ZNM-ALE-MSB-
Submittal Ref: Rev.00
Discipline: AR CV DR EL FC FL HS ME PH ST AR-FI-000787
Cross reference
Element: Chemical Anchor Bolts Date: 01-03-2024
Material Hilti Chemical Anchor Bolts Manufacturer M/s. Hilti
List of Submitted Items:
Item Description No of Copies Remarks
Material Submittal for Chemical Anchor Bolts (HILTI)
for Cubicle Partition
Material Details:
01 Hilti HIT-HY 200-R V3 Injection Mortar Soft Copy only
Threaded Rod TRS
Manufacturer / Supplier: M/s Hilti / M/s Venesta Middle
East FZE
Ref. Spec (s): 050523 Ref. Drwg (s): Refer to the attached drawing
Compliance Statement:
The Contractor hereby confirms that the submitted items have been reviewed in detail and are correct and in strict
conformance with the Contract Documents. (compliance statement attached)
Initiator / ALEC Sustainability / STJV QA/QC Manager / STJV Technical Director / STJV
REVIEWER’S COMMENTS
Sustainability-No comments
Deena 06/March/2024
Name & Signature: Date:
Note: The CSC/PMC approval shall not in any way relieve the Contractor of his obligation under the Contract. The Contractor
shall be solely responsible for the soundness and the correctness of the submitted Materials and Documents as per the
required Contract Conditions and Contract Clauses
Codes: A: Approved B: Approved with comments C: Revise & Resubmit D: Rejected E: For Information only
Page 1 of 1
Zayed National Museum Abu Dhabi, U.A.E.
Material List
Material Code "SPECS" Material Material Material Manufacturer /
SL.No Specs Detail/DWG Material Description Spec. Section Area of used Product / Finish
Reference Description Type Classification Supplier
Toilet –
Threaded Threaded
2 Threaded Rod Threaded Rod TRS 050523 Fixation Cubicle Hilti
Rod TRS Rod
Partition
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS
2. COMPLIANCE STATEMENT
OBSERVATION COMMENTS SHEET (OCS)
Zayed National Museum
D. Use fixings that are suitable for their intended purpose and
45 050523 Complied
adequate to comply with the requirements stated in the Specification.
G. Use fixings that are suitable for their intended purpose and
48 050523 Complied
adequate to comply with the requirements stated in the Specification.
55 050523 2. Tools shall be to BS 4078: Part 2 and Kite mark certified. Complied
64 050523 F. Masonry Nails: Do not use without acceptance by the Engineer. Complied
72 050523 C. Welding shall not be permitted, unless accepted by the Engineer. N/A
4. Countersink screw heads not less than 2mm below timber surfaces
89 050523 Complied
that will be visible in the completed work, unless specified otherwise.
END OF SECTION
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS
3. CATALOGUE / BROCHURE /
MATERIAL DATA SHEET
Dear Sir,
We would like to outline the support available to you from HILTI on your project. As well as offering top
quality product solutions, HILTI also offers to you the following service solutions that as a package are
unique in the market:
Technical seminars
We offer technical seminars regarding Hilti engineered products free of charge, covering various topics ranging from
the principles behind these products to the most commonly used international norms and standards.
Material estimation
Material estimations for all firestopping applications at site, can be provided free of charge. Ensuring the most cost-
effective, tested and approved system, based on the firestop estimation form filled by you.
Leed Documentation
Request for LEED documentation for all Hilti products through your Hilti representative or download them online,
anytime.
AT YOUR FINGERTIPS. Order, manage your inventory, check shipping status and more.
Hilti website: www.hilti.ae
Product Information
Hilti‘s website is available for around the clock advice and information, including an online catalogue of products,
Firestop and Anchor Design Centers, plus a technical library and details of your local Hilti Center.
Technical Information
Access relevant technical information such as safety data sheets, approvals and specifications for Hilti products.
Download the latest Hilti PROFIS Design Software and BIM/CAD objects for planners, specifiers and engineers as
well as latest specification texts, free of charge.
Product offers
View Hilti Center product packages and purchase exclusive online* offers featured in the products section page.
Store locator
Browse through our website for contact information and location of our stores within the region.
Training
To ensure you profit from Hilti’s vast experience, we organize training on any current topic concerning Hilti products
and services. These events are organized throughout the country. For details of dates and locations ask your local
Hilti representative.
Specific courses
- HIT rebar training
- Firestop training
- Product-specific competence training
- DX training
- Diamond coring and sawing training
- Health and safety workshops
- Technical software training (PROFIS)
Yours Sincerely,
Hilti Engineering Department
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS
This is a multi-site certificate, additional site is/are listed on the next page/s
Bureau Veritas Certification certify that the Management System of the above organisation has
been audited and found to be in accordance with the requirements of the management system
standards detailed below
ISO 9001:2015
Scope of Certification
002 – CB - QMS
Signed on behalf of Bureau Veritas – Dubai Br.
Local office: Bureau Veritas – Dubai Br, 2nd Floor, Block C, Al Hudaiba Awards Building, Jumeirah
Road with 2nd December Interchange, Dubai, U.A.E.
Further clarifications regarding the scope and validity of this certificate, and the applicability of the
management system requirements, please call: 00971 4 3074400.
88 Mar-2019
1/2
HILTI EMIRATES L.L.C
DUBAI INVESTMENT PARK, DUBAI, P.O. BOX 11051, DUBAI, UNITED ARAB EMIRATES
Bureau Veritas Certification certify that the Management System of the above organisation has
been audited and found to be in accordance with the requirements of the management system
standards detailed below
ISO 9001:2015
Scope of Certification
002 – CB - QMS
Signed on behalf of Bureau Veritas – Dubai Br.
Local office: Bureau Veritas – Dubai Br, 2nd Floor, Block C, Al Hudaiba Awards Building, Jumeirah
Road with 2nd December Interchange, Dubai, U.A.E.
Further clarifications regarding the scope and validity of this certificate, and the applicability of the
management system requirements, please call: 00971 4 3074400.
Mar-2019 89
1/1
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS
5. RELATED B.O.Q
PART 1 GENERAL 1
1.1 SUMMARY 1
1.2 SUBMITTALS 1
1.4 SUSTAINABILITY 1
1.6 WARRANTIES 2
PART 2 PRODUCTS 2
2.2 MATERIALS 2
PART 3 EXECUTION 3
3.1 EXAMINATION 3
3.2 INSTALLATION 3
PART 1 GENERAL
1.1 SUMMARY
A. General: Read this Section in conjunction with other related Sections, Division 01 General
Requirements, Preliminaries and the Contract Conditions.
B. Section Includes:
1. Metal fastening and fixings.
1.2 SUBMITTALS
A. General: Comply with the requirements of Section 013300 Submittal Procedures and submit
the following.
B. Tender Submittals:
1. As referenced in applicable Work Sections.
C. Pre-contract Samples:
1. As referenced in applicable Work Sections.
A. General: Comply with the requirements of Section 017800 Closeout Submittals, and submit
the following:
1. Operation and Maintenance Manuals: Include component list with manufacturer's
reference numbers, descriptions of materials and procedures for repairing and cleaning
of finishes; and cleaning frequency.
1.4 SUSTAINABILITY
A. It shall be a Client prerequisite for the project to achieve dual accreditation to the two principal
sustainability programmes prevalent in the region, summarised hereunder.
1. The Contractor shall be required to fully discharge all obligations necessary to ensure
compliance with the pursuance of the LEED New Construction 2009 Rating Program.
Refer to Section 018113 - Sustainable Design Requirements - LEED and associated
environmental Sections forming part of the Division 01 suite of documents.
2. The Contractor shall be required to fully discharge all obligations necessary to ensure
compliance with the pursuance of the Estidama Pearl Building Rating System Version 1.
Refer to Section 018114 - Sustainable Design Requirements - Estidama and associated
environmental Sections forming part of the Division 01 suite of documents.
A. QA/ QC procedures for inspection of fixings to the Engineer to include, but not be limited to,
checking each fixing for correct torques, depth of mortices, alignment, etc.
B. All fixings shall be tested in accordance with BS 5080: Parts 1 and 2 by an independent Testing
Authority acceptable to the Engineer.
D. Mock-ups:
1. Refer to Document No. A-Z - PS001:
E. Prototypes:
1. Refer to Document No. A-Z - PS001:
1.6 WARRANTIES
A. Provide a warranty or warranties for the work of this section as requested by the Client or
within the contract documentation.
PART 2 PRODUCTS
A. Durability - fixings shall be selected such that adequate protection against any corrosion likely
to occur in their position of use is provided for the service life specified.
B. Rigidity - fixings shall be used which are suited to the likely stresses, movements and vibrations
in use.
C. Appearance - unless otherwise specified, fixings shall not be visible; where fixings are visible
these shall match or suit the items being fixed or comply with the Design Drawings.
D. Use fixings that are suitable for their intended purpose and adequate to comply with the
requirements stated in the Specification.
E. All bolts, screws, nuts, anchors and other fixings shall be of adequate strength for their designed
purpose and shall, unless specified otherwise, be manufactured from the most appropriate
grade of austenitic stainless steel or other materials as specified. Where specified, structural
steel fixings shall comply with the grades specified.
F. Supply all necessary and appropriate fasteners, fixings, bearings, brackets, etc. necessary for
the safe and proper installation plus associated flashings and closures.
G. Use fixings that are suitable for their intended purpose and adequate to comply with the
requirements stated in the Specification.
H. All bolts, screws, nuts, anchors and other fixings shall be of adequate strength for their designed
purpose and shall, unless specified otherwise, be manufactured from the most appropriate
grade of austenitic stainless steel or other materials as specified. Where specified, structural
steel fixings shall comply with the grades specified.
I. Supply all necessary and appropriate fasteners, fixings, bearings, brackets, etc. necessary for
the safe and proper installation plus associated flashings and closures.
2.2 MATERIALS
A. All fixings shall be of sufficient strength, appropriate to their location, and are provided at
adequate positions so as to ensure the performance of the elements being attached. The
fixings shall be suitable and used solely for the purposes intended by the manufacturer in order
to satisfy the requirements of the Specification.
C. Screw Fixings:
1. Screws to BS 1210.
2. Washers and screw cups, where specified, shall be of the same material as the screw.
D. Packings Generally:
1. Provide suitable, tight packings at fixing points to take up tolerances and prevent distortion.
2. Use non-compressible, rot-proof, non-corrodible materials positioned adjacent to fixing
points.
G. Plugs Generally: Use proprietary types selected to suit the background, loads to be supported
and conditions expected in use.
PART 3 EXECUTION
3.1 EXAMINATION
3.2 INSTALLATION
A. Carry out all necessary preparation work such as drilling, plugging, screwing, bolting, cutting
for anchor bolts or sockets to be cast-in and for making good, including grouting-in of anchor
bolts and fixings where necessary.
B. The method of fixing shall not damage anything being fixed or anything receiving fixings.
D. Fasteners shall be installed with a co-ordinated purpose design tooling system that incorporates
a mechanical depth locator to ensure consistent depth setting and facilitates perpendicular
installation. The fastener manufacturer shall be capable of providing on-Site instruction in the
use of the fastener installation tooling system.
F. Generally, fixings within aluminium framing components shall not be visible, with the exception
of capping pieces fixed to vertical mullions.
G. Visible fixings shall be restricted to the assembly of non-visible elements to support steelwork,
using round-headed Allen bolts into a proprietary system.
H. Any steel sub-frame assemblies shall be galvanised and effectively weatherproofed to avoid
exposure to the external environment.
I. Provide cast-in channel fixings in concrete and fixings directly made to structural steelwork.
K. Screw Fixings:
1. All screws shall have clearance holes. Screws of 8 gauge or more and all screws into
hardwood shall have pilot holes approximately half the diameter of the shank.
2. Before using brass, aluminium or other soft metal wood screws, pre-cut the thread with
a matching steel wood screw.
3. Do not hammer screws unless specifically designed to be hammered.
4. Countersink screw heads not less than 2mm below timber surfaces that will be visible in
the completed work, unless specified otherwise.
L. Packings Generally: Ensure that packings do not intrude into zones that are to be filled with
sealants.
M. Nail Fixing:
1. In joints, use not less than two nails and opposed skew nailing unless specified otherwise.
2. Drive nails fully in without splitting or crushing the material being fixed.
3. Punch nail heads below surfaces that will be visible in the completed work.
N. Plugs Generally: Locate plugs accurately in correctly sized holes in accordance with the
manufacturer's recommendations.
END OF SECTION
AS PER PLAN
49
18 18
13 BLK-101 BLOCK WALL /
OUTSIDE INSIDE OUTSIDE INSIDE CON-101 CONCRETE WALL ZINC PLATED STEEL TIE BACK
STAINLESS STEEL CSK SCREW ROD FIX WITH 6x50mm CSK
ZNM-ALE-MSB-AR-FI-000787 SGL HANGING CLIPS
WITH RAWAL PLUG
49 5 (ZNM-ALE-MSB-AR-FI-000787)
(ZNM-ALE-MSB-AR-FI-000787
MDF BACKING VERTICAL STRIPS 18 18
PAN203 HPL MDF PAN203 HPL MDF (ZNM-ALE-MSB-AR-FI-000227) WALL TIE M8 THREADED BAR
BLK-101 BLOCK WALL /
DOOR PANEL (ZNM-ALE-MSB-AR-FI-000787)
NOTE: DOOR PANEL CON-101 CONCRETE WALL
WATERPROFFING DETAILS REFERED ZNM-ALE-MSB-AR-FI-000227 ZNM-ALE-MSB-AR-FI-000227 WALL FIXING STAINLESS STEEL PAN PAN-203 CUBICLE DUCT PANEL SUBFRAME 18mm HPL MDF FLASHGAPS
AND COORDINATED WITH WESTERN HEAD SCREW WITH FISHERPLUG PARTITION 18mm HPL MDF (ZNM-ALE-MSB-AR-FI-000787) (ZNM-ALE-MSB-AR-FI-000227)
ZNM-WII-AR-WP-MUB1-SDW-021036/37/38 (ZNM-ALE-MSB-AR-FI-000227) PAN-203 CUBICLE PARTITION
DOOR DETAILS REFER DOOR DETAILS REFER BLOCK WALL 18mm HPL MDF
SILICON SEALANT JOINT
DOOR SHOPDRAWINGS DOOR SHOPDRAWINGS (ZNM-ALE-MSB-AR-FI-000227)
(ZNM-ALE-MSB-AR-FI-000788
SILICON SEALANT JOINT
TRM-514 CERAMIC TILE SKIRTING WITH
3
(ZNM-ALE-MSB-AR-FI-000788
3
TILE ADHESIVE
(ZNM-ALE-MSB-AR-FI-000060) CLICK FIX NYLON CONNECTOR
12 (ZNM-ALE-MSB-AR-FI-000787) TRM-514 CERAMIC TILE SKIRTING
150
FL-704 CERAMIC TILE SHIM SPACE/PACKER/PLYWOOD WITH TILE ADHESIVE
FL-704 CERAMIC TILE STAINLESS STEEL CSK SCREW
150
FLOORING 400x800x10MM 10 (ZNM-ALE-MSB-AR-FI-000227) LIGHT GREY POWDER COATED ALUMINIUM (ZNM-ALE-MSB-AR-FI-000060)
FLOORING 400x800x10MM
103
NOTES :
100
4
100
95
95
THICK WITH 5MM ADHSIVE ZNM-ALE-MSB-AR-FI-000787 SILICON SEALANT JOINT BASERAIL (ZNM-ALE-MSB-AR-FI-000787)
THICK WITH 5MM ADHSIVE SILICON SEALANT JOINT
(ZNM-ALE-MSB-AR-FI-000060) (ZNM-ALE-MSB-AR-FI-000788) -FLOOR DETAILS ARE COORDINATED WITH
(ZNM-ALE-MSB-AR-FI-000060) ZNM-ALE-MSB-AR-FI-000788
10
F.F.L. F.F.L. F.F.L. F.F.L. F.F.L.
10
10
10
10
5
5
AR: provide reference to Western's detail,
showing the application of same materials
5
identified here. This is to confirm the THIS SDW 232077,232079,232081,232082 DETAILS PERTAINING TO
waterproofing system can accommodate the
HST R-M8/10
RM 0118/RM 0119 SUBMITTED AS SBF- ZNM-STJV-SBF-ID-00-003966 ,
5
6-10mm gap in the floor, and use of the sealant
won't harm the WP system. z 6MM THICK OXICELL PE 6MM THICK OXICELL PE
ZNM-STJV-SBF-ID-00-003990
100
100
100
100
AR: note that in the TDS of the waterproofing POLYETHYLENE COMPRESSIBLE JOINT POLYETHYLENE COMPRESSIBLE JOINT
80
80
80
80
system, call for ditra 25 to be submerged into FILLER ZNM-STJV-MSB-CV-00-000106 FILLER ZNM-STJV-MSB-CV-00-000106
tile adhesive, followed by the another layer of
the tile adhesive applied on top of the WP
membrane. These works should be considered
and demonstrated on site mockup/first in
place. Typical
FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK FL-704 CERAMIC TILE FLOORING 400x800x10MM FL-704 CERAMIC TILE FLOORING 400x800x10MM
NOTE: NOTE: NOTE: NOTE:
WITH 5MM ADHSIVE WITH 5MM ADHSIVE THICK WITH 5MM ADHSIVE THICK WITH 5MM ADHSIVE
WATERPROFFING DETAILS REFERED WATERPROFFING DETAILS REFERED WATERPROFFING DETAILS REFERED WATERPROFFING DETAILS REFERED
(ZNM-ALE-MSB-AR-FI-000060) (ZNM-ALE-MSB-AR-FI-000060) (ZNM-ALE-MSB-AR-FI-000060) (ZNM-ALE-MSB-AR-FI-000060)
AND COORDINATED WITH WESTERN AND COORDINATED WITH WESTERN AND COORDINATED WITH WESTERN AND COORDINATED WITH WESTERN
ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 THIN BED MORTAR POLYBIT CM 11 AS PER ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 THIN BED MORTAR POLYBIT CM 11 AS PER ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 THIN BED MORTAR POLYBIT CM 11 AS PER AR: refer to comment, ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 THIN BED MORTAR POLYBIT CM 11 AS PER
MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372 MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372 MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372 *
marked on D503 MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372
SCHLUTER DITRA 25 POLYETHYENE SCHLUTER DITRA 25 POLYETHYENE SCHLUTER DITRA 25 POLYETHYENE SCHLUTER DITRA 25 POLYETHYENE REFERENCE IFC DRAWINGS
WATERPROOFING MEMBRANEAS PER WATERPROOFING MEMBRANEAS PER WATERPROOFING MEMBRANEAS PER WATERPROOFING MEMBRANEAS PER
MATERIAL-REF-NO. MATERIAL-REF-NO. MATERIAL-REF-NO. MATERIAL-REF-NO. DRG. NO Rev
ZNM-WII-MSB-AR-WP-000265 ZNM-WII-MSB-AR-WP-000265 ZNM-WII-MSB-AR-WP-000265 ZNM-WII-MSB-AR-WP-000265
POLYTHENE SHEET, 1000 GAUGE POLYTHENE SHEET, 1000 GAUGE POLYTHENE SHEET, 1000 GAUGE POLYTHENE SHEET, 1000 GAUGE A-M-WC530, A-M-WC531, A-M-WC532, A-M-WC533
(ZNM-STJV-MSB-AR-FI-000008) The purpose of this detail (ZNM-STJV-MSB-AR-FI-000008) (ZNM-STJV-MSB-AR-FI-000008) (ZNM-STJV-MSB-AR-FI-000008)
PAN-201 is mentioned in the title, but is unclear (it does not A-M-WC534, A-M-WC535, A-M-WC536, A-M-WC537
SCR-301 HEAVY DUTY UNBOUNDED SCR-301 HEAVY DUTY UNBOUNDED
nowhere in the actual detail. Please clarify, clarify any interfaces). SCR-301 HEAVY DUTY UNBOUNDED SCR-301 HEAVY DUTY UNBOUNDED
SCREED (ZNM-STJV-MSB-AR-FI-000008) SCREED (ZNM-STJV-MSB-AR-FI-000008) A-M-WC538, A-M-WC539, A-M-WC540, A-M-WC541
noting as well that the purpose of this detail SCREED (ZNM-STJV-MSB-AR-FI-000008) SCREED (ZNM-STJV-MSB-AR-FI-000008)
is unclear (it does not clarify any interfaces). FLOOR FIXING CHEMICAL CSK 5 x 50 mm SCREW M8 CHEMICAL ANCHOR BOLT
Typical for entire work-flow: A-M-WC542, A-M-WC543, A-M-WC544, A-M-WC545
(ZNM-ALE-MSB-AR-FI-000227) (ZNM-ALE-MSB-AR-FI-000787)
- Provide list of applicable rooms,
and shop-drawing set references. JOINTS SEAMING TAPE SCHLUTER-KERDI KEBA JOINTS SEAMING TAPE SCHLUTER-KERDI KEBA
FIXED WITH ADHESIVE SCHLÜTER®- FIXED WITH ADHESIVE SCHLÜTER®-
REFERENCE SHOP DRAWINGS
KERDI-COLL-L AS PER MATERIAL-REF-NO. KERDI-COLL-L AS PER MATERIAL-REF-NO.
ZNM-WII-MSB-AR-WP-000265 ZNM-WII-MSB-AR-WP-000265 DRG. NO Rev
234020/021/022/023/024/025/026/027/028/029/030 R00
234031/032/033,234004, 234005, 234006 R00
D501 INTERFACE DETAIL - (PAN201-FL 704) FLOOR INTERFACE D502 INTERFACE DETAIL - (PAN203-FL704) FLOOR INTERFACE D503 INTERFACE DETAIL - (PAN203-FL704) FLOOR INTERFACE D504 INTERFACE DETAIL - (PAN203-TRM514-FL704) FLOOR INTERFACE
ZNM-WII-AR-WP-MUB1-SDW-021030-38 R00
IFC Ref. DRAWING No. A-M-WC-530/531/532/544 IFC Ref. DRAWING No: A-M-WC560 IFC Ref. DRAWING No. A-M-WC-532, DETAIL 01 IFC Ref. DRAWING No. A-M-WC-532, DETAIL 04 ZNM-EMC-AR-FI-MUAL-SDW-152301 R00
AR GENERAL:
- All fasteners employed to secure anything to the floor should be made of stainless steel REFERENCE RFI NO.
A4 to ensure sufficient corrosion resistance.
- All penetrations through the waterproofing membrane must be identified and resolved in
collaboration with the waterproofing applicator (Western). Penetrations and expansion DRG. NO Rev
joints (corners) should be sealed using materials compatible with the approved Ditra 25
WP system. 100 ZNM-ALE-RFI-AR-FI-001459
When planning the sequence of work, it's essential to consider sealing the WP
2 2
18 60 18
penetrations since access is required to apply the appropriate sealant. Details must be
prepared with this requirement in mind. Please note that flood tests are to be conducted
once the penetrations are sealed. And no penetrations shall be done after flood test is
completed. 60X100MM ALUMINUM
With this in mind, the contractor is advised to review the partition fixing detail and to avoid NOTE: SUPPORT FRAME
Please minimize the thickness of adhesive, the abortive work if any leaks are identified during the flood test. This can be achieved by SECTION: A-A (ZNM-ALE-MSB-AR-FI-000787)
opting for a pre-fixed anchor rod that is sealed before the application of tiles above it. PAN203 HPL MDF
and offer a benchmark for review/approval. (FL-904 STONCLAD HT SYSTEM (6 mm)
DOOR PANEL
- Note that the TDS of the waterproofing system specifies that Ditra 25 should be
submerged into the tile adhesive, followed by another layer of tile adhesive applied on top
COVED SKIRTING DETAILS)
ZNM-ALE-MSB-AR-FI-000227
FIXING CLIPS
(ZNM-ALE-MSB-AR-FI-000787)
DOCUMENT REVIEW
BLK-101 BLOCK WALL / ZNM-EMC-AR-FI-MUAL-SDW-152301
of the waterproofing (WP) membrane. These procedures should be taken into account and
CON-101 CONCRETE WALL demonstrated through an on-site mockup or during the initial installation. DOOR DETAILS REFER
DOOR SHOPDRAWINGS
60 x100mm TUBE WITH
20MM DIA HOLES FOR
PAN-203 CUBICLE
PARTITION 18mm HPL MDF A APPROVED.
3
thickness of ditra 25 membrane
Provide descriptions 7 mm
(ZNM-ALE-MSB-AR-FI-000060)
for all components.
FL-704 CERAMIC TILE
M8 CHEMICAL ANCHOR BOLT SHIM SPACE/PACKER/PLYWOOD D REJECTED
20 mm
FL-704/TRM-514 SKIRTING CERAMIC (ZNM-ALE-MSB-AR-FI-000787)
7 mm FL-904 EPOXY RESIN FLOORING FLOORING 400x800x10MM (ZNM-ALE-MSB-AR-FI-000227)
TILE FLOORING 400x800x10MM FOR INFORMATION AND RECORD
E
100
95
95
SILICON SEALANT JOINT
100
95
THICK WITH 5MM ADHSIVE 100 ZNM-STJV-MSB-AR-FI-000041 THICK WITH 5MM ADHSIVE SILICON SEALANT JOINT
AR: refer to ONLY
D503
*
comment, marked on (ZNM-ALE-MSB-AR-FI-000060)
7 mm
(ZNM-ALE-MSB-AR-FI-000060)
F.F.L. F.F.L.
(ZNM-ALE-MSB-AR-FI-000788)
F.F.L.
(ZNM-ALE-MSB-AR-FI-000788)
F.F.L.
F.F.L. F.F.L. ENG. R.E.
10
10
5
6
10
10
DATE: DATE: Company: F+ P
5
5
5
03.11.2023 Architect: Mouzo Ntagkala Date: 02/11/2023
6 mm
5
ZNM-ALE-MSB-AR-FI-000788
HST R-M8/10
5
5
5
100
100
100
94
POLYETHYLENE COMPRESSIBLE JOINT
80
80
how is the penetration sealed. Provide
80
COMPRESSIBLE JOINT FILLER sealant material submittal. Obtain 00 ISSUED FOR APPROVAL 29.12.22 IRIVET ALEC
FILLER ZNM-STJV-MSB-CV-00-000106 approval from the waterproofing
(ZNM-STJV-MSB-CV-00-000106)
applicator (Western), as this will
penetrate their system, compromising the
01 REVISED AS PER COMMENTS 10.02.23 IRIVET ALEC
water bearing properties of the whole
toilet. 02 REVISED AS PER COMMENTS 05.05.23 IRIVET ALEC
POLYTHENE SHEET, 1000 GAUGE FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK
FL-704 CERAMIC TILE FLOORING 400x800x10MM (ZNM-STJV-MSB-AR-FI-000008) 03 RE ISSUED FOR APPROVAL 17.07.23 IRIVET ALEC
THICK WITH 5MM ADHSIVE FL-904 EPOXY RESIN FLOORING WITH 5MM ADHSIVE WITH 5MM ADHSIVE
(ZNM-ALE-MSB-AR-FI-000060) SCHLUTER DITRA 25 POLYETHYENE WATERPROOFING (ZNM-STJV-MSB-AR-FI-000041) (ZNM-ALE-MSB-AR-FI-000060) (ZNM-ALE-MSB-AR-FI-000060) 04 RE ISSUED FOR APPROVAL 12.10.23 IRIVET ALEC
NOTE: MEMBRANEAS PER MATERIAL-REF-NO. THIN BED MORTAR POLYBIT CM 11 AS PER THIN BED MORTAR POLYBIT CM 11 AS PER
WATERPROFFING DETAILS REFERED THIN BED MORTAR POLYBIT CM 11 AS PER (ZNM-WII-MSB-AR-WP-000265) MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372
THIN BED MORTAR POLYBIT CM MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372
AND COORDINATED WITH WESTERN MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372
SCR-301 HEAVY DUTY UNBOUNDED SCREED 11 AS PER MATERIAL REF NO. NOTE: SCHLUTER DITRA 25 POLYETHYENE NOTE: SCHLUTER DITRA 25 POLYETHYENE
ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 SCHLUTER DITRA 25 POLYETHYENE (ZNM-STJV-MSB-AR-FI-000008) WATERPROFFING DETAILS REFERED WATERPROOFING MEMBRANEAS PER WATERPROFFING DETAILS REFERED
(ZNM-WII-MSB-AR-WP-000372) WATERPROOFING MEMBRANEAS PER
WATERPROOFING MEMBRANEAS PER AND COORDINATED WITH WESTERN MATERIAL-REF-NO. AND COORDINATED WITH WESTERN MATERIAL-REF-NO.
MATERIAL-REF-NO. ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 ZNM-WII-MSB-AR-WP-000265 ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 ZNM-WII-MSB-AR-WP-000265 EMPLOYER:
ZNM-WII-MSB-AR-WP-000265
POLYTHENE SHEET, 1000 GAUGE POLYTHENE SHEET, 1000 GAUGE DEPARTMENT OF CULTURE AND TOURISM
POLYTHENE SHEET, 1000 GAUGE (ZNM-STJV-MSB-AR-FI-000008) (ZNM-STJV-MSB-AR-FI-000008)
(ZNM-STJV-MSB-AR-FI-000008) P.O. Box 94000, Abu Dhabi, U.A.E.
PAN-203 is mentioned in the title, but SCR-301 HEAVY DUTY UNBOUNDED SCR-301 HEAVY DUTY UNBOUNDED Telephone : (971-2) 444 0 444
SCR-301 HEAVY DUTY UNBOUNDED nowhere in the actual detail. Please clarify, SCREED (ZNM-STJV-MSB-AR-FI-000008) SCREED (ZNM-STJV-MSB-AR-FI-000008) Fax : (971-2) 599 5 720
SCREED (ZNM-STJV-MSB-AR-FI-000008) noting as well that the purpose of this detail web : www.tcaabudhabi.ae
FLOOR FIXING CHEMICAL CSK 5 x 50 mm SCREW is unclear (it does not clarify any interfaces).
(ZNM-ALE-MSB-AR-FI-000227)
JOINTS SEAMING TAPE SCHLUTER-KERDI KEBA PROJECT MANAGEMENT CONSULTANT :
FIXED WITH ADHESIVE SCHLÜTER®-
A-M-WC560 related to toilet KERDI-COLL-L AS PER MATERIAL-REF-NO.
doors. It is not a reference for ZNM-WII-MSB-AR-WP-000265 EIBFS Muroor Tower, 2nd Floor
Sheikh Sultan Bin Zayed The First Street
the presented detail.
P.O.Box 5201, Abu Dhabi-U.A.E.
Telephone : +971 2 627 7358
D505 INTERFACE DETAIL - (RENDER-FL704) FLOOR INTERFACE D506 INTERFACE DETAIL - (PT102-FL904) FLOOR INTERFACE D507 INTERFACE DETAIL - (PAN204-FL704) FLOOR INTERFACE D508 INTERFACE DETAIL - (PAN203-FL704) FLOOR INTERFACE LEAD DESIGN AND CONSTRUCTION SUPERVISION CONSULTANT:
IFC Ref. DRAWING No. A-M-WC560 IFC Ref. DRAWING No. ZNM-EMC-AR-FI-MUAL-SDW-152301 IFC Ref. DRAWING No. A-M-WC560 IFC Ref. DRAWING No. BASED ON 02/A-M-WC540
CSC Arch:
- Approval is fully subject to the receipt and approval of the relevant associated SAM/MSB and integration details
for all devices which are to be integrated in this area.
- STJV to ensure coordination amongst other associated shopdrawings for this area (i.e. Builderswork and MEP
Layouts). In the event of a discrepancy between the above mentioned documents, STJV shall inform the CSC
prior to proceeding with any site activities, although the CSC notes that the Architectural/ID GA as commented
takes precedence in principle. CONSULTANT-OF-RECORD :
-Approval of drawing is subject to approval of referenced call-out details.
- All integration of MEP items are excluded from approval until the receipt of fully coordinated details and
material submittal.
DOOR DETAILS ARE SUBMITTED ON 100
DRAWING 234020 TO 234033 2 2 - All doors are excluded from this review. AS PER PLAN
18 60 18 - This submittal is to be read alongside ZNM-STJV-SBF-ID-00-003966
-Ensure all vertical skirting joint lines are lined up with floor grouts. NOTE: WSP P.O Box 47445
CSC Arch: PAN203 HPL MDF
sealant should have equal tile joint width as WATERPROFFING DETAILS REFERED International Tower Tel: +971 2 652 9222
DOOR PANEL 25th Floor, Suite 2508 Fax: 971 2 677 9772
elsewhere AND COORDINATED WITH WESTERN
ZNM-ALE-MSB-AR-FI-000227 ADNEC Capital Centre, Karamah Street Abu Dhabi, UAE
60X100MM ALUMINUM ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38
FL-704 CERAMIC TILE FLOORING NOTE: SUPPORT FRAME
400x800x10MM THICK WITH 5MM ADHSIVE WATERPROFFING DETAILS REFERED (ZNM-ALE-MSB-AR-FI-000787) ZINC PLATED STEEL TIE BACK ROD FIX
PT-102 PAN FINISHING LINE MAIN CONTRACTOR :
(ZNM-ALE-MSB-AR-FI-000060) AND COORDINATED WITH WESTERN NOTE: WITH 6x50mm CSK WITH RAWAL PLUG
FIXING CLIPS (ZNM-ALE-MSB-AR-FI-000787 (PAN 203/204/205)
The MSB reference is for plastering
ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 WATERPROFFING DETAILS REFERED
(ZNM-ALE-MSB-AR-FI-000787)
accessories and is not applicable to this SILICON SEALANT AND COORDINATED WITH WESTERN DETAILED DOOR DRAWING
detail. Moreover the profile fixation is unclear. BETWEEN TRIM-FL 904 100 PAN-203 CUBICLE ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 TO BE SUBMITTED SEPARATELY
(ZNM-ALE-MSB-AR-FI-000788) 60 x100mm TUBE WITH PARTITION 18mm HPL MDF
10
F.F.L. F.F.L.
20MM DIA HOLES FOR (ZNM-ALE-MSB-AR-FI-000227) SILICON SEALANT JOINT
10
+2.800 LVL C
NSTALLATION PURPOSE L (ZNM-ALE-MSB-AR-FI-000787)
NOTE:
5
marked on D503
(ZNM-ALE-MSB-AR-FI-000787) 18 joint width as elsewhere M8 CHEMICAL ANCHOR BOLT
ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 TRM-514 CERAMIC TILE SKIRTING AR: liaise with Western and Voltas, and
100
WITH TILE ADHESIVE FL-904 EPOXY RESIN FLOORING (ZNM-ALE-MSB-AR-FI-000787) show the application of the sealant that SUB CONTRACTOR :
3
3
BRUSHED SS TRANSITION
80
SILICON SEALANT JOINT (ZNM-ALE-MSB-AR-FI-000060) SILICON SEALANT (ZNM-STJV-MSB-AR-FI-000041) will be used to seal any gap between the
STRIP15 X 15 MM BETWEEN TRIM-FL 904 JOINTS SEAMING TAPE
gully and screed. since the gully has a ALEC FITOUT
(ZNM-ALE-MSB-AR-FI-000788) flashing recessed into the tiles, provide
150
FLOOR FINISH CLARIFICATION RFI REF: FIXED WITH SCREW ON SCREED SHIM SPACE/PACKER/PLYWOOD (ZNM-ALE-MSB-AR-FI-000788) FL-704 CERAMIC TILE FLOORING SCHLUTER-KERDI KEBA SILICON SEALANT JOINT sample showing such integration to obtain Box 27639
200
ZNM-ALE-RFI-AR-FI-001459 (ZNM-ALE-MSB-AR-FI-000736) (ZNM-ALE-MSB-AR-FI-000227) 400x800x10MM THICK WITH 5MM ADHSIVE 9 (ZNM-ALE-MSB-AR-FI-000788) approval on the quality of workmanship.
Marina Plaza, Dubai Marina
BRUSHED SS TRANSITION FIXED WITH ADHESIVE SCHLÜTER®-
100
95
95
SILICON SEALANT JOINT (ZNM-ALE-MSB-AR-FI-000060) Dubai, United Arab Emirates
FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK STRIP15 X 15 MM KERDI-COLL-L AS PER AM-314 FLOOR GULLY
FL-904 EPOXY RESIN FLOORING (ZNM-ALE-MSB-AR-FI-000788)
WITH 5MM ADHSIVE FIXED WITH SCREW ON SCREED MATERIAL-REF-NO. ZNM-VOL-MSB-PH-TO-000005[01] Phone +971 4 429 0599
ZNM-STJV-MSB-AR-FI-000041 F.F.L. F.F.L. (ZNM-ALE-MSB-AR-FI-000736) F.F.L. F.F.L. F.F.L.
SLOPE
(ZNM-ALE-MSB-AR-FI-000060) ZNM-WII-MSB-AR-WP-000265 www.alecfitout.ae
10
10
10
5
5
+2.800 LVL
5
280
5
5
THIN BED MORTAR POLYBIT CM 11 AS PER 6MM THICK OXICELL PE FL-704 CERAMIC TILE
F.F.L. MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372 POLYETHYLENE COMPRESSIBLE WITH 5MM ADHESIVE
HST R-M8/10
HST R-M8/10
+2.600 LVL 5MM SEALANT BETWEEN FL-704
5
5
SCHLUTER DITRA 25 POLYETHYENE AND FL-904 LOCATION The MSB reference is for plastering JOINT FILLER (ZNM-ALE-MSB-AR-FI-000060)
5
AM-314 FLOOR GULLY
ZAYED NATIONAL MUSEUM
100
100
100
WATERPROOFING MEMBRANEAS PER (ZNM-ALE-MSB-AR-FI-000788) accessories and is not applicable to this (ZNM-STJV-MSB-CV-00-000106)
80
80
80
MATERIAL-REF-NO. 6MM THICK OXICELL PE detail. Moreover the profile fixation is unclear. SCR-301 HEAVY DUTY ABU DHABI - SECTOR SDN8
ZNM-WII-MSB-AR-WP-000265 POLYETHYLENE UNBOUNDED SCREED
POLYTHENE SHEET, 1000 GAUGE COMPRESSIBLE JOINT FILLER (ZNM-STJV-MSB-AR-FI-000008) PLOT No.P8
CONCRETE STEP SCHLUTER DITRA 25 POLYETHYENE
(ZNM-STJV-MSB-AR-FI-000008) (ZNM-STJV-MSB-CV-00-000106) WATERPROOFING MEMBRANE
FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK POLYTHENE SHEET, 1000 GAUGE AS PER ZNM-WII-MSB-AR-WP-000265
SCR-301 HEAVY DUTY UNBOUNDED
SHOP DRAWING
200
IFC Ref. DRAWING No. NOT FOUND IFC Ref. DRAWING No. NOT FOUND IFC Ref. DRAWING No. NOT FOUND IFC Ref. DRAWING No. A-M-WC-532, DETAIL 02 SUBMITTAL No.: __________Rev. : ____
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS
To be submitted separately
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS
OIBt
Deutsch es
lnstitut
fur
Bautet:hnik
www.eota.eu
*
according to
*
Article 29 of Regula-
An institution established by the Federal and
tion (EU) No 305/2011
Laender Governments
* *
and member of EOTA
(European Organi-
sation for Technical
* * *
Assessment)
This European Technical Assessment 45 pages including 3 annexes which form an integral part
contains of this assessment
This European Technical Assessment is EAD 330499-01-0601 Edition 04/2020
issued in accordance with Regulation (EU)
No 305/2011, on the basis of
This version replaces ETA-19/0601 issued on 14 December 2020
220774.21 8.06.01-6/21
DUBAI CENTRAL LABORATORY DEPARTMENT
DCLD-CQPS PRODUCT CONFORMITY CERTIFICATION SCHEME
SCOPE OF CERTIFICATION
FOR CERTIFICATE NO. CL20020730
NOTE 1: This document forms an integral part of the Certificate of Product Conformity bearing the same
certificate number.
NOTE 2: The above product shall bear the DCLD Conformity Mark.
ARIF AL MARZOOQI
MANAGER
CERTIFICATION AND QUALITY CONTROL OF PRODUCTS SECTION
DM‐DCLD‐F‐IC‐2032 R10
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
OPEN DATA / ﺑﻴﺎﻧﺎت ﻣﻔﺘﻮﺣﺔ
CERTIFICATE OF PRODUCT CONFORMITY
Dubai Central Laboratory Department (DCLD) of Dubai Municipality
hereby attests that the product(s)
HILTI GmbH
86916 Kaufering, Germany
have been assessed in accordance with DCLD Document Ref. No. DM-DCLD-RD-DP21-2001 (IC) "General Rules for DM third party product
certification system through factory assessment" and the relevant Specific Rules, and were found in conformity with the standard specification:
ARIF AL MARZOOQI
Certification and Quality Control of Products Section Manager
Dubai Central Laboratory Department-Dubai Municipality
DM-DCLD-F-IC-2031 Rev 20
DUBAI CENTRAL LABORATORY DEPARTMENT
DCLD-CQPS PRODUCT CONFORMITY CERTIFICATION SCHEME
SCOPE OF CERTIFICATION
FOR CERTIFICATE NO. CL20020730
DM‐DCLD‐F‐IC‐2032 R10
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
OPEN DATA / ﺑﻴﺎﻧﺎت ﻣﻔﺘﻮﺣﺔ
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS
Legal Type Branch of Company Registered in other emirates فرع لشركة مقرها في امارة أخرى الشكل القانونى
Expiry Date 07/10/2024 تاريخ النتهاء Issue Date 08/10/1991 تاريخ الصدار
D&B D-U-N-S ® 499426948 الرقم العالمي Main License No. 226074 رقم الرخصة الم
No.
Register No. رقم السجل التجارى DCCI No. 22211 عضوية الغرفة
100.00% Co. Owner / مالك United Arab Emirates / م. م. ذ.(هيلتي المارات (ش 286876
الشركة المارات
HILTI EMIRATES LLC
Manager / مدير France / فرنسا توماس جريقورى دروبست 922508
THOMAS GREGORY DROPSIT
مجمع دبي للستثمار الولى- بردبي- م.م.ذ. ملك شركة ديكو المارات ش1 مستودع
Remarks / الملحظات
** ) ابوظبي1023936( رقم الرخصة الم
10/3/2016 تغيير المدير
دبي-يمنع مزاولة نشاط الشركة الخاص بالدفاع المدني قبل أخذ موافقة الدارة العامة للدفاع المدنيThe Company Shall not Carry on The DCD activities unless approved by
Dubai Civil Defence
Print Date 24/08/2023 10:29 تاريخ الطباعة Receipt No. 15175971 رقم اليصال
اتصالت) للحصول/ (دو6969 أرسل رقم الرخصة إلى،يمكنك الن تجديد رخصتك التجارية من خلل الرسائل النصية القصيرة
.على اذن الدفع Get FREE access to
Zoho One for the first
Now you can renew your trade license by sending a text message )SMS(. Send your trade year
license number to 6969 )Du/ Etisalat( to receive payment voucher. احصل على زوهو ون مجانا
للسنة الولى
Zoho.com/det
لمراجعة صحة البيانات الواردة في الرخصة يرجي مسح رمزالستجابة السريعة. وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة القتصاد والسياحة في دبي
this is a certified e-document issued without signature by the department of Economy and Tourism .Kindly Scan the QR Code to
Verify the certificate
Permit Details / بيانات التصريح
Permit Nr رقم التصريح
9205995
Permit Type نوع التصريح
إعلنات إضافية على الواجهة
Expiry Date 07/10/2024 تاريخ النتهاء Issue Date 07/10/2010 تاريخ الصدار
Description HILTI شرح
Expiry Date 07/10/2024 تاريخ النتهاء Issue Date 07/10/2010 تاريخ الصدار
Description HILTI هلتي + ) المزروعي للمنتجات الهندسية ( ام اي بي شرح
Remarks ملحظات
Print Date 24/08/2023 10:29 تاريخ الطباعة Receipt No. 15175971 رقم اليصال
اتصالت) للحصول/ (دو6969 أرسل رقم الرخصة إلى،يمكنك الن تجديد رخصتك التجارية من خلل الرسائل النصية القصيرة
.على اذن الدفع Get FREE access to
Zoho One for the first
Now you can renew your trade license by sending a text message )SMS(. Send your trade year
license number to 6969 )Du/ Etisalat( to receive payment voucher. احصل على زوهو ون مجانا
للسنة الولى
Zoho.com/det
لمراجعة صحة البيانات الواردة في الرخصة يرجي مسح رمزالستجابة السريعة. وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة القتصاد والسياحة في دبي
this is a certified e-document issued without signature by the department of Economy and Tourism .Kindly Scan the QR Code to
Verify the certificate
License no. 226074 226074 رقم الرخصة
Trade Name HILTI EMIRATES L.L.C (م )فرع دبي.م.ذ.هيلتي المارات ش السم التجاري
(DUBAI BR )
Legal Status Branch of Company Registered in فرع لشركة مقرها في امارة أخرى الشكل القانوني
Activity Building & Construction Materials تجارة مواد البناء نوع النشاط
Trading تجارة مواد مكافحة واطفاءالحريق
Fire Extinguishing Materials Trading تجارة معدات وآليات التشييد والبناء
Construction Equipment & تأجير معدات وآليات التشييد والبناء
Machinery Trading
Construction Equipment &
Machinery Rental
OWNER(S) INTERCEDE MIDDLE EAST إنترسد ميدل ايست إنفستمنت ليميتد المــــالــــــــــــك
INVESTMENT LIMITED
REMARKS THIS LICENSE IS ISSUED AND BASED هذه الرخصة صادرة استنادا الى المرسوم الميري ملحظـــــــــات
UPON EMIRI DECREE NO. 2 OF 1995
الصادر في الشارقة بتاريخ١٩٩٥ لسنة٢ رقم
ISSUED IN SHARJAH ON MAY 8, 1995
١٩٩٥ مايو٨
THIS LICENSE IS GRANTED TO THE
LICENSEE ONLY AND SHALL NOT BE له فقط ول يجوز هذه الرخصة ممنوحة للمرخص
LEASED OR TRANSFERRED WITHOUT
PRIOR APPROVAL OF THE SAIF ZONE
تأجيرها أو تحويلها إل بموافقة هيئة المنطقة
الحرة لمطار الشارقة الدولي
SALES IN U.A.E. SHALL BE CARRIED OUT
IN ACCORDANCE WITH THE VALID
تتم أعمال البيع داخل الدولة وفقا للنظم والقوانين
LAWS AND REGULATIONS THEREOF
السارية فيها
1- Send an SMS to 2514 with License number. . مع رقم الرخصة2514 ) إلى الرقمSMS( رسالة نصية قصيرة-1
2- Scan the QR code. )QR Code( مسح رمز الستجابة السريع-2
3- Visit the website: : زيارة الموقع اللكتروني-3
https://portal.saif-zone.com/LicenseDetail.aspx https://portal.saif-zone.com/LicenseDetail.aspx
www.saif-zone.com هذه الوثيقة رسمية ول تحتاج لختم أو توقيع وللتأكد من صحة البيانات يرجى زيارة الموقع
This document is official and it does not need to be stamped or signed. To view license detail visit www.saif-zone.com
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS
04 Jan 2024
Ref. Spec (s): 055000, 055200, 074213 Ref. Drwg (s): Attached
Compliance Statement:
The Contractor hereby confirms that the submitted items have been reviewed in detail and are correct and in strict conformance
with the Contract Documents. (Compliance statement attached)
Initiator/ALEC Sustainability/STJV QA/QC Manager/STJV Technical Director/STJV
REVIEWER’S COMMENTS
Note: The CSC/PMC approval shall not in any way relieve the Contractor of his obligation under the Contract. The Contractor
shall be solely responsible for the soundness and the correctness of the submitted Materials and Documents as per the required
Contract Conditions and Contract Clauses
Codes: A: Approved B: Approved with comments C: Revise & Resubmit D: Rejected E: For Information only
1 of 1Page
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS
Document
Credit Required Documents
Material Type attached
Reference (To be attached along with this questionnaire)
(Yes/No/NA)
All materials SM-R1 Manufacturer’s letter confirming No asbestos content Yes
Regional Materials. For composite materials, weighted average distance calculation N/A
SM-9 / Country of Origin certificate Yes
Note: calculations of MRc-5 Trade License copy Yes
distance to be used is 500 Manufacturer’s letter confirming material origin and the N/A
km. manufacturing location.
Masonry, Metals, N/A
Woodworks, Plastics, For steels, provide CARES Sustainability Certification (Appendix
Composites, Doors, 05-structural steel or Appendix 01-reinforcement bars).
Windows Glazing, A manufacture declaration or TDS stating the % of post-
Thermal & Moisture SM-10 consumer and % of pre-consumer recycled content. Note:
Protections and Exterior MRc-4 Waste reuse from the same production line should be excluded.
Improvements
Mix design component sheet including all types of mix grades N/A
confirming quantities with BOQ.
Concrete
Cumulative GHG calculator with all proposed mixes N/A
Supplementary Cementitious Calculation table for LEED N/A
A data sheet and test report for Aggregate. Only recycled aggregate N/A
Aggregate SM-10
is specified for use as base, sub-base or backfill.
Chain of Custody – COC- certificate for supplier N/A
Chain of Custody – COC - certificate for manufacturer N/A
SM-12; CITES declaration List from Manufacturer N/A
Timber
MRc7 % of certified wood by weight (for assemblies) % . (Attach N/A
Calculation Table for Assembly wood content)
If it is FSC Mix ( )%, provide supporting documentation N/A
External Timber SM-R1 Manufacturer letter confirming no CCA treatment on wood N/A
LBi-2.1 Technical Data sheet N/A
Adhesives & Sealants IEQc-4.1 Material Safety Data sheet N/A
Paints & Coatings LBi-2.2 VOC Test Report N/A
IEQc-4.2 Supporting doc for fungal resistant (for all paints & Coatings) N/A
Carpet Data sheet Carpets -CRI Green Label PLUS Program Certificate N/A
Carpet Cushion Carpet Cushion -CRI Green Label Program Certificate N/A
Hard Flooring Floor Score Certificate N/A
LBi 2.3
Formaldehyde Test report N/A
IEQc-4.3
Floor Score Certificate (for LEED) N/A
Wood Flooring Pentachlorophenol (PCP) content Test report N/A
Supporting document for wood product tested, classified and N/A
marked according to BS EN 14342:2005
Ceiling Systems Formaldehyde (mg/m3) test report N/A
LBi-2.4
Pentachlorophenol (PCP) content Test Report N/A
Furniture & Internal LBi-2.5 N/A
Formaldehyde (mg/m3) test report
Finishing Materials
Composite Wood & TDS/manufacturer letter stating NO-ADDED UREA FORMALDEHYDE N/A
IEQc-4.4
Agrifibre Products resin used
IDP-4 Off-site test reports for custom-made cladding systems N/A
Document
Credit Required Documents
Material Type attached
Reference (To be attached along with this questionnaire)
(Yes/No/NA)
Custom made cladding N/A
works; Curtain wall Standard product pre-testing certificates for curtain wall systems
system
Plant schedule with details of native/adaptive/drought N/A
tolerant/invasive species and at least 10 types of plant species
NS-3
Landscaping works 3 years growth tree size including crown width and height (Shade N/A
WEc-1
calculation in Sketchup for 3 years growth)
Irrigation water demand calculations N/A
LBo-R3 & N/A
Shading Materials Technical data sheet (TDS) / third party test certificate for average
LBo-1
(Canopies / Solar Reflectance Index (SRI) of the selected shading material (SRI
SSc-7
architectural elements) should be > 29)
LBo-7 Data sheet of bicycle racks with layout showing locations N/A
Bicycle Racks
SSc-4.2 Data sheet of shower with layout showing locations N/A
Electrical car spaces Data sheet of Charging station with layout showing locations N/A
signage and charging LBo-8 N/A
Data sheet of Charging station with layout showing locations
stations
LBi-R2 Manufacturer technical information of signage type and printing of N/A
Signage
IEQp-2 no smoking selection with health impact details
Envelope – External RE R1 & Third Party Test Certificate for Thermal Conductivity of (W/mk) N/A
walls block, insulation, RE1 Elemental U-value calculation with sectional details N/A
Roofing EAp2/c1: Area weighted Average U-Value Calculation (Wall /Roof) N/A
U-value full thermal simulation report and thermal calculations for N/A
RE R1 & RE all glazing system with shop drawings showing psi
Envelope – Glazing &
1 Third party test certificate for air tightness and leakage N/A
Skylights
EAp2/c1 Technical data sheet for Solar Heat Gain Coefficient SHGC N/A
Area weighted Average U-Value Calculation (Glazing /Skylight) N/A
RE-2: Non-roof hardscape cut sheet/compliance statement / certification N/A
Roofing, Pavers and
SSc-7 that SRI 29 or higher
Hardscape Materials
SRI 78 or higher for roofing material N/A
SM- N/A
Manufacturer catalogue confirming capacity and type of bins, with
Operational waste bins R3/14/15
color coding.
MRp-1
Technical data sheet or Test Report for ODP=0 & GWP<5 for N/A
Thermal Insulation SM-1
insulation with blowing agent
A product datasheet indicating the chlorine content. N/A
Waterproofing sheets &
N/A
membranes, Floor &
SM-1b Surface area calculation for waterproofing sheets and Floor & Wall
Wall coverings,
Coverings / Linear length calculation for Windows & door frames
Windows & door frames
AC units /Chillers/DX Third party test report for COP at AHRI test conditions AND Abu N/A
units Dhabi Quality Conformity Council Certificate
RE R1/ RE1
Technical data sheet with power consumption and schedule with N/A
AHUs/FAHUs/FCUs/Fans EAp2/c1
proposed specific power consumption (W/lps)
Pumps TDS confirming the power consumption with pump selection curve. N/A
Document
Credit Required Documents
Material Type attached
Reference (To be attached along with this questionnaire)
(Yes/No/NA)
Water Heaters Technical data sheet N/A
Efficiency comparison table demonstrating compliance with ASHRAE N/A
All Motors
90.1 - 2007 section 10.4 OR NEMA standards.
LBi-R1, N/A
FAHU Fresh air calculation sheet as per ASHRAE 62.1.2007
IEQp-1
For FAHUs, provide manufacturer datasheets of air flow sensors and N/A
sequence of control from BMS.
LBi-1
Duct mounted CO2 sensors, provide manufacturer datasheets of CO2 N/A
FAHUs, CO2 sensors IEQc-1
sensors and sequence of control from BMS.
Wall mounted CO2 sensors, provide manufacturer datasheets of CO2 N/A
sensors with set points for alarming.
TDS of water filtration system with schematic diagram. Filtration N/A
Water Filtration System LBi-R3
system must include UV system/Chemical Dosing System.
Car parking ventilation fan data sheet N/A
Carbon Monoxide (CO), Nitrogen Dioxide (NO2), Particular Matter N/A
Car parking ventilation
LBi-4 PM10 sensors data sheets
fans and BMS control
BMS schematic diagram with control sequence for parking N/A
ventilation.
PW-R1/1 Technical Data sheet N/A
Sanitary Fittings
WE-c2 Flow -pressure chart N/A
Water Meters, Electrical PW-R2/3 N/A
Technical Data sheet of meter & Building Management System
Meter, BMS RE-R2
Refrigeration Units, & Technical Data sheet (with ODP, GWP values) N/A
RE-R3
Fire Suppression N/A
EAp3/EAc4 Refrigerant Atmospheric Impact calculation as per EAc4
Systems
TDS of lighting fixture /occupancy sensor / daylight sensor N/A
Lighting Fixture, LBi-6 Technical data sheet of High-frequency ballasts. N/A
Occupancy, day light RE R1/RE 1 Shop drawings highlighting the location of occupancy sensor and N/A
sensor EAp2/c1 control diagram.
Space-wise light power density (LPD) calculation N/A
Technical data sheet with Energy Star Certificate or EU Energy N/A
Appliances RE-3
efficiency label
Technical data sheet with idle/downtime’(standby) features, N/A
Lifts RE-4
regenerative drive system, LED lighting and LCD display features.
Provide Product Specific Values in the table below as per the supporting documents attached.
Credit
Material Type Required Information Product Value Unit
Reference
Product VOC Content N/A g/l
LBi-2.1 VOC limit as per SCAQMD 1168 N/A g/l
Adhesives & Sealants
IEQc-4.1 VOC category as per SCAQMD 1168 N/A
Test method used (shall be as per SCAQMD Rule 1168) N/A
Paints & Coatings LBi-2.2 Product VOC Content N/A
Confirmed by Manufacturer/Supplier:
Date : 22/02/2024
Signature / Stamp :
Signature :
Date :
01-03-2024
Signature :
Date :
Name : Chellapil
Chellapillai
piilla
pillai
pi
pil la
lai
ai Srinivasan
Srri
Sri
Srriniv
niv
niv
ni
ivasa
i as
assa
asaan
Signature :
Date :
If you have any queries, please contact the undersigned on 800-HILTI (44584).
Remarks:
We herewith certify that the material described above complies with the terms of the
order. Which is matching with specifications and standards mentioned in the HILTI
applications and product catalogue.
WARRANTY CERTIFICATE
We (Venesta Middle East FZE) confirm that all items under our scope of work for the above-
mentioned sub-contract agreement were executed by ourselves and are warranted for one year for
workmanship from the date of taking over the certificate.
Venesta Middle East FZE hereby confirms as well that the aforementioned supplied items follow the
project-approved details and Venesta Middle East FZE will not have any liability or obligation under
this warranty for the following exclusions:
1. Any defect caused by misuse or abuse of the items.
2. Damage caused by natural disasters.
3. Damage caused by unauthorized modification by the main contractor/client& other
subcontractors.
4. Wilful, intentional, or accidental damage.
5. Damage caused by carrying out any workmanship on the panels without MEP permission.
6. Damage caused by changes made to the sub-frames and Panels.
7. Damage due to cleaning of the peel of materials by non-neutral chemicals
8. Damage due to removing our product & installing where it was not designed or intended to be
used.
9. The whole or partial replacement of the profiles or parts of it.
10. Direct or indirect damage due to deformation of the materials due to climatic conditions
prevailing.
11. Failure to follow cleaning and maintenance guidelines & If the maintenance team of the main
contractor/client does not follow the correct procedures or maintain proper records as stated in
the operation & maintenance manual issued by M/s Venesta Middle East FZE.
Any claim on the above warranty should be received by our office in writing on or before the expiry
date of the warranty period.
Yours Faithfully
For Venesta Middle East FZE
General Manager