Sl No: Description / Specification UG Sump-01 UG Sump-02 TO OHT (STP-1&2) Booster pump
(Monoblock) (Submersible)
Total Working Load in KW 3.73 3.73 2.98 2.98 2.24 2.24 2.24
UG Sump UG Sump STP -01 (Pump STP -02 (Pump Storm water lift Storm water lift Storm water lift Storm water lift
Booster pump Sump-01
pump room-01 pump room-02 room) room) pump-01 pump-02 pump-03 pump-04
30000 2000 2000 2000 2000 40000 40000 35000 35000 100000
4 1 1 1 1 2.5 2.5 2 2 8
3 1 1 1 1 5 5 5 5 4
2.46 0.41 0.41 0.41 0.41 2.05 2.05 2.05 2.05 2.46
(1w+1s) (1w+1s) (1w+1s) (1w+1s) (1w+1s) (1w+1s) (1w+1s) (1w+1s) (1w+1s) (1w+1s)
Monoblock Submersible Submersible Submersible Submersible Submersible Submersible Submersible Submersible Submersible
2.24 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37
0.003 0.001 0.001 0.001 0.001 0.005 0.005 0.005 0.005 0.004
0.05 0.03 0.03 0.03 0.03 0.07 0.07 0.07 0.07 0.06
50 29 29 29 29 65 65 65 65 58
65 32 32 32 32 50 65 65 65 65
North B1 B3
30 30 30
8 12 12
4 2 2
58 41 41
65 50 50
Client
Consultant
3 Total No of Fixture Units in Nos 825 Lpm 825 Lpm 714 Lpm 588 Lpm
Lower than above FU (Flow in Lpm) 800 682.4 800 682.4 700 606 500 472.9
Higher than above FU (Flow in Lpm) 900 739 900 739 800 682.4 600 549.3
7.5 7.5 3 3
Dia of Pipe = A*V { Area of pipe & Velocity ie., velocity considered 1.5 & A
= ╥ d²/4 }
Dia of Pipe in M 0.10 0.10 0.09 0.09
Dia of Pipe in MM 99 99 93 87
Available Dia of Pipe in mm 100 100 100 100