THE ROYAL ATLANTIS RESORT AND RESIDENCES

MATERIAL SUBMITTAL SCHEDULE k 404 TOTAL MATERIAL SUBMITTALS


Project Name: THE ROYAL ATLANTIS RESORT AND RESIDENCES 36 ACTUAL SUBMITTED
Project No: G3 368 BALANCE SUBMITTALS
Client: The Royal Atlantis Palm Dubai 1 UR UNDER REVIEW BY DEC
Consultant: Dynamic Engg. Consultancy 0 A APPROVED
Main Contractor: SsangYong - BESIX JV 22 B APPROVED AS NOTED
Date: 20-Jun-24 5 C REVISE AND RESUBMIT
Contractor: HENNESSEY LLC 5 D REJECTED
3 UR UNDER REVIEW BY SBJV
Document Reference: TRA-HYL-PLA-GN-GEN-00002 Rev. 00

FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

Civil

Concrete - Rebar

DEC-complince statement &


DECAE-WTRAN- Prequalification
0 B C N/A 31-Mar-21 - 2 CEMEX TOP MIX UAE WF-133742 20-Feb-21 HLLC-WTRAN-000002 23-Feb-21 WF-133742 16-Mar-21 2-Mar-21
094696 -14
1 TRA-HYL-MAR-CV-GEN 00001 G3 Concrete Mix CV
No objection for proposed mix deign
DECAE-WTRAN- subject to trial mix test results.
1 A B N/A 31-Mar-21 - 1 CEMEX TOP MIX UAE WF-135272 6-Mar-21 HLLC-TRANSMIT-000006 7-Mar-21 WF-135272 22-Mar-21 16-Mar-21
095874 -6 grade of concrete to match IFC and
approved SDG only.
frequency
MTC of testing
and test report to
forbe as per
8mm DiaTRA
is
CONSTRUCTIVE TRADING DECAE-WTRAN- spec.
missing.
2 TRA-HYL-MAR-RF-GEN 00002 G3 Reinforcement Bar Grade 500B RF 0 A B N/A 31-Mar-21 - 1 LLC / M-JINDAL SHADEED
OMAN WF-133962 22-Feb-21 HLLC-WTRAN-000005 22-Feb-21 WF-133962 15-Mar-21 2-Mar-21
094703 -13 No objection to other prospered Dia.
sample to be taken form site delivery
andobjection
No to be tested as per frequency
for proposed material.
ADMIRAL HARDWARE LLC / UAE DECAE-WTRAN- stated intoproject
sample spec.
be taken and to be tested
3 TRA-HYL-MAR-CV-GEN 00004 G3 Binding Wire (1.6 mm Diameter Soft Black Annealed Steel
Wire) CV 0 B B N/A 31-Mar-21 - 1 M-ANJIA WIRE
WF-134176 23-Feb-21 HLLC-WTRAN-000008 23-Feb-21 WF-134176 16-Mar-21 2-Mar-21
094691 -14 upon TRA site delivery.

No objection for proposed spacer


DECAE-WTRAN- block, sample from site delivery to
4 TRA-HYL-MAR-CV-GEN 00003 G3 Reinforced Concrete Spacers Blocks CV 0 B B N/A 31-Mar-21 - 1 AL UROOJ / M-MAX FRANK UAE WF-134018 22-Feb-21 HLLC-WTRAN-000006 1-Mar-21 WF-134236 22-Mar-21 9-Mar-21 095208 -13 be taken and to be tested by 3rd
part. DCL certificate to be provided.
location to be supporting
SBJV- Provide as per SDG documents
only.
demonstrate that the proposed
0 D N/A DANUBE UAE WF-138118 1-Apr-21 SBJV-WTRAN-246351 7-Apr-21 WF-138118 28-Apr-21
kangaroo plywood does not contain
added urea formaldehyde resins.
SBJV- Refer to previous LEED
comment: Provide manufacturer
5 TRA-HYL-MAR-CV-GEN 00017 G3 Formworks CV 0 D N/A DANUBE UAE WF-139471 15-Apr-21 HLLC-WTRAN-000056 19-Apr-21 WF-139471 10-May-21
letter demonstrate that the
proposed kangaroo plywood does
not contain added urea
0 B UR N/A 1-Apr-21 - 1 DANUBE UAE WF-140349 26-Apr-21 HLLC-WTRAN-000065 29-Apr-21 WF-140349 20-May-21 -44336
DEC-Exact use to be clarified.
G3 CONCRETE REPAIR MATERIAL - WEBER 360 FFR DECAE-WTRAN- DCL scope of certificate to be
6 TRA-HYL-MAR-MS-GEN 00023
PREMIXED POLYMER MODIFIED CEMENTITIOUS COATING.
CV 0 B C N/A 20-Jun-21 - 1 SODAMCO UAE WF-138763 8-Apr-21 HLLC-WTRAN-000049 12-Apr-21 WF-138763 3-May-21 19-Apr-21
098676 -14 provided.

DEC-Exact use of the proposed


G3 G3 CONCRETE REPAIR MATERIAL - WEBER 331 TX NON DECAE-WTRAN- material to be mentioned.
7 TRA-HYL-MAR-MS-GEN 00024
SHRINK THIXOTROPIC MORTAR WITH FIBER
CV 0 B C N/A 20-Jun-21 - 1 SODAMCO UAE WF-138793 8-Apr-21 HLLC-WTRAN-000050 12-Apr-21 WF-138793 3-May-21 26-Apr-21
099187 -7 DCL scope of certificate to be
provided.
Earth, Aggregate, sand & cement

No objection for proposed material.


DECAE-WTRAN- certificate after application to be
8 TRA-HYL-MAR-AT-GEN 00007 G3 Soil treatment CV 0 B B N/A 28-Mar-21 - 1 EURO GULF UAE WF-135411 8-Mar-21 HLLC-WTRAN-000017 10-Mar-21 WF-135411 31-Mar-21 16-Mar-21
095868 -15 provided.

DEC-values of CBR on attached


DECAE-WTRAN- compliance to be clarified.
9 TRA-HYL-MAR-CV-GEN 00006 G3 Road Base EW 0 D N/A 28-Mar-21 - 1 ADROIT UAE WF-135378 7-Mar-21 HLLC-WTRAN-000014 10-Mar-21 WF-135378 31-Mar-21 16-Mar-21
095864 -15 the test reports provided are not
covering all criteria of road base.
gradation
Sample of of material
material to to
bebe reviewed,
taken for m
DECAE-WTRAN- some
site values and
delivery do not meet
to be the by
tested spec.
DCL
10 TRA-HYL-MAR-EW-GEN 00011 G3 Road Base EW 0 B B N/A 28-Mar-21 23-Apr-21 1 FIRDOUS OASIS UAE WF-137521 28-Mar-21 HLLC-WTRAN-000028 1-Apr-21 WF-137521 21-Apr-21 8-Apr-21
097934 -13 approved Lab. location where to use
to be as per approved SDG only
Sample of aggregate to be taken and
DECAE-WTRAN- to be tested by by approved 3rd
11 TRA-HYL-MAR-CV-GEN 00009 G3 Aggregates) 3/8" & 3/4" CV 0 B B N/A 28-Mar-21 - 1 ADROIT UAE WF-135638 9-Mar-21 HLLC-WTRAN-000020 11-Mar-21 WF-135638 24-Mar-21 4-Apr-21
096565 11 party lab as per TRA spec. frequency.

Sample of sand to be collected from


DECAE-WTRAN- site delivery and to be tested by
12 TRA-HYL-MAR-CV-GEN 00008 G3 Black Washed Sand CV 0 B B N/A 28-Mar-21 - 1 ADROIT UAE WF-135702 10-Mar-21 HLLC-WTRAN-000018 12-Mar-21 WF-135702 24-Mar-21 4-Apr-21
096584 11 approved 3rd party lab.

S-Rashidco Cement Approval is subject to approval of


company WLL DECAE-WTRAN- MIX design.
13 TRA-HYL-MAR-CV-GEN 00005 G3 Cement - OPC CV 0 B B N/A 28-Mar-21 1 M- Ras Al Khaimah Cement
UAE WF-134723 28-Feb-21 HLLC-WTRAN-000011 3-Mar-21 WF-134723 24-Mar-21 9-Mar-21
095236 -15 frequency of cement testing to be
Company/ followed as per TRA specification.
S-Rashidco Cement Approval is subject to approval of
company WLL DECAE-WTRAN- MIX design.
14 TRA-HYL-MAR-CV-GEN 00005 G3 Cement - SRC CV 0 B B N/A 28-Mar-21 1 M- Ras Al Khaimah Cement
UAE WF-134723 28-Feb-21 HLLC-WTRAN-000011 3-Mar-21 WF-134723 24-Mar-21 9-Mar-21
095236 -15 frequency of cement testing to be
Company/ followed as per TRA specification.

15 G3 White Washed Sand CV N/A 28-Mar-21 23-Apr-21 1 ADROIT 20-Jan-00

16 G3 Concrete Repair Material N/A 10-Apr-21 6-May-21 1

Page 1 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

Structural Steel

17 G3 SHS Structural steel Main Building SS 20-Apr-21 16-May-21 6 20-Jan-00

18 G3 SHS Structural steel DJ Booth SS 20-Apr-21 16-May-21 6 20-Jan-00

19 G3 Anchor Bolts & Concrete embedded Connections SS 31-Mar-21 26-Apr-21 1 20-Jan-00

20 G3 Fixing Accessories SS 20-Apr-21 16-May-21 1 20-Jan-00

21 G3 Acrylic paint & Fire rated paint 60 min SS 20-Apr-21 16-May-21 2 20-Jan-00

22 G3 Intumescent paint SS 20-Apr-21 16-May-21 2 20-Jan-00

23 G3 beading Plates SS 20-Apr-21 16-May-21 1 20-Jan-00

24 G3 Grout SS N/A 20-Apr-21 16-May-21 1 20-Jan-00

25 G3 Welding materials SS 20-Apr-21 16-May-21 1 20-Jan-00

Waterproofing

26 G3 Bituminous protection board, 4mm thick WP 29-Mar-21 24-Apr-21 2 20-Jan-00

G3 SBS modified non reinforced homogenous membrane,


27 4mm thick
WP 29-Mar-21 24-Apr-21 2 20-Jan-00

28 G3 Primer top of concrete surface WP 29-Mar-21 24-Apr-21 2 20-Jan-00

29 G3 Geotextile protective layer, 200 gsm CV 29-Mar-21 24-Apr-21 2 S-Soprema 20-Jan-00

waterproofing fit-out

30 G3 Membrane WP 2-Jul-21 28-Jul-21 2 20-Jan-00

S- Exeed Geotextile
31 G3 Primer WP 2-Jul-21 28-Jul-21 2
LLC
20-Jan-00

ROOF INSULATION SYSTEM

32 G3 Loose Gravel 25mm to 50mm CV 2-Jul-21 28-Jul-21 4 S- Al Futtaim Clas LLC 20-Jan-00

33 G3 Geotextile fabric CV 2-May-21 28-May-21 2 20-Jan-00

34 G3 Waterproof membrane WP 2-May-21 28-May-21 2 20-Jan-00

35 G3 Foam Concrete 50mm to 100mm CV 2-May-21 28-May-21 2 20-Jan-00

Architec

Finishes

Rough Finishes

COC to be provided with each


DECAE-WTRAN- material delivery.
36 TRA-HYL-MAR-MS-GEN 00015 G3 150mm concrete block PO 0 B B N/A 2-Jun-21 28-Jun-21 1 HENNESSEY UAE WF-137957 31-Mar-21 HLLC-WTRAN-000036 5-Apr-21 WF-137957 26-Apr-21 12-Apr-21
098152 -14 Block file file to be maintained.
usage to be as per approved SDG and
MST.to be provided with each
COC
DECAE-WTRAN- material delivery.
37 TRA-HYL-MAR-MS-GEN 00015 G3 100mm concrete block PO 0 B B N/A 2-Jun-21 28-Jun-21 1 HENNESSEY UAE WF-137957 31-Mar-21 HLLC-WTRAN-000036 5-Apr-21 WF-137957 26-Apr-21 12-Apr-21
098152 -14 Block file file to be maintained.
usage to be as per approved SDG and
MST.
SBJV-License will expire next month,
submit renewal. Submit test result
38 TRA-HYL-MAR-MS-GEN 00019 G3 BLOCK WORK MORTAR MIX DESIGN CV 0 D N/A 1-Apr-21 - 1 CEMEX TOP MIX UAE WF-138879 10-Apr-21 HLLC-WTRAN-000051 12-Apr-21 WF-138879
with exactly same design mix
(SC5A2X1-2-F12D), and/ or perform
sampling
DEC-Exactwith our QC inspector
accessories andto
will be used
SIGMA FACTORY STEEL DECAE-WTRAN- be highlighted in the submittal, as
39 TRA-HYL-MAR-CV-GEN 00016 G3-BLOCK ACCESSORIES CV 0 B C N/A 31-Mar-21 26-Apr-21 1 PRODUCTS
UAE WF-137784 29-Mar-21 HLLC-WTRAN-000035 2-Apr-21 WF-137784 26-Apr-21 12-Apr-21
098156 -14 the submittal includes different types
of material like HDG and SS as
example. accessories will be used to
DEC-Exact
G3 Plastering Accessories (Angle Beads, Plaster Stop Beads, SIGMA FACTORY STEEL DECAE-WTRAN- be highlighted in the submittal, as
40 TRA-HYL-MAR-CV-GEN 00016
Control Joint Bead)
RD 0 B C N/A 31-Mar-21 26-Apr-21 1 PRODUCTS
UAE WF-137784 29-Mar-21 HLLC-WTRAN-000035 2-Apr-21 WF-137784 26-Apr-21 12-Apr-21
098156 -14 the submittal includes different types
of material like HDG and SS as
example. for proposed concrete
DEC-PQD
DECAE-WTRAN- supplier is not submitted for
41 0 B B N/A 2-Jun-21 28-Jun-21 1 CEMEX TOP MIX UAE WF-133742 20-Feb-21 HLLC-WTRAN-000002 23-Feb-21 WF-133742 16-Mar-21 2-Mar-21
094696 -14 approval, PQD to be provided. also
TRA-HYL-MAR-CV-GEN 00001 G3 Screed Ready Mix C20 (OPC) CV
compliance statement against TRA
specification
No objection to forbe providedmix deign
proposed
DECAE-WTRAN- subject to trial mix test results.
42 1 A B N/A 2-Jun-21 28-Jun-21 1 CEMEX TOP MIX UAE WF-135272 6-Mar-21 HLLC-TRANSMIT-000006 7-Mar-21 WF-135272 22-Mar-21 16-Mar-21
095874 -6 grade of concrete to match IFC and
approved SDG only.
frequency of testing to be as per TRA
spec.
Page 2 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

Material has been approved in other


G3 Cementous rendering Plaster - PLAXIT 152 & PLAXIT PLAXIT DRYMIX COMPANY UAE DECAE-WTRAN- packages as attached. refer to
43 TRA-HYL-MAR-AR-GEN 00025
114
RD 0 B B N/A 2-Jun-21 28-Jun-21 1 LLC
WF-139069 11-Apr-21 HLLC-WTRAN-000053 14-Apr-21 WF-139069 5-May-21 15-Apr-21
098391 -20 comments on other packages and
comply accordingly.

44 G3 25mm concrete trowel RD N/A 2-Jun-21 28-Jun-21 1 20-Jan-00

S- Al Amara Srushers LLC/


45 G3 Plaster dry ready mix RD N/A 2-Jun-21 28-Jun-21 1 Al Firdous Oasis General 20-Jan-00
Transport Est.

46 G3 Skim coat (weberpremix skim coat) CV N/A 2-Jun-21 28-Jun-21 1 20-Jan-00

Partitions

Refer to previously approved


HLLC-WTRAN- DECAE-WTRAN- materials for other packages, the
47 TRA-HYL-MAR-PO-GEN 00027 G3 18mm MOISTURE RESISTANT WBP NAUF PLYWOOD AR 0 B B 20-Jun-21 1 AL DANUBE BLDG. MAT. UAE WF-139357 14-Apr-21 000054 19-Apr-21 WF-139357 10-May-21 26-Apr-21
099188 -14 same material has been previously
approved. TRA-III-MAR-WW-GEN-
00037,
No TRA-BWI-MAR-WW-GEN-
Objection subject to full
DECAE-WTRAN- compliance with project specification
48 TRA-HYL-MAR-CV-GEN 00012 G3 Air / Vapor Barrier AR 0 B B 20-Jun-21 - 1 SODAMCO UAE WF-137732 29-Mar-21 HLLC-WTRAN-000031 1-Apr-21 WF-137732 22-Apr-21 14-Apr-21
098314 -8 and requirement. strictly follow
manufacturer recommendation for
installation.to previously approved
DEC-Refer
DECAE-WTRAN- material via other packages i.e. CTS-
49 TRA-HYL-MAR-CV-GEN 00022 G3 50 mineral wool insulation (Rockwool) AR 0 B B 20-Jun-21 - 2 FUJAIRAH ROCK WOOL UAE WF-138571 6-Apr-21 HLLC-WTRAN-000044 8-Apr-21 WF-138571 29-Apr-21 15-Apr-21
098389 -14 MAR-00066 and comply accordingly.

50 G3 15mm gypsum wallboard DY 20-Jun-21 1 20-Jan-00

51 G3 15mm exterior plywood board DY 20-Jun-21 1 20-Jan-00

52 G3 15mm densglass sheathing DY 20-Jun-21 8 20-Jan-00

53 G3 13mm densglass sheeting DY 20-Jun-21 8 20-Jan-00

54 G3 70mm steel studs @60 cm c/c DY 20-Jun-21 1 20-Jan-00

55 G3 92mm steel studs DY 20-Jun-21 1 20-Jan-00

56 G3 50mm furring channel AR 20-Jun-21 1 20-Jan-00

57 G3 20mm furring channel AR 20-Jun-21 1 20-Jan-00

58 G3 sealant material AR N/A 20-Jun-21 1 20-Jan-00

59 G3 Firerated sealant AR 21-Jun-21 1 20-Jan-00

FAHU ROOM

60 G3 NON STRUCTURAL STEEL COLUMNS FOR FAHU ROOM 19-May-21 1

61 G3 STEEL LENTIL FOR FAHU ROOM 20-May-21 2

FINISHES FLOORING

WOODEN
The proposed hardware is the same as
specified. Installation to be as per
DIDON GENERAL HLLC-WTRAN- DECAE-WTRAN- manufacturer recommendation, Shop
62 TRA-HYL-MAR-WW 00100 G3 Hardware for all doors WW 0 B B 10-Jun-21 3
TRADING LLC UAE WF-139852 20-Apr-21
000058
26-Apr-21 WF-139852 17-May-21 29-Apr-21
099451 -18 drawing and door schedule to be submitted
for review and approval. Sample board to be
submitted.

63 G3 Wood decking, WD03, horizontally / to floor WW 10-Jun-21 10 20-Jan-00

64 G3 Wood decking, WD03 vertically / riser WW 10-Jun-21 10 20-Jan-00

65 G3 Wood flooring, WD04; pathway / wood slats WW 10-Jun-21 3 20-Jan-00

66 G3 Wood flooring, WD04; pathway risers WW 10-Jun-21 3 20-Jan-00

TILING/STONE

HLLC-WTRAN-
67 TRA-HYL-MAR-FI-GEN 00028 CT01 - CEILING TILE - KITCHEN FINISHES FI 00 UR 10-Jun-21 10 KNAUF LLC UAE (WF-141860) 16-May-21 000076 20-Jan-00

HLLC-WTRAN-
68 TRA-HYL-MAR-FI-GEN 00035 PT01 - PT02 FINISHES PAINT FI 00 UR 10-Jun-21 10 JOTUN UAE (WF-141999) 17-May-21 000078

HLLC-WTRAN-
69 TRA-HYL-MAR-FI-GEN 00035 PT01 - PT02 FINISHES PAINT FI 00 UR 10-Jun-21 10 JOTUN UAE (WF-141999) 17-May-21 000078

70 G3 Terrazzo stone, ref ST03 FI 10-Jun-21 10 20-Jan-00

Page 3 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

71 G3 Porcelain floor tiles, ref TL05 FI 10-Jun-21 10 20-Jan-00

72 G3 Porcelain floor tiles, ref TL06 FI 10-Jun-21 10 20-Jan-00

G3 Cenia grey limestone, 20mm thick, Landscape steps


73 flooring
FI 10-Jun-21 10 20-Jan-00

G3 Cenia grey limestone, 20mm thick, Landscape risers &


74 planters
FI 10-Jun-21 10 20-Jan-00

CONCRETE FINISH

75 G3 Polished concrete finish To floor FI 30-Jun-21 2 20-Jan-00

76 G3 Polished concrete finish To risers / concrete face FI 30-Jun-21 2 20-Jan-00

GENERAL

No objection to the proposed


HLLC-WTRAN- DECAE-WTRAN- material however sample to be
77 TRA-HYL-MAR-FI-GEN 00029 G3 - Tactile indicators, Approx. dimension 1720 x 300mm FI 0 A B 15-Jun-21 - 2 NITHI STEEL INDUSTRIES UAE WF-140999 3-May-21 000070 8-May WF-140999 29-May-21 24-May-21
100515 -5 submitted for final review and
approval.
Strictly follow
Material manufacturer
has been approved in other
DECAE-WTRAN- recommendation
package forcomments
refer to the installation-
78 TRA-HYL-MAR-CV-GEN 00013 G3 Webercol Premium - Tile Adhesive (Latex Modified) AR 0 B B N/A 15-Jun-21 - 1 SODAMCO UAE WF-138583 6-Apr-21 HLLC-WTRAN-000045 9-Apr-21 WF-138583 30-Apr-21 15-Apr-21
098402 -15 Country
providedofandorigin to beaccordingly
comply provided.
(CTS-MAR-00029) DCL certificate to
be submitted prior MDIR as
Application to be as per manufacture
DECAE-WTRAN- data sheet.
79 TRA-HYL-MAR-CV-GEN 00014 G3 Tile Grout Weber Joint Perfect AR 0 B B N/A 15-Jun-21 - 2 SODAMCO UAE WF-137737 29-Mar-21 HLLC-WTRAN-000033 1-Apr-21 WF-137737 22-Apr-21 15-Apr-21
098383 -7 color to be approved by Arch,
subject to mock up approval.

80 G3 - Tactile indicators Approx. area 2200 x 300mm FI 15-Jun-21 2 20-Jan-00

81 G3 - Tactile indicators, Approx. area 2510 x 300mm FI 15-Jun-21 2 20-Jan-00

82 G3 sealant material AR 15-Jun-21 1 20-Jan-00

83 MT-01 - Antique gold decorative strips at floor FOH AR 15-Jun-21 3 20-Jan-00

WALL FINISHES

WOODEN WALL FINISHES

84 G3 Timber cladding, ref. WD06 WW 15-Jun-21 3 20-Jan-00

85 G3 Cladding Fixing Accessories AR 15-Jun-21 3 20-Jan-00

TILE/STONE WALL FINISHES

G3 Natural stone, 20mm thick, Travertine light split finish,


86 ref. ST02; to washroom feature wall
SF 15-Jun-21 10 20-Jan-00

G3 Basaltina stone, 20mm thick, ref. ST04; to washroom


87 corridor wall
SF 15-Jun-21 10 20-Jan-00

88 G3 Mosaic porcelain wall tiles, ref TL01; to bar feature wall FI 15-Jun-21 10 20-Jan-00

Refer to latest ID specification dated


TILELINE December 17,2020 and comply accordingly.
G3 Mosaic porcelain wall tiles, ref TL02; to washroom HLLC-WTRAN- DECAE-WTRAN-
89 TRA-HYL-MAR-FI-GEN 00020
hallways
FI 0 B C N/A 15-Jun-21 - 10 INTERNATIONAL UAE WF-139849 20-Apr-21
000057
26-Apr-21 WF-139849 17-May-21 29-Apr-21
099449 -18 Contractor to ensure material submittal is
SERVICES LLC. based on the latest IFC.

90 G3 Porcelain wall tiles, ref TL04; to signage wall FI 15-Jun-21 10 20-Jan-00

91 G3 Porcelain wall tiles, ref TL05; to ADA washrooms FI 15-Jun-21 10 20-Jan-00

92 G3 Wood tiles, ref TL07; to washrooms FI 15-Jun-21 10 20-Jan-00

93 G3 Porcelain floor tiles, ref TL06; to kitchen & janitor room FI 15-Jun-21 10 20-Jan-00

94 G3 Floor tile cove base, ref TL08; to kitchen FI 15-Jun-21 10 20-Jan-00

CONCRETE WALL FINISHES

95 G3 Rendered concrete finish, to washrooms FI 15-Jun-21 2 20-Jan-00

96 G3 Rendered concrete finish, to exterior walls FI 15-Jun-21 2 20-Jan-00

97 G3 Rendered concrete finish to washroom corridor FI 15-Jun-21 2 20-Jan-00

Page 4 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

98 G3 sealant material AR N/A 15-Jun-21 1 20-Jan-00

CEILING FINISHES

WOODEN CEILING FINISHES

G3 Timber ceiling soffit & sides, ref. WD06; including


99 supports to bar area
2-Jun-21

G3 Timber fins to ceiling, ref. WD06; including supports to


100 corridor & washrooms
2-Jun-21

GYPSUM CEILING FINISHES

G3 Ceiling tile, ref. CT-01 (tagged as AC01 in RCF); to


101 Kitchen area
2-Jun-21

102 G3 Ceiling supports and accessories 2-Jun-21

G3 Ceiling tile, ref. CT-01 (tagged as AC01 in RCF); to BOH


103 area
CI 2-Jun-21 3 20-Jan-00

104 G3 Assumed polished concrete finish to exposed concrete FI 2-Jun-21 2 20-Jan-00

Material has been previously approved in


G3 Moisture resistant gypsum board ceiling, painted HLLC-WTRAN- DECAE-WTRAN- other packages, refer to comments on other
105 TRA-HYL-MAR-CV-GEN 00026
(measured separately)
CI 0 B B N/A 2-Jun-21 2 GYPROC UAE WF-139383 14-Apr-21
000055
18-Apr-21 WF-139383 9-May-21 26-Apr 099189
packages and comply accordingly along with
the structural verification to be provided.

106 G3 Timber ceiling soffit & sides, ref. WD06; to bar area WW 2-Jun-21 5 20-Jan-00

G3 Timber fins to ceiling, ref. WD06; to corridor to


107 washrooms
WW 2-Jun-21 3 20-Jan-00

PAINTING FINISHES

108 G3 CEILING White paint , ref. PT-01 PW 20-Jul-21 2 20-Jan-00

G3 Latex paint; soft pink in satin finish to walls; type IC-PT-


109 01
PW 20-Jul-21 2 20-Jan-00

G3 Latex paint; egg shell in satin finish to gypsum ceilings;


110 type IC-PT-02
PW 20-Jul-21 2 20-Jan-00

G3 Latex paint; egg shell in satin finish to bulkheads; type


111 IC-PT-02
PW 20-Jul-21 2 20-Jan-00

G3 Latex paint; egg shell in satin finish to light coves; type


112 IC-PT-02
PW 20-Jul-21 2 20-Jan-00

113 G3 Primer (Jotun) PW N/A 20-May-21 1 20-Jan-00

114 G3 PVA Primer (Jotun) PW N/A 20-May-21 1 20-Jan-00

115 G3 Stucco (Jotun) PW N/A 20-May-21 1 20-Jan-00

116 G3 Block Filler (Jotun) PW N/A 20-May-21 1 20-Jan-00

ROOF DECORATION

117 G3 Bamboo for ceiling & Bracing WW 16-Aug-21 6 20-Jan-00

118 G3 32 x 32mm SS angles to fix the bamboo AR 16-Aug-21 3 20-Jan-00

119 G3 Metal Canopy Fabric FI 16-Aug-21 3 20-Jan-00

120 G3 Metal canopy fixtures & accessories FI 16-Aug-21 3 20-Jan-00

121 G3 Bamboo fixtures & accessories AR 16-Aug-21 3 20-Jan-00

LANDSCAPING

122 G3 Green landscaping to roof LA 16-Sep-21 3 20-Jan-00

Wood Works

123 G3 DJ Booth Wooden Material JR 1-Aug-21 4 20-Jan-00

Page 5 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

G3 Bar counter, U-shaped, approx. length 15000 x


124 1150mm;
JR 1-Aug-21 3 20-Jan-00

125 G3 Back bar counter, L-shaped, approx. 7300 x 2850mm; JR 1-Aug-21 3 20-Jan-00

No objection for the material to


HLLC-WTRAN- DECAE-WTRAN- follow manufacturer
126 TRA-HYL-MAR-WW-GEN 00101 G3 Electric closet, L-shaped, approx. 2835 x 300 x 2700mm; JR 0 A B 1-Aug-21 3 GEAP TRADERS LLC UAE WF-140678 29-Apr-21
000067
6 MAY 21 WF-140678 #VALUE! 24-May-21
100507 -3 recommendation for installation.
Item code in compliance statement
should berefers
SBJV-MSDS 115.61.604 as specified.glue
to urea formaldehyde
which is not
only the in compliance
length with LEED v3,
will differ.
HLLC-WTRAN- please provide supporting document
0 D 1-Aug-21 3 WF-140895 2-May-21 000069 4-May-21 WF-140895 25-May-21 demonstrate that the proposed product and
its laminating adhesive/glue do not contain
added urea formaldehyde resins
SBJV-MSDS refers to urea formaldehyde glue
which is not in compliance with LEED v3,
HLLC-WTRAN- please provide supporting document
127 TRA-HYL-MAR-WW-GEN 00102 G3 Server station, approx. size 1170 x 600 x 1150mm JR 0 D 1-Aug-21 3 HANDS ME LLC UAE WF-141586 10-May-21 000074 5-Dec-21 (WF-141586) 26-Dec-21 demonstrate that the proposed product and
its laminating adhesive/glue do not contain
added urea formaldehyde resins - 1.Sample
submission required, cover page should list

HLLC-WTRAN-
0 UR 1-Aug-21 3 (WF-142850) 25-May-21 000099

128 G3 Banquette seating, approx. length 6440mm JR 1-Aug-21 3 20-Jan-00

129 G3 Banquette seating, approx. length 6750mm JR 1-Aug-21 3 20-Jan-00

130 G3 Vanity counter, 1900 x 600mm, with 2 apertures JR 1-Aug-21 3 20-Jan-00

131 G3 Planter 1; size: 600 x 600 x 600mm JR 1-Aug-21 3 20-Jan-00

G3 Planter 2; size: 1480 x 350 x 600mm ; Dwg. Ref. 90-


132 IB80-00-14,
JR 1-Aug-21 3 20-Jan-00

133 G3 Planter 3; size: 2450 x 350 x 600mm JR 1-Aug-21 3 20-Jan-00

134 G3 Wine Display, approx. 777mm x 600mm x 500mm JR 1-Aug-21 3 20-Jan-00

135 G3 Wine Display Shelf, approx. 2715mm x 600mm x 50mm JR 1-Aug-21 3 20-Jan-00

136 G3 Wine Display Shelf, approx. 2715mm x 300mm x 50mm JR 1-Aug-21 3 20-Jan-00

137 G3 Timber handrail WW 1-Aug-21 3 20-Jan-00

138 G3 Timber fins / trellis WW 1-Aug-21 3 20-Jan-00

Metal Works

139 G3 Glass railing, 1066mm high MW 1-Jul-21 3 20-Jan-00

140 G3 Metal railing, 900mm high MW 1-Jul-21 3 20-Jan-00

141 G3 Floor-mounted metal handrail, 900mm high MW 1-Jul-21 3 20-Jan-00

142 G3 Anodized Aluminum Coping MW 1-Jul-21 3 20-Jan-00

G3 Metal screen - 1430 x 3000mm; 3mm including


143 supports & accessories
MW 1-Jul-21 2 20-Jan-00

144 G3 Metal Screen supports & accessories MW 1-Jul-21 2 20-Jan-00

G3 Metal hanger, 170 x 1285mm x 760; 4mm including


145 supports & accessories
MW 1-Jul-21 2 20-Jan-00

146 G3 50 x 50mm hollow metal to support Metal hanger MW 1-Jul-21 2 20-Jan-00

147 G3 Manhole cover MX 1-Jul-21 2 20-Jan-00

DOORS

148 G3 Ironmonogry DS 13-Jun-21 16 20-Jan-00

EXTERNAL WOODEN DOOR

149 G3 D1 - EXT. Wooden Single leaf, 915 x 2400 x 45mm DS 2-Aug-21 3 20-Jan-00

Page 6 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

150 G3 D2 - EXT. Wooden Single leaf, 915 x 2400 x 45mm DS 2-Aug-21 3 20-Jan-00

INTERNAL WOODEN DOOR

151 G3 D3 - INT. Wooden Single leaf, 715 x 2400 x 45mm DS 2-Aug-21 3 20-Jan-00

EXTERNAL METAL DOOR

152 G3 M3 - EXT. METAL Single leaf, sliding, 965 x 2400 x 45mm DS 2-Aug-21 3 20-Jan-00

153 G3 M1 - EXT. METAL Single leaf, 915 x 2400 x 45mm DS 2-Aug-21 3 20-Jan-00

154 G3 M2 - EXT. METAL Single leaf, 915 x 2400 x 45mm DS 2-Aug-21 3 20-Jan-00

INTERNAL METAL DOOR

155 G3 MD1 - INT. Single leaf, 615 x 2200 x 45mm, DS 2-Aug-21 3 20-Jan-00

BASICS

156 G3 Fire rated Foam FP N/A 19-May-21 1 20-Jan-00

157 G3 Silicone MX N/A 19-May-21 1 20-Jan-00

158 G3 Paintable Silicone MX N/A 19-May-21 1 20-Jan-00

159 G3 concrete repair material CV N/A 19-May-21 1 20-Jan-00

sanitary wares, fixtures & accessories

160 G3 Mirror MX 2-Aug-21 2 20-Jan-00

161 G3 Toilet roll holder MX 2-Aug-21 8 20-Jan-00

162 G3 Spare roll holder MX 2-Aug-21 8 20-Jan-00

163 G3 Single hook MX 2-Aug-21 8 20-Jan-00

164 G3 Urinal partitions MX 2-Aug-21 8 20-Jan-00

165 G3 Grab bar; TA03 MX 2-Aug-21 8 20-Jan-00

166 G3 Grab bar; TA04 MX 2-Aug-21 8 20-Jan-00

167 G3 Soap dispenser; TA05 MX 2-Aug-21 8 20-Jan-00

168 G3 Recessed sanitary napkin disposal; TA06 MX 2-Aug-21 8 20-Jan-00

169 G3 Grab bar; TA08 MX 2-Aug-21 8 20-Jan-00

170 G3 Grab bar; TA02 MX 2-Aug-21 8 20-Jan-00

171 G3 Washroom basin - PF01 MX 2-Aug-21 8 20-Jan-00

172 G3 Water closet - PF02 MX 2-Aug-21 8 20-Jan-00

173 G3 Wall mounted basin spout - PF03 MX 2-Aug-21 8 20-Jan-00

174 G3 Water closet (disabled) - PF04 MX 2-Aug-21 8 20-Jan-00

175 G3 Bottle trap - PF05 MX 2-Aug-21 8 20-Jan-00

176 G3 Urinal - PF06 MX 2-Aug-21 8 20-Jan-00

177 G3 Washroom basin - PF09 MX 2-Aug-21 8 20-Jan-00

Page 7 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

178 G3 Exterior lenear drain MX 2-Aug-21 8 20-Jan-00

179 G3 Shattaf MX 2-Aug-21 8 20-Jan-00

180 G3 Floor drain MX 2-Aug-21 3 20-Jan-00

Kitchen Equipment

181 G3 G3 Fly Killer - Uplighter - Glueboard KL 2-Aug-21 10 20-Jan-00

182 G3 Beer Keg Refrigerated Counter - 2 doors KL 2-Aug-21 10 20-Jan-00

183 G3 Cabinet on Plinth - Wall Type 2mm top KL 2-Aug-21 10 20-Jan-00

SlimJim Bottle Bin with handles, Lid and Trolley with built in
184 pivoting cover
KL 2-Aug-21 10 20-Jan-00

G3 Cocktail Unit Ice well adjacent to chopping area with


185 waste chute and pull out bin, next to sink with blender KL 2-Aug-21 10 20-Jan-00
station .

G3 Commercial Blender with Sound Enclosure - 2.1 Ltr/Jar


186 Recess to counter
KL 2-Aug-21 10 20-Jan-00

G3 Ice Box for Store & Pour with Speed Rail & 1/9x3 GN
187 pan*
KL 2-Aug-21 10 20-Jan-00

188 G3 Automatic Multifruit Juicer KL 2-Aug-21 10 20-Jan-00

G3 Cabinet on Plinth - Wall Type with inset wash hand


189 basin (pull out bin beneath) 2mm top
KL 2-Aug-21 10 20-Jan-00

190 G3 Electronic Faucet with syphon/drain KL 2-Aug-21 10 20-Jan-00

G3 Bottle Display Unit 2 door - Under counter restricted


191 height
KL 2-Aug-21 10 20-Jan-00

G3 Self Contained Hinged Refuse Bin for incorporation into


192 top counter
KL 2-Aug-21 10 20-Jan-00

193 G3 141 Ltr Under counter Fridge KL 2-Aug-21 10 20-Jan-00

194 G3 Cabinet on Plinth - Wall Type 2mm top KL 2-Aug-21 10 20-Jan-00

195 G3 Inset Sink for Handwash KL 2-Aug-21 10 20-Jan-00

196 G3 Electronic Faucet with syphon/drain KL 2-Aug-21 10 20-Jan-00

197 G3 Under Counter Pull Out Waste Bin KL 2-Aug-21 10 20-Jan-00

198 G3 Ice Cuber 44 kg/day -Air Cooled KL 2-Aug-21 10 20-Jan-00

G3 Filter System For Under Counter Ice Production


199 Machines
KL 2-Aug-21 10 20-Jan-00

200 G3 Cabinet on Plinth - Wall Type 2mm top KL 2-Aug-21 10 20-Jan-00

G3 Handwash Sink (wall mounted) knee operated (with


201 Soap Dispenser and Towel Dispenser By OTHERS) with KL 2-Aug-21 10 20-Jan-00
outlet for water hose for floor cleaning

202 G3 Fly Killer - Ss Cover- Glueboard - To Suit Site KL 2-Aug-21 10 20-Jan-00

203 G3 Mobile Waste Bin Slim Jim Step-On KL 2-Aug-21 10 20-Jan-00

G3 Cabinet on Plinth - Wall Type with single bowl sink 2mm


204 top
KL 2-Aug-21 10 20-Jan-00

205 G3 Faucet and other Attachments - Sink Unit KL 2-Aug-21 10 20-Jan-00

206 G3 141 Ltr Under counter Fridge KL 2-Aug-21 10 20-Jan-00

207 G3 Semi-Automatic Espresso Machine-2 Groups KL 2-Aug-21 10 20-Jan-00

Page 8 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

208 G3 Filter system for espresso machines KL 2-Aug-21 10 20-Jan-00

209 G3 Single Wall Shelf KL 2-Aug-21 10 20-Jan-00

210 G3 Upright Ice Cuber- Air Cooled KL 2-Aug-21 10 20-Jan-00

211 G3 Filter System For Ice Production Machines KL 2-Aug-21 10 20-Jan-00

212 G3 Upright Slimline Refrigerator 312L Single Door KL 2-Aug-21 10 20-Jan-00

213 G3 Bottle Display Unit 1 door - Upright 210 bottle capacity KL 2-Aug-21 10 20-Jan-00

214 G3 Anodized Aluminum Slatted 4 Tier Rack KL 2-Aug-21 10 20-Jan-00

215 G3 Grease Skimmer (2700 ltr water per hour) KL 2-Aug-21 10 20-Jan-00

216 G3 Mobile Table KL 2-Aug-21 10 20-Jan-00

G3 Plasma ionisation Smell Reduction Unit - 100 sq mtr


217 Coverage
KL 2-Aug-21 10 20-Jan-00

G3 Cabinet on Plinth - Wall Type with single bowl sink 2mm


218 top - with Chute
KL 2-Aug-21 10 20-Jan-00

219 G3 Faucet and other Attachments - Sink Unit KL 2-Aug-21 10 20-Jan-00

220 G3 Mobile Waste Bin - Brute KL 2-Aug-21 10 20-Jan-00

221 G3 Undercounter Glass and Dishwasher - 30 basket/hr KL 2-Aug-21 10 20-Jan-00

G3 Filter System For Scale Prevention & Corrosion Control


222 for Dishwasher /Glass washer
KL 2-Aug-21 10 20-Jan-00

223 G3 Overhead Wash Rack Holder KL 2-Aug-21 10 20-Jan-00

224 G3 Sink for janitors room, type PF12 & PF-11 KL 2-Aug-21 10 20-Jan-00

MEP

PLUMBING

DOMISTEC COLD WATER

G3 Cold Water Pipes Pre-formed fiber glassthermal


225 insulations.
PL 10-Apr-21 6-May-21 1 20-Jan-00

226 G3 PPR PIPES 20mm diameter including fittings PL 10-Apr-21 6-May-21 1 20-Jan-00

227 G3 PPR PIPES 25mm diameter including fittings PL 10-Apr-21 6-May-21 1 20-Jan-00

228 G3 PPR PIPES 32mm diameter including fittings PL 10-Apr-21 6-May-21 1 20-Jan-00

229 G3 PPR PIPES 40mm diameter including fittings PL 10-Apr-21 6-May-21 1 20-Jan-00

230 G3 PPR PIPES 50mm diameter including fittings PL 10-Apr-21 6-May-21 1 20-Jan-00

231 G3 Gate valves 40mm diameter PL 10-Apr-21 6-May-21 1 20-Jan-00

232 G3 Pressure reducing valve 50mm diameter PL 10-Apr-21 6-May-21 1 20-Jan-00

DOMISTEC HOT WATER

G3 Cold Water Pipes Pre-formed fiber glassthermal


233 insulations.
PL 10-Apr-21 6-May-21 1 20-Jan-00

G3 PPR FIBRE reinforced PIPES 20mm diameter including


234 fittings
PL 10-Apr-21 6-May-21 1 20-Jan-00

G3 PPR Fibre reinforced PIPES 25mm diameter including


235 fittings
PL 10-Apr-21 6-May-21 1 20-Jan-00

Page 9 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

G3 PPR Fibre reinforced PIPES 32mm diameter including


236 fittings
PL 10-Apr-21 6-May-21 1 20-Jan-00

G3 PPR Fibre reinforced PIPES 40mm diameter including


237 fittings
PL 10-Apr-21 6-May-21 1 20-Jan-00

238 G3 Mixing valves15mm diameter PL 10-Apr-21 6-May-21 1 20-Jan-00

239 G3 Electric water heater PL 10-Jun-21 6-Jul-21 2 20-Jan-00

240 G3 Electric water heater accessories and connections PL 10-Jun-21 6-Jul-21 1 20-Jan-00

241 G3 Circulating pumps PL 10-Jun-21 6-Jul-21 4 20-Jan-00

242 G3 Electric water heater accessories & connections PL 10-Jun-21 6-Jul-21 1 20-Jan-00

243 G3 Circulating pumps accessories & connections PL 10-Jun-21 6-Jul-21 1 20-Jan-00

Sanitary Waste and Vent Piping System

244 G3 UPVC 50mm diameter PL 10-Apr-21 6-May-21 1 20-Jan-00

245 G3 UPVC 80mm diameter PL 10-Apr-21 6-May-21 1 20-Jan-00

246 G3 UPVC 100mm diameter PL 10-Apr-21 6-May-21 1 20-Jan-00

247 G3 UPVC Connections, fittings & accessories PL 10-Apr-21 6-May-21 1 20-Jan-00

248 G3 Gate valves 100mm diameter PL 10-Apr-21 6-May-21 1 20-Jan-00

249 G3 Check valves 100mm diameter PL 10-Apr-21 6-May-21 1 20-Jan-00

250 G3 Cleanouts 100mm diameter PL 10-Apr-21 6-May-21 1 20-Jan-00

251 G3 Floor drains 50mm diameter PL 10-Apr-21 6-May-21 1 20-Jan-00

252 G3 Floor drains80mm diameter PL 10-Apr-21 6-May-21 1 20-Jan-00

G3 Soak away Connections, fittings & accessories 1m x 1mx


253 0.5m
PL 10-Apr-21 6-May-21 1 20-Jan-00

254 G3 Soak away 1m x 1mx 0.5m concrete cover dim= xxxx PL N/A 10-Apr-21 6-May-21 1 20-Jan-00

255 G3 Channel drains 300mm wide x 2000mm length PL 10-Apr-21 6-May-21 1 20-Jan-00

256 G3 Roof drains100mm diameter PL 20-Jun-21 16-Jul-21 1 20-Jan-00

G3 Chamber 1300 x 1300mm; depth 0 to 1.5m Concrete


257 Cover dim=xxxx
PL N/A 20-Jun-21 16-Jul-21 2 20-Jan-00

G3 Chamber 450 x 450mm; depth 0 to 1.5m Concrete


258 Cover dim=xxxx
PL N/A 20-Jun-21 16-Jul-21 2 20-Jan-00

259 G3 Chambers connections, Fittings & accessories PL 20-Jun-21 16-Jul-21 2 20-Jan-00

260 G3 motor control panel PL 20-Jun-21 16-Jul-21 4 20-Jan-00

261 G3 alarm bell PL 20-Jun-21 16-Jul-21 2 20-Jan-00

PLUMBING FIXTURES

262 G3 Water closet; SW-08 PL 20-Jun-21 16-Jul-21 2 20-Jan-00

263 G3 Water closet for Disabled; SW-12 PL 20-Jun-21 16-Jul-21 2 20-Jan-00

264 G3 Urinal PL 20-Jun-21 16-Jul-21 2 20-Jan-00

265 G3 Sink PL 20-Jun-21 16-Jul-21 2 20-Jan-00

Page 10 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

266 G3 Disabled - Standalone wash hand basin - SW-13 PL 20-Jun-21 16-Jul-21 2 20-Jan-00

267 G3 Disabled - Faucets for lavatories for disable; SW-13 PL 20-Jun-21 16-Jul-21 2 20-Jan-00

268 Wall Mounted Basin Spout, type PF03 PL 20-Jun-21 16-Jul-21 2 20-Jan-00

G3 Connections, Fittings & Accessories for plumbing


269 fixtures
PL 20-Jun-21 16-Jul-21 2 20-Jan-00

270 G3 Flush valves for water closets; SW-09 PL 20-Jun-21 16-Jul-21 2 20-Jan-00

271 G3 Flush valves for urinals; SW-10 PL 20-Jun-21 16-Jul-21 2 20-Jan-00

272 G3 Connections, Fittings & Accessories for Tabs PL 20-Jun-21 16-Jul-21 2 20-Jan-00

FIRE SUPPRESSION

G3 Galvanized steel - ERW pipes - for sprinkler system / fire


273 house cabinet requirements
FF 15-Apr-21 11-May-21 3 20-Jan-00

274 G3 ERW pipes Fittings & Accessories FF 15-Apr-21 11-May-21 3 20-Jan-00

FIRE SUPPRESSION - EQUIPMENTS

275 FE, Trolley type 25KG Dry Chemical Powder FF 29-Aug-21 24-Sep-21 2 20-Jan-00

276 Portable FE, 6KG Dry Chemical Fire Extinguisher FF 29-Aug-21 24-Sep-21 2 20-Jan-00

277 Portable FE, 5KG CO2 Fire Extinguisher FF 29-Aug-21 24-Sep-21 2 20-Jan-00

278 fire blanket FF 29-Aug-21 24-Sep-21 2 20-Jan-00

279 Motor control panel FF 29-May-21 24-Jun-21 4 20-Jan-00

280 alarm bell FF 29-Aug-21 24-Sep-21 1 20-Jan-00

Fittings & accessories for existing services connection


281 including motor control panel and alarm bell
FF 29-Aug-21 24-Sep-21 1 20-Jan-00

HVAC - Main units & Ducting

282 FCU ME N/A 14-Apr-21 10-May-21 8 20-Jan-00

283 Fittings & accessories for FCU ME 14-Apr-21 10-May-21 2 20-Jan-00

284 Ventilation fan ref. TEF ME 14-Apr-21 10-May-21 3 20-Jan-00

285 Ventilation fan ref. KEF ME 14-Apr-21 10-May-21 3 20-Jan-00

286 Fittings & accessories for Ventilation fans ME 14-Apr-21 10-May-21 2 20-Jan-00

Galvanized steel sheet rectangular ducts - 24 gauge;


287 longest dimensions not exceeding 300mm
ME 14-Apr-21 10-May-21 2 20-Jan-00

Galvanized steel sheet rectangular ducts - 22 gauge;


288 longest dimensions 301-750mm
ME 14-Apr-21 10-May-21 2 20-Jan-00

Galvanized steel sheet rectangular ducts - 20 gauge;


289 longest dimensions 751-1300mm
ME 14-Apr-21 10-May-21 2 20-Jan-00

290 Fittings & accessories for Galvanized steel sheet ducts ME 14-Apr-21 10-May-21 2 20-Jan-00

HVAC - Fixtures

291 Volume dampers 150 x 150mm ME 14-Apr-21 3 20-Jan-00

292 Fire/smoke dampers ME 14-Apr-21 3 20-Jan-00

293 Louvers 200 x 200mm ME 14-Apr-21 3 20-Jan-00

Page 11 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

294 Louvers 700 x 300mm ME 14-Apr-21 3 20-Jan-00

295 Louvers - Linear diffusers ME 14-Apr-21 3 20-Jan-00

296 Louvers - Door undercut ME 14-Apr-21 3 20-Jan-00

HVAC - Chilled Water Systems

297 Black steel pipes 20mm diameter CW 14-Apr-21 3 20-Jan-00

298 Black steel pipes 40mm diameter CW 14-Apr-21 3 20-Jan-00

299 Fittings 40mm diameter CW 14-Apr-21 3 20-Jan-00

300 Fixing Supports & accessories for Steel pipes CW 14-Apr-21 3 20-Jan-00

301 HVAC Piping Insulation to 20mm diameter pipes CW 14-Apr-21 3 20-Jan-00

302 HVAC Piping Insulation to 40mm diameter pipes CW 14-Apr-21 3 20-Jan-00

303 Isolation Valve 20mm diameter CW 14-Apr-21 3 20-Jan-00

304 Isolation Valve 40mm diameter CW 14-Apr-21 3 20-Jan-00

305 Isolation Valve Thermostatic CW 14-Apr-21 3 20-Jan-00

306 Fittings & Accessories for connection to existing services CW 20-Aug-21 3 20-Jan-00

307 BMS Equipment & related fixtures & accessories BM 14-Aug-21 6 20-Jan-00

FIRE DETECTION & ALARM - Equipment & related Accessories

308 Smoke detector (optical) (addressable) FA 14-Apr-21 3 20-Jan-00

309 Ceiling mounted speaker with strobe (candela rating 75cd) FA 14-Apr-21 3 20-Jan-00

310 Wall mounted speaker with strobe (candela rating 75cd) FA 14-Apr-21 3 20-Jan-00

311 Heat detector FA 14-Apr-21 3 20-Jan-00

312 Manual call point FA 14-Apr-21 3 20-Jan-00

313 Fire alarm interface FA 19-Apr-21 6 20-Jan-00

314 Fire alarm control panel (FACP) FA 19-Apr-21 3 20-Jan-00

FIRE DETECTION & ALARM - Wiring, Conduits, boxes supports, and etc..

Fixing & Connection requirement for Smoke detector


315 (optical) (addressable)
FA 14-Apr-21 3 20-Jan-00

Fixing & Connection requirement for Ceiling mounted


316 speaker with strobe (candela rating 75cd)
FA 14-Apr-21 3 20-Jan-00

Fixing & Connection requirement for Wall mounted


317 speaker with strobe (candela rating 75cd)
FA 14-Apr-21 3 20-Jan-00

318 Fixing & Connection requirement for Heat detector FA 14-Apr-21 3 20-Jan-00

319 Fixing & Connection requirement for Manual call point FA 14-Apr-21 3 20-Jan-00

320 Fixing & Connection requirement for Fire alarm interface FA 19-Apr-21 3 20-Jan-00

Fixing , Accessories & Requirement for connection to


321 existing services
FA 19-Apr-21 3 20-Jan-00

ELICTRICAL - Wiring, Conduits, boxes supports, and etc..

Page 12 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

Wiring & Conduits for 4C 70mm2 XLPE/LSF/SWA/LSF Cu +


322 1C 35mm2 LSF Cu G/Y
EL 20-Apr-21 2 20-Jan-00

Wiring & Conduits for 4C 120mm2 XLPE/LSF/SWA/LSF Cu +


321 1C 70mm2 LSF Cu G/Y
EL 20-Apr-21 2 20-Jan-00

322 socket outlet points EL 20-Apr-21 2 20-Jan-00

323 Double pole switch points EL 20-Apr-21 2 20-Jan-00

324 20A; isolator EL 20-Apr-21 2 20-Jan-00

325 Floor box EL 20-Apr-21 2 20-Jan-00

DBs Related Panel, Materials, Equipment, Supports &


326 accessories
EL 20-Apr-21 2 20-Jan-00

327 lighting control panel, LCP-LVFP03-BB01 EL 20-Apr-21 4 20-Jan-00

328 lighting points EL 20-Apr-21 2 20-Jan-00

329 Emergency Lighting Point EL 20-Apr-21 3 20-Jan-00

330 DBs EL 29-Jul-21 4 20-Jan-00

ELICTRICAL - Equipment & Accessories

331 13A single switched socket outlet EL 19-May-21 3 20-Jan-00

332 13A single switched socket outlet weather proof EL 19-May-21 3 20-Jan-00

333 13A un-switched fused connection unit EL 19-May-21 3 20-Jan-00

334 13A switched fused connection unit with flex outlet EL 19-May-21 3 20-Jan-00

335 double pole key switch EL 19-May-21 3 20-Jan-00

336 floor box EL 19-May-21 3 20-Jan-00

337 ISOLATOR 20A, 1P EL 19-May-21 3 20-Jan-00

338 ISOLATOR 20A, 3P EL 19-May-21 3 20-Jan-00

339 lighting control panel, LCP-LVFP03-BB01 EL 19-May-21 4 20-Jan-00

340 DBs Panel, Equipment, Materials, Supports & accessories EL 19-Aug-21 3 20-Jan-00

LIGHTINGS

341 Type; BB-B1 EL 14-May-21 8 20-Jan-00

342 Type; BB-D1 EL 14-May-21 8 20-Jan-00

343 Type; BB-D2 EL 14-May-21 8 20-Jan-00

344 Type; BB-D3 EL 14-May-21 8 20-Jan-00

345 Type; BB-D4 EL 14-May-21 8 20-Jan-00

346 Type; BB-D5 EL 14-May-21 8 20-Jan-00

347 Type; BB-IDF EL 14-May-21 8 20-Jan-00

348 Type; BB-IDT EL 14-May-21 8 20-Jan-00

349 Type; BB-L1 EL 14-May-21 8 20-Jan-00

Page 13 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

350 Type; BB-L10 EL 14-May-21 8 20-Jan-00

351 Type; BB-L11 EL 14-May-21 8 20-Jan-00

352 Type; BB-L12 EL 14-May-21 8 20-Jan-00

353 Type; BB-L2 EL 14-May-21 8 20-Jan-00

354 Type; BB-L3 EL 14-May-21 8 20-Jan-00

355 Type; BB-L4 EL 14-May-21 8 20-Jan-00

356 Type; BB-L5 EL 14-May-21 8 20-Jan-00

357 Type; BB-L6 EL 14-May-21 8 20-Jan-00

358 Type; BB-L7 EL 14-May-21 8 20-Jan-00

359 Type; BB-L8 EL 14-May-21 8 20-Jan-00

360 Type; BB-L9 EL 14-May-21 8 20-Jan-00

361 Type; BB-LT02 EL 14-May-21 8 20-Jan-00

362 Type; BB-LT03 EL 14-May-21 8 20-Jan-00

363 Type; BB-S1 EL 14-May-21 8 20-Jan-00

364 Type; BB-S2 EL 14-May-21 8 20-Jan-00

365 Type; BB-SP1 EL 14-May-21 8 20-Jan-00

366 Type; BB-SP2 EL 14-May-21 8 20-Jan-00

367 Type; BB-U1 EL 14-May-21 8 20-Jan-00

368 Type; BB-W1 EL 14-May-21 8 20-Jan-00

369 Type; BB-W2 EL 14-May-21 8 20-Jan-00

370 Type; PiR (By Others) EL 14-May-21 8 20-Jan-00

371 Type; BB-CP1 EL 14-May-21 8 20-Jan-00

372 Lighting control for Beach bar EL 14-May-21 8 20-Jan-00

373 all necessary connection to existing services EL 14-May-21

ELICTRICAL - EMERGENCY LIGHTINGS 14-May-21 6

374 Type E LE 20-Jan-00

375 Type E - G LE 14-May-21 3 20-Jan-00

376 Exit Light LE 14-May-21 3 20-Jan-00

Emergency lighting monitoring panel including all


377 necessary
LE 14-May-21 3 20-Jan-00

378 DBs Panel, Equipment, Materials, Supports & accessories LE 14-May-21 4 20-Jan-00

AV, IT & Security Systems 14-May-21 3

379 Fixed dome type camera with vari-focal lens LC 20-Jan-00

Page 14 of 19
FINISH
HYL SUBMISSION SBJV DEC

SBJV STATUS
PLANNED

DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS

REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN

STATUS

DEC ACTUAL
AL NUMBER

AL NUMBER

REPLY DATE
TRANSMITT

TRANSMITT

LATE REPLY
SUBMISSIO

SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER

TRANSMIT
DEC REPLY
DUE DATE

NUMBER

IN DAYS
TAG DATE (REV-0) (Weeks)

N DATE

N DATE
SBJV

SBJV
N DATE

DEC
HYL

HYL
CODE

380 External fixed camera with vari-focal lens LC 29-May-21 3 20-Jan-00

381 Fixed dome type camera with vari-focal lens LC 29-May-21 3 20-Jan-00

382 External fixed camera with vari-focal lens LC 29-May-21 3 20-Jan-00

383 9U network cabinet for AV & IT System LC 29-May-21 3 20-Jan-00

384 9U network cabinet for Security System LC 29-May-21 6 20-Jan-00

385 Panic alarm button (Medical alarm) LC 29-May-21 6 20-Jan-00

386 Data outlet; dual LC 29-May-21 3 20-Jan-00

387 Data outlet; single LC 29-May-21 3 20-Jan-00

388 External wireless access point LC 29-May-21 3 20-Jan-00

389 Professional DJ booth; including 2 monitor speaker, LC 29-May-21 3 20-Jan-00

390 mixer, DJ CD decks, turntable; item complete LC 29-May-21 6 20-Jan-00

391 Self powered subwoofer - SW LC 29-May-21 4 20-Jan-00

392 Self powered loudspeaker - ES LC 29-May-21 4 20-Jan-00

393 Floor box, Type 6, including Four RJ45 data outlet & LC 29-May-21 3 20-Jan-00

394 four 13A power outlet. LC 29-May-21 3 20-Jan-00

395 Self powered miniature loudspeaker - FR LC 29-May-21 3 20-Jan-00

396 55” interactive LED screens; to include brackets LC 29-May-21 3 20-Jan-00

397 SAI panel LC 29-May-21 3 20-Jan-00

398 BGM source and volume control panel LC 29-May-21 4 20-Jan-00

399 Allow for Sundries & Incidental works LC 29-May-21 3 20-Jan-00

400 Allow for connection to existing services LC 29-May-21 3 20-Jan-00

401 16A single switched socket outlet points on UPS LC 29-May-21 3 20-Jan-00

402 13A dual switched socket outlet points. LC 29-May-21 3 20-Jan-00

403 16A single switched socket outlet on UPS LC 29-May-21 3 20-Jan-00

404 13A dual switched socket outlet LC 29-May-21 3 20-Jan-00

Page 15 of 19
MAX
MIN
(A)

1 Metal Works 30-Dec 30-Dec


2 Aluminium Works MANDATORY 30-Dec 30-Dec
3 MASONARY MANDATORY 30-Dec
4 Waterproofing Wet & Roof 30-Dec 30-Dec
5 OPENINGS Doors 30-Dec 30-Dec
6 OPENINGS Ironmongery 30-Dec
7 MILL WORKS 30-Dec 30-Dec
8 CEILING WORKS MANDATORY 30-Dec 30-Dec
9 TILES MANDATORY 30-Dec 30-Dec
10 STONE 30-Dec 30-Dec
11 WALL COVERING 30-Dec
12 PAINT MANDATORY 30-Dec
13 METAL 30-Dec
14 METAL 30-Dec
15 GLASS 30-Dec
16 DRAPERIES 30-Dec
17 SANITARY WARE 30-Dec
18 LIGHT #N/A
19 Off The Shelf Cabana #N/A
20 MEP Not Mandatory 30-Dec 30-Dec
21 MEP Mandatory 30-Dec 30-Dec

SA

Equation related "Don't Touch"


Equation related "Don't Touch"
Expected Period remaining
REMARKS Finish date for fixing
(B) (C) = B - A

ALL 30-Sep
ALL 30-Sep
ALL 30-Sep
101, 102, 201, 202, 203, 204, 301, 302, 303, 304, 308, 309 30-Sep 44104
101, 102, 201, 202, 203, 301, 302, 309 30-Sep 44104
101, 102, 201, 202, 203, 301, 302, 309 30-Sep 44104
101, 102, 103, 107, 108, 201, 202, 203, 204, 304 30-Sep 44104
101, 102, 201, 202, 203, 301, 302 30-Sep
101, 102, 201, 202, 203, 204, 301, 302, 304 30-Sep 44104
101, 102, 103, 107, 201, 202, 203, 204, 301, 302, 304, 309 30-Sep 44104
101, 102, 201, 202, 203 30-Sep 44104
101, 102, 201, 202, 203 30-Sep
101, 102,201, 202, 203 30-Sep 44104
201, 202, 203 30-Sep 44104
201,202,203, 101, 102 30-Sep 44104
103, 204 30-Sep 44104
201, 202, 203, 304 30-Sep 44104
101, 102, 103, 107, 108, 201, 202 , 203, 204, 301, 301, 303, 304, 309 30-Sep #N/A
30-Sep
Mainly be end of May 30-Sep 44104
ALL 30-Sep
Waterproofing &
Concrete Steel Structure Finishing
MEP

ALL 30-Dec 30-Dec


101 30-Dec 30-Dec
102 30-Dec 30-Dec
103 30-Dec 30-Dec
107 30-Dec 30-Dec
108 30-Dec 30-Dec
201 30-Dec 30-Dec
202 30-Dec 30-Dec
203 30-Dec 30-Dec
204 30-Dec 30-Dec
301 30-Dec 30-Dec
302 30-Dec 30-Dec
303 30-Dec 30-Dec
304 30-Dec 30-Dec
308 30-Dec 30-Dec
309 30-Dec 30-Dec