Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

elev=9.

34m
elev=9.33m
x=-21.75m
STA. 0+464.28

x=0.00m
END OF PROP.
S.M. @ L/S

elev=8.16m
x=-29.76m
6.65m 3.35m 3.35m 6.65m

elev=7.77m

elev=7.77m
1.50

x=3.13m

x=4.13m
SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER

s = -3.00% e = -1.50% e = -1.50% s = -3.00%

elev=6.21m
TOP OF REVETMENT = 9.336m

x=7.51m

elev=5.71m
x=10.76m
2:1
FREEBOARD CLEARANCE 1.50m
2.00
D.F.L = 7.836m

elev=4.30m
x=12.17m
TOP OF BERM = 7.766m
M.E.F.L = 7.536m

elev=3.83m
2:1

x=22.97m
1.14
TOP OF PILE CAP = 6.206m

elev=8.39m
x=-18.14m
STA. 0+453.05 BOT. OF PILE CAP = 5.706m
BEG. OF PROP. O.W.L. = 5.706m
ELEV. 5

elev=7.17m
S.M.@ L/S

x=-11.17m

elev=6.47m
x=-9.40m

elev=5.91m
ITEM NO. QTY.

x=0.00m

elev=5.63m
x=7.89m
A1702(1)a 0.000

elev=4.65m
x=9.28m

elev=4.41m
A1707(1) 8.240

x=10.25m
A1704(1)b 45.776
A1710(1) 2.710
A1710(3) 1.780
A1712(2) 2.510 0 460
A1407(3) 3.550

elev=9.34m
elev=9.33m
x=-21.75m

STA. 0+453.05

x=0.00m
elev=8.78m

END OF PROP.
elev=8.76m
x=-30.00m

x=-26.18m

S.M.H.W. @ L/S
6.65m 3.35m 3.35m 6.65m

elev=7.77m

elev=7.77m
1.50

x=3.13m

x=4.13m
SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER

s = -3.00% e = -1.50% e = -1.50% s = -3.00%

elev=6.21m
TOP OF REVETMENT = 9.336m

x=7.51m

elev=5.71m
x=10.76m
2:1
FREEBOARD CLEARANCE 1.50m
Inlet Elev=6.818m
Outlet Elev=6.306m D.F.L = 7.836m
3.50 TOP OF BERM = 7.766m

elev=3.99m
M.E.F.L = 7.536m

x=12.48m
2:1

elev=3.71m
x=22.73m
TOP OF PILE CAP = 6.206m
elev=8.50m
x=-14.45m

s = -1.00%
BOT. OF PILE CAP = 5.706m
O.W.L. = 5.706m
ELEV. 5 2.00
elev=6.94m
x=-12.72m

STA. 0+450.61

elev=6.32m
x=-7.10m
BEG. OF PROP.

elev=5.85m
ITEM NO. QTY.

x=0.00m

elev=5.57m
S.M.H.W. @ L/S

x=7.99m
A1702(1)a 0.000

elev=4.43m
A1707(1) 8.240

x=9.32m

elev=4.08m
x=10.92m
A1704(1)b 46.352
A1710(1) 2.710
A1710(3) 1.780
A1712(2) 2.510 0 451.83
A1407(3) 4.433
INSTALL 1L-610Ø X 30.00M RCCP
CONSTRUCT S.M. H.W. AND APRON @ L/S.

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
REGIONAL OFFICE No. II
OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- PDS
CAGAYAN FIRST DISTRICT CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES
1ST
29
WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CROSS SECTION ROMNALD I. BOLANDO RODERICK T. LABINAY FELISA M. SALVADOR ROSARIO V. DE GUZMAN OSCAR G. GUMIRAN, Ph.D. CAG
ENGINEERING OFFICE FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL
INSTRUMENTMAN ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 35
APARRI, CAGAYAN
ALONG CAGAYAN RIVER, BARANGAY TORAN, APARRI, CAGAYAN FC
BRGY. TORAN, APARRI, CAGAYAN
DATE: DATE: DATE: DATE: DATE:

You might also like