B

BACK OF WALL TOP OF WALL


(BOW) (TOW)
SECTION 4 SECTION 3 SECTION 1 SECTION 1 SECTION 3

FOW = 2.0%

G
FOW FRONT OF WALL
163.18 162.61 (FOW)
TOW = FOW = TOW=163.33
TOP OF WALL
163.33 161.81 (TOW)
TOW=163.33
BACK OF WALL
(BOW)

C.J.

C.J.

C.J.

C.J.
E.J.
BOW PVC PIPE
2% 163.18 163.18

E.J.
FOW
BOF= 161.44 FOW FOW =160.17 As 6
171.70 2% 160.91 FOW =
160.78 TOW=161.00

C.J.
T.P.
160.91 As 1
2% TOW=159.62
BOF= BACKFILL MATERIAL A-2-6 OR BETTER COMPACTED

C.J.
161.74 FOW TO 85% OF THE MODIFIED PROCTOR (ASTM D1557)
BOF= 2% TO SEE DAYLIGHT OR MAXIMUM DRY DENSITY
2" CL. 1 1/2" CL.
162.50 159.72 CONNECT TO NEAREST

H (MAX.)
2%
STORM SEWER
BOTTOM OF 160.50 160.00 CCW MIRADRAIN 5000 PRE-FABRICATED
159.50 DRAINAGE COMPOSITE (SEE NOTE 1)
FOOTING (BOF) BOF= BOF= 158.70
159.10 159.00
FOW 158.50
158.25
SEE FOOTING 160.31
STEP DETAIL
EXISTING
ON DWG. CI509 As 5
GROUND

4" DIA. WEEP HOLE


@ 1.52m C.C.
(2% SLOPE)

FRONT OF WALL
(FOW)

0.152
EXCAVATION CONSTRUCTION JOINT
LINE
4" DIA. PERFORATEDPVC PIPE
TO SEE DAYLIGHT OR CONNECT
TO NEAREST STORM SEWER

(MIN.)
C B A

F
2" CL. As 2
1
1 1
4
2" CL. As 7

D
SECTION 3 SECTION 2 SECTION 1 SECTION 2 SECTION 3 SECTION 4
3" CL.
TOW=163.15 As 3 As4 BOTTOM OF FOOTING
TOW = 163.15 PVC PIPE BOW = (BOF)
BOW= BACK OF WALL TOP OF WALL
FOW= FOW= 163.00 E
163.00 (BOW) (TOW)
162.51 162.71

C.J.
C.J.
C.J.
FOW=

E.J.
C.J.
C.J.
BOW = 161.02 FOW 2%
161.91
161.60 BOF=
2%
T.P.

TOW = 161.17 FOW= FRONT OF WALL 161.60


E.J.

160.92
C.J.

(FOW) 162.50
TOW = 159.15 FOW 2%
FOW 160.35 161.50 162.82
C.J.

TOW=158.15 BOTTOM OF
159.95 BOF =160.99 FOOTING (BOF)
2% BOF=159.85
FOW BOW = 159.00
C.J.

158.86 160.50 SEE FOOTING


159.50 STEP DETAIL
2%
FOW ON DWG. CI509
158.00 BOF =158.86
BOF=
2%
157.00
157.76 158.50
RETAINING WALL SCHEDULE
BOF= 157.07
157.50
DIMENSIONS
TO SEE DAYLIGHT OR RETAINING SECTION
CONNECT TO NEAREST EXISTING GROUND
STORM SEWER WALL ID H (max) F (min)
155.50 A [m] B [m] C [m] D [m] E [m] G [m] J [m] K [m] L [m]
155.26 [m] [m]
1 3.353 0.305 0.253 2.743 0.610 3.301 0.457 0.152 - - -
154.00
2 2.438 0.305 0.253 1.981 0.610 2.539 0.457 0.152 - - -
ABCDE
3 1.524 0.305 0.253 1.219 0.457 1.777 0.457 0.152 - - -
4 0.914 0.305 0.253 0.762 0.457 1.320 0.457 0.152 - - -
5 3.353 1.067 0.253 2.743 0.610 4.063 0.533 0.152 - - -
6 2.438 0.610 0.253 1.981 0.610 2.844 0.533 0.152 - - -
F
7 1.524 0.610 0.253 1.219 0.457 2.082 0.533 0.152 - - -
8 0.914 0.610 0.253 0.762 0.457 1.625 0.533 0.152 - - -
9 3.353 1.067 0.253 2.743 0.610 4.063 0.914 0.152 0.381 0.914 1.067
10 2.438 0.762 0.253 1.981 0.610 2.996 0.914 0.152 0.381 0.610 0.762
H
SECTION 4 SECTION 2 SECTION 1 11 1.524 0.610 0.253 1.219 0.457 2.082 0.914 0.152 0.305 0.305 0.610
TOW=162.02
BACK OF WALL
(BOW)
12 0.914 0.610 0.253 0.762 0.457 1.625 0.914 0.152 - - -
TOW=162.00 TOW=161.85 BOW=
161.70
TOW=161.95
TOW=162.01
TOW=162.03 13 1.524 0.762 0.253 1.524 0.457 2.539 0.610 0.914 - - -
G
BOW= 14 3.295 0.762 0.253 1.524 0.457 2.539 0.610 VARIES - - -
C.J.

BOW=
C.J.

BOW BOW= 161.88


C.J.

FOW= 161.80
E.J.

161.85 161.85
2% 160.23 BOW=
E.J.
T.P.

T.P.
C.J.

FOW= 161.87
BOF=
159.97 2% 159.61 FOW
158.88
2%
TO SEE DAYLIGHT OR
RETAINING WALL SCHEDULE
BOF=159.16
2% CONNECT TO NEAREST
FOW= STORM SEWER
160.90
BOF=158.52 REINFORCEMENT
RETAINING SECTION
FRONT OF WALL BOF=157.81
WALL ID X [m]
(FOW)
As1 As2 As3 As4 As5 As6 As7 As8 As9
PVC PIPE #4 @ 9" #4 @ 12" #4 @ 12"
1 - #7 @ 12" #7 @ 6" #7 @ 12" #4 @ 12" - -
(T & B) (E.F.) (E.W.)
#4 @ 9" #4 @ 12"
TO MATCH RETAINING WALL "DD"

2 - #6 @ 12" #6 @ 8" #6 @ 12" #4 @ 12" - - -


(T & B) (E.F.)
ABCDE #4 @ 12" #4 @ 12"
3 - #5 @ 10" #5 @ 12" #5 @ 12" #4 @ 12" - - -
(T & B) (E.F.)
#4 @ 12" #4 @ 12"
4 - #5 @ 12" #5 @ 12" #5 @ 12" #4 @ 12" - - -
STA 0+00.0000

(T & B) (E.F.)
#4 @ 9" #4 @ 12" #4 @ 12"
5 - #7 @ 12" #7 @ 6" #7 @ 12" #4 @ 12" - -
(T & B) (E.F.) (E.W.)
#4 @ 12" #4 @ 12" #4 @ 12"
6 - #6 @ 10" #6 @ 6" #6 @ 12" #4 @ 12" - -
(T & B) (E.F.) (E.W.)
F #4 @ 12" #4 @ 12"
7 - #5 @ 10" #5 @ 12" #5 @ 12" #4 @ 12" - - -
EXISTING (T & B) (E.F.)
GROUND 149.01
#4 @ 12" #4 @ 12"
8 - #5 @ 12" #5 @ 12" #5 @ 12" #4 @ 12" - - -
(T & B) (E.F.)
146.50
#4 @ 12" #4 @ 12" #4 @ 12" #4 @ 12"
9 1.524000 #7 @ 12" #7 @ 6" #7 @ 12" #4 @ 12" #5 @ 6" NOTES:
(T & B) (E.F.) (E.W.) (E.W.) 1.
2.
MANUFACTURER ESTABLISHED ONLY AS DESIGN BASIS. SEE STRUCTURAL GENERAL NOTE 19 ON DRAWING SK001.
LEGEND:

#4 @ 12" #4 @ 12" #4 @ 12" TOW = TOP OF WALL


BOW = BACK OF WALL
10 - #6 @ 10" #6 @ 6" #6 @ 12" #4 @ 12" - #5 @ 12" FOW = FRONT OF WALL
(T & B) (E.F.) (E.W.) BOF = BOTTOM OF FOOTING
H #4 @ 12" #4 @ 12"
E.J. = EXPANSION JOINT
C.J. = CONTRACTION JOINT
11 - #5 @ 8" #5 @ 10" #5 @ 12" #4 @ 12" - - #5 @ 12" T.P. = TURNING POINT
(T & B) (E.F.) 3.
144.11 = EXISTING ELEVATIONS
RETAINING WALLS FOOTINGS TO BE PLACED OVER COMPACTED STRUCTURAL FILL AT LEAST 3 FEET BELOW BOTTOM
#4 @ 12" #4 @ 12" OF FOOTING ON AREAS WHERE THE FOUNDATION LEVEL IS ANTICIPATED OVER THE EXISTING OVERBURDEN SOILS.
12 - #5 @ 10" #5 @ 12" #5 @ 12" #4 @ 12" - - - SEE FOUNDATION NOTES ON DRAWINGS SK001 FOR COMPLETE REQUIREMENTS.
(T & B) (E.F.) 4. IF THE GEOTECHNICAL ENGINEER RETAINED FOR THE PROJECT DETERMINES THAT THE EXISTING SOILS AT THE
BOTTOM OF FOOTING LEVEL ARE SUITABLE FOR THE RETAINING WALLS TO BEAR ON, AN EXPANSION JOINT SHALL BE
#4 @ 12" #4 @ 12" PROVIDED BETWEEN THE SECTION OF THE WALL THAT BEARS ON EXISTING SOILS AND THE SECTION THAT BEARS ON
COMPACTED STRUCTURAL FILL. SEE FOUNDATION NOTES ON DRAWINGS SK001 FOR COMPLETE REQUIREMENTS.
13 - #5 @ 8" #5 @ 12" #5 @ 12" #4 @ 12" - - - 5. CONTRACTION JOINTS SHALL BE PLACED AT A MAXIMUM SPACING OF 9.14m.
(T & B) (E.F.) 6. EXPANSION JOINTS SHALL BE PLACED AT A MAXIMUM SPACING OF 27.43m.
G #4 @ 12" #4 @ 12"
7. OVER-COMPACTION OF THE SOIL BEHIND THE WALLS SHALL BE AVOIDED, AS THE EARTH PRESSURE COEFFICIENT
UNDER THIS CONDITION COULD INCREASE TO 3 OR MORE, LIGHTWEIGHT COMPACTION EQUIPMENT SHALL BE
14 - #5 @ 8" #5 @ 12" #5 @ 12"
(T & B) (E.F.)
#4 @ 12" - - - 8.
CONSIDERED AS WELL AS USING 85% OF THE MODIFIED PROCTOR (ASTM D1557) MAXIMUM DRY DENSITY.
SEE TYPICAL DETAILS AND DESIGN DATA ON DRAWING CI509.

RETAINING WALLS STRUCTURAL


DETAILS - WALLS A, B, & C
B
BACK OF WALL TOP OF WALL
SECTION 1 (BOW) (TOW)

2.0%

G
TOP OF WALL
TOW=162.03 (TOW)

PVC PIPE
BOW BACK OF WALL
161.88 (BOW)
TOW=159.15

E.J.
As 6
BOW=
FRONT OF 159.00
WALL (FOW)

C.J.
As 1
FOW= 158.76
BACKFILL MATERIAL A-2-6 OR BETTER COMPACTED
TO 85% OF THE MODIFIED PROCTOR (ASTM D1557)
2% 2" CL. 1 1/2" CL.
FOW MAXIMUM DRY DENSITY
158.88

H (MAX.)
BOF= 157.69 TO SEE DAYLIGHT OR CCW MIRADRAIN 5000 PRE-FABRICATED
CONNECT TO NEAREST DRAINAGE COMPOSITE (SEE NOTE 1)
STORM SEWER

BOTTOM OF
FOOTING (BOF)

TO MATCH RETAINING WALL "CC"


As 5

4" DIA. WEEP HOLE


@ 1.52m C.C.
(2% SLOPE)

FRONT OF WALL
CONSTRUCTION JOINT (FOW)
STA 0+61.0695

EXISTING

0.152
GROUND EXCAVATION
151.50 LINE 4" DIA. PERFORATEDPVC PIPE
TO SEE DAYLIGHT OR CONNECT
TO NEAREST STORM SEWER

(MIN.)
C B A

F
2" CL. As 2
1
1 1
4
2" CL. As 7

D
149.50

3" CL.
As 3 As4 BOTTOM OF FOOTING
(BOF)
E

RETAINING WALL SCHEDULE


DIMENSIONS
RETAINING SECTION
WALL ID H (max) F (min)
SECTION 4 SECTION 3 SECTION 2 SECTION 1 SECTION 2 SECTION 3 SECTION 4 A [m] B [m] C [m] D [m] E [m] G [m] J [m] K [m] L [m]
[m] [m]
1 3.353 0.305 0.253 2.743 0.610 3.301 0.457 0.152 - - -
TOW=156.78
TOP OF WALL
BACK OF WALL
(BOW)
2 2.438 0.305 0.253 1.981 0.610 2.539 0.457 0.152 - - -
FOW= (TOW) TOW TOW=156.35 BOW=
ABCDE
157.00 156.47
EXISTING GROUND 157.00 156.78
TOW=156.78
156.07 3 1.524 0.305 0.253 1.219 0.457 1.777 0.457 0.152 - - -
FOW BOW= FOW=
154.94 FOW=
156.20 155.12
155.53
TOW=156.04 4 0.914 0.305 0.253 0.762 0.457 1.320 0.457 0.152 - - -
C.J.

BOW= FOW
C.J.

BOW=
E.J.

156.50
156.63 155.26 FOW BOW= 5 3.353 1.067 0.253 2.743 0.610 4.063 0.533 0.152 - - -

C.J.
2% 156.63
C.J.

T.P.

E.J.
C.J.

C.J.
154.52

T.P.
156.63

C.J.
C.J.

155.89
154.50 2%
T.P.
E.J.

2%
BOF= 155.04
155.67 2%
6 2.438 0.610 0.253 1.981 0.610 2.844 0.533 0.152 - - -
BOF= 154.34 2% 155.00
2% BOF=154.45 F
2% 2% 7 1.524 0.610 0.253 1.219 0.457 2.082 0.533 0.152 - - -
FOW BOF= 153.45 154.00 154.00
155.97 BOF= 153.08
BOF=153.37 8 0.914 0.610 0.253 0.762 0.457 1.625 0.533 0.152 - - -
FOW= BOF=154.03
FRONT OF FOW= 155.44
PVC PIPE WALL (FOW) 154.24 9 3.353 1.067 0.253 2.743 0.610 4.063 0.914 0.152 0.381 0.914 1.067
SEE FOOTING FOW
BOTTOM OF
FOW= STEP DETAIL
ON DWG. CI509
FOOTING (BOF)
155.36 10 2.438 0.762 0.253 1.981 0.610 2.996 0.914 0.152 0.381 0.610 0.762
154.15 H
TO SEE DAYLIGHT OR
11 1.524 0.610 0.253 1.219 0.457 2.082 0.914 0.152 0.305 0.305 0.610
CONNECT TO NEAREST
STORM SEWER 12 0.914 0.610 0.253 0.762 0.457 1.625 0.914 0.152 - - -
13 1.524 0.762 0.253 1.524 0.457 2.539 0.610 0.914 - - -
G
14 3.295 0.762 0.253 1.524 0.457 2.539 0.610 VARIES - - -

RETAINING WALL SCHEDULE


REINFORCEMENT
RETAINING SECTION
WALL ID X [m] As1 As2 As3 As4 As5 As6 As7 As8 As9
#4 @ 9" #4 @ 12" #4 @ 12"
1 - #7 @ 12" #7 @ 6" #7 @ 12" #4 @ 12" - -
(T & B) (E.F.) (E.W.)
#4 @ 9" #4 @ 12"
2 - #6 @ 12" #6 @ 8" #6 @ 12" #4 @ 12" - - -
(T & B) (E.F.)
ABCDE #4 @ 12" #4 @ 12"
3 - #5 @ 10" #5 @ 12" #5 @ 12" #4 @ 12" - - -
(T & B) (E.F.)
#4 @ 12" #4 @ 12"
4 - #5 @ 12" #5 @ 12" #5 @ 12" #4 @ 12" - - -
(T & B) (E.F.)
#4 @ 9" #4 @ 12" #4 @ 12"
5 - #7 @ 12" #7 @ 6" #7 @ 12" #4 @ 12" - -
(T & B) (E.F.) (E.W.)
#4 @ 12" #4 @ 12" #4 @ 12"
6 - #6 @ 10" #6 @ 6" #6 @ 12" #4 @ 12" - -
(T & B) (E.F.) (E.W.)
F #4 @ 12" #4 @ 12"
7 - #5 @ 10" #5 @ 12" #5 @ 12" #4 @ 12" - - -
(T & B) (E.F.)
#4 @ 12" #4 @ 12"
8 - #5 @ 12" #5 @ 12" #5 @ 12" #4 @ 12" - - -
(T & B) (E.F.)
#4 @ 12" #4 @ 12" #4 @ 12" #4 @ 12"
9 1.5240 #7 @ 12" #7 @ 6" #7 @ 12" #4 @ 12" #5 @ 6"
(T & B) (E.F.) (E.W.) (E.W.)
#4 @ 12" #4 @ 12" #4 @ 12"
10 - #6 @ 10" #6 @ 6" #6 @ 12" #4 @ 12" - #5 @ 12" NOTES:
(T & B) (E.F.) (E.W.) 1.
2.
MANUFACTURER ESTABLISHED ONLY AS DESIGN BASIS. SEE STRUCTURAL GENERAL NOTE 19 ON DRAWING SK001.
LEGEND:
H #4 @ 12" #4 @ 12" TOW = TOP OF WALL
BOW = BACK OF WALL
11 - #5 @ 8" #5 @ 10" #5 @ 12" #4 @ 12" - - #5 @ 12" FOW = FRONT OF WALL
(T & B) (E.F.) BOF = BOTTOM OF FOOTING
E.J. = EXPANSION JOINT
#4 @ 12" #4 @ 12" C.J. = CONTRACTION JOINT
12 - #5 @ 10" #5 @ 12" #5 @ 12" #4 @ 12" - - - T.P. = TURNING POINT
(T & B) (E.F.) 3.
144.11 = EXISTING ELEVATIONS
RETAINING WALLS FOOTINGS TO BE PLACED OVER COMPACTED STRUCTURAL FILL AT LEAST 3 FEET BELOW BOTTOM
#4 @ 12" #4 @ 12" OF FOOTING ON AREAS WHERE THE FOUNDATION LEVEL IS ANTICIPATED OVER THE EXISTING OVERBURDEN SOILS.
13 - #5 @ 8" #5 @ 12" #5 @ 12" #4 @ 12" - - - SEE FOUNDATION NOTES ON DRAWINGS SK001 FOR COMPLETE REQUIREMENTS.
(T & B) (E.F.) 4. IF THE GEOTECHNICAL ENGINEER RETAINED FOR THE PROJECT DETERMINES THAT THE EXISTING SOILS AT THE

G #4 @ 12" #4 @ 12"
BOTTOM OF FOOTING LEVEL ARE SUITABLE FOR THE RETAINING WALLS TO BEAR ON, AN EXPANSION JOINT SHALL BE
PROVIDED BETWEEN THE SECTION OF THE WALL THAT BEARS ON EXISTING SOILS AND THE SECTION THAT BEARS ON

14 - #5 @ 8" #5 @ 12" #5 @ 12" #4 @ 12" - - - 5.


COMPACTED STRUCTURAL FILL. SEE FOUNDATION NOTES ON DRAWINGS SK001 FOR COMPLETE REQUIREMENTS.
CONTRACTION JOINTS SHALL BE PLACED AT A MAXIMUM SPACING OF 9.14m.
(T & B) (E.F.) 6. EXPANSION JOINTS SHALL BE PLACED AT A MAXIMUM SPACING OF 27.43m.
7. OVER-COMPACTION OF THE SOIL BEHIND THE WALLS SHALL BE AVOIDED, AS THE EARTH PRESSURE COEFFICIENT
UNDER THIS CONDITION COULD INCREASE TO 3 OR MORE, LIGHTWEIGHT COMPACTION EQUIPMENT SHALL BE
CONSIDERED AS WELL AS USING 85% OF THE MODIFIED PROCTOR (ASTM D1557) MAXIMUM DRY DENSITY.
8. SEE TYPICAL DETAILS AND DESIGN DATA ON DRAWING CI509.

RETAINING WALLS STRUCTURAL


DETAILS - WALLS D & E
SECTION 8 SECTION 7 SECTION 6 SECTION 5

TOP OF WALL
(TOW)
BOW BACK OF WALL
TOW=148.15 148.00 TOW=148.15
FOW= (BOW)
147.23

TOW=147.15 BOW=

C.J.
FOW= FOW= 146.99
FOW=
148.00 146.00

C.J.
2% 146.63
EXISTING

C.J.

E.J.
BOF= FOW= GROUND

C.J.
2%
145.73

C.J.
146.23 PVC PIPE

C.J.
BOF= 145.63 2% FOW=

E.J.
FOW= 144.77
147.00 TOW=144.15
BOF= 144.57

C.J.
TO SEE DAYLIGHT OR
FOW=
2% CONNECT TO NEAREST
146.50 BOF= 143.62 STORM SEWER
FOW= FOW=
BOTTOM OF 145.00 BOF= 142.87
145.50
FOOTING (BOF) FOW= FOW= FOW=
144.50 144.00 144.00
SEE FOOTING
STEP DETAIL
FRONT OF WALL
ON DWG. CI509
(FOW)

B
1 BACK OF WALL TOP OF WALL
2 (BOW) (TOW)

G
CONCRETE
SWALE

BACKFILL MATERIAL A-2-6 OR BETTER COMPACTED As 6


TO 85% OF THE MODIFIED PROCTOR (ASTM D1557)
MAXIMUM DRY DENSITY

As 1
SECTION 13 SECTION 14

H (MAX.)
2" CL. 1 1/2" CL.
TOP OF WALL
TOW=152.33 (TOW) B
TOP OF WALL BACK OF WALL TOW=152.33
(TOW) TOP OF WALL
(BOW) CCW MIRADRAIN 5000 PRE-FABRICATED (TOW)
DRAINAGE COMPOSITE (SEE NOTE 1)

TOW=150.98 TOW=150.98
CYCLONE FENCE
As 5
BOW= BOW= As 1
BOW= BOW= 149.76 149.99

E.J.
C.J.

C.J.
150.07 150.07 BACK OF WALL

G
(BOW)
As 6
MAINTENANCE YARD
E.J.
E.J.
C.J.

C.J.

C.J.

C.J.

C.J.

C.J.

T.P.
E.J.
CONCRETE PAVEMENT
FOW= (SEE CIVIL DWGS.)
149.75 2.0%
As 5
FOW= 2% 2% 4" DIA. WEEP HOLE
149.13 @ 1.52m C.C.
(2% SLOPE)

H (MAX.)
BOF= 147.97
FOW= FOW= FRONT OF WALL
FRONT OF WALL FOW= (FOW) EXPANSION JOINT
149.08 149.13 CONSTRUCTION JOINT
(FOW) 149.03
CONCRETE 1 1/2" CL. 2" CL.
BOTTOM OF PVC PIPE SWALE
FOOTING (BOF)

0.152
4" DIA. PERFORATEDPVC PIPE 2.0%
145.56 TO SEE DAYLIGHT OR CCW MIRADRAIN 5000 PRE-FABRICATED
TO SEE DAYLIGHT OR CONNECT
CONNECT TO NEAREST TO NEAREST STORM SEWER 4" DIA. WEEP HOLE DRAINAGE COMPOSITE (SEE NOTE 1)
EXISTING STORM SEWER EXCAVATION @ 1.52m C.C.
GROUND LINE (2% SLOPE)

(MIN.)
C B A BACKFILL MATERIAL A-2-6 OR BETTER

F
FRONT OF WALL COMPACTED TO 85% OF THE MODIFIED
145.00 (FOW) PROCTOR (ASTM D1557) MAXIMUM DRY DENSITY
2" CL. As 2

0.152
144.11 2.0% 4" DIA. PERFORATEDPVC PIPE
142.50 1 TO SEE DAYLIGHT OR CONNECT
143.50 2" CL. TO NEAREST STORM SEWER
1 As 7
143.01

(MIN.)
F
CONSTRUCTION JOINT
A B C
EXCAVATION
2" CL. As 2 LINE
141.50 3" CL.
As 3 As4

BOTTOM OF FOOTING
1

D
(BOF)
As 9 1

K
#4 @ 12" E.F. 2" CL.
3" CL.
#4 @ 12" As 3 As4
BOTTOM OF FOOTING
(BOF)

J L E

SECTION 10 SECTION 10 SECTION 11 RETAINING WALL SCHEDULE RETAINING WALL SCHEDULE


SECTION 9

DIMENSIONS REINFORCEMENT
BACK OF WALL RETAINING SECTION RETAINING SECTION
BOW= (BOW) TOW=147.39
147.00 WALL ID H (max) F (min) WALL ID X [m]
A [m] B [m] D [m] E [m] J [m] K [m] L [m] As1 As2 As3 As4 As5 As6 As7 As8 As9
BOW=
TOW=147.15 C [m] G [m]
TOP OF WALL TOW=147.15 147.24 [m] [m]
(TOW) #4 @ 9" #4 @ 12" #4 @ 12"
EXISTING 1 - #7 @ 12" #7 @ 6" #7 @ 12" #4 @ 12" - -
GROUND FOW=
FOW=
147.00 1 3.353 0.305 0.253 2.743 0.610 3.301 0.457 0.152 - - - (T & B) (E.F.) (E.W.)
145.94
BOW= #4 @ 9" #4 @ 12"
145.00 FOW= FRONT OF WALL
2 - #6 @ 12" #6 @ 8" #6 @ 12" #4 @ 12" - - -
TOW=145.15 144.91 (FOW) 2 2.438 0.305 0.253 1.981 0.610 2.539 0.457 0.152 - - - (T & B) (E.F.)
C.J.

FOW=
2% FOW=146.00
ABCDE ABCDE #4 @ 12" #4 @ 12"
C.J.

143.52
FOW=
FOW= 3 1.524 0.305 0.253 1.219 0.457 1.777 0.457 0.152 - - - 3 - #5 @ 10" #5 @ 12" #5 @ 12" #4 @ 12" - - -
144.00
145.00 BOF= 144.57 (T & B) (E.F.)
TOW=142.92 FOW=
143.50 #4 @ 12" #4 @ 12"
4 0.914 0.305 0.253 0.762 0.457 1.320 0.457 0.152 - - - 4 - #5 @ 12" #5 @ 12" #5 @ 12" #4 @ 12" - - -
E.J.

FOW=
142.77
2% BOF= 143.38 (T & B) (E.F.)
2%
5 3.353 1.067 0.253 2.743 0.610 4.063 0.533 0.152 - - - #4 @ 9" #4 @ 12" #4 @ 12"
FOW=
BOF= 142.47 5 - #7 @ 12" #7 @ 6" #7 @ 12" #4 @ 12" - -
2% 143.00
BOF= 142.00
(T & B) (E.F.) (E.W.)
6 2.438 0.610 0.253 1.981 0.610 2.844 0.533 0.152 - - - #4 @ 12" #4 @ 12" #4 @ 12"
BOF= 141.25 6 - #6 @ 10" #6 @ 6" #6 @ 12" #4 @ 12" - -
PVC PIPE F (T & B) (E.F.) (E.W.)
BOTTOM OF 7 1.524 0.610 0.253 1.219 0.457 2.082 0.533 0.152 - - - F #4 @ 12" #4 @ 12"
SEE FOOTING
FOOTING (BOF) STEP DETAIL 7 - #5 @ 10" #5 @ 12" #5 @ 12" #4 @ 12" - - -
ON DWG. CI509 (T & B) (E.F.)
TO SEE DAYLIGHT OR 8 0.914 0.610 0.253 0.762 0.457 1.625 0.533 0.152 - - - #4 @ 12" #4 @ 12"
CONNECT TO NEAREST 8 - #5 @ 12" #5 @ 12" #5 @ 12" #4 @ 12" - - -
STORM SEWER (T & B) (E.F.)
9 3.353 1.067 0.253 2.743 0.610 4.063 0.914 0.152 0.381 0.914 1.067 NOTES:
#4 @ 12" #4 @ 12" #4 @ 12" #4 @ 12" 1. MANUFACTURER ESTABLISHED ONLY AS DESIGN BASIS. SEE STRUCTURAL GENERAL NOTE 19 ON DRAWING SK001.
9 1.5240 #7 @ 12" #7 @ 6" #7 @ 12" #4 @ 12" #5 @ 6" 2. LEGEND:

10 2.438 0.762 0.253 1.981 0.610 2.996 0.914 0.152 0.381 0.610 0.762 (T & B) (E.F.) (E.W.) (E.W.) TOW = TOP OF WALL
BOW = BACK OF WALL

H #4 @ 12" #4 @ 12" #4 @ 12" FOW = FRONT OF WALL


10 - #6 @ 10" #6 @ 6" #6 @ 12" #4 @ 12" - #5 @ 12" BOF = BOTTOM OF FOOTING

11 1.524 0.610 0.253 1.219 0.457 2.082 0.914 0.152 0.305 0.305 0.610 (T & B) (E.F.) (E.W.) E.J. = EXPANSION JOINT
C.J. = CONTRACTION JOINT
H #4 @ 12" #4 @ 12" T.P. = TURNING POINT
144.11 = EXISTING ELEVATIONS
11 - #5 @ 8" #5 @ 10" #5 @ 12" #4 @ 12" - - #5 @ 12"
12 0.914 0.610 0.253 0.762 0.457 1.625 0.914 0.152 - - - (T & B) (E.F.) 3. RETAINING WALLS FOOTINGS TO BE PLACED OVER COMPACTED STRUCTURAL FILL AT LEAST 3 FEET BELOW BOTTOM
OF FOOTING ON AREAS WHERE THE FOUNDATION LEVEL IS ANTICIPATED OVER THE EXISTING OVERBURDEN SOILS.
SEE FOUNDATION NOTES ON DRAWINGS SK001 FOR COMPLETE REQUIREMENTS.
#4 @ 12" #4 @ 12" 4. IF THE GEOTECHNICAL ENGINEER RETAINED FOR THE PROJECT DETERMINES THAT THE EXISTING SOILS AT THE
13 1.524 0.762 0.253 1.524 0.457 2.539 0.610 0.914 - - - 12 - #5 @ 10" #5 @ 12" #5 @ 12" #4 @ 12" - - - BOTTOM OF FOOTING LEVEL ARE SUITABLE FOR THE RETAINING WALLS TO BEAR ON, AN EXPANSION JOINT SHALL BE
(T & B) (E.F.) PROVIDED BETWEEN THE SECTION OF THE WALL THAT BEARS ON EXISTING SOILS AND THE SECTION THAT BEARS ON
G #4 @ 12" #4 @ 12" 5.
COMPACTED STRUCTURAL FILL. SEE FOUNDATION NOTES ON DRAWINGS SK001 FOR COMPLETE REQUIREMENTS.
CONTRACTION JOINTS SHALL BE PLACED AT A MAXIMUM SPACING OF 9.14m.
14 3.295 0.762 0.253 1.524 0.457 2.539 0.610 VARIES - - - 13 - #5 @ 8" #5 @ 12" #5 @ 12"
(T & B) (E.F.)
#4 @ 12" - - - 6.
7.
EXPANSION JOINTS SHALL BE PLACED AT A MAXIMUM SPACING OF 27.43m.
OVER-COMPACTION OF THE SOIL BEHIND THE WALLS SHALL BE AVOIDED, AS THE EARTH PRESSURE COEFFICIENT
UNDER THIS CONDITION COULD INCREASE TO 3 OR MORE, LIGHTWEIGHT COMPACTION EQUIPMENT SHALL BE
G #4 @ 12" #4 @ 12" CONSIDERED AS WELL AS USING 85% OF THE MODIFIED PROCTOR (ASTM D1557) MAXIMUM DRY DENSITY.
8. SEE TYPICAL DETAILS AND DESIGN DATA ON DWG. CI509.
14 - #5 @ 8" #5 @ 12" #5 @ 12" #4 @ 12" - - -
(T & B) (E.F.)

RETAINING WALLS STRUCTURAL


DETAILS - WALLS F, G & H
RETAINING WALLS DESIGN DATA
FACTORED BEARING CAPACITY 3375 PSF

BEARING RESISTANCE FACTOR ( ) 0.45

EXTREME EVENT BEARING CAPACITY 5625 PSF


EXT. EVENT BEARING RESIST. FACTOR
0.75
( )

BACKFILL MATERIAL ANGLE OF INTERNAL


FRICTION ( )

BACKFILL MATERIAL UNIT WEIGHT ( ) 135 PCF

COEFFICIENT OF ACTIVE LATERAL EARTH


0.3
PRESSURE (Ka)

COEFFICIENT OF PASSIVE LATERAL


3.2
EARTH PRESSURE (Kp)

COEFFICIENT OF AT-REST LATERAL


0.85
EARTH PRESSURE (Ko)

DESIGN FORCE TRAFFIC RAILING TL-1, (Ft) 13.5 KIPS

IMPACT FORCE DISTRIBUTION LENGTH 4 FT

HEIGHT OF RAILING 27 IN

NOTES:
1. MANUFACTURER ESTABLISHED ONLY AS DESIGN BASIS. SEE
STRUCTURAL GENERAL NOTE 19 ON DRAWING SK001.
1'-6" 2. LEGEND:
RET. WALL FOOTING TOW = TOP OF WALL
REINFORCEMENT BOW = BACK OF WALL
FOW = FRONT OF WALL
BOF = BOTTOM OF FOOTING
PROVIDE ASPHALT SATURATED PROVIDE ONLY 50% OF E.J. = EXPANSION JOINT
FELT PAPER OR OTHER APPROVED REINFORCEMENT C.J. = CONTRACTION JOINT
D

PREMOLDED EXP. BOND-BREAKING MATERIAL THROUGH JOINT


JOINT MATERIAL T.P. = TURNING POINT
144.11 = EXISTING ELEVATIONS
VARIES

B 3. RETAINING WALLS FOOTINGS TO BE PLACED OVER COMPACTED


#4 @ 12" E.F. STRUCTURAL FILL AT LEAST 3 FEET BELOW BOTTOM OF FOOTING ON
RET. WALL FOOTING AREAS WHERE THE FOUNDATION LEVEL IS ANTICIPATED OVER THE
B/3

RET. WALL FOOTING REINFORCEMENT B/3 B/3 B/3 EXISTING OVERBURDEN SOILS. SEE FOUNDATION NOTES ON DRAWINGS
REINFORCEMENT SK001 FOR COMPLETE REQUIREMENTS.
B/3
B

B
#4 @ 12" E.F. 4. IF THE GEOTECHNICAL ENGINEER RETAINED FOR THE PROJECT
DETERMINES THAT THE EXISTING SOILS AT THE BOTTOM OF FOOTING
B/3

LEVEL ARE SUITABLE FOR THE RETAINING WALLS TO BEAR ON, AN


EXPANSION JOINT SHALL BE PROVIDED BETWEEN THE SECTION OF THE
D

WALL THAT BEARS ON EXISTING SOILS AND THE SECTION THAT BEARS
ON COMPACTED STRUCTURAL FILL. SEE FOUNDATION NOTES ON
"V" GROOVE ACROSS DRAWINGS SK001 FOR COMPLETE REQUIREMENTS.
TOP & DOWN VERTICAL 5. CONTRACTION JOINTS SHALL BE PLACED AT A MAXIMUM SPACING OF
FACE OF WALL 9.14m.
RET. WALL FOOTING
6. EXPANSION JOINTS SHALL BE PLACED AT A MAXIMUM SPACING OF
REINFORCEMENT
27.43m.
7. OVER-COMPACTION OF THE SOIL BEHIND THE WALLS SHALL BE
AVOIDED, AS THE EARTH PRESSURE COEFFICIENT UNDER THIS
CONDITION COULD INCREASE TO 3 OR MORE, LIGHTWEIGHT
TYPICAL FOOTING STEP DETAIL EXPANSION JOINT DETAIL CONTRACTION JOINT DETAIL KEY DETAIL COMPACTION EQUIPMENT SHALL BE CONSIDERED AS WELL AS USING
F2 NOT TO SCALE
F4 NOT TO SCALE
F6 NOT TO SCALE
F7 NOT TO SCALE 85% OF THE MODIFIED PROCTOR (ASTM D1557) MAXIMUM DRY DENSITY.

RETAINING WALLS STRUCTURAL


TYPICAL DETAILS

CI509