Professional Documents
Culture Documents
Earthfconf&test
Earthfconf&test
lrssuEl.0l
ALSTOM DRIVES & CONTROLS Preface2 of3
EARTH FAIJLT CARD CONTIGURATION & TEST
METHODSTATEMLNf
ltssuEl.0l
ALSTOM DRIVES & CONTROLS Pref¡ce3 of3
EARTH FAIILT CARD CONTIGTIRATÍON& TEST
METHOD STATEMENT
lrssuEl.0l
ALSTOM DRIVES & CONTROLS PageI of4
EARTH FAIJLT CARD CONFIGURATTON& TEST
METHODSTATEMENT
l. Introduction
Thisdocumentspecifiesthecalibrationa¡d testrcquirements
for th€NorthCormo¡a[t
CuttingsRe-injectionSCRsFtem'searthfaultca¡dinst&llation.
2, TestStrategy
completiolofthe tests,all epFopriatesignatures
On thesucrcessful at
shouldbeaomplet€d
theendofthis document,
Thefollowinghardwarewill berequiredto executethc te8tsdetailedin this document:
.l kvMegger.
. 500VMegger.
¡ 2A fuse& fusewi¡e.
. Voltage/CurrentMeter.
. DecadeBox.
3. TestEnvironment
Thesetestsshouldbeperformedin-situon theNorthComoraritplatform,undsrthc
of Shellpersonnel.
supervisior/approval
ALSTOM DRIVES & CONTROLS Pago2 of4
EARTH FAULT CARD CONFTGURATION& TEST
METHODSTATEMENT
4. Tests
All ofthe followingchecks& testsshouldbe executed
duringcommissioning.
trssuE1.01
AISTOM DRMS & CONTROLS Pase3 of 4
EARTH FAIJLT CARD CONFIGIJRATION& TEST
METHOD STATFMENI
. Adjust the ac earthfault potentiomete¡until the meterdisplaysa 100%reading.
Repeatthe abovestepsfor both the yellow andblue phases.
. Ensulethat the 3-phaseacmainsisolatoris open.
. Switch the €artht'aults€lectorswitchto its dc position.
. Verify that ¡o voltag€is p¡esenton the dc busba¡s,prior to continuing.
. Connecta 2A fusein s€riesbetweenthe +ve busbaxandearth.
. Ensurethat the motor a¡matwecontactorsa¡eopenandinhibited.
. Connecta high impodancoload ac¡ossth€ dc link.
. Closethemeinsisolator.
. Rampup the throttle to Approximately 300V
. Adjust the dc earthfault potentiometeruntil the mete¡displaysa 100%rcading.
. Rampthe throttle back down to 0V,
Repeatthe abovestepsfor the -Ve busbar.
Severaliterationsofthe abovecalibrationstepsmayberequired,asboththeac & da
calibrationstepsdetailedabove,havea degreeofinter-dependence.
4.4 Test C¡ce4: Te¡thg of the Earth Fsult Trip PLC Input
This testcascshouldonlyb€ executed on the successful
completionoftest case3.
. Ensurethatthe3-phaseacmainsisolatoris opon.
. Switchthe earthfault selectorswitchto its acposition.
. Veriry that no voltageis p¡esenton the ac busba$,p¡ior to continuing.
. Conn€cta 2A fuse in serieswith a decadebox betweenthe red phaseandearth.
r Closethe mainsisolator andveriry that the red phaseearthfault indicationdoesco¡rectly
reflect the fault being present.
. Adjust the decadebox until the meterdisplals a 30% reading.
. Adjust th€ trip level potentiometerso that it tlips at a 30% reading.
r Verifu that the PLC driven eaÍh fault indicationilluminatesat a 30% ¡eading.
lrssrjE1.01
ALSTOM DRIVES & CONIROLS P¿se4 of4
EARTH FAULT CARD CONFIGTJRATTON
& TEST
ME T'I{ODSTATIMENT
TestsConductedBy i
TestsWitn€ssedBy r
1.01
lrss{JE