TO MEERUT TO PRAYAGRAJ NOTES:-

1.ALL DIMENSIONS ARE IN MM UNLESS SPECIFIED OTHERWISE.


TO MEERUT TO PRAYAGRAJ
2.ALL STRUCTURAL STEEL OF TEMP.ARRANGEMENT SHALL CONFIRM TO
IS2062-2011 GRADE E-250 BR.

3.ALL SAFETY PRECAUTIONS SHOULD BE OBSERVED AT SITE.

4.TRESTLE SHOULD BE BRACED PROPERLY IN LONGITUDINAL AND


TRANSVERSE DIRECTION. BRACING TO BE CONNECTED BY WELDING.

5300 22135 5.PROPER DIVERSION OF ROAD TO BE DONE AT SITE.


5300 ℄ OF EXT. UP ℄ OF EXT. UP
MAIN LINE MAIN LINE 6.IN CASE THE PROPOSED MATERIAL IS NOT AVAILABLE NEXT HIGHER
℄ OF EXT. UP
MAIN LINE
℄ OF EXT. UP
MAIN LINE 5500
1618 16500 16375500 5500 SECTION MAY BE USED.
ELEVATION
P1 P2 7.EXACT LENGTH OF MEMBERS TO BE ASCERTAINED BY ACTUAL LAYOUT.
ELEVATION
P1 P2 ℄ OF EXT. UP ℄ OF EXT. UP
MAIN LINE MAIN LINE 8.THICKNESS OF FOUNDATION PADS FOR TRESTLE TO BE DECIDED AT
SITE TO KEEP THE SAME LEVEL OF TOP OF PADS AND THE GROUND
SHOULD BE PROPERLY COMPACTED BEFORE CASTING THE PADS.

9.ASSUMED BEARING CAPACITY OF SOIL IS 15T/SQM.

10.CONCRETE PAD SHOULD BE OF M-25 GRADE MIX.

14600
13100

CG-25

CG-25
CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13
CG-3

CG-3

CG-3

CG-3

CG-3

CG-3

CG-3
5300
14600

CG-25

CG-25
CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13
CG-3

CG-3

CG-3

CG-3

CG-3

CG-3

CG-3
5300 11.HEIGHT OF TRESTLE TO BE ADJUSTED BY STEEL STOOLS & WOODEN
PACKING.

12.MINOR MODIFICATION MAY BE DONE AT SITE TO SUIT THE PRIOR


APPROVED OF ENGINEER-IN-CHARGE.
2600

PLAN 14.DO NOT SCALE THE DRAWING.MARKED DIMENSIONS SHOULD BE


STAGE 17 FOLLOWED.
STAGE-17 (WITHOUT TRAFFIC AND POWER BLOCK)
1. DISMANTLE THE BEAM EXCEPT ABOVE TRACKS. 15.WINCHES OF 15MT CAPACITY WILL BE INSTALLED AT SITE WITH 28MM
DIA WIRE ROPE.
CG-25

CG-25
14600

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13
CG-3

CG-3

CG-3

CG-3

CG-3

CG-3

CG-3
5300 2. DISMANTLE THE TRESTLE AND BRACING EXCEPT AROUND TRACKS.
3. REST THE GIRDER ON WOODEN BLOCKS AND JACKS AT PIER PEDESTAL.
16. 150MT AND 65MT CRAWLER CRANE WILL BE USED AT SITE FOR
ERECTION.

17.WOODEN SLEEPERS WILL BE USED ABOVE TRESTLES.


TO MEERUT TO PRAYAGRAJ
14600

CG-25

CG-25
CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13
CG-3

CG-3

CG-3

CG-3

CG-3

CG-3

CG-3

5300

℄ OF EXT. UP ℄ OF EXT. UP
MAIN LINE MAIN LINE
14600

CG-25

CG-25
CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13
CG-3

CG-3

CG-3

CG-3

CG-3

CG-3

CG-3

5300
ELEVATION
P1 P2
℄ OF EXT. UP ℄ OF EXT. UP
MAIN LINE MAIN LINE

STAGE 16
1. STAGE 1 TO STAGE 13 WILL BE REPEATED FOR
ERECTION OF BALANCE GIRDERS.
14600
13100

CG-25

CG-25
CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13
CG-3

CG-3

CG-3

CG-3

CG-3

CG-3

CG-3
5300

PLAN
STAGE 18
STAGE-18 (WITH TRAFFIC AND POWER BLOCK)
1. DISMANTLE THE BEAM AND THE PIPES AND BRACING AROUND TRACKS IN BLOCK.
2. START THE LOWERING PROCESS

TO MEERUT TO PRAYAGRAJ

℄ OF EXT. UP ℄ OF EXT. UP
MAIN LINE MAIN LINE

ELEVATION
P1 P2
℄ OF EXT. UP ℄ OF EXT. UP
MAIN LINE MAIN LINE
14600
13100

CG-25

CG-25
CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13

CG-13
CG-3

CG-3

CG-3

CG-3

CG-3

CG-3

CG-3

5300

PLAN
STAGE 19
STAGE-19 (WITHOUT TRAFFIC AND POWER BLOCK)
1. LOWER THE GIRDER ON BEARINGS ONE BY ONE WITH THE HELP OF JACKS AND WOODEN BLOCKS.
THE SOLE PROPERTY

TITLE:-
AND SHALL NOT BE
USED, COPIED OR
THIS DRAWING IS

WITHOUT THEIR
REPRODUCED

DRG.No.
PERMISSION.

REV.
SUB CONTRACTOR:
WRITTEN

PROJECT:
OF M/S.

DESIGN BY- SCALE


TO THE SCALE
PREPARED BY- SHEET NO.
CHECKED BY- SHEET 3

You might also like