P01P0054-SS-PSA 01 - HP Small Horizontal Saddle Support Report
P01P0054-SS-PSA 01 - HP Small Horizontal Saddle Support Report
P01P0054-SS-PSA 01
Rev. 00
Customer: INDIANOIL LNG PRIVATE LIMITED
Page 1of 8
Project: HP LNG PUMP MAINTENANCE AT INDIAN OIL LNG PVT LTD,ENNORE CHENNAI
Table of Contents
1. GEOMETRY AND 3D MODEL ................................................................................................................ 2
2. LOAD CALCULATION ............................................................................................................................. 3
2.1 DEAD LOAD ....................................................................................................................................... 3
2.2 LIVE LOAD ......................................................................................................................................... 4
3. LOAD CASES AND LOAD COMBINATIONS............................................................................................ 4
4. STAAD INPUT FILE................................................................................................................................. 5
5. STAAD OUTPUT .................................................................................................................................... 7
5.1 MEMBER UTILITY RATIO................................................................................................................... 7
5.2 NODAL DISPLACEMENT .................................................................................................................... 8
Doc. P01P0054-SS-PSA 01
Rev. 00
Customer: INDIANOIL LNG PRIVATE LIMITED
Page 2of 8
Project: HP LNG PUMP MAINTENANCE AT INDIAN OIL LNG PVT LTD,ENNORE CHENNAI
The following figure shows the geometry of the HP LNG PUMP- Small Horizontal Saddle Support
2. LOAD CALCULATION
The following dead load is considered for the HP LNG PUMP-Small Horizontal saddle support
analysis & design
As per IS code, the following load combina ons are considered for the analysis and design of the
tower
Load cases
1.0 Dead Load
2.0 Live Load
Load Combina ons
Serviceability
1 2 5 6 8 9 11 12 14 15 TABLE ST ISMB200
3 4 7 10 13 16 TABLE ST ISMB150
*******************************************************************************
UNIT METER KN
SUPPORTS
1 TO 4 7 8 PINNED
MEMBER RELEASE
7 13 16 START MX MY MZ
7 13 16 END MY MZ
***************************************************************************
*********************************************************************************
LOAD 1 LOADTYPE Dead TITLE DL
SELFWEIGHT Y -1.15
FLOOR LOAD
_SUPPORTINGFRAME FLOAD -0.5 GY
*******************************************************************************
LOAD 2 LOADTYPE Live TITLE LL
MEMBER LOAD
3 7 10 13 16 CON GY -14
FLOOR LOAD
_SUPPORTINGFRAME FLOAD -1 GY
*******************************************************************************
*** LOAD COMBINATION STRENGTH *******************************
LOAD COMB 201 1.5DL+1.5LL
1 1.5 2 1.5
*************************************************************************
*************************************************************************
*** LOAD COMBINATION SERVICEABILITY ********************
LOAD COMB 301 1.0DL+1.0LL
1 1.0 2 1.0
*****************************************************************
PERFORM ANALYSIS
DEFINE ENVELOPE
301 ENVELOPE 1 TYPE SERVICEABILITY
201 ENVELOPE 2 TYPE STRENGTH
END DEFINE ENVELOPE
********************************************************************************
LOAD LIST 201
PARAMETER 1
CODE IS800 LSD
FYLD 250000 ALL
MAIN 180 ALL
LZ 5.15 MEMB 1 2 5 6 8 9 11 12 14 15
STP 1 ALL
Doc. P01P0054-SS-PSA 01
Rev. 00
Customer: INDIANOIL LNG PRIVATE LIMITED
Page 7of 8
Project: HP LNG PUMP MAINTENANCE AT INDIAN OIL LNG PVT LTD,ENNORE CHENNAI
TRACK 1 ALL
STEEL MEMBER TAKE OFF ALL
CHECK CODE ALL
FINISH
5. STAAD OUTPUT