REQUEST FOR INSPECTION /ACCEPTANCE

Project: Design & Build of East Bay Phase 1 Water Treatment Plant
Operation
Checking Required on: DEC. 20, 2023 At: 9:00 A.M RFI/A No. 001
Date Time
Quantity Represented: 1 set Roll – up
Detailed Location: DEWATERING BLDG, THICKENER CHAMBER

Discipline: Survey Civil Electrical Inspection

Re-Inspection
Architectural Mechanical
Test

Item of RFI/A: FUNCTIONALITY TEST Re-test


1 set 1pnl (3.0+ mW x 3.0+ mH) DR 1 (Roll up)
Ref: Drawing No.

Initiated by:
JESTONI COLDES
Signature Over Printed Name

FB Quality Control
Checked By: Noted By:
Q.C. CIVIL
Q.C. ARCHITECTURAL
Q.C. ELECTRICAL
Q.C. MECHANICAL FB Project Manager
Signature Over Printed Name
SURVEYOR

Client/Third Party
Remarks

Satisfactory YES NO

Third Party Inspector Date


Signature Over Printed Name
Concurred

Client Inspector Date


Signature Over Printed Name

Note: Request for inspection must be received by Third Party/ Client one day before inspection schedule.