Professional Documents
Culture Documents
Hammer Rental Checklists v080414
Hammer Rental Checklists v080414
Hammer Inspection * Customer is responsible for all wear components and charges incurred due to damage.
Time: 30 min.
Tool must be removed for inspection
Tool Information:
Super
Wear Components Moil Chisel Blunt
Good Worn or Damaged Blunt
Housing / side plates:
Munting Bracket / Bolts Remove Tool and measure from top to tip.
Machine Testing
Note:
For Non-Cat Machines with hammers H45 - H100, Flow @ Pressure Test (with Flow Meter) MUST be completed.
Additional Comments:
Circle One
Attendant Signature: Outgoing Return
04-14-08 GL
H115s – H180DS
Hammer Inspection * Customer is responsible for all wear components and charges incurred due to damage.
Time: 30 min.
Tool must be removed for inspection
Tool Information:
Super
Wear Components Moil Chisel Blunt
Good Worn or Damaged Blunt
Housing / side plates:
Munting Bracket / Bolts Remove Tool and measure from top to tip.
Machine Testing
Time: 1 hr.
Note:
* Excavators' Auxilary Circuit MUST be tested with flow meter at least every 12 months!
Aux. Line Relief Setting: ______psi
Flow @ Hammer Operating Pressure: ____Gpm _____psi
Oil Temperature (During Test) ____°F
Back Pressure ______psi
Hammer Operating Pressure (At ball valve, hammer running) ______psi
Additional Comments:
Circle One
Attendant Signature: Outgoing Return
04-14-08 GL