3 UR UNDER REVIEW
Project No: PACKAGE G3-BEACH BAR-THE ROYAL ATLANTIS RESORT AND RESIDENCES 5 B APPROVED AS NOTED
CONCRETE TRIAL MIX C50 SUBSTRUCTURE & DEC-CONCRETE TRIAL MIX FOR C50 (Mix code
1 TRA-HYL-OIR-CO-GEN-02547 00
SUPERSTRUCTURE CONCRETE 502M7X4-4-S47D) SUB STRUCTURE & SUPER
STRUCTURE By approved Third party Wimpey
Approved as Approved as Laboratory at Cemex top mix Readymix plant Jabel
HLLC-OIR-000003 CO OFFSITE WIR 0 28-Apr-21 B DECAE-ROIR-001793 4-May-21
Noted
DECAE-ROIR-001793 4-May-21
Noted Ali. (PLANT No. 306 / Batch No.1)has been carried
out /witnessed on 2nd May 2021 at Jabel Ali plant
with attached Initial report.
Contractor is required to fallow the cubes crushing
witnessing and all other test to be done at
approved lab .
2 TRA-HYL-OIR-CO-GEN-02548 00 HLLC-OIR-000004 CO OFFSITE WIR CONCRETE TRIAL MIX C25 - BLINDING 0 28-Apr-21 UR
4 TRA-HYL-OIR-CO-GEN-02550 00 HLLC-OIR-000006 CO OFFSITE WIR CONCRETE TRIAL MIX C20 - DRY MIX 0 28-Apr-21 UR