Datum/ Date: Report no.

ZAPISNIK O IZRADI MONTAŽNOG AB ELEMENTA / ID OF RC PRECAST ELEMENT

Projekat:
Objekat:
Vrsta elementa:
Tip elementa:

Beton/Concrete: Pozicija montaže/Assembling position:


Marka betona/ Concrete class: Traka/Lane:
Vodonepropusnost/Water penetration: Polje/Span:
Otpornost na mraz /Frost Resistance: Oznaka Nosača/Beam Mark:

Vrsta Provere / Rezultat Kontrolisao/


Opis Radova / Datum/ Controlled by: Napomena /
Type of ispitivanja /
Description of Works Date Comments
inspection * Test Results Izvođač/Contractor: Nadzor/Supervisior:

Provera pre betoniranja / Inspection Before Concrete Works

Armatura / Reinforcement V

Trasa zaštitnih cevi / Ducts routes V

Oplata / Formwork V

Betoniranje / Concreting V

Provera tokom betoniranja / Inspection During Concreting


Uzimanje uzorka/
R
Test Sampling
Provere nakon betoniranja / Inspection After Concreting

Provera čvrstoće betona pre demontaže oplate/


Checking of Concrete Strength Before Formwork R
Removal

Demontaža oplate /
V
Formwork Removal

Provera čvrstoće betona nakon 28 dana/ Checking


R
of Concrete Strength After 28 Days

Provere pre prednaprezanja kablova / Inspection Before Prestressing

Užad, kotve i druge komponente /


V
Strands, Anchorages and Other Components

Provera čvrstoće betona pre utezanja kablova/


Checking of Concrete Strength Before R
Prestressing
Provere tokom utezanja kablova / Inspection During Prestressing
Faza Ia - utezanje kabla K1/
Phase Ia - Stressing cable K1 R
Utezanje kablova/ Faza Ib - utezanje kabla K1/
Post-Tensioning Phase Ib - Stressing cable K1 R
Faza II - utezanje kabla K2 (i K3)/
Phase II - Stressing cable K2 (K3) R
Faza I - Injektiranje kabla K1/
Phase I - Grouting cable K1 R
Injektiranje/
Grouting Faza II - Injektiranje kabla K2 (i K3)/
Phase II - Grouting cable K2 (i K3) R
Faza I/
Provera čvrstoće injekcione smese Phase I: R
nakon 28 dana/ Checking of Grout
Faza II/
Strength After 28 Days Phase II: R
Transport i montiranje nosača / Transport and Installation of Beams

Transportovanje nosača do mesta ugradnje/


V
Transportation of beams to the installation place

Montaža nosača na ležišnu gredu/


V
Placing of Beam on Bearing Beam
Karakteristike / Characteristics:

TIP 1; TIP 2; TIP 3;


H=1,6m TIP 4;
H=1,6m H=1,8m H=1,6m
L=24,4m L=29,4m L=35,4m L=35,4m

* 1) V = Visual inspection 2) R - Report 3) N/A - Not Applicable