DNG1-CV-UAW-DTL-ENG-50003 Cut and Fill Cross Section Detail - Rev.A-Sheet2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

LEGEND

GALIAN KABEL
A PIPA CONDENSAT A

PIPA STEAM
PIPE SUPPORT
0+000 Station

LOKASI STEAM TRAP

STEAM TRAP
B B

CDP PUMP

INDEX
HCE-10A

10"
10"

10"

10"
16"

10"

8"
10"

16"

10"
8"

10"

10"
24"
8"
10" 10"

10"
24"
10"
24"

A
LOCATION
PAD 33

C C

2+800.00
2+775
29-AC-01 KOLAM
(EXISTING)
AIR COMPRESSOR
SHELTER

SEPARATOR
29-T-01
ACID
TANK
SHELTER SHELTER

(FUTURE)
29-MP-01A/B/C
ACID FOR:
PUMPS
29-MP-02A/B
SEAL
KOLAM WATER
(EXISTING) PUMPS

V-180
MH
PUMPS
BRINE
29-T-02 EXISTING
SEAL
WATER

TANK
MCC

ROOM
W-180

S-180
HCE-029 POWER

DN
UP
HOUSE
EXISTING

W-181
29-MP-03
SUMERSIBLE

PUMP

T
S-181
UP GRADE
EL.

DN
T

HCE-029A
(+)

FENCE
1920.600

GUARD
= (+) HOUSE
0,00

PIPING

PAD
OPEN PIPELINE

29
DITCH

FENCE

(EXISTING)
KOLAM

(EXISTING)
KOLAM

PAD 29

.00
2+7
A

5
D PAD 7
D

0.00
2+7

2+86
2+825.00
2
5.00
2+625.00

4.22
2+675.00
2+650.00

2+700.00

PT GEO DIPA
ENERGI

APPROVED
APPROVED WITH NOTE
NOT APPROVED
REVIEWED BY APPROVED BY

E E

NAMA : NAMA : NAMA :

DATE : DATE : DATE :

PT. KH / PT. GDE PT. GEO DIPA ENERGI


Material Area
Name (m²)
Ground DRAWING NO REV TITLE
0.36
261 200 200 Removed REFERENCE DRAWINGS

Ground
0.00
Fill
F Jalan F
0 ISSUED FOR APPROVAL

DRW CHK'D APP'D CHK'D APP'D


REV. DATE DESCRIPTION
KONTRAKTOR PT. KH/PT. GDE

ISSUED FOR APPROVAL

CLIENT

CONSULTANT

G
POTONGAN A-A G
SKALA : 1:150 CONTRAKTOR KSO

PROJECT Pengadaan Pekerjaan EPC


(Engineering, Procurement, and Contruction)
Tie In Sumur HCE 10 A Dieng
TITLE

CUT & FILL CROSS SECTION DETAIL

SCALE JOB NO.


V = 1 : 800
H A3 H
H = 1 : 800
DRAWING NO REV. STATUS

DNG1-CV-UAW-DTL-ENG-50003 1 OF 12 IFA