0.471
TUNNEL SPECIFICATION DETAILS TUNNEL QTY CALCULATION DETAILS 2.732
ROCK ANCHORS Consider the length of the D‐Shaped Tunnel (L) 110.00 m
Rock Anchors are 25mm dia with Anchor Plate (HYSD Bars)
The HYSD shall be chamfered at one end and other end shall be threaded with length
Final Quantities:
of 100mm. To ensure Rock Bolt head to be covered with 50mm sprayed concrete
3
Quantity of rock excavation (Qrock) ((0.471x17.76²x110)= 16,339.84 m
3
SPRAYED CONCRETE Quantity ofshotcrete (Qshortcrete) (((0.471x17.76²)‐(0.471x17.71²))x110)= 91.87 m
3
Sprayed Concrete of Grade M30 with Poly Fiber Quantity ofconcrete lining (QLining) (((0.471x17.71²)‐(0.471x17.61²))x110)= 182.97 m
For CLASS A, B and C Rock Bolt Noʹs ((110/2)/2x6)+((110/2)/2x7)+7= 293.00 noʹs
After the deformation in the tunnel and after installing the Primary Rock support
system and additional 50mm Thick layer of Concrete shall be sprayed as Final
Support/Lining.