Deployed Equipment Detail & Verification with EASI

JPMLN17_Battery
Asset Info Plan (EASI) Actual Installed at Site
Battery Brand Vision_48V, 100 AH Vision_48V, 100 AH
Battery Model Vision_48V, 100 AH Vision_48V, 100 AH
Individual Battery Voltage 48V 48V
Total Battery Capacity (Ah) 300Ah 300Ah
Quantity of Battery Set (String) 1 1
Battery Serial Number SO20240104003H00693, SO20240104003H00477, SO20240104003H00694
Battery Asset Tag LTH-W016246, LTH-W016245, LTH-W016247
Rectifier
Asset Info Plan (EASI) Actual Installed at Site
Rectifier Brand/Name Huawei_12 KW Huawei_12 KW
Rectifier Version/Model Huawei_12 KW Huawei_12 KW
Rectifier AC Connection (1P/3P) 3 3
Rectifier Module Quantity 3 3
Rectifier Serial Number BN23B1050883
Rectifier Asset Tag DCP-W014179
Rectifier Module Serial Number 2102312QTDLUP3010738, QTDLUP3011084, QTDLUP3010720
Rectifier Module Asset Tag DCP-W017651, DCP-W017652, DCP-W017653
Generator
Asset Info Plan (EASI) Actual Installed at Site
Generator Brand Name
Generator Model
Generator Rating (KVA)
Generator Outpour Phase (1P/3P)
Generator Fuel status (Liters)
Phase-Neutral Voltage Red: V; Yellow: V; Blue: V
Phase-Phase Voltage Red-Yellow: V; Yellow-Blue: V; Blue-Red: V

Air Conditioner (AC)


Asset Info Plan (EASI) Actual Installed at Site
AC Brand/Name
AC Version/Model
AC Capacity (ton)
AC Quantity

IVS
Asset Info Plan (EASI) Actual Installed at Site
IVS Brand/Name
IVS Version/Model
IVS Type (Single Fan/4-Fan)

RMS Unit
Asset Info Plan (EASI) Actual Installed at Site
RMS Brand/Name
RMS Controller Version/Model
RMS Controller Power Connection
RMS Controller Serial Number
RMS Controller Asset Tag
RMS Controller SIM no

Submeter
Asset Info Plan (EASI) Actual Installed at Site
Sunmeter Brand/Name
Submeter Version/Model
Main energy
meter(REB/PDB/DPDC/DESCO)
reading during Submeter
Commissioning day
Initial energy reading of Sub Energy
Meter
Sub Energy Meter Serial Number
Sub Energy Meter Asset Tag
Sub Energy Meter SIM no
Signature of Signature of
EM Representative: RO Representative:

PAT Document for Energy Deployment, Version: edotco/Operations/QA/V5.4, Date:09th October 2022