PHILIPPINES FREVIFOUNDATIONS DATE February 11, 2022 REF. NO.: TFPINSCRP-S1-080 To MR. JERRY SICAT Project Manager RE NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 Caloocan City to Sta, Mesa Manila ‘tached herewith are the folowing woman oF | REMARKS ITEM DESCRIPTION UMBER ‘STANDBY TIME — JANUARY 2022 1 Letter Reference No. TFFUMAA/22—012wih | 40 pages | Orainal Copy Signed and Reconciad Summary of Standby time 2 Daily Activity Reports 133 pages Original Copy rom | sopsoes “Nothing Follows" | Data Tine pECEIY eh Received By: D.M. CONSUNII, INC. N 11 2 Rective by (Siar or pie ray REWIFOUNDATIONS T Y PHILIPPINES Date: 09 February 2022 Reference No.: TFPI/MAA/22 - 012 D.M. CONSUNGI, INC. 2281 DMCI Plaza Bldg. Don Chino Roces Ave., Makati City Attn: Mr. Jerry D, Sicat Project Manager Project: NLEX-SLEX CONNECTOR ROAD Bored Piling Works Subject: Summary of January 2022 Stand-by Time Dear Sir, Please find attached Summary of Stand-by Time for January 2022 for your immediate attention, JANUARY 2022 —] RIG NUMBER: ‘STANDBY HOURS: RECONCILED AND SIGNED SUMMARY RIG 1 - - RIG2 197 3 pages RIG3 = 2 pages RIG4 156 T pages TOTAL 353 ‘| We hope that this matter will be addressed immediately in order to avoid further standby in the future. Yours faithfully, en PHILIPPINES, INC, MrANDREA MANETTI Vice President for Operations Tec MMW Gon aS OUROATIONS LPPOE i ° 20.29 BE Caper Carn, are at ees et ac age ann 7s ‘TREWIFOUNDATIONS PHILIPPINES NLEX-SLEX CONNECTOR ROAD PROSECT- SECTION onto Prune WORKS 2 Summary o Standby for the Month of JANUARY 131, 2022 2-30 816-2) [ewan | mt | sos at ‘om ‘me vez] nae ro -tena ew m ah 3 neow Tacomas estatocauassntoni fe ‘nee mn] wes | ——_ one . |r snap 098 ee aoe a fea | rwamernamaiemematee | ee S100 600 aig re ‘ximanet neyaoe at ‘rieceupae prem | sooner | se | ‘femtmgmnrceangy as unt asore | semne-sain antec tam aR PR eon 2am soa ‘TREVIFOUNDATIONS PHIUPPINES Nu x conmeeroR ROAD PROECT- SECTION + Weal Stan forthe Month of ANUARY 19,2022 8-830 /BIG-2) etsemn | socat onutac at awsome oto JATIONS PHIUPPINES HLB«-$12x CONNECTOR ROAD PROXECT-SECTION + ne WORKS cl Stand for the Moth of ANUARY 19-16, 2022 (R920, 846-2) wn P-Baee —[panae ge a I score wing te season | a eect _| TREVIFOUNDATIONS PAILPPINES NUEXSLEx CONNECTOR ROAD PRIDECT -SECTION + Bone tine won Wook Stan forthe Month of WUARY 17.23, 2022 (BNO G2 somseom | a2 |coqurotnaamawvansereten mentee vom | saan ane dtegtom inter one ‘seem TREWIFOUNDATIONS PHILIPPINES NULL CONNECTOR ROAD PRONECT- SECTION 4 SoneD sine worn Westy Standby forthe Month of SUARY 24:3, 2022 8-430 816-2) "ann mans! | Sy dno seg scomssoan | 59 |soptnnstesaarchematel TREVIFOUNDATIONS PHIUPPINES. MADE s4commecrox nono RODET-sEcTION DAILY ACTIVITY REPORT SUMMARY ‘Stand fr he month of SANUARY 2022 TREVIFOUNDATIONS NLEX-SLEX CONNECTOR Ri BORED PILING WORKS PHILIPPINES }OAD PROJECT - SECTION 4 DAILY STANDBY TIME - JANUARY 1, 2022 DRILLING RIG R-930 - RIG 2 ue P-me [simmer [rancor ae “ans seu arc omer AouORY MEW Eat = ae op TREVIFOUNDATIONS NA PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS, DAILY STANDBY TIME - JANUARY 2, 2022 DRILLING RIG R-930 - RIG2 et tee = a — = pout TREWIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 3, 2022 DRILLING RIG R-930 - RIG 2 ee mays oun mai co rie starr oF mo; ove ro Te conPLANTS [pees “th TREWIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 2 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 4, 2022 DRILLING RIG R-930 - RIG 2 [wwe [me | wos iii fol nee TREWIFOUNDATIONS PHILIPPINES: scsi comecron nono monet Sen043 erase DAILY STANDBY TIME - JANUARY 5, 2022 DRILLING RIG R-930 - RIG 2 Bt [eee oo — = feast] =| saedeaamimiane TREVIFOUNDATIONS v PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 6, 2022 DRILLING RIG R-930 - RIG 2 og ee = = TREVIFOUNDATIONS PHILIPPINES [NLEX-‘SLEX CONNECTOR ROAD PROJECT - SECTION 1 BORED PILING WORKS DAILY STANDBY TIME - JANUARY 7, 2022 DRILLING RIG R-930 - RIG 2 Lene | me ours ert es) eeu ff TREVIFOUNDATIONS v PHILIPPINES !NUEX-SLEX CONNECTOR ROAD PROJECT ~ SECTION 1 ‘BORED PILING WORKS DATLY STANDBY TIME - JANUARY 8, 2022 DRILLING RIG R-930 - RIG 2 [me] sraneer | stam owns rowanes a a ‘Dw ‘one PHILIPPINES 'NLEX:SLEX CONNECTOR ROAD PROJECT- SECTION 1 BORED PILING WORKS DAILY STANDBY TIME - JANUARY 9, 2022 DRILLING RIG R-930 - RIG 2 TREVIFOUNDATIONS | ot Fes [eee] ‘me ‘ma meas | in| aise ‘cai smo warcansouss eee i, TREWIFOUNDATIONS PHILIPPINES [NLEX‘SLEX CONNECTOR ROAD PROJECT- SECTION 1 BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 10,2022 DRILLING RIG R-930 - RIG 2 | t_[ sce [sane owns ney bit mumece Tae ours fee = — rarer | op | stm aint baa trettotminiatppvtessiorn TREWIFOUND ATIONS PHILIPPINES [NUEX-SLEX CONNECTOR ROAD PROJECT SECTION. BORED PILING WORKS DAILY STANDBY TIME - JANUARY 14, 2022 DRILLING RIG R-930 - RIG 2 Er igipeee | tee oa oe = ines ATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 BORED PILING WORKS DAILY STANDBY TIME - JANUARY 12, 2022 DRILLING RIG R-930 -RIG 2 a a a ven runs uMaER Te ours: oom = i HH. ome TREVIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 4 ‘BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 13, 2022 DRILLING RIG R-930 - RIG 2 rer | mwe | vous | uae ‘ow ‘ne zamnsom | 20 | “tan enter Sm athat mel osouszan | 60 |ccmmnseleninstenereepwaned ‘aromas PH ATIONS MIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 14, 2022 DRILLING RIG R-930 - RIG 2 es es fee a — rosousana | <0 |sompsmsot maton ttn naie med acconene et hay TREWIFOUNDATIONS PHILIPPINES i a i as cee Senaorea DAILY STANDBY TIME - JANUARY 15, 2022 DRILLING RIG R-930 - RIG 2 ii cee (ere ee tn = a ornecwonene TREVIFOUNDATIONS PHILIPPINES [NLEX-SLEK CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 16, 2022 DRILLING RIG R-930 - RIG 2 | ime [ soe [senor rowan ] inane [uae | rae | sours ae ener ev fences ee dc ce TREVIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION. BORED PILING Wonk DAILY STANDBY TIME - JANUARY 47, 2022 DRILLING RIG R-930 - RIG 2 = a TREVIFOUNDATIONS q PHILIPPINES IMEX SLEX CONNECTOR ROAD PRONECT-SECTION 1 Bone Pituwe WOR DAILY STANDBY TIME - JANUARY 18, 2022 DRILLING RIG R-930- RIG2 [wna | me | wos fre oo ire) TREWIFOUNDATIONS & PRILIPPINES [NLEX-SLEX CONNECTOR ROND PROJECT - SECTION 1 SoReD Pine works DAILY STANDBY TIME - JANUARY 20,2022 DRILLING RIG R-930 - RIG 2 ee erat tra aL sown omer ime passe | aon entotte Y PHILIPPINES NLEX-SLEX CONNECTOR ROAD PROJECT- SECTION 1 ‘BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 24, 2022 DRILLING RIG R-930 - RIG2 TREVIFOUNDATIONS Suen |e nous mae ‘owe one ear ce TREWIFOUNDATIONS PHILIPPINES [NUEX-SLEX CONNECTOR ROAD PROJECT - SECTION 2 BORED PILING WORKS DAILY STANDBY TIME - JANUARY 22, 2022 DRILLING RIG R-930 - RIG2 oa ate —— ac] TREWIFOUNDATIONS v PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT- SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 23, 2022 DRILLING RIG R-930 - RIG2 TREWIFOUNDATIONS yi PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 24, 2022 DRILLING RIG R-930 - RIG2 "panne [nae | nos fee owe cm PHILIPPINES NLEX-SLEX CONNECTOR ROAD PROJECT- SECTION 3 ‘BORED PILING WORKS. DATLY STANDBY TIME - JANUARY 25, 2022 DRILLING RIG R-930 - RIG 2 TREVIFOUNDATIONS we pote [sian] oe = roms omc) et aww orn: oorromeanrraave) KO stavby Ae amare! 761 eat tete scien, ie eee sean py ad bad va TREWIFOUNDATIONS PHILIPPINES INLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 26, 2022 DRILLING RIG R-930 - RIG 2 Lemon | ome | neues a cana fee socsmsou | 60 |eenpams reinatoin me peta Srnswesent| T 22 & TREWIFOUNDATIONS di PHILIPPINES NLEX-SLEx CONNECTOR ROAD PROJECT SECTION A Bono riuine wonKs DAILY STANDBY TIME - JANUARY 27, 2022 DRILLING RIG R-930 - RIG2 unaer | nave ours Ga} ao4 TREWIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROND PROJECT - SECTION 1 BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 28, 2022 DRILLING RIG R-930 - RIG2 rwocrnsena | 60 |eomplannofrnrtste the me pened rise casomen TREWIFOUNDATIONS PHILIPPINES ‘Lex SLEX CONNECTOR ROAD PRONECT- SECTION. Dono Pune WORN DAILY STANDBY TIME - JANUARY 30, 2022 DRILLING RIG R-930- RIG 2 Frise litre ct os ‘oa ne soomsooa| 60 lemme tren TREVIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 3 ‘BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 29, 2022 DRILLING RIG R-930- RIG 2 OT amaen |e | veuns ae eo rn TREVIFOUND. ATIONS PHILIPPINES © eset ercee sasensence DAILY STANDBY TIME - JANUARY 31, 2022 DRILLING RIG R-930 - RIG 2 == = = rcoURD BY ne PAE FREWIFOUNDATIONS PHIUPPINES |MLEX-SLEX CONNECTOR ROAD PROXECT- SECTION saeco ce cl 22 = = ee el L ae a = a — 9 +— saison lf ees | | roomeranne ] iis mang ste sowed nm itm at TREWIFOUNDATIONS PHIUPPINES {CONNECTOR ROAD PRORECT- SECTION 1 ‘onto slunc wom ‘Welty Standby forthe Month of JANUARY 19, 2022 {58-20 16:3) ee a: a TREVIFOUNDATIONS usu connecron ouD PROEET FECTION DAILY ACTIVITY REPORT SUMMARY Standby for he marth of SAMUARY 2022 TREWIFOUND: Soneo pine w ATIONS. PHILDPPINES .ECTOR ROAD PROJECT - SECTION 4 omnes Way Standby for the Month of UNUARY 10-6, 2022 158-20/ BG) suamn_| roe | nous “we omc “ TREWIFOUNDATIONS PHILIPPINES ae TREWIFOUND: ATIONS PHIUPPINES NUEXSLEx CONNECTOR ROAD PRONCT- SECTION 1 neo ruin works \Weety Standby forthe Month ef ANUARY 26-31, 2022 (S80 (BIG) mF mer | name | ns ne ad mt ageuerotcone no nunriane| faces nt i cy 4 TREWIFOUNDATIONS v PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 BORED PILING WORKS DAILY STANDBY TIME - JANUARY 1, 2022 DRILLING RIG SR-90 - RIG 3 a ee ous frre poet cme cuuman| pss aroma ony: HOUDAY px ean Praag PHILIPPINES |NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 2, 2022 DRILLING RIG SR-90- RIG 3 TREWIFOUNDATIONS v [enw [omar | ues fee ect men JREVIEOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 3, 2022 DRILLING RIG SR-90 - RIG 3 Sawer | re one rt ‘om oa TREVIFOUNDATIONS PHILIPPINES LEK LEX CONNECTOR ROAD PRODECT- SECTION DAILY STANDBY TIME - JANUARY 4, 2022 DRILLING RIG SR-90 - RIG 3 oe en ours re Br nem TREVIFOUND: ATIONS PHILIPPINES [NLEX SLEX CONNECTOR ROAD PROJECT SECTION 1 BoRED PrLinG WORKS DAILY STANDBY TIME - JANUARY 5, 2022 DRILLING RIG SR-90- RIG3 ) . O/ TREWIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 6, 2022 DRILLING RIG SR-90 - RIG 3 | “HOON T:008M TREWIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION BORED PILING WORKS DAILY STANDBY TIME - JANUARY 7, 2022 DRILLING RIG SR-90 - RIG 3 JRaWFOUND ATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT SECTION 1 DAILY STANDBY TIME - JANUARY 8, 2022 DRILLING RIG SR-90 - RIG 3 er (anu REP uae ua ct ‘owe ‘mon TREVIFOUNDATIONS v PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 9, 2022 DRILLING RIG SR-90 - RIG 3 - Eee =| = i JREWFOUNDATIONS [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION BORED PILING WORKS DAILY STANDBY TIME - JANUARY 10, 2022 DRILLING RIG SR-90 - RIG 3 woe pete aoe ae soume TREVIFOUND. JATIONS PHILIPPINES. [MLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 11, 2022 DRILLING RIG SR-90 - RIG 3 SP awen [roe | ooins et aa foe TREVIFOUNDATIONS ¥ PHILIPPINES. [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 BoReD PILING WORKS DAILY STANDBY TIME - JANUARY 12, 2022 DRILLING RIG SR-90 - RIG 3 a rs ours fern a) a TREVIFOUN| ‘BORED PILING WORKS ATIONS PHILIPPINES [NLEX:SLEX CONNECTOR ROAD PROJECT - SECTION 1 DAILY STANDBY TIME - JANUARY 13, 2022 DRILLING RIG SR-90 - RIG 3 2 eo TREWIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 14, 2022 DRILLING RIG SR-90 - RIG 3 swouncn | se | nouns ee = at TREWIFOUNDATIONS ¥ FHIUPPINES [NUEX-SLEX CONNECTOR ROAD PROJECT: SECTION 1 BORED PILING WORKS DAILY STANDBY TIME - JANUARY 15, 2022 DRILLING RIG SR-90 - RIG 3 rams [roe | tones ant tay ery pot ‘Sho TREWIFOUNDATIONS PHILIPPINES INLEX-SLEX CONNECTOR ROAD PROJECT - SECTION ‘BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 16,2022 DRILLING RIG SR-90 - RIG 3 Oem | nme | nouns i a mat TREWIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 BORED PILING WORKS DAILY STANDBY TIME - JANUARY 17, 2022 DRILLING RIG SR-90 - RIG 3 TREWIFOUNDATIONS PHILIPPINES ee nme sass pan DRILLING RIG SR-90 - RIG 3 QE =e, = = TREVIFOUNDATIONS PHILIPPINES NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 20, 2022 DRILLING RIG SR-90-RIG 3 sworn | me | owns men me -. Pagyoyat oy f [Seyfbapyec oot) 1 s TREWIFOUNDATIONS PHILIPPINES. NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 21, 2022 DRILLING RIG SR-90 - RIG 3 TREWIFOUNDATIONS o PHILIPPINES INLEX-SLEX CONNECTOR ROAD PROTECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 22, 2022 DRILLING RIG SR-90 - RIG 3 a [a re | vous fae owe en fea eee ue enone aro wanrnce TREWIFOUNDATIONS PHILIPPINES. [NLEX‘SLEX CONNECTOR ROAD PRONECT - SECTION 1 'SORED PILING WORKS DAILY STANDBY TIME - JANUARY 23, 2022 DRILLING RIG SR-90 - RIG 3 SF nace | nae | noone ere ‘em ‘eer TREWIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 24, 2022 DRILLING RIG SR-90 - RIG 3 oe ae as ome Ff pao TREWIFOUNDATIONS PHILIPPINES: [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 2 DAILY STANDBY TIME - JANUARY 25, 2022 DRILLING RIG SR-90 - RIG 3 a Pree bet inca pSjrmteter a TREWIFOUNDATIONS PHILIPPINES [NLEX SLEX CONNECTOR ROAD PROJECT - SECTION 1 [BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 26, 2022 DRILLING RIG SR-90 - RIG3 a MUN Me Hours : (oma (mew) z lig. Te TREWIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 27, 2022 DRILLING RIG SR-90 - RIG 3 iz etree = = oe wuwaen me “nouns: aera o—_ may { TREVIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT “SECTION 1 BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 28, 2022 DRILLING RIG SR-90 - RIG 3 L _ ‘omar rec oe yz (fe. ATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 4 ‘BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 28, 2022 DRILLING RIG SR-90 - RIG3 ss une. rte nouns. fee haneod sv saowessu ‘omararrrowerowt A970 f ; ‘TREVIFOUNDATIONS PHILIPPINES oe suecomacon| OND PRONECT- SECTION ‘Summary of Standby for the Month of JANUARY 1:34, 2022 830 / 6-4) OL mer | me [aos sie os eet | aaron eranrene, ‘onsen soo |ertenoe earn na rane] ‘TREWIFOUND, /ATIONS: PHUPRINES ‘MExSLEX CONNECTOR ROAD PRONCT- SECTION Weck Stand forthe Month of NUARY 19,2022 8930/6) SSE ie = i | tl ATIONS PHILIPPINES NLBE-SUEx CONNECTOR ROAD PROXECT- SECTION 1 Soneo mine womns ‘Woot Standby forthe Month of RAUARY 10-4, 2022 .§-910 846-9) nnn croc eae rooms | 04 lames TREWIFOUNDATIONS q PHILIPPINES [NUEXSLEX CONNECTOR ROAD PROXECT- SECTION 1 Soreo rune wonns ‘eel Standby for the Month et ANUARY 17-2, 2022 8-530 BIG) snsonescarn | 49, |eonumdrstonrn emer Tyeccrinene ihe ‘TREWIFOUNDATIONS J PHIUPPINES mupestex connecron ‘Done rine woRne ROAD PROMCT-SECTION 1 ‘Weekty Standby for the Month of AWUARY 24-94, 2022 (R930 (i6-8) q | reesei it an ne | scrutinise a TREVIFOUNDATIONS v PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 1. 2022 DRILLING RIG R-930 -RIG 4 eur | snow re) ‘aroma om: KoUEAY pe EA TREWIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT- SECTION SoRED PILING WORKS DAILY STANDBY TIME - JANUARY 2, 2022 DRILLING RIG R-930 - RIG 4 [meer [ow | woos | fe eal fer leet di eo TREVIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION BoRED PILING WORKS DAILY STANDBY TIME - JANUARY 3, 2022 DRILLING RIG R-930 - RIG 4 ‘oma simas1 oF me; ou 0 commas PHILIPPINES TREWIFOUNDATIONS [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 Sone rite worn DAILY STANDBY TIME - JANUARY 4, 2022 DRILLING RIG R-930 -RIG 4 fa aad nae — ‘ow ‘re FOUNDATIONS PHILIPPINES NLEx-SLEX CONNECTOR ROAD PROJECT SECTION 1 ‘BORED PILING WORKS. DATLY STANDBY TIME - JANUARY 5, 2022 DRILLING RIG R-930 - RIG 4 TREWIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 BORED PILING WORKS DAILY STANDBY TIME - JANUARY 6, 2022 DRILLING RIG R-930 - RIG 4 roaonesoowe | ao | or me sieve ne nose oF tum sera fot Be ie TREVIFOUNDATIONS Y PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT SECTION 1 BORED PILING WORKS DAILY STANDBY TIME - JANUARY 7, 2022 DRILLING RIG R-930 - RIG 4 oF rewaen [nme | nouns fe ‘ew ‘ones Pernt a TREVIFOUNDATIONS "NLEX-SLEX CONNECTOR ROAD PROJECT SECTION BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 8, 2022 DRILLING RIG R-930 - RIG 4 [me [sano [racer wana oan Fae | ome | sous roe BS a PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION. BORED PILING WORKS. TREWIFOUNDATIONS DAILY STANDBY TIME - JANUARY 9, 2022 DRILLING RIG R-930 -RIG 4 eee == TREWIFOUNDATIONS v PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 BORED PILING WORKS DAILY STANDBY TIME - JANUARY 10, 2022 DRILLING RIG R-930 - RIG 4 TREWIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT SECTION [BORED PILING WORKS DAILY STANDBY TIME - JANUARY 11, 2022 DRILLING RIG R-930 - RIG 4 reawrnsaone | 6a | cnpaauetstens brie omen TREVIFOUNDATIONS PHILIPPINES NUEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ‘BORED PILING WORKS DAILY STANDBY TIME - JANUARY 12, 2022 DRILLING RIG R-930 -RIG 4 = [nea [eae vous. eos Co men) ‘be casper Fy y ATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 BORED PILING WORKS DAILY STANDBY TIME - JANUARY 13, 2022 DRILLING RIG R-930 - RIG 4 oF any | ae ours fa a) a} TREVIFOUNDATIONS PHILIPPINES [NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 [BORED PILING WORKS. DAILY STANDBY TIME - JANUARY 14, 2022 DRILLING RIG R-930-RIG 4 me] sae | aman e ie te [soo - 97200 > | 17:00 - 19:00 a Prime peratonal ours = 15 Dec 2022 16:23, Standbyhours=_ © co ¥ joak revi Pdundetions inc NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 ae DRILLING RIG DAILY ACTIVITIES pee nb Of | Nightshitt | Poona 19:00 - 07:00 ine Tails Narain Desaiaton Eee | SL 1900 21:00 as CENTINE peu G eee TUMMINN Go HOLE 2x00 - 23:00 t fsb Hees saute a on Ht avo. exo Poy Mé_ STN Oy pur Spe zee eee Vater ce eum puna ou 030 | eee fie MOE Panu 7 Hee BY fie Oui Why m6 pee EEE eee evo. 0500 1 CANTIUUE™ DML & 0500 = 07.00 Printed 10 2021 13344 Field Engineer Trevi Foundations Inc DM. Const, Project tw Charge ‘Tonstniction Wan Bike eye DIM. Cons ic DM. Consin 0x NLEX Co NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 an DRILLING RIG DAILY ACTIVITIES at WAR eo a Dayshift tocation | Rig# ’ 07: 1 0 fee asi estas —[ TE] [SRS ii] e700 - os00 j a say - vat Drill 1 | xm - su0 13:00 15:00 a 1500. 17:00 £ : l oe. nen i J Printed Operational hours =__ WL 18 Dec 2021 16:23 ay Oe ee ee Field Engineer . Proj Trevi Foundations Inc. Tre Reviewed and Concurred by Project in-charge Constrvetion Manager “Site Representative DM. Consungi, Inc DM.Consuni, nc NLEX Corporation NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES bate = MeN 0D Day ey Location rs. DMCi Remarks | 19:00 ONE DUNG ‘7:06 Pm - \tbo Ym fic Spy put 10 esp Ce CML! Pitout WE NE peooMeH 7 fr] WE OMUN 6 MG 03:00 05:00 07-00 jonmue DMUING | Printed operational hours =_& sopeezoa isan aa standhyhours=_@ Prepare Pham yen conasnen ramon sic Field Engineer Prdject Project Supeffitendent Tres toendaonsing Hla Aten Do constah nc Reviewed and Concurred by ‘Project in Charge DM ‘Consiructinn Manager Site Reprecentauve ie DIM Consunji, tac NLOX Ly NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 Date BRELLING RIG DAILY ACTIVITIES 1, 2009 bs a8 Dayshitt tecstion : “p= ; : ney eae 07:00 - 19:00 DiGi Wittens | 1100 13:00 Ofeerriopier | 4 | Dowie Epon { = Hm down 1300 - 15:00 eae | > 15:00 - 17:00 a | / | » 1700-19100 | Primed 15 Dec 2024 16:23 Prepare\ by fd Enghrter ‘Trevi Foundations tne. Reviewed and Concurred by. DM, Consunji ine “Construct DM. Cons Operational hours= 4 Standby hours =_© NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 4 DRILLING RIG DAILY ACTIVITIES vate ii =| oe gee Nightshitt Location CT ai i Rig eo (pm. 19:00 - 07:60 ME ai rie iecetption ine] [Tenis] (ena 500 axco | fe pring 2 a io 2200 Dring (qratoul) |] ere 2100 - 23.00 Dwr 2300 Slody ) za00 = 0100 Vtardey of Rg: : [ aa bmo.oey By THe fz ae oL00 03:00 RETIDECE Avovt | 2 | WE NOME PROE Dy He tH Peete BR LQWEMoIT oxo = 0s:00 2 _ ji} — pe eee 05:00. 07:00 Ongping DK 2 poe pee Printed Operational ow 10 Dec 2021 1244 Standby ‘Trdvi Foundations Inc Reviewer and Concurred ty DM. Comm, nc DM Consus, NLX NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 coe RIG DAILY ACTIVITIES precy eee a Dayshift ye 07:00 - 19:00 The Acivig Rarave Desergton Te] [eens] (eons ~ sarin for gureryor to 700 ona0 | CME che ecemtncty ot |g eriction om ted eneingg 900 = 11.00 2 = Barta’ beret i OF shed eer mart 1:00 - 13:00 fad) OF Sone a 13:00 15:00 e 15:00 17:00 d v0 as | + Dui’ | Printed 15 Dec 2023 16:23, Standby hours = Operational hours =_[0. 2 ‘Trevi Foundations Inc Reviewad aif) Concurred by Projed tn Charge — DM. Consunit, ine a a ii Field Engiheer Pre iH Conaracuon Manager DM Consuni ne ‘Site Represer NLEX Corporation M* NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES Date Day vocation gt cliviy Navara tescopton [Hie] [bw Remar (90-2208) rune | « Com PRUNE seam | G5" To WM Printed Operational hows =_ 3 10 Dec2021 1344 SS Sandyyhours=_@ Reviewa) aff Concurred by Proje tn Chaige DM NL X NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES Date an Ft, soot. A Taco ————— Dayshife Location Pama, Rigé = BC TIME ‘Activity Narrative Description | lis MCI Remarks NLEX Remarks 0700 - 0x00 \ eon. x00 | \ wing #F 11:00 - 13,00 L 1700 - 19:00 = Printed: Operationateurs =_@ sae 15 Dee 2021 16:23 ° Standby hours =O Profect Superinte a Bs. Consus tn wine | NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES Dee: Non 26, sore Day Dayshift ection ; “BEGneaey————_— Rigé o TIME ‘Aativigy Nevative Decaption | rs DNCI Remar MEX Remarks 700 - 09:00 . 0.00 = 1100 - Brea pragorotton, L Stork em Woy 5 11:00 + 13400 cas tiny 4 + ve aay po 13:00. 15:00 L po —+—| 1800 - 1700 a Printed: 18 Dec 2021 16:23, ca ‘Trevi Founflations Ine Standby hours = US Ni G es i ‘TreFoundanonsine i Mi DM. Cossunyi, I Operational hours = FS DAM. Consunjt NLEK C NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RiG DAILY ACTIVITIES Day vocation mae af — smaieDean ssi00 = 2x00 |) MATING OF Cuneo Ginny EOE 21:00 - 23:00 23:00 - o1.00 pe Ty MAME COMPOST Rout The 01:00 = 03:00 ne puced PY Me | 2 DMWNY We 03:00 - 0500 SET-IN Ne oso. e700 |) PREF Tia Fm Deyn L. CASTUNE DIQUAS C Printed 10 Rec 2021 13:44 Operational hours = =|¢| Standby hours = nd pccay a Manager DM Consunis, ne oo. Ce et NLEX-SLEX CONNECTOR ROAD PROJECT ~ SECTION i DRILLING RIG DAILY ACTIVITIES = | Nightshift toatton Riga eles 2 t= i | Orta | casi Contin (220- exe) + Mo ACWIY pas — | e_NOUE_Crnguen BY The Relipeny (Gn-eos) Hrs DMCi Remarks) 2100 - 23.00 23.00 - 9100 RE 4 Peer 0109 + 93100 03:00 - 05:00 05:00 - 97:00 Printed : Operational hours =, 4 wobec 2021 13:44 Stanyhours = _ , Frofeatnhape Tips Found avs ne Dm. Constnfine DM, Consin) NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION £ DRILLING RIG DAILY ACTIVITIES Date: Ugh 2S, 09% Day: Tuecdey Dayshift Location sp TEAL aa Rig# ~R-Q3e (Omer) _ - sii Mamatne Desston J“) Tactieaea Mane 2 ue HO the ona @ erat eng are mt yet Prepared PF rig cannot Fadl ho te Ones er blodted by miters Printed 18Dec 2021 16:23, Reviewed ag Mrcurres by ‘Project charge DM. ns Pe DM. Consum. tne fy Ctra: NLEX-SLEX CONNECTOR ROAD PROJECT ~ SECTION 1 Bate Day Locatton Rig \_ tre met due DRILLING RIG DAILY ACTIVITIES 3 eben Digna iy 7 Gyn. \o- OO UNDUE TD PNPM: Nightshift TP mou OnE 21:00 mor $8 iT Mel 2voo - 23.00 Once wr fehr p_ SAS OF DMILING WG ox00 eee é we ty Ral DENG COMP VANT oe arom} NSE _ Prope by | “| 5.00 Ser- UP Lyon 7-00 Pants (Fr seT ‘Trevi Foundations Ine Operational hows = rage feGiFouand ations Inc Pal Unable to position Bast Male Re CR co) Pelee eo Le belceLaT oy IRs aces cera) Ste ee ti eRe Re eld RPP yAr) FECT E OS ASE UL em cule MY keen ene) NLEX-SLEX CONNECTOR ROAD PROJECT ~ SECTION 1 DRILLING RIG DAILY ACTIVITIES pe: Nightshift tpeaton : meee 15:00-07:00 -— Toa ara besipen [ms] (bcRemaris Renae] (90-226) soo - 2x00 | © Coma ORUMUAG HIM) Bum qo anm (ea- a8) = Ee HEREC 209 - 23:00 een ee ee 6 To seme MUM To Base. Crcfnie | (can- 07) * Pie BNE Cheanle oxo 05:00 a i Printed operattonat hours =__]} 10Dec 2021 13:44 i Standby hours= _© py Py er evi Fandavions bse NLEX-SLEX CONNECTOR ROAD PROJECT — SECTION 1 DRILLING RIG DAILY ACTIVETIES D992 Date ae 7 Rigt * 07: 19:00 ————— TIME ‘Activity Narrative Description Hrs: DMC Remarks] NLEX Remarks. 09:00 - 11:00 Drihne 7) Operational hours = 15 Dec 2021 16:23, Standby hows= N Se Project Super} et Trdvs Fourtfstions tne DM. Consunj . fe wy Project dn-Charge “Tonsiicton Manager “Site Represeniaive — DM Consunji Ine DM. Consunyi, NLEX Corporation WM . NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 4 DRILLING RIG DAILY ACTIVITIES Date: Yan-ad) P- Th Day vonckayy Location : Ce gemL Rigtt R920 (Omei) Actviey erative Description | His) [_Duci Reman L v Ope MATION EL Ore PRO L Dra bet + BSS a z . ct Printed operations hours=_Lf 18 Dec 2021 16:23 Standby hours = Tite Representaive Dit, ConSunis tne NLEX Corporation ~~ by. Project-lf-Chatge ce wction Manager t e NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES u bac ut Nightshift Cae 19:00 - 07:00 Tin “Aaivty Nevis Desaiption He] (pvt temans Pe 1900-2100 Jove To WUD tt | iHet i} DTP G DIE TR 21:00 23:00 cutin€ @ piso ee ae Te PET | aaa alte | cat unemne c betnwed — | 0100 - 0300 . G mranny creer Nab Font PSS Mi s ieee Hea fh Weseein C 03:00 = 05:00 rr ee lin “| 05:00 - 07:00 WKE ena Printed Operational hours = 10 Dee 2021 13:44 Standby hours cae Field Engineer ‘Trevi Foundations Inc DM Consunis, ne aoe DM. Consuaif, ine. Sie Representative NLEX Corporation NLoX gl) NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES Spon Date Day Dayshift Location 100-195 ne 07:00 - 19:00 TNE Aeivin Narative Description His] [bwin MEK Remarks iy spin 07:00 - 09.00 9:00. 11:00 = Drilling 11:00 = 13:00 13:00 - 15:00 1500 - a7.00 | Printed Operational hours = Standby hours=_) Kola maemo Field Engineer Trevi Foundations Ine. Reviewed and Coffurred by Projectintharge Construction Mani DAM. Consunj, Inc DM.Consuni, Ie Site Representative NLEX Corporation NLT™X 4 Working in 338 Spit of Mutual Trust and Cooperation NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES ne | Nightshire ha 19:00 - 07:00 Time ctv Nanative Description ie DuciRemars—_] | NoXRenas (9-220) 19:00 21:00 econmmue Pluie % rem _ qo i7g% | ile Qa g Rnace— a ae 21:00 - 23:00 @n- aro) 6 [eee 2 HO RIUM, Pwe | fe T> MBE campuaney 2300-0100 BY Mire Pastel ce (@n- 670) jeer oxo - 0300 | * Comme DRG Alen) gc 2S" 7 em Wins eset | oo a _| 0300 - as00 | (05%- 070) Ls * connug DRUMS ae Fram Pe aga sSerrariaaa) os00 - 700 | WING 25% Bucher Printed 10Dec 2021 12:44 Pre D Prfie TRECETTIations Inc Tyvi Foundations ine v fer NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 4 DRILLING RIG DAILY ACTIVITIES Date; rane rem Day srutony Bayshift Caestion pe en Rit: hay (ymerd ae ar TNE. | detivity Narrative Description iis) [pyiciRemaris NLEX Remarks 4 0700 - 08 7 0 \ ie oso 14:00 2 perros el > | Peewee, wma 1100 13400 or ome f 13:00 15:00 au 15:00 17:00 B | 17:00 - 19:00 = =a Printed: Operational hours« 4] oe 1s pec 2021 1623 ae sundtypowse Fo @ Poundstone Ba. conn i ‘Site Representative NLEX Corporation NLEX-SLEX CO! INNECTOR ROAD PROJECT ~ SECTION 1 RALLING RIG DAILY ACTIVITIES ae SPY 94, 202M Day vI seem Location Rig TIME, ‘Activity Narrative Description His] [7 DMcr Remarks NLEX Remarks , 1s:00 - 21:00 | \ Commit Omid Fem z Asm pam Om es eae 2100 - 23:00 1 23:00 - 01.00 1 1 Me sim by UE 0 Jocsio enue corn i 800) frye 6 vie { Pneangry bY we / Duyjue Me ox00 = 05.00 / a mae ae Caotwit OU ¢ mm oem TH Lom L Printed Operational hours ery Mey HPN d= Field Engineer Trevi Foundations Inc DM. consunj, ine soqfec 2021 13:44 Standby hours = onstruction Manager DM. Consus, tn Projet 2 rinendent DM. Consunj, Inc ‘te Representative NLEX Corp NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES Date: SOI Day Location Rig# Dayshift TINE e700 - 08:00 | Remon a4 Teton b+ 09:09 - 11:00 - Sep ee boring due Ye Teak 9 hyArwhe 1400 + 13:00 Omid Haj e Pag, memntorance\ 13:00 15:00 gZ HI 1 cul 1500-1700 |-Zeeme Rir~towring 2g ~sexbig fr sunseypr 40 100 - 19:00 | Chere the eceenticly aed | 2 E ctesabon ap chert a) Printed Operational hours =_!0 Standby hours=_@ Tren Foinistonsic. > TrenletakonsTic Lupe Projeccid Charge ‘Gonatration Manager DM. Censunft ne DM. ConsumyiInc ‘Se Rapresentaive NLEX Corporation NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES - — a _—_Aecivity Ma (i90- 3130) warnné FOL smc SUES To CHeOe [RRR Ke @aine~ 2000) Printea 10 Dee 2021 12:44 Standby hours= eG eee ee NLUX a. ee Worting in the Spur of Mutual Trust and Cooperaon NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 2 DRILLING RIG DAILY ACTIVITIES bate Jans ay, v0 a Dayshtfe pee oe Rigt 42; pase (ome) 07:00 - 19:00 ThE ‘edvity Nariative Description | irs DMCI Remarks NLEK Remarks 0700-0900 os00 = a3:00 see ae 1190-13100 four ot i I. LL geht ate Octederves 15:00 - 17.00 17:00 - 19:00 | | (Operational hours = SESnSnSsESSasais so? === nonESSEEEOSE FEEDS 18 Dec 2021 16:25, Standby hours © Printed : Reviewed and red by vied Tonstriction Ma DM. Cousin Ine = NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION L DRILLING RIG DAILY ACTIVITIES T ‘Acivity Werrative Description UNION GF SIME L Pim phhine NE 21.00 23.00 |/ Fi WE PUTIN fF Me Dea fn \eee Ft Nightshitt 19:06 - 07:00 \ 100 | | \ (Me mip Pie Te VWETIWEN CE OpmMPLIN Plt os00 |) pk nae PMDacED | hy me bau é fe 7 |euptm - Sam as.00 | / Printed 1p pec 2021 1844 ‘Projecen mat a DM. Consunyl fn NLUX A. i NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES Dae Jory 9, ooe Day Location Rig 4 Dayshift 07: 19: TNE ‘Ativicy Narative Description [lie] [~~ bhiGi Renae 07:00 - 09:00 Frpaartton cant Q towd te Rio fom fils do par 0300. 11:00 2 11:00 - 13:00 . 2 seth Ser te | soe trae wat |! 1700 y 9 Printed operational hours =_@ 15 Dec 2021 1623 Standby hours = 4 Reviewed ang/ogred by ite P DM. Consunit ine DAM. Consinyt tae NLEX Corporation earn Charge Cansircion Manager = “SweRepresentive NLEX n NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES pees ata _____ Nightshift fonts + ee a tee ee LE [ Acti arate gen is Duel Remarks NEN Remaris ePins- Arta puparatin For fig e peerng 2 1900 - 2100 |» pag. cahner detnctieg fa OPI dra prepacation | 21:00 23:00 ad CP NE- Contre Astancliey L- Ai 9 He aca eee ern fg alee ; 23:00 01:00 WD Haw Citppeet FA ceunce saserding CP it fig Steud by Hue» — eal” 0x00 + 0800 ‘2 dee Citroen Pie Cehwwe L CPE hip Wag ty da 0300 = 0500 bein PCG ten CPB Gritince Aatorcieg Pit Hig Ba’, m \ ca '- pe ovens Civ 05:00 - 07:00 duailable par criling 7 °K. Gordnvd. dearding Printed Operational hours=_ 5 10 Dee 2021 1244 SEE Standby hours =_ @G D.M. Consunjifip Reviewe be Projengin charge Tonstraction Manager NLU XK § NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 2 DRILLENG RIG DAILY ACTIVITIES by Seog eee Dayshife lone Rig 2: These [oon 07:00- 19:00 Tt | aan is] (nines Wtinads 0700-0900 i 09100 = 11:00 PregaraAve~ er | | dicmarttyy of ~~] 1100 13:00, me 4 1300-1800 ‘ 1800-1700 ot 1700-1900 ) 1 Operational heurs=_G Standby hows=_D. Construelion Manager iM. Consunys tne Day Lacabon ig Aaiviy Ranaiye bean is Brpormhon — anct Yiobalizahor 1090-2400 a ef Bary ay fo er boo amon Aerial ere t Pec ee pee CEE Eee eee) Ee eee eee eee eee eee z200 04:00 | | ausimay of ox0e + 9300 : 5 105 08:00 galing 9 oad = oso 0500 = o70 Printed: ‘peratiewal hours=_ 10 pee 2021 13: Standby hours = oss Cbs: NLEX-SLEX CONNECTOR ROAD PROJECT ~ SECTION 1 SPRELEING. RIG DAILY ACTIVITIES Date Jar BD, env Day Location : Ret: THE - ‘Activity Narrative Description iis ‘DMcIRemarks | [—NLEX Remarks 0790-0900 09:00 11:00 ‘1 Dring \ 1190 = 1300 1300-1500 L L Printed Operational hours = I 15 Dec 2021 16:23, standby hous=_Q ou ‘Trew Foundations in rb Fochdotons tn DM Coasunse Field Enginéer Project Supeh Reviewed and feigurred by ca) Projectin-dharge Construction M ‘Site Representative DM. Consunjt ne DM. Consunji.tnc NLEX Corporation a. NILEX-SLEX CONNECTOR ROAD PROJECT - SECTION 4 DRILLING RIG DAILY ACTIVITIES Nightshift D2" (2200-0508) ado = 23:00 WHINE FOr Cooimenty D Ses Punt TO SIRE RE CORAM zsu0 - oso | (opr awe) * PVs BASE CANIN | (Ga-07Ww) | 0100 - 03:00 © ANAL DRSANINIE 03.00 - 05.00 SSeS cere eee eee eee eee = | ceases osuo = 0700 Printed Operational ours =_ YY 10 bec 2021 12:44 Standby hours=_O Tonsiriclios Branager Location Rigi 19:00 eee NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES hein ie] (Cas (9% -2200) aie fe cantiane ortune Hum | 2 a7 ism Nightsbitt | a0 4 23:00 Brg se 2 Me 9G TUE Te & Me Come ANN a oer PRCENT omas om 2500. 01:00 UE DRUG Fam | ton 70 _ o100 - 030 oxo - 08:00 05:00 07:00 Princes 20 Dee 2021 13:44 Noted Fai? & n NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES bas 3 Aansig eva ____ Dayshist Leestion | Peay torn: Se 07:00 - 15:00 TE. ‘Aelivity Narrative Description fics | ("DiiciRemaris NLEX Remarks: eDescript a e709 - 9900 ‘ on = 1400 Welting Be Lee 1 Prot tp | 1 tx0e = 13.00 be cubed xe trot dee sunt | 1300. as00 on PAHEK con | be ed bo. db L_ ! 1500 - 17.00 Pepa 1700-19900 Printed Operational hears =, 15 .Dec 2021, 16:23 Standby hours= ©. ons Ine NEEX Pecos NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 PEILtInG RIG DAILY ACTIVITIES bed 1 BU Dayshift roca ra 19:00 Te, ‘Aclivigy Narrative Description lis DMCI Remarks ‘NUEX Remarks 00 - 09:00 Fe Vo->paratontt 0900 11:00 due axrnpe Qwin wich uncoRe ue. 1100 13:00 - Peplccenes} * svirewpe 3300 - 15:00 4500 - 17:00 a) x90 1900 | 22 Operon ort keene Drilig Printed (Operational hours = 15 Dec 2021 16:23, Standby houws= _ 2 Field Engineer Project Syptrinfendent ‘Trevi Foundations tne ‘Toaff Foundations tne aa Copsunyfne. In Construction Manager DAM. Constnj, Inc DM, Consunj tne NL Cees NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 a DRILLING RIG DAILY ACTEVITIES o Date: 1, eae Dayshife Location 14a. 00 - Rig 07:00 - 19:00 TE Tati Nanatie Desciion Hs Tekin 0700 = os00 otc ) Drie 1:00 - 13:00 13:00 17:00 Printed: 18 Dec 2021 16:28, Field Engineer Fr @ ‘Trevi Foundations tne TrdFFoundations in. Construction Manager Dias Corsini tne NLEX-SLEX CONNECTOR ROAD PROJECT - § DRILLING RIG DAILY ACTIVITIES cate: _ Of 17-2022. Location Rig Nightshift 19:00-07:00 | 0800 = 07:00 Printed Gyerational hours =_O Gee 2028 13:40 2 Standby hours = oe NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES :); Aeity Ne ia COHUME AMD! E 7K09 Te 9 D600 ty Wty zie = 23.00 TDI pus Mr 23:00 01:00 REVNPEMCE om flan UT _ PAE NOSE proalibg BY ME PEMA ee 04:00 = 03:00 05:00 ov00 | COTHOE DAWLING Den Oe Oe Printed ‘Operational hours =_ 10 Dec 2021 12:44 Standby hours Prepared i Noted by BM. csp ine RNLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACFIVITIES seater Day Location» “paysqi Saag ee Rige Re Way | Activity NarmativeDescription | firs] [—oNciRemaris _] {__NLEX Remarks 0700-0900 ee siting L al LH 4 0900-1100 spely L uo - no) Voge 7 L 13:00 - 15:00 L 1500. 700] | “Aimy for Septly J ~ 7 17:00 + 19:00 - Printed: Operstionst hours» 4 Bee ere eee re eee 15 Dac 2021 1625 sanyo» BO aj Fe Project Superintendent iat TreWrbundstions In. DM. Consuny.ine NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES Date Neo Dove Day Location: [Petan” ge die WRU) STE J “Ravi Nerve Deseraton tis baci nenars | [WN Repals 0700-0500 sor. xx00 | \ Mathing Fe sony Venton. wl ing 1300 = 13.00 13:00 15.00 Seteuy of cbrygor t 4 welding on cast ee — “}- 1 1500 - 37.00 L Centihwe Ming doa gm 17:00 19:00, 2 Frinted Operational hourse_ 15 Dee 2021 16:23 Standby hows= _O Prepared by: \ Hated by; Frofee Project Superinta “Tag Fovnstons lve, BAM, Consungin NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 a DRILLING RIG DAILY ACTIVITIES 28. Date Day fo Daysh Location nee 07:00 - 19:00 (hve [Activity Narrative Description Tis] [—pNGrRenais —] [7 Nex Remaris oro 0800} Brita) sao - io | BOs Flr cleaving suc - 1300 | Bare Pile cleaning 13:00 15:00 Rig mantenanee \ = Replocement_ op aliig For at 1500 - 1700 rociotor VPepTel_ eye x00 1500 [evel oF Fo Fo PHA to Pre Printed Operational hours =, 15 Dec 2021 16:23 Standby hours= _@ 7 Proj « ~ Tre Oihtiations inc Day Lecation +: NLEX-SLEX CONNECTOR ROAD PR RIG DAILY ACTIVITIES DRILL GYECT - SECTION 1 Highssieift 00 = “Activity Narrative Description ((@m-2200) sTHASFO a pu |__ Tod R mare is. Se WAIN Fatt SURE 1 To Op re ele NUE vane 2 ANiDo OF SUNY PEE | @m- Or) 0100 | HOUT UE tO Printed 10 Dee 2021 15:48 “poems NLEX-SLEX CONN! ‘OR ROAD PROJECT = SECTION b Pe inausnit RIG DAILY ACTIVITIES Nightshift Dave Day Location Rig 30 Sa, eau @ 82D" 9: eM 23:00 nf | Me Wd ONE _T MALU YN CamPuRiT O10 03:00 Apt THE nus prepuce Py Te DMUNG [Ue 0300 05:00 500 07.00 DMILID & Operational hours=__2 Milas Standby hours = Field Fngineer ‘Trevi Foitntations tne NL. x wn 7 NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES Date jon: \s, ree Day Lecstion : “p= Rigi =93e SL ET | | 0700-0900 1 ee st deovivg of ~~ Tenet sero a aa osso san | J Pee fr etme fa eee) ee See ee 4H oon travel oF noo - 1300 | Jig ea Pee Bet lex (ew cere uy oe MG Iseceye ep Loyingy 1500-1500 \ 1g doh fe He % and =ariving ay et jst easing 1500 = 17:00 ae yan. 1900 | batting Fe Surveyor L Primed 18 Dec 2021 16:23, Prepared by: Operational hours = 84D NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1. DRILLING RIG DAILY ACTIVITIES par: Shy Hoe Nightshift | ioe “ai Rig # — [19:00 - 07:00, ane ai anatvedescapton His] [conGiRenads 7] Cees) roo avap [\ CONTE DIALING Fu) 27M VOM To poe som, no - noo f (70m gpa) — |e | 2x00» oxo | | Me SPAY Due Te Q _\eaiomy odin apwr feed || et aeeteE r now PM miley 6Y r | 0100 = 93:00 Are prin 6 Mb |Z lo pm - 6m) |__| a woe cae || BO RTL PLE DAGE ClEWINe | fee oso = 0700) ey ene £ TMT ee PETAWOW Printed ORee 2021 1344 Operation hours=_S standby hows = 6S ae ee Prepared 67 Noted by < CAGE, iv Ae howe eee eee eee Field Enginesr yee rofecrSwperbadenw Tre Foundations Ine . Dm. consy. i ProjecvIn DM cow NLEX-SLEX CONNEC Bate Day Bige ‘OR ROAD PROJECT ~ SECTION 1 JING RIG DAILY ACTIVITIES eT Dh RPBURDIE ite ppb « EYL Ay pe A e100 - o300 | a MK Yer paepeniere PoEECCLeEEE thie 1) Renn? ate THE” MER RL OE PRE LEA Prtnted operat 20 ee 2021 18:88 Standby hours = = & ae Hons tn Prepared b CARYN ‘ew Es NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES be Ep ae — : ea tees —— ee TNE Aseaeneneiaas Ti] Fauci] [aaa] 0700 - 0800 Combrue Pre-bonoe 0900 - 11:00 Ee 00-1300 \ 13:00 15:00 Psion ae Gael canny anc Ee 17.00 ante 1700-1900 Printed Operational hours = 15 Dec 2021 16:23 Standby hours = Field edgier ‘Trevi Foundations tne Reviewefland Foncurred by Projectin-chd DAM. Consunj Construction Manager ‘Site Represen DM, Consunj, inc NLEX Corporation NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES Mate: Yin Gy tet i a Dayshift a THe AF Lewin Big aca Rie a ee warn, fox Dur Contract Piece Fim IY 70 BL 2m. thf, RO Him. SOI. BUC eT. CM vstey wae) Compu PRU poy POD foo - eso [PRL7M 7D tor Ub 2K Dirm Soe Buller C50 Vek | Conte Dien PRN use - 1900 PSM 2 Rom Csi. BR Dine UB Prine Operational hours= If 48 ec 2021 16:28 ‘Standby hows=_O sodations Inc 4 fig Mgewrres vy D.M. Consus. tne NLEX Corporation NLEX-SLEX Date Ol 06-2022 Day 7 ony Locatton Rigt xn i+] ONNECTOR ROAD PROJECT - SEC DRILLING RIG DAILY ACTIVITIES NE | Nightshift 19:00 - 07:00 21-00 23:00 + COmr. PRE-gEOA roam | (Bat e506) 23:00 01:00 2 Ne PUA Rue TO | ox00 NOSE Comfunnd SY THE peepee 03:00 — Soe pee | | x00 s:00 | 0s00 = 07:00 Printes 10 Dee 2021 12:44 Operational how Standby hours NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES ; [eonces ba le 002 Nightshift lotion : “PF Rigt 2 19:00 07: :00 Caer 1900 - 21:00 , pimon °F YE ‘Redivity Narrative Deseripiion its es | (“RE Rename ru00 2300) AG STmoey we JO Prin em DAN)? at it onic ice pn Bf 2 26 Mewes Camila hr? 2200 - 0100) wamace? ay MEME Ae Tre pase ou00 - 03:00 ee 7 osu - 05:00 Mo 05:00 - 07:00 | pus aed team Printed. 10 Dec 2021 13:44 Prepared wee Wax Operational hours = standby hours=_7 Field Engineer ‘Trevi Foundations ine Trevi Foundations In. DM. Consunji Ine Reviewed and Concurred by ‘Project in Charge DM Consunjs. tne Construction Manager DAM Consbany ba NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES Date ©, op ; by: Siac Dayshift ee ee 07:00 - 19:00 Ripe ee LC Teg Rana Deaepton Cities Cote] o700 0900 ~ Rig ut-oparchenaa) ovo = 100] \ Que to viernpe of Tati Sanchar Jp uce becowee 11000. 13:00 Srond , need to lace anc ongpi ie grag |__| op refocencrt 300° 1500 1500 17:00 v 1100-1900 Printed Operational hous = 15 Dec 2021 16:23, Standby hours Field Endincer Trevi Foundations Inc Project. Charge DM. Consunyt Ine Tonsiracion Manager Site Represent NLEX Corpora DM. Constni, Inc NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 oy LING RIG DAILY ACTIVITIES Date Jowory : bay svete rgehag Dayshift tae | ee 07:00 - 19:00 TNE “iy Nawatve Dexpton is] [oN Ronans Mienans Unable to reame cin man 00 \ “Que to 9. apne, Dngoig For reporr. 0900-1200 1100-1300 1300 = 15:00 ; ~ Ream Onlng, 1500 - 17:00 w00 ~ 19:00 - | [| Printed Operational hours= 18 Dee 2021 16:23 Trevi Foundations Inc Reviewed an ed by Ryu Projectln-Charge Construction Manager DM. Consun Ine DM. Coasanji Inc NETX JY. NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 DRILLING RIG DAILY ACTIVITIES Dae: _Ol-9- 2022 i Day Location oo Rig 4 a TINE “Ti Narrative Description —_ iis MCI Remarks (Ci700— 2}00) 19:00 - 21-00 com. DRULINS FEM | 7 2LAM Yo 22.4% (2\@ - 2200) 21:00 23:00 + DECANTING Ts £ | | COMENONS ~ PLEPAR ANAS a TTT PIU BAgE coERmNG | ——| ae ——— 23:00 oreo | (2200-0500) c © WAIN Fon Seormeng! — Testes tae — nell sve - ue) ox00 0200 T PILE bare ale | @weowy || es eee eee 0200 05:00 + pesanone soning 0500. 07.00 Printed Operational howrs= IY 10 Der 2021 13:44 Tif Foundations ine Proi in- Sarge Standby hours = “aby NL™X n NLEX-SLEX CONNECTOR ROAD PROJECT ~ SECTION 1 DRILLING RIG DAILY ACTIVITIES. Date WMS BE, 2682 pa Bera Nightshift Location H Riga aE NE ‘fain Narine Descipuon [Tis DNC Remarks Mie Remars penn € Soy Hal Kn € aM 19:00 2x00 | QMMNUE PMLING Fan Wm oon Th lekn 21.00 23:00 | WUC SPriPhf one 7d a REY OEP CE Conr CHT po 23:00 0100 | BAT WE NOE zZ eee Penuen BY WE NE a | 01:00 = 03:00 " @ 7 SsIsSEAS serene || /SUPeRRONSOOSRSSEGEE 0300 - 05.00 Zz Cnc Bulut © paar 500-0700 | ppm pun 7 Ila Printed LO Dec 2021 13644 ‘onthe ek folndations ine Field Engineer Trevi Foundations Ine " Projed in Charge DM. Consun, tne Paeite eee ae a DM. Const, inc

You might also like