HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
Civil
Concrete - Rebar
Page 1 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
Structural Steel
21 G3 Acrylic paint & Fire rated paint 60 min SS 20-Apr-21 16-May-21 2 20-Jan-00
Waterproofing
waterproofing fit-out
S- Exeed Geotextile
31 G3 Primer WP 2-Jul-21 28-Jul-21 2
LLC
20-Jan-00
32 G3 Loose Gravel 25mm to 50mm CV 2-Jul-21 28-Jul-21 4 S- Al Futtaim Clas LLC 20-Jan-00
Architec
Finishes
Rough Finishes
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
Partitions
FAHU ROOM
FINISHES FLOORING
WOODEN
The proposed hardware is the same as
specified. Installation to be as per
DIDON GENERAL HLLC-WTRAN- DECAE-WTRAN- manufacturer recommendation, Shop
62 TRA-HYL-MAR-WW 00100 G3 Hardware for all doors WW 0 B B 10-Jun-21 3
TRADING LLC UAE WF-139852 20-Apr-21
000058
26-Apr-21 WF-139852 17-May-21 29-Apr-21
099451 -18 drawing and door schedule to be submitted
for review and approval. Sample board to be
submitted.
TILING/STONE
HLLC-WTRAN-
67 TRA-HYL-MAR-FI-GEN 00028 CT01 - CEILING TILE - KITCHEN FINISHES FI 00 UR 10-Jun-21 10 KNAUF LLC UAE (WF-141860) 16-May-21 000076 20-Jan-00
HLLC-WTRAN-
68 TRA-HYL-MAR-FI-GEN 00035 PT01 - PT02 FINISHES PAINT FI 00 UR 10-Jun-21 10 JOTUN UAE (WF-141999) 17-May-21 000078
HLLC-WTRAN-
69 TRA-HYL-MAR-FI-GEN 00035 PT01 - PT02 FINISHES PAINT FI 00 UR 10-Jun-21 10 JOTUN UAE (WF-141999) 17-May-21 000078
Page 3 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
CONCRETE FINISH
GENERAL
WALL FINISHES
88 G3 Mosaic porcelain wall tiles, ref TL01; to bar feature wall FI 15-Jun-21 10 20-Jan-00
93 G3 Porcelain floor tiles, ref TL06; to kitchen & janitor room FI 15-Jun-21 10 20-Jan-00
Page 4 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
CEILING FINISHES
106 G3 Timber ceiling soffit & sides, ref. WD06; to bar area WW 2-Jun-21 5 20-Jan-00
PAINTING FINISHES
ROOF DECORATION
LANDSCAPING
Wood Works
Page 5 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
125 G3 Back bar counter, L-shaped, approx. 7300 x 2850mm; JR 1-Aug-21 3 20-Jan-00
HLLC-WTRAN-
0 UR 1-Aug-21 3 (WF-142850) 25-May-21 000099
135 G3 Wine Display Shelf, approx. 2715mm x 600mm x 50mm JR 1-Aug-21 3 20-Jan-00
136 G3 Wine Display Shelf, approx. 2715mm x 300mm x 50mm JR 1-Aug-21 3 20-Jan-00
Metal Works
DOORS
149 G3 D1 - EXT. Wooden Single leaf, 915 x 2400 x 45mm DS 2-Aug-21 3 20-Jan-00
Page 6 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
150 G3 D2 - EXT. Wooden Single leaf, 915 x 2400 x 45mm DS 2-Aug-21 3 20-Jan-00
151 G3 D3 - INT. Wooden Single leaf, 715 x 2400 x 45mm DS 2-Aug-21 3 20-Jan-00
152 G3 M3 - EXT. METAL Single leaf, sliding, 965 x 2400 x 45mm DS 2-Aug-21 3 20-Jan-00
153 G3 M1 - EXT. METAL Single leaf, 915 x 2400 x 45mm DS 2-Aug-21 3 20-Jan-00
154 G3 M2 - EXT. METAL Single leaf, 915 x 2400 x 45mm DS 2-Aug-21 3 20-Jan-00
155 G3 MD1 - INT. Single leaf, 615 x 2200 x 45mm, DS 2-Aug-21 3 20-Jan-00
BASICS
Page 7 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
Kitchen Equipment
SlimJim Bottle Bin with handles, Lid and Trolley with built in
184 pivoting cover
KL 2-Aug-21 10 20-Jan-00
G3 Ice Box for Store & Pour with Speed Rail & 1/9x3 GN
187 pan*
KL 2-Aug-21 10 20-Jan-00
Page 8 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
213 G3 Bottle Display Unit 1 door - Upright 210 bottle capacity KL 2-Aug-21 10 20-Jan-00
215 G3 Grease Skimmer (2700 ltr water per hour) KL 2-Aug-21 10 20-Jan-00
224 G3 Sink for janitors room, type PF12 & PF-11 KL 2-Aug-21 10 20-Jan-00
MEP
PLUMBING
226 G3 PPR PIPES 20mm diameter including fittings PL 10-Apr-21 6-May-21 1 20-Jan-00
227 G3 PPR PIPES 25mm diameter including fittings PL 10-Apr-21 6-May-21 1 20-Jan-00
228 G3 PPR PIPES 32mm diameter including fittings PL 10-Apr-21 6-May-21 1 20-Jan-00
229 G3 PPR PIPES 40mm diameter including fittings PL 10-Apr-21 6-May-21 1 20-Jan-00
230 G3 PPR PIPES 50mm diameter including fittings PL 10-Apr-21 6-May-21 1 20-Jan-00
Page 9 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
240 G3 Electric water heater accessories and connections PL 10-Jun-21 6-Jul-21 1 20-Jan-00
242 G3 Electric water heater accessories & connections PL 10-Jun-21 6-Jul-21 1 20-Jan-00
254 G3 Soak away 1m x 1mx 0.5m concrete cover dim= xxxx PL N/A 10-Apr-21 6-May-21 1 20-Jan-00
255 G3 Channel drains 300mm wide x 2000mm length PL 10-Apr-21 6-May-21 1 20-Jan-00
PLUMBING FIXTURES
Page 10 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
266 G3 Disabled - Standalone wash hand basin - SW-13 PL 20-Jun-21 16-Jul-21 2 20-Jan-00
267 G3 Disabled - Faucets for lavatories for disable; SW-13 PL 20-Jun-21 16-Jul-21 2 20-Jan-00
268 Wall Mounted Basin Spout, type PF03 PL 20-Jun-21 16-Jul-21 2 20-Jan-00
270 G3 Flush valves for water closets; SW-09 PL 20-Jun-21 16-Jul-21 2 20-Jan-00
272 G3 Connections, Fittings & Accessories for Tabs PL 20-Jun-21 16-Jul-21 2 20-Jan-00
FIRE SUPPRESSION
275 FE, Trolley type 25KG Dry Chemical Powder FF 29-Aug-21 24-Sep-21 2 20-Jan-00
276 Portable FE, 6KG Dry Chemical Fire Extinguisher FF 29-Aug-21 24-Sep-21 2 20-Jan-00
277 Portable FE, 5KG CO2 Fire Extinguisher FF 29-Aug-21 24-Sep-21 2 20-Jan-00
286 Fittings & accessories for Ventilation fans ME 14-Apr-21 10-May-21 2 20-Jan-00
290 Fittings & accessories for Galvanized steel sheet ducts ME 14-Apr-21 10-May-21 2 20-Jan-00
HVAC - Fixtures
Page 11 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
300 Fixing Supports & accessories for Steel pipes CW 14-Apr-21 3 20-Jan-00
306 Fittings & Accessories for connection to existing services CW 20-Aug-21 3 20-Jan-00
307 BMS Equipment & related fixtures & accessories BM 14-Aug-21 6 20-Jan-00
309 Ceiling mounted speaker with strobe (candela rating 75cd) FA 14-Apr-21 3 20-Jan-00
310 Wall mounted speaker with strobe (candela rating 75cd) FA 14-Apr-21 3 20-Jan-00
FIRE DETECTION & ALARM - Wiring, Conduits, boxes supports, and etc..
318 Fixing & Connection requirement for Heat detector FA 14-Apr-21 3 20-Jan-00
319 Fixing & Connection requirement for Manual call point FA 14-Apr-21 3 20-Jan-00
320 Fixing & Connection requirement for Fire alarm interface FA 19-Apr-21 3 20-Jan-00
Page 12 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
332 13A single switched socket outlet weather proof EL 19-May-21 3 20-Jan-00
334 13A switched fused connection unit with flex outlet EL 19-May-21 3 20-Jan-00
340 DBs Panel, Equipment, Materials, Supports & accessories EL 19-Aug-21 3 20-Jan-00
LIGHTINGS
Page 13 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
378 DBs Panel, Equipment, Materials, Supports & accessories LE 14-May-21 4 20-Jan-00
Page 14 of 19
FINISH
HYL SUBMISSION SBJV DEC
SBJV STATUS
PLANNED
DEC SAMPLE
DEC STATUS
ES PLANNED DELIVER
MATERIAL TARGET TARGET MATERIAL ACONEX
MATERIAL SCHED Discipli MATERIAL Y COUNTRY
MATERIAL TITLE DESCRIPTION Activity IDs RE- ORDER MATERIAL REQUIRED SUPPLIER WORKFLOW REMARKS
REVISION
NO. ULE ne SUBMISSION TIME OF ORIGIN
STATUS
DEC ACTUAL
AL NUMBER
AL NUMBER
REPLY DATE
TRANSMITT
TRANSMITT
LATE REPLY
SUBMISSIO
SUBMISSIO
SUBMISSIO DATE DELIVERY ON SITE NUMBER
TRANSMIT
DEC REPLY
DUE DATE
NUMBER
IN DAYS
TAG DATE (REV-0) (Weeks)
N DATE
N DATE
SBJV
SBJV
N DATE
DEC
HYL
HYL
CODE
381 Fixed dome type camera with vari-focal lens LC 29-May-21 3 20-Jan-00
393 Floor box, Type 6, including Four RJ45 data outlet & LC 29-May-21 3 20-Jan-00
401 16A single switched socket outlet points on UPS LC 29-May-21 3 20-Jan-00
Page 15 of 19
MAX
MIN
(A)
SA
ALL 30-Sep
ALL 30-Sep
ALL 30-Sep
101, 102, 201, 202, 203, 204, 301, 302, 303, 304, 308, 309 30-Sep 44104
101, 102, 201, 202, 203, 301, 302, 309 30-Sep 44104
101, 102, 201, 202, 203, 301, 302, 309 30-Sep 44104
101, 102, 103, 107, 108, 201, 202, 203, 204, 304 30-Sep 44104
101, 102, 201, 202, 203, 301, 302 30-Sep
101, 102, 201, 202, 203, 204, 301, 302, 304 30-Sep 44104
101, 102, 103, 107, 201, 202, 203, 204, 301, 302, 304, 309 30-Sep 44104
101, 102, 201, 202, 203 30-Sep 44104
101, 102, 201, 202, 203 30-Sep
101, 102,201, 202, 203 30-Sep 44104
201, 202, 203 30-Sep 44104
201,202,203, 101, 102 30-Sep 44104
103, 204 30-Sep 44104
201, 202, 203, 304 30-Sep 44104
101, 102, 103, 107, 108, 201, 202 , 203, 204, 301, 301, 303, 304, 309 30-Sep #N/A
30-Sep
Mainly be end of May 30-Sep 44104
ALL 30-Sep
Waterproofing &
Concrete Steel Structure Finishing
MEP
pi[