01 - G.a.d.of Syphon
01 - G.a.d.of Syphon
01 - G.a.d.of Syphon
NON-RIDING :1
5000 (SERVICE ROAD) NOTES:-
500
1.5
BANK RL 144.447 M
1.5
150
150
500
: 1 500 500 2000 :1
612
612
1.5
G.L. 143.835 M DY. FSL 143.947 M G.L. 143.835 M 1. THIS DRAWING IS BASED ON FOLLOWING DATA
900
100 TH. C.C. LINNING
1.5
:1
DY. CBL
143.047 M 1.5
:1 [A]. KANDY DY. AT CHAINAGE 5.30 KM
100
(A) DESIGN DISCHARGE 0.74 CUMEC
G.L. 143.835 M
1027,5
1027,5
1027,5
G.L. 143.835 M
G (C) WATER DEPTH AT DESIGN DIS. 0.900 M
662 7725
5225
(D) U/S BED LEVEL 143.047 M
2100 300 E
A D/S BED LEVEL 143.047 M
5000
5000
5000
B (E) F.S.L. FOR DESIGN DISCHARGE AT CROSSING SITE 143.947 M
500
900
1500 1500
600 900 F 900 600
D D H H
(F) BED SLOPE 25.0 CM/KM
1500
1500
600 2325 1200 1700 1200 3550 (SERVICE ROAD) (G) FREE BOARD 0.500 M
(H) SIDE SLOPE 0.5:1
1000
1000
150
3000
25000 LINING
1
C
1:
1000
1000
(J) VALUE OF 'N' 0.0225
2000
2000
600
600
[B]. CROSSING DRAIN
(WITH 20 MM TO 45 MM COARSE AGGREGATES)
KANDI DY.
(A) DESIGNED DISCHARGE 30.0 CUMEC
B C (B) U/S BED LEVEL 140.150/141.340 M
F
A DRAIN E
5000
5000
200 MM TH. GRADED FILTER
500 900
10000
10000
10000
500
500
100 MM TH. SAND FILLING
13700
450 2050
(H) SIDE SLOPE 1:1
2725 2500
(I) VALUE OF 'N' 0.03
5000
5000
5225
100 (J) SILT FACTOR (ASSUMED) 0.85
1200 600 3100 600 1200 1000 2000
150 TH. PCC M-10
4000
2225 5500 3450 3050 4675 3000
(K) CATCHMENT AREA 6.30 SQ. KM.
7725
40000 LINING
DY. CBL 143.047 M
BANK RL 144.447 M
600
2000
2000
CHECKED FROM APPROVED L-SECTION PRIOR TO CONSTRUCTION.
1000
1000
3000
100
4. BACK FILLING OF THE SIDES OF BARRELS SHOULD CONFORM TO DESIGN
1000
1000
150
1500
IN LENGTH OF 40 M U/S & D/S OF STRUCTURE.
600 900 900 600
1500 1500 6. THE FILTER MATERIAL WHICH IS SAND, GRAVEL AND SHINGLE IN BED OF
5000
5000
5000
685 DRAIN AND IN THE BACK OF WING WALLS SHOULD BE WELL GRADE,
CONFORMING TO IS 8237. IT SHOULD BE WELL CLEAN AND DURABLE AS
G.L. 143.835 M
5225
500
900
7725
REQUIRED FOR CONCRETE WORK.
2100 300 7. NO FOUNDATION SHALL BE LAID ON FILLED EARTH.
1027,5
1027,5
1027,5
8. THE SYPHON STRUCTURE UNLESS FULLY CONSTRUCTED AND LOADED,
612
G.L. 143.835 M
:1
G.L. 143.835 M 1.5 DY. FSL 143.947 M
G.L. 143.835 M
1:
M-25
100
SYPHON BARRELS
900
685
685
1 1
1:
DY. CBL
DRAIN TOP RL 143.150 M DRAIN TOP RL 143.150 M
143.047 M
M-20
600 300
1000
3000
DRAIN DRAIN
1100 TH APRON
M-15
2000
2000
450
500
500
1000
1000
11. GAD IS BASED ON THE DATA SUPPLIED AS PER L-SECTION OF KANDY DY,
1500
1500
3 ROWS CC BLOCKS
500 TH APRON
850 900X900X900 OVER 2
12. D/S BED OF DRAIN SHALL BE REGRADED AS PER REQUIREMENT.
300
LAYERS OF FILTER
850
300
150 TH EACH
2 ROWS CC BLOCKS
900X900X900 OVER 2 100 MM TH. SAND FILLING
LAYERS OF FILTER
150 TH EACH 200 MM TH. GRADED FILTER
150 TH PCC M10
(WITH 20 MM TO 45 MM
COARSE AGGREGATES)
450 2050 300 2700 1425 1700 1425 3625 300 3050 450 4225
2725 2500 2700 4550 3925 3500 4225
5225 18900
Prepared by :-
DETAIL SECTION OF SYPHON Project Title :- NORTH KOEL RESERVOIR PROJECT, BIHAR AND JHARKHAND
WAPCOS LTD.
Drawing Title :- G.A.D. OF SYPHON AT KM 5.300 OF KANDY DY.
SCALE A:-
Drawing No. :- WAP/INFRA/NORTH KOEL/LMC/SYPHON 01 of 05
1500
1500
3000
0
4500