PMNP CBIM Form 08-a

Environmental and Social Management Plan

PHILIPPINE MULTI SECTORAL NUTRITION PROJECT

Environment and Social Management Plan (ESMP)

I. Subproject Information
Name of the Sub-Project: IMPROVEMENT OF EXISTING DAY CARE CENTER WITH PROVISION OF AMENITIES Sub-project Type:

Sub-Project Location: Sub-Project Status: Basic Social Services (ECCD-related SP)

Region: VIII Date Started:

Province: NORTHERN SAMAR Date Completed:

Municipality: LOPE DE VEGA Date of Spot Checking:

Barangay: BONIFACIO

II. Site/ Location Description

III. ESMP Matrix


PMNP CBIM Form 08-a
Environmental and Social Management Plan

Time Frame/ Schedule for


Proposed Risk
Potential Environmental & the Implementation of
Mitigation/ Enhancement Responsibility Cost/ Budget
Social Risks and Impacts Mitigation/ Enhancement
Measures
Measures
A. Environment
May mga banwa ngan mga  Kaestoryahon an  Minutes of the Before the
digto na tanom tag-iya han mga Meeting implementation
tanom nga  Attendance
masasabod na pan  Photo documentation
isdugon nla an
mga nasabi na
tanom.

 Posible mag  Siguruhon nga May ada 3 nga sako During implementation 3pcs sako
damo ngan dire permi
naka segregate limpyuhan kada -May ada n aka paskil nga
an basura sugad kada human san mga pahinumdom.
san mga trabaho nga ig
bubutang sa -May ada sin designated
ginagamit nga
basurahan an nga area nga bubutangan
mask. Sako
mga basura. base san plano.
semento ug iba
 Mag provide sin
tungod san sako agud  -Photo
paghimo san masiguro nga
pathway. mayaon
bubutangan san
basura nga
sisigurohon nga
nakalain – lain
PMNP CBIM Form 08-a
Environmental and Social Management Plan

Time Frame/ Schedule for


Proposed Risk
Potential Environmental & the Implementation of
Mitigation/ Enhancement Responsibility Cost/ Budget
Social Risks and Impacts Mitigation/ Enhancement
Measures
Measures
an nadudunot
ngan an mga
diri nadudunot
ngan pwedi pa
ma recycle.

Posible mag kulang an Sisigurohon nga -May picture sa drum During implementation
may sadang na
supply sa tubig an stakan san tubig na stakan san tubig.
Barangay tungod para magamit sa -Yaon guin identify na
san pag konstrak
mag tatrabaho san lugar pag bubutangan
Sub-Project.
san tinirok nga tubig
san proyekto. Siguruhon na yaon tawo
nakatuka na mag hahakot para sa construction
Posible maka
san tubig para sap ag
kotaminar han mga *Presensya han
papatrabaho.
tanum an ginamit na mixing board
 Paggamit hin
tubig tikang han pagmasa *Photo
mixing board para maiwasan
han semento an pakakontaminar han mga documentation
tanum

Posible an site mag-  Sisigurohon an -Presensya san facemask  Antis magtikang Facemask 10 boxes
aalpog tungod san gamit tama nga pag para san mag tatrabaho. an pag trabaho 50pcs-Php. 1,950
san pag construct gamit san mask ug
parehas paghalo san samtang nag -Picture san drum na Implementasyon. 4 bottle alcohol
semento, baras ngan hahalo ngan nag aada sa site. Sa actual nga 500ml-Php. 600
graba nga gagamiton papatrabaho. implementasyon
PMNP CBIM Form 08-a
Environmental and Social Management Plan

Time Frame/ Schedule for


Proposed Risk
Potential Environmental & the Implementation of
Mitigation/ Enhancement Responsibility Cost/ Budget
Social Risks and Impacts Mitigation/ Enhancement
Measures
Measures
nga maka apekto san  Sigurohon nga  -Yaon guin
haragne nga mga mayaon permi identify na lugar
panimalay labi na san stock ngan pagbubutangan
kabataan ug kalagsan. sadang nga
san materyales.
supply san tubig
para permi  Construction
Logbook
saribuhan an
construction
site.
 Dapat Yaon
lugar stock
room naoag
bubutangan sa
sulod san pag
tatrabaho.
Hulson an tuna
para mamnimize
an tapo-tapo
Possible maka disgrasya an  Tama nga lugar  Documentation
mga hinukad or inucab na nga Construction Logbook
mga tuna pagbubutangan
han mga inukab
 Igsako-sako para
dire makaulang ha
kalsada
PMNP CBIM Form 08-a
Environmental and Social Management Plan

Time Frame/ Schedule for


Proposed Risk
Potential Environmental & the Implementation of
Mitigation/ Enhancement Responsibility Cost/ Budget
Social Risks and Impacts Mitigation/ Enhancement
Measures
Measures

B. Land Acquisition and Access to Resources
Posible dugngan an mga  Dapat notaryado,  Notarized Permit to Before Implementation
pribado nga lote mayda SPA kon construct
kinahanglan  Municipal Assessor
 Mayda Tax Certification
Declaration ngan  Tax Declaration
Municipal  Hard copy at the
Assessor barangay
Certification

C. Indigenous People

D. Pesticides and Agricultural Chemicals

E. General Construction Management


Dako an posibilidad nga an  Dapat aware hi  Minutes of the
Treasurer in magkawara Treasurer han Meeting
wara ha panahon han petsa han pag Copy of the Pakyaw
pagsweldo sweldo. Contract
 Dapat andam an
mga document
PMNP CBIM Form 08-a
Environmental and Social Management Plan

Time Frame/ Schedule for


Proposed Risk
Potential Environmental & the Implementation of
Mitigation/ Enhancement Responsibility Cost/ Budget
Social Risks and Impacts Mitigation/ Enhancement
Measures
Measures

Posible madelay madeliver Ig klaro daan nga kuun pira Materials Record sheet During implementation
an mga materyales ka dasy delivery san
materyales
Posible magraot an panahon Dapat mag andam kun Suspension Order During implementation
parehas san permi pag uran may tiabot na bagyo pra
ngan bagyo nga pwede mag maiprarar an
resulta sa pagkadelay sa mgamateryales ngan
sub project implementation maitago sin maupay
ngan makahulos san
mgamaterials parehas san
semento
F. Occupational Health and Safety
Possible magkaada hin mga  Ig-explain an  Minutes of the Before and during
disgrasya han dire paggamit importansya han Meeting implementation
han mga PPEs mga PPEs  Attendance sheet
 Ig imposar an  Photo documentation
paggamit han mga
PPEs han mga
nagtratrabaho ha
construction

G. Community Health and Safety


Possible mayda mga  Pag erestoryahan  Minutes of the Before and during
PMNP CBIM Form 08-a
Environmental and Social Management Plan

Time Frame/ Schedule for


Proposed Risk
Potential Environmental & the Implementation of
Mitigation/ Enhancement Responsibility Cost/ Budget
Social Risks and Impacts Mitigation/ Enhancement
Measures
Measures
umaragi labi na an mga dida han meeting Meeting implementation
kabataan nga madisgrasya an importansya.
o mahulog dida han mga gin  Butangan hin mga
excavate para han pag warning signages
construct han SP ha mga sites

Instructions in accomplishing the ESMP template:


1. Check relevant items under (i) Potential E&S Risks and Impacts, (ii) Proposed Risk Mitigation/ Enhancement Measures, (iv) Time Frame/ Schedule for the
Implementation of Mitigation/Enhancement Measures, and (v) Cost/ Budget
2. Compute and provide the costs necessary for implementing the mitigating measure/s;
PMNP CBIM Form 08-a
Environmental and Social Management Plan

Prepared by:

____________________________ _________________
Name and Signature of PPT Chairperson Name and Signature of PPT Member Name and Signature of PPT Member

Approved by:

____________________ _________________
CNSPMC Chairperson BNC Chairperson

Noted by:

ENGR. PETER PAUL E. BASILOY HON. BOBBIE SALUDARIO


Municipal Engineer Mayor