Project: Design & Build of East Bay Phase 1 Water Treatment Plant
Operation
Checking Required on: DEC. 20, 2023 At: 9:00 A.M RFI/A No. 001
Date Time
Quantity Represented: 1 set Roll – up
Detailed Location: DEWATERING BLDG, THICKENER CHAMBER
Re-Inspection
Architectural Mechanical
Test
Initiated by:
JESTONI COLDES
Signature Over Printed Name
FB Quality Control
Checked By: Noted By:
Q.C. CIVIL
Q.C. ARCHITECTURAL
Q.C. ELECTRICAL
Q.C. MECHANICAL FB Project Manager
Signature Over Printed Name
SURVEYOR
Client/Third Party
Remarks
Satisfactory YES NO
Note: Request for inspection must be received by Third Party/ Client one day before inspection schedule.