PATEL ENGINEERING Ltd.

Palel
ENGINEERS AND CONTRACTORS
4E,Type Quarters/ Block No. 8
House No:4, Emerald Camp
Emerald -643 209
The Nilgiris
Date: 29.07.2023

TO WHOMIT MAY CONCERN


We are glad to inform youthat Mr. Nitesh M (Reg
Engineering from SSN College of Engineering No:201001025) pursuing B.E Civil
has successfully completed his
internship in Patel Engineering Ltd at Kundah Pumped Storage Hydro Electric
Project, 4x 125 MW at Nilgiris, Tamil Nadu from 3rd July 2023 to 29th July Power
2023.
During his internship, he was exposed to various activities in the
Department and gained on-site experience. Planning
We found him extremely inguisitive and hard working. He was very much interested in
learning the functions of our core division and also willing to put forward his best
efforts and get into the depth of the subject to understand it better.
His association with us was very fruitful and we wish him all the best in his future
endeavors.

For PATEL ENGINEERING LTD.


GINF
UNDHA

AUTHOED SGNATOY
(SABREESH G)
PROJECT MANAGÉR

REGO. FFCE:
INDA
&HWARI (WET, MUNHAI 400 t02
PATEL ESTATE ROAD. JOGE T0N16 FAX122 NIANS3 20761s05
PHONE : + t 22 20761600,
MiceiNg Qrn www.pbe om
Em:hedo CIN L99MNt4ELCo0T03
Week No
LOGBOOK SECTION B- WEEKLY REPORT
Date
/7 - &/7|Proiect Brief Description of Activities
odine -roiet Componeits
2
ol7-1s/1Qulity
|nl- 22/h|te visit Col- te Safdy
MA7 ,TRT , PH DT t..
24/7-29/7e visit - HRT, Surge shot, Ps
ct.
Logbook Weckly Evaluation by HOST
Instruction to Host Company Supervisor
Please refcr to the student's detailed report for
COMPANY SUPERVISOR
that
Plezse markin the appropriate boxbased on the particular weck before assessing his/her perfomance.
Unsatisfactory following score:(5] Excellent [4] Good [3] Average [2] Below
Student's Average |)
4 3
Score 2
Initiative Completes
required Completes Completes Partially Incomplete work
work,required work, but required work as completed work as
identifies and requires minimum
requested. requested
pursues supervision to
opportunities/to
cxpand
pursucs
opportunitics to
knowledge, skills, Cxpand
and abilities. knowledge, skills,
and abilities
Independence Very independent Independent and
and pursucs pursues
Independent
pursuing
in Fairly
independent
Too dependent on
others
substantial, substantial, knowledge pursuing
additional additional knowlcdge
knowledge knowledge
Relection Always reviewsModerately
prior learning review
Occasionally
prior review prior
Minimum revicw
prior learning
No revicw of pior
lenraing
past cxperiences learning past learning ( past
inside and outside experiences inside experiences inside
of the workand outside of the and outside of the
cnvironment) and work work
indicating broaderenvironment)environment)
penspective. Explores a topic Minimun No curioity
Curosity Explores a topje Explores a topic in superficially
yielding a lch depth
curiosity
aWArcnass Score: 3/20

Comments.
Host Company Supervisor's Sigeature &stamp:
Name & Designation MPrasbuserLAlag
Date q7l2 0I
sUMMARY OF THE WEEKLYREPORT
SCORES (LOGBOOK) FORM
Stadent Name: Nteoh N
Pace of Training ! kundah Nilris Dirt Register Number: 201001025
Training Period: 03/7/h3 - 21h3
Week
Score
-2
3
4

KINDLY SUBMIT A COPY OF THIS COMPLETED FORM WITH SCORES TO


THE COORDINATOR

Rost Company Supervisor Signature &Stamp


UNDHA
| Supervisor Name M.Prekunat

Designation
Date 2q)1|2023
SurveySte |FlaaningLE Department
Designation Supervisor
Date Name Host
Training
Student
Place
Company anniSingie of
Name:
Training
Activities1
Supervisor Nitesh
kundah :
SSuMTINIA
MITWTH
FISSa
Signature |2 M
|34 NilgirisLOGBOOK
&
Stamp S67|89
D't
SECTION

K
A-
10
11 INTERNSHIP

aal12023 MPrenlunan 12| 20001025


WORK DAY
13
Number:
Register
Training
TRAINING
14
Period:
1s
MTNTH
UNONA 16
SCHEDULE
17| 3/l23
18
FS 19
20
SoMT 21 -
2/7/22
|
22
23
WdFSISu 24|
25
26|
27|
23
LOGBOOK SECTION-DETAILED REPORT

WEEK No: 1

Objestve(s) of the actvitles: Project Outline -Project Components -LO| -Contract


Agreement- Work Order

Contents:

1. The Planning Manager started the week by providing an overview of this Pumped
Storage Hydro Electric Power Plant 1x 125 MW project's scope, objectives, and
goals. This introduction helped me grasp the significance of the project.

2. The planning team helped to familiarize me with the project layout and provided me
with crucial documents to understand the project better.

3. In the subsequent meeting, the Planning Manager took time to explain the various
components of the project. This included a breakdown of the key deliverables,
milestones, and the roles and responsibilities of different team members involved.
4. lalso got toknow about the various technology stack and tools that the team would
be using throughout the project.

5. One of the crucial tasks during the first week was reading the Letter of Intent (LO)
of the project. The LOloutlined the project's purpose, objectives, and the formal
agreement between the involved parties. It provided key insights into the
contractual and legal aspects of the project.
6. Throughout the week, Ihad the opportunity to interact with various team members
from different departments. These interactions allowed me to gain a holistic
understanding of the project's collaboratve nature and how each team contributes
to its suCcess.

7. Iwas also taught how to read the plans and sections of various components.

UNDHANG
LOGBOOK SECTIONC DETAILED REPORT

WEEK No: 2

Objective(s) of the activities: Quality control -Site Safety -Planning and Billing Processes

Contents:

1. In the second week of my internship, I was exposed deeper into the project
operations.

2. The second week began with an in-depth session on the quality control practices
carried out both on-site and in the laboratory. This knowledge was crucial as it
empathized the significance of maintaining high-quality standards throughout the
project.

3. Safety is of utmost importance in any project, and the safety engineer dedicated a
session to explain the safety precautions and procedures in place at the project site.
4. Later in the week, Iwas introduced to the project planning processes. I learned
about various stages involved in planning, including setting objectives, creating
timelines, allocating resources etc..

5. This understanding gave me valuable insights into how projects are strategically
organized and executed for success.

6. Alongside the planning process, Ialso received information on the billing procedures
used in the project. Ilearned about the documentation required for the billing, the
invoicing process and the Importance of accurate record-keeping to maintain
financial transparency.

7. Throughout the week, Ihad the opportunity to observe the practical applications of
quality control practices, safety measures, and project planning.
LOGBOOK SECTION C- DETAILED REPORT

WEEK No: 3

Objective(s) of the activities: Lower Intake Site Visit (Package 1)

Contents:

1. During the third week of my internship, Ihad an opportunity to visit the project
site with the site engineer.

2. The site visit provided me with a firsthand experience of the lower intake site,
where Iobserved various components of the project, such as the Main Access
Tunnel (MAT), Tail Race Tunnel (TRT), Power House Cavern, Transformer Cavern,
Pressure Shaft, Bus Ducts, Draft Tube etc...

3. The week started with the site engineer taking me to the Lower Intake site,
where Icould witness the progress of the Lower Intake Structure. This on-site
exposure was invaluable as it allowed me to see the project's scale and
understand how different components come together to form the entire
structure.

4. At the site, I also got to see the Power House and Transformer
Cavern, where
being set up.
the project's energY generation and distribution infrastructure are
about the Gantry Concreting
5. One of the key highlights of the week was learning
engineer provided a detailed
process in the Tail Race Tunnel. The site and cure concrete eficlently
explanation of how this method is utilized to pour
in the tunnel.
Concreting
tothe Lower Intake site, along with observing the Gantry and the
6. The visit project's complexities
process, deepened my understanding of the
engineering expertise involved.
LOGBOOK SECTIONC- DETAILED REPORT

WEEK No: 4

Obiectlve(s) of the actvities: Upper Intake Site Visit ( Package 2)

Contents:

1. The week commenced with a visit to the Upper Intake structure, which was an
essential part of the project. The site engineer guided me through the
components present in this area, including the Head Race Tunnel (HRT), Surge
Shaft, Pressure Shaft, Erection Chamber etc..
2. The Surge Shaft is acritical component I saw at the upper intake structure.
Understanding its function and importance in controlling water pressure
fluctuations provided me with insights into the hydraulic aspects of the project.
3. One of the key highlights of the visit was learning about the Pressure Shaft and
the drilling process involved in its construction. The site engineer explained the
technical challenges and methods employed for drilling the inclined Pressure
Shaft.

4. Later in the week, Ihad a learning session with the surveyor in-charge. They
taught me about the surveying processes and techniques employed within the
tunnel for precise measurements and alignment checks.

5. During my session with the surveyor, Ihad the opportunity to gain hands-on
experience in using surveying instruments within the tunnel environment, This
practical exposure helped me understand the importance of accuracy in
construction projects.
drives the whole
6. Ialso understood the importance of accuracy In surveying as it proper sunvey le
through
project forward. Providing accurate measurements
whole lot of time.
highly important as it can save a