Topic-SUM Prepare Part
Topic-SUM Prepare Part
Topic-SUM Prepare Part
DMO Procedure?
Right Answers:-
2) During the SUM Procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see
the reason for the error?
Right Answers:-
In the latest log files in the SUM Directory, subdirectory ABAP, subdirectory Log.
3) During a SUM run, you want to check if the phase SHADOW_IMPORT_INC is still running
properly. Where can you find information about this?
Right Answers:-
Check latest log files in the SUM Directory, subdirectory ABAP, subdirectory tmp.
Check for running R3Trans processes on the host of the primary application server.
Right Answer:-
A change of the database type is performed, without changing the software components.
5) You are using the maintenance planner to calculate the required software components for
your SAP S4HANA conversion. What do you need to know regarding sUM?
Right Answer:-
As soon as the next SP level of SUM is available, the current version of SUM passes into “patch on
request mode” immediately .
6) You are performing an upgrade with SUM using DMO. You entered a specific number of
R3load processes during roadmap step ‘Extraction’. Where can you change this during the
migration via the ‘More-utilities’ option of the SUM UI ?
Right Answers:-
In SUM Parameters.
7) When using the DMO of SUM, which files can be handled by SUM in the download directory.
Right Answers:-
8) What is the benefit of using the file UPGANA.XML from a previous SUM run?
Right Answer:-
9) Which additional configuration options are offered by SUM when selecting ‘Switch expert
mode on’ in main configuration option standard?
Right Answers:-
10) You are executing a SUM Procedure to update an SAP System in standard mode. When will
the shadow instance be stopped for the last time?
Right Answer:-
11) During the configuration of DMO for SUM, how does the tool behave if option ‘do not
compare table contents’ is selected regarding table comparison?
Right Answer:-
12) You are performing a upgrade with SUM. You are in BIND_Patch phase of the roadmap step
configuration. For some software components you find entries in the calculated level
column. What does the calculated level indicate for those software components?