Item No. A A A A: Elev. 5 STA. 0+466.72 Beg. of Prop. S.M. at L/S
Item No. A A A A: Elev. 5 STA. 0+466.72 Beg. of Prop. S.M. at L/S
34m
elev=9.33m
x=-21.75m
x=0.00m
elev=8.07m
x=-30.01m
6.65m 3.35m 3.35m 6.65m
elev=7.77m
elev=7.77m
1.50
x=3.13m
x=4.13m
SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER
elev=6.21m
TOP OF REVETMENT = 9.336m
x=7.51m
elev=5.71m
x=10.76m
2:1
FREEBOARD CLEARANCE 1.50m
2.00
D.F.L = 7.836m
TOP OF BERM = 7.766m
M.E.F.L = 7.536m
elev=3.92m
elev=3.91m
2:1
x=15.96m
x=12.56m
elev=3.41m
1.14
x=17.63m
elev=3.23m
x=23.00m
TOP OF PILE CAP = 6.206m
elev=8.19m
x=-16.23m
BOT. OF PILE CAP = 5.706m
STA. 0+466.72 O.W.L. = 5.706m
ELEV. 5
BEG. OF PROP.
S.M. @ L/S
elev=6.18m
x=-7.92m
elev=5.86m
ITEM NO. QTY.
x=0.00m
elev=5.53m
x=8.06m
A1702(1)a 0.000
elev=4.47m
A1707(1) 8.240
x=9.22m
elev=4.02m
x=10.35m
A1704(1)b 49.887
A1710(1) 2.710
A1710(3) 1.780
A1712(2) 2.510 STA. 0+466.72 0 480
A1407(3) 4.835 END OF PROP.
S.M.H.W. @ L/S
elev=9.34m
elev=9.33m
x=-21.75m
x=0.00m
elev=8.71m
x=-30.00m
elev=8.55m
x=-25.97m
elev=7.77m
elev=7.77m
1.50
x=3.13m
x=4.13m
elev=7.53m
x=-22.42m
elev=7.02m
x=7.57m
elev=6.71m
x=-24.13m
elev=5.71m
x=10.76m
2:1
FREEBOARD CLEARANCE 1.50m
Inlet Elev=6.817m
Outlet Elev=6.305m D.F.L = 7.836m
3.50
elev=4.17m
2:1 TOP OF BERM = 7.766m
x=12.30m
M.E.F.L = 7.536m
elev=3.38m
x=22.41m
s = -1.00% TOP OF PILE CAP = 6.206m
BOT. OF PILE CAP = 5.706m
elev=7.99m
x=-14.93m
elev=7.75m
x=-13.91m
O.W.L. = 5.706m
ELEV. 5 2.00
elev=6.64m
x=-11.12m
STA. 0+464.28
elev=5.94m
BEG. OF PROP.
x=0.00m
ITEM NO. QTY.
elev=5.61m
S.M.H.W. @ L/S
x=7.93m
A1702(1)a 0.000
elev=4.42m
A1707(1) 8.240
x=9.31m
elev=4.19m
x=10.68m
A1704(1)b 49.350
A1710(1) 2.710
A1710(3) 1.780
A1712(2) 2.510 0 465.50
A1407(3) 4.206
INSTALL 1L-610Ø X 30.00M RCCP
CONSTRUCT S.M. H.W. AND APRON @ L/S.
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
REGIONAL OFFICE No. II
OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- PDS
CAGAYAN FIRST DISTRICT CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES
1ST
30
WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CROSS SECTION ROMNALD I. BOLANDO RODERICK T. LABINAY FELISA M. SALVADOR ROSARIO V. DE GUZMAN OSCAR G. GUMIRAN, Ph.D. CAG
ENGINEERING OFFICE FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL
INSTRUMENTMAN ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 35
APARRI, CAGAYAN
ALONG CAGAYAN RIVER, BARANGAY TORAN, APARRI, CAGAYAN FC
BRGY. TORAN, APARRI, CAGAYAN
DATE: DATE: DATE: DATE: DATE: