3. TODAY’S ACTIVITIES
No DESCRIPTION STATUS
SITE CLEARANCE AND PREPARATION
1 Backfilling and compaction at the offices (Y1-Y5, X1-X11) Ongoing
2 Hardcore placement for foundation at the offices (Y1-Y5, X1-X11) Ongoing
3 Sand blinding (Y7-Y8, X6-X11) and (Y9-Y10, X6-X11) Ongoing
4 Steel fixing for beam and slab (Y5-Y7, X6-X11) Ongoing
5 Shuttering and de-shuttering of formwork for fence wall capping Ongoing
6 Concrete casting for fence wall capping Ongoing
7 Fence wall and columns plastering Ongoing
8 Steel base plate cutting and drilling for steel columns Ongoing
9 Fence block wall, beam, slabs, plaster and columns curing Ongoing
4. TOMORROW’S ACTIVITIES
No DESCRIPTION STATUS
SITE CLEARANCE AND PREPARATION
1 Backfilling and compaction at the offices (Y1-Y5, X1-X11) Ongoing
2 Hardcore placement for foundation at the offices (Y1-Y5, X1-X11) Ongoing
3 Sand blinding and anti-termite at (Y7-Y8, X6-X11) and (Y9-Y10, X6-X11) Ongoing
4 Steel fixing for beam and slab (Y5-Y7, X6-X11) Ongoing
5 Shuttering and de-shuttering of formwork for fence wall capping Ongoing
6 Concrete casting for fence wall capping Ongoing
7 Fence wall and columns plastering Ongoing
8 Steel base plate cutting and drilling for steel columns Ongoing
9 Concrete casting for ground beam and slab {Y10-YS, X6-X11) Ongoing
10 Fence block wall, beam, slabs, plaster and columns curing Ongoing