Download as pdf
Download as pdf
You are on page 1of 6
MR-NM2- 01-04 ce Me REQUEST FOR INSPECTION q - . cereale Cd NM2-SCI-SP-5-INS-IR-0078 Req. No ‘To: NM2 Employer’s Engineer (LJ Hydro Consultancy) Date:27/02/2024 a CWwil Geologist’ «=O H&M = ERM OHSE eac © Survey © River Diversion # ‘0 Power Intake Jo Access Road © Diversion Tunnel 5 Intake Slope © Temporary Access Road © Upstream Cofferdam © Intake Foundation © Operation Road © Downstream Cofferdam © Headrace Channel 0 Operator Camps © Main Dam © Power Tunnel 7 Caninar Pawerhone 2 Dam Body ‘3 Headrace Tunnel Breriyrienn © Left Dam Abutment o Vertical Shaft Be ae ie Rig Dan Aburnent © Penstock 1» teoomer eet o Ansty Dam o ones platform © Crushing Panta 1 Left Dam Abutment ‘© Powerhouse Platform Aone tee © Right Dam Abutment © Powerhouse Building Labo © Spitwa Powethouse Slope Hi Labeatery Spitiway 0 i © Spilway © Tailrace Channel Bl Quarry go © Chute © Switehyard © H&M atthe © Plunge Pool Silling Basin | © Auxiliary Tunnet © E&Matthe © Spillway Slope SAdUT © Adit? Bone: a Adit © Other. ‘The NM2_EPC Contractor is hereby informing/requesting inspection_o 1 o W_s Has follows: Location (Elevation, Station) | Item for Inspection | 275° | Proposed Date and Time | Remarks Pull put testing for Rock bolts at Right bank of Scour | eee hole-Type 2 " Location: Seour hole 1) Inspection purpose: ‘A-Punch List, D-Re-evaluation of NCR B-QC completion inspection E-Notification of NCR deficiency of correction ‘G-Material's manufacturing at site Field testing and inspection (C-Defnition of constuction desil__| F-General inspection during work Others, Requested by SCI AP/QCE/QCM: ea Received by EE: Name: Tran Van Vinh Name: Ahoy a Employer / Engineer QC Remarks By Employer/ Engineers QC: J 0 Name: phon a Signature: > bul __ate:_ ft} Dy scl C Yin Van V4 w 4. SC at NAM MO2 HYDROPOWER PROJECT Epc conTRAcT Rock bolt Anchor Pull Out Test! Thi nghigm kéo neo mai dé ‘astm 04435 ‘PrjcvDy a] NAMUO2 HYOROPGMER PROJET rtnanber bequest it Hatt ag He saulahaased Kore Hang mye |Right bon of Scour Hole - Type 2 Drm Hole Lengthy Chidu e818 ne0, 160, | oracles Se ie onde [24-Feb28 ‘Rock Bolt Length Chidu di neo, m 160 ee Somanomaae Cetin ‘Testing Age :| + ays 00.9 ae ‘WIC: 0.40 saaggeee ima | TE emery | saw Co 9a cree oat easa 60 1.99 2.65 e 1.99 2.65 7 eae Hees an ae Pullout st Land (KN) Vs Displacement) Teslieutpatowtiestnhinumiesd = 753. KN Mosman epacemert = 125mm = sis wee: 00 Aero 2545 Ussvues 046 Wher: 3000 E 206000 Ue Ut = 276 ete us an Test Result pass [wot pass oan cron at os sctin te t melted on nm exon ett east rasa tele tet te carte tha eco ra samt te tad [rest by: Laboratory [cheek By OC Engineer —_ |Wenossed dy : LHe Ae {Siento ( jt 2iortery” tom: 23 /0p} fee. Dian aly eee Tian an Vol Loy, oe. H{O4 TA \ vo ted, ys we i. SC ab ‘NAM MO2 HYDROPOWER PROJECT recosreyer Rock bolt Anchor Pull Out Tes Thi nghiém kéo neo mai ai sti 0436 ‘okey im] WA O2 VWOROPOERPeCT rnb one a nae Danse Boiron wom) a em kta rio ag esti wows) tea enon Testtoroama Oviatt mn] wo ‘estan Date Npby ag rap.26 ‘Rock Bolt Lengthy Chidu da nee , 160 ie Ca a Tess rule revat SS Code micNua-Grouto1 a ee wie 040 st ap gh ae | Rent al TT TGREI | — anor eno ‘Load Tal trong (mm) (enm) ee Remarks! Ghi chi ise! Gauge 1 Rebound Gouge 2 Rebound Gauge Rebound ° 000 110 ooo) 110 10 005 147 1 00s | tar 20 026 168 036 168 0 1.08 2.24 ‘ 1.08 224 40 1.70 2.89 \ 1.70 289 Ey 238 at 2m [at @ 281 ast 281 361 70 a7 388 am aoe o 138 438 i loot ot nd (599 V4 Dipuenent( mm) I eae Hi 3184 wots nb ot 000 evden eer 2545 Coen ae 046 a dba eet Wee: b= 3000 mmeoset eet E = 206000 eaten et en v= Uta 252 mitecmetat tt acon | Where: JRemarks: a a Qe 438 ‘ee total daplcerent of te bol heed Teaeuapilotininnmmtas 783 KN a ia avn Ortaca 125m Testes: [7 ]pe5s [not pass wines ay [Tost by: Laboratory Check By: OC Engines ye lems <—— ene: (_ (V7 maa: \)- lume: Tron Vou \)»% hon tho as faa Mid low: 24/02/ 2ory owe Mi] OF 25 ate SoD sl bee: NAM MO2 HYDROPOWER PROJECT @ i. SCI dt srccamact Rock bot Anchor Pll Out Tesv Thi nghlgm Kéo noo mal dt Ast pass es wince eae nara ee ae erham eieoer ee Dat Cac] wanna aba er eer] eT ra pe ttieee Gear] am m re =F Te Stitt Cade ie rot 1 em] we = wie: 40 Tt a aN Ta RT ont rtm ‘ime may ‘sera Tong bem) foseyulas - Gauge 1 Rebound Gauge 2 Rebound Gauge Rebound Q 00s | om oc | on 10 ont 075 5, ont 0.75 20 0.44 0.90 4 044 0.90 2 oro | ta om | 1a © var [tse \ tats 50, 1.83 1.87 5 1.53 1.87 ie [20 1a | 210 a zs | 200 as | aa © ae Bet | Or heat tamer vee sto mises 25 avomnanosemin 046 eaten oat | thee Lm so ecpamunte f= 2h) cena toni | | Ue cls 206 mmbecomeced bt etd debeemert | ; | er hare us 25 gout geass Tmenetpdotuionmneet 783 eae estResot: [Jp (nto fest tatty a a pene Cw” DS — — i teh Prog fi Ly uum Tenn Vian Viv8 Ios: phous donb et es 24/027 024 eM) Hp fe &__ Sc am ‘NAM MO2 IIYDROPOWER PROJECT Ene contaact Rock bolt Anchor Pull Out Tesu Thi nghigm kéo neo mal da sr oaass opin] HO! WIDROPOWER FORGE natal ‘entrar Senior Danae Binatone nc] ao ‘tg nah Serre Te annex] a ato en fen SC a ‘an Da rasan Tarte ile ae] ew ‘at eee eS Spend ai Pe my Coe ie Grout 1 ost er ace Weta a toners (mm (men) eee ‘Remarks! Ghi chi J Gauge 1 Rebound Gauge 2 Rebound Gauge Rebound ° 08 085 aos | as 70 one ot or | oe 20 050 1.05 050 | t06 30 O78 1a 376 12a © oar 138 os | ta6 50 1.34 1.42 \ 1.34 142 ~ iat 1 vat 154 70 187 188 157 [108 o 176 176 ‘Pull out text Lond ( KN) Displacement mm) Et | Gin PA 3184 tonteen mveoat Wee: P= 00. ettndontenn A= nD 254.5 me Cross section area ofthe bolt Uoeut= 046 maatcntmsne re Wee: 3000 nme hit © = O00 pence en Usteh= 1) amc | vie ne i Lt wskdedbecnchicmmees Tetra poaisinnmunin’ 763K seeantbapiese ssn TestResut: — [}pass —[] not pass et by: taborstony enc 8 ae Engi 7 Pines aig se — man (We poo | Tent Flow Iuone file lea Wee Van Viv lng, hom ches lost Y 2 pate. Dorf 2or4 te WL Oo ue

You might also like