Risk Assessment For Gypsum Board Installation Works
Risk Assessment For Gypsum Board Installation Works
manual handling.
Pinch point/hand injury awareness shall Pre-tasks briefing to all personnel involved
allowed.
manual handling.
from obstruction.
fatigue.
Page 1 of 9
Risk Assessment for Gypsum Board Installation
battery/electrical room.
Suitable equipment with all valid A trained flagman shall assign with
Trained personnel shall be operated, and keep close to the ground as reasonably
Inspection and proper functioning of A speed limit of 10 km/h shall follow in the
The load shall be secured and are unable The equipment movement area shall keep
Personal shall be away from line of fire prevent the collapse of the load.
while lifting, loading and unloading the Ensure the personnel stay away from line
and safe working load shall be considered working load shall consider.
prior to use of transporting/lifting the Pinch points and hand safety awareness
Page 2 of 9
Risk Assessment for Gypsum Board Installation
work.
operation/movement.
Work at height work permit shall be For the mobile scaffold, castor wheels shall
trained for work at height requirements. While shifting the mobile scaffold from one
Correct use of full body harness shall be place to another, workers working on top
Visual inspection shall be done prior to At a height of more than 1.8 meters, a full-
Men and materials fall from each use of full body harness. body harness with 2 lanyards shall be
Work at Height
height Monthly inspection and color coding shall used.
be provided for full-body harness. 5 3 15 Work at height log shall be maintained for 3 1 3
(Scaffold erection and
dismantling for gypsum Board Collapse of scaffold Guardrail system (top-rail, mid-rail, and those workers who shall perform work at
Installation) toe board) shall be provided as fall height.
OSHA standards (105 cm/42 inch from the A 100 % tie-off procedure shall be
Page 3 of 9
Risk Assessment for Gypsum Board Installation
supervisor/inspector.
shall be used.
work.
supervision.
edges.
person.
Page 4 of 9
Risk Assessment for Gypsum Board Installation
protecting from abrasion and cutting due Only trained and experienced workers
shall allow replacing the
to sharp edges.
grinding/cutting disks.
Jewelry (Rings, bracelets, and pendants)
non-conductive material.
pedestrians.
Page 5 of 9
Risk Assessment for Gypsum Board Installation
accesses.
Page 6 of 9
Risk Assessment for Gypsum Board Installation
Grinding and cutting shall be allowed in a Frequent breaks shall observe to avoid
well-ventilated area. exposure.
Safety awareness signboards shall be
Gypsum board grout materials shall be provided for the awareness of workers
stored properly. involved in the activity and other workers.
Sweet water shall be provided to wash
COSHH assessment awareness training hands and other body parts after finishing
shall be conducted. the work.
Health surveillance shall be done for those
Periodic inspection of power tools shall be workers involved in the activity.
conducted by a competent electrician to
make sure power tools are safe for use.
working area.
All rotating parts shall be guarded. Unauthorized entry during the use of
abrasive wheels activity shall be restricted.
Loose cloth shall not be used while
Installation of Gypsum Board Entanglement 2 2 4 Jewelry (rings, bracelets, and pendants) 2 1 2
working with machinery.
shall not be allowed to use during work at
Awareness training shall be conducted for the site.
the work crew.
Power tools shall be used with handle as
PPEs related to activity shall be provided per manufacturer recommendations to
including heavy-duty gloves, safety control the power tools.
goggles (ANSI Z87.1), Face shield and
earplugs.
Page 7 of 9
Risk Assessment for Gypsum Board Installation
gypsum skips.
Page 8 of 9
Risk Assessment for Gypsum Board Installation
Likelihood
Very Low Low Medium High Very High
Severity
Unlikely Possible Likely Very Likely 1 2-3 4-6 8-18 24
1 2 3 4
Moderate - 2 2 4 6 8
Minor - 1 1 2 3 4
Page 9 of 9