Lorry Crane 01.04.2024
Lorry Crane 01.04.2024
Lorry Crane 01.04.2024
LP Reference No. GBWFJV 2024 - 01 Start Date - Expiry Date 30/03/2024 – 29/04/2024
IMPORTANT:
Lifting Plan (LP) shall be submitted to GBWFJV CR111 Lifting Engineer for review at least 24 HOURS IN ADVANCE.
Method of Statement Title: MOS No. ________________________
Temporary Traffic Arrangements / Lane Closure required? YES NO TCP No. ________________________
For all USED Materials, Machineries or Equipment as LOAD to be lifted to substances resided in them (such as oil, residue, etc.).
Without a written consent by GBWFJV CR111 Lifting Engineer, and approval by GBWFJV CR111 Management, deviation of LP (from the
Approved one) is strictly NOT ALLOWED
Tick (√)
No. Checklist Remarks by GBWFJV LE
YES NO N.A.
Have the Approved Crane Contractor and the Contractor managing the lift
01
been determined? √
Have all clear copies of LM Cert, LG/LA Certs, Load Chart, Insurance Cert and
02
latest Service Record been attached? √
Are there adequate numbers of manpower resources to carry out the Lifting
03
Op comfortably and without undue pressure? √
Have all clear copies of the Involved Personnel relevant certificates, LOAs
04
and/or Undertaking Letter been attached? √
Has the Mean of Communication for the Lifting Op been determined and
05
agreed by all Involved Personnel? √
Have the details of Ground Bearing Capacity been indicated, and the COS been
06
attached? √
Have the required Manufacturer’s Design or PE’s Design with COS of the Load’s
07
Lifting Lug(s) been attached? √
Have the description of each Load to be lifted been indicated, and the Safety
08
Factor of the LM been calculated? √
Have the Rigging Method(s) been specifically shown, and the details of
09
measurements been indicated? √
Have all the LG/LA to be used been determined, and all clear copies of their
10
valid certificates been attached? √
Acknowledged by CM/DPM/PM
Rev_01 1
CR111- Design & Construction of Defu Station & Tunnels
B – Details of Lifting Machine (LM) – Attach clear copies of LM Certificate / Load Chart / Insurance Certificate / Latest Service Report.
Length as stated in LM Cert (J) – N.A. Radius (Main Hook / Aux H) (AH) –
Weight / SWL of MAIN HOOK (WT)_________/________(SWL) Total Counterweights to be
C – Details of Involved Personnel – Attach clear copies of all relevant certificates / proof of competencies.
D – Means of Communication – To be determined and agreed by all Involved Personnel for the lifting operations.
Rev_01
2
CR111- Design & Construction of Defu Station & Tunnels
Front 7.8m
Outrigger Dimension Outrigger Pressure (OP) 3.62T
Back 5.72m
Area of Base Plate / Crane Mats 1M X 1M Force= OP x Gravity 35.5KN
ESS LOCATION
3
Rev_01
CR111- Design & Construction of Defu Station & Tunnels
Max. Weight Weight Weight of Total Max. Max. Safe Corresponding Crane Safety
SWL of of Load of Hook Lifting Weight Boom Radius (m) SWL Capacity Factor
LM Block Gear Length Load Usage
(m) Chart
9500Kg 1000Kg 50Kg 20Kg 1070Kg 16.55m 16.55m 1645Kg 65.05% 1.537
Rev_01 4
CR111- Design & Construction of Defu Station & Tunnels
Max. Weight Weight Weight of Total Max. Max. Safe Corresponding Crane Safety
SWL of of Load of Hook Lifting Weight Boom Radius (m) SWL Capacity Factor
LM Block Gear Length Load Usage
(m) Chart
9500Kg 1000Kg 50Kg 20Kg 1070Kg 16.55m 16.55m 1645Kg 65.05% 1.537
Rev_01 5
CR111- Design & Construction of Defu Station & Tunnels
Max. Weight Weight Weight of Total Max. Max. Safe Corresponding Crane Safety
SWL of of Load of Hook Lifting Weight Boom Radius (m) SWL Capacity Factor
LM Block Gear Length Load Usage
(m) Chart
9500Kg 1000Kg 50Kg 20Kg 1070Kg 16.55m 16.55m 1645Kg 65.05% 1.537
Rev_01 6
CR111- Design & Construction of Defu Station & Tunnels
S/No. Description of LG (Example: 3M – Chain Sling) SWL (Kg) LG No. Date of Inspection Owner
20
Rev_01 7
CR111- Design & Construction of Defu Station & Tunnels
S/No. Description of Material Size of Material Max. Weight of Material Safety Factor
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
8
Rev_01