6 X 500W MONO Crystalline Solar Panel in Series Connection (STRING 1)

SOLAR PANEL PER STRING REPUBLIC OF THE PHILIPPINES


ISC = (12.28A) X 1.25 = 15.35A
Use: 16AT DC MCB
DPWH
2 -8.0mm² THHN Cu. 2 - 4mm² PV Cable + 1 - 5.5mm² TW(G) OFFICE OF THE BUILDING OFFICIAL
SERVICE ENTRANCE in 32mm Dia. uPVC PIPE in 20mm LQT Conduit MUNICIPALITY OF LILOAN
230V, 1Ø, 60Hz
PROVINCE OF CEBU
Cable Loss: Model SUN-5K-SG03LP1-EU
M Ppv_cable = 2 x k x I² x L
Battery Input Data RECOMMENDING APPROVAL
Ppv_cable = 2*(4.75Ω/km)*0.03km*(11.69A)²
METER Battery Type Lead-acid or Lithium-ion
Ppv_cable = 38.95W (per string)
Battery Voltage Range (V) 40V-60V
Max. Charging Current (A) 120A
Ppv_input = Ppv_peak - Ppv_cable
Max. Discharging Current (A) 120A HEAD OF SECTION DATE
Ppv_input = 500W*6*1.03*0.912 - 38.95W
Charging Curve 3 Stages/ Equalization APPROVED:
Ppv_input = 2779.13W (String 1)
External Temperature Sensor Optional
Charging Strategy for Li-Ion Battery Self-adoption to BMS
1 3 5 7 L1 L2 L3 N
Vpv_input = 42.8V * 6units
32A-ACU
ON ON
SALA Ppv_input = 256.8V (String 1)
OFF OFF PV String Input Data
8 6 4 2 T1 T2 T3 N Voltage Drop: Max. DC Input Power (W) 6500W BUILDING OFFICIAL DATE
Vdrop_cable = 2 x k x I x L PV Input Voltage (V) 370V (100V-500V)
6 X 500W MONO Crystalline Solar Panel in Series Connection (STRING 2)
APPROVED AS TO:
Vdrop_cable = 2*4.75Ω/km*11.69A*0.03km MPPT Range (V) 125V-425V
32A-ACU 32A 20A 16A 20A 16A Vdrop_cable = 3.33V Full Load DC Voltage Range 240V-425V
ROOM REF CO LO CO LO
Start-up Voltage (V) 150V
%Vd = Vd / V = [3.33 / (6*42.8)] x 100% = 1.3% PV Input Current (A) 13A + 13A

Parallel 2
LOAD No. of MPP Trackers 2

CAN
PEC recommends that 5% Voltage drop is allowed in No. of Strings per MPPT 1+1
PV IN BATTERY GEN GRID

HM
any circuit installation , therefor 4mm² PV Cable is
acceptable AC Output Data
Rated AC Output and UPS Power (W) 5000W
BATTERY PROTECTION Max. AC Output Power (W) 5500W
IMAX = (PMAXINV / VBATT) x 125% Peak Power (Off-Grid) 2 times of rated power, 10 S
IMAX = 5000W / 51.2V = 97.656 A x 125% AC Output Rated Current (A) 21.7A
IMAX = 122.07 A Max. AC Current (A) 25A
Use: 125AT DC MCCB Max. Continuous AC Passthrough (A) 35A
2-35mm² Battery Cable Power Factor 0.8 leading to 0.8 lagging
Output Frequency and Voltage 50/60Hz; 220/230/240 VAC
www.niceaye.com www.niceaye.com
INVERTER AC PROTECTION Grid Type Single Phase
1055.0W 1055.0W
2218.8kWh
232.6V 59.8Hz
2218.8kWh
232.6V 59.8Hz IMAX = (PMAXINV / VAC) x 125% Current Harmonic Distortion THD <3% (Linear load <1.5%)
5.00A 0.90PF 5.00A 0.90PF

IMAX = 5000W / 230V = 21.739 A x 125% Module Number TSM-DE18M(II)


IMAX = 27.174 A Efficiency MODULE NUMBER 500W
Use: 32AT AC MCB Max. Efficiency 97.60% MAX. POWER CURRENT 11.69A
2-5.5mm² THHN/THWN-2 Cu. Wire Euro Efficiency 96.50% MAX. POWER VOLTAGE 42.8V
in 25mm RSC/IMC/PVC Pipe MPPT Efficiency 99.90% SHORT CIRCUIT CURRENT 12.28A
OPEN CIRCUIT VOLTAGE 51.7V

1 SINGLE LINE DIAGRAM 2 Circuit Protection and 3 5kW Hybrid Inverter (DEYE) 4 500W Solar Panel (Trina)
E 1 E 1 E 1 E 1
Voltage Drop Calculation Specifications Specifications

GENERAL ELECTRICAL NOTES SOLAR ELECTRICAL NOTES 1 3 5 7


ON

MC4 CONNECTOR OFF DC ISOLATOR SWITCH


1. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE WITH THE PROVISION OF THE LATEST EDITION OF 1. UTILITY HAS 24 HOURS UNRESTRICTED ACCESS 8 6 4 2

THE: TO ALL PV SYSTEM COMPONENTS LOCATED AT L1 L2 L3 N


ON

A. PHILIPPINE ELECTRICAL CODE (PEC); SERVICE ENTRANCE. M KWH METER OFF


AC ISOLATOR SWITCH
B. THE RULES AND REGULATIONS OF LOCAL GOVERNMENT UNIT (LGU); AND T1 T2 T3 N

C. THE REQUIREMENTS OF THE LOCAL POWER COMPANY. 2. MODULES CONFORM TO AND ARE LISTED TO UL
1703. CT LIMITER
2. ALL ELECTRICAL WORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
SOLAR INVERTER
LICENSED ELECTRICAL PRACTITIONER. 3. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE SERVICE ENTRANCE
LISTED AS SUNLIGHT RESISTANT AS PER PEC.
3. ALL EQUIPMENT, DEVICES, MATERIALS AND INSTALLATION METHODS SHALL BE APPLICABLE TO THE
DESIGN , INTENT/ PURPOSE/ FUNCTION, LOCATION, SITE/ AREA CONDITION, AND WEATHER. 4. CONDUCTORS EXPOSED TO WET LOCATION GROUNDING
SHALL BE SUITABLE FOR USE ON WET LOCATION
www.niceaye.com

4. THE CONTRACTOR / IN-CHARGE OF INSTALLATION SHALL VERIFY AND ORIENT THE ACTUAL LOCATION AS PER PEC. LIFEPO4 BATTERY
1055.0W
OF THE UNITS TO BE INSTALLED. 2218.8kWh
232.6 V 59.8Hz
5.00A 0.90PF
DIGITAL WATT-METER
5. NEW REC METER SHALL BE INSTALLED NEAR THE
5. EXPOSED CONDUIT RUNS SHALL BE INSTALLED PARALLEL TO OR PERPENDICULAR WITH THE NEW BI-DIRECTIONAL METER.
BUILDING LINE, DIAGONAL RUN SHALL NOT BE ACCEPTED, ALL BOXES AND CONDUITS SHALL BE
RIGIDLY SUPPORTED BY HANGER RODS, ANGLE BARS, U-BOLTS AND METAL CONDUIT CLAMPS. USE 6. TAPPING POINT OF REC METER LOAD SIDE AC/DC SURGE PROTECTIVE DEVICE SOLAR PANEL
OF G.I WIRE HANGER IS NOT ACCEPTABLE. CONDUIT SUPPORT SHALL BE EVERY 1500MM MAXIMUM CONDUCTORS SHALL BE AT THE LOAD VISIBLE, A
INTERVAL. USE OF NON-METALLIC FLEXIBLE CONDUIT IS PROHIBITED. SERVICE DISCONNECT DEVICE SHALL BE
INSTALLED BEFORE SERVICE EQUIPMENT, REC AC/ DC CIRCUIT BREAKER
6. ALL RACEWAYS, SPLICE BOXES, AND/OR WIRE GUTTERS SHALL BE GAUGE #16, G.I SHEET, PAINTED METERS LOAD SIDE CONDUCTORS SHOULD BE NEGATIVE/ NEUTRAL WIRE (L2)
FINISH WITH MATCHING TOUCH-UP COATING. SHORT AS POSSIBLE.
MANUAL TRANSFER SWITCH POSITIVE/ LIVE WIRE (L1)
7. ALL DEVICES AND NON-CURRENT CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT SHALL BE 7. THE LINE SIDE CONDUCTORS OF THE REC METER
PROPERLY GROUNDED TO THE BOX BY MEANS OF TERMINAL LUGS IN ACCORDANCE WITH THE BETWEEN THE GRID-TIE INVERTER SHALL BE GROUNDING WIRE
PROVISION IN THE ARTICLE 2.50 "GROUNDING AND BONDING" PHILIPPINE ELECTRICAL CODE, VOLUME ENCLOSED IN AN EXPOSED RIGID METALLIC AC/ DC MOLDED CASE COMM. CABLE/ RS485
1, 2017 EDITION. CONDUIT OR INTERMEDIATE METALLIC CONDUIT. CIRCUIT BREAKER
CT WIRE
8. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND OF THE APPROVED TYPE FOR LOCATION AND 8. WARNING SHOULD BE MOUNTED ON OR
PURPOSE. ADJACENT TO THE VISIBLE DISCONNECTION

9. EXACT LOCATION AND RATING OF ALL EQUIPMENT TO BE SUPPLIED BY OTHER TRADES SHALL BE
DEVICE AND SHALL BE READ PROMINENTLY.
5 LEGENDS 6 SITE LOCATION
COORDINATED WITH THEIR RESPECTIVE TRADE DRAWINGS / PLANS PRIOR TO IMPLEMENTATION.
E 1 E 1

SOLARALL SOLAR ENERGY


IN-CHARGE OF INSTALLATION:
PRC REG. NO: 0067168
SEAL RECOMMENDING APPROVAL:
PRC REG. NO:
PROJECT TITLE: PROJECT OWNER: SCALE: SHEET NO.:
RA 545
VALIDITY: 03-18-26 VALIDITY: NTS
IT SHALL BE UNLAWFUL OF ANY
5KW HYBRID
1
ADDRESS: PERSON WITHOUT WRITTEN
PTR NO.: 5229774 PTR NO.:
M. C. BRIONES STREET, CONSENT OF THE AUTHOR OR
BRGY. SUBANGDAKU, DATE ISSUED: 01-03-23
AUTHOR OF THE SAID DOCUMENTS
TO DUPLICATE OR TO MAKE COPIES
DATE ISSUED: SOLAR PV SYSTEM LAYOUT CHARMAINE T. ANDALES
CONTENT:
MANDAUE CITY, 6014 CEBU, FOR USER IN THE EXPOSITION OF
PHILIPPINES, TEL NO. ARWIN JAY U. CORSINO PLACE ISSUED:
AND/OR OTHER PROJECT OF
PLACE ISSUED: OWNER
CATARMAN N. SAMAR AS SHOWN
413-0518 REGISTERED ELECTRICAL ENGINEER TIN: 482-129-950-000 BUILDING, WHETHER EXPOSITION PROFESSIONAL ELECTRICAL ENGINEER TIN:
PARTLY OR IN A WHOLE. LOCATION: EASTLAND SUBDIVISION, YATI, LILOAN, CEBU ADDRESS: EASTLAND SUBDIVISION, YATI, LILOAN, CEBU