7,072,891 0.285
PROJECT MAN-HOURS WITHOUT LTI
328
PROJECT TARGET HOURS PROJECTED
0.28
Direct Man-Power Indirect Man-Power START 3,932,898 LOST MAN-HOURS 20,000,000 HRS
0.275
RE-START 7,072,891 HRS W/O LTI 17,000,000 HRS
0.27
0.265
HSE ACCIDENT TRIANGLE DIAGRAM PATTERN HSE ACCIDENT/INCIDENT INDICATOR DEC-21 JAN-22
Fatality
QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD Page 1 to 6
HSE Monthly Performance
1 to 28 February
Date: 202022
SHOULDER
2 2 2 FACIAL
1 1 1 1 1 1 1 1 1 0
1 1 1 1 1 1 1 1
Icon B-900 P-500 B-300 B-801 B-102 B-200 T-400 P300 P-700 QIN HAND
Lifting Backfilling Concreting Shuttering Shifting of
Doka
Pedestrian Coring
Concrete
MEP Block works Hualing
Tower Road
NECK
4 0
Accident and Incident Injuries and First Aid Case BODY SYSTEMS
ARM
Category 0
0
WRIST
0
2 LEG
3 5
1 KNEE
Fallen object 0
Road Traffic 3
Cought in Between ANKLE
FOOT
0
0
7
Injuries FAC
QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD. Page 2 to 6
1 to 28 February
Date: 2022 HSE Monthly Performance
RCA Safety Officers Observation Activity Hazards Lagging Indicators
Raised: 119
39 37 22
16 16 16
1613 17 17 14 8 6 12 11 4
14
3 1 0 1 2 2 2 1 5 5 0 0 10 8 2 0 4 4 0 0 4
9 7 4
2 1 1 1 2 2 2
AMOS A. DAVID BRIGHT SHAKAWAT ATIBA JOHNSON SAMUEL VIVEK JUSTINE
HOSSAIN 7
QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD. Page 3 to 6
1 to 28 February
Date: 2022 HSE Monthly Performance
IOR Site Engineer Close-out and Good Practices Performance Hazard & Risk
2020
Compliances
Falling from Height
1110
9 9 9 9 8 8 Fire
7 7 6 5
5 4 5 5 5 5 4 3 Housekeeping
1 0 1 1 1 1 0 2 2 1 1 1 1 0 1 1 0 1
0 0 0 0 0 0 0 0 Permit To Work
Working at
Height
ENG. ENG. ENG. ENG. ENG. ENG. ENG. ENG. ENG. JOE ENG. ENG. ENG. ENG. ENG. ENG. ENG.
ABDULLA AMMAR EHAB FRANCIS HAMDI HOSSAIN JABER JAWAD MAZIM MOATH MOAZ MEHADY OMAR RAUF RYAN
Scaffolding
Access/Egress
271
228
Ext. Report
141
123
Closed Out %
Quarterly Safety Inspection Remaining
Closed HS
Report
16 15 13 22 14
6
NCN HSE LEADERSHIP SITE WALK HSE INSPECTION REPORT NON HSE OBSERVATION SEE AND ACT OBSERVATION
REPORT REPORT % for Closed
Reports
75%
ISSUED REPORT CLOSED
QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD. Page 4 to 6
HSE Monthly Performance
1 to 28 February
Date: 2022
15 60%
10 40%
5 1 1 2 1 1 20%
0 0%
HSE MANAGER SAFETY OFFICERS SITE DOCTOR NURSE ENVIRONMENTAL ENVIRONMENTAL
MANAGER ENGINEER
INTERNAL INT/EXT CONSULTANT RAMS REVIEW WEEKLY TBT HSE STAFF
Series1 Series2
OBSERVATION MEETINGS RCO
QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD. Page 5 to 6
1 to 28 February
Date: 2022 HSE Monthly Performance
HSE TOOLBOX MEETINGS HSE OBSERVATION AND INSPECTION
GOOD OBSERVATION