4 SCHEDULE OF BUILDING CONDITION ON BARIS


BARIS
No LEVEL AREA/ ELEMENT/ DEFECT
. LOCATION COMPONENT Condition Priority Matrix Defect
assesment assesment (b) analysis (c) Sheet No./
(a) Indication Code
1 G Wall Vertical cracks 3 2 6 G-01
2 G Wall Vertical cracks 3 2 6 G-02
3 G Wall Horizontol cracks 2 3 6 G-03
4 G Ceiling Dampness on concrete ceiling 3 3 9 G-04
5 G Ceiling Peeling paint 3 1 3 G-05
6 G Ceiling Peeling paint 2 3 6 G-06
7 G Floor Crack on concrete slab-crazing crack 3 1 3 G-07
8 G Door The door rubber sealing is torn off 2 2 4 G-08
9 G Door Broken office door handle 3 2 6 G-09
10 G Door Crack on the glass door 3 3 9 G-10
11 G Ceiling Peeling paint and dampness 3 4 12 G-11
12 G Ceiling Chipping concrete ceilling 2 2 4 G-12
13 G Ceiling Spalling concrete on ceiling 3 3 9 G-13
14 G Floor concrete slab Popout concrete on the floor 3 2 6 G-14
15 G Wall Peeling paint 3 3 9 G-15
16 G Wall Chipped wall 3 3 9 G-16
17 G Ceiling Peeling paint and uneven surface on 4 4 16 G-17
ceiling concrete
18 G Ceiling Spalling concrete on ceiling concrete 4 4 16 G-18
19 G Wall Crack 4 4 16 G-19
20 G Ceiling Spalling concrete on concrete ceiling 3 4 12 G-20
21 G External Signboard Signboard faded 4 3 12 E-01
building
22 G Entrance Grill Rusty and peeling paint 2 2 4 E-02
23 G Ceiling Peeling paint and uneven surface on 3 3 6 G-21
ceiling concrete
24 G Pipe Leaking plumbing 4 4 16 G-22
Total marks(d) 205
Number of defects (e) Number of defects (e) 24
Total Score (d/e)
8.5
Overall Building Rating
FAIR
Staionery & Print Shop- Perniagaan Haneemas
Vg-11, Jalan Plumbum V 7/V, Seksyen 7, 40000 Shah Alam
Selangor
40000
Syed Abu Tahir bin Abu Kadir

18/4/2024 5 /5/2024

Asyirah
NUR ASYIRAH BINTI SHARIDAN
021210-04-0178
0155
SRIBUMI Surveying Sdn. Bhd.

You might also like