Professional Documents
Culture Documents
Daily Summary 20-05-2012
Daily Summary 20-05-2012
BRITMINDO
Drilling Report
DAILY SUMMARY
Site Name : KAD SEMBAWANG Easting : 288344
Bore Hole Name : CH058R1 Northing : 9873900
Drill Rig Name : JC 175/RIG 1 Elevation : 96M
Relative Location : PANDRANJARI Geologist : CN
Coal Summary
Depth
Seam Number Thickness Description
From To
S210 45.74 45.83 0.09 Brittle,Dull,Brown Streak,Black
Coal Sampling
Depth
Sample No Thickness Core Rec (%) Foto Name
From To
Drilling Summary
Depth
Activity Description
From To
7.00 8.00 Travel Time
8.00 11.30 OH (28.03-45.35 M)
11.30 12.30 Rest
12.30 13.00 Maintenance Slash Bit
13.00 14.00 Flushing
14.00 15.30 CH (45.33-45.85 M)
15.30 16.00 Travel Time
Geophysical Logging
Time Depth
Activiy Foto Name
From To From To
Activity Description
AT = Active Time Hole conditional, Lost Circulation, Setting Casing, Cementing, Survey or Logger
IT = Inactive Time Moving, Waiting Decision Geo, No Site Ready or No Access, Drying Cement, Rain
NC = Non Chargeable Safety Meeting, Break down, Maintenance, Change Drill Bit, Travel Time, Drilling Time