ALSTOMDRIVES& CONTROLS PrefaceI of3

EARTH FAULT CARD CONFIGIIRATION & TEST


METHOD STATEMENT

ALSTOM DRIVES & CONTROLS


BAUTEIL DIVISION

EARTH FAULT CARI)


CONFIGURATIOI\ & TEST
METHOD STATEMENT

CLIENT: SHELL NORTH CORMORANT


AUTHOR: JOHN DUFF"Y
ISSUE: 1.0
DATE: 3O'hSEPTEMBER1999

lrssuEl.0l
ALSTOM DRIVES & CONTROLS Preface2 of3
EARTH FAIJLT CARD CONTIGURATION & TEST
METHODSTATEMLNf

lssue Comment Dste


1 .0 Initial Draft. 30' Seoternber
1999

ltssuEl.0l
ALSTOM DRIVES & CONTROLS Pref¡ce3 of3
EARTH FAIILT CARD CONTIGTIRATÍON& TEST
METHOD STATEMENT

lrssuEl.0l
ALSTOM DRIVES & CONTROLS PageI of4
EARTH FAIJLT CARD CONFIGURATTON& TEST
METHODSTATEMENT

l. Introduction
Thisdocumentspecifiesthecalibrationa¡d testrcquirements
for th€NorthCormo¡a[t
CuttingsRe-injectionSCRsFtem'searthfaultca¡dinst&llation.

2, TestStrategy
completiolofthe tests,all epFopriatesignatures
On thesucrcessful at
shouldbeaomplet€d
theendofthis document,
Thefollowinghardwarewill berequiredto executethc te8tsdetailedin this document:
.l kvMegger.
. 500VMegger.
¡ 2A fuse& fusewi¡e.
. Voltage/CurrentMeter.
. DecadeBox.

3. TestEnvironment
Thesetestsshouldbeperformedin-situon theNorthComoraritplatform,undsrthc
of Shellpersonnel.
supervisior/approval
ALSTOM DRIVES & CONTROLS Pago2 of4
EARTH FAULT CARD CONFTGURATION& TEST
METHODSTATEMENT

4. Tests
All ofthe followingchecks& testsshouldbe executed
duringcommissioning.

4.1 Test C¡se l: AC BusbarsEarth Fault Check


With ref'erenceto the approp¡iated¡awings,openthe relevantisolatorsandremovethe
relevantfusesthatisolatethebusbarsfrom thecontrol,monitoring,SCRstack,andindication
circuitry.
Checkthecontinuityi¡tegdty ofthe busbarsAom theincomerisolatorto thebusba¡send,
prior to commencing
thefollowingmeggertcsts.
Theresultsofthe followi¡g testsshouldbe recorded
on QAP-22testsheets.
Thesetestsheets
shouldbe signedandretainedaspartofthe formaltestrcco¡d.
. Meggerbetwe€ntheredphaseafldearth,usinga 1000Vtestsource.
o Meggerbetweentheyellowphaseandcarth,usinga 1000Vtestsource.
I Meggerbetweenthebluephaseand€arth,usinga 1000Vtestsource.

4.2 Test Case2: DC Busb¡rs Earth Fault Check


Priorto cxecutingthis t€stcasethe followingprecautions
shouldbe taken:
. all gateandcathodeterminalsliom theirrespective
On the SCRstackdisconnect firing
cardsandshorteachpairtogether.
. Ensurethatthe fusesremovedin testcaseI arestill removed,with theexceptionofthe
SCRstackflises.
. Ensuethatthe 3-phaseacmainsisolatoris open.
¡ Ensu¡ethattheSCRfusemicro-switches
a¡edisconnected.
Theresultsofthe followingtestsshouldbe recordedon QAP-22testsheets.
Thesetestsheets
shouldbe signedandretailledaspartofthe fo¡maltestrecord.
. Meggerbetweenthe +ve busbarandea¡th,usinga 500V test source.
. Meggerbetweenthe-ve busbarandea¡th,usinga 500Vtestsou¡ce.

4.3 TestCrse 3: C¡libration & Testingof the Earth F¡ult Card


Thistestcaseshouldonly be executed on thesuccessfulcompletionoftcst cases1 & 2.
. Ensurethat all the fusesremovedin test cases1 & 2 a¡ere-instated.
. Ensu¡ethatthe3-phaseacmainsisolatoris open.
. Switch the ea¡thfault selectorswitchto its acposition.
. Veriry that no voltageis p¡esenton the acbusbars,prior to continuing.
. Connecta 2A fuse in seriesbetweenthe red phaseandearth.
. Closethe mainsisolator andvedry that the red phaseearthfault indicationdoescor¡ectly
reflect the eafh fault being presenton the red phase.

trssuE1.01
AISTOM DRMS & CONTROLS Pase3 of 4
EARTH FAIJLT CARD CONFIGIJRATION& TEST
METHOD STATFMENI
. Adjust the ac earthfault potentiomete¡until the meterdisplaysa 100%reading.
Repeatthe abovestepsfor both the yellow andblue phases.
. Ensulethat the 3-phaseacmainsisolatoris open.
. Switch the €artht'aults€lectorswitchto its dc position.
. Verify that ¡o voltag€is p¡esenton the dc busba¡s,prior to continuing.
. Connecta 2A fusein s€riesbetweenthe +ve busbaxandearth.
. Ensurethat the motor a¡matwecontactorsa¡eopenandinhibited.
. Connecta high impodancoload ac¡ossth€ dc link.
. Closethemeinsisolator.
. Rampup the throttle to Approximately 300V
. Adjust the dc earthfault potentiometeruntil the mete¡displaysa 100%rcading.
. Rampthe throttle back down to 0V,
Repeatthe abovestepsfor the -Ve busbar.
Severaliterationsofthe abovecalibrationstepsmayberequired,asboththeac & da
calibrationstepsdetailedabove,havea degreeofinter-dependence.

4.4 Test C¡ce4: Te¡thg of the Earth Fsult Trip PLC Input
This testcascshouldonlyb€ executed on the successful
completionoftest case3.
. Ensurethatthe3-phaseacmainsisolatoris opon.
. Switchthe earthfault selectorswitchto its acposition.
. Veriry that no voltageis p¡esenton the ac busba$,p¡ior to continuing.
. Conn€cta 2A fuse in serieswith a decadebox betweenthe red phaseandearth.
r Closethe mainsisolator andveriry that the red phaseearthfault indicationdoesco¡rectly
reflect the fault being present.
. Adjust the decadebox until the meterdisplals a 30% reading.
. Adjust th€ trip level potentiometerso that it tlips at a 30% reading.
r Verifu that the PLC driven eaÍh fault indicationilluminatesat a 30% ¡eading.

lrssrjE1.01
ALSTOM DRIVES & CONIROLS P¿se4 of4
EARTH FAULT CARD CONFIGTJRATTON
& TEST
ME T'I{ODSTATIMENT

5. Confirmation of SuccessfulInstallatlon& Testing


The app¡opriatesignaturesshouldbe recordedbelow, on successñrlcompletionofthe
installationandtestingof the earthfault card,
Note: Provisionhasbeenmadefo¡ any commerits.

Name Simature Dat€

TestsConductedBy i

TestsWitn€ssedBy r

1.01
lrss{JE