elev=9.

34m
elev=9.33m
x=-21.75m

x=0.00m
elev=8.07m
x=-30.01m
6.65m 3.35m 3.35m 6.65m

elev=7.77m

elev=7.77m
1.50

x=3.13m

x=4.13m
SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER

s = -3.00% e = -1.50% e = -1.50% s = -3.00%

elev=6.21m
TOP OF REVETMENT = 9.336m

x=7.51m

elev=5.71m
x=10.76m
2:1
FREEBOARD CLEARANCE 1.50m
2.00
D.F.L = 7.836m
TOP OF BERM = 7.766m
M.E.F.L = 7.536m

elev=3.92m
elev=3.91m
2:1

x=15.96m
x=12.56m

elev=3.41m
1.14

x=17.63m

elev=3.23m
x=23.00m
TOP OF PILE CAP = 6.206m

elev=8.19m
x=-16.23m
BOT. OF PILE CAP = 5.706m
STA. 0+466.72 O.W.L. = 5.706m
ELEV. 5
BEG. OF PROP.
S.M. @ L/S

elev=6.18m
x=-7.92m

elev=5.86m
ITEM NO. QTY.

x=0.00m

elev=5.53m
x=8.06m
A1702(1)a 0.000

elev=4.47m
A1707(1) 8.240

x=9.22m

elev=4.02m
x=10.35m
A1704(1)b 49.887
A1710(1) 2.710
A1710(3) 1.780
A1712(2) 2.510 STA. 0+466.72 0 480
A1407(3) 4.835 END OF PROP.
S.M.H.W. @ L/S

elev=9.34m
elev=9.33m
x=-21.75m

x=0.00m
elev=8.71m
x=-30.00m

elev=8.55m
x=-25.97m

6.65m 3.35m 3.35m 6.65m

elev=7.77m

elev=7.77m
1.50

x=3.13m

x=4.13m
elev=7.53m
x=-22.42m

SHOULDER CARRIAGEWAY CARRIAGEWAY SHOULDER

elev=7.02m
x=7.57m
elev=6.71m
x=-24.13m

s = -3.00% e = -1.50% e = -1.50% s = -3.00%


TOP OF REVETMENT = 9.336m

elev=5.71m
x=10.76m
2:1
FREEBOARD CLEARANCE 1.50m
Inlet Elev=6.817m
Outlet Elev=6.305m D.F.L = 7.836m
3.50

elev=4.17m
2:1 TOP OF BERM = 7.766m

x=12.30m
M.E.F.L = 7.536m

elev=3.38m
x=22.41m
s = -1.00% TOP OF PILE CAP = 6.206m
BOT. OF PILE CAP = 5.706m
elev=7.99m
x=-14.93m

elev=7.75m
x=-13.91m

O.W.L. = 5.706m
ELEV. 5 2.00
elev=6.64m
x=-11.12m

STA. 0+464.28

elev=5.94m
BEG. OF PROP.

x=0.00m
ITEM NO. QTY.

elev=5.61m
S.M.H.W. @ L/S

x=7.93m
A1702(1)a 0.000

elev=4.42m
A1707(1) 8.240

x=9.31m

elev=4.19m
x=10.68m
A1704(1)b 49.350
A1710(1) 2.710
A1710(3) 1.780
A1712(2) 2.510 0 465.50
A1407(3) 4.206
INSTALL 1L-610Ø X 30.00M RCCP
CONSTRUCT S.M. H.W. AND APRON @ L/S.

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
REGIONAL OFFICE No. II
OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- PDS
CAGAYAN FIRST DISTRICT CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES
1ST
30
WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF CROSS SECTION ROMNALD I. BOLANDO RODERICK T. LABINAY FELISA M. SALVADOR ROSARIO V. DE GUZMAN OSCAR G. GUMIRAN, Ph.D. CAG
ENGINEERING OFFICE FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL
INSTRUMENTMAN ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 35
APARRI, CAGAYAN
ALONG CAGAYAN RIVER, BARANGAY TORAN, APARRI, CAGAYAN FC
BRGY. TORAN, APARRI, CAGAYAN
DATE: DATE: DATE: DATE: DATE: