050DAN POSTE DE 12mX1050DAN


REGISTRO TIPO
RS-07 EDEQ
EPE003 EPE002

3 X #4AWG FASE + #4N, Al THHN/THW


2 2" PVC

HACIA REGISTRO AP

cable de cobre
desnudo #6
VER DETALLE
CAJA DE
INSPECCIÓN B.T.

VARILLA PUESTA A (Potencia)


TIERRA 5/8" x 2.40m


LISTADO DE MATERIALES



N

NS
TE
IA
ED

N

EM

NS
NT

TE
TE

IA
NOTA:
1. Las cantidades de materiales se duplican para puentes BT dobles.

ED
XIS
2. Se seleccionará el material de acuerdo al sistema de puesta a tierra. (copper clad o acero austenitico)
3. Se le sumará la cantidad de conductor bajando de la red de MT hasta el seleccionador fusible.

M
E

TE
EA
A continuación se desglosan los materiales con las diferentes opciones

EN
LÍN

IST
EX
E

EA
D
4T RAU

LÍN
AL NTIF
Este listado no incluye los materiales para el sistema de puesta a tierra, remitase a las normas de SPT
Alternativas

A
*1 De acuerdo a capacidad del transformador

+#
*2 De acuerdo a calibre del conductor de MT NOTA:
*3 De acuerdo a sistema de puesta a tierra
*SISTEMA DE PUESTA A TIERRA ≤ 10 Ω

N 3 DA
*4 De acuerdo a diseño y capacidad del trafo en BT



A
#4
NS ECT
0.70

0.10 0.50 0.10


0.05 0.05

Y
Refuerzo adicional
0.10 TAPA DE CONCRETO
mallas Eléctrosoldada


JA PRO
unidas
Ø 5 mm o una Ø 7mm
15x15

 KWH

TE
Dos mallas

EA
Eléctrosoldada unidas 0.60
0.87 0.65
Ø 5 mm o una Ø 7mm
15x15
MARCO PARA CAJA DE INSPECCIÓN
Acometida 3x#4+#4 desde transformador existente

LÍN
DE ACOMETIDAS DE B.T.
Rec=0.075

BA
0.12 Dos mallas Eléctrosoldada
Rec=0.075 Rec=0.02 unidas Ø 5 mm

0.10 LÍN
0.28 Sustitución con subbase
granular e=0.15 m Rec=0.02 BA EA
JA E
TE XIS
DRENAJE REDUCIDO 0.60
MATERIAL
0.20 NORMA EDEQ RS-26

NS TE
IÓ NTE
0.20
VARILLA #5
90°
N

0.05 MÍNIMO
SOLDADURA 0.22
AW E-6010

RE
A
0.30

Dos mallas Eléctrosoldada


unidas Ø 5 mm

0.60
RESERVA
B

0.30

0.60
DETALLE TRASLAPO DE MALLAS
A
CONTRATANTE DIRECTOR: CONSULTORÍA INTERVENTORÍA DIRECTOR DE INTERVENTORÍA: ESCALA: MODIFICACIONES PROYECTO: CONTIENE: PLANO No. FECHA:

No. REVISIONES FECHA PUENTE AV 19 NORTE


REDES ELÉCTRICAS
REVISÓ: DISEÑÓ: ESPECIALISTA INTERVENTORIA: DIBUJO: ARCHIVO: CONSECUTIVO: REV.
ALIMENTADOR PRINCIPAL
Y PUNTO DE CONEXIÓN
PLANO No.

ESPACIO PARA SELLOS

CONVENCIONES
ELEMENTO EXISTENTE PROYECTADO

P21
-
POSTE DE MT
Ram
al 3
POSTE DE BT
ARMADO MT ALINEACION O
P20
- R am ANGULO
al 3

ARMADO MT ANCLAJE
3X
2 #4A
2" P WG F ARMADO MT FIN DE LINEA
P19
VC AS - Ram
E +# al 3

4N 11
ARMADO BT ALINEACION O
+# ANGULO
6T,
Al T
H HN ARMADO BT ANCLAJE
/TH P18
- Ra NOTAS PARA ACLARAR CONVENCIONES EN LOS TIPOS DE APOYOS:
W mal
3

ARMADO BT FIN DE LINEA 1. _H: HORMIGÓN.


Eje
de
Ande
n
LINEA MT 13.2KV 2. _FL: APOYO FINAL DE LINEA.
P17
- Ram 3. _AL: APOYO DE ALINEACIÓN.
al 3
LINEA BT TRENZADA
Eje
de
vía
4. _AG: APOYO DE ANGULO.
LINEA BT DESNUDA 5. _AC: APOYO DE ESTRELLAMIENTO.
TRES CONDUCTORES
Eje
P16
6. _12/750: ALTURA DEL APOYO (en m) Y SU ESFUERZO PRINCIPAL (en Kg).
de
Sepa
- Ram
rado
r
a l3
7. _CS: AISLADOR TIPO CADENA DE SUSPENSIÓN
Eje
de
vía LINEA BT SUBTERRANEA
3X P15
- Ra
8. _PC: AISLADOR TIPO POSTE INSTALADO EN CRUCETA.
2 #4A mal
3 CORTACIRCUITO E
9. _PD: AISLADOR TIPO POSTE INSTALADO EN CRUCETA DOBLE.
Eje
de
Sepa
rado
2" P W GF
VC AS
r
Eje

CENTROS DE TRANSFORMACION
de

E+
Ande
n
10. _II: NIVEL DE AISLAMIENTO (13,2 KV)
Eje #4N
+#
de
Cic
loru
P14
PUESTA A TIERRA E 11. _N: AISLAMIENTO NORMAL.
6 T,
ta
- Ra
mal
Al T 2
HH PARARRAYOS
E 12. _CTPC2B: CENTRO DE TRF TIPO POSTE CONVENCIONAL MONOFASICO.
N /TH
11 W 13. _45: POTENCIA NOMINAL.
2x(3 CAJA PARA TCs
2 #4 P13 TCs TCs 14. _13200: TENSIÓN NOMINAL DE SERVICIO EN EL PRIMARIO.
2" I AWG F
- Ram
al 2
MC CONTADOR KWH KWH
14. _240/120: TENSIÓN NOMINAL DE SERVICIO EN EL SECUNDARIO.
ASE
+#
4N
+ #6T
, Al P12
THH - Ram
al 2
N/T
H W)
NOTAS:
2x(3 P11
- Ra

2 #4A mal
2
2" I W G
MC FAS
E+
#4N
+#
6T, P10
- Ra 26
Al T mal
2
HH
N /TH
W)
Eje
de An

2x(3 P9 den
- Ra
mal
2 #4A 2

2" I W G
MC FAS Eje
de

E+
vía

#4N
+# P8
6T, - Ra
mal
Eje
de
Sepa

Al T 2
rado
r

HH
N/T
HW Eje
de

)
vía

Eje
de
Sepa
rado
r
Eje
de P7
Ande
n - Ra
mal
1
Eje
de C

3X
iclo
ruta

3 (3#
4
2" P AWG
VC FAS P6
- Ra
E +# mal
1
4N
+#
6T,
26 Al T
HH
N/T
HW P5
- Ra
) mal
1

(Potencia)
P4
- Ra
mal
1

3X
3 (3#
2" P 4AWG
VC FAS P3
- Ra
E +#
mal
1
4N
+#
6T,
Al T
H HN
/T HW P3
- Ra
mal
) 1

P1
- Ra
mal
1

+ #4N
)
+ #6T, Al THHN/THW
3x (3#4AWG FASE

3 2" PVC
CONVENCIONES

3x 6T, VC
+ # 2" P
(3# Al T
3

4A HH
WG N
PROYECTADO

FA /THW
SE )
+#
4N
AL
IM
Co EN
ntr TA
ol DO
de RP
trá PA
fico L



SEPARADOR
30cm

30cm
60cm

60cm

60cm 60cm
mínimo 40cm mínimo 40cm

CONTRATANTE DIRECTOR: CONSULTORÍA INTERVENTORÍA DIRECTOR DE INTERVENTORÍA: ESCALA: MODIFICACIONES PROYECTO: CONTIENE: PLANO No. FECHA:

No. REVISIONES FECHA PUENTE AV 19 NORTE


REDES ELÉCTRICAS
REVISÓ: DISEÑÓ: ESPECIALISTA INTERVENTORIA: DIBUJO: ARCHIVO: CONSECUTIVO: REV.
PLANTA LUMINARIAS
DETALLES DE REGISTROS Y CANALIZACIONES
PLANO No.

NOTAS: Cálculos de consumo de potencia ESPACIO PARA SELLOS

CANTIDAD CARGA TOTAL (W) FP CARGA (KVA) CORRIENTE NOMINAL (A)


Luminaria 80W 42 3360 0.9 3.7 10.4
CONVENCIONES
TOTAL 3360 0.9 3.7 10.4 ELEMENTO EXISTENTE PROYECTADO

3x15A
POSTE DE MT
PROTECCIÓN POSTE DE BT
ARMADO MT ALINEACION O
ANGULO
CALCULOS DE REGULACIÓN ARMADO MT ANCLAJE

ARMADO MT FIN DE LINEA

ARMADO BT ALINEACION O
ANGULO
ARMADO BT ANCLAJE
NOTAS PARA ACLARAR CONVENCIONES EN LOS TIPOS DE APOYOS:
ARMADO BT FIN DE LINEA 1. _H: HORMIGÓN.
LINEA MT 13.2KV 2. _FL: APOYO FINAL DE LINEA.
3. _AL: APOYO DE ALINEACIÓN.
LINEA BT TRENZADA
4. _AG: APOYO DE ANGULO.
LINEA BT DESNUDA 5. _AC: APOYO DE ESTRELLAMIENTO.
TRES CONDUCTORES 6. _12/750: ALTURA DEL APOYO (en m) Y SU ESFUERZO PRINCIPAL (en Kg).
7. _CS: AISLADOR TIPO CADENA DE SUSPENSIÓN
LINEA BT SUBTERRANEA
8. _PC: AISLADOR TIPO POSTE INSTALADO EN CRUCETA.
E
CORTACIRCUITO 9. _PD: AISLADOR TIPO POSTE INSTALADO EN CRUCETA DOBLE.
CENTROS DE TRANSFORMACION 10. _II: NIVEL DE AISLAMIENTO (13,2 KV)
PUESTA A TIERRA E 11. _N: AISLAMIENTO NORMAL.
E 12. _CTPC2B: CENTRO DE TRF TIPO POSTE CONVENCIONAL MONOFASICO.
PARARRAYOS
2 2" PVC 2 2" PVC CAJA PARA TCs
13. _45: POTENCIA NOMINAL.
TCs TCs 14. _13200: TENSIÓN NOMINAL DE SERVICIO EN EL PRIMARIO.
CONVENCIONES CONTADOR KWH KWH
14. _240/120: TENSIÓN NOMINAL DE SERVICIO EN EL SECUNDARIO.

PROYECTADO

Alimentador
3 X #4+ #4, Al

(Potencia)

DETALLE 1

POSTE METALICO SEPARADOR. PUENTE CONEXIÓN STP A POSTE

DETALLE 8

DETALLE

CONEXIÓN ALIMENTADOR A LUMINARIA

DETALLE

DETALLE 10

CONTRATANTE DIRECTOR: CONSULTORÍA INTERVENTORÍA DIRECTOR DE INTERVENTORÍA: ESCALA: MODIFICACIONES PROYECTO: CONTIENE: PLANO No. FECHA:

No. REVISIONES FECHA PUENTE AV 19 NORTE


REDES ELÉCTRICAS
REVISÓ: DISEÑÓ: ESPECIALISTA INTERVENTORIA: DIBUJO: ARCHIVO: CONSECUTIVO: REV.
CÁLCULOS ELÉCTRICOS
Y DETALLES DE LUMINARIAS
PLANO No.

ESPACIO PARA SELLOS

RO
CONVENCIONES
ELEMENTO EXISTENTE PROYECTADO

FO
POSTE DE MT
POSTE DE BT

MA
ARMADO MT ALINEACION O

HN HW N2
ANGULO
ARMADO MT ANCLAJE

/TH N2
TH N/T THW

2
SE

WN
ARMADO MT FIN DE LINEA

RO
ARMADO BT ALINEACION O

PV AWG THH HN/


ANGULO
ARMADO BT ANCLAJE

H
Po NOTAS PARA ACLARAR CONVENCIONES EN LOS TIPOS DE APOYOS:

FO
2 3x16 AW Al T
ste ARMADO BT FIN DE LINEA 1. _H: HORMIGÓN.
me LINEA MT 13.2KV 2. _FL: APOYO FINAL DE LINEA.
tál 3. _AL: APOYO DE ALINEACIÓN.

MA
2# 4x16 WG
LINEA BT TRENZADA
ico 4. _AG: APOYO DE ANGULO.
T2 LINEA BT DESNUDA 5. _AC: APOYO DE ESTRELLAMIENTO.

2# 2#8A
TRES CONDUCTORES 6. _12/750: ALTURA DEL APOYO (en m) Y SU ESFUERZO PRINCIPAL (en Kg).

SE
7. _CS: AISLADOR TIPO CADENA DE SUSPENSIÓN
LINEA BT SUBTERRANEA
8. _PC: AISLADOR TIPO POSTE INSTALADO EN CRUCETA.
E
CORTACIRCUITO

1x
9. _PD: AISLADOR TIPO POSTE INSTALADO EN CRUCETA DOBLE.

2"
CENTROS DE TRANSFORMACION

H N 2
10. _II: NIVEL DE AISLAMIENTO (13,2 KV)

/T W N
PUESTA A TIERRA E 11. _N: AISLAMIENTO NORMAL.

N H W
W 2
H /T TH
E 12. _CTPC2B: CENTRO DE TRF TIPO POSTE CONVENCIONAL MONOFASICO.
PARARRAYOS

2
N
13. _45: POTENCIA NOMINAL.

TH HN N/
CAJA PARA TCs TCs TCs 14. _13200: TENSIÓN NOMINAL DE SERVICIO EN EL PRIMARIO.

C WG T HH
CONTADOR KWH KWH
14. _240/120: TENSIÓN NOMINAL DE SERVICIO EN EL SECUNDARIO.

PV A G l T
H
2" 16 AW G A
2 3 x16 W
4# 4 8A
4# X #
1

x
HH /THW N2
HW 2
N2
W
N
2" P AW THH N/TH
N/T
WG THH
N
4# x16 A G Al

VC G T

(Potencia)
4# #8AW

6
3x1
4
1X

Po
ste
me
tál
ic oT
2
RO
FO
MA

TH WN2 2
HH /TH WN

2
WN
C G T HN /TH
SE

PV W TH HN

N/
H
2 3x1 AW Al T
2" 6 A G
6# 4x1 WG

AL
IM
EN
6# #8A

Co TA
6

ntr DO
ol
1X

RP
RO

de
trá PA
fico L
O
AF
M
HN HW N2
/TH N2
TH N/T HW

SE
2
WN
PV AWG THH HN/T

RO
H
2 3x16 AW Al T

FO
G
4# 4x16 WG

30cm

30cm
60cm

60cm
MA
4# #8A

C
1X

SE
HN HW N2
2"

/TH N2
TH N/T HW

2
WN
PV AWG THH HN/T

60cm 60cm
mínimo 40cm mínimo 40cm
H
2 3x16 AW Al T
G
2# 4x16 WG
2# #8A

C
1X

2"

CONTRATANTE DIRECTOR: CONSULTORÍA INTERVENTORÍA DIRECTOR DE INTERVENTORÍA: ESCALA: MODIFICACIONES PROYECTO: CONTIENE: PLANO No. FECHA:

No. REVISIONES FECHA PUENTE AV 19 NORTE


REDES ELÉCTRICAS
REVISÓ: DISEÑÓ: ESPECIALISTA INTERVENTORIA: DIBUJO: ARCHIVO: CONSECUTIVO: REV.
PLANTA SEMAFORIZACIÓN
DETALLES DE REGISTROS Y CANALIZACIONES