Supply, Delivery, Installation, Testing and Commissioning of Water Distribution System and Renovation of Comfort Rooms at PTB and

Communal Toilet

Item Quantity Unit Description Unit Price Amount CONVERTED TO


1 10 cu.m Sand 1,320.00 13,200.00
2 10 cu.m Gravel 1,920.00 19,200.00
3 45 bags Cement 264.00 11,880.00 Canopy and fence around water
4 20 pcs Hardieflex 6mm 759.00 15,180.00 tank area at PTB and Communal
5 30 pcs Metal furring 4mm 135.00 4,050.00 toilet. (Pls. specify the materials
6 30 pcs Carrying channel 125.00 3,750.00 and labor amount that has been
7 5 pc Tile adhesive 25kg 285.00 1,425.00 used to compensate the said
8 30 pc Liquid nails 350g 350.00 10,500.00 materials in the approved boq)
9 20 box Blind rivets 450.00 9,000.00
Sub-total 88,185.00
Ceramic Drop-in Bathroom Sink
10 5 unit 6,000.00 30,000.00
(Premium quality) at Pre-departure 3 Water Closet at PTB
Sub-total 30,000.00
11 2 unit Urinal Flush Valve 5,400.00 10,800.00
PVC Door complete w/ Jamb Premium 1 Water closet at Communal CR
6,600.00 6,600.00
12 1 unit Quality (for VIP CR)
Sub-total 17,400.00
TOTAL AMOUNT 135,585.00