∑DL= 772kg/m2 ≈ 800kg/m2

Live Load =490kg/m2


Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #01:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 6
β= = = 1.33 < 2
𝑙𝑎 4.325

Two Way Slab


(Dead Load)
W mosaic = 0.03*2000kg/m3=60kg/m2 hmin = 15cm
W Cement Mortar = 0.02*1800kg/m3
da =15cm – cover=>db=15cm-2.5cm
W Cement Mortar = 36kg/m2
W PCC= 0.05*2000kg/m3=100kg/m2 da =12.5cm
W Soil= 0.1*1800kg/m3=180kg/m2 db= 15cm – 3.5=> db= 11.5cm
W RCC= 0.15 *2400kg/m3=360kg/m2 𝑙𝑎 4.325
W Plaster= 0.02 *1800kg/m3=36kg/m2 m= = = 0.721
𝑙𝑏 6

Moment Coefficient for Slab #01


Case #09 {m= 0.721}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.0797 0.0126 0.034 0.007 0.05 0.014

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.0797*1.75*4.3252 = 2.61


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.0126*1.75*62 = 0.7938
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.034*0.96*4.3252 = 0.61
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.007*0.96*62 = 0.242
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.05*0.784*4.3252 =0.74
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.014*0.784*62 =0.4
Therefore Finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.61+0.74=1.35
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.242+0.4=0.64

RCC (REINFORCED CEMENT CONCRETE) 1


da =15cm – cover=>db=15cm-2.5cm =12cm As min= ρmin*b*hmin
db= 15cm – 3.5=> da= 11.5cm As min= 0.0018*100*15cm
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬ As min= 2.7cm2
2.7
Mspan=1.35T.m N= =4𝜑10mm@25cm c/c
0.785

Mn=1.35/0.9 => 1.5 T.m 1m = 4𝜑10mm


4.325m= X
𝑚𝑛 1.5∗105
Rn =
𝑏𝑑 2
=
100∗12.55
= 9.6kg/cm2 X=18 𝜑10mm+1
𝑓𝑦 4200
X=19 𝜑10mm@25cm c/c
m= => m= = 24.7 ‫ عدد قات سیخان‬۳۱
0.85 𝐹𝑐` 0.85∗200
‫ عدد مستقیم سیخان‬۹
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − -:‫( لپاره د سیخانو محاسبه‬Support)‫د لنډ لوری‬
𝑚 𝐹𝑦

Ma (-)S2=2.341
1 2∗9.6∗24.7
ρ= (1-√1 − Ma (-)S1=2.61
24.7 4200

ρ= 0.0024 Ma (-)S5=1.73
As= ρ*b*d => As=0.0024*100*12.5 M Cantilever=0.689
As=3cm2 M support =2.61
Asmin= ρmin*b*h => As=0.0018*100*15 -:‫ لپاره محاسبه کوو‬Slab #01 ‫پس یواځی د‬
As=3cm2 M support =2.61
𝐴𝑠 3
As= 3cm2 , N= => N= =4 𝜑10mm@25 Mn=
𝑚𝑢
=
2.61
=2.9T.m
𝐴𝜑10 0.785
𝜑 0.9
1m = 4𝜑10mm
𝑚𝑛 2.9∗105
6m= X Rn = 2
= = 18.56kg/cm2
𝑏𝑑 100∗12.52
X=24 𝜑10mm+1
m=24.7
X=25 𝜑10mm
‫ عدد قات سیخان‬۳۱ 1 2∗18.56∗24.7
ρ= (1-√1 −
‫ عدد مستقیم سیخان‬۳۱ 24.7 4200

:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬ ρact=0.0046


As = ρ*b*d
Mspan=0.64T.m
As = 0.0046*100*12.5cm
Mn=0.64/0.9 => 0.72 T.m As = 5.75cm2
𝑚𝑛 0.72∗105 As`=4*0.785: ‫ذخیروی سیخان‬
Rn = = = 5.445kg/cm2
𝑏𝑑 2 100∗11.52 As`=3.14cm 2

m=
𝑓𝑦
=> m=
4200
= 24.7 As Rem=5.75cm2 – 3.14cm2 =2.61cm2
0.85 𝐹𝑐` 0.85∗200 2.61
N= =4𝜑10mm @ 25cm
0.785
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − 1m = 4𝜑10mm
𝑚 𝐹𝑦
6m= X
1 2∗5.445∗24.7
ρ= (1-√1 − X=25 𝜑10mm @ 25cm c/c
24.7 4200

ρact=0.0013 < ρmin=0.0018

RCC (REINFORCED CEMENT CONCRETE) 2


Shrinkage Rebars: 6m= X
As = ρsh*b*h X=12 𝜑10mm @ 25cm c/c+1
As = 0.0018*100*15cm X=13 𝜑10mm @ 25cm c/c
As = 2.7cm2
2.7 Shrinkage Rebars:
N= =4𝜑10mm @ 25cm c/c
0.785 As = ρsh*b*h
4.325 As = 0.008*100*15cm
L/4= =1.08cm:‫د لنډ لوری لپاره‬
4
As = 2.7cm2
1m = 4𝜑10mm 2.7
1.08m= X N= =4𝜑10mm @ 25cm c/c
0.785
600
X=5 𝜑10mm @ 25cm c/c L/4= =1.5cm:‫د اوږد لوری لپاره‬
4

-:‫( لپاره د سیخانو محاسبه‬Support) ‫د اوږد لوری‬ 1m = 4𝜑10mm


1.5m= X
Mb(-)S1=0.7938
Ma(-)S6=1.355 X=6 𝜑10mm @ 25cm c/c
M support=1.355 600
L/7= =0.857cm:‫د متحرکی اتکاء لپاره‬
7
.‫پس دغه اتکاء هماغه سلب ډیزاین کی محاسبه شویده‬ 1m = 4𝜑10mm
0.857m= X
-:‫د اوږد لوری آزاد اتکاء لپاره د سیخانو محاسبه‬
X=4 𝜑10mm @ 25cm c/c
Mb(-) Roller =1/3mb(+)
Mb(-) Roller =1/3*0.64=0.2134
𝑚𝑢 0.2134
Mn= = =0.237T.m
𝜑 0.9

𝑚𝑛 0.237∗105
Rn = 2
= = 1.79kg/cm2
𝑏𝑑 100∗11.52

m=24.7

1 2∗1.79∗24.7
ρ= (1-√1 −
24.7 4200

ρact=0.00042< ρmin=0.0018
As min= ρmin*b*hmin
As min= 0.0018*100*15cm
As min= 2.7cm2
As`=2*0.785: ‫ذخیروی سیخان‬
As`=1.57cm2
As Rem=2.7cm2 – 1.57cm2 =1.13 cm2
1.13
N= =2𝜑10mm @ 50cm c/c
0.785

1m = 2𝜑10mm

RCC (REINFORCED CEMENT CONCRETE) 3


∑DL= 772kg/m2 ≈ 800kg/m2
Live Load =490kg/m2
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #02:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 6
β= = = 1.33 < 2
𝑙𝑎 4.325

Two Way Slab


(Dead Load)
W mosaic = 0.03*2000kg/m3=60kg/m2 hmin = 15cm
W Cement Mortar = 0.02*1800kg/m3 da =15cm – cover=>db=15cm-2.5cm
2
W Cement Mortar = 36kg/m
da =12.5cm
W PCC= 0.05*2000kg/m3=100kg/m2
W Soil= 0.1*1800kg/m3=180kg/m2 db= 15cm – 3.5=> db= 11.5cm
W RCC= 0.15 *2400kg/m3=360kg/m2 m= =
𝑙𝑎 4.325
= 0.721
𝑙𝑏 6
W Plaster= 0.02 *1800kg/m3=36kg/m2
Moment Coefficient for Slab #02
Case #02 {m= 0.721}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.0715 0.0195 0.029 0.008 0.047 0.013

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.0715*1.75*4.3252 = 2.341


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.0195*1.75*62 = 1.2285
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.029*0.96*4.3252 = 0.520
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.008*0.96*62 = 0.276
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.047*0.784*4.3252 =0.6893
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.013*0.784*62 =0.3669
Therefore Finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.6893+0.520=1.35
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.276+0.3669=0.64291

RCC (REINFORCED CEMENT CONCRETE) 4


da =15cm – cover=>db=15cm-2.5cm =12cm 1 2 𝑅𝑛∗𝑚
ρ= (1-√1 −
𝑚 𝐹𝑦
db= 15cm – 3.5=> da= 11.5cm
1 2∗5.445∗24.7
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬ ρ= (1-√1 −
24.7 4200
Mspan=1.21T.m
ρact=0.0013 < ρmin=0.0018
Mn=1.21/0.9 => 1.34 T.m
As min= ρmin*b*hmin
𝑚𝑛 1.34∗105 2
Rn = = = 8.576kg/cm
𝑏𝑑 2 100∗12.55 As min= 0.0018*100*15cm
𝑓𝑦 4200
m= => m= = 24.7 As min= 2.7cm2
0.85 𝐹𝑐` 0.85∗200
2.7
1 2 𝑅𝑛∗𝑚 N= =4𝜑10mm@25cm c/c
ρ= (1-√1 − 0.785
𝑚 𝐹𝑦
1m = 4𝜑10mm
1 2∗8.576∗24.7
ρ= (1-√1 − 4.325m= X
24.7 4200
ρ= 0.0020
X=18 𝜑10mm+1
As= ρ*b*d => As=0.0020*100*12.5
X=19 𝜑10mm@25cm c/c
As=2.5cm2 ‫ عدد قات سیخان‬۳۱

Asmin= ρmin*b*h => Asmin=0.0018*100*15 ‫ عدد مستقیم سیخان‬۹

Asmin=2.7cm2 -:‫( لپاره د سیخانو محاسبه‬Support)‫د لنډ لوری‬


Ma (-)S2=2.341 < Ma (-)S1=2.61
As=2.5cm2 < Asmin=2.7cm2
.‫پس دغه اتکاء هماغه سلب ډیزاین کی محاسبه شویده‬
𝐴𝑠 2.7
N= => N= =4 𝜑10mm@25 Ma (-)S12=1.76
𝐴𝜑10 0.785
Ma (-)S11=1.769
1m = 4𝜑10mm
Ma (-)S2=2.341
6m= X M support =2.341
X=24 𝜑10mm+1 -:‫ لپاره محاسبه کوو‬Slab #02 ‫پس یواځی د‬
X=25 𝜑10mm M support =2.341
‫ عدد قات سیخان‬۳۱ Mn=
𝑚𝑢
=
2.341
=2.6T.m
𝜑 0.9
‫ عدد مستقیم سیخان‬۳۱
𝑚𝑛 2.6∗105
Rn = 2
= = 16.65kg/cm2
:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬ 𝑏𝑑 100∗12.52

Mspan=0.64T.m m=24.7

Mn=0.64/0.9 => 0.72 T.m 1 2∗16.65∗24.7


ρ= (1-√1 −
24.7 4200
𝑚𝑛 0.72∗105
Rn = = = 5.445kg/cm2 ρact=0.004
𝑏𝑑 2 100∗11.52
𝑓𝑦 4200
m= => m= = 24.7 As = ρ*b*d
0.85 𝐹𝑐` 0.85∗200

RCC (REINFORCED CEMENT CONCRETE) 5


As = 0.004*100*12.5cm ρact=0.0026
As = 5.22cm2 As = ρ*b*d
As`=4*0.785: ‫ذخیروی سیخان‬ As = 0.0022*100cm*12.5cm
As`=3.14cm2
As = 3.32cm2
As Rem=5.22cm2 – 3.14cm2 =2.08cm2
As`=4*0.785: ‫ذخیروی سیخان‬
2.08
N= =3𝜑10mm @ 33cm
0.785 As`=3.14cm2
1m = 3𝜑10mm As Rem=As – As`
6m= X As Rem=3.32cm2 – 3.14cm2 =0.18cm2
X=18 𝜑10mm @ 25cm c/c +1 .‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬
X=19 𝜑10mm @ 25cm c/c Shrinkage Rebars:
Shrinkage Rebars: As = ρsh*b*h
As = ρsh*b*h As = 0.008*100*15cm
As = 0.0018*100*15cm As = 2.7cm2
2.7
As = 2.7cm2 N= =4𝜑10mm @ 25cm c/c
0.785
2.7
N= =4𝜑10mm @ 25cm c/c 600
0.785 L/4= =1.5cm:‫د اوږد لوری لپاره‬
4
4.325
L/4= =1.08cm:‫د لنډ لوری لپاره‬ 1m = 4𝜑10mm
4
1m = 4𝜑10mm
1.5m= X
1.08m= X
X=6 𝜑10mm @ 25cm c/c
X=5 𝜑10mm @ 25cm c/c
-:‫( لپاره د سیخانو محاسبه‬Support) ‫د اوږد لوری‬
Mb(-)Cantilever=0.689 T.m
Mb(-) S2=1.2285 T.m
Mb(-) S6=0.802
M support=1.2285 T.m
𝑚𝑢 1.2285
Mn= = =1.428T.m
𝜑 0.9

𝑚𝑛 1.428∗105
Rn = 2
= = 10.8kg/cm2
𝑏𝑑 100∗11.52

m=24.7

1 2∗10.8∗24.7
ρ= (1-√1 −
24.7 4200

RCC (REINFORCED CEMENT CONCRETE) 6


∑DL= 772kg/m2 ≈ 800kg/m2
Live Load =490kg/m2
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #03:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 4.325
β= = = 1.27 < 2
𝑙𝑎 3.4

Two Way Slab


(Dead Load) hmin = 15cm
W mosaic = 0.03*2000kg/m3=60kg/m2
da =15cm – cover=>db=15cm-2.5cm
W Cement Mortar = 0.02*1800kg/m3
W Cement Mortar = 36kg/m2 da =12.5cm
W PCC= 0.05*2000kg/m3=100kg/m2 db= 15cm – 3.5=> db= 11.5cm
W Soil= 0.1*1800kg/m3=180kg/m2
𝑙𝑎 3.4
W RCC= 0.15 *2400kg/m3=360kg/m2 m= = = 0.786
𝑙𝑏 4.325
W Plaster= 0.02 *1800kg/m3=36kg/m2
Moment Coefficient for Slab #03
Case #09 {m= 0.786}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.0765 0.0155 0.03 0.0085 0.044 0.015

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.0765*1.75*3.42 = 1.548T.m


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.0155*1.75*4.3252 = 0.51T.m
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.03*0.96*3.42 = 0.333T.m
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.0085*0.96*4.3252 = 0.1526T.m
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.044*0.784*3.42 =0.399T.m
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.015*0.784*4.3252 =0.2199T.m
Therefore Finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.333+0.399=0.729T.m
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.2199+0.1526=0.3725T.m
RCC (REINFORCED CEMENT CONCRETE) 7
da =15cm – cover=>db=15cm-2.5cm =12cm 1 2∗3.129∗24.7
ρ= (1-√1 −
24.7 4200
db= 15cm – 3.5=> da= 11.5cm
ρact=0.000075< ρmin=0.0018
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬
As min= ρmin*b*hmin
Mspan=0.729T.m
As min= 0.0018*100*15cm
Mn=0.729/0.9 => 0.81 T.m
As min= 2.7cm2
𝑚𝑛 0.81∗105 2
Rn = = = 5.184kg/cm
𝑏𝑑 2 100∗12.55 2.7
N= =4𝜑10mm@25cm c/c
𝑓𝑦 4200 0.785
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200 1m = 4𝜑10mm
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − 3.4m= X
𝑚 𝐹𝑦
X=14 𝜑10mm+1
1 2∗5.184∗24.7
ρ= (1-√1 −
24.7 4200 X=15 𝜑10mm@25cm c/c
ρ= 0.0012 < ρmin
‫ عدد قات سیخان‬۸
Asmin= ρmin*b*h => As=0.0018*100*15
‫ عدد مستقیم سیخان‬۷
Asmin=2.7cm2
-:‫( لپاره د سیخانو محاسبه‬Support)‫د لنډ لوری‬
𝐴𝑠 2.7
N= => N= =4 𝜑10mm@25 Ma (-)S2=2.341
𝐴𝜑10 0.785
Mb (-)S3=0.51
1m = 4𝜑10mm
Ma (-)S8=2.6
4.325m= X M support =2.6
X=18 𝜑10mm+1 .‫پس دغه اتکاء هماغه اتم سلب ډیزاین کی محاسبه شویده‬
X=19 𝜑10mm@25cmc/c M support =2.61
‫ عدد قات سیخان‬۳۱
Shrinkage Rebars:
‫ عدد مستقیم سیخان‬۹
As = ρsh*b*h
:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬
As = 0.008*100*15cm
Mspan=0.3725T.m
As = 2.7cm2
Mn=0.3725/0.9 => 0.4138 T.m
2.7
N= =4𝜑10mm @ 25cm c/c
𝑚𝑛 0.4138∗105 2 0.785
Rn = = = 3.129kg/cm 3.4
𝑏𝑑 2 100∗11.52 L/4= =85cm:‫د لنډ لوری لپاره‬
4
𝑓𝑦 4200 1m = 4𝜑10mm
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200
0.85m= X
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 −
𝑚 𝐹𝑦 X=4 𝜑10mm @ 25cm c/c

RCC (REINFORCED CEMENT CONCRETE) 8


2.7
-:‫( لپاره د سیخانو محاسبه‬Support) ‫د اوږد لوری‬ N= =4𝜑10mm @ 25cm c/c
0.785
4.325
Mb(-)S3=0.51 L/4= =1.08m:‫د اوږد لوری لپاره‬
4
Mb(-)S6=0.802 1m = 4𝜑10mm
M support=0.802
1.08m= X
-:‫ لپاره محاسبه کوو‬Slab #06 ‫پس یواځی د‬
X=5 𝜑10mm @ 25cm c/c
-:‫د اوږد لوری آزاد اتکاء لپاره د سیخانو محاسبه‬ 4.325
L/7= =0.618m:‫د متحرکی اتکاء لپاره‬
7
Mb(-) Roller =1/3mb(+)
1m = 4𝜑10mm
Mb(-) Roller =1/3*0.3725=0.12416 0.618m= X
𝑚𝑢 0.12416 X=3 𝜑10mm @ 25cm c/c
Mn= = =0.138T.m
𝜑 0.9

𝑚𝑛 0.138∗105
Rn = 2
= = 1.04kg/cm2
𝑏𝑑 100∗11.52

m=24.7

1 2∗1.04∗24.7
ρ= (1-√1 −
24.7 4200

ρact=0.00025< ρmin=0.0018
As min= ρmin*b*hmin
As min= 0.0018*100*15cm
As min= 2.7cm2
As`=2*0.785: ‫ذخیروی سیخان‬
As`=1.57cm2
As Rem=2.7cm2 – 1.57cm2 =1.13cm2
1.13
N= =2𝜑10mm @ 50cm c/c
0.785

1m = 2𝜑10mm
4.325m= X
X=9 𝜑10mm @ 25cm c/c+1
X=10 𝜑10mm @ 25cm c/c
Shrinkage Rebars:
As = ρsh*b*h
As = 0.008*100*15cm
As = 2.7cm2

RCC (REINFORCED CEMENT CONCRETE) 9


W Plaster= 0.02 *1800kg/m3=36kg/m2
∑DL= 772kg/m2 ≈ 800kg/m2
Live Load =490kg/m2
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #04:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 3.4
β= = =1<2
𝑙𝑎 3.4

Two Way Slab


(Dead Load)
hmin = 15cm
W mosaic = 0.03*2000kg/m3=60kg/m2
W Cement Mortar = 0.02*1800kg/m3 da =15cm – cover=>db=15cm-2.5cm
W Cement Mortar = 36kg/m2 da =12.5cm
W PCC= 0.05*2000kg/m3=100kg/m2
db= 15cm – 3.5=> db= 11.5cm
W Soil= 0.1*1800kg/m3=180kg/m2
𝑙𝑎 3.4
W RCC= 0.15 *2400kg/m3=360kg/m2 m= = =1
𝑙𝑏 3.4

Moment Coefficient for Slab #04


Case #08 {m= 1}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.033 0.061 0.020 0.023 0.028 0.030

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.033*1.75*3.42 = 0.668


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.061*1.75*3.42 = 1.23
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.020*0.96*3.42 = 0.222
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.023*0.96*3.42 = 0.255
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.028*0.784*3.42 =0.253
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.030*0.784*3.42 =0.272
Therefore Finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.222+0.253=0.475
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.272+0.255=0.52
RCC (REINFORCED CEMENT CONCRETE) 10
da =15cm – cover=>db=15cm-2.5cm =12cm As min= ρmin*b*hmin
As min= 0.0018*100*15cm
db= 15cm – 3.5=> da= 11.5cm
As min= 2.7cm2
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬ 2.7
N= =4𝜑10mm@25cm c/c
0.785
Mspan=0.475T.m 1m = 4𝜑10mm
Mn=0.475/0.9 => 0.52 T.m 3.4= X
X=14 𝜑10mm+1
𝑚𝑛 0.52∗105
Rn = 2
= = 3.328kg/cm2 X=15 𝜑10mm@25cm c/c
𝑏𝑑 100∗12.55
𝑓𝑦 4200 ‫ عدد قات سیخان‬۸
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200 ‫ عدد مستقیم سیخان‬۷
1 2 𝑅𝑛∗𝑚
-:‫( لپاره د سیخانو محاسبه‬Support)‫د لنډ لوری‬
ρ= (1-√1 −
𝑚 𝐹𝑦
Ma(-)S5=1.73
1 2∗3.328∗24.7 Ma(-)S4=0.668
ρ= (1-√1 −
24.7 4200 M support=1.73
ρact=0.0008 < ρmin=0.0018
Ma (-)S4=0.668 < Ma (-)S5=1.73
As min= ρmin*b*hmin
.‫پس دغه اتکاء هماغه سلب ډیزاین کی محاسبه شویده‬
As min= 0.0018*100*15cm
As min= 2.7cm2 -:‫د لنډ لوری آزاد اتکاء لپاره د سیخانو محاسبه‬
𝐴𝑠 3
N= => N= =4 𝜑10mm@25 Ma(-) Roller =1/3ma(+)
𝐴𝜑10 0.785
1m = 4𝜑10mm Ma(-) Roller =1/3*0.475=0.158
3.4m= X 𝑚𝑢 0.158
Mn= = =0.175T.m
X=14 𝜑10mm+1 𝜑 0.9

X=15 𝜑10mm 𝑚𝑛 0.175∗105


Rn = 2
= = 1.12kg/cm2
‫ عدد قات سیخان‬۸ 𝑏𝑑 100∗12.52

‫ عدد مستقیم سیخان‬۷ m=24.7


:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬
1 2∗1.12∗24.7
ρ= (1-√1 −
Mspan=0.527T.m 24.7 4200

Mn=0.527/0.9 => 0.585 T.m ρact=0.00026< ρmin=0.0018


𝑚𝑛 0.585∗105
As min= ρmin*b*hmin
Rn = 2
= = 4.42kg/cm2 As min= 0.0018*100*15cm
𝑏𝑑 100∗11.52
𝑓𝑦 4200 As min= 2.7cm2
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200 As`=2*0.785: ‫ذخیروی سیخان‬
1 2 𝑅𝑛∗𝑚 As`=1.57cm 2
ρ= (1-√1 −
𝑚 𝐹𝑦 As Rem=2.7cm2 – 1.57cm2 =1.13cm2
1.13
1 2∗4.42∗24.7 N= =2𝜑10mm@50cm c/c
0.785
ρ= (1-√1 −
24.7 4200 1m = 2𝜑10mm
ρact=0.0010 < ρmin=0.0018 3.4= X

RCC (REINFORCED CEMENT CONCRETE) 11


X=7 𝜑10mm+1 As Rem=2.7cm2 – 3.14cm2 =-0.44cm2
X=8 𝜑10mm@50cm c/c .‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬
Shrinkage Rebars: -:‫( لپاره د سیخانو محاسبه‬Support) ‫د اوږد لوری‬
As = ρsh*b*h Mb(-)S4=1.23
As = 0.0018*100*15cm Mb(-)S9=0.535
Mb(-)S10=0.921
As = 2.7cm2
M support=1.23
2.7
N= =4𝜑10mm @ 25cm c/c 𝑚𝑢 1.23
0.785 Mn= = =1.36T.m
𝜑 0.9
3.4
L/4= =0.85cm:‫د لنډ لوری لپاره‬ 𝑚𝑛 1.36∗105
4
Rn = = = 10.33kg/cm2
1m = 4𝜑10mm 𝑏𝑑 2 100∗11.52
0.85m= X m=24.7
X=4 𝜑10mm @ 25cm c/c
1 2∗10.33∗24.7
L/7=
3.4
=0.4857cm:‫د متحرکی اتکاء لپاره‬ ρ= (1-√1 −
24.7 4200
7
1m = 4𝜑10mm ρact=0.0025> ρmin=0.0018
0.4857m= X
X=2 𝜑10mm @ 25cm c/c As = ρ*b*d

-:‫( لپاره د سیخانو محاسبه‬Support) ‫د اوږد لوری‬ As = 0.0025*100*12.5cm

Mb(-)S4=1.23 As = 3.174cm2
Mb(-)S6=0.802 As`=4*0.785: ‫ذخیروی سیخان‬
M support=1.355 As`=3.14cm2
𝑚𝑢 0.802
Mn= = =0.89T.m As Rem=As – As`
𝜑 0.9

𝑚𝑛 0.89∗105
As Rem=3.174cm2 – 3.14cm2 =0.033cm2
2
Rn = = = 6.73kg/cm
𝑏𝑑 2 100∗11.52
.‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬
m=24.7
Shrinkage Rebars:
1 2∗6.73∗24.7
ρ= (1-√1 − As = ρsh*b*h
24.7 4200
As = 0.008*100*15cm
ρact=0.0016< ρmin=0.0018
As = 2.7cm2
As min= ρmin*b*hmin
2.7
As min= 0.0018*100*15cm N= =4𝜑10mm @ 25cm c/c
0.785
3.4
2 L/4= =0.85cm:‫د اوږد لوری لپاره‬
As min= 2.7cm 4
As`=4*0.785: ‫ذخیروی سیخان‬ 1m = 4𝜑10mm

As`=3.14cm2 0.85m= X

As Rem=As – As` X=4 𝜑10mm @ 25cm c/c


RCC (REINFORCED CEMENT CONCRETE) 12
∑DL= 772kg/m2 ≈ 800kg/m2
Live Load =490kg/m2
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #05:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 6
β= = = 1.76 < 2
𝑙𝑎 3.4

Two Way Slab


(Dead Load)
hmin = 15cm
W mosaic = 0.03*2000kg/m3=60kg/m2
W Cement Mortar = 0.02*1800kg/m3 da =15cm – cover=>db=15cm-2.5cm
W Cement Mortar = 36kg/m2 da =12.5cm
3 2
W PCC= 0.05*2000kg/m =100kg/m
db= 15cm – 3.5=> db= 11.5cm
W Soil= 0.1*1800kg/m3=180kg/m2
𝑙𝑎 3.4
W RCC= 0.15 *2400kg/m3=360kg/m2 m= = = 0.566
𝑙𝑏 6
3 2
W Plaster= 0.02 *1800kg/m =36kg/m
Moment Coefficient for Slab #05
Case #09 {m= 0.566}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.0855 0.0055 0.025 0.0035 0.061 0.0065

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.0855*1.75*3.42 = 1.73T.m


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.0055*1.75*62 = 0.347T.m
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.025*0.96*3.42 = 0.278T.m
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.0035*0.96*62 = 0.121T.m
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.061*0.784*3.42 =0.553T.m
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.0065*0.784*62 =0.184T.m
Therefore finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.553+0.278=0.831T.m
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.184+0.121=0.31T.m
RCC (REINFORCED CEMENT CONCRETE) 13
da =15cm – cover=>db=15cm-2.5cm =12cm As min= 2.7cm2
db= 15cm – 3.5=> da= 11.5cm 2.7
N= =4𝜑10mm@25cm c/c
0.785
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬
1m = 4𝜑10mm
Mspan=0.831T.m 3.4m= X
Mn=0.831/0.9 => 0.924 T.m X=14 𝜑10mm+1
X=15 𝜑10mm@25cm c/c
𝑚𝑛 0.924∗105
Rn =
𝑏𝑑 2
=
100∗12.55
= 5.9136kg/cm2 ‫ عدد قات سیخان‬۸
𝑓𝑦 4200
‫ عدد مستقیم سیخان‬۷
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200 -:‫( لپاره د سیخانو محاسبه‬Support) ‫د لنډ لوری‬
1 2 𝑅𝑛∗𝑚 Ma (-)S1=2.61
ρ= (1-√1 −
𝑚 𝐹𝑦 Ma (-)S5=1.73
M support =2.61
1 2∗5.9136∗24.7
ρ= (1-√1 −
24.7 4200 -:‫ لپاره محاسبه کوو‬Slab #01 ‫پس یواځی د‬
ρ= 0.0014 < ρmin=0.0018 Shrinkage Rebars:
Asmin= ρmin*b*h => As=0.0018*100*15 As = ρsh*b*h
Asmin=2.7cm2 As = 0.0018*100*15cm
𝐴𝑠 2.7
N= => N= =4 𝜑10mm@25 As = 2.7cm2
𝐴𝜑10 0.785
2.7
1m = 4𝜑10mm N= =4𝜑10mm @ 25cm c/c
0.785
3.4
6m= X L/4= =0.85cm:‫د لنډ لوری لپاره‬
4
X=24 𝜑10mm+1 1m = 4𝜑10mm
X=25 𝜑10mm@25cmc/c 0.85m= X
‫ عدد قات سیخان‬۳۱ X=4 𝜑10mm @ 25cm c/c
‫ عدد مستقیم سیخان‬۳۱
:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬ -:‫( لپاره د سیخانو محاسبه‬Support)‫د اوږد لوری‬
Mb (-)S5=0.347
Mspan=0.31T.m Mb (-)S4=1.23
Mn=0.3/0.9 => 0.35 T.m M support =1.23
𝑚𝑛 0.35∗105 -:‫ لپاره محاسبه کوو‬Slab #05 ‫پس یواځی د‬
Rn = 2
= 2
= 2.647kg/cm2
𝑏𝑑 100∗11.5
M support =1.23
𝑓𝑦 4200
m= => m= = 24.7 𝑚𝑢 1.23
0.85 𝐹𝑐` 0.85∗200
Mn= = =1.333T.m
𝜑 0.9
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − 𝑚𝑛 1.3333∗105
𝑚 𝐹𝑦
Rn = = = 10.08kg/cm2
𝑏𝑑2 100∗11.52
1 2∗2.647∗24.7
ρ= (1-√1 − m=24.7
24.7 4200
1 2∗10.08∗24.7
ρact=0.00063< ρmin=0.0018 ρ= (1-√1 −
24.7 4200
As min= ρmin*b*hmin
As min= 0.0018*100*15cm ρ= 0.0024 > ρmin=0.0018

RCC (REINFORCED CEMENT CONCRETE) 14


As= ρ*b*d => As=0.0024*100*12.5 X=6 𝜑10mm @ 25cm c/c
As=3.09cm2 6
L/7= =0.857cm:‫د متحرکی اتکاء لپاره‬
As`=4*0.785: ‫ذخیروی سیخان‬ 7

As`=3.14cm2 1m = 4𝜑10mm
As Rem=3.09cm2 – 3.14cm2 =-0.045cm2 0.857m= X
.‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬ X=4 𝜑10mm @ 25cm c/c

-:‫د اوږد لوری آزاد اتکاء لپاره د سیخانو محاسبه‬


Mb(-) Roller =1/3mb(+)
Mb(-) Roller =1/3*0.31=0.103333
𝑚𝑢 0.10333
Mn= = =0.1148 T.m
𝜑 0.9

𝑚𝑛 0.1148∗105
Rn = = = 0.8668kg/cm2
𝑏𝑑 2 100∗11.52

m=24.7

1 2∗0.8668∗24.7
ρ= (1-√1 −
24.7 4200

ρact=0.0002< ρmin=0.0018
As min= ρmin*b*hmin
As min= 0.0018*100*15cm
As min= 2.7cm2
As`=2*0.785: ‫ذخیروی سیخان‬
As`=1.57cm2
As Rem=2.7cm2 – 1.57cm2 =1.13cm2
1.13
N= =2𝜑10mm @ 50cm c/c
0.785
1m = 2𝜑10mm
3.4m= X
X=7 𝜑10mm @ 50cm c/c+1
X=8 𝜑10mm @ 50cm c/c
Shrinkage Rebars:
As = ρsh*b*h
As = 0.008*100*15cm
As = 2.7cm2
2.7
N= =4𝜑10mm @ 25cm c/c
0.785
6
L/4= =1.5cm:‫د لنډ لوری لپاره‬
4
1m = 4𝜑10mm
1.5m= X
RCC (REINFORCED CEMENT CONCRETE) 15
∑DL= 772kg/m2 ≈ 800kg/m2
Live Load =490kg/m2
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #06:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 432.5
β= = = 1.27 < 2
𝑙𝑎 340

Two Way Slab

(Dead Load) hmin = 15cm


W mosaic = 0.03*2000kg/m3=60kg/m2 da =15cm – cover=>db=15cm-2.5cm
3
W Cement Mortar = 0.02*1800kg/m
da =12.5cm
W Cement Mortar = 36kg/m2
W PCC= 0.05*2000kg/m3=100kg/m2 db= 15cm – 3.5=> db= 11.5cm
W Soil= 0.1*1800kg/m3=180kg/m2 𝑙𝑎 340
m= = = 0.786
3
W RCC= 0.15 *2400kg/m =360kg/m 2 𝑙𝑏 432.5

W Plaster= 0.02 *1800kg/m3=36kg/m2


Moment Coefficient for Slab #06
Case #02 {m= 0.786}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.067 0.0245 0.027 0.01 0.0585 0.0155

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.067*1.75*3.42 = 1.355T.m


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.0245*1.75*4.3252 = 0.802T.m
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.027*0.96*3.42 = 0.3T.m
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.01*0.96*4.3252 = 0.18T.m
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.0585*0.784*3.42 =0.53T.m
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.0155*0.784*4.3252 =0.227T.m
Therefore finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.3+0.53=0.83T.m
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.18+0.227=0.407T.m

RCC (REINFORCED CEMENT CONCRETE) 16


da =15cm – cover=>db=15cm-2.5cm =12cm 1 2∗3.58∗24.7
ρ= (1-√1 −
24.7 4200
db= 15cm – 3.5=> da= 11.5cm
ρact=0.00083< ρmin=0.0018
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬
As min= ρmin*b*hmin
Mspan=0.83T.m
As min= 0.0018*100*15cm
Mn=0.83/0.9 => 0.92 T.m
As min= 2.7cm2
𝑚𝑛 0.92∗105 2
Rn = = = 5.888kg/cm
𝑏𝑑 2 100∗12.55 2.7
N= =4𝜑10mm@25cm c/c
𝑓𝑦 4200 0.785
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200 1m = 4𝜑10mm
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − 3.4m= X
𝑚 𝐹𝑦
X=14 𝜑10mm+1
1 2∗5.888∗24.7
ρ= (1-√1 −
24.7 4200 X=15 𝜑10mm@25cm c/c
ρ= 0.0014 < ρmin=0.0018
‫ عدد قات سیخان‬۸
Asmin= ρmin*b*h => As=0.0018*100*15
‫ عدد مستقیم سیخان‬۷
Asmin=2.7cm2
-:‫( لپاره د سیخانو محاسبه‬Support) ‫د لنډ لوری‬
𝐴𝑠 2.7
N= => N= =4 𝜑10mm@25 Mb(-)S1=0.7938
𝐴𝜑10 0.785
Ma(-)S6=1.355
1m = 4𝜑10mm
M support=1.355
4.325m= X 𝑚𝑢 1.355
Mn= = =1.51T.m
𝜑 0.9
X=18 𝜑10mm+1
𝑚𝑛 1.51∗105
X=19 𝜑10mm@25cmc/c Rn = = = 9.664kg/cm2
𝑏𝑑2 100∗12.52
‫ عدد قات سیخان‬۳۱
m=24.7
‫ عدد مستقیم سیخان‬۹
1 2∗9.664∗24.7
:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬ ρ= (1-√1 −
24.7 4200

Mspan=0.407T.m ρact=0.0023
Mn=0.407/0.9 => 0.452 T.m As = ρ*b*d
𝑚𝑛 0.452∗105
Rn = = = 3.58kg/cm2 As = 0.0023*100cm*12.5cm
𝑏𝑑 2 100∗11.52
𝑓𝑦 4200 As = 2.963cm2
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200 As`=4*0.785: ‫ذخیروی سیخان‬
1
ρ= (1-√1 −
2 𝑅𝑛∗𝑚 As`=3.14cm2
𝑚 𝐹𝑦
As Rem=As – As`
As Rem=2.963cm2 – 3.14cm2 =-0.17cm2
RCC (REINFORCED CEMENT CONCRETE) 17
.‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬ Asmin = ρmin*b*d
Mb(-)Cantilever=0.689 T.m Asmin = 0.0018*100cm*12.5cm
Mb(-) S2=1.2285 T.m
Asmin = 2.7cm2
Mb(-) S6=0.802
M support=1.2285 T.m As`=4*0.785: ‫ذخیروی سیخان‬

.‫پس دغه اتکاء هماغه سلب ډیزاین کی محاسبه شویده‬ As`=3.14cm2

Mb (-) Cantilever=0.689T.M As Rem=As – As`


Mb (-) S8=1.575T.m As Rem=2.7cm2 – 3.14cm2 =-0.44cm2
Ma (-) S6=1.355T.m
.‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬
M support =1.575T.m
Mb(-)S4=1.23
-:‫ لپاره محاسبه کوو‬Slab #08 ‫پس یواځی د‬
Mb(-)S6=0.802
Shrinkage Rebars: M support=1.23
As = ρsh*b*h
:‫ لپاره محاسبه کوو‬Slab #04 ‫پس یواځی د‬
As = 0.0018*100*15cm
As = 2.7cm2 Mb(-)S6=0.802
2.7 Mb(-)S10=0.921
N= =4𝜑10mm @ 25cm c/c
0.785
3.4 M support=0.21
L/4= =0.85cm:‫د لنډ لوری لپاره‬
4
:‫ لپاره محاسبه کوو‬Slab #10 ‫پس یواځی د‬
1m = 4𝜑10mm
0.85m= X Shrinkage Rebars:
X=4 𝜑10mm @ 25cm c/c As = ρsh*b*h
-:‫( لپاره د سیخانو محاسبه‬Support) ‫د اوږد لوری‬ As = 0.0018*100*15cm
As = 2.7cm2
Mb(-)S3=0.51 2.7
N= =4𝜑10mm @ 25cm c/c
Mb(-)S6=0.802 0.785
4.325
Ma()S16=0.595 L/4= =1.08cm:‫د اوږد لوری لپاره‬
4
M support=0.802 1m = 4𝜑10mm
1.08m= X
:‫ لپاره محاسبه کوو‬Slab #06 ‫پس یواځی د‬
X=5 𝜑10mm @ 25cm c/c
M support=0.802
𝑚𝑢 0.802
Mn= = =0.89T.m
𝜑 0.9

𝑚𝑛 0.89∗105
Rn = = = 6.73kg/cm2
𝑏𝑑 2 100∗11.52

m=24.7

1 2∗6.73∗24.7
ρ= (1-√1 −
24.7 4200

ρact=0.0016
RCC (REINFORCED CEMENT CONCRETE) 18
∑DL= 772kg/m2 ≈ 800kg/m2
Live Load =490kg/m2
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #07:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 3.4
β= = = 1.28 < 2
𝑙𝑎 2.65

Two Way Slab


(Dead Load) hmin = 15cm
W mosaic = 0.03*2000kg/m3=60kg/m2
da =15cm – cover=>db=15cm-2.5cm
W Cement Mortar = 0.02*1800kg/m3
W Cement Mortar = 36kg/m2 da =12.5cm
W PCC= 0.05*2000kg/m3=100kg/m2
db= 15cm – 3.5=> db= 11.5cm
W Soil= 0.1*1800kg/m3=180kg/m2
𝑙𝑎 2.65
W RCC= 0.15 *2400kg/m3=360kg/m2 m= = = 0.78
𝑙𝑏 3.4
3 2
W Plaster= 0.02 *1800kg/m =36kg/m
Moment Coefficient for Slab #07
Case #09 {m= 0.78}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.0765 0.0155 0.03 0.0085 0.044 0.015

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.0765*1.75*2.652 = 0.94T.m


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.0155*1.75*3.42 = 0.313T.m
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.03*0.96*2.652 = 0.202T.m
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.0085*0.96*3.42 = 0.094T.m
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.044*0.784*2.652 =0.242T.m
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.015*0.784*3.42 =0.136T.m
Therefore finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.242+0.202=0.444T.m
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.136+0.094=0.23T.m
RCC (REINFORCED CEMENT CONCRETE) 19
da =15cm – cover=>db=15cm-2.5cm =12cm As min= 2.7cm2
db= 15cm – 3.5=> da= 11.5cm 2.7
N= =4𝜑10mm@25cm c/c
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬ 0.785

Mspan=0.444T.m 1m = 4𝜑10mm
Mn=0.444/0.9 => 0.5 T.m 2.65m= X
X=11 𝜑10mm+1
𝑚𝑛 0.5∗105
Rn = 2
= = 3.15kg/cm2 X=12 𝜑10mm@25cm c/c
𝑏𝑑 100∗12.55
𝑓𝑦 4200 ‫ عدد قات سیخان‬۶
m= => m= = 24.7 ‫ عدد مستقیم سیخان‬۶
0.85 𝐹𝑐` 0.85∗200

1 2 𝑅𝑛∗𝑚
-:‫( لپاره د سیخانو محاسبه‬Support) ‫د لنډ لوری‬
ρ= (1-√1 −
𝑚 𝐹𝑦
Ma (-) S15=1.3
1 2∗3.15∗24.7 Ma (-) S7=0.313
ρ= (1-√1 − M support =1.3
24.7 4200

ρ= 0.00075 < ρmin=0.0018 -:‫ لپاره محاسبه کوو‬Slab #15 ‫پس یواځی د‬
Asmin= ρmin*b*h => As=0.0018*100*15 Shrinkage Rebars:
Asmin=2.7cm2 As = ρsh*b*h
𝐴𝑠 2.7
N= => N= =4 𝜑10mm@25 As = 0.0018*100*15cm
𝐴𝜑10 0.785
1m = 4𝜑10mm As = 2.7cm2
2.7
3.4m= X N= =4𝜑10mm @ 25cm c/c
0.785
X=14 𝜑10mm+1 2.65
X=15 𝜑10mm@25cmc/c L/4= =0.6625cm:‫د لنډ لوری لپاره‬
4
‫ عدد قات سیخان‬۸ 1m = 4𝜑10mm
‫ عدد مستقیم سیخان‬۷ 0.6625m= X
:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬ X=3 𝜑10mm @ 25cm c/c
-:‫( لپاره د سیخانو محاسبه‬Support)‫د اوږد لوری‬
Mspan=0.23T.m
Mb (-) S9=0.535
Mn=0.23/0.9 => 0.2555 T.m Mb (-) S7=0.313
𝑚𝑛 0.2555∗105 M support =0.535
Rn = 2
= = 1.93kg/cm2
𝑏𝑑 100∗11.52
𝑓𝑦 4200
-:‫ لپاره محاسبه کوو‬Slab #09 ‫پس یواځی د‬
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200
M support =0.535
1 2 𝑅𝑛∗𝑚 𝑚𝑢 0.535
ρ= (1-√1 − Mn= = =0.6T.m
𝑚 𝐹𝑦 𝜑 0.9

1 2∗1.93∗24.7 𝑚𝑛 0.6∗105
ρ= (1-√1 − Rn = 2
= = 4.5kg/cm2
24.7 4200 𝑏𝑑 100∗11.52

m=24.7
ρact=0.00046< ρmin=0.0018
As min= ρmin*b*hmin 1 2∗4.5∗24.7
ρ= (1-√1 −
As min= 0.0018*100*15cm 24.7 4200

RCC (REINFORCED CEMENT CONCRETE) 20


3.4
ρ= 0.0010 < ρmin=0.0018 L/4= =0.85cm:‫د لنډ لوری لپاره‬
4
Asmin= ρmin*b*h => As=0.0018*100*15 1m = 4𝜑10mm
Asmin=2.7cm2
0.85m= X
As`=4*0.785: ‫ذخیروی سیخان‬
As`=3.14cm 2 X=4 𝜑10mm @ 25cm c/c
As Rem=2.7cm2 – 3.14cm2 =-0.44cm2 3.4
.‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬ L/7= =0.485cm:‫د متحرکی اتکاء لپاره‬
7
1m = 4𝜑10mm
-:‫د اوږد لوری آزاد اتکاء لپاره د سیخانو محاسبه‬
0.485m= X
Mb (-) Roller =1/3mb(+) X=2 𝜑10mm @ 25cm c/c
Mb (-) Roller =1/3*0.23=0.0766
𝑚𝑢 0.0766
Mn= = =0.085T.m
𝜑 0.9

𝑚𝑛 0.085∗105
Rn = 2
= = 0.644kg/cm2
𝑏𝑑 100∗11.52

m=24.7

1 2∗0.644∗24.7
ρ= (1-√1 −
24.7 4200

ρ= 0.00015 < ρmin=0.0018


Asmin= ρmin*b*h => As=0.0018*100*15
Asmin=2.7cm2
As`=2*0.785: ‫ذخیروی سیخان‬
As`=1.57cm2
As Rem=2.71cm2 – 1.57cm2 =1.13cm2
1.13
N= =2𝜑10mm @ 50cm c/c
0.785

1m = 2𝜑10mm
2.65m= X
X=6 𝜑10mm @ 25cm c/c+1
X=7 𝜑10mm @ 25cm c/c
Shrinkage Rebars:
As = ρsh*b*h
As = 0.008*100*15cm
As = 2.7cm2
2.7
N= =4𝜑10mm @ 25cm c/c
0.785

RCC (REINFORCED CEMENT CONCRETE) 21


W Soil= 0.1*1800kg/m3=180kg/m2
W RCC= 0.15 *2400kg/m3=360kg/m2
W Plaster= 0.02 *1800kg/m3=36kg/m2
∑DL= 772kg/m2 ≈ 800kg/m2
Live Load =490kg/m2
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #08:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 600
β= = = 1.38 < 2
𝑙𝑎 432.5

Two Way Slab


hmin = 15cm
da =15cm – cover=>db=15cm-2.5cm
(Dead Load) da =12.5cm
W mosaic = 0.03*2000kg/m3=60kg/m2
W Cement Mortar = 0.02*1800kg/m3 db= 15cm – 3.5=> db= 11.5cm
W Cement Mortar = 36kg/m2 𝑙𝑎 432.5
m= = = 0.7208
3 2 𝑙𝑏 600
W PCC= 0.05*2000kg/m =100kg/m
Moment Coefficient for Slab #08
Case #09 {m= 0.7208}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.0795 0.025 0.03 0.0065 0.048 0.012

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.0795*1.75*4.3252 = 2.6T.m


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.025*1.75*62 = 1.575T.m
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.03*0.96*4.3252 = 0.538T.m
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.0065*0.96*62 = 0.224T.m
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.048*0.784*4.3252 =0.704T.m
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.012*0.784*62 =0.338T.m
Therefore finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.538+0.704=1.242T.m
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.224+0.338=0.562T.m
RCC (REINFORCED CEMENT CONCRETE) 22
da =15cm – cover=>db=15cm-2.5cm =12cm As min= 0.0018*100*15cm
db= 15cm – 3.5=> da= 11.5cm As min= 2.7cm2
2.7
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬ N= =4𝜑10mm@25cm c/c
0.785
1m = 4𝜑10mm
Mspan=1.242T.m
4.325m= X
Mn=1.242/0.9 => 1.38T.m X=18 𝜑10mm+1
𝑚𝑛 1.38∗105 X=19 𝜑10mm@25cm c/c
Rn = 2
= = 8.832kg/cm2
𝑏𝑑 100∗12.55 ‫ عدد قات سیخان‬۳۱
m=
𝑓𝑦
=> m=
4200
= 24.7 ‫ عدد مستقیم سیخان‬۹
0.85 𝐹𝑐` 0.85∗200
-:‫( لپاره د سیخانو محاسبه‬Support) ‫د لنډ لوری‬
1 2 𝑅𝑛∗𝑚 Ma (-) S2=2.341
ρ= (1-√1 −
𝑚 𝐹𝑦
Ma (-) S8=2.6
1 2∗8.832∗24.7
Mb (-) S3=0.51
ρ= (1-√1 − M support =2.6
24.7 4200

ρ= 0.0021 > ρmin=0.0018 -:‫ لپاره محاسبه کوو‬Slab #08 ‫پس یواځی د‬
As= ρ*b*h => As=0.0021*100*12.5
M support =2.6
As=2.62cm2
𝐴𝑠 2.62 𝑚𝑢 2.6
N= => N= =4 𝜑10mm@25 Mn= = =2.9T.m
𝐴𝜑10 0.785 𝜑 0.9
1m = 4𝜑10mm 𝑚𝑛 2.9∗105
Rn = 2
= = 18.56kg/cm2
6m= X 𝑏𝑑 100∗12.52

X=24 𝜑10mm+1 m=24.7


X=25 𝜑10mm@25cmc/c
1 2∗18.56∗24.7
‫ عدد قات سیخان‬۳۱ ρ= (1-√1 −
24.7 4200
‫ عدد مستقیم سیخان‬۳۱
:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬ ρact=0.0047

Mspan=0.562T.m As = ρ*b*d

Mn=0.562/0.9 => 0.624 T.m As = 0.0047*100*12.5cm


𝑚𝑛 0.624∗105 As = 5.86cm2
Rn = 2
= 2
= 4.71kg/cm2
𝑏𝑑 100∗11.5
𝑓𝑦 4200
As`=4*0.785: ‫ذخیروی سیخان‬
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200
As`=3.14cm2
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − As Rem=5.86cm2 – 3.14cm2 =2.72cm2
𝑚 𝐹𝑦
2.72
N= =4𝜑10mm @ 25cm c/c
1 2∗4.71∗24.7 0.785
ρ= (1-√1 −
24.7 4200
1m = 4𝜑10mm
ρact=0.0011< ρmin=0.0018 6m= X
As min= ρmin*b*hmin X=24 𝜑10mm @ 25cm c/c+1

RCC (REINFORCED CEMENT CONCRETE) 23


4.325
X=25 𝜑10mm @ 25cm c/c L/7= =0.6179cm:‫د متحرکی اتکاء لپاره‬
7
-:‫د لنډ لوری آزاد اتکاء لپاره د سیخانو محاسبه‬ 1m = 4𝜑10mm
0.6179m= X
Ma (-) Roller =1/3mb(+)
X=3 𝜑10mm @ 25cm c/c
Ma (-) Roller =1/3*1.242=0.414
-:‫( لپاره د سیخانو محاسبه‬Support)‫د اوږد لوری‬
𝑚𝑢 0.414
Mn= = =0.46T.m
𝜑 0.9 Mb (-) Cantilever=0.689T.M
𝑚𝑛 0.46∗105 Mb (-) S8=1.575T.m
Rn = 2
= = 2.944kg/cm2
𝑏𝑑 100∗12.52 Ma (-) S6=1.355T.m
m=24.7 M support =1.575T.m

1 2∗2.944∗24.7
-:‫ لپاره محاسبه کوو‬Slab #08 ‫پس یواځی د‬
ρ= (1-√1 −
24.7 4200
M support =0.646
ρ= 0.0007 < ρmin=0.0018 𝑚𝑢 1.575
Mn= = =1.75T.m
𝜑 0.9
Asmin= ρmin*b*h => As=0.0018*100*15
𝑚𝑛 1.75∗105
2 Rn = = = 13.23kg/cm2
Asmin=2.7cm 𝑏𝑑2 100∗11.52

As`=2*0.785: ‫ذخیروی سیخان‬ m=24.7

As`=1.57cm2 ρ=
1
(1-√1 −
2∗13.23∗24.7
24.7 4200
As Rem=2.71cm2 – 1.57cm2 =1.13cm2
1.13
ρ= 0.0032 > ρ=0.0018
N= =2𝜑10mm @ 50cm c/c
0.785
As= ρ*b*h => As=0.0032*100*12.5
1m = 2𝜑10mm
As=4.10cm2
6m= X
X=12 𝜑10mm @ 25cm c/c+1 As`=4*0.785: ‫ذخیروی سیخان‬

X=13 𝜑10mm @ 25cm c/c As`=3.14cm2

Shrinkage Rebars: As Rem=4.10cm2 – 3.14cm2 =0.96cm2

As = ρsh*b*h .‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬


Shrinkage Rebars:
As = 0.0018*100*15cm As = ρsh*b*h
As = 2.7cm2 As = 0.008*100*15cm
2.7 As = 2.7cm2
N= =4𝜑10mm @ 25cm c/c 2.7
0.785 N= =4𝜑10mm @ 25cm c/c
0.785
4.325 6
L/4= =1.08cm:‫د لنډ لوری لپاره‬ L/4= =1.5cm:‫د اوږد لوری لپاره‬
4 4
1m = 4𝜑10mm 1m = 4𝜑10mm
1.08m= X 1.5m= X
X=5 𝜑10mm @ 25cm c/c X=6𝜑10mm @ 25cm c/c

RCC (REINFORCED CEMENT CONCRETE) 24


W Soil= 0.1*1800kg/m3=180kg/m2
W RCC= 0.15 *2400kg/m3=360kg/m2
W Plaster= 0.02 *1800kg/m3=36kg/m2
∑DL= 772kg/m2 ≈ 800kg/m2
Live Load =490kg/m2
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #09:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 600
β= = = 1.76 < 2
𝑙𝑎 340

Two Way Slab


hmin = 15cm
da =15cm – cover=>db=15cm-2.5cm
(Dead Load)
W mosaic = 0.03*2000kg/m3=60kg/m2 da =12.5cm
W Cement Mortar = 0.02*1800kg/m3 db= 15cm – 3.5=> db= 11.5cm
W Cement Mortar = 36kg/m2
𝑙𝑎 340
W PCC= 0.05*2000kg/m3=100kg/m2 m= = = 0.566
𝑙𝑏 600

Moment Coefficient for Slab #09


Case #02 {m= 0.566}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.0825 0.0085 0.0345 0.0035 0.06 0.0065

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.0825*1.75*3.42 = 1.67T.m


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.0085*1.75*62 = 0.535T.m
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.0345*0.96*3.42 = 0.382T.m
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.0035*0.96*62 = 0.121T.m
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.06*0.784*3.42 =0.543T.m
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.0065*0.784*62 =0.183T.m
Therefore finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.382+0.543=0.925T.m
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.121+0.183=0.304T.m

RCC (REINFORCED CEMENT CONCRETE) 25


da =15cm – cover=>db=15cm-2.5cm =12cm 1 2∗2.55∗24.7
ρ= (1-√1 −
24.7 4200
db= 15cm – 3.5=> da= 11.5cm
ρact=0.0006< ρmin=0.0018
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬
As min= ρmin*b*hmin
Mspan=0.925T.m
As min= 0.0018*100*15cm
Mn=0.925/0.9 => 1.03T.m
As min= 2.7cm2
𝑚𝑛 1.03∗105 2
Rn = = = 6.6kg/cm
𝑏𝑑 2 100∗12.55 2.7
N= =4𝜑10mm@25cm c/c
𝑓𝑦 4200 0.785
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200 1m = 4𝜑10mm
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − 3.4m= X
𝑚 𝐹𝑦
X=14 𝜑10mm+1
1 2∗6.6∗24.7
ρ= (1-√1 −
24.7 4200 X=18 𝜑10mm@25cm c/c
ρ= 0.0016 < ρmin=0.0018
‫ عدد قات سیخان‬۸
As min= ρmin*b*hmin
‫ عدد مستقیم سیخان‬۷
As min= 0.0018*100*15cm
-:‫( لپاره د سیخانو محاسبه‬Support)‫د لنډ لوری‬
As min= 2.7cm2
Ma (-) S11=1.769 T.m
𝐴𝑠 2.7 Ma (-) S9=1.67 T.m
N= => N= =4 𝜑10mm@25
𝐴𝜑10 0.785
M support =1.769 T.m
1m = 4𝜑10mm
-:‫ لپاره محاسبه کوو‬Slab #11 ‫پس یواځی د‬
6m= X
Shrinkage Rebars:
X=24 𝜑10mm+1
As = ρsh*b*h
X=25 𝜑10mm@25cmc/c
As = 0.0018*100*15cm
‫ عدد قات سیخان‬۳۱
As = 2.7cm2
‫ عدد مستقیم سیخان‬۳۱
2.7
:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬ N= =4𝜑10mm @ 25cm c/c
0.785
3.4
Mspan=0.304 T.m L/4= =0.85cm:‫د لنډ لوری لپاره‬
4
Mn=0.304/0.9 => 0.338 T.m 1m = 4𝜑10mm
0.85m= X
𝑚𝑛 0.338∗105
Rn =
𝑏𝑑 2
=
100∗11.52
= 2.55kg/cm2 X=4 𝜑10mm @ 25cm c/c

m=
𝑓𝑦
=> m=
4200
= 24.7 -:‫( لپاره د سیخانو محاسبه‬Support)‫د اوږد لوری‬
0.85 𝐹𝑐` 0.85∗200
Mb (-) S9=0.535
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − Mb (-) S7=0.313
𝑚 𝐹𝑦

RCC (REINFORCED CEMENT CONCRETE) 26


M support =0.535
-:‫ لپاره محاسبه کوو‬Slab #09 ‫پس یواځی د‬
M support =0.535
𝑚𝑢 0.535
Mn= = =0.6T.m
𝜑 0.9

𝑚𝑛 0.6∗105
Rn = = = 4.5kg/cm2
𝑏𝑑 2 100∗11.52

m=24.7

1 2∗4.5∗24.7
ρ= (1-√1 −
24.7 4200

ρ= 0.0010 < ρmin=0.0018


Asmin= ρmin*b*h => As=0.0018*100*15
Asmin=2.7cm2
As`=4*0.785: ‫ذخیروی سیخان‬
As`=3.14cm 2

As Rem=2.7cm2 – 3.14cm2 =-0.44cm2


.‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬
Shrinkage Rebars:
As = ρsh*b*h
As = 0.008*100*15cm
As = 2.7cm2
2.7
N= =4𝜑10mm @ 25cm c/c
0.785
6
L/4= =1.5cm:‫د اوږد لوری لپاره‬
4
1m = 4𝜑10mm
1.5m= X
X=6𝜑10mm @ 25cm c/c

RCC (REINFORCED CEMENT CONCRETE) 27


W RCC= 0.15 *2400kg/m3=360kg/m2
W Plaster= 0.02 *1800kg/m3=36kg/m2
∑DL= 772kg/m2 ≈ 800kg/m2
Live Load =490kg/m2
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #10:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 350
β= = = 1.03 < 2
𝑙𝑎 340

Two Way Slab


hmin = 15cm
(Dead Load)
W mosaic = 0.03*2000kg/m3=60kg/m2 da =15cm – cover=>db=15cm-2.5cm
W Cement Mortar = 0.02*1800kg/m3 da =12.5cm
W Cement Mortar = 36kg/m2
db= 15cm – 3.5=> db= 11.5cm
W PCC= 0.05*2000kg/m3=100kg/m2
𝑙𝑎 340
W Soil= 0.1*1800kg/m3=180kg/m2 m= = = 0.971
𝑙𝑏 350

Moment Coefficient for Slab #10


Case #02 {m= 0.971}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.0475 0.043 0.019 0.017 0.0285 0.026

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.0475*1.75*3.42 = 0.961 T.m


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.043*1.75*3.52 = 0.921 T.m
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.019*0.96*3.42 = 0.210 T.m
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.017*0.96*3.52 = 0.199 T.m
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.0285*0.784*3.42 =0.2583 T.m
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.026*0.784*3.52 =0.249 T.m
Therefore finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.2583+0.210=0.4683 T.m
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.249+0.199=0.448 T.m

RCC (REINFORCED CEMENT CONCRETE) 28


da =15cm – cover=>db=15cm-2.5cm =12cm 1 2∗3.76∗24.7
ρ= (1-√1 −
24.7 4200
db= 15cm – 3.5=> da= 11.5cm
ρact=0.0009 < ρmin=0.0018
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬
As min= ρmin*b*hmin
Mspan=0.4683T.m
As min= 0.0018*100*15cm
Mn=0.4683/0.9 => 0.5203T.m
As min= 2.7cm2
𝑚𝑛 0.5203∗105 2
Rn = = = 3.33kg/cm
𝑏𝑑 2 100∗12.55 2.7
N= =4𝜑10mm@25cm c/c
𝑓𝑦 4200 0.785
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200 1m = 4𝜑10mm
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − 3.4 m= X
𝑚 𝐹𝑦
X=14 𝜑10mm+1
1 2∗3.33∗24.7
ρ= (1-√1 −
24.7 4200 X=15 𝜑10mm@25cm c/c
ρ= 0.0008 < ρmin=0.0018
‫ عدد قات سیخان‬۸
As min= ρmin*b*hmin
‫ عدد مستقیم سیخان‬۷
As min= 0.0018*100*15cm
-:‫( لپاره د سیخانو محاسبه‬Support)‫د لنډ لوری‬
As min= 2.7cm2
Ma (-) S10=0.961 T.m
2.7 Mb (-) S11=0.535 T.m
N= =4𝜑10mm@25cm c/c
0.785
M support =0.961 T.m
1m = 4𝜑10mm
-:‫ لپاره محاسبه کوو‬Slab #10 ‫پس یواځی د‬
3.5m= X
M support =0.961
X=14 𝜑10mm+1 𝑚𝑢 0.961
Mn= = =1.06T.m
𝜑 0.9
X=15 𝜑10mm@25cmc/c
‫ عدد قات سیخان‬۸ 𝑚𝑛 1.06∗105
Rn = = = 6.83kg/cm2
𝑏𝑑2 100∗12.52
‫ عدد مستقیم سیخان‬۷
m=24.7
:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬
1 2∗6.83∗24.7
Mspan=0.448T.m ρ= (1-√1 −
24.7 4200

Mn=0.448/0.9 => 0.497 T.m ρ= 0.0016 < ρmin=0.0018


𝑚𝑛 0.4∗105 Asmin= ρmin*b*d => As=0.0018*100*15
Rn = = = 3.76kg/cm2
𝑏𝑑 2 100∗11.52
𝑓𝑦 4200 As=2.7cm2
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200
As`=4*0.785: ‫ذخیروی سیخان‬
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − As`=3.14cm2
𝑚 𝐹𝑦

RCC (REINFORCED CEMENT CONCRETE) 29


As Rem=2.7cm2 – 3.14cm2 =-0.44cm2 .‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬
Mb (-) S10=0.921 T.m
.‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬
Mb (-) S4=1.23 T.m
Ma (-) S10=0.961 T.m
M support =1.23 T.m
Mb (-) S12=1.08 T.m
M support =1.08 T.m -:‫ لپاره محاسبه کوو‬Slab #04 ‫پس یواځی د‬
-:‫ لپاره محاسبه کوو‬Slab #12 ‫پس یواځی د‬ Shrinkage Rebars:
As = ρsh*b*h
Shrinkage Rebars:
As = ρsh*b*h As = 0.008*100*15cm
As = 0.008*100*15cm As = 2.7cm2
2.7
As = 2.7cm2 N= =4𝜑10mm @ 25cm c/c
0.785
2.7 3.5
N= =4𝜑10mm @ 25cm c/c L/4= =0.875cm:‫د اوږد لوری لپاره‬
0.785 4
L/4=
3.4
=0.85cm:‫د لنډ لوری لپاره‬ 1m = 4𝜑10mm
4
0.875m= X
1m = 4𝜑10mm
X=4𝜑10mm @ 25cm c/c
0.85m= X
X=4𝜑10mm @ 25cm c/c
-:‫( لپاره د سیخانو محاسبه‬Support)‫د اوږد لوری‬
Mb (-) S10=0.921 T.m
Mb (-) S6=0.802 T.m
M support =0.921 T.m
-:‫ لپاره محاسبه کوو‬Slab #10 ‫پس یواځی د‬
M support =0.921 T.m
𝑚𝑢 0.921
Mn= = =1.02T.m
𝜑 0.9

𝑚𝑛 1.02∗105
Rn = 2
= = 7.73kg/cm2
𝑏𝑑 100∗11.52

m=24.7

1 2∗7.73∗24.7
ρ= (1-√1 −
24.7 4200

ρ= 0.0018 = ρmin=0.0018
Asmin= ρmin*b*d => As=0.0018*100*15
As=2.7cm2
As`=4*0.785: ‫ذخیروی سیخان‬
As`=3.14cm2
As Rem=2.7cm2 – 3.14cm2 =-0.44cm2

RCC (REINFORCED CEMENT CONCRETE) 30


W Soil= 0.1*1800kg/m3=180kg/m2
W RCC= 0.15 *2400kg/m3=360kg/m2
W Plaster= 0.02 *1800kg/m3=36kg/m2
∑DL= 772kg/m2 ≈ 800kg/m2
Live Load =490kg/m2
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #11:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 600
β= = = 1.71 < 2
𝑙𝑎 350

Two Way Slab


hmin = 15cm
da =15cm – cover=>db=15cm-2.5cm
(Dead Load)
da =12.5cm
W mosaic = 0.03*2000kg/m3=60kg/m2
W Cement Mortar = 0.02*1800kg/m3 db= 15cm – 3.5=> db= 11.5cm
W Cement Mortar = 36kg/m2 𝑙𝑎 350
m= = = 0.583
W PCC= 0.05*2000kg/m3=100kg/m2 𝑙𝑏 600

Moment Coefficient for Slab #11


Case #02 {m= 0.583}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.0825 0.0085 0.0345 0.0035 0.06 0.0065

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.0825*1.75*3.52 = 1.769T.m


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.0085*1.75*62 = 0.535T.m
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.0345*0.96*3.52 = 0.405T.m
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.0055*0.96*62 = 0.121T.m
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.06*0.784*3.52 =0.576T.m
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.0065*0.784*62 =0.183T.m
Therefore finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.405+0.576=0.981T.m
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.121+0.183=0.304T.m
RCC (REINFORCED CEMENT CONCRETE) 31
da =15cm – cover=>db=15cm-2.5cm =12cm 1 2∗2.55∗24.7
ρ= (1-√1 −
24.7 4200
db= 15cm – 3.5=> da= 11.5cm
ρact=0.00016< ρmin=0.0018
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬
As min= ρmin*b*hmin
Mspan=0.981T.m
As min= 0.0018*100*15cm
Mn=0.981/0.9 => 1.09T.m
As min= 2.7cm2
𝑚𝑛 1.09∗105 2
Rn = = = 6.77kg/cm
𝑏𝑑 2 100∗12.55 2.7
N= =4𝜑10mm@25cm c/c
𝑓𝑦 4200 0.785
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200 1m = 4𝜑10mm
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − 3.5m= X
𝑚 𝐹𝑦
X=14 𝜑10mm+1
1 2∗6.77∗24.7
ρ= (1-√1 −
24.7 4200 X=15 𝜑10mm@25cm c/c
ρ= 0.00016 < ρmin=0.0018
‫ عدد قات سیخان‬۸
As min= ρmin*b*hmin
‫ عدد مستقیم سیخان‬۷
As min= 0.0018*100*15cm
-:‫( لپاره د سیخانو محاسبه‬Support)‫د لنډ لوری‬
As min= 2.7cm2
Ma (-)S12=1.76
2.7 Ma (-)S11=1.769
N= =4𝜑10mm@25cm c/c
0.785
Ma (-)S2=2.341
1m = 4𝜑10mm M support =2.341
6m= X -:‫ لپاره محاسبه کوو‬Slab #02 ‫پس یواځی د‬
X=24 𝜑10mm+1 Ma (-) S11=1.769 T.m
Ma (-) S9=1.67 T.m
X=25𝜑10mm@25cm c/c M support =1.769 T.m
‫ عدد قات سیخان‬۳۱ -:‫ لپاره محاسبه کوو‬Slab #11 ‫پس یواځی د‬
‫ عدد مستقیم سیخان‬۳۱ M support =1.769
:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬ 𝑚𝑢 1.769
Mn= = =1.96T.m
𝜑 0.9
Mspan=0.304T.m
𝑚𝑛 1.96∗105
Rn = 2
= = 14.86kg/cm2
Mn=0.304/0.9 => 0.338 T.m 𝑏𝑑 100∗11.52

𝑚𝑛 0.338∗105 m=24.7
Rn = = = 2.555kg/cm2
𝑏𝑑 2 100∗11.52
1 2∗14.86∗24.7
m=
𝑓𝑦
=> m=
4200
= 24.7 ρ= (1-√1 −
24.7 4200
0.85 𝐹𝑐` 0.85∗200

1 2 𝑅𝑛∗𝑚 ρ= 0.0037 > ρ=0.0018


ρ= (1-√1 −
𝑚 𝐹𝑦

RCC (REINFORCED CEMENT CONCRETE) 32


As= ρ*b*d => As=0.0037*100*12.5
As=4.625cm2
As`=4*0.785: ‫ذخیروی سیخان‬
As`=3.14cm2
As Rem=4.625cm2 – 3.14cm2 =1.48cm2
1.48
N= =2𝜑10mm @ 50cm c/c
0.785

1m = 2𝜑10mm
6m= X
X=12 𝜑10mm @ 50cm c/c+1
X=13 𝜑10mm @ 50cm c/c
Shrinkage Rebars:
As = ρsh*b*h
As = 0.008*100*15cm
As = 2.7cm2
2.7
N= =4𝜑10mm @ 25cm c/c
0.785
3.5
L/4= =0.875cm:‫د لنډ لوری لپاره‬
4
1m = 4𝜑10mm
0.875m= X
X=4𝜑10mm @ 25cm c/c
-:‫( لپاره د سیخانو محاسبه‬Support)‫د اوږد لوری‬
Ma (-) S10=0.961 T.m
Mb (-) S11=0.535 T.m
M support =0.961 T.m
-:‫ لپاره محاسبه کوو‬Slab #10 ‫پس یواځی د‬
Shrinkage Rebars:
As = ρsh*b*h
As = 0.008*100*15cm
As = 2.7cm2
2.7
N= =4𝜑10mm @ 25cm c/c
0.785
6
L/4= =0.875cm:‫د اوږد لوری لپاره‬
4
1m = 4𝜑10mm
1.5m= X
X=6𝜑10mm @ 25cm c/c

RCC (REINFORCED CEMENT CONCRETE) 33


W PCC= 0.05*2000kg/m3=100kg/m2
W Soil= 0.1*1800kg/m3=180kg/m2
W RCC= 0.15 *2400kg/m3=360kg/m2
W Plaster= 0.02 *1800kg/m3=36kg/m2
∑DL= 772kg/m2 ≈ 800kg/m2
Live Load =490kg/m2
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #12:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 6
β= = = 1.71 < 2
𝑙𝑎 3.5

Two Way Slab


hmin = 15cm
da =15cm – cover=>db=15cm-2.5cm
da =12.5cm
(Dead Load) db= 15cm – 3.5=> db= 11.5cm
W mosaic = 0.03*2000kg/m3=60kg/m2 𝑙𝑎 3.5
3 m= = = 0.58
W Cement Mortar = 0.02*1800kg/m 𝑙𝑏 6

W Cement Mortar = 36kg/m2


Moment Coefficient for Slab #12
Case #08{m= 0.58}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.0825 0.016 0.05 0.006 0.0675 0.008

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.0825*1.75*3.52 = 1.76T.m


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.016*1.75*62 = 1.08T.m
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.05*0.96*3.52 = 0.588T.m
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.006*0.96*62 = 0.224T.m
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.0675*0.784*3.52 =0.648T.m
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.008*0.784*62 =0.225T.m
Therefore finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.588+0.648=1.236T.m
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.207+0.225=0.432T.m

RCC (REINFORCED CEMENT CONCRETE) 34


da =15cm – cover=>db=15cm-2.5cm =12cm 1 2∗3.629∗24.7
ρ= (1-√1 −
24.7 4200
db= 15cm – 3.5=> da= 11.5cm
ρact=0.00087< ρmin=0.0018
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬
As min= ρmin*b*hmin
Mspan=1.236T.m
As min= 0.0018*100*15cm
Mn=1.236/0.9 => 1.37T.m
As min= 2.7cm2
𝑚𝑛 1.37∗105 2
Rn = = = 8.768kg/cm
𝑏𝑑 2 100∗12.55 2.7
N= =4𝜑10mm@25cm c/c
𝑓𝑦 4200 0.785
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200 1m = 4𝜑10mm
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − 3.5m= X
𝑚 𝐹𝑦
X=14 𝜑10mm+1
1 2∗8.768∗24.7
ρ= (1-√1 −
24.7 4200 X=15 𝜑10mm@25cm c/c
ρ= 0.0018 = ρmin=0.0018
‫ عدد قات سیخان‬۸
As min= ρmin*b*hmin
‫ عدد مستقیم سیخان‬۷
As min= 0.0018*100*15cm
-:‫( لپاره د سیخانو محاسبه‬Support) ‫د لنډ لوری‬
As min= 2.7cm2
‫ سلب څخه زیات مومنټ‬S12 ‫ سلب د‬S2 ‫په لنډ لوری کی‬
2.7 .‫لري نو ځکه منفی سیخان هملته محاسبه کوو‬
N= =4𝜑10mm@25cm c/c
0.785
-:‫د لنډ لوری آزاد اتکاء لپاره د سیخانو محاسبه‬
1m = 4𝜑10mm
Ma (-) Roller =1/3mb(+)
6m= X
Ma (-) Roller =1/3*1.236=0.412
X=24𝜑10mm+1
𝑚𝑢 0.412
Mn= = =0.458T.m
X=25 𝜑10mm@25cm c/c 𝜑 0.9

𝑚𝑛 0.458∗105
‫ عدد قات سیخان‬۳۱ Rn = 2
= = 2.93kg/cm2
𝑏𝑑 100∗12.52
‫ عدد مستقیم سیخان‬۳۱ m=24.7
:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬
1 2∗2.943∗24.7
ρ= (1-√1 −
Mspan=0.432T.m 24.7 4200

Mn=0.432/0.9 => 0.48 T.m ρ= 0.0007 < ρmin=0.0018


𝑚𝑛 0.48∗105 Asmin= ρmin*b*h => As=0.0018*100*15
Rn = = = 3.629kg/cm2
𝑏𝑑 2 100∗11.52
𝑓𝑦 4200
Asmin=2.7cm2
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200
As`=2*0.785: ‫ذخیروی سیخان‬
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − As`=1.57cm2
𝑚 𝐹𝑦

RCC (REINFORCED CEMENT CONCRETE) 35


As Rem=2.71cm2 – 1.57cm2 =1.13cm2 ρ= 0.0022 > ρ=0.0018
1.13
N= =2𝜑10mm @ 50cm c/c As= ρ*b*h => As=0.0022*100*12.5
0.785

1m = 2𝜑10mm As=2.75cm2
6m= X As`=4*0.785: ‫ذخیروی سیخان‬
X=12 𝜑10mm @ 25cm c/c+1
As`=3.14cm2
X=13 𝜑10mm @ 25cm c/c
As Rem=2.75cm2 – 3.14cm2 =-0.39cm2
Shrinkage Rebars:
.‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬
As = ρsh*b*h Shrinkage Rebars:
As = ρsh*b*h
As = 0.0018*100*15cm
As = 0.008*100*15cm
As = 2.7cm2
2.7 As = 2.7cm2
N= =4𝜑10mm @ 25cm c/c
0.785 2.7
N= =4𝜑10mm @ 25cm c/c
3.5 0.785
L/4= =0.875cm:‫د لنډ لوری لپاره‬ 6
4 L/4= =1.5cm:‫د اوږد لوری لپاره‬
4
1m = 4𝜑10mm
1m = 4𝜑10mm
0.875m= X
1.5m= X
X=4 𝜑10mm @ 25cm c/c
X=6𝜑10mm @ 25cm c/c
3.5
L/7= =0.5cm:‫د متحرکی اتکاء لپاره‬
7
1m = 4𝜑10mm
0.5m= X
X=2 𝜑10mm @ 25cm c/c
-:‫( لپاره د سیخانو محاسبه‬Support)‫د اوږد لوری‬
Mb (-) Cantilever=0.689T.M
Mb (-) S12=1.08
Ma (-) S10=0.961
M support =1.08
-:‫ لپاره محاسبه کوو‬Slab #12 ‫پس یواځی د‬
M support =0.646
𝑚𝑢 1.08
Mn= = =1.2T.m
𝜑 0.9

𝑚𝑛 1.2∗105
Rn = 2
= = 9.07kg/cm2
𝑏𝑑 100∗11.52

m=24.7

1 2∗9.07∗24.7
ρ= (1-√1 −
24.7 4200

RCC (REINFORCED CEMENT CONCRETE) 36


[0.85 ∗ 2 + (2 ∗ 1.2) + 0.15] ∗ 0.15 ∗ 3.75 ∗ 1.8
(3.4)(4.325)
=0.3t/m + 0.8 t/m2=1.1t/m2 *1m=1.1t/m
2

Live Load =490kg/m2


Wu=1.2DL+1.6LL Wu=1.1*800+1.6*0.49
Wu =2.1 t/m
Design Data for Slab #13:-
Wu= 2.1 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 4.325
β= = = 1.27 < 2
𝑙𝑎 3.4

Two Way Slab


hmin = 15cm
(Ultimate Weight) da =15cm – cover=>db=15cm-2.5cm
∑DL= 772kg/m 2
≈ 800kg/m 2
da =12.5cm
Dead load of walls comes on slab=
𝑊𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 ‫حجمی وزن∗ارتفاع∗عرض∗طول‬ db= 15cm – 3.5=> db= 11.5cm
=
𝐴𝑟𝑒𝑎 𝑜𝑓 𝑆𝑙𝑎𝑏 ‫مساحت‬
𝑙𝑎 3.4
m= = = 0.78
𝑙𝑏 4.325

Moment Coefficient for Slab #13


Case #06{m= 0.78}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0.087 0 0.0465 0.014 0.053 0.0175

Ma , Neg = Ca , Neg*Wu*La2 =>> 0.087*2.1*3.42 = 2.112T.m


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0*2.1*3.3252 = 0T.m
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.0465*1.32*3.42 = 0.7T.m
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.014*1.32*4.3252 = 0.34T.m
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.053*0.784*3.42 =0.480T.m
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.0175*0.784*4.3252 =0.256T.m
Therefore finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 0.480+0.7=1.18T.m
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 0.256+0.34=0.596T.m
RCC (REINFORCED CEMENT CONCRETE) 37
da =15cm – cover=>db=15cm-2.5cm =12cm 𝑚𝑛 0.662∗105
Rn = 2
= = 5kg/cm2
𝑏𝑑 100∗11.52
db= 15cm – 3.5=> da= 11.5cm 𝑓𝑦 4200
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬
1 2 𝑅𝑛∗𝑚
Mspan=1.18T.m ρ= (1-√1 −
𝑚 𝐹𝑦

Mn=1.18/0.9 => 1.31T.m


1 2∗5∗24.7
ρ= (1-√1 −
𝑚𝑛 1.31∗105 24.7 4200
Rn = 2
= 5
= 8.384kg/cm2
𝑏𝑑 100∗12.5
ρact=0.0012< ρmin=0.0018
𝑓𝑦 4200
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200 As min= ρmin*b*hmin
1 2 𝑅𝑛∗𝑚
ρ= (1-√1 − As min= 0.0018*100*15cm
𝑚 𝐹𝑦
As min= 2.7cm2
1 2∗8.384∗24.7
ρ= (1-√1 − 2.7
24.7 4200 N= =4𝜑10mm@25cm c/c
0.785
ρ= 0.0020 > ρmin=0.0018
1m = 4𝜑10mm
As = ρ*b*d
3.4m= X
As = 0.0020*100*12.5cm
X=14 𝜑10mm+1
As = 2.55cm2
X=15 𝜑10mm@25cm c/c
As min= ρmin*b*hmin
‫ عدد قات سیخان‬۸
As min= 0.0018*100*15cm
‫ عدد مستقیم سیخان‬۷
As min= 2.7cm2
-:‫( لپاره د سیخانو محاسبه‬Support)‫د لنډ لوری‬
2.7
N= =4𝜑10mm@25cm c/c
0.785 Ma (-)S13=2.112
1m = 4𝜑10mm Mb (-)S14=6.612
M support =6.612
4.325m= X
-:‫ لپاره محاسبه کوو‬Slab #14 ‫پس یواځی د‬
X=18𝜑10mm+1
-:‫د لنډ لوری آزاد اتکاء لپاره د سیخانو محاسبه‬
X=19 𝜑10mm@25cm c/c Ma(-) Roller =1/3ma(+)
‫ عدد قات سیخان‬۳۱ Ma(-) Roller =1/3*1.18=0.4
‫ عدد مستقیم سیخان‬۹ 𝑚𝑢 0.4
Mn= = =0.43T.m
𝜑 0.9
:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬
𝑚𝑛 0.43∗105
Mspan=0.596T.m Rn = 2
= = 2.8kg/cm2
𝑏𝑑 100∗12.52

Mn=0.596/0.9 => 0.662 T.m m=24.7

RCC (REINFORCED CEMENT CONCRETE) 38


𝑚𝑢 0.2
ρ=
1
(1-√1 −
2∗2.8∗24.7 Mn= = =0.22T.m
𝜑 0.9
24.7 4200
𝑚𝑛 0.22∗105
ρact=0.0006< ρmin=0.0018 Rn = = = 1.67kg/cm2
𝑏𝑑2 100∗11.52

As min= ρmin*b*hmin m=24.7


As min= 0.0018*100*15cm 1 2∗1.67∗24.7
ρ= (1-√1 −
24.7 4200
As min= 2.7cm2
As`=2*0.785: ‫ذخیروی سیخان‬ ρact=0.0004< ρmin=0.0018
As`=1.57cm2 As min= ρmin*b*hmin
As Rem=2.7cm2 – 1.57cm2 =1.13cm2 As min= 0.0018*100*15cm
1.13
N= =2𝜑10mm@50cm c/c As min= 2.7cm2
0.785
As`=2*0.785: ‫ذخیروی سیخان‬
1m = 2𝜑10mm
As`=1.57cm2
4.325= X
As Rem=2.7cm2 – 1.57cm2 =1.13 cm2
X=9 𝜑10mm+1 1.13
N= =2𝜑10mm @ 50cm c/c
0.785
X=10 𝜑10mm@50cm c/c
1m = 2𝜑10mm
Shrinkage Rebars:
3.4m= X
As = ρsh*b*h X=7 𝜑10mm @ 50cm c/c+1
As = 0.0018*100*15cm X=8 𝜑10mm @ 50cm c/c
As = 2.7cm2 Shrinkage Rebars:
2.7 As = ρsh*b*h
N= =4𝜑10mm @ 25cm c/c
0.785 As = 0.008*100*15cm
L/4=
3.4
=0.85cm:‫د لنډ لوری لپاره‬ As = 2.7cm2
4 2.7
1m = 4𝜑10mm N= =4𝜑10mm @ 25cm c/c
0.785
4.325
0.85m= X L/4= =0.875cm:‫د اوږد لوری لپاره‬
4
X=4 𝜑10mm @ 25cm c/c 1m = 4𝜑10mm
3.4 1.08m= X
L/7= =0.4857cm:‫د متحرکی اتکاء لپاره‬
7
X=5𝜑10mm @ 25cm c/c
1m = 4𝜑10mm
4.325
0.4857m= X L/7= =0.617cm:‫د متحرکی اتکاء لپاره‬
7
X=2 𝜑10mm @ 25cm c/c 1m = 4𝜑10mm
-:‫د اوږد لوری آزاد اتکاء لپاره د سیخانو محاسبه‬ 0.617m= X
X=3 𝜑10mm @ 25cm c/c
Mb(-) Roller =1/3mb(+)
Mb(-) Roller =1/3*0.596=0.2

RCC (REINFORCED CEMENT CONCRETE) 39


2.28t/m + 0.8 t/m=3.08
Wu=1.2DL+1.6LL Wu=1.1*3.08+1.6*0.49
Wu =4.48 t/m
Design Data for Slab #14:-
Wu= 4.48 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 6
β= = = 1.38 < 2
𝑙𝑎 4.325

(Ultimate Weight) Two Way Slab


∑DL= 772kg/m2 ≈ 800kg/m2 hmin = 15cm
Dead load of walls comes on slab=
𝑊𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑊𝑎𝑙𝑙 ‫حجمی وزن∗ارتفاع∗عرض∗طول‬
da =15cm – cover=>db=15cm-2.5cm
=
𝐴𝑟𝑒𝑎 𝑜𝑓 𝑆𝑙𝑎𝑏 ‫مساحت‬
da =12.5cm
[0.85 ∗ 4 + (4 ∗ 1.2) + 0.55] ∗ 0.15 ∗ 3.75 ∗ 1.8
(6)(4.325) db= 15cm – 3.5=> db= 11.5cm
2
=2.28t/m *1m=2.28t/m 𝑙𝑎 4.325
m= = = 0.72
𝑙𝑏 6

Moment Coefficient for Slab #14


Case #07 {m= 0.72}
Coefficient For Negative Coefficient For Dead Coefficient For Live
Moment in Slab Load (+) Moment in Load (+) Moment in
Slab Slab

Ca, Neg Cb , Neg Ca , DL Cb , DL Ca , LL Cb , LL

0 0.041 0.054 0.0185 0.059 0.0185

Ma , Neg = Ca , Neg*Wu*La2 =>> 0*4.48*4.3252 = 0 T.m


Mb , Neg = Cb , Neb*Wu*Lb2=>> 0.041*4.48*62 = 6.612T.m
Ma, Pos, DL = Ca, Pos, DL*Wu,DL* La2 =>>0.054*3.696*4.3252 = 3.733T.m
Mb, Pos, DL = Cb, Pos, DL*Wu,DL*Lb2 =>> 0.0185*3.696*62 = 2.461T.m
Ma, Pos, LL= Ca, Pos, LL*Wu,LL*La2 =>> 0.059*0.784*4.3252 =0.865T.m
Mb, Pos, LL =Cb, Pos, LL*Wu,LL*Lb2 =>>0.0185*0.784*62 =0.522T.m
Therefore finally we have:-
Ma, Pos = Ma, Pos, LL + Ma, Pos, DL = 3.733+0.865=4.598T.m
Mb, Pos= Mb,Pos, LL + Mb, Pos, DL = 2.461+0.522=2.983T.m

RCC (REINFORCED CEMENT CONCRETE) 40


da =15cm – cover=>db=15cm-2.5cm =12cm As = ρ*b*d
db= 15cm – 3.5=> da= 11.5cm As = 0.0064*100*12.5cm
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬ As = 7.44cm2
7.44
N= =4𝜑16mm@25cm c/c
Mspan=4.598T.m 2
1m = 4𝜑16mm
Mn=4.598/0.9 => 5.10T.m 4.325m= X
𝑚𝑛 5.10∗105 X=18𝜑16mm+1
Rn = 2
= = 32.64kg/cm2
𝑏𝑑 100∗12.55 X=19 𝜑16mm@25cm c/c
𝑓𝑦 4200
m= => m= = 24.7 ‫ عدد قات سیخان‬۳۱
0.85 𝐹𝑐` 0.85∗200
‫ عدد مستقیم سیخان‬۹
1
ρ= (1-√1 −
2 𝑅𝑛∗𝑚 -:‫د لنډ لوری آزاد اتکاء لپاره د سیخانو محاسبه‬
𝑚 𝐹𝑦
Ma(-) Roller =1/3ma(+)
1 2∗32.64∗24.7
ρ= (1-√1 − Ma(-) Roller =1/3*4.598=1.5326
24.7 4200
ρ= 0.0087 > ρmin=0.0018 𝑚𝑢 1.5326
Mn= = =1.7029T.m
𝜑 0.9
As = ρ*b*d
𝑚𝑛 1.7029∗105
As = 0.0087*100*12.5cm Rn = = = 10.89kg/cm2
𝑏𝑑2 100∗12.52
As = 10.88cm2
10.88
m=24.7
N= =6𝜑16mm@16.5cm c/c
2
1 2∗10.89∗24.7
1m = 4𝜑16mm ρ= (1-√1 −
24.7 4200
6m= X
X=36𝜑10mm+1 ρact=0.0026 > ρmin=0.0018
X=37 𝜑10mm@16.5cm c/c As = ρ*b*d
‫ عدد قات سیخان‬۳۹
As min= 0.0026*100*12.5cm
‫ عدد مستقیم سیخان‬۳۸
:‫( لپاره د سیخانو محاسبه‬span) ‫د اوږد لوری‬ As min= 3.355cm2
As`=2*0.785: ‫ذخیروی سیخان‬
Mspan=2.983T.m
As`=1.57cm2
Mn=2.983/0.9 => 3.31 T.m
As Rem=3.35cm2 – 1.57cm2 =1.785 cm2
𝑚𝑛 3.31∗105
Rn = = = 25.02kg/cm2 1.785
𝑏𝑑2 100∗11.52
N= =3𝜑10mm @33cm c/c
0.785
𝑓𝑦 4200
m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200 1m = 3𝜑10mm
1 2 𝑅𝑛∗𝑚 6m= X
ρ= (1-√1 −
𝑚 𝐹𝑦 X=18 𝜑10mm @ 33cm c/c+1

1 2∗25.02∗24.7 X=19 𝜑10mm @ 33cm c/c


ρ= (1-√1 −
24.7 4200 Shrinkage Rebars:
ρ= 0.0064 > ρmin=0.0018 As = ρsh*b*h

RCC (REINFORCED CEMENT CONCRETE) 41


As = 0.0018*100*15cm -:‫د اوږد لوری آزاد اتکاء لپاره د سیخانو محاسبه‬
As = 2.7cm2 Mb(-) Roller =1/3mb(+)
2.7
N= =4𝜑10mm @ 25cm c/c Mb(-) Roller =1/3*2.983=0.9943
0.785
4.325 𝑚𝑢 0.4
L/4= =1.08125cm:‫د لنډ لوری لپاره‬ Mn= = =0.43T.m
4 𝜑 0.9
1m = 4𝜑10mm
𝑚𝑛 0.9943∗105
1.08125m= X Rn = 2
= = 7.518kg/cm2
𝑏𝑑 100∗11.52
x=5 𝜑10mm @ 25cm c/c
m=24.7
4.325
L/7= =0.6178cm:‫د متحرکی اتکاء لپاره‬ 1 2∗7.518∗24.7
7 ρ= (1-√1 −
24.7 4200
1m = 4𝜑10mm
0.6178m= X ρact=0.0018< ρmin=0.0018
X=3 𝜑10mm @ 33cm c/c
As min= ρmin*b*hmin
-:‫( لپاره د سیخانو محاسبه‬Support)‫د اوږد لوری‬
As min= 0.0018*100*15cm
Ma (-)S13=2.112
Mb (-)S14=6.612 As min= 2.7cm2
M support =6.612 As`=2*0.785: ‫ذخیروی سیخان‬
-:‫ لپاره محاسبه کوو‬Slab #14 ‫پس یواځی د‬ As`=1.57cm2
M support =6.612 As Rem=2.7cm2 – 1.57cm2 =1.13cm2
𝑚𝑢 6.612
Mn= = =7.34T.m 1.13
𝜑 0.9
N= =2𝜑10mm@50cm c/c
0.785
𝑚𝑛 7.34∗105
Rn = = = 55.55kg/cm2
𝑏𝑑2 100∗11.52 1m = 2𝜑10mm
m=24.7 4.325= X
X=9 𝜑10mm+1
ρ=
1
(1-√1 −
2∗55.55∗24.7 X=10 𝜑10mm@50cm c/c
24.7 4200
Shrinkage Rebars:
ρ= 0.01665 > ρ=0.0018 As = ρsh*b*h
As = 0.008*100*15cm
As= ρ*b*d => As=0.0665*100*12.5
As = 2.7cm2
As=20.81cm2 N=
2.7
=4𝜑10mm @ 25cm c/c
0.785
As`=9*0.785: ‫ذخیروی سیخان‬ 6
As`=7.06cm2 L/4= =1.5cm:‫د اوږد لوری لپاره‬
4
1m = 4𝜑10mm
As Rem=20.81cm2 – 7.06cm2 =13.75cm2
1.5m= X
13.75
N= =7𝜑16mm @ 14cm c/c X=6𝜑10mm @ 25cm c/c
2
6
1m = 7𝜑16mm L/7= =0.857cm:‫د متحرکی اتکاء لپاره‬
7
4.325m= X 1m = 4𝜑10mm
X=31 𝜑16mm @ 14cm c/c+1 0.857m= X
X=4 𝜑10mm @ 25cm c/c
X=32 𝜑16mm @ 14cm c/c
RCC (REINFORCED CEMENT CONCRETE) 42
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490
Design Data for Slab #15:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 3.5
β= = = 2.33 > 2
𝑙𝑎 1.5

One Way Slab


hmin = 15cm
da =15cm – cover=>db=15cm-2.5cm
da =12.5cm
db= 15cm – 3.5=> db= 11.5cm
-:(check) ‫د عرضی قوی لپاره‬
5𝑤𝑙 5∗1.75∗1.85
Vu= => =2.023 Ton
8 8
Vc=0.53 √𝐹𝑐` b*d
Vc=0.53 √200 100cm*12.5cm
Vc= 9.369 Ton
2.687<0.75*9.369
2.687<7.026 (okay)
-:‫د لنډ لوری لپاره د مومنټ محاسبه‬
9𝑤𝑙 2 9∗1.75∗1.852
Mspan= => =0.4211T.m
128 128
𝑤𝑙𝑎 2 1.75∗1.852
Msupport = = = 0.7486T.m
8 8

-:‫د آزادی اتکاء لپاره‬


𝑤𝑙𝑎2
Msup= *1/3 => 0.7486/3 = 0.2495
8
-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬

(Dead Load) Mspan=0.4211T.m


W mosaic = 0.03*2000kg/m3=60kg/m2 Mn=0.4211/0.9 => 0.4678T.m
W Cement Mortar = 0.02*1800kg/m3 𝑚𝑛 0.4678∗105
W Cement Mortar = 36kg/m2 Rn = = = 2.99kg/cm2
𝑏𝑑2 100∗12.55
W PCC= 0.05*2000kg/m3=100kg/m2 𝑓𝑦 4200
m= => m= = 24.7
W Soil= 0.1*1800kg/m3=180kg/m2 0.85 𝐹𝑐` 0.85∗200

W RCC= 0.15 *2400kg/m3=360kg/m2 1 2 𝑅𝑛∗𝑚


ρ= (1-√1 −
W Plaster= 0.02 *1800kg/m3=36kg/m2 𝑚 𝐹𝑦

∑DL= 772kg/m2 ≈ 800kg/m2


Live Load =490kg/m2

RCC (REINFORCED CEMENT CONCRETE) 43


1 2∗2.99∗24.7 m=24.7
ρ= (1-√1 −
24.7 4200 1 2∗1.7742∗24.7
ρ= (1-√1 −
ρ= 0.0007 < ρmin=0.0018 24.7 4200

Asmin = ρmin*b*h ρact=0.00042 < ρmin=0.0018


As = 0.0018*100*15cm Asmin = ρmin*b*h
As = 2.7cm2 Asmin = 0.0018*100*15cm
2.7
N= 4𝜑10mm@25cm c/c As = 2.7cm2
0.785
1m = 4𝜑10mm As`=2*0.785: ‫ذخیروی سیخان‬
As`=1.57cm 2
3.5m= X
As Rem=2.7cm2 – 1.57cm2 =1.13cm2
X=14𝜑10mm+1 1.13
X=15 𝜑10mm@16.5cm c/c N= =2𝜑10mm@50cm c/c
0.785
‫ عدد قات سیخان‬۸ 1m = 2𝜑10mm
‫ عدد مستقیم سیخان‬۷ 3.5= X
-:‫( لپاره د سیخانو محاسبه‬Support) ‫د لنډ لوری‬ X=7 𝜑10mm+1
Mb (-)S11=0.535 T.m X=8 𝜑10mm@50cm c/c
Ma (-)S15=0.7486 Shrinkage Rebars:
Msupport=0.7486T.m As = ρsh*b*h
Mn=0.7486/0.9 => 0.8317T.m As = 0.0018*100*15cm
𝑚𝑛 0.8317∗105 As = 2.7cm2
Rn = 2
= = 5.32kg/cm2
𝑏𝑑 100∗12.55 2.7
𝑓𝑦 4200 N= =4𝜑10mm @ 25cm c/c
m= => m= = 24.7 0.785
0.85 𝐹𝑐` 0.85∗200
1.5
1 2 𝑅𝑛∗𝑚 L/4= =0.375cm:‫د لنډ لوری لپاره‬
ρ= (1-√1 − 4
𝑚 𝐹𝑦
1m = 4𝜑10mm
1 2∗5.32∗24.7 0.375m= X
ρ= (1-√1 −
24.7 4200
X=2 𝜑10mm @ 50cm c/c
ρ= 0.0012 < ρmin=0.0018
1.5
Asmin = ρmin*b*h L/7= =0.2142cm:‫د متحرکی اتکاء لپاره‬
7
As = 0.0018*100*15cm 1m = 4𝜑10mm
As = 2.7cm2 0.2142m= X
As`=4*0.785: ‫ذخیروی سیخان‬ X=1 𝜑10mm @ 100cm c/c
As`=1.57cm2 :Shrinkage Rebars ‫د اوږد لوری لپاره‬
As Rem=2.7cm2 – 3.14cm2 =-0.44cm2 As = ρsh*b*h
.‫پس هماغه ذخیروی سیخان ورته کفایت کوي‬ As = 0.008*100*15cm
As = 2.7cm2
-:‫د لنډ لوری آزاد اتکاء لپاره د سیخانو محاسبه‬
2.7
N= =4𝜑10mm @ 25cm c/c
M Roller =0.2495 T.m 0.785
3.5
𝑚𝑢 0.2495
L/4= =1.5cm:‫د اوږد لوری لپاره‬
4
Mn= = =0.2772T.m
𝜑 0.9 1m = 4𝜑10mm
𝑚𝑛 0.2472∗105 0.875m= X
Rn = 2
= = 1.7742kg/cm2 X=4𝜑10mm @ 25cm c/c
𝑏𝑑 100∗12.52

RCC (REINFORCED CEMENT CONCRETE) 44


Design Data for Slab #16:-
Wu= 1.75 Ton/m2
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑙𝑏 3.4
β= = = 2.61 > 2
𝑙𝑎 1.3

One Way Slab


hmin = 15cm
da =15cm – cover=>db=15cm-2.5cm
da =12.5cm
db= 15cm – 3.5=> db= 11.5cm
-:(check) ‫د عرضی قوی لپاره‬
5𝑤𝑙 5∗1.75∗1.65
Vu= => =1.80 Ton
8 8
Vc=0.53 √𝐹𝑐` b*d
Vc=0.53 √200 100cm*12.5cm
Vc= 9.369 Ton
2.687<0.75*9.369
2.687<7.026 (okay)
-:‫د لنډ لوری لپاره د مومنټ محاسبه‬
9𝑤𝑙 2 9∗1.75∗1.652
Mspan= => =0.3349T.m
128 128
𝑤𝑙𝑎 2 1.75∗1.652
Msupport = = = 0.595T.m
8 8

-:‫د آزادی اتکاء لپاره‬


𝑤𝑙𝑎2
Msup= *1/3 => 0.595/3 = 0.1985T.m
8

-:‫( لپاره د سیخانو محاسبه‬span) ‫د لنډ لوری‬


(Dead Load) Mspan=0.3349T.m
W mosaic = 0.03*2000kg/m3=60kg/m2
W Cement Mortar = 0.02*1800kg/m3 Mn=0.3349/0.9 => 0.3721T.m
W Cement Mortar = 36kg/m2 𝑚𝑛 0.3721∗105
Rn = 2
= = 2.3815kg/cm2
W PCC= 0.05*2000kg/m3=100kg/m2 𝑏𝑑 100∗12.55
𝑓𝑦 4200
W Soil= 0.1*1800kg/m3=180kg/m2 m= => m= = 24.7
0.85 𝐹𝑐` 0.85∗200
W RCC= 0.15 *2400kg/m3=360kg/m2
1 2 𝑅𝑛∗𝑚
W Plaster= 0.02 *1800kg/m3=36kg/m2 ρ= (1-√1 −
𝑚 𝐹𝑦
∑DL= 772kg/m2 ≈ 800kg/m2
1 2∗2.3815∗24.7
Live Load =490kg/m2 ρ= (1-√1 −
24.7 4200
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*490 ρ= 0.0005 < ρmin=0.0018

RCC (REINFORCED CEMENT CONCRETE) 45


Asmin = ρmin*b*h As = 0.0018*100*15cm
As = 0.0018*100*15cm As = 2.7cm2
2.7
As = 2.7cm2 N= =4𝜑10mm @ 25cm c/c
2.7 0.785
N= 4𝜑10mm@25cm c/c 1.3
0.785 L/4= =0.325cm:‫د لنډ لوری لپاره‬
4
1m = 4𝜑10mm 1m = 4𝜑10mm
3.4m= X 0.325m= X
X=14𝜑10mm+1 X=2 𝜑10mm @ 50cm c/c
X=15 𝜑10mm@16.5cm c/c 1.3
L/7= =0.1857cm:‫د متحرکی اتکاء لپاره‬
‫ عدد قات سیخان‬۸ 7
‫ عدد مستقیم سیخان‬۷ 1m = 4𝜑10mm
-:‫( لپاره د سیخانو محاسبه‬Support) ‫د لنډ لوری‬ 0.1857m= X
Ma (-) S16 =0.595 X=1 𝜑10mm @ 100cm c/c
Mb (-)S6 = 0.802
:Shrinkage Rebars ‫د اوږد لوری لپاره‬
Msupport=0.802T.m
As = ρsh*b*h
:‫ لپاره محاسبه کوو‬Slab#06 ‫پس یواځی د‬ As = 0.008*100*15cm
-:‫د لنډ لوری آزاد اتکاء لپاره د سیخانو محاسبه‬ As = 2.7cm2
2.7
M Roller =0.1985 T.m N=
0.785
=4𝜑10mm @ 25cm c/c
𝑚𝑢 0.1985 3.4
Mn= = =0.22T.m L/4= =1.5cm:‫د اوږد لوری لپاره‬
𝜑 0.9 4
1m = 4𝜑10mm
𝑚𝑛 0.22∗105
Rn = = 2
= 1.411kg/cm 0.85m= X
𝑏𝑑2 100∗12.52
X=4𝜑10mm @ 25cm c/c
m=24.7

1 2∗1.411∗24.7
ρ= (1-√1 −
24.7 4200

ρact=0.00033 < ρmin=0.0018


Asmin = ρmin*b*h
Asmin = 0.0018*100*15cm
As = 2.7cm2
As`=2*0.785: ‫ذخیروی سیخان‬
As`=1.57cm2
As Rem=2.7cm2 – 1.57cm2 =1.13cm2
1.13
N= =2𝜑10mm@50cm c/c
0.785
1m = 2𝜑10mm
3.4= X
X=7 𝜑10mm+1
X=8 𝜑10mm@50cm c/c
Shrinkage Rebars:
As = ρsh*b*h
RCC (REINFORCED CEMENT CONCRETE) 46
Cantilever Slab Mx=_0.33x – 0.65x2
X=0 Mx=0
X=0.675 Mx=0.53T.m
Mu=0.53*1.3=0.689T.m
‫ اضافه‬۱۱۳ ‫د زلزلی قوی په اساس باندی د مومنټ قیمت‬
:‫نیسو‬
Vx=0.33+1.3x =>
X=0 Vx=0.33
X=0.675 Vx=1.21 Ton
Hmin=15cm
d=hmin – cover=>15cm – 2.5cm=12.5cm
mn=0.689/0.9=0.765T.m
Design Data: -
Wu= 1.3 Ton/m
FC`=200kg/cm2
Fy= 4200kg/cm2
𝑚𝑛 0.765∗105
Rn = 2
= = 4.9kg/cm2
3 𝑏𝑑 100∗12.52
Pwall RCC=0.6*0.15*1m*2.4T/m =0.22Ton
m=17.65
Pplaster=(0.02*0.8)*2*1.8=0.058 Ton 1 2∗4.9∗24.7
ρ= (1-√1 −
24.7 4200
∑P=0.278 Ton, Pu=1.2DL=pu=0.33Ton/m
ρact=0.0011 <ρmin=0.002
(Dead Load) As min= ρmin*b*hmin
1. W morter = 0.05*1800kg/m3=90kg/m2 As min= 0.0018*100*15cm
2. W Soil= 0.2*1800kg/m3=360kg/m2 As min= 2.7cm2
2.7
3. W RCC= 0.15 *2400kg/m3=360kg/m2 N= =4 𝜑10mm @25cm c/c
0.785
4. W plaster= 0.02*1800kg/m3=36kg/m2 :‫ د برخی سره وصل دي‬Cantilever ‫الندی سلبونه د‬
∑DL= 800kg/m2 Slab Orientation Moment
Live Load, Rain load=200kg/m2
Slab #01 Neg (b) 0.7938
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*200
Slab #02 Neg (b) 1.2285
Wu= 1280Kg/m ≈ 1300kg/m=1.3 Ton/m
Slab #08 Neg (b) 1.575
Slab #12 Neg (b) 1.08
‫ برخی مومنټ ددی مومنټونو څخه کم دي‬Cantilever ‫د‬
.‫نو ځکه منفی سیخان هملته محاسبه کوو‬

∑Mx=0 Mx+1.3*x*x/2+0.33x

RCC (REINFORCED CEMENT CONCRETE) 47


Main Door Cantilever X=1.025 Mx=1.022T.m
Mu=1.022*1.3=1.3286T.m
‫ اضافه‬۱۱۳ ‫د زلزلی قوی په اساس باندی د مومنټ قیمت‬
:‫نیسو‬
Vx=0.33+1.3x =>
X=0 Vx=0.33
X=1.025 Vx=1.66 Ton
Hmin=15cm
d=hmin – cover=>15cm – 2.5cm=12.5cm
mn=1.3286/0.9=1.47T.m
Design Data: -
Pwall RCC=0.6*0.15*1m*2.4T/m3=0.22Ton Wu= 1.3 Ton/m
Pplaster=(0.02*0.8)*2*1.8=0.058 Ton FC`=200kg/cm2
∑P=0.278 Ton, Pu=1.2DL=pu=0.33Ton/m Fy= 4200kg/cm2
(Dead Load) 𝑚𝑛 1.47∗105
Rn = 2
= = 9.44kg/cm2
𝑏𝑑 100∗12.52
W morter = 0.05*1800kg/m3=90kg/m2
m=17.65
W Soil= 0.2*1800kg/m3=360kg/m2
W RCC= 0.15 *2400kg/m3=360kg/m2 1 2∗9.44∗24.7
ρ= (1-√1 −
W plaster= 0.02*1800kg/m3=36kg/m2 24.7 4200

∑DL= 800kg/m2 ρact=0.0023 > ρmin=0.002


Live Load, Rain load=200kg/m2
As = ρ*b*d
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*200
As = 0.0023*100*12.5cm
Wu= 1280Kg/m ≈ 1300kg/m=1.3 Ton/m
As = 2.89cm2
2.89
N= =4 𝜑10mm @25cm c/c
0.785

-:‫( لپاره د سیخانو محاسبه‬Support) ‫د لنډ لوری‬


Ma Cantilever=1.3286T.M
Mb (-) S15=0.707
M support =1.3286T.m
∑Mx=0 Mx+1.3*x*x/2+0.33x
-:‫ لپاره محاسبه کوو‬Cantilever Slab ‫پس یواځی د‬
Mx=_0.33x – 0.65x2
M support =1.3286
X=0 Mx=0

RCC (REINFORCED CEMENT CONCRETE) 48


𝑚𝑢 1.3286
Mn= = =1.476T.m
𝜑 0.9

𝑚𝑛 1.476∗105
Rn = = = 9.44kg/cm2
𝑏𝑑2 100∗12.52

m=24.7

1 2∗9.44∗24.7
ρ= (1-√1 −
24.7 4200

ρ= 0.0023 > ρmin=0.0018


As= ρ*b*d => As=0.0023*100*12.5
As=2.92cm2
As`=2*0.785: ‫ذخیروی سیخان‬
As`=1.57cm2
As Rem=2.71cm2 – 1.57cm2 =1.13cm2
1.13
N= =2𝜑10mm @ 50cm c/c
0.785

Shrinkage Rebars:
As = ρsh*b*h
As = 0.0018*100*15cm
As = 2.7cm2
2.7
N= =4𝜑10mm @ 25cm c/c
0.785
3.5
L/4= =0.875cm:‫د لنډ لوری لپاره‬
4
1m = 4𝜑10mm
0.85m= X
X=4 𝜑10mm @ 25cm c/c

RCC (REINFORCED CEMENT CONCRETE) 49


Side Door Cantilever X=2.062 Mx=3.44T.m
Mu=0.44*1.3=4.472T.m
‫ اضافه‬۱۱۳ ‫د زلزلی قوی په اساس باندی د مومنټ قیمت‬
:‫نیسو‬
Vx=0.33+1.3x =>
X=0 Vx=0.33
X=2.062 Vx=3.0106 Ton
Hmin=15cm
d=hmin – cover=>15cm – 2.5cm=12.5cm
mn=4.472/0.9=4.96T.m
Design Data: -
Pwall RCC=0.6*0.15*1m*2.4T/m3=0.22Ton Wu= 1.3 Ton/m

Pplaster=(0.02*0.8)*2*1.8=0.058 Ton FC`=200kg/cm2


∑P=0.278 Ton, Pu=1.2DL=pu=0.33Ton/m Fy= 4200kg/cm2
(Dead Load) 𝑚𝑛 4.96∗105
Rn = 2
= = 31.744kg/cm2
𝑏𝑑 100∗12.52
W morter = 0.05*1800kg/m3=90kg/m2
m=17.65
W Soil= 0.2*1800kg/m3=360kg/m2
W RCC= 0.15 *2400kg/m3=360kg/m2 1 2∗31.744∗24.7
ρ= (1-√1 −
24.7 4200
W plaster= 0.02*1800kg/m3=36kg/m2
∑DL= 800kg/m2 ρact=0.0084 > ρmin=0.002
Live Load, Rain load=200kg/m2
As = ρ*b*d
Wu=1.2DL+1.6LL Wu=1.2*800+1.6*200
As = 0.0084*100*12.5cm
Wu= 1280Kg/m ≈ 1300kg/m=1.3 Ton/m
As = 10.5cm2
10.5
N= =14 𝜑10mm @25cm c/c
0.785

:‫ ملی متره سیخان ورته په نظر کی نیسو‬۳۶


10.5
N= =6 𝜑16mm @25cm c/c
2

-:‫( لپاره د سیخانو محاسبه‬Support) ‫د لنډ لوری‬


∑Mx=0 Mx+1.3*x*x/2+0.33x
M Cantilever=4.472T.M
Mx=_0.33x – 0.65x2 Ma (-) S2=2.341
M support =4.472T.m
X=0 Mx=0

RCC (REINFORCED CEMENT CONCRETE) 50


-:‫ لپاره محاسبه کوو‬Cantilever Slab ‫پس یواځی د‬
M support =4.472
𝑚𝑢 4.472
Mn= = =4.96T.m
𝜑 0.9

𝑚𝑛 4.96∗105
Rn = 2
= = 31.8kg/cm2
𝑏𝑑 100∗12.52

m=24.7

1 2∗31.8∗24.7
ρ= (1-√1 −
24.7 4200

ρ= 0.0084 > ρmin=0.0018 ‫تمت بالـــــخیر‬


As= ρ*b*d => As=0.0084*100*12.5
2
Computerized by:
As=10.56cm
As`=2*0.785: ‫ذخیروی سیخان‬
Eng. Shakeel Osmani
As`=1.57cm2 Date: 22, January, 2016
As Rem=10.56cm2 – 1.57cm2 =8.99cm2 Group members:
8.99
N= =5𝜑16mm @ 20cm c/c
2 1. Irfanullah
Shrinkage Rebars: 2. Nisar ahmad Omar
As = ρsh*b*h 3. Khwazak
As = 0.0018*100*15cm 4. Mohammad Agha
As = 2.7cm2 5. Sayeedullah
N=
2.7
=4𝜑10mm @ 25cm c/c
6. Shakeel Osmani
0.785

1m = 4𝜑10mm
1.887m= X
X=8 𝜑10mm @ 25cm c/c