Professional Documents
Culture Documents
Key Performance
Key Performance
4 Effective control of Overtime. Within the fixed norm at each site 7.5
8 Avaliability of Equipment
Control damage of equipment and
machinary,material wastage.Recovery from
9 Cost Control UG.
10 Utilisation of Equipment
Total Weightage:-
nes)
MOCHIA MINES
35
10
7.5
7.5
7.5
7.5
7.5
7.5
100
S. K. Khetan Infraprojects Pvt. Ltd. ( Zawar Mines)
· KEY PERFORMANCE AREA OF SECTION INCHARES OF BALARIA AND MOCHIA MINES
· (Please quantify the Task and Targets wherever possible)
o TASK AND TARGETS
Name:__________________________Reporting manager________________
S.No. Assignd tasks/targets Criteria of measurement
35
10
7.5
7.5
7.5
7.5
7.5
7.5
100
S. K. Khetan Infraprojects Pvt. Ltd. ( Zawar Mines)
· KEY PERFORMANCE AREA OF SECTION INCHARES OF BALARIA AND MOCHIA MINES
· (Please quantify the Task and Targets wherever possible)
o TASK AND TARGETS
Name:__________________________Reporting manager________________
S.No. Assignd tasks/targets Criteria of measurement
10 Pull= 3.6m/blast=95%
Total Weightage:-
nes)
MOCHIA MINES
35
10
7.5
7.5
7.5
7.5
7.5
7.5
100