Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Employee Review Sheet.

Name of Company: Evolute constructions.

Date of Review: 16/06/2024.

Review Period: 7 days (10/6 to 16/6)

Name of Employee: Mr. Vishal

Date of Joining: 10/06/2024.

Sr no Parameter Score/10 Comment


01 Response to 8 Continue like that only.
instructions
02 Adherence to 7.5 Continue like that only.
instructions
03 Productivity 8 Continue like that only.
04 Understanding 7.5 More understanding needs to be
of work developed
05 Knowledge 6 Learning is needed.
about work
06 Relations with 6 Need to be more responsive to
labour labors.
07 Time 6 Labour time management and self-
Management time management can be done well.
08 Labor 6 Scope for learning is immense,
Management identification of non-useful labors
and using them in work which suits
them.
09 Puntuality 9 Continue like that only.
10 Review from 8 Continue like that only.
client
11 Dependability 8 Continue like that only.
12 Communication 7.5 Can be improved, no major comment
Skills.
13 Initiative From 7.5 Continue like that only.
Self
14 Consistency in 8 Do not loose the momentum for
work work, regular breaks for mind is
important.
Average score 103/140 Overall performance is satisfactory.
Employee Review Sheet.

Name of Company: Evolute constructions.

Date of Review: 16/06/2024.

Review Period: 7 days (10/6 to 16/6)

Name of Employee: Mr. Sayyed.

Date of Joining: 10/06/2024.

Sr no Parameter Score/10 Comment


01 Response to 5 Scope of improvement is present
instructions
02 Adherence to 7 Scope of improvement is present
instructions
03 Productivity 4 Must focus on certain tasks to
showcase his productivity.
04 Understanding 7.5 Good ability to grasp things is
of work observed.
05 Knowledge 7.5 Learning is needed. Especially
about work Technical.
06 Relations with 6 Could not establish proper co
labour relation. So same points awarded to
both candidates
07 Time 6 Could not establish proper co
Management relation. So same points awarded to
both candidates
08 Labor 6 Could not establish proper co
Management relation. So same points awarded to
both candidates
09 Puntuality 4
10 Review from 6 Clients comment is candidate is less
client enthusiastic.
11 5 Does not take initiative and no role is
Dependability
observed in planning.
12 Communication 8 Has ability to communicate well, but
Skills. not using the skill.
13 Initiative From 4 No self initiative is observed.
Self
14 Consistency in 4 Lack of intrest is observed.
work
Average score 80/140 Overall performance is not
satisfactory.

You might also like