TAKING OFF - FOUNDATION

COLUMN AND FOUNDATION(FOOTING)


EXCAVATION WORK
excavation of 100 mm top soil from existing
level
0.23
2/ 0.38

0.175

13/ 0.23
0.38

1.136

4/ 0.12
0.3

0.144 1.455m2

excavation of trench depth not exceeding


0.05m

2/ 0.23 0.45
0.38 0.15 - topsoil
0.33
0.35
0.058 0.050 + hardcore
0.4

13/ 0.23
0.38
0.33

0.375

4/ 0.13
0.3
0.35
0.055 0.488m3

excavation of trench depth exceeding 1.5 m


but not exceeding 3.0m

2/ 0.23
0.38
0.38

0.066

13/ 0.23
0.38
0.375
0.426

4/ 0.12
0.3
0.3

0.043 0.535m3

CONCRETE WORK

- concrete grade 1:2:4


-20mm aggregate for stumps

2/ 0.23 0.45
0.38 0.38 - ground beam
0.40 0.07
0.069 0.400 - footing
0.47

13/ 0.23
0.38
0.40
0.45

4/ 0.12 0.45
0.3 0.3 - ground beam
0.40 0.15

0.400 - footing
0.55

0.576 1.095m3

FORMWORK

Rough surface
formwork for footings
2/4/ 0.225
0.40

0.72

13/4/ 0.225
0.40
4.68

4/4/ 0.125
0.40

0.8 6.2m2

Rough surface formwork


for side of stump
2/4/ 1.20
0.40

3.84

13/4/ 1.20
0.40

24.96

4/4/ 1.20
0.40
7.68 36.48m2
REINFORCEMENT
reinforcement for footing
reinforcement for T1
footing 225x375x375

2.4
0.060 - cover 2/0.03
2.34
0.176 + bends 2/5.5d @ 2/5.5/0.016
2/2/7 2.52 2.516  2.52
70.56 MR of Y16 ø steel bar

reinforcement for T3
footing 225x375x375
3.15
0.060 - cover 2/0.03
3.09
0.176 + bends 2/5.5d @ 2/5.5/0.016
3.266  3.27
13/2/7 3.27

595.14 MR of Y16 ø steel bar

reinforcement for T4
footing 125x300x450
2.4
0.060 - cover 2/0.03
2.34
0.176 + bends 2/5.5d @ 2/5.5/0.016
2.516  2.52

4/2/7 2.52
141.12 MR of Y16 ø steel bar
Reinforcement For Stump

Reinforcement for stump T1 160 x 160

Length of one bar


2.4
0.200 - less grd. level to grd beam
2.2
0.375 + depth of grd beam
2.575
0.030 - cover
2.545
0.032 - Less 2Y16
2.513 (i)
0.088 + bend 5.5d (4Y16)
2.601
0.640 + Lap 40d
3.241

2/4 3.241
25.928 MR of Y16 ø steel bar

Mild steel link for stump 100 x 100

Length of one link

0.16
0.060 - cover 2/0.030
0.1
4/0.1 = 0.4
0.144 + hook 24d
0.544
Distance that require link
2.513 (Length of steel bar from (i))
0.375 - Ground beam
2.138
No. of links = 2.138/0.16 +1
= 14.36, say 15
2/15/ 0.544
16.32 MR of M6 ø link

Reinforcement For Stump

Reinforcement for stump T3 230 x 230

Length of one bar


3.150
0.200 - less grd level to grd beam
2.95
0.375 + depth of grd beam
3.325
0.030 - cover
3.293
0.032 - Less 2Y16
3.891 (i)
0.088 + bend 5.5d (4Y16)
3.979
0.640 + Lap 40d
4.619 ≈ 4.62
13/4/ 4.62
240.24 MR of Y16 ø steel bar
Mild steel link for stump 170 x 170

Length of one link

0.230
0.060 - cover 2/0.030
0.17
4/0.17 = 0.68
= 0.144 + hook 24d
= 0.824

Distance that require link


3.891 (Length of steel bar from (i))
0.375 - Ground beam
3.516

No. of links = 3.516/0.230 +1


= 16.28, say 17

13/17/ 0.824
182.104 MR of M6 ø link

Reinforcement For Stump

Reinforcement for stump T4 160 x 160

Length of one bar


2.400
0.125 - less grd level to grd beam
2.275
0.375 + depth of grd beam
2.65
0.030 - cover
2.62
0.032 - Less 2Y16
2.588 (i)
0.088 + bend 5.5d (4Y16)
2.676
0.640 + Lap 40d
3.316 ≈ 3.32
4/4/ 3.32
53.12 MR of Y16 ø steel bar

Mild steel link for stump 100 x 100

Length of one link

0.160
0.060 - cover 2/0.030
0.1
4/0.1 = 0.4
0.144 + hook 24d
0.544

Distance that require link


2.588 (Length of steel bar from (i))
0.375 - Ground beam
2.213
No. of links = 2.213/0.16 +1
= 14.83, say 15
4/15/ 0.544
32.64 MR of M6 ø link
375 140

TAKING OFF - BEAM


150

BEAM (A-A) Stirrups


Reinforcement
Reinforcement
(TOP)
2R12

Length=3.6
Length=0.375
Add (+)column
Less (-) cover
1 /0.150
= 0.150 2/0.030=0.060
=3.75 =0.325
Less(-) cover
2/0.030=0.060 Length= 0.150
=3.69 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.09
2x5x0.012
=0.120 0.325+0.09
=3.81 =0.415
Say, 3.8 2/0.415=
0.83
Add(+)
6/2 3.8 Anchorage 24d
45.6 45.60 24x0.006=
0.144
Reinforcement =0.974
(BOTTOM) Total length,
Say, 0.97
2R12
No. of stirrups
Length= 3.6 Length=3.6
Add (+)column Less(-) column
2/1/0.125 2/1/0.125=0.25
=0.125 =3.35
=3.725
(3350/140)+1
Less(-) cover
=24.92
2/0.030=0.060
Say, 25
=3.665
Add 10mm dia. M.s
Bend 2/5d stirrups
2x5x0.012
10/12 0.97
=0.120
116.4 116.4m
=3.785
Say, 3.79
6/2 3.79

45.48
45.8m
375 140

BEAM (B-B) Stirrups 225


Reinforcement
Reinforcement
(TOP)
2R 12

Length=3.6
Length=0.375
Add (+)column
Less (-) cover
2/1 /2/0.225
= 0.225 2/0.030=0.060
=3.825 =0.325
Less(-) cover
2/0.030=0.060 Length= 0.225
=3.765 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.165
2x5x0.012
=0.120 0.325+0.165
=3.885 =0.49
Say, 3.89 2/0.49=
0.98
Add(+)
6/2 3.89 Anchorage 24d
46.68 46.68 24x0.006=
0.144
Reinforcement 1.124
(BOTTOM) Total length,
Say, 1.12
2R16
No. of stirrups
Length= 3.6 Length=3.6
Add (+)column Less(-) column
2/1/0.225 2/1/0.225=0.45
=0.225 = 3.15
=3.825
(3150/140)+1
Less(-) cover
=23.5
2/0.030=0.060
Say, 24
=3.765
Add 10mm dia. M.s
Bend 2/5d stirrups
2x5x0.012
10/12 1.12
=0.120
134.4 134.4m
=3.885
Say, 3.89
6/2 3.89

46.68
46.68m
375 140

BEAM (C-C) Stirrups 225


Reinforcement
Reinforcement
(TOP)
2R16

Length=9.0
Length=0.375
Add (+)column
Less (-) cover
2/1 /2/0.225
= 0.225 2/0.030=0.060
=9.225 =0.325
Less(-) cover
2/0.030=0.060 Length= 0.225
=9.165 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.165
2x5x0.012
=0.120 0.325+0.165
=9.285 =0.49
Say, 9.29 2/0.49=
0.98
Add(+)
6/2 9.29 Anchorage 24d
111.42 111.42m 24x0.006=
0.144
Reinforcement 1.124
(BOTTOM) Total length,
Say, 1.12
2R16
No. of stirrups
Length= 9.0 Length=9.0
Add (+)column Less(-) column
2/1/0.225 2/1/0.225=0.45
=0.225 =8.55
=9.225
(8550/140)+1
Less(-) cover
=62.07
2/0.030=0.060
Say, 62
=9.165
Add 10mm dia. M.s
Bend 2/5d stirrups
2x5x0.012
10/12 1.12
=0.120
134.4 134.4m
=9.285
Say, 9.29
6/2 9.29

111.42
111.42m
375 140

BEAM (D-D) Stirrups 225


Reinforcement
Reinforcement
(TOP)
2R16

Length=9.0
Length=0.375
Add (+)column
Less (-) cover
2/1 /2/0.225
= 0.225 2/0.030=0.060
=9.225 =0.325
Less(-) cover
2/0.030=0.060 Length= 0.225
=9.165 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.165
2x5x0.012
=0.120 0.325+0.165
=9.285 =0.49
Say, 9.29 2/0.49=
0.98
Add(+)
6/2 9.29 Anchorage 24d
111.42 111.42m 24x0.006=
0.144
Reinforcement 1.124
(BOTTOM) Total length,
Say, 1.12
2R16
No. of stirrups
Length= 9.0 Length=9.0
Add (+)column Less(-) column
2/1/0.225 2/1/0.225=0.45
=0.225 =8.55
=9.225
(8550/140)+1
Less(-) cover
=62.07
2/0.030=0.060
Say, 62
=9.165
Add 10mm dia. M.s
Bend 2/5d stirrups
2x5x0.012
10/12 1.12
=0.120
134.4 134.4m
=9.285
Say, 9.29
6/2 9.29

111.42
111.42m
375 140

BEAM (E-E) Stirrups 225


Reinforcement
Reinforcement
(TOP)
2R16

Length=6.9
Length=0.375
Add (+)column
Less (-) cover
2/1 /2/0.225
= 0.225 2/0.030=0.060
=7.125 =0.325
Less(-) cover
2/0.030=0.060 Length= 0.225
=7.065 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.165
2x5x0.012
=0.120 0.325+0.165
=7.185 =0.49
Say, 7.19 2/0.49=
0.98
Add(+)
6/2 7.19 Anchorage 24d
86.28 86.28m 24x0.006=
0.144
Reinforcement 1.124
(BOTTOM) Total length,
Say, 1.12
2R16
No. of stirrups
Length= 6.9 Length=6.9
Add (+)column Less(-) column
2/1/0.225 2/1/0.225=0.45
=0.225 =6.45
=7.125
(6450/140)+1
Less(-) cover
=47.07
2/0.030=0.060
Say, 47
=7.065
Add 10mm dia. M.s
Bend 2/5d stirrups
2x5x0.012
10/12 1.12
=0.120
134.4 134.4m
=7.185
Say, 7.19
6/2 7.19
86.28m
86.28
375 140

BEAM (F-F) Stirrups 225


Reinforcement
Reinforcement
(TOP)
2R12

Length=5.4
Length=0.375
Add (+)column
Less (-) cover
2/1 /2/0.225
= 0.225 2/0.030=0.060
=5.625 =0.325
Less(-) cover
2/0.030=0.060 Length= 0.225
=5.565 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.165
2x5x0.012
=0.120 0.325+0.165
=5.685 =0.49
Say, 5.69 2/0.49=
0.98
Add(+)
6/2 5.69 Anchorage 24d
68.28 68.28m 24x0.006=
0.144
Reinforcement 1.124
(BOTTOM) Total length,
Say, 1.12
2R12
No. of stirrups
Length= 5.4 Length=5.4
Add (+)column Less(-) column
2/1/0.225 2/1/0.225=0.45
=0.225 =4.95
=5.625
(4950/140)+1
Less(-) cover
=36.357
2/0.030=0.060
Say, 36
=5.565
Add 10mm dia. M.s
Bend 2/5d stirrups
2x5x0.012
10/12 1.12
=0.120
134.4 134.4m
=5.685
Say, 5.69
6/2 5.69

68.28
68.28m
375 140

BEAM (G-G) Stirrups 150


Reinforcement
Reinforcement
(TOP)
2R12

Length=1.8
Length=0.375
Add (+)column
Less (-) cover
2/1 /2/0.225
= 0.225 2/0.030=0.060
=2.025 =0.325
Less(-) cover
2/0.030=0.060 Length= 0.150
=1.965 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.09
2x5x0.012
=0.120 0.325+0.09
=2.085 =0.415
Say, 2.09 2/0.415=
0.83
Add(+)
6/2 2.09 Anchorage 24d
25.08 25.08m 24x0.006=
0.144
Reinforcement =0.974
(BOTTOM) Total length,
Say, 0.97
2R12
No. of stirrups
Length= 1.8 Length=1.8
Add (+)column Less(-) column
2/1/0.225 2/1/0.225=0.45
=0.225 =1.35
=2.025
(1350/140)+1
Less(-) cover
=10.64
2/0.030=0.060
Say, 11
=1.965
Add 10mm dia. M.s
Bend 2/5d stirrups
2x5x0.012
10/12 0.97
=0.120
116.4 116.4m
=2.085
Say, 2.09
6/2 2.09

25.08
25.08m
375 140

225

BEAM (H-H) Stirrups


Reinforcement
Reinforcement
(TOP)
2R12

Length=3.00
Length=0.375
Add (+)column
Less (-) cover
2/1 /2/0.225
= 0.225 2/0.030=0.060
=3.225 =0.325
Less(-) cover
2/0.030=0.060 Length= 0.225
=3.165 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.165
2x5x0.012
=0.120 0.325+0.165
=3.285 =0.49
Say, 3.30 2/0.49=
0.98
Add(+)
6/2 3.30 Anchorage 24d
39.60 39.60 24x0.006=
0.144
Reinforcement 1.124
(BOTTOM) Total length,
Say, 1.12
2R12
No. of stirrups
Length= 3.00 Length=3.00
Add (+)column Less(-) column
2/1/0.225 2/1/0.225=0.45
=0.225 =2.55
=3.225
(2550/140)+1
Less(-) cover
=19.21
2/0.030=0.060
Say, 19
=3.165
Add 10mm dia. M.s
Bend 2/5d stirrups
2x5x0.012
10/12 1.12
=0.120
134.4 134.4m
=3.285
Say, 3.90
6/2 3.90

46.8
46.8m
375 140

225

BEAM (J-J) Stirrups


Reinforcement
Reinforcement
(TOP)
2R12

Length=2.40
Length=0.375
Add (+)column
Less (-) cover
2/1 /2/0.225
= 0.225 2/0.030=0.060
=2.175 =0.325
Less(-) cover
2/0.030=0.060 Length= 0.225
=2.115 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.165
2x5x0.012
=0.120 0.325+0.165
=2.235 =0.49
Say, 2.24 2/0.49=
0.98
Add(+)
6/2 2.24 Anchorage 24d
26.88 26.88 24x0.006=
0.144
Reinforcement 1.124
(BOTTOM) Total length,
Say, 1.12
2R12
No. of stirrups
Length= 2.4 Length=2.40
Add (+)column Less(-) column
2/1/0.225 2/1/0.225=0.45
=0.45 =1.95
=2.85
(1950/140)+1
Less(-) cover
=14.9285
2/0.030=0.060
Say, 15
=2.79
Add 10mm dia. M.s
Bend 2/5d stirrups
2x5x0.012
10/12 1.12
=0.120
134.4 134.4m
=2.91
Say, 2.90
6/2 2.90

34.8
34.8m
375 140

BEAM (K-K)-(L-L) Stirrups 225


Reinforcement
Reinforcement
(TOP)
2R16

Length=4.50
Length=0.375
Add (+)column
Less (-) cover
2/1 /2/0.225
= 0.225 2/0.030=0.060
=4.275 =0.325
Less(-) cover
2/0.030=0.060 Length= 0.225
=4.215 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.165
2x5x0.012
=0.120 0.325+0.165
=4.335 =0.49
Say, 4.34 2/0.49=
0.98
Add(+)
6/2 4.34 Anchorage 24d
52.08 52.08 24x0.006=
0.144
Reinforcement 1.124
(BOTTOM) Total length,
Say, 1.12
2R16
No. of stirrups
Length= 4.5 Length=4.50
Add (+)column Less(-) column
2/1/0.225 2/1/0.225=0.45
=0.45 =4.95
=4.95
(4950/140)+1
Less(-) cover
=36.35
2/0.030=0.060
Say, 36
=4.89
Add 10mm dia. M.s
Bend 2/5d stirrups
2x5x0.012
10/16 1.12
=0.120
179.2 179.2m
=5.01
Say, 5.0
6/2 5.0

60.0
60.0m
300 101

BEAM (M-M) Stirrups 125


Reinforcement
Reinforcement
(TOP)
2R10

Length=6.60
Length=0.30
Add (+)column
Less (-) cover
2/1 /0.125
= 0.125 2/0.030=0.060
=6.725 =0.24
Less(-) cover
2/0.030=0.060 Length= 0.125
=6.665 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.065
2x5x0.012
=0.120 0.24+0.065
=6.785 =0.305
Say, 6.79 2/0.305=0.61
Add(+)
Anchorage 24d
6/2 6.79 24x0.006=
81.48 81.48 0.144
=0.754
Reinforcement Total length,
(BOTTOM) Say, 0.75

2R10 No. of stirrups


Length=6.6
Length= 6.60 Less(-) column
Add (+)column 2/1/0.125=0.25
2/1/0.225 =6.35
=0.45
(6350/150)+1
=7.05
=43.333
Less(-) cover
Say, 43
2/0.030=0.060
10mm dia. M.s
=6.99
Add stirrups
Bend 2/5d
2x5x0.012
10/10 0.75
=0.120
75 75m
=7.11
Say, 7.10
6/2 7.10

85.2
85.2m
300 101

BEAM (N-N) Stirrups 125


Reinforcement
Reinforcement
(TOP)
2R10

Length=8.4
Length=0.30
Add (+)column
Less (-) cover
2/1 /0.125
= 0.125 2/0.030=0.060
=8.525 =0.24
Less(-) cover
2/0.030=0.060 Length= 0.125
=8.465 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.065
2x5x0.012
=0.120 0.24+0.065
=8.585 =0.305
Say, 8.59 2/0.305=0.61
Add(+)
Anchorage 24d
6/2 8.59 24x0.006=
103.08 103.08 0.144
=0.754
Reinforcement Total length,
(BOTTOM) Say, 0.75

2R10 No. of stirrups


Length=8.4
Length= 8.4 Less(-) column
Add (+)column 2/1/0.125=0.25
2/1/0.225 =8.15
=0.45
(8150/150)+1
=8.85
=55.333
Less(-) cover
Say, 55
2/0.030=0.060
10mm dia. M.s
=8.79
Add stirrups
Bend 2/5d
2x5x0.012
10/10 0.75
=0.120
75 75m
=8.91
Say, 8.9
6/2 8.9

106.8
106.8m
300 101

BEAM (0-0) Stirrups 125


Reinforcement
Reinforcement
(TOP)
2R10

Length=2.1
Length=0.30
Add (+)column
Less (-) cover
2/1 /0.125
= 0.125 2/0.030=0.060
=2.225 =0.24
Less(-) cover
2/0.030=0.060 Length= 0.125
=2.165 Less(-)cover
Add 2/0.030=0.060
Bend 2/5d =0.065
2x5x0.012
=0.120 0.24+0.065
=2.285 =0.305
Say, 2.29 2/0.305=0.61
Add(+)
Anchorage 24d
6/2 2.29 24x0.006=
27.48 27.48 0.144
=0.754
Reinforcement Total length,
(BOTTOM) Say, 0.75

2R10 No. of stirrups


Length=2.1
Length= 2.1 Less(-) column
Add (+)column 2/1/0.125=0.25
2/1/0.225 =1.85
=0.45
1850/150)+1
=2.55
=13.333
Less(-) cover
Say, 13
2/0.030=0.060
10mm dia. M.s
=2.49
Add stirrups
Bend 2/5d
2x5x0.012
10/10 0.75
=0.120
75 75m
=2.61
Say, 2.6
6/2 2.6

31.2
31.2m
Slab - Take Off Sheet

Slab T1

Slab T1

Concrete Work

Mass Concrete

2.4
0.150
0.05
0.018 m
3

Reinforcement

Reinforcement Reinforcement
( bottom - Y (bottom - X direction)
direction)
R16-160
R12-139

Length = 2.4 Length = 0.150


Less (-) cover Less (-) cover
2 / 0.03 = 2/0.03 =
0.06 0.06
2.54 0.09

Add Add
Bend 2/5d= Bend 2/5d
2×5×0.016= 2×5×0.010 =
0.16 0.10
2.70 0.19

Total length Total length required


required steel steel
(190-30-30) (2700-30-30)
= 130 = 2640

No. of steel No. Of steel


130/160 = 2640/139 =
0.813 18.99
Say, 1
Say, 19
1/ 4.41 19/ 0.19 3.61
m, R12
m, R16
4.41
Slab - Take Off Sheet

Slab T4
Slab T4

Concrete Work

Mass Concrete

2.4
0.355
0.05
0.43 3
m
Reinforcement

Reinforcement Reinforcement
(bottom - Y (bottom - X direction)
direction)
R12-168
R10-161

Length = 2.4 Length = 0.355


Less (-) cover Less (-) cover
2 / 0.03 = 2/0.03=
0.06 0.06
2.34 0.295

Add Add
Bend 2/5d= Bend 2/5d
2×5×0.012= 2×5×0.010 =
0.12 0.10
2.46 0.325

Total length Total length required


required steel steel
(325-30-30) (2460-30-30)
= 265 = 2400

No. of steel No. Of steel


265/168 = 2400/161 = 14.90
1.58
Say, 2 Say, 15
m, R10
2/ 2.46 15/ 0.325 4.875
m, R12
4.92
Slab - Take Off Sheet

Slab T3 ( Keratan 5-5 )

Slab T3

Concrete Work

Mass Concrete

3.0
0.23
0.05
0.035 m
3

Reinforcement

Reinforcement Reinforcement
(bottom - Y (bottom - X direction)
direction)
R20-166
R10-162

Length = 3.0 Length = 0.230


Less (-) cover Less (-) cover
2 / 0.03 = 2/0.03 =
0.06 0.06
2.94 0.17

Add Add
Bend 2/5d= Bend 2/5d
2×5×0.020= 2×5×0.010 =
0.20 0.10
3.14 0.27

Total length Total length required


required steel steel
(270-30-30) (3140-30-30)
= 210 = 3080

No. of steel No. Of steel


210/166 = 3080/162= 19.02
1.27
Say, 2 Say, 20
m, R10
2/ 3.14 20/ 0.27 5.4
m, R20
6.28
Slab - Take Off Sheet

Slab T3 ( Keratan 6-6 )

Slab T3

Concrete Work

Mass Concrete

3.15
0.23
0.05
0.0.036 3
m
Reinforcement

Reinforcement Reinforcement
(bottom - Y (bottom - X direction)
direction)
R20-167
R10-162

Length = 0.23
Length = 3.15
Less (-) cover
Less (-) cover
2/0.030 =
2 / 0.03 =
0.06
0.06
0.17
3.09
Add
Add
Bend 2/5d
Bend 2/5d=
2×5×0.010 =
2×5×0.012=
0.10
0.12
0.27
3.21
Total length required
Total length
steel
required steel
(3210-30-30)
(270-30-30)
= 3150
= 210
No. Of steel
No. of steel
3210/162= 19.81
210/167 =
1.26
Say, 20
Say, 2
2/ 3.21 20/ 0.27 5.40 m, R10
6.42
m, R20
TAKING OFF - COLOUM
CONCRETE WORK
Concrete grade 1:2:4
- 20 mm aggregate for column

2/ 0.16 2.4
0.16 0.375 - Ground beam
0.475 2.025

0.024 0.225 - Footing


1.800

13/ 0.23 3.150


0.23 0.375 - Ground beam
0.475 2.775
0.326 0.225 - Footing
2.55

4/ 0.16
0.16
0.300

0.031 0.381 m3

FORMWORK
Rough surface
formwork for side of column

2/4/ 0.475
0.160

0.608
13/4/ 0.475
0.230

5.681

4/4/ 0.300
0.160

0.768 7.057 m2

Reinforcement For Stump

Reinforcement for stump T1 160 x 160

Length of one bar


2.4
0.200 - less grd. level to grd beam
2.2
0.375 + depth of grd beam
2.575
0.030 - cover
2.545
0.032 - Less 2Y16
2.513 (i)
0.088 + bend 5.5d (4Y16)
2.601
0.640 + Lap 40d
3.241

2/4 3.241

25.928 MR of Y16 ø steel bar

Mild steel link for stump 100 x 100

Length of one link

0.16
0.060 - cover 2/0.030
0.1
4/0.1 = 0.4
0.144 + hook 24d
0.544

Distance that require link


2.513 (Length of steel bar from (i))
0.375 - Ground beam
2.138
No. of links = 2.138/0.16 +1
= 14.36, say 15
2/15/ 0.544
16.32 MR of M6 ø link

Reinforcement For Stump

Reinforcement for stump T3 230 x 230

Length of one bar


3.150
0.200 - less grd level to grd beam
2.95
0.375 + depth of grd beam
3.325
0.030 - cover
3.293
0.032 - Less 2Y16
3.891 (i)
0.088 + bend 5.5d (4Y16)
3.979
0.640 + Lap 40d
4.619 ≈ 4.62
13/4/ 4.62
240.24 MR of Y16 ø steel bar

Mild steel link for stump 170 x 170

Length of one link

0.230
0.060 - cover 2/0.030
0.17
4/0.17 = 0.68
= 0.144 + hook 24d
= 0.824

Distance that require link


3.891 (Length of steel bar from (i))
0.375 - Ground beam
3.516

No. of links = 3.516/0.230 +1


= 16.28, say 17
13/17/ 0.824
182.104 MR of M6 ø link

Reinforcement For Stump

Reinforcement for stump T4 160 x 160

Length of one bar


2.400
0.125 - less grd level to grd beam
2.275
0.375 + depth of grd beam
2.65
0.030 - cover
2.62
0.032 - Less 2Y16
2.588 (i)
0.088 + bend 5.5d (4Y16)
2.676
0.640 + Lap 40d
3.316 ≈ 3.32
4/4/ 3.32
53.12 MR of Y16 ø steel bar

Mild steel link for stump 100 x 100

Length of one link

0.160
0.060 - cover 2/0.030
0.1
4/0.1 = 0.4
0.144 + hook 24d
0.544

Distance that require link


2.588 (Length of steel bar from (i))
0.375 - Ground beam
2.213
No. of links = 2.213/0.16 +1
= 14.83, say 15
4/15/ 0.544
32.64 MR of M6 ø link