Doc.

P01P0054-SS-PSA 01
Rev. 00
Customer: INDIANOIL LNG PRIVATE LIMITED
Page 1of 8
Project: HP LNG PUMP MAINTENANCE AT INDIAN OIL LNG PVT LTD,ENNORE CHENNAI

Table of Contents
1. GEOMETRY AND 3D MODEL ................................................................................................................ 2
2. LOAD CALCULATION ............................................................................................................................. 3
2.1 DEAD LOAD ....................................................................................................................................... 3
2.2 LIVE LOAD ......................................................................................................................................... 4
3. LOAD CASES AND LOAD COMBINATIONS............................................................................................ 4
4. STAAD INPUT FILE................................................................................................................................. 5
5. STAAD OUTPUT .................................................................................................................................... 7
5.1 MEMBER UTILITY RATIO................................................................................................................... 7
5.2 NODAL DISPLACEMENT .................................................................................................................... 8
Doc. P01P0054-SS-PSA 01
Rev. 00
Customer: INDIANOIL LNG PRIVATE LIMITED
Page 2of 8
Project: HP LNG PUMP MAINTENANCE AT INDIAN OIL LNG PVT LTD,ENNORE CHENNAI

HP LNG PUMP-SMALL HORIZONTAL SADDLE SUPPORT ASSEMBLY

1. GEOMETRY AND 3D MODEL

HP LNG PUMP-Small Horizontal Saddle Support dimension is 5.15x1.3m.


Support base is considered as pinned condi on. ISMB Profile is used for beams.

The following figure shows the geometry of the HP LNG PUMP- Small Horizontal Saddle Support

Fig 1.0 Geometry of the Small Horizontal Saddle Support


Doc. P01P0054-SS-PSA 01
Rev. 00
Customer: INDIANOIL LNG PRIVATE LIMITED
Page 3of 8
Project: HP LNG PUMP MAINTENANCE AT INDIAN OIL LNG PVT LTD,ENNORE CHENNAI

Fig 2.0 Small Horizontal Saddle Support 3D Model

2. LOAD CALCULATION

2.1 DEAD LOAD

The following dead load is considered for the HP LNG PUMP-Small Horizontal saddle support
analysis & design

 Dead load includes the self-weight of main beam and e beam


 Beams are modelled and their weight is taken by self-weight command.
 Super Imposed dead load of 0.5kN/m2 is applied on saddle support

Fig 3.0 Dead Load Applica on


Doc. P01P0054-SS-PSA 01
Rev. 00
Customer: INDIANOIL LNG PRIVATE LIMITED
Page 4of 8
Project: HP LNG PUMP MAINTENANCE AT INDIAN OIL LNG PVT LTD,ENNORE CHENNAI

2.2 LIVE LOAD


As per the IS code, the following live load is considered for the analysis and design
 Live Load on pla orm 1.5kN/m2
 Pump Load 7MT

Fig 4.0 Live Load Applica on

3. LOAD CASES AND LOAD COMBINATIONS

As per IS code, the following load combina ons are considered for the analysis and design of the
tower

Load cases
 1.0 Dead Load
 2.0 Live Load
Load Combina ons
Serviceability

 301 1.0DL +1.0LL


Strength
 201 1.5DL +1.5LL

Doc. P01P0054-SS-PSA 01
Rev. 00
Customer: INDIANOIL LNG PRIVATE LIMITED
Page 5of 8
Project: HP LNG PUMP MAINTENANCE AT INDIAN OIL LNG PVT LTD,ENNORE CHENNAI

4. STAAD INPUT FILE


STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 26-Dec-23
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 5.15 0 0; 3 0 0 1.3; 4 5.15 0 1.3; 5 1.54 0 0; 6 1.54 0 1.3;
7 2.785 0 0; 8 2.785 0 1.3; 9 3.905 0 0; 10 3.905 0 1.3; 11 5.025 0 0;
12 5.025 0 1.3;
MEMBER INCIDENCES
1 1 5; 2 3 6; 3 1 3; 4 2 4; 5 5 7; 6 6 8; 7 5 6; 8 7 9; 9 8 10; 10 7 8;
11 9 11; 12 10 12; 13 9 10; 14 11 2; 15 12 4; 16 11 12;
START GROUP DEFINITION
MEMBER
FLOOR
_SUPPORTINGFRAME 1 TO 16
END GROUP DEFINITION
START USER TABLE
END
DEFINE MATERIAL START
ISOTROPIC STEEL
E 2.05e+008
POISSON 0.3
DENSITY 76.8195
ALPHA 1.2e-005
DAMP 0.03
TYPE STEEL
STRENGTH FY 253200 FU 407800 RY 1.5 RT 1.2
ISOTROPIC CONCRETE
E 2.17185e+007
POISSON 0.17
DENSITY 23.5616
ALPHA 1e-005
DAMP 0.05
TYPE CONCRETE
STRENGTH FCU 27579
END DEFINE MATERIAL
CONSTANTS
MATERIAL STEEL ALL
UNIT METER KG
MEMBER PROPERTY INDIAN
Doc. P01P0054-SS-PSA 01
Rev. 00
Customer: INDIANOIL LNG PRIVATE LIMITED
Page 6of 8
Project: HP LNG PUMP MAINTENANCE AT INDIAN OIL LNG PVT LTD,ENNORE CHENNAI

1 2 5 6 8 9 11 12 14 15 TABLE ST ISMB200
3 4 7 10 13 16 TABLE ST ISMB150
*******************************************************************************
UNIT METER KN
SUPPORTS
1 TO 4 7 8 PINNED
MEMBER RELEASE
7 13 16 START MX MY MZ
7 13 16 END MY MZ
***************************************************************************
*********************************************************************************
LOAD 1 LOADTYPE Dead TITLE DL
SELFWEIGHT Y -1.15
FLOOR LOAD
_SUPPORTINGFRAME FLOAD -0.5 GY
*******************************************************************************
LOAD 2 LOADTYPE Live TITLE LL
MEMBER LOAD
3 7 10 13 16 CON GY -14
FLOOR LOAD
_SUPPORTINGFRAME FLOAD -1 GY
*******************************************************************************
*** LOAD COMBINATION STRENGTH *******************************
LOAD COMB 201 1.5DL+1.5LL
1 1.5 2 1.5
*************************************************************************
*************************************************************************
*** LOAD COMBINATION SERVICEABILITY ********************
LOAD COMB 301 1.0DL+1.0LL
1 1.0 2 1.0
*****************************************************************
PERFORM ANALYSIS
DEFINE ENVELOPE
301 ENVELOPE 1 TYPE SERVICEABILITY
201 ENVELOPE 2 TYPE STRENGTH
END DEFINE ENVELOPE
********************************************************************************
LOAD LIST 201
PARAMETER 1
CODE IS800 LSD
FYLD 250000 ALL
MAIN 180 ALL
LZ 5.15 MEMB 1 2 5 6 8 9 11 12 14 15
STP 1 ALL
Doc. P01P0054-SS-PSA 01
Rev. 00
Customer: INDIANOIL LNG PRIVATE LIMITED
Page 7of 8
Project: HP LNG PUMP MAINTENANCE AT INDIAN OIL LNG PVT LTD,ENNORE CHENNAI

TRACK 1 ALL
STEEL MEMBER TAKE OFF ALL
CHECK CODE ALL
FINISH

5. STAAD OUTPUT

5.1 MEMBER UTILITY RATIO


The following figure shows the member u lity ra os taken from STAAD Pro

Fig 5.0 Member U lity Ra o


All the member ra os are less 1.0. Hence within allowable limit
Doc. P01P0054-SS-PSA 01
Rev. 00
Customer: INDIANOIL LNG PRIVATE LIMITED
Page 8of 8
Project: HP LNG PUMP MAINTENANCE AT INDIAN OIL LNG PVT LTD,ENNORE CHENNAI

5.2 NODAL DISPLACEMENT


The following figure shows the nodal displacement taken from STAAD Pro

Fig 6.0 Member Displacement


Maximum allowable ver cal displacement = 1300/250 = 5.2mm

Actual displacement = 0.473mm < 5.2mm Hence Ok