TIME AND WORK Class Notes
TIME AND WORK Class Notes
Basic concept
Q2. If A will do a job in 12 days , B can do the same job in 4 days , in how
many days working together they will complete the work?
a) 2 days b) 3 days c) 4 days d) 12 days
Q 3.A can do a piece of work in 200 days and B can do the same piece of
work in 30 days. Find in how many days both can do the work?
a)28 days b)20 days c)34 days d)12 days
Q6. A can do a piece of work in 10 days, A and B can do the same piece of
work in 5 days. How many days B will take to complete the work ?
a)10 days b)20 days c)5 days d)12 days
Remining work
Q8.A can complete a work in 35 days and B can do the same work in
28 days. If A after doing 10 days, leaves the
work, find in how many days B will do the
remaining work?
a)25 days b) 20 days c)27 days d) 24 days
Q9. A can do the work in 10 days ,B can do the same work in 15 days ,if
they are working on alternate days means, how many days it will take to
finish the work?
a) 10 days b)12 days c) 15 days d) 16 days
Q16.A Tank has two pipes. The first pipe can fill it in 4
hours and the second can empty it in 16 hours. If two pipes
be opened together at a time then the tank will be filled in
a) 5 1/2 hours(b) 6hours (c) 10hours (d) 5 1/3 hours
Q17. Pipe A can fill the tank in 12 hours & pipe B can fill the tank in 8
hours and pipe C can empty the tank in 15 hours . if all pipes are opened
together then after 5 hours at what portion of the tank will be filled
a) 17/24 b)24/17 c)17/23 d) 1/3
Assignment question
1. An air container can cool the hall in 40 minutes while another takes 45
minutes to cool under similar conditions. If both air conditioners are
switched on at same instance, then how long will it take to cool the room?
A)About 22 minutes
B)About 20 minutes
C)About 30 minutes
D)About 25 minutes
2. Jagdish can build a wall in 10 days. Narender can build the same wall in
12 days while Sumit takes 15 days to do the same job.Which two of them
should be employed to finish the job in 6 days?
A)Jagdish and Narender
B) Jagdish and Sumit
C)Sumit and Narender
D)None of the above
3. Mary and John can do a piece of work in 24 days; John and Vino in 30
days; Vino and Mary in 40 days. If Mary, John and Vino work together
they will complete the work in :
A)10 days
B)20 days
C)17 days
D)15 days
4. A can do a piece of work in 100 days, B and C together can do the same
work in 20 days. If B can do the work in same time as that of C and A
together then how long C alone can do the same work?
A)100 days
B)50 days
C)25 days
D)20 days
5. A man can complete a job in 12 days and his wife can complete the
same job in 15 days. How long will they take to complete the job if they
work together?
A)6 2/3
B)6 ½
C)10 1/2
D)10 2/3
8. If 15 oxen or 20 cows can eat the grass of a field in 80 days, then in how
many days will 6 oxen and 2 cows eat the same grass?
A)40
B)60
C)100
D)160
9. Two pipes A & B can separately fill a cistern in 220 minutes and 330
minutes. Together they can fill the cistern in
A)1 hour 32 minutes
B)1 hour
C)2 hour 12 minutes
D)2 hours
E)none of the above
10. 39 persons can repair a road in 12 days, working 5 hours a day. In how
many days will 30 persons, working 6 hours a day, complete the work ?
A)10
B)13
C)14
D)15
11.Faiza and Fida finish a piece of work in 30 days, Fida and Fiza take 40
days for the same while Fiza and Faiza complete it in 60 days. How long
will they take to finish it together? (capgimini question)
a) 20.3 days
b) 21 days
c) 26.6 days
d) 21.3 days