WF-196827

01 Mar 2024

MATERIAL APPROVAL SUBMITTAL


Zayed National
Project Name: Employer: Dept of Culture & Tourism
Museum
Project Manager: Hill International Supervision Consultant: F+P/WSP JV
Consultant of Record: WSP Contractor: STJV

ZNM-ALE-MSB-
Submittal Ref: Rev.00
Discipline: AR CV DR EL FC FL HS ME PH ST AR-FI-000787
Cross reference
Element: Chemical Anchor Bolts Date: 01-03-2024
Material Hilti Chemical Anchor Bolts Manufacturer M/s. Hilti
List of Submitted Items:
Item Description No of Copies Remarks
Material Submittal for Chemical Anchor Bolts (HILTI)
for Cubicle Partition

Material Details:
01  Hilti HIT-HY 200-R V3 Injection Mortar Soft Copy only
 Threaded Rod TRS
Manufacturer / Supplier: M/s Hilti / M/s Venesta Middle
East FZE
Ref. Spec (s): 050523 Ref. Drwg (s): Refer to the attached drawing

Compliance Statement:
The Contractor hereby confirms that the submitted items have been reviewed in detail and are correct and in strict
conformance with the Contract Documents. (compliance statement attached)
Initiator / ALEC Sustainability / STJV QA/QC Manager / STJV Technical Director / STJV

Signature: Signature: Signature: Signature:


Date: 01-03-2024 Date: 01-03-2024 Date: 01-03-2024 Date: 01-03-2024
Name: Mickel Gerges Fouad Name: Adeliza Coronacion Name: Mondher Ouafi Name: Santanu Chattopadhyay

REVIEWER’S COMMENTS

CSC (Engineering) A☐ B☐ C☐ D☐ E☐ CSC (Architectural) A☐ B☐ C☐ D☐ E ☐


STR:
As per Section 7 (Approved Shop Drawing/Sketch/Design Drawing), the "drawings are
indicative only, shop drawings shall be submitted separately for area of
application/scope'.
The approval is subject to the approved area of application, as per the associated
approved structural design and shop drawings.

Sustainability-No comments

Name, Signature and date 05-03-24


Name, Signature and date
Comments Sheet Attached? Yes ☐ No ☐ Comments Sheet Attached? Yes ☐ No ☐
PROJECT MANAGEMENT CONSULTANTS A☐ B☐ C☐ D☐ E☐

ER: Status E - Refer to the CSC comments.

Deena 06/March/2024
Name & Signature: Date:

Note: The CSC/PMC approval shall not in any way relieve the Contractor of his obligation under the Contract. The Contractor
shall be solely responsible for the soundness and the correctness of the submitted Materials and Documents as per the
required Contract Conditions and Contract Clauses

Codes: A: Approved B: Approved with comments C: Revise & Resubmit D: Rejected E: For Information only
Page 1 of 1
Zayed National Museum Abu Dhabi, U.A.E.

TITLE : Material Submittal for Chemical Anchor Bolts (HILTI)


for Cubicle Partition
CLIENT : DEPARTMENT OF CULTURE AND TOURISM
CONSULTANT : Foster + PARTNERS / WSP JV
MAIN CONTRACTOR : STJV
SUB-CONTRACTOR : M/s. ALEC Fit Out
SUPPLIER NAME : M/s. Venesta Middle East FZE
MANUFACTURER : M/s. HILTI
Material Ref. No. : ZNM-ALE-MSB-AR-FI-000787 Rev.00
Table of Content

 Product name, Manufacturer’s Name, location of use and Scope


 Compliance Statement
 Catalogue / Brochure / Material Data Sheet – Original+copies+pdf
 Valid Manufacturer Quality certificate (ISO or Other)
 Marked Copy of Related B.O.Q.
 Marked Copy of Related Contract Specification
 Extract of Copy of Approved Shop Drawing / Sketch/ Design drawing
 Material Safety Data Sheet
 Technical / Material Data Sheet
 Application Information
 Application Method Statement (site specific MSRA shall be submitted separately upon
the selection of the material if required by the CSC)
 Labelled Sample
 Test Results as required
 Licenses of Supplier / Manufacturer / Applicator
 Previous Approvals, similar projects
 Sustainability Material Submittal Questionnaire
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

1. PRODUCT NAME, MANUFACTURER’S


NAME, LOCATION OF USE AND SCOPE
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

Material List
Material Code "SPECS" Material Material Material Manufacturer /
SL.No Specs Detail/DWG Material Description Spec. Section Area of used Product / Finish
Reference Description Type Classification Supplier

Chemical HY 200 Toilet –


Chemical Anchor Hilti HIT- HY 200-R V3 Injection Chemical
1 Anchor 050523 Chemical Cubicle Hilti
Bolts Mortar Fixation
Bolts Fixation Partition

Toilet –
Threaded Threaded
2 Threaded Rod Threaded Rod TRS 050523 Fixation Cubicle Hilti
Rod TRS Rod
Partition
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

2. COMPLIANCE STATEMENT
OBSERVATION COMMENTS SHEET (OCS)
Zayed National Museum

ZAYED NATIONAL MUSEUM


SPECIFICATION COMPLIANCE STATEMENT
SECTION 050523 METAL FASTENINGS
Sub Ref ZNM-ALE-MSB-AR-FI-000787
Doc Title: Material Submittal for Chemical Anchor Bolts (HILTI) for Cubicle Partition Revision 00
Date 23-Feb-24
SPECIFICATION REQUIREMENTS CONTRACTORS PROPOSAL REMARKS
S/N SPECIFICATION DETAILS PROPOSAL COMPLIANCE
1 050523 SECTION 050523 METAL FASTENINGS
2 050523 PART 1 GENERAL
3 050523 1.1 SUMMARY
A. General: Read this Section in conjunction with other related
4 050523 Sections, Division 01 General Requirements, Preliminaries and the Complied
Contract Conditions.
5 050523 B. Section Includes: Complied
6 050523 1. Metal fastening and fixings. Complied
7 050523 C. Related Work Sections and documentation: Complied
8 050523 1. As referenced in applicable Work Sections. Complied
9 050523 1.2 SUBMITTALS
A. General: Comply with the requirements of Section 013300
10 050523 Complied as noted
Submittal Procedures and submit the following.
11 050523 B. Tender Submittals: Complied
12 050523 1. As referenced in applicable Work Sections. Complied
13 050523 C. Pre-contract Samples: Complied
14 050523 1. As referenced in applicable Work Sections. Complied
15 050523 D. Post Contract Submittals: Complied
16 050523 1. As referenced in applicable Work Sections. Complied
17 050523 E. Post Contract Samples: Complied
18 050523 1. As referenced in applicable Work Sections. Complied
19 050523 1.3 CLOSEOUT SUBMITTALS
A. General: Comply with the requirements of Section 017800 Closeout
20 050523 Complied
Submittals, and submit the following:
1. Operation and Maintenance Manuals: Include component list with
manufacturer's reference numbers, descriptions of materials and
21 050523 Complied
procedures for repairing and cleaning of finishes; and cleaning
frequency.
22 050523 1.4 SUSTAINABILITY
A. It shall be a Client prerequisite for the project to achieve dual
23 050523 accreditation to the two principal sustainability programmes prevalent in N/A
the region, summarised hereunder.
1. The Contractor shall be required to fully discharge all obligations
necessary to ensure compliance with the pursuance of the LEED New
Construction 2009 Rating Program. Refer to Section 018113 -
24 050523 N/A
Sustainable Design Requirements - LEED and associated
environmental Sections forming part of the Division 01 suite of
documents.
OBSERVATION COMMENTS SHEET (OCS)
Zayed National Museum

ZAYED NATIONAL MUSEUM


SPECIFICATION COMPLIANCE STATEMENT
SECTION 050523 METAL FASTENINGS
Sub Ref ZNM-ALE-MSB-AR-FI-000787
Doc Title: Material Submittal for Chemical Anchor Bolts (HILTI) for Cubicle Partition Revision 00
Date 23-Feb-24
SPECIFICATION REQUIREMENTS CONTRACTORS PROPOSAL REMARKS
S/N SPECIFICATION DETAILS PROPOSAL COMPLIANCE
2. The Contractor shall be required to fully discharge all obligations
necessary to ensure compliance with the pursuance of the Estidama
Pearl Building Rating System Version 1. Refer to Section 018114 -
25 050523 N/A
Sustainable Design Requirements - Estidama and associated
environmental Sections forming part of the Division 01 suite of
documents.
26 050523 1.5 QUALITY ASSURANCE
A. QA/ QC procedures for inspection of fixings to the Engineer to Installation and post-installation activities
27 050523 include, but not be limited to, checking each fixing for correct torques, will be carried out per the Engineer's Complied
depth of mortices, alignment, etc. requirement

B. All fixings shall be tested in accordance with BS 5080: Parts 1


28 050523 Complied
and 2 by an independent Testing Authority acceptable to the Engineer.

C. Provide mock-ups, prototypes, quality benchmark installations,


29 050523 testing and inspections in accordance with Section 014000 Quality Complied
Requirements.
30 050523 D. Mock-ups: Complied
31 050523 C. Pre-contract Samples: Complied
32 050523 E. Prototypes: Complied
33 050523 1. Refer to Document No. A-Z - PS001: N/A
34 050523 F. Quality Benchmark Installation: Complied
35 050523 1. As referenced in applicable Work Sections. Complied
36 050523 G. Sustainability Standards Certifications: Complied
37 050523 1. As referenced in applicable Work Sections. Complied
38 050523 1.6 WARRANTIES

A. Provide a warranty or warranties for the work of this section as


39 050523 Warranty certificate will be provided Complied
requested by the Client or within the contract documentation.
OBSERVATION COMMENTS SHEET (OCS)
Zayed National Museum

ZAYED NATIONAL MUSEUM


SPECIFICATION COMPLIANCE STATEMENT
SECTION 050523 METAL FASTENINGS
Sub Ref ZNM-ALE-MSB-AR-FI-000787
Doc Title: Material Submittal for Chemical Anchor Bolts (HILTI) for Cubicle Partition Revision 00
Date 23-Feb-24
SPECIFICATION REQUIREMENTS CONTRACTORS PROPOSAL REMARKS
S/N SPECIFICATION DETAILS PROPOSAL COMPLIANCE
40 050523 PART 2 PRODUCTS
41 050523 2.1 PERFORMANCE REQUIREMENTS
A. Durability - fixings shall be selected such that adequate
42 050523 protection against any corrosion likely to occur in their position of use is Complied
provided for the service life specified.
B. Rigidity - fixings shall be used which are suited to the likely
43 050523 Complied
stresses, movements and vibrations in use.

C. Appearance - unless otherwise specified, fixings shall not be


44 050523 visible; where fixings are visible these shall match or suit the items Complied
being fixed or comply with the Design Drawings.

D. Use fixings that are suitable for their intended purpose and
45 050523 Complied
adequate to comply with the requirements stated in the Specification.

E. All bolts, screws, nuts, anchors and other fixings shall be of


adequate strength for their designed purpose and shall, unless specified
46 050523 otherwise, be manufactured from the most appropriate grade of N/A
austenitic stainless steel or other materials as specified. Where
specified, structural steel fixings shall comply with the grades specified.

F. Supply all necessary and appropriate fasteners, fixings, bearings,


47 050523 brackets, etc. necessary for the safe and proper installation plus Complied
associated flashings and closures.

G. Use fixings that are suitable for their intended purpose and
48 050523 Complied
adequate to comply with the requirements stated in the Specification.

H. All bolts, screws, nuts, anchors and other fixings shall be of


adequate strength for their designed purpose and shall, unless specified
49 050523 otherwise, be manufactured from the most appropriate grade of Complied
austenitic stainless steel or other materials as specified. Where
specified, structural steel fixings shall comply with the grades specified.

I. Supply all necessary and appropriate fasteners, fixings,


50 050523 bearings, brackets, etc. necessary for the safe and proper installation Complied
plus associated flashings and closures.
OBSERVATION COMMENTS SHEET (OCS)
Zayed National Museum

ZAYED NATIONAL MUSEUM


SPECIFICATION COMPLIANCE STATEMENT
SECTION 050523 METAL FASTENINGS
Sub Ref ZNM-ALE-MSB-AR-FI-000787
Doc Title: Material Submittal for Chemical Anchor Bolts (HILTI) for Cubicle Partition Revision 00
Date 23-Feb-24
SPECIFICATION REQUIREMENTS CONTRACTORS PROPOSAL REMARKS
S/N SPECIFICATION DETAILS PROPOSAL COMPLIANCE
51 050523 2.2 MATERIALS

A. All fixings shall be of sufficient strength, appropriate to their


location, and are provided at adequate positions so as to ensure the
52 050523 performance of the elements being attached. The fixings shall be Complied
suitable and used solely for the purposes intended by the manufacturer
in order to satisfy the requirements of the Specification.

53 050523 B. Powder Actuated Fixing Systems: N/A


1. Do not use powder actuated fixing systems without acceptance
54 050523 Complied
by the Engineer.

55 050523 2. Tools shall be to BS 4078: Part 2 and Kite mark certified. Complied

3. Fasteners, accessories and consumables shall be types


56 050523 Complied
recommended by the tool manufacturer.
57 050523 C. Screw Fixings: Complied
58 050523 1. Screws to BS 1210. Complied
2. Washers and screw cups, where specified, shall be of the same
59 050523 Complied
material as the screw.
60 050523 D. Packings Generally: Complied
1. Provide suitable, tight packings at fixing points to take up
61 050523 Complied
tolerances and prevent distortion.
2. Use non-compressible, rot-proof, non-corrodible materials
62 050523 Complied
positioned adjacent to fixing points.
63 050523 E. Types of Nail: Nails shall be to BS 1202. Complied

64 050523 F. Masonry Nails: Do not use without acceptance by the Engineer. Complied

G. Plugs Generally: Use proprietary types selected to suit the


65 050523 Complied
background, loads to be supported and conditions expected in use.

66 050523 PART 3 EXECUTION


67 050523 3.1 EXAMINATION

A. Verification of Conditions: Prior to commencing installation, examine


the structural openings, substrate, adjacent construction and the
Before commencing the installation, the
68 050523 conditions in which the work will be installed. Verify dimensions and Complied
areas will be examined.
levels, and surfaces to receive the work of this Section. Notify the
Engineer of unsatisfactory conditions.
OBSERVATION COMMENTS SHEET (OCS)
Zayed National Museum

ZAYED NATIONAL MUSEUM


SPECIFICATION COMPLIANCE STATEMENT
SECTION 050523 METAL FASTENINGS
Sub Ref ZNM-ALE-MSB-AR-FI-000787
Doc Title: Material Submittal for Chemical Anchor Bolts (HILTI) for Cubicle Partition Revision 00
Date 23-Feb-24
SPECIFICATION REQUIREMENTS CONTRACTORS PROPOSAL REMARKS
S/N SPECIFICATION DETAILS PROPOSAL COMPLIANCE
69 050523 3.2 INSTALLATION
A. Carry out all necessary preparation work such as drilling,
All the holes for bolting/fastening to
plugging, screwing, bolting, cutting for anchor bolts or sockets to be
70 050523 assemble will be done in the factory itself, Complied as noted
cast-in and for making good, including grouting-in of anchor bolts and
but not on-site
fixings where necessary.
B. The method of fixing shall not damage anything being fixed or
71 050523 Complied
anything receiving fixings.

72 050523 C. Welding shall not be permitted, unless accepted by the Engineer. N/A

D. Fasteners shall be installed with a co-ordinated purpose design


tooling system that incorporates a mechanical depth locator to ensure
73 050523 consistent depth setting and facilitates perpendicular installation. The Complied
fastener manufacturer shall be capable of providing on-Site instruction
in the use of the fastener installation tooling system.

74 050523 E. Ensure that no lock-up stresses are generated. N/A


F. Generally, fixings within aluminium framing components shall not
75 050523 be visible, with the exception of capping pieces fixed to vertical Complied
mullions.
G. Visible fixings shall be restricted to the assembly of non-visible
76 050523 elements to support steelwork, using round-headed Allen bolts into a N/A
proprietary system.
H. Any steel sub-frame assemblies shall be galvanised and
77 050523 effectively weatherproofed to avoid exposure to the external N/A
environment.
I. Provide cast-in channel fixings in concrete and fixings directly
78 050523 N/A
made to structural steelwork.
79 050523 J. Powder Actuated Fixing: N/A
1. Tools shall be used in accordance with BS 4078: Part 1.
80 050523 Operatives shall be trained and certified as competent by the Complied
Contractor.
2. Ensure that operatives take full precautions against injury to
81 050523 Complied
themselves and others.
3. Remove all unspent cartridges from the Site when no longer
82 050523 Complied
required.

4. Apply zinc rich primer to heads of fasteners used externally in


83 050523 N/A
external walls or in other locations subject to dampness.

5. Use top hat section plastic washers to isolate cartridge-fired nails


84 050523 from stainless steel components fixed externally, in external walls or in N/A
other locations subject to dampness.
85 050523 K. Screw Fixings:
OBSERVATION COMMENTS SHEET (OCS)
Zayed National Museum

ZAYED NATIONAL MUSEUM


SPECIFICATION COMPLIANCE STATEMENT
SECTION 050523 METAL FASTENINGS
Sub Ref ZNM-ALE-MSB-AR-FI-000787
Doc Title: Material Submittal for Chemical Anchor Bolts (HILTI) for Cubicle Partition Revision 00
Date 23-Feb-24
SPECIFICATION REQUIREMENTS CONTRACTORS PROPOSAL REMARKS
S/N SPECIFICATION DETAILS PROPOSAL COMPLIANCE
Bolt connections are tight and flush with
1. All screws shall have clearance holes. Screws of 8 gauge or more
the adjoining surface. The excess length
86 050523 and all screws into hardwood shall have pilot holes approximately half Complied
for relation in stress during the re-torque is
the diameter of the shank.
allowed
2. Before using brass, aluminium or other soft metal wood screws,
87 050523 Complied
pre-cut the thread with a matching steel wood screw.
3. Do not hammer screws unless specifically designed to be
88 050523 Complied
hammered.

4. Countersink screw heads not less than 2mm below timber surfaces
89 050523 Complied
that will be visible in the completed work, unless specified otherwise.

L. Packings Generally: Ensure that packings do not intrude into


90 050523 Complied
zones that are to be filled with sealants.
91 050523 M. Nail Fixing: Complied
1. In joints, use not less than two nails and opposed skew nailing
92 050523 N/A
unless specified otherwise.
2. Drive nails fully in without splitting or crushing the material being
93 050523 N/A
fixed.
3. Punch nail heads below surfaces that will be visible in the
94 050523 Complied
completed work.

N. Plugs Generally: Locate plugs accurately in correctly sized holes


95 050523 Complied
in accordance with the manufacturer's recommendations.

END OF SECTION
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

3. CATALOGUE / BROCHURE /
MATERIAL DATA SHEET
Dear Sir,

We would like to outline the support available to you from HILTI on your project. As well as offering top
quality product solutions, HILTI also offers to you the following service solutions that as a package are
unique in the market:

PROFESSIONAL ASSISTANCE. Helps make every project a success.

 Engineering design and calculation


When you need support in identifying the most suitable, cost-effective and approved solution from Hilti for your
different fastening, firestopping or installation tasks, our Engineering team will be at your side free of charge.

 Technical seminars
We offer technical seminars regarding Hilti engineered products free of charge, covering various topics ranging from
the principles behind these products to the most commonly used international norms and standards.

 Material estimation
Material estimations for all firestopping applications at site, can be provided free of charge. Ensuring the most cost-
effective, tested and approved system, based on the firestop estimation form filled by you.

 Hands-on training and mock-up


To ensure proper application of our firestop and installation systems products, hands-on training will be provided free
of charge for all installers. Mock-ups will be done free of charge to verify if the recommended solution suits the actual
conditions.

 UL and BS based firestop engineering judgment


Engineering judgments will be provided free of charge by certified Hilti Fire Protection Engineers. These judgments
represent firestop systems that would be expected to pass the stated ratings and requirements if tested, for those
situations where a tested system is not doable at site.

 Fasteners pullout test


A qualified Hilti representative will check on site if the trained workers already know how to properly install anchors
and/or verify the loads in case of uncertain base material strength. Number of free pullout tests will be provided as per
the Hilti policy.

 Firestop random spot inspection


To assist the customer in verifying proper installation according to the approved firestop systems and to facilitate the
requirements of the project’s official firestop inspectors, a qualified Hilti representative will do random spot inspections
on site free of charge.

 Project tendering, planning and support


Our experienced technical staff give you support to ensure things are done right the first time. We can help with
bidding, norm and non-norm specification and provide individual type catalogues. Plans, materials lists, calculations,
CAD / BIM drawings for larger projects are part of the package. Hilti project managers assist by coordinating logistics
services and technical support for defined projects.

 Leed Documentation
Request for LEED documentation for all Hilti products through your Hilti representative or download them online,
anytime.

We bring our services to you


Your local Hilti representative is at your service on your job-sites, bringing experience that helps you stay a step
ahead by providing application know-how and solutions for complex situations, helping you select the optimum
product for the job, as well as giving on-site demonstrations of innovative products.
Customer Service takes your orders
We’re ready to answer your questions, take your orders, and meet your requests. But don’t worry if you can’t find the
time to talk to us- our fax line is open for you 24 hours a day.

Hilti Center – your shop around the corner


Where Hilti products are available off the shelf – backed by the know-how and experience of our competent staff. Ask
for a product demonstration and be sure to leave with the right solution for your needs. Bring us your Hilti tool if it
needs servicing – we’ll check it in the shop and suggest the best course of action.

AT YOUR FINGERTIPS. Order, manage your inventory, check shipping status and more.
Hilti website: www.hilti.ae

 Product Information
Hilti‘s website is available for around the clock advice and information, including an online catalogue of products,
Firestop and Anchor Design Centers, plus a technical library and details of your local Hilti Center.

 Technical Information
Access relevant technical information such as safety data sheets, approvals and specifications for Hilti products.
Download the latest Hilti PROFIS Design Software and BIM/CAD objects for planners, specifiers and engineers as
well as latest specification texts, free of charge.

 Product offers
View Hilti Center product packages and purchase exclusive online* offers featured in the products section page.

 Store locator
Browse through our website for contact information and location of our stores within the region.

Know How. for everyone in the construction.

 Training
To ensure you profit from Hilti’s vast experience, we organize training on any current topic concerning Hilti products
and services. These events are organized throughout the country. For details of dates and locations ask your local
Hilti representative.

 What we offer and how you benefit


- Training duration from 2 hours up to 2 days
- Technical and practical know-how
- Increased safety and productivity in your work and projects Certification

 Specific courses
- HIT rebar training
- Firestop training
- Product-specific competence training
- DX training
- Diamond coring and sawing training
- Health and safety workshops
- Technical software training (PROFIS)

Yours Sincerely,
Hilti Engineering Department
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

4. VALID MANUFACTURER QUALITY


CERTIFICATE
HILTI EMIRATES L.L.C
DUBAI INVESTMENT PARK, DUBAI, P.O. BOX 11051, DUBAI, UNITED ARAB EMIRATES

This is a multi-site certificate, additional site is/are listed on the next page/s

Bureau Veritas Certification certify that the Management System of the above organisation has
been audited and found to be in accordance with the requirements of the management system
standards detailed below

ISO 9001:2015
Scope of Certification

SALES, TECHNICAL SERVICES, MARKETING AND REPAIR OF HARDWARE, ELECTRICAL


OPERATED TOOLS, BATTERY OPERATED TOOLS, MECHANICAL PRODUCTS, STEEL
PRODUCTS, MEASURING PRODUCTS, MANUAL TOOLS, CHEMICAL ANCHOR AND FIRE
SALES, TECHNICAL SERVICES, MARKETING AND REPAIR OF HARDWARE, ELECTRICAL
OPERATED TOOLS, BATTERY OPERATED TOOLS, MECHANICAL PRODUCTS, STEEL
PRODUCTS, MEASURING PRODUCTS, MANUAL TOOLS, CHEMICAL ANCHOR AND FIRE
PROTECTION PRODUCTS AND RELATED ACCESSORIES TO CONSTRUCTION, OIL AND GAS
AND ENERGY INDUSTRIES.

Original cycle start date: 09 July 2019

Expiry date of previous cycle: 08 July 2022

Certification / Recertification Audit date: 11 June 2022

Certification / Recertification cycle start date: 04 August 2022

Subject to the continued satisfactory operation of the organization’s 08 July 2025


Management System, this certificate expires on:

Certificate no.: DU004964 Version: 1 Issue date: 04 August 2022

002 – CB - QMS
Signed on behalf of Bureau Veritas – Dubai Br.

Local office: Bureau Veritas – Dubai Br, 2nd Floor, Block C, Al Hudaiba Awards Building, Jumeirah
Road with 2nd December Interchange, Dubai, U.A.E.
Further clarifications regarding the scope and validity of this certificate, and the applicability of the
management system requirements, please call: 00971 4 3074400.
88 Mar-2019
1/2
HILTI EMIRATES L.L.C
DUBAI INVESTMENT PARK, DUBAI, P.O. BOX 11051, DUBAI, UNITED ARAB EMIRATES

Bureau Veritas Certification certify that the Management System of the above organisation has
been audited and found to be in accordance with the requirements of the management system
standards detailed below

ISO 9001:2015
Scope of Certification

SALES, TECHNICAL SERVICES, MARKETING AND REPAIR OF HARDWARE, ELECTRICAL


OPERATED TOOLS, BATTERY OPERATED TOOLS, MECHANICAL PRODUCTS, STEEL
PRODUCTS, MEASURING PRODUCTS, MANUAL TOOLS, CHEMICAL ANCHOR AND FIRE
PROTECTION PRODUCTS AND RELATED ACCESSORIES TO CONSTRUCTION, OIL AND GAS
AND ENERGY INDUSTRIES

Original cycle start date: 09 July 2019

Expiry date of previous cycle: 08 July 2022

Certification / Recertification Audit date: 11 June 2022

Certification / Recertification cycle start date: 04 August 2022

Subject to the continued satisfactory operation of the organization’s 08 July 2025


Management System, this certificate expires on:

Certificate no.: DU004964-001 Version: 1 Issue date: 04 August 2022

002 – CB - QMS
Signed on behalf of Bureau Veritas – Dubai Br.

Local office: Bureau Veritas – Dubai Br, 2nd Floor, Block C, Al Hudaiba Awards Building, Jumeirah
Road with 2nd December Interchange, Dubai, U.A.E.
Further clarifications regarding the scope and validity of this certificate, and the applicability of the
management system requirements, please call: 00971 4 3074400.
Mar-2019 89
1/1
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

5. RELATED B.O.Q

Based on Contract Bill of Quantities


ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

6. RELATED CONTRACT SPECIFICATION


Zayed National Museum

SECTION 050523 METAL FASTENINGS 1

PART 1 GENERAL 1

1.1 SUMMARY 1

1.2 SUBMITTALS 1

1.3 CLOSEOUT SUBMITTALS 1

1.4 SUSTAINABILITY 1

1.5 QUALITY ASSURANCE 1

1.6 WARRANTIES 2

PART 2 PRODUCTS 2

2.1 PERFORMANCE REQUIREMENTS 2

2.2 MATERIALS 2

PART 3 EXECUTION 3

3.1 EXAMINATION 3

3.2 INSTALLATION 3

Architectural Specification ZNM-FP-AS-001 050523 Foster + Partners


Issue: IFC for plot P08 only METAL FASTENINGS
7th May 2020
Zayed National Museum

SECTION 050523 METAL FASTENINGS

PART 1 GENERAL

1.1 SUMMARY

A. General: Read this Section in conjunction with other related Sections, Division 01 General
Requirements, Preliminaries and the Contract Conditions.

B. Section Includes:
1. Metal fastening and fixings.

C. Related Work Sections and documentation:


1. As referenced in applicable Work Sections.

1.2 SUBMITTALS

A. General: Comply with the requirements of Section 013300 Submittal Procedures and submit
the following.

B. Tender Submittals:
1. As referenced in applicable Work Sections.

C. Pre-contract Samples:
1. As referenced in applicable Work Sections.

D. Post Contract Submittals:


1. As referenced in applicable Work Sections.

E. Post Contract Samples:


1. As referenced in applicable Work Sections.

1.3 CLOSEOUT SUBMITTALS

A. General: Comply with the requirements of Section 017800 Closeout Submittals, and submit
the following:
1. Operation and Maintenance Manuals: Include component list with manufacturer's
reference numbers, descriptions of materials and procedures for repairing and cleaning
of finishes; and cleaning frequency.

1.4 SUSTAINABILITY

A. It shall be a Client prerequisite for the project to achieve dual accreditation to the two principal
sustainability programmes prevalent in the region, summarised hereunder.
1. The Contractor shall be required to fully discharge all obligations necessary to ensure
compliance with the pursuance of the LEED New Construction 2009 Rating Program.
Refer to Section 018113 - Sustainable Design Requirements - LEED and associated
environmental Sections forming part of the Division 01 suite of documents.
2. The Contractor shall be required to fully discharge all obligations necessary to ensure
compliance with the pursuance of the Estidama Pearl Building Rating System Version 1.
Refer to Section 018114 - Sustainable Design Requirements - Estidama and associated
environmental Sections forming part of the Division 01 suite of documents.

1.5 QUALITY ASSURANCE

A. QA/ QC procedures for inspection of fixings to the Engineer to include, but not be limited to,
checking each fixing for correct torques, depth of mortices, alignment, etc.

Architectural Specification ZNM-FP-AS-001 050523 / 1 Foster + Partners


Issue: IFC for plot P08 only METAL FASTENINGS
7th May 2020
Zayed National Museum

B. All fixings shall be tested in accordance with BS 5080: Parts 1 and 2 by an independent Testing
Authority acceptable to the Engineer.

C. Provide mock-ups, prototypes, quality benchmark installations, testing and inspections in


accordance with Section 014000 Quality Requirements.

D. Mock-ups:
1. Refer to Document No. A-Z - PS001:

E. Prototypes:
1. Refer to Document No. A-Z - PS001:

F. Quality Benchmark Installation:


1. As referenced in applicable Work Sections.

G. Sustainability Standards Certifications:


1. As referenced in applicable Work Sections.

1.6 WARRANTIES

A. Provide a warranty or warranties for the work of this section as requested by the Client or
within the contract documentation.

PART 2 PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Durability - fixings shall be selected such that adequate protection against any corrosion likely
to occur in their position of use is provided for the service life specified.

B. Rigidity - fixings shall be used which are suited to the likely stresses, movements and vibrations
in use.

C. Appearance - unless otherwise specified, fixings shall not be visible; where fixings are visible
these shall match or suit the items being fixed or comply with the Design Drawings.

D. Use fixings that are suitable for their intended purpose and adequate to comply with the
requirements stated in the Specification.

E. All bolts, screws, nuts, anchors and other fixings shall be of adequate strength for their designed
purpose and shall, unless specified otherwise, be manufactured from the most appropriate
grade of austenitic stainless steel or other materials as specified. Where specified, structural
steel fixings shall comply with the grades specified.

F. Supply all necessary and appropriate fasteners, fixings, bearings, brackets, etc. necessary for
the safe and proper installation plus associated flashings and closures.

G. Use fixings that are suitable for their intended purpose and adequate to comply with the
requirements stated in the Specification.

H. All bolts, screws, nuts, anchors and other fixings shall be of adequate strength for their designed
purpose and shall, unless specified otherwise, be manufactured from the most appropriate
grade of austenitic stainless steel or other materials as specified. Where specified, structural
steel fixings shall comply with the grades specified.

I. Supply all necessary and appropriate fasteners, fixings, bearings, brackets, etc. necessary for
the safe and proper installation plus associated flashings and closures.

2.2 MATERIALS

Architectural Specification ZNM-FP-AS-001 050523 / 2 Foster + Partners


Issue: IFC for plot P08 only METAL FASTENINGS
7th May 2020
Zayed National Museum

A. All fixings shall be of sufficient strength, appropriate to their location, and are provided at
adequate positions so as to ensure the performance of the elements being attached. The
fixings shall be suitable and used solely for the purposes intended by the manufacturer in order
to satisfy the requirements of the Specification.

B. Powder Actuated Fixing Systems:


1. Do not use powder actuated fixing systems without acceptance by the Engineer.
2. Tools shall be to BS 4078: Part 2 and Kite mark certified.
3. Fasteners, accessories and consumables shall be types recommended by the tool
manufacturer.

C. Screw Fixings:
1. Screws to BS 1210.
2. Washers and screw cups, where specified, shall be of the same material as the screw.

D. Packings Generally:
1. Provide suitable, tight packings at fixing points to take up tolerances and prevent distortion.
2. Use non-compressible, rot-proof, non-corrodible materials positioned adjacent to fixing
points.

E. Types of Nail: Nails shall be to BS 1202.

F. Masonry Nails: Do not use without acceptance by the Engineer.

G. Plugs Generally: Use proprietary types selected to suit the background, loads to be supported
and conditions expected in use.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verification of Conditions: Prior to commencing installation, examine the structural openings,


substrate, adjacent construction and the conditions in which the work will be installed. Verify
dimensions and levels, and surfaces to receive the work of this Section. Notify the Engineer
of unsatisfactory conditions.

3.2 INSTALLATION

A. Carry out all necessary preparation work such as drilling, plugging, screwing, bolting, cutting
for anchor bolts or sockets to be cast-in and for making good, including grouting-in of anchor
bolts and fixings where necessary.

B. The method of fixing shall not damage anything being fixed or anything receiving fixings.

C. Welding shall not be permitted, unless accepted by the Engineer.

D. Fasteners shall be installed with a co-ordinated purpose design tooling system that incorporates
a mechanical depth locator to ensure consistent depth setting and facilitates perpendicular
installation. The fastener manufacturer shall be capable of providing on-Site instruction in the
use of the fastener installation tooling system.

E. Ensure that no lock-up stresses are generated.

F. Generally, fixings within aluminium framing components shall not be visible, with the exception
of capping pieces fixed to vertical mullions.

G. Visible fixings shall be restricted to the assembly of non-visible elements to support steelwork,
using round-headed Allen bolts into a proprietary system.

Architectural Specification ZNM-FP-AS-001 050523 / 3 Foster + Partners


Issue: IFC for plot P08 only METAL FASTENINGS
7th May 2020
Zayed National Museum

H. Any steel sub-frame assemblies shall be galvanised and effectively weatherproofed to avoid
exposure to the external environment.

I. Provide cast-in channel fixings in concrete and fixings directly made to structural steelwork.

J. Powder Actuated Fixing:


1. Tools shall be used in accordance with BS 4078: Part 1. Operatives shall be trained and
certified as competent by the Contractor.
2. Ensure that operatives take full precautions against injury to themselves and others.
3. Remove all unspent cartridges from the Site when no longer required.
4. Apply zinc rich primer to heads of fasteners used externally in external walls or in other
locations subject to dampness.
5. Use top hat section plastic washers to isolate cartridge-fired nails from stainless steel
components fixed externally, in external walls or in other locations subject to dampness.

K. Screw Fixings:
1. All screws shall have clearance holes. Screws of 8 gauge or more and all screws into
hardwood shall have pilot holes approximately half the diameter of the shank.
2. Before using brass, aluminium or other soft metal wood screws, pre-cut the thread with
a matching steel wood screw.
3. Do not hammer screws unless specifically designed to be hammered.
4. Countersink screw heads not less than 2mm below timber surfaces that will be visible in
the completed work, unless specified otherwise.

L. Packings Generally: Ensure that packings do not intrude into zones that are to be filled with
sealants.

M. Nail Fixing:
1. In joints, use not less than two nails and opposed skew nailing unless specified otherwise.
2. Drive nails fully in without splitting or crushing the material being fixed.
3. Punch nail heads below surfaces that will be visible in the completed work.

N. Plugs Generally: Locate plugs accurately in correctly sized holes in accordance with the
manufacturer's recommendations.

END OF SECTION

Architectural Specification ZNM-FP-AS-001 050523 / 4 Foster + Partners


Issue: IFC for plot P08 only METAL FASTENINGS
7th May 2020
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

7. APPROVED SHOP DRAWING /


SKETCH/ DESIGN DRAWING

Drawings are indicative only, Shop Drawings shall


be submitted separately for Area of Application /
Scope
PROJECT KEY PLAN :
N

AS PER PLAN

49
18 18
13 BLK-101 BLOCK WALL /
OUTSIDE INSIDE OUTSIDE INSIDE CON-101 CONCRETE WALL ZINC PLATED STEEL TIE BACK
STAINLESS STEEL CSK SCREW ROD FIX WITH 6x50mm CSK
ZNM-ALE-MSB-AR-FI-000787 SGL HANGING CLIPS
WITH RAWAL PLUG
49 5 (ZNM-ALE-MSB-AR-FI-000787)
(ZNM-ALE-MSB-AR-FI-000787
MDF BACKING VERTICAL STRIPS 18 18
PAN203 HPL MDF PAN203 HPL MDF (ZNM-ALE-MSB-AR-FI-000227) WALL TIE M8 THREADED BAR
BLK-101 BLOCK WALL /
DOOR PANEL (ZNM-ALE-MSB-AR-FI-000787)
NOTE: DOOR PANEL CON-101 CONCRETE WALL
WATERPROFFING DETAILS REFERED ZNM-ALE-MSB-AR-FI-000227 ZNM-ALE-MSB-AR-FI-000227 WALL FIXING STAINLESS STEEL PAN PAN-203 CUBICLE DUCT PANEL SUBFRAME 18mm HPL MDF FLASHGAPS
AND COORDINATED WITH WESTERN HEAD SCREW WITH FISHERPLUG PARTITION 18mm HPL MDF (ZNM-ALE-MSB-AR-FI-000787) (ZNM-ALE-MSB-AR-FI-000227)
ZNM-WII-AR-WP-MUB1-SDW-021036/37/38 (ZNM-ALE-MSB-AR-FI-000227) PAN-203 CUBICLE PARTITION
DOOR DETAILS REFER DOOR DETAILS REFER BLOCK WALL 18mm HPL MDF
SILICON SEALANT JOINT
DOOR SHOPDRAWINGS DOOR SHOPDRAWINGS (ZNM-ALE-MSB-AR-FI-000227)
(ZNM-ALE-MSB-AR-FI-000788
SILICON SEALANT JOINT
TRM-514 CERAMIC TILE SKIRTING WITH

3
(ZNM-ALE-MSB-AR-FI-000788

3
TILE ADHESIVE
(ZNM-ALE-MSB-AR-FI-000060) CLICK FIX NYLON CONNECTOR
12 (ZNM-ALE-MSB-AR-FI-000787) TRM-514 CERAMIC TILE SKIRTING

150
FL-704 CERAMIC TILE SHIM SPACE/PACKER/PLYWOOD WITH TILE ADHESIVE
FL-704 CERAMIC TILE STAINLESS STEEL CSK SCREW

150
FLOORING 400x800x10MM 10 (ZNM-ALE-MSB-AR-FI-000227) LIGHT GREY POWDER COATED ALUMINIUM (ZNM-ALE-MSB-AR-FI-000060)
FLOORING 400x800x10MM

103
NOTES :

100
4

100
95

95
THICK WITH 5MM ADHSIVE ZNM-ALE-MSB-AR-FI-000787 SILICON SEALANT JOINT BASERAIL (ZNM-ALE-MSB-AR-FI-000787)
THICK WITH 5MM ADHSIVE SILICON SEALANT JOINT
(ZNM-ALE-MSB-AR-FI-000060) (ZNM-ALE-MSB-AR-FI-000788) -FLOOR DETAILS ARE COORDINATED WITH
(ZNM-ALE-MSB-AR-FI-000060) ZNM-ALE-MSB-AR-FI-000788

10
F.F.L. F.F.L. F.F.L. F.F.L. F.F.L.

* STJV SCREED DRAWINGS-ZNM-GCS-AR-CO-MUB1-SDW-150003

10

10

10

10
5

5
AR: provide reference to Western's detail,
showing the application of same materials

5
identified here. This is to confirm the THIS SDW 232077,232079,232081,232082 DETAILS PERTAINING TO
waterproofing system can accommodate the

HST R-M8/10
RM 0118/RM 0119 SUBMITTED AS SBF- ZNM-STJV-SBF-ID-00-003966 ,

5
6-10mm gap in the floor, and use of the sealant
won't harm the WP system. z 6MM THICK OXICELL PE 6MM THICK OXICELL PE
ZNM-STJV-SBF-ID-00-003990

100
100

100

100
AR: note that in the TDS of the waterproofing POLYETHYLENE COMPRESSIBLE JOINT POLYETHYLENE COMPRESSIBLE JOINT

80

80

80

80
system, call for ditra 25 to be submerged into FILLER ZNM-STJV-MSB-CV-00-000106 FILLER ZNM-STJV-MSB-CV-00-000106
tile adhesive, followed by the another layer of
the tile adhesive applied on top of the WP
membrane. These works should be considered
and demonstrated on site mockup/first in
place. Typical
FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK FL-704 CERAMIC TILE FLOORING 400x800x10MM FL-704 CERAMIC TILE FLOORING 400x800x10MM
NOTE: NOTE: NOTE: NOTE:
WITH 5MM ADHSIVE WITH 5MM ADHSIVE THICK WITH 5MM ADHSIVE THICK WITH 5MM ADHSIVE
WATERPROFFING DETAILS REFERED WATERPROFFING DETAILS REFERED WATERPROFFING DETAILS REFERED WATERPROFFING DETAILS REFERED
(ZNM-ALE-MSB-AR-FI-000060) (ZNM-ALE-MSB-AR-FI-000060) (ZNM-ALE-MSB-AR-FI-000060) (ZNM-ALE-MSB-AR-FI-000060)
AND COORDINATED WITH WESTERN AND COORDINATED WITH WESTERN AND COORDINATED WITH WESTERN AND COORDINATED WITH WESTERN
ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 THIN BED MORTAR POLYBIT CM 11 AS PER ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 THIN BED MORTAR POLYBIT CM 11 AS PER ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 THIN BED MORTAR POLYBIT CM 11 AS PER AR: refer to comment, ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 THIN BED MORTAR POLYBIT CM 11 AS PER
MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372 MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372 MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372 *
marked on D503 MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372
SCHLUTER DITRA 25 POLYETHYENE SCHLUTER DITRA 25 POLYETHYENE SCHLUTER DITRA 25 POLYETHYENE SCHLUTER DITRA 25 POLYETHYENE REFERENCE IFC DRAWINGS
WATERPROOFING MEMBRANEAS PER WATERPROOFING MEMBRANEAS PER WATERPROOFING MEMBRANEAS PER WATERPROOFING MEMBRANEAS PER
MATERIAL-REF-NO. MATERIAL-REF-NO. MATERIAL-REF-NO. MATERIAL-REF-NO. DRG. NO Rev
ZNM-WII-MSB-AR-WP-000265 ZNM-WII-MSB-AR-WP-000265 ZNM-WII-MSB-AR-WP-000265 ZNM-WII-MSB-AR-WP-000265
POLYTHENE SHEET, 1000 GAUGE POLYTHENE SHEET, 1000 GAUGE POLYTHENE SHEET, 1000 GAUGE POLYTHENE SHEET, 1000 GAUGE A-M-WC530, A-M-WC531, A-M-WC532, A-M-WC533
(ZNM-STJV-MSB-AR-FI-000008) The purpose of this detail (ZNM-STJV-MSB-AR-FI-000008) (ZNM-STJV-MSB-AR-FI-000008) (ZNM-STJV-MSB-AR-FI-000008)
PAN-201 is mentioned in the title, but is unclear (it does not A-M-WC534, A-M-WC535, A-M-WC536, A-M-WC537
SCR-301 HEAVY DUTY UNBOUNDED SCR-301 HEAVY DUTY UNBOUNDED
nowhere in the actual detail. Please clarify, clarify any interfaces). SCR-301 HEAVY DUTY UNBOUNDED SCR-301 HEAVY DUTY UNBOUNDED
SCREED (ZNM-STJV-MSB-AR-FI-000008) SCREED (ZNM-STJV-MSB-AR-FI-000008) A-M-WC538, A-M-WC539, A-M-WC540, A-M-WC541
noting as well that the purpose of this detail SCREED (ZNM-STJV-MSB-AR-FI-000008) SCREED (ZNM-STJV-MSB-AR-FI-000008)
is unclear (it does not clarify any interfaces). FLOOR FIXING CHEMICAL CSK 5 x 50 mm SCREW M8 CHEMICAL ANCHOR BOLT
Typical for entire work-flow: A-M-WC542, A-M-WC543, A-M-WC544, A-M-WC545
(ZNM-ALE-MSB-AR-FI-000227) (ZNM-ALE-MSB-AR-FI-000787)
- Provide list of applicable rooms,
and shop-drawing set references. JOINTS SEAMING TAPE SCHLUTER-KERDI KEBA JOINTS SEAMING TAPE SCHLUTER-KERDI KEBA
FIXED WITH ADHESIVE SCHLÜTER®- FIXED WITH ADHESIVE SCHLÜTER®-
REFERENCE SHOP DRAWINGS
KERDI-COLL-L AS PER MATERIAL-REF-NO. KERDI-COLL-L AS PER MATERIAL-REF-NO.
ZNM-WII-MSB-AR-WP-000265 ZNM-WII-MSB-AR-WP-000265 DRG. NO Rev

234020/021/022/023/024/025/026/027/028/029/030 R00
234031/032/033,234004, 234005, 234006 R00
D501 INTERFACE DETAIL - (PAN201-FL 704) FLOOR INTERFACE D502 INTERFACE DETAIL - (PAN203-FL704) FLOOR INTERFACE D503 INTERFACE DETAIL - (PAN203-FL704) FLOOR INTERFACE D504 INTERFACE DETAIL - (PAN203-TRM514-FL704) FLOOR INTERFACE
ZNM-WII-AR-WP-MUB1-SDW-021030-38 R00
IFC Ref. DRAWING No. A-M-WC-530/531/532/544 IFC Ref. DRAWING No: A-M-WC560 IFC Ref. DRAWING No. A-M-WC-532, DETAIL 01 IFC Ref. DRAWING No. A-M-WC-532, DETAIL 04 ZNM-EMC-AR-FI-MUAL-SDW-152301 R00
AR GENERAL:
- All fasteners employed to secure anything to the floor should be made of stainless steel REFERENCE RFI NO.
A4 to ensure sufficient corrosion resistance.
- All penetrations through the waterproofing membrane must be identified and resolved in
collaboration with the waterproofing applicator (Western). Penetrations and expansion DRG. NO Rev
joints (corners) should be sealed using materials compatible with the approved Ditra 25
WP system. 100 ZNM-ALE-RFI-AR-FI-001459
When planning the sequence of work, it's essential to consider sealing the WP
2 2
18 60 18
penetrations since access is required to apply the appropriate sealant. Details must be
prepared with this requirement in mind. Please note that flood tests are to be conducted
once the penetrations are sealed. And no penetrations shall be done after flood test is
completed. 60X100MM ALUMINUM
With this in mind, the contractor is advised to review the partition fixing detail and to avoid NOTE: SUPPORT FRAME
Please minimize the thickness of adhesive, the abortive work if any leaks are identified during the flood test. This can be achieved by SECTION: A-A (ZNM-ALE-MSB-AR-FI-000787)
opting for a pre-fixed anchor rod that is sealed before the application of tiles above it. PAN203 HPL MDF
and offer a benchmark for review/approval. (FL-904 STONCLAD HT SYSTEM (6 mm)
DOOR PANEL
- Note that the TDS of the waterproofing system specifies that Ditra 25 should be
submerged into the tile adhesive, followed by another layer of tile adhesive applied on top
COVED SKIRTING DETAILS)
ZNM-ALE-MSB-AR-FI-000227
FIXING CLIPS
(ZNM-ALE-MSB-AR-FI-000787)
DOCUMENT REVIEW
BLK-101 BLOCK WALL / ZNM-EMC-AR-FI-MUAL-SDW-152301
of the waterproofing (WP) membrane. These procedures should be taken into account and
CON-101 CONCRETE WALL demonstrated through an on-site mockup or during the initial installation. DOOR DETAILS REFER
DOOR SHOPDRAWINGS
60 x100mm TUBE WITH
20MM DIA HOLES FOR
PAN-203 CUBICLE
PARTITION 18mm HPL MDF A APPROVED.

PT-102 PAINT FINISH INSTALLATION PURPOSE (ZNM-ALE-MSB-AR-FI-000227)

AR: how is ditra 25 membrane


ZNM-STJV-MSB-AR-FI-000004
ZNM-ALE-RFI-AR-FI-001459
SILICON SEALANT JOINT SILICON SEALANT JOINT B APPROVED WITH COMMENTS.
restrained on the wall? Show the (ZNM-ALE-MSB-AR-FI-000788 (ZNM-ALE-MSB-AR-FI-000788
18 18
C
actual thickness and do a first in CSC Arch:
place to show the render can PT-102 TRM-514 CERAMIC TILE SKIRTING REVISE & RESUBMIT.
Please ensure these are
accommodate the additional ZNM-STJV-MSB-AR-FI-000004 water resistant. WITH TILE ADHESIVE

3
thickness of ditra 25 membrane
Provide descriptions 7 mm
(ZNM-ALE-MSB-AR-FI-000060)
for all components.
FL-704 CERAMIC TILE
M8 CHEMICAL ANCHOR BOLT SHIM SPACE/PACKER/PLYWOOD D REJECTED

20 mm
FL-704/TRM-514 SKIRTING CERAMIC (ZNM-ALE-MSB-AR-FI-000787)
7 mm FL-904 EPOXY RESIN FLOORING FLOORING 400x800x10MM (ZNM-ALE-MSB-AR-FI-000227)
TILE FLOORING 400x800x10MM FOR INFORMATION AND RECORD
E

100
95

95
SILICON SEALANT JOINT
100
95

THICK WITH 5MM ADHSIVE 100 ZNM-STJV-MSB-AR-FI-000041 THICK WITH 5MM ADHSIVE SILICON SEALANT JOINT
AR: refer to ONLY
D503
*
comment, marked on (ZNM-ALE-MSB-AR-FI-000060)
7 mm
(ZNM-ALE-MSB-AR-FI-000060)
F.F.L. F.F.L.
(ZNM-ALE-MSB-AR-FI-000788)
F.F.L.
(ZNM-ALE-MSB-AR-FI-000788)
F.F.L.
F.F.L. F.F.L. ENG. R.E.

10

10
5
6
10

SILICON SEALANT JOINT Danijel Pavic

10
DATE: DATE: Company: F+ P

5
5

5
03.11.2023 Architect: Mouzo Ntagkala Date: 02/11/2023

6 mm
5

ZNM-ALE-MSB-AR-FI-000788

HST R-M8/10
5

5
5

6MM THICK OXICELL PE REV DESCRIPTION DATE DRAWN CHKD


6MM THICK OXICELL PE 100

100

100
100

POLYETHYLENE AR: provide enlarged detail and show

94
POLYETHYLENE COMPRESSIBLE JOINT

80

80
how is the penetration sealed. Provide
80

COMPRESSIBLE JOINT FILLER sealant material submittal. Obtain 00 ISSUED FOR APPROVAL 29.12.22 IRIVET ALEC
FILLER ZNM-STJV-MSB-CV-00-000106 approval from the waterproofing
(ZNM-STJV-MSB-CV-00-000106)
applicator (Western), as this will
penetrate their system, compromising the
01 REVISED AS PER COMMENTS 10.02.23 IRIVET ALEC
water bearing properties of the whole
toilet. 02 REVISED AS PER COMMENTS 05.05.23 IRIVET ALEC
POLYTHENE SHEET, 1000 GAUGE FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK
FL-704 CERAMIC TILE FLOORING 400x800x10MM (ZNM-STJV-MSB-AR-FI-000008) 03 RE ISSUED FOR APPROVAL 17.07.23 IRIVET ALEC
THICK WITH 5MM ADHSIVE FL-904 EPOXY RESIN FLOORING WITH 5MM ADHSIVE WITH 5MM ADHSIVE
(ZNM-ALE-MSB-AR-FI-000060) SCHLUTER DITRA 25 POLYETHYENE WATERPROOFING (ZNM-STJV-MSB-AR-FI-000041) (ZNM-ALE-MSB-AR-FI-000060) (ZNM-ALE-MSB-AR-FI-000060) 04 RE ISSUED FOR APPROVAL 12.10.23 IRIVET ALEC
NOTE: MEMBRANEAS PER MATERIAL-REF-NO. THIN BED MORTAR POLYBIT CM 11 AS PER THIN BED MORTAR POLYBIT CM 11 AS PER
WATERPROFFING DETAILS REFERED THIN BED MORTAR POLYBIT CM 11 AS PER (ZNM-WII-MSB-AR-WP-000265) MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372
THIN BED MORTAR POLYBIT CM MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372
AND COORDINATED WITH WESTERN MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372
SCR-301 HEAVY DUTY UNBOUNDED SCREED 11 AS PER MATERIAL REF NO. NOTE: SCHLUTER DITRA 25 POLYETHYENE NOTE: SCHLUTER DITRA 25 POLYETHYENE
ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 SCHLUTER DITRA 25 POLYETHYENE (ZNM-STJV-MSB-AR-FI-000008) WATERPROFFING DETAILS REFERED WATERPROOFING MEMBRANEAS PER WATERPROFFING DETAILS REFERED
(ZNM-WII-MSB-AR-WP-000372) WATERPROOFING MEMBRANEAS PER
WATERPROOFING MEMBRANEAS PER AND COORDINATED WITH WESTERN MATERIAL-REF-NO. AND COORDINATED WITH WESTERN MATERIAL-REF-NO.
MATERIAL-REF-NO. ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 ZNM-WII-MSB-AR-WP-000265 ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 ZNM-WII-MSB-AR-WP-000265 EMPLOYER:
ZNM-WII-MSB-AR-WP-000265
POLYTHENE SHEET, 1000 GAUGE POLYTHENE SHEET, 1000 GAUGE DEPARTMENT OF CULTURE AND TOURISM
POLYTHENE SHEET, 1000 GAUGE (ZNM-STJV-MSB-AR-FI-000008) (ZNM-STJV-MSB-AR-FI-000008)
(ZNM-STJV-MSB-AR-FI-000008) P.O. Box 94000, Abu Dhabi, U.A.E.
PAN-203 is mentioned in the title, but SCR-301 HEAVY DUTY UNBOUNDED SCR-301 HEAVY DUTY UNBOUNDED Telephone : (971-2) 444 0 444
SCR-301 HEAVY DUTY UNBOUNDED nowhere in the actual detail. Please clarify, SCREED (ZNM-STJV-MSB-AR-FI-000008) SCREED (ZNM-STJV-MSB-AR-FI-000008) Fax : (971-2) 599 5 720
SCREED (ZNM-STJV-MSB-AR-FI-000008) noting as well that the purpose of this detail web : www.tcaabudhabi.ae
FLOOR FIXING CHEMICAL CSK 5 x 50 mm SCREW is unclear (it does not clarify any interfaces).
(ZNM-ALE-MSB-AR-FI-000227)
JOINTS SEAMING TAPE SCHLUTER-KERDI KEBA PROJECT MANAGEMENT CONSULTANT :
FIXED WITH ADHESIVE SCHLÜTER®-
A-M-WC560 related to toilet KERDI-COLL-L AS PER MATERIAL-REF-NO.
doors. It is not a reference for ZNM-WII-MSB-AR-WP-000265 EIBFS Muroor Tower, 2nd Floor
Sheikh Sultan Bin Zayed The First Street
the presented detail.
P.O.Box 5201, Abu Dhabi-U.A.E.
Telephone : +971 2 627 7358

D505 INTERFACE DETAIL - (RENDER-FL704) FLOOR INTERFACE D506 INTERFACE DETAIL - (PT102-FL904) FLOOR INTERFACE D507 INTERFACE DETAIL - (PAN204-FL704) FLOOR INTERFACE D508 INTERFACE DETAIL - (PAN203-FL704) FLOOR INTERFACE LEAD DESIGN AND CONSTRUCTION SUPERVISION CONSULTANT:

IFC Ref. DRAWING No. A-M-WC560 IFC Ref. DRAWING No. ZNM-EMC-AR-FI-MUAL-SDW-152301 IFC Ref. DRAWING No. A-M-WC560 IFC Ref. DRAWING No. BASED ON 02/A-M-WC540
CSC Arch:
- Approval is fully subject to the receipt and approval of the relevant associated SAM/MSB and integration details
for all devices which are to be integrated in this area.
- STJV to ensure coordination amongst other associated shopdrawings for this area (i.e. Builderswork and MEP
Layouts). In the event of a discrepancy between the above mentioned documents, STJV shall inform the CSC
prior to proceeding with any site activities, although the CSC notes that the Architectural/ID GA as commented
takes precedence in principle. CONSULTANT-OF-RECORD :
-Approval of drawing is subject to approval of referenced call-out details.
- All integration of MEP items are excluded from approval until the receipt of fully coordinated details and
material submittal.
DOOR DETAILS ARE SUBMITTED ON 100
DRAWING 234020 TO 234033 2 2 - All doors are excluded from this review. AS PER PLAN
18 60 18 - This submittal is to be read alongside ZNM-STJV-SBF-ID-00-003966
-Ensure all vertical skirting joint lines are lined up with floor grouts. NOTE: WSP P.O Box 47445
CSC Arch: PAN203 HPL MDF
sealant should have equal tile joint width as WATERPROFFING DETAILS REFERED International Tower Tel: +971 2 652 9222
DOOR PANEL 25th Floor, Suite 2508 Fax: 971 2 677 9772
elsewhere AND COORDINATED WITH WESTERN
ZNM-ALE-MSB-AR-FI-000227 ADNEC Capital Centre, Karamah Street Abu Dhabi, UAE
60X100MM ALUMINUM ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38
FL-704 CERAMIC TILE FLOORING NOTE: SUPPORT FRAME
400x800x10MM THICK WITH 5MM ADHSIVE WATERPROFFING DETAILS REFERED (ZNM-ALE-MSB-AR-FI-000787) ZINC PLATED STEEL TIE BACK ROD FIX
PT-102 PAN FINISHING LINE MAIN CONTRACTOR :
(ZNM-ALE-MSB-AR-FI-000060) AND COORDINATED WITH WESTERN NOTE: WITH 6x50mm CSK WITH RAWAL PLUG
FIXING CLIPS (ZNM-ALE-MSB-AR-FI-000787 (PAN 203/204/205)
The MSB reference is for plastering
ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 WATERPROFFING DETAILS REFERED
(ZNM-ALE-MSB-AR-FI-000787)
accessories and is not applicable to this SILICON SEALANT AND COORDINATED WITH WESTERN DETAILED DOOR DRAWING
detail. Moreover the profile fixation is unclear. BETWEEN TRIM-FL 904 100 PAN-203 CUBICLE ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 TO BE SUBMITTED SEPARATELY
(ZNM-ALE-MSB-AR-FI-000788) 60 x100mm TUBE WITH PARTITION 18mm HPL MDF
10

F.F.L. F.F.L.
20MM DIA HOLES FOR (ZNM-ALE-MSB-AR-FI-000227) SILICON SEALANT JOINT
10

+2.800 LVL C
NSTALLATION PURPOSE L (ZNM-ALE-MSB-AR-FI-000787)
NOTE:
5

SILICON SEALANT JOINT CSC Arch: AR:


WATERPROFFING DETAILS REFERED OF DOOR SHUTTER
M8 CHEMICAL ANCHOR BOLT 18
(ZNM-ALE-MSB-AR-FI-000787 sealant should have equal tile OUT SIDE TOILET refer to comment,
AND COORDINATED WITH WESTERN
5

marked on D503
(ZNM-ALE-MSB-AR-FI-000787) 18 joint width as elsewhere M8 CHEMICAL ANCHOR BOLT
ZNM-WII-AR-WP-MUB1-SDW-021034/36/37/38 TRM-514 CERAMIC TILE SKIRTING AR: liaise with Western and Voltas, and
100

WITH TILE ADHESIVE FL-904 EPOXY RESIN FLOORING (ZNM-ALE-MSB-AR-FI-000787) show the application of the sealant that SUB CONTRACTOR :
3

3
BRUSHED SS TRANSITION
80

SILICON SEALANT JOINT (ZNM-ALE-MSB-AR-FI-000060) SILICON SEALANT (ZNM-STJV-MSB-AR-FI-000041) will be used to seal any gap between the
STRIP15 X 15 MM BETWEEN TRIM-FL 904 JOINTS SEAMING TAPE
gully and screed. since the gully has a ALEC FITOUT
(ZNM-ALE-MSB-AR-FI-000788) flashing recessed into the tiles, provide

150
FLOOR FINISH CLARIFICATION RFI REF: FIXED WITH SCREW ON SCREED SHIM SPACE/PACKER/PLYWOOD (ZNM-ALE-MSB-AR-FI-000788) FL-704 CERAMIC TILE FLOORING SCHLUTER-KERDI KEBA SILICON SEALANT JOINT sample showing such integration to obtain Box 27639
200

ZNM-ALE-RFI-AR-FI-001459 (ZNM-ALE-MSB-AR-FI-000736) (ZNM-ALE-MSB-AR-FI-000227) 400x800x10MM THICK WITH 5MM ADHSIVE 9 (ZNM-ALE-MSB-AR-FI-000788) approval on the quality of workmanship.
Marina Plaza, Dubai Marina
BRUSHED SS TRANSITION FIXED WITH ADHESIVE SCHLÜTER®-
100

95

95
SILICON SEALANT JOINT (ZNM-ALE-MSB-AR-FI-000060) Dubai, United Arab Emirates
FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK STRIP15 X 15 MM KERDI-COLL-L AS PER AM-314 FLOOR GULLY
FL-904 EPOXY RESIN FLOORING (ZNM-ALE-MSB-AR-FI-000788)
WITH 5MM ADHSIVE FIXED WITH SCREW ON SCREED MATERIAL-REF-NO. ZNM-VOL-MSB-PH-TO-000005[01] Phone +971 4 429 0599
ZNM-STJV-MSB-AR-FI-000041 F.F.L. F.F.L. (ZNM-ALE-MSB-AR-FI-000736) F.F.L. F.F.L. F.F.L.
SLOPE
(ZNM-ALE-MSB-AR-FI-000060) ZNM-WII-MSB-AR-WP-000265 www.alecfitout.ae

10
10

10
5

5
+2.800 LVL

5
280
5

5
THIN BED MORTAR POLYBIT CM 11 AS PER 6MM THICK OXICELL PE FL-704 CERAMIC TILE
F.F.L. MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372 POLYETHYLENE COMPRESSIBLE WITH 5MM ADHESIVE
HST R-M8/10

PROJECT NAME & LOCATION:

HST R-M8/10
+2.600 LVL 5MM SEALANT BETWEEN FL-704
5

5
SCHLUTER DITRA 25 POLYETHYENE AND FL-904 LOCATION The MSB reference is for plastering JOINT FILLER (ZNM-ALE-MSB-AR-FI-000060)

5
AM-314 FLOOR GULLY
ZAYED NATIONAL MUSEUM
100

100

100
WATERPROOFING MEMBRANEAS PER (ZNM-ALE-MSB-AR-FI-000788) accessories and is not applicable to this (ZNM-STJV-MSB-CV-00-000106)
80

80

80
MATERIAL-REF-NO. 6MM THICK OXICELL PE detail. Moreover the profile fixation is unclear. SCR-301 HEAVY DUTY ABU DHABI - SECTOR SDN8
ZNM-WII-MSB-AR-WP-000265 POLYETHYLENE UNBOUNDED SCREED
POLYTHENE SHEET, 1000 GAUGE COMPRESSIBLE JOINT FILLER (ZNM-STJV-MSB-AR-FI-000008) PLOT No.P8
CONCRETE STEP SCHLUTER DITRA 25 POLYETHYENE
(ZNM-STJV-MSB-AR-FI-000008) (ZNM-STJV-MSB-CV-00-000106) WATERPROOFING MEMBRANE
FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK POLYTHENE SHEET, 1000 GAUGE AS PER ZNM-WII-MSB-AR-WP-000265
SCR-301 HEAVY DUTY UNBOUNDED
SHOP DRAWING
200

WITH 5MM ADHSIVE (ZNM-STJV-MSB-AR-FI-000008) FL-704 CERAMIC TILE FLOORING


SCREED (ZNM-STJV-MSB-AR-FI-000008) 400x800x10MM THICK WITH 5MM ADHESIVE THIN BED MORTAR POLYBIT CM 11
(ZNM-ALE-MSB-AR-FI-000060) SCHLUTER DITRA 25 POLYETHYENE
AR: provide enlarged detail and (ZNM-ALE-MSB-AR-FI-000060) AS PERZNM-WII-MSB-AR-WP-000372
show how is the penetration sealed. THIN BED MORTAR POLYBIT CM 11 AS PER WATERPROOFING MEMBRANEAS
Provide sealant material submittal. THIN BED MORTAR POLYBIT CM DRAWING TITLE
MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372 PER MATERIAL-REF-NO. SCR-301 HEAVY DUTY UNBOUNDED
Obtain approval from the 11 AS PER MATERIAL REF NO.
waterproofing applicator (Western), THIN BED MORTAR POLYBIT CM 11 AS PER ZNM-WII-MSB-AR-WP-000265 SCREED(ZNM-STJV-MSB-AR-FI-000008)
F.F.L.
as this will penetrate their system,
compromising the water bearing MATERIAL REF NO. ZNM-WII-MSB-AR-WP-000372
SCHLUTER DITRA 25 POLYETHYENE
WATERPROOFING MEMBRANEAS PER POLYTHENE SHEET, 1000 GAUGE
(ZNM-STJV-MSB-AR-FI-000008)
ZNM-WII-MSB-AR-WP-000372
FLOORING & WALL
+2.400 LVL properties of the whole toilet. SCHLUTER DITRA 25 POLYETHYENE MATERIAL-REF-NO.
WATERPROOFING MEMBRANEAS PER
MATERIAL-REF-NO.
ZNM-WII-MSB-AR-WP-000265 Note: GCS to confirm whether
AM-314 assembly requires a soft-joint
INTERFACE DETAILS
POLYTHENE SHEET, 1000 GAUGE
ZNM-WII-MSB-AR-WP-000265 (ZNM-STJV-MSB-AR-FI-000008) between it and the screed.
AM-314 FLOOR GULLY
POLYTHENE SHEET, 1000 GAUGE
CONCRETE FINISH NOTE: (ZNM-STJV-MSB-AR-FI-000008) SCR-301 HEAVY DUTY UNBOUNDED
MEP AREA ACCESS STEPS
WATERPROFFING DETAILS REFERED SCREED (ZNM-STJV-MSB-AR-FI-000008) POLYTHENE SHEET, 1000 GAUGE
WITHOUT FLOOR FINISH STEPS WITHOUT FLOOR FINISH
AND COORDINATED WITH WESTERN SCR-301 HEAVY DUTY UNBOUNDED (ZNM-STJV-MSB-AR-FI-000008)
ZNM-WII-AR-WP-MUB1-SDW-021036/37/38 SCREED (ZNM-STJV-MSB-AR-FI-000008) DRAWING NUMBER ALEC REV.
FL-704 CERAMIC TILE FLOORING 400x800x10MM THICK
WITH 5MM ADHSIVE AM-314 FLOOR GULLY
(ZNM-ALE-MSB-AR-FI-000060) ZNM-VOL-MSB-PH-TO-000005[01]
ZNM-ALE-ID-00-MUAL-SDW-232079 04
PROJECT NO. DATE SCALE DRAWN BY CHKD BY
1:5
D509 INTERFACE DETAIL - (PAN203-FL 904-FL 704) FLOOR INTERFACE D510 INTERFACE DETAIL-(PAN203-FL704-FL904) FLOOR INTERFACE D511 INTERFACE DETAIL - (FL904-FL704) FLOOR INTERFACE D512 INTERFACE DETAIL (FL704-FL925) FLOOR INTERFACE - 12.10.23 @ A1
IR ALEC

IFC Ref. DRAWING No. NOT FOUND IFC Ref. DRAWING No. NOT FOUND IFC Ref. DRAWING No. NOT FOUND IFC Ref. DRAWING No. A-M-WC-532, DETAIL 02 SUBMITTAL No.: __________Rev. : ____
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

8. MATERIAL SAFETY DATA SHEET


ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

9. TECHNICAL / MATERIAL DATA SHEET


ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

10. APPLICATION INFORMATION


ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

11. APPLICATION METHOD STATEMENT

Site Specific Method Statement and Risk


Assessment to be submitted separately
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

12. LABELLED SAMPLE

To be submitted separately
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

13. TEST RESULTS


TEST REPORTS Member of

OIBt
Deutsch es
lnstitut
fur
Bautet:hnik
www.eota.eu

Approval body for construction products


* * *
* *
and types of constniction
Designated
Bautechnisches Prufamt

*
according to

*
Article 29 of Regula-
An institution established by the Federal and
tion (EU) No 305/2011
Laender Governments

* *
and member of EOTA
(European Organi-
sation for Technical

* * *
Assessment)

European Technical ETA-19/0601


Assessment of 30 April 2021
English translation prepared by DIBt - Original version in German language

Technical Assessment Body issuing the Deutsches lnstitut fur Bautechnik


European Technical Assessment:
Trade name of the construction product Injection System Hilti HIT-HY 200-R V3
Product family Bonded fastener for use in concrete
to which the construction product belongs
Manufacturer Hilti Aktiengesellschafl
Feldkircherstrasse 100
9494 SCHAAN
FORSTENTUM LIECHTENSTEIN
Manufacturing plant Hilti Werke

This European Technical Assessment 45 pages including 3 annexes which form an integral part
contains of this assessment
This European Technical Assessment is EAD 330499-01-0601 Edition 04/2020
issued in accordance with Regulation (EU)
No 305/2011, on the basis of
This version replaces ETA-19/0601 issued on 14 December 2020

Deutsches In stitut fur Bautechn ik


Kolunmmstra/3e 30 BI 10829 Berlin I GERMANY I Phone: +49 30 78730-0 I Faic +49 30 78730-320 I Email: dibt@dibt.deIwww.dibt.de

220774.21 8.06.01-6/21
DUBAI CENTRAL LABORATORY DEPARTMENT
DCLD-CQPS PRODUCT CONFORMITY CERTIFICATION SCHEME
SCOPE OF CERTIFICATION
FOR CERTIFICATE NO. CL20020730

NOTE 1: This document forms an integral part of the Certificate of Product Conformity bearing the same
certificate number.
NOTE 2: The above product shall bear the DCLD Conformity Mark.

Original Issue Date : 23 February 2020


Current Issue Date : 23 February 2023
Valid Until : 22 February 2024

ARIF AL MARZOOQI
MANAGER
CERTIFICATION AND QUALITY CONTROL OF PRODUCTS SECTION

DM‐DCLD‐F‐IC‐2032 R10
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
OPEN DATA / ‫ﺑﻴﺎﻧﺎت ﻣﻔﺘﻮﺣﺔ‬
CERTIFICATE OF PRODUCT CONFORMITY
Dubai Central Laboratory Department (DCLD) of Dubai Municipality
hereby attests that the product(s)

Low Emitting Materials


(Details as per the attached Scope of Certification)
manufactured by:

HILTI GmbH
86916 Kaufering, Germany
have been assessed in accordance with DCLD Document Ref. No. DM-DCLD-RD-DP21-2001 (IC) "General Rules for DM third party product
certification system through factory assessment" and the relevant Specific Rules, and were found in conformity with the standard specification:

2020 AL SA'FAT DUBAI GREEN BUILDING SYSTEM


Accordingly, DCLD hereby authorizes the above manufacturer
to affix the DCL Product Conformity Mark on the above-mentioned product(s).

ARIF AL MARZOOQI
Certification and Quality Control of Products Section Manager
Dubai Central Laboratory Department-Dubai Municipality

Certificate No: CL20020730 Current Issue Date: 23/02/2023


Valid Until: 22/02/2024 Original Issue Date: 23/02/2020

DM-DCLD-F-IC-2031 Rev 20
DUBAI CENTRAL LABORATORY DEPARTMENT
DCLD-CQPS PRODUCT CONFORMITY CERTIFICATION SCHEME
SCOPE OF CERTIFICATION
FOR CERTIFICATE NO. CL20020730

Certificate Issued To: HILTI GmbH


86916 Kaufering, Germany
Applicable Standard Specification: 2020 Al Sa’fat Dubai Green Building System.
Applicable Specific Rules: DM-DCLD-RD-DP21-2180-(IC) Specific Rules for Certification of
Low Emitting Materials (Paints, Coatings, Adhesives, Sealants) As
per the 2020 Al Sa’fat Dubai Green Building System.

S/N PRODUCT DESCRIPTION BRAND NAME PRODUCT DETAILS

One-pack performance coatings


Coatings (Other Types) Firestop coating CP
1 (Solvent Free-WB-for internal applications)
(Sub-category 9) 670
VOC (Al Sa’fat DGBS limit is Max is 140 g/L)
Firestop joint spray
CFS-SP WB
Firestop foam CP 620 Architectural Sealant
2 Sealant Firestop sealant FS-
(Internal/External Applications)
One/ FS-One Max
VOC (Al Sa’fat DGBS limit is Max is 250 g/L)
Firestop joint filler CP
606
HIT-RE 500 V4
Injectable Adhesive
HIT-RE 100 Injectable
Adhesive
HIT-HY 200 V3
Multi-Purpose Construction Adhesives
Injectable Adhesive
3 Adhesives (Internal/External Applications)
HIT-HY 270 Injectable
VOC (Al Sa’fat DGBS limit is Max is 70 g/L)
Adhesive
HIT-HY 170 Injectable
Adhesive
HVU 2 Adhesive
Capsule

DM‐DCLD‐F‐IC‐2032 R10
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
OPEN DATA / ‫ﺑﻴﺎﻧﺎت ﻣﻔﺘﻮﺣﺔ‬
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

14. LICENSES OF SUPPLIER /


MANUFACTURER / APPLICATOR
‫رخصة تجارية‬
Commercial License
License Details / ‫تفاصيل الرخصة‬
License No. 226074 ‫رقم الرخصة‬

)‫م (فرع دبي‬.‫م‬.‫ذ‬.‫هيلتي المارات ش‬ ‫السم التجارى‬


Trade Name HILTI EMIRATES L.L.C )DUBAI BR (

Legal Type Branch of Company Registered in other emirates ‫فرع لشركة مقرها في امارة أخرى‬ ‫الشكل القانونى‬
Expiry Date 07/10/2024 ‫تاريخ النتهاء‬ Issue Date 08/10/1991 ‫تاريخ الصدار‬

D&B D-U-N-S ® 499426948 ‫الرقم العالمي‬ Main License No. 226074 ‫رقم الرخصة الم‬
No.
Register No. ‫رقم السجل التجارى‬ DCCI No. 22211 ‫عضوية الغرفة‬

License Members / ‫الطراف‬


Share / ‫الحصص‬ Role / ‫الصفة‬ Nationality / ‫الجنسية‬ Name / ‫السم‬ No./‫رقم الشخص‬

100.00% Co. Owner / ‫مالك‬ United Arab Emirates / ‫ م‬.‫ م‬.‫ ذ‬.‫(هيلتي المارات (ش‬ 286876
‫الشركة‬ ‫المارات‬
HILTI EMIRATES LLC
Manager / ‫مدير‬ France / ‫فرنسا‬ ‫توماس جريقورى دروبست‬ 922508
THOMAS GREGORY DROPSIT

License Activities / ‫نشاط الرخصة التجارية‬


Construction Equipment & Machinery Trading ‫تجارة معدات وآليات التشييد والبناء‬
Building & Construction Materials Trading ‫تجارة مواد البناء‬
Fire Extinguishing Materials Trading ‫تجارة مواد مكافحة واطفاءالحريق‬
Construction Equipment & Machinery Rental ‫تأجير معدات وآليات التشييد والبناء‬
Address / ‫العنوان‬
Phone No 971-4-8019755 ‫تليفون‬ P.O. Box 11051 ‫صندوق بريد‬
Fax No 971-4-8854405 ‫فاكس‬ Parcel ID 598-902 ‫رقم القطعة‬
Mobile No 971-50-6522649 ‫هاتف متحرك‬ mohammad.hammoud@hilti.com Email / ‫البريد اللكتروني‬

‫ مجمع دبي للستثمار الولى‬- ‫ بردبي‬- ‫م‬.‫م‬.‫ذ‬.‫ ملك شركة ديكو المارات ش‬1 ‫مستودع‬

Remarks / ‫الملحظات‬
** ‫) ابوظبي‬1023936( ‫رقم الرخصة الم‬
10/3/2016 ‫تغيير المدير‬
‫ دبي‬-‫يمنع مزاولة نشاط الشركة الخاص بالدفاع المدني قبل أخذ موافقة الدارة العامة للدفاع المدني‬The Company Shall not Carry on The DCD activities unless approved by
Dubai Civil Defence

Print Date 24/08/2023 10:29 ‫تاريخ الطباعة‬ Receipt No. 15175971 ‫رقم اليصال‬
‫اتصالت) للحصول‬/‫ (دو‬6969 ‫ أرسل رقم الرخصة إلى‬،‫يمكنك الن تجديد رخصتك التجارية من خلل الرسائل النصية القصيرة‬
.‫على اذن الدفع‬ Get FREE access to
Zoho One for the first
Now you can renew your trade license by sending a text message )SMS(. Send your trade year
license number to 6969 )Du/ Etisalat( to receive payment voucher. ‫احصل على زوهو ون مجانا‬
‫للسنة الولى‬
Zoho.com/det

‫لمراجعة صحة البيانات الواردة في الرخصة يرجي مسح رمزالستجابة السريعة‬. ‫وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة القتصاد والسياحة في دبي‬
this is a certified e-document issued without signature by the department of Economy and Tourism .Kindly Scan the QR Code to
Verify the certificate
Permit Details / ‫بيانات التصريح‬
Permit Nr ‫رقم التصريح‬
9205995
Permit Type ‫نوع التصريح‬
‫إعلنات إضافية على الواجهة‬

Extra Sign Boards

Expiry Date 07/10/2024 ‫تاريخ النتهاء‬ Issue Date 07/10/2010 ‫تاريخ الصدار‬
Description HILTI ‫شرح‬

Remarks 10*4 ‫ملحظات‬

Permit Details / ‫بيانات التصريح‬


Permit Nr ‫رقم التصريح‬
9408703
Permit Type ‫نوع التصريح‬
‫إعلنات السماء التجارية‬

Trade Name Sign Boards

Expiry Date 07/10/2024 ‫تاريخ النتهاء‬ Issue Date 07/10/2010 ‫تاريخ الصدار‬
Description HILTI ‫هلتي‬ + ) ‫المزروعي للمنتجات الهندسية ( ام اي بي‬ ‫شرح‬

Remarks ‫ملحظات‬

Print Date 24/08/2023 10:29 ‫تاريخ الطباعة‬ Receipt No. 15175971 ‫رقم اليصال‬
‫اتصالت) للحصول‬/‫ (دو‬6969 ‫ أرسل رقم الرخصة إلى‬،‫يمكنك الن تجديد رخصتك التجارية من خلل الرسائل النصية القصيرة‬
.‫على اذن الدفع‬ Get FREE access to
Zoho One for the first
Now you can renew your trade license by sending a text message )SMS(. Send your trade year
license number to 6969 )Du/ Etisalat( to receive payment voucher. ‫احصل على زوهو ون مجانا‬
‫للسنة الولى‬
Zoho.com/det

‫لمراجعة صحة البيانات الواردة في الرخصة يرجي مسح رمزالستجابة السريعة‬. ‫وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة القتصاد والسياحة في دبي‬
this is a certified e-document issued without signature by the department of Economy and Tourism .Kindly Scan the QR Code to
Verify the certificate
License no. 226074 226074 ‫رقم الرخصة‬

Membership no. 22211 22211 ‫رقم العضوية‬

Registration no. 23674 23674 ‫رقم السجل التجاري‬

Trade Name HILTI EMIRATES L.L.C (‫م )فرع دبي‬.‫م‬.‫ذ‬.‫هيلتي المارات ش‬ ‫السم التجاري‬
(DUBAI BR )

Legal Status Branch of Company Registered in ‫فرع لشركة مقرها في امارة أخرى‬ ‫الشكل القانوني‬

Activity Building & Construction Materials ‫تجارة مواد البناء‬ ‫نوع النشاط‬
Trading ‫تجارة مواد مكافحة واطفاءالحريق‬
Fire Extinguishing Materials Trading ‫تجارة معدات وآليات التشييد والبناء‬
Construction Equipment & ‫تأجير معدات وآليات التشييد والبناء‬
Machinery Trading
Construction Equipment &
Machinery Rental

Member Since 08/10/1991 08/10/1991 ‫تاريخ النتساب‬

Date of Issue 08/10/1991 08/10/1991 ‫تاريخ الصدار‬

Expiry Date 07/10/2024 07/10/2024 ‫تاريخ النتهاء‬


‫شهادة ترخيص‬
License Certificate

LICENSE NO. 18781 ١٨٧٨١ ‫رقم الرخصة‬


NAME VENESTA MIDDLE EAST (FZE)
)‫ح‬.‫م‬.‫فينيستا ميدل ايست (م‬ ‫الســــــــــــم‬
LEGAL STATUS Free Zone Est. with Limited Liability ‫مؤسسة منطقة حرة ذات مسؤولية محدودة‬ ‫الشكل القانوني‬
TYPE OF LICENSE Industrial ‫صناعية‬ ‫نوع الرخصة‬
ACTIVITY(S) Manufacturing of Wooden & ‫صناعة اللواح الخشبية واللومنيوم‬ ‫النشــــــــــاط‬
Aluminium Partitions

OWNER(S) INTERCEDE MIDDLE EAST ‫إنترسد ميدل ايست إنفستمنت ليميتد‬ ‫المــــالــــــــــــك‬
INVESTMENT LIMITED

MANAGER UMESH CHATHAMPALLI KALLI ‫اوميش شاتامبالي كالي‬ ‫المدير المسؤول‬

SAIF-ZONE 400 M2 Warehouse T5-070 ٠٧٠-٥‫م تي‬٢ ٤٠٠‫مستودع‬ ‫العــــنوان فــي‬


ADDRESS 600 M2 Warehouse T5-027, T5-028 ,٠٢٧-٥‫ تي‬٢‫ م‬٦٠٠ ‫مستودع‬ ‫المنطقة الحرة‬
P.O.Box 122909 ٠٢٨-٥‫تي‬
Sharjah - U.A.E ١٢٢٩٠٩ .‫ب‬.‫ص‬
‫م‬.‫ع‬.‫ أ‬- ‫الشارقة‬
INCORPORATION DATE 18 October 2017 ٢٠١٧ ‫ أكتوبر‬١٨ ‫تاريخ عقد التاسيس‬
ISSUE DATE 18 October 2023 ٢٠٢٣ ‫ أكتوبر‬١٨ ‫تاريخ الصدار‬
EXPIRY DATE 17 October 2024 ٢٠٢٤ ‫ أكتوبر‬١٧ ‫تاريخ النتهــــــــاء‬

REMARKS THIS LICENSE IS ISSUED AND BASED ‫هذه الرخصة صادرة استنادا الى المرسوم الميري‬ ‫ملحظـــــــــات‬
UPON EMIRI DECREE NO. 2 OF 1995
‫ الصادر في الشارقة بتاريخ‬١٩٩٥ ‫ لسنة‬٢ ‫رقم‬
ISSUED IN SHARJAH ON MAY 8, 1995
١٩٩٥ ‫ مايو‬٨
THIS LICENSE IS GRANTED TO THE
LICENSEE ONLY AND SHALL NOT BE ‫له فقط ول يجوز‬ ‫هذه الرخصة ممنوحة للمرخص‬
LEASED OR TRANSFERRED WITHOUT
PRIOR APPROVAL OF THE SAIF ZONE
‫تأجيرها أو تحويلها إل بموافقة هيئة المنطقة‬
‫الحرة لمطار الشارقة الدولي‬
SALES IN U.A.E. SHALL BE CARRIED OUT
IN ACCORDANCE WITH THE VALID
‫تتم أعمال البيع داخل الدولة وفقا للنظم والقوانين‬
LAWS AND REGULATIONS THEREOF
‫السارية فيها‬

To check the validity of the license: :‫للتحقق من صلحية الرخصة‬

1- Send an SMS to 2514 with License number. .‫ مع رقم الرخصة‬2514 ‫) إلى الرقم‬SMS( ‫ رسالة نصية قصيرة‬-1
2- Scan the QR code. )QR Code( ‫ مسح رمز الستجابة السريع‬-2
3- Visit the website: :‫ زيارة الموقع اللكتروني‬-3
https://portal.saif-zone.com/LicenseDetail.aspx https://portal.saif-zone.com/LicenseDetail.aspx

www.saif-zone.com ‫هذه الوثيقة رسمية ول تحتاج لختم أو توقيع وللتأكد من صحة البيانات يرجى زيارة الموقع‬
This document is official and it does not need to be stamped or signed. To view license detail visit www.saif-zone.com
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

15. PREVIOUS APPROVAL / SIMILAR


PROJECTS
WF-185069

04 Jan 2024

MATERIAL APPROVAL SUBMITTAL


Project Name: Zayed National Museum Employer: Dept of Culture & Tourism
Project Manager: Hill International Supervision Consultant: F+P/WSP JV
Consultant of Record: WSP Contractor: STJV
ZNM-ALE-MSB-AR-
Submittal Ref: FI-000795
REV. 01
Discipline: AR CV DR EL FC FL HS ME PH ST ZNM-ALE-SAM-
Cross reference Rev 00
AR-FI-000795
Element: Metal Date: 04-Jan-2024
M/s Metallic Equipment
Material Hilti Anchors and Chemical Fixation Manufacturer
Co.LLC
List of Submitted Items:
Item Description No of Copies Remarks
Material Submittal for Chemical Fixation and Thread _The same chemical fixation
rod for AM-207 & EWS-805,806 & BAL-125 is used for all of these items.
Materials:
 Chemical Anchor - HY 200 _ The type of anchor (Thread
01 Soft copy only rod HAS-U A4) is used for
 Mechanical Anchor - HAS-U A4
 Mechanical Anchor - TRS EWS-805,806 & BAL-125.
_ The type of anchor (Thread
Supplier / Mfr. M/s. Metallic Equipment Co.LLC rod TRS is used for AM-207).

Ref. Spec (s): 055000, 055200, 074213 Ref. Drwg (s): Attached

Compliance Statement:
The Contractor hereby confirms that the submitted items have been reviewed in detail and are correct and in strict conformance
with the Contract Documents. (Compliance statement attached)
Initiator/ALEC Sustainability/STJV QA/QC Manager/STJV Technical Director/STJV

Signature: Signature: Signature: Signature:


Date: 04-Jan-2024 Date: 04-Jan-2024 Date: 04-Jan-2024 Date: 04-Jan-2024
Name: Mickel Gerges Name: Adeliza Coronacion Name: Mondher Ouafi Name: Santanu Chattopadhyay

REVIEWER’S COMMENTS

CSC (Engineering) A☐ B☐ C☐ D☐ E☐ CSC (Architectural) A☐ B☐ C☐ D☐ E ☐


Sustainability-No comments
STR:
-No objection subject to the approved calculations and shop drawings.
-The properties of the materials must be as per the associated shop drawings and
calculations. (The associated reference calculations and shop drawings should
have been indicated.)
-The installation shall be as per the material data sheets or approved calculations.

Name, Signature and date Name, Signature and date


Comments Sheet Attached? Yes ☐ No ☐ Comments Sheet Attached? Yes ☐ No ☐
PROJECT MANAGEMENT CONSULTANTS A☐ B☐ C☐ D☐ E☐

Name & Signature: Date:

Note: The CSC/PMC approval shall not in any way relieve the Contractor of his obligation under the Contract. The Contractor
shall be solely responsible for the soundness and the correctness of the submitted Materials and Documents as per the required
Contract Conditions and Contract Clauses

Codes: A: Approved B: Approved with comments C: Revise & Resubmit D: Rejected E: For Information only
1 of 1Page
ZAYED NATIONAL MUSEUM
INTERIOR DESIGN / FIT-OUT WORKS

16. SUSTAINABILITY MATERIAL


SUBMITTAL QUESTIONNAIRE
Sustainability Material Submittal Questionnaire
Zayed National Museum (ZNM), Cultural District, Saadiyat Island, Abu Dhabi

Material Reference #: ZNM-ALE-MSB-AR-FI-000787 Rev.00 Specification Number: 050523


Product Name/Model: Chemical Anchor Bolt Manufacturer’s Name: M/s. Hilti
Product Description: HIT-HY 200-R V3 Injection Mortar Manufacturing location: Liechtenstein
Location of usage: Cubicle Partition Supplier’s Name: M/s. Venesta
Relevant Estidama
Relevant LEED Credits
Credits

Document
Credit Required Documents
Material Type attached
Reference (To be attached along with this questionnaire)
(Yes/No/NA)
All materials SM-R1 Manufacturer’s letter confirming No asbestos content Yes
Regional Materials. For composite materials, weighted average distance calculation N/A
SM-9 / Country of Origin certificate Yes
Note: calculations of MRc-5 Trade License copy Yes
distance to be used is 500 Manufacturer’s letter confirming material origin and the N/A
km. manufacturing location.
Masonry, Metals, N/A
Woodworks, Plastics,  For steels, provide CARES Sustainability Certification (Appendix
Composites, Doors, 05-structural steel or Appendix 01-reinforcement bars).
Windows Glazing,  A manufacture declaration or TDS stating the % of post-
Thermal & Moisture SM-10 consumer and % of pre-consumer recycled content. Note:
Protections and Exterior MRc-4 Waste reuse from the same production line should be excluded.
Improvements
Mix design component sheet including all types of mix grades N/A
confirming quantities with BOQ.
Concrete
Cumulative GHG calculator with all proposed mixes N/A
Supplementary Cementitious Calculation table for LEED N/A
A data sheet and test report for Aggregate. Only recycled aggregate N/A
Aggregate SM-10
is specified for use as base, sub-base or backfill.
Chain of Custody – COC- certificate for supplier N/A
Chain of Custody – COC - certificate for manufacturer N/A
SM-12; CITES declaration List from Manufacturer N/A
Timber
MRc7 % of certified wood by weight (for assemblies) % . (Attach N/A
Calculation Table for Assembly wood content)
If it is FSC Mix ( )%, provide supporting documentation N/A
External Timber SM-R1 Manufacturer letter confirming no CCA treatment on wood N/A
LBi-2.1 Technical Data sheet N/A
Adhesives & Sealants IEQc-4.1 Material Safety Data sheet N/A
Paints & Coatings LBi-2.2 VOC Test Report N/A
IEQc-4.2 Supporting doc for fungal resistant (for all paints & Coatings) N/A
Carpet Data sheet Carpets -CRI Green Label PLUS Program Certificate N/A
Carpet Cushion Carpet Cushion -CRI Green Label Program Certificate N/A
Hard Flooring Floor Score Certificate N/A
LBi 2.3
Formaldehyde Test report N/A
IEQc-4.3
Floor Score Certificate (for LEED) N/A
Wood Flooring Pentachlorophenol (PCP) content Test report N/A
Supporting document for wood product tested, classified and N/A
marked according to BS EN 14342:2005
Ceiling Systems Formaldehyde (mg/m3) test report N/A
LBi-2.4
Pentachlorophenol (PCP) content Test Report N/A
Furniture & Internal LBi-2.5 N/A
Formaldehyde (mg/m3) test report
Finishing Materials
Composite Wood & TDS/manufacturer letter stating NO-ADDED UREA FORMALDEHYDE N/A
IEQc-4.4
Agrifibre Products resin used
IDP-4 Off-site test reports for custom-made cladding systems N/A

37457160-NB-210627-ZNM-SMQ-LEED Estidama_Rev8 (003) - HY 200R Anchor Bolts


Page 1 of 5
Sustainability Material Submittal Questionnaire
Zayed National Museum (ZNM), Cultural District, Saadiyat Island, Abu Dhabi

Material Reference #: ZNM-ALE-MSB-AR-FI-000787 Rev.00 Specification Number: 050523


Product Name/Model: Chemical Anchor Bolt Manufacturer’s Name: M/s. Hilti
Product Description: HIT-HY 200-R V3 Injection Mortar Manufacturing location: Liechtenstein
Location of usage: Cubicle Partition Supplier’s Name: M/s. Venesta
Relevant Estidama
Relevant LEED Credits
Credits

Document
Credit Required Documents
Material Type attached
Reference (To be attached along with this questionnaire)
(Yes/No/NA)
Custom made cladding N/A
works; Curtain wall Standard product pre-testing certificates for curtain wall systems
system
Plant schedule with details of native/adaptive/drought N/A
tolerant/invasive species and at least 10 types of plant species
NS-3
Landscaping works 3 years growth tree size including crown width and height (Shade N/A
WEc-1
calculation in Sketchup for 3 years growth)
Irrigation water demand calculations N/A
LBo-R3 & N/A
Shading Materials Technical data sheet (TDS) / third party test certificate for average
LBo-1
(Canopies / Solar Reflectance Index (SRI) of the selected shading material (SRI
SSc-7
architectural elements) should be > 29)

LBo-7 Data sheet of bicycle racks with layout showing locations N/A
Bicycle Racks
SSc-4.2 Data sheet of shower with layout showing locations N/A
Electrical car spaces Data sheet of Charging station with layout showing locations N/A
signage and charging LBo-8 N/A
Data sheet of Charging station with layout showing locations
stations
LBi-R2 Manufacturer technical information of signage type and printing of N/A
Signage
IEQp-2 no smoking selection with health impact details
Envelope – External RE R1 & Third Party Test Certificate for Thermal Conductivity of (W/mk) N/A
walls block, insulation, RE1 Elemental U-value calculation with sectional details N/A
Roofing EAp2/c1: Area weighted Average U-Value Calculation (Wall /Roof) N/A
U-value full thermal simulation report and thermal calculations for N/A
RE R1 & RE all glazing system with shop drawings showing psi
Envelope – Glazing &
1 Third party test certificate for air tightness and leakage N/A
Skylights
EAp2/c1 Technical data sheet for Solar Heat Gain Coefficient SHGC N/A
Area weighted Average U-Value Calculation (Glazing /Skylight) N/A
RE-2: Non-roof hardscape cut sheet/compliance statement / certification N/A
Roofing, Pavers and
SSc-7 that SRI 29 or higher
Hardscape Materials
SRI 78 or higher for roofing material N/A
SM- N/A
Manufacturer catalogue confirming capacity and type of bins, with
Operational waste bins R3/14/15
color coding.
MRp-1
Technical data sheet or Test Report for ODP=0 & GWP<5 for N/A
Thermal Insulation SM-1
insulation with blowing agent
A product datasheet indicating the chlorine content. N/A
Waterproofing sheets &
N/A
membranes, Floor &
SM-1b Surface area calculation for waterproofing sheets and Floor & Wall
Wall coverings,
Coverings / Linear length calculation for Windows & door frames
Windows & door frames
AC units /Chillers/DX Third party test report for COP at AHRI test conditions AND Abu N/A
units Dhabi Quality Conformity Council Certificate
RE R1/ RE1
Technical data sheet with power consumption and schedule with N/A
AHUs/FAHUs/FCUs/Fans EAp2/c1
proposed specific power consumption (W/lps)
Pumps TDS confirming the power consumption with pump selection curve. N/A

37457160-NB-210627-ZNM-SMQ-LEED Estidama_Rev8 (003) - HY 200R Anchor Bolts


Page 2 of 5
Sustainability Material Submittal Questionnaire
Zayed National Museum (ZNM), Cultural District, Saadiyat Island, Abu Dhabi

Material Reference #: ZNM-ALE-MSB-AR-FI-000787 Rev.00 Specification Number: 050523


Product Name/Model: Chemical Anchor Bolt Manufacturer’s Name: M/s. Hilti
Product Description: HIT-HY 200-R V3 Injection Mortar Manufacturing location: Liechtenstein
Location of usage: Cubicle Partition Supplier’s Name: M/s. Venesta
Relevant Estidama
Relevant LEED Credits
Credits

Document
Credit Required Documents
Material Type attached
Reference (To be attached along with this questionnaire)
(Yes/No/NA)
Water Heaters Technical data sheet N/A
Efficiency comparison table demonstrating compliance with ASHRAE N/A
All Motors
90.1 - 2007 section 10.4 OR NEMA standards.
LBi-R1, N/A
FAHU Fresh air calculation sheet as per ASHRAE 62.1.2007
IEQp-1
For FAHUs, provide manufacturer datasheets of air flow sensors and N/A
sequence of control from BMS.
LBi-1
Duct mounted CO2 sensors, provide manufacturer datasheets of CO2 N/A
FAHUs, CO2 sensors IEQc-1
sensors and sequence of control from BMS.
Wall mounted CO2 sensors, provide manufacturer datasheets of CO2 N/A
sensors with set points for alarming.
TDS of water filtration system with schematic diagram. Filtration N/A
Water Filtration System LBi-R3
system must include UV system/Chemical Dosing System.
Car parking ventilation fan data sheet N/A
Carbon Monoxide (CO), Nitrogen Dioxide (NO2), Particular Matter N/A
Car parking ventilation
LBi-4 PM10 sensors data sheets
fans and BMS control
BMS schematic diagram with control sequence for parking N/A
ventilation.
PW-R1/1 Technical Data sheet N/A
Sanitary Fittings
WE-c2 Flow -pressure chart N/A
Water Meters, Electrical PW-R2/3 N/A
Technical Data sheet of meter & Building Management System
Meter, BMS RE-R2
Refrigeration Units, & Technical Data sheet (with ODP, GWP values) N/A
RE-R3
Fire Suppression N/A
EAp3/EAc4 Refrigerant Atmospheric Impact calculation as per EAc4
Systems
TDS of lighting fixture /occupancy sensor / daylight sensor N/A
Lighting Fixture, LBi-6 Technical data sheet of High-frequency ballasts. N/A
Occupancy, day light RE R1/RE 1 Shop drawings highlighting the location of occupancy sensor and N/A
sensor EAp2/c1 control diagram.
Space-wise light power density (LPD) calculation N/A
Technical data sheet with Energy Star Certificate or EU Energy N/A
Appliances RE-3
efficiency label
Technical data sheet with idle/downtime’(standby) features, N/A
Lifts RE-4
regenerative drive system, LED lighting and LCD display features.

Provide Product Specific Values in the table below as per the supporting documents attached.
Credit
Material Type Required Information Product Value Unit
Reference
Product VOC Content N/A g/l
LBi-2.1 VOC limit as per SCAQMD 1168 N/A g/l
Adhesives & Sealants
IEQc-4.1 VOC category as per SCAQMD 1168 N/A
Test method used (shall be as per SCAQMD Rule 1168) N/A
Paints & Coatings LBi-2.2 Product VOC Content N/A

37457160-NB-210627-ZNM-SMQ-LEED Estidama_Rev8 (003) - HY 200R Anchor Bolts


Page 3 of 5
Sustainability Material Submittal Questionnaire
Zayed National Museum (ZNM), Cultural District, Saadiyat Island, Abu Dhabi

IEQc-4.2 VOC limit: as per LEED as per SCAQMD 1168 g/l


VOC category as per LEED as per SCAQMD 1168 N/A
VOC limit: as per ESTIDAMA (EU directive 2004/42/CE) N/A g/l
VOC category per ESTIDAMA (EU directive 2004/42/CE) N/A
Test method used for Estidama compliance: (only
N/A
ISO-11890-2, ASTM D -2369 allowed)
Test method used LEED: N/A
Base: (Water / Solvent) N/A
IEQc-4.4, LBi-
Wooden Materials (Flooring, Formaldehyde content (Test shall be as per EN
2.5, LBi-2.4,
ceiling, furniture, finishing, 717-1, EN120, or EN 717-2) N/A Mg/m3
LBi 2.3, IEQc-
composite wood products)
4.3
Wood based ceiling / flooring LBi-2.4
Pentachlorophenol (PCP) content N/A PPM
panels LBi 2.3
Shading Materials (Canopies LBo-R3 & LBo-
SRI value of Shading Materials N/A
/ architectural elements) 1, SSc-7-
Roofing, Pavers and RE-2: SRI value of Non-roof hardscape N/A
Hardscape Materials SSc-7 SRI value of Roof Materials N/A
Thermal Conductivity – Elemental N/A W/mk
Envelope – External walls
Area weighted Average U-Value - Wall
block, insulation, Roofing, N/A W/m2K
/Roof/Glazing/skylight
Glazing/skylight etc.,
RE R1 & RE1 Solar Heat Gain Coefficient SHGC -Glazing/skylight N/A
EAp2/c1:
Chillers, DX units, Pumps, RE R1/ RE1 Does the equipment meet relevant ASHRAE 90.1 -
AHU, FCUs, FAHU, Fans, EAp2/c1 2007 section 5.4, 6.4, 7.4, 8.4, 9.4 and 10.4 OR N/A
Water heaters NEMA standards? (YES/ NO)
Motor efficiency N/A %
Motors
Motor efficiency Class (IE3, IE2 etc.) N/A
AC units COP of AC units N/A
PW-R1/1 Fixture water flow rate. (liters/ min) or (lpf) N/A liter
Sanitary Fittings
WE-c2 Pressure at which flow measures N/A KPa

We hereby confirm that the product information provided above is correct.

Confirmed by Manufacturer/Supplier:

Name : Roldan Dsouza

Position/Company : Technical Support Engineer

Date : 22/02/2024

Signature / Stamp :

Reviewed & Confirmed LEED/Estidama credit compliance by STJV Sustainability Engineer:

Name : Adeliza Coronacion

Signature :

Date :
01-03-2024

37457160-NB-210627-ZNM-SMQ-LEED Estidama_Rev8 (003) - HY 200R Anchor Bolts


Page 4 of 5
Sustainability Material Submittal Questionnaire
Zayed National Museum (ZNM), Cultural District, Saadiyat Island, Abu Dhabi

Reviewed & Confirmed ESTIDAMA credit compliance by PLATINUM Estidama Rep:

Name : Vinoo Gopal


al

Signature :

Date :

Reviewed & Confirmed LEED credit compliance by PLATINUM LEED Rep:

Name : Chellapil
Chellapillai
piilla
pillai
pi
pil la
lai
ai Srinivasan
Srri
Sri
Srriniv
niv
niv
ni
ivasa
i as
assa
asaan

Signature :

Date :

37457160-NB-210627-ZNM-SMQ-LEED Estidama_Rev8 (003) - HY 200R Anchor Bolts


Page 5 of 5
DOCUMENT: CS-10-0111204

We hereby certify the country of origin for the below-mentioned item:

2262132 Injectable mortar HY 200-R V3 500/1/P Germany

If you have any queries, please contact the undersigned on 800-HILTI (44584).

Remarks:

We herewith certify that the material described above complies with the terms of the
order. Which is matching with specifications and standards mentioned in the HILTI
applications and product catalogue.

Hilti Emirates LLC


Dubai Investment Park, Jebel Ali, Dubai
P.O Box 11051
Venesta Middle East (FZE) T +971 6 5533361
PO Box 122909, Sharjah F +971 6 5533362
United Arab Emirates www.venesta.co.uk
TRN: 100264725100003

WARRANTY CERTIFICATE

Project: Zayed National Museum


Location: Abu Dhabi, UAE
Contractor: Alec Engineering and Contracting LLC
Sub-Contractor: Venesta Middle East FZE
Scope of Works: Supply and Installation of Toilet Cubicles & Wall claddings
Contract: AFO-CFC394-SUB-MR-LTR-0003

We (Venesta Middle East FZE) confirm that all items under our scope of work for the above-
mentioned sub-contract agreement were executed by ourselves and are warranted for one year for
workmanship from the date of taking over the certificate.

Venesta Middle East FZE hereby confirms as well that the aforementioned supplied items follow the
project-approved details and Venesta Middle East FZE will not have any liability or obligation under
this warranty for the following exclusions:
1. Any defect caused by misuse or abuse of the items.
2. Damage caused by natural disasters.
3. Damage caused by unauthorized modification by the main contractor/client& other
subcontractors.
4. Wilful, intentional, or accidental damage.
5. Damage caused by carrying out any workmanship on the panels without MEP permission.
6. Damage caused by changes made to the sub-frames and Panels.
7. Damage due to cleaning of the peel of materials by non-neutral chemicals
8. Damage due to removing our product & installing where it was not designed or intended to be
used.
9. The whole or partial replacement of the profiles or parts of it.
10. Direct or indirect damage due to deformation of the materials due to climatic conditions
prevailing.
11. Failure to follow cleaning and maintenance guidelines & If the maintenance team of the main
contractor/client does not follow the correct procedures or maintain proper records as stated in
the operation & maintenance manual issued by M/s Venesta Middle East FZE.

Any claim on the above warranty should be received by our office in writing on or before the expiry
date of the warranty period.

Yours Faithfully
For Venesta Middle East FZE

General Manager

We know washrooms. Registered in England


No. 06129513
Responding to your every need. VAT No. 894 3096 86
Registered Office: Venesta Washroom
Systems,
Alderflat Drive, Newstead Industrial Estate,
Trentham, Staffordshire, ST4 8HX

You might also like