Construction Cost Estimation are include of 3 Sub-Cost

. Quantity based on the drawing


(Direct Cost) Reasonable price per unit

Planning Construction Method And Temp. Expenses


- PRO
2. Machine tools, equipment, materials FIT
(Indirect Cost) All Temporary -
Safety Protection Cost +
-
Building, temporary equipment, personnel costs TAX

3.
Central expenses
(Overhead Cost)
Construction Planning
1 ( )
2
3
Planning before start construction working 4
Planning for the contribution
(Must be done on estimation process) Planning during construction Planning for Hand-Over insurance period.
1) 4)4)
2) 3)
( )
q q Quality Manual q As-Built Drawing q Inspection Schedule
w w Worker Training Programe w Structure Design Drawing w 6 month Check
w Photo Site Survey Report w Work Method Statement w Architectural Design Drawing w Final Check
q (Spec. & Design Dwg.) w Work Instruction w As-Built Shop Drawing q Request Maintainance Bond
w Project Outline w Check List Form q Testing & Commisioning Report
w , (TOR.) w Inspection & Test Plan(ITP) q Training Program of M/E Work to Owner
w q Safety Manual ,Regulation and Safety Laws q Defect and Inspection Check List
, , , q Review Master Schedule q Hand Over Schedule
q Monthly Schedule & Report q Handover Document
q q Weekly Schedule & Report w Inspection Check List
q (Temporary Work Planning Drawing) q , w Key List,keys and Key Box
w Construction Method Statement q Shop Drawing Schedule w Manual of Operation
q w Photo Completion Work
- q w Remaining Material List
- q Preventive Plan w Supplier List
- q Corrective Plan w List of Warrantly Letters
w (Temp. layout plan) q Variation Order Work q Submit Maintainance Bond
,Store, q Request Payment q
w (Under Ground WorK) q Budget Control
w (Super Structure Work) q (Feed back,Evaluate Data)
w Special Structure Work
w (Safety Plan)( , , )
w (Temp. Electric)
w (Temp. Pumbling)
w (Labour Camp)
q
q (Master Schedule)
q (Organization Project Chart)
Planning before start construction working

Planning during construction

Planning for Hand-Over

Planning for the contribution insurance period.


1.
(Indirect Cost) All Planning/Method

Surveying the construction area

Spec. & Design Drawing

Temporary Work Planning Drawing

Estimate the cost of temporary work.

Master Schedule Plan

Organization Project Chart

Construction Planning
Spec.&Design Dwg.)

Project Outline

Term Of Reference (TOR)

Quantity Survey based on the drawing such as Concrete, Formwork, Steel bar ,
Steel skeleton, decorative materials.
Building Design Drawing
Lay-out
Section
Underground
Planning before start construction working
(Temporary Work Planning Drawing)

(Construction Method Statement)


, Office Temp. Layout Plan)
(Underground Work)
(Super Structure Work)
Horizontal & Vertical Transportation)
(Special Structure Work)
(Safety Plan , Emergency Call)
(Temp.Electric,Plumbing)
(Labour Camp)
(Construction Method Statement)

Engineering Based On

Schedule Time

Budget Control
Construction Safety work to be careful

Safety For machine , tools .And Some part of Work

Personal Safety

Environmental Safety
THE Sample PROJECT
BANGKOK THAILAND

Organization Project Chart ORGANIZATION PROJECT CHART

Project manager HEAD OFFICE

Deputy manager

Chief foreman Chief foreman Survey Chief Eng. Chief M&E Material
Material
Engineer

Foreman Foreman Survey Foreman Clerk


Clerk

Shop drawing
Engineer Engineer Foreman Clerk
Clerk
division

Foreman Foreman

- Entertainment and
- Spa, Suite and Survey work - Temporary work Mechanical
Retail building Procurement
Procurement
Massage building - Quanlity control &
- Swimming Pool &
&
- External work - Safety control Electrical
- Porte cochere Administration
Administration
- Quantity survey Shop drawing Co-ordinate
- External work
- Quantity survey
Planning during construction
Quality Manual
Safety Manual , Regulation and Safety Preparing the procurement plan.
Laws
Review Master Schedule Permission for electricity and
water supply from government
Monthly Schedule & Report
Preventive Plan
Weekly Schedule & Report
Corrective Plan
Variation Order Work
Request Payment
Access to and delivery of area, Budget Control
Confirm the official pin .
Project Evaluate
Shop Drawing Schedule Feed back,Evaluate Data)
Quality Manual

Worker Training Program


Work Method Statement
Work Instruction
Check List Form

Inspection & Test Plan (ITP)


Safety
Step for Safety Work in Construction Project

Set up the policy of the company


2. Accident shall be Zero
Set up Target such as Accident to be Zero.

Plan a basic safety plan.

Put the plan into action.

Review the implementation and make improvements to the defect.

Collect data, including costs, as a basis for the work.


As-Built Drawing Hand Over Schedule
Testing & Hand Over
Commission Report Document
Training Program of Submit Maintenance
M/E Work to Owner Bond
Defect and Building Permit
Inspection Check ( )
List
Planning for the insurance period.

Inspection Schedule
6 Month check
Final check
Request Maintenance Bond