Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Presentaion

Batch No Case study topic schedule

Energy Auditing of Management block at PU


Batch 1 4/12/2019 (11:20 to 11:40)
campus

Material Auditing of Basic material testing


Batch 2 4/12/2019(11:40 tp 12:00)
lab at PU campus

Batch 3
Water Auditingof Management block at 4/12/2019 (12:00 to 12:20)
PU Campus

Material Auditing of construction site testing


Batch 4 4/12/2019 (12:20 to 12:40)
lab at PU campus

Material Auditing of Concrete and highway


Batch 5 4/12/2019 (12:40 to 1:00)
material testing lab at PU campus

Water Auditingof E and F block at PU


Batch 6 6/12/2019 (12:15 to 12:30)
Campus

Healty and safety auditing on Construction


Batch 7 6/12/2019 (12:30 to 12:45)
project in PU Campus

Energy Auditing of E and F Block at PU


Batch 8 6/12/2019 (12:45 to 1:00)
campus

Waste water Disposal Auditing of


Batch 9 11/12/2019 (11:20 to 11:40)
managemnt block PU campus

Batch 10 Energy Auditing of H and K Block at PU campus 11/12/2019 (11:40 to 12:00)


Batch 10 Energy Auditing of H and K Block at PU campus 11/12/2019 (11:40 to 12:00)

You might also like