Download as pdf or txt
Download as pdf or txt
You are on page 1of 840

LIMITED MORNING REPORT

Username: ALAAMRKR
Database: EPPR QTIF-790 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/30/2024 - 08/25/2024
Report ID: OPERLMTDMRREP

088TE @ QTIF-790 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL Foreman(s)SAKR ALI, MOHAMED KHAMIS / ALMAGDAD, ABDULLAH EBRAHIM
D&WO Morning Report (Service Providers View) Rig Charge #: DISPOSAL TARGETING ARAB-C) Engineer ALROQAIE, ABDULAZIZ ABDULLAH
Copyright 2024 Saudi Aramco. All Rights Reserved 088TE (66-24012-0790) Manager ABADA, YASSINE
Daily Onshore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: +882167771 1297 013 673-73 91 /CLERK VSA
Date: Tuesday 06/18/2024 QTIF-790 (0) QTIF_790_0 T
013 673-73 93

Last 24 hr operations Next 24 hr plan


ROTARY DRLG. 22" HOLE SECTION. ROTARY DRLG. 22" HOLE SECTION TO CP @ 3,076'. CHC. WIPER TRP. POOH & L/D 22" BHA. RUN
18-5/8" CSG.
Location Next Location
DRILLSITE: W6, 55 KM FROM DH MAIN GATE *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
3,060 Last Csg Size MD TVD Size Top
24 863 863 Formations Comments
Depth
RUS 933
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ARUM 2,197
2015 (Date) 0 1,045 55 LAMS 2,968
11.2 (06/07/2024@0130 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0830 3.5 0 22 N DRLG D TDS RIG 2015 2205 ROTARY DRLG. 22" VERTICAL HOLE WITH WATER LIME TREATED & GEL SWEEPS &
TOTAL LOSSES.

HELD STAND DOWN MEETING WITH CREW DISCUSSED SENOIR VP SAFE WORK
0830 - 0900 0.5 0 22 N DRLG SDR1 NA RIG 2205 2205
PRACTICE LETTER & STOP WORK AUTHORITY AND SAFETY CULTURE
IMPROVEMENT.

ROTARY DRLG. 22" VERTICAL HOLE WITH WATER LIME TREATED & GEL SWEEPS &
0900 - 1200 3 0 22 N DRLG D TDS RIG 2205 2300
TOTAL LOSSES.

1200 - 1230 0.5 0 22 N DRLG RR TDS RIG 2300 2300 SERVICE TDS, CHECK FOR DROP OBJECTS.

HELD STAND DOWN MEETING WITH CREW DISCUSSED SENOIR VP SAFE WORK
1230 - 1300 0.5 0 22 N DRLG SDR1 NA RIG 2300 2300
PRACTICE LETTER & STOP WORK AUTHORITY AND SAFETY CULTURE
IMPROVEMENT

ROTARY DRLG. 22" VERTICAL HOLE, WITH SHALE INHIBITED PHPA MUD & TOTAL
LOSSES.
- SWEEP HOLE W/ 50 BBL HVP EVERY 30' DRILLED.
1300 - 0459 16 0 22 N DRLG D TDS RIG 2300 3060 - WASH UP / REAM DOWN FULL STD EVERY CONNECTION.
- SPOT 50 BBLS HVP ON BTM PRIOR CONNECTION.
- AT 2,700' ( BEFORE LAMS) SWITCH TO SHALE INHIBITED PHPA MUD.
* CONT. RUNNING TRIP TANK, PUMPING MUD CAP INTO ANNULUS @ 1.5 - 2.0 BPM.

Foreman Remarks

QTIF-790 WILL BE DRILLED AND COMPLETED FROM DRILL-SITE W-6 AS AN OPEN HOLE SINGLE LATERAL DISPOSAL WELL TARGETING ARAB-C
RESERVOIR TO TD OF (23,794 FT MD/ 7,836 FT TVD). THE WELL WILL BE COMPLETED WITH 7" GRE TUBING (NON-CEMENTED TIE-BACK
TO SURFACE).
=====================WELL DESIGN ==========================
* 42" HOLE, 36" CONDUCTOR @ 125' MD/TVD. (COMPLETED)
* 34" HOLE, 30" CONDUCTOR @ 333' MD/TVD. (COMPLETED)
* 28" HOLE, 24" CSG @ 863' MD/TVD. (COMPLETED)
* 22" HOLE, 18-5/8" CSG @ 3,068' MD/TVD (100' TVD INSIDE LAMS).
* 17" HOLE, 13-3/8" CSG @ 5,049' MD/4,998' TVD (50' TVD ABOVE SHUB).
* 12-1/4" HOLE, 9-5/8" CSG @ 5,521' MD / 5,434' TVD (300' TVD INSIDE BIYADH).
* 8-1/2" HOLE, 7" LINER @ 19,449' MD / 7,748' TVD.
* 6-1/8" HOLE @ 23,794' MD / 7,836' TVD (ARAB-C RESERVOIR).
================================================== NEXT WELL =======================================
- QTIF-598 (DRILL SITE: W-6).
============================================ ERP & SAFETY REQUIREMENT =================================
THE WELL IS PLANNED AS ZERO RER WELL DESIGNED TO PENETRATE WATER ZONES ONLY. IF ANY MOVABLE HYDROCARBONS ARE
INTERSECTED WHILE DRILLING QTIF-793, DRILLING MUST BE STOPPED, THE WELL SHALL BE CEMENTED ACROSS THE HYDROCARBON ZONE
AND SIDE-TRACKED DOWN-DIP OF THE HYDROCARBON ZONE. THE SITUATION MUST BE REGISTERED AND NOTIFIED TO DHALPD.
MINIMUM SPACING IS 60 M.
===============================EXISTING WELLS ON LOCATION / ACTIVATE SIMOPS===============================
- 112 CEMENT CONCRETE BLOCKS ON LOCATION.
================================================= SAFETY =========================================
- PERFORMED DAILY RADIO CHECK WITH DH ECC.
- CONDUCT DAILY SAFETY & PRE-TOUR MEETING.
- STAND DOWN MEETING WITH RIG CREW DISCUSS SAFE OPERATION VERIFICATION, CRITICAL FALL FROM HEIGH AND FALL PROTECTION.
- SAFETY CAMPAIGN: SWA / HAND FINGUER INJURY/ PPE/ HOUSEKEEPING.
- INCIDENT ID : NONE.
- SAFETY DRILL:
- NEAR MISS: NONE.
- REP. OBS.: 4.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-790 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/30/2024 - 08/25/2024
Report ID: OPERLMTDMRREP

============================ ARAMCO PERSONNEL ON LOCATION ================================


- ALI ALHUNTUSHI, MATERIAL EXPEDITOR #8496232 ON LOCATION SINCE 06/08/2024.
-KHALID S. ALSHAMRANI, FOREMAN TRAINEE #812868 ON LOCATION SINCE 6/17/2024.
=========================== SERVICE COMPANY & RENTAL TOOLS =================================
- BAKER MUD ENG. ON LOCATION SINCE 2/27/2024.
- TAQA SHOCK SUB 12" SN: ST5-1200-139 (ON LOCATION 06/07/2024 A 00:00).
- TAQA DRLG. JAR (DJ6-900-087) ON LOCATION 06/14/2024 @ 14:00 HR.
=================================== DIRECTIONAL =========================================
===============================CONTRACTOR MANAGEMENT VISIT================================
========================= ======"WASTE MANAGEMENT"=======================================
- 4 VACUUM TANKERS ON LOCATION ON MONTHLY BASES.
==============================DRILLING FLUID RECYCLING======================================
- TOTAL MUD RECEIVED: 400 BBL WBM.
- TOTAL MUD SHIPPED: 0.
====================================== RIG VISIT ==========================================

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 4 API 0 0 Volts 3.54 9.5 138,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 86 30 0 9 / 11 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 25 14 9 / 10 0 0 0
83
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 4 API 0 0 Volts 3.82 9 133,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 86 29 0 9 / 11 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 25 14 8/9 0 0 0
81

BARITE SODASH CAOH2 IDCAP D MUSOL MAX-GUARD CAUST


MUD 30 ( 5000L ) 4 ( 100LB ) 55 ( 55LB ) 10 ( 50LB ) 1 ( 55GL ) 16 ( 55GL ) 10 ( 50LBP )
TREATMENT DRIL-STARCH NACL XC NEWDRILSTK
152 ( 50LB ) 78 ( 2200L ) 67 ( 50LB ) 3 ( 25LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
3 863 3,060 DP Av DC Av Bit HHP 35 120 435 22 SMT
Pressure GPM Jet Vel 45.39 50.09 161 I-Row O-Row DC Location Bearings
1,500 850 205 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
RV1669 GSI12 3 x 18 / 3 x 16 / 1.335
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A 8,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 22 1 22 1 2.2 7-5/8" REG RV1669
2 Roller Reamer RIG 22 1 22 2.8 9.2 7 5/8 REG 7 5/8 REG 0 3 POINT 2203
3 Shock Sub CTC 12 1 12 3 14 7-5/8" REG 7-5/8" REG 0 ST5-1200139
4 Roller Reamer RIG 22 1 22 2.8 9.32 7 5/8 REG 7 5/8 REG 0 3 POINT 23510
DRILL STRING 5 Drillcollar RIG 9.5 2 9.5 2.813 58 7 5/8 REG 7 5/8 REG 206 SPRL RIG TALLY
6 String Reamer RIG 22 1 22 3.063 8 7-5/8" REG 7-5/8" REG 0 174998
7 Drillcollar RIG 9.5 3 9.5 2.813 91.3 7 5/8 REG 7 5/8 REG 206 SPRL RIG TALLY
8 Crossover RIG 9.5 1 9.5 2.813 3.5 6 5/8 REG 7 5/8 REG 0 2922
9 Drillcollar RIG 8.25 6 8.25 3 180 6 5/8 REG 6 5/8 REG 157 SPRL RIG TALLY
10 Hydraulic Jar CTC 9 1 9 3 30 6-5/8" REG 6-5/8" REG 0 DJ690087
11 Drillcollar RIG 8.25 3 8.25 3 91.85 6 5/8 REG 6 5/8 REG 157 SPRL RIG TALLY
12 Crossover RIG 8.25 1 8.25 2.875 3.5 NC50 6 5/8 REG 0 3322
13 Heavy Weight Drillpipe (HWDP) RIG 5 15 5 3 472 NC50 NC50 44.99 CONV RIG TALLY
14 Drillpipe RIG 5 1 5 4.276 30 NC50 NC50 19.5 G105 PREMIUM RIG TALLY

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 3,722 N/A

Company BCM RZT RIG BDF RIG ARM MI2 OTH ARM
PERSONNEL
PCS CTRG RIG DFMS OTHR OTHR SCS VAC WSC
Total
AND SERVICES Category
102
INFORMATION
No. of Persons 4 15 53 2 17 1 4 4 2

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-790 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/30/2024 - 08/25/2024
Report ID: OPERLMTDMRREP

Personnel on Loc. Hrs. 12 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 24 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
ARAMCO VEHICLE DH-7517

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 547 N/A N/A 2000

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNIF-304 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/16/2024 - 09/07/2024
Report ID: OPERLMTDMRREP

095TE @ MNIF-304 Limited Morning Report for 06/18/2024


Objective : (MNIF-304 WILL BE Foreman(s)MOHAMED RIZK, AHMED MAHMOUD
D&WO Morning Report (Service Providers View) Rig Charge #: A SINGLE LATERAL PRODUCER Engineer TASHKANDI, AHMAD AIMAN
Copyright 2024 Saudi Aramco. All Rights Reserved 095TE (66-24026-0304) TARGETING THE LRTW Manager GARNI, ABDULLAH SALEH
Daily Onshore RESERVOIR ACROSS LRTW- ) THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 8821677711 258 379-5218 /CLERK VSA
Date: Tuesday 06/18/2024 MNIF-304 (0) MNIF_304_0 T
379-5220

Last 24 hr operations Next 24 hr plan


R/D ON MNIF-309, PERFORM RIG MAINTENANCE & MOVE TO MNIF-304 R/D ON MNIF-309, PERFORM RIG MAINTENANCE & MOVE TO MNIF-304
Location Next Location
MNIF-304 / DS-21 MNIF-100
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 195
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

R/D ,PERFORM MAINT ON MNIF-309 & MOVE TO MNIF-304


- HOLD PRE-JOB MEETING WITH RIG CREW AND RIG MOVE TEAM, REVIEW STOP
WORK AUTHORITY, RIG MOVE PLAN, JSA'S AND PTW.
- CONTINUE PREPARE MAST FOR UNPINNING
- UNPIN AND LOAD MAST ON DOLLY
- CONTINUE SPOTTING AND RIGGING UP MUD SYSTEM
- R/D AND MOVE DWKS
0500 - 0459 24 0 PRE M MAIN RD NA RIG 0 0 - WASH AND CLEAN MAST AND SUBSTRUCTURE
- PREPARE MUD PUMP #2 TO SWAP WITH NEWLY REFURBISHED PUMP
- LOWER DRILLER'S SIDE MAST SECTION TRANSPORTED TO UNITED CARAVAN
TRADING COMPANY FOR MAST RAISING LINE SHEAVE REPLACEMENT.(6/17/2024)
- R/D A-LEGS & SUB BASE
- R/D GENERATORS AND DIESEL TANKS
- GENERAL HOUSEKEEPING

- R/D: 60%, R/M: 40% & R/U: 20 %


Foreman Remarks

MNIF-304 WILL BE DRILLED AS A SINGLE-LATERAL HORIZONTAL OIL PRODUCER TARGETING LRTW RESERVOIR ACROSS LRTW-A AS PART OF THE MAINTAIN POTENTIAL PROGRAM.THE TOTAL
DEPTH IS 16461' MD/7969' TVD. THE WELL WILL BE COMPLETED WITH BAKER HUGHES DUAL ESP COMPLETION.

------------------------------------------------SAFETY ----------------------------------------------------------------------------
* SIMOPS DEACTIVATED ON 06/12/2024 .
* AMBULANCE, EMERGENCY BUS AND LIFE BOAT ON LOCATION.
* ALL WELL HEADS, HEADER LINES ARE BARRICADED WITH CONCRETE BLOCKS.
* REPORT NEAR MISS INC ID# 7236098

--------------------------------------------ARAMCO PERSONNEL, RENTAL TOOLS & OTHERS----------------------------

* M.E. NAIF ALHUNTUSHI #8496231 ON LOCATION FROM JUNE 17

--------------------------------------------------------------------
AL-MADEED 1 VACUUM TANKER: 7118LRE, DUMP TRUCK:7440 LRA
VP DAILY REMARKS
N/A
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 4,368 N/A

Company RZT RIG BDF SMI ARM ARM

Category CTRG RIG DFMS DFMS OTHR WSC


PERSONNEL
14 62 1 1 1 1
Total
AND SERVICES No. of Persons
80
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24

TRUCKS/BOATS Standby/Tankers

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNIF-304 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/16/2024 - 09/07/2024
Report ID: OPERLMTDMRREP

N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DMMM-134 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:19 06/08/2024 - 08/26/2024
Report ID: OPERLMTDMRREP

910TE @ DMMM-134 Limited Morning Report for 06/18/2024


Objective : (DMMM-134 IN Foreman(s)KUMAR, ANURAG / SHAMAH, MUHANNAD HASSAN
D&WO Morning Report (Service Providers View) Charge #: DMMM DS-B (MAIN PAD):ERD Engineer ALI, SYED MUHAMMAD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved 910TE (71-24011-0134) RE-ENTRY WELL, WILL BE Manager HAQWI, MOHAMMED MOSA
COMPLETE WELL AS ARAB THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: C&D MANARA SMRT PR)
(0500-0500) Saudi Aramco Well 0088216777 12726 0135773939 OFFICE 0135773927 OFFICE
Date: Tuesday 06/18/2024 DMMM-134 (0) DMMM_134_0 CONTRACTOR /CLERK VSA T
0135773593 CLERK

Last 24 hr operations Next 24 hr plan


CONT. POOH & L/D 8-1/2" C/O ASSY, P/U & RIH WBCO/RCJB ASSY (RUN#1), CONT. RIH WBCO/RCJB ASSY (RUN#1), CHC, POOH & L/D WBCO/RCJB ASSY (RUN#1).
Location Next Location
DMMM DRILL-SITE B (MAIN PAD) / 6 KM SW FROM DH MAIN GATE. DMMM-129
Current Depth (ft) Liner TOL MD TVD Formation Tops
17,512 Last Csg Size MD TVD Size Top
9 5/8 17485 4425 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
17512 (Date) 100 0 6
4.7 (06/13/2024@1200 )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0500 - 1115 6.25 0 POST N CT TO STDP RIG 17512 17512 13500 600
CONT. POOH WITH 8-1/2" C/O ASSY TO TOP OF BHA.
1115 - 1130 0.25 0 POST N CT CIRC MPMP RIG 17512 17512
* FLOW CHECK; WELL STATIC.

1130 - 1330 2 0 POST N CT HT BHA RIG 17512 17512 HPJSM, POOH & L/D 8-1/2" C/O ASSY.
* L/D 6-1/2" NOV JAR @ 12:15.

HPJSM, P/U & M/U 9-5/8" RCJB & 6 CORETRAX STRING MAGNETS (WBCO ASSY )
(RUN#1).
1330 - 1530 2 0 POST N CT WBCO WBCL CRT 17512 17512
* PERFORM RCJB SURFACE TEST & RECORD FLOW RATE/PRESSURE: 2, 4, 6 & 8
BPM / 0, 0, 20 & 70 PSI.
* P/U 6-1/2" NOV JAR @ 15:00.

1530 - 1715 1.75 0 POST N CT WBCO WBCL CRW 17512 17512 549 3570 HPJSM, RIH WITH 9-5/8" RCJB TO 3,570'.
* FILL UP STRG EVERY 20 STDS.

CONT. RIH WITH 9-5/8" WBCO ASSY WHILE P/U 5" JTS DP TO 6,602'.
1715 - 2100 3.75 0 POST N CT TI SPDP RIG 17512 17512 3570 6602
* FILL UP STRG EVERY 20 STDS.
* P/U 96 JTS X 5" DP.
2100 - 2115 0.25 0 POST N CT HT PEL RIG 17512 17512
HPJSM, CHANGE HANDLING EQUIPMENT TO 5-1/2".

CONT. RIH WITH 9-5/8" WBCO ASSY WHILE P/U 5-1/2" JTS DP TO 8,373'.
2115 - 2330 2.25 0 POST C CT TI SPDP RIG 17512 17512 6602 8373
* FILL UP STRG EVERY 20 STDS.
* P/U 57 JTS X 5-1/2" DP.

CONT. RIH WITH 9-5/8".RCJB & 6 WBCO ASSY ON 5-1/2" STDS DP TO


2330 - 0459 5.5 0 POST N CT TI STDP RIG 17512 17512 8373 17000
17,000'...ON GOING ....@ RPT.
* FILL UP STRG EVERY 20 STDS.
Workover Objectives
Foreman Remarks

DMMM-134 DMMM ERD RE-ENTRY WELL, WILL BE DRILLED THROUGH ARABS A, B, C & D RESERVOIRS AND COMPLETE AS ARAB C & D MANARA SMART OIL PRODUCER.

========================== RER & STAGING AREAS ===================


* 1/2 LFL: 71 M ,100 PPM @ 339 M, 30PPM @ 583 M.
* GOR: 312 SCF/STB, H2S: 1.39 %.
* STAGING AREA #1 , COORDINATES: N: 2907810 E: 409505.
* STAGING AREA #2 , COORDINATES: N: 2905808 E: 409856.

========================== RIG KPI'S ============================


* PLANNED D/P TRIPPING SPEED (CSG) 18 STD/HR, ACTUAL: NONE.

========================== PERSONNEL ON BOARD ================


- ARAMCO CLERK ASAD SHAH ID# 8266406 ON LOCATION SINCE 02/08/2024.
- ARAMCO MATERIAL EXPEDITOR ABDULMOHSEN ALAJMI #8530513 ON LOCATION SINCE 06/17/2024.

========================== SAFETY & DRILLS ====================


PRE-TOUR SAFETY MEETING (2), WEEKLY SAFETY MEETING (0), COLD PTW (5), HOT PTW (1), CONFINED SPACE (0), JSA (19), STOP CARDS (61), NM (0).

SAFETY TOPICS:
- REVIEW NEAR MISS #7209482 - HAMMER SLIPPED DUE TO GREASY HANDLE.
- REVIEW HAZCOM PROGRAM, HAZMAT HANDLING AND STORAGE.
- REVIEW THE WAY HAZMAT AFFECT OUR BODY I.E. INHALATION, DIGESTION, INJECTION & SKIN ABSORPTION.
- OPEN DISCUSSION WITH CREW ABOUT THE DIFFERENCE BETWEEN CHB, LABEL AND SDS.
- EMPHASIS TO CREW ABOUT THE ARRANGEMENT OF CHEMICALS AS PER RATING.
- EMPHASIS TO CREW ABOUT THE DIFFERENT PPE TO BE UTILIZED WHILE HANDLING CHEMICALS.
- AWARDING THE MAN OF THE MONTH FROM THE OBSERVATION REGARDING HANDS & FINGERS SAFETY.
- REVIEW ERT AND THEIR KEY RESPONSIBILITIES.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DMMM-134 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:19 06/08/2024 - 08/26/2024
Report ID: OPERLMTDMRREP

- REVIEW DAY OPERATIONS WITH EMPHASIS TO CREW ABOUT UTILIZING PROPER PPE FOR THE JOB.
- EMPHASIS TO CREW ABOUT RISK ASSESSING THE AREA BEFORE TAKING UP TASK.

CAMPAIGN:
- REFRESHER ON HAZCOM.
- STAY HYDRATED TO AVOID HEAT STRESS & HEAT EXHAUSTION.
- HOUSEKEEPING.

FIRE DRILL (0), MAN DOWN DRILL (0), VERTICAL RESCUE DRILL (0), MAN-LOST DRILL (0), CONFINED SPACE RESCUE DRILL (0), H2S RELEASE DRILL (0), H2S RESCUE DRILL (0), PIT DRILL (1), TRIP
DRILL (3), BOP FUNCTION TEST (0), BOP/SPACE OUT DRILL (3), ACCUMULATOR TEST (0), FIRE WATER SYSTEM EQUIPMENT FUNCTION TESTS (0), OIL SPILL DRILL (0), COVID 19 DRILL (0).

========= JAR & SHOCK SUB & RENTAL TOOLS ========


- RECEIVED 6-1/2" NOV HYD DA JAR, SN: GFJ650-4385222 ON 06/13/2024 @ 16:40 HRS, P/U ON 06/14/2024 @ 15:00 HRS.
- P/U 96 JTS (3021') X 5", 19.5#, G-105, DS-50 DP @ 15:00 HRS ON 06/14/2024.

============EQUIPMENT ON LOCATION ==========================


- TAMIMI WATER SPRAY TANKER DRSS#1004326485 (PLATE# 4453 BRA ID# 2314728326).
- TAMIMI VACUUM TANKERS DRSS#1004326492 ( (PLATE# 6418 NRA, ID# 2481845739 / PLATE# 6278 NRA, ID# 2524733728) - 2 TRIPS PER DAY.

========= SPECIAL EQUIPMENT ON LOCATION ===============


* RAWABI PLUME TRACKER SYSTEM INSTALLED ON 2 SECURITY VEHICLES ON 06/13/2024 @ 07:00 HRS.
* R/U RAWABI H2S MONITORING SYSTEM ON 06/13/2024 @ 07:00 HRS.

======WATER CONSERVATION IMPLEMENTED INITIATIVES====


- REDUCED WATER PITS: N.
- DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: N.

============== VISITORS =============


DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 1 4.6 API 8 0 Volts 5.02 9.5 82,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 18.6 HTHP 82 18 0 5/6 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0.5 11 10 5/6 0 480 0
42
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 1 4.6 API 8 0 Volts 5.02 9.5 82,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 18.6 HTHP 82 18 0 5/6 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0.5 11 10 5/6 0 480 0
42

BCTRN ECO-LUBE MRBL-F MGO NF25 NF-5 S-SCAV S


MUD 28 ( 5GLD ) 80 ( 55GL ) 74 ( 2200L ) 35 ( 50KG ) 250 ( 55LB ) 250 ( 55LB ) 5 ( 55GL )
TREATMENT SODASH NACL POLY-SAL DUOVIS-NS BARACORE95
42 ( 100LB ) 86 ( 2200L ) 330 ( 50LB ) 63 ( 55LB ) 5 ( 55GL )

BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Component Not listed RIG 8 1 4.01 4-1/2" IF 0 1813768-1
2 String Magnet CRT 6.5 1 6.5 2.25 7.23 NC50 NC50 96 CX 1992
3 String Magnet CRT 6.5 1 6.5 2.25 7.06 NC50 NC50 96 CX 1991
4 String Magnet CRT 6.5 1 6.5 2.25 7.36 NC50 NC50 96 CX 1644
5 String Magnet CRT 6.5 1 6.5 2.25 6.92 NC50 NC50 96 CX 1872
6 String Magnet CRT 6.5 1 6.5 2.25 6.6 NC50 NC50 96 CX 3076
DRILL STRING
7 String Magnet CRT 6.5 1 6.5 2.25 7.21 NC50 NC50 96 CX 1682
8 Sub RIG 6.5 1 6.5 2.5 2.67 NC50 NC50 0 64046
9 Crossover RIG 6.5 1 6.5 2.25 2.96 4 1/2 REG NC50 0 5002
10 Heavy Weight Drillpipe (HWDP) RIG 5.5 5 5.5 3.25 152.85 XT54 XT54 52.51 CONV TALLY
11 Hydraulic Jar NOJ 6.5 1 6.5 2.75 34.11 XT54 XT54 1,510 4385222
12 Heavy Weight Drillpipe (HWDP) RIG 5.5 10 5.5 3.25 310.09 XT54 XT54 52.51 CONV TALLY
13 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 XD105 PREMIUM TALLY

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/12/2024 N/A CALM N/A SEASONAL 2,546 SWA & CURRENT
OPERATION

Company RZT RIG BDF MJH RUE RIG ARM OTH ARM

Category CTRG RIG DFMS SEC H2S OTHR OTHR VAC WSC
PERSONNEL
17 54 2 8 2 12 2 4 2
Total
AND SERVICES No. of Persons
103
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 0 24 12 12 10 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DMMM-134 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:19 06/08/2024 - 08/26/2024
Report ID: OPERLMTDMRREP

Standby/Tankers
TRUCKS/BOATS
ab6504

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 706 19 N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-743 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 11/28/2022 - 06/27/2024
Report ID: OPERLMTDMRREP

AD-150 @ MRJN-743 Limited Morning Report for 06/18/2024


Objective : (MRJN-743 SINDI, BADR FOUAD / ALQAHTANI, KHALED ABDULRAHMAN / RENETZKY,
Foreman(s)
WILL BE DRILLED AS ROBERT ANDREW
MAINTAIN POTENTIAL DUAL Engineer NAFFAA, YOUNISS MAHMOUD / ALAZEB, MOHANAD SAEED
D&WO Morning Report (Service Providers View) Rig Charge #: LATERAL WELL IN KHAFJI Manager HUSSAIN, MOATH YOSEF
Copyright 2024 Saudi Aramco. All Rights Reserved AD-150 (66-22073-0743) RESERVOIR) THURAYA RIG FORMAN VSAT CONTRACTOR
Daily OffShore /CLERK VSA
+882 16777 14204 0133788299
(0500-0500) Saudi Aramco Well Wellbores:
T
Date: Tuesday 06/18/2024 MRJN-743 (1) MRJN_743_1
0133788298
CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
0138297719 (RADIO) 0138297724 (OIM)

Last 24 hr operations Next 24 hr plan


RIH WITH 9-5/8" RBP FISHING ASSY, FISH 9-5/8" RBP, POH, L/D RBP, M/U WBCO ASSY, RIH RIH WITH WBCO, CHC, POH, CHECK MAGS AND JB, RIH WBCO
Location Next Location
MRJN 740/749 PF MRJN-743
Current Depth (ft) Liner TOL MD TVD Formation Tops
13,000 Last Csg Size MD TVD Size 5,876 9,848 6,831 Top
9 5/8 8727 6833 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9856 (Date) 100 0 237
89.8 (06/10/2024@0200 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0800 3 1 EOW C FISH ST STDP RIG 13000 13000 1950 6168 RIH W/BAKER RBP RETRIEVING TOOLS ON 5-1/2" DP (FILL UP EVERY 20 STANDS.)

0800 - 0900 1 1 EOW C FISH RW FISHT RIG 13000 13000 6186 6297 WASHED DOWN AND TAGGED RBP AT 6,297

0900 - 1100 2 1 EOW C FISH CIRC MPMP RIG 13000 13000 PUMPED SWEEP AND CIRCULATED HOLE CLEAN

1100 - 1115 0.25 1 EOW C FISH FISH FISHT BFW 13000 13000 ENGAGED RBP PER BAKER ENGINEER, CONFIRMED CATCH BY SLACKOFF 20K,
OVER PULLED 10K, S/O 20K ROTATED AND RELEASED RBP
1115 - 1145 0.5 1 EOW C FISH CIRC MPMP RIG 13000 13000
EXTENEDED FLOW CHECK - STATIC

POOH W/ BAKER RBP PKR TOOL ON 5-1/2" DP AT CONTROLLED SPEED F/ 6297'/


1145 - 1915 7.5 1 EOW C FISH FISH FISHT RIG 13000 13000
100'

1915 - 1930 0.25 1 EOW C FISH CIRC MPMP RIG 13000 13000
FLOW CHECK AT BHA - STATIC

POOH WITH BAKER RBP ON 5-1/2" DP TO SURFACE - CONFORMED RETRIEVAL OF


1930 - 2000 0.5 1 EOW C FISH FISH FISHT BFW 13000 13000
RBP - LAID DOWN BAKER TOOL AND RBP

2000 - 2030 0.5 1 EOW C FISH FISH FISHT BFW 13000 13000 CLEANED & CLEARED RIG FLOOR

2030 - 2045 0.25 1 EOW C CT HT BHA RIG 13000 13000 CHANGED HANDLING TOOLS TO 4"

HPJSM & M/U 8 1/2'' BIT ON CORETRAX WBCO BHA B/SUB,6-1/2" DC,8-1/2"
2045 - 2315 2.5 1 EOW C CT HT BHA RIG 13000 13000
STRING MILL +3X6-1/2" DC+ ( JUNK SUBS & MAGNETS& DRAFT SUB ) R

2315 - 2345 0.5 1 EOW C CT HT BHA RIG 13000 13000 CHANGE HANDLING TOOL 5-1/2"

CONT RIH W/ 9 5/8" CORETRAX WBCO BHA ASSY ON 5 1/2" HWDP P/UP 6 1/2"
2345 - 0030 0.75 1 EOW C CT HT BHA RIG 13000 13000
DRILLING JAR

CONT RIH W/ 9 5/8" CORETRAX WBCO ON 5 1/2" DP AT CONTROLLED SPEED -


0030 - 0415 3.75 1 EOW C CT ST STDP RIG 13000 13000 540 5525
FILL UP STRING EVERY 20 STDS ( SMOOTH PASSING DV & WINDOW)

WORKED SCRAPER ACROSS PACKER SETTING DEPTH F/5525'TO 5938'AS PER


0415 - 0459 0.75 1 EOW C CT CIRC MPMP RIG 13000 13000
CORETRAX RECP. ONGOING REPORT TIME

Foreman Remarks

MRJN-743 WILL BE DRILLED AS DUAL LATERAL WELL IN KHAFJI RESERVOIR. THE FIRST LATERAL WILL BE DRILLED TO A TOTAL
PLANNED DEPTH OF 12735' MD / 6890' TVD AND COMPLETED WITH 5 1/2'' ICD SCREENS. SUBSEQUENTLY, A SECOND LATERAL WILL BE DRILLED USING THE MILL-RITE SYSTEM DOWN TO 12120'

MD / 6895' TVD AND COMPLETED WITH 4-1/2" ICD SCREENS. THE WELL UPPER COMPLETION WILL CONSIST OF ICV, PRODUCTION PACKERS, PDHMS AND GAS LIFT COMPLETION.
=========================================================================================================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-743 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 11/28/2022 - 06/27/2024
Report ID: OPERLMTDMRREP

WELL DESIGN=
-PLANNED 30" CONDUCTOR PIPE AT 328 FT - ACTUAL AT 328 FT.
-PLANNED 18-5/8" AT 2440 FT (50'MD INTO RUS) - ACTUAL AT 2416 FT.
-PLANNED 13-3/8" AT 5808 FT (50' MD ABOVE LWWH) - ACTUAL AT 5793 FT.
-PLANNED 9-5/8" AT 8936 FT (70' MD INTO KHFJ-RSVR) - ACTUAL AT 8735 FT.
-PLANNED L-0 8-1/2" AT 12,735 FT INTO KHAFJI-RSVR ) - ACTUAL AT 12,412 FT.
-BAKER RBP @ 6300' FT MD, L-1 TOW @ 5875' FT MD, L-1 BOW @ 5885' FT MD, WINDOW ORIENTED 25 DEG RHS.
-PLANNED L-1 8-1/2" AT 9817 FT INTO KHAFJI-RSVR ) - ACTUAL AT 9856'.
-PLANNED L-1 7" LINER AT 9817 FT ACTUAL AT 9848'
-PLANNED L-1 6-1/8" TD AT 12560 FT ACTUAL AT 13,000 FT
===========================================================================================================
DRILLING SEQUENCE:
MRJN-743 DL - CURRENT WELL DRILLING AND COMPLETE 2 LATERALS.
MRJN-745 SL WHIPSTOCK ST DRLG 8.5" LANDING SECTION RUN 7" LINER THEN DRILLING AND COMPLETE 1 LATERAL.
MRJN-744 SL RUN 7" LINER THEN DRILLING AND COMPLETE 1 LATERAL.
MRJN- 740 - CLEAN OUT ,LOGGING AND PERFORATE AND RUN OBSERVATION COMPL.

SUSPENDED WELLS STATUS:-


1. MRJN-740 DRILLED AS MSL WELL ALREADY TIE-BACK, AND STUSPNDED TO BE COMPLETED AS OBSERVATION WELL.
2. MRJN-746 COMPLETED AS DUAL LATERAL LEVEL-2 OIL PRODUCER INTO RATAWI AND SUSPENDED FOR FLOWBACK.
3. MRJN-747 COMPLETED AS SINGLE LATERAL INTO RATAWI OIL PRODUCER AND SUSPENDED FOR FLOWBACK.
4. MRJN-748 COMPLETED AS SINGLE LATERAL INTO KHFJ OIL PRODUCER AND SUSPENDED FOR FLOWBACK.
5. MRJN-743 (CURRENT WELL)
6. MRJN-741 COMPLETED AS DUAL-LATERALS LEVEL-4 GAS LIFT PRODUCER INTO KHAFJ OIL AND SUPENDED FOR FLOWBACK.
7. MRJN-742 COMPLETED AS DUAL-LATERALS LEVEL-4 GAS LIFT PRODUCER INTO KHAFJ OIL AND SUPENDED FOR FLOWBACK.
8. MRJN-745 (SUSPENDED WITH 4 X CMT PLUGS INSIDE 7" & 9-5/8" CSG TAGGED/ POSITIVE TESTED, AND 11" X 4-1/16" TBG BONNET W/4-1/16" GV)
9. MRJN-744 (SUSPENDED WITH 2 X CMT PLUGS INSIDE 9-5/8" CSG TAGGED/ POSITIVE TESTED, AND 11" X 4-1/16" TBG BONNET W/4-1/16" GV)

RIG LOCATION- MRJN/740-749


* RIG HEADING 323
* LAT- 28 23' 01.20" N / LONG - 049 33' 16.20" E
* AIR GAP = 41 FT
* WATER DEPTH = 156 FT RKB
* RKB TO MSL = 116.4 FT
* RKB TO PLATFORM DECK (NFD)= 77 FT.
* LEG PENETRATION: BOW 8.86 FT, PORT 8.5 FT, AND STBD 8.86 FT.
================SAFETY & DRILLS=============
* DRILLS CONDUCTED:
- H2S AND SHIP ABANDONMENT DRILLS CONDUCTED ON 06/10/2024.
- MAN -DOWN DRILL CONDUCTED ON 05/25/2024
- FIRE DRILL CONDUCTED ON 06/10/2024.
- ABANDON SHIP DRILL CONDUCTED ON 06/10/2024.
- CONFINED SPAC ENTRY DRILL CONDUCTED ON 05/25/2024
- OIL SPELL DRILL CONDUCTED ON 12/31/2023
- TRIP DRIL WAS CONDUCTED ON 06/15/2024.
- PIT DRILL WAS CONDUCTED ON 06/15/2024.
- ACUUMULATOR DRILL CONDUCTED ON 05/28/2024
- MAN OVERBOARD WAS CONDUCTED ON 05/03/2024.
- RESCUE / LIFEBOAT DRILL WAS CONDUCTED ON 05/03/2024.
- SEARCH AND RESCUE DRILL WAS CONDUCTED ON 01/28/2024
- VERTICAL RESCUE DRILL CONDUCTED ON 09/14/2023
- SECONDARY EMERGECY DRILL CONDUCTED ON 09/06/2023
====================PERSONNEL ONBOARD========================
- ARAMCO DE YOUNISS NAFFAA #750933 ONBAORD SINCE 06/07/2024
- ARAMCO DOE&CD MOTAZ ISTANBULI 285794 ON BOARD SINCE 06/11/2024
- ARAMCO MATERIAL EXP HARSHA FAHAD #8380678 ONBOARD SINCE 06/04/2024
- ARAMCO HSE ALIDAR TOMANOV ID#8979666 ON BOARD SINCE 06/11/2024
===================================================
HELD STUCK PIPE PREVENTION AWARENESS (SPPA) ON 05.12.2024.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
86 PCF N/A 0 API 0 0 Volts 0 9.1 318,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 N/A HTHP 85 N/A 0 N/A / CACL N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 N/A 15 / N/A N/A N/A
28
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
86 PCF N/A 0 API 0 0 Volts 0 9.1 318,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 N/A HTHP 85 N/A 0 N/A / CACL N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 N/A 15 / N/A N/A N/A
28

MUD HEC
TREATMENT 4 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-743 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 11/28/2022 - 06/27/2024
Report ID: OPERLMTDMRREP

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
05/29/2024 N/A 3 KNT WSW 0-1 M SEASONAL 332 TOURLY

Company BC1 SCB ITS GOS WCS SCP BHI RIG BDF SMI MIF NRT HML ARM BCM GD1 MI2 ARM CRW

Category BRCR BRCR CSR CTRG PSSC ICE DPDS RIG DFMS DFMS FILT HO MULS OTHR PCS SLS SCS WSC WBCS
PERSONNEL
1 1 5 13 1 6 0 56 1 1 2 0 1 4 1 3 0 3 1
Total
AND SERVICES No. of Persons
100
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 0 24 24 24 24 0 24 24 24 24 0 24 24

Operating Hours. 24 0 0 0 0 0 0 24 12 12 24 0 0 12 24 0 0 24 12

Standby/Tankers
TRUCKS/BOATS
TOPAZ JAFILIYA

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2251 2503 885 2725 N/A 3443

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MHWZ-950 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:19 05/10/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

AD-71 @ MHWZ-950 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (WTR DISPOSAL) Foreman(s)MESHAL, MOHAMMED ABDULLAH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (87-24644-4234) Engineer ALBAKHURJI, ABDULLAH BASSAM / HUSSAIN, SAJJAD
AD-71
Manager HAZAWBAR, ALHASSAN FARIS
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: RIG FORMAN VSAT CONTRACTOR /CLERK VSA T
Date: Tuesday 06/18/2024 MHWZ-950 (0) MHWZ_950_0 0135767891 0135767856

Last 24 hr operations Next 24 hr plan


LD 6-1/8" SPS BHA, RIH SCRAPER/ POLISH MILL BHA. SCRAPE SAME, POOH, L/D 4" DP AND RUN TIE-BACK, PICKLE JOB, LAND TBG, HGR, DRIFT LINER, RIH RBP, POOH R/T, P/T TBG,
SCRAPER/POLISH MILL BHA. RETRIEVED WB. DUMMY RUN, RUN TIE-BACK. RETRIEVE PLUG, R/D HLB S/L, WH/BOP WORS, SECURE WELL, L/D DP.
Location Next Location
HRDH -KHARJ HIGHWAY AFTER SASCO STATION TAKE RIGHT ON THE BRIDGE FOLLOW SIGN BOARD 33KM SKID ROAD. MHWZ-203202
Current Depth (ft) Liner TOL MD TVD Formation Tops
13,155 Last Csg Size MD TVD Size 1,516 7,236 6,543 Top
9 5/8 5594 5594 Formations Comments
7 Depth
ARUM 887 5' SHALLOWER.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) LAMS 1,315 48' DEEPER.
13155 (Date) 100 0 269 WASI 1,666 42' DEEPER.
39.2 (05/09/2024@2345 ) AHMD 1,826 49' DEEPER.
SFNY 2,074 14' DEEPER.
SHUB 2,909 12' DEEPER.
BYDH 3,089 25' DEEPER.
BUWB 4,315 21' SHALLOWER.
SULY 4,903 5' SHALLOWER.
HITH 5,531 9' DEEPER.
ABAR 5,963 99' DEEPER.
ABBR 6,099 94' DEEPER.
ABCR 6,310 79' DEEPER.
ARBD 6,392 89' DEEPER.
ABDR 6,504 63' DEEPER.
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM, POOH AND L/D 6-1/8" SPS RSS WITH MWD/LWD BHA.
> FILLED HOLE WITH 74 PCF NACL UNFILTERED BRINE CONTINUOUSLY ON THE
0500 - 0830 3.5 0 6 1/8 N DRLG HT BHA SPS 13155 13155 BACK SIDE.
> L/D 4-3/4" D/JAR.
> REMOVED RADIOACTIVE SOURCES.

0830 - 0900 0.5 0 6 1/8 N DRLG RR TDS RIG 13155 13155


SERVICED TDS.

HPJSM. M/U & RIH 7" BAKER POLISH MILL / SAMAA SCRAPER BHA.
0900 - 1100 2 0 EOW C COMP OTH PBR BC 13155 13155
> FILLED HOLE WITH 74 PCF NACL UNFILTERED BRINE CONTINUOUSLY ON THE
BACK SIDE.

RIH 7" POLISH MILL ASSY/ SCRAPER AS PER BAKER/ SAMMA ENGINEERS.
1100 - 1200 1 0 EOW C COMP OTH PBR BC 13155 13155
> FILLED HOLE WITH 74 PCF NACL UNFILTERED BRINE CONTINUOUSLY ON THE
BACK SIDE.

BREAK CIRCULATION AND RECORDED P/U , S/OFF WEIGHTS AND TORQUE BEFORE
1200 - 1230 0.5 0 EOW C COMP HT PBR BC 13155 13155 ENTERING TOL.
> FILLED HOLE WITH 74 PCF NACL UNFILTERED BRINE CONTINUOUSLY ON THE
BACK SIDE.
1230 - 1345 1.25 0 EOW C COMP WBCO SCRP RIG 13155 13155 1516 2100
WASHED & SCRAPPED 7" CASING AS PER SAMAA ENGINEER FROM 1516' TO 2100'.

1345 - 1430 0.75 0 EOW C COMP WBCO SCRP RIG 13155 13155 1516 2100 ENGAGED POLISH MILL IN TBR AT 2975 FT, SLACK OFF 5 KLBS ON TBR, ROTATE
& WORK ASSEMBLY AS PER BAKER ENG. CHC.

POOH WHILE L/D 4" DRILL PIPE, LD BAKER POLISH MILL ASSY AND L/D 7" SAMAA
1430 - 2100 6.5 0 EOW C COMP LDP BHA RIG 13155 13155 2100 0 SCRAPER BHA.
> FILLED HOLE WITH 74 PCF NACL UNFILTERED BRINE CONTINUOUSLY ON THE
BACK SIDE.

2100 - 2145 0.75 0 EOW C WH RTRV WBSH RIG 13155 13155 RETRIEVED WEAR BUSHING AS PER CAMERON ENGINEER.

2145 - 2230 0.75 0 EOW C WH OTH NA RIG 13155 13155 JET WELLHEAD PRIOR TO DUMY RUN.

HPJSM, R/U SAPESCO CSG HANDLING EQUIPMENT.


2230 - 2345 1.25 0 EOW C COMP HT PEL SPR 13155 13155
> FILLED HOLE WITH 74 PCF NACL UNFILTERED BRINE CONTINUOUSLY ON THE
BACK SIDE.

P/U TBG HGR W/ LANDING JT & PERFORMED DUMMY RUN AS PER CAMERON
2345 - 0100 1.25 0 EOW C COMP HT PEL SPR 13155 13155
ENGINEER. MARK JT & L/D SAME.

HPJSM, M/U BAKER 7" TIE-BACK ASSY AS PER BAKER ENGINEER.


0100 - 0215 1.25 0 EOW C COMP HT SEAL BC 13155 13155
> FILLED HOLE WITH 74 PCF NACL UNFILTERED BRINE CONTINUOUSLY ON THE
BACK SIDE.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MHWZ-950 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:19 05/10/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

RIH W/ 7" 26# L-80 NVAM BARE UPPER COMPLETION.


0215 - 0415 2 0 EOW C COMP RPCS UPCOM SPR 13155 13155 0 1516
> FILLED HOLE WITH 81 PCF UNFILTERED BRINE CONTINUOUSLY ON THE BACK
SIDE.

R/U SURFACE LINES PRIOR CIRCULATION.


=
0415 - 0459 0.75 0 EOW C COMP CIRC MPMP RIG 13155 13155
RIG MOVE EQUIPMENT AND PERSONELL ARRIVED LAST NIGHT ON JUNE 17,2024
TO START PRE-MOVE ON JUNE 18, 2024.
Foreman Remarks

MHWZ-950 IS AWATER DISPOSAL WELL WILL BE DRILLED BY RIG AD-71. THIS 6,000FT EFFECTIVE HORIZONTAL WELL WILL INJECT WATER FROM THE UR GSP INTO THE UPPER ARAB -D
RESERVOIR SECTION. MHWZ-950 WILL BE LANDED AND GEOSTEERED WITHIN A TARGET WINDOW WHICH WILL BE DEFINE AFTER LANDING USING LWD LOGS ACROSS THE CURVE SECTION. THE
WELL WILL INTIALLY BE LANDED 35FT BELOW THE TOP OF ABDR.
===========================================================================================================
PRIOR TO EXITING BLACKTOP ONTO SKID ROAD ALL MUST CALL ARAMCO CLERK.
PROVIDE NAME OF COMPANY, NUMBER OF PERSONNEL, COLOR OF VEHICLE, & EMERGENCY CONTACT.
NIGHT DRIVING IS NOT RECOMMENDED & SPECIAL PRECAUTIONS MUST BE FOLLOWED.
===========================================================================================================
> ARAMCO RIG CLERK MOHAMMED SHAFEEULLAH KADVALAM ID#8581392 ON LOCATION SINCE 05/03/2024.
===========================================================================================================
- 4-3/4" NOV HM D-JAR SN#380-47874 ON LOCATION SINCE 6/11/24.
========================================WELL INFO============================================================
- 24" CSG AT 118' MD/TVD CONDUCTOR).
- 18-5/8" CSG AT 944' MD/TVD (50' FT INTO ARUMA).
- 13-3/8" CSG AT 1,827' MD/TVD (50 FT INTO AHMD FMT).
- 9-5/8" CSG AT 5,572' MD/TVD (50FT INTO HITH FMT).
- KOP AT 5,672'.
- 7" LINER AT 7,238' MD/ 6,543' TVD.
- WELL TD AT +/- 13,155' MD/ 6,665' TVD.
===================================HSE REPORT================================================================
> NEAR MISS: NON.
> DRILL: NON.
===================================FUEL USAGE================================================================
DAILY FUEL CONSUMPTION:
RIG: 32 BBLS ,CAMP: 4 BBLS.
===========================================================================================================

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 13,155 87.4 82.1 0 6,638 200.29 2147.86 7,077.36 0.91
MUD DATA
MUD
TREATMENT
BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit REED 1 0.54
2 RSS SPS 4.75 1 4.75 3.98 34.98 3-1/2" IF 3-1/2" REG 55.83 13257585
3 Logging While Drilling (LWD) SPS 4.75 1 4.75 18.2 HAL-40 3 1/2'' IF 45.57 13928540
4 Logging While Drilling (LWD) SPS 4.75 1 4.75 18.27 HAL-40 HAL-40 52.2 13242565
5 Stabilizer SPS 5.875 1 4.75 2.25 3.56 NC38 NC38 55 13881343
6 Logging While Drilling (LWD) SPS 4.75 1 4.75 13.42 HAL-40 HAL-40 5.18 13997005
7 Logging While Drilling (LWD) SPS 4.75 1 4.75 10.1 3 1/2'' IF HAL-40 5.18 13872951
DRILL STRING 8 Measurement While Drilling (MWD) SPS 4.75 1 4.75 11.19 3 1/2'' IF 3 1/2'' IF 46.3 13809743
9 Screen sub SPS 4.75 1 4.5 2.8 6.7 NC38 NC38 10 12874929
10 Float Sub SPS 4.75 1 4.75 2.25 2.75 NC38 NC38 5 13642907
11 Float Sub SPS 4.75 1 4.75 2.25 2.45 NC38 NC38 2 13650673
12 Sub RIG 5 1 5 2.25 3.69 XT39 NC38 2 1001454-1
13 Heavy Weight Drillpipe (HWDP) RIG 4 2 4 2.562 62.8 XT39 XT39 25.1 CONV
14 Hydro-Mechanical Jar NOJ 4.75 1 4.75 2.25 30.32 XT39 XT39 550 380-47874
15 Heavy Weight Drillpipe (HWDP) RIG 4 6 4 2.563 188.51 VX39 VX39 34.41 SPRL
16 Drillpipe RIG 4 400 4 3.34 12,519 XT39 XT39 14 XD105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/10/2024 N/A N/A N/A N/A 40 2 DAILY

Company SPR OTH RIG SMI BFL BLH SPS ARM NCS HSL ARM SAM CAM INW

Category CSR CTRG RIG DFMS FILT LHES LWD OTHR PCS SLS WSC WBCS WHES BRCR
PERSONNEL
4 13 67 2 4 1 1 1 4 3 1 1 4 1
Total
AND SERVICES No. of Persons
107
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 12 12

Operating Hours. 24 0 24 24 24 24 4 24 0 0 24 24 12 0

Standby/Tankers
TRUCKS/BOATS
N/A

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MHWZ-950 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:19 05/10/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 645 184 36 2100

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MZLJ-81 EXPLORATION DRILLING-1 BI-1514
Print Date: 06/18/2024 06:19 05/30/2024 - 08/02/2024
Report ID: OPERLMTDMRREP

AD-72 @ MZLJ-81 Limited Morning Report for 06/18/2024


Objective : (THE OBJECTIVE OF Foreman(s)ALJABRI, SAMEH SALEM / DOUYEM, BRAHIM ATHMANE
D&WO Morning Report (Service Providers View) Rig Charge #: MZLJ-81 WELL WORKOVER IS Engineer ALDOSSARY, MOHAMMED ADNAN
Copyright 2024 Saudi Aramco. All Rights Reserved AD-72 (82-23086-4222) TO DIAGNOSE THE SOURCE OF Manager HAZAWBAR, ALHASSAN FARIS
Daily Onshore TCA PRESSURE) THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 8821677714 104 013-576-60 95 /CLERK VSA
Date: Tuesday 06/18/2024 MZLJ-81 (0) MZLJ_81_0 T
013-576-69 27

Last 24 hr operations Next 24 hr plan


RIG MOVE TO MZLJ-81 & RIG UP. RIG MOVE TO MZLJ-81 & RIG UP.
Location Next Location
MZLJ-81 *EXPLORATION UNCONVENTIONAL GAS (INCLUDING BI34)*
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 286
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM RELATED TO GENERAL RIG MOVE & RIG UP. RIG MOVE TO MZLJ-81.

- LOAD & MOVE: SUBBASE PLATFORMS, SUPPORT BEAMS, MONKEY BOARD.


- LOAD & MOVE RIG EQUIPMENT AND MISCELLANEOUS ITEMS.
- PREPARE LOADS FOR MOVING.
0500 - 0459 24 0 PRE N RM RM NA RIG 17850 17850
- SPOT GENERATOR, PCR, COMPRESSURE ROOM, CABLE TRAYS, INSTALL SUBBASE
UPPER SECTIONS.
- CONNECT MUD TANKS - ONGOING.

RIG DOWN - 85%, RIG MOVE - 65%, RIG UP - 25%.


Foreman Remarks

WELL OBJECTIVE
- THE OBJECTIVE OF MZLJ-81 WELL WORKOVER IS TO DIAGNOSE THE SOURCE OF TCA PRESSURE, PERFORM REMEDIAL WORK AND RE-COMPLETE THE WELL.
============================================================================
JOURNEY MANAGEMENT
- CALL RIG AD-72 AT 013-829-7639 / 013-813-5901 OR ARAMCO OFFICE AT 013-576-6095/013-576-6927 PRIOR TO TURNING OFF MAIN BLACKTOP ROAD.
PROVIDE MEDIC/CLERK - NAME OF COMPANY, NUMBER OF PERSONNEL, COLOR OF VEHICLE AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL.
============================================================================
LOCATION DIRECTIONS
- RIG LOCATION AT 286 KM FROM DHAHRAN MAIN GATE.
- FROM KHURAIS TAKE MAZALIJ ROAD & DRIVE FOR 90 KM THEN TURN LEFT THEN FOLLOW SIGN BOARDS ON SKID ROAD TO RIG (NO SIGNAL COVERAGE).
============================================================================
SAUDI ARAMCO PERSONNEL
- ARAMCO MATERIAL EXPEDITOR: RADAD ALZAHRANI, BADGE #8659147 ARRIVED ON LOCATION 06/09/2024.
- ARAMCO MATERIAL EXPEDITOR: MOHAMMED ALABED, BADGE #8506107 ARRIVED ON LOCATION 06/16/2024.
============================================================================
DAILY SAFETY REPORT
- PCI AUDIT/ 24- MAY 2024: TOTAL 85, CLOSED 64, OPEN 21.
- IN HOUSE AUDIT 21 MAY-2024: TOTAL FINDING: 369, CLOSED: 337, OPEN: 32.
- TOTAL SOC: 11, SAFE ACT: 2, UNSAFE ACT: 4, SAFE CONDITION: 1, UNSAFE CONDITION: 4.
- JSA: REVISED 0, REVIEWED 5 , PTW 5, LOTO 0.
============================================================================
RIG MOVE EQUIPMENT:
25 X TRUCKS, 4 X CRANES, 2 X FORKLIFT.
TOTAL LOADS MOVED: 111.

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 17,850 89.8 328.5 0 13,680 1308.52 -786.04 5,008.09 0.39
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A N/A

Company OTH RIG SMI RIG ARM ARM

Category CTRG RIG DFMS OTHR OTHR WSC


PERSONNEL
14 38 1 83 3 2
Total
AND SERVICES No. of Persons
141
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MZLJ-81 EXPLORATION DRILLING-1 BI-1514
Print Date: 06/18/2024 06:19 05/30/2024 - 08/02/2024
Report ID: OPERLMTDMRREP

Standby/Tankers
TRUCKS/BOATS
DH-6040

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MHWZ-253202 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:19 05/29/2024 - 09/06/2024
Report ID: OPERLMTDMRREP

AD-73 @ MHWZ-253202 Limited Morning Report for 06/18/2024


Objective : (THE WELL BE MORSLI, LAHCENE / ZGAOULA, YASSINE / KRUEGER, AUSTIN
Foreman(s)
D&WO Morning Report (Service Providers View) 250 FT BELOW THE TOP OF WILLIAM
Rig Charge #: THE SARAH FORMATION AND Engineer ALDOSSARY, MOHAMMED ADNAN
Copyright 2024 Saudi Aramco. All Rights Reserved AD-73 (87-24644-4242) DRILL 5000 FT OF LATERAL) Manager HAZAWBAR, ALHASSAN FARIS
Daily Onshore
Wellbores: THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well
8821677714 393 5767824 /CLERK VSA
Date: Tuesday 06/18/2024 MHWZ-253202 (0) MHWZ_253202_0
T
5767841

Last 24 hr operations Next 24 hr plan


ROT DRILL 17" HOLE SECTION TO CP @ 6,870', CHC. CHC, SPOT HIGH VIS PILL, POOH, RUN 13-3/8" CSG.
Location Next Location
HRDH -KHARJ HIGHWAY AFTER SASCO STATION TAKE RIGHT ON THE BRIDGE FOLLOW SIGN BOARD 50 KM SKID ROAD. *EXPLORATION UNCONVENTIONAL GAS (INCLUDING BI34)*
Current Depth (ft) Liner TOL MD TVD Formation Tops
6,870 Last Csg Size MD TVD Size Top
18 5/8 1733 1733 Formations Comments
Depth
ARUM 761 14' SHALOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) LAMS 1,134 14 FT DEEPER
6013 (Date) 100 857 278 WASI 1,438 14 FT DEEPER
20.5 (05/28/2024@1000 ) AHMD 1,681 12FT DEEPER
SFNY 1,879 32 FT DEEPER
SHUB 2,680 26 FT DEEPER
BYDH 2,829 2 FT DEEPER
BUWB 4,048 22 FT DEEPER
SULY 4,640 26 FT DEEPER
HITH 5,287 26 FT DEEPER
ABAR 5,737 29 FT DEEPER
ABBR 5,876 32 FT DEEPER
ABCR 6,093 21 FT DEEPER
ARBD 6,162 23 FT DEEPER
ABDR 6,268 21 FT DEEPER
JUBL 6,416 14 FT DEEPER
HNIF 6,816 13 FT DEEPER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

ROTARY DRILLED 17" HOLE W/ 72 PCF INHIBITIVE MUD, 100% RETURN.


0500 - 1845 13.75 0 17 N DRLG D TDS RIG 6013 6516
> PUMPED 1 X HI-VISC PER STAND.
> DROPPED 3 X RAPID STICKS EA CONNECTION.
1845 - 1915 0.5 0 17 N DRLG RR TDS RIG 6516 6516
TDS SERVICE

ROTARY DRILLED 17" HOLE W/ 72 PCF INHIBITIVE MUD, 100% RETURN.


1915 - 0300 7.75 0 17 N DRLG D TDS RIG 6516 6870
> PUMPED 1 X HI-VISC PER STAND.
> DROPPED 3 X RAPID STICKS EA CONNECTION.
0300 - 0459 2 0 17 N DRLG CIRC MPMP RIG 6870 6870
PUMP 200 BBL HIGH VIS SWEEP AND CIRC HOLE CLEAN.
Foreman Remarks

MHWZ-253202 WILL BE THE FIRST WELL ON THE PAD TO BE DRILLED BY AD-73 RIG, TARGETING MIDDLE SARAH RESERVOIR. THE LANDING POINT WILL BE 250 FT BELOW THE TOP OF THE
SARAH FORMATION AND DRILL 5000 FT OF LATERAL AT 89.2 DEGREE INCLINATION AND 150 DEGREE AZIMUTH. THE PLANNED TD OF THE WELL IS 20,429 FT MD / 15,065 FT TVD. THE WELL
WILL BE COMPLETED WITH 5 1/2"-26# VM95HCSS VAMTOP HC-R3 LONG STRING.
===========================================================================================================
RIG LOCATION DIRECTIONS & JOURNEY MANAGEMENT:
1: 21 KM WEST OF HARADH TOWARD AL KHARJ (2.7 KM PAST SASCO GAS STATION). TURN RIGHT
2: DRIVE 42 KM ON BLACK TOP , FOLLOW SIGNES AND TURN RIGHT ON TO THE SKID ROAD.
3: DRIVE 50 KM SKID ROAD FOLLOWING RIG SIGNS TO LOCATION.
===========================================================================================================
ARAMCO PERSONEL:
> ARAMCO RIG CLERK MOHAMMED RAFI ID#8455402 ON LOCATION SINCE 06/07/2024.
===================================================================================
RENTAL TOOLS:
-9-1/2" NOV JAR ARRIVED ON LOCATION ON 4 JUNE 2024, SN: 381-95103.
========================================WELL INFO============================================================
- 24" CSG AT 241' MD/TVD.
- 18-5/8" CSG AT 1733' MD/TVD (52' INTO AHMADI MEMBER).
NEXT:
- 13-3/8" CSG AT 6,853 MD/TVD (50' INTO HANIFA FORMATION).
- 9-5/8" CSG AT 13,619' MD/TVD (100' INTO KHUFF D ANHYDRITE).
- KOP AT 13,960'.
- WELL TD AT +/- 20,427' MD/ 15,065' TVD.
- 5 1/2" LONG COMPLETION STRING AT 20,429 FT MD / 15,065 FT TVD.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 4 API 0 0 Volts 3.6 9 75,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA
150 0 HTHP 92 27 0 9 / 12 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC)

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MHWZ-253202 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:19 05/29/2024 - 09/06/2024
Report ID: OPERLMTDMRREP

54 1 11 8 8/9 5 400 N/A

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 4.2 API 0 0 Volts 3.6 9.4 74,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 0 HTHP 92 29 0 9 / 12 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 11 8 8/9 5 400 0
50

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 4 API 0 0 Volts 3.6 9.5 74,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 0 HTHP 92 28 0 9 / 12 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 11 8 9 / 10 5 400 0
51

BCTRN CAUST BFIBRE-SF CACO3-25 MRBL-M CACO3-50 MICA-FINE


MUD 6 ( 5GLD ) 4 ( 50LBP ) 24 ( 25KG ) 48 ( 50LB ) 2 ( 2200L ) 48 ( 50LB ) 24 ( 50LB )
TREATMENT SODASH HYSTAR-P DUOVIS-NS MAX-GUARD IDCAP D
84 ( 100LB ) 24 ( 50LB ) 20 ( 50LB ) 8 ( 55GL ) 24 ( 50LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
3 1,733 6,870 DP Av DC Av Bit HHP 65 160 S423 17 ULTR
Pressure GPM Jet Vel 94.72 113.08 424 I-Row O-Row DC Location Bearings
2,000 1,000 291 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
70951 SPL716S 10 x 12 / 1.104
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 99.5 347 355 340 16,000 99.5
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit ULTR 17 1 17 1.5 7-5/8 reg 70951
2 Near Bit Roller Reamer RIG 44 1 14 3 7.65 8 5/8 REG 8 5/8 REG 217 3 POINT 130015680
3 Drillcollar RIG 9.5 1 14 3 30.42 8 5/8 REG 8 5/8 REG 217 SPRL 230595FL
4 Roller Reamer RIG 44 1 14 3 7.6 8 5/8 REG 8 5/8 REG 217 3 POINT 130015877
DRILL STRING
5 Drillcollar RIG 9.5 1 14 3 3,036 8 5/8 REG 8 5/8 REG 217 SPRL 230608FL
6 Roller Reamer RIG 17 1 12 2.813 8.57 8 5/8 REG 8 5/8 REG 217 3 POINT 130080718
7 Drillcollar RIG 9.5 11 14 3 335.9 8 5/8 REG 8 5/8 REG 217 SPRL ON FILE
8 Hydro-Mechanical Jar NOJ 9.5 1 9.5 2.75 31.44 7-5/8" REG 7-5/8" REG 140 381-95103
9 Drillcollar RIG 9.5 3 14 3 91.04 8 5/8 REG 8 5/8 REG 217 SPRL ON FILE
10 Crossover RIG 9.125 1 14 4 3.55 7 5/8 REG 7 5/8 REG 217 1002114-1
11 Drillcollar RIG 8.5 6 8.5 3 184.19 6 5/8 REG 6 5/8 REG 162 SPRL IN FILE
12 Crossover RIG 6.625 1 6.625 2.813 3.58 XT54 6 5/8 REG 162 1002130-2
13 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 5.5 3.25 280.88 XT54 XT54 54 CONV ON FILE
14 Heavy Weight Drillpipe (HWDP) RIG 5.5 1 5.5 3.25 273.55 XT54 XT54 54 CONV ON FILE
15 Drillpipe RIG 5.5 1 5.5 4.67 30.25 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/07/2024 N/A NORMAL NO SEASIONAL 21 2 DAILY

Company OTH RIG BAR SMI ARN OTH ARM

Category CTRG RIG DFMS DFMS OTHR VAC WSC


PERSONNEL
13 70 9 2 1 1 3
Total
AND SERVICES No. of Persons
99
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 12 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 200 397 657 273 3950

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MHWZ-253202 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:19 05/29/2024 - 09/06/2024
Report ID: OPERLMTDMRREP

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HZEM-710604 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:19 06/18/2024 - 07/18/2024
Report ID: OPERLMTDMRREP

AD-74 @ HZEM-710604 Limited Morning Report for 06/18/2024


Objective : (HORIZONTAL Foreman(s)ALMERZA, HUSSAIN RADHI / BENNADJI, ABDELHAMID
D&WO Morning Report (Service Providers View) Rig Charge #: DEVELOPMENT TIGHT GAS Engineer ALSAGGAF, ALBARAA ADNAN
Copyright 2024 Saudi Aramco. All Rights Reserved AD-74 (87-23541-7968) WELL TARGETING TUWAIQ Manager BIN LEBDAH, SALMAN FAISAL
Daily Onshore MOUNTAIN SOURCE ROCK THURAYA RIG FORMAN VSAT CONTRACTOR
Well Wellbores: RESERVOIR B (TQMB) ) /CLERK VSA
(0500-0500) Saudi Aramco 8988205202 0057 0135767843
Date: Tuesday 06/18/2024 HZEM-710604 (0) HZEM_710604_0 T
0135767886

Last 24 hr operations Next 24 hr plan


SPUDDED ON HZEM-710604, ROTARY DRILLED 28" HOLE SECTION , CHC. DROP GYRO,POOH & L/D 28" ROTARY BHA, RUN 24" CASING & CEMENT SAME.
Location Next Location
66 KM F/DMG. FROM HOFUF 68 KM ON SALWA RD, TURN RIGHT FOR 33 KMS ON B/T, TURN LEFT FOR 25 KM SKID HZEM-710614
Current Depth (ft) Liner TOL MD TVD Formation Tops
614 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 100 614 176
0.6 (06/17/2024@1330 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
1330 - 1330 0 0 PRE S OT SPUD NA RIG 0 0
HPJSM SPUDDED ON HZEM-710404 ON 06/17/2024 AT 13:30.

ROTARY DRILLED 28" HOLE SECTION WITH 65 PCF SPUD MUD & 100%
CIRCULATION.
1330 - 1730 4 0 28 N DRLG D TDS RIG 0 127 > WOB: 5-15 KLBS, RPM: 30-50, TQ: 1-1,5 KLBS.FT, FR: 250-350 GPM & SPP: 200
PSI.
> PUMPED ANTIBALLING SWEEP.

1730 - 1830 1 0 28 N DRLG HT BHA RIG 127 127 PICKED UP 1 STAND OF HWDP AND INSTALLED SUPPORTING BEAM IN CELLAR.
> CLEANED BIT AND REAMRS.

ROTARY DRILLED 28" HOLE SECTION WITH 65 PCF SPUD MUD & 100%
CIRCULATION.
1830 - 2000 1.5 0 28 N DRLG D TDS RIG 127 219 > WOB: 20-35 KLBS, RPM: 60-80, TQ: 3-6 KLBS.FT, FR: 400-500 GPM & SPP: 250
PSI.
> PUMPED HIVIS AND ANTIBALLING SWEEPS.
> WASHED UP AND REAMED DOWN FULL STAND.

L/D SINGLE JOINT OF 5-1/2" HWDP, RACKED BACK 1 STAND OF 5-1/2" HWDP WITH
2000 - 2045 0.75 0 28 N DRLG HT BHA RIG 219 219
XO, PICK UP 1 STAND OF 9-1/2" DC AND PICKED UP 1 STAND OF 5-1/2" HWDP
WITH XO.

ROTARY DRILLED 28" HOLE SECTION WITH 65 PCF SPUD MUD & 100%
CIRCULATION.
2045 - 2200 1.25 0 28 N DRLG D TDS RIG 219 272 > WOB: 25-40 KLBS, RPM: 70-90, TQ: 4-6 KLBS.FT, FR: 550-650 GPM & SPP: 550
PSI.
> PUMPED HIVIS AND ANTIBALLING SWEEPS.
> WASHED UP AND REAMED DOWN FULL STAND.

2200 - 2300 1 0 28 N DRLG HT BHA RIG 272 272 RACKED BACK 1 STAND OF 5-1/2" HWDP WITH XO, PICK UP 1 STAND OF 8-1/2" DC
AND PICKED UP 1 STAND OF 5-1/2" WWDP WITH XO.

ROTARY DRILLED 28" HOLE SECTION WITH 65 PCF SPUD MUD & 100%
CIRCULATION.
2300 - 0415 5.25 0 28 N DRLG D TDS RIG 272 614
> WOB: 30-40 KLBS, RPM: 100, TQ: 6-8 KLBS.FT, FR: 700 GPM & SPP: 690 PSI.
> PUMPED HIVIS AND ANTIBALLING SWEEPS.
> WASHED UP AND REAMED DOWN FULL STAND.

PUMPED 2 X 150 BBLS HI VIS SWEEP & CHC. 100% RETURNS WITH 65 PCF SPUD
0415 - 0445 0.5 0 28 N DRLG CIRC MPMP RIG 614 614 MUD.
* SPOTTED HI-VIS AS PER PROGRAM.

0445 - 0459 0.25 0 28 N DRLG TO BHA RIG 614 614 614 200
POOH 28" VERTICAL HOLE ROTARY BHA.
Foreman Remarks

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 0 API N/A Volts 3 10 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 83 0 HTHP 97 34 0 17 / 23 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 16 3 14 / 17 25 200 0
86

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HZEM-710604 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:19 06/18/2024 - 07/18/2024
Report ID: OPERLMTDMRREP

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 0 API 0 0 Volts 3 9.8 82,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
82 0 HTHP 97 35 0 17 / 25 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 16 3 15 / 18 20 200 0
85

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 0 API 0 Volts 3 10 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 97 33 0 19 / 22 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 16 3 14 / 17 20 200 0
78

MUD BENT CAUST CONDET ENVIROTHIN


TREATMENT 27 ( 2500L ) 32 ( 25KG ) 12 ( 5GL ) 20 ( 50LB )

BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 28 1 2.12 839540
2 Near Bit Roller Reamer RIG 28 1 9.5 3.25 8.6 7 5/8 REG 7 5/8 REG 220 3 POINT VF
3 Shock Sub GUL 12 1 12 3 12.06 7-5/8" REG 7-5/8" REG 4,500 70473-6
4 Roller Reamer RIG 28 1 25 3 8.6 7 5/8 REG 7 5/8 REG 1 3 POINT 5171230234
DRILL STRING 5 Drillcollar RIG 9.5 5 9.5 2.813 153.38 7 5/8 REG 7 5/8 REG 220 SPRL FILE
6 Crossover RIG 9.5 1 9.5 2.813 2.61 6 5/8 REG 7 5/8 REG 50 10031151
7 Drillcollar RIG 8.25 3 8.25 2.813 91.74 6 5/8 REG 6 5/8 REG 161 SPRL FILE
8 Crossover RIG 8.125 1 8.125 2.813 2.61 XT54 6 5/8 REG 50 10021312
9 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 310 XT54 XT54 53.3 CONV FILE
10 Drillpipe ARM 5.5 1 5.5 4.67 9 XT54 XT54 24.7 G105 PREMIUM FILE

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 1 N/A

Company OTH RIG RIG ARM ARM SDM PW OGS NCS ITS BAR MH2

Category CTRG RIG OTHR WSC OTHR DPDS ISPCT ISS PCS CSR DFMS H2S
PERSONNEL
13 52 37 2 3 2 4 2 6 3 12 1
Total
AND SERVICES No. of Persons
137
INFORMATION
Personnel on Loc. Hrs. 15 15 15 15 15 15 15 15 15 15 15 15

Operating Hours. 0 15 4 15 4 0 4 0 0 0 4 4

Standby/Tankers
TRUCKS/BOATS
3171 stb

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 2150

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NEW RIG MOBILIZATION BI-MOB
Print Date: 06/18/2024 06:19 05/30/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

AD-74 @ *MOBILIZATION* Limited Morning Report for 06/18/2024


Objective : (*MOBILIZATION*) Foreman(s)ALMERZA, HUSSAIN RADHI / BENNADJI, ABDELHAMID
D&WO Morning Report (Service Providers View) Rig Engineer ALSAGGAF, ALBARAA ADNAN
Copyright 2024 Saudi Aramco. All Rights Reserved Charge #: Manager BIN LEBDAH, SALMAN FAISAL
AD-74
()
Daily THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well 8988205202 0057 0135767843 /CLERK VSA
Wellbores:
Date: Tuesday 06/18/2024 *MOBILIZATION* T
0135767886

Last 24 hr operations Next 24 hr plan


CLOSED OUT PRE-SPUD CHECKLIST ACCEPTED RIG.
Location Next Location
66 KM F/DMG. FROM HOFUF 68 KM ON SALWA RD, TURN RIGHT FOR 33 KMS ON B/T, TURN LEFT FOR 25 KM SKID HZEM-710604
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date)
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM WITH ALL PERSONAL INVOLVED IN MOBILIZATION AND RIG UP


OPERATIONS.

DAY OPERATION:

- MIXED 2000 BBLS OF 65 PCF SPUD MUD,500 BBLS OF HI-VIS PILL, 2000 BBLS OF
85 PCF CASING-GO PILL.
- P/U & R/B 369 JTS OF 5-1/2" DPS & 15 JTS OF 5-1/2" HWDPS, 9 JTS OF 8-1/2" &
5 JTS OF 9-1/2"DC.
- P/U & M/U 28" BHA.
- CHECKED ALL MUD PUMPS, OK
- FUNCTION TETSTED CATWALK
- PREPARED HANDLING TOOLS AND WELL CONTROL EQUIPMENT. 100%.
- REVIEWING AND INSPECTING RIG EQUIPMENT AS PER ARAMCO SCHEDULE G
.100%.
- CONTINUE WORKING ON MUD TANKS AND MUD SYSTEM 100%.
- CONTINUE WORKING ON CEMENT TANKS, 100%
- PERFORMED ENVIRONMENTAL AUDIT BY DOE&CD AUDITOR COMPLETED.
- PERFORMED WELL CONTROL & SAFETY AUDIT BY DOE&CD AUDITOR
COMPLETED.
- PERFORMED TRAINING AND DRILLS FOR DRILLING CREW.
- CLOSED OUT PRESPUD CHECKLIST.
0500 - 1200 7 PRE M MAIN RU NA RIG
- URDD AUDIT ITEMS:
OPEN: 18
CLOSED: 394.

[RIG MOBILIZATION]:
> R/M = 100%.
> R/U = 100%.

WCEI:

OPEN FINDINGS :
0 PRIORITY 2, 0 PRIORITY 3.

CLOSED FINDINGS:
09 PRIORITY 2, 0 PRIORITY 3

SAFETY AND ENVIRONMENT PCI:

OPEN FINDINGS :
0 PRIORITY 1, 03 PRIORITY 2 & 01 PRIORITY 3.

CLOSED FINDINGS:
06 PRIORITY 1, 64PRIORITY 2 & 03 PRIORITY 3.

HELD PRE SPUD SAFETY MEETING WITH ALL RIG CREW & DISCUSSED SAFETY,
OPERATION, CRITICAL LIFT PLAN, PTW & JSA.
1200 - 1330 1.5 PRE M MAIN RU NA RIG
> CONDUCTED H2S DRILL WITH MAN DOWN FOR BOTH CREWS, GOOD RESPONSE.
> CHECKED RIG FOR ACCEPTANCE AS PER ARAMCO PRE-SPUD CHECK LISTS.
> CONDUCTED FINAL WALK AROUND.
1330 - 1330 0 PRE S OT RELS NA RIG
RELEASED RIG TO HZEM-710604.
Foreman Remarks

ARAMCO PERSONNEL:
- ARAMCO URDD HSE ADVISOR MOHAMED LOTFY ID# 8141109 ON LOCATION SINCE 06/06/2024.
- ARAMCO MATERIAL EXPEDITOR SAMHAN ALDAWSARI #8606818 ON LOCATION SINCE 06/12/2024.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NEW RIG MOBILIZATION BI-MOB
Print Date: 06/18/2024 06:19 05/30/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

- STEFAN DIACONESCU URDD HSE ADVISOR ID#8680363 ON LOCATION SINCE 6/13/2024.

-------------------------------------------------------------------------------------------------------------------------------
- DAILY STOP CARDS: 32
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A HOT 1 N/A

Company ITS RIG SDM RIG BAR MH2 OGS PW RIG APF ARM NCS ARM

Category CSR CTRG DPDS RIG DFMS H2S ISS ISPCT OTHR OTHR OTHR PCS WSC
PERSONNEL
3 13 3 51 12 1 2 4 37 2 3 6 2
Total
AND SERVICES No. of Persons
139
INFORMATION
Personnel on Loc. Hrs. 8 8 8 8 8 8 8 8 8 8 8 8 8

Operating Hours. 0 0 0 8 8 8 0 8 8 8 8 0 8

Standby/Tankers
TRUCKS/BOATS
3171 stb

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-868 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/18/2024 - 02/25/2026
Report ID: OPERLMTDMRREP

ADC-110 @ MRJN-868 Limited Morning Report for 06/18/2024


Objective : (DUAL LATERAL Foreman(s)HEGAZI, AHMED EDREES
D&WO Morning Report (Service Providers View) Rig Charge #: WELL TARGETING SHUB Engineer ALMAJED, YOUSEF ABDULLAH
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-110 (66-23073-0868) RESERVOIR TO FURTHER Manager RAJHI, MOHAMMAD ALI
Daily OffShore DEVELOP SHUB RESERVOIR IN THURAYA RIG FORMAN VSAT CONTRACTOR
Well Wellbores: 106 DOME IN MRJN FIE) /CLERK VSA
(0500-0500) Saudi Aramco +882167771 4135 013-673408 2
Date: Tuesday 06/18/2024 MRJN-868 (0) MRJN_868_0 T
013-673857 8

Last 24 hr operations Next 24 hr plan


SKID RIG OVER MRJN-868 WELL, NU 30" DIVERTER, RIH WITH 22" BHI/SCIENTIFIC MM/GWD ASSY, DRILL 22" HOLE SECTION WITH BHI/SCIENTIFIC MM/GWD ASSY TO CP AT +/- 2473 FT.
CO 32" COND., SPUD WELL, DRILL 22" HOLE SECTION.
Location Next Location
MRJN- 504, 861/869 PF MRJN-866
Current Depth (ft) Liner TOL MD TVD Formation Tops
390 Last Csg Size MD TVD Size Top
32 346 346 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
346 (Date) 100 44 252
0.1 (06/18/2024@0200 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0900 4 0 PRE N RM OTH NA RIG 0 0
HPJSM, PREPARE AND SKID RIG OVER MRJN-868 WELL CENTER.

0900 - 1700 8 0 PRE N BOP NU DVRT RIG 0 0 NU 30" DIVERTER OVER 30" 1M WELDED NECK FLANGE, CONNECT OVERBOARD
LINES, E-KILL LINE.
1700 - 1830 1.5 0 CP N DRLG HT PEL RIG 0 0
CHANGE OUT TDS LINKS.
1830 - 1900 0.5 0 CP N DRLG RR TDS RIG 0 0
SERVICE TOP DRIVE SYSTEM.

1900 - 2130 2.5 0 CP N DRLG HT BHA BHI 0 0 HPJSM, RIH WITH 22" BHI/SCIENTIFIC MM/GWD ASSY WITH NEW TCI BAKER BIT
(TYPE: VGA-C310H; SN: Z396ZT).
2130 - 2215 0.75 0 CP N DRLG CIRC MPMP RIG 0 0
SHALLOW TEST SCIENTIFIC GWD TOOL, OK.

2215 - 2230 0.25 0 CP N DRLG OTH NA RIG 0 0 RIH WITH 22" BHI/SCIENTIFIC MM/GWD ASSY ON 5 1/2" HWDP, TAG SEABED AT
267 FT.

2230 - 2300 0.5 0 CP N BOP BOP DVRT RIG 0 0 FUNCTION TEST DIVERTER AND PERFORMED HYDRO TEST WITH WATER AS PER
ARAMCO PROCEDURE.

CLEAN OUT 32" CONDUCTOR WITH 22" BHI/SCIENTIFIC MM/GWD ASSY TO 346 FT,
2300 - 0200 3 0 CP N DRLG RW BIT BHT 0 0 0 0
MEANWHILE DISPLACING WELL TO 68 PCF WBM.
- TAKE GYRO SURVEY AT MUD LINE DEPTH AND 32" COND. SHOE.
0200 - 0200 0 0 PRE S OT SPUD NA RIG 346 346
SPUD MRJN-868 WELL @ 02:00 HRS ON JUNE, 18, 2024.

DIRECTIONAL DRILL AND TAKE GWD SURVEYS WITH 22" BHI/SCIENTIFIC MM/GWD
ASSY.
- DRILL WITH CONTROLLED PARAMETERS BELOW 32" COND. SHOE.
0200 - 0459 3 0 22 N DRLG DMS MMOT BHI 346 390
- PUMP HI-VIS SWEEPS PERIODICALLY.
- FOOTAGE ROTATE: 26 FT, 59 %, 2.0 HRS.
- FOOTAGE SLIDE: 18 FT, 41 %, 1.0 HRS.
- WELL PATH DISTANCE FROM PLAN: 3.5 FT BELOW & 1.3 FT RIGHT, 3.8 FT C-C.
Foreman Remarks

WELL OBJECTIVE:
MRJN-868 WILL BE DRILLED AS A MAINTAIN POTENTIAL DUAL LATERAL WELL TARGETING SHUB RESERVOIR TO FURTHER DEVELOP SHUB
RESERVOIR IN 106 DOME IN MARJAN FIELD. THE WELL WILL BE COMPLETED AS LEVEL-2 WITH ELECTRIC SUBMERSIBLE PUMP.
==========================RIG INFO==================================================================
FINAL POSITION: 28 DEG 30.99' N, 049 DEG 32.13' E.
RIG HEADING: 329 DEG.
WATER DEPTH: 160 FT (LAT)
RIG FLOOR TO MSL: 107 FT
FINAL AIRGAP: 43 FT
FINAL RIG PENETRATION: BOW 13 FT, STBD 12.3 FT, PORT 12.6 FT.
NEXT RIG MOVE:
==========================WELL STATUS==========================================
WELL TYPE: DUAL LATERAL OIL PRODUCER IN MRJN FIELD.
LAST CASING SIZE / LB/FT/ 100% BURST PRESSURE / SET IN WHICH FORMATION: 32" CP / 346 FT.
NEXT CASING SIZE / DEPTH / FORMATION OR NEXT TD: 18 5/8" CSG / +/- 2473 FT.
=====================================PF WELLS STATUS============================================
MRJN-861: DRILL 22" HOLE TO 2470 FT. RUN 18-5/8" CSG AND SUSPENDED FOR DRILL 16" HOLE.
MRJN-863: DRILL 22" HOLE TO 2478 FT. RUN 18-5/8" CSG AND SUSPENDED FOR DRILL 16" HOLE.
MRJN-867: DRILL 22" HOLE TO 2478 FT. RUN 18-5/8" CSG AND SUSPENDED FOR DRILL 16" HOLE.
MRJN-504: WELL TIED-BACK WITH WELL HEAD INSTALLED AND SUSPENDED FOR PERFORATION AND COMPLETION.
MRJN-865: DRILL 22" HOLE TO 2484 FT. RUN 18-5/8" CSG AND SUSPENDED FOR DRILL 16" HOLE.
MRJN-868: BATCH DRILLING. 32" CP AT 346 FT, CURRENT WELL.
MRJN-866: BATCH DRILLING. 32" CP AT 346 FT.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-868 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/18/2024 - 02/25/2026
Report ID: OPERLMTDMRREP

MRJN-864: BATCH DRILLING. 32" CP AT 346 FT.


MRJN-862: BATCH DRILLING. 32" CP AT 346 FT.
==============================================================================
HOLE SECTIONS:
* L-0 22" PLANNED DEPTH AT 2473 FT MD/ 2469 FT TVD, ACTUAL DEPTH AT XXXX FT MD/ XXXX FT TVD. - RUS FORMATION.
* L-0 16" PLANNED DEPTH AT 5421 FT MD/ 5336 FT TVD, ACTUAL DEPTH AT XXXX FT MD/ XXXX FT TVD. - 50 FT ABOVE LWHH.
* L-0 12 1/4" PLANNED DEPTH AT 10440 FT MD/ 7240 FT TVD, ACTUAL DEPTH AT XXXX FT MD/ XXXX FT TVD. - TARGET ENTRY IN SHUB RES.
* L-0 8 1/2" PLANNED DEPTH AT 14534 FT MD/ 7254 FT TVD, ACTUAL DEPTH AT XXXX FT MD/ XXXX FT TVD. - SHUB.
* L-1 8 1/2" PLANNED DEPTH AT 13259 FT MD/ 7257 FT TVD, ACTUAL DEPTH AT XXXX FT MD/ XXXX FT TVD. - SHUB.
===========================SAFETY & DRILLS========================================
** HSE ALERTS REVIEWED WITH CREWS: 69-24, 70-24, 71-24 & 72-24.
** HELD H2S DRILL & ABANDON RIG DRILL, AND FIRE DRILL ON JUNE, 13, 2024.
==========================ARAMCO PERSONNEL================================================
** ARAMCO ODD2 FCT RAYAN ALAMRI #796774 ONBOARD SINCE 11-JUNE-2024.
** ARAMCO MATERIALS EXPEDITOR BAQER M AL JERANI # 822104 ONBOARD SINCE 07-JUNE-2024.
** ARAMCO PDP RAKAN ALDOWAIS # 819464 ONBOARD SINCE 14-JUNE-2024.
====================RENTAL EQUIPMENT ON BOARD========================================
- 9 1/2" NOV DRLG JAR (SN:HMJ950-4326077), RECEIVED ONBOARD AT 03, JUNE, 2024 WITH MANIFEST #2100905680.
===================================================================================
- HAVE 1 X 7" EZ-SVB WITH BRASS ELEMENT ON BOARD.
- HAVE 1 X 9 5/8" EZ-SVB WITH BRASS ELEMENT ON BOARD.
- HAVE 1 X 13-3/8" EZSV WITH BRASS PLUG ONBOARD.
==========================WAITING TIME ===============================================
- WAIT ON WEATHER: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON PRODUCING: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON MARINE: TODAY 0 HRS / CUMULATIVE 0 HRS
===================================================================================
- LC-50 WBM SAMPLE: SENT ON ZAMIL-506 BOAT WITH M#2400691945 ON 17TH OF JUNE, 2024.
==================================================================================
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 0 9.4 API 0 0 Volts 2.34 9.6 25,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
80 0 HTHP 96 27 0 14 / 17 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 13 4 12 / 13 10 160 0
63
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 0 9.4 API 0 0 Volts 2.34 9.6 25,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
80 0 HTHP 96 28 0 14 / 17 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 13 4 12 / 13 10 160 0
63

MUD CAUST SODASH PACR XC BARITE-BULK MRBL-M BENT


TREATMENT 7 ( 50LBP ) 8 ( 100LB ) 20 ( 55LB ) 20 ( 50LB ) 300 ( 100LB ) 2 ( 2200L ) 135 ( 100LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
1 0 44 DP Av DC Av Bit HHP 15 50 435 22 HTC
Pressure GPM Jet Vel 16.2 17.86 10 I-Row O-Row DC Location Bearings
250 300 82 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
Z396ZT VGAC310H 6 x 16 / 1.178
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 6 135 135 130 2,000 54.5
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
62.5

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 22 1 22 1.8 7 5/8" REG Z396ZT
2 Mud Motor BHI 12.75 1 12.75 9.042 35.7 7 5/8" REG 7 5/8" REG 10 15836610
3 Stabilizer BHI 22 1 22 3 9.1 7 5/8 REG 7 5/8 REG 10 ZIBSITTS330
DRILL STRING
4 Measurement While Drilling (MWD) SCD 9.5 1 9.5 3 31.3 7 5/8 REG 7 5/8 REG 10 SPRL 90025
5 Sub ARM 9.5 1 9.5 3 6.5 7 5/8 REG 7 5/8 REG 10 91070
6 Drillcollar RIG 9.5 7 9.5 3 216.97 7 5/8 REG 7 5/8 REG 220 SPRL
7 Hydro-Mechanical Jar NOJ 9.5 1 9.5 2.625 30.72 7 5/8" REG 7 5/8" REG 200 9504326077
8 Drillcollar RIG 9.5 2 9.5 3 62.1 7 5/8 REG 7 5/8 REG 220 SPRL
9 Crossover RIG 9.5 1 9.5 3 3.56 7 5/8 REG 6 5/8 REG 200 4287010C
10 Drillcollar RIG 8.5 4 8.5 2.813 124.04 6 5/8 REG 6 5/8 REG 165 SPRL
11 Crossover RIG 8.5 1 8.5 2.813 3.4 XT54 6 5/8 REG 160 4299312B
12 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 464.21 XT54 XT54 52 CONV
13 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 S135 PREMIUM

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-868 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/18/2024 - 02/25/2026
Report ID: OPERLMTDMRREP

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A PIT & TRIP 07-09 KNTS, 1-2 FT SEASONAL 561 N/A
NNW

Company OCS HTD GOS BHI SCD RIG BDF NOJ ARM SJC ARM

Category CSR CSV CTRG DPDS DPDS RIG DFMS JST OTHR PCS WSC
PERSONNEL
4 2 13 2 2 55 2 0 3 2 1
Total
AND SERVICES No. of Persons
86
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 0 24 24 24

Operating Hours. 0 8 0 10 10 24 24 0 12 24 24

Standby/Tankers Others Others


TRUCKS/BOATS
TOPAZ KHUWAIR rawabi-55 rawabi-47

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
3900 1650 1251 4440 360 4500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABQQ-115 WORKOVER-5 BI-60
Print Date: 06/18/2024 06:19 04/30/2024 - 06/30/2024
Report ID: OPERLMTDMRREP

ADC-12 @ ABQQ-115 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK IN Foreman(s)SAYED, SAID AHMED / OSMAN, ABUBAKER ABDALLA
D&WO Morning Report (Service Providers View) Charge #: ARAB-D ZONE) Engineer AVILA ROMERO, MIGUEL AUGUSTO
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24050-0115) Manager HAJRI, ASKAR SAUD
ADC-12
Daily Onshore THURAYA RIG FORMAN VSAT FAX VSAT
(0500-0500) Saudi Aramco Well Wellbores: 00-88-216- 777-110-77 572-9490 572-5140
Date: Tuesday 06/18/2024 ABQQ-115 (0-3) ABQQ_115_3 CONTRACTOR /CLERK VSA T
572-3810

Last 24 hr operations Next 24 hr plan


DISPLACE WELL FRESH SOLIDS FREE BRINE, POOH & L/D 3-7/8" C/O ASSY, RUN 4-1/2" SWAB CUPS P/T 4-1/2" TOL, RIH, PT 4-1/2" LNR ABOVE HYDROSEAL CEMENTING VALVE, POOH & L/D SWAB
ON 2-3/8" / 4" DP'S. CUPS ASSY.
Location Next Location
37 KM FROM DMG ABQQ-365
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
11,093 Size 6972 6972 Size 5,857 8,150 7,021 Top
Formations Comments
7 4 1/2 Depth
AD1B 7,021 8093' MD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
11093 (Date) 100 0 37
35.2 (05/13/2024@2300 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0700 2 0-3 EOW N CT CIRC MPMP RIG 11093 11093 CHC, DISPLACE WELL TO 82 PCF FRESH SOLIDS FREE BRINE, FLOW CHECK - WELL
STATIC.

POOH W/ 3-7/8" C/O ASSY IN CONTROL SPEED THRU 4-1/2" LNR TO 6000' (143'
0700 - 1330 6.5 0-3 EOW N CT TO BHA RIG 11093 11093 10894 6000 BELOW 4-1/2" TOL), FLOW CHECK - WELL STATIC.
>> MONITOR WELL THRU TRIP TANK - WELL STATIC.
>> CONDUCT FLOW CHECK 5 STDS OFF BTM - WELL STATIC.
1330 - 1500 1.5 0-3 EOW N CT CIRC MPMP RIG 11093 11093
HPJSM, CIRC BTM UP W/ MAX FLOW RATE , FLOW CHECK - WELL STATIC.

CONT.POOH W/ 3-7/8" C/O ASSY TO TOP OF 2-3/8" DP'S, FLOW CHECK - WELL
1500 - 1530 0.5 0-3 EOW N CT TO STDP RIG 11093 11093 6000 5200 STATIC.
>> MONITOR WELL THRU TRIP TANK - WELL STATIC.

1530 - 1630 1 0-3 EOW N CT HT PEL RIG 11093 11093


CHANGE HANDLING TOOLS TO 2-3/8" SIZE.

COMPL. POOH W/ 3-7/8" C/O ASSY TO SURFACE.


1630 - 2030 4 0-3 EOW N CT TO STDP RIG 11093 11093 5200 0
>> MONITOR WELL THRU TRIP TANK - WELL STATIC.
>> CONDUCT FLOW CHECK 5 STDS ABOVE BHA AND @ BHA, WELL STATIC..
2030 - 2100 0.5 0-3 EOW N CT RR TDS RIG 11093 11093
SERVICED TDS.

HPJSM, P/U & M/U INNOVEX SWAB CUP TOOL BHA, 3-7/8" RR PDC BIT, 3-3/8" FS
WITH FLOAT, 1 X 2-3/8" DP, INNOVEX SWAB CUP TOOL,9 X 2-3/8" DP, 3-3/8"
2100 - 2300 2 0-3 EOW N CT HT BHA RIG 11093 11093
DRLG JAR. ( TO P/T 4-1/2" TOL & P/T 4-1/2" LNR ABOVE HYDROSEAL CEMENTING
VALVE).
>> MONITOR WELL THRU TRIP TANK - WELL STATIC.

RIH INNOVEX SWAB CUP TOOL ASSY ON 2-3/8" DP TO 2499'.


2300 - 0030 1.5 0-3 EOW N CT TI STDP RIG 11093 11093 334 2499
>> FILL AND CIRCULATE STRING VOLUME EVERY 15 JTS.
>> MONITOR WELL THRU TRIP TANK - WELL STATIC.
0030 - 0130 1 0-3 EOW N CT CIRC MPMP RIG 11093 11093
CUMULATIVE TIME FOR CIRC WHILE RIH.
0130 - 0230 1 0-3 EOW N CT HT PEL RIG 11093 11093
CHANGED HANDLING TOOLS TO 4" SIZE.

CONT RIH INNOVEX SWAB CUP TOOL ASSY ON 2-3/8"/ 4" DP TO 5827' (30 ABOVE
0230 - 0459 2.5 0-3 EOW N CT TI STDP RIG 11093 11093 2499 5807 TOL).
>> FILL UP & CIRC STRG VOLUME EVERY 10 STANDS WHILE RIH.
>> MONITOR WELL THRU TRIP TANK - WELL STATIC.
Workover Objectives
Foreman Remarks

>> ODF CORRECTION: -11 FT. TOW @ 5954', BOW @ 5963'


================================================================================
>> MAT EXPEDITOR ZAID AL HARTI ID# 8331490 ON LOCATION SINCE 05/26/2024.
>> ARAMCO CLERK AHMED ALQUZI #821794 ON LOCATION SINCE 06/02/2024.
>> SAOWOD SAFETY ADVISOR KHALIL MOHAMED #8556268 ON LOCATION SINCE 06/10/2024.
================================================================================
>> 4-3/4" OILSERV REPLACEMENT DRLG JAR HJDA-475-0057 ON SITE SINCE 05/31/2024, P/U ON 06/02/2024 @ 2:30 HRS. L/D ON 06/07/2024 @ 09:00 HRS, P/U ON 06/07/2024 @ 17:00 HRS.
L/D ON 06/08/2024 @ 15:30 HRS, P/U ON 06/10/2024 @ 09:00 HRS. L/D ON 06/12/2024 AT 20:30 HRS. REQUESTED TO B/L.
>> 2 X 6.023" BESTE-BIT/SHURIKEN DLR'S ON SITE 05/22/2024. ONE DLR P/U ON 06/02/2024 @ 02:00 HRS. L/D ON 06/07/2024 @ 09:30 HRS, REQUESTED TO B/L.
>> 3-3/8" OILSERV DRLG JAR#HJDA-338-0008 ON LOCATION SINCE 06/09/2024 @ 19:00 HRS. P/U ON 06/14/2024 AT 21:00 HRS, L/D ON 06/17/2024 @ 20:00 HRS,P/U ON 06/14/2024 AT 21:00
HRS.
>> GCAT VACUUM TANKERS ARRIVED ON 06/06/2024 @ 16:30 HRS. 4021 AGA & 1026 KJA 0 LOAD EACH ON 06/14/2024. TOTAL 26 LOADS.
==================================NEXT WELL======================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABQQ-115 WORKOVER-5 BI-60
Print Date: 06/18/2024 06:19 04/30/2024 - 06/30/2024
Report ID: OPERLMTDMRREP

>> ABQQ-365, STRIPPED OUT 100%, LOCATION 80%, KOM DONE ON 05/21/2024 BY SINO-8, WHIT DONE ON 06/12/2024.
>> ABQQ-75: KOM DONE ON 05/13/2024. PE KILLED & SECURED W/ 4-1/2" MONOLOCK ON 06/14/2024, STRIPPED OUT 100%. WHIT DONE ON 06/13/2024, WS PREPARATION: 0% .
>> NEXT WELL AFTER ABQQ-75 NOT IDENTIFIED.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 0 0 API 0 0 Volts 0 9.5 268,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
125 0 HTHP 87 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 13 0/0 0 0 0
30
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 0 0 API 0 0 Volts 0 9.5 268,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
125 0 HTHP 87 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 13 0/0 0 0 0
29

MUD CACL2-80 BCTRN CAOH2


TREATMENT 23 ( 2200L ) 3 ( 5GL ) 3 ( 25KG )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/01/2024 AS MODERATE NA SEASONAL 472 TOURLY
REQUIRED

Company MSD ABE RIG GDF ASH NPJ TOT RIG ARM OTH ARM

Category CSR CTRG RIG DFMS FLD JST LHES OTHR OTHR VAC WSC
PERSONNEL
3 14 39 1 3 0 3 18 2 0 2
Total
AND SERVICES No. of Persons
85
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 0 24 24 24 0 24

Operating Hours. 0 0 24 24 12 20 8 12 12 0 24

Standby/Tankers Others Others Others Others


TRUCKS/BOATS
DH-7503 RIG AMBULANCE MAIN CAMP DIESEL : 93 bBLS 3 X RAW WTR TRUCKS COMPLETION DIESEL = 370 BBLS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1500 100 226 21 60 1000

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1532 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/19/2023 - 08/25/2024
Report ID: OPERLMTDMRREP

ADC-120 @ ZULF-1532 Limited Morning Report for 06/18/2024


Objective : (SINGLE Foreman(s)SHIPULA, STEVEN JOHN / PRADO, MARTIN
D&WO Morning Report (Service Providers View) Charge #: LATERAL OIL-PRODUCER Engineer ALGHAMDI, OMAR MISHAL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23062-1532) WELL IN SFNY RESER) Manager ALRASHEEDI, ABDULMAJEED NASSER
ADC-120
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882 16 77 71 4136 013-673-99 80 RADIO/013- 673-9197
Date: Tuesday 06/18/2024 ZULF-1532 (0) ZULF_1532_0 CONTRACTOR /CLERK VSA T
013-673922 0

Last 24 hr operations Next 24 hr plan


SET BAKER RBP AND TEST BAKER RBP C/O WH FROM 10K TO 3K NU BOP & PT, RIH AND RETRIEVE BAKER RBP, POOH, RIH W/ WHIPSTOCK AND SET, MILL
WINDOW, POOH, POOH, RIH W/ 8 3/8" MOTOR ASSY AND DRILL +/- 200'
Location Next Location
P/F ZULF - 1530/1539 ZULF-1532
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,300 Last Csg Size MD TVD Size Top
9 5/8 9300 8181 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9300 (Date) 100 0 261
111.9 (06/11/2024@1430 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

SET BAKER RBP - TAKE PARAMETERS, ROTATE 15 TURNS RIGHT SO 60K HOLD 15
0500 - 0715 2.25 0 8 1/2 N DRLG SET CHAMP BC 10920 10920 6000 6020
MIN, PERFORM PUSH PULL TEST, RELEASE SETING TOOL. BAKER RBP SET AT
6020'. PERFORM POSITIVE PRESSURE TEST - 1500 PSI / 15 MINS - GOOD TEST.

0715 - 0900 1.75 0 8 1/2 N DRLG TO STDP RIG 10920 10920 6020 2005 POOH W/ BAKER RBP SETTTING TOOL F/6020' T/2005'
MONITOR WELL ON TT - CORRECT FILLS

0900 - 1230 3.5 0 8 1/2 N DRLG RR TRVL RIG 10920 10920 SLIP AND CUT
MONITOR WELL ON TT - STATIC

POOH W/ BAKER RBP SETTTING TOOL F/2005' T/SURFACE - LD BAKER RBP


1230 - 1445 2.25 0 8 1/2 N DRLG TO STDP RIG 10920 10920 2005 0
SETTING TOOL
MONITOR WELL ON TT - CORRECT FILLS

1445 - 1500 0.25 0 8 1/2 N DRLG OTH NA RIG 10920 10920 CLEAR AND CLEAN RIG FLOOR
MONITOR WELL ON TT - STATIC

1500 - 2330 8.5 0 8 1/2 N BOP ND BOP RIG 10920 10920 HOLD PJSM ON ND BOP'S - ND OVERSHOT, AND DIVERTER, MOVE BOP AND
SECURE, ND RISER AND DSA.
2330 - 0045 1.25 0 8 1/2 N BOP OTH BOP RIG 10920 10920
REMOVE SCAFFOLDING AND PREPARE TO REMOVE 10K WELL HEAD
0045 - 0245 2 0 8 1/2 N WH ND WH CAM 10920 10920
HOLD PJSM AND ND 10K WELL HEAD PER CAMERON TECH

0245 - 0459 2.25 0 8 1/2 N WH NU WH GEP 10920 10920 HOLD PJSM ON NU 3K WELL HEAD. PREPARE 9 5/8" CASING TO NU 3K WELL
HEAD. NU VG 3K WELL HEAD PER VG TECH.
Foreman Remarks

ZULF-1532 WILL BE DRILLED AS A SINGLE LATERAL HORIZONTAL PRODUCER TARGETING SAFANIYA RESERVOIR AND WILL BE COMPLETED WITH ICD'S/SCREENS LOWER COMPLETION AND ESP
UPPER COMPLETION.
===============================================================================
RIG HEADING= 328 DEG
FINAL LEG PENETRATION: BOW: 8.3 FT; STBD: 7.9 FT; PORT: 6.3 FT
AIR GAP = 55 FT
RKB TO ML = 261.7 FT
RKB TO MSL = 118.7 FT
ODF CORRECTION -13.7 FT
WATER DEPTH = 140 FT
===============================================================================
**PLATFORM ZULF-1530/1539 WELL STATUS:
*ZULF-1530: TIE BACK AND SUSPENDED WITH CEMENT PLUGS
*ZULF-1531: WELL SUSPENDED FOR FUTURE FLOW-BACK.
*ZULF-1532: 22", 16", 12" HOLE DRILLED. 8-1/2" DRILLED AND 5-7/8" DRILLED AND SUSPENDED FOR SIDETRACK.
*ZULF-1533: WELL SUSPENDED FOR FUTURE FLOW-BACK.
*ZULF-1535: WELL SUSPENDED FOR FUTURE FLOW-BACK.
*ZULF-1537: 22", 16", 12-1/4" WELL SUSPENDED FOR FUTURE FLOW-BACK.
*ZULF-1539: 22", 16", 12", 8-3/8" PILOT HOLE DRILLED.
===============================================================================
**CURRENT WELL: ZULF-1532:
* L-0 22" PLANNED DEPTH AT 2411 FT MD/ 2375 FT TVD, ACTUAL DEPTH AT 2413 FT MD/ 2373 FT TVD. - 50 INTO RUS FORMATION
* L-0 16" PLANNED DEPTH AT 5389 FT MD/ 4921 FT TVD, ACTUAL DEPTH AT 5436 FT MD/ 4932 FT TVD. ~ 30 ABOVE LHHR.
* L-0 12" PLANNED DEPTH AT 9406 FT MD/ 8284 FT TVD, ACTUAL DEPTH AT 9300 FT MD/ 8181 FT TVD, ~ 21 FEET TVD INTO YAMAMA.
* L-0 8-3/8" PLANNED DEPTH AT 10972 FT MD/ 9728 FT TVD, ACTUAL DEPTH AT XXX FT MD/ XXX FT TVD, ~ 10 FEET TVD ABOVE HITH.
* L-0 5-7/8" PLANNED DEPTH AT 12075 FT MD/ 10749 FT TVD, ACTUAL DEPTH AT XXX FT MD/ XXX FT TVD
===========================SAFETY & DRILLS========================================
**HOLD WEEKLY SAFETY MEETING WITH ALL POB ON 30-MAY-2024.
**HOLD WEEKLY H2S & ABANDON DRILL ON 12-JUNE-2024.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1532 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/19/2023 - 08/25/2024
Report ID: OPERLMTDMRREP

**PERFORM MAN OVERBOARD DRILL ON 22-APRIL-2024.


**PERFORM WEEKLY THURAYA CHECK ON 09-JUNE-2024.
**RUN EMERGENCY GENERATOR FOR 2 HRS ON 7-JUNE-2024.
--RE-ENFORCE STOP WORK AUTHORITY & HANDS-FREE OPERATIONS IN PRE-TOUR MEETINGS.
--DISCUSS ARAMCO & ADC HSE ALERTS (61-24, 62-24, 63-24 & 64-24) IN PRE TOUR-MEETINGS & WEEKLY SAFETY MEETING.
==========================ARAMCO PERSONNEL==========================================
** ARAMCO MATERIAL EXPEDITOR OMAR ALUMTAIRI BADGE# 8651568 ARRIVED RIG ADC-120 ON 01-JUNE-2024.
==========================WAITING TIME ===============================================
- WAIT ON WEATHER: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON PRODUCING: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON MARINE: TODAY 0 HRS / CUMULATIVE 0 HRS
===================================================================================
- LC-50 SAMPLE, RHELIANT OBM SENT ON URDANETA TIDE MN#2400672141
- LC-50 SAMPLE, POLYMER WBM SENT ON MOLLY R MCCALL MN# 2400674717
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 10,920 22.01 29.58 0 9,681 1276.95 498.44 4,497.32 0

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
92 PCF 1 0 API 63 580 Volts 1.77 0 252,757
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2 HTHP 17 19 0 12 / 17 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 30 20 9 / 10 0 27,400 N/A
75
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
92 PCF 1 0 API 63 585 Volts 1.77 0 252,757
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2 HTHP 17 19 0 12 / 17 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 29 20 9 / 10 0 27,200 N/A
74

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/06/2024 TOURLY NE 8-10 2-3 FT SEASONAL 478 PRE-TOUR & PRE-
KNOTS JOB

Company INW WCR GOS BC WI3 SPS RIG OES SMI BRT ARM BCM SPL BC ARM WWB CAM GEP

Category BRCR CSR CTRG PSSC WPSTK DPDS RIG DFMS DFMS OTHR OTHR PCS SLS SSSV WSC WBCS WHES WHES
PERSONNEL
0 2 13 1 1 4 51 1 1 0 1 3 0 0 2 1 1 2
Total
AND SERVICES No. of Persons
84
INFORMATION
Personnel on Loc. Hrs. 0 24 24 24 24 24 24 24 24 0 24 24 0 0 24 24 24 24

Operating Hours. 0 0 0 0 1 1 24 12 12 0 12 12 0 0 24 0 12 12

Standby/Tankers
TRUCKS/BOATS
JUZOR

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1954 1371 1801 3890 0 3942

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-658 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 09/17/2022 - 09/11/2024
Report ID: OPERLMTDMRREP

ADC-130 @ MRJN-658 Limited Morning Report for 06/18/2024


Objective : (DUAL Foreman(s)ALGHAMDI, ABDULLAH ABDULGHANI / ABDELGHANI, HUSSEIN RASHAD
D&WO Morning Report (Service Providers View) Charge #: LATERAL HORIZONTAL Engineer VALIYEV, MEHDI / ALKUWAYKIBI, AHMED SAQER
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-21073-0658) OIL PRODUCER) Manager ALRASHEEDI, ABDULMAJEED NASSER
ADC-130
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14205 013-673-19 14 (FOREMA N) 013-829-77 72 (RADIO ROOM)
Date: Tuesday 06/18/2024 MRJN-658 (1) MRJN_658_1 CONTRACTOR /CLERK VSA T
013-673-15 00 (CLERK)

Last 24 hr operations Next 24 hr plan


DISPLACE WELL TO 78 PCF VISCOUS BRINE, PUMP OUT OF HOLE TO WINDOW, POOH W/ 6-1/8" PU&MU & RIH W/ WIS HOOK ASSY & RETRIEVE WHIPSTOCK, POOH & L/D WHIPSTOCK, PERFORM
REMAING ASSY & L/D. WBCO RUNS.
Location Next Location
MRJN-650/659 PF MRJN-650
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
14,741 Size 7662 7092 Size 7,346 11,594 7,207 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
14741 (Date) 100 0 253
52.2 (06/16/2024@0745 )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

DISPLACE HOLE WITH 78 PCF VIS CACL2 BRINE AS FOLLOWS :


- PUMP 60 BBLS SURFACTANT PILL W/ 5% SURFACTANT.
0500 - 0715 2.25 1 EOW N CT CIRC MPMP RIG 14741 14741 - PUMP 80 BBLS SOLVENT PILL W/ 5% SOLVENT.
- PUMP 50 BBLS HI VIS BRINE W/ 3 PPB HEC.
- PUMP 78 PCF VIS CACL2 BRINE TILL CLEAR BRINE AT SURFACE.
- CLEAN FLOWLINES . FLUSH CHOKE MANIFOLD AND MGS WITH BRINE.
0715 - 0815 1 1 EOW N CT CIRC MPMP RIG 14741 14741
EXTEND FLOW CHECK - WELL STATIC.

0815 - 1000 1.75 1 EOW N CT RW BIT RIG 14741 14741 14741 14245 PUMP OUT OF HOLE SMOOTHLY W 6-1/8" REAMING ASSY ON 5-1/2" DP (5
STANDS).
1000 - 1015 0.25 1 EOW N CT CIRC MPMP RIG 14741 14741
FLOW CHECK - WELL STATIC.

1015 - 1800 7.75 1 EOW N CT RW BIT RIG 14741 14741 14245 10077 PUMP OUT OF HOLE SMOOTHLY W 6-1/8" REAMING ASSY ON 5-1/2" DP TO TOW
@ 10077'
1800 - 1930 1.5 1 EOW N CT CIRC MPMP RIG 14741 14741
CIRCULATE FULL CYCLE.
1930 - 2000 0.5 1 EOW N CT CIRC MPMP RIG 14741 14741
EXTEND FLOW CHECK - WELL STATIC, MEANWHILE RIG SERVICE TDS.
2000 - 2030 0.5 1 EOW N CT RR TDS RIG 14741 14741
SERVICE TOP DRIVE SYSTEM
2030 - 2145 1.25 1 EOW N CT TO STDP RIG 14741 14741 10077 7988
POOH W/ 6-1/8" REAMING ASSY ON 5-1/2" DP.
2145 - 2200 0.25 1 EOW N CT HT PEL RIG 14741 14741
CHANGE OUT DRILL PIPE ELEVATOR FROM 5-1/2" TO 4".
2200 - 0130 3.5 1 EOW N CT TO STDP RIG 14741 14741 7988 833
POOH W/ 6-1/8" REAMING ASSY ON 4" DP.
0130 - 0145 0.25 1 EOW N CT CIRC MPMP RIG 14741 14741
FLOW CHECK PRIOR TO LAST 5 STDS - STATIC
0145 - 0200 0.25 1 EOW N CT ST STDP RIG 14741 14741 833 368
POOH W/ 6-1/8" REAMING ASSY ON 4" DP.
0200 - 0215 0.25 1 EOW N CT CIRC MPMP RIG 14741 14741
FLOW CHECK PRIOR TO BHA - STATIC.

0215 - 0245 0.5 1 EOW N CT HT BHA RIG 14741 14741 POOH W/ 6-1/8" REAMING ASSY ON 4" HWDP.
- L/D 4-3/4" NESR HM JAR.

0245 - 0400 1.25 1 EOW N CT HT BHA RIG 14741 14741 POOH W/ 6-1/8" REAMING ASSY TO SURFACE & L/D.
- L/D 4-3/4" SAMAA PBL.
0400 - 0430 0.5 1 EOW N CT HT BHA RIG 14741 14741
CLEAN & CLEAR RIG FLOOR.
0430 - 0459 0.5 1 EOW N FISH HT FISHT RIG 14741 14741
PJSM, M/U BHI MWD WITH WIS HOOK ASSY...ON GOING AT RT.
Foreman Remarks

=CURRENT WELL DATA=====================


MRJN-658 WILL BE DRILLED AS A LEVEL-2 DUAL LATERAL HORIZONTAL OIL PRODUCER TARGETING SHUAIBA RESERVOIR TO TOTAL DEPTH (TD) OF 16,153' MD (7,182' TVD) FOR MOTHERBORE
(L-0) AND TOTAL DEPTH (TD) OF 13,603' MD (7,196' TVD) FOR LATERAL 1 (L-1).
=======================================PF WELLS STATUS============================================
MRJN-650 : WELL TIED-BACK WITH WELL HEAD SECTIONS INSTALLED AND SUSPENDED FOR PERFORATION AND COMPLETION.
MRJN-651: SUSPENDED FOR ACID STIMULATION AND FLOWBACK.
MRJN-652: SUSPENDED FOR DECOMPLETION AND COMPLETION WITH ESP ( WORKOVER).
MRJN-653: SUSPENDED FOR FLOWBACK.
MRJN-654: SUSPENDED FOR FLOWBACK.
MRJN-656: SUSPENDED FOR DECOMPLETION AND COMPLETION WITH ESP ( WORKOVER).
MRJN-657: SUSPENDED FOR FLOWBACK.
MRJN-658: CURRENT WELL.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-658 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 09/17/2022 - 09/11/2024
Report ID: OPERLMTDMRREP

MRJN-659: SUSPENDED FOR DECOMPLETION AND COMPLETION WITH ESP ( WORKOVER).

==============================================================================
MRJN-658:
PLANNED VS ACTUAL CASING POINTS (L-0):
32" CONDUCTOR AT 309'.
18 5/8" CASING ( 50' INTO RUS ): 2,590' VS 2,589'.
13-3/8" CASING ( 50' TVD ABOVE LHHR ): 5,479' VS 5,377'.
9-5/8" CASING ( 30' TVD INSIDE YMM ): 7,625' VS 7,662'.
7" LINER DEPTH @ 11,153' VS 11594'.
6-1/8" TD (SHUB): (5000 FT INSIDE SHUB) 16,153' VS 16780.

LATERAL (L-1):
ACTUAL TOW: 10077'.
ACTUAL BOW: 10087'.
PLANNED 6-1/8" TD (SHUB): (5000' INSIDE SHUB FROM TOW) 14,740'.

========================SAFETY & DRILLS=========================================


ALERTS DISCUSS WITH CREWS.
- HSE ALERT: 65-24 FINGERS INJURYY DURING FLARE LINE RIG UP.
- HSE ALERT: 66-24 FINGERTIP AMPUTATION INCIDENT.
- HSE ALERT: 67-24 STRUCK BY MANUAL TONG.
- HSE ALERT: 68-24 STRUCK BY CHIKSAN ASSEMBLY.

==============================================================================
DRILLS:
- FIRE DRILL: 25-MAY-2024
- H2S DRILL: 08-JUN-2024
- ABANDON SHIP: 08-JUN-2024
- CONFINED SPACE DRILL: 01-JUN-2024
- MAN DOWN INJURY DRILL: 03-JUN-2024
- 1 X SWA DRILL : 10-JUNE -2024
====================PERSONNEL ONBOARD===================
** ARAMCO MATERIAL CLERCK: MANSOUR ALANAZI #8532046 ON BOARD SINCE JUNE 04, 2024.
** ARAMCO PDP: ABDULLAH ALHADRAMI , BADGE#833924 ON BOARD SINCE 7 JUNE 2024.
=====================RENTAL TOOLS================================================
- 4-3/4" NPS HJDA , SN# 475-0059 RECEIVED ON JUNE 08 , 2024 FROM RAWABI-55 , MN# 2100908895.
- 2 X 4 -3/4" SAMAA PBL RECEIVED ON MAY 20 , 2024 FROM SEACOR 888 , MN# 2100894455.
- 9-5/8" RTTS & STORM VALVE RECEVIED ON MAY 22 , 2024 FROM RJ COCO , MN # 2100896573
- 6-1/8" NAPESCO DUAL ECCENTRIC REAMER RECEIVED ON MAY 23 , 2024 , MN# 2100896914.
- 2 EA 9-5/8" EZSV ONBOARD
- 2 EA 7" EZSV ONBOARD
============================LC-50 SAMPLE==========================================
* LC-50 SAMPLE FOR WBM SENT ON MAY 05TH, 2024 ON POSH PELICAN, MANIFEST# 2400683407.
* LC-50 SAMPLE FOR OBM SENT ON MAY 05TH, 2024 ON POSH PELICAN, MANIFEST# 2400683407.
========================RIG DATA=========================
RIG HEADING :330
FINAL POSITION: LAT- 28DEG 32.32' N, LONG-049DEG 33.97' E
WATER DEPTH = 154 FT
AIR GAP = 48 FT
RKB TO HULL = 62 FT
RKB TO MSL = 110 FT
RKB TO ML = 264 FT
ODF TO MSL = 103 FT
ODF TO ML = 253

INITIAL PENETRATION:
BOW LEG - 8 FT; STBD LEG - 9 FT; PORT LEG - 8 FT

FINAL PENETRATION:
BOW LEG - 11.5 FT; STBD LEG - 12 FT; PORT LEG - 11 FT
========================RIG MOVE REQUESTS=========================
** PDS REQUEST SUBMITTED FOR SFNY 65 - 1190/1199 PF , SERVICE REQUEST # 8800022361.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
78 PCF 0 0 API 0 0 Volts 0 9.3 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 91 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 9 0/0 0 0 0
101
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
78 PCF 0 0 API 0 0 Volts 0 9.2 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 91 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 9 0/0 0 0 0
102

MUD
MUSOL DETERGENT HEC CAOH2
TREATMENT

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-658 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 09/17/2022 - 09/11/2024
Report ID: OPERLMTDMRREP

6 ( 55GL ) 2 ( 55GL ) 60 ( 2200L ) 23 ( 50LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
12RR 14,741 14,741 DP Av DC Av Bit HHP N/A N/A 117 6.125 HTC
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
RV1268 MX1 POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 42.4
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 6.125 1 0.6 RV1268
2 Near Bit Roller Reamer RIG 6.125 1 4.75 1.25 6.65 NC38 NC38 14 3 POINT 528.4.10.42
3 Drillcollar RIG 4.75 1 4.75 2.25 31.07 NC38 NC38 44 SPRL DC4016
4 String Reamer RIG 6.125 1 6.125 1 6.34 NC38 NC38 14 528.4.10.42
DRILL STRING 5 Drillcollar RIG 4.75 2 4.75 2.375 62.22 NC38 NC38 44 SPRL DC4011,4009
6 String Reamer RIG 6.125 1 6.125 1 6.31 NC38 NC38 14 525.410.410
7 Drillcollar RIG 4.75 1 4.75 2.25 31.03 NC38 NC38 44 SPRL
8 Multi Activation Circulating Sub SAM 4.75 1 4.75 2.125 8.43 NC38 NC38 14 SBM475BP176
9 Crossover RIG 4.875 1 4.875 2.25 3.66 NC38 XT39 14 4126-17-3
10 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.562 93 XT39 XT39 25.1 CONV 4050-4023
11 Hydro-Mechanical Jar NPJ 4.75 1 4.75 30.63 28 HJDA475-005
12 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.562 94.77 XT39 XT39 25.1 CONV
13 Drillpipe RIG 4 80 4 3.34 7,616.6 XT39 XT39 14 XD105 PREMIUM 0
14 Crossover RIG 6.875 1 6.875 2.875 3.56 XT39 XT54 24 0
15 Drillpipe RIG 5.5 0 5.5 4.67 0 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/09/2024 N/A 7-11 SSE KTS 1-2 FT N/A 333 TWICE DAILY

Company BAL FMC SWK SCP WI3 BHI RIG BDF SMI BFL RIG ARM HCM SPL MI2 ARM SAM SCB

Category ALS CSR CTRG PSSC WPSTK DPDS RIG DFMS DFMS FILT OTHR OTHR PCS SLS SCS WSC WBCS BRCR
PERSONNEL
2 2 17 1 1 2 49 1 1 3 6 2 1 3 1 2 1 1
Total
AND SERVICES No. of Persons
96
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 24 0 24 12 12 0 0 12 24 0 0 24 24 0

Standby/Tankers
TRUCKS/BOATS
TOPAZ KHUBAYB

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
4749 1557 1000 3555 261 1978

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1869 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:19 03/27/2024 - 07/07/2024
Report ID: OPERLMTDMRREP

ADC-14 @ HRDH-1869 Limited Morning Report for 06/18/2024


Objective : (TO DE- Foreman(s)ALMUQRIN, MUATH ADEL / ZAKI, MARK SHAFIK
D&WO Morning Report (Service Providers View) Charge #: COMPLETE, SIDETRACK Engineer HASHIM, AHMED OMAR / BAKHSH, KHALID SULTAN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24058-1869) AND DRILL THE WELL AS A Manager OTAIBI, MUKHLED FARAH
ADC-14
PRE-SET IN ONE HOLE SIZE THURAYA RIG FORMAN VSAT MOBILE
Daily Onshore
Wellbores: TARGETING UNZC
(0500-0500) Saudi Aramco Well +882167771 1078 577-3938 053-161-32 69
RESERVOIR.)
Date: Tuesday 06/18/2024 HRDH-1869 (0-1-1) HRDH_1869_2 FAX VSAT CONTRACTOR /CLERK VSA T
880-7327 577-3509

Last 24 hr operations Next 24 hr plan


SAPESCO S/L CONT. WORK ON FISH, R/D SLICK LINE, R/U TAQA CTB EQUIPMENT. CONT R/U TAQA CTB EQUIPMENT, M/U & RIH W/ BAKER HYD OVERSHOT BHA, WORK ON FISH.
Location Next Location
288 KM F/DH M-GATE: F/HRDH BRIDGE CONTINUE SOUTH 30 KM THEN TURN LEFT TO LOCATION. HRDH-1030
Current Depth (ft) Liner TOL MD TVD Formation Tops
16,647 Last Csg Size MD TVD Size 13,024 12,994 Top
7 10564 10564 Formations Comments
4 1/2 Depth
13,552 FT MD, 4 FT
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KFDA 13,520
DEEPER.
16670 (Date) 100 0 288 14,149 FT MD, 16 FT
75.1 (04/04/2024@0200 ) BKDC 14,046
SHALLOWER.
14,254 FT MD, 1 FT
PKFU 14,123
SHALLOWER.
UNZB 14,538 15,133 FT MD
15334 FT MD, 9 FT
UNZC 14,589
SHALLOWER.

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End

RUN#4:
>> CONT WORK ON STUCK FISH WITH 3.45" WL FINDER
GRAPPER AT 14,116 FT WITH 40 DEG WITH MAX. SAFE PULL:
0500 - 0630 1.5 0-1-1 EOW C FISH OTH NA SPL 16670 16670 STUK 934849 2600 LB.
>> POOH TO SURFACE, RECOVER 10 FT OF 0.125" WIRE. FULL
RECOVERY OF 3.45" WL FINDER GRAPPER BHA.
>> FISH IN HOLE: 3.688" PR PLUG + S/L TOOL STRING (24 FT) +
590 FT S/L WIRE.

RUN#5:
>> CUT 40 FT OF S/L AND CHANGE ROPE SOCKET.
>> S/L RIH WITH 3.45" WL FINDER GRAPPER, TAG AND ENGAGE
TOF AT 14,444 FT WITH 50 DEGREE.
>> WORK ON STUCK FISH WITH MAX. SAFE PULL: 2600 LB.
0630 - 2300 16.5 0-1-1 EOW C FISH OTH NA SPL 16670 16670 STUK 934849
>> POOH TO SURFACE: CHECKED BHA, FOUND 3.45" WL
FINDER GRAPPER LOST IN HOLE .
>> FISH IN HOLE: 3.688" PR PLUG + S/L TOOL STRING (24 FT) +
590 FT S/L WIRE + 3.45 WL FINDER GRAPPER .
>> R/D SAPESCO S/L.

2300 - 0000 1 0-1-1 EOW C FISH OTH NA RIG 16670 16670 STUK 934849 SPACE OUT & ADJUST TBG STICK-UP FOR RIGGING UP TAQA
CTB.
0000 - 0030 0.5 0-1-1 EOW C FISH OTH NA BCR 16670 16670 STUK 934849
R/D BAKER TBG POWER TONG.
0030 - 0200 1.5 0-1-1 EOW C FISH OTH NA RIG 16670 16670 STUK 934849
HPJSM, R/D CATWALK & V-DOOR.

0200 - 0459 3 0-1-1 EOW C FISH OTH NA SJT 16670 16670 STUK 934849 HPJSM, SPOT & RIG UP 2-3/8"-10K TAQA CTU, CT EQUIPMENT,
PCE... ONGOING AT RT.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
17 Jun 0600 24 47 934849 STUK HINW SLICK SPL 10705 SAPESCO SLICK LINE RIH TO SET PR-PLUG
IN LOWER R-NIPPLE @ 10,800'. HAD S/O
ACROSS PBR AT 10,705 FT. TRY TO PASS.
NO SUCCESS. >> TRY TO PULL, ENCOUNTER
OVERPULL UP TO 1200 LBS THEN LOST
WEIGHT FROM 760 LBS TO 350 LBS. >>
LOST IN HOLE: 3.688" PR PLUG + S/L TOOL
STRING (24 FT) + 600 FT S/L WIRE.
Workover Objectives
Foreman Remarks

>> ODF: + 5.2 FT.


==================================SAFETY & DRILLS===================================================
>> DRILLS: NONE.
>> NEAR MISS: NONE
>> HSE ALERT 69-24 - INJURY DURING ENGINE MAINTENANCE
>> HSE ALERT 70-24 - PIPE HANDLER MAIN ARM UNCONTROLLED DECENT
>> HSE ALERT 71-24 - TRIP AND FALL INCIDENT
>> HSE ALERT 72-24 - SNAKE BITE & SCORPION STING INCIDENTS

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1869 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:19 03/27/2024 - 07/07/2024
Report ID: OPERLMTDMRREP

==================================ARAMCO PERSONNEL ON LOCATION=======================================


>> ARAMCO PDP ALI ALNAMI #797718 ON LOCATION 06/10/2024.
>> MATERIAL EXPEDITOR JOHAR ALQATARI #8508949 ON LOCATION 06/10/2024.
>> KHALID BAKHSH DRILLING ENGINEER #817991 ON LOCATION.
==================================THIRD PARTY PERSONNEL & EQUIPMENT====================================
>> TODAY CREW SHORTAGE: NONE.
>> EMEC MUD ENG. ON LOCATION.
>> BAKER FILTRATION ON LOCATION 05/22/24
>> HALLIBURTON COMPLETION ON LOCATION 06/13/24.
>> SAPESCO S/L ON LOCATION 06/14/24.
>> TAQA CT ON LOCATION 06/17/2024.
>> BAKER FISHING ENG ON LOCATION 06/17/2024.
==================================DIR & SURVEY DATA==================================================
>> TIE IN NEW LATERAL "0-1-1", TOW @ 13,340', BOW @ 13,350'.

==================================MISCELLANEOUS====================================================
>> IMPLEMENTING CLOSED LOOP SYSTEM (RE-ENTRY TYPE).
>> TOTAL RECOVERD FLUID FROM CUTTING DRYER= 62 BBL
===================== =============NEXT WELLS=======================================================
>> 1ST WELL: HRDH-1030, KHUFF C, PRE-SET WELL, ONE HOLE SIZE, PRE-WORKOVER MEETING HELD ON 31/01/2024 , STRIP OUT 100%, LOCATION PREPARATION 100%, WOCP IS ISSUED.
>> 2ND WELL: HWYH-1111, JAUF, S-SHAPE, ONE HOLE SIZE, PRE-WORKOVER MEETING HELD ON 12/02/2024, STRIP OUT 100%, LOCATION PREPARATION 0%, WOCP IS ISSUED.
>> 3RD WELL: HWYH-1069, KHUFF C, PRE-SET WELL, MILL 773' OF 7" LINER, TWO HOLE SIZES, PRE-WORKOVER MEETING HELD ON 03/11/2024, STRIP OUT 0%, LOCATION PREPARATION 0%,
WOCP IS ISSUED.

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
97 PCF 0 0 API 0 0 Volts 0 0 320,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 1/2 WBM-CAB 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
26
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
97 PCF 0 0 API 0 0 Volts 0 0 320,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 1/2 WBM-CAB 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
26

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/06/2024 N/A NORMAL N/A SEASONAL 4,755 DAILY

Company SCC HCO RIG EMC BFS RIG ARM SPL BCR ARM SJT BFW

Category CTRG PSSC RIG DFMS FILT OTHR OTHR SLS PRS WSC COIL WMFE
PERSONNEL
13 1 41 1 2 55 4 7 4 2 12 2
Total
AND SERVICES No. of Persons
144
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 12 12

Operating Hours. 0 12 24 12 0 24 24 18 1 24 3 0

Standby/Tankers
TRUCKS/BOATS
AB-6304

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 400 365 119 7 N/A

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
THURAYA PHONE + HAND HELD RADIO NEED NEW BATTERIES

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1365 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 08/11/2023 - 09/20/2024
Report ID: OPERLMTDMRREP

ADC-140 @ ZULF-1365 Limited Morning Report for 06/18/2024


Objective : (THE WELL WILL Foreman(s)GRAULUND, MARTIN / ZAYED, ALI TAHA
D&WO Morning Report (Service Providers View) Charge #: BE DRILLED AS A Engineer SUBRAMANIAM, ASHOK KUMAR
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-140 (66-23062-1365) HORIZONTAL SIGLE LATERAL Manager ALRASHEEDI, ABDULMAJEED NASSER
OIL PRODUCER TARGETING THURAYA RIG FORMAN VSAT OTHER VSAT
Daily OffShore
Wellbores: SAFANIYA RESERVOIR)
(0500-0500) Saudi Aramco Well 8821677714 164 013-673-19 22 013-673-15 14
Date: Tuesday 06/18/2024 ZULF-1365 (0) ZULF_1365_0 CONTRACTOR /CLERK VSA T
013-673-19 15

Last 24 hr operations Next 24 hr plan


CONT REAM OH TO BTM. PUMP SWEEPS & CHC. PERFORM WIPER TRIP, CHC, RIH SIMULATING LC CON'T POOH , P/U & RIH LOWER COMPLETION AS PER TALLY. DISPLACE WELL TO BRINE &
RUN, PERFORM PST, SPOT CSG GO PILL, POOH 8-1/2" REAMING ASSY. PERFORM MUD WASH. SET LH. POOH STINGER ASSY TO SURFACE.
Location Next Location
ZULF-1360/1369 PLTF ZULF-1367
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,076 Last Csg Size MD TVD Size Top
9 5/8 7066 5704 Formations Comments
Depth
SCFS 5,614 6277' MD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
10076 (Date) 100 0 244
38.5 (06/16/2024@1345 )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

PRECAUTIONARY REAM OPEN HOLE WITH 8-1/2" REAMING BHA AND DOG LEG
0500 - 1330 8.5 0 EOW N CT RW BIT RIG 10076 10076 8618 10076 REAMER.
* PUMP SWEEPS PERIODICALLY.
* NO LOSSES.
1330 - 1515 1.75 0 EOW N CT CIRC MPMP RIG 10076 10076
PUMP SWEEPS & CHC.
1515 - 1530 0.25 0 EOW N CT CIRC MPMP RIG 10076 10076
FLOW CHECK - STATIC.

1530 - 1845 3.25 0 EOW N CT ST STDP RIG 10076 10076 10076 7040 POOH WITH 8-1/2" REAMING BHA ON ELEVATORS TO INSIDE 9-5/8" SHOE.
- HOLE IN GOOD CONDITION.
1845 - 1945 1 0 EOW N CT CIRC MPMP RIG 10076 10076
CIRCULATE AND PERFORM 3X PST TEST - OK.
1945 - 2015 0.5 0 EOW N CT CIRC MPMP RIG 10076 10076
FLOW CHECK - STATIC.

RIH WITH 8-1/2" REAMING BHA ON 5-1/2'' DP IN OH ON ELEVATORS - SIMULATE


2015 - 2315 3 0 EOW N CT ST STDP RIG 10076 10076 7040 10076
LC RUN.
- HOLE IN GOOD CONDITION.

2315 - 0115 2 0 EOW N CT CIRC MPMP RIG 10076 10076 CIRC 2X B/U. PERFORM 3X PST TEST - OK.
- RECIPROCATE STRING UP & DOWN SLOWLY W/O ROTATION.
0115 - 0130 0.25 0 EOW N CT CIRC MPMP RIG 10076 10076
FLOW CHECK - STATIC.

0130 - 0200 0.5 0 EOW N CT CIRC MPMP RIG 10076 10076 SPOT 210 BBLS LUBRAGLIDE PILL ON OPEN HOLE.
- RECIPROCATE STRING UP & DOWN SLOWLY W/O ROTATION.

0200 - 0459 3 0 EOW N CT ST STDP RIG 10076 10076 10076 7076 POOH WITH 8-1/2" REAMING BHA ON 5-1/2'' DP IN OH ON ELEVATORS.
- HOLE IN GOOD CONDITION.
Foreman Remarks

=====================CURRENT WELL DATA======================================================================


THE WELL WILL BE DRILLED AS A HORIZONTAL SINGLE LATERAL OIL PRODUCER TARGETING SAFANIYA RESERVOIR AS PART OF ZULF ARAB HEAVY INCREMENT PLAN. THE WELL WILL BE
COMPLETED WITH 350 MICRO ICDS, PACKERS AND ESP.

===================ZULF-1360/1369 PLATFORM===================================================================
- ZULF-1360: TIE BACK ... COMPLETED

BATCH DRILLING SEQUENCE:

- ZULF-1368: 8-1/2" HOLE & EOW......COMPLETED.


- ZULF-1366: 8-1/2" HOLE & EOW......COMPLETED.
- ZULF-1364: 8-1/2" HOLE & EOW......COMPLETED.
- ZULF-1363: 8-1/2" HOLE & EOW......COMPLETED.
- ZULF-1365: 8-1/2" HOLE & EOW......ONGOING
- ZULF-1367: 8-1/2" HOLE & EOW.
- ZULF-1362: 8-1/2" HOLE & 6-1/8" HOLE & EOW.

====================CASING POINTS==========================================================================
- 32" CONDUCTOR SET 56' BELOW SEABED - 32" COND SHOE @ 321'.
- 18-5/8" PLANNED CASING POINT 2,034' (50' TVD INSIDE RUS) - ACTUAL AT 2,002'
- 13-3/8" PLANNED CASING POINT 5,153' (50' TVD ABOVE TOP OF LAWHAH), ACTUAL AT 5,061'
- 9-5/8" PLANNED CASING POINT 7,291', ACTUAL 7066'

====================ARAMCO PERSONNEL ONBOARD===============================================================


- ARAMCO MATERIAL EXPEDITOR MOHAMMED ALDAHBUS #821426 ARRIVED ON LOCATION ON 04-JUNE-2024.
- ARAMCO HSE HASSAN MUGHARBIL #763743 ARRIVED ON LOCATION ON 04-JUNE-2024.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1365 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 08/11/2023 - 09/20/2024
Report ID: OPERLMTDMRREP

==================CONTRACTOR MANAGEMENT VISITS=============================================================


ADC RIG MANAGER ABDULRAHMAN AL KHALDI VISIT ON LOCATION ON 10-JUNE-2024, DEPARTURE 11-JUNE-2024.

====================SAFETY & DRILLS=========================================================================


* DRILLS:
- ABANDON RIG: 8-JUNE-2024
- FIRE DRILL: 8-JUNE-2024
- H2S DRILL: 15-JUNE-2024
- MAN DOWN DRILL: 17-JUNE-2024
- CONFINED SPACE RESCUE: 11-MAY-2024
- CRANE RESCUE: 11-MAY-2024
- PLATFORM RESCUE: 13-MAY-2024
- 2X SWA & 2X LOF DRILLS

======================JAR & SHOCK SUB & RENTAL TOOLS===========================================================


- RECEIVED OILSERV 6-3/4" HM JAR OR 8-JUNE-2024. MNF# 2100910368.

============================LC-50=========================================================================
* LC-50 SAMPLE: BARITE FREE RHELIANT OBM, 85 PCF, MN# 2400676033 ON 29-MARCH-2024.

=====================RIG POSITION & DATA=====================================================================


* LATITUDE 28 DEG 24.27 NORTH, LONGITUDE 49 DEG 23.36 EAST
* RIG HEADING= 331 DEG
* LEG PENETRATION: BOW LEG 9.6 ', PORT LEG 10.05', STARBOARD LEG 10.05'
* AIR GAP= 40'
* WATER DEPTH= 161.4'
* RKB TO MSL = 103.58'
* RKB TO ML= 264.98'
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 10,076 89 236 0 5,748 -1147.86 -1359.21 5,836.79 0.11

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 1 0 API 57 845 Volts 1.87 N/A 256,182
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
140 1 HTHP 14 21 0 13 / 19 RELIANT 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 34 29 10 / 11 N/A N/A 1.2
76

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 1 0 API 57 875 Volts 1.86 N/A 256,182
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 144 1.2 HTHP 14 22 0 12 / 18 RELIANT 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 34 29 10 / 11 N/A N/A 1.4
75

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 1 0 API 57 780 Volts 1.87 N/A 256,182
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1 HTHP 14 24 0 12 / 19 RELIANT 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 33 29 10 / 11 N/A N/A 1.4
78

MUD CAOH2 MRBL-M CACO3-25 CACO3-50


TREATMENT 13 ( 50LB ) 1 ( 2200L ) 13 ( 50LB ) 13 ( 50LB )

BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 8.5 1 8.5 0.78 4 1/2 REG Z824XT
2 Near Bit Roller Reamer RIG 8.5 1 8.5 1.75 7.3 NC46 4 1/2 REG 0 3 POINT 528.4.7.237
3 Drillcollar RIG 6.5 1 6.5 2.25 30.9 NC46 NC46 99.5 SPRL AD140DC6001
4 Crossover RIG 6.5 1 6.5 2.75 3.66 NC50 NC46 88 4125-21-2
5 Roller Reamer CDS 8.5 1 8.5 1.75 6.99 NC50 NC50 88 3 POINT 23-1776
6 Crossover RIG 6.75 1 6.75 2.875 3.66 NC46 NC50 88 4125-20-2
DRILL STRING 7 Drillcollar RIG 6.5 2 6.5 2.25 61.64 NC46 NC46 99.5 SPRL RIG
8 String Reamer RIG 6.25 1 6.25 2.3 6.96 NC46 NC46 90 528.4.7.200
9 Drillcollar RIG 6.5 1 6.5 2.25 30.82 NC46 NC46 99.5 SPRL AD140DC6010
10 Crossover RIG 6.625 1 6.625 2.813 1.34 XT54 NC46 88 4125-27-1
11 Heavy Weight Drillpipe (HWDP) RIG 5.5 3 5.5 3.25 93.47 XT54 XT54 52.51 CONV RIG
12 Hydro-Mechanical Jar OJR 6.75 1 6.75 3 31.65 XT54 XT54 54 AMJ675-169
13 Heavy Weight Drillpipe (HWDP) RIG 5.5 6 5.5 3.25 186.87 XT54 XT54 52 CONV RIG
14 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 XD105 PREMIUM RIG

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/07/2024 N/A 6 KTS NW 2 FT N/A 343 N/A

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1365 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 08/11/2023 - 09/20/2024
Report ID: OPERLMTDMRREP

Company SUW SDM RIG EMC SMI OJR HLH RIG ARM HCO HCM BRD BCR ARM SAM

Category CTRG DPDS RIG DFMS DFMS JST LHES OTHR OTHR PSIE PCS SCS PRS WSC WBCS
PERSONNEL
17 3 46 1 1 0 2 6 2 2 1 1 4 2 1
Total
AND SERVICES No. of Persons
89
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 0 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 12 12 24 0 0 0 0 0 6 0 24 0

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1629 1403 11167 1956 N/A 2566

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1310 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/27/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

ADC-15 @ HWYH-1310 Limited Morning Report for 06/18/2024


Objective : (MK-1 Foreman(s)SNIDER, SETH / BENSAFI, BOUSMAHA
D&WO Morning Report (Service Providers View) Charge #: VERTICAL KHUFF WELL Engineer TARIQ, BILAL / ALNAHDI, ABDULLAH AHMED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23053-1310) IN HWYH FIELD) Manager AMRI, ABDULLAH SALEH
ADC-15
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 00-88-216- 7771-1059 013-577-35 95 013-880-72 44 GEOLOGI ST
Date: Tuesday 06/18/2024 HWYH-1310 (0) HWYH_1310_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
013-577-35 94 013-880-72 46 RIG CLE RK

Last 24 hr operations Next 24 hr plan


CONT CMT 13-3/8" CSG, SET PACK OFF, N/D 26-3/4"-3K BOP, WH WORK, N/U 13 5/8'' BOP. P/T BOP, L/D 16" BHA, M/U & RIH 12" ROTARY BHA, P/U DP, C/O CMT & DVT, P/U DP, C/O SHOE
TRACK.
Location Next Location
RIG IS LOCATED IN HWYH FIELD, 21 KM AFTER HWYH GOSP 2 BLACK TOP, TURN LEFT FOR 5 KM SKID ROAD. *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
5,580 Last Csg Size MD TVD Size Top
13 3/8 5572 5572 Formations Comments
Depth
UERA 320 29 FT SHALLOWER.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 805 8 FT DEEPER.
5580 (Date) 0 0 180 ARUM 1,920
17 (06/01/2024@0500 ) LAMS 2,400 16 FT DEEPER
AHMD 3,015 155 FT SHALLOWER.
SHUB 4,270 1 FT SHALLOWER.
BYDH 4,580 17FT DEEPER.
MDTM 5,530 30FT SHALLOWER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT. 2ND STAGE CMT JOB AS FOLLOWS..


> RIG PUMP 150 BBLS OF 78 PCF ARAMCO SPACER AHEAD.
> SANJEL PUMP 253 BBLS OF 101 PCF CMT & 146 BBLS OF 118 PCF TAIL CMT.
> HALLIBURTON DROP CLOSING PLUG. SANJEL KICK-OFF WITH 10 BBLS OF CMT &
10 BBLS SPACER
0500 - 0745 2.75 0 16 N CSG CMC CSG SJC 5580 5580 > RIG DISPLACE WITH 385 BBLS OF PHPA WBM, SLOW DOWN LAST 10 BBLS &
BUMP PLUG TO 1,200 PSI OVER FCP. HOLD PRESSURE FOR 5 MIN,
> OBSERVED DV-TOOL CLOSED & CONFIRMED NO U-TUBE AFTER BLEED -OFF.
> CMT IN PLACE @ 07:45 HRS, ANNULUS STATIC. ALL SPACER & 40 BBLS OF PURE
CMT ON SURFACE.
> TOTAL CMT CONSUMPTION DURING 1ST & 2ND STAGE: 2800 SKS.

0745 - 0845 1 0 16 N CSG HT PEL RIG 5580 5580 R/D SANJEL CMT HEAD, HARD LINES & CMT MANIFOLD.
> FLUSH WELL HEAD SOV & BOP WITH WATER.

0845 - 0945 1 0 16 N WH OTH NA RIG 5580 5580 APPLY RIGHT HAND TURNS & RELEASE FMC FMH RUNNING TOOL. L/D FMH
RUNNING TOOL & LANDING JNT.

CLEAN AND CLEAR RIG FLOOR.


0945 - 1115 1.5 0 16 N DRLG OTH NA RIG 5580 5580
> R/D REMAINING CASING EQUIPMENT/CRT.
> DRESS TDS WITH DRILLING BALES AND ELEVATORS.
1115 - 1245 1.5 0 16 N WH OTH NA RIG 5580 5580
P/U & M/U FMC WASH TOOL, FLUSH WELLHEAD AREA WITH WATER.

P/U FMC 13-3/8" PACK OFF ASSEMBLY & RIH TO SET PACK OFF.
> LAND PACK OFF & PT SEALS TO 5,000 PSI FOR 10 MINS.
> LOCK PACK OFF & PERFORM PULL TEST TO 10 KLBS.
1245 - 1445 2 0 16 N CSG SET FMH FME 5580 5580
> RELEASE PACK OFF RUNNING TOOL, POOH & L/D TOOLS.

* CIW 18" X 13" FLUTED MANDREL HGR: PN:P4000097701 & SN:139SG-1247195 .


* CIW 18" X 13" PACK-OFF ASSY W/ PN:P400033863 & SN:FMH-2020-01-05-046 .

1445 - 1600 1.25 0 16 N BOP ND BNIP RIG 5580 5580 N/D BELL NIPPLE-FLOW LINE,
> REMOVE MOUSE HOLE, V-DOOR.
1600 - 1845 2.75 0 16 N BOP ND BOP RIG 5580 5580
HPJSM, N/D 26-3/4"-3K BOP & RELATED EQUIPMENT.

HPJSM, N/U CAMERON 18-3/4" 5K X 13-5/8" 10K CSG SPOOL (PN:2201888-0400-


394 & SN:122053217002. )
> PT VOID TO 5,000 PSI FOR 10 MINS & PT BETWEEN SEALS TO 5,000 PSI FOR 10
MINS.
1845 - 2130 2.75 0 16 N WH NU WH CAM 5580 5580 > OFFLINE DRIFT TEST PLUG & WB.
> KPI: 5 HRS, ACTUAL: 4 HRS.

* CIW GATE VALVE LEFT SIDE: PN:141553-41-77-23 & SN:122053206004


* CIW GATE VALVE RIGHT SIDE: PN:141553-41-77-23 REV 06 &
SN:122053206003.
2130 - 0300 5.5 0 16 N BOP NU BOP RIG 5580 5580
N/U 13-5/8", 10 M CLASS "A" BOPS.
0300 - 0459 2 0 16 N BOP NU BNIP RIG 5580 5580
HPJSM, N/U BELL NIPPLE, FLOW LINE & R/U V-DOOR.
Foreman Remarks

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1310 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/27/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

**OBJECTIVE**
HWYH-1310 WILL BE DRILLED AS AN VERTICAL WELL TARGETING KHUFF-C RESERVOIR AS A PRIMARY TARGET AND KHUFF-B AS A SECONDARY TARGET IN THE EASTERN PART OF HWYH FIELD.
======================================================================================================
** JOURNEY MANAGEMENT PLAN **
> RIG IS LOCATED IN HWYH FIELD, 21 KM AFTER HWYH GOSP 2 BLACK TOP, TURN LEFT FOR 5 KM SKID ROAD.. FOLLOW RIG SIGN BOARDS.
> CALL RIG ON (8297715 - 5773594) PRIOR TO ENTERING SKID ROAD, PROVIDE COMPANY NAME, NUMBER OF PERSONNEL, VEHICLE SPECIFICATIONS & EMERGENCY CONTACT NUMBER.
=====================================================================================================
> DP TRIPPING KPI: 19 STD/HR / ACTUAL:
> 24" CSG KPI: 4 JTS/HR / ACTUAL:
> 18-5/8" CSG KPI: 7 JT/HR / ACTUAL:
> 13-3/8" CSG KPI: 11.5 JT/HR/ ACTUAL:
> 9-5/8" CSG KPI: 14 JT/HR/ACTUAL:
> 7" LINER KPI: 14 JT/HR/ACTUAL:
> 4-1/2 LINER KPI: 13 JT/HR/ACTUAL:
> 4-1/2" UPPER COMPLETION KPI: 13.5 JT/HR/ACTUAL:
INSTALL 18 5/8" X 18-3/4" 5M CSG HEAD KPI: 5 HR/ACTUAL:
INSTALL 18 3/4" X 13 5/8" 10M CSG SPOOL KPI: 5 HR/ACTUAL:
INSTALL 13-5/8" 10K X 11" 10K TBG SPOOL KPI: 4 HR/ACTUAL:
=====================================================================================================
DRILL 28" HOLE TO 847 FT (50 FT INTO RUS) & SET 24" CSG AT 862'.
DRILL 22" HOLE TO 2910 FT (50 FT INTO AHMADI) & SET 18-5/8" CSG
DRILL 16" HOLE TO 5610 FT (50 FT INTO MDTM) & SET 13-3/8" CSG
DRILL 12" HOLE TO 10957 FT (30' TVD INTO BJDM) & SET 9-5/8" CSG
DRILL 8-3/8" HOLE TO 13037 FT (10 FT TVD INTO KFBC) & SET 7" LINER.
DRILL 5-7/8" HOLE TO 14031 FT (300 FT TVD INTO KFDA) & SET 4-1/2" LINER
=====================================================================================================
**ARAMCO POB & VISITORS**
>ARAMCO MATERIAL CLERK SALEH ALGHAMD #820941 LEFT LOCATION SINCE JUNE-17-2024.
> ARAMCO MATERIAL CLERK HUSSAIN ALNASSER #813640 ON LOCATION SINCE JUNE-15-2024.
======================================================================================================
THIRD PARTY RENTAL:
> NESR 9'' HJDA # # VHDA-910007 ON LOCATION JUNE-16-2024.
> CORETRAX 8.25 DV MAX PBL SUB# DVBB5-1075 ON LOCATION JUNE-17TH-2024.
======================================================================================================
PRE-TOUR SAFETY MEETING:
REVIEWED & DISCUSSED HSE ALERT 99-23 BOP HOIST FAILURE, HSE ALERT 88-23 BOP PRESSURE TEST FAILURE. PROPER HANDOVER BETWEEN THEIR RELIEVER, WORKING AT HEIGHT &
CONFINED SPACE DANGER & CONTROL MAESURES. LATEST HEAT INDEX DANGER CATERGORIES & CONTROL MEASURES. ALWAYS STAY AWAY FROM THE LINE OF FIRE. STOP IF IN DOUBT.
ALWAYS PLAN AHEAD & AVOID SHORTCUT. PROPER HANDOVER FROM THEIR RELIEVER. REMINDED CREW THAT GREEN HANDS ARE NOT ALLOWED TO WORK ALONE. REMINDED CREW TO
COMPLY ON STOP CARDS, STOP TOURS, & SALAMA CARD. RS DISCUSSED THE ARAMCO GAME PLAN. DAILY HAZARD HUNT FINDINGS. HAZARDS & CONTROL MEASURES FOR NIPPLE DOWN 26 3/4"
BOP, NIPPLE UP 13 5/8" BOP & PRESSURE TEST BOP.

NEAR MISS: NIL.


DRILLS: 2 X FIRE DRILL.
DAILY OBSERVATIONS: 10 // DAILY PTW: 16.
======================================================================================================
** WATER CONSERVATION INITIATIVES**
> REDUCED WATER PITS: YES
> DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: YES.
> CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION: YES.
======================================================================================================
> NEXT LOCATION : HWYH-1366.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 0 6 API 0 0 Volts 3.4 9.5 40,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 84 25 0 10 / 13 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 27 16 9 / 10 10 280 0
73
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 0 6 API 0 0 Volts 3.4 9.5 40,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 84 26 0 10 / 13 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 27 16 9 / 10 10 280 0
74

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
4RR 3,065 4,578 DP Av DC Av Bit HHP N/A N/A S423 16 CDB
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A 1 1 PN A X
BIT DATA
Serial Number Type Jets TFA
266283 TS716MB 10 x 13 / 1.296
Gauge Other POOH Reason
1

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1310 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/27/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 0
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/11/2024 6/11/2024 CALM CALM SEASONAL 3,096 TOURLY

Company SUW SBT RIG EMC MJH SGR RIG ARM SJC NRT OTH OTH ARM CAM

Category CTRG BITS RIG DFMS SEC MLS OTHR OTHR PCS RENT RENT VAC WSC WHES
PERSONNEL
16 1 40 2 8 2 17 1 6 4 3 1 2 1
Total
AND SERVICES No. of Persons
104
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 24 0 0 24 24 4 24 24 10 24 5

Standby/Tankers
TRUCKS/BOATS
AB-6418

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1500 1200 804 215 55 1650

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2472 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/02/2024 - 07/02/2024
Report ID: OPERLMTDMRREP

ADC-16 @ HRDH-2472 Limited Morning Report for 06/18/2024


Objective : (MK-1 S-SHAPE Foreman(s)RODLEY, JAMES IAN
D&WO Morning Report (Service Providers View) Charge #: PRE-KHUFF GAS PRODUCER) Engineer ALZAILAIE, QUSAI SULTAN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23058-2472) Manager DOSSARY, AYEDH HAMAD
ADC-16
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 8821677711 358 013-574504 7 0135745048
Date: Tuesday 06/18/2024 HRDH-2472 (0) HRDH_2472_0 CONTRACTOR /CLERK VSA T
013-574504 6

Last 24 hr operations Next 24 hr plan


RIH, CO SHOE TRACK, DRILL, CIRC, FIT, MOTOR DRILL 5-7/8"HOLE MOTOR DRILL 5-7/8"TO 13384'
Location Next Location
278 KM FROM DMG, 14 KM FROM HRDH GAS PLANT. HRDH-2447
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
11,800 Size 9816 9604 Size 9,521 11,537 11,322 Top
Formations Comments
9 5/8 7 Depth
KFAR 11,206 20' HIGH
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KFBC 11,532
11542 (Date) 100 258 278
36.5 (05/12/2024@1700 )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0500 - 0830 3.5 0 8 3/8 N DRLG TI STDP RIG 11542 11542 5000 10820
RIH 5-7/8" WFD MWD/MOTOR BHA. FILL UP & BREAK CIRC EA 20 STD.
0830 - 0900 0.5 0 8 3/8 N DRLG RR TDS RIG 11542 11542
SERVICE TDS.
0900 - 0915 0.25 0 8 3/8 N DRLG TI STDP RIG 11542 11542 10820 11392
RIH 5-7/8" WFD MWD/MOTOR BHA. FILL UP & BREAK CIRC EA 20 STD.
0915 - 1000 0.75 0 8 3/8 N DRLG LOG LWD WDS 11542 11542 11305 11480
RE-LOG AS PER GOC.
1000 - 1145 1.75 0 8 3/8 N DRLG DFS MMOT WDS 11542 11542 11480 11542
CLEAN OUT CMT, SHOE & RATHOLE.
1145 - 1215 0.5 0 5 7/8 N DRLG DMR MMOT WDS 11542 11552
MOTOR DRILL 10' NEW FORMATION.
1215 - 1330 1.25 0 5 7/8 N DRLG CIRC MPMP RIG 11552 11552
CIRCULATE HOLE CLEAN & CONFIRM 101 PCF MW IN/OUT.
1330 - 1400 0.5 0 5 7/8 N DRLG PTST MPMP RIG 11552 11552
FIT 120 PCF EMW/1500 PSI-GOOD TEST.

1400 - 0459 15 0 5 7/8 N DRLG DMR MMOT WDS 11552 11800 MOTOR DRILL 5-7/8' HOLE W/101 PCF DELTA DRILL OBM. REAM & SURVEY EA
CONNECTION.
Foreman Remarks

=======================ARAMCO PERSONNEL ON LOCATION==================================


- ARAMCO CLERK, GOVIND BAHADUR OLI #8157609 ON LOCATION SINCE 12/20/2023.
-======================RENTAL TOOLS & EQUIP===========================================
- NOV 4-3/4" HM JAR SN#380-47185 ON LOCATION 6/11/2024@12:00 PU 6/16/24 20:00
- WFD HYPERLINE MOTOR 7/8 LOBE/STAGE: 0.35 REV/GAL. MWD SENSORS 32.68' INC, 36.81 GAMMA
======================HSE DAILY REPORT===============================================
- DISCUSSED CURRENT OPERATION RELATED HAZARDS/RISKS.
==================================================================================
- RAC VACUUM TANKER X 3 ON LOCATION DRSS#1004316359, PLATE/DOOR#512/3305, TRIPS : 2 PER DAY.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 11,542 0.98 84.19 0 11,322 286.89 90.19 986.67 0
DAILY SURVEY
0 11,637 1 76.66 95 11,417 286.98 90.69 987.42 0.14
0 11,732 1.05 77.6 95 11,512 287.09 91.19 988.28 0.06

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
101 PCF 1 0 API 57 362 Volts 4.8 0 28,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
146 2.4 HTHP 18 12 0 6/9 DELTADR 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 37 25 5/6 0 0 1.4
56
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
101 PCF 1 0 API 56 351 Volts 4.92 0 28,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2.6 HTHP 19 12 0 6/8 DELTADR 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 35 25 5/6 0 0 1.8
53

DELTA LIFT DELTA FL-HT CACO3-50 CACO3-5 DELTA MUL AR DELTA-VERT -ST CAOH2
MUD 1 ( 50GL ) 16 ( 50LB ) 16 ( 25KG ) 16 ( 55LB ) 4 ( 50GL ) 2 ( 50GL ) 16 ( 25LB )
TREATMENT STELSL50
16 ( 50LB )

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2472 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/02/2024 - 07/02/2024
Report ID: OPERLMTDMRREP

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
9 11,542 11,800 DP Av DC Av Bit HHP 12 120 M233 5.875 VAR
Pressure GPM Jet Vel 1,264.11 451.11 29 I-Row O-Row DC Location Bearings
3,020 220 137 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7000807 F611PG2XOA 3 x 15 / 0.518
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 17 278 300 250 5,000 17
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0 0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit VAR 5.875 1 0.6 7000807
2 Mud Motor WDS 4.75 1 4.75 21 3.5 3.5 24 47577583
3 Roller Reamer RIG 5.875 1 4.75 1 5 NC38 NC38 24 3 POINT RIG
DRILL STRING 4 Measurement While Drilling (MWD) WDS 4.75 1 4.75 30 3.5 3.5 50.1 AK240447
5 FIlter Sub WDS 4.75 1 4.75 2.25 8.5 3 1/2 FH NC38 24 16330245
6 Roller Reamer RIG 5.875 1 4.75 1 5 NC38 NC38 24 3 POINT RIG
7 PBL (Multiple Activation By Pass) CRW 1 2 25 60 C1101855
8 Drillcollar RIG 4.75 24 4.75 2.25 730 NC38 NC38 43 SPRL RIG
9 Hydraulic Jar CTC 4.75 1 2.5 28.37 60 380472
10 Drillcollar RIG 4.75 2 4.75 2.25 59 NC38 NC38 43 SPRL
11 Heavy Weight Drillpipe (HWDP) RIG 4 15 4 2.562 450 XT39 XT39 26.24 CONV RIG
12 Drillpipe RIG 4 90 4 3.476 3,489 XT39 XT39 11.85 G105 PREMIUM
13 Crossover RIG 6 1 5.5 3.813 3.5 4 1/2 VAM 4 1/2 VAM 24 RIG
14 Drillpipe RIG 5.5 1 5.5 4.67 7,500 XT54 XT54 24.7 CYX105 PREMIUM RIG

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/16/2024 WEEKLY SEASONAL ONSHORE SEASONAL 4,564 PRE-TOUR MEETING

Company RIG WDS RIG BDF EMC SGR RIG ARM MI2 ARM

Category CTRG DPDS RIG DFMS DFMS MLS OTHR OTHR SCS WSC
PERSONNEL
18 3 35 1 1 4 13 1 3 1
Total
AND SERVICES No. of Persons
80
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24 0 24

Standby/Tankers
TRUCKS/BOATS
AB-7364 ARAMCO VEHICLE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 250 555 90 62 1650

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABSF-250 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 10/05/2023 - 09/03/2024
Report ID: OPERLMTDMRREP

ADC-17 @ ABSF-250 Limited Morning Report for 06/18/2024


Objective : (OIL Foreman(s)ALJADAANI, TALAL MENWER / SALTING, JOEL SABAYBAY
D&WO Morning Report (Service Providers View) Charge #: PRODUCER) Engineer RUIZ, FERNANDO ENRIQUEZ
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22019-0250) Manager DAHMOUSH, ABDULLATEEF AHMAD
ADC-17
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088-216-7 77-11092 378-6505 013-829-77 17 (OIM)
Date: Tuesday 06/18/2024 ABSF-250 (0) ABSF_250_0 OTHER VSAT CONTRACTOR /CLERK VSA T
013-829-77 18 (RADIO ROOM) 378-6507 ( CLERK)

Last 24 hr operations Next 24 hr plan


RUN KILL STRING, CIRC & CONDITION MUD, LAND TBG HGR. INSTALL BPV, N/D BOP,SUSPEND SKID OVER ABSF-259
OPERATIONS ON ABSF-250,
Location Next Location
ABSF PF-250/259, 504 ABSF-259
Current Depth (ft) Liner TOL MD TVD Formation Tops
8,789 Last Csg Size MD TVD Size 6,018 8,787 6,699 Top
9 5/8 6328 5865 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
8789 (Date) 100 0 77
22.8 (06/16/2024@1615 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 1700 12 0 PLGABN N PA TI SPDP RIG 8789 8789 0 5498
RIH 4.5'' 11.6 # NEW VAM KILL STRING.
1700 - 1745 0.75 0 PLGABN N PA OTH NA RIG 8789 8789
RIGGED UP SURFACE LINE AND PUMP-IN SUB, PRESSURE TESTED TO 2500 PSI
1745 - 2200 4.25 0 PLGABN N PA OTH NA RIG 8789 8789
CIRCULATED AND CONDITIONED MUD. FLOW CHECKED WELL, STATIC
2200 - 2230 0.5 0 PLGABN N PA PTST MPMP RIG 8789 8789
PRESSURE TESTED CASING TO 1500 PSI FOR 15 MIN

PICKED AND MADE UP BAKER TUBING HANGER. FLUSHED 13-5/8" BOP WITH
2230 - 0000 1.5 0 PLGABN N PA OTH NA RIG 8789 8789
WATER & DRAINED BOP STACK. LANDED IN WELLHEAD AND TIGHTENED LOCK
DOWN SCREWS.
0000 - 0045 0.75 0 PLGABN N PA OTH NA RIG 8789 8789
LAID DOWN LANDING JOINTS AND INSTALLED BPV.
0045 - 0130 0.75 0 PLGABN N PA OTH NA RIG 8789 8789
RIGGED DOWN 4-1/2'' HANDLING TOOLS.
0130 - 0300 1.5 0 PLGABN N BOP ND BNIP RIG 8789 8789
DISCONNECTED FLOW LINE AND NIPPLED DOWN BELL NIPPLE.
0300 - 0459 2 0 PLGABN N BOP ND BOP RIG 8789 8789
NIPPLED DOWN 13-5/8" 5M BOP STACK AND E-KILL LINE

SUSPENDED OPERATIONS ON ABSF-250.


- END OF KILL STRING AT 5,548'
- BPV INSTALLED ON TUBING HANGER.
0459 - 0459 0 0 PLGABN S OT SUSP NA RIG 8789 8789
OFFLINE OPERATIONS:
-NIPPLED UP 11" X 4-1/16" TBG BONNET. PRESSURE TESTED TO 2500 PSI FOR 10
MINS.
-INSTALLED 4-1/16" GATE VALVE AND BLIND FLANGE WITH NEEDLE VALVE.
PRESSURE TESTED TO 1000 PSI FOR 10 MIN
Foreman Remarks

**OBJECTIVE:
-WELL NAME ABSF-250
- SINGLE LATERAL
- OIL PRODUCER WELL.
- TARGET RESERVOIR : ARAB-D
- COMPLETION TYPE:-ICDS AND ESP COMPLETION.
=============WELL DRILLING PROGRAM STATUS============
22" SECTION: PLANNED TD 522', ACTUAL TD 526'
16" SECTION: PLANNED TD 3,502', ACTUAL TD 3504'
12-1/4" SECTION: PLANNED TD 6,498', ACTUAL TD 6340'
8-1/2" SECTION: PLANNED TD 7,763', ACTUAL TD 8789'
6-1/8" SECTION: PLANNED TD 10,735', ACTUAL TD XXXX
=================PLATFORM STATUS=======
ABSF-504 (OBSERVATION WELL): PLANNED FOR COMPLETION AND FLOWBACK.
STATUS OF BATCH DRLG OPERATION 6-1/8" HOLE
ABSF-251: 6-1/8" SECTION COMPLETED
ABSF-253: 6-1/8" SECTION COMPLETED
STATUS OF SUSPENSION OPERATION.
ABSF-255 SUSPENDED AND SECURE WITH KILL STRING & BPV.
ABSF-257 SUSPENDED AND SECURE WITH KILL STRING & BPV.
ABSF-250 SUSPENDED AND SECURE WITH KILL STRING & BPV.
ABSF-259 NEXT WELL.
ABSF-254: 9-5/8" CSG PRESSURE 0 PSI (6/11/2024)
ABSF-252: 9-5/8" CSG PRESSURE 0 PSI (6/11/2024)
ABSF-258: 9-5/8" CSG PRESSURE 0 PSI (6/11/2024)
ABSF-256: 9-5/8" CSG PRESSURE 0 PSI (6/11/2024)

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABSF-250 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 10/05/2023 - 09/03/2024
Report ID: OPERLMTDMRREP

=================CURRENT LOCATION=================
ABSF-250/259, 504
LATITUDE: 26 DEG 55' 57.978 N
LONGITUDE: 50DEG 29' 1.603 E
WATER DEPTH = 28.6 FT
RKB TO MSL = 93.6 FT
RKB TO ML = 122 FT
RKB TO PLATFORM = 59.7 FT
AIR GAP = 49 FT
HEADING = 330 DEG
NEAREST GOSP: GOSP-1
===================RENTAL TOOLS ==================

======================H.S.E.======================
RE-ENFORCE STOP WORK AUTHORITY & HANDS-FREE OPERATIONS IN PRE-TOUR MEETINGS.
PERFORM DAILY SWA & LINE OF FIRE DRILLS.
DISCUSS ARAMCO HSE ALERTS 65-24, 66-24, 67-24 ,68-24 IN PRE TOUR-MEETINGS & WEEKLY SAFETY MEETING.
29-APRIL-24 ODD-1 PRIMARY DRILL
13-JUNE-24 ABANDON SHIP DRILL
13-JUNE-24 H2S RELEASE DRILL
31-MAY-24 FIRE DRILL
06-JUNE-24 MAN DOWN INJURY / H2S RESCUE DRILL
27-MAR-24 RESCUE BOAT / LIFEBOAT
27-MAR-24 MAN OVERBOARD
24-MAY-24 CONFINED SPACE RESCUE DRILL
09-JUN-24 OIL SPILL DRILL
10-JUN-24 VERTICAL RESCUE DRILL /ANNUAL EMERGENCY DRILL
20-APRIL-24 HELI CRASH
* LC 50 NOT REQUIRED ZERO DISCHARGE LOCATION.
** *REVIEWED STUCK PIPE PREVENTION & OFFSHORE DRILLING BEST PRACTICES WITH DRLG ENG. AND DISCCUSSED WITH ALL RIG KEY PERSONNEL.
=============================================
** ADC RIG MANAGER LEFT RIG ON 15/05/2024
===========================PERSONNEL=============================================================
*MATERIAL CONTROL MAN MOHAMMED ALMUTAIRI, ID# 8404151 ON BOARD SINCE 04/06/2024.
*MATERIAL CONTROL MAN FAISAL ALYAMI, ID#819722 ON BOARD SINCE 11/06/2024.
================================================================================================
RIG MOVE REQUEST #RM-2024-4010745.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 8,789 91.5 54 0 6,699 317.88 1168.61 3,973.33 0.44

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
79 PCF 1 0 API 54 425 Volts 3.72 0 198,200
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2.8 HTHP 28 25 0 13 / 16 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 38 18 11 / 12 0 0 0
84
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
79 PCF 1 0 API 55 477 Volts 3.56 0 204,800
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2.8 HTHP 27 23 0 13 / 17 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 37 18 11 / 12 0 0 0
83

MUD SUREWET SUREMUL MRBL-F CAOH2 MUL-XT


TREATMENT 1 ( 55GL ) 2 ( 55GL ) 5 ( 2200L ) 8 ( 55LB ) 1 ( 55GL )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/17/2024 AS 8-10 KNTS 1-2 FT SEASONAL 606 EVERY TOUR/ AS
REQUIRED NNW REQUIRED

Company FMC RIG RIG EMC SMI ARM HCM MI2 ARM GEP

Category CSR CTRG RIG DFMS DFMS OTHR PCS SCS WSC WHES
PERSONNEL
3 13 56 1 1 2 2 3 2 1
Total
AND SERVICES No. of Persons
84
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 12 0 24 12 12 12 24 24 24 12

Standby/Tankers
TRUCKS/BOATS
RAWABI-206

BULK Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABSF-250 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 10/05/2023 - 09/03/2024
Report ID: OPERLMTDMRREP

1288 697 1518 2540 0 2660

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MHWZ-216301 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:19 03/20/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

ADC-21 @ MHWZ-216301 Limited Morning Report for 06/18/2024


Objective : (THE WELL Foreman(s)CARNLINE, JASON RILEY / GIBSON, JAMES ROBERT
D&WO Morning Report (Service Providers View) Charge #: WILL BE 360 FT BELOW Engineer UD DIN, GHIAS NIZAM / ALHAJRI, NAIF MUTLAQ
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (87-23644-4230) THE TOP OF THE SARAH Manager HAZAWBAR, ALHASSAN FARIS
ADC-21
FORMATION AND DRILL THURAYA RIG FORMAN VSAT FAX VSAT
Daily Onshore
Wellbores: 5000 FT OF LATERAL)
(0500-0500) Saudi Aramco Well +88216-777 -12136 0135784395 0135784265
Date: Tuesday 06/18/2024 MHWZ-216301 (0) MHWZ_216301_0 CONTRACTOR /CLERK VSA T
0135784215

Last 24 hr operations Next 24 hr plan


DRILL 8-3/8" LATERAL SECTION IN SARAH FORMATION TOWARDS TD @ 20,550'. CIRCU, TOOH. TOOH, L/D SLB BHA, PICK UP NEW SLB BHA, TIH
Location Next Location
MHWZ-216301 MHWZ-216101
Current Depth (ft) Liner TOL MD TVD Formation Tops
20,160 Last Csg Size MD TVD Size Top
9 5/8 13492 13492 Formations Comments
Depth
48' HIGHER THAN
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KFDA 13,400
PROJECTED
20047 (Date) 100 113 282 43' HIGHER THAN
76.8 (04/02/2024@0930 ) BKDC 13,895
PROJECTED
50' HIGHER THAN
UNZA 13,932
PROJECTED
20' HIGHER THAN
QUSB 14,521
PROJECTED
45' HIGHER THAN
QBHS 14,651
PROJECTED
4' LOWER THAN
SARH 14,711
PROJECTED
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

ROTARY DRILL 8 3/8" LATERAL SECTION WITH SLB MOTORIZED RSS ORBIT ASSY
110 PCF OBM WITH 100% CIRCULATION. PUMP SWEEPS AS REQUIRED,
WOB: 20 -35 KLBS
0500 - 1200 7 0 8 3/8 N DRLG DMR MRSS SDM 20047 20105 SURFACE RPM: 40 + MOTOR RPM( 0.36 REV/GAL) 156. TOTAL RPM 197
TORQ: 8-12 K FT-LBS, OFF BTM 3-5 K FT-LBS
GPM: 435 @ 3680 PSI
DIFF PRES 200-350 PSI
AVG ROP: 8.3 FT/HR

ROTARY DRILL 8 3/8" LATERAL SECTION WITH SLB MOTORIZED RSS ORBIT ASSY
110 PCF OBM WITH 100% CIRCULATION. PUMP SWEEPS AS REQUIRED,
WOB: 20 -35 KLBS
1200 - 1700 5 0 8 3/8 N DRLG DMR MRSS SDM 20105 20135 SURFACE RPM: 40 + MOTOR RPM( 0.36 REV/GAL) 156. TOTAL RPM 197
TORQ: 8-12 K FT-LBS, OFF BTM 3-5 K FT-LBS
GPM: 435 @ 3680 PSI
DIFF PRES 200-350 PSI
AVG ROP: 6.0 FT/HR

ROTARY DRILL 8 3/8" LATERAL SECTION WITH SLB MOTORIZED RSS ORBIT ASSY
110 PCF OBM WITH 100% CIRCULATION. PUMP SWEEPS AS REQUIRED,
WOB: 20 -35 KLBS
SURFACE RPM: 40 + MOTOR RPM( 0.36 REV/GAL) 156. TOTAL RPM 197
1700 - 2130 4.5 0 8 3/8 N DRLG DMR MRSS SDM 20135 20160 TORQ: 8-12 K FT-LBS, OFF BTM 3-5 K FT-LBS
GPM: 435 @ 3680 PSI
DIFF PRES 200-350 PSI
AVG ROP: 5.5 FT/HR
LAST SURVEY @20,027' - INC 90.38, AZM 330.45, TVD 15026.91, 0.34' ABOVE &
14.92' LEFT OF THE PLAN.
2130 - 2330 2 0 8 3/8 N DRLG CIRC MPMP RIG 20160 20160
PUMP SWEEP, CIRCULATE & CONDITION, UNTIL SHAKERS ARE CLEAN.
2330 - 0000 0.5 0 8 3/8 N DRLG WCNT NA RIG 20160 20160
FLOW CHECK - WELL STATIC
0000 - 0030 0.5 0 8 3/8 N DRLG TO STDP RIG 20160 20160 20160 19684
TRIP OUT IN OPEN HOLE WITH 8-3/8" SLB ORBIT RSS ASSY ON 5 1/2" DP
0030 - 0045 0.25 0 8 3/8 N DRLG WCNT NA RIG 20160 20160
FLOW CHECK - WELL STATIC
0045 - 0459 4.25 0 8 3/8 N DRLG TO STDP RIG 20160 20160 19684 15089
TRIP OUT IN OPEN HOLE WITH 8-3/8" SLB ORBIT RSS ASSY ON 5 1/2" DP
Foreman Remarks

MHWZ-216301 WILL BE THE FIRST WELL ON THE PAD TO BE DRILLED BY ADC-21 RIG, TARGETING LOWER SARAH FORMATION. THE LANDING POINT WILL BE 360 FT BELOW THE TOP OF THE
SARAH FORMATION AND DRILL 5000 FT OF LATERAL AT 90.5 DEGREE INCLINATION AND 330 DEGREE AZIMUTH. THE PLANNED
TD OF THE WELL IS ~ 20,553 FT MD / 15,076 FT TVD. THE WELL WILL BE COMPLETED WITH 5 1/2"-26# VM95HCSS VAMTOP HC-R3 LONG
STRING.. ** SURFACE COORDINATE: N-2697817.00, E-231140.00
=====================================================================================
RIG LOCATION DIRECTIONS & JOURNEY MANAGEMENT:
1: 21 KM WEST OF HARADH TOWARD AL KHARJ (2.7 KM PAST SASCO GAS STATION). TURN RIGHT
2: DRIVE 42 KM ON BLACK TOP , FOLLOW SIGNES AND TURN RIGHT ON TO THE SKID ROAD.
3: DRIVE 61 KM SKID ROAD FOLLOWING RIG SIGNS TO LOCATION.
CALL ADC-21 MEDIC AT 013-880-7192 OR ARAMCO RIG CLERK AT 013-578-4215 PRIOR TO HARADH. PROVIDE NAME OF COMPANY, NUMBER OF PERSONNEL, COLOR OF VEHICLE AND
EMERGENCY CONTACT NUMBER OF BASE PERSONNEL. HAVE SUFFICIENT WATER AND SNACKS ONBOARD. NIGHT DRIVING BY 3RD PARTY PERSONNEL IS NOT RECOMMENDED.
========================================================================================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MHWZ-216301 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:19 03/20/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

DAILY SAFETY DATA:


**JSA REVISED: 0, JSA REVIEWED: 7, PTW: 7, LOTO: 1
**SAFE ACT: 75, UNSAFE ACT: 5, SAFE CONDITION: 5, UNSAFE CONDITION: 5, TOTAL SOC: 90
**NEAR MISS:
**DRILLS: 0 H2S, 0 PIT DRILL, 0 TRIP DRILL, 0 CASUALTY HANDLING, 0 FIRST AID, 0 FIRE DRILL
**IN-HOUSE AUDIT: 63 ITEMS TOTAL, 43 OPEN, 15 CLOSED.
**RHSEI - TOTAL FINDINGS: 45 , CLOSED: 42, OPEN: 3. WCEI - TOTAL FINDINGS: 11, CLOSED: 10, OPEN: 1
**DSLTI: 2305 DAYS.
===================================================================================
ARAMCO PERSONEL:
*ARAMCO CLERK: SYED KADAR, BADGE # 8544203, ARRIVED ON LOCATION 5/8/2024.
*ARAMCO HSE ADVISOR MOHAMED SAWAN, BADGE # 8553278 ARRIVED ON LOCATION 06/16/2021.
*ARAMCO HSE ADVISOR ABDULLAH ALHAJRI, BADGE # 8679004 ARRIVED ON LOCATION 06/16/2021.
===================================================================================
RENTAL TOOLS:
NOV JAR 6 1/2" CW4043906-3 ARRIVED ON LOCATION 5/19/2024 STANDBY
===================================================================================
WELLSITE RENTAL EQUIPMENT:
AL SALOMI WATER TRUCK - ON LOCATION - 11/15/23 - / PLATE -UDA 7310, DOOR-1129,BADGE#2520710480 - 2 LOAD.
AL SALOMI VACUUM TRUCK - ON LOCATION - 6/1/24 - / PLATE -UDA 4111, DOOR-1459,BADGE# 2472137443 - 1 LOAD
AL SALOMI VACUUM TRUCK - ON LOCATION - 6/1/24 - / PLATE -ZDA 9919, DOOR-1433,BADGE#2490892573 - 1 LOAD
AL SALOMI VACUUM TRUCK - ON LOCATION - 6/1/24 - / PLATE -ZRA 4107 , DOOR-1424,BADGE#2476329665 - 1 LOAD
AL SALOMI VACUUM TRUCK - ON LOCATION - 6/1/24 - / PLATE -UDA 5852, DOOR- 1434,BADGE#2476329558 - 1 LOAD
===================================================================================
24" CASING POINT @ 122 FT
18-5/8'' CASING POINT @ 1637 FT
13-3/8" CASING POINT @ 6801 FT
9-5/8" CASING POINT @ 13,492 FT
5-1/2" CASING POINT ESTIMATE @ 20,550 FT
====================================================================================
LITHOLOGY: 90% SANDSTONE, 10% SILTSTONE AT 20,160'
MAX GAS: UNITS 143.4 @ 20,045'
AVG GAS: 95.6 UNITS
TRIP GAS: N/A

WATER WELL - MHWZ-801 & 815


NEXT WELL: - MHWZ-216101
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
110 PCF 2 0 API 55 1,258 Volts 6.17 0 40,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
168 2.8 HTHP 12 18 0 12 / 15 OBM 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 36 33 9 / 10 0 0 2.6
64
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
110 PCF 2 0 API 55 1,294 Volts 6.13 0 41,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
169 2.4 HTHP 12 18 0 12 / 16 OBM 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 37 33 9 / 11 0 0 3
65

CACO3-25 CACO3-50 STELSL50 STELSEALFN CARBOTROL CAOH2 MRBL-M


MUD 10 ( 55LB ) 10 ( 55LB ) 12 ( 50LB ) 12 ( 50LB ) 14 ( 50LB ) 16 ( 55LB ) 1 ( 2200L )
TREATMENT BARITE
2 ( 5000L )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
14 19,481 20,160 DP Av DC Av Bit HHP 25 40 M422 8.375 SMT
Pressure GPM Jet Vel 267.28 N/A 148 I-Row O-Row DC Location Bearings
3,650 435 211 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
SA00396 ZR616C 6 x 12 / 0.663
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 64 381 394 350 9,500 Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs
64
DRILL STRING
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 8.375 1 0.79 SA00396
2 RSS SDM 8.25 1 8.25 2.25 13.31 4-1/2 IF 4-1/2 REG 65 N9M1271
3 FIlter Sub SDM 6.75 1 6.75 3 4.2 NC50 5 1/2 FH 65 0498

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MHWZ-216301 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:19 03/20/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID SizeLength Top Thread Bottom Thread Weight Grade Class Serial #
4 Mud Motor SDM 7 1 7 5.5 36.24 4-1/2 IF 4-1/2 IF 85 FS70DS0758
5 Measurement While Drilling (MWD) SDM 6.75 1 6.75 3.125 33.52 5-1/2FH 4-1/2IF 83 N001634
6 Saver Sub SDM 6.875 1 6.875 3.938 1.54 5 1/2 FH 5 FH 83 NTS-SA40183
7 Pony Collar SDM 6.75 1 11.93 80 13347
8 Float Sub SDM 6.938 1 6.938 2.81 1.33 NC50 NC50 82 338083
9 FIlter Sub SDM 6.75 1 6.75 2.25 6.52 4 1/2 FH 4 1/2 FH 82 675-8015
10 Crossover RIG 6.75 1 6.75 2.875 2.63 XT54 NC46 38 1021-01
11 Heavy Weight Drillpipe (HWDP) RIG 5.5 3 5.5 3.625 90.08 XT54 XT54 60 QYX105 CONV ON FILE
12 Drillpipe RIG 5.5 171 5.5 4.67 5,401.15 XT54 XT54 24.7 QYX105 PREMIUM ON FILE
13 Heavy Weight Drillpipe (HWDP) RIG 5.5 32 5.5 3.625 977.46 XT54 XT54 60 CONV ON FILE
14 Drillpipe RIG 5.5 1 5.5 4.67 31.27 XT54 XT54 24.7 XD105 PREMIUM ON FILE

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/13/2024 N/A N/A N/A SEASONAL 2,306 DAILY

Company SUW SDM RIG SMI HMS RIG ARM NRT MI2 OTH ARM

Category CTRG DPDS RIG DFMS MLS OTHR OTHR RENT SCS VAC WSC
PERSONNEL
14 2 46 2 4 9 3 0 1 1 2
Total
AND SERVICES No. of Persons
84
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 0 24 24 24

Operating Hours. 0 24 24 24 24 24 24 0 24 24 24

Standby/Tankers
TRUCKS/BOATS
ab-6526

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 446 654 147 2400

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRZK-8 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:19 12/29/2023 - 09/07/2024
Report ID: OPERLMTDMRREP

ADC-23 @ MRZK-8 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Objective : (EVALUATE Foreman(s)GOMAA, TAMER SAYED / LUQUETTA BERRIO, HELMUT JOSIP
Rig Charge #: RUWAYDAH,ARAB-C&D LOWER Engineer GARCIA VILLALOBOS, JAIRO ENRIQUE
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-23 (75-22519-0008) JUBAILA,HADRIYA,U FADHILI Manager HAWSAWI, ABDULLAH OMAR
Daily Onshore AND JILH DOL,BUWAIB,U
Wellbores: THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well RATAWI)
00882 1677 711367 577-6124 /CLERK VSA T
Date: Tuesday 06/18/2024 MRZK-8 (0) MRZK_8_0
577-6164/5 77-6168

Last 24 hr operations Next 24 hr plan


POOH AND REVERSE OUT EXCESS OF CEMENT, POOH 5 STANDS MORE AND FLUSH STRING. POOH CHC. POOH C/O BHA TO SURFACE. M/U & RIH C/O BHA# 2 WITH 3 3/8'' PDC BIT, 2 7/8 PIPE AND
RT TO SURFACE. M/UP 5 7/8'' BIT & 4'' HWDP & 9 5/8 SCRAPER AND RIH TO TOL. PBL SUB TO CLEAN INSIDE 4 1/2'' LINER
Location Next Location
410 KM F/ DMG TO BATHA, GO 117 KM F/ BATHA ON SHAYBAH HWY, TURN LEFT & GO 50 KM ON SKID ROAD. *RIG MAINTENANCE*
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
12,351 Size 13170 13170 Size 10,532 12,346 12,346 Top
Formations Comments
9 5/8 4 1/2 Depth
DHRM 13,110 21' DEEPER.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) LFDR 13,230 25' SHALLOW
12351 (Date) 100 0 390 LDMR 13,730 89' SHALLOW
136.5 (02/02/2024@1700 ) MRRT 13,950 98' SHALLOW
MNJR 14,095 223' SHALLOW
MJRR 14,193 NOT IN THE PLAN
JILH 14,394 398' SHALLOW.
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0500 - 0545 0.75 0 EOW C CSG RCSG STRG RIG 14790 14790 10532 10532
POOH WITH 5 STAND , SPACE OUT TOP OF 2 7/8'' INNER STRING ABOVE 7'' TOL

REVERSE CIRCULATE ANNULUS VOLUME=TWO STRING VOLUME , RECOVERED


0545 - 0730 1.75 0 EOW C CSG CIRC MPMP RIG 14790 14790
140 BBL'S SPACER ,18 BBL'S CONTAMINATED CMT AND 90 BBL'S CONTAMINATED
OBM W/SPACER. .
0730 - 0830 1 0 EOW C CSG RCSG STRG RIG 14790 14790 10532 10080
POOH WITH 5 STAND .
0830 - 1030 2 0 EOW C CSG CIRC MPMP RIG 14790 14790
DIRECT CIR 1.5X STRING VOLUME.FLOW CHECK-WELL STATIC , PUMP SLUG.
1030 - 1530 5 0 EOW C CT TO STDP RIG 14790 14790 10080 532
POOH WITH 5 1/2'' STRING TO 532 FT.

L/D BAKER RUNNING TOOL. CHANGED OUT TO HANDLE 2 7/8'' PIPE AND AND L/D
1530 - 1900 3.5 0 EOW C CT LDP SPDP RIG 14790 14790 532 0
14 JOINTS 2 7/8'' PH-6.

1900 - 2000 1 0 EOW C CT HT BHA RIG 14790 14790


P/UP BAKER CEMENT HEAD AND BREAK OUT X/OVERS AND PUPS AND L/D SAME.
2000 - 2030 0.5 0 EOW C CT HT BHA RIG 14790 14790
CLEAN AND CLEAR RIG FLOOR.

2030 - 0030 4 0 EOW C CT HT BHA RIG 14790 14790 PJSM, P/U AND M/U 8 3/8 CLEAN OUT BHA AS FOLLOW:
5 7/8'' BIT + BIT SUB + XO + 15 X 4'' HWDP + XO + 9 5/8'' SCRAPER + XO

0030 - 0430 4 0 EOW C CT TI STDP RIG 14790 14790 532 8200 RIH 5 7/8'' CLEAN OUT BHA ON STANDS OF 5 1/2" DP
***ONGOING AT REPORT TIME***
0430 - 0459 0.5 0 EOW C CT CIRC MPMP RIG 14790 14790
CUMMULATIVE TIME TO BREAK CIRCULATION
Foreman Remarks

THE PLAN IS TO DRILL MRZK-8 AS A VERTICAL WELL TARGETING RUWAYDAH,ARAB-C&D,LOWER JUBAILA, HADRIYA,UPPER FADHILI AND JILH DOLOMITE AS PRIMARY OBJECTIVES & BUWAIB,
UPPER RATAWI RESERVOIRS AS SECONDARY OBJECTIVES. THE PLANNED TOTAL DEPTH OF THE WELL WILL BE 15,342' MD/TVD (-15,139' TVDSS) OR +/- 200 FT INTO BASE JILH DOLOMITE.

========================EXTRA REQUIREMENT (TOTAL 13.09 DAY) ======================================


-16" HOLE MDT PT & SWC LOG OPERATION : (TOTAL 122HRS)
-16" COND TRIPS PRIOR LOGS (TOTAL 59.75HRS)
- M/U 12" LWD TOOLS & TEST (6 ADDITIONAL HOURS)
- P/U STANDS OF DP FOR 12" SECTION (8 HOURS)
- EXTRA LOGGING TIME 12" OH SECTION: (25.5HRS)
- 9-5/8" SCRAPING RUN & CBL LOG : TOTAL 85.75 HRS.
- 5-7/8" HOLE: EXTRA CIRC TIME TO CONFIRM CORE PT 8 HRS.
============================== ARAMCO POB & VISITORS =========================================
- ARAMCO MATERIAL EXPEDITOR HAMED ALNAIM # 8589418 LEFT LOCATION ON 06/16/2024.
- EDD DRILLING ENGINEER JAIRO VILLALOBOS # 722017 LOCATION SINCE 06/14/2024
============================== RIG VISIT ====================================================

============================== PLANNED VS ACTUAL CASING DEPTHS ================================


- 30" CONDUCTOR: 200 FT
- 24" CASING: 1,430 FT. 50 FT IN RUS FORM.
- 18 5/8" CASING: 5,600 FT. 100 FT INTO LAFFAN MEMBER .
- 13-3/8" CASING: 10,120 FT. 20 FT INTO SULAY FORMATION.
- 9-5/8" CASING: 13,170 FT. 60 FT DHRUMA FORMATION.
- 7" LINER: 14,444 FT. 50 FT INTO JILH.
- 4-1/2" LINER: 14,790 FT, TD @ 40 FT INTO BJDM.
============================== SAFETY, DRILLS, INCD & ALERTS ===================================
ALERTS : HSE ALERT 69/24-70/24-71/24-/72/24
DRILLS :
=============================== AUDITS ====================================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRZK-8 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:19 12/29/2023 - 09/07/2024
Report ID: OPERLMTDMRREP

- 2024 WELL CONTROL AUDIT 1 OPEN ITEM. RHSEI 1 OPEN ITEMS.


=============================== DIESEL CONSUMPTION =======================================
GATE MAN INFORMATION: ALI HASSAN AL ABAD, SAUDI NATIONAL ID: 1085291795 & - ABDULLAH JABER, SAUDI NATIONAL ID: 1091630648
============================== =======================================
NEXT WELL: QMRN-3, WELL CONSTRUCTION COMPLETED, SKID ROAD SAND COVERED WAITING TO BE CLEARED FOR LOCATION VISIT.
RIG MOVE DISTANCE: 153 KM, 68 KM SKID ROAD/85 KM BLACK TOP.
WATER WELL: QMRN-806, READY WITH 700-800 GPM FLOW RATE, PENDING WATER LINE INSTALATION.
********************************* RIG ADC-23 JOURNEY MANAGEMENT *******************
-CREATE JOURNEY MANAGMENT PLAN BEFORE LEAVING YOUR BASE.
-ALL CARS SHOULD HAVE SUPPLIE OF DRINKING WATER & CAR SURVIVAL KIT.
-50 KM SKID ROAD LEADING TO RIG ADC-23, SKID ROAD HAS NO MOBILE SIGNAL.(NEED THURAYA PHONE)
-NO RADIO COVERAGE FOR RIG ADC-23 ,MRZK-8
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
87 PCF 1 0 API 62.4 329 Volts 3.9 0 251,600
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 3 HTHP 20 14 0 7/9 INOVRT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 38 17.6 5/6 0 0 0
75
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
87 PCF 1 0 API 62.4 335 Volts 3.9 0 251,600
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 3 HTHP 20 13 0 7/9 INOVRT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 38 17.6 5/6 0 0 0
72

MUD BARITE
TREATMENT 3 ( 5000L )

BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 1 5.875 5.875 0.6 3-1/2 REG N 839272
2 Bit Sub RIG 4.75 1 4.75 1.75 2.98 3 1/2 REG NC38 40 1
3 Crossover RIG 4.75 1 4.75 2.25 3.36 NC38 XT39 40 1
DRILL STRING 4 Heavy Weight Drillpipe (HWDP) RIG 4 15 4 2.563 462 XT39 XT39 25.16 CONV 1
5 Crossover RIG 6.5 1 6.5 2.25 3.1 XT39 NC46 40 1
6 Crossover RIG 9.625 1 6.5 2.25 6.7 XT39 NC46 40 1143
7 Crossover RIG 6.875 1 6.875 2.875 2 XT54 NC46 40 1
8 Drillpipe RIG 5.5 1 5.5 4.67 0 XT54 XT54 24.7 XD105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
06/04/2024 2 N/A N/A SEASONAL 5,433 HSE ALERT 69/24-
MISCELLANEOUS
70/24-71/24-
/72/24

Company BTT RIG RIG BAR EMC MJH BLH RIG ARM SCM OTH ARM

Category COIL CTRG RIG DFMS DFMS SEC LHES OTHR OTHR PCS VAC WSC
PERSONNEL
1 15 38 1 1 4 2 22 2 3 1 2
Total
AND SERVICES No. of Persons
92
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 24 24 24 24 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
AB-7347

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A 290 84 1700

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3116 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/10/2024 - 08/15/2024
Report ID: OPERLMTDMRREP

ADC-31 @ UTMN-3116 Limited Morning Report for 06/18/2024


Objective : (K-1 PRE-SET Foreman(s)KHALID, MUTHANNA ABDULLAH / UBARU, CHARLES CHUKWUMA
KFBC WELL FOR UBCTD, Engineer OLORUNTOBI, OLALERE SUNDAY
D&WO Morning Report (Service Providers View) Rig Charge #: TARGETING KHUFF-B Manager HARTHI, HUSSAIN AHMAD
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-31 (66-22057-3116) RESERVOIR) THURAYA RIG FORMAN VSAT CONTRACTOR
Daily Onshore /CLERK VSA T
00882-1677 7-11441 572-2600
(0500-0500) Saudi Aramco Well Wellbores:
829-7631 C LINC
Date: Tuesday 06/18/2024 UTMN-3116 (0) UTMN_3116_0
CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
577-1547 C LERK 829-7731 C ONTRACTOR

Last 24 hr operations Next 24 hr plan


R/U AT UTMN-3116. R/U AT UTMN-3116.
Location Next Location
UTMN-3116 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 131
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD PRE JOB SAFETY MEETING WITH ALL INVOLVED PERSONNEL.

>> RIG UP ON UTMN-3116.

- RIG UP TDS MONORAIL AND TDS, FUNCTION TEST


- RIG UP POSSUM BELLY SKID
- HYDROTEST MUD TANKS
- RIG UP MANUAL TONGS, PIPE SPINNER, V DOOR
0500 - 0459 24 0 PRE N RM RU NA RIG 0 0
- RIG UP CEMENT TANKS & SILOS
- RIG UP FLARE LINES
- RIG UP POOR BOY DEGASSER & SPOT CHOKE MANIFOLD

RIG DOWN = 100%


RIG UP = 95%
RIG MOVE =100%

TOTAL LOADS MOVED VS PLANNED = 237 / 237 LOADS


Foreman Remarks

UTMN-3116 IS PLANNED TO BE DRILLED AS A DEVIATED K-1 PRE-SET WELL FOR UBCTD TARGETING KHUFF-B RESERVOIR. THE WELL IS LOCATED WITHIN THE SHALLOW GAS AREA. UTMN-3116
WILL BE COMPLETED WITH A 7" X 4 1/2'' TAPERED CEMENTED LINER.
==================================== ARAMCO PERSONNEL ===========================================
- SYED JAINULABUDEEN #8387052, CLERK, ON LOCATION 12/10/23.
- FCT MOHAMMED ALMUKHAIMER, 764534, ON LOCATION 06/8/24.
- NGGDD HSE ADVISOR YDZEL JUDILLA #8346933 ON LOCATION
- ARAMCO FOREMAN UBARU, CHARLES CHUKWUMA ON LOCATION.
=========================================== RIG VISITS==============================================

================================3RD PARTY SERVICES PER & RENTAL TOOLS===================================

==== ======================================== HSE =================================================


DISCUSSED CURRENT OPERATION AND ITS ASSOCIATED HAZARDS.
REFRESHMENT DISCUSSION ON WORK AT HEIGHT PROCEDURE AND MECHANICAL LIFTING PROCEDURE.
PROCEDURES, CREW SUPERVISION, RISK ASSESSMENT, SITUATIONAL AWARENESS, HOT WEATHER CONDITION, STOP WORK AUTHORITY, LINE IF FIRE AWARENESS.

- STOP CARD:17, STOP TOUR: RIG-MOVE. SALAMA CARD:


- SAFETY DRILLS: NONE
=====================================AUDIT ITEMS================================================
-WCI : OPEN - 0, CLOSED - 12 , TOTAL - 12.
-RHSEI: 28TH MAY 2024,TOTAL = 22, OPEN = 05.
==== ======================================== MUD ==============================================

=====================================VACCUM TANKERS =============================================


DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 5,127 N/A

PERSONNEL RIG RIG EMC SMI RIG ARM MI2 OTH ARM OTH
Total
Company
AND SERVICES 104

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3116 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/10/2024 - 08/15/2024
Report ID: OPERLMTDMRREP

INFORMATION CTRG RIG DFMS DFMS OTHR OTHR SCS VAC WSC RENT
Category

No. of Persons 13 45 1 1 30 3 3 5 2 1

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 0 0 12 12 0 8 24 0

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3228 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 04/30/2024 - 09/11/2024
Report ID: OPERLMTDMRREP

ADC-32 @ UTMN-3228 Limited Morning Report for 06/18/2024


Objective : (PRE-KHUFF S- Foreman(s)KHAFAGY, ALAA MOHAMED / KOUSA, AMIR WAGDY
SHAPE K-2 WELL) DEL ANGEL RODRIGUEZ, ALEJANDRO / ALHADHIRA, AHMED
Engineer
D&WO Morning Report (Service Providers View) Charge #: ABDULLAH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23057-3228) Manager HARTHI, HUSSAIN AHMAD
ADC-32
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 00882 1677 7 11440 013-577-48 20 FCT 013-57 7-4822
Date: Tuesday 06/18/2024 UTMN-3228 (0) UTMN_3228_0 OTHER VSAT FAX VSAT CONTRACTOR
CLINIC 013 -829-7632 NONE /CLERK VSA T
CLERK 013- 577-4298

Last 24 hr operations Next 24 hr plan


N/U 13-5/8" 10M BOP'S, TEST, P/U, M/U AND RIH 12" CO BHA. WASH DOWN, DRILL OUT DVT, RIH, DISPLACE, CLEAN OUT CMT, DRILL 10 FT NEW FM, CIR, FIT
AND POOH.
Location Next Location
UTMN-3228 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,414 Last Csg Size MD TVD Size Top
13 3/8 10404 10404 Formations Comments
Depth
HITH 5,890 12 FT SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ABAR 6,370 13 FT SHALLOWER
10414 (Date) 100 0 148 ABBR 6,474 26 FT SHALLOWER
42.3 (05/06/2024@2200 ) ABCR 6,557 55 FT SHALLOWER
ARBD 6,684 42 FT SHALLOWER
PADS 6,813 1 FT DEEPER
BPDS 6,832 15 FT SHALLOWER
ABD1 6,847 9 FT SHALLOWER
AD2A 6,854 9 FT SHALLOWER
AD2B 6,913 14 FT SHALLOWER
AD3A 6,985 28 FT SHALLOWER
AD3B 7,039 27 FT SHALLOWER
ABD4 7,095 25 FT SHALLOWER
BADR 7,141 23 FT SHALLOWER
HNIF 7,674 30 FT SHALLOWER
BHDR 8,134 6 FT SHALLOWER
DHRM 8,257 23 FT SHALLOWER
LFDR 8,307 8314 FT MD (2 FT LOW)
BLFR 8,475 8482 FT MD (6 FT HIGH)
HURN 9,009 9018 FT MD (7 FT HIGH)
MRRT 9,152 9162 FT MD (31 FT HIGH)
MNJR 9,554 9565 MD (24 FT LOW)
9981 FT MD (7 FT TVD
JILH 9,970
HIGH)
10232 FT MD (18 FT TVD
JLDM 10,220
HIGH)
10384 FT MD (24 FT TVD
BJDM 10,372
HIGH)
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 1000 5 0 16 N BOP NU BOP RIG 10414 10414 HPJSM, N/U 13-5/8" 10M CLASS "A" CAMERON BOP'S STACK WITH ALL RELATED
CHOKE & KILL LINES AS PER ARAMCO STANDARDS. (NB13)
1000 - 1100 1 0 16 N BOP NU BNIP RIG 10414 10414
HPJSM, N/U BELL NIPPLE AND CONNECTED FLOW LINE-OK.

1100 - 1200 1 0 16 N BOP OTH BOP RIG 10414 10414 FUNCTION TEST ALL RAMS & ANNULAR PREVENTER-OK AND PERFORMED
ACCUMULATOR TEST AS PER ARAMCO STANDARDS-OK.

HPJSM, RIH WITH 5X5-1/2" DP'S STDS, M/U 13-5/8" CAMERON TEST PLUG
1200 - 1315 1.25 0 16 N BOP OTH BOP RIG 10414 10414
ASSEMBLY, LANDED SAME INSIDE 13-5/8" CAMERON CHS AND FILL UP BOP'S
STACK WITH WATER -OK.

HOLD PRE JOB SAFETY MEETING WITH ALL INVOLVED PERSONNEL BEFORE
1315 - 1330 0.25 0 16 N BOP PJSM BOP RIG 10414 10414
PRESSURE TESTING 13-5/8" 10M CLASS "A" BOP'S STACK, DISCUSSED THE
PROCEDURES FOR PRESSURE TESTING BOP'S STACK AND HAZARDS ASSOCIATED.

HPJSM, PRESSURE TEST 13-5/8" 10M BOP'S STACK, 13-5/8" 10M HYDRIL
1330 - 1700 3.5 0 16 N BOP BOPT BOP RIG 10414 10414
ANNULAR WITH ALL RELATED CHOCK & KILL LINES AS PER ARAMCO STANDARDS.

1700 - 1730 0.5 0 16 N BOP BOPT RBOP RIG 10414 10414


PERFORMED ACCUMULATOR DRAWDOWN TEST, OK.

1730 - 1845 1.25 0 16 N BOP OTH BOP RIG 10414 10414 HPJSM, L/D 13-5/8" CAMERON TEST PLUG ASSEMBLY, RACK BACK 5X5-1/2" DP'S
STDS ON DERRICK AND HOUSEKEEPING RIG FLOOR-OK.

HPJSM, M/U CAMERON WEAR BUSHING RUNNING TOOL, RIH, SET WEAR BUSHING
1845 - 1945 1 0 16 N WH SET WBSH IWS 10414 10414 AS PER CAMERON WH ENG. RECOMMENDATIONS-OK, POOH, L/D WEAR BUSHING
RUNNING TOOL.
- H.O.P AT: 41 FT.
1945 - 2015 0.5 0 16 N DRLG RR TDS RIG 10414 10414
SERVICE TOP DRIVE SYSTEM AND GREASE TRAVELLING BLOCK.
2015 - 2030 0.25 0 16 N DRLG PJSM NA RIG 10414 10414

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3228 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 04/30/2024 - 09/11/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
HOLD PRE JOB SAFETY MEETING WITH ALL INVOLVED PERSONNEL ON RIG FLOOR
DISCUSSED THE PROCEDURES FOR HANDLING 12" CLEAN OUT BHA, HAZARDS
ASSOCIATED AND REVIEWED JSA.

P/U & M/U 12" CLEAN OUT BHA (SLICK BHA) AS FOLLOW;
12" NEW SECURITY MILLED TOOTH BIT (TYPE: QH3S SN: 839519, IADC: 137 AND
3X20/32" NOZZLES), 8-1/2" BIT SUB C/W FLOAT VALVE, 14X8-1/2" DC'S JTS, 1X8-
2030 - 0230 6 0 16 N DRLG HT BHA RIG 10414 10414
1/4" NESR DRILLING JAR (SN: DJ-00152), 2X8-1/2" DC'S JTS, X.O.S, 9X6-5/8"
HWDP'S JTS, X.O.S, 9X5-1/2" HWDP'S JTS AND RIH SAME TO 1064 FT.
- MONITOR WELL ON TRIP TANK, WELL STATIC-OK.
- BELOW JAR WT: 55 KLB, TOTAL BHA WT: 90 KLB.

CONT. RIH 12" CLEAN OUT BHA (SLICK BHA) ON 5-1/2" DP'S STDS FROM BHA
0230 - 0459 2.5 0 16 N DRLG TI STDP RIG 10414 10414 1064 5322
DEPTH AT 1064 FT TO 5322 FT.
- MONITOR WELL ON TRIP TANK, WELL STATIC-OK.
Foreman Remarks

UTMN-3228 IS PLANNED TO BE DRILLED AS S-SHAPE K-2 WELL, TARGETING PRE-KHUFF (JAUF) AS PRIMARY AND KHUFF AS SECONDARY.

============ ARAMCO PERSONNEL ==========


- CLERK SALMAN PARIS # 8394791 ON LOC FEB 01 2024.
- M. EXPEDITOR "SAEED AL-MUTLAQ" ID# 816274 BACK ON LOC 29-MAY-24... LEFT ON 11-JUNE-24
- PDP "MALIK ALMALKI" ID#786339 ON LOCATION 5-JUNE...LEFT ON 14-JUNE
- SR. DRILLING ENGINEER "ALEJANDRO DEL ANGEL RODRIGUEZ" ON LOC 13-JUNE...LEFT ON 16-JUNE.

==============RIG VISITS================
- ADC RIG MANAGER: HUSSAIN ALI AL-YOUSEF VISITED RIG ON 27-MAY-24.

=====================HSE=========================
HSE ACTIVITIES TODAY:

1.PRE TOUR SAFETY MEETING: DISCUSS PRESSURE TEST PROCEDURES AND WORKING AT HEIGHTS PROCEDURES
2.RS & SA FOREMAN DISCUSS WITH CREW CURRENT OPERATION, RELATED HAZARDS AND PRECAUTIONS.
3.DAILY OBSERVATIONS: NIPPLE UP 13 5/8" BOP AND INSTALLING BELL NIPPLE, INSTALLING V-DOOR.
4.UPDATED WEEKLY CHECKLIST ONLINE
5.STOP TOUR & HAZARD HUNT - MUD PUMP.
6.REVIEWED ALL PTWS.

STOP CARDS : 40
SALAMA CARDS: 2

DRILLS:

=================ARAMCO SERVICE COMPANIES=============


> EMEC MUD ENGINEER ON LOC.
> SLB CLOSED-LOOP CREW ON LOC.
> BH BIT RUNNER ON LOCATION.
> SLB MWD ENG. ON SITE 19-MAY-24.

=================RENTAL TOOLS========================
> RECEIVED CORETRAX 8-1/4" PBL SUB (SN:DVBB5-1127/CC1B1107) ON JUNE 15 2024 AT 14:00 HRS.
> WFD RCD TEAM ON LOCATION JUNE 15 2024 AT 18:00 HRS.
> CAMERON APPROVED WH ENG. ON LOCATION JUNE 15 2024 AT 14:00 HRS.

============== AUDITS =========


1ST RHSEI AUDIT FROM 15 TO 19 MAY, 2024.

======== VACUUM / SPRAY TANKERS ==========


DRSS# 1004326437 - ABDULMOHSEN AL-TAMIMI CONTRACTING.

PLATE & DOOR# 4473/ 041 TRIP# 2 (STARTING FROM: 06/08/2024)


PLATE & DOOR# 4476/ 042 TRIP# 2
PLATE & DOOR# 4172/ 161 TRIP# 0
PLATE & DOOR# VJV 1/ 302 TRIP# 0

TOTAL - 4 TRIPS

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 10,414 2.6 288 0 10,402 21.61 -120.47 401.56 0.09

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
92 PCF 0 4.6 API 0 0 Volts 3.4 9.6 40,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
140 0 HTHP 83 26 0 9 / 12 MUDCAP 0
MUD DATA
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 22 17 9 / 10 5 320 0
58

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3228 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 04/30/2024 - 09/11/2024
Report ID: OPERLMTDMRREP

92 PCF 0 4.8 API 0 0 Volts 4.28 9.5 45,000


FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
135 0 HTHP 77 28 0 9 / 12 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 22 23 8 / 10 5 360 0
61

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/18/2024 N/A N/A N/A N/A 5,426 2

Company SCC RIG BDF EMC SDM WUD RIG ARM MI2 ARM CAM

Category CTRG RIG DFMS DFMS LWD MPD OTHR OTHR SCS WSC WHES
PERSONNEL
13 38 1 2 4 3 19 1 7 2 2
Total
AND SERVICES No. of Persons
92
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 12 24 24 0 0 12 12 24 24 18

Standby/Tankers
TRUCKS/BOATS
AB-6315

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 496 211 110 250

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2354 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 04/26/2024 - 07/26/2024
Report ID: OPERLMTDMRREP

ADC-34 @ UTMN-2354 Limited Morning Report for 06/18/2024


Objective : (K1SL SINGLE Foreman(s)OKISHITA, BERT / AZAOUNE, YACINE
D&WO Morning Report (Service Providers View) Charge #: LATERAL GAS PRODUCER Engineer BHANOT, RAHUL CHETAN / DAWOOD, MOHAMMAD FAWZI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-34 (66-23057-2354) WELL TARGETING KHUFF-C Manager DOSSARY, AYEDH HAMAD
RESERVOIR) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 11085 013-577-35 65 013-577-39 33
Date: Tuesday 06/18/2024 UTMN-2354 (0) UTMN_2354_0 CONTRACTOR /CLERK VSA T
013-577-35 71

Last 24 hr operations Next 24 hr plan


RIH W/ BAKER RBP INFLOW TEST PKR, POOH W/ BAKER RBP PACKER, P/U+RIH W/ CORETRAX RIH W/ CORETRAX CLEANOUT BHA, POOH, RIH W/ BAKER RBP INFLOW TEST, NEGATIVE TEST
CLEANOUT BHA
Location Next Location
24.9290779 N LAT, 49.321754 E LONG 174KM FROM DMG UTMN-2365
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
14,029 Size 10719 10719 Size 10,401 14,029 13,184 Top
Formations Comments
9 5/8 7 Depth
BJDM 10,695 17' SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) 10977' MD / 15'
14029 (Date) 100 0 174 MDJR 10,976
SHALLOWER TVD
48.2 (04/30/2024@2300 ) 11816' MD / 37'
SUDR 11,813
SHALLOWER TVD
12598' MD / 0' ON PROG
KHFF 12,537
TVD
12644' MD / 5' SHALLOWER
KFAC 12,575
TVD
KFBC 12,701 12799' MD / 7' DEEPER TVD
KFCC 13,180 13883' MD / 2' DEEPER TVD

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End

CONT. M/U 9-5/8'' BAKER RBP PACKER ASSY + 9-5/8" 53.5#


SCRAPER. P/U 1 STD X 5-1/2" DP, RIH, STRING HANG UP @
140', POOH, L/D BAKER RBP PACKER, RIH W/ ONLY 9-5/8"
0500 - 1030 5.5 0 8 3/8 N DRLG HT BHA RIG 14029 14029 TF 934872 53.5# SCRAPER ASSY, RIH 5 STD - NO ISSUE, POOH, P/U 9-5/8"
BAKER RBP PACKER, RIH, STRING HANG UP @ 40',
RECIPROCATE STRING, AND STRING PASS THROUGH, CONT. RIH
AND STRING HANG UP AGAIN @ +/-300', +/-400'. AFTER 500',
RESUME RIH IN NO ISSUES.
1030 - 1100 0.5 0 8 3/8 N DRLG RR TDS RIG 14029 14029
PJSM: SERVICE TDS, TRAVELLING BLOCK.

RIH W/ 9-5/8" BAKER RBP PACKER ASSY @ CONTROL SPEED.


1100 - 1630 5.5 0 8 3/8 N DRLG HT STRG RIG 14029 14029
PACKER ASSY HUNG UP AT THE 9-5/8" DV DEPTH (+-6800') AND
UNABLE TO PASS THROUGH.

9-5/8" BAKER RBP PACKER ASSY HANG UP @ 6800' (9-5/8" DV)


1630 - 1900 2.5 0 8 3/8 N DRLG CIRC MPMP RIG 14029 14029 TF 934872 RECIPROCATE/CIRCULATE NUMEROUS TIMES WITH NO
SUCCESS. (9-5/8" 53.5# CORETRAX CASING SCRAPER BELOW
PASS THROUGH DV WITH NO ISSUE.)
1900 - 0100 6 0 8 3/8 N DRLG HT STRG RIG 14029 14029 TF 934872
POOH W/ 9-5/8" BAKER RBP PACKER ASSY @ CONTROL SPEED.
0100 - 0300 2 0 8 3/8 N DRLG HT BHA RIG 14029 14029 TF 934872
PJSM: L/D 9-5/8'' BAKER RBP PACKER ASSY.

PJSM: P/U & M/U 8-3/8" RR BIT + 8-1/2" CORETRAX HEAVY


0300 - 0430 1.5 0 8 3/8 N DRLG HT BHA RIG 14029 14029 TF 934872 DUTY POLISH MILL RIDGEBACK STRING MILL + 9-5/8" 53.5#
CORETRAX CASING SCRAPER.

RIH 8-3/8" RR BIT + 8-1/2" CORETRAX HEAVY DUTY POLISH


0430 - 0459 0.5 0 8 3/8 N DRLG HT STRG RIG 14029 14029 TF 934872
MILL RIDGEBACK STRING MILL + 9-5/8" 53.5# CORETRAX
CASING SCRAPER ON 5-1/2" DP.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 0500 18 18 934872 TF FOT RTTS BC 6800 M/U 9-5/8'' BAKER RBP PACKER ASSY + 9-
5/8" 53.5# SCRAPER. P/U 1 STD X 5-1/2"
DP, RIH, STRING HANG UP @ 140', POOH,
L/D BAKER RBP PACKER, RIH W/ ONLY 9-
5/8" 53.5# SCRAPER ASSY, RIH 5 STD - NO
ISSUE, POOH, P/U 9-5/8'' BAKER RBP
PACKER, RIH, STRING HANG UP @ 40',
RECIPROCATE STRING, AND STRING PASS
THROUGH, CONT. RIH AND STRING HANG
UP AGAIN @ +/-300', +/-400'. AFTER 500',
RESUME RIH IN NO ISSUES UNTIL 6800' @ 9-
5/8" DV. (9-5/8'' BAKER RBP PACKER IS
DESIGNED TO PASS THROUGH 8-3/8").
Foreman Remarks

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2354 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 04/26/2024 - 07/26/2024
Report ID: OPERLMTDMRREP

=======================================PERSONNEL ON BOARD============================================
> ARAMCO MATERIAL EXPEDITOR, ABDULAZIZ ALZAHRANI #8529960 ON LOCATION 6/14/2024.
> ARAMCO PDP, ALI ALAWADH #816806 OFF LOCATION SINCE 5/12/2024.
> ARAMCO PDP, FAISAL S. ALQAHTANI #794853 ON LOCATION SINCE 6/9/2024.
=======================================HSE=========================================================
> DISCUSSED DAILY OPERATION: CONTINUE RIH 9 5/8" SCRAPPER RTTS WITH DP STANDS, CLEAN CEMENT TANK. PTW PROCEDURE AND RULES: CSE SAFETY PRECAUTIONS. WORKING AT HEIGHT
(WAH) CAMPAIGN.
> DRILLS: H2S DRILL.
===========================================JARS & SHOCK SUB===========================================
> SLB HYDRA JAR 6-1/2" SN#44532K ON 05/31/2024. B/L 6/15/2024 @ 15:00.
> SLB HYDRA JAR 4-3/4" SN#49458H ON 6/15/2024 @ 14:00.
=========================================WELLSITE TRUCKS & ACID ========================================
> DRSS#1004324960, AL AJINAH TRADING , VACUUM TANKER# 1 EA: PLATE NO: 1794 : 2 TRIP PER DAY.
=====================================COST OPTIMIZATION================================================
> 2 X SLB BULK BARITE SILO SYSTEM ON LOCATION RIGGED UP SINCE 2/27/2024.
=============================================NEARBY RIGS & SITES========================================
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 14,029 87.7 168 0 13,184 -455.36 57.28 1,505.74 0.86

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
117 PCF 1 0 API 58 670 Volts 6.4 0 16,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
80 1 HTHP 8 17 0 10 / 14 INOVRT 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 45 34 7/8 0 0 1.8
66
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
117 PCF 1 0 API 58 656 Volts 6.4 0 16,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
80 1 HTHP 8 18 0 9 / 14 INOVRT 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 44 34 7/8 0 0 2
66

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/03/2024 AS N/A N/A SEASONAL 4,514 DAILY PRE TOUR
REQUIRED

Company SUW SDM RIG BAR EMC SDM HMS RIG ARM SCM MI2 ARM BWC

Category CTRG DPDS RIG DFMS DFMS LWD MLS OTHR OTHR PCS SCS WSC WBCS
PERSONNEL
14 2 37 1 1 2 3 11 2 3 5 2 2
Total
AND SERVICES No. of Persons
85
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 12 24 24 24 12 24 24 24 0 24 24 24

Standby/Tankers
TRUCKS/BOATS
Aramco Pickup AB-0006

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 N/A 337 220 77 600

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1167 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/16/2024 - 09/07/2024
Report ID: OPERLMTDMRREP

ADC-35 @ SDGM-1167 Limited Morning Report for 06/18/2024


Objective : (KHUFF-B1 Foreman(s)AHMED, MOHANAD ALY / ZAHRANI, NAWAF MOHAMMED
D&WO Morning Report (Service Providers View) Charge #: LATERAL 15K CEMENTED Engineer ALMARWAN, RAYAN TAWFIQ / ALZAILAIE, QUSAI SULTAN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22054-1167) MSF.) Manager HARTHI, HUSSAIN AHMAD
ADC-35
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 8821677711 421 013-574-50 79 013-574-50 49 ( GEO )
Date: Tuesday 06/18/2024 SDGM-1167 (0) SDGM_1167_0 OTHER VSAT CONTRACTOR /CLERK VSA T
013-829-76 35 ( CLINI C ) 013-574-50 57

Last 24 hr operations Next 24 hr plan


R/D ON UTMN-3221 & MOVE TO SDGM-1167. R/D ON UTMN-3221 & MOVE TO SDGM-1167.
Location Next Location
SDGM-1167 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 100 0 109
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

PJSM WITH ADC & OFSAT TEAMS.


- DISCUSS HAZARDS & CONTROL MEASURES RELATED TO RIG MOVE OPS. SHARE
PREVIOUS RM HSE ALERTS & CORRECTIVE ACTIONS. HIGHLIGHT THE IMPORTANCE
OF FOLLOWING APPROVED MOVE ROUTE, SECURING LOADS, MOVING IN CONVOY,
CHECKING HEIGHT OF EACH LOAD, WORKING AT HEIGHT & 100% TIE OFF,
CONFINED SPACE WORK, EFFECTIVE SUPERVISION, LINE OF FIRE, SWA, PTW,
LIGHTS AT NIGHT, PINCH POINTS, CIRTICAL LIFT REQUIREMENTS, JOB
COMPLETION, PROPER HANDOVER, WELDING PRECAUTIONS.

- R/D ON UTMN-3221 & MOVE TO SDGM-1167.


- HPJSM, PERFORM DROPS SURVEY.
0500 - 0459 24 0 PRE N RM RM NA RIG 0 0 - LOWER DRAWWORKS & MAST.
- R/D MONKEY BOARD & PREPARE TO UNPIN MAST FOR MOVE.
- INSTALL NEW RAISING LINES.
- MOVE CMT TANKS, CHOKE MANIFOLD, POORBOY, CHEMICALS, DRLG MATERIALS
BASKETS.
- FINAL SPOT MUD TANKS ON NEW LOCATION.
- COMPLETE R/U MAIN CAMP 100%.

- LOADS MOVED TODAY = 18


- TOTAL LOADS MOVED = 108

- R/D=50%, R/M=25%, R/U=10%


Foreman Remarks

- SDGM-1167 IS PLANNED TO BE DRILLED AS A (HORIZONTAL) KHUFF-B1 AS A PRIMARY TARGET AND COMPLETED WITH 15K CEMENTED MSF.
-----------ARAMCO PERSONNEL ON LOCATION -------
- CLERK MOHAMED SHALIK # 8544443 ON LOCATION 06/9/24.
- ARAMCO FCT, MOHAMMAD ALSADUN, ON LOCATION 06/16/24.
-----------THIRD PARTY PERSONNEL & EQUIP ON LOCATION--------
- 1 X EMEC MUD ENG ON LOCATION.
- 2X BARITE SILOS ON LOCATION @ 26-FEB-24.
-----------RENTAL TOOLS--------------------
- N/A.
----------NEARBY RIGS & FACILITIES-------------
- N/A.
-------------------HSE-----------------
DWLTI: 326

INCIDENTS: 0

DRILLS: 0

TRAINING MATRIX: 99%

AUDIT STATUS:
RHSEI: 1ST 2024
TOTAL = 25
OPEN = 2 (PLANNED TO BE CLOSED DURING RIG MOVE)

WELL CONTROL:
TOTAL = 8
OPEN = 0

PRE-TOUR MEETING:
OPERATIONAL HIGHLIGHTS BY RS & SA FOREMAN.
CREW CHANGE DAY-EMPHASIZED TO AVOID HECTIC JOBS, HEAT STRESS AND DEHYDRATION.
AWARENESS SESSION ON GOOD AND DETAILED HANDOVER.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1167 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/16/2024 - 09/07/2024
Report ID: OPERLMTDMRREP

AWARENESS SESSION HANDLING TUBULARS.


INCIDENT REPORT RECEIVED FROM ARAMCO REGARDING CATERING CREW INJURY SHARED AND BRIEFED.
CURRENT MONTH MAJOR AND POTENTIAL INCIDENTS BRIEFED. EMPHASIZED TO HAND AND FINGERS SAFETY.
STOP CARD OBSERVATIONS HIGHLIGHTS AND EMPHASIZED ON ONLINE REPORTING.
EMPHASIZED ON NO SHORTCUTS, PTW & SALAMA CARD.
MAINTAIN HOUSEKEEPING ALL TIME.
SWA & LINE OF FIRE.

STOP CARDS: 38
SALAMA CARDS: 03

====== ADC RIG VISITS==========


** ADC OPS MANAGER AHMED ALELIWI LAST VISIT 12/17/23.
** ADC RIG MANAGERS ABDULMOHSEN ALSAILIK # 104838 & GOHAR PERVAIZ #105785 VISITED THE RIG ON 6/3/2024.
** ADC HSE MANAGER MOHAMED ALQUDAHY VISITED RIG 5/21/24.
=========TANKERS==============
1. ABDUL QADIR - PLATE/DOOR# 2045-ARA (2 TRIPS) - FROM 1ST MAY 2024 (DRSS# 1004295712).
2. MUQADAS SADDIQUE- PLATE/DOOR# 3167-BRA (2 TRIPS) - FROM 1ST MAY 2024 (DRSS# 1004295712).
3. REYMOND - PLATE/DOOR# 7801-TRA (2 TRIPS) - FROM 21ST MAY 2024 (DRSS# 1004312903).
4. OSMAN - PLATE/DOOR# 8005-AUA (2 TRIPS) - FROM 21ST MAY 2024 (DRSS# 1004312903).
========COST OPTIMIZATION=====
- FRAC TANKS: 0
- ACID: 0
==========NEXT LOCATIONS========================
- SDGM-1183.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 4,294 N/A

Company RIG EMC RIG ARM ARM

Category RIG DFMS OTHR OTHR WSC


PERSONNEL
40 1 15 1 2
Total
AND SERVICES No. of Persons
59
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24

Operating Hours. 24 12 24 24 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR IFAL-4 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:19 12/19/2023 - 07/01/2024
Report ID: OPERLMTDMRREP

ADC-36 @ IFAL-4 Limited Morning Report for 06/18/2024


Objective : (GEOTHERMAL- Foreman(s)GUEROUACHE, ADEL / ELASSI, GOMAA MOHAMED
D&WO Morning Report (Service Providers View) Charge #: WILDCAT TO EVALUATE THE Engineer SLATEWALA, HUZEFA SHABBIR
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved GEOTHERMAL POTENTIAL IN Manager HARBI, MAGBEL MENAWER
ADC-36 (75-23873-0004)
THE WEST COAST) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 11445 577-3991 577-3698 ( RIG CLERK)
Date: Tuesday 06/18/2024 IFAL-4 (0) IFAL_4_0 CONTRACTOR /CLERK VSA T
0138297736 (ADC OFFI CE)

Last 24 hr operations Next 24 hr plan


SLB W/L LOGGING DOWN TEMPERATURE TO BTM RUN#8, 1 HR STATIONARY ON BTM, LOGGING L/D RUN#8, BOPE TEST, RIH W/ 8-3/8" CT BHA, CHC, DISPLACE TO 77 PCF W/ MPD, PORE TEST
UP TO SURFACE. TO 77 PCF, WIPER TRIP, CHC, POOH T/SURFACE.
Location Next Location
AL BADA CITY DIRECTION FOLLOW RIG SIGNS. 3 KM SKID ROAD. DRIVING DISTANCE F/ DMG TO RIG 1919 KM *RIG MAINTENANCE*
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
16,472 Size 14097 14090 Size 8,994 14,097 14,097 Top
Formations Comments
9 5/8 9 5/8 Depth
BRQN 3,580 AS PER GEOLOGIST
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) BASED ON CHEMO
16472 (Date) 100 0 1504 REPORTS, LEAD GEOLOGIST
175.4 (12/25/2023@1900 ) WAJH 14,100
CONFIRMED WAJH TOP
FORMATION
273' DEEP , PLANNED BSMT
BSMT 16,350
TOP AT 16077'.
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

SLB W/L LOGGING DOWN WITH RUN#8 PBMS/GR ( TEMPERATURE LOG ) TO BTM
16,472' AT 900 FT/HR SPEED AS PER RDD INSTRUCTION..
0500 - 1030 5.5 0 EOW E LOG LOG WLT SWL 16472 16472 13020 16472 > MONITORING HOLE THRU TRIP TANK.
> RECORDED 291.14 DEG F AT 9-5/8" CSG SHOE AFTER 80.75 HRS FROM LAST
CIRC TIME
> RECORDED 330 DEG F AT BTM AFTER 84.5 HRS FROM LAST CIRC TIME. .

SLB W/L WITH TEMPERATURE TOOLS ON BTM PERFORMED 60 MIN STATIONARY


TIME AS PER RDD.
1030 - 1130 1 0 EOW E LOG LOG WLT SWL 16472 16472 16472 16472
> MONITORING HOLE THRU TRIP TANK.
> BHST RECORDED AFTER 1 HRS STATIONARY TIME : 330.36 DEG F.

SLB W/L LOGGING UP WITH RUN#8 PBMS/GR ( TEMPERATURE LOG ) F/ BTM


16,472' TO SURFACE' AT 900 FT/HR SPEED AS PER RDD INSTRUCTION.
1130 - 0459 17.5 0 EOW E LOG LOG WLT SWL 16472 16472 16472 820
.............................ONGOING @ 820 FT.
> MONITORING HOLE THRU TRIP TANK.
> TIME SINCE LAST CIRCULATION 103 HOURS.
Foreman Remarks

IFAL-4 WILL BE DRILLED AS GEOTHERMAL-WILDCAT IN IFAL.


THE OBJECTIVE OF IFAL-4 IS TO EVALUATE THE GEOTHERMAL POTENTIAL IN THE WEST COAST, WHICH INCLUDES ESTABLISHING RESERVOIR PRESENCE WITH HIGH WATER FLOW POTENTIAL,
EVALUATING THERMAL PROPERTIES OF THE TARGET FORMATION INCLUDING THE RESERVOIR AND THE FLOWING WELLHEAD TEMPERATURES. ALSO, IT INCLUDES EVALUATING THE SEAL
CAPACITY AND TEST THE INJECTIVITY OF THE TARGETED RESERVOIR. THE TARGETS OF THE WELL ARE ALWAJH AND BURQAN FORMATIONS.
===========================================================
- 9 5/8" PLANNED CP @ 14,500'. (50' INTO ALWAJH), GEOLOGIST SET 9-5/8" CP AT 14,100'.
- PLANNED WELL TD 16500' AS PER SUPPL# 4 .BASED ON CHEMO REPORTS, LEAD GEOLOGIST CONFIRMED WAJH TOP FORMATION AT 14100 ON 05/20/24. WELL TD CONFIRMED AT 16472'.
===================PERSONNEL ON BOARD========================
- MAT EXPD ABDULLAH, MOHAMED 8625231 ON LOC 12/5/23, MAT EXPD ABBAD ALMUTAIRI# 8328070 ON LOC 06/12/24.
- ARAMCO SEN EXPECARC LAB TEC. MOHAMMED L AL-SUBHI #235319 ON LOC SINCE 6/11/2024.
- ARAMCO FCT MR. TOQIQI, ABDULMAJEED #295514 ON LOC SINCE 6/17/24.
==============SERVICE PERSONNEL & RENTAL EQUIP===================
- SLB CLOSED LOOP CREW ON LOCATION 12/18/2023.
- SLB CMT CREW & EQPT ON LOCATION 12/18/2023.
- RENTAL CAR W/ DRIVER FOR ARAMCO FOREMAN NEEDS, CHEVROLET TAHOE 2023 4X4 PLATE 6545-LGR BLACK COLOR , ON 04/08/2023 AT 16:00
- EXLOG MUD LOG UNIT & CREW ON LOC: STANDARD SINCE 12/19/2023,
- MPD CREW & EQPT ON LOC SINCE 03/05/2024 AT 12H00.
- RCVD 1 X 6 1/2" JAR SN= HMJ6504666984 ON 5/30/2024 AT 13H00.
- RCVD 1 X 6 1/2" JAR SN= HMJ6504385071 ON 6/8/2024 AT 12H30.
==============JOURNEY MANAGEMENT==============
- FROM TABOUK OR NEOM CITY TO AL BADA CITY DIRECTION FOLLOW RIG SIGNS.
- ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
==============SAFETY======================
- SAFETY TOPIC: LIFE SAVING RULLES- MECHANICAL LIFTING, LIFE SAVING RULLES - HOT WORK
- PTW/JSA: COLD PTW: (5), HOT PTW:(1) CONFINED SPACE: (0), DIESEL TRANSFER: (1), MAN RIDER: (0), JSA: (5), S/CARDS: (33), SALAMA CARDS: (11),
- DRILLS: H2S EMERGENCY RELEASE DRILL(1), MAN LOST - SEARCH / RESCUE DRILL(1)
=============SERVICE PERSONNEL & RENTAL EQUIP==================
DAILY SKIPS USED / SHIPPED: = 0 / 0
SKIP USED PER SECTION TO DATE 8-3/8" = 43
TOTAL SKIPS USED TO DATE = 749
TOTAL SHIPPED SKIPS / TONNAGE TO DATE: 749 / 4,170
DAILY VACUUM TRUCKS LOADS / BBLS = 0 / 0 BBLS
V. TRUCKS LOAD USED PER SECTION TO DATE 8-3/8" = 69 / 6,900 BBLS
TOTAL VACUUM TRUCK LOADS / BBLS TO DATE: 503 / 49,942 BBLS
RECOVERED MUD PER SECTION 173 BBLS / CUMULATIVE MUD RECOVERED : 1,573 BBLS
========== VACUUM TANKERS & FLAT BED FOR ZERO DISCHARGE=============

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR IFAL-4 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:19 12/19/2023 - 07/01/2024
Report ID: OPERLMTDMRREP

- 09 EA FLAT BED TRUCKS & 16 EA VACUUM TANKERS AL-FAHHAD ZEGWAARD COMPANY.


- 06 EA FLAT BED TRUCKS & 05 EA VACUUM TANKERS ESTIDAMA COMPANY.
- SPRAY TRUCK #3883 (DRSS#1004319913) ON LOCATION SINCE 3 JUNE 2024
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
87 PCF 2 4.6 API 0 0 Volts 17.69 10 21,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 17.6 HTHP 80 24 0 12 / 19 HPWBM 1.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 35 20 11 / 12 10 280 13.8
70
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
87 PCF 2 4.6 API 0 0 Volts 17.64 10 21,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 18 HTHP 80 24 0 12 / 20 HPWBM 2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 36 20 11 / 12 10 240 14
71

MUD CAUST BCTRN


TREATMENT 4 ( 50LBP ) 4 ( 5GL )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/04/2024 06/13/2024 WEST N/A HOT 3,338 SHARED SAFETY
ALERTS

Company SUW RIG BDF MIF BGP WUD XLG RIG ARM SCM MI2 OTH ARM SWL

Category CTRG RIG DFMS FILT LPS MPD MLS OTHR OTHR PCS SCS VAC WSC WLS
PERSONNEL
25 37 1 4 7 3 2 32 5 2 12 38 2 7
Total
AND SERVICES No. of Persons
177
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 12 0 0 0 24 12 12 0 24 12 24 24

Standby/Tankers Others Others


TRUCKS/BOATS
N/A AB-0715 AB-0715

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A 282 83 2600

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1322 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 03/29/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

ADC-41L @ SDGM-1322 Limited Morning Report for 06/18/2024


Objective : (K2PK-S SHAPE Foreman(s)BOWES, JEFFREY LYNN
WELL TARGETING JAUF Engineer ALSHAMMARI, HAMED MUZIL / ALOKE, CHINWIKE DARLYNTIN
D&WO Morning Report (Service Providers View) Rig Charge #: RESERVOIR TO BE Manager MEQBEL, ALI NASSER
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-41L (66-23054-1322) COMPLETED WITH 4-1/2" 15K THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK) CEMENTED LINER)
+882167771 1179 577 3998 SLB 013 66 4 8810
(0500-0500) Saudi Aramco Well Wellbores:
SDGM-1322 (0) SDGM_1322_0 OTHER VSAT OTHER VSAT CONTRACTOR
Date: Tuesday 06/18/2024 /CLERK VSA T
ADC - 013 829 7741 FCT - 577 3935
577 3574

Last 24 hr operations Next 24 hr plan


SET PACKER, SHEAR PBR, SPACE OUT, DISPLACE, PUMP PICKLE TRAIN, DISPLACE, LAND HANGER, RIG TO & RUN SLICK LINE OPERATIONS, SET BPV, N/D BOPS, N/U WELLHEAD, PRESSURE TEST
PRESSURE TEST TCA & TBG ALL WELL HEAD, RIG TO & RUN SLICK LINE
Location Next Location
94 KM FROM THE DHAHRAN MAIN GATE SDGM-1159
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
15,218 Size 12559 12343 Size 12,334 15,215 14,996 Top
Formations Comments
9 5/8 4 1/2 Depth
1 FT HIGHER THAN
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KFDA 13,385
PROGNOSIS (13,385 MD)
15218 (Date) 100 0 95 14 FT HIGHER THAN
72.5 (04/06/2024@1700 ) BKDC 13,790
PROGNOSIS (14,009 MD)
16 FT HIGHER THAN
PKFU 13,837
PROGNOSIS (14,056 MD)
8 FT HIGHER THAN
UNYC 13,888
PROGNOSIS (14,108 MD)
27 FT HIGHER THAN
PUZU 13,971
PROGMOSIS (14,190 MD)
91 FT HIGHER THAN
JAUF 14,164
PROGMOSIS (14,383 MD)
3 FT HIGHER THAN
TWLF 14,799
PROGMOSIS (15,018 MD)
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

SET COMPRESSION SET ANCHOR & SHEAR PBR SEALS


OPEN BOP. CONFIRMED ANCHOR SET WITH 40 KLBS O/P.
PRESSURE UP TUBING TO 2000 PSI & APPLIED 40 KLBS O/P TO SHEAR OUT PBR
SEALS.
0500 - 0700 2 0 EOW C COMP HT PBR HCO 15218 15218 MARK TUBING AT NEUTRAL POINT & P/U 15'
CLOSE BOPS & P/T TCA TO 2000 PSI FOR 15 MIN, OK
BLEED OFF PRESSURE AND OPEN BOPS, PLACE SEAL ASSEMBLY IN COMPRESSION
W/ 5 KLBS SOW
P/T TUBING TO 2000 PSI FOR 15 MIN, OK, BLEED OFF PRESSURE.
RAISE TUBING TO NEUTRAL POINT.

HPJSM, REVIEW JSA, MEANWHILE LETTING TBG STAND ONE HR TO ACHIEVE


STATIC GEOTHERMAL GRADIENT.
0700 - 0800 1 0 EOW C COMP OTH TBG RIG 15218 15218 - DISCUSS UPCOMING OPERATIONAL PROCEDURES HAZARDS AND CONTROLS,
- PRESSURES ON LINES WHILE DISPLACING FLUID, HAZZARDS OF WORKING WITH
CACL2/CABR2,
- RED ZONE AREA'S, WATCHFUL OF 3RD PARTY SERVICES.

SPACE OUT FOR TBG HANGER


- L/D 4 JOINTS OF TUBING.
0800 - 1030 2.5 0 EOW C WH HT TBGHR RIG 15218 15218 - P/U AND M/U 1 X CROSSOVER + 4 PUP JTS + 2 X 4 1/2" VT TBG JTS + CAMERON
11" X 4 1/2" TBG HGR.
- DRIFT ALL TUBING WITH 3.795" D2 FLOATING DRIFT.
- MONITOR WELL ON TRIP TANK WELL STATIC.

PUMP 50 BBL HI-VIS AND REVERSE CIRC OUT KILL BRINE WTH FILTERED WATER
AND RECOVER SAME
1030 - 1130 1 0 EOW C COMP CIRC MPMP RIG 15218 15218
- MAKE UP ALL SURFACE LINES FOR REVERSE CIRCULATION.
- FR: 3 BPM, PR: 720 PSI.
- RECOVER 70 PCF KILL BRINE ON MUD TANKS

HOLD STAND DOWN SAFETY MEETING WITH RIG CREW


DISCUSSED ARAMCO HEAT STRESS PRESENTATION WITH CREW
1130 - 1200 0.5 0 EOW C COMP PJSM TBG RIG 15218 15218 DEHYDRATION HAZARDS AND PEAK HOURS OF HEAT SAFETY PRECAUTIONS
WORK ALONE HAZARDS DURING PEAK HOURS OF HEAT, HEAT HAZARDS DURING
CONFINED SPACE JOBS

CONT TO PUMP 50 BBL HI-VIS AND REVERSE CIRC OUT KILL BRINE WTH FILTERED
WATER AND RECOVER SAME
1200 - 1400 2 0 EOW C COMP CIRC MPMP RIG 15218 15218
- MAKE UP ALL SURFACE LINES FOR REVERSE CIRCULATION.
- FR: 3 BPM, PR: 350-720 PSI.
- RECOVER 70 PCF KILL BRINE ON MUD TANKS

PRE JOB SAFETY MEETING - PICKLE TUBING


1400 - 1430 0.5 0 EOW C COMP PJSM TBG RIG 15218 15218 - DISCUSS SCOPE OF JOB.
- ASSIGN ROLES AND RESPONSIBILITES.
- HIGHLIGHT POTENTIAL HAZARDS AND SAFETY CONCERNS

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1322 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 03/29/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

PICKLE TUBING BY PUMPING FLUID TREATMENT DOWN THE TUBING USING MAX
OF 3 BPM AS FOLLOWS:
- LINE UP TO CMT UNIT AND PUMP.
- 20 BBL OF VISCOSIFIED WATER SPACER.
- 54 BBL OF CCT-8051 AT 43% CONCENTRATION (31 BBL WATER + 18 DRUMS OF
MI CCT-8051 TUBING PICKLE CHEMICAL).
1430 - 1730 3 0 EOW C COMP CIRC MPMP RIG 15218 15218 - 20 BBL OF VISCOSIFIED WATER SPACER.
- DISPLACE WITH FILTERED WATER USING MAX OF 3 BPM TO GET THE CCT-8051
PICKLE CHEMICAL WITHIN 4 BBL SHORT FROM END OF TUBING.
- CLOSE PIPE RAMS AND LINE UP TO MUD PUMPS.
- REVERSE CIRC WITH FILTERED WATER USING 3 BPM UNTIL ALL THE PILLS ARE
OUT OF TUBING.
- CONTINUE REVERSE CIRCULATION WITH ADDITIONAL 1.5 STRING VOLUME OF
FILTERED WATER USING 3 BPM,

PERFORMED TUBING ACID PICKLING JOB


- LINE UP TO CMT UNIT AND PUMP.
- 30 BBL HI-VIS PILL.
- 60.4 BBL 15% HCL ACID PILL.
- 30 BBL HI-VIS PILL.
1730 - 2030 3 0 EOW C COMP CIRC MPMP RIG 15218 15218 - CMT UNIT DISPLACE WITH 86.6 BBLS FILTERED WATER AT 3 BPM UNTIL ACID IS
4 BBLS SHORT OF SEALS.
- CLOSE PIPE RAMS AND LINE UP TO MUD PUMPS.
- REVERSE CIRC WITH FILTERED WATER USING 3 BPM UNTIL ALL THE PILLS ARE
OUT OF TUBING.
- CONTINUE REVERSE CIRCULATION WITH ADDITIONAL 1.5 STRING VOLUME OF
FILTERED WATER USING 3 BPM,

REVERSE OUT WITH FILTERED WATER WITH 3 BPM TO ACHEIVE REQUIRED NTU
AND TSS READINGS
2030 - 2130 1 0 EOW C COMP CIRC MPMP RIG 15218 15218 * NTU < 50 & TSS < 0.05 % THREE SAMPLES ONE HOUR APART.
- SAMPLE # 1: NTU:19, TSS: 0.01 %.
- SAMPLE # 2 NTU:10, TSS: 0.01 %.
- SAMPLE # 3: NTU:14, TSS: 0.01 %.

2130 - 2330 2 0 EOW C COMP CIRC MPMP RIG 15218 15218 PUMP 25 BBL 3 BPM HI VIS GEL AND DISPLACE THE WELL WITH 70 PCF INHIBITED
NACL BRINE TILL CLEAN BRINE ON SURFACE.

HOLD STAND DOWN SAFETY MEETING WITH RIG CREW


DISCUSSED ARAMCO HEAT STRESS PRESENTATION WITH CREW
2330 - 0000 0.5 0 EOW C COMP PJSM TBG RIG 15218 15218 DEHYDRATION HAZARDS AND PEAK HOURS OF HEAT SAFETY PRECAUTIONS
WORK ALONE HAZARDS DURING PEAK HOURS OF HEAT, HEAT HAZARDS DURING
CONFINED SPACE JOBS

0000 - 0030 0.5 0 EOW C COMP CIRC MPMP RIG 15218 15218 CONT TO PUMP 25 BBL 3 BPM HI VIS GEL AND DISPLACE THE WELL WITH 70 PCF
INHIBITED NACL BRINE TILL CLEAN BRINE ON SURFACE.

SLOWLY RIH, STING INTO PBR AND LAND TBG HANGER INTO CIW TBG HEAD
SPOOL WITH ALL STRING WEIGHT AS PER CAMERON WH ENGINEER TIGHTENED
0030 - 0300 2.5 0 EOW C WH HT TBGHR RIG 15218 15218
ALL LOCK DOWN SCREWS, CLOSED BOP AND APPLIED 4,200 PSI PRESSURE FROM
CMT UNIT TO SET HANGER AS PER CAMERON WH ENGINEER, BLEED OFF
PRESSURE AND RE-TIGHTENED ALL LOCK DOWN SCREWS

HOLD SAFETY STAND DOWN MEETING WITH CREW AND SERVICE HANDS.
- DISCUSSED SAFTY CONCERNS REGARDING HIGH PRESSURE TESTING, HARD
0300 - 0330 0.5 0 EOW C COMP PJSM TBG RIG 15218 15218
LINES, BARRIERS, WHAT NOT TO DO WITH PRESSURED LINES, ONLY CEMENTER
CAN HAMER A LINE TIGHT, COMMUNICATION, RED ZONES OPERATIONAL
PROCEDURES AND SAFETY.

PRESSURE TEST TCA AND TUBING TO 6,500 PSI WITH CEMENT UNIT.... ONGING
AT RPT TIME
- RIG UP HARD LINES, FLUSH AND P/T TO 8,000 PSI FOR 10 MIN.
- P/T TCA TO 6,500 PSI WITH 70 NACL BRINE AND MONITOR TBG FOR 30 MIN,
0330 - 0459 1.5 0 EOW C COMP PTST SEAL RIG 15218 15218 OK.
- VOLUME PUMPED & RETURNED = 12.1 BBL
- P/T TUBING TO 6,500 PSI WITH 70 NACL BRINE AND MONITOR TCA FOR 30 MIN,
OK.
- VOLUME PUMPED AND RETURNED = 4.2 BBL
- BREAK OUT AND L/D HARD LINES.
Foreman Remarks

SDGM-1322 IS PLANNED TO BE DRILLED AS A K2PK-S SHAPE WELL TARGETING JAUF RESERVOIR IN THE MIDDLE PART OF SHEDGUM FIELD AND WILL BE COMPLETED WITH 4-1/2" 15K CEMENTED
LINER. THE WELL IS DESIGNED WITH A K-2 CASING DESIGN TO ISOLATE KHUFF FROM PRE-KHUFF FORMATIONS.
============================================ARAMCO PERSONNEL=============================================
>> MAZEN ALGHAMDI #820710 MATERIAL EXPEDITOR ON LOCATION 06/12/2024.
>> CHINWIKE ALOKE #896900 - ARAMCO DE ON LOCATION FROM 15/06/2024 FOR UPPER COMPLETION.
>> NAFAL ALDMNAN #740877 SGGDD FCT ON LOCATION 05/26/2024.
==============================================IDS PERSONNEL===============================================
IDS SUPERVISORS:

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1322 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 03/29/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

>> DAY: GANESH


>> NIGHT: PARVEZ
==============================================ADC PERSONNEL===============================================
>> TOOL PUSHER: AISSA
>> NIGHT PUSHER: ALI
========================================LAST CONTRACTOR MANAGEMENT VISIT======================================
>> MURTADA ATA SLB SUPT 06/09/2024.
>> MAKSIM ANTONOV IDS PROJECT MANAGER 06/03/2024.
>> VIKTOR YURTAEV IDS HSE MANAGER 06/05/2024.
>> JAFAAR ADC RIG MGR 04/30/2024.
=================================================SAFETY==================================================
DISCUSSED ARAMCO HEAT STRESS PRESENTATION WITH CREW
DEHYDRATION HAZARDS AND PEAK HOURS OF HEAT SAFETY PRECAUTIONS
WORK ALONE HAZARDS DURING PEAK HOURS OF HEAT, HEAT HAZARDS DURING CONFINED SPACE JOBS
RIG MOVE PREPARATION AND PRE MOVE PLAN SHARED WITH CREW
PUMPING ACID SAFETY PRECAUTIONS
HIGHLIGHTED AND DISCUSSED AD LIFE SAVING RULES , BY PASSING SAFETY EQUIPMENT
HAZARD IDENTIFICATION AND REPORTING IMPORTANCE
REINFORCED THE CREW TO UTILIZE THEIR "STOP WORK AUTHORITY" WHEN REQUIRED.
OPERATION HIGHLIGHTS BY AD RS , IDS WSL AND ARAMCO FOREMAN.

DAILY HSE REPORT DWLTI - 3151

AUDITS:
>> LPD TOTAL 14 (CLOSED 14 & OPEN 00)
>> 1ST QSI INSPECTION TOTAL 40:( CLOSED 39 OPEN 01).
>> 1ST RSI INSPECTION TOTAL 32:( CLOSED 32 OPEN 00 )
>> 2ND QSI AUDIT TOTAL 32: (CLOSED 28 OPEN 04)
NEAR MISS:
>> NONE
DRILLS:
>> FIRE PUMP TEST X 2
INSPECTION:
>> RIG MOVE GEARS INSPECTION
================================================VACUUM TANKERS=============================================
COMPANY: AL-FUWAILEH DRSS #1004329108 / #1004329107
TODAY: 1
TOTAL: 57
=================================================NEXT WELL================================================
NEXT WELL CHANGED TO SDGM-1159 - 100% FINISHED AS PER WELLSITE
WATER WELLS SDGM - 984 / 995
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 15,218 3.1 222 0 14,997 506.57 -88.23 1,686.99 0.33
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
05/30/2024 05/30/2024 N/A N/A SEASONAL 3,152 2 X DAILY

Company SCM SUW HCO RIG SMI MJH BR1 TK3 RIG ARM TK3 ARM

Category PCS CTRG PSSC RIG DFMS SEC MLS OTHR OTHR OTHR WSC WSC
PERSONNEL
2 13 1 41 3 7 0 5 16 3 2 1
Total
AND SERVICES No. of Persons
94
INFORMATION
Personnel on Loc. Hrs. 18 24 24 24 24 24 0 24 24 24 24 24

Operating Hours. 4 0 24 24 12 0 24 12 12 12 24 24

Standby/Tankers Others
TRUCKS/BOATS
ARAMCO PICKUP AB-7104 RIG AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 500 447 269 69 800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3209 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 04/25/2024 - 07/16/2024
Report ID: OPERLMTDMRREP

ADC-42L @ UTMN-3209 Limited Morning Report for 06/18/2024


Objective : (K-2 DEVIATED Foreman(s)ALTARIQ, IBRAHIM SAAD
D&WO Morning Report (Service Providers View) Charge #: WELL TARGETING PRE- Engineer OMBE, EBIKEBENA MARK
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23057-3209) KHUFF RESERVOIR AS Manager NEJIDI, AHMED ABDULLAH
ADC-42L
PRIMARY TARGET & KHUFF THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK)
Wellbores: AS SECONDARY TARGET)
(0500-0500) Saudi Aramco Well 0088216777 11726 013 577 39 83 013 664880 0 (SLB)
Date: Tuesday 06/18/2024 UTMN-3209 (0) UTMN_3209_0 OTHER VSAT CONTRACTOR /CLERK VSA T
013 577 39 36 (FCT) 013 577 35 79 (RIG CL ERK)

Last 24 hr operations Next 24 hr plan


DIRC DRILL 8-3/8" HS DIRC DRILL 8-3/8" HS TO 15,733 FT (460 INTO KFDA)
Location Next Location
UTMN-3209 UTMN-2381
Current Depth (ft) Liner TOL MD TVD Formation Tops
14,350 Last Csg Size MD TVD Size Top
9 5/8 12828 12828 Formations Comments
Depth
KFBC 12,068 1' TVD DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KFB1 12,113 2' TVD SHALLOWER
13360 (Date) 100 990 163 KFB2 12,220 13' DEEPER
46.8 (05/02/2024@1000 ) KFB3 12,269 3 FT SHALLOWER
KFB4 12,332 19' DEEPER
KFB5 12,384 14' DEEPER
KFB6 12,445 25' DEEPER
KFB7 12,493 14' DEEPER
KFCC 12,564 25' TVD DEEPER
KC01 12,576 25' DEEPER
KC02 12,596 27' TVD DEEPER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

DRILLING 8-3/8" HOLE SECTION WITH RSS BHA FROM 13,360 FT TO 13,990 FT.
- OBSERVED SHOCKS AND VIBRATION, MITIGATE SAME WITH PARAMETERS.
0500 - 2000 15 0 8 3/8 N DRLG D RSS SDM 13360 13990
- PERFORMED FLOW CHECK ON EVERY CONNECTION.
- CONT HOURLY TREATMENT + SWEEP 20 BBL BRIDGING PILL EVERY STAND.

2000 - 2030 0.5 0 8 3/8 N DRLG RR TDS RIG 13990 13990


SERVICE TOP DRIVE

DRILLING 8-3/8" HOLE SECTION WITH RSS BHA FROM 13,990 FT TO 14,350 FT.
- OBSERVED SHOCKS AND VIBRATION, MITIGATE SAME WITH PARAMETERS.
- PERFORMED FLOW CHECK ON EVERY CONNECTION.
2030 - 0459 8.5 0 8 3/8 N DRLG D RSS SDM 13990 14350 - CONT HOURLY TREATMENT + SWEEP 20 BBL BRIDGING PILL EVERY STAND.
- CONDUCT STICK TEST INSIDE KHUFFC EVERY CONNECTION, NO STICKING
TENDENCY.
- CT-CT: 10.22 FT, 3.81 ABOVE, 9.31 RIGHT OF THE PLAN.

Foreman Remarks

==========================================WELL OBJECTIVE=============================================
UTMN-3209 IS A DEVIATED WELL TARGETING PRE-KHUFF AS PRIMARY AND KHUFF AS SECONDARY RESERVOIR AND WILL BE COMPLETED WITH 4-1/2" 15K CEMENTED LINER. THE WELL IS
DESIGNED WITH A K-2 CASING DESIGN DUE TO THE FUTURE SIDETRACK REQUIREMENT. THE WELL IS OUT OF SHALLOW GAS BOUNDARY/AREA.
==================================== ARAMCO PERSONNEL ===============================================
> ARAMCO MC #820719, ABDULLAH AL-ZAHRANI OFF LOCATION (05/28/2024)
> ARAMCO FCT #796606, ABDUALZIZ ALOTAIBI OFF LOCATION (06/01/2024)
================================== IDS PERSONNEL =====================================================
> IDS SUPERVISORS DAY: GOPALA/ NIGHT: YOGI
==================================== ARAMCO SERVICES PERSONNEL ========================================
>
================================== RIG VISIT =========================================================
> TOP MANAGEMENT FOR SLB & ADC THEY VISITED THE RIG ON 05/20/2024 FOR CELEBRATE WITH ENTIRE TEAM OF ADC-42L FOR 10 YEARS WITHOUT AN LTI.
> SLB IWC PROJECT MANAGER MAKSIM LAST VISIT 05/20/2024.
> SLB IWC INTEGRATION MANAGER GIANLUIGI MORONI LAST VISIT ON 04/11/2024
> SLB IWC WELL OPERATION MGR RAED GHALI LAST VISIT ON 02/26/2024
> SLB IWC RIG SUPT. MURTADA ATA LAST VISIT ON 05/30/2024.
> SLB IWC RIG SUPT. NADER AL-KHADRAWI LAST VISIT ON 02/20/2024.
> ABDULLA FAHED AL-AHMED (ADC DIRECTOR OF KSA OPERATIONS) VISIT RIG ON 02/06/2024
> NAHEL BURHAN DABJAN (ADC GAS LSTK OPERATION MANAGER) VISIT RIG ON 02/06/2024
> RIG MGR ALEKSANDER SEREBRIANSKI LAST VISIT ON 04/17/2024
> SLB IWC SNR WE. ABDULLATIF ALBARUT LAST VISIT ON 01/18/2024
==================================== HSE ========================================================
TOTAL STOP CARDS ENTERED IN THE REPORT: 25 (06 SUBSTANDARD ACT, 15 SUBSTANDARD CONDITIONS, 04 POSITIVE HSE CULTURE).

-REFRESHED THE CREW ON THE AWARENESS OF HEAT STRESS WITH NEW CREW
-DEVELOPED THE SAFE WORK INSTRUCTIONS FOR THE PLANNED ACTIVITY.
-DISCUSSED WITH NEW CREW ON THE SITUATIONAL AWARENESS, DEVELOPMENT ON THE SWI REQUIREMENT.
-DISCUSSED ON THE LINE OF FIRE AND STOP WORK AUTHORITY
-REFRESHED THE AWARENESS ON THE PTW
-FOLLOW UP ON WEEKLY ACTION ITEMS. -NEW ADDED

INSPECTIONS:
-DAILY GAS DETECTOR INSPECTION
-CHEMICAL YARD INSPECTION

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3209 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 04/25/2024 - 07/16/2024
Report ID: OPERLMTDMRREP

TOFS:
DURING OFFLOADING VACUUM TRUCK, STOP WORK AUTHORITY HAS BEEN APPLIED BY RIG SAFETY TRNG CO-ORD DUE TO MISSING STOPPERS ON TIRES.
TIME OUT FOR SAFETY HAS BEEN CONDUCTED WITH ALL TEAM INVOLVED IN THE JOB TO DISCUSS IMPORTANCE OF PUTTING STOPPERS ON TIRES.
=========================================DRILLS==================================================
> PIT DRILL
======================================== DIESEL CONSUMED F/ OBM ======================================
> TOTAL APPROVED 3300 BBLS (16 LOADS), 12 LOADS RECIEVED
========================================= AUDITS ================================================
> LP CONDUCT A RIG SAFETY INDEX ASSESSMENT ON MAY 16, 2024
> ANNUAL SECONDARY H2S DRILL ON 13TH FEB, 2024
> 1ST HALF CEHA, 2024: TOT. ITEMS: 19, OPEN 1 & CLOSED 18
> 1ST WCI 2024: TOTAL ITEMS: 9, CLOSED & RHSEI 2024: TOTAL ITEMS: 30, CLOSED.
> HAZCOM AUDIT ON 28/3/2024, TOTAL ITEMS: 28 CLOSED
====================================== NEXT LOCATION =============================================
> UTMN-2381 (100% READY)
> WATER WELLS UTMN-3523/3524
============================== VACUUM TANKERS AND CONSTRUCTION EQUIP ==================================
> 8 VACUUM TANKERS DRSS#1004314625 & 1004320848
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 13,438 65.47 346.89 95 12,328 636.14 -55.04 2,094.86 0.22
0 13,561 65.5 347.08 123 12,379 669.37 -62.72 2,205.72 0.15
0 13,625 65.39 346.99 64 12,406 686.66 -66.7 2,263.43 0.22
0 13,719 65.48 347.08 94 12,445 712.06 -72.55 2,348.24 0.13
DAILY SURVEY 0 13,814 65.4 347.29 95 12,484 737.74 -78.39 2,434.03 0.22
0 13,909 65.53 347.46 95 12,524 763.44 -84.15 2,519.9 0.2
0 14,004 65.5 347.3 95 12,563 789.16 -89.91 2,605.85 0.15
0 14,098 65.54 347.11 94 12,602 814.59 -95.68 2,690.9 0.18
0 14,191 65.63 346.59 93 12,641 839.72 -101.55 2,775.06 0.52
0 14,287 65.55 345.87 96 12,680 865.6 -107.89 2,861.87 0.68

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
92 PCF 1 0 API 44 800 Volts 3.7 0 23,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 2.4 HTHP 12 22 0 9 / 12 RELIANT 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 30 44 7/8 0 0 3.6
54

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
92 PCF 1 0 API 44 820 Volts 3.7 0 23,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 150 2 HTHP 12 22 17 13 / 18 RELIANT 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 44 44 12 / 14 0 0 3.8
56

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
92 PCF 1 0 API 44 833 Volts 3.7 0 23,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 2.8 HTHP 12 19 16 10 / 15 RELIANT 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 35 44 10 / 11 0 0 3.6
51

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
7 12,835 14,350 DP Av DC Av Bit HHP 15 140 M423 8.375 SMT
Pressure GPM Jet Vel 337.94 433.76 250 I-Row O-Row DC Location Bearings
2,800 550 267 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
SA00081 MSI616C 6 x 12 / 0.663
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 72 N/A N/A N/A 6,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
DRILL STRING 1 Bit SMT 8.375 1 0.95 SA00081
2 RSS SDM 6.75 1 6.75 13.37 0 N002656
3 Pony Collar SDM 6.77 1 9.08 0 0
4 Stabilizer SDM 8.25 1 6.5 2.875 5.52 NC46 NC46 0 5661
5 Saver Sub SDM 6.875 1 6.875 4.625 0.9 4 1/2 FH 5 1/2 IF 0 OSS19-00794
6 Component Not listed SDM 60 1 7.15 0 0

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3209 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 04/25/2024 - 07/16/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
7 Saver Sub SDM 6.875 1 6.875 4.625 1.2 4 1/2 FH 5 1/2 IF 0 OSS19-00794
8 Measurement While Drilling (MWD) SDM 6.75 1 6.75 25.07 90 N001637
9 Saver Sub SDM 6.875 1 6.875 4.625 1.2 4 1/2 FH 5 1/2 IF 0 OSS19-00794
10 Non Magnetic Drill Collar ( NMDC ) SDM 6.75 1 6.75 2.5 28 NC50 NC50 0 SPRL 0
11 Stabilizer SDM 8.25 1 6.5 2.875 4.9 NC46 NC46 0 5366
12 Float Sub SDM 6.969 1 6.969 3.375 2.6 4 1/2 FH 4 1/2 FH 0 4605-3-9
13 Float Sub SDM 6.969 1 6.969 3.375 1.7 4 1/2 FH 4 1/2 FH 0 4605-3-9
14 FIlter Sub SDM 6.75 1 6.75 2.25 6.8 4 1/2 FH 4 1/2 FH 0 675-1086
15 Crossover RIG 6.25 1 6.25 2.25 3.15 NC46 4 1/2 REG 0 0
16 Drillcollar RIG 6.25 3 6.25 2.82 90 NC46 NC46 0 SLCK
17 Hydraulic Jar SJS 6.5 1 6.5 2.75 33.6 4" IF 4" IF 0 112758A
18 Drillcollar RIG 6.25 3 6.25 2.813 89.32 NC46 NC46 91.69 SPRL
19 Crossover RIG 6.5 1 6.5 2.875 3.11 XT54 NC46 0 0
20 Heavy Weight Drillpipe (HWDP) RIG 5.5 12 5.5 3.25 375 XT54 XT54 52.51 CONV
21 Drillpipe RIG 5.5 1 5.5 4.67 1 XT54 XT54 24.7 S135 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/14/2024 N/A SEASONAL N/A SEASONAL 3,696 2 X DAILY

Company SUW SDM RIG SMI TK3 RIG ARM OTH TK3 ARM TUB

Category CTRG DPDS RIG DFMS OTHR OTHR OTHR VAC WSC WSC ISPCT
PERSONNEL
15 1 39 3 3 11 0 3 2 1 3
Total
AND SERVICES No. of Persons
81
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 0 24 24 24 24

Operating Hours. 0 24 12 12 12 12 0 12 24 24 12

Standby/Tankers Others Others Others


TRUCKS/BOATS
AB-7105 ADC AMBULANCE ADC PICKUP TRUCK ADC SUV TRUCK

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
0 500 597 240 146 600

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1320 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/29/2024 - 09/16/2024
Report ID: OPERLMTDMRREP

ADC-43L @ SDGM-1320 Limited Morning Report for 06/18/2024


Objective : (S-SHAPE Foreman(s)BOUGRISSA, MOHAMED CHARAF
TARGETING PRE-KHUFF AS Engineer ALOKE, CHINWIKE DARLYNTIN / ALQHTANI, SAAD HUSSAIN
D&WO Morning Report (Service Providers View) Rig Charge #: PRIMARY AND KHUFF AS Manager MEQBEL, ALI NASSER
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-43L (66-23054-1320) SECONDARY RESERVOIRS THURAYA RIG FORMAN VSAT CONTRACTOR
Daily Onshore (LSTK) IN THE NORTHEASTERN /CLERK VSA T
0088216777 12579 577-3910
(0500-0500) Saudi Aramco Well Wellbores: PART OF)
ADC 880-78 79
Date: Tuesday 06/18/2024 SDGM-1320 (0) SDGM_1320_0
CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
IPM 880-78 59 CLERK 577- 3956

Last 24 hr operations Next 24 hr plan


CONTINUE RIG MAINTENANCE (CAT-IV) ACTIVITIES AS PER PLAN. RIG DOWN: 100%. RIG MOVE: CONTINUE RIG MAINTENANCE (CAT-IV) ACTIVITIES.
100 %. RIG UP: 70 %
Location Next Location
SDGM-1320 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 94
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

************************************************* RIG MAINTENANCE


************************************************
0500 - 0530 0.5 0 PRE M MAIN PJSM NA RIG 0 0 PERFORMED PJSM PRIOR TO START R/D & R/M ACTIVITIES WITH ALL CREW AND
THIRD PARTIES TO HIGHLIGHT RIG MOVE RELATED RISKS AND HAZARDS. SHARED
& REFRESHED GENERAL AND SPECIFIC SAFETY POLICIES / STANDARDS AND
PROCEDURES.

****************************************** RIG MAINTENANCE (CAT-IV) ACTIVITIES AT


SDGM-1320 SITE ***********************************
> REPAIRED ON ACTIVE#1 DISCHARGE LINE OF HOPPER#2.
> PM TASKS TDS. ( ONGOING ).
> VFD ELECTRICAL TEST ( COMPLETED ).
> R/UP OPERATION @SDGM-1320 :
> INSTALLED MAST LIGHTS AND ELECTRICAL CABLES ( ONGOING ).
> INSTALLED ROTARY TABLE ; DRAWWORKS ; GRASS HOPPER & CROWN BLOCK
0530 - 0459 23.5 0 PRE M MAIN OTH NA RIG 0 0 SHEAVES.
> SPOT KOOMEY UNIT.
> CLEANNIG MUD SYSTEM BY 3RD PARTY ( ONGOING ).
> INSTALLED RIG FLOOR PLATES ( ONGOING ).
> OLD LOCATION: COMPLETED WAITING WELL SITE ENGINEER CONFIRMATION.
********************************************************* RIG MOVE ACTIVITIES
**************************************************
> RIG DOWN = 100 %. ; RIG MOVE = 100 %. ; RIG UP = 70 %.
> RIG MOVE CREW AND EQUIPMENT:
> TRUCKS= 4, CRANE= 2, FORKLIFT= 1, CHERRY PICKER=1, DIESEL TANK=1
Foreman Remarks

SDGM-1320, PLANNED AS AN S-SHAPE TARGETING PRE-KHUFF AS PRIMARY AND KHUFF AS SECONDARY RESERVOIRS IN THE NORTHEASTERN PART OF SHEDGUM FIELD, AND WILL BE COMPLETED
WITH A 4-1/2 " 15K CEMENTED LINER. THE WELL IS DESIGNED WITH A K-2 CASING DESIGN DUE TO THE FUTURE SIDETRACK REQUIREMENT.
================================== PERSONNEL ON LOCATION ====================================================
> AHMED ALSUBHI, MATERIAL EXPEDITOR ID# 8032991 LEFT LOCATION 6/04/2024
> ARAMCO FCT ALZAHRANI, BASEL #796633 LEFT LOCATION ON 5/11/2024
> AHMAD ALMUTLAQ # 823639 ON LOCATION 06/16/2024
> IDS SUPERVISORS: DAY: LOUIS; NIGHT : HUSSAIN
==================================================== RIG KPI ===============================================

================================== THIRD PARTY PERSONNEL ON LOCATION ===========================================


> NONE
================================================ HSE ======================================================
DWO-LTI: 2735
FOLLOWING TOPICS ARE DISCUSSED DURING PTSMS WITH BOTH CREWS:
> SHARED RECENT SLB FIRE INCIDENT IN KUWAIT.
> DISCUSSED ADC RECENT FIRE INCIDENT INVOLVING MUD TANK.
> DISCUSSED DIRECT CAUSES AND PRECAUTIONS TO PREVENT REOCCURRING.
> DISCUSSED SMOKING IN NON DESIGNATED AREA PROHIBITION & SMOKE DETECTORS TAMPERING.
> HIGHLIGHTED SWA AND LINE OF FIRE.
> DISCUSSED SUMMER CAMPAIGN, HEAT STRESS AND IMPORTANCE OF DRINKING WATER. CONTINUE.
> NEAR MISS: NONE.
> DRILLS: NO DRILLS.
> INSPECTIONS: RIG MOVE EQUIPMENT INSPECTION.
============================================ EQUIPMENT ON LOCATION ==========================================
> NONE
==================================================VACUUM TANKERS ==========================================
> DRSS : 1004319011 / 1004325918 : NONE
=================================================RENTAL DOWNHOLE==========================================
> NONE
====================================== OBM DIESEL & MUD CHEMICALS PROVIDED BY ARAMCO=============================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1320 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/29/2024 - 09/16/2024
Report ID: OPERLMTDMRREP

> NONE
===================================================NEXT LOCATION===========================================
> NONE
==============================================COST SAVINGS & OTHER IMPROVEMENTS===============================
> NONE
====================================================RIG VISITS===========================================
> NONE
====================================================RIG MOVE==============================================
> NONE
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A SEASONAL N/A SEASONAL 2,736 2 X DAILY PRE
TOUR

Company SCC RIG SMI RIG RIG ARM TK3 ARM

Category CTRG RIG DFMS MED OTHR OTHR WSC WSC


PERSONNEL
13 39 1 1 34 1 2 1
Total
AND SERVICES No. of Persons
92
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24

Operating Hours. 0 24 0 0 12 12 24 24

Standby/Tankers Others Others Others


TRUCKS/BOATS
AB-5410 ADC AMBULANCE ADC PICKUP TRUCK ADC SUV TRUCK

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
0 636 449 0 0 0

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DMMM-7 WORKOVER-6 BI-90
Print Date: 06/18/2024 06:19 04/17/2024 - 06/30/2024
Report ID: OPERLMTDMRREP

ADC-45 @ DMMM-7 Limited Morning Report for 06/18/2024


Objective : (P&A THE Foreman(s)YOUNISS, AHMED FIKRY / GARNI, SAAD SALEH
WELL) HARTHI, SULTAN MOHSIN / ALHAJRI, ABDULLAH MOHAMMED / ALMULHIM,
D&WO Morning Report (Service Providers View) Charge #: Engineer
Rig ABDULLAH SAAD
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-45 (61-23011-0007) Manager ALDOSARI, ABDULRAHMAN MUTLAQ
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores:
0088216777 12153 (013)-578- 4235 (013)-829- 7745 RIG M GR
Date: Tuesday 06/18/2024 DMMM-7 (0) DMMM_7_0
OTHER VSAT CONTRACTOR /CLERK VSA T
(013)-829- 7645 CLINI C (013)-578- 4236

Last 24 hr operations Next 24 hr plan


POH & L/D 3-7/8" COA, RUN 6-1/8" COA, ENLARGE 3-7/8" PILOT HOLE TO 6-1/8" , CHC & PT CSG DRILL OUT CEMENT PLUGS TO 3150'.
Location Next Location
INSIDE DHAHRAN COMMUNITY SDGM-6
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
4,996 Size 4388 4388 Size 4,388 4,974 4,974 Top
Formations Comments
7 6 5/8 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
4996 (Date) 100 0 1
32.3 (05/16/2024@2200 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

PUMP HI-VIS & CIRCULATE HOLE CLEAN WITH 85 PCF BRINE UNTIL SHAKERS
0500 - 0615 1.25 0 POST N MILL CIRC MPMP RIG 4996 4996
CLEAN, FLOW CHECK, WELL STATIC.
- MONITOR ALL CCA'S PRESSURES.

0615 - 0700 0.75 0 POST N MILL RW MILL RAC 4996 4996 1915 1706 HPJSM, POH W/ 3-7/8" MOTOR ASSY TO ABOVE PILOT HOLE @ 1706'.
- MONITOR ALL CCA'S PRESSURES.

PUMP HI-VIS & CIRCULATE HOLE CLEAN WITH 85 PCF BRINE UNTIL SHAKERS
0700 - 1030 3.5 0 POST N MILL CIRC MPMP RIG 4996 4996
CLEAN.
- MONITOR ALL CCA'S PRESSURES.

1030 - 1130 1 0 POST N MILL OTH NA RIG 4996 4996 FLOW CHECK FOR 1 HR, WELL STATIC.
- MONITOR ALL CCA'S PRESSURES.

1130 - 1230 1 0 POST N BOP OTH RCD WUD 4996 4996 HPJSM, RETRIEVE WFD RCD BEARING AND RACK BACK ON 1X4" DP STAND.
- MONITOR ALL CCA'S PRESSURES.

POOH W/ 3-7/8" MOTOR ASSY ON 4" DP STDS TO TOP OF BHA.


1230 - 1400 1.5 0 POST N MILL OTH NA RIG 4996 4996
- MONITOR WELL ON TRIP TANKS, WELL IS STATIC.
- MONITOR ALL CCA'S PRESSURES.

HPJSM, POOH & L/D W/ 3-7/8" MOTOR BHA.


1400 - 1530 1.5 0 POST N MILL HT MILL RAC 4996 4996
- FLOW CHECK 15 MIN AT TOP OF BHA, WELL IS STATIC.
- MONITOR ALL CCA'S PRESSURES.

HPJSM, INSTALLED NEW WFD BEARING WITH 1 STAND 4" DP'S & RACKED ON
1530 - 1615 0.75 0 POST N BOP NU RCD WUD 4996 4996
DERRICK.
- MONITOR ALL CCA'S PRESSURES.

HPJSM, P/U & M/U 6-1/8" CO ASSY AS FOLLOW: 6-1/8" NEW PDC BIT (SN#
1615 - 1800 1.75 0 POST N CT HT BHA RIG 4996 4996 7916315), BIT SUB W/ FLOAT, WFD FLOAT VALVE (FLAPPER), 4 JT 4-3/4" DC, XO,
2 JT 4" HWDP'S, 4-3/4" DRLG. JAR, 3 JTS 4" HWDP'S.
- MONITOR ALL CCA'S PRESSURES.

RIH W/ 6-1/8" CO ASSY TO 1500'.


1800 - 2000 2 0 POST N MILL TI STHDP RIG 4996 4996 0 1500
- FILL & BREAK CIRC EACH 10 STANDS.
- MONITOR THE WELL ON TRIP TANK, WELL STATIC.

HPJSM, MU 4" DP WITH WFD BEARING ASSEMBLY & LAND BEARING INSIDE RCD
HOUSING & SECURE SAME.
2000 - 2130 1.5 0 POST N BOP NU RCD WUD 4996 4996 - CALIBRATE & FUNCTION TEST SLB MUD LOGGING SENSORS & FLOW METERS.
- CHECK & CONFIRM NO ANY LEAK IN MUD SYSTEM, DRY LOCATION & ZERO
DISCHARGE SYSTEM.
- MONITOR ALL CCA'S PRESSURES.

RIH & TAG TOC @ 1707', SET PARAMETERS, CLEAN OUT & ENLARGE 3-7/8" PILOT
2130 - 0000 2.5 0 POST N MILL RW MILL RIG 4996 4996 1707 1738
HOLE TO 6-1/8" WITH 85 PCF BRINE UNTIL BREAK THRU CEMENT AT 1738'.
- MONITOR ALL CCA'S PRESSURES DURING CLEAN OUT CEMENT.

0000 - 0230 2.5 0 POST N MILL RW MILL RIG 4996 4996 1738 1915 REAM & WASH DOWN AND TAG TOC AT 1915'
- MONITOR ALL CCA'S PRESSURES DURING CLEAN OUT CEMENT.

PUMP HI-VIS & CIRCULATE HOLE CLEAN WITH 85 PCF BRINE UNTIL SHAKERS
0230 - 0400 1.5 0 POST N MILL CIRC MPMP RIG 4996 4996
CLEAN.
- MONITOR ALL CCA'S PRESSURES.

0400 - 0430 0.5 0 POST N MILL OTH NA RIG 4996 4996 FLOW CHECK FOR 30 MIN, WELL IS STATIC.
- MONITOR ALL CCA'S PRESSURES.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DMMM-7 WORKOVER-6 BI-90
Print Date: 06/18/2024 06:19 04/17/2024 - 06/30/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

P/T CASING TO 500 PSI IN STAGES (100 PSI EACH STAGE) WITH 85 PCF BRINE.
0430 - 0459 0.5 0 POST N MILL OTH NA RIG 4996 4996
(HOLD-OK)
-MONITOR ALL CCA'S WHILE PRESSURE TEST, NO CHANGES.
Workover Objectives
Foreman Remarks

- ODF CORRECTION= -20 FT.


===================================================================================================DMMM-7 8"X10" CCA PRESSURE:
- 8"X10" CCA WAS BLED FROM 250 PSI TO 100 PSI (CO & LEL: OR - H2S: 7 PPM) @ 03:00 HRS, BLEED TIME: 5 MINUTES. TIME SINCE LAST BLEED IS 44 HRS.
- MONITOR 8"X10" CCA PRESSURE: 190 PSI @ 5:00 HRS. (2 HOURS BUILD UP TIME)
=======================================================================================================
- READY ON LOCATION 470 BBLS OF 160 PCF MICROMAX NACL/ POLYMER KILL MUD IN SLB MI-SWACO TANKS.
=======================================================================================================
- CUTTING SKIPS SHIPPED TODAY:- 0 SKIPS, TOTAL OF WELL:- 3 SKIPS.
=======================================================================================================
>>NEXT LOCATIONS:
- SDGM-6 KOM HELD ON 12, FEB, 2024, 0% STRIP-OUT & 0% WELLSITE WORK.
=======================================================================================================
>> ARAMCO POB:
- ARAMCO MATERIAL EXPEDITOR AHMED, HUSSAIN A #818699 ON LOCATION.
- ARAMCO MATERIAL EXPEDITOR ALTANEM, SALEH A #8350279 ON LOCATION.
- SAOWOD SAFETY ADVISOR ALLAN KIRBY GANELO ID# 8451165 ON LOCATION.
- SAOWOD SAFETY ADVISOR SANDEEP DAULE ID# 8383055 ON LOCATION.
- DTH DISPATCHER ALGRNI, AWWATH H #820894 ON LOCATION (MORNING SHIFT).
- DTH DISPATCHER MUTAIRI, BADER M #820831 ON LOCATION (AFTERNOON SHIFT).
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
160 PCF 15 9.4 API 0 Volts 0.6 9.54 58,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
168 38.8 HTHP 52 42 0 29 / 46 MMX-WBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 8 26 48 22 / 26 0 440 N/A
50

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF N/A 2.2 API 0 Volts 1 9.6 284,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 110 0 HTHP 81.7 21 0 5/6 VB N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 16 18.3 4/6 N/A 162,800 N/A
49

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF N/A 2.2 API 0 Volts 0.9 9.1 285,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
110 0 HTHP 81.7 20 0 5/6 VB N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 17 18.3 5/6 N/A 162,800 N/A
49

MUD CAOH2 CAUST H2S-SCAV-L H2S-SCAV-S


TREATMENT 2 ( 25KG ) 2 ( 25KG ) 3 ( 55GL ) 10 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/09/2024 AS NORMAL N/A SEASONAL 2,135 PRE-TOUR MEETING
REQUIRED

Company AM RIG BAR RUE WUD SGR RIG ARM SCM MI3 ARM HTS

Category CTRG RIG DFMS H2S MPD MLS OTHR OTHR PCS WMS WSC WTSE
PERSONNEL
15 38 2 2 4 2 20 6 2 8 2 5
Total
AND SERVICES No. of Persons
106
INFORMATION
Personnel on Loc. Hrs. 0 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
AB-6426

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DMMM-7 WORKOVER-6 BI-90
Print Date: 06/18/2024 06:19 04/17/2024 - 06/30/2024
Report ID: OPERLMTDMRREP

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3207 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 03/24/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

ADC-46L @ UTMN-3207 Limited Morning Report for 06/18/2024


Objective : (MK-1 SINGLE Foreman(s)MARICHE, ABDELKADER
D&WO Morning Report (Service Providers View) Charge #: LATERAL ACROSS KHUFF- Engineer OMBE, EBIKEBENA MARK
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23057-3207) B.) Manager MEQBEL, ALI NASSER
ADC-46L
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 2725 013-577-39 11 013-664-88 02 SLB
Date: Tuesday 06/18/2024 UTMN-3207 (0) UTMN_3207_0 OTHER VSAT CONTRACTOR /CLERK VSA T
013-829-77 46/829-764 6 ADC 013-577-39 68

Last 24 hr operations Next 24 hr plan


DISPLACE WELL TO 70 PCF BRINE - LAND TBG HGR - P/T TCA AND TBG - SECURE WELL. N/D BOPE, N/U X-TREE AND P/T SAME, RETRIEVE PLUG F/ R-NIPPLE, PERFORM FINAL DRIFT,
INSTALL BPV AND RELEASE RIG
Location Next Location
162 KM FROM DMG UTMN-3229
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
17,785 Size 10454 10454 Size 11,685 17,780 12,202 Top
Formations Comments
9 5/8 4 1/2 Depth
JILH 10,007 46 FT DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) JLDM 10,278 61 FT DEEPER
17785 (Date) 100 0 162 BJDM 10,430 57 FT DEEPER
75.2 (04/03/2024@1700 ) MDJR 10,680 21 FT DEEPER
SUDR 11,439 27 FT SHALLOW
SDDM 11,748 6 FT SHALLOW
KHFF 12,065 10 FT SHALLOW
KFAC 12,103 17 FT SHALLOW
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONTINUE REVERSE CIRCULATION WITH RIG PUMPS BY PUMPING FILTERED


WATER
> PUMP THRU WH SOV @ 3.0 BPM 135 PSI UNTIL SUCCESSIVE TESTS :
0500 - 0945 4.75 0 EOW C COMP CIRC MPMP RIG 17785 17785 > NTU & TSS (NTU < 50, TSS < 0.05%) ARE ACHIEVED IN 3 SUCCESSIVE TESTS
TAKEN IN 60 MIN APART.
> NTU: 43, TSS: 0.02 %.
> NTU: 35.0, TSS: 0.01 %.
> NTU: 28, TSS: 0.01 %

DIRECT DISPLACED WELL TO 70 PCF INHIBITED FILTERED NACL BRINE @ 3.0 BPM.
0945 - 1430 4.75 0 EOW C CT CIRC MPMP RIG 17785 17785
> PUMPED 25 BBL HVP AHEAD @ 3.0 BPM & 100 PSI.
> 70 PCF FILTERED INHIBITED NACL BRINE IN / OUT.

1430 - 1530 1 0 EOW C CT CIRC MPMP RIG 17785 17785 DIRECT DISPLACE AND SPOT 10 BBL SPACER AND 166 BBL CACL2 BRINE @3 BPM.
> 5 BBL SPACE INSIDE THE STRING IN ANNULUS.

LAND TUBING HANGER.


1530 - 1700 1.5 0 EOW C COMP HT TBG GEP 17785 17785 > DRAINED BOP, LANDED BAKER TUBING HANGER (S/N: AT37949688-08, P/N
R89155-20H203).
> TIGHTENED THE LOCK DOWN SCREWS ON THS BY BAKER ENGINEER.

PRESSURE TEST TCA WITH NACL2 70 PCF BRINE.


1700 - 1830 1.5 0 EOW C COMP PTST PKR RIG 17785 17785 > R/U HARD LINES, FLUSHED W/ NACL2 BRINE & P/T TO 7000 PSI.
> P/T TCA TO 6500 PSI WITH 70 PCF FILTERED NACL2 BRINE FOR 30 MIN - OK.
> VOLUME PUMPED & VOLUME RETURNED 10 BBLS.

PRESSURE TEST TUBING WITH CACL2 70 PCF BRINE.


> R/U HARD LINES TO RIG FLOOR , FLUSHED W/ CACL2 BRINE & P/T TO 4000 PSI.
1830 - 2000 1.5 0 EOW C COMP PTST TBG RIG 17785 17785
> P/T TUBING TO 3500 PSI WITH 70 PCF FILTERED CACL2 BRINE FOR 30 MIN -
OK.
> VOLUME PUMPED & VOLUME RETURNED 3 BBLS.

2000 - 2030 0.5 0 EOW C COMP OTH TBG RIG 17785 17785 R/D TEST ASSY & CEMENT LINES.
> HPJSM PRIOR RIG UP SLICKLINE.

R/U QNC SLICKLINE WITH BOP/LUBRICATOR AND P/T SL PCE 2000 PSI - OK .
> PERFORMED FOLLOWING RUNS:
> RUN # 01 : RIH AND BRUSH UPPER R- NIPPLE.
2030 - 0200 5.5 0 EOW C COMP SET PLUGN QEM 17785 17785 0 2500
> RUN # 02 : RIH WITH PRR PLUG AND SET INUPPER R-NIPPLE.
> RUN # 03 : RIH WITH CHECK SET TOOL. PULL TEST TO 1200 LBS - CONFIRMED
PLUG SET - OK.
> RUN # 04: RIH WITH PRONG AND SET THE SAME.

0200 - 0300 1 0 EOW C COMP SET PLUGN QEM 17785 17785 0 400 RIH AND SET INTERWELL RETRIEVABLE BRIDGE PLUG @ 400 FT.
> SET PLUG UNDER INTERWELL ENGINEER SUPERVISION.
0300 - 0330 0.5 0 EOW C COMP SET PLUGN QEM 17785 17785 400 0
R/D QNC SLICK LINE SURFACE TOOLS AND BOP EQUIPMENT.

B/O & L/D THE LANDING JOINT.


0330 - 0400 0.5 0 EOW C COMP HT TBG RIG 17785 17785
> B/O & L/D LANDING SUB FROM LANDING JNT.
> R/D TESCO TUBING RUNNING TOOLS.
0400 - 0459 1 0 EOW C WH SET BPV ARM 17785 17785
R/U GWSD AND INSTALLED 4" BPV IN TUBING HANGER.....ONGOING ATRPT.
Foreman Remarks

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3207 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 03/24/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

======================================== WELL OBJECTIVE =======================================================


UTMN-3207, PLANNED TO BE DRILLED AS MK1 SINGLE LATERAL WELL ACROSS KHUFF-B RESERVOIR. & COMPLETED WITH 4-1/2" 15K OH MSF.
========================================ARAMCO PERSONNEL=====================================================
- ARAMCO MATERIAL EXPEDITOR HESHAM BUOBAID #8532887 OFF LOCATION ON 06/11/2024.
- SGGDD HSE COORDINATOR BILAL AHMED VISIT RIG ON 06/07/2024.
- ARAMCO DRILLING ENGINEER OMBE, EBIKEBENA MARK #722743 ON LOCATION ON 06/14/2024 .
========================================SERVICE PERSONNEL======================================================
-IDS FOREMEN: STEVE & USMAN.
-ADC TOOLPUSHERS: HAMZA & MUHAMMAD.
====================================================HSE======================================================
DAY WITHOUT LTI - 1348
>DAY WITHOUT LTI - 1348
> DISCUSSED OPERATION: PRESSURE TESTING ANNULUS
> OPERATION: TUBING TESTING
> DISCUSSED REGARDING BRINE DISPLACEMENT
> DISCUSSED REGARDING TAKING PROPER HANDOVER ON FIRST DAY AFTER SHIFT
> DISCUSSED TO KEEP HIGH PRESSURE AREA CLEAR
> DISCUSSED ARAMCO HEAT STRESS CAMPAIGN WITH THE CREW
> DISCUSSED REGARDING MIXING BRINE - USE REQUIRED PPE - KEEP COVERALL SLEEVE ROLLED DOWN>
> ASKED CREW TO APPLY SWA FOR UNSAFE ACTS.
> PROPER IMPLEMENTATION OF PTW JSA AND SAFETY MEETINGS FOR ALL CRITICAL OPERATION
> PERFORMED DAILY HAZARD HUNT / STOP TOURS
> UPDATE CREW ABOUT SWA/ STOP CARDS AND SALAMA CARDS.

> INSPECTION: DAILY GDS INSPECTION - RIG MOVE GEARS INSPECTION .


> NEAR MISS: (FOR THE MONTH) : 1-SLS # 7109057- 2-SLS # 71450856, 3-SLS # 7188772 , 4- 4-SLS # 7215680 .
> TOTAL STOP CARDS: TOTAL STOP CARDS: 37 (10 UNSAFE ACTS, 15 UNSAFE CONDITIONS, 12 POSITIVE HSE CULTURE), SALAMA CARDS: 05.
============================================ AUDITS ==========================================================
> QSI-1 2024: TOTAL FINDINGS: 28 CLOSED: 28, OPEN: 0 CLOSE PERCENTAGE: 100%.
> RHSEI-1 - 2024 __TOTAL FINDINGS: 33_CLOSED: 33_OPEN: 0_CLOSURE PERCENTAGE: 100%

=========================================VACUUM TANKERS=====================================================

* 02 VACUUM TANKERS : 1179 TRA - 3952 BRA

============================================NEXT WELL ========================================================


- NEXT WELL: UTMN-3229 (100% COMPLETED). WATER WELLS UTMN-3508 / 3509 .
=========================================NEAR BY RIG & SITE======================================================

=======================================LAST CONTRACTOR VISIT====================================================


- MURTADA ALHASSAN IDS SUPERINTENDENT VISITED THE RIG ON 05/27/2024.
- MAKSIM ANTONOV IDS PROJECT MNGR VISITED THE RIG ON 04/01/2024.
- ADC RM JAFFER AL-ALI VISITED THE RIG ON 05/28/2024.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 17,785 91.2 319 0 12,202 1465.32 -1229.28 6,275.16 0.19

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
92 PCF 0 0 API 0 0 Volts 0 10.5 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 N/A
27
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
92 PCF 0 0 API 0 0 Volts 0 10.5 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 N/A
27

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
10RR 16,845 17,785 DP Av DC Av Bit HHP 20 140 M423 5.875 SMT
Pressure GPM Jet Vel 1,379.02 N/A 64 I-Row O-Row DC Location Bearings
3,400 240 198 4 1 CR A X
BIT DATA
Serial Number Type Jets TFA
SM2865 XS613C 3 x 13 / 0.389
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 70.3 235 250 200 6 70.3
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3207 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 03/24/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/09/2024 05/01/2024 MODERATE NA SEASONAL 1,349 STOP WORK
AUTHORITY

Company RIG BC NC1 RIG SMI BLH SDM TK3 RIG ARM TK3 ARM GEP

Category CTRG PSSC PSSC RIG DFMS LHES LWD OTHR OTHR OTHR WSC WSC WHES
PERSONNEL
13 1 0 37 2 1 0 1 65 2 2 1 1
Total
AND SERVICES No. of Persons
126
INFORMATION
Personnel on Loc. Hrs. 24 24 0 24 24 24 0 24 24 24 24 24 24

Operating Hours. 0 24 0 12 12 12 0 12 12 12 12 24 12

Standby/Tankers
TRUCKS/BOATS
ab6509

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 500 637 1500 2200 620

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MZLJ-63 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:19 05/01/2024 - 09/11/2024
Report ID: OPERLMTDMRREP

ADC-47 @ MZLJ-63 Limited Morning Report for 06/18/2024


Objective : (DRILLED AS Foreman(s)SLIMANI, LAKHDAR / BECHKA, MOHAMED LAMINE
D&WO Morning Report (Service Providers View) Charge #: GAS-DELINEATION IN MZLJ) Engineer ALSHAMMARI, MESHARI FARHAN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (75-23086-0063) Manager BENAICHA, MOHAMED
ADC-47
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 2390 0135784968 0138297747 //01382976 47
Date: Tuesday 06/18/2024 MZLJ-63 (0) MZLJ_63_0 CONTRACTOR /CLERK VSA T
0135784967 /013578496 5

Last 24 hr operations Next 24 hr plan


CHC. WIPER TRIP , CHC, FLOW CHECK, POOH POOH TO SURFACE, BOP TEST , R/U BAKER LOGGING EQUIP, LOGGING OPS.
Location Next Location
288 KM FROM DHRN MG, FR KHERAIS TAKE MAZALIJ ROAD,DRIVE 90 KM,TURN LEFT,SKID ROAD 7KM (NO SIGNAL). *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,690 Last Csg Size MD TVD Size Top
13 3/8 4485 4485 Formations Comments
Depth
SULY 3,790 230 ' SHALLOWER.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) HITH 4,390 215 ' SHALLOWER.
9690 (Date) 100 0 288 ABAR 4,790 215' SHALLOWER.
33.9 (05/15/2024@0800 ) ABBR 4,920 202' SHALLOWER.
ABCR 5,120 230' SHALLOWER
PADS 5,320 181 ' SHALLOWER.
ABDR 5,350 192' SHALLOWER.
HNIF 5,830 210' SHALLOWER.
TQMN 6,290 200' SHALLOWER.
DHRM 6,740 NOT IN PROGRAM
LFDR 6,970 209' SHALLOWER
HURN 7,690 184' SHALLOWER
MRRT 8,060 173' SHALLOWER
MNJR 8,290 145' SHALLOWER
JILH 9,120 120' SHALLOWER.
JLDM 9,510 153' SHALLOWER.
BJDM 9,660 164' SHALLOWER.
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0630 1.5 0 12 N DRLG CIRC MPMP RIG 9690 9690 GEOLOGICAL CIRCULATION AS PER ARAMCO GEOLOGIST CONFIRMED 9-5/8 CSG
POINT @ 9,690'(30' INTO BJDM).

0630 - 0845 2.25 0 12 N DRLG CIRC MPMP RIG 9690 9690 SWEEP HOLE WITH HVP & CIRCULATE HOLE CLEAN TILL SHECKERS CLEAN.WITH
100% RETURN .
0845 - 0900 0.25 0 12 N DRLG WCNT NA RIG 9690 9690
FLOW CHECK - WELL STATIC.

0900 - 1000 1 0 12 N DRLG ST STDP RIG 9690 9690 9690 9250 POOH 5 STDS FOR WIPER TRIP TO 9250 FT , HOLE IN GOOD CONDITION .
> METAL DISPLACEMENT -OK
1000 - 1030 0.5 0 12 N DRLG WCNT NA RIG 9690 9690
FLOW CHECK -WELL STATIC

CONTINUE POOH W/ 12" DRILLING BHA AT CONTROLLED SPEED TO 13-3/8" CSG


1030 - 1900 8.5 0 12 N DRLG ST STDP RIG 9690 9690 9250 4485
SHOE .
> BACKREAMING & WORKED TIGHT SPOT FROM 9150FT TO 8800FT .
1900 - 1930 0.5 0 12 N DRLG WCNT NA RIG 9690 9690
FLOW CHECK - WELL STATIC

RUN BACK FREELY W/ 12" DRILLING BHA TO BTM, WASH DOWN LAST STAND.
1930 - 0145 6.25 0 12 N DRLG ST STDP RIG 9690 9690 4485 9690 HOLE IN GOOD CONDITION.
> FILL UP STRING EVERY 20 STDS .

SWEEP HOLE WITH HVP & CIRCULATE TILL SHACKERS CLEAN WITH 100% RETURN.
0145 - 0415 2.5 0 12 N DRLG CIRC MPMP RIG 9690 9690 > SPOTTED LOGGING PILL.
> LAST CIRCULATION IN THE WELL @ 04:00HRS.
> PERFORMED OPEN HOLE STICKING TENDENCY TEST ... ON GOING @ RT
0415 - 0445 0.5 0 12 N DRLG WCNT NA RIG 9690 9690
FLOW CHECK - WELL STATIC.

HPJSM. POOH WITH 12" DRILLING BHA TO 13-3/8" CSG SHOE FREELY , HOLE IN
0445 - 0459 0.25 0 12 N DRLG ST STDP RIG 9690 9690 9690 9290
GOOD CONDITION .
> FLOW CHECK AFTER POOH 05 STDS, WELL STATIC.
Foreman Remarks

MAZALIJ 63 (MZLJ-63) WELL IS PROPOSED TO BE DRILLED AS A VERTICAL GAS DELINEATION WELL TARGETING UNAYZAH-B/C RESERVOIR AS A
PRIMARY TARGET, WITH UNAYZAH-A RESERVOIR AS A SECONDARY TARGET. THE WELL WILL BE DRILLED TO A TOTAL DEPTH OF 13,509 FT (140 FT
TVD INTO QUSB FORMATION).
*****************************CASING SETTING DEPTHS**************************************
- PLANNED 30" CASING SET AT 75 FT
- PLANNED 24" CASING SET AT 200 FT
- PLANNED 18-5/8" CASING SET AT 1186 FT, (50' INTO AHMADI).ACTUAL AT 1190 FT.
- PLANNED 13-3/8" CASING SET AT 4705 FT, (100' FT INTO HITH). ACTUAL #4485
- PLANNED 9-5/8" LINER SET AT 9854 FT MD, (30' FT INTO BJDM), ACTUAL ###

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MZLJ-63 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:19 05/01/2024 - 09/11/2024
Report ID: OPERLMTDMRREP

- PLANNED 7" LINER SET AT 12,999 FT MD, 400' IN KFDA, ACTUAL ###
- PLANNED 4-1/2" LINER SET AT 13500 FT MD, (140 FT INTO QUSB).
****************************** ERP ***********************************************************
* STAGING AREA #1: LOCATED AT 1.2 KM N FROM WELL MZLJ-63.
* STAGING AREA #2: LOCATED AT 3.5 KM N FROM WELL MZLJ-63.
****************************** ARAMCO PERSONNEL ON LOCATION *************************
- ARAMCO MATERIAL EXPEDITOR SALEM MURTADHA #754126 ON LOCATION SINCE JUNE 11, 2024
- ARAMCO GEOLOGIST MAHBOUB M.ALQAHTANI #788166 ON LOCATION SINCE 6/04/2024.
- ARAMCO GEOLOGIST ABDULAZIZ ALFOZAN #790162 ON LOCATION SINCE 6/09/2024.

*******************************SERVICE PERSONNEL ***************************************************


02 EMEC MUD ENG
SLB CLOSE LOOP SYS CREW & EQPTS ON LOCATION SINCE 5/6/2024.
X-LOG MUD LOGGING & CREW ON LOCATION SINCE 5-10-2024.
HALLIBURTON CORING CREW & EQTS ON LOCATION SINCE 06/07/2024
******************************* RENTAL EQPT *********************************************************
- 8-1/2" NAPESCO HYDRO MECHANICAL D-JAR ON LOCATION SINCE 6-04-2024.
- 2 EA 8-1/4" SAMA PBL ON LOCATION SINCE 6-04-2024.
****************************************** RIG ADC-47 JOURNEY MANAGEMENT ***************************************************
* 288 KM FROM DAHRAN MG, FROM KHURAIS TAKE MAZALIJ ROAD & DRIVE FOR 90 KM THEN TURN LEFT, 7 KM SKID ROAD WITH NO SIGNAL COVERAGE.
* RIG ARAMCO CAR AB-0731 IN DHAHRAN BASE AND MAINTENANCE CAR DH8888 ON LOCATION SINCE 05/30/2024.
***************************************** NEXT LOCATION *******************************************************************
* NEXT LOCATION : MZLJ-64. READINESS: 60%.
* WATER WELLS SUPPLY: MZLJ-809/810.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
78 PCF 1 3 API 3 0 Volts 4.81 10.6 105,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 13.2 HTHP 78.5 26 0 10 / 12 NCPOL 2.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 24 18.5 9 / 12 5 320 13
59
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
78 PCF 1 2.8 API 3 0 Volts 4.81 10.7 106,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 13 HTHP 78.5 25 0 9 / 11 NCPOL 2.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 24 18.5 8 / 11 5 340 12.8
58

MUD PACLV CACO3-5 CACO3-25 RD SODASH CAUST DUOVIS-NS


TREATMENT 20 ( 55LB ) 20 ( 55LB ) 20 ( 55LB ) 2 ( 55GL ) 20 ( 100LB ) 5 ( 50LBP ) 4 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
6RR 8,370 9,690 DP Av DC Av Bit HHP 23 60 M423 12 SMT
Pressure GPM Jet Vel 161.6 256.2 0 I-Row O-Row DC Location Bearings
2,380 750 N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
SM2509 XS716C POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A 306 306 306 7 Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 12 1 12 1.02 SM2509
2 Mud Motor NTH 9.625 1 9.625 38.68 PHX900017
3 Roller Reamer RIG 12 1 8.5 2.813 8.93 6 5/8 REG 6 5/8 REG 3 POINT TALLY
DRILL STRING 4 Drillcollar RIG 8.5 8.5 2.813 31.03 6 5/8 REG 6 5/8 REG SPRL TALLY
5 Roller Reamer RIG 12 1 8.5 2.813 8.9 6 5/8 REG 6 5/8 REG 3 POINT TALLY
6 PBL (Multiple Activation By Pass) SAM 8.25 1 8.25 3.5 8.15 6 5/8 FH 6 5/8 REG WES825BP387
7 Drillcollar RIG 8.5 9 8.5 2.813 275.84 6 5/8 REG 6 5/8 REG SPRL TALLY
8 Hydro-Mechanical Jar NPC 8.5 1 8.5 32.66 850-8496803
9 Drillcollar RIG 8.5 8.5 3 61.74 6 5/8 REG 6 5/8 REG SPRL TALLY
10 Crossover RIG 8.25 1 8.25 2.813 3.28 XT54 6 5/8 REG TALLY
11 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 458.48 XT54 XT54 53.3 CONV TALLY
12 Drillpipe RIG 5.5 1 6.625 5.901 1 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM TALLY

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/04/2024 6/04/2024 NA NA SEASONIAL 2,116 DAILY

PERSONNEL Company SBT ZPC SUW HCS NTH RIG EMC TUB XLG RIG ARM NCS MI3 ARM SAM BAW
Total
AND SERVICES
BITS CSR CTRG CEQS DPDS RIG DFMS ISPCT MLS OTHR OTHR PCS WMS WSC WBCS WLS 96
INFORMATION Category

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MZLJ-63 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:19 05/01/2024 - 09/11/2024
Report ID: OPERLMTDMRREP

No. of Persons 0 0 14 0 4 37 2 0 4 18 3 0 4 2 1 7

Personnel on Loc. Hrs. 0 0 24 0 24 24 24 0 24 24 24 0 24 24 24 24

Operating Hours. 0 0 0 0 24 24 24 0 24 24 24 0 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
dh-8888

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 398 N/A N/A 2400

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2315 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/07/2024 - 09/28/2024
Report ID: OPERLMTDMRREP

ADC-48 @ HRDH-2315 Limited Morning Report for 06/18/2024


Objective : (HRDH-2315 Foreman(s)MEZIANE, ABDELGHANI / MARDJI, SOFIANE
WILL BE DRILLED AS Engineer DE ABREU GONCALVES, MIGUEL ANTONIO
D&WO Morning Report (Service Providers View) Rig Charge #: HORIZONTAL MK-1 WELL Manager HARTHI, HUSSAIN AHMAD
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-48 (66-23058-2315) TARGETING UNAYZAH A THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore RESERVOIR)
882-167-77 1-2620 013-577-39 44 013-829-77 48-ADC RIG SUPT
(0500-0500) Saudi Aramco Well Wellbores:
HRDH-2315 (0) HRDH_2315_0 OTHER VSAT OTHER VSAT CONTRACTOR /CLERK VSA
Date: Tuesday 06/18/2024
013-829-76 48-CLINIC 013-577-39 46 - FCT T
013-577-39 69

Last 24 hr operations Next 24 hr plan


CEMENT 24" CSG, CUT CASING, M/U & RIH 22" RTR BHA, D/OUT CEMENT, RTR DRILL 22" HOLE RTR DRILL 22" HOLE TO 18-5/8" CP@+/- 2643'
Location Next Location
HRDH-2315 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
920 Last Csg Size MD TVD Size Top
24 610 610 Formations Comments
Depth
RUS 565 45' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UMER 695 42' DEEPER
610 (Date) 100 310 283
3.3 (06/14/2024@2200 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0530 0.5 0 28 N CSG HT PEL RIG 610 610
ROUGH CUT EXCESS CASING & L/D SAME. CHANGE ELEVATOR & R/U FALSE RT
0530 - 0700 1.5 0 28 N CSG SET SLIPS RIG 610 610
M/U & RIH ISC ON 5.5" DRIFTED DP TO FC@610' (USE 5' & 15' DP PUP JTS)

0700 - 0800 1 0 28 N CSG SET SLIPS RIG 610 610 STING IN. FILL UP CSG/DP ANNULUS W/80 PCF MUD. LEVEL AT SURFACE &
STATIC. R/U LINES
0800 - 0845 0.75 0 28 N CSG PJSM CSG SCM 610 610
PJSM. SLB FLUSH & P/T LINES TO 3000 PSI.

SLB PUMP 100 BBL WATER SPACER AHEAD, SLB MIX & PUMP 160 BBLS 118 PCF
CMT SLURRY (900 SX G CEMENT). CEMENT AT SURFACE. DROP WFD LATCH-DOWN
0845 - 1145 3 0 28 N CSG CMC CSG SCM 610 610
PLUG, SLB DISPLACE W/ 5 BBLS CMT + 10.5 BBLS WATER. BUMP PLUG WITH 1500
PSI. BLEED OFF PRESS, FLOATS HOLD. PRESSURE UP TO 700 PSI AND STING OUT,
PRESSURE DROP TO ZERO. 100% CIRC.
1145 - 1245 1 0 28 N CSG HT PEL RIG 610 610
POOH W/ISC TO SURFACE.
1245 - 1545 3 0 28 N CSG HT PEL RIG 610 610
ROUGH CUT 24" CASING. L/D SAME
1545 - 2030 4.75 0 28 N DRLG HT BHA RIG 610 610
M/U & RIH 22" RTR BHA. WASH & TAG CEMENT AT 606'
2030 - 2100 0.5 0 28 N DRLG CIRC MPMP RIG 610 610
CIRCULATE & PERFORM CSG HYDRO-TEST -OK-
2100 - 2115 0.25 0 28 N DRLG DFS TDS RIG 610 610 606 610
CLEAN OUT CEMENT AND F.SHOE

ROTARY DRILL 22" HOLE WITH 65 PCF SPUD MUD WITH 100% RETURN.
2115 - 0115 4 0 22 N DRLG D TDS RIG 610 762
> P/UP HYD JAR AT 18:00, WEIGHT BELOW JAR= 76 KLB
> OBSERVED TOTAL LOSSES AT THIS DEPTH

0115 - 0459 3.75 0 22 N DRLG D TDS RIG 762 920 CONT. BLIND RTR DRILL 22" HOLE WITH PHPA MUD
> PUMP 80PCF MUD CUP BACK SIDE AT 02 BPM
Foreman Remarks

OBJECTIVE: HRDH-2315 WILL BE DRILLED AS HORIZONTAL MK-1 WELL TARGETING UNAYZAH A RESERVOIR

---------------------------------------------------------------------- HSE ----------------------------------------------------------------------------


DISCUSSED THE WORKING AT HEIGHT CAMPAIGN WITH CREW
DISCUSSED WITH CREW THAT WHILE WORKING AT HEIGHT 100% TIE OFF
DISCUSSED HSE ALERT 50-24 - FINGER INJURY DURING LAYING DOWN DRILL PIPES
DISCUSSED THE AD-LSR WORK AUTHORIZATION
DISCUSSED WITH CREW WHAT IS THE DIFFERENCE BETWEEN PTW AND SALAMA CARDS
EMPHASIZE THE CREW ABOUT STOP CARDS AND STOP TOUR WRITING
DISCUSSED THE HIGHLIGHTED STOP CARDS WITH CREW

STOP CARDS: 32
OBSERVATION-INTERVENTION: 08
PTW: 12
DRILLS: 2 X TRIP DRILL + 01 H2S DRILL
NEAR MISS: NONE
----------------------------------------------------- ARAMCO PERSONNEL -------------------------------------
- ARM CLERK MOHAMMED ABID KHAN #8163763 LEFT LOC FOR DAYS-OFF SINCE 13 JUNE 2024
- FCT MOHAMMED AL SADUN # 764539 ON LOCATION SINCE 12 JUNE 24
- ARAMCO MATERIAL EXPEDITOR HAMED M. AL HABES # 8341694 LEFT LOCATION 14 MAY 2024 TO RIG ADC-35
-------------------------------------------------------- RIG VISITS ---------------------------------------------------
- MICHEAL MACLEAN ADC MANAGER # 120828 VISITED THE RIG ON 7 JUNE-24 AND 10 JUNE 24
---------------------------------------------------- THIRD PARTY PERSONNEL --------------------------------------
- EMEC MUD ENGINEER ON LOC. FR 3/9/2024

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2315 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/07/2024 - 09/28/2024
Report ID: OPERLMTDMRREP

- SLB CLOSE LOOP CREW ON LOC FR 3/9/2024


---------------------------------------------------- RENTALS --------------------------------------------------
- WELLLINK LAPTOP ON LOC
- RECEIVED TAQA 12" SHOCK TOOL (ST5-1200-145) ON 11 JUNE 24 AT 19:30
- RECEIVED TAQA 12" SHOOK TOOL (ST-1200-128) ON 16 JUNE 24 AT 08:30
- RECEIVED TAQA HYD-MECH D.JAR (DJ10-950-022) ON 16 JUNE 24 AT 08:30
---------------------------------------------- WELL SITE EQUIPMENT ----------------------------------------

--------------------------------------------------- NEXT LOCATION---------------------------------------------

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 8 API 0 0 Volts 12.32 10 2,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 85 28 0 8 / 10 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 19 15 8 / 10 12.5 240 0
70
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 10 API 0 0 Volts 3.79 10 2,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
85 0 HTHP 94 30 0 15 / 22 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 14 6 11 / 14 25 240 0
68

MUD BENT NACL CAUST XC BARITE


TREATMENT 6 ( 2500L ) 4 ( 2200L ) 5 ( 55LB ) 10 ( 25LB ) 15 ( 5000L )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
2 610 920 DP Av DC Av Bit HHP 50 50 425 22 SMT
Pressure GPM Jet Vel 54.02 59.53 981 I-Row O-Row DC Location Bearings
1,700 1,000 466 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
RV1671 GSI06 4 x 15 / 0.69
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 7.7 170 173 168 170 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 1 22 1.82 7-5/8" REG RV1671
2 Near Bit Roller Reamer RIG 44 1 14 3 9.56 8 5/8 REG 8 5/8 REG 208 3 POINT 528042299
3 Shock Sub OJR 12 1 12 3 14.01 7 5/8 REG 7 5/8 REG 208 1200128
4 Roller Reamer RIG 44 1 14 3 9.14 8 5/8 REG 8 5/8 REG 208 3 POINT 52842274
DRILL STRING 5 Drillcollar RIG 9.5 1 14 3 30.36 8 5/8 REG 8 5/8 REG 208 SPRL
6 Roller Reamer RIG 44 1 14 3 9.25 8 5/8 REG 8 5/8 REG 208 3 POINT 529040232
7 Drillcollar RIG 9.5 11 14 3 319.92 8 5/8 REG 8 5/8 REG 208 SPRL
8 Hydro-Mechanical Jar OJR 9.5 1 9.5 3 30.49 7-5/8 REG 7-5/8 REG 208 DJ10950022
9 Drillcollar RIG 9.5 3 14 3 85.99 8 5/8 REG 8 5/8 REG 208 SPRL
10 Crossover RIG 9.5 1 14 4 3.62 7 5/8 REG 7 5/8 REG 165 425513A
11 Drillcollar RIG 8.5 6 14 3 149.12 8 5/8 REG 8 5/8 REG 165 SPRL
12 Crossover RIG 1 1 14 4 3.6 7 5/8 REG 7 5/8 REG 165 425512A
13 Heavy Weight Drillpipe (HWDP) RIG 6.625 9 6.625 5 242.85 6-5/8FH 6-5/8FH 58.1 CONV
14 Crossover RIG 8.5 1 14 4 3.3 7 5/8 REG 7 5/8 REG 60.87 425511A
15 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 6.625 5 242.83 6-5/8FH 6-5/8FH 58.1 CONV
16 Drillpipe RIG 5.5 1 6.625 5.901 30 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A SEASONAL N/A N/A 3,215 2

Company SUW RIG EMC RIG MI3 ARM

Category CTRG RIG DFMS OTHR WMS WSC


PERSONNEL
14 39 1 15 4 2
Total
AND SERVICES No. of Persons
75
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24

Operating Hours. 0 24 12 12 24 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2315 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/07/2024 - 09/28/2024
Report ID: OPERLMTDMRREP

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 498 54 101 N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2404 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/20/2024 - 07/20/2024
Report ID: OPERLMTDMRREP

ADC-49 @ HRDH-2404 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (MK-1 PRE-SET GAS Foreman(s)JUMAH, MOHAMMED FAISAL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23058-2404) WELL TARGETING KHUFF-B Engineer ALJAAFRI, MOHAMMED ABDULRAHMAN
ADC-49
RESERVOIR.) Manager DOSSARY, AYEDH HAMAD
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: RIG FORMAN VSAT CONTRACTOR /CLERK VSA T
Date: Tuesday 06/18/2024 HRDH-2404 (0) HRDH_2404_0 013-576-25 51 013-829774 9/013-576- 3282

Last 24 hr operations Next 24 hr plan


PT BOP, PU/MU 8-3/8" RSS BHA, RIH, CO CMT & DV, POH, RIH W/ S-MILL, DRESS DV POH & L/D S-MILL, RIH, CO CMT, DISP MW, PT CSG, CO S/T, DRILL 10' FM, FIT, RSS DRILL 8-3/8"
HOLE
Location Next Location
HRDH HRDH-1964
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,053 Last Csg Size MD TVD Size Top
9 5/8 9044 9044 Formations Comments
Depth
MDTM 4,260 66' DEEP
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SULY 4,795 61' DEEP
9053 (Date) 100 0 261 HITH 5,400 62' DEEP
22 (05/27/2024@0400 ) ABAR 5,843 19' DEEP
ABCR 6,044 33' SHALLOW
ARBD 6,200 10' SHALLOW
HNIF 6,929 NOT IN PRGM
HURN 8,315 13' DEEP
MRRT 8,430 16' DEEP
MNJR 8,570 4' SHALLOW
JILH 8,718 AS PRGM
JLDM 8,893 9' DEEP
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0945 4.75 0 12 N BOP BOPT BOP RIG 9053 9053
PRESSURE TEST 13-5/8" CLASS 'A' 10M BOPE AS PER ARAMCO POLICY.
0945 - 1015 0.5 0 12 N BOP SDR1 NA RIG 9053 9053
CONDUCT ACCUMULATOR DRILL.
1015 - 1115 1 0 12 N BOP OTH BOP RIG 9053 9053
POOH & L/D TEST PLUG ASSY.
1115 - 1230 1.25 0 12 N WH SET WBSH IWS 9053 9053
INSTALL WEAR BUSHING AS PER CIW REP.

PU/MU 8-3/8" NEW REED PDC BIT W/ BKR RSS BHA + PBL-SUB.
1230 - 1700 4.5 0 12 N DRLG HT BHA RIG 9053 9053 > PU NEWLY INSPECTED 29 X 5-1/2" HWDP & 30 X 5-1/2" DP FROM SURFACE
RACKS.
> SHALLOW TEST BKR TOOLS - OK.
1700 - 1800 1 0 12 N DRLG TI STDP RIG 9053 9053 900 3700
RIH 8-3/8" RSS BHA ON 5-1/2" DP.
1800 - 2100 3 0 12 N DRLG DFS TDS RIG 9053 9053 3700 4039
WASH DOWN TILL TAG TOC @ 3,850'. DRILL OUT CMT & DV.
2100 - 2200 1 0 12 N DRLG CIRC MPMP RIG 9053 9053
PUMP SWEEP & CIRC HOLE CLEAN WHILE DRESS DV DEPTH 3 X UP/DOWN.
2200 - 2230 0.5 0 12 N DRLG CIRC MPMP RIG 9053 9053
FLOW CHECK - STATIC. SLUG PIPE.
2230 - 2330 1 0 12 N DRLG TO STDP RIG 9053 9053 4039 900
POOH FOR STRING MILL.
2330 - 0100 1.5 0 12 N DRLG HT BHA RIG 9053 9053
PU/MU XO'S + CRTX STRING MILL.
0100 - 0215 1.25 0 12 N DRLG TI STDP RIG 9053 9053 900 4800
RIH TO 4,800'. (STRING MILL @ +/- 100' ABOVE DV).

0215 - 0415 2 0 12 N DRLG RW BIT RIG 9053 9053 4800 4950 WASH DOWN TILL DV DEPTH (STRING MILL @3,999'). DRESS DV AS PER CTRX REP
3X & CONFIRM FREE PASS - OK.
0415 - 0459 0.75 0 12 N DRLG CIRC MPMP RIG 9053 9053
PUMP HV & CIRC HOLE CLEAN.
Foreman Remarks

========================================ARAMCO PERSONNEL====================================================
- ARAMCO CLERK VICTOR BRYAN ORMIDO #8292407 ON LOC SINCE 7/19/23.
- PDP MUTAB AL-MARRI #894004 ON LOC 6/13/24.
========================================SERVICE PERSONNEL=====================================================
- EMEC MUD ENG.
- MI CLOSE LOOP CREW & EQMT.
- BKR MWD/DD CREW & UNIT.
- GEOLOG MUD LOGGING CREW & UNIT.
- SLB MUD ENG.
- WFD RCD CREW & EQMT.
==========================================RENTAL TOOLS=======================================================
- CRTX PBL-SUB.
=========================================HSE / AUDITS=========================================================
CONDUCT DAILY PRE-TOUR SAFETY MEETINGS: DISCUSS RECENT ALERTS, LESSONS LEARNED, PTW, JSA & SWA, PPE, COMMUNICATION, PLANNING AHEAD & HOUSEKEEPING.
- NEAR MISS: N/A
- INCIDENT: N/A
=====================================VACUUM TANKERS / DUMP TRUCK=================================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2404 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/20/2024 - 07/20/2024
Report ID: OPERLMTDMRREP

============================================VISITS===========================================================
- N/A
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/17/2024 AS NORMAL N/A SEASONAL 1,212 2 X DAILY
REQUIRED

Company OTH RIG EMC SMI BHI RO1 RIG ARM ARM

Category CTRG RIG DFMS DFMS LWD MLS OTHR OTHR WSC
PERSONNEL
14 44 1 1 3 4 20 2 1
Total
AND SERVICES No. of Persons
90
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 12 12 15 0 12 12 24

Standby/Tankers
TRUCKS/BOATS
AB-5336

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 N/A 500 200 109 2500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2410 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/26/2024 - 07/29/2024
Report ID: OPERLMTDMRREP

ADC-51 @ HRDH-2410 Limited Morning Report for 06/18/2024


Objective : (MK-1 PRE-SET Foreman(s)NADOR, LASZLO TAMAS
D&WO Morning Report (Service Providers View) Rig Charge #: WELL TO BE DRILLED IN THE Engineer ALJAAFRI, MOHAMMED ABDULRAHMAN
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-51 (66-23058-2410) SOUTH OF HRDH, TARGET Manager DOSSARY, AYEDH HAMAD
Daily Onshore UNYZ-C RES.) THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 8821677712 775 5726525 /CLERK VSA
Date: Tuesday 06/18/2024 HRDH-2410 (0) HRDH_2410_0 T
5723427

Last 24 hr operations Next 24 hr plan


ROTARY DRILL 12" VERT HOLE, TAKING SURVEY 30 FT OFF BTM. ROTARY DRILL 12" VERT HOLE TO CP @ +/- 10,460 FT (30 FT INTO BJDM).
Location Next Location
283 KM FROM DMG, YABRYEEN ROAD AFTER HRDH CITY. HRDH-2377
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,300 Last Csg Size MD TVD Size Top
13 3/8 5372 5372 Formations Comments
Depth
MDTM 5,330 53 FT SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SULY 5,954 40 FT SHALLOWER
7700 (Date) 100 1,600 283 HITH 6,592 44 FT SHALLOWER
15.5 (06/02/2024@1700 ) ABAR 7,087 56 FT SHALLOWER
ABBR 7,218 63 FT DEEPER
ABCR 7,336 42 FT DEEPER
AD2A 7,492 38 FT SHALLOWER
UHFR 8,119 12 FT DEEPER
BUHR 8,275 6 FT DEEPER
HDRR 8,423 22 FT SHALLOWER
BHDR 8,659 52 FT SHALLOWER
DHRM 8,884 42 FT SHALLOWER
LFDR 8,959 34 FT SHALLOWER
BLFR 9,079 1 FT DEEPER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

DRILL AHEAD 12" VERTICAL HOLE WITH SPERRY SUN MWD/GR+WFD PBL SUB. MW
IN/OUT TO 85 PCF.
0500 - 2330 18.5 0 12 N DRLG D TDS RIG 7700 8950 > TAKE SURVEY EA 2 STDS DRILLED 30 FT OFF BTM
> SWEEP HOLE WITH 50 BBLS DRILL'N SEAL EACH STD.
> FOLLOW UP GAS WELLS INTEGRATED VERTICAL HOLE DRILLING PRACTICES
> PERFORM FLOW CHECK @ EACH CONNECTION - WELL STATIC.
2330 - 0000 0.5 0 12 N DRLG RR TDS RIG 8950 8950
TOP DRIVE SERVICE.

DRILL AHEAD 12" VERTICAL HOLE WITH SPERRY SUN MWD/GR+WFD PBL SUB. MW
IN/OUT TO 85 PCF.
0000 - 0400 4 0 12 N DRLG D TDS RIG 8950 9300 > TAKE SURVEY EA 2 STDS DRILLED 30 FT OFF BTM
> SWEEP HOLE WITH 50 BBLS DRILL'N SEAL EACH STD.
> FOLLOW UP GAS WELLS INTEGRATED VERTICAL HOLE DRILLING PRACTICES
> PERFORM FLOW CHECK @ EACH CONNECTION - WELL STATIC.
0400 - 0459 1 0 12 N DRLG SURV MWD SPS 9300 9300
ACCUMULATED TIME FOR TAKING SURVEY WITH MWD.
Foreman Remarks

======================================PERSONNEL============================================
- ARAMCO RIG CLERK DARWIN CABERIO ON LOCATION SINCE 02/10/2023.
- ARAMCO NGGDD FCT MUSHABAB AL AHMARI OFF LOCATION 06/09/2024.
- AD RIG MANAGER GOHAR PARVEZ VISIT RIG 06/11/2024.
======================RENTAL TOOLS & EQUIP===========================================
- COUGAR 8" DRILLING JAR SER# DJ6-800-432 ON LOCATION 06/13/2024.
- 100 BBL 20% VDA ACID ON LOCATION IN OILSERVE TANKER FROM 06/16/2024.
=======================HSE========================================================
- CONDUCTED PRE-TOUR SAFETY MEETING: DISCUSSED AND PROJECTED LINE OF FIRE VIDEO -AWARENESS FOR LINE OF FIRE RELATED TO DIFFERENT TASKS ( STANDING POSITIONS, WORK AY
HEIGHT, ELECTRICALS LINE OF FIRE, VEHICLES AND OFF LOADING LINE OF FIRE), DISCUSSED HEALTH DECLARATION AND ITS IMPORTANCES RELEVANCY WITH TASKS, DISCUSSED PROPE
PLANNIG OF TASKS AND MITIGATION OF THEIR RISKS, DISCUSSED STOP WORK AUTHORITY TO BE EXERCISED IN CASE OF UNSAFE ACTS AND CONDITIONS, DISCUSSED OPERATIONAL HAZARDS
AND MITIGATION OF THEIR RISKS, FOLLOW ARAMCO GAME PLAN

- DRILLS: 1 X H2S DRILL, 2 X PIT DRILLS.


- HSE ALERT 58-24 - STRUCK BY MANUAL TONGS, HSE ALERT 60-24 - POISONOUS ANIMALS & INSECTS AT RIG SITES.
===============================NEARBY SITES=================================================
- SITE-22 / HRDH-2428 /3.98 KM NE OF RIG ADC-51/CONTACT 577-3931/3925
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 7,834 2.7 79.83 190 7,832 16.26 21.73 89.05 0.06
0 8,022 2.78 86 188 8,019 16.6 24.44 96.93 0.16
0 8,209 2.74 81.28 187 8,206 16.9 27.17 104.97 0.12
DAILY SURVEY 0 8,400 3.07 80.8 191 8,397 17.36 30.08 113.95 0.17
0 8,587 3.45 85.07 187 8,584 17.75 33.3 123.8 0.24
0 8,777 3.37 82.88 190 8,773 18.11 36.72 134.32 0.08
0 8,968 3.96 86.35 191 8,964 18.45 40.42 145.78 0.33
0 9,157 4.22 85.49 189 9,153 18.74 44.52 158.49 0.14

MUD DATA Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2410 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/26/2024 - 07/29/2024
Report ID: OPERLMTDMRREP

85 PCF 0 5 API 0 0 Volts 2.72 9 12,000


FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
90 0 HTHP 88 22 0 10 / 13 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 16 12 8/9 10 800 0
44

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 0 5 API 0 0 Volts 3.61 9 18,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
90 0 HTHP 88 22 0 10 / 13 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 17 12 8/9 10 640 0
46

BARITE FLO-TROL MRBL-M BAROFIBRS XC ASPHASOL CAUST


1 ( 5000L ) 40 ( 50LB ) 1 ( 2200L ) 56 ( 25LB ) 5 ( 50LB ) 80 ( 50LB ) 10 ( 50LBP )
MUD MICA-CRSE PACLV BLACKFURY GLYCOL-MEG DRILL ZONE DFMR NACL
TREATMENT 20 ( 50LB ) 45 ( 50LB ) 4 ( 55GL ) 4 ( 55GL ) 4 ( 55GL ) 4 ( 55GL ) 4 ( 2200L )
RESINEX II SODASH
20 ( 50LB ) 20 ( 100LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
4 5,380 9,300 DP Av DC Av Bit HHP 48 150 M423 12 SEC
Pressure GPM Jet Vel 172.38 273.28 291 I-Row O-Row DC Location Bearings
2,400 800 248 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
14119211 HD86D 8 x 13 / 1.037
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 56 367 370 365 17,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 12 1 12 1.34 6-5/8" reg n/a 14119211
2 Near Bit Roller Reamer RIG 12 1 12 2.813 9.4 6 5/8 REG 6 5/8 REG 167 3 POINT 52843361
3 Pony Collar RIG 8.5 1 8.5 2.875 14.91 6 5/8" REG 6 5/8" REG 167 5554
4 Roller Reamer RIG 12 1 8.5 2.813 9.21 6 5/8 REG 6 5/8 REG 270 3 POINT 528.4.5.143
5 Measurement While Drilling (MWD) SPS 8 1 8 2.5 31.49 6 5/8" REG 6 5/8" REG 145.2 13605861
DRILL STRING 6 FIlter Sub SPS 8.5 1 8 3.25 5.59 6 5/8 REG 6 5/8 REG 170 13409678
7 Roller Reamer RIG 12 1 8.5 2.813 8.73 6 5/8 REG 6 5/8 REG 270 3 POINT 528.4.5.181
8 PBL (Multiple Activation By Pass) WWB 8.5 1 8.25 2.875 8.1 6 5/8 REG 6 5/8 REG 170 HYD825BP96
9 Drillcollar RIG 8.5 15 8.5 2.813 455.24 6 5/8 REG 6 5/8 REG 170 SPRL
10 Hydraulic Jar CTC 8 1 8.5 2.875 27.94 6 5/8" REG 6 5/8" REG 170 DJ6-800-432
11 Drillcollar RIG 8.5 3 8.5 2.813 91.3 6 5/8 REG 6 5/8 REG 170 SPRL
12 Crossover RIG 8.5 1 8.5 2.813 2.58 6 5/8 FH 6 5/8 REG 170 2039
13 Heavy Weight Drillpipe (HWDP) RIG 6.625 6 6.625 4 184.27 6-5/8FH 6-5/8FH 82.748 CONV
14 Crossover RIG 8.5 1 8.5 2.813 3.87 XT54 6 5/8 FH 168 41131-2B
15 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 5.5 4 278.02 VX54 VX54 42.9 CONV
16 Drillpipe RIG 5.5 1 5.5 4.67 32 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/14/2024 AS CALM NA SEASONAL 2,805 PRE-TOUR SAFETY
REQUIRED MEETING

Company SEC SCC SPS RIG EMC XLG RIG ARM OTH MI3 ARM

Category BITS CTRG DPDS RIG DFMS MLS OTHR OTHR VAC WMS WSC
PERSONNEL
1 13 2 39 1 2 14 1 1 4 1
Total
AND SERVICES No. of Persons
79
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 24 12 24 12 12 12 24 24

Standby/Tankers Others
TRUCKS/BOATS
PICK UP TRUCK # AB6168 4 X TRIPOD SILOS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 100 407 212 153 4500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2410 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 05/26/2024 - 07/29/2024
Report ID: OPERLMTDMRREP

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3217 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/06/2024 - 09/19/2024
Report ID: OPERLMTDMRREP

ADC-52 @ UTMN-3217 Limited Morning Report for 06/18/2024


Objective : (K2, S-SHAPE Foreman(s)OBIORA, PATRICK UZOKA
D&WO Morning Report (Service Providers View) Charge #: GAS PRODUCER TARGETING Engineer UTUNEDI, AWOTU FRIDAY
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23057-3217) PRE-KHUF & KHUF Manager AMRI, ABDULLAH SALEH
ADC-52
RESERVOIRS ) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 0088-216-7 77-12774 5773914 5779347
Date: Tuesday 06/18/2024 UTMN-3217 (0) UTMN_3217_0 CONTRACTOR /CLERK VSA T
5773964

Last 24 hr operations Next 24 hr plan


CON'T R/UP ON UTMN-3217, FINALIZE PRE-SPUD CHECK-LIST AND ACCEPTANCE TESTS, ACCEPT DRILL 34" PILOT HOLE TO 110', CHC, POH, ENLARGE HOLE TO 42" WITH HOLE OPERNER, RUN
RIG, CONDUCT PRE-SPUD MEETING, SPUD WELL, DRILL 34" PILOT HOLE. 36" CONDUCTOR.
Location Next Location
124 KM FROM DMG. 3 KM EAST OF UTMN GOSP-7 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
51 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 51 124
0 (06/18/2024@0445 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CON'T R/UP ON UTMN-3217 LOCATION;

HELD RU/PJSM SAFETY MEETING WITH ALL PARTIES AND DISCUSS WORK PERMIT,
STOP WORK AUTHORITY, JSA, CRITICAL LIFT PLAN, LIFTING GEAR AND COLOR
CODE, USE OF PPE, CRANE OPERATORS FOCUS ON LIFTING WORKS AND DAILY
CHECK LIST, ERP.

R/UP OPERATIONS :
=================
> CON'T PU/MU & RACK BACK 30STDS X 5.5" D/P, 5STDS X 5.5" HWDP, 2STDS X
6.5/8" HWDP, 2STDS X 8.5" DC, 4STDS X 9.5" DC, DRILLING STD (2JTS 9.5" DC + 1
JTS 5.5" HWDP).
0500 - 0400 23 0 PRE N RM OTH NA RIG 0 0
> FUNCTION-TEST AND ALIGN TDS.
> PU/MU 34" PILOT HOLE BHA.
> P/T PUMP LINES, STANDPIPE MANIFOLD, ROTARY HOSE TO 3000 PSI
> FUNCTION-TEST CELLAR PUMPS AND SLB CLOSED-LOOP WASTE MANAGEMENT
SYSTEM
> FUNCTION TEST AND P/TEST FIRE PUMP TO 250 PSI
> TEST H2S/LEL SENSORS WITH LIVE GAS, AND CONDUCT H2S DRILL
> CON'T WORK ON PRE-SPUD CHECK LIST

** RIG MOVE DETAILS**


================
> TOTAL MOVE DISTANCE: 103 KM (30 KM SKID ROAD & 73 KM BLACK TOP).

0400 - 0445 0.75 0 PRE N RM OTH NA RIG 0 0


FINALISE PRE-SPUD CHECK-LIST, ACCEPT RIG, CONDUCT PRE-SPUD MEETING.
0445 - 0445 0 0 PRE S OT SPUD NA RIG 0 0
SPUD UTMN-3217 @ 0445 HRS ON 6/18/2024.

ROTARY DRILL 34" PILOT HOLE WITH 64 PCF SPUD MUD, 100% CIRC.
0445 - 0459 0.25 0 42 N DRLG D TDS RIG 0 51
> START WITH LOW PARAMETERS TO PREVENT CELLAR WASHOUT
> REAM EVERY UP/DOWN, AND SWEEP HOLE WITH 100 BBLS HIVIS EVERY JOINT
Foreman Remarks

=====WELL OBJECTIVE====
K-2 S-SHAPE WELL TARGETING PRE KHUFF RESERVOIR AS PRIMARY & KHUFF AS SECONDARY TARGETS. TO BE COMPLETED WITH 4-1/2" 15K CEMENTED LINER.

========ERP========
- THE WELL IS LOCATED IN SHALLOW GAS BOUNDARIES, IN POPULATED AREA.
- LFL @ 160M, RER 100 PPM @ 894 M & RER 30 PPM @ 2,452 M.
- H2S IS 4.68 MOLE % THROUGH KHUFF-C RESERVOIR.
- STAGING AREA #1 (2.8 KM NE): 25.455199, 49.388615 & STAGING AREA #2 (2..8 KM SW) 25.419444 , 49.371934.
- RELIEF WELL: UTMN-1801, ( 2.55 KM N ) .

======PERSONNEL ON BOARD======
- RIG CLERK JOHN ADRIAN ID#8096397 ON LOCATION SINCE 03/18/2024.
- FCT SALEM ALGHAMDI (796696) ON LOCATION FROM 6/13/2024.

======JOURNEY MANAGEMENT======
- THE RIG IS 0.5 KM SKID ROAD FROM THE BLACK TOP, NIGHT DRIVING IS PROHIBITED. ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT .

=====CSG SETTING DEPTHS======


- 36'' CSG AT 120'.
- 30" CSG AT 621' (50' INTO RUS).
- 24" CSG AT 2,607' (50' INTO AHMADI)
- 18-5/8" CSG AT 4,781' (50' INTO MDTM)
- 13-3/8" CSG AT 10574'/10,418' TVD(30' INTO BJDM)

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3217 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/06/2024 - 09/19/2024
Report ID: OPERLMTDMRREP

- 9-5/8" CSG AT 12,504'/12,348' TVD (10' INTO KHFF)


- 7" LINER AT 13,683' MD/13,527 TVD ( 400' TVD INTO KFDA)
- 4-1/2" LINER AT 14,626' MD/14,431' TVD (250' FT TVD INTO TAWL).

======FLAT TIME KPI======


- TRIPPING SPEED KPI: 19 STDS/HR, ACTUAL:
- 36" CSG: 0.6 JTS/HR, ACTUAL:
- 30" CSG: 2.9 JTS/HR, ACTUAL:
- 24" CSG: 4 JTS/HR, ACTUAL:
- 18-5/8" CSG: 7 JTS/HR, ACTUAL:
- 13-3/8" CSG: 11.5 JTS/HR, ACTUAL:
- 9-5/8" CSG: 14 JTS/HR, ACTUAL:
- 7" LINER: 14 JT/HR , ACTUAL:
- 4-1/2" LINER: 13 JT/HR , ACTUAL:
- 4-1/2" UPPER COMPLETION: 13.5 JT/HR, ACTUAL:

** WELLHEAD KPI'S:
- INSTALL 24" SOW X 26-3/4" 3M CHH KPI: 6.5 HR / ACTUAL:
- INSTALL26-3/4" 3M X 18-3/4" 5M CHS KPI: 5 HR / ACTUAL:
- INSTALL 18-3/4" 5M X 13-5/8" 10M CHS KPI: 5 HR / ACTUAL:
- INSTALL 13-5/8 10M X 11" 10M TBG SPL KPI: 4 HR / ACTUAL:

======SAFETY======
CONDUCTED WEEKLY MEETING & DISCUSSED AS PER WEEKLY MEETING AGENDA. DISCUSSED PRE SPUD PREPARATION. CONDUCTED PJSM TESTING HIGH PRESSURE LINES, LINE OF FIRE &
LIFESAVING RULES, HEAT STROKE & DEHYDRATION, MSDS & CHB AWARENESS.

COLD PTW: (13), HOT PTW:(02) CONFINED SPACE: (01), DIESEL TRANSFER: (01), MAN RIDER: (02), ELECTRICAL(), JSA: (19).

STOP CARDS: (51), SALAMA CARDS: (23).


NM : (0).
INCD:(0)
DRILLS:(0

======AUDITS======
- WCI: 8 CLOSED & 0 OPEN.
- HAZCOM AUDIT: 10 CLOSED & 0 OPEN.
- RSI AUDIT: 35 CLOSED & 0 OPEN.
- 4TH QSI : 44 CLOSED & 0 OPEN

= =====RENTAL TOOLS ON LOCATION======


-NPS SHOCK SUB (S/NO: GE-SS-00023) RECIEVED @ 18:15 HRS ON 15TH JUNE, 2024

========WATER SPRAY & VACUUM TANKERS========


- 1 TUWAIRESH SPRAY TANKER .

======WATER CONSERVATION IMPLEMENTED INITIATIVES======


- REDUCED WATER PITS: Y.
- DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: Y.
- CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION: Y.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 454 N/A

Company ARM SUW RIG EMC MJH SNS MI3 ARM OTH SCM PW

Category OTHR CTRG RIG DFMS SEC H2S WMS WSC VAC PCS ISPCT
PERSONNEL
3 13 64 1 7 1 4 3 1 3 4
Total
AND SERVICES No. of Persons
104
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 12 0 24 12 24 12 24 24 12 0 0

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 263 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-593 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/17/2024 - 07/25/2024
Report ID: OPERLMTDMRREP

ADC-53L @ HRDH-593 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL Foreman(s)LEBIB, SOFIANE
D&WO Morning Report (Service Providers View) Charge #: ARAB-D ZONE 2A05 OIL Engineer ALMALEKI, HESHAM ABDULMALEK
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23058-0593) PROD.) Manager SHAMMARY, FAHAD SALEM
ADC-53L
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12565 0135784179 0138137823
Date: Tuesday 06/18/2024 HRDH-593 (0) HRDH_593_0 CONTRACTOR /CLERK VSA T
0135784039

Last 24 hr operations Next 24 hr plan


R/D ON KHRS-389, RIG MOVE TO NEW LOCATION HRDH-593. R/D ON KHRS-389, RIG MOVE & R/U ON NEW LOCATION HRDH-593.
Location Next Location
245 KM F/DH MG. UTMN-4128
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 251
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

RAISE JSA WITH ALL PERSONNEL, DISCUSS RESPONSIBILITIES & USING STOP WORK
AUTHORITY.
- RIG MOVE FROM KHRS-389 TO NEW LOCATION HRDH-593.
- R/D: 20%, R/M: 10%, R/U: 0%.

RIG DOWN @ KHRS-389:


- SECURE TDS & L/D SAME.
- PREPARE TO LOWER SUB-BASE.
- DISMANTLE AND MOVE MUD TANKS - IN PROGRESS.
- R/D HP UNIT FROM RIG FLOOR.
- DISCONNECT FLARE/VENT LINES.
- LOAD & MOVE EXTRA TUBULARS, CHEMICALS, EXTRA BOXES, CHEMICALS BOXES,
DPS BOXES.
0500 - 0459 24 0 PRE N RM RD NA RIG 0 0
- SUSPENDED ALL TANDEM & CRITICAL LIFTS AT NIGHT, SUSPENDED ALL TRUCKS
MOVEMENT.

- PRE-MOVE LOADS: 52 LOADS.


- DAILY / TOTAL LOADS MOVED: 17/ 69 LOADS.
- TOTAL PLANNED LOADS: 210 LOADS.
- MOVE DISTANCE FROM KHRS-389 TO HRDH-593: 247.5 KM (9.4 KM SKID ROAD +
238.1 KM BLACK TOP).
- RIG MOVE ASSETS: FB TRUCK: 12, WINCH TRUCK: 6, LOW BED: 07, HIGH BED:
02, CRANE: 5, FORKLIFT: 2, RIGGER-1: 2, TRUCK PUSHER: 2, MAN LIFT: 2.

- RIG RELEASED FROM KHRS-1045 ON 16TH JUNE 2024 @ 18:00.


- DAYS SINCE RIG RELEASE: 1.46 DAY.
- EXPECTED SPUD IN HRDH-593 ON 28 JUNE 2024.
Foreman Remarks

============================== WELL OBJECTIVE ===========================


HRDH-593 WELL WHICH WILL BE DRILLED AS SINGLE LATERAL PRODUCER (PHZ) TARGETING ARBD RESERVOIR, ZONE 2A05 AND COMPLETED WITH LOWER COMPLETION AND BAKER UPPER
COMPLETION WITHOUT PDHMS.
- GOR ARAB-D: 470 SCF/BBL, H2S ARAB-D: 0.39 MOL%. RER 1/2 LFL: 189 M. RER 100 PPM: 270 M. RER 30 PPM: 464 M.

============================== WELL DESIGN ==============================


- DRILL 28" HOLE SECTION X 24'' PLANNED CP @ 528 FT. ACTUAL XXX FT.
- DRILL 17" HOLE SECTION X 13-3/8'' PLANNED CP @ 1,786 FT, (+/-50 FT INTO AHMADI). ACTUAL XXXX FT.
- DRILL 12-1/4" HOLE SECTION X 9-5/8'' PLANNED CP @ 3,363 FT MD (300 FT INTO BIYADH). ACTUAL XXXX FT MD.
- DRILL 8-1/2" CURVE SECTION TO 7" LP 7,628 FT MD/ 6,231 FT TVD (2 FT ABOVE ABD1). ACTUAL XXXX FT MD / XXXX FT TVD.
- DRILL 6-1/8" HZ SECTION TO TD 11,097 FT MD/ 6,286 FT TVD. ACTUAL XXXX FT MD / XXXX FT TVD.
===========================EXTRA REQUIREMENT =========================

===================== ARAMCO PERSONNEL ON LOCATION ======================

===================== LSTK OR CONTRACTOR PERSONNEL ON LOCATION =============


- BAKER DSV: YAO, BHI HSE: JERRY, BHI SUPT: NO.

=============================SAFETY ===================================
- DISCUSSED WITH CREW: HSE ALERT 69-24 - INJURY DURING ENGINE MAINTENANCE.

============================== ==VISIT=================================

===============================NEXT WELL==============================
- HRDH-593 (100% READY), APPROVED DP (NO) & ERP (NO).
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-593 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/17/2024 - 07/25/2024
Report ID: OPERLMTDMRREP

DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A SEASONAL NA HOT 2,156 TWICE DAILY

Company SUW RIG BDF TK2 RIG TK2 ARM

Category CTRG RIG DFMS OTHR OTHR WSC WSC


PERSONNEL
15 40 1 2 40 1 1
Total
AND SERVICES No. of Persons
100
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24

Operating Hours. 0 24 24 12 12 24 24

Standby/Tankers
TRUCKS/BOATS
DH-3073

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 351 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1556 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 04/24/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

ADC-54L @ HRDH-1556 Limited Morning Report for 06/18/2024


Objective : (HRDH-1556 Foreman(s)AMRIOUI, KAMAL
D&WO Morning Report (Service Providers View) Charge #: WELL WHICH WILL BE Engineer ALMALEKI, HESHAM ABDULMALEK
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-24058-1556) DRILLED AS A SINGLE Manager SHAMMARI, ABDULLAH SHUWAIHAT
ADC-54L
LATERAL PRODUCER WITH A THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK)
Wellbores: VERTICAL EVALUATION
(0500-0500) Saudi Aramco Well +882167771 2645 013-572-30 76 013-813-78 10
HOLE TA)
Date: Tuesday 06/18/2024 HRDH-1556 (1) HRDH_1556_1 CONTRACTOR /CLERK VSA T
013-572-48 26

Last 24 hr operations Next 24 hr plan


CONT RIH TO BTM @ 12,150', DROP DART & DEPLOY LOGGING TOOLS,LOGGING UP F/12,150 FT CONT RIH 6-1/8" REAMING & 7" C/O ASSY TO BTM, CHC , POOH TO SURFACE & L/D , RUN 4-1/2"
T/ 8,301 FT,POOH TO SURFACE & L/D SAME , PU&MU 6-1/8'' REAMING BHA . BKR LOWER COMPLETION (L-1).
Location Next Location
5 KM SKID ROAD AFTER HRDH BRIDGE. HWYH-2532
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,150 Last Csg Size MD TVD Size 4,624 8,300 6,690 Top
9 5/8 6655 6655 Formations Comments
7 Depth
RUS 308
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UERA 394
12150 (Date) 100 0 269 UMER 439
44.4 (05/04/2024@2000 ) ARUM 1,120
LAMS 1,430
WASI 1,955
AHMD 2,135
SHUB 3,390
BYDH 3,600
MDTM 4,602
SULY 5,174
HITH 5,732
ABAR 6,170
ARBB 6,211
ABBR 6,284
ARBC 6,311
ABCR 6,417
ABDR 6,653
PADS 6,658
BPDS 6,664
ABD1 6,668
AD2A 6,678
2A05 6,685
2A06 6,706
AD2B 6,720
AD3A 6,774
AD3B 6,821
ABD4 6,869
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

RIH WITH WFD CWS (IMAGE- CALIPER- GR) LOGGING TOOLS ON DRIFTED 4" DP'S/
5'' HWDP F/ 6,020 FT. T/ 12,150 FT.
0500 - 1100 6 1 6 1/8 E LOG ST STDP RIG 12150 12150 6020 12150 - CONTROL RUNNING SPEED @ 1 MINS PER STAND FROM SLIPS TO SLIPS.
- HOLE IN GOOD CONDITION .
- FILL STRING EVERY 20 STANDS W/ 68 PCF WBM USING WFD LOG SCREEN.
- MONITOR WELL THRU TRIP TANK & TRIP SHEET.

1100 - 1200 1 1 6 1/8 E LOG CIRC MPMP RIG 12150 12150 CIRCULATE & CONDITION MUD @ 5 BPM & 900 PSI, MWT IN/OUT 68 PCF , 100 %
RETURN.

SPACE OUT 90 FT , FILL STRING, DROP WFD CWS (IMAGE- CALIPER- GR) DART,
CHASE SAME & DEPLOYED LOGGING TOOL.
- CHASE DART W/ 68 PCF SALT POLYMER MUD AT 2 BPM / 230 PSI.
1200 - 1300 1 1 6 1/8 E LOG LOG WLT WWL 12150 12150 12150 12150
- CONFIRMED DEPLOYMENT LOGGING TOOL W/ 1 ST SHEAR INDICATION @ 500
PSI.
- CONFIRMED DEPLOYMENT W/ 2ND SHEAR INDICATION @ 1250 PSI.
- WAIT TO ACTIVATE TOOL FOR 10 MINS.

POOH WFD CWS (IMAGE- CALIPER- GR) WHILE LOGGING UP FROM 12,150 FT TO
1300 - 1900 6 1 6 1/8 E LOG ST STDP RIG 12150 12150 12150 8301 8,301 FT .
- RUNNING SPEED 7 FPM .
- MONITOR WELL THRU TRIP TANK & TRIP SHEET.
1900 - 1930 0.5 1 6 1/8 E LOG WCNT NA RIG 12150 12150
EXTENDED FLOW CHECK - WELL STATIC .
1930 - 2000 0.5 1 6 1/8 E LOG RR TDS RIG 12150 12150
SERVICE TDS .

POOH WFD CWS (IMAGE- CALIPER- GR) FROM 8,301 FT TO 641 FT ( 5 STDS
2000 - 2345 3.75 1 6 1/8 E LOG TO BHA RIG 12150 12150 8301 641
ABOVE TOP OF LOGGING TOOLS ).
- MONITOR WELL THRU TRIP TANK & TRIP SHEET.
2345 - 0000 0.25 1 6 1/8 E LOG WCNT NA RIG 12150 12150
FLOW CHECK - WELL STATIC.

0000 - 0015 0.25 1 6 1/8 E LOG TO BHA RIG 12150 12150 641 176 POOH WFD CWS (IMAGE- CALIPER- GR) FROM 641 FT TO 176 FT ( TOP OF BHA ).
- CONTROL POOH SPEED @ 1 MIN PER STAND FROM SLIPS TO SLIPS.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1556 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 04/24/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
- MONITOR WELL THRU TRIP TANK & TRIP SHEET.
0015 - 0030 0.25 1 6 1/8 E LOG WCNT NA RIG 12150 12150
FLOW CHECK - WELL STATIC.

0030 - 0330 3 1 6 1/8 E LOG OTH NA WWL 12150 12150 POOH WFD CWS (IMAGE- CALIPER- GR) F/ 176 FT TO SURFACE & L/D SAME .
- MONITOR WELL THRU TRIP TANK & TRIP SHEET.

HPJSM, P/U, M/U & RIH W/ 6-1/8" REAMING BHA T/302 FT -ONGOING.
- 6-1/8" WELDED TRICONE BIT, 6-1/8" NBRR (W/ FLOAT), 4-3/4" DC, 6-1/8"STRR,
0330 - 0459 1.5 1 6 1/8 N CT HT BHA RIG 12150 12150
4-3/4" DC, 6-1/8" STRR, 4-3/4" DC, X-O, DLR , 3 X 4" HWDP, 4-3/4" JAR, 2 X 4"
HWDP
- MONITOR WELL THRU TRIP TANK .
Foreman Remarks

HRDH-1556 WELL WHICH WILL BE DRILLED AS A SINGLE LATERAL PRODUCER WITH A VERTICAL EVALUATION HOLE TARGETING ARAB-D RESERVOIR. THE WELL WILL BE COMPLETED WITH
LOWER COMPLETION REGARDLESS OF LOSSES AND HAL ISORITE TAML-4 COMPLETION.

=================WELL DESIGN ================


** 24" CP PLANNED/ACTUAL: 454 FT / 454 FT.
** 18"5/8 CP PLANNED/ACTUAL: 2,169 FT / 2,203 FT
** 13-3/8" CP PLANNED/ACTUAL: 3,778 FT / 3,875 FT.
** 9-5/8" CP PLANNED/ACTUAL: 6,658' FT / 6,657 FT.
** L-0 (MB): PLANNED TD 7,063' MD, ACTUAL TD 7,065 MD; PLANNED RC: 405', ACTUAL RC 408 '.
** L-1 7 " LINER PLANNED/ACTUAL: 8,305 FT / 8,306 FT.
** L-1: PLANNED TD 12,857' MD, ACTUAL TD 12,150' MD; PLANNED RC: 4,552', ACTUAL RC 3,844'.
** TOTAL WELL FOOTAGE PLANNED / ACTUAL: XXXX FT/XXXX FT.

=============== ARAMCO MNGT PERSONNEL ON LOCATION ====================


* ARAMCO FOREMAN (PDP) FALAH ALHAJRI #818852 ON LOCATION.
* ARAMCO DRILLING ENGINEER ALMALEKI, HESHAM ABDULMALEK #780847 ON LOCATION SINCE 06/15/2024.

================RIG MANAGEMENT VISIT================================

========== NEXT WELL ===============================================


NEXT WELL: HWYH-2532
* DRILLING PROGRAM/ERP: YES/ NO.
* WATER WELL: HWYH-3510.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 0 5.2 API 0 0 Volts 0 10 37,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 0 HTHP 92 20 0 7/9 PERFLOW 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 9 8 6/8 0 0 0
42
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 0 4 API 0 0 Volts 0 10 36,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 0 HTHP 92 20 0 7/9 PERFLOW 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 9 8 6/8 0 0 0
42

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
10 8,311 12,150 DP Av DC Av Bit HHP 10 100 M233 6.125 HTC
Pressure GPM Jet Vel 341.75 N/A 87 I-Row O-Row DC Location Bearings
2,600 300 248 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
7917792 DD406VX 3 x 13 / 0.389
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 57 158 238 N/A 10,000 0
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/11/2024 06/11/2024 SEASONAL N/A SEASONAL 1,823 RIG UP
OPERATIONS

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1556 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 04/24/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

Company SUW BHI RIG BDF WWL HML TK2 RIG ARM TK2 ARM

Category CTRG DPDS RIG DFMS LPS MULS OTHR OTHR OTHR WSC WSC
PERSONNEL
14 2 37 1 5 2 2 15 2 2 1
Total
AND SERVICES No. of Persons
83
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 24 24 0 12 12 12 24 24

Standby/Tankers
TRUCKS/BOATS
dh-1582

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 300 N/A N/A 800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1334 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 02/18/2024 - 06/29/2024
Report ID: OPERLMTDMRREP

ADC-55L @ HWYH-1334 Limited Morning Report for 06/18/2024


Objective : (MK-1 VERTICAL Foreman(s)SKEOCH, SHANE WILLIAM
WELL TARGETING MQSB) Engineer ALHAJJAJ, FERAS MONEEF / ALBAQAMI, KHALID ABDULLAH
D&WO Morning Report (Service Providers View) Rig Charge #: Manager NEJIDI, AHMED ABDULLAH
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-55L (66-23053-1334)
THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK)
0088216777 12648 013-577-39 88 ARAMCO 013-664-88 14 IDS
(0500-0500) Saudi Aramco Well Wellbores:
HWYH-1334 (0) HWYH_1334_0 OTHER VSAT OTHER VSAT CONTRACTOR
Date: Tuesday 06/18/2024 /CLERK VSA T
013-829-76 55 CLINIC 013-875-69 83 ADC
013-577-39 07 CLERK

Last 24 hr operations Next 24 hr plan


CONT POOH, RIH W/ NEW BHA, SLIP AND CUT DRILL LINE, CONT RIH TO BTM RESUME ROTARY DRILL 5-7/8" HOLE SECTION W/ MWD SURVEYS TO WELL TD @ +/- 17,787' (250'
INTO MQSB)
Location Next Location
HWYH-1334 HWYH-1365
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
17,053 Size 11216 11205 Size 10,917 13,458 13,447 Top
Formations Comments
9 5/8 7 Depth
KHFF 13,303 17' LOW ( 13,314' MD).
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KFAC 13,336 12' LOW ( 13,347' MD).
17053 (Date) 100 0 179 KFBC 13,430 9' HIGH (13,441' MD ).
113.5 (02/25/2024@1630 ) KFB1 13,488 2' LOW (13,499' MD).
KFB7 13,859 5' HIGH (13,870' MD).
KFCC 13,939 4' HIGH ( 3,950' MD).
KFDA 14,228 2' LOW (14,239' MD).
PKFU 14,834 10' LOW
UNZA 14,863 34' LOW
BUZA 15,151 124' HIGH (15,165' MD)
UNZB 15,515 124' HIGH (15,529' MD)
PUZU 15,851 129' HIGH (15,865' MD)
JAUF 15,868 170' HIGH (15,882' MD)
TWLF 16,266 144' HIGH (16,280' MD)
SHRR 16,633 260' HIGH (16,647' MD)
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

POOH 5-7/8" ROT DRLG BHA F/ 1208' TO SURFACE.


- R/B 3 X 4" HWDP STDS, 9 X 4-3/4" DC STDS.
0500 - 0800 3 0 5 7/8 N DRLG HT BHA RIG 17053 17053 - L/D: 4-3/4" DRLG JAR, 2 X 5-3/4" ST.STAB, FLOAT SUB, FILTER SUB, MWD, NB-
STAB & BIT.
- BIT DULL GRADE: 1- 2- WT- A- X- I- BT- PR.
- MONITOR WELL ON TRIP TANK & RECORDED TRIP SHEET.
0800 - 0830 0.5 0 5 7/8 N DRLG RR TDS RIG 17053 17053
SERVICE TDS.

0830 - 0900 0.5 0 5 7/8 N DRLG PJSM NA RIG 17053 17053 HPJSM PRIOR TO P/U BHA, DISCUSSED JSA & JOB PROCEDURE.
- PERFORMED HOUSEKEEPING ON RF.

P/U, M/U 5-7/8" ROTARY DRLG BHA & RIH TO 1,171'.


- 5 7/8" NEW PDC BIT (MR613-C, SN: QG0512, NOZ: 3 X 13)
- 5-3/4" NB.STAB W/FV
- UBHO SUB
- SLIM PULSE MWD
- FLOW SLEEVE SUB
- 5 3/4" ST. STAB
0900 - 1200 3 0 5 7/8 N DRLG HT BHA RIG 17053 17053
- FLOAT SUB W/ FV
- FILTER SUB
- 23 X 4-3/4" DC
- 4-3/4" DRLG JAR
- 3 X 4-3/4" DC
- X/O
- 9 X 4" HWDP
** MONITOR WELL ON TRIP TANK & RECORDED TRIP SHEET.

1200 - 1230 0.5 0 5 7/8 N DRLG TI STDP RIG 17053 17053 1171 2116 RIH 5-7/8" DRLG BHA ON 4" DP STDS IN CH FROM 1171' TO 2,116'.
- MONITOR WELL ON TRIP TANK & RECORDED TRIP SHEET.

1230 - 1300 0.5 0 5 7/8 N DRLG CIRC MPMP RIG 17053 17053 SHALLOW TESTED MWD TOOLS, ALL SIGNALS OK.
- FR: 220 GPM, SPP: 1800 PSI.

RIH 5-7/8" DRLG BHA ON 4" DP STDS IN CH F/ 2,116; TO 7,789'.


1300 - 1600 3 0 5 7/8 N DRLG TI STDP RIG 17053 17053 2116 7789 - TRIP SPEED: 21 STD/HR
- USED MANUAL TONGS & PIPE SPINNER TO M/U 4" DP.
- MONITOR WELL ON TRIP TANK & RECORDED TRIP SHEET.
1600 - 1730 1.5 0 5 7/8 N DRLG CIRC MPMP RIG 17053 17053
CUMULATIVE TIME TO FILL UP 4" DP STRING EVERY 20 STD'S.

1730 - 1800 0.5 0 5 7/8 N DRLG HT PEL RIG 17053 17053 CHANGED HANDLING TOOLS F/ 4" TO 5-1/2".
- MU X-OVER (XT-39 P X XT-54 B).

1800 - 2130 3.5 0 5 7/8 N DRLG RR DWKS RIG 17053 17053 HPJSM, SLIP & CUT DRILL LINE. CALIBRATED BLOCK HEIGHTS.
- MONITOR WELL ON TRIP TANK, WELL STATIC.
2130 - 2200 0.5 0 5 7/8 N DRLG HT STRG RIG 17053 17053

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1334 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 02/18/2024 - 06/29/2024
Report ID: OPERLMTDMRREP

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
HPJSM, L/D 6 X 5-1/2" DP JNTS (REJECTED 2 X DP STD'S FROM DERRICK).
- MONITOR WELL ON TRIP TANK & RECORDED TRIP SHEET.

RIH 5-7/8" DRLG BHA ON 5-1/2" DP STDS IN CH F/ 7789' TO 13,458' (7" LINER
SHOE).
- PASSED 7" TOL SMOOTHLY.
2200 - 0045 2.75 0 5 7/8 N DRLG TI STDP RIG 17053 17053 7789 13458
- TRIP SPEED: 22 STDS/HR
- USED IR WHILE M/U 5-1/2" DP.
- FILL UP STRING EVERY 20 STD'S.
- MONITOR WELL ON TRIP TANK & RECORDED TRIP SHEET.

0045 - 0200 1.25 0 5 7/8 N DRLG CIRC MPMP RIG 17053 17053 CUMULATIVE TIME TO FILL UP STRING EVERY 20 STDS & BREAK CIRC AFTER
11,000' AS PER HT STAGING PROCEDURE.

BREAK CIRC AT 7" LINER SHOE & RECORDED PARAMETERS.


- FR: 230 GPM, SPP: 2470 PSI.
0200 - 0230 0.5 0 5 7/8 N DRLG CIRC MPMP RIG 17053 17053
- CONFIRMED ALL MWD SIGNALS OK.
- DHT: 270DEG F.
- RECORDED SCR.

RIH 5-7/8" DRLG BHA INTO OH F/ 13,458' TO 17,053'.


0230 - 0459 2.5 0 5 7/8 N DRLG TI STDP RIG 17053 17053 13458 17053 - MONITOR WELL ON TRIP TANK & RECORDED TRIP SHEET.
- FILL UP & BREAK CIRCULATION EVERY 5-10 STD'S WHILE RUN IN OH, TO COOL
DOWN MWD AS PER HT STAGING PROCEDURE (DHT: 265DEG - 288DEG F).
Foreman Remarks

VERTICAL WELL TARGETING KHUFF-C AS PRIMARY AND PRE-KHUFF AS SECONDARY TARGETS IN THE EASTERN AREA OF HAWIYAH FIELD. THE WELL WILL BE DEEPENING TO MID-QUSAIBAH TO
EVALUATE ITS POTENTIAL, WITH A K-2 CASING DESIGN TO SEPARATE KHUFF AND PRE-KHUFF. THE 5-7/8" OH WILL BE COMPLETED WITH A 4-1/2" 15K CEMENTED LINER
- WATER WELLS: HWYH-3542 & HWYH-3526
============================================= ARAMCO PERSONNEL==========================================
- ARAMCO SGGDD FIELD COMPLIANCE TECHNICIAN - ABDULLAH ALDOSSARY #777181 OFF LOCATION 06/1/2024
- ARAMCO MATERIAL CLERK NAWAF ALSHALAWI #816284 ON LOCATION 06/05/2024
=============================================== IDS PERSONNEL =============================================
- WSL: MOHAMAD
- NWSL: MUSTAFA
==================================== LAST CONTRACTOR VISIT, IDS & ADC==========================================
- ACD OPERATION MGR 01/10/24
- ADC 55 RIG MGR- 06/3/24
- LSTK GAS HSE MGR-03/19/24
- GLOBAL INTEGRATION OI & RISK MGR - 3/19/2024
- IWC PROJECT MGR - 03/10/24
- IWC PROGRAM MGR - 04/10/24
- SLB HSE - 06/15/24
- SLB DRILLING SUPT - 6/09/24
- SLB HSE SUPT - 2/10/24
- SLB WC SPECIALIST - 5/13/24
============================================== SERVICE COMPANY ===========================================
-
================================================== SAFETY ===============================================
> DWLTI: 1181
== = = ======================================= DRILLS & INSPECTION =========================================
- DRILLS: 2X TRIP DRILLS
============================================= HSE / OBSERVATIONS ==========================================
STOP CARDS: 58 (23 POSITIVE STOP CARDS, 19 UNSAFE CONDITIONS, 15 UNSAFE ACTS)
PRE TOUR-SAFETY MEETING HELD WITH BOTH CREW AND FOLLOWING TOPICS ARE DISCUSSED:
- DISCUSSED HAZARD AND SAFETY PRECAUTION WHEN SLIP AND CUT DRILLING LINE .
- DISCUSSED LINE OF FIRE , PINCH POINTS HAZARD WHEN HANDLING RIG EQUIPMENT .
- REFRESH CREW FOR HEAT STRESS PREVENTION CAMPAIGN FROM ARAMCO
- REMINDED CREW FOR MENTORSHIP PROGRAM- COACHING AND MENTORING GREEN HATS TO FAMILIARIZE THEIR JOB DESCRIPTION.
- DISCUSSED IMPLEMENTATION OF PTW AND SALAMA CARD.
- REMINDED CREW RELATED TO ARAMCO GENERAL SAFETY RULES ( PRACTICAL JOKING/HORSEPLAYING NOT ALLOWED AT WORKPLACE.
- ENCOURAGE CREW TO INTERVENE AND STOP IF UNSAFE ACT OR CONDITION OBSERVED.
- OPERATION DISCUSSED BY IDS WSL, RS AND ARAMCO FOREMAN
- CREW SHARED FEEDBACK AND SHOWED SOME HAZARDS AWARENESS, ABOUT THE DISCUSSED SAFETY AND OPERATION TOPIC
===================.============================ INCIDENTS ============================================
- 1 X NM INCIDENT ID: 7239958
================================================ AUDITS ==============================================
> 1ST WCI: TOTAL ITEMS: 4, ALL CLOSED, & RHSEI 2024: TOTAL ITEMS: 15, CLOSED: 15, OPEN: 0
> 2023 GAP ANALYSIS: 97% COMPLIANCE
=============================================== NEXT WELL ============================================
- HWYH-1365 (READINESS: 75% AS PER WELLSITE)
============================================== VACUUM TANKER =========================================
- 1 X VACUUM TANKER ON LOCATION 2/28/24 #2052 ARA (MONTHLY)
============================================ NEARBY RIGS OR SITES ========================================
- DPS-44 OUT OF 30 PPM RER
=========================================== DIESEL CONSUMED F/ OBM ======================================
- APPROVED DIESEL FOR OBM: (2,177 BBL - 346,143L, 11 LOADS) - RECEIVED: 12
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
MUD DATA 96 PCF 1 0 API 56 805 Volts 6.32 0 39,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1334 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 02/18/2024 - 06/29/2024
Report ID: OPERLMTDMRREP

0 2.4 HTHP 14 13 0 7 / 11 RELIANT 1.6


Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 38 30 6/7 0 0 4
64

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
96 PCF 1 0 API 56 820 Volts 6.29 0 40,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2.4 HTHP 14 13 0 7 / 11 RELIANT 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 37 30 6/7 0 0 1.8
63

MUD
TREATMENT
BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 5.875 1 0.64 QG0512
2 Float Sub SDM 4.75 1 19.875 3.5 5.2 7 5/8 REG 7 5/8 REG 0 19933-5
3 UBHO Sub SDM 4.75 1 4.75 2 2.49 3 1/2 REG 3 1/2 REG 0 89751-1
4 Measurement While Drilling (MWD) SDM 4.86 1 28 3.06 30.03 7 5/8 REG 7 5/8 REG 0 C0577
5 Flow Sleeve Sub SDM 4.688 1 4.688 2.25 3 NC38 NC38 0 742751-13A1
6 Stabilizer SDM 28 1 28 3 4.43 7 5/8 REG 7 5/8 REG 0 19933-1
DRILL STRING 7 Float Sub SDM 4.99 1 19.875 3.5 2.39 7 5/8 REG 7 5/8 REG 0 7340-4
8 FIlter Sub SDM 4.8 1 9.5 4 6.04 7 5/8 REG 7 5/8 REG
9 Drillcollar RIG 4.75 22 4.75 2.25 711.14 NC38 NC38 0 SPRL
10 Hydraulic Jar SJS 4.75 1 4.75 1.97 29.6 0 OSC105162A
11 Drillcollar RIG 4.75 3 14 3 92.84 8 5/8 REG 8 5/8 REG 0 SPRL
12 Crossover RIG 4.75 1 14 4 2.71 7 5/8 REG 7 5/8 REG
13 Heavy Weight Drillpipe (HWDP) RIG 4 9 6.625 5 279.79 6-5/8FH 6-5/8FH 58.1 CONV
14 Drillpipe RIG 5.5 0 6.625 5.901 0 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/08/2024 AS SEASONAL ONSHORE SEASONAL 1,181 TOURLY
REQUIRED

Company SUW SDM RIG SMI SGR TK3 RIG ARM OTH TK3 ARM

Category CTRG DPDS RIG DFMS MLS OTHR OTHR OTHR VAC WSC WSC
PERSONNEL
14 1 38 3 4 3 14 1 1 3 1
Total
AND SERVICES No. of Persons
83
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24 10 24 24

Standby/Tankers Others
TRUCKS/BOATS
AB-6313 AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 500 515 221 0 1150

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1241 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/01/2024 - 09/05/2024
Report ID: OPERLMTDMRREP

ADC-56L @ SDGM-1241 Limited Morning Report for 06/18/2024


Objective : (K2 S- SHAPE Foreman(s)ROGERS, RICHARD ALLEN
WELL TARGET JAUF Engineer MATA PETIT, FELIX EMILIO
D&WO Morning Report (Service Providers View) RESERVOIR) Manager NEJIDI, AHMED ABDULLAH
Rig Charge #:
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-56L (66-23054-1241) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK) +882167771 2649 013-577-39 92 013-829-77 56 (ADC)
(0500-0500) Saudi Aramco Well Wellbores: OTHER VSAT OTHER VSAT OTHER VSAT
Date: Tuesday 06/18/2024 SDGM-1241 (0) SDGM_1241_0 013-577-93 48 (FCT) 013-664-88 15 (SLB) 013-829-76 56 (CLINIC )
CONTRACTOR /CLERK VSA T
013-577-39 48

Last 24 hr operations Next 24 hr plan


RIG UP ON SDGM-1241 RIG UP ON SDGM-1241, CERTIFY LOAD TEST FOR BOP HOISTS.
Location Next Location
SDGM-1241 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 101
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM WITH ALL PERSONNEL, DISCUSSED PLAN, ALL


RELATED HAZARDS AND PRECAUTIONS.
- CONTINUE WORKING TO COMPLETE PRE-SPUD CL
- CONNECTED ROTARY HOSE TO STANDPIPE MANIFOLD.
- INSTALL UPPER IBOP, LOWER IBOP, SAVER SUB ON GOING.
0500 - 1700 12 0 PRE N RM RU NA RIG 0 0 - INSTALL LOCK-WIRE ON ALL REQUIRED COMPONENTS ON
TDS ONGOING
- R/U HP LINES TO RIG FLOOR
- R/U RIG TONGS AND PIPE SPINNER.
- INSTALL 4 FALL ARRESTORS IN SUBBASE AREA.
- TROUBLESHOOT TDS POWER CABLE & AUXILIARY CABLES
ON GOING.

WAIT ON DAYLIGHT.
- COMPLETE UPPER IBOP, LOWER IBOP, SAVER SUB
INSTALLATION
- COMPLETE LOCK-WIRE INSTALLATION
- P/T SURFACE LINE AND ALL VALVES @ 5000 PSI - OK.
- CONTINUE WORKING ON PRE-SPUD CHECKLIST.
- CONTINUE GENERAL MECHANICAL & ELECTRICAL R/U
PRE-MOVE LOADS TO SDGM-1241: 37 LOADS.
1700 - 0459 12 0 PRE N SUSP OTH NA RIG 0 0
- CUMULATIVE LOADS: 239 LOADS.
- RIG MOVE FLEET: 2 TRUCKS, 1 CRANES, 1 FORKLIFT, 1
CHERRY PICKER.
- RIG MOVE PERSONNEL: 1 TRUCK PUSHERS, 1 RIGGER-1.
- RIG MOVE DISTANCE: 23 KM.
- ACTUAL RIG MOVE + MAINTENANCE: 9.95 DAYS
- R/D: 100%, RM: 100 %, R/U: 85%.
- TOTAL PLANNED DAYS: 7.27+3 = 10.27 DAYS
- EXPECTED SPUD DATE: 19-06-202
Foreman Remarks

SDGM-1241, WILL BE DRILLED AS K2 S-SHAPE WELL TARGETING JAUF RESERVOIR IN THE MIDDLE PART OF SHEDGUM FIELD AND WILL BE COMPLETED WITH 4-1/2" 15K CEMENTED LINER.
===========================================ARAMCO PERSONNEL===================================
- ARAMCO MATERIAL EXPEDITOR ALI ALSULTAN #8519555 ON LOCATION SINCE 05/29/2024.
- ARAMCO MATERIALS EXPEDITOR MOHAMMED ALSULTAN (ID# 8524021) ON LOCATION ON 05/27/2024. LEFT LOCATION 6/3/2024
- ARAMCO FCT #796651, INAD ALYAN ON LOCATION FROM 05/29/2024. LEFT LOCATION 6-11-2024
- SGGDD HSE COORDINATOR, NADEEM SHAH ID# 8094935 ON LOCATION FROM 05/15/2024. OFF LOCATION 06/05/2024
- SGGDD HSE COORDINATOR, BILAL AHMED ID# 8557373 ON LOCATION FROM 06/04/2024.
=============================================IDS PERSONNEL=======================================
- IDS WSL: FAHAD.
- IDS NWSL: RAFIK.
============================================SERVICE COMPANY=====================================
MI-SWACO VISITED THE RIG FOR SITE SURVEY CLOSED LOOP SYSTEM 6/9/2024
============================================VISIT==============================================
- IDS PROGRAM MANAGER-SLB IWC GIANLUIGI MORONI VISITED RIG 04-12-2024
-IDS DRLG SUPT YOUSIF ABDALLA VISITED RIG ON 06/13/2024.
- ADC RIG MANAGER ABBAS VISITED RIG ON 06/10/2024.
- IDS PROJECT MANAGER MOHAMMED RAYES ALAWFI VISTED RIG ON 05/15/2024.
-IDS HSE MANAGER VIKTOR YURTAEV VISITED RIG ON 06/4/2024.
- ADC MOHAMED FOUAD MENSHAWY ADC HSE MGR VISITED RIG ON 02/13/2024.
============================================SAFETY ==========================================
DWLTI: 2090.
- SGGDD SAFETY TOPIC: SLIP TRIP FALL HAZARD
- SAFETY ALERTS: HSE ALERT 37-24 - PINCH POINT INJURY WHILE BACKING OFF NUT/HSE ALERT 38-24 - TRAVELLING BLOCKS STRICK TDS HANG-OFF LINK
- EMPHASIZED ON STOP CARDS PARTICIPATION BY CREW MEMBERS THROUGH STOP CARD DIGITAL PLATFORM.
- MAINTAINING HOUSEKEEPING AROUND RIG

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1241 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 06/01/2024 - 09/05/2024
Report ID: OPERLMTDMRREP

- EMPHASIZED ON THE LINE OF FIRE AND ZONE MANAGEMENT.


================================================DRILLS========================================

=============================================NEAR MISS & SLS=====================================


NEAR MISS ID: 7227706 SPILL KIT COVER.
=================================================AUDITS========================================
-2024 1ST RHSEI TOTAL FINDINGS : 25 & CLOSED: 24 & OPEN: 1 .
-2024 WELL CONTROL EQUIPMENT AUDIT: FINDINGS: 4, CLOSED-4, OPEN-0
============================================CASING SETTING DEPTHS=================================
- 30" SHOE AT MD =
- 24" SHOE AT MD =
- 18 5/8" SHOE AT MD =
- 13 3/8" SHOE AT MD =
- 9 5/8" SHOE AT MD =
- 7" LINER SHOE AT MD =
- 4.5" LINER SHOE AT MD =
================================================NEXT WELL====================================

===========================================VACUUM TANKERS=====================================
- VACCUM TANKER PLAT NO#1163-TRA (DOOR#2008-28) ON LOCATION SINCE 05/01/2024 (MONTHLY) UNDER DRSS-1004295271.
================================================DIRECTIONAL PLAN================================

============================================DIESEL CONSUMED F/ OBM================================

DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A SEASONAL N/A SEAONAL 2,091 PRE-TOUR

Company SUW RIG SMI BR1 TK3 RIG ARM OTH TK3 ARM

Category CTRG RIG DFMS MLS OTHR OTHR OTHR VAC WSC WSC
PERSONNEL
14 43 2 0 3 37 2 1 3 1
Total
AND SERVICES No. of Persons
106
INFORMATION
Personnel on Loc. Hrs. 24 24 24 0 24 24 24 24 24 24

Operating Hours. 0 24 24 0 0 0 12 0 24 24

Standby/Tankers Others
TRUCKS/BOATS
AB-7106 AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
0 500 404 168 64 4350

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR FDHL-170 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 02/27/2024 - 07/27/2024
Report ID: OPERLMTDMRREP

ADC-57L @ FDHL-170 Limited Morning Report for 06/18/2024


Objective : (HORIZONTAL TRI- Foreman(s)ARNDT, TYLER / ABDULLAH, NASHWAN KHALID
D&WO Morning Report (Service Providers View) Rig Charge #: LATERAL OIL PRODUCER IN Engineer RODRIGUEZ CAMPOS, FERNANDO CARLOS
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-57L (66-23018-0170) LFDL RESERVOIR) Manager MUTAIRI, NAIF MUTLAQ
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: +882167771 2658 679 1875/4 /CLERK VSA
Date: Tuesday 06/18/2024 FDHL-170 (0-1-2) FDHL_170_3 T
679 1873

Last 24 hr operations Next 24 hr plan


DRILL L-0-1-2 WITH SLB RSS ASSY, 79 PCF WBM & FULL RETURNS DRILL L-0-1-2 TO TD @ +/- 17,054'WITH SLB RSS ASSY.
Location Next Location
TAKE RIGHT EXIT FROM FADHIL BRIDGE THEN TURN LEFT TO PASS UNDER THE BRIDGE TO FDHL-170 FDHL-176
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
13,725 Size 10040 Size 11,220 13,128 10,108 Top
Formations Comments
9 5/8 7 Depth
LFDR 10,058 8' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12585 (Date) 100 1,140 122
102.4 (03/07/2024@1900 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

DRILL 6 1/8" LATERAL W/ SLB RSS/MWD/LWD ASSY, 79 PCF LSND WBM & FULL
0500 - 1700 12 0-1-2 6 1/8 N DRLG D RSS SDM 12585 13050 RETURNS.
- PUMP SWEEPS & REAM EACH STAND AS REQUIRED.
- FLOW CHECK EACH CONNECTION.

1700 - 1730 0.5 0-1-2 6 1/8 N DRLG PJSM NA RIG 13050 13050 HELD SAFETY STAND DOWN MEETING, DISCUSSED PINCH POINTS, HAND & FINGER
INJURIES.

DRILL 6 1/8" LATERAL W/ SLB RSS/MWD/LWD ASSY, 79 PCF LSND WBM & FULL
1730 - 0430 11 0-1-2 6 1/8 N DRLG D RSS SDM 13050 13725 RETURNS.
- PUMP SWEEPS & REAM EACH STAND AS REQUIRED.
- FLOW CHECK EACH CONNECTION.
0430 - 0459 0.5 0-1-2 6 1/8 N DRLG RR TDS RIG 13725 13725
HPJSM. SERVICE TDS & INSPECT FOR POSSIBLE DROPPED OBJECTS.
Foreman Remarks

FDHL-170 TO BE DRILLED AS A HORIZONTAL TRI-LATERAL OIL PRODUCER IN LFDL RESERVOIR. ACID STIMULATION WILL BE PERFORMED IN L0, L2, L3 AND COMPLETED WITH SMART
COMPLETION (ICVS) EQUIPPED WITH PDHMS & ESP. THE SMART COMPLETION WILL BE RUN WITH 4-1/2" TUBING, 9-5/8" DOWNHOLE PACKER AND 4" X 5K WELLHEAD TREE.
=====================================================
WELL DATA:
36" CSG PLAN/ACTUAL: 120'/116'.
30" CSG PLAN/ACTUAL: 290'/289'.
24" CSG PLAN/ACTUAL: 1,336'/1,069' (50' INTO RUS)
18 5/8" CSG PLAN/ACTUAL: 4,300' /4,228' ; DV TOOL@ 879' (50' INTO LAMS)
13 3/8" CSG PLAN/ACTUAL: 6,666' /6,636'. DV TOOL@ 4,030' (50' INTO BUWB)
9 5/8" CSG PLAN/ACTUAL: 11,693'MD /10,034' TVD/ 11,730' MD / 10,040 TVD & DV TOOL@ 6,430' (16' ABOVE LFDL)
7" LINER CSG PLAN/ACTUAL: 12760 MD'/10077 TVD, 13,128' MD/ 10,108' TVD (INSIDE LFDL) TOL @ 11.220'
6 1/8" L-0 PLAN/ACTUAL: 16,880' MD'/10,084' TVD, 16,680 MD/ 10,076' TVD.
6 1/8" L-1 PLAN BOW 12,150/ACTUAL 12,156, PLAN 16,285' MD/ 10,057 TVD.
6 1/8" L-2 PLAN BOW 11,867'/ACTUAL 11,867', PLAN 17,054 MD/ 10007 TVD.
=====================================================
WELL SITE LEADER: WU/ALISTAR
MUD ENGINEER: HAMZA
RIG SUPERINTENDENT: MOKHTAR/AHMED/NACERADDINE
=====================================================
ARAMCO PERSONNEL ON LOCATION:
ABDULKALEQ ALGHAMDI MATERIAL EXPEDITOR ID# 8341435 ON DAYS OFF 6/11
SALMAN ALOTAIBI MATERIAL EXPEDITOR ID# 8586319 ON LOCATION 6/3
SALEM ALSHAMMARI ARAMCO FCT #818411 ON DAYS OFF 6/11
ABBAS ALSADAH HSE SPSP TRAINEE #826809 OFF LOCATION 6/12
ARAMCO SAFETY ADVISOR GOWRI SHANKAR ADAPA #8525313 ON LOCATION SINCE 14-JUNE-2024 FOR HSE SUPPORT.
=====================================================
RIG VISIT: SLB SUPT ISMAIL BASYOUNY & SLB DRGL ENG EMAD HASSAN
=====================================================
FOLLOWING DIR PLAN: FDHL-170 L1-2 D10.0 050624 SGR PROPOSAL GEODETIC REPORT. DATED JUNE 5, 2024.
TOW @ 11,857' & BOW @ 11,867'.
DIRECTIONAL OFFSETS:
GAMA: 6.57', INC: 7.47', DIR: 9.57', RES: 36.93', D+I: 42.13', GAMA: 44.13', NMR: 71.21', DEN: 100.28' & NEUTRON: 103.92'
0.46' ABOVE & 5.37' RIGHT OF PLAN
=====================================================
NEXT WELL: FDHL-176 80% READY
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0-1-2 12,656 90.55 211.02 97 10,068 -1199.25 -145.87 3,963.55 3.91
0-1-2 12,752 90.52 211.98 96 10,067 -1224.2 -161.16 4,051.06 1
DAILY SURVEY 0-1-2 12,848 90.55 211.82 96 10,066 -1249.04 -176.62 4,138.66 0.17
0-1-2 12,943 90.55 211.28 95 10,065 -1273.71 -191.77 4,225.95 0.57
0-1-2 13,037 90.59 210.98 94 10,065 -1298.24 -206.58 4,312.89 0.32
0-1-2 13,132 90.45 209.02 95 10,064 -1323.31 -221.06 4,401.73 2.07

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR FDHL-170 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:19 02/27/2024 - 07/27/2024
Report ID: OPERLMTDMRREP

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0-1-2 13,227 90.38 208.41 95 10,063 -1348.7 -234.97 4,491.54 0.64
0-1-2 13,323 90.83 209.91 96 10,062 -1374.26 -249.23 4,582.26 1.63
0-1-2 13,419 91.24 210.11 96 10,060 -1399.59 -263.86 4,672.71 0.48
0-1-2 13,511 91.03 209.11 92 10,058 -1423.96 -277.71 4,759.81 1.11

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
79 PCF 1 4.6 API 8 0 Volts 16.76 10.4 36,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
130 15.8 HTHP 75 22 0 10 / 12 WBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0.5 25 17 7/8 0 320 0
56
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
79 PCF 1 4.8 API 8 0 Volts 16.7 10.5 37,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
128 15.4 HTHP 75 20 0 10 / 12 WBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0.5 21 17 7/8 0 360 0
52

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
12RR 11,878 13,725 DP Av DC Av Bit HHP 16 90 M433 6.125 SMT
Pressure GPM Jet Vel 528.76 N/A 74 I-Row O-Row DC Location Bearings
2,600 270 223 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
QF8785 X613C 3 x 13 / 0.389
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 50.5 220 240 210 9,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID SizeLength Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 6.125 1 6.125 0.53 3.5 REG QF8785
2 RSS SDM 4.75 1 4.75 1.43 30.05 NC-35 3.5 REG 43 75445045
DRILL STRING 3 Measurement While Drilling (MWD) SDM 4.75 1 4.75 2.25 64.6 NC-38 NC-35 25.4 B1127
4 Logging While Drilling (LWD) SDM 4.75 1 4.75 2.5 41.61 3.5 IF NC-38 54.94 B1381
5 Crossover RIG 4.75 1 4.75 2.25 2.63 XT39 NC38 43 C429731
6 Heavy Weight Drillpipe (HWDP) RIG 4 9 4 2.56 279.08 XT39 XT39 28.24 CONV 00
7 Hydraulic Jar SJS 4.75 1 4.75 2.25 34.2 XT-39 XT-39 43 02128K
8 Heavy Weight Drillpipe (HWDP) RIG 4 4 4 2.563 124.09 XT39 XT39 26 CONV 00
9 Drillpipe RIG 4 195 4 3.476 6,106.54 XT39 XT39 11.85 G105 PREMIUM
10 Crossover SDM 5 1 5 2.25 2.63 4 1/2 REG XT39 80 368611A
11 Drillpipe RIG 5 165 5 4.276 5,170.94 NC50 NC50 19.5 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/15/2024 YES MILD N/A HOT 2,063 2 X PRE-TOUR
MEETING

Company SCC SDM RIG SMI MJH BR1 TK3 RIG ARM SCT OTH TK3 ARM

Category CTRG DPDS RIG DFMS SEC MLS OTHR OTHR OTHR SFS VAC WSC WSC
PERSONNEL
13 2 37 1 7 0 8 15 1 4 1 2 2
Total
AND SERVICES No. of Persons
93
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 0 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 0 24 12 12 12 0 12 24 24

Standby/Tankers Others
TRUCKS/BOATS
AMBULANCE AB-6241

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 500 337 N/A N/A 900

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABHD-187 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/04/2024 - 08/20/2024
Report ID: OPERLMTDMRREP

ADC-58L @ ABHD-187 Limited Morning Report for 06/18/2024


Objective : (PILOT HOLE TO Foreman(s)VAN HEREWEGHE, RONALD LOUIS / BALOBAID, FAISAL SALEH
D&WO Morning Report (Service Providers View) Charge #: UFDL RESERVOIR & A SINGLE Engineer RODRIGUEZ CAMPOS, FERNANDO CARLOS
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23014-0187) LATERAL HRZ OIL Manager GARNI, ABDULLAH SALEH
ADC-58L
PRODUCER IN NW FLANK OF THURAYA RIG FORMAN VSAT RIG FORMAN VSAT
Daily Onshore (LSTK)
Wellbores: HDRY RESERVOIR)
(0500-0500) Saudi Aramco Well +882167771 2659 3786458 3786457
Date: Tuesday 06/18/2024 ABHD-187 (0) ABHD_187_0 MOBILE CONTRACTOR /CLERK VSA T
+966593021 582 3786459

Last 24 hr operations Next 24 hr plan


MRSS DRILL 12-1/4" HOLE - CHC - POOH - L/D 12-1/4" BHI MRSS BHA P/U NEW BIT & 12-1/4" BHI MRSS BHA - RIH - MRSS DRILL 12-1/4" HOLE
Location Next Location
ABUHADRIA ROAD, 156 KM FROM DMG, (DIRECTION FROM DHAHRAN: N47W), BEHIND ABUHADRIA CHECK POI ABHD-641
Current Depth (ft) Liner TOL MD TVD Formation Tops
8,574 Last Csg Size MD TVD Size Top
13 3/8 7140 7139 Formations Comments
Depth
AS PER GOC 7687' TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) BURR 7,690
SHALLOWER 5'
8515 (Date) 100 59 164 AS PER GOC 7796' TVD
34.2 (05/14/2024@2230 ) SULY 7,801
SHALLOWER 12 '
AS PER GOC 7951' TVD
BLRR 7,959
DEEPER 4'
AS PER GOC 8247' TVD
MNFR 8,268
SHALLOWER 7'
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

BHI MRSS DRILL 12-1/4" HOLE TO 8574' W/79 PCF OBM, 100% CIRC.
- WOB: 25-35 - GPM 800 PSI - SPP: 3500-3700 PSI - DIFF PRESSURE: 50-200 PSI -
RPM 80-100 + 72 M - TORQUE: 5-6 KFT.LB.
0500 - 1415 9.25 0 12 1/4 N DRLG DMR MRSS BHI 8515 8574
- ADJUST DRILLING PARAMETERS TO MITIGATE STICK-SLIP VIBRATION.
- SWEEP HOLE WITH 15/20 BBL LO VIS / HI-WT PILL EVERY 2 STD'S.
- REAM UP/DOWN ONE JT EVERY STD & FULL STD EVERY 3 STD'S.
- PPT SPURT /TOTAL @1000 PSI DIFF PRESS: 0.4 / 2.6 ML

1415 - 1515 1 0 12 1/4 N DRLG CIRC MPMP RIG 8574 8574 CIRC HOLE CLEAN W/ 79 PCF OBM - 100% RETURNS
- PREPARE TO POOH DUE TO LOW ROP
1515 - 1530 0.25 0 12 1/4 N DRLG OTH NA RIG 8574 8574
FLOW CHK - WELL STATIC
1530 - 1600 0.5 0 12 1/4 N DRLG TO STDP TK2 8574 8574 8574 8104
POOH W/ 5 STDS - HOLE IN GOOD CONDITION
1600 - 1615 0.25 0 12 1/4 N DRLG OTH NA RIG 8574 8574
FLOW CHK - WELL STATIC - PUMP SLUG

CONDUCTED MAN DOWN (INJURY) DRILL ON RIG FLOOR WITH MEDICAL


1615 - 1645 0.5 0 12 1/4 N DRLG SDR1 NA RIG 8574 8574 EVACUATION BY STRETCHER USING A CRANE. IP (DUMMY) TRANSFERRED FROM
RIG FLOOR TO CLINIC. HELD STAND DOWN CRITIC MEETING WITH RIG CREW &
DISCUSS THE AREA OF IMPROVEMENT.

1645 - 1715 0.5 0 12 1/4 N DRLG TO STDP TK2 8574 8574 8104 7140 POOH W/ BHI 12-1/4" MRSS DIR BHA
- MONITOR WELL ON TRIP TANK - STATIC
1715 - 1745 0.5 0 12 1/4 N DRLG OTH NA RIG 8574 8574
FLOW CHK @ CSG SHOE 7140' - WELL STATIC

1745 - 2100 3.25 0 12 1/4 N DRLG TO SPDP TK2 8574 8574 7140 1038 CONTINUE TO POOH W/ BHI 12-1/4" MRSS DIR BHA
- MONITOR WELL ON TRIP TANK - STATIC
2100 - 2115 0.25 0 12 1/4 N DRLG OTH NA RIG 8574 8574
FLOW CHK @ TOP OF BHA - WELL STATIC

2115 - 2230 1.25 0 12 1/4 N DRLG TO SPHDP TK2 8574 8574 1038 200 CONT. POOH W/ 12 1/4" MRSS ASSY. F/ 1,040 FT TO SURFACE.
- MONITOR WELL ON TRIP TANK - STATIC

HPJSM, L/D BHI 12-1/4" MRSS BHA, PBL SUB & DRLG JARS (BIT DULL GRADING: 1-
2230 - 0400 5.5 0 12 1/4 N DRLG HT BHA BHI 8574 8574 1038 0 1-WT-A-I-X-NO-RP)
- DUMPED MWD MEMORY.
- MONITOR WELL ON TRIP TANK - STATIC
0400 - 0430 0.5 0 12 1/4 N DRLG OTH NA RIG 8574 8574
HOUSEKEEPING ON RIG FLOOR
0430 - 0459 0.5 0 12 1/4 N DRLG RR TDS RIG 8574 8574
SERVICE TDS.
Foreman Remarks

ABHD-187 WELL WILL BE DRILLED AS A SINGLE LATERAL HORIZONTAL OIL PRODUCER IN THE NORTH WEST FLANK OF HDRY RESERVOIR WITH A PILOT HOLE TO UFDL RESERVOIR, COMPLETED
WITH PDHMS, ESP, Y-TOOL &TRSSV.
======================ERP===================================
- GOR HDRY: 260 SCF/STB, H2S HDRY : 2.34 %
- 30 PPM RER @ 1228 M, 100 PPM RER @ 694 M & 1/2 LFL: 138 M.
- THE RELIEF WELL FOR ABHD-187 IS ABHD-601.
======================= WELL DESIGN ===========================
- 9-5/8" CSG PLAN 10,143' (50 FT TVD INTO BUHR).
- 7" LINER PLAN 10,383' (5 FT TVD INTO HDRR.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABHD-187 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/04/2024 - 08/20/2024
Report ID: OPERLMTDMRREP

- 6 1/8" SECTION PLAN 11,013 FT


========================DIRECTIONAL============================================================
* 12-1/4" BHI MRSS BHA: MOTOR SPECIFICATION: 9.5" ULRA XL/VS - 7/8 - 4.0 STAGES - 0.09 REV/GAL.
- SENSORS OFF SET FROM BIT: NBI 4.68 FT - RESESTIVITY: 65.02 FT - PRESSURE: 69.25 FT - GR: 72.18 FT - DIRECTIONAL / VSS: 76.96.
* WELL TRAJECTORY: 1.7' ABOVE & 0.27' RIGHT OF PLAN, FOLLOWING ABHD-187_0REV-G.2 (PWP).
======================= SAFETY===================================
**DISCUSSED SAFETY ALERT RELATED TO CURRENT OPERATION :
======================= ARAMO POB================================
- BATIH MOHAMMED ALJAMEELI ID# 822178 MATERIAL EXPEDITER ON LOCATION.
===================LSTK/CONTRACTOR =================================
-WSL: KHALID/ ALI. ADC: MOHAMED/ HAMDY.
=============================VACUUM TANKERS=========================
- 02 VACUUM TANKERS ON LOCATION SINCE 5/01/2024.
=======================ADC / BAKER VISIT =============================
=============================NEXT LOCATION==========================
- NEXT LOCATION ABHD-637: READINESS 0 %.
* WATER WELLS SUPPLY: ,
- APPROVED PROGRAM: NO & ERP: NO.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
79 PCF 1 0 API 69 715 Volts 3.5 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
135 3.8 HTHP 17 19 0 9 / 11 OBM 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 19 14 9 / 11 0 0 2.6
57
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
79 PCF 1 0 API 69 720 Volts 3.5 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
135 3.6 HTHP 17 23 0 10 / 12 OBM 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 18 14 10 / 12 0 0 2.6
59

MARBLE-FINE MRBL-M MLCRB-10V MLCRB-20V MLCRB-30V MLCRB-5V CARBOTROL


MUD 2 ( 2200L ) 1 ( 2200L ) 12 ( 25KG ) 12 ( 25KG ) 12 ( 25KG ) 12 ( 25KG ) 10 ( 50LBP )
TREATMENT CAOH2
10 ( 50LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
9RR 7,170 8,574 DP Av DC Av Bit HHP 35 162 M223 12.25 HTC
Pressure GPM Jet Vel 156.79 251.99 0 I-Row O-Row DC Location Bearings
3,600 800 N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7918044 DD506XV1 POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 94.8 248 263 237 8 94.8
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
94.8

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 12.25 1 1.18 7918044
2 RSS BHI 9.5 1 9.5 8.33 1 16241275
3 Mud Motor BHI 9.5 1 9.5 37.02 0 15760073
4 Flex Joint BHI 9.5 1 9.5 3 11.84 9 1/2 T2 9 1/2 T2 1 14742174
5 Measurement While Drilling (MWD) BHI 9.5 1 9.5 22.45 215.23 15691612
DRILL STRING
6 BCPM. Bi-directional Communication and BHI 9.5 1 9.5 3 7.93 6 5/8 T2 6 5/8 T2 1 16122339
Power Module
7 Stop Sub BHI 8 1 8 3 2.68 6 5/8 REG 9 1/2 T2 1 12197321
8 Stabilizer BHI 8.25 1 6.5 2.875 7 NC46 NC46 1 301485
9 Float Sub BHI 8 1 8 2.875 3.58 6 5/8 REG 6 5/8 REG 1 14730729
10 FIlter Sub BHI 8 1 8 3 5.58 6 5/8 REG 6 5/8 REG 1 15598341
11 Multi Activation Circulating Sub BWC 8.25 1 8.25 2.813 7.93 6 5/8 REG 6 5/8 REG 0 W582558681
12 Drillcollar RIG 8.25 3 8.25 3 282 6 5/8 REG 6 5/8 REG 1 SLCK
13 Hydro-Mechanical Jar NPC 8 1 8 31.73 1 HMJ-800-194
14 Drillcollar RIG 8.5 2 8.5 2.813 190 6 5/8 REG 6 5/8 REG 1 SLCK
15 Heavy Weight Drillpipe (HWDP) RIG 5 24 5 3 762 NC50 NC50 50.14 CONV
16 Drillpipe RIG 5 10 5 4.276 300 NC50 NC50 19.5 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/02/2024 06/02/2024 N/A N/A N/A 2,048 N/A

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABHD-187 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/04/2024 - 08/20/2024
Report ID: OPERLMTDMRREP

Company SCC BHI RIG BDF MJH TK2 RIG OTH TK2 ARM

Category CTRG DPDS RIG DFMS SEC OTHR OTHR VAC WSC WSC
PERSONNEL
13 2 39 1 8 1 17 4 2 1
Total
AND SERVICES No. of Persons
88
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 12 12 12

Standby/Tankers
TRUCKS/BOATS
DH8959

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 5000

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1296 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/14/2024 - 10/01/2024
Report ID: OPERLMTDMRREP

ADC-59L @ HWYH-1296 Limited Morning Report for 06/18/2024


Objective : (VERTICAL Foreman(s)GRIFFITH IV, HIRAM THOMAS
WELL TARGETING PRE- Engineer MATA PETIT, FELIX EMILIO
D&WO Morning Report (Service Providers View) Rig Charge #: KHUFF AS PRIMARY (200 Manager NEJIDI, AHMED ABDULLAH
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-59L (66-23053-1296) FT INTO TWLF) AND THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK) KHUFF AS SECONDARY
8821677712 650 013-577-39 90 ARAMCO 013-664-88 16 IDS
(0500-0500) Saudi Aramco Well Wellbores: RESERVOIR AND)
HWYH-1296 (0) HWYH_1296_0 OTHER VSAT CONTRACTOR /CLERK VSA T CONTRACTOR
Date: Tuesday 06/18/2024 /CLERK VSA T
013-829-77 59 ADC 013-829-76 59 CLINIC
013-577-39 52 CLERK

Last 24 hr operations Next 24 hr plan


GENERAL RIG DOWN AT HWYH-1319 & MOVE TO HWYH-1296. GENERAL RIG DOWN AT HWYH-1319, MOVE & R/U @ HWYH-1296.
Location Next Location
HWYH-1296 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 0 180
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0530 0.5 0 PRE M RM PJSM NA RIG 0 0 HPJSM WITH ALL PERSONNEL PRIOR TO START RIG DOWN & L/D ACTIVITIES.
- DISCUSSED RELATED HAZARDS & PRECAUTIONS.

RIG DOWN ON WELL HWYH-1319 & MOVE TO WELL HWYH-1296 (DISTANCE 60.6
KMS). HWYH-1319 (OLD LOCATION):
- DISCONNECT TDS INTO SECTIONS.
- PREPARED DERRICK SECTION FOR SAND BLASTING.
- R/D DRAWWORKS.
- DISCONNECT ROTARY HOSE.
- SECURED ALL CABLES AND DRILL LINE.
- DISCONNECTING FLARE LINE.
- CONT-CLEANING SUB-BASE BY THIRD PARTY COMPANY.

HWYH-1296 (NEW LOCATION):


- LOADED & MOVED CABLE TRAY.
- LOADED & MOVED CROSS OVER BASKET.
- LOADED & MOVED ARAMCO TOOLS.
- LOADED & MOVED ADC BOX.
- LOADED & MOVEDCONTAINER.
- LOADED & MOVED MISCS.
- R/U MUD SYSTEM IN PROGRESS.
LOAD MOVED TO NEW LOC BY TODAY: 21 LOADS
0530 - 1700 11.5 0 PRE M RM RD NA RIG 0 0
TOTAL PRE-MOVE LOAD MOVED : 41 LOADS.
TOTAL LOAD MOVED TO NEW LOC : 131 LOADS
EQUIPMENT ARRIEVED AT RIG.
1. LBW TRUCKS = 10
2. LB TRUCKS = 09
3. FB TRUCKS = 05
3. LBH TRUCKS = 02
4. 7 AXEL TRUCKS = 02
5. 85 TON CRANE = 04
6. 10 TON FORKLIFT = 02
7. RIGGER-I = 02
8. RIGGER-II = 00
9. TRUCK PUSHER = 08
10. MAN-LIFT = 02
11. EXTRA MEDIC = 01
12. EXTRA AMBULANCE= 01

- RIG MOVE DISTANCE: 60.6 KM.


- R/D: 70 %, R/M: 60 %, R/U: 15 %.

1700 - 0459 12 0 PRE M SUSP OTH NA RIG 0 0 WAIT ON DAY LIGHT.


- MEANWHILE PERFORM GENERAL HOUSEKEEPING.
Foreman Remarks

PLANNED AS A VERTICAL WELL TARGETING PRE-KHUFF AS PRIMARY (+/-300 FT INTO TWLF) AND KHUFF AS SECONDARY RESERVOIR AND WILL BE COMPLETED WITH 4-1/2" 15K CEMENTED
LINER.
===================================================================================================
> PRE-SPUD MEETING TBD
===================================================================================================
> ARAMCO MAT. EXP. SAAD ALQATHAMI #816327 OFF LOCATION FROM 6/11/2024.
> ARAMCO SGGDD FIELD COMPLIANCE TECHNICIAN - ASAAD AKBAR #796636 OFF LOCATION FROM 6/11/2024.
> ARAMCO DRLG ENGINEER - FELIX MATA #721387 ON LOCATION (06/09/2024)
> ARAMCO LOSS PREVENTION MR. NASSAR ALDHAFEERI # 831460 CONDUCTED RSI 6/3/24.
================================ARAMCO SERVICE COMPANY PERSONNEL=======================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1296 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/14/2024 - 10/01/2024
Report ID: OPERLMTDMRREP

===========================IDS & ADC PERSONNEL & CONTRACTOR VISITS======================================


> IDS SUPERVISORS (DAY/NIGHT): BABJI/WALIED
> SLB IWC PROJECT MANAGER MOHAMMED RAYES LAST VISIT ON 03/10/2024.
> SLB IWC SUPERINTENDENT YOUSIF LAST VISIT ON 05/20/2024.
> ADC RIG MANAGER ABAS LAST VISIT 05/22/2024.
> IDS FIELD HSE SPECIALIST ABDELMADJID BOUKHALFA LAST VISIT 4/9/2024 .
===================================================HSE=============================================
> PRE-TOUR MEETING SAFETY TOPIC: PTM DISCUSSED ABOUT HSE ALERT RELATED TO FALL IN THE SUB BASE WHILE WORKING AT HEIGHT. PIN DROP FROM THE MAST. INCREASE AND RAISE THE
AWARENESS OF THE NEW CREW ARRIVED. OPERATION HIGHLIGHT AND DISCUSSION BY THE RS.

STOP CARDS
STOP CARDS REPORTED - 10
ADDITIONAL STOP CARDS - 0
DIGITAL STOP CARDS - 3
STOP CARDS TOTAL - 13
STOP CARDS RATE - 0.09

> RHSEI 2024 - 23 TOTAL, 23 CLOSED, 0 OPEN.


> WC 2024 - 8 TOTAL, 8 CLOSED, 0 OPEN.
> 1ST HALF CEHA, 2024: TOT. ITEMS: 30, OPEN 0 & CLOSED 30
> ADC-59L - MONTHLY PTW & LOTO ASSESSMENT REPORT: RIG SCORE 93%
======================================DRILLS========================================================
> DRILLS :
> INSPECTIONS :
> NEAR MISS :
==================================APPROVED DIESEL====================================================
> TBD
======================================VACUMMTANKERS================================================
> N/A
==========================================NEXTWELL=================================================
> TBD
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A 2 X WEEK LIGHT N/A SEASONAL 2,025 2 X DAILY

Company SCC RIG TK3 RIG OTH TK3 ARM

Category CTRG RIG OTHR OTHR VAC WSC WSC


PERSONNEL
13 41 6 86 4 2 1
Total
AND SERVICES No. of Persons
153
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24

Operating Hours. 0 12 12 12 12 12 12

Standby/Tankers Others Others Others


TRUCKS/BOATS
AB-6314 AMBULANCE, ADC-478 LAND CRUISER, ADC-478 P/U, ADC-505

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 440 259 0 0 0

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-2007 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 12/21/2023 - 11/09/2024
Report ID: OPERLMTDMRREP

ADC-60 @ MRJN-2007 Limited Morning Report for 06/18/2024


Objective : (OIL-WATER MUHEDB, ALI MOHAMMED / ALHUDAIB, KHALID MOHAMMED / ALZYADI,
Foreman(s)
INJECTOR IN MRJN ) RAEED ABDULLAH
D&WO Morning Report (Service Providers View) Charge #: Engineer HAJRI, FALEH SAHMI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-21073-2007) Manager MAJDI, SULAIMAN AL HASSAN
ADC-60
Daily OffShore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 0088-2167- 771-2838 378-6510 /CLERK VSA T
Date: Tuesday 06/18/2024 MRJN-2007 (1) MRJN_2007_1 378-6511 ( RR)
CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
378-6512 ( CLERK) 013-829-77 60 (OIM)

Last 24 hr operations Next 24 hr plan


PERFORM MIDWAY WIPER TRIP, DISPLACE TO 73 PCF AND CHANGE RCD BEARING. SLIP AND CUT. CONTINUE RIH WITH BHI MRSS ASSY TO BOTTOM AND AND DRILL 6-1/8" HOLE SECTION TO TD.
DISPLACED TO 68 PCF, RIH WITH 6-1/8" BHI MRSS ASSY.
Location Next Location
MRJN-506, 2001/2009 PF MRJN-2007
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
16,022 Size 10346 8159 Size 10,033 15,420 8,424 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
14830 (Date) 100 0 254
91.4 (06/10/2024@0500 )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

PUMPED TANDEM PILL AND SWEEP HOLE TILL SHALE SHAKER CLEAN.
0500 - 1000 5 1 6 1/8 N DRLG CIRC MPMP RIG 16022 16022
* CIRCULATED WITH OPEN MPD CHOKE WHILE MONITORING ECD WITH 250 GPM
(73 PCF EMW).
1000 - 1015 0.25 1 6 1/8 N DRLG CIRC MPMP RIG 16022 16022
FLOW CHECKED, STATIC.

1015 - 1115 1 1 6 1/8 N DRLG ST STDP RIG 16022 16022 16022 15444 POOH ON ELEVATOR WITH 6 1/8'' BHI MRSS BHA WITH WFD MPD 5 STADS.
* MEANWHILE, HELD 430 PSI SURFACE PRESSURE WITH MPD TO 73 PCF EMW.
1115 - 1130 0.25 1 6 1/8 N DRLG CIRC MPMP RIG 16022 16022
FLOW CHECKED, STATIC.

1130 - 1515 3.75 1 6 1/8 N DRLG TO STDP RIG 16022 16022 15444 13141 POOH ON ELEVATOR WITH 6 1/8'' BHI MRSS BHA WITH WFD MPD.
* MEANWHILE, HELD 430 PSI SURFACE PRESSURE WITH MPD TO 73 PCF EMW.
1515 - 1530 0.25 1 6 1/8 N DRLG CIRC MPMP RIG 16022 16022
FLOW CHECK, STATIC.

1530 - 1830 3 1 6 1/8 N DRLG CIRC MPMP RIG 16022 16022 DISPLACE WELL TO KILL MUD 73 PCF MUD WHILE HOLDING 430 PSI SURFACE
PRESSUED WITH MPD TILL 73 PCF MUD AT SURFACE.
1830 - 1900 0.5 1 6 1/8 N DRLG CIRC MPMP RIG 16022 16022
FLOW CHECKED, STATIC.
1900 - 2100 2 1 6 1/8 N DRLG RR DWKS RIG 16022 16022
SLIP AND CUT 105' OF DRILLING LINE.
2100 - 2130 0.5 1 6 1/8 N DRLG RR TDS RIG 16022 16022
SERVICED TDS.
2130 - 2200 0.5 1 6 1/8 N DRLG PJSM NA RIG 16022 16022
HELD PJSM WITH ALL PERSONNEL.

2200 - 2315 1.25 1 6 1/8 N DRLG OTH NA WUD 16022 16022 RIH WITH RCD BEARING RT. RETRIEVED BEARING AND RACKED BACK SAME. RIH
WITH NEW RCD BEARING AND INSTALLED SAME
2315 - 0345 4.5 1 6 1/8 N DRLG CIRC MPMP RIG 16022 16022
DISPLACED WELL TO 68 PCF MUD. CIRCULATED AND CONDITIONED MUD.
0345 - 0415 0.5 1 6 1/8 N DRLG CIRC MPMP RIG 16022 16022
FLOW CHECKED, STATIC.

0415 - 0459 0.75 1 6 1/8 N DRLG TI STDP RIG 16022 16022 13141 13620 RIH WITH 6-1/8" BHI MRSS ASSY WITH WFD MPD.
* MEANWHILE, HELD 430 PSI SURFACE PRESSURE WITH MPD TO 73 PCF EMW.
Foreman Remarks

MRJN-2007 WELL WILL BE DRILLED AS A DUAL LATERAL HORIZONTAL WATER INJECTOR ACROSS RTWI RESERVOIR . THIS WELL WILL BE COMPLETED AS AN OPEN HOLE COMPLETION WITH
PRODUCTION PACKER AND GRE TUBING.
==========================================================================================================
LATERAL-1
TOW: 13,228'
BOW: 13,238'
==========================================================================================================
* RENTAL TOOLS
* 4-3/4" TAQA JAR S/N DJ10-500-105 ON BOARD SINCE 05/08/24
* 2 X 6-3/4" WFD BPL SUB ON BOARD SINCE 4/24/24.
==========================================================================================================
* WAIT ON WEATHER: TODAY 0 HRS, TOTAL 0 HRS
* WAIT ON PRODUCING: TODAY 0 HRS, TOTAL 0 HRS
* WAIT ON MARINE: TODAY 0 HRS, TOTAL 0 HRS
* WAIT ON TOOL HOUSE: TODAY 0 HRS, TOTAL 0 HRS
==========================================================================================================
* RIG FINAL POSITION: LAT 28 DEG 33.27' N, LONG: 049 DEG 37.26' E.
* FINAL LEG PENETRATION: BOW: 9 FT; STBD: 8 FT; PORT: 8 FT.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-2007 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 12/21/2023 - 11/09/2024
Report ID: OPERLMTDMRREP

* WATER DEPTH = 152 FT.


* AIR GAP = 50'.
* RIG HEADING = 335 DEG.
* RKB TO MEAN SEA LEVEL = 114 FT.
* RKB TO SEA BED = 266 FT.
==========================================================================================================
HOLE SECTIONS:
* 22" PLANNED DEPTH AT 2,877' MD/2,850' TVD, ACTUAL DEPTH AT 2,880 FT MD/ 2,852 FT TVD - RUS FORMATION.
* 17" PLANNED DEPTH AT 5,894' MD/5,673' TVD, ACTUAL DEPTH AT 5930 FT MD/ 5745 FT TVD - LAMS FORMATION.
* 12-1/4" PLANNED DEPTH AT 10,441' MD/ 8,185' TVD, ACTUAL DEPTH AT 10348 FT MD/ 8159 TVD - YAMM FORMATION.
* 8-1/2" PLANNED DEPTH AT 15,430' MD/ 8,424' TVD, ACTUAL DEPTH AT 15424 FT MD/ 8425 FT TVD - RATAWI FORMATION.
* 6-1/8" PLANNED DEPTH AT 20,478' MD/ 8,650' TVD, ACTUAL DEPTH AT 20465 FT MD/ 8,650 FT TVD - RATAWI FORMATION - TD FOR MB.
==========================================================================================================
DRILLS: H2S RESCUE, MAN DOWN STRECHER & FIRE ON 5/27/2024; H2S & ABANDON SHIP DRILL ON 06/15/2024.
HSE ALERTS: D&WO HSE ALERTS - WEEK # 22
==========================================================================================================
PERSONNEL ON BOARD:
** ARAMCO FOREMAN RAEED ALZYADI, ID# 786203 ARRIVED LOCATION SINCE JUNE 10 2024
** MEHDI VALIYEV ARAMCO DE , BADGE # 897354 , ONBOARD SINCE JUNE 11, 2024.
** IBRAHIM AL ZURAI ARAMCO HSE , BADGE # 795207 , ONBOARD SINCE JUNE 4, 2024.
** AHMED HAMDI, ARAMCO MATERIAL EXPEDITOR, BADGE # 8534310, ONBOARD SINCE JUNE 4, 2024.
** ABDULLAH ALSHUKR, ARAMCO DOECD TRAINEE, BADGE# 795024, ONBOARD SINCE JUNE 4, 2024.
==========================================================================================================
BATCH DRILLING SEQUENCE:
* MRJN-2006 (DUAL LAT/RATAWI). 22" HOLE (FINISHED). 17" HOLE SECTION (FINISHED). 12-1/4" SECTON (FINISHED).
* MRJN-2007 (DUAL LAT/RATAWI). 22" HOLE (FINISHED). 17" HOLE SECTION (FINISHED). 12-1/4" SECTON (FINISHED). 8-1/2" SECTION (FINISHED) 6-1/8" (IN PROGRESS).
* MRJN-2008 (SINGLE LAT/SFNY). 22" HOLE (FINISHED). 17" HOLE SECTION (FINISHED). 12-1/4" SECTON (FINISHED).
* MRJN-2001 SUSPENDED FOR COMPLETION.
==========================================================================================================
* LC-50 SAMPLE FOR WBM SENT ON JANUARY 25TH, 2024 ON RAWABI-56, MANIFEST# 2400664541.
* LC-50 SAMPLE FOR OBM SENT ON MARCH 23RD, 2024 ON RAWABI-23, MANIFEST# 2400674966.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 2 3.1 API 2 0 Volts 3.15 10.2 40,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
135 13.6 HTHP 92 20 0 7/9 NCPOL 3.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0.5 18 6 6/7 0 200 13.2
53
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 2 3 API 2 0 Volts 3.15 10.2 40,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 13.2 HTHP 92 20 0 7/9 NCPOL 3
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0.5 18 6 6/7 0 200 13
54

BCTRN CAUST SODASH FLO-TROL ODCA128 MAXSHIELD PACLV


MUD 2 ( 5GL ) 2 ( 25KG ) 4 ( 100LB ) 24 ( 25KG ) 2 ( 55GL ) 1 ( 55GL ) 6 ( 25KG )
TREATMENT OXYGON SAFE-SCAV DUOVIS-NS
1 ( 100LB ) 1 ( 55GL ) 10 ( 25KG )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
15RR 13,249 16,022 DP Av DC Av Bit HHP N/A N/A M233 6.125 HTC
Pressure GPM Jet Vel 284.79 N/A N/A I-Row O-Row DC Location Bearings
N/A 250 178 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7918102 TD406K 3 x 14 / 0.451
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A 255 208 N/A Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 1 0.65 7918102
DRILL STRING
2 RSS BHI 6 1 4.75 1.02 8.2 4 3/4" T2 3-1/2" REG 0 15670064
3 Gamma Sub BHI 5 1 9.5 2.75 4.27 9 1/2 T2 9 1/2 T2 0 15874109
4 Mud Motor BHI 5.875 1 4.75 3.421 32.01 4 3/4" T2 4 3/4" T2 0 16103625
5 Measurement While Drilling (MWD) BHI 4.75 1 4.75 20.16 64.14 12898969
6 Modular Stabilizer BHI 5.75 1 4.75 1.575 2.6 4 3/4 T2 4 3/4 T2 0 15273519
7 BCPM. Bi-directional Communication BHI 4.75 1 9.719 2.8 16.75 6 5/8 REG 6 5/8 REG 0 15788990
and Power Module
8 Modular Stabilizer BHI 4.75 1 4.75 2.264 2.9 4 3/4 T2 4 3/4 T2 10 15024060

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-2007 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 12/21/2023 - 11/09/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
9 Logging While Drilling (LWD) BHI 4.75 1 8.25 2.835 14.46 8 1/4 T2 8 1/4 T2 0 14365518
10 Stop Sub BHI 4.75 1 12 3.5 2.42 7 5/8 REG 7 5/8 REG 0 15898643
11 Stabilizer BHI 5.875 1 5.875 2.25 4.58 NC38 NC38 0 ZSTB702128F
12 FIlter Sub BHI 4.75 1 4.563 2.25 5.59 NC38 NC38 0 15453148
13 Float Sub WDS 4.75 1 4.75 2.25 3.87 NC38 NC38 0 89623861110
14 Float Sub WDS 4.75 1 4.75 2.25 3.87 NC38 NC38 0 9455915414
15 Multi Activation Circulating Sub WWB 4.75 1 4.75 2.125 8.1 NC38 NC38 0 OSC475BP542
16 Float Sub WDS 4.75 1 4.75 2.25 3.87 NC38 NC38 0 1064941713
17 Crossover RIG 4.75 1 4.75 2.25 2.69 NC38 XT39 0 425203A
18 Heavy Weight Drillpipe (HWDP) RIG 4 4 4 2.563 121.39 XT39 XT39 28 CONV 4013
19 Hydraulic Jar CTC 4.75 1 4.75 2.25 33.75 XT-39 XT-39 0 DJ10500096
20 Heavy Weight Drillpipe (HWDP) RIG 4 4 4 2.563 122.74 XT39 XT39 28 CONV 4051
21 Drillpipe RIG 4 0 6.625 5.901 0 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/10/2024 N/A 6-8 KNOTS 2-3 FT SEASONAL 2,648 HELD STAND DOWN
S

Company GOS WI3 BHI RIG BDF WUD RIG ARM SCM MI2 ARM WWB

Category CTRG WPSTK DPDS RIG DFMS MPD OTHR OTHR PCS SCS WSC WBCS
PERSONNEL
15 1 3 52 2 6 7 4 1 1 3 1
Total
AND SERVICES No. of Persons
96
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 12 24 24 24 12 12 24 12 12 0

Standby/Tankers
TRUCKS/BOATS
walker tide

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
4371 813 1609 5070 0 4828

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-1550 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/20/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

ADC-63L @ ANDR-1550 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL MELKEM, ABDERRAHMANE / ANDRADE, HAROLD ARTURO
Foreman(s)
D&WO Morning Report (Service Providers View) OIL PRODUCER TARGETING GUTIERREZ
Rig Charge #: ARAB-D RESERVOIR) Engineer CHERESHNIUK, VITALII
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-63L (66-24056-1550) Manager SHAMMARY, FAHAD SALEM
Daily Onshore (LSTK)
Wellbores: THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well
ANDR-1550 (0) ANDR_1550_0 +882167771 4146 013-679 22 51 / 54 /CLERK VSA
Date: Tuesday 06/18/2024 T
013-679 22 53

Last 24 hr operations Next 24 hr plan


RSS DRILL 6 1/8" HRZ HOLE TO 8,870' WITH 82 PCF LSND WBM & 100% RETURNS. RSS DRILL 6-1/8" HORZ HOLE TO TD AT +/- 10,682' MD-6657' TVD .
Location Next Location
100.17 KM FROM DMG. (DAMMAM _ ALRYAD HI-WAY TO RIYAD THEN TURN LEFT FROM FZRN BRIDGE THEN 18 KM). ANDR-1551
Current Depth (ft) Liner TOL MD TVD Formation Tops
8,870 Last Csg Size MD TVD Size 2,469 7,407 6,529 Top
9 5/8 5133 5133 Formations Comments
7 Depth
ABAR 6,403 7.5' DEEPER.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ARBB 6,441 6.5' DEEPER.
7495 (Date) 100 1,375 100 ARBC 6,518 4.5' DEEPER.
22.5 (05/26/2024@1100 ) ABCR 6,727 6.5' DEEPER.
ABC4 6,807 9.5' DEEPER.
ARBD 6,884 5.5' DEEPER.
ANDR_PADS_20 7,111 5.5' DEEPER.
BASE_ANDR_PADS_20 7,143 3.5' DEEPER.
PADS 7,203 5.5' DEEPER.
BPDS 7,286 3.5' DEEPER.
ABD1 7,549 4.5' DEEPER

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End

RSS DRILL 6 1/8" HRZ HOLE F/ 7495' TO 7582' WITH 82 PCF


LSND WBM & 100% RETURNS.
- FOLLOWING PLAN ANDR-1550_0_REV-F.0 (PWP) & GOC
0500 - 0800 3 0 6 1/8 N DRLG D RSS BHI 7495 7582
INSTRUCTIONS.
- SWEEP HOLE WITH 10/20 BBL LO-VIS/HWT PILL EVERY 2-3
STD.

0800 - 1030 2.5 0 6 1/8 N DRLG CIRC MPMP RIG 7582 7582 JF 934844
GOC LOST COMMUNICATION THROUGH WELLLINK.

RESUMED RSS DRILL 6 1/8" HRZ HOLE F/ 7582' TO 8,870' WITH


82 PCF LSND WBM & 100% RETURNS.
- FOLLOWING PLAN ANDR-1550_0_REV-F.0 (PWP) & GOC
INSTRUCTIONS.
- DRILL WITH CONTROLLED PARAMETERS TILL BHA OUT OF
1030 - 0459 18.5 0 6 1/8 N DRLG D RSS BHI 7582 8870 SHOE.
- DRILLING PARAMETERS: WOB: 10-15 KLB, RPM: 120 @ 3/6
KFT-LB OFF/ ON BTM TQ, GPM 270, 2,200 PSI PRESSURE.
- SWEEP HOLE WITH 10/20 BBL LO-VIS/HWT PILL EVERY 2-3
STD.
- PROJECTION TO BIT: 8,870' MD / 91.35 DEG INCL. / 329.5
DEG AZM / 6,670' TVD.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 0800 2.5 2.5 934844 JF RTTI NET ARN 7582 GOC LOST COMMUNICATION THROUGH
WELLLINK.
Foreman Remarks

ANDR-1550, WHICH IS TO BE DRILLED AS A SINGLE LATERAL HORIZONTAL OIL PRODUCER TARGETING ARAB-D RESERVOIR. THE WELL WILL BE COMPLETED WITH LOWER COMPLETION AND
UPPER COMPLETION ON 4-1/2" TUBING
- ARAB-D H2S: 1.9 % , ARAB-C H2S: 8.37 %, 1/2 LFL: 180 M , RER 100PPM: 616 M , RER 30PPM: 1085 M
- GOR: ARAB-D 583 SCF/BBL. GOR: ARAB-C 186 SCF/BBL.

=================================WELL DATA=======================
* 24" CSG PLAN/ACTUAL: 120'/116'.
* 18-5/8" CSG PLAN/ACTUAL: 708 '/677' (+/- 50' TVD INTO RUS).
* 13-3/8" CSG PLAN/ACTUAL: 2853'/2821' (+/- 50' TVD INTO AHMADI),XD
* 9-5/8" CSG PLAN/ACTUAL: 5140'/5,133' (+/- 300' TVD INTO MID-THAMAMMA),
* 7'' LINER L1 PLAN/ACTUAL : 7370'/7407' (+/- 2' TVD IABOVE ABD-1),
* 6-1/8" OPEN HOLE PLAN/ACTUAL : 10600'/ '

================================ SIMOPS =================================


* SIMOPS APPLIED WITH DQ-50L RIG.

============================= ARAMCO ON LOCATION =========================


- ARAMCO MATERIAL EXPEDITOR KHALED AL ZYDAN #821398 ON LOCATION SINCE 04/06/2024.

============================= LSTK BAKER CONTRACTOR DSV ====================


- BAKER DSV: MOHAMED / MUNTHER.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-1550 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/20/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

============================= NEXT LOCATION ==============================


ANDR-1551 , 90% PROGRESS.

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 7,573 87.77 333.32 95 6,685 401.63 -242.36 1,539 2.6
0 7,668 90.29 332.89 95 6,687 427.45 -255.45 1,633.73 2.69
0 7,763 91.37 333.7 95 6,686 453.31 -268.46 1,728.48 1.42
0 7,858 90.94 332.57 95 6,684 479.14 -281.54 1,823.27 1.26
0 7,953 90.57 329.61 95 6,682 504.48 -295.54 1,918.22 3.15
0 8,047 90.26 330.99 94 6,682 529.36 -309.73 2,012.21 1.51
DAILY SURVEY 0 8,142 90.38 330.7 95 6,681 554.65 -323.84 2,107.19 0.33
0 8,237 90.2 330.5 95 6,681 579.88 -338.05 2,202.17 0.28
0 8,332 90.32 330.83 95 6,680 605.12 -352.24 2,297.16 0.37
0 8,428 91.03 331.05 96 6,679 630.7 -366.45 2,393.14 0.77
0 8,523 90.9 330.79 95 6,678 656 -380.52 2,488.11 0.3
0 8,618 90.78 330.77 95 6,676 681.27 -394.65 2,583.08 0.13
0 8,714 90.69 329.85 96 6,675 706.69 -409.14 2,679.07 0.96
0 8,810 90.87 328.55 96 6,674 731.82 -424.12 2,775.06 1.37

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 0 5.2 API 0 0 Volts 2.4 0 32,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
132 0 HTHP 85 25 0 8 / 11 LS-ND 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 15 15 7/9 0 200 0
50
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 0 5.4 API 0 0 Volts 2.3 0 34,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
132 0 HTHP 86 23 0 7 / 10 LS-ND 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 14 14 6/8 0 240 0
48

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
6RR 7,420 8,870 DP Av DC Av Bit HHP 15 120 M233 6.125 HTC
Pressure GPM Jet Vel 307.58 N/A 77 I-Row O-Row DC Location Bearings
1,882 270 223 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7916998 DD406VT 3 x 13 / 0.389
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A 6,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 6.125 1 6.125 0.62 3 1/2" REG RR 7916998
2 RSS BHI 4.75 1 4.75 1 8.2 3 1/2" REG T2 43 14948781
3 Gamma Sub BHI 4.75 1 4.75 1.339 4.27 3 1/2 T2 3 1/2 T2 46 14157730
4 Modular Flex Stabilizer BHI 4.75 1 4.75 1.5 10.28 3 1/2 T2 3 1/2 T2 43 15744952
5 Measurement While Drilling (MWD) BHI 4.75 1 4.75 2.62 64.14 15024066
6 Sub TK2 4.75 1 4.75 2.25 14.2 4 3/4 T2 4 3/4 T2 64 13522862
7 Measurement While Drilling (MWD) BHI 4.75 1 4.75 3 64.14 12251981
DRILL STRING 8 Measurement While Drilling (MWD) BHI 4.75 1 4.75 9.8 64.14 16239976
9 Measurement While Drilling (MWD) BHI 4.75 1 4.75 2.13 64.14 14267613
10 BCPM. Bi-directional Communication and BHI 4.75 1 4.75 2.25 17.01 4 3/4 T2 4 3/4 T2 46 15582636
Power Module
11 Stop Sub BHI 4.75 1 4.75 1.378 4.58 4 3/4 T2 NC38 46 SDT11345
12 Float Sub BHI 4.75 1 4.75 2.25 3.33 NC38 NC38 46 15673373
13 FIlter Sub BHI 4.75 1 4.75 2.125 5.69 NC38 NC38 46 15738261
14 Crossover BHI 4.75 1 4.75 2.25 2.35 NC38 XT39 26 99723654-1
15 Heavy Weight Drillpipe (HWDP) RIG 4 6 4 2.56 186.33 XT39 XT39 28.24 CONV ON FILE
16 Roller Reamer BHI 5.5 1 4.75 1 4.9 NC38 NC38 46 3 POINT T100968
17 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.56 93.23 XT39 XT39 28.24 CONV RIG
18 Hydraulic Jar NPC 4.75 1 32.33 0 HMT-500-005
19 Heavy Weight Drillpipe (HWDP) RIG 4 2 4 2.56 62.3 XT39 XT39 28.24 CONV ON FILE
20 Drillpipe RIG 4 1 4 3.34 31.2 XT39 XT39 14 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/15/2024 06/15/2024 SEASONAL N/A HOT 2,174 N/A

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-1550 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/20/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

Company RIG BHI RIG BDF MJH TK2 RIG ARM OTH TK2 ARM

Category CTRG DPDS RIG DFMS SEC OTHR OTHR OTHR VAC WSC WSC
PERSONNEL
15 3 40 1 8 3 19 1 3 2 2
Total
AND SERVICES No. of Persons
97
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 0 12 12 24 10 24 24

Standby/Tankers
TRUCKS/BOATS
DH-8954

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3211 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/04/2024 - 07/15/2024
Report ID: OPERLMTDMRREP

ADC-64L @ UTMN-3211 Limited Morning Report for 06/18/2024


Objective : (K2PK-S SHAPE Foreman(s)ALI, SHERIF AHMED
WELL TARGETING PRE- Engineer ALOKE, CHINWIKE DARLYNTIN
D&WO Morning Report (Service Providers View) Rig Charge #: KHUFF AS PRIMARY Manager MEQBEL, ALI NASSER
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-64L (66-23057-3211) TARGET (200 FT INTO THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK) TWLF) & KHUFF AS 2ND
*882167771 2646 ARM: 013-5 77-3986 FCT: 013-5 77-9350
(0500-0500) Saudi Aramco Well Wellbores: RESERVOIR.)
UTMN-3211 (0) UTMN_3211_0 OTHER VSAT OTHER VSAT CONTRACTOR /CLERK
Date: Tuesday 06/18/2024
ADC-RM: 01 3-8297664 IDS-WSL: 0 13-6648812 VSA T
MAT EXP: 0 13-577-396 1

Last 24 hr operations Next 24 hr plan


PERFORM CSG PICKLING. DISPLACE TO 79 PCF CACL2 BRINE. POSITIVE PT (7" & 4.5") LINERS TO CHANGE RAMS. FULL P/T BOP. RUN 4-1/2" UPPR COMPLETION ASSY.
5750 PSI, "OK". POH TO SURFACE. RETRIEVE 11" W/B. CHANGE RAMS..ONGOING.
Location Next Location
163.87 KM FROM THE DHAHRAN MAIN GATE UTMN-3032
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
14,170 Size 12231 12168 Size 11,972 14,167 14,104 Top
Formations Comments
9 5/8 4 1/2 Depth
KFDA 12,918 33" SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) BKDC 13,530 13' SHALLOWER
14170 (Date) 100 0 164 PUZU 13,583 10' DEEPER
65 (04/14/2024@0500 ) 38' SHALLOWER (13998'
TWLF 13,935
MD)
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

PERFORM SAFETY STAND DOWN MEETING.


0500 - 0530 0.5 0 EOW C CT SDR1 NA RIG 14170 14170
- DISCUSS RECENT ALERTS & UPCOMING OPERATIONAL PROCEDURES AND
SAFETY.

PUMP 50 BBLS HI-VISC AND CIRCULATE WITH FILTERED WATER UNTIL TARGET
NTU AND TSS WERE ACHIEVED IN 3 SUCCESSIVE READINGS ONE HOUR APART.
- LAST 3 READINGS IN 60 MINUTES APART
0530 - 0830 3 0 EOW C CT CIRC MPMP RIG 14170 14170
- SAMPLE # 1: NTU: 32, TSS: 0.01 %.
- SAMPLE # 2: NTU: 14, TSS: 0.01 %.
- SAMPLE # 3: NTU: 11.2, TSS: 0.01 %.
- FR: 280 GPM, SPP: 3970 PSI.

DISPLACE WELL WITH 79 PCF FILTERED CACL2 KILL BRINE.


0830 - 1145 3.25 0 EOW C CT CIRC MPMP RIG 14170 14170 - PUMP 30 BBL HI-VIS WATER,
- PUMP & DISPLACE WELL TO 70 PCF BRINE.
- FR: 240-310 GPM, PR: 3500-3900 PSI.
1145 - 1200 0.25 0 EOW C CT WO NA RIG 14170 14170
FLOW CHECK - WELL STATIC.

SPACE OUT, CONNECT CMT LINES TO SES, 2 X FOSV ASSEMBLY AND PRESSURE
TEST 4-1/2" TOL TO 5,750 PSI WITH 70 PCF BRINE AT 4-1/2" TOL.
1200 - 1300 1 0 EOW C CT HT STRG RIG 14170 14170
- HOLD AND MONITOR PRESSURE FOR 15 MINUTES - GOOD TEST.
- BLEED OFF PRESSURE SLOWLY IN 100 PSI / 10 SECONDS STEPS.
- PUMPED / RECEIVED - 10.5 BBLS.
1300 - 1315 0.25 0 EOW C CT WO NA RIG 14170 14170
FLOW CHECK - WELL STATIC
1315 - 1345 0.5 0 EOW C CT HT STRG RIG 14170 14170
BREAK CMT LINES, L/D SES, 2 X FOSV.

1345 - 1845 5 0 EOW C CT TO STDP RIG 14170 14170 14025 2425 POOH SPS BHA F/ 14025 FT TO 2425 FT.
- MONITOR WELL WITH TRIP TANK - OK.

HPJSM. POOH BHA F/ 2420 FT TO 2062 FT.


- L/D 9-5/8", 7'' AND 4 1/2'' WELLBORE CLEANOUT SPS ASSY.
- 9-5/8" AND 7" CLEAN OUT TOOL IN GOOD CONDITION.
1845 - 2100 2.25 0 EOW C CT HT BHA RIG 14170 14170
- OBSERVED CLEAR WORKING MARKS ON 4-1/2" TOL POLISH MILL NO GO.
- L/D 2 X 4-3/4" DC JTS.
- MONITOR WELL WITH TRIP TANK - OK
- CHANGE HANDLING GEAR TO 2-7/8.

POOH BHA F/ 2062 FT TO SURFACE AND L/D 65 JTS OF 2-7/8" DP USING HCW.
2100 - 0230 5.5 0 EOW C CT LDP SPDP RIG 14170 14170 2062 0 - L/D 4-1/2" SPS CLEANOUT TOOLS.
- 3-5/8" PDC BIT IN GOOD CONDITION.
- MONITOR WELL WITH TRIP TANK - OK.

CHANGE PIPE HANDLING GEAR TO 5-1/2".


0230 - 0345 1.25 0 EOW C WH RTRV WBSH RIG 14170 14170
- MU 11" TEST PLUG ASSY. & RETRIEVED 11" W/B.
- PERFORM HOUSEKEEPING ON RIG FLOOR.

0345 - 0459 1.25 0 EOW C BOP BOP RAMS RIG 14170 14170 HPJSM, CHANGE BOP PIPE RAMS (5-1/2" UPR AND 4") TO 4-1/2".... IN PROGRESS.
- RIH 5 STDS X 5-1/2" DP & SECURED WELL ON MASTER PIPE RAMS.
Foreman Remarks

WELL OBJECTIVE: TO DRILL WELL UTMN-3211, AN S-SHAPE WELL TARGETING PRE-KHUFF AS PRIMARY (200 FT TVD INTO TWLF) AND KHUFF AS SECONDARY RESERVOIR AND WILL BE
COMPLETED WITH 4-1/2" 15K CEMENTED LINER.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3211 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/04/2024 - 07/15/2024
Report ID: OPERLMTDMRREP

RER 1/2 LFL = 120 M; 100 PPM = 614 M; 30 PPM = 1,716 M


=======================JOURNEY MANAGEMENT==================
- THE RIG IS 6 KM SKID ROAD FROM THE BLACK TOP.
- NIGHT DRIVING IS PROHIBITED. ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
=======================ARAMCO PERSONNEL====================
- FCT ABDULHAFEEZ ALHARBI ID# 818178 OFF LOCATION SINCE 06/12/2024.
- MATERIAL CLERK ALHAJI ABDULHADI #818353 OFF LOCATION SINCE 06/12/2024.
- MATERIAL CLERK ABDULELAH ALAYSH #824646 ON LOCATION SINCE 06/05/2024.
================================= IDS PERRSONNEL=============
- IDS WSL; DAY: ILGAR, NIGHT: MICHAEL.
=========================VACUUM TANKERS ON LOCATION =========
- AL-TAMIMI: 04 VACCUMS SINCE ON 05/12/2024.
* RSA:3040 / LRA:2350 / LRA:2049 / SXB:5647 (OFF DUTY).
===================================RIG MOVE==================
RIG RELEASED @ 23:00 HR ON 03/04/2024 , TOTAL DISTANCE 3.9 KM .
** 3.5 DAYS SINCE RIG RELEASED (KPI 7.28 DAYS).
** PRE RIG MOVE LOADS :- 23 LOADS ON 3/4/2024 ( CHEMICAL AND TOOL BOXES).
** TOTAL RIG MOVE LOADS 201 LOADS OFF TOTAL 201 LOADS
====================================AUDITS===============
- 2022, 1ST RSI: 42 ITEMS,0 OPEN; 2022 2ND RSI: 18 ITEM, 0 OPEN ; WCI 2022: 11 ITEM, 0 OPEN ; HAZCOM SCORE: 98%, CEHA SCORE= 95%.
====================================HSE==================
SAFETY MEETING: TOPICS DISCUSSED
WSM & PTSM MEETING CONDUCTED AT 11:30 AM AND 11:30 PM, TOOK PART BY RSTC, WSL, RS AND ARAMCO FOREMAN AND ALL SHIFT CREW MEMBERS, THE TOPICS OF DISCUSSION WERE AS
FOLLOWS:-
HEAT STRESS AWARENESS SESSION.
LIFE SAVING RULE#6 (OBTAIN AUTHORIZATION BEFORE STARTING EXCAVATION ACTIVITIES).
HSE ALERT 55-24 - STABBING BELL DROPPED TO RIG FLOOR
HSE ALERT 56-24 - CRANE BOOM INCIDENT
PTW & JSA REFRESHMENT .
REINFORCE STOP WORK AUTHORITY.

NEAR MISSES TODAY: NIL NEAR MISSES THIS WEEK: 1 SALAMA CARDS: 6.

WEEK NO: 25

DRILLS: PIT DRILL*2

DWLTI: 2196
==============================WATER WELLS================
- ASSIGNED WATER WELL:
1) UTMN-900
2) UTMN-940
==========================NEXT LOCATION=================
- UTMN-3032.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
79 PCF 0 0 API 0 0 Volts 0 10.5 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
0
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
79 PCF 0 0 API 0 0 Volts 0 10.5 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
0

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/03/2024 06/03/2024 SEASONIAL N/A N/A 2,197 N/A

Company TSC HCO SRT RIG SMI TK3 RIG ARM SCM OTH TK3 ARM TSC

Category CSV PSSC DRF RIG DFMS OTHR OTHR OTHR PCS VAC WSC WSC CSR
PERSONNEL
2 1 2 39 2 25 30 1 2 4 2 1 4
Total
AND SERVICES No. of Persons
115
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 5 24 24 12

Operating Hours. 24 24 24 24 24 12 12 12 24 5 24 24 12

TRUCKS/BOATS Standby/Tankers

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3211 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/04/2024 - 07/15/2024
Report ID: OPERLMTDMRREP

ARAMCO TRUCK AB-5568

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 1000 338 1500 2200 700

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
EMERGENCY RADIO NOT WORKING NEED NEW BATTERY.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1279 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/28/2024 - 09/06/2024
Report ID: OPERLMTDMRREP

ADC-65L @ SDGM-1279 Limited Morning Report for 06/18/2024


Objective : (K2 S-SHAPE Foreman(s)ZERROUKI, MOHAMED
WELL TARGETING PRE- Engineer ALHAJJAJ, FERAS MONEEF / ALSHAMRANI, MOHAMMED IBRAHIM
D&WO Morning Report (Service Providers View) KHUFF JAUF RESERVOIR) Manager MEQBEL, ALI NASSER
Rig Charge #:
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-65L (66-23054-1279) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK) 00882-167- 771-2647 013-577-39 82 013-577-93 51 (FCT)
(0500-0500) Saudi Aramco Well Wellbores: OTHER VSAT OTHER VSAT OTHER VSAT
Date: Tuesday 06/18/2024 SDGM-1279 (0) SDGM_1279_0 013-829-77 65 (ADC) 013-664-88 13 (IDS) 013-829-76 65 (CLINIC )
CONTRACTOR /CLERK VSA T
013-577-39 08

Last 24 hr operations Next 24 hr plan


P/T BOP STACK. P/U & M/U 22" BHA. RIH TO BOTTOM. D/O SHOE TRACK. DRILL 22" HOLE TO CONT PERFORMANCE DRILL 22" HOLE CASING POINT @ +/- 4,710 FT
2,700 FT
Location Next Location
THE NORTHERN PART OF SHEDGUM FIELD, 1.5 KM FROM DPC-549, 2.29 KM FROM SDGM GOSP-1 & 94 KM FROM DH MG SDGM-1293
Current Depth (ft) Liner TOL MD TVD Formation Tops
2,700 Last Csg Size MD TVD Size Top
24 2550 2550 Formations Comments
Depth
RUS 680 34' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ARUM 1,715 9' HIGHER
2550 (Date) 100 150 94 LAMS 2,210 32' HIUGHER
8.1 (06/10/2024@0300 ) AHMD 2,500 31' HIGHER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT. N/U 26 3/4" 3M BOP STACK W/30" 1M ANNULAR.


0500 - 0630 1.5 0 28 N BOP BOP BOP RIG 2550 2550
- FUNCTION TEST ALL ITEMS.
- N/U BELL NIPPLE, FLOW LINE.

0630 - 0745 1.25 0 28 N BOP BOPT BOP RIG 2550 2550 M/U & SET TEST PLUG + TEST ASSY. FLUSH BOP STACK +CHOKE MANIFOLD + MGS
WITH WATER.

0745 - 0815 0.5 0 28 N BOP PJSM BOP RIG 2550 2550 PERFORMED PJSM.
* COMPLETED CL: BOP P/T.

P/T 26-3/4" 3M BOP AS PER ARAMCO/IWC/ADC PROCEDURE


WITH RELATED LINES & VALVES FOR EACH ITEM.-
0815 - 1030 2.25 0 28 N BOP BOPT BOP RIG 2550 2550 * PIPE RAMS (300 & 3000 PSI X 10 MIN EACH
ANNULAR TO 700 PSI) PERFORMED PREVIOUSLY ON STUMP.
* OFFLINE TESTS: SECONDARY KILL LINE, CHOKE MANIFOLD AND 2 REMOTE
CHOKES.

1030 - 1100 0.5 0 28 N BOP BOPT CTRL RIG 2550 2550 PERFORMED ACCUMULATOR TEST.
* MEANWHILE: P/T STANDPIPE (300 / 5000 PSI X 10 MIN EACH).

RETRIEVED TEST PLUG FROM WELLHEAD . POOH & L/D TEST ASSEMBLY & TEST
1100 - 1145 0.75 0 28 N BOP OTH BOP RIG 2550 2550
PLUG.
- RACKED BACK 5 STDS OF 5 1/2" DP.
1145 - 1230 0.75 0 28 N WH RTRV WBSH IWS 2550 2550
M/U TOOL & INSTALLED WEAR BUSHING (FMC). L/D TOOL

1230 - 1300 0.5 0 28 N DRLG PJSM NA RIG 2550 2550 PERFORMED PSJM. CLEARED RIG FLOOR.
* COMPLETED CL: BIT SPEC, TRIP IN.

M/U AND RIH 22" PERFORMANCE BHA TO 783 FT.-


BHA: 22" TRICONE BIT (SMITH, GSI12, IADC: 435X, S/N: RP1355, 3X13 + 3X16) +
11-1/4" DHM (WITH 21-7/8" SLEEVE) W/ FV + 21-
1300 - 1730 4.5 0 28 N DRLG TI BHA RIG 2550 2550 0 783 7/8" SSTAB #1 + 12" SHOCK SUB + 21-7/8" SSTAB + NMDC + 9"MWD + 21-7/8"
SSTAB #2 (WITH TOTCO RING) + FILTER SUB + 9
X 9-1/2" DC + 9-1/2" JAR + 03 X 9-1/2" DC + X-O + 03 X 8-1/2" DC +X-O + 06 X 5-
1/2" HWDP
* MONITOR WELL WITH TRIP TANK & TRIP SHEET.
1730 - 1800 0.5 0 28 N DRLG RR TDS RIG 2550 2550
SERVICE TDS

RIH 22" PERFORMANCE BHA FROM 783 FT BY P/U 5-1/2" DP JTS F/RACK TO 1918
1800 - 1945 1.75 0 28 N DRLG TI SPDP RIG 2550 2550 783 1918
FT,
* MONITOR WELL ON TRIP TANK & TRIP SHEET.

1945 - 2015 0.5 0 28 N DRLG CIRC MPMP RIG 2550 2550 PERFORM SHALLOW TEST FOR DNM TOOLS.
- SHALLOW TEST DNM TOOLS, FR: 500 GPM, PR:600 PSI. OK.

2015 - 2030 0.25 0 28 N DRLG RW BIT RIG 2550 2550 1918 2455 RIH 22" BHA ON 5-1/2" STD, TAG CEMEN.
- RIH 22" PERFORMANCE BHA, WASH DOWN & TAG CEMENT TOP @ 2455 FT,

- DRILL OUT SHOE TRACK, CMT + PLUG + FC + CMT FROM 2455 FT TO 2500 FT
(50 FT ABOVE 24" SHOE). -
2030 - 2245 2.25 0 28 N DRLG DFS MMOT SDM 2550 2550 2455 2500
* WOB= 5-35 KLB, FR= 500-800 GPM, SPP= 750-1300 PSI, S/RPM: 20-40, TQ= 3-5
KLB-FT
* RECOVERED 70 PCF MUD.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1279 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/28/2024 - 09/06/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
* MW= 66 PCF (SPUD MUD).
* 24" FC @ 2461 FT.
* DRESS FLOAT COLLAR AREA.
* OBSERVE MEDIUM/HARD CEMENT.

2245 - 2330 0.75 0 28 N DRLG PTST MPMP RIG 2550 2550 CIRCULATE HOLE CLEAN.
PRESSURE TEST CASING WITH 500 PSI EQUIVELENT PRESSURE WITH WATER

DRILL OUT REMAINING SHOE TRACK FROM 2500 FT TO 2550 FT.


* OBSERVED HARD CEMENT.
2330 - 0015 0.75 0 28 N DRLG DFS MMOT SDM 2550 2550 2500 2550 FR = 800 GPM SPP = 1300 - 1400 PSI WOB = 5 - 30 KLB RPM = 30-40 TORQUE = 4-
6 KLB-FT
- 24" CSG FLOAT SHOE AT 2550 FT.
- DRESS SHOE AREA.

DRILL 22' HOLE WITH PERFORMANCE BHA FROM 2550 FT TO 2650 FT.-
* WOB= 40-55 KLB, FR= 800-950 GPM, SPP= 1900-2100 PSI, TDS= 30-40 RPM,
0015 - 0330 3.25 0 22 N DRLG DMS MMOT SDM 2550 2650
TQ= 5-8 KLB-FT. DIFF PR: 350-500 PSI
* AVG ROP= 30 FT/HR.
* NO LOSSES.

DRILL 22" HOLE WITH PERFORMANCE BHA FROM 2650 FT TO 2700 FT.-
* WOB= 30-60 KLB, FR= 900-1000 GPM, SPP= 2300-2500 PSI, TDS= 60-80 RPM,
TQ= 10-15KLB-FT, DIFF= 300-500 PSI, MW= 67 PCF HB.
0330 - 0459 1.5 0 22 N DRLG DMS MMOT SDM 2650 2700
* AVG ROP= 30 FT/HR.
* NO LOSS.
* CONNECTION PROCEDURE AS PER IWC GUIDELINES
* MEANWHILE DISPLACE HOLE TO 67 PCF HB WBM (40 PPB) FROM 2700 FT.
Foreman Remarks

SDGM-1279, IS PLANNED TO BE DRILLED AS K-2 DESIGN, S-SHAPE WELL TARGETING JAUF RESERVOIR IN THE NORTHERN PART OF SHEDGUM FIELD AND WILL BE COMPLETED WITH 4-1/2" 15K
CEMENTED LINER
================= ERP POPULATED AREA ===========================================
>> SDGM-1279 POPULATED AREA ERP (DPC-549 INSIDE 30 PPM RER).
>> SDGM-1279 RER: 1/2 LEL = 186M. 100 PPM = 638M. 30 PPM = 1329M.
>> SGA#1: 1.8 KM NNE; SGA#2: 1.8 KM WSW
>> CONDUCTED ON 06/02/2024 JOIN RISK ASSESSMENT WITH DPC-549. ATTENDED BY ARAMCO FOREMAN, GDED DE, SGGDD SAFETY ADVISOR, IDS HSE ADVISOR, IDS WSL LEADER, ADC RIG
SAFETY OFFICER & DPC-549 STAFFS.
>> INSTALLED PERIMETER GAS MONITORING STATIONS: H2S & LEL SENSORS (KASAB COMPANY) ON 06/05/2024. KASAB OPERATOR ON LOCATION.
================= PERSONNEL ON LOCATION ============================================
>> ARAMCO MATERIAL EXP. FAISAL T. ALAJMI# 8530517 ONLOCATION 06/12/2024
>> ARAMCO FCT HUSSAIN AL EID #818139 ON LOCATION 06/12/2024
>> ARAMCO PDP MARWAN ALGHAMDI # 809396 ON LOCATION 06/12/2024
>> IDS WSL: DAY (AHMED) / NIGHT (PANNA)
=================RIG VISIT====================================================
>> JOSE LUIS (SLB INTEGRATION HSE MANAGER), VIKTOR YURTAEV (SLB LSTK GAS HSE AND OI MANAGER), VIJAY (SLB WCS SUPERINTENDANT), VISITED THE RIG ON 4/19/2024.
>> SLB MANUEL CENTENO ACUNA (IWC WELL PERFORMANCE MANAGER), MUHAMMAD NASRUMMINALLAH (IWC SENIOR WELL ENGINEER) VISITED RIG ON 06/07/2024, REVIEWED PERFORMANCE &
DISCUSSED RECENT OPERATIONAL & HSE ALERTS.
=======================BARRIERS TO N/D BOP STACK===========================================

==============================================HSE====================
>>>> HSE PLAN & PERFORMANCE: PRE-TOUR SAFETY MEETING
SGGDD HEAT STRESS AWARENESS
HSE ALERT: 67-24 STRUCK BY MANUAL TONG
POOR HOUSEKEEPING IN LOCATION
STOP TOUR SCHEDULE
DIGITAL STOP CARDS

>> NEAR MISS: 0 /24 YTD


>> DRILLS:
SHARED 3 VIDEOS RELATIVE TO LINE OF FIRE
SGGDD 012-2024 AUTHORIZATION OF HIGH-RISK ACTIVITIES
STOP TOUR SCHEDULE
DIGITAL STOP CARDS

>> INSPECTION: ACCUMULATOR DRILL WITH BOP PRESSURE TEST, PIT DRILL, TRIP DRILL, H2S DRILL
>> AUDITS:
2ND RSI (2022) TOTAL ACTION ITEMS 32 - OPEN ITEMS 0 CLOSED 32 ---- 100%
4TH QSI (2022) TOTAL ACTION ITEMS 24 - OPEN ITEMS 0 CLOSED 24 ----- 100%
1ST QSI (2023) TOTAL ACTION ITEMS 27 - OPEN ITEMS 0 CLOSED 27 ----- 100%
2ND QSI (2023) TOTAL ACTION ITEMS 49 - OPEN ITEMS 0 CLOSED 49 ----- 100%
3RD QSI (2023) TOTAL ACTION ITEMS 28 - OPEN ITEMS 0 CLOSED 28 ----- 100%
2ND RSI (2023) TOTAL ACTION ITEM 25 -- OPEN ITEM 0 CLOSED 25 ----- 100%
4TH QSI (2023) TOTAL ACTION ITEM 34 ----OPEN ITEM 0 CLOSED 34----- 100%
1ST RSI (2024) TOTAL ACTION ITEM 26 ---OPEN ITEM 1, CLOSED DURING AUDIT- 15 ------AFTER AUDIT CLOSED 11 --- 100%
1ST QSI(2024) TOTAL ACTION ITEM 26---OPEN ITEM 0 CLOSED DURING AUDIT- 23------OPEN 0 --- 100%

>> STOP CARDS UPLOADED: TOTAL STOP CARDS: 12 (UNSAFE ACTS - 3, UNSAFE CONDITIONS -5, POSITIVE HSE CULTURE -4)
>> STOP CARDS SUBMITTED: 39
>> SALAMA CARDS :6

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1279 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/28/2024 - 09/06/2024
Report ID: OPERLMTDMRREP

>> SWA: 2
>> DWLTI: 2176
================================================
COST OPTIMIZATION & WATER CONSERVATION
>> PLAN TO SPUD THE WELL WITHOUT FILL UP WATER PIT.
>> KILL MUD: 0. >> ACID: 0. >> FRAC TANK: 0.
>> DIESEL FOR MUD TOTAL VOLUME ALLOWED; // BBL
>> TOTAL RECEIVED DIESEL FOR MUD = // BBL
>> DIESEL FOR MUD: // BBL FROM PREVIOUS WELL.
====== VACUUM TANKERS ================================
>> COMPANY: AL-MADEED. DRSS: 1004318087 == 4 TANKERS X 4 LOADS (ON OLD LOCATION SDGM-1161).
=====================NEXT LOCATION===================
>> SDGM-1293 BUILD: 60%.
>> WW: ///
============= WW'S & WATER LINES ======================
>> WATER LINES - 2 LINES - CONNECTED ON 06/01/2024.
>> WW'S: SDGM-806 (0.4 KM) & 807 (1.5 KM) (NO BOOSTERS INSTALLED).
DAILY SURVEY
MUD DATA
MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
2RR 730 2,550 DP Av DC Av Bit HHP 60 35 435 28 SMT
Pressure GPM Jet Vel 39.02 41.32 844 I-Row O-Row DC Location Bearings
2,550 1,200 395 1 1 WT A 0
BIT DATA
Serial Number Type Jets TFA
RP7534 GSI12 3 x 16 / 3 x 13 / 0.978
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 48 210 215 205 11,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 22 1 2.1 RP1884
2 Mud Motor SDM 11.25 1 11.25 35.25 150 FS11B0051
3 Stabilizer RIG 22 1 9.5 3 8.27 7 5/8 REG 7 5/8 REG 150 NTST33768
4 Shock Sub SJS 12 1 12 3.25 11.68 7-5/8" H90 7-5/8" H90 4,500 SDW-4511361
5 Non Magnetic Drill Collar ( NMDC ) SDM 9.5 1 9.5 2.81 17.68 7 5/8 REG 7 5/8 REG 120 SPRL 950105P
DRILL STRING
6 Measurement While Drilling (MWD) SDM 9.5 1 9.5 14.53 188.5 P830
7 Stabilizer RIG 22 1 22 3 7.88 7 5/8 REG 7 5/8 REG 150 SDT8738
8 Float Sub RIG 9.5 1 9.375 3 2.3 7 5/8 REG 7 5/8 REG 120 ITS340804
9 FIlter Sub SDM 9 1 9 2.875 7.44 7 5/8 REG 6 5/8 REG 150 IMT950-8018
10 Drillcollar RIG 9.5 12 9.5 2.81 364.9 7 5/8 REG 7 5/8 REG 120 SPRL
11 Hydraulic Jar SJS 9.5 1 9.5 3 24.35 7-5/8" REG 7-5/8" REG 5,600 632
12 Drillcollar RIG 9.5 3 9.5 3 91.69 7 5/8 REG 7 5/8 REG 150 SPRL
13 Crossover RIG 9.5 1 9.5 3 2.79 7 5/8 REG 6 5/8 REG 150 1166
14 Drillcollar RIG 8.5 3 8.5 3 89.15 6 5/8 REG 6 5/8 REG 150 SPRL
15 Crossover RIG 8.5 1 8.5 2.813 3.38 6 5/8 REG XT54 150 333
16 Heavy Weight Drillpipe (HWDP) RIG 5.5 6 5.5 3.25 184.14 XT54 XT54 54 CONV
17 Drillpipe RIG 5.5 84 5.5 4.67 2,640 DSTJ DSTJ 24.7 S135 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A SEASONAL N/A SEASONAL 2,177 DAILY / 2 X PRE-
TOUR

Company SDM RIG SMI RIG TK3 RIG ARM TK3 ARM

Category DPDS RIG DFMS MED OTHR OTHR OTHR WSC WSC
PERSONNEL
2 37 2 1 4 31 3 2 1
Total
AND SERVICES No. of Persons
83
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 12 24 24 12 12 12 12 24 12

Standby/Tankers Others
TRUCKS/BOATS
AB-7144 AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 500 436 200 200 4500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1321 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/17/2024 - 09/03/2024
Report ID: OPERLMTDMRREP

ADC-66L @ HWYH-1321 Limited Morning Report for 06/18/2024


Objective : (MK1 WITH S- Foreman(s)STEINHOFF, DARCY RAY
SHAPE PROFILE TO TWLF, Engineer ALHAJJAJ, FERAS MONEEF
D&WO Morning Report (Service Providers View) TARGETING KHUFF-C Manager NEJIDI, AHMED ABDULLAH
Rig Charge #: RESERVOIR AS A PRIMARY THURAYA
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-66L (66-23053-1321) RIG FORMAN VSAT OTHER VSAT
TARGET)
Daily Onshore (LSTK) 8821677712 543 577-3975 577-3597
(0500-0500) Saudi Aramco Well Wellbores: OTHER VSAT OTHER VSAT OTHER VSAT
Date: Tuesday 06/18/2024 HWYH-1321 (0) HWYH_1321_0 013-664-88 04 IDS 013-829-77 66 ADC 013-829-76 69 CLINIC
CONTRACTOR /CLERK VSA T
577-9352

Last 24 hr operations Next 24 hr plan


DRILL OUT CEMENT TO 3825'. DISPLACE TO HB MUD AND TRIP OUT. RACK BHA AND PRESSURE MAKE UP CLEANOUT BHA AND RIH TO 3825', WIPER TRIP
TEST BOPE
Location Next Location
HWYH-1321 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
5,696 Last Csg Size MD TVD Size Top
18 5/8 3037 3037 Formations Comments
Depth
SFNY 3,300 17' LOW
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SHUB 4,215 31' LOW
5696 (Date) 0 0 182 BYDH 4,510 57' LOW
26.2 (05/23/2024@0100 ) MDTM 5,475 86' LOW
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

DRILLOUT CEMENT PLUG IN OH FROM 3650 FT TO 3825 FT


- WOB: 5-17 KLB, FR: 800-900 GPM, SPP: 1100-1500 PSI, RPM: 30-50, TQ: 2-7
0500 - 1030 5.5 0 16 N DRLG DC MMOT SDM 5696 5696 3650 3825 KLB-FT.
- OBSERVED HARD CEMENT + SAND FORMATION ON SHAKERS
- PUMP 50 BBL HI-VIS EVERY STAND
- NO LOSS/GAIN

DISPLACE HOLE TO 67 PCF HBM AND CIRCULATE AND CONDITION


1030 - 1400 3.5 0 16 N DRLG CIRC MPMP RIG 5696 5696
- FR: 300-700 GPM, SPP: 300-900 PSI
- NO LOSS/GAIN
1400 - 1415 0.25 0 16 N DRLG WCNT NA RIG 5696 5696
FLOW CHECK, WELL STATIC.

1415 - 1600 1.75 0 16 N DRLG TO STDP RIG 5696 5696 3825 3030 POOH W/ 16" MOTOR C/O BHA #2 F/ 3825 FT TO 3030 FT
- MONITOR WELL ON TTK
1600 - 1615 0.25 0 16 N DRLG WCNT NA RIG 5696 5696
FLOW CHECK AT 18-5/8 SHOE, WELL STATIC.
1615 - 1645 0.5 0 16 N DRLG RR TDS RIG 5696 5696
RIG SERVICE, SERVICE TDS AND OVERHEAD DROPS INSPECTION

1645 - 1745 1 0 16 N DRLG TO STDP RIG 5696 5696 3030 640 POOH W/ 16" MOTOR C/O BHA #2 F/ 3030 FT TO 640 FT
- MONITOR WELL ON TTK
1745 - 1800 0.25 0 16 N DRLG WCNT NA RIG 5696 5696
FLOW CHECK, WELL STATIC

POOH R/B & L/D 16" MOTOR C/O BHA #2 F/ 640 FT TO SURFACE
- R/B 6 X JTS OF 5.5" HWDP, 3 X JTS OF 8.5" DC, 6X JTS OF 9.5" DC'S
1800 - 2200 4 0 16 N DRLG HT BHA RIG 5696 5696 - L/D 9-1/2" JAR
- L/D 1 X 15-7/8" ST STABS, 1 X JT 9.5" DC, FILTER SUB, FLOAT SUB, MOTOR.
- BIT DULL GRADING: 1-1-WT-A-E-I-CT-BHA
- MONITOR WELL ON TTK

2200 - 2245 0.75 0 16 N WH RTRV WBSH RIG 5696 5696 RETRIEVE WEAR BUSHING AS PER FMC REP. INSTRUCTIONS
- MONITORING WELL ON TTK

P/U & M/U BOP PRESSURE TEST ASSEMBLY.


2245 - 2345 1 0 16 N BOP BOP BOP RIG 5696 5696
- M/U & RIH 5 STDS X 5 1/2" DP BELOW TEST PLUG.
- FLUSH BOP, CHOKE LINE, KILL LINE, MGS WITH WATER
2345 - 0015 0.5 0 16 N BOP PJSM BOP RIG 5696 5696
PJSM AND REVIEW JSA'S FOR PRESSURE TESTING OPS.

P/T 26 3/4" 3M BOP AS PER ARAMCO STANDARDS (ALL


TESTS 300 / 3000 PSI X 10 MINS EACH).
- TEST #1: ANNULAR (300 / 1400 PSI X 10 MIN EACH).
- TEST # 2: UPPER PIPE RAM, PRIMARY & EMERGENCY KILL
LINE MANUAL VALVES, CHOKE MANIFOLD MASTER VALVE, FOSV
0015 - 0345 3.5 0 16 N BOP BOPT BOP RIG 5696 5696
- TEST # 3: UPPER PIPE RAM, CHOKE LINE HCR, UPPER &
LOWER KILL LINE HCR & LOWER IBOP
- TEST # 4: UPPER PIPE RAM, CHOKE LINE INNER MANUAL
VALVE, UPPER & LOWER KILL LINE INNER MANUAL VALVES &
UPPER IBOP
- TEST # 5: LOWER PIPE RAM, KILL LINE BRIDGE & UPPER IBOP

0345 - 0400 0.25 0 16 N BOP BOPT BOP RIG 5696 5696 BACK OFF TEST JOINT FROM TEST PLUG AND POOH TO
SURFACE

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1321 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/17/2024 - 09/03/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT. P/T 26 3/4" 3M BOP AS PER ARAMCO TEST PROCEDURE


0400 - 0430 0.5 0 16 N BOP BOPT RAMS RIG 5696 5696
(ALL DONE BY APPLYING 300 / 3000 PSI X 10 MINS EACH).
- TEST #6: BLIND RAMS & KILL LINE CHECK VALVES.

0430 - 0459 0.5 0 16 N BOP BOPT BOP RIG 5696 5696 P/U & M/U CSG TEST JT AND ENGAGE TEST PLUG. (ONGOING
AT RPT)
Foreman Remarks

- THE WELL IS PLANNED TO BE DRILLED AS MK1 WITH S-SHAPE PROFILE TO TWLF, TARGETING KHUFF-C RESERVOIR AS A PRIMARY TARGET. THE WELL WILL BE DEEPENED TO PRE-KHUFF TO
ASSESS THE DEVELOPMENT.
- WATER WELLS: HWYH-3508 / HWYH-3512.
============================================= ARAMCO PERSONNEL===========================================
- ABDULLAH ALZAHRANI #781239 - HSE OFF LOCATION 05/29/2024.
=============================================== IDS PERSONNEL =============================================
- WSL: ALONSO.
- NWSL: LACINER.
==================================== LAST CONTRACTOR VISIT, IDS & ADC==========================================
- SLB HSE CORDINATOR: 02/18/24
- LSTK OPERATIONS MANAGER: 4/10/2024
- GG PROJECT HSES: 07/10/23
- SLB ADC-66L RIG MANAGER: 2/18/2024
- IDS PROJECT MANAGER: 4/10/2024
- IDS DRILLING SUP. 4/10/2024
- IDS HSE MANAGER 07/31/2023.
- IDS WELL ENGINEER 2/18/2024
- ADC HSE MANAGER, 08/24/2023
- ADC RIG MANAGER 2/12/2024
- IWC PROJECT MANAGER 12/18/2023.
- ADC OPERATIONS MANAGER 09/11/2023
- ADC DIRECTOR OF OPERATIONS 09/11/2023
- ADC OPERATIONS MANAGER 01/04/2024
============================================== SERVICE COMPANY ===========================================

============================================== HSE / OBSERVATIONS ==========================================


* DISCUSSED HAZARD IDENTIFICATION
* DISCUSSED BEHAVIOUR OBSERVATION AT RIG SITE
* REFRESHMENT ABOUT HEAT STRESS.
* BRIEFING THE CREW ON THE LAST HSE ALERT .
* DISCUSSED DAILY STOP CARDS, STOP TOURS
* DAILY INSPECTION FOR GAS DETECTION EQUIPMENT.

>> RSI 2024: TOTAL FINDING 28 ACTION ITEMS - CLOSED ITEMS: 28 OPEN ITEMS: 0
>> WCI 2024: TOTAL FINDING 11 ACTION ITEMS - CLOSED ITEMS: 11 - OPEN ITEMS: 0
>> INSPECTIONS: >> - GAS DETECTION
>> DRILLS: TRIP, PIT,
>> STOP CARDS:8
>> STOP WORK AUTHORITY 2
=============================================== INCIDENTS =================================================
- NONE
================================================ AUDITS ==================================================
>> RSI 2024: TOTAL FINDINGS 28 ACTION ITEMS - CLOSED ITEMS: 28 - OPEN ITEMS: 0
>> WCI 2024: TOTAL FINDINGS 11 ACTION ITEMS - CLOSED ITEMS: 11 - OPEN ITEMS: 0
>> CEHA 2024: TOTAL FINDINGS 19 ACTION ITEMS - CLOSED ITEMS: 9 - OPEN ITEMS: 2
=============================================== NEXT WELL ================================================
- HWYH-1312
============================================== VACUUM TANKER ============================================

============================================ NEARBY RIGS OR SITES ===========================================

========================================= DIESEL CONSUMED F/ OBM ===========================================


DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
66 PCF 0 12 API 0 0 Volts 2.5 10 1,100
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
90 0 HTHP 96 22 0.1 10 / 14 WBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 4 4 8/9 17 560 0
60
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
66 PCF 0 10 API 0 0 Volts 2.5 10 1,100
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
90 0 HTHP 96 20 0.1 10 / 14 WBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 5 4 8/9 17 560 0
56

MUD

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1321 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/17/2024 - 09/03/2024
Report ID: OPERLMTDMRREP

TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
5RR 5,696 5,696 DP Av DC Av Bit HHP 20 50 435 16 SMT
Pressure GPM Jet Vel 86.86 106.71 256 I-Row O-Row DC Location Bearings
1,100 800 262 1 1 CT S E
BIT DATA
Serial Number Type Jets TFA
RP8149 GSI12 3 x 16 / 1 x 16 / 10.982
x 16 /
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 25 195 198 192 5,000 0
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
12

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
05/30/2024 2X WEEKLY N/A N/A SEASONAL 2,230 EACH TOUR DAILY

Company FME RIG RIG SMI TK3 RIG SCM TK3 ARM

Category WHES CTRG RIG DFMS OTHR OTHR PCS WSC WSC
PERSONNEL
2 13 42 3 13 16 4 3 1
Total
AND SERVICES No. of Persons
97
INFORMATION
Personnel on Loc. Hrs. 14 24 24 24 24 24 24 24 24

Operating Hours. 12 0 24 12 12 12 12 24 24

Standby/Tankers
TRUCKS/BOATS
ab8966

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 200 214 146 125 3400

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2325 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/30/2024 - 08/30/2024
Report ID: OPERLMTDMRREP

ADC-67L @ UTMN-2325 Limited Morning Report for 06/18/2024


Objective : (MK1 SINGLE Foreman(s)OUAFFI, MOHAMED AMINE
LATERAL WELL TOWARDS Engineer MATA PETIT, FELIX EMILIO
D&WO Morning Report (Service Providers View) Rig Charge #: THE MINIMUM HORIZONTAL Manager NEJIDI, AHMED ABDULLAH
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-67L (66-23057-2325) STRESS ACROSS KHUFF-B THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK) RESERVOIR)
0882-167-7 712544 577-3957 664 8806 S LB IDS
(0500-0500) Saudi Aramco Well Wellbores:
UTMN-2325 (0) UTMN_2325_0 OTHER VSAT OTHER VSAT CONTRACTOR
Date: Tuesday 06/18/2024 /CLERK VSA T
829 7667 M OH MEDIC 829 7767 A DC
577-3592

Last 24 hr operations Next 24 hr plan


DRILL 16" HOLE TO SECTION TD @4490FT, CHC, DROP GYRO SURVEY, POOH TO SURF & LD BHA, RUN 13-3/8 IN CSG TO CP @ 4,490 FT,CHC, SPACE OUT AND INSTALL FMH HANGER AND
PT ANNULAR WITH 13-3/8" CSG, PERFORM FMH DUMMY RUN, PERFORM CEMENT JOB
Location Next Location
UTMN-2325 LOCATED 174.5 KM FROM THE DHAHRAN MAIN GATE. *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
4,490 Last Csg Size MD TVD Size Top
18 5/8 2295 2295 Formations Comments
Depth
ARUM 1,380 158' SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) LAMS 1,850 52' SHALLOWER
4450 (Date) 100 40 175 AHMD 2,245 3' DEEPER
11.8 (06/06/2024@1000 ) SFNY 2,550 22' DEEPER
SHUB 3,380 14' DEEPER
BYDH 3,620 6' DEEPER
MDTM 4,440 18' SHALLOWER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

DRILLED 16" HOLE SECTION WITH PERFORMANCE BHA & 67 PCF PHPA FROM
3,930 FT TO 13-3/8 IN CP @ 4,490 FT. -CONFIRMED BY GOC-
- WOB: 30-55, RPM: 40-80, FLOW : 1100 GPM, PRESS: 1900- 2,050 PSI, DIFF
PRES: 200-250 PSI, TQ: 2-8 KLBS.FT.
- OBSD INTERMITTENT ERRATIC TQ , ADJUSTED DRILLING
0500 - 0730 2.5 0 16 N DRLG DMR MMOT SDM 4450 4490 PARAMETERS TO MITIGATE.
- FOLLOWED IWC CONNECTION PRACTICES.
- RECORD THE B/O TQ EVERY CONNECTION WITH 40 RPM - OK
- AVG ROP: 26.7 FT/HR.
- BHA HRS: 87.5 HRS.
- BIT HRS : 47.25 HR.
- JAR HRS : 47.25 HRS

CIRCULATE HOLE CLEAN PRIOR TO POOH. MEANWHILE SWEEP HOLE WITH 2X 150
0730 - 0945 2.25 0 16 N DRLG CIRC MPMP RIG 4490 4490
BBL HIVIS SWEEP
- FR: 900-950 GPM, SPP: 2500-2700 PSI , RPM: 60-100

0945 - 1000 0.25 0 16 N DRLG OTH NA RIG 4490 4490 FLOW CHECK WELL STATIC
- RECORD SCR.

1000 - 1115 1.25 0 16 N DRLG CIRC MPMP RIG 4490 4490 SPOT 400 BBLS X 80PCF INHIBITED CASING GO PILL.
- DROP GYRO SURVEY

POOH W/ 16" PERFORMANCE BHA FROM 4,490 FT TO 3,550 FT.


1115 - 1145 0.5 0 16 N DRLG TO STDP TK3 4490 4490 4490 3550
- MONITOR WELL ON TRIP TANK & TRIP SHEET.
- HOLE CONDITION IS OK.
1145 - 1245 1 0 16 N DRLG CIRC MPMP RIG 4490 4490
SPOT 400 BBLS X 80 PCF SECOND INHIBITED CASING GO PILL

POOH W/ 16" PERFORMANCE BHA F/3.350 FT T/2,295 FT


- ENCOUNTER TIGHT SPOT CLEAN SAME WITH SOFT BACK REAMING,REAMING
1245 - 1430 1.75 0 16 N DRLG BR STRG RIG 4490 4490 3350 2295 DOWN & RECIPROCATION.
- TIGHT SPOT @ 3550 FT.
- CONFIRM FREE PASS FOR ALL TIGHT INTERVAL
- FLOW 900 GPM , PRESS. 2200 PSI , RPM 70- 100 , TQ- 5 -19 KLBS. FT
1430 - 1445 0.25 0 16 N DRLG OTH NA RIG 4490 4490
FLOW CHECK @ 18-5/8 IN CSG SHOE,WELL STATIC

1445 - 1515 0.5 0 16 N DRLG OTH NA RIG 4490 4490 CONDUCT SAFETY STAND DOWN MEETING WITH RIG CREW AND THIRD PARTY
SERVICES.

1515 - 1545 0.5 0 16 N DRLG TO STDP RIG 4490 4490 2295 820 CONT. POOH W/ 16" PERFORMANCE BHA FROM 2295 TO 820 FT TOP OF BHA.
- MONITOR WELL THROUGH TRIP TANK & SHEET.
1545 - 1600 0.25 0 16 N DRLG OTH NA RIG 4490 4490
FLOW CHECK WELL STATIC.

POOH WITH 16" PERF. MOTOR BHA FROM 820FT TO SURFACE.


- RB 2 STDS X 5 1/2" HWDP
- RB 1 STDS X 8 1/2" DC
1600 - 2230 6.5 0 16 N DRLG HT BHA RIG 4490 4490 - LD 5 STDS X 9 1/2" D/C
- LD 9-1/2"D.JAR.
- LD 2 X 15-7/8" ST.STAB + SHOCK SUB + 15-7/8" NB. STAB.
- LD 16 IN BIT
- FOUND STABS FULLY BALLED UP

Saudi Aramco: Confidential Page 1 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2325 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/30/2024 - 08/30/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
- BIT DULL (1-1-WT-S-X-I-NO-TD)
- RECOVER GYRO SUR INC=0.5 DEG
- MONITOR WELL ON TRIP TANK & SHEET.
2230 - 2315 0.75 0 16 N WH RTRV WBSH RIG 4490 4490
RETRIEVING ASSY & RETRIEVED WEAR BUSHING

2315 - 0000 0.75 0 16 N DRLG CIRC MPMP RIG 4490 4490 P/U FMC JETTING TOOL AND PERFORM JETTING FOR WELL HEAD
- RACK BACK JETTING TOOL..

M/U AND SET TEST ASSEMBLY WITH CSG JT (86#) + PLUG +2 STDS OF 5-1/2" DP
0000 - 0100 1 0 16 N BOP BOPT BOP RIG 4490 4490 BELOW TEST PLUG
- FLUSH BOP WITH WATER AND FILL SAME.
- OPEN SOV

0100 - 0200 1 0 16 N BOP BOPT BOP RIG 4490 4490 PRESSURE TEST 26-3/4" BOP AS FOLLOWS.
- P/T ANNULAR BOP TO 300/1400 PSI FOR 10 MINS EACH - OK

0200 - 0300 1 0 16 N DRLG HT PEL RIG 4490 4490 POOH & L/D TEST ASSEMBLY + PLUG.
- RACK-BACK 2 STDS OF DP

RIG UP TESCO CRT, JAM UNIT AND 13-3/8"" CASING HANDLING EQUIPMENT.
0300 - 0400 1 0 16 N CSG HT PEL TSC 4490 4490 - FUNCTION TEST EQUIPMENT CONDITION.
- FUNCTION TEST INTERLOCKING DEVICE OF HYDRAULIC UNIT OF CRT.
- MONITOR WELL THRU TRIP TANK
0400 - 0430 0.5 0 16 N DRLG OTH NA RIG 4490 4490
PSJM PRIOR TO RIH 13-3/8" CSG.

P/U FMC CASING HANGER RUNNING TOOL AND FMH CASING HANGER MANDREL,
MADE UP WITH LANDING JOINT.
0430 - 0459 0.5 0 16 N CSG OTH CSG TK3 4490 4490 - PERFORM DUMMY RUN LOWERING CHGR ASSY IN CHH AND TAKE THE
MEASUREMENTS.
- CONFIRM MARKS CAN BE SEEN FROM SOV'S.
- L/D ALL ASSEMBLY TOGETHER ON THE RACK
Foreman Remarks

UTMN-2325 ISPLANNED TO BE DRILLED AS MK1 SINGLE LATERAL WELL TOWARDS THE MINIMUM HORIZONTAL STRESS ACROSS KHUFF-B RESERVOIR. A SEPARATE SUPPLEMENT WILL BE ISSUED
TO COVER THE COMPLETION DETAILS. THE WELL IS INSIDE SHALLOW GAS BOUNDARY/AREA
A 10 KM RADIUS ANTI-COLLISION SCAN WAS PERFORMED FOR THE WELL AND NO ISSUES WERE FOUND.
============================ARAMCO PERSONNEL=================================
>> AHMED AL-ALI #8334174 ARAMCO MATERIAL EXPEDITER OFF LOCATION FROM 06/12/2024
===================================SPUD MEETING ==============================
PRE-SPUD AND STUCK PIPE AWARENESS MEETING CONDUCTED AT RIG SITE ON 06/04/2024. PARTICIPATED BY ARAMCO FOREMAN, DE (SALMN ZAHID ID 76691), SLB LSTK AND ADC RIG TEAM.
============================IDS/ADC PERSONNEL =================================
>> IDS SUPERVISORS: DAY /MAHER DOMAH - NIGHT / HOSNY
>> ADC TOOL PUSHERS: SAJJAD/ MAHMOUD
========================LAST CONTRACTOR VISIT, IDS & ADC===========================
- SLB HSE ADVISOR-
- SLB DRILLING SUPT -
- SLB HSE SUPT -
- SLB WELL CONTROL SPECIALIST -
- SLB MUD SUP -
- SLB PROJECT MANAGER ALEXANDRE JAVAY- ON 17/06/2024
=========================SERVICE COMPANIES ==================================
>> FMC ENGINEER : AHMED ALBABA
=====================COMMUNICATION WITH NEAR BY FACILITY========================

================================HSE=========================================
PRE TOUR-MEETING:
- HSE TOPIC OF THE DAY ( FLARE IGNITION PROCEDURE BRIEF )
- REFRESHER TRAINING SIPP CTA
- REVIEWING LIFE SAVING RULES (ELECTRICAL SAFETY )
- HSE ALERT HEAT SNAKE BIT HAZARD
- STOP CARDS.
- STOP WORK AUTHORITY.

>> INSPECTION: MONTHLY FIRE EXTINGUISHERS INSPECTION & WEEKLY AMBULANCE INSPECTION, DAILY PORTABLE H2S GAS DETECTORS INSPECTION
>> DRILLS: 1 X H2S DRILL, 1 X TRIP DRILL
>> NEAR MISS:
>> INCIDENTS:

================================AUDITS & INSPECTIONS=================================


>> 1ST QSI 2024: TOTAL FINDINGS , OPEN .
>> 2ND QSI 2024: TOTAL FINDINGS , OPEN .
>> 3RD QSI 2024: TOTAL FINDINGS , OPEN .
>> GAP ANALYSIS: 92.10%
>> RHSEI (1ST HALF-2024) : TOTAL FINDINGS 33 , OPEN 0.
>> WCI (1ST HALF-2024) : TOTAL FINDINGS 06 , OPEN 0.
>> CEHA (1ST HALF-2024) : TOTAL , OPEN

Saudi Aramco: Confidential Page 2 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2325 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/30/2024 - 08/30/2024
Report ID: OPERLMTDMRREP

====================DIRECTIONAL DATA==========================================

=========================SGGDD COST OPTIMIZATION===============================


>> KILL MUD: NOT PROVIDED BY SAUDI ARAMCO, LSTK RIG.
>> FRAC TANK: NOT PROVIDED BY SAUDI ARAMCO, LSTK RIG.
>> ACID FOR STUCK PIPE: NOT PROVIDED BY ARAMCO, LSTK RIG.
=============================VACUUM TANKERS=================================
>> VACUUM TANKERS (TAMIMI) DRSS
>> TAMIMI: DOOR/PLATE NUMBER:
============================DIESEL CONSUMPTION ============================
>> DAILY DIESEL CONSUMPTION FOR ENGINES (RIG+CAMP): 99 BBLS --- CUM. DIESEL CONSUMPTION FOR WELL = 820 BBLS.
======================DIESEL CONSUMED F/OBM================================
> TOTAL APPROVED QUANTITY IS 0000 BBLS WHICH WILL BE 00 LOADS. TOTAL REQUESTED 0 LOADS. TOTAL RECEIVED 0 LOADS.
===============================WATER WELLS===============================
- CURRENT WW:
UTMN-919 SHARING WITH SND 2001
UTMN- 973 SHARING WITH SND 2001
===============================NEXT WELL=================================
>> NEXT WELL: MAINTENANCE
>> WATER WELLS:
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 4.6 API 0 0 Volts 2.54 10.2 120,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 86 28 0 12 / 18 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 18 14 11 / 14 2.5 240 0
83
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
67 PCF 0 10.4 API 0 0 Volts 3.47 9.5 1,100
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
85 0 HTHP 93 21 0 9 / 13 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 8 7 8 / 11 12.5 320 0
63

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
4RR 2,295 4,490 DP Av DC Av Bit HHP 45 80 M223 16 SMT
Pressure GPM Jet Vel 104.23 128.05 254 I-Row O-Row DC Location Bearings
1,100 960 238 1 1 WT S X
BIT DATA
Serial Number Type Jets TFA
QF8594 MSI716V1C 10 x 13 / 1.296
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 23 232 55 50 8 1
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
1

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/14/2024 N/A N/A N/A N/A 2,184 N/A

Company TSC SUW RIG SMI TK3 RIG ARM SCM TK3 ARM FME

Category CSR CTRG RIG DFMS OTHR OTHR OTHR PCS WSC WSC WHES
PERSONNEL
4 14 40 3 4 18 0 4 2 1 1
Total
AND SERVICES No. of Persons
91
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 0 24 24 24 15

Operating Hours. 24 0 24 24 12 24 0 24 24 24 12

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 228 244 161 2500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Saudi Aramco: Confidential Page 3 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2325 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/30/2024 - 08/30/2024
Report ID: OPERLMTDMRREP

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 4 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JLDI-854 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/28/2024 - 06/29/2024
Report ID: OPERLMTDMRREP

ADC-68L @ JLDI-854 Limited Morning Report for 06/18/2024


Objective : (DEVIATED WASIA Foreman(s)HAJRI, EID SAAD
D&WO Morning Report (Service Providers View) WATER SUPPLY WELL) RODRIGUEZ CAMPOS, FERNANDO CARLOS / GHAMDI, THAMER
Rig Charge #: Engineer
MOHAMMAD
Copyright 2024 Saudi Aramco. All Rights Reserved ADC-68L (66-18034-0854) Manager GARNI, ABDULLAH SALEH
Daily Onshore (LSTK)
Wellbores: THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well
JLDI-854 (0-1) JLDI_854_1 +882167771 2630 3788071/37 88073 /CLERK VSA
Date: Tuesday 06/18/2024 T
3788072

Last 24 hr operations Next 24 hr plan


DRILL W/ 12 1/4" MRSS-LWD BHA AND 91 PCF OBM TO +/- 7514 FT. SWEEP & CHC. PERFORM WIPER TRIP. SWEEP & CHC. POOH W/ 12 1/4" MRSS BHA TO SURFACE & L/D SAME. R/U
TRS EQT. HPJSM, RIH 9 5/8" LINER AS PER PROGRAM.
Location Next Location
203 KM F/DMG, GO172 KM DMM/ABHD H/W, TURN RIGHT, GO 21 KM NUAYRIAH H/W,TURN RIGHT,GO 14 KM SKID ROAD JLDI-855
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,514 Last Csg Size MD TVD Size Top
13 3/8 4823 4657 Formations Comments
Depth
DMMM 275 275' TVD (63' SHALLOWER)
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 980 980' TVD (134' DEEPER)
6850 (Date) 100 674 182 UMER 1,465 1465' TVD (60' DEEPER)
41.1 (05/08/2024@0300 ) ARUM 3,289 3247' TVD (6' DEEPER)
LAMS 4,465 4465' TVD (12' DEEPER)
PAMU 5,548 5271' TVD
RUML 5,672 5376' TVD (15' DEEPER)
PLVL 5,738 5433' TVD
WARA 6,030 5682' TVD
SFNY 6,104 5746' TVD (14' DEEPER)
KHFJ 6,867 6390' TVD (38' DEEPER)
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

MRSS DRILL 12 1/4" HOLE W/ 91 PCF OBM & 100% RETURN F/ 6850 FT TO WELL
TD @ 7524 FT (6946 TVD) . CONFIRMED BY GOC.
- WOB : 20-40 KIPS - FR: 750 GPM - SPP : 4000 PSI - RPM:60-80, TORQUE : 7-16
0500 - 0230 21.5 0-1 12 1/4 N DRLG DMR MRSS BHI 6850 7524 KLBFT - DIFF PRESSURE : 300-400 PSI.
- SWEEP HOLE WITH 30 BBL HI-VIS PILL EVERY STAND
- BACK REAM & REAM DOWN EVERY STD.
- RECORD SURVEY 30 FT OFF BOTTOM PRIOR CONNECTION.
- LAST SURVEY AT 7429 FT, INC:32.03 DEG, AZ: 158.44 DEG,
0230 - 0300 0.5 0-1 12 1/4 N DRLG RR TDS RIG 7524 7524
SERVICE TDS.

SWEEP W/ 50 BBL HVP TWICE & CIRCULATE HOLE TILL SHAKERS CLEAN. WITH 94
0300 - 0459 2 0-1 12 1/4 N DRLG CIRC MPMP RIG 7524 7524 PCF OBM, 100% CIRC.
- INCREASE MUD WEIGHT TO 94 PCF WHILE CIRC.
- CONDITIONING MUD IN & OUT TO 94 PCF.
Foreman Remarks

=======================================OBJECTIVE OF THE WELL====================================


* JJLDI-854 WELL WHICH WILL BE DRILLED AS A DEVIATED WASIA WATER SUPPLY TO TOTAL DEPTH 7,514' MD/ 6,947' TVD.
* WELL WILL BE COMPLETED AS A CASED HOLE WITH PERFORATION INTERVAL ACROSS SFNY RESERVOIR, SAND SCREEN AND ESP COMPLETION.

============================== PLANNED VS ACTUAL CASING DEPTHS ===================================


- 9-5/8" LINER AT 7,514 FT (595 FT TVD INTO KHFJ FORMATION).

=============================DIRECTIONAL DATA==================================================
- FOLLOWING DIR. PLAN JLDI-854_REV-D.0
- LAST SURVEY: 6693' MD / 6243.06' TVD, 32.75 DEG INC, 158.31 DEG AZI. DLS: 0.49 DEG/100 FT
- WELL PATH IS 0.18 FT BELOW & 6.4 FT RIGHT OF THE PLAN.

============================= ARAMCO PERSONNEL ===========================================


- ARAMCO MATERIAL EXPEDITOR NOOR B. ALNEMER #760623 ON LOCATION SINCE 6/10/2024

============================== RIG VISIT ========================================================

================================== SAFETY ======================================================


- SIMOPS IS STARTED SINCE 05/12/2024 AT 09:30 HR'S.
- JLDI-856, JLDI-858 & JLDI-859 UNDER SIMOPS.
- BARRICADED HEADER & FLOW LINES IN DS-2.
- INSTALLED SINOPEC H2S STAND-ALONE MONITORING SENSORS.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0-1 6,883 32.74 157.14 95 6,403 -560.37 249.28 2,012.2 0.4
0-1 6,978 32.02 156.63 95 6,483 -574.63 255.37 2,063.07 0.81
0-1 7,073 32.03 155.71 95 6,564 -588.68 261.58 2,113.45 0.51
DAILY SURVEY
0-1 7,168 32.05 155.91 95 6,644 -602.69 267.87 2,163.84 0.12
0-1 7,265 32.05 156.32 97 6,726 -617.04 274.22 2,215.32 0.22
0-1 7,361 32.01 157.48 96 6,808 -631.31 280.31 2,266.22 0.64
0-1 7,429 32.03 158.44 68 6,865 -641.5 284.43 2,302.26 0.75

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JLDI-854 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/28/2024 - 06/29/2024
Report ID: OPERLMTDMRREP

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
91 PCF 1 0 API 61 0 Volts 4 0 75,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
164 6 HTHP 15 26 0 12 / 15 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 30 24 12 / 14 0 0 0
70
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
91 PCF 1 0 API 61 0 Volts 4 0 75,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
159 6 HTHP 15 26 0 12 / 15 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 30 24 12 / 14 0 0 0
75

MUD BARITE CAOH2 CARBOTROL CARBGEL


TREATMENT 2 ( 1500K ) 120 ( 25KG ) 84 ( 50LB ) 10 ( 25KG )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
8RR 6,037 7,524 DP Av DC Av Bit HHP 35 80 M223 12.25 HTC
Pressure GPM Jet Vel 146.99 224.18 199 I-Row O-Row DC Location Bearings
3,900 750 205 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7916076 DD606TX 6 x 16 / 1.178
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 12 205 255 175 13 22
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 12.25 1 1 6-5/8" REG 7916076
2 RSS BHI 9.5 1 9.5 8.32 230 15364378
3 Gamma Sub BHI 9.5 1 9.531 3 4.5 9 1/2 T2 9 1/2 T2 116 11625584
4 Mud Motor BHI 9.5 1 9.5 36.79 9-1/2" T2 9-1/2" T2 114 15823529
5 Modular Stabilizer BHI 9.5 1 9.5 3.15 5.82 9 1/2 T2 9 1/2 T2 72 15625365
6 Measurement While Drilling (MWD) BHI 9.5 1 9.5 22.55 9-1/2" T2 9-1/2" T2 215.23 12720176
7 Measurement While Drilling (MWD) BHI 9.5 1 9.5 11.79 9-1/2" T2 9-1/2" T2 215.23 15370623
8 Modular Stabilizer BHI 9.5 1 9.5 3.15 11.98 9 1/2 T2 9 1/2 T2 114 15949817
9 Modular Flex Stabilizer BHI 9.5 1 9.5 3.125 3.62 9 1/2 T2 9 1/2 T2 114 16349681
DRILL STRING 10 Logging While Drilling (LWD) BHI 9.5 1 9.5 8.37 9-1/2" T2 9-1/2" T2 215.23 12519313
11 Logging While Drilling (LWD) BHI 8.25 1 8.25 8.75 162.7 12806741
12 Stop Sub BHI 8.25 1 8.25 2.81 2.68 6 5/8 REG 6 5/8 REG 150 16129231
13 Stabilizer BHI 12.25 1 8.5 2.821 7.59 6 5/8 REG 6 5/8 REG 114 TOTAE302140
14 Float Sub BHI 8.25 1 8 3 3.59 6 5/8 REG 6 5/8 REG 150 14730731
15 FIlter Sub BHI 8 1 8 3 5.6 6 5/8 REG 6 5/8 REG 114 16092203
16 Drillcollar RIG 8.25 1 8.25 3 30.22 6 5/8 REG 6 5/8 REG 158 SPRL 2022125260
17 Dogleg Reamer NPD 12.25 1 12.25 3 7.13 6-5/8" REG 6-5/8" REG 80 T100684
18 Drillcollar RIG 8.25 1 8.25 3 30.53 6 5/8 REG 6 5/8 REG 158 SPRL 2022125330
19 Crossover RIG 8.25 1 8.25 2.875 2.6 NC50 6 5/8 REG 150 102479
20 PBL (Multiple Activation By Pass) BWC 8 1 8 3 8.62 NC50 NC50 99 HYD675SPB25
21 Heavy Weight Drillpipe (HWDP) RIG 5 8 5 3 241.6 NC50 NC50 50.14 CONV NA
22 Mechanical Jar NPC 1 30.02 99 HMJ-650-38
23 Heavy Weight Drillpipe (HWDP) RIG 5 21 5 3.25 641 NC50 NC50 54 CONV NA
24 Drillpipe RIG 5 1 5 4.276 30 NC50 NC50 19.5 G105 PREMIUM NA

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/11/2024 N/A CALM N/A SEASON 2,094 PRE-TOUR MEETING

Company SCC BHI RIG BDF MJH TK2 RIG ARM OTH TK2 ARM TIL

Category CTRG DPDS RIG DFMS SEC OTHR OTHR OTHR VAC WSC WSC LHES
PERSONNEL
13 3 36 1 7 3 14 1 5 2 1 1
Total
AND SERVICES No. of Persons
87
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 8

Operating Hours. 0 24 24 24 24 12 12 12 0 24 24 0

Standby/Tankers
TRUCKS/BOATS
DH-8962

BULK Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JLDI-854 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/28/2024 - 06/29/2024
Report ID: OPERLMTDMRREP

N/A N/A N/A N/A N/A 3100

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-730 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:20 06/16/2024 - 07/07/2024
Report ID: OPERLMTDMRREP

ADES-13 @ HRDH-730 Limited Morning Report for 06/18/2024


Objective : (EXTEND 7" Foreman(s)MEBARKI, ABDELKARIM
LINER TO SURFACE) Engineer KHAN, AAMIR
D&WO Morning Report (Service Providers View) Rig Charge #: Manager SAAD, SAAD RASHED
Copyright 2024 Saudi Aramco. All Rights Reserved ADES-13 (61-24058-0730)
THURAYA RIG FORMAN VSAT CONTRACTOR /CLERK VSA
Daily Onshore T
0088216777 12823 577-3977
(0500-0500) Saudi Aramco Well Wellbores:
ARAMCO CLE RK / 577-3 590
Date: Tuesday 06/18/2024 HRDH-730 (0) HRDH_730_0
CONTRACTOR /CLERK VSA T
TP OFFICE 810-2796

Last 24 hr operations Next 24 hr plan


R/D ON HRDH-55 & R/M TO HRDH-730 R/D ON HRDH-55, R/M & R/U ON HRDH-730.
Location Next Location
NORTH: 2691105.36 EAST: 290413.8 HRML-25
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,999 Last Csg Size MD TVD Size 1,971 8,629 8,629 Top
9 5/8 3880 3880 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12999 (Date) 0 253
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONDUCT PRE-MOVE SAFETY MEETING WITH ALL RI PERSONNEL, RIG MOVERS TO


DISCUSS RIG MOVE HAZARDS & CONTROL MEASURES.

0500 - 0459 24 0 PRE M RM RM NA RIG 0 0 R/D 75% ON HRDH-55, R/M 40% & R/U 10% ON HRDH-730.

R/D ACTIVITIES:
>>DISMANTLE MAST TO TWO SECTIONS.
>>LOAD SUB BASE SECTIONS AND PREPARE TO MOVE.
Workover Objectives
Foreman Remarks

----------------------------------------------------SAFETY-----------------------------------------------------------------------------
> HELD DAILY SAFETY MEETINGS WITH ALL INVOLVED PERSONNEL.

----------------------------------------------NEXT LOCATIONS-----------------------------------------------------------------------
- HRDH-738 : KOM DONE ON 6-30-2024. 15% STRIP OUT & 0% LOCATION READINESS.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 1,711 N/A

Company LIG RIG OES MJH ARM

Category CTRG RIG DFMS SEC WSC


PERSONNEL
16 50 1 8 1
Total
AND SERVICES No. of Persons
76
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24

Operating Hours. 0 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 1 of 1


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRML-823 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:20 05/19/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

ADES-14 @ HRML-823 Limited Morning Report for 06/18/2024


Objective : (CHANGE ESP) Foreman(s)MEZIANE, AMAR / MUJAMMAMI, MOHAMMED HUSSAIN
D&WO Morning Report (Service Providers View) Charge #: Engineer AKBAR, KITOS GEMINI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (72-24085-0823) Manager SAAD, SAAD RASHED
ADES-14
Daily Onshore THURAYA RIG FORMAN VSAT MOBILE
(0500-0500) Saudi Aramco Well Wellbores: 8821677712 824 013577-398 0 T.PUSHER 0 13-810-278 6
Date: Tuesday 06/18/2024 HRML-823 (0) HRML_823_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
013-577-93 58 TOOL PUSHE R 05430132 556

Last 24 hr operations Next 24 hr plan


CONT. PERFORMING ACID STIMULATION. POOH CT & L/D NOV AGITATOR, RIH W/ CT, PUMP N2 & FLOW BACK THE WELL.
Location Next Location
4 KM NW FROM HRML GOSP #1 AND 204 KM FROM DMG HWYH-292
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
11,088 Size 5359 5359 Size 4,400 6,748 5,690 Top
Formations Comments
13 3/8 9 5/8 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
11115 (Date) 0 0 204
20.6 (05/28/2024@1430 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT. PUMP 1833 BBLS 7.5% HCL ACID WITH CT STRING MOVING UPWARD F/
10990' T/ 7196' AND CHOKE IN CLOSE POSITION.
0500 - 0830 3.5 0 EOW C STIM STIM CTU JCT 11115 11115
** AVERAGE CT SPEED 6 FPM, PUMPING RATE: 2.7 BPM WITH 3300 PSI
CIRCULATING PRESSURE. WELL HEAD PRESSURE 200 PSI.
** CUMULATIVE ACID PUMPED: 3810 BBL (TOTAL ACID VOLUME)

PUMP 3048 BBLS OF 4% NH4CL BRINE (POST FLUSH) WITH CT BHA ACROSS
LOWER COMPLETION SCREENS INTERVAL AS FOLLOWING:
- PUMP 72 BBLS 4% NH4CL BRINE (POST FLUSH) WITH CT STRING MOVING
UPWARD F/ 7196' T/ 7052' AND CHOKE IN CLOSE POSITION.
0830 - 0330 19 0 EOW C STIM STIM CTU JCT 11115 11115
- PUMP 1524 BBLS 4% NH4CL BRINE (POST FLUSH) WITH CT STRING MOVING
DOWNWARD F/ 7052' T/ 10990' AND CHOKE IN CLOSE POSITION.
- PUMP 1452 BBLS 4% NH4CL BRINE (POST FLUSH) WITH CT STRING MOVING
UPWARD F/ 10990' T/ 7263' AND CHOKE IN CLOSE POSITION.

PUMP 218 BBLS OF DISPLACEMENT FLUID WITH CT BHA ACROSS LOWER


COMPLETION SCREENS INTERVAL AS FOLLOWING:
- PUMP 79 BBLS DISPLACEMENT FLUID WITH CT STRING MOVING UPWARD F/
7263' T/ 7052' AND CHOKE IN CLOSE POSITION.
0330 - 0430 1 0 EOW C STIM STIM CTU JCT 11115 11115
- PUMP 139 BBLS DISPLACEMENT FLUID WITH CT STRING @ 7052' AND CHOKE IN
CLOSE POSITION.

** AVERAGE CT SPEED 8 FPM, PUMPING RATE: 2.8 BPM WITH 3000 PSI
CIRCULATING PRESSURE. WELL HEAD PRESSURE 60 PSI.

0430 - 0459 0.5 0 EOW C STIM OTH NA JCT 11115 11115 POOH JEREH 2-3/8" CT W/ 3-1/8 " CTU NOZZLE BHA TO SURFACE.......ONGOING
@ RPT
Workover Objectives
Foreman Remarks

- ODF CORRECTION = -3 FT.


=======================================================================================================
>>SAFETY
- GOR: 0 SCF/STB, H2S: 0%.
- 1/2 LFL= 0 M, 100 PPM= 0 M, 30 PPM= 0 M.
=======================================================================================================
>>DIESEL CONSUMPTION.
- DIESEL CONSUMPTION FOR ENGINES (RIG+CAMP): (DAILY: 17 BBLS / CUMULATIVE FOR CURRENT WELL: 661 BBLS).
=======================================================================================================
>> ARAMCO POB

=======================================================================================================
>>TRUCKS VAC, WATER & GARBAGE
- 3 X RAW WATER TANKERS.
=======================================================================================================
>>RENTAL EQUIPMENT ON LOCATIONS

=======================================================================================================
>>NEXT LOCATIONS
- HWYH-292: KOM DONE ON 4/01/2024, STRIP OUT: 100%, LOCATION: 95%.
=======================================================================================================
>>VISITORS:
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 11,115 89.1 28 0 5,741 1757.36 975.92 6,594.99 0.87

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRML-823 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:20 05/19/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
69 PCF 0 0 API 0 0 Volts 0 10 97,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 90 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 10 0/0 0 240 0
28
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
69 PCF 0 0 API 0 0 Volts 0 10 97,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 90 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 10 0/0 0 240 0
28

MUD BACT SA-64


TREATMENT 1 ( 5GL ) 8 ( 55GL )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/13/2024 N/A SEASONAL NA NORMAL 1,431 PRE-TOUR
MEETINGS

Company RIG JCT RIG OES ARM SCM OTH ARM EX2

Category CTRG COIL RIG DFMS OTHR PCS VAC WSC WTSE
PERSONNEL
15 17 40 1 0 4 4 2 4
Total
AND SERVICES No. of Persons
87
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 0 24 24 24 24

Operating Hours. 0 24 24 24 0 24 0 24 24

Standby/Tankers Others Others


TRUCKS/BOATS
ARAMCO PICK UP AB-5546 8 RAW WATER TANKERS 1 X AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 900

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1333 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/29/2024 - 07/28/2024
Report ID: OPERLMTDMRREP

ADES-144 @ HWYH-1333 Limited Morning Report for 06/18/2024


Objective : (MK-1 S-SHAPE Foreman(s)CHAREF, KADA EL / ALGHAMDI, FAHAD ABDULAZIZ
D&WO Morning Report (Service Providers View) Charge #: TARGETTING KHUFF-C) Engineer DE ABREU GONCALVES, MIGUEL ANTONIO
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23053-1333) Manager SHAIKH, ALI JAFER
ADES-144
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 00-882-167 -771-1115 013-572-50 57 013-572-55 29
Date: Tuesday 06/18/2024 HWYH-1333 (0) HWYH_1333_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
013-572-71 59 0112687240

Last 24 hr operations Next 24 hr plan


ROTARY DRILL 22" HOLE ROTARY DRILL 22" HOLE TO CP +/- 3,064 FT (50 FT INTO AHMADI), CHC, POH & L/D 22" BHA,
RUN 18-5/8" CSG
Location Next Location
GO EAST FROM UDH BRIDGE THEN GO 25 KM SOUTH ON HAWIYAH HIGHWAY, RIG ON WEST SIDE. (177 KM FROM DMG) HWYH-1276
Current Depth (ft) Liner TOL MD TVD Formation Tops
2,470 Last Csg Size MD TVD Size Top
24 730 730 Formations Comments
Depth
RUS 680 S9' SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UMER 870 43' DEEPER
1710 (Date) 100 1,190 177 ARUM 1,845 2' DEEPER
6.5 (06/11/2024@1700 )

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End

ROTARY DRILL 22" HOLE W/ INHIBITED PHPA MUD.


0500 - 1600 11 0 22 N DRLG D TDS RIG 1710 2295 - PUMP 75 PCF MUD CAP @ 2 BPM.
- PUMP 50 BBLS HI VIS EA 30' DRILLED.
- DRILL W/ CONTROLLED ROP DUE TO HIGH VIBRATIONS.
1600 - 1630 0.5 0 22 N DRLG RR TDS RIG 2295 2295
RIG SERVICE TDS.

WORK ON TDS
- UNABLE TO BREAKOUT CONNECTION AFTER KELLY DOWN.
1630 - 0200 9.5 0 22 N DRLG RR TDS RIG 2295 2295 RR 934871 - AFTER SEVERAL ATTEMPTS OPENED CONNECTION BETWEEN
SAVER SUB AND I-BOP.
- CHANGE SAVER SUB - PRECAUTIONARY .
- TROUBLE SHOOT TDS HYD. SYSTEM & REPAIR SAME.

ROTARY DRILL 22" HOLE W/ INHIBITED PHPA MUD.


0200 - 0459 3 0 22 N DRLG D TDS RIG 2295 2900 - PUMP 75 PCF MUD CAP @ 2 BPM.
- PUMP 50 BBLS HI VIS EA 30' DRILLED.
- DRILL W/ CONTROLLED ROP DUE TO HIGH VIBRATIONS.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 1630 9.5 9.5 934871 RR FOT TDS RIG 2295 DIFFICULTIES TO BREAK OUT TOP DRIVE
FROM DRILL PIPE
Foreman Remarks

HWYH-1333 WILL BE DRILLED AS MK-1 S-SHAPE TO KHUFF-C PRIMARY TARGET & KHUFF-B SECONDARY TARGET. DIRECTIONAL WORK WILL BE PERFORMED IN 12" HS BELOW ARABS TO KICK OFF
TO 25 DEG INC & 90 DEG AZM, THEN DROP INC TO VERTICAL IN 8-3/8" HS. TD WILL BE AT +/- 14,772' MD/14,484' TVD (+/-250' INTO KFDA)

=================ARAMCO PERSONNEL===============
- PERUMAL RAMANAN, RIG CLERK #8544200, ON LOCATION SINCE 06/13/24.
- OMER ALDULAIJAN, FDP # 814047, OFF LOC SINCE 06/09/24.
- SULTAN ALJUHANI, FDP HOT-II #794825, OFF LOC SINCE 06/16/24.
- ALI GHAMDI, MC #821448, ON LOCATION SINCE 06/12/24.
- ASSAF ALAWAJI, DOECD FCC #794622 ON LOC SINCE 06/12/24.

=================ADES PERSONNEL==================
- LAST VISIT OF ADES QHSE MANAGER ON 05/25/2024.
- LAST VISIT OF ADES QHSE SUPERVISOR ON 05/25/2024.
- LAST VISIT ADES RIG SUPT 06/16/2024.
- LAST VISIT ADES OPERATION MANAGER 05/26/2024.
- CREW SHORTAGE: 1

===============SERVICE COMPANY PERSONAL ==========


- EMEC MUD ENG.
- SLB CLOSE LOOP.
- BKR CRS.

===============RENTAL TOOLS=================
- TQ COUGAR 12" SHOCK TOOL 7-5/8" REG P/B SN# ST5-1200-146, RECEIVED ON 6/13/24 AT 20:30HRS. P/U ON 6/16/24 AT 01:00 HRS,
- TQ COUGAR 9-1/2" JAR SN# DJ10-950-033 RECEIVED ON 6/15/24 AT 20:00HRS. P/U ON 6/16/24 AT 02:30 HRS,

=================HSE==================
- RED ZONE MANAGEMENT STANDARDIZATION CAMPAIGN
- HSE ALERT 60-24 - POISONOUS ANIMALS & INSECTS AT RIG SITES
- HSE ALERT 61-24 - HOT WORK RESULTED IN MUD TANK FIRE
- HEAT INDEX PRECAUTIONS: WORK-REST PERIODS 50:10,ONE CUP OF WATER EVERY 20 MINS AND WORK IN SHADED AREA

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1333 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/29/2024 - 07/28/2024
Report ID: OPERLMTDMRREP

AUDITS:
- 1ST RHSEI 2024: 25 FINDINGS; ALL CLOSED.
- 3RD 3-MCI 2023: 48 FINDING; 46 CLOSED; 2 OPEN
- 1ST 3-MCI 2024: 45 FINDING; 43 CLOSED; 1 OPEN
- LPD RSI 2024: 8 FINDINGS; ALL CLOSED.
- WCI 2024: 7 FINDINGS; ALL CLOSED.

- DRILLS: 1X H2S DRILL


- NEAR MISS: N
============ERP================
N

===============WATER CONSERVATION==============
- USING CLOSED LOOP SYSTEM & ONE WASTE PIT FOR WBM & OBM.
- WATER PIT NOT USED.

========= VACUUM TANKER AND DUMP TRUCK ON LOCATION HWYH-1269 =======


- SINOPEC SPRAY TANKER, ASIM DRSS#1004258975, DOOR# PLATE# 1930-TRA START FROM 11/02/2023. F/ 06.00 TO 16:00- 2 TRIPS,

===============NEXT WELL==============
- HWYH-1276: TBC
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF 0 0 API 0 0 Volts 1.22 10 400
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 98 0 0 0/0 INPHHVG 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 2 0/0 0 200 0
42
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF 0 0 API 0 0 Volts 1.22 10 400
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 98 0 0 0/0 INPHHVG 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 2 0/0 0 200 0
42

MUD CAUST DUOVIS-NS BENT S-PHPA-S


TREATMENT 65 ( 50LBP ) 11 ( 50LB ) 2 ( 2500L ) 144 ( 50LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
2 730 2,900 DP Av DC Av Bit HHP 60 70 425 22 SMT
Pressure GPM Jet Vel 43.21 47.62 502 I-Row O-Row DC Location Bearings
1,900 800 373 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
RV1678 GSI06 4 x 15 / 0.69
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 84 240 250 230 17,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 22 1 1.86 RV1678
2 Near Bit Roller Reamer RIG 22 1 22 2.8 9.03 7 5/8 REG 7 5/8 REG 216 3 POINT 52200160RR
3 Shock Sub CTC 12 1 14.29 216 ST-51200146
4 Roller Reamer RIG 22 1 9.5 3 8.63 7 5/8 REG 7 5/8 REG 216 3 POINT 26407-20
5 Drillcollar RIG 9.5 1 9.5 3 31.14 7 5/8 REG 7 5/8 REG 216 SPRL RECORDED
DRILL STRING 6 Roller Reamer RIG 22 1 9.5 3 8.74 7 5/8 REG 7 5/8 REG 216 3 POINT 26408-15
7 Drillcollar RIG 9.5 12 9.5 3 329.82 7 5/8 REG 7 5/8 REG 216 SPRL RECORDED
8 Hydraulic Jar CTC 9.5 1 30.98 216 DJ10950-033
9 Drillcollar RIG 9.5 3 9.5 3 90.97 7 5/8 REG 7 5/8 REG 216 SPRL RECORDED
10 Crossover RIG 9.5 1 9.5 3 2.55 7 5/8 REG 8 5/8 REG 216 41310-1A
11 Drillcollar RIG 8.5 6 8.5 3 179.23 6 5/8 REG 6 5/8 REG 166 SPRL RECORDED
12 Crossover RIG 8.5 1 8.5 2.813 2.3 6 5/8 REG 6 5/8 FH 166 1987-2
13 Heavy Weight Drillpipe (HWDP) RIG 6.625 9 6.625 4 281.17 6-5/8FH 6-5/8FH 82.748 CONV RECORDED
14 Crossover RIG 8.5 1 8.5 2.813 2.54 XT54 6 5/8 REG 72 144-5-01
15 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 5.5 4 257.18 VX54 VX54 42.9 CONV RECORDED
16 Drillpipe RIG 5.5 1 5.5 4.67 1 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A CALM N/A SEASONAL 8,447 TOURLY

PERSONNEL MSI SBT OTH CTC RIG EMC MJH RIG ARM SJC MI2 OTH ARM
Total
Company
AND SERVICES 92

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1333 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/29/2024 - 07/28/2024
Report ID: OPERLMTDMRREP

INFORMATION ISPCT BITS CTRG DRF RIG DFMS SEC OTHR OTHR PCS SCS VAC WSC
Category

No. of Persons 4 1 17 0 37 1 8 11 3 3 4 1 2

Personnel on Loc. Hrs. 10 24 24 0 24 24 24 24 24 0 24 24 24

Operating Hours. 0 24 0 24 24 24 24 12 12 24 24 10 24

Standby/Tankers Others Others


TRUCKS/BOATS
Ab-5320 AMBULANCE EMERGENCY BUS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
0 500 539 210 156 2000

Instrumentation Other
REPAIR ASAP OK N Reporter
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1227 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 04/01/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

ADES-157 @ HRDH-1227 Limited Morning Report for 06/18/2024


Objective : (TO DE- Foreman(s)SLAMENE, YACINE / ALYOUSEF, OTHMAN KHALID
D&WO Morning Report (Service Providers View) Charge #: COMPLETE, MILL 335 FT Engineer BAKHSH, KHALID SULTAN / OTUDI, AHMED MOHAMMED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24058-1227) OF 7IN LINER (WITH BAKER Manager TURAIFI, MOHAMMED AHMED
ADES-157
LH), SIDETRACK & DRILL THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: THE WELL INTO TWO HS)
(0500-0500) Saudi Aramco Well 0088216777 11298 577-5683 RIG CLERK: 5775736
Date: Tuesday 06/18/2024 HRDH-1227 (0-2) HRDH_1227_2 FAX VSAT CONTRACTOR /CLERK VSA T
880-7317 880-7312

Last 24 hr operations Next 24 hr plan


CONT. POOH W/SAMAA WBCO BHA WHILE L/D PIPES, RECONFIGURE BOP & PT. CONT. PT BOP, P/U & RIH W/HLB 4 1/2'' RATCH LATCH UPPER COMPLETION.
Location Next Location
281 KMS DHAHRAN GATE,155 KMS UDH GATE, 25 KMS ON UBRAIN ROAD FROM AL-KHARJ HRDH-1106
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
16,423 Size 10781 10781 Size 10,120 12,182 11,929 Top
Formations Comments
9 5/8 7 Depth
10,962' MD ( 23'
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SDDM 10,960
SHALLOWER )
16415 (Date) 100 0 281 10,993' MD ( 21'
71.1 (04/08/2024@0200 ) BSRD 10,990
SHALLOWER )
11,317' MD ( 11'
KHFF 11,310
SHALLOWER )
11,341' MD ( 14'
KFAR 11,334
SHALLOWER )
11,458' MD ( 16'
KFBR 11,451
SHALLOWER )
11,511' MD ( 17'
KFB1 11,502
SHALLOWER )
11,601' MD ( 11'
KFB2 11,589
SHALLOWER )
11,670' MD ( 15'
KFB3 11,653
SHALLOWER )
11,708' MD ( 15'
KFB4 11,686
SHALLOWER )
11,770' MD ( 13'
KFB5 11,738
SHALLOWER )
11,846' MD ( 13'
KFB6 11,794
SHALLOWER )
11,956' MD ( 15'
KFB7 11,860
SHALLOWER )
12,122' MD ( 14'
KFCC 11,924
SHALLOWER )
12,454' MD ( 26'
KC01 11,947
SHALLOWER )
12,854' MD ( 10'
KC02 11,962
SHALLOWER )
KC03 11,973 15,614' MD
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

0500 - 0615 1.25 0-2 EOW N CT LDP SPDP RIG 16622 16622 12200 11402 CONT. POOH WITH SAMAA WBCO ASSY ON 5" DP TO 4-1/2" TOL
> LAY DOWN 5" DRILL PIPE IN SINGLES.
0615 - 0630 0.25 0-2 EOW N CT WCNT NA RIG 16622 16622
FLOW CHECK; WELL STATIC

0630 - 0800 1.5 0-2 EOW N CT LDP SPDP RIG 16622 16622 11402 10120 CONT. POOH WITH SAMAA WBCO ASSY ON 5" DP TO 7" TOL
> LAY DOWN 5" DRILL PIPE IN SINGLES.
0800 - 0815 0.25 0-2 EOW N CT WCNT NA RIG 16622 16622
FLOW CHECK; WELL STATIC

0815 - 1245 4.5 0-2 EOW N CT LDP SPDP RIG 16622 16622 10120 6338 CONT. POOH WITH SAMAA WBCO ASSY ON 5" DP TO 6,338'
> LAY DOWN 5" DRILL PIPE IN SINGLES.

L/D SAMAA 9-5/8'' C/O TOOLS.


1245 - 1315 0.5 0-2 EOW N CT WBCO WBCL SAM 16622 16622
> 9''5/8 SCRAPER + X-O + 9''5/8 MAGNET + 9''5/8 JUNK TRAPPER + 9''5/8
BRUSH.

1315 - 1330 0.25 0-2 EOW N CT HT PEL RIG 16622 16622 CHANGE HANDLING EQUIPMENT TO 4" PIPE SIZE.
> MEANWHILE FLOW CHECK - WELL STATIC.

1330 - 1445 1.25 0-2 EOW N CT LDP SPDP RIG 16622 16622 6338 5061 CONT. POOH WITH SAMAA WBCO ASSY ON 4" DP TO 5,061'
> LAY DOWN 4" DRILL PIPE IN SINGLES.

L/D SAMAA 7'' C/O TOOLS.


1445 - 1515 0.5 0-2 EOW N CT WBCO WBCL SAM 16622 16622
> 7'' STRING MILL + 7'' SCRAPER + 7'' MAGNET + 7'' JUNK TRAPPER + 7'' BRUSH +
X-O.

1515 - 1600 0.75 0-2 EOW N CT HT PEL RIG 16622 16622 HPJSM, R/U NABORS 4.5" & 2-7/8" TBG HANDLING EQUIPMENT.
> MEANWHILE FLOW CHECK - WELL STATIC.

1600 - 1800 2 0-2 EOW N CT LDP SPDP RIG 16622 16622 5061 2523 POOH WITH SAMAA WBCO BHA ON 2-7/8" TBG.
> LAY DOWN 2 7/8" TBG, PH-6 , IN SINGLES.
1800 - 1830 0.5 0-2 EOW N CT WBCO WBCL SAM 16622 16622

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1227 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 04/01/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
L/D SAMAA 4-1/2" BRUSH WITH X/O'S.

1830 - 2100 2.5 0-2 EOW N CT LDP SPDP RIG 16622 16622 2523 23 POOH WITH SAMAA WBCO BHA ON 2-7/8" TBG.
> LAY DOWN 2 7/8" TBG, PH-6 , IN SINGLES.

2100 - 2130 0.5 0-2 EOW N CT WBCO WBCL SAM 16622 16622 POOH & L/D SAMAA 4-1/2" CLEAN OUT BHA.
> 2 7/8" MULE SHOE + X-O + 4''1/2 SCRAPER + 4''1/2 MAGNET + 4''1/2 BRUSH
2130 - 2200 0.5 0-2 EOW N CT HT PEL RIG 16622 16622
R/D NABORS 2-7/8" TBG HANDLING EQUIPMENT.

L/D EXCESS DRILL PIPE.


2200 - 2345 1.75 0-2 EOW N CT LDP SPDP RIG 16622 16622 1034 0
> L/D 12 JTS OF 4" HWDP.
> L/D 21 JTS OF 4" DP.
2345 - 0015 0.5 0-2 EOW N WH RTRV WBSH RIG 16622 16622
RETRIEVED V.G 11" WEAR-BUSHING.
0015 - 0100 0.75 0-2 EOW N BOP OTH BOP RIG 16622 16622
P/U JETTING TOOL AND JETTING BOP, WELL HEAD. L/D JETTING TOOL.

RIH 5 STD 5", SECURED WELL ON 5" LOWER MASTER RAM & RE-CONFIGURE BOP
0100 - 0330 2.5 0-2 EOW N BOP BOP RAMS RIG 16622 16622
FOR 4-1/2" UPPER COMPLETION.

0330 - 0400 0.5 0-2 EOW N BOP BOP BOP RIG 16622 16622 M/U 11" VG TEST PLUG ASSEMBLY & LAND SAME INTO WH. FLUSH BOP W/
WATER

HPJSM, PRESSURE TEST BOP AS PER ARAMCO STANDARDS.


0400 - 0459 1 0-2 EOW N BOP BOPT BOP RIG 16622 16622
>>> ON GOING @RT.......
Workover Objectives
Foreman Remarks

==============================================ARAMCO PERSONNEL=========================================
> ARAMCO MATERIAL EXPEDITOR ABDULELAH BASHA #8519205 ON LOCATION SINCE 6/10/2024.
===========================================SERVICE COMPANY PERSONNEL======================================
> EMEC MUD ENG ON LOCATION.
> NABORS CSG RUNNING CREW & EQUIPMENT ON LOCATION 5/26/2024.
> BAKER FILTRATION CREW & EQUIPMENT ON LOCATION ON LOCATION 05/30/2024.
> SAMAA WBCO ENGINEER ON LOCATION 5/31/2024.
> HLB ENGINEER FOR UPPER COMPLETION JOB ON LOCATION SINCE 6/1/2024.
> TAQA CMT CREW & EQUIPMENT ON LOCATION ON LOCATION 6/01/2024.
> SLB SLICKLINE CREW AND UNIT ON LOCATION ON 6/17/2024.
> D2 OIL TOOLS ENGINEER AND EQUIPMENT ON LOCATION ON 6/17/2024
> GE WELLHEAD ENGINEER ON LOCATION SINCE 6/17/2024.
==================================================RIG VISIT==============================================

=================================================CHEMICALS ON LOCATION====================================
> 1058 GAL OF HYDROCHLORIC ACID FOR COMPLETION JOB.
============================================SAGWOD COST OPTIMIZATION======================================

=============================================ADES RIG CREWS==============================================


SHORTAGE:
> NUMBER OF MEMBER IN BOTH CREW (CREW 1/ CREW 2): (FULL CREW / FULL CREW)
====================================================HSE================================================
> DISCUSSED: L/D PIPES HAZARDS & PRECAUTIONS.
> DRILLS: NONE.
> NEAR MISS: NONE.
> REVIEWED HSE ALERTS: NONE.
> WATER CONSERVATION EFFORTS.
> WASTE PIT SIZE 25 M X 30 M (REDUCED).
> NOT USING WATER PIT.
> VACUUM TRUCK ( ENJAZ CONTRACTOR) DRSS# 1004275289 ON LOCATION : DAILY LOADS: 8, TOTAL LOADS: 73.

> MI-SWACO CUTTING DRYER EQUIP (VERTI -G DRYER, & 3 SIDED BIN). RECOVERED (8-3/8" SECTION) 63 BBLS.
> MI-SWACO CUTTING DRYER EQUIP (VERTI-G DRYER, & 3 SIDED BIN). RECOVERED (5-7/8" SECTION) 65 BBLS.
>> TOTAL RECOVERED 128 BBLS.
=========================================WHIPSTOCK DATA/ DIRECTIONAL DATA=========================================

=================================================OPERATION=============================================
> ODF CORRECTION FROM RIG NA-393S = 32 FT TO RIG ADES-157 = 31 FT: 1 FT CORRECTION.
==============================================WELLSITE SERVICES===========================================

=============================================HSE FINDINGS STATUS==========================================

================================================NEXT WELL===============================================
> 1ST NEXT WELL: HRDH-1106, ONE HOLE SIZE, KHUFF-C, PRE-SET WELL, PRE-WORKOVER MEETING HELD ON 02/7/2024, STRIP OUT 100%, LOCATION PREPARATION 90%, WOCP IS RUNNING.
> 2ND NEXT WELL: HRDH-2104, ONE HOLE SIZE, UNYZ-C, PRE-SET WELL, PRE-WORKOVER MEETING HELD ON 01/18/2024, STRIP OUT 100%, LOCATION PREPARATION 90%, WOCP IS RUNNING.
> 3RD NEXT WELL: HRDH-1846, ONE HOLE SIZE, KHUFF-C, PRE-SET WELL, PRE-WORKOVER MEETING NOT HELD, STRIP OUT 0%, LOCATION PREPARATION 0%, WOCP WOCP IS RUNNING.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
MUD DATA
76 PCF 0 0 API 0 0 Volts 0 10 0

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1227 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 04/01/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
130 0 HTHP 100 6 0 2/3 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 3 0 1/2 0 0 0
30

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
76 PCF 0 0 API 0 0 Volts 0 10 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
130 0 HTHP 100 6 0 2/3 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 3 0 1/2 0 0 0
30

MUD CAUST NACL


TREATMENT 4 ( 50LBP ) 24 ( 2200L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/04/2024 N/A NORMAL ONSHORE SEASONAL 3,803 N/A

Company GEP TSC LIG HCO RIG EMC BFS RIG ARM SJC OTH ARM SAM SLL

Category WHES CSR CTRG PSSC RIG DFMS FILT OTHR OTHR PCS VAC WSC WBCS SLS
PERSONNEL
1 4 17 1 37 2 2 12 1 3 4 2 1 3
Total
AND SERVICES No. of Persons
90
INFORMATION
Personnel on Loc. Hrs. 8 24 24 24 24 24 24 24 24 24 24 24 24 15

Operating Hours. 0 12 0 0 24 12 12 12 12 0 10 24 12 0

Standby/Tankers Others Others


TRUCKS/BOATS
AB-5541 CREW BUS RIG AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 470 141 49 450

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DILM-702 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/02/2024 - 08/08/2024
Report ID: OPERLMTDMRREP

ADES-158 @ DILM-702 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL Foreman(s)RASSASI, MOHAMMAD AHMAD
D&WO Morning Report (Service Providers View) Charge #: HORIZONTAL OIL PRODUCER) Engineer MINDA BENALCAZAR, JUAN CARLOS
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Manager SAIARI, WALEED AAMER
ADES-158 (66-23059-0702)
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +88-216-77 7-11-295 5773974 5779355
Date: Tuesday 06/18/2024 DILM-702 (0) DILM_702_0 CONTRACTOR /CLERK VSA T
5773586/( CLERK)

Last 24 hr operations Next 24 hr plan


CONT DRILL 8-1/2" PILOT HOLE SECTION TO TD, CHC, WIPER TRIP, POOH & L/D. CONT POOH & L/D, NU SHOOTING NIPPLE, MU & RIH SLB LOG#1.
Location Next Location
1.967 KM N74W OF DILM-801 & 2.233 KM N85W OF DILM-1 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
8,860 Last Csg Size MD TVD Size Top
13 3/8 2859 2859 Formations Comments
Depth
JUBL 280 SHALLOWER BY 177 FT
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) HNIF 750 SHALLOWER BY 146 FT
8565 (Date) 100 295 408 TQMN 1,100 SHALLOWER BY 161 FT
29.9 (05/19/2024@0800 ) DHRM 1,880 SHALLOWER BY 136 FT
HURN 2,400 SHALLOWER BY 312 FT
MRRT 2,800
MJRA 3,190 SHALLOWER BY 8 FT
JILH 4,748 DEEPER BY 2 FT
JLDM 4,899 SHALLOWER BY 25 FT
BJDM 4,935 SHALLOWER BY 24 FT
SUDR 5,900 DEEPER BY 4 FT
KHFF 6,707 DEEPER BY 19 FT
KFBR 6,946 DEEPER BY 14 FT
BKBR 7,129 DEEPER BY 13 FT
KFCR 7,402 DEEPER BY 8 FT
BKCR 7,655 DEEPER BY 11 FT
BKDC 7,982 DEEPER BY 31 FT
BKFC 8,055 DEEPER BY 50 FT
UNZA 8,080 DEEPER BY 31 FT
SARH 8,302 DEEPER BY 28 FT
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0530 0.5 0 8 1/2 N DRLG RR TDS RIG 8565 8565
SERVICE TDS & CHECK FOR POTENTIAL DROP OBJECTS.

ROTARY DRILL 8-1/2" VERTICAL PILOT HS WITH WFD MWD-GR & 70 PCF OBM TO
8750'.
0530 - 1500 9.5 0 8 1/2 N DRLG D TDS RIG 8565 8750
- CIRC THREE MIN OFF BTM, REAM UP FOR TWO MIN ONE JOINT EVERY STAND
DRILLED, THEN REAM DOWN FOR TWO MIN.
- SWEPT HOLE WITH 20 BBLS EVERY STANDS DRILLED.

1500 - 1530 0.5 0 8 1/2 N DRLG PJSM NA RIG 8750 8750 HELD STAND-DOWN MEETING WITH CREW AND DISCUSSED:
- FASTING, DEHYDRATION & HEAT STROKE.

ROTARY DRILL 8-1/2" VERTICAL PILOT HS WITH WFD MWD-GR & 70 PCF OBM TO
TD AT 8860'.
1530 - 2300 7.5 0 8 1/2 N DRLG D TDS RIG 8750 8860
- CIRC THREE MIN OFF BTM, REAM UP FOR TWO MIN ONE JOINT EVERY STAND
DRILLED, THEN REAM DOWN FOR TWO MIN.
- SWEPT HOLE WITH 20 BBLS EVERY STANDS DRILLED.

2300 - 2330 0.5 0 8 1/2 N DRLG PJSM NA RIG 8860 8860 HELD STAND-DOWN MEETING WITH CREW AND DISCUSSED:
- FASTING, DEHYDRATION & HEAT STROKE.

2330 - 0130 2 0 8 1/2 N DRLG CIRC MPMP RIG 8860 8860 PUMP 50 BBLS HI-VIS SWEEPS AND CIRC TWO HOLE VOLUMES WITH 75 PCF OBM &
100% RETURN.
0130 - 0145 0.25 0 8 1/2 N DRLG CIRC MPMP RIG 8860 8860
FLOW CHECK PRIOR TRIPPING, WELL STATIC.

0145 - 0215 0.5 0 8 1/2 N DRLG ST STDP RIG 8860 8860 8860 8390 POOH 5 STD WITH 8-1/2" ROTARY DRLG BHA TO 8390.
- MONITOR WELL ON TRIP TANKS, STATIC.
0215 - 0230 0.25 0 8 1/2 N DRLG CIRC MPMP RIG 8860 8860
FLOW CHECK AFTER PULLING 5 STD, WELL STATIC.

0230 - 0300 0.5 0 8 1/2 N DRLG ST STDP RIG 8860 8860 8390 8005 POOH 8-1/2" ROTARY DRLG BHA WITH WFD MWD-GR TO 9-5/8" SHOE AT 8005'.
- MONITOR WELL ON TRIP TANKS, STATIC.
0300 - 0315 0.25 0 8 1/2 N DRLG CIRC MPMP RIG 8860 8860
FLOW CHECK AT 9-5/8" SHOE, WELL STATIC.

0315 - 0400 0.75 0 8 1/2 N DRLG ST STDP RIG 8860 8860 8005 8860 RIH8-1/2" ROTARY DRLG BHA WITH WFD MWD-GR TO TD AT 8860'.
- MONITOR WELL ON TRIP TANKS, STATIC.

PUMP 50 BBLS HI-VIS SWEEPS AND CIRC TWO HOLE VOLUMES WITH 75 PCF OBM &
0400 - 0459 1 0 8 1/2 N DRLG CIRC MPMP RIG 8860 8860
100% RETURN.....ONGOING AT RPT
- SPOT 100 BBL LOGGING GO PILL
Foreman Remarks

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DILM-702 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/02/2024 - 08/08/2024
Report ID: OPERLMTDMRREP

DILM-702 WILL BE DRILLED AS A NEW VERTICAL PILOT HOLE ACROSS BKFC, UNZA AND SARH RESERVOIRS TO CONFIRM THE STRUCTURE,
RESERVOIR QUALITY, CONTINUITY, PRESSURE AND FLUID CONTACTS IN DILM FIELD. THE VERTICAL PILOT HOLE WILL THEN BE SIDETRACKED
IN UNZA AND CONVERTED AS A 1 KM SINGLE LATERAL HORIZONTAL OIL PRODUCER TO CONTRIBUTE 1 MBOD TO SUPPORT AND MAINTAIN
ASL PRODUCTION FOR NYYM TREND.

- H2S CONTENT MOLAR % ZERO (0) ACROSS THE RESERVOIR. 100PPM/30PPM RERS HAVE BEEN DEFINED WITH ZERO (0) RADIUS AND 1/2 LFL IS 400 M.
- THE WELL IS NOT IN SHALLOW GAS AREA.
- THE RESERVOIR IS LOCATED UNDER GAS CAP.
- WELL GOR: 2500 SCF/BBL.
- WATER WELL:DILM-807.
========== JOURNEY MANAGEMENT PLAN ==========
- RIG LOCATION: DISTANCE FROM DHAHRAN TO RIG IS (408 KM), SKID ROAD IS 12 KM.
- THE TRIP FROM DMG WILL TAKE 6 HRS. TRUCK 10 - 12 HRS.
- NEAREST CITY IS DILAM (21 KM) FROM RIG SITE.
- ALL VEHICLES SHOULD ACTIVATE JMP & FOLLOW APPROVED ROAD WITH NO SHORT CUT.
========== PERSONNEL ON RIG ==========
- ARAMCO MATERIAL CONTROL MAN HUMOOD ALBAREEK #760453 ON LOCATION SINCE 6/12/2024.
- ARAMCO PDP RAKAN ALZAHRANI #823636 ON LOCATION SINCE 6/8/24.
- ARAMCO PDP FAHAD QARNI #774573 ON LOCATION SINCE 6/11/24.
- ARAMCO RIG FOREMAN SIDDIQ ALKURAYA# 283550 ON LOCATION SINCE 6/16/2024.
===================== SAFETY & DRILLS =======================
* PRE-TOUR SAFETY MEETINGS: 2, WEEKLY SAFETY MEETING:0
* STOP CARDS: 34
*INC/NEAR MISS: 0
* STOP WORK AUTHORITY: 5
* SAFETY ALERTS DISCUSSED:0

* DRILLS:
- H2S DRILL:1,PIT DRILL: 2 ,TRIP DRILL:0, SPILL DRILL: 0, FIRE DRILL: 0, FIRE PUMP DRILL: 0, CONFINED SPACE RESCUE DRILL: 0, MAN LOST DRILL: 0, ACCUMULATOR DRILL: 0, VERTICAL
RESCUE DRILL: 0, BOP FUNCTION TEST:0

* PERMITS TO WORK:
- COLD WORK: 5 HOT WORK:1 MAN RIDER: 1 CONFINED SPACE:0 RADIOACTIVE PERMIT: 0, DIESEL TRANSFER PERMIT:1 , LIFTING PERSONAL PERMIT: 0 THIRD PARTY PERMIT: 0, ISOLATION-2
============================ AUDIT ==============================
* 1ST QSI 2024 (3/19/2024): FINDINGS: 41, CLOSED: 40 & OPEN: 1.
*2ND QSI 2024 (4/27/2024) : FINDINGS: 44, CLOSED: 44 & OPEN: 0.
* RHSEI (3/17/2024): FINDINGS: 38, CLOSED: 35 & OPEN: 03.
* WCI AUDIT (3/17/2024): FINDINGS: 07, CLOSED: 07 & OPEN: 0
* LPCR AUDIT ON 01/25/2024: FINDINGS: 10, CLOSED: 10 & OPEN: 0

*SAFETY MEETING TOPIC:


=====================
FASTING, DEHYDRATION & HEAT STROKE.

========== JAR, SHOCK SUB & RENTAL TOOLS ==========


- OILSERV 6-1/2" HM-JAR SN#HMJ-675-248 ON LOCATION SINCE 6/11/2024 AT 08:00 PM.
- OILSERV 6-1/2" HM-JAR SN#HMJ-662-01-038 ON LOCATION SINCE 6/14/2024 AT 08:00 PM.
- OILSERV 6-1/2" HM-JAR SN#HMJ-662-01-009 ON LOCATION SINCE 6/16/2024 AT 08:00 AM.
- GULF ENERGY CENTRIFUGE ON LOCATION SINCE 5/29/2024.
========== RENTAL EQUIPMENT========
- SPRAY TANKER STARTED MAY.14.2024.
========= SERVICE COMPANIES ON LOCATION===========
- 6 X DRY CUTTINGS NOV ON LOCATION SINCE MAY.16.24.
- 7 X GEOLOG MUDLOGGER ON LOCATION SINCE MAY.17.24 @6PM.
========== WATER CONSERVATION IMPLEMENTED INITIATIVES ==========
- REDUCED WATER PITS: N.
- DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: N.
- NOV CLS-CUTTINGS DRYER SYS. IMPLEMENTATION: Y.+
========== DRILLING INFORMATION ==========
- 8-1/2" WFD MWD SENSOR OFF SET: GR 53.19', DIR 48.87'.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 8,656 0.83 301.7 94 8,655 -13.17 -14.28 63.74 0.23
DAILY SURVEY
0 8,749 0.87 282.31 93 8,748 -13.02 -14.67 64.34 0.31
0 8,806 0.99 278.22 57 8,805 -12.96 -14.95 64.92 0.24
MUD DATA
MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
5 8,005 8,860 DP Av DC Av Bit HHP 40 80 M323 8.5 HTC
Pressure GPM Jet Vel 350.14 443.12 192 I-Row O-Row DC Location Bearings
2,100 600 248 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7917563 DD506XV2 6 x 13 / 0.778
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
DRILL STRING Y 36 279 285 275 11,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DILM-702 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/02/2024 - 08/08/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 1 0.6 7917563
2 Near Bit Roller Reamer RIG 44 1 14 3 5.1 8 5/8 REG 8 5/8 REG 53 3 POINT DEP-17-0765
3 Drillcollar RIG 6.25 1 14 3 31.11 8 5/8 REG 8 5/8 REG 88 SPRL
4 String Reamer RIG 8.5 1 4 2.562 4.9 XT39 XT39 28.72 SPRL M-14488
5 Crossover BHO 6.5 1 6.5 4.219 2.75 NC46 NC46 97 SPRL 186451
6 Measurement While Drilling (MWD) CDS 6.75 1 6.75 4.219 21.6 NC46 NC46 100 AK240489
7 FIlter Sub CDS 6.75 1 6.75 2.375 2.8 NC50 XT54 97 16090489
8 Crossover RIG 6.5 1 14 4 2.17 7 5/8 REG 7 5/8 REG 90 47584-1-1
9 String Reamer RIG 8.5 1 8.5 2 5.1 NC46 NC46 53 RR-84-0076
10 Drillcollar RIG 6.25 6 6.25 2.813 185 NC46 NC46 91 SPRL
11 Crossover RIG 6.5 1 6.5 4.219 2.1 NC46 NC46 90 33807
12 Heavy Weight Drillpipe (HWDP) RIG 5.5 30 6.625 5 915 6-5/8FH 6-5/8FH 58.1 CONV
13 Hydraulic Jar OJR 6.5 1 6.5 30.86 123 HMJ-662-01-
14 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.625 457 XT54 XT54 60 CONV
15 Drillpipe RIG 5.5 246 6.625 5.901 7,503 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/13/2024 07/04/2024 NORMAL N/A HOT 2,883 TWICE DAILY

Company BHT LIG WDS RIG EMC MJH RO1 VRA RIG ARM MI2 OTH ARM

Category BITS CTRG DPDS RIG DFMS SEC MLS OTHR OTHR OTHR SCS VAC WSC
PERSONNEL
1 16 2 40 2 8 7 6 12 4 1 1 1
Total
AND SERVICES No. of Persons
101
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 24 24 0 24 24 12 12 24 12 24

Standby/Tankers
TRUCKS/BOATS
AB-6329

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 1600

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
NO RADIO COVERAGE AT DILM AREA.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-1957 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 01/03/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

ADES-173 @ UTMN-1957 Limited Morning Report for 06/18/2024


Objective : (MILL 878' OF 7" Foreman(s)DATCHER, ANTONIA EARL / YISHE, WANG
D&WO Morning Report (Service Providers View) Charge #: LINER STK AS A PRESET 2 Engineer MEJIAS, ERNESTO JOSE
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-23057-1957) HOLE SIZES TARGET KHFB Manager TURAIFI, MOHAMMED AHMED
ADES-173
COMPLETE WITH 7" PKR ON THURAYA RIG FORMAN VSAT FAX VSAT
Daily Onshore
Wellbores: 4-1/2" TBG.)
(0500-0500) Saudi Aramco Well 8821677712 622 013 576-23 29 013 880-54 67
Date: Tuesday 06/18/2024 UTMN-1957 (0-2) UTMN_1957_2 CONTRACTOR /CLERK VSA T
013 576-24 28

Last 24 hr operations Next 24 hr plan


CONT. RIH W/ SAMAA FSC TEST PACKER ASSY, C/O CMT AND L/C. CONT C/O CMT TO 20' ABOVE 7" FLOAT SHOE, CHC, NEG TEST, UNSET SAMAA FSC PKR, REV.
OUT WATER, DISPLACE TO 110 PCF OBM, POOH, P/U BAKER BHA
Location Next Location
UTMN-1957 AT 20 KM RIGHT OF UDHALIYAH MAIN GATE UTMN-1932
Current Depth (ft) Liner TOL MD TVD Formation Tops
11,504 Last Csg Size MD TVD Size 9,449 11,501 11,369 Top
9 5/8 10390 10390 Formations Comments
7 Depth
MDJR 10,653 11' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SUDR 11,338 13' DEEPER
11504 (Date) 100 0 143
120.4 (03/23/2024@2200 )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

0500 - 0930 4.5 0-2 8 3/8 N CT ST STDP RIG 11504 11504 2800 9400 CONT RIH 5-7/8" SAMAA C/O ASSY (+ LINER TOP TEST TOOL) ON 4" & 5.5" DP.
FILL-UP EVERY 20 STDS
0930 - 1015 0.75 0-2 8 3/8 N CT RW BIT RIG 11504 11504 9400 9560
WASH DOWN SLOWLY THRU 7" TOL @ 9449'

1015 - 1330 3.25 0-2 8 3/8 N CT ST STDP RIG 11504 11504 9560 10238 CONT RIH 5-7/8" SAMAA C/O ASSY (+ LINER TOP TEST TOOL) ON 4" & 5.5" DP.
> WASH DOWN EVERY 5TH STDS.
1330 - 1530 2 0-2 8 3/8 N CT RW BIT RIG 11504 11504 10238 10700
WASH DOWN & TAG CMT @ 10,700'

1530 - 1930 4 0-2 8 3/8 N DRLG DFS TDS RIG 11504 11504 10700 11331 CLEAN OUT CMT TO TOP OF L/C.

1930 - 0400 8.5 0-2 8 3/8 N DRLG DFS TDS RIG 11504 11504 11331 11333
CLEAN OUT L/C @ 11,331'
0400 - 0459 1 0-2 8 3/8 N DRLG DFS TDS RIG 11504 11504 11333 11336
CONT, CLEAN OUT CMT ,...ONGOING @RT.
Workover Objectives
Foreman Remarks

DAYS SINCE SPUD:


DPS-46: 34.1 DAYS.
ADES-173: 86.3 DAYS.
TOTAL DAYS: 120.4 DAYS.
====================================ARAMCO PERSONNEL=====================
> ARAMCO MATERIAL EXPEDITOR MAJED ALHOSHAN #8513217 ON LOCATION.
> ARAMCO MATER. EXPEDITOR MUHAMMAD GHAZLY ALSHADLY #820970 ON LOCATION.

========SERVICE COMPANY PERSONNEL=======================================


> EMEC MUD ENG ON LOCATION.
> BAKER MUD ENGINEER ON LOCATION.
> EXLOG MUD LOG CREW ON LOCATION.
> SLB SOLID CONTROL CREW ON LOCATION.
> WDF MPD ON LOCATION.
> SLB PUMP UNIT CREW ON LOCATION.
> BAKER DIRECTION DRLG CREW ON LOCATION
> SAMAA ENG ON LOCATION

============RENTAL EQUIPMENT===========================================
> BKR-HUGHES WELL LINK COMPUTER FOR ONLINE DATA TRANS
> WFD 4-3/4'' JAR S/N: 14207650 ON LOCATION ON 6/13/2024, P/U ON 6/17/2024 @ 2:30AM
> SLB 3 SIDE PIN ON LOCATION.
> SLB SOLID CONTROL EQUIPMENT.
> EXLOG MUD LOG UNIT ON LOCATION.
> BAKER DIRECTIONAL UNIT ON LOCATION.
> WFD RCD EQUIPMENT ON LOCATION.
> SLB 100 BBL OF 20% VDA ACID ON LOCATION.
> 4 X HALL FRACK TANKS ON LOCATION
> SLB CMT UNIT ON LOCATION.
===============================================DIRECTIONAL DATA=====================================
SENSORS OFFSET FROM BIT AS BELOW;
- NEAR BIT INC: 6.8'
- NEAR BIT VSS: 6.8'
- GR:13.14'
- DIRECT/VSS: 23.21'
- WELL PATH POSITION: 1.04' ABOVE & 1.86' RIGHT.
- LAST SURVEY AT MD 11450' INC 42.59 DEG, AZM 250.44, TVD 11369'
===============================================FISHING DATA=====================================
FISH IN HOLE:

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-1957 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 01/03/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

> TOF @ 10,807'.


> LOF = 1,051'.
=======================================MILLING DATA================================================

> ODF CORRECTION TO DPS-46 RIG = 30 FT TO RIG ADES-173 = 38 FT: CORRECTION: 8FT.

> TOW @ 10,440', BOW @ 10,453'


===========ADES RIG CREW==============================================
SHORTAGE: NONE.

==========HSE FINDINGS STATUS===========================================


> RHSEI AUDIT: TOTAL FINDINGS (27) / CLOSED (27) / OPEN (0)
> WCEI AUDIT: TOTAL FINDINGS (4) / CLOSED (4) / OPEN (0)
============HSE==========
> SAFE GATHERING AREA#1: 1.53 KM WEST; SAFE GATHERING AREA#2: 1.51 KM EST.
> DRILLS: NONE.
> NEAR MISS: NONE.
> OBSERVATIONS: NONE .
> SAFETY ALERTS: NONE
> IMPLEMENTING CLOSED LOOP DRLG PRACTICE: SLB CUTTING DRYER EQUIP (AUGER, DRYER & 3 SIDED BIN) ON LOCATION. DAILY/ TOTAL RECOVERED VOLUME (8-3/8'' SECTION) / 84 BBLS.
> WATER CONSERVATION EFFORTS.
> NOT USING WATER PIT.
> WASTE NUMBER OF LOADS DAILY/TOTAL: 1/88.

======WELLSITE SERVICES=====================================================
> TUWAIRESH SPRAY TANKER ON LOCATION. DRSS #1004322605
> DOOR NO: 782, PLATE NO: 5088.
> TUWAIRESH 4 VACUUM TANKERS ON LOCATION. DRSS #1004322609
> DOOR NO: 1011, 1002, 1041, 1022 PLATE NO: 9651, 6320, 9925, 2564.

==========NEXT WELL========================================================
> 1ST WELL: UTMN-1932 PRE-WORKOVER MEETING HELD ON 2/7/24, STRIP OUT 100% COMPLETION. LOCATION 100% READY.
> 2ND WELL: UTMN-1971 PRE-WORKOVER MEETING HELD ON 03/27/2023, STRIP-OUT 0%, LOCATION 0% READY.

======================================== RIG MOVE================================================


DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
148 PCF 1 0 API 46 565 Volts 7 0 10,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
110 2 HTHP 5 14 0 9 / 13 DELTADR 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 113 49 8/9 0 0 0
83
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
148 PCF 1 0 API 46 465 Volts 7 0 10,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
110 1.8 HTHP 5 14 0 9 / 13 DELTADR 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 112 49 8/9 0 0 0
88

MUD SLIK-5 BARITE KDP-82


TREATMENT 32 ( 5GL ) 4 ( 5000L ) 8 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
14RR 11,504 11,504 DP Av DC Av Bit HHP 19 60 637 5.875 SEC
Pressure GPM Jet Vel 1,252.61 N/A 0 I-Row O-Row DC Location Bearings
3,200 218 N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
837990 EQH55R POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 24 230 271 225 8,400 24
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
DRILL STRING
1 Bit SEC 5.875 1 2.98 837990
2 Bit Sub RIG 4.25 1 4.25 1.5 3 3 1/2 REG 3 1/2 REG 24 61993-1-1
3 Heavy Weight Drillpipe (HWDP) RIG 4 5 4 2.56 152.79 XT39 XT39 25.16 CONV 1902151-8-2
4 String Mill SAM 5.875 1 5.875 2.25 6.04 XT39 XT39 24 732903
5 Heavy Weight Drillpipe (HWDP) RIG 4 1 4 2.56 30.43 XT39 XT39 25.16 CONV GP63590
6 Crossover RIG 4.625 1 4.625 2.25 2.58 XT39 NC38 24 23030032
7 String Mill SAM 7 1 7 2.5 5.67 NC38 NC38 25 71605

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-1957 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 01/03/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
8 Scraper SAM 6.625 1 6.625 2.375 5.26 NC38 NC38 25 71692
9 Crossover RIG 4.625 1 4.625 2.25 2.7 XT39 NC38 25 173-1
10 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.56 91.04 XT39 XT39 25.16 CONV
11 Junk Basket SAM 5.75 1 5.75 2.25 19.98 XT39 XT39 25 81621
12 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.56 91.32 XT39 XT39 25.16 CONV
13 Hydraulic Jar WJS 4.75 1 4.75 2.25 31.14 XT39 XT39 1,200 1146809812
14 Heavy Weight Drillpipe (HWDP) RIG 4 2 4 2.56 60.92 XT39 XT39 25.16 CONV
15 Drillpipe RIG 4 48 4 3.24 1,513.22 VX39 VX39 14 G105 PREMIUM
16 Crossover RIG 4.938 1 4.938 2.125 2.7 XT39 NC38 15 2841
17 Inflow Test Tool SAM 5.866 1 9.05 25 31710
18 String Magnet SAM 9.625 1 9.625 3.18 6.13 NC50 NC50 208 72117
19 Junk Basket SAM 9.625 1 9.625 3.25 19.94 NC50 NC50 208 1624
20 Crossover RIG 6.75 1 6.75 3.25 2.49 XT54 NC50 52.51 521431-1
21 Drillpipe RIG 5.5 410 5.5 4.67 13,148.8 XT54 XT54 24.7 CYX105 PREMIUM RIG

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/17/2024 1 N/A N/A N/A 2,512 1

Company SAM GOS BHI RIG BDF EMC WJS XLG RIG ARM SCM MI2 OTH ARM

Category WBCS CTRG DPDS RIG DFMS DFMS JST MLS OTHR OTHR PCS SCS VAC WSC
PERSONNEL
1 18 1 38 1 1 1 4 12 2 1 2 4 2
Total
AND SERVICES No. of Persons
88
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 0 24 24 24 24 24 24 24

Operating Hours. 24 0 0 24 24 24 24 24 12 12 0 24 10 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 370 166 33 148

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHDN-10 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 05/14/2024 - 07/24/2024
Report ID: OPERLMTDMRREP

ADES-174 @ SHDN-10 Limited Morning Report for 06/18/2024


Objective : (TO DE- Foreman(s)ELKHWESKI, ABDELHAMID MOUSTAFA / MEKKI, KHALED
D&WO Morning Report (Service Providers View) Charge #: COMPLETE, CLEAN OUT Engineer LANDAETA CAMACHO, LUIS JOSE
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved CEMENT PLUGS, SIDETRACK Manager NAJIM, KHALID YOUSEF
ADES-174 (71-23521-0010)
AND DRILL THE WELL THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: (DEVIATED) IN ONE-HOLE
(0500-0500) Saudi Aramco Well 0088216777 11127 577-9688 577-9646
SIZE TAR)
Date: Tuesday 06/18/2024 SHDN-10 (0-1-1-1) SHDN_10_3 CONTRACTOR /CLERK VSA T
577-9689

Last 24 hr operations Next 24 hr plan


DIRECT. DRILL 5-7/8'' HOLE SECTION W/SPERRY RSS & MWD/GR BHA TO 14,245FT (REMAINING DIRECT. DRILL 5-7/8'' HOLE SECTION W/SPERRY RSS & MWD/GR BHA TO TD @ +/-
FOOTAGE 2,471). 16,716'MD/15,256' TVD (50 DEG INC/341 DEG AZI) (200' INTO PUZU).
Location Next Location
339 KM F/DH MG, @HRDH BRIDGE, 48 KM KHARGE RD THEN LEFT 15 KM, 30KM GHZL RD, LEFT 41 KM SKID ROAD SHDN-2
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
14,245 Size 9945 9935 Size 8,927 15,382 13,915 Top
Formations Comments
9 5/8 7 Depth
13332 FT MD (2 FT
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KFCC 13,080
DEEPER)
13890 (Date) 100 355 339 13801 FT MD (3 FT
23 (05/26/2024@0500 ) KFDA 13,381
SHALLOWER)
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

ROTARY STEERABLE DRILL 5-7/8" HOLE WITH SPERRY (RSS + MWD+GR) BHA AND
90 PCF RHELIANT OBM WITH 100% CIRCULATION.
> PUMP 20 BBLS SEALING PILL EVERY STD DRILLED.
0500 - 1600 11 0-1-1-1 5 7/8 N DRLG D RSS SPS 13890 13999
> FOLLOW INTEGRATED HZ CONNECTION PRACTICES EVERY CONNECTION.
> TAKE MWD SURVEY WITH 30 FT OFF BOTTOM.
> PERFORM DRILL OFF BEFORE CONNECTION.
> MONITOR TORQUE DRAG DATA.
1600 - 1630 0.5 0-1-1-1 5 7/8 N DRLG RR TDS RIG 13999 13999
SERVICE RIG TDS.

ROTARY STEERABLE DRILL 5-7/8" HOLE WITH SPERRY (RSS + MWD+GR) BHA AND
90 PCF RHELIANT OBM WITH 100% CIRCULATION.
> PUMP 20 BBLS SEALING PILL EVERY STD DRILLED.
1630 - 0459 12.5 0-1-1-1 5 7/8 N DRLG D RSS SPS 13999 14245
> FOLLOW INTEGRATED HZ CONNECTION PRACTICES EVERY CONNECTION.
> TAKE MWD SURVEY WITH 30 FT OFF BOTTOM.
> PERFORM DRILL OFF BEFORE CONNECTION.
> MONITOR TORQUE DRAG DATA.
Workover Objectives
Foreman Remarks

================================ODF CORRECTION====================================
> ODF FOR RIG ADES-174 = 36.7 FT
===============================ARAMCO PERSONNEL ==================================
> ARAMCO MATERIAL EXPEDITOR MOHAMED ALMAJHAD #8515888 ON LOCATION SINCE 06/13/2024.
========================================= RIG VISIT=================================
> NONE.
====================================COST OPTIMIZATION================================
> RECIEVED 500 BBL'S 95 PCF RELIANT OBM FROM RIG ADC-14 WITH MNFT# 2300130930.
> RECIEVED 400 BBL'S 125 PCF OBM FROM RIG NA-18S WITH MNFT# 2300131301.
> RECIEVED 100 BBL'S 101 PCF OBM FROM RIG NA-18S WITH MNFT# 2300131303.
> RECIEVED 500 BBL'S 100 PCF OBM FROM RIG NA-18S WITH MNFT# 2300131390.
> RECIEVED 300 BBL'S 125 PCF OBM FROM RIG T-559 WITH MNFT# 2300131516.
> RECIEVED 400 BBL'S 95 PCF OBM FROM RIG ADC-14 WITH MNFT# 2300131523.
====================================CLOSED LOOP SYSTEM ================================
>> IMPLEMENTING CLOSED LOOP DRILLING PRACTICE (NOV FULL PACKAGE LUMP SUM).
>> NOT USING EITHER WATER PIT NOR WASTE PIT.
>> USING CMT PIT WITH PLASTIC LINER.
>> INSTALLED (UNDER GROUND TANK+ DISPOSAL TANK) NEAR MUD SYSTEM FOR FLUID DISPOSAL.
===================================SAFETY========================================
> DRILLS: H2S DRILL
> NEAR MISS REPORTED: NONE
> HSE INSPECTION STATUS:
1ST RHSI 2024: TOTAL FININGS (45) - CLOSED (45) - OPEN (0).
1ST WCI 2024: TOTAL FINDINGS: (23) - CLOSED (23) - OPEN (0).
1ST CEHA 2024: TOTAL FININGS (19) - CLOSED (19) - OPEN (0).
1ST 3MCI 2024: TOTAL FININGS (59) - CLOSED (59) - OPEN (0).
2ND 3MCI 2024: TOTAL FININGS (41) - CLOSED (40) - OPEN (1).
> SAFETY ALERTS/INCIDENTS DISCUSSED WITH CREW:
HSE ALERT 59-24 - SEARCH AND RESCUE FOR STUCK VEHICLE
HSE ALERT 58-24 - STRUCK BY MANUAL TONGS
HSE ALERT 57-24 - SLIPPED ON STAIRCASE.
===============================SERVICE COMPANIES======================================
> EMEC MUD ENGINEER.
> NOV CLOSED LOOP SYSTEM OPERATORS & EQUIPMENT.
> MI MUD ENGINEER.
> HALLIBURTON MUD LOGGING CREW & EQUIPMENT.
> SPERRY SUN DD/ MWD CREW & EQUIPMENT.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHDN-10 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 05/14/2024 - 07/24/2024
Report ID: OPERLMTDMRREP

> SCOMI CENTRIFUGE.


> REED BIT RUNNER
===========================SIDE TRACK AND DIRECTIONAL DATA================================
> FOLLOWING DIRECTIONAL PLAN L-0-1-1-1 #4 FINAL
> TOW: 12,600 FT | BOW: 12,611 FT
> SENSORS DISTANCE FROM BIT: NEAR BIT GAMA 13.91 FT | SURVEY: 19.01 FT
> LAST SURVEY: 50.01/340.83DEG INC/AZI @ 14,182/13,625.5FT MD/TVD.
> PROJECTION : 14,250FT, INC: 50.00DEG, AZ: 341.00DEG.
> DEVIATION FROM PLAN: 1.5 FT ABOVE, 2.0FT LEFT OF PLAN.
> LAST LITHOLOGY SAMPLE: 14,190/ 13,630.6 FT MD / TVD : 60% DOLOMITIC LIMESTONE , 20% ANHYDRITE & 20% SHALE.
===============================RENTAL EQUIPMENT======================================
> TAQA HM JAR 4-3/4' SERIAL # DJ6-500-163 ON LOCATION SINCE 06-09-2024 @ 12:30, RIH 06-13-24@05:00.
> TAQA ACID TANKER 100 BBLS VDA ACID ON LOCATION FROM 06-05-2024.
==============================WELLSITE SERVICES========================================
VACUUM TANKER F/ AL TAMIMI 4, DRSS#: 1004326550
=================================NEXT WELLS==========================================
>1ST NEXT WELL: SHDN-2, ONE HOLE SIZE, S-SHAPE UNZA, PRE-WORKOVER MEETING 02/26/2024. STRIP OUT NOT DONE. LOCATION 0% READY, WOCP IS ONGOING.
>2ND NEXT WELL: GHZL-48, ONE HOLE SIZE, PRE-SET UNZA, PRE-WORKOVER NOT DONE. STRIP OUT NOT DONE. LOCATION 0% READY, WOCP NOT READY.
>3RD NEXT WELL: GHZL-57, ONE HOLE SIZE, DEVIATED UNZR, PRE-WORKOVER MEETING 05/21/2024. STRIP OUT NOT DONE. LOCATION 0% READY, WOCP NOT READY.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0-1-1-1 13,900 49.91 340.6 95 13,444 382.33 -38.29 1,260.65 1.15
DAILY SURVEY 0-1-1-1 13,993 50.43 340.96 93 13,504 402.89 -45.46 1,330.2 0.63
0-1-1-1 14,087 50.07 340.81 94 13,564 423.7 -52.67 1,400.8 0.4
0-1-1-1 14,182 50.01 340.83 95 13,625 444.66 -59.96 1,472.08 0.07

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 1 0 API 62 590 Volts 6.5 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.6 HTHP 16 15 0 7/9 RELIANT 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 29 22 6/7 0 0 1.2
53
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 1 0 API 62 580 Volts 6.5 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.8 HTHP 16 14 0 7/9 RELIANT 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 29 22 6/7 0 0 2.4
52

CACO3-25 CACO3-50 BARITE ECOTROL-RD MRBL-M STELSL50 STELSEALFN


MUD 34 ( 25KG ) 34 ( 25KG ) 3 ( 5000L ) 8 ( 25KG ) 4 ( 2200L ) 34 ( 25KG ) 34 ( 25KG )
TREATMENT SUREMUL SUREWET VG-SUP VG-PL
2 ( 55GL ) 1 ( 55GL ) 4 ( 25KG ) 4 ( 25KG )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
21 12,621 14,245 DP Av DC Av Bit HHP 16 140 M432 5.875 REED
Pressure GPM Jet Vel 1,447.98 N/A 62 I-Row O-Row DC Location Bearings
2,700 252 198 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
S307912 SK711M1A 1 x 14 / 2 x 13 / 0.41
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 103 274 274 261 5,000 103
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit REED 5.875 1 0.51 S307912
2 RSS SPS 4.75 1 7 1.4 54.97 3-1/2" IF 3-1/2" REG 0 13231435
3 Gamma Sub SPS 4.75 1 9.5 2.75 16.15 9 1/2 T2 9 1/2 T2 0 0
4 Directional Sub SPS 4.75 1 4.75 1.13 0 0 0
5 PWD (Pressure while Drilling) SPS 4.75 1 8 2 0 6 5/8 REG 6 5/8 REG 0 0
DRILL STRING 6 Logging While Drilling (LWD) SPS 4.75 1 8.25 2.835 18.37 8 1/4 T2 8 1/4 T2 0 0
7 Power & Communication Sub SPS 4.75 1 8.25 5.9 10.13 6 5/8 REG 6 5/8 REG 0 0
8 Logging While Drilling (LWD) SPS 4.75 1 8.25 2.835 14.02 8 1/4 T2 8 1/4 T2 0 0
9 Logging While Drilling (LWD) SPS 4.75 1 8.25 2.835 10.98 8 1/4 T2 8 1/4 T2 0 0
10 Pulse Sub SPS 4.75 1 9.531 3.15 11.02 8 1/4 T2 8 1/4 T2 0 0
11 Screen sub SPS 4.75 1 8 4 6.6 6 5/8 REG 6 5/8 REG 0 13459710
12 Float Sub SPS 4.75 1 19.875 3.5 2.39 7 5/8 REG 7 5/8 REG 0 13818197
13 Crossover RIG 4.75 1 14 4 2.67 7 5/8 REG 7 5/8 REG 0 0
14 Heavy Weight Drillpipe (HWDP) RIG 4 2 6.625 5 61.13 6-5/8FH 6-5/8FH 58.1 CONV
15 Hydraulic Jar NPJ 4.75 1 4.75 2.25 30.73 XT-39 XT-39 0 DJ6-500-163
16 Heavy Weight Drillpipe (HWDP) RIG 4 18 6.625 5 91.17 6-5/8FH 6-5/8FH 58.1 CONV

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHDN-10 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 05/14/2024 - 07/24/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
17 Drillpipe RIG 4 216 6.625 5.901 7,660 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM
18 Crossover RIG 6.6 1 14 4 2.73 7 5/8 REG 7 5/8 REG 0 0
19 Drillpipe RIG 5.5 5 6.625 5.901 158.44 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/12/2024 PIT DRILL N/A N/A N/A 3,163 PRE-TOUR SAFETY
MEETING

Company RTC RIG SPS RIG EMC SMI MJH HMS RIG ARM BRD GU1 ARM

Category BITS CTRG DPDS RIG DFMS DFMS SEC MLS OTHR OTHR SCS SCS WSC
PERSONNEL
1 18 4 40 1 1 8 4 12 1 3 2 2
Total
AND SERVICES No. of Persons
97
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 24 12 12 0 24 0 12 24 24 24

Standby/Tankers
TRUCKS/BOATS
ARAMCO TRUCK, AB-6300

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 371 263 6 800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-415 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:20 04/07/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

ADES-40 @ ANDR-415 Limited Morning Report for 06/18/2024


Objective : (ELIMINATE Foreman(s)KATHIRI, MOHAMMED MEZHEF / ESSA, ABDULRAHMAN ANWAR
D&WO Morning Report (Service Providers View) Charge #: HIGH TCA PRESSURE) Engineer NGO, TUAN ANH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (61-24056-0415) Manager SAAD, SAAD RASHED
ADES-40
Daily Onshore THURAYA RIG FORMAN VSAT RIG FORMAN VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088-216-7 77-12550 013-572-34 17 ( FOREM AN ) 013-574-77 93 ( FOREM AN )
Date: Tuesday 06/18/2024 ANDR-415 (0-1-1) ANDR_415_2 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
013-810-27 60 (TP) 013-574-77 92

Last 24 hr operations Next 24 hr plan


CONT N/D TREE, N/U BOP & P/T, L/D TBG HANGER. CONT PULL OLD COMP, RIH W/ STRING MILL, C/O RTTS DEPTH, POH & L/D STRING MILL, M/U &
RIH W/RTTS.
Location Next Location
116 KM FROM DHAHRAN MAIN GATE UTMN-787
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,878 Last Csg Size MD TVD Size 2,095 6,663 6,663 Top
9 5/8 4321 4321 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
7878 (Date) 100 0 116
4.1 (06/16/2024@1200 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 1000 5 0-1-1 POST N WH ND TREE RIG 0 0 CONT. N/D X-TREE AND BONNET.
- FUNCTION TIE-DOWN SCREWS ONE BY ONE, OK.

1000 - 1500 5 0-1-1 POST N BOP NU BOP RIG 0 0 HPJSM, N/U CLASS "A" 13-5/8" - 5M BOPE & RELATED EQUIPMENT.
- FUNCTION TEST BOP FROM ALL PANELS, OK.
1500 - 1530 0.5 0-1-1 POST N WH RTRV BPV RIG 0 0
HPJSM, RETRIEVE BPV.
1530 - 1630 1 0-1-1 POST N WH OTH NA RIG 0 0
HPJSM. M/U 4-1/2" N.VAM LANDING JOINT TO HANGER.

HPJSM. PT BOP AS PER ARAMCO STANDARDS TO 300/2550 PSI.


1630 - 2000 3.5 0-1-1 POST N BOP BOPT BOP RIG 0 0
- BOP WAS FULLY STUMP TESTED ON JUNE 16TH, 2024.
- PERFORM ACCUMULATOR DRILL, OK.

2000 - 2200 2 0-1-1 POST N WH OTH NA RIG 0 0 HPJSM. R/U HARD LINES & SAFETY VALVE, PT LINES TO 2500 PSI, OK. UN-SCREW
TIE-DOWN SCREWS.

2200 - 2330 1.5 0-1-1 POST N DCOM OTH NA RIG 0 0 HPJSM. STING OUT SEAL ASSY FREELY. PULL HANGER ABOVE ROTARY TABLE.
FLOW CHECK, STATIC.
2330 - 0300 3.5 0-1-1 POST N DCOM CIRC MPMP RIG 0 0
CHC W/ HI-VIS 83 PCF BRINE, FLOW CHECK - STATIC.
0300 - 0400 1 0-1-1 POST N DCOM HT TBG RIG 0 0
HPJSM, R/U FRANKS POWER TONG.
0400 - 0459 1 0-1-1 POST N DCOM OTH NA RIG 0 0
HPJSM, L/D TBG HANGER BREAK X/O BEELOW HANGER... INC AT RT.
Workover Objectives
Foreman Remarks

- ODF CORRECTION =
===================================================================================
>>SAFETY:-
- H2S= 1.9%. RER VALUES: 30 PPM = 1085 M, 100 PPM = 616 M, RER 1/2 LEL = 180 M (GOR=583 SCF/STB).
===================================================================================
>>DIESEL CONSUMPTION:-
- DIESEL CONSUMPTION FOR ENGINES (RIG+CAMP): (DAILY: 11.27 BBLS / CUMULATIVE FOR CURRENT WELL: 388.09 BBLS).
===================================================================================
>>ARAMCO POB:
- ARAMCO MATERIAL EXPEDITOR ABDULWAHAB AL-OTAIBI ID# 8371559 ON LOCATION.
===================================================================================
>>TRUCKS VAC, WATER & GARBAGE:-
- AL-HABAS RAW WATER TANKERS: RW-4056 PLATE #2218-T R A, RW-4050 PLATE #2374-T R A.
- AL SHURIE RAW WATER TANKERS: RW 5833 PLATE # 329 T R A, RW 5839 PLATE # T R A 334.
===================================================================================
RENTAL TOOLS:
- NESR SUPERFISHING JARS: SN# X001-0003.
- NESR FISHING INTENSIFIER: SN# SDW-3465753-1.
- NESR FISHING BUMBER SUB: SN# SDW-3465780-2.
===================================================================================
>>NEXT LOCATIONS:-
- UTMN-787: KOM WAS DONE ON 03/05/2024, STRIP OUT 95%, LOCATION 65%.
- UTMN-1056: KOM WAS DONE ON 03/28/2024, STRIP OUT 100%, LOCATION 0%.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-415 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:20 04/07/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A SEASONAL N/A SUNNY 3,912 TOUR MEETING

Company LIG RIG OES ARM OTH ARM

Category CTRG RIG DFMS OTHR VAC WSC


PERSONNEL
13 40 2 1 4 2
Total
AND SERVICES No. of Persons
62
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24

Operating Hours. 0 24 12 24 0 24

Standby/Tankers Others Others


TRUCKS/BOATS
ARAMCO P/U DH-7558 4 RAW WATER TANKERS RIG AMBULANCE 4X4

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 700

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2374 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/21/2024 - 07/24/2024
Report ID: OPERLMTDMRREP

ADES-798 @ HRDH-2374 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (K-2 HORIZONTAL Foreman(s)KHADRA, MOHAMED ABDELMAKSOUD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23058-2374) ACROSS KHUFF-C) Engineer AGUILAR ACOSTA, VICTOR JOSE
ADES-798
Manager QAHTANI, MOHAMMED TURKI
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: THURAYA RIG FORMAN VSAT OTHER VSAT
Date: Tuesday 06/18/2024 HRDH-2374 (0) HRDH_2374_0 8821677712 150 013-577-96 95 CLERK #013 5773904

Last 24 hr operations Next 24 hr plan


FLUSH 4" DP, RIH 5-7/8" BAKER RSS DRLG ASSY.,D/O CEMENT, 10' NEW FM., CHC, FIT, DISPLACE. RIH 5-7/8" BAKER RSS DRLG ASSY.,D/O CEMENT, 10' NEW FM., CHC, FIT, DISPLACE. DRILL 5-7/8"
DRILL 5-7/8" HZ. SECTION. HZ. SECTION TO TD @ 16,525' MD / 12,007' TVD.
Location Next Location
HRDH-2374, 262 KMS FROM DMG, 4 KM NE F/HRDH GOSP-3. HRDH-2539
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
12,341 Size 11408 11402 Size 11,108 12,341 12,047 Top
Formations Comments
9 5/8 7 Depth
KHFF 11,414 10' SHALLOW (TVD 11,408')
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KFAC 11,433 11' SHALLOW (TVD 11,426')
12341 (Date) 100 0 262 KFBC 11,560 7' SHALLOW (TVD 11,554')
47 (05/02/2024@0500 ) KFB1 11,620 1' DEEPER (TVD 11,612')
KFB2 11,700 7' SHALLOW (TVD 11,688')
KFB3 11,775 2' SHALLOW (TVD 11,757')
KFB4 11,813 7' SHALLOW (TVD 11,789')
KFB5 11,863 8' SHALLOW (TVD 11,831')
KFCC 12,214 7' DEEPER (TVD 12,026 )

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End

0500 - 1400 9 0 8 3/8 N DRLG LDP SPDP RIG 12341 12341 0 0 RIH 55 X 4" STD DP FLUSH SAME WITH MAX RATE AS PER BAKER
REQUIREMENT. POOH & R/B ON DERRICK BEFORE P/U BHA.
1400 - 1430 0.5 0 8 3/8 N DRLG RR TDS RIG 12341 12341
SERVICE TDS.

P/U & M/U 5-7/8" REED NEW PDC BIT (TYPE: SK711M-1A, S/N:
S307913 & 3X15 NOZZELS) ON BAKER DIR. ASSY
1430 - 2100 6.5 0 8 3/8 N DRLG HT BHA RIG 12341 12341
(RSS/LWD/MWD-GR) TO 409'.
- MWD OFFSETS: DENSITY: 74.64 POROSITY: 83.43 - GR: 31.77
FT - RESISTIVITY: 38.96 FT.

SHALLOW TEST BHI DIR. TOOLS GOT NO MWD SIGNAL,


2100 - 0100 4 0 8 3/8 N DRLG HT BHA RIG 12341 12341 BHA 934868 TROUBLESHOOTING SAME W/O SUCCESS.
- REPLACED MALFUNCTIONED TOOLS WITH ANOTHER ONE.
- SHALLOW TEST BHI DIR. TOOLS: 265 GPM ; 2300 PSI.

0100 - 0400 3 0 8 3/8 N DRLG TI STDP RIG 12341 12341 409 5780 CONT. RIH 5-7/8" BAKER DIR. ASSY (RSS/MWD/LWD/GR) ON 4"
STD DP'S TO 5,780' - FILL UP STRG EVERY 20 STD.
0400 - 0415 0.25 0 8 3/8 N DRLG HT PEL RIG 12341 12341
CHANGED ELEVATOR & HANDLING EQUIPMENT TO 5-1/2".

0415 - 0459 0.75 0 8 3/8 N DRLG TI STDP RIG 12341 12341 5780 7100 CONT. RIH 5-7/8" BAKER DIR. ASSY (RSS/MWD/LWD/GR) ON 5-
1/2" STD DP'S TO 7,100' - FILL UP STRG EVERY 20 STD.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 2100 4 4 934868 BHA FOT MWD BHI 0 SHALLOW TEST BH MWD TOOL, GOT NO
SIGNAL. TROUBLESHOOTING HAS BEEN
DONE W/O SUCCESS.
Foreman Remarks

OBJECTIVE:-
HRDH-2374 IS PLANNED AS K-2 DESIGN TO BE DRILLED AS HORIZONTAL WELL TARGETING KHUFF-C RESERVOIR AS PRIMARY TARGET. BASED ON THE LOGS THE WELL WILL BE COMPLETED WITH
15K CEMENTED LINER OR 15K OH MSF COMPLETION
========================================================================================================
ARAMCO PERSONNEL ON BOARD:-
- ARAMCO PDP, OMAR ALMENAIF (ID# 818520) ON LOCATION.
- ARAMCO FOREMAN MOSAED ALHARBI (ID# 793051) ON LOCATION.
- ARAMCO MATERIAL EXPT. HUSSAIN ALOSFUR (ID# 821442) ON LOCATION.
========================================================================================================
SERVICE COMPANY PERSONNEL:-
- BAKER LINER ENG.
- BAKER MWD.
- EMEC MUD ENGINEER ON LOCATION.
- BAKER MUD ENGINEER ON LOCATION.
- SLB. MUD LOGGING CREW ON LOCATION.
- SLB BULK BARITE SILOS OPERATORS ON LOCATION.
- SLB MI-SWACO CUTTING DRYER CREW ON LOCATION.
========================================================================================================
RIG VISIT:-
========================================================================================================
SAFETY SUMMARY:-
- HELD 2 X PRE-TOUR MEETINGS.
- DRILLS: H2S DRILL.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2374 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/21/2024 - 07/24/2024
Report ID: OPERLMTDMRREP

- NEAR MISS: 0
- ALERTS: HSE ALERT 68-24 - STRUCK BY CHICKSAN ASSEMBLY.
- SAFETY OBSERVATIONS: 20.
========================================================================================================
RENTAL TOOLS & EQPT:-
- 2 X SLB BULK BARITE SILOS.
- SLB 3 X 500 BBLS FRAC TANK.
- SLB CUTTING RECOVERY SYSTEM ON LOCATION (MISWACO SHAKERS).
========================================================================================================
WELLSITE SERVICES:-
- AL-MADEED SPREAD WATER TANKER ON LOCATION.
========================================================================================================
NEXT LOCATION:-
- HRDH-2539, 20% READY
DAILY SURVEY
MUD DATA
MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
9 12,341 12,341 DP Av DC Av Bit HHP N/A N/A 211 5.875 SEC
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
839205 Q4R POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
N N/A N/A N/A N/A N/A Shock Sub Serial # Shock Sub Hrs
DRILL STRING Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/15/2024 06/03/2024 CALM ONSHORE SEASONAL 1,405 TOUR MEETING

Company OTH RIG BDF EMC BHI SGR RIG ARM MI2 MI3 ARM

Category CTRG RIG DFMS DFMS LWD MLS OTHR OTHR SCS WMS WSC
PERSONNEL
19 40 1 1 2 4 31 2 1 4 2
Total
AND SERVICES No. of Persons
107
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 12 12 24 24 12 12 12 24 24

Standby/Tankers Others
TRUCKS/BOATS
SA TRUCK AB-6508 ADES AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 500 905 200 114 450

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-448 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:20 05/26/2024 - 07/19/2024
Report ID: OPERLMTDMRREP

ADES-799 @ SHYB-448 Limited Morning Report for 06/18/2024


Objective : (REPLACE Foreman(s)ZEIDAN, FISAL AMIN / ABDELMAGED, BASAM ABDELMAGED
D&WO Morning Report (Service Providers View) Charge #: FAULTY SMART Engineer DOSSARY, ABDULLAH RASHED / ALKHATEEB, MOHAMMAD ABDULLAH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved COMPLETION) Manager SAIARI, WALEED AAMER
ADES-799 (61-23072-0448)
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 88-216-777 1-3961 578-4860 578-4149 ( FCT)
Date: Tuesday 06/18/2024 SHYB-448 (2) SHYB_448_2 OTHER VSAT OTHER VSAT FAX VSAT
578-4324 ( ARAMCO CLE RK) 810-2788 ( ADES-TP) 8821677713 961

Last 24 hr operations Next 24 hr plan


SLB E/L PERFORM CUT BELOW PKR#2, CUT ABOVE PKR#2, PUNCH BELOW PKR#3, BULLHEADING SET PTP BY S/L. POOH TBG HGR/COMPLETION TOP PART.
L-2, SLB E/L PERFORM CUT ABOVE PKR#3, L/D E/L. BULLEADING. CIRC. R/U TRS.
Location Next Location
SHAYBAH FIELD - SABKHAH# 46 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,862 Last Csg Size MD TVD Size 3,686 7,128 5,042 Top
9 5/8 6000 5003 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12862 (Date) 0 0 572
6.7 (06/11/2024@1200 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

SCHL . E-LINE PERFORM CUT BELOW PKR#2


- RIH WITH 2" RCT ON CCL TOOL ON 2-1/8" TRACTOR TO CUT POINT @ 6701.5 FT
BELOW PKR#2.
- TRACTOR ACTIVATED FROM DEPTH 5500' (INC 68 DEG).
0500 - 0800 3 2 POST N DCOM OTH NA SWL 12862 12862
- PERFORM CORRELATION TO CONFIRM THE DEPRH, AND PERFORM CUT.
- POOH AND L/D 2" RCT TOOL,
- CHECK RCT TOOL @ SURFACE, OK.
- KEEP HOLE FULL OF 71 PCF NACL VISCOUS BRINE THROUGH TRIP TANK, STATIC
LOSSES 5 BBLS/HR.

HELD STAND-UP MEETING WITH RIG CREW, REVIEWED & DISCUSSED: HSE ALERT
0800 - 0830 0.5 2 POST N DCOM PJSM NA RIG 12862 12862
69-24 - INJURY DURING ENGINE MAINTENANCE & HSE ALERT 70-24 - PIPE
HANDLER MAIN ARM UNCONTROLLED DECENT.

HPJSM, SCHL . E-LINE PERFORM CUT ABOVE PKR#2


- RIH WITH 2" RCT ON CCL TOOL ON 2-1/8" TRACTOR TO CUT POINT @ 6689.5 FT
ABOVE PKR#2.
- TRACTOR ACTIVATED FROM DEPTH 5500' (INC 68 DEG).
0830 - 1330 5 2 POST N DCOM OTH NA SWL 12862 12862
- PERFORM CORRELATION TO CONFIRM THE DEPRH, AND PERFORM CUT.
- POOH AND L/D 2" RCT TOOL,
- CHECK RCT TOOL @ SURFACE, OK.
- KEEP HOLE FULL OF 71 PCF NACL VISCOUS BRINE THROUGH TRIP TANK, STATIC
LOSSES 5 BBLS/HR

HPJSM, SCHL . E-LINE PERFORM PUNCH BELOW PKR#3


- RIH WITH 1-11/16" PTC PUNCHER ON CCL TOOL AND 2-1/8" TRACTOR TO
PUNCH POINT AT 4570 FT BELOW PKR#3.
- TRACTOR ACTIVATED FROM DEPTH 5500' (INC 68 DEG).
1330 - 1730 4 2 POST N DCOM OTH NA SWL 12862 12862
- PERFORM CORRELATION TO CONFIRM THE DEPRH, AND PERFORM PUNCH.
- POOH AND L/D 1-11/16" PTC PUNCHER TOOL,
- CHECK PTC PUNCHER @ SURFACE, OK.
- KEEP HOLE FULL OF 71 PCF NACL VISCOUS BRINE THROUGH TRIP TANK, STATIC
LOSSES 5 BBLS/HR

BULLHEADING WELL L-1 WITH 400 BBLS 71 PCF VISCOUS NACL BRINE @ 3 BPM &
1730 - 1930 2 2 POST N DCOM CIRC MPMP RIG 12862 12862 MAX. SURFACE PRESSURE 1000 PSI.
- HAD NO CHANGE IN CCA'S DURING BULL-HEAD.
- FLOW CHECK, 7 BPH STATIC LOSSES.

HELD STAND-UP MEETING WITH RIG CREW, REVIEWED & DISCUSSED: HSE ALERT
1930 - 2000 0.5 2 POST N DCOM PJSM NA RIG 12862 12862
69-24 - INJURY DURING ENGINE MAINTENANCE & HSE ALERT 70-24 - PIPE
HANDLER MAIN ARM UNCONTROLLED DECENT.

SCHL . E-LINE PERFORM CUT ABOVE PKR#3


- RIH WITH 2" RCT ON CCL TOOL ON 2-1/8" TRACTOR TO CUT POINT @ 4485 FT
ABOVE PKR#3.
- TRACTOR ACTIVATED FROM DEPTH 5500' (INC 68 DEG).
2000 - 0000 4 2 POST N DCOM OTH NA SWL 12862 12862
- PERFORM CORRELATION TO CONFIRM THE DEPRH, AND PERFORM CUT.
- POOH AND L/D 2" RCT TOOL,
- CHECK RCT TOOL @ SURFACE, OK.
- KEEP HOLE FULL OF 71 PCF NACL VISCOUS BRINE THROUGH TRIP TANK, STATIC
LOSSES 7 BBLS/HR

HPJSM. BULL-HEAD TCA W/ 50 BBLS 71 PCF HI-VIS NACL BRINE FOLLOWED BY


250 BBLS 71 PCF VIS BRINE.
0000 - 0200 2 2 POST N DCOM CIRC MPMP RIG 12862 12862
- TBG SIDE CLOSED DURING BULLHEAD.
- HAD NO CHANGE IN CCA'S DURING BULL-HEAD.
- LAY-DOWN SCHL. E-LINE TOOLS & R/D SURFACE PCE EQUIPMENT WHILE

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-448 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:20 05/26/2024 - 07/19/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
BULLHEADING.

BULL-HEAD TBG SIDE W/ 50 BBLS 71 PCF HI-VIS NACL BRINE FOLLOWED BY 380
0200 - 0400 2 2 POST N DCOM CIRC MPMP RIG 12862 12862
BBLS 71 PCF VIS BRINE.
- HAD NO CHANGE IN CCA'S DURING BULL-HEAD.

0400 - 0459 1 2 POST N DCOM CIRC MPMP RIG 12862 12862 HPJSM. CIRCULATE HOLE CLEAN THROUGH CHOKE WITH 71 PCF NACL VISCOUS
BRINE. MW IN/OUT = 71 PCF.....INCOMPLETE AT RT.
Workover Objectives
Foreman Remarks

==============ERP ==================
- RER: 100 PPM (10 M), 30 PPM (100 M), 1/2 LFL (500 M).
- GOR/H2S AT SHU'AIBA RESERVOIR = 1930 SCF/STB & H2S: 0.35%.
- STAGING AREA#1 (N: 54.01935, E: 22.57642), DISTANCE: 0.766 KM / STAGING AREA#2 (N: 54.00972, E: 22.56657), DISTANCE: 0.844 KM.

======= JOURNEY MANAGEMENT PLAN ======


- PRIOR MOVE TO THE RIG & ENTER THE SKID ROAD CALL YOUR COMPANY BASE.
- ALL VEHICLES SHOULD FOLLOW APPROVED ROAD WITH NO SHORT CUT AND FOLLOW DRIVING SPEED LIMIT.

============ WELL DATA ==============


- RIG RKB: 35.3 FT.
- ODF CORRECTION: 0.7 FT.
- WH DIRECTIONS: OPERATING VALVES TO NORTH & WING VALVE TO EAST.
- SHYB-448 WAS DRILLED ON FEBRUARY 2016, AND COMPLETED AS SHUB OPEN HOLE TRI LATERAL HORIZONTAL OIL PRODUCER WELL.
- 13-3/8" CSG SHOE @ 4023' MD/3953' TVD 32 DEG, HES DV @1566' MD/TVD.
- 9-5/8" CSG SHOE @ 6001' MD/5003' TVD 81 DEG, HES DV @ 3851' MD/3806' TVD 30 DEG.
- 7" TOL @ 3686' MD/3658 TVD 24 DEG, 7" LINER SHOE @ 7128' MD/5042' TVD 90 DEG.
- L-0: 6-1/8" OH TD @ 12860' MD/5033' TVD 90 DEG - 77 PCF POLY. MUD/SHUB FORM./FULL RETURN.
- L-0-1: 6 1/8" OH TD @ 12935' MD/5031' TVD 90 DEG (TOW @ 6810', BOW @ 6812') - 77 PCF POLY. MUD/SHUB FORM./FULL RETURN.
- L-0-2: 6 1/8" OH TD @ 12862' MD/5029' TVD 90 DEG (TOW @ 6560', BOW @ 6573') - 77 PCF POLY. MUD/SHUB FORM./FULL RETURN.

========= WELL HEAD PRESSURES ==========


- TCA: 250 PSI - CCA#1: 40 PSI - CCA#2: 50 PSI - CCA#3: 0 SPI (SURVEY ON 03/17/2024).
- SIWHP: 1730 PSI (SURVEY ON 2/18/2024).
- TODAY BLEED-OFF THRU FLARE LINES: N/A.
- TODAY WH PRESSURES: TCA: 0 PSI - CCA#1: 200 PSI - CCA#2: 180 PSI - CCA#3: 0 SPI.

=========== ARAMCO PERSONNEL =============


- ARAMCO MATERIAL EXPEDITOR MOHAMED ALI, SIDDIKMOULANA# 8518454 ON LOCATION SINCE 03/31/2024.

============== VISITORS ==================

========= SERVICE COMPANIES PERSONNEL =======


- OILSERV SL X 1 ARRIVED ON 06/06/24 @ 1900 HRS & 2 ON 06/07/24 @ 1200 HRS.
- BHI COMPL. X 4 ARRIVED ON 06/07/24 @ 1030 HRS, 1 ON 06/09/24 @ 1330 HRS & 1 ON 06/10/24 @ 18:00 HRS.
- INTERWELL X 1 ARRIVED ON 06/09/24 @ 15:00 HR.
- SLB W/L X 4 ARRIVED ON 06/11/24 @ 15:30 HR.
- APC X 1 ARRIVED ON 06/11/24 @ 15:30 HR.
- WFD FISHING ENG X 1 ARRIVED ON 06/12/24 @ 11:15 HR.
- OILSERV C/T X 4 ARRIVED ON 06/12/24 @ 1700 HRS.
- WFORD TRS X 2 ARRIVED ON 06/12/2024 @ 18:00.
- WFORD TT X 2 ARRIVED ON 06/13/2024 @ 17:00.

============= SAFETY & DRILLS ==============


* MEETING: PRE-TOUR SAFETY MEETING: 02. WEEKLY SAFETY MEETING:00, STAND UP SAFETY MEETING:02
.*AUDITS: 1ST QSI 2024: 0 OPEN ITEMS & 2ND QSI 2024 8 OPEN ITEMS.
* TOPICS DISCUSSED:
HSE ALERT 69-24 - INJURY DURING ENGINE MAINTENANCE.
HSE ALERT 70-24 - PIPE HANDLER MAIN ARM UNCONTROLLED DECENT
* STOP CARDS: 20.
* INC/NEAR MISS: 0.
* DRILLS:-
H2S RELEASE: 0, PIT: 0, TRIP: 0, MAN DOWN (INJURY): 0, SPILL: 0, FIRE: 0, FIRE PUMP: 0, CONFINED SPACE RESCUE: 0, MAN LOST: 0, SWAD:1, ACCUMULATOR: 0, VERTICAL RESCUE: 0.
ANNUAL SECONDARY: 0.
*SAFETY ALERTS: 2
* STOP WORK AUTHORITY: 5.
* PERMITS TO WORK: 5
- COLD WORK: 3, HOT WORK: 0, MAN RIDER: 0, CONFINED SPACE: 0, RADIOACTIVE: 0, DIESEL TRANSFER: 0, LIFTING PERSONAL: 1, THIRD PARTY: 1, ISOLATION: 0.

================= KPI =================


- TRIPPING KPI 4-1/2" TBG: 13.5 STD/HR, ACTUAL: NONE.

============= RENTAL TOOLS =============


- RECEIVED NESR FISHING JAR (SDW-3465748-1), INTENSIFIER (X002-0001) & BUMPER SUB (X011-00051) ON 06/11/2024 @ 08:00 AM.

============ VACCUUM TANKERS ===========


- 2 RAW WATER TANKERS AL-HABBAS# HB-1917/1922 ON LOCATION SINCE 01/29/2024.
- 2 RAW WATER TANKERS AL-HABBAS# HP-4034/4029 ON LOCATION SINCE 05/31/2024.
- 2 RAW WATER TANKERS AL-HABBAS# HP-1930/1920 ON LOCATION SINCE 06/11/2024.

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-448 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:20 05/26/2024 - 07/19/2024
Report ID: OPERLMTDMRREP

============= NEXT LOCATION =============

============= ARAMCO VEHICLE ============


- ARAMCO VEHICLE NO.: JD-6434 (PLATE# 8369 LNA) ON LOCATION, NEXT PM SERVICE ON 31 JULY, 2024.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
71 PCF 0 0 API 0 0 Volts 0 9.8 132,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 95 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 5 0/0 0 0 0
59
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
71 PCF 0 0 API 0 0 Volts 0 9.8 132,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 95 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 5 0/0 0 0 0
60

MUD BCTRN CAUST HEC NACL SOURSCAV


TREATMENT 7 ( 5GL ) 4 ( 50LBP ) 28 ( 55LB ) 35 ( 2200L ) 4 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/15/2024 06/15/2024 NORMAL NO HOT 1,945 2 X DAILY SAFETY
MEETINGS.

Company WTS INW WCR OTH OZT BC RIG GDF RIG ARM OSL OTH ARM SWL WRT WFS

Category SLS BRCR CSR CTRG COIL ICE RIG DFMS OTHR OTHR SLS VAC WSC WLS DRF WMFE
PERSONNEL
1 1 2 18 11 6 36 1 16 1 3 6 2 6 1 1
Total
AND SERVICES No. of Persons
112
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 0 0 24 12 12 12 0 12 24 24 0 0

Standby/Tankers
TRUCKS/BOATS
JD-6434

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2000 257 667 17 29 1500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NJYN-39 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 04/11/2024 - 07/06/2024
Report ID: OPERLMTDMRREP

ADES-889 @ NJYN-39 Limited Morning Report for 06/18/2024


Objective : (RE-ENTER, S/T BERREHAL, OUALID / MOHAMED, MAHMOUD EZZAT / ALKHLIFAH,
Foreman(s)
& DRILL WELL IN 2 HOLES MOHAMMED MOFEED
D&WO Morning Report (Service Providers View) Rig Charge #: TARGET UNZA AS Engineer BHATTACHARYA, SUDIP
Copyright 2024 Saudi Aramco. All Rights Reserved ADES-889 (71-23535-0039) HORIZONTAL & COMP. Manager TURAIFI, MOHAMMED AHMED
Daily Onshore W/10K SAND SCREEN. ) THURAYA RIG FORMAN VSAT FAX VSAT
(0500-0500) Saudi Aramco Well Wellbores:
0088216777 12624 5773506 8806987
Date: Tuesday 06/18/2024 NJYN-39 (0-1) NJYN_39_1
CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
5779380 5773959

Last 24 hr operations Next 24 hr plan


CONT RIH W/ BAKER 5-7/8" RSS & MWD/GR DRILLING BHA, D/O CMT, FS & START DRLG. 5 7/8' AS DRILLING 5-7/8" HOLE SECTION TO WELL TD AT +/- 17,654' MD. (REMAINING +/- 636 FT TO TD).
PER DIRECTIONAL PLAN.
Location Next Location
296KM F/DMG @ HRDH BRDG ON KHARKHEER RD 38KM TURN LEFT ON MDRK RD 0.5KM B/TOP, TURN LEFT 4KM SKID RD MDRK-19
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
17,018 Size 11160 11160 Size 10,460 16,976 14,452 Top
Formations Comments
9 5/8 7 Depth
SUDR 12,168 12206' MD (46 FT DEEPER)
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SDDM 12,499 12589' MD (59 FT DEEPER)
16979 (Date) 100 39 296 KHFF 12,841 13044' MD (36 FT DEEPER)
61.8 (04/17/2024@0800 ) KFAC 12,861 13075' MD (37 FT DEEPER)
KFBC 12,963 13230' MD (14 FT DEEPER)
KFCC 13,441 14271' MD (36 FT DEEPER)
KFDA 13,712 14988' MD (40 FT DEEPER)
BKDC 14,238 16384' MD (73 FT DEEPER)
PKFU 14,313 16583' MD (45 FT DEEPER)
UNZA 14,395 16802' MD (18 FT DEEPER)
UZ13 14,446 16956' MD (34 FT DEEPER)
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

CONT. RIH WITH BAKER 5-7/8" RSS & LWD/MWD/GR BHA ON 4" DP STD TO 7702'.
0500 - 0830 3.5 0-1 5 7/8 N DRLG TI STDP RIG 16979 16979 1675 7702 > FILL STRING EVERY 20 STD.
> TEST MWD EVERY 40 STD.
> MAINTAIN TRIP SHEETS - OK.

0830 - 0930 1 0-1 5 7/8 N DRLG CIRC MPMP RIG 16979 16979 CIRCULATE BOTTOM UP WITH 280 GPM AND 3550 PSI.
> CHANGE ELEVATOR TO 5-1/2" DP.

CONT RIH WITH BAKER 5-7/8" RSS & LWD/MWD/GR BHA ON 5-1/2" DP STD TO
16,865'.
0930 - 1430 5 0-1 5 7/8 N DRLG TI STDP RIG 16979 16979 7702 16865 > FILL STRING EVERY 20 STD.
> TEST MWD EVERY 40 STD.
> MAINTAIN TRIP SHEETS - OK.
> CAREFULLY PASS THRU 7" TOL @ 10,460' - OK.
1430 - 1800 3.5 0-1 5 7/8 N DRLG LOG LWD BHI 16979 16979 16865 16951
RE-LOG DOWN FROM 16,865' TO TOP OF CMT @ 16,951' AS PER GOC.

DRILL OUT CEMENT FROM 16,951' TO 7" LINER SHOE @ 16,976' & 5' RAT HOLE
W/ 90 PCF INNOVERT RDF OBM & 100% RETURNS.
1800 - 2230 4.5 0-1 5 7/8 N DRLG DC RSS BHI 16979 16979 16951 16979
> SWEEP HOLE WITH HVP WHILE DRILL OUT CMT.
> WORK STRING ACROSS 7" L/S - OK.
> FLOW CHECK - WELL STATIC.

DRILL 5-7/8" HOLE SECTION WITH BAKER 5-7/8" RSS & MWD/GR BHA W/ 90 PCF
INNOVERT RDF OBM & 100% CIRCULATION T/17018
- DRILL WITH REDUCED RPM WHILE STAB.INSIDE 7" LINER.
2230 - 0459 6.5 0-1 5 7/8 N DRLG D RSS BHI 16979 17018 - ALLOW BIT TO DRILL OFF & TAKE SURVEY 30 FT OFF BTM.
- FLOW CHECK DURING CONNECTION.
- FOLLOW INTEGRATED HORIZONTAL DRILLING PRACTICES VER 3.0. FOR STUCK
PIPE AVOIDANCE.
> TOOL OFFSET : NBI 7.02', GAMMA 5.05', DIRECTIONAL 31.01'
Workover Objectives
Foreman Remarks

=====================================ARAMCO PERSONNEL==========================================
> ARAMCO PDP YUSUF ALMULHIM #833976 ON LOCATION ON 6/17/2024.
===================================== SERVICE COMPANY PERSONNEL ==================================
> EMEC MUD ENG @ LOCATION.
> BAROID MUD ENG @ LOCATION.
> BKR DD CREW @ LOCATION.
> SLB MUD LOGGING CREW & TOOLS @ LOCATION.
> NOV VERTI-G & CENTRIFUGE (BARITE RECOVERY) CREW & TOOLS @ LOCATION.
===============================RENTAL EQUIPMENT & TOOLS===========================================
> NAPESCO 4-3/4" DRLG JAR (SN#HMDA-47-0065) @ LOCATION F/ 6/12/24.
===================================== ADES RIG CREW ============================================
> SHORTAGE: FULL CREW
===========================================HSE=================================================
> DRILLS: NONE.
> NEAR MISS: NONE.
> SAFETY ALERTS DISCUSSED: NONE

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NJYN-39 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 04/11/2024 - 07/06/2024
Report ID: OPERLMTDMRREP

> SGA #1: 1.89 KM (N: 2635338M, E: 313889M), SGA #2: 1.93 KM (N: 2635436M, E: 311386M)
> WATER CONSERVATION EFFORTS (NOT USING WATER PIT)
> IMPLEMENT CLOSED LOOP DRLG PRACTICE (NOV CUTTING DRYER: VERTI-G ), DAILY RECOVERED (8-3/8" HS) 0 BBLS & TOTAL 207 BBLS
=======================================ERP ===================================================
> ERP POSTED IN ARAMCO FOREMAN OFFICE
> 30 PPM: 0 M; 100 PPM: 0 M; 1/2 LFL: 139
================================= DUMPED WATER ==================================================

================================= DIRECTIONAL DATA ================================================


> FOLLOW APPROVED DIRECITONAL PLAN: NJYN-39_1_REV-I.1 (PWP)
> SENSOR OFFSET FROM BIT: NBI 7.02', GAMMA 5.05', DIRECTIONAL 31.01'
> PROJECTION TO BIT DEPTH @ 16,979' MD, 14,452' TVD, 73.39 DEG INC, 19.8 DEG AZM
> WELLPATH POSITION: 2.2' ABOVE , 2.9' RIGHT
================================= OH 8-3/8" WPSTK DATA ====================================
> SETTING DEPTH: 11,379', GYRO TF: 25 DEG, TOW: 11,348', BOW: 11,362'
====================================== OPERATION ==============================================
> ODF CORRECTION FROM SSA-5969 RIG = 35 FT TO RIG ADES-889 = 35 FT: 0 FT
=========================================RIG VISIT ===============================================

=================================== SAGWOD COST OPTIMIZATION ===================================


> RECEIVE 400 BBL 85 PCF WBM F/ADES-157
> TRANSFER 300 BBL 90 PCF WBM TO T-598
> RECEIVE 1500 BBL 130 PCF INNOVERT OBM F/PA-604S
> RECEIVE 1000 BBL 101 PCF INNOVERT OBM F/PA-604S
> TRANSFER 400 BBL 130 PCF INNOVERT OBM TO T-532
> TRANSFER 500 BBL 115 PCF INNOVERT OBM TO ADES-173
===========================WELLSITE SERVICES=============================================
> AL-TAMIMI SPRAY TANKER DRSS #1004326512 @ LOCATION SINCE 5/15/24
> VACUUM TANKER @ LOCATION : 1, DAILY LOAD: 1, TOTAL LOAD: 57.
====================================HSE FINDINGS STATUS=========================================
> FINDINGS STATUS WCEI 2024: 13; 13 ITEM CLOSE / 00 ITEM OPEN
> FINDINGS STATUS RHSEI 2024: 32; 32 ITEM CLOSE / 00 ITEM OPEN
> FINDINGS STATUS LPD 2024: 11; 11 ITEM CLOSE / 00 ITEM OPEN
======================================= NEXT WELL =============================================
1ST WELL: MDRK-19, TWO HOLE SIZES, DEV UNZA, PRE-WO MEETING DONE, STRIP OUT NOT REQUIRED, LOCATION 75% READY, WOCP ISSUED (RUN)
2ND WELL: HRDH-2538, WO BI60 TCA REPAIR, PRE-WO MEETING DONE, STRIP OUT 0%, LOCATION 0% READY, WOCP ISSUED (NO)
3RD WELL: HRDH-2100, WO BI60 TCA REPAIR, PRE-WO MEETING DONE, STRIP OUT 0%, LOCATION 0% READY , WOCP ISSUED (RUN)
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 1 0 API 57 360 Volts 5.1 0 28,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
140 1.2 HTHP 19 15 0 8 / 14 INOVRT 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 35 24 6/7 0 0 1.4
72
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 1 0 API 57 331 Volts 5.1 0 28,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.2 HTHP 19 14 0 8 / 14 INOVRT 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 36 24 6/7 0 0 2.4
74

CACO3-25 CAOH2 CACO3-50 STELSEALFN STELSL50 FACTANT MRBL-F


MUD 30 ( 25LB ) 12 ( 55LB ) 30 ( 55LB ) 30 ( 55LB ) 30 ( 55LB ) 1 ( 55GL ) 5 ( 2200L )
TREATMENT MRBL-M RHEMODL ADAPTA
3 ( 2200L ) 1 ( 55GL ) 1 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
15 16,979 17,018 DP Av DC Av Bit HHP 15 60 M333 5.875 HTC
Pressure GPM Jet Vel 1,436.48 N/A 29 I-Row O-Row DC Location Bearings
3,650 250 136 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7918345 LCDD407VHX1 3 x 16 / 0.589
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 19.5 285 340 314 320 19.5
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 5.875 1 5.875 1.03 0.82 XT3 52 7918345
2 RSS BHI 4.75 1 4.75 1.03 37.01 XT3 XT3 52 16371932
3 Logging While Drilling (LWD) BHI 4.75 1 4.75 1.2 39.57 XT3 XT3 53.21 14496644
4 Measurement While Drilling (MWD) BHI 4.75 1 4.75 1.2 26.27 XT3 XT3 53.21 15673368

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NJYN-39 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 04/11/2024 - 07/06/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
5 Crossover BHI 3.5 1 3.5 1.5 2.83 2 3/8 REG NC26 52 1625272
6 Stabilizer BHI 5.875 1 4.75 2.25 5.49 NC38 NC38 52 ZIBS9847
7 Float Sub BHI 4.75 1 4.75 2.25 3.31 NC38 NC38 52 15673376
8 FIlter Sub BHI 4.75 1 4.75 2.125 5.67 NC38 NC38 52 14821024
9 FIlter Sub BHI 4.75 1 4.75 2.125 8.51 NC38 NC38 52 WDS0142
10 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.56 94.5 XT39 XT39 28.24 CONV RIG
11 Hydraulic Jar NPC 4.75 1 4.75 2.25 30 XT39 XT39 1,200 RIG
12 Heavy Weight Drillpipe (HWDP) RIG 4 9 4 2.562 275.72 XT39 XT39 25.19 CONV RIG
13 Drillpipe RIG 4 129 4 3.34 4,063.25 XT39 XT39 14 G105 PREMIUM RIG
14 Heavy Weight Drillpipe (HWDP) RIG 4 18 4 2.56 567 XT39 XT39 28.24 CONV RIG
15 Drillpipe RIG 4 63 4 3.24 1,985 VX39 VX39 14 G105 PREMIUM RIG
16 Crossover RIG 5.75 1 5.75 2.5 3 NC38 XT39 26 RIG
17 Drillpipe RIG 5.5 1 5.5 4.67 10,510.1 XT54 XT54 24.7 XD105 PREMIUM RIG

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/16/2024 N/A NORMAL ONSHORE SEASONAL 2,038 PRE TOUR SAFETY
MEETING

Company TGC BHI RIG BAR EMC NPC SGR RIG ARM BRD ARM

Category CTRG DPDS RIG DFMS DFMS JST MLS OTHR OTHR SCS WSC
PERSONNEL
18 3 40 1 2 0 4 12 1 5 3
Total
AND SERVICES No. of Persons
89
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 0 24 24 24 24 24

Operating Hours. 0 24 12 12 12 16 16 12 12 16 24

Standby/Tankers Others Others


TRUCKS/BOATS
AB-7107 CREW BUS RIG AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 524 167 19 0

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-857 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 06/09/2024 - 07/19/2024
Report ID: OPERLMTDMRREP

ADM-261 @ MRJN-857 Limited Morning Report for 06/18/2024


Objective : (ESP Foreman(s)MACLEOD BAIN, IAIN MACLEOD / SOLIMAN, ALI SALEM
D&WO Morning Report (Service Providers View) Charge #: INSTALLATION) Engineer ELSOKKARY, OSSAMA AHMED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (72-24073-0857) Manager OTAIF, HASSAN WAFI
ADM-261
Daily OffShore THURAYA RIG FORMAN VSAT RIG FORMAN VSAT
(0500-0500) Saudi Aramco Well Wellbores: 88216-777- 11416 378-7463 378-7463
Date: Tuesday 06/18/2024 MRJN-857 (1) MRJN_857_1 OTHER VSAT CONTRACTOR /CLERK VSA T
378-7464 RADIO ROOM 378-7467 C LERK

Last 24 hr operations Next 24 hr plan


M/U SPACE OUT JOINTS. M/UP HGR & TERMINATE ALL LINES. RIH & LAND COMPLETION. CYCLE N/D BOP. N/U BONNET, TEST & TERMINATE ALL LINES. N/U CIW TREE, RETRIEVE BARRIERS.
ICV VALVES. SET R PLUG & SET PKR, TEST TCA, SET 2ND BARRIER. SUSPEND WELL PENDING FLOWBACK. SKID OVER MRJN-2000.
Location Next Location
MRJN-851/859 PLATFORM MRJN-2000
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,163 Last Csg Size MD TVD Size 6,338 8,272 6,884 Top
9 5/8 6563 6141 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12238 (Date) 100 0 251
9.4 (06/08/2024@1900 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

COMPLETE SLB CONTROL LINE PRESSURE TEST TO 3,000 PSI & ALLOW SEALS TO
RELAX FOR 15 MINUTES. UNSEAT HLWM WITH 20 KLBS OVER PULL, BREAK OUT
0500 - 0630 1.5 1 EOW C COMP HT SEAL SCP 12238 12238 TDS AND LAY OUT LANDING AYSSY. CHANGE HANDLING EQUIPMENT FROM 4"
BACK TO 4-1/2".
- TRIP TANK RUNNING, 73 PCF, VISCOUS FILTERED BRINE, LOSSES STEADY AT 2
BBL'S/HR.

POOH WITH 3 JOINTS 4-1/2" 12.6# TUBING SPOOLING ALL LINES.


0630 - 0645 0.25 1 EOW C COMP RPCS SMCOM RIG 12238 12238 5292 5170
- TRIP TANK RUNNING, 73 PCF, VISCOUS FILTERED BRINE, LOSSES STEADY AT 2
BBL'S/HR.

SLB RE-MEASURE ALL LAID OUT JOINTS AND MAKE SPACE OUT CALCULATIONS.
0645 - 0815 1.5 1 EOW C COMP HT SEAL SCP 12238 12238
- TRIP TANK RUNNING, 73 PCF, VISCOUS FILTERED BRINE, LOSSES STEADY AT 2
BBL'S/HR.

RIH WITH SLB HLWM STINGER & BAKER ESP UPPER COMPLETION WHILE PICKING
UP 2 JOINTS 4-1/2" 12.6# L-80 NEW VAM TUBING FOR SPACE OUT (1 X 10FT
0815 - 0900 0.75 1 EOW C COMP HT TBG RIG 12238 12238 ALREADY IN THE STRING). MAKE UP NEW FMC HANGER C/W 10FT 12.6# PUP
JOINT.
- TRIP TANK RUNNING, 73 PCF, VISCOUS FILTERED BRINE, LOSSES STEADY AT 2
BBL'S/HR.

R/U SLB SLICK LINE, RIH WITH 3.833" DRIFT TO 234 FT WLM TAG TRSSSV & 3.80"
DRIFT TO PASS TRSSSV TO 400 FT WLM, R/D SLCIK LINE.
0900 - 0930 0.5 1 EOW C COMP DTU DRFT SLL 12238 12238 CONCURRENTLY BAKER ESP CHECK CABLE READING P-P 6.OHM & P-G 2.31GOHM.
(2,500V/10MIN)
- TRIP TANK RUNNING, 7 PCF, VISCOUS FILTERED BRINE, LOSSES STEADY AT 2
BBL'S/HR.

0930 - 1015 0.75 1 EOW C COMP HT TBG RIG 12238 12238 CHANGE OUT HANDLING EQUIPMENT TO 4" AND MAKE UP LANDING JOINT
ASSEMBLY TO TDS.

SLB TERMINATE TRSSSV CONTROL LINE THROUGH HGR, FUNCTION CHECK,


1015 - 1130 1.25 1 EOW C COMP HT SSSV SCP 12238 12238 PRESSURE TEST TO 6,000 PSI - GOOD.
- TRIP TANK RUNNING, 73 PCF, VISCOUS FILTERED BRINE, LOSSES STEADY AT 2
BBL'S/HR.

SLB COMMENCE TERMINATING ICV CONTROL LINES THROUGH FMC TBG HGR.
1130 - 1200 0.5 1 EOW C COMP HT SEAL SCP 12238 12238
- TRIP TANK RUNNING, 73 PCF, VISCOUS FILTERED BRINE, LOSSES STEADY AT 2
BBL'S/HR.

HOLD SAFETY STAND DOWN WITH BOTH CREWS & SERVICE COMPANIES AND
DISCUSS:
- RECENT MAN RIDING INCIDENT
1200 - 1230 0.5 1 EOW C COMP SDR1 NA RIG 12238 12238 - RECENT INCIDENT WHERE ROUSTABOUT SLIPPED ON CASING JOINT REQUIRING
MEDIVAC.
- GOOD PLANNING, RISK ASSESSMENT, NOT TAKING SHORT CUTS & STOP WORK
AUTHORITY.
- WELL MONITORED ON TRIP TANK.

SLB COMPLETE ICV CONTROL LINE TERMINATIONS THROUGH FMC TBG HGR.
1230 - 1315 0.75 1 EOW C COMP HT SEAL SCP 12238 12238
- TRIP TANK RUNNING, 73 PCF, VISCOUS FILTERED BRINE, LOSSES STEADY AT 2
BBL'S/HR.

BAKER / RMS TERMINATE ESP CABLE AT HANGER, ELECTRICAL INTEGRITY


1315 - 1730 4.25 1 EOW C COMP HT ESPL BAL 12238 12238 BEFORE TERMINATION, P-P 6.9 OHM & P-G 2.31 GOHM AND AFTER TERMINATION
5.3 OHMS P-P, 6.3 GOHMS P-G 3.85 GOHM(2,500V/10MIN).
CONCURRENTLY DISPLACED TBG & TCA TO 73 PCF INHIBITED FILTERED BRINE,

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-857 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 06/09/2024 - 07/19/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
2.8 BPM, 400 PSI.
- TRIP TANK RUNNING, 72 PCF, VISCOUS FILTERED BRINE, LOSSES STEADY AT 2
BBL'S/HR.

HPJSM, DRAIN BOP , CONFIRM LOCK DOWN SCREWS ARE ALL OPEN (4-3/4'), RIH
TO 10 FT ABOVE HLWM RECEPTACLE, SLB FLUSHED EACH ICV CONTROL LINE,
1730 - 1900 1.5 1 EOW C COMP HT TBG RIG 12238 12238 RIH & LAND TBG HANGER IN WELLHEAD, SECURE LOCK DOWN SCREWS (3/4").
-CONCURRENTLY SLB HLWM CONFIRMED CONTROL LINES INTEGRITY WITH 3000
PSI TEST - GOOD .
BAKER ESP CONFIRM ELECTRICAL INTEGRITY AFTER LANDING -GOOD.

R/U SLB SLICK LINE EQUIPMENT & P/T SAME TO 3,500 PSI- GOOD TEST ,
- DRIFT LANDING JOINTS W/ 3.833" AND TAG ON SSSV @ 285 FT (WLM).
- RIH & SET PR PLUG BODY WITH LONG CATCHER SUB IN R-NIPPLE AT 5,002
1900 - 0000 5 1 EOW C COMP SET PLUGN SLL 12238 12238 5008 5008
FT(WLM), CHECK SET (GOOD), SET PRONG & CONFIRM HOLDING WITH 400 PSI,
POOH.
- CONCURRENTLY SLB SMART COMPLETION CYCLE ICV#1 & ICV#2 FROM OPEN TO
CLOSE TO OPEN POSITION AND LEAVE BOTH ICV'S IN OPEN POSITION.

PRESSURE UP GRADUALLY TO 3,100 PSI AND SET 9-5/8" MSR 'OCTOPUS' ESP
0000 - 0030 0.5 1 EOW C COMP SET PKR BAL 12238 12238 4945 4945 PACKER AS PER BAKER HOLD FOR 15 MINUTES (TCA OPEN). PACKER AT 4,945
FT, ESP INTAKE AT 5,110 FT.
- 1ST MECHANICAL BARRIER, R-PLUG 64 FT BELOW PACKER, SET & TESTED.

0030 - 0100 0.5 1 EOW C COMP PTST PKR RIG 12238 12238 FILL UP TCA W/ 3 BBLS 73 PCF FILTERED INHIBITED BRINE, P/TEST TCA (TBG
OPEN) TO 1,000 PSI/10 MINS - GOOD TEST.

SLB SLICKLINE RIH & SET PX PLUG IN TRSSSV NIPPLE AT 285 FT WLM,RUN CHECK
SET (GOOD) & SET PRONG. P/T PLUG TO 1,000 PSI -GOOD TEST
0100 - 0245 1.75 1 EOW C COMP SET PLUGN SLL 12238 12238 285 285 - 2ND MECH BARRIER SET & TESTED.
CONCURRENTLY DURING SLICKLINE WORK, BLEED TCA FROM 1,000 PSI TO ZERO
OVER 30 MINUTES & BAKER ESP CONFIRM ELECTRICAL INTEGRITY AFTER SETTING
PACKER P-P: 6.4 OHM, P-G: 4.31GOHM.

0245 - 0315 0.5 1 EOW C COMP HT TBG SLL 12238 12238 R/D SLB SLICKLINE EQUIPMENT.

0315 - 0400 0.75 1 EOW C COMP HT TBG RIG 12238 12238 BREAK OUT & LAY OUT LANDING JOINTS. R/D TBG TONG, CLEAN & CLEAR RIG
FLOOR.
0400 - 0459 1 1 EOW C BOP ND BNIP RIG 12238 12238
REMOVE MOUSE HOLE, N/D BELL NIPPLE ONGOING AT RPT.
Workover Objectives
Foreman Remarks

ODF-THS = 60.71 FT, PRT-THS = 50.40 FT, ODF= PRT + 10.31 FT.
DUAL LATERAL WELL (KHFJ FORMATION), GOR 594, 0% H2S.
-------------------------------------------------------------------------------------------------------------------------------------------
MRJN-851/859, 2000, 8 WELLS FOR W/O, 5 ESP INSTALLATIONS, & 3 TRSSSV TROUBLESHOOTING.
ESP INSTALLATIONS: MRJN 851 & 853 SINGLE LATERAL WELLS, 854, 855 & 857 DUAL LATERAL SMART COMPLETIONS.
TRSSSV TROUBLESHOOTING :MRJN-856, 859 & 2000.
CURRENT WELL: MRJN-857 (5TH OF 8) DUAL LATERAL, KHFJ FORMATION.
MRJN-851, 853, 854 & 855 SUSPENDED PENDING ESP FUNCTION TEST & FLOWBACK.
PLATFORM IS ONLY THE WELLHEAD DECK, SLIP ON PLATFORM NOT INSTALLED, NO GOSP LINE (ALL WELLS TO BE FLARED).
-------------------------------------------------------------------------------------------------------------------------------------------------
DISCUSSED HSE ALERTS # 69-24,70-24 ,71-24, 72-24 .
DISCUSSED ARO 140 NEAR MISS -DROPPED OBJECT EMERGENCY DESCENDING KIT DROPPED TO RIG FLOOR.
--------------------------------------------------------------------------------------------------------------------------------------
ARAMCO CLERK, ATHEEQ AKBAR ID#8583996 ONBOARD SINCE 05/13/2024.
ARAMCO FCT, FILIMBAN, ABDULLAH, (ID#780242) ARRIVED 06/04/2024.
-----------------------------------------------------------------------------------------------------------------------------------------
TOTAL FLUID LOST/BULLHEADED DURING WORKOVER - DAILY 30 BBLS, TOTAL 3090 BBLS.
------------------------------------------------------------------------------------------------------------------------------------------
NEXT PLATFORMS:

1ST PLATFORM - SFNY 281/286 FOR ONE ESP CHANGE OUT, SFNY-284.
**** WOED ADVISED, 06/13/2024, THAT THIS PLATFORM CAN'T BE ATTENDED DUE TO LACK OF ESP AVAILABILITY.
DEBRIS SURVEY COMPLETED 04/12/2024, AWAITING REPORT.
DISCUSSED DEPRESSURIZATION WITH SFNY CENTRAL FS (06/13/2024), DEPRESSURIZATION STARTED BUT NOT COMPLETED.
DEBRIS SURVEY COMPLETED, 2 ITEMS OF DEBRIS FOR REMOVAL, AWAITING CHARGE CODE TO INITIATE DIVE REQUEST.
RMM NOT REQUESTED, LPA & LA NOT RECEIVED, DEPRESSURIZATION REQUEST PENDING.

2ND PLATFORM - SFNY 1010/1019 FOR ONE ESP CHANGE OUT, SFNY-1017 & 2 TRSSSV CONVERSTIONS (SFNY-1013 & 1018).
DEBRIS SURVEY COMPLETED 04/05/2024, REPORT RECEIVED, NO DEBRIS REMOVAL REQUIRED.
DISCUSSED DEPRESSURIZATION WITH SFNY NORTH FS (06/13/2024), PLATFORM ON PRODUCTION, AWAITING FURTHER FEEDBACK.
RMM NOT REQUESTED, LPA & LA NOT RECEIVED, DEPRESSURIZATION REQUEST PENDING.

3RD PLATFORM - ZULF-264-269 / 320-321 FOR TWO WELLS, ZULF-320 (SAFETY WORKOVER) & ZULF-265 (TRSSSV REPAIR).
*** WOE ADVISED 06/11/2024 THAT ADM-261 WOULD NOT ATTEND THIS PLATFORM ****
PF ASSIGNED BY WOE ON 5/16/2024 (PF WAS PREVIOUSLY ASSINED TO RIG HI-9) AND RESCHEDULED ON 06/09/2024.
SEA BED SURVEY REPORT DATED 13 APRIL 2024, RECEIVED. DEBRIS REMOVED MAY 03 2024.
ZULF FIELD SERVICES CONFIRMED BY EMAIL ON 05/11/2024 PF IS DEPRESSURIZED, 1ST VISIT 06/04/2024, ALL OK.

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-857 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 06/09/2024 - 07/19/2024
Report ID: OPERLMTDMRREP

LPA & LA RECEIVED FROM ADES ON 05/28/2024, RMM MINUTES RECEIVED.


** BUOYING REQUEST PENDING.

4TH PLATFORM ZULF-110/120 FOR ON WELL, ZULF-117 (SAFETY WORKOVER).


CRM REQUEST #8800022215 SUBMITTED FOR HSU SBS ON 05/26/2024.
* BOREHOLE DATA SENT TO ADES ON 05/28/2024 FOR LOCATION APPROVAL.
* RIG MOVE REQUEST RM-2024-4010762 SUBMITTED ON 05/30/2024.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 0 0 API 0 0 Volts 0 9 73,791
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
82 0 HTHP 95 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 5 0/0 0 130,600 0
28
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 0 0 API 0 0 Volts 0 9 73,791
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
82 0 HTHP 95 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 5 0/0 0 130,600 0
28

MUD O-3670R BCTRN ECCO-TEMP


TREATMENT 4 ( 55GL ) 3 ( 5GL ) 2 ( 55LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/10/2024 N/A 5-7 KNTS S 1-2 FT SEASONAL 1,502 N/A

Company BAL LIG BC SCP RIG BDF RIG ARM INW SLL ARM NWT

Category ALS CTRG ICE ICE RIG DFMS OTHR OTHR SLS SLS WSC WTSE
PERSONNEL
5 13 1 4 44 1 5 2 1 3 2 5
Total
AND SERVICES No. of Persons
86
INFORMATION
Personnel on Loc. Hrs. 24 24 1 24 24 24 24 24 24 24 24 24

Operating Hours. 17 0 21 24 24 12 24 12 0 8 24 0

Standby/Tankers
TRUCKS/BOATS
TOPAZ-KHUBAYB

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2202 819 1467 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-703 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 03/08/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

ADM-266 @ MRJN-703 Limited Morning Report for 06/18/2024


Objective : (FLOWBACK OPS) Foreman(s)POPA, COSTIN-KARIM / ABDELHAMID, HOUSSAM ESSAM
D&WO Morning Report (Service Providers View) Charge #: Engineer JAYPRAKASH, GIRISH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (72-23073-0703) Manager OTAIF, HASSAN WAFI
ADM-266
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 882-167-77 1-1859 378-6338 378-6328
Date: Tuesday 06/18/2024 MRJN-703 (0) MRJN_703_0 OTHER VSAT CONTRACTOR /CLERK VSA T
880-6186 378-6329

Last 24 hr operations Next 24 hr plan


CONCLUDE FLOWBACK FOR MRJN-703. INFLOW TEST TRSSSV. R/D SLB UPSTREAM COFLEX HOSE SKID OVER MRJN-704. R/U SLB UPSTREAM LINE. PT. R/U SLB SL. PT.
& BAKER CTU FROM XMASS TREE. SECURE WELL & RELEASE RIG TO MRJN-704.
Location Next Location
MRJN 700/709 MRJN-704
Current Depth (ft) Liner TOL MD TVD Formation Tops
11,623 Last Csg Size MD TVD Size 5,932 9,554 6,794 Top
9 5/8 10240 6817 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
11623 (Date) 0 248
3.8 (06/16/2024@0000 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

FLOWBACK LATERAL NATURALLY THROUGH SLB ZERO FLARING PACKAGE TO


0500 - 1430 9.5 0 EOW E TEST CPT SEPR SWT 11623 11623 GOSP.
** DETAILED REPORT SENT EVERY 4 HOURS TO TOWN.
** BAKER CTU AT SURFACE.

1430 - 1530 1 0 EOW E TEST OTH NA SCP 11623 11623 SLB COMPLETION CYCLE ICV #1 (MOTHER BORE) TO FULLY-OPEN POSITION &
KEEPT ICV #2 (LATERAL-1) TO FULLY-OPEN POSITION - COMMINGLE FLOW.

FLOWBACK COMMINGLE MB & LATERAL NATURALLY THROUGH SLB ZERO


1530 - 1800 2.5 0 EOW E TEST CPT SEPR SWT 11623 11623 FLARING PACKAGE TO GOSP.
** DETAILED REPORT SENT EVERY 4 HOURS TO TOWN.
** FLOWBACK ACCEPTED BY RMD/PE.

1800 - 1830 0.5 0 EOW E TEST PJSM NA RIG 11623 11623 HOLD PREJOB SAFETY MEETING WITH ALL RELEVANT PERSONNEL WITH WELL
SHUTDOWN & R/D PROCEDURES.

SHUT IN THE WELL FROM SLB CHOKE MNFLD. RECORD 968 PSI SIWHP. SLB
1830 - 1930 1 0 EOW E TEST OTH NA RIG 11623 11623 CLOSSED TRSSSV. PERFORM INFLOW TEST-GOOD TEST. CLOSE XMASS TREE
MASTER VALVE.
** BOTH ICV'S LEFT IN FULLY OPEN POSITION.
1930 - 2030 1 0 EOW E TEST RD WTSE SWT 11623 11623
FLUSH SLB FLOWBACK EQPT & SURFACE LINES W/ SOAPY WATER.

2030 - 2200 1.5 0 EOW E TEST RD WTSE SWT 11623 11623 R/D SLB FLOWBACK UPSTREAM HP COFLEX HOSE & ESD VALVE FROM MRJN-703
XMASS TREE WING VALVE.

2200 - 2330 1.5 0 EOW E TEST RD CTU BCT 11623 11623 HPJSM. R/D BAKER CTU BOP HYDRAULIC HOSES. DISCONNECT BAKER CTU RISER
FROM MRJN-703 XMASS-TREE. SECURE SAME.
2330 - 0000 0.5 0 EOW E TEST OTH NA RIG 11623 11623
INSTALL 4-1/16 3M TREE CAP & SECURE WELL.

0000 - 0000 0 0 EOW S OT RELS NA RIG 11623 11623 WORKOVER OBJECTIVE COMPLETED FOR MRJN-703 & RIG RELEASED TO MRJN-
704 AT 00:00 HRS ON 18-JUNE-2024.
Workover Objectives
Foreman Remarks

ODF - THS = 46.32 FT, PRT - THS = 52.69 FT, ODF CORRECTION: PRT = ODF +6.37 FT.
===============================================================================
- ARAMCO CLERK: HAMEER, MOHAMMAD HARSHAN N #8626285 ONBOARD SINCE 10/18/2023.
===============================================================================
- 2ND RHSEI: TOTAL FINDINGS: 44 / 0 OPEN.
- LPD TOTAL FINDINGS 27/ 1 OPEN.
- REVIEWED WITH CREW: DROPPED EMERGENCY DESCENDING KIT INCIDENT.
- ===============================================================================
- CURRENT RIG LOCATION AT PF MRJN-700/709.
- SUSPEND GAS LIFT OPERATION ON CURRENT PLT DUE TO MAJOR WH PROBLEMS AS PER WIT & RMD.
- COMPLETED & DELIVERED WELLS: MRJN-705 & 701.
- COMPLETED WELL MRN-706 W/ UPPER COMPLETION & SUSPENDED FOR ACID JOB, N2 LIFTING AND FLOW BACK.
- COMPLETED WELL MRJN-704 W/ GAS LIFT & SUSPENDED FOR N2 LIFTING AND FLOW BACK.
- NO ANCHORING RESTRICTIONS AT THIS LOCATION.
- RIG HEADING 329 DEG.
- WATER DEPTH 48.5 M.
- ===============================================================================
NEXT PLATFORM: BRRI 228/260 (TWO WELLS TO WORKOVER: BRRI-228 & BRRI-260).
- HSU SBS RECEIVED FROM SYSTEM, SWO: 8000645783 (231089) ON 09-MAY-24.
- BHD SHARED WITH ADES ON 9-MAY-24 FOR LA & LPA.
- NOTIFIED FIELD SERVICE TEAM FOR PF DEPRESSURIZATION STATUS ON 09-MAY-24. PF DEPRESSURIZED AS PER FIELD SERVICE EMAIL.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-703 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 03/08/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

- RIG MOVE REQUEST #4010655 & 4010653 SUBMITTED ON 09-MAY-24 - APPROVED BY RMM.
- RECIEVED FROM ADES LA & LPA AND SHARED WITH RMM ON 14-MAY-24.
- RIG MOVE MTG MINUTES RMM 359-2024 CONDUCTED ON 16-MAY-24.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A 5-7 KNTS 1-2 FT SEASONAL 4,088 N/A
WNW

Company HCO RIG BCT SCP RIG BDF RIG ARM SCM SLL WI2 ARM SWT

Category PSSC CTRG COIL ICE RIG DFMS OTHR OTHR PCS SLS SLS WSC WTSE
PERSONNEL
1 12 7 1 43 1 1 1 1 3 1 2 7
Total
AND SERVICES No. of Persons
81
INFORMATION
Personnel on Loc. Hrs. 19 19 19 19 19 19 19 19 19 19 19 19 19

Operating Hours. 0 0 0 2 19 12 0 12 0 0 0 19 19

Standby/Tankers
TRUCKS/BOATS
Topaz Khubayb

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
291 767 747 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-704 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 03/11/2024 - 06/21/2024
Report ID: OPERLMTDMRREP

ADM-266 @ MRJN-704 Limited Morning Report for 06/18/2024


Objective : (FLOWBACK OPS) Foreman(s)POPA, COSTIN-KARIM / ABDELHAMID, HOUSSAM ESSAM
D&WO Morning Report (Service Providers View) Charge #: Engineer JAYPRAKASH, GIRISH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (72-23073-0704) Manager OTAIF, HASSAN WAFI
ADM-266
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 882-167-77 1-1859 378-6338 378-6328
Date: Tuesday 06/18/2024 MRJN-704 (0) MRJN_704_0 OTHER VSAT CONTRACTOR /CLERK VSA T
880-6186 378-6329

Last 24 hr operations Next 24 hr plan


RECIEVE RIG FROM MRJN-703. PREPARE & SKID OVER MRJN-704. R/U SLB UPSTREAM LINE. PT. SLB SL RTRV WRSSSV. R/U BAKER CTU INJECTOR HEAD. PT. FLOWBACK THE WELL TO GOSP VIA
R/U SLB SL. PT. SLB ZERO FLARING EQPT.
Location Next Location
MRJN 700/709 MRJN-706
Current Depth (ft) Liner TOL MD TVD Formation Tops
15,252 Last Csg Size MD TVD Size Top
7 10577 7223 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
15252 (Date) 0 248
38.8 (06/18/2024@0459 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0000 - 0130 1.5 0 PRE N RM RD NA RIG 15104 15104 GENERAL PREPARATION FOR SKIDDING. RE-ARRANGE RIG FLOOR. RE-POSITION
BAKER CTU REEL ON CANTILEVER.
0130 - 0200 0.5 0 PRE N RM POV NA RIG 15104 15104
HPJSM. SKID DRILLING PACKAGE OVER MRJN-704.

R/U SLB FLOWBACK UPSTREAM HP COFLEX HOSE & ESD VALVE ON XMASS TREE
0200 - 0300 1 0 PRE N RM OTH NA SWT 15104 15104
WING VALVE. P/T UPSTREAM TO 300/2,500 PSI, GOOD TEST.
** FUNCTION TEST ESD VALVE FROM ALL REMOTE STATIONS.

0300 - 0459 2 0 PRE N RM OTH NA SLL 15104 15104 HPJSM. R/U BAKER CTU RISERS. R/U SLB SLICKLINE PCE. P/T TO 300/2,500 PSI,
GOOD TEST.
0459 - 0459 0 0 PRE S OT COMM NA RIG 15104 15104
COMMENCE OPS ON MRJN-704 AT 05:00 HRS ON 18-JUNE-2024.
Workover Objectives
Foreman Remarks

- BEFORE MAJOR WELLHEAD WORK: ODF - THS = 47.8 FT, PRT - THS = 53.34 FT, ODF CORR.: PRT = ODF +5.54 FT.
- AFTER MAJOR WELLHEAD WORK: ODF - NEW THS = 42.9 FT, PRT - NEW THS = 48.44 FT, ODF CORR.: PRT = ODF +5.54 FT.
* NEW THS IS 4.9 FT HIGHER THAN OLD THS.
===============================================================================
- ARAMCO CLERK: HAMEER, MOHAMMAD HARSHAN N #8626285 ONBOARD SINCE 10/18/2023.
===============================================================================
- 2ND RHSEI: TOTAL FINDINGS: 44 / 0 OPEN.
- LPD TOTAL FINDINGS 27/ 1 OPEN.
- REVIEWED WITH CREW: DROPPED EMERGENCY DESCENDING KIT INCIDENT.
- ===============================================================================
- CURRENT RIG LOCATION AT PF MRJN-700/709.
- SUSPEND GAS LIFT OPERATION ON CURRENT PLT DUE TO MAJOR WH PROBLEMS AS PER WIT & RMD.
- COMPLETED & DELIVERED WELLS: MRJN-705, 701 & 703.
- COMPLETED WELL MRJN-704 W/ GAS LIFT.
- COMPLETED WELL MRN-706 W/ UPPER COMPLETION & SUSPENDED FOR ACID JOB, N2 LIFTING AND FLOW BACK.
- NO ANCHORING RESTRICTIONS AT THIS LOCATION.
- RIG HEADING 329 DEG.
- WATER DEPTH 48.5 M.
- ===============================================================================
NEXT PLATFORM: BRRI 228/260 (TWO WELLS TO WORKOVER: BRRI-228 & BRRI-260).
- HSU SBS RECEIVED FROM SYSTEM, SWO: 8000645783 (231089) ON 09-MAY-24.
- BHD SHARED WITH ADES ON 9-MAY-24 FOR LA & LPA.
- NOTIFIED FIELD SERVICE TEAM FOR PF DEPRESSURIZATION STATUS ON 09-MAY-24. PF DEPRESSURIZED AS PER FIELD SERVICE EMAIL.
- RIG MOVE REQUEST #4010655 & 4010653 SUBMITTED ON 09-MAY-24 - APPROVED BY RMM.
- RECIEVED FROM ADES LA & LPA AND SHARED WITH RMM ON 14-MAY-24.
- RIG MOVE MTG MINUTES RMM 359-2024 CONDUCTED ON 16-MAY-24.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A 5-7 KNTS 1-2 FT SEASONAL 4,088 N/A
WNW

PERSONNEL Company RIG BCT HCO SCP RIG BDF RIG ARM WI2 SLL SWT ARM SCM
Total
AND SERVICES
CTRG COIL PSSC ICE RIG DFMS OTHR OTHR SLS SLS WTSE WSC PCS 81
INFORMATION Category

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-704 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 03/11/2024 - 06/21/2024
Report ID: OPERLMTDMRREP

No. of Persons 12 7 1 1 43 1 1 1 1 3 7 2 1

Personnel on Loc. Hrs. 5 5 5 5 5 5 5 5 5 5 5 5 5

Operating Hours. 0 5 0 0 5 0 0 0 0 2 5 5 0

Standby/Tankers
TRUCKS/BOATS
TOPAZ KHUBAYB

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
291 767 747 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HSBH-28 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/28/2024 - 04/16/2025
Report ID: OPERLMTDMRREP

ADM-337 @ HSBH-28 Limited Morning Report for 06/18/2024


Objective : (GAS-PRODUCER Foreman(s)AIRAGHI, DARIO / SALAKO, OLAOLUWA SAMSON
D&WO Morning Report (Service Providers View) Charge #: IN HSBH FIELD WITH HYBRID Engineer SHAH, KHURRAM ABBAS
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved COMPLETION 7" X 9-5/8" X 7" Manager HARBI, SALEH MOHAMMAD
ADM-337 (66-22023-0028)
) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily OffShore
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14132 378-2132 013-819-80 40 (OIM)
Date: Tuesday 06/18/2024 HSBH-28 (0) HSBH_28_0 OTHER VSAT OTHER VSAT
378-2134 ( RADIO ROOM ) 378-2133 ( CLERK)

Last 24 hr operations Next 24 hr plan


CHC, POOH CLEANOUT BHA. M/U & RIH 17" MRSS BHA. CONT. RIH 17" MRSS BHA. CIRC. & COND. MUD. DRILL AHEAD 17" HOLE SECTION.
Location Next Location
HSBH-28 HSBH-22
Current Depth (ft) Liner TOL MD TVD Formation Tops
6,605 Last Csg Size MD TVD Size Top
18 5/8 6590 6572 Formations Comments
Depth
HSBR 1,320 1318' TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) DMMM 1,490 1487' TVD
6600 (Date) 100 0 207 RUS 1,840 1836' TVD
93.5 (03/07/2024@2030 ) UMER 1,980 1976' TVD
ARUM 3,500 3495' TVD
AHMD 4,320 4315' TVD
WARA 4,540 4535 TVD
MDDD 4,590 4585 TVD
SFAR 4,820 4815 TVD
SHUB 5,180 5175 TVD (47' HIGH)
BYDH 5,520 5513' TVD (60' LOW)
MDTM 5,870 5860' TVD (31' LOW)
SULY 6,130 6117 TVD (35' LOW)
HITH 6,550 6531 TVD (50' HIGH)

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End

0500 - 0600 1 0 17 N DRLG CIRC MPMP RIG 6605 6605 CONTINUE TO CIRCULATE AND CONDITION 74 PCF WBM, AS PER
BAKER ME.
0600 - 0645 0.75 0 17 N DRLG OTH NA RIG 6605 6605
FLOW CHECK WELL (STATIC), PUMP SLUG FOR TRIPPING OUT.
0645 - 0930 2.75 0 17 N FISH TO STDP RIG 6605 6605 6590 1014
POOH WITH 17" C/O BHA ON 5-1/2" S-135 DRILL PIPE.
0930 - 1000 0.5 0 17 N DRLG OTH NA RIG 6605 6605
FLOW CHECK WELL - STATIC.

1000 - 1100 1 0 17 N DRLG LDP SPDP RIG 6605 6605 1014 1479 RIH WITH 17" CLEANOUT BHA WHILE PICKING UP 15 JNTS OF 5-
1/2" G-105 DRILL PIPE FROM THE DECK.

1100 - 1115 0.25 0 17 N DRLG TO STDP RIG 6605 6605 1479 1014 POOH WITH 17" CLEANOUT BHA RACKING BACK 5 X 5-1/2" G-
105 DRILL PIPE STANDS.
1115 - 1145 0.5 0 17 N DRLG TO STHDP RIG 6605 6605 1014 554
CONT. POOH WITH 17" CLEANOUT BHA ON 5-1/2" HWDP.

1145 - 1345 2 0 17 N DRLG HT BHA RIG 6605 6605 CONT. POOH WITH 17" CLEANOUT BHA RACKING BACK DRILL
COLLAR STANDS IN DERRICK, L/OUT NAPESCO HYD DRLG JAR.

1345 - 1600 2.25 0 17 N DRLG HT BHA RIG 6605 6605 B/OUT AND L/DOWN BHA COMPONENTS: 3 X JUNK BASKETS,
X/O, 2 X 9-1/2" DC JNTS, 16" SRR, BS AND 17" BIT.

1600 - 1700 1 0 17 N DRLG CIRC MPMP RIG 6605 6605 RIH 5 STDS OF 5 1/2" DP. FLUSH SAME WITH DRILLING MUD @
800 GPM AND RACK BACK SAME.

1700 - 1800 1 0 17 N DRLG RR TDS RIG 6605 6605 SERVICE TDS. PERFORM DROPS INSPECTION AND GREASE
CROWN.
1800 - 1830 0.5 0 17 N DRLG OTH NA RIG 6605 6605
CLEAN & CLEAR RIG FLOOR FOR NEXT OPERATION.
1830 - 1900 0.5 0 17 N DRLG PJSM NA RIG 6605 6605
HOLD PJSM FOR P/U & M/U BAKER 17" MRSS BHA.

1900 - 0300 8 0 17 N DRLG HT BHA BHI 6605 6605 PICK UP & MAKE UP 17" BAKER MRSS DRLG BHA. BAKER
PERFORM TOOL VERIFICATION -OK.

0300 - 0330 0.5 0 17 N DRLG HT BHA BHI 6605 6605 DD 934861 EXTRA TIME FOR BAKER DIRECTIONAL SERVICE TO
RECONFIGURE MRSS BHA.
0330 - 0459 1.5 0 17 N DRLG HT BHA BHI 6605 6605
CONT. MU REMAINING 17" MRSS BHA....ONGOING.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 0300 .5 .5 934861 DD HERR RSS BHI 100 MRSS TOOL STRING CONFIGURATION BEING
CHANGED AFTER MOBILIZATION REQUIRING
EXTRA HANDLING TIME.
Foreman Remarks

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HSBH-28 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/28/2024 - 04/16/2025
Report ID: OPERLMTDMRREP

- FINAL POSITION HSBH-22/28: LAT 28DEG 10.528"N, LONG 49DEG 59.433'E; RIG ARRIVED LOCATION ON 2/28/2024.
- WATER DEPTH: 146 FT, FINAL AIR GAP: 61.1 FT, DFE: 145.78 FT (RKB-MSL), RKB-PLATFORM MAIN DECK: 104.77 F
- RIG CONTACTS: (ADES) RIG NET NO: +966-13-819 8039 IN CASE ARAMCO V-SAT DOWN.
- DISTANCE FROM RKB TO TOP OF CAMERON 18-3/4" UNI-HEAD: 81.09'
-

CASING POINTS:
- 48'' DRIVE PIPE PLANNED= 347' MD / 347' TVD; ACTUAL = 347' MD / 347' TVD
- 36'' PLANNED= 500' MD / 500' TVD; ACTUAL = 493' MD/ 493' TVD
- 30'' PLANNED= 2,019' MD / 2,016' TVD; ACTUAL = 1888' MD / 1884' TVD
- 24'' PLANNED= 4,465' MD / 4,462' TVD; ACTUAL = 4383' MD / 4379' TVD
- 18-5/8'' PLANNED= 6,671' MD / 6,631' TVD; ACTUAL = 6590' MD / 6570' TVD
- 14'' PLANNED= 10,273' MD / 10,039' TVD.
- 9-5/8'' PLANNED= 11,925' MD / 11,691' TVD.
- TD PLANNED= 13,243' MD / 13,008' TVD.
-

SAFETY:
- HOLD TOURLY SAFETY MEETING AS PER ADES AND SAUDI ARAMCO & RESPOND TO DAILY ARAMCO RADIO CHECK WITH ECC: OK
- PERFORM RESCUE FROM CRANE, MAN-DOWN / IP HANDLING / STRETCHER DRILL 3-JUNE-2024
- PERFORM FIRE, HS2, ABANDON RIG DRILLS 9-JUNE-24
- LC-50 KIT SENT ON MARCH 08/2024 ON MANIFEST # 2400672494.
- DISTRIBUTE, DISCUSS & POST ARAMCO WEEKLY SAFETY ALERTS W/ ALL POB.
- NO OF NEAR MESS SUBMITTED TO THE SLS: 0 / YTD: 3
-

PERSONNEL:
- ARAMCO MATERIAL EXPEDITOR: AIGHAMDI MAJED A ID# 815391 ON-BOARD 11-JUNE-2024
-

CCA RECORDED DAILY AT 09:30


- HSBH-22: TCA= 0, CCA-1 = 0, CCA-2 = 0, CCA-3 = 100, CCA-4 =0 PSI
- HSBH-28 - TCA= N/A, CCA-1 = N/A, CCA-2 = 0, CCA-3 = 0, CCA-4 =0 PSI
-

- WAIT ON WEATHER: TODAY 0 HRS / CUMULATIVE 1.5 HRS


- WAIT ON PRODUCING: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON MARINE: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON TOOL HOUSE: TODAY 0 HRS / CUMULATIVE 0 HRS.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 2 4.6 API 0 0 Volts 1.6 9.6 70,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 15 HTHP 91 27 0 10 / 14 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 11 9 9 / 11 5 320 0
53

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 2 4.6 API 0 0 Volts 1.6 9.6 70,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 15 HTHP 91 28 0 10 / 15 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 11 9 9 / 11 5 320 0
53

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 2 4.8 API 0 0 Volts 1.6 9.8 70,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 15.2 HTHP 91 27 0 10 / 14 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 12 9 9 / 11 7.5 320 0
51

MUD BCTRN CAUST CITRICACID MIL-GRD SODASH XC


TREATMENT 14 ( 5GL ) 18 ( 50LBP ) 2 ( 50LBP ) 2 ( 55GL ) 4 ( 50KG ) 33 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
7 6,600 6,600 DP Av DC Av Bit HHP 5 80 134 17 SEC
Pressure GPM Jet Vel 37.89 45.23 18 I-Row O-Row DC Location Bearings
350 400 94 1 1 NO A E
BIT DATA
Serial Number Type Jets TFA
839044 XT3 3 x 20 / 1 x 24 / 1.362
Gauge Other POOH Reason
0

DRILL STRING Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HSBH-28 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/28/2024 - 04/16/2025
Report ID: OPERLMTDMRREP

Y N/A 330 350 310 30 0 Shock Sub Serial #


Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 17 1 1.55 7918177
2 Bit HTC 17 1 8.29 208 7918177
3 RSS BHI 9.5 1 9.5 36.85 208 12092625
4 Stabilizer BHI 17 1 17 3 5.63 7 5/8 REG 7 5/8 REG 208 15947215
5 Measurement While Drilling (MWD) BHI 9.5 1 9.5 22.78 BHI T2 BHI T2 215.23 12488046
6 Stabilizer BHI 16 1 9.5 3 5.59 7 5/8 REG 7 5/8 REG 208 10430039
7 BCPM. Bi-directional Communication BHI 9.5 1 9.5 3 12.13 6 5/8 T2 6 5/8 T2 208 13179860
and Power Module
8 Measurement While Drilling (MWD) BHI 9.5 1 9.5 7.14 207.86 12891839
9 Stop Sub BHI 9.5 1 9.5 3 1.65 6 5/8 REG 9 1/2 T2 208 10666986
10 Stabilizer BHI 16 1 9.5 3 6.35 7 5/8 REG 7 5/8 REG 208 ZBHI1546
11 Float Sub BHI 9.5 1 19.875 3.5 3.65 7 5/8 REG 7 5/8 REG 0 14802747
12 Drillcollar RIG 9.5 1 9.5 2.813 30.11 7 5/8 REG 7 5/8 REG 208 SPRL RIG
13 PBL (Multiple Activation By Pass) CRW 1 18.6 208 DVBD6-1013
14 Drillcollar RIG 9.5 3 9.5 3 91.11 7 5/8 REG 7 5/8 REG 198 SPRL ONFILE
15 Crossover RIG 9.375 1 9.375 2.75 3.22 6 5/8 REG 7 5/8 REG 198 PRO15606-5
16 Drillcollar RIG 8.25 6 8.25 2.813 183.44 6 5/8 REG 6 5/8 REG 158 SPRL ONFILE
17 Hydraulic Jar NPC 9.5 1 9.5 26.32 6-5/8 REG 6-5/8" REG 208 HJDA-950-00
18 Drillcollar RIG 8.25 3 8.25 2.813 91.51 6 5/8 REG 6 5/8 REG 158 SPRL ONFILE
19 Crossover RIG 8.5 1 8.5 2.813 2.4 XT54 6 5/8 REG 158 97111313
20 Heavy Weight Drillpipe (HWDP) RIG 5.5 18 5.5 3.25 552.11 XT54 XT54 52.51 CONV ONFILE
21 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 CYX105 PREMIUM ONFILE

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/09/2024 DAILY 2 KNOTS CALM SEASONAL 944 N/A

Company GOS BHI RIG BDF SGR ARM SCM ARM CRW

Category CTRG DPDS RIG DFMS MLS OTHR PCS WSC WBCS
PERSONNEL
14 3 61 2 4 1 1 2 1
Total
AND SERVICES No. of Persons
89
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 0 12 24 24 24 12 0 24 0

Standby/Tankers Others
TRUCKS/BOATS
RAWABI-324 (rig) POSH FULMAR (tanajib)

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
4501 2340 1993 7702 0 5513

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HSBH-35 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 03/05/2024 - 01/20/2025
Report ID: OPERLMTDMRREP

ADM-339 @ HSBH-35 Limited Morning Report for 06/18/2024


Objective : (GAS-WILDCAT Foreman(s)RIVAS PAZ, RAIDER GERARDO / COSTA, DRISS JOAQUIM
WELL) Engineer BAYAT, AHMED HAIDER / QAHTANI, MOHAMMED HAMMAD
D&WO Morning Report (Service Providers View) Rig Charge #: Manager HARBI, SALEH MOHAMMAD
Copyright 2024 Saudi Aramco. All Rights Reserved ADM-339 (75-19023-0035) THURAYA RIG FORMAN VSAT CONTRACTOR
Daily OffShore /CLERK VSA T
0088216777 12238 013-876-52 60
(0500-0500) Saudi Aramco Well Wellbores:
013-876-56 31 (CLERK)
Date: Tuesday 06/18/2024 HSBH-35 (0) HSBH_35_0
CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
013-819-80 10 (OIM) 013-876-53 75 (RADIO ROOM)

Last 24 hr operations Next 24 hr plan


RIG SHUTDOWN FOR SAFETY INVESTIGATION. MONITOR WELL ON TRIP TANK. RIG SHUTDOWN FOR SAFETY INVESTIGATION. MONITOR WELL ON TRIP TANK.
Location Next Location
HSBH-35 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
8,753 Last Csg Size MD TVD Size Top
24 4732 4732 Formations Comments
Depth
HDRK 570
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) HSBR 1,330
8675 (Date) 100 0 208 RUS 1,940
77.3 (04/01/2024@2215 ) UMER 2,090
ARUM 3,680
AHMD 4,710
WARA 4,990
MDDD 5,030
SFNY 5,170
SHUB 5,570
BYDH 5,810
BUWB 6,150
MDTM 6,250
SULY 6,630
HITH 7,010
ARBA 7,180
ARBB 7,250
ARBC 7,315
ARBD 7,490
HNIF 7,750
TQMN 8,060
DHRM 8,510
LFDR 8,640

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End

RIG SHUTDOWN FOR SAFETY INVESTIGATION. MONITOR WELL


0500 - 1930 14.5 0 22 N DRLG OTH NA RIG 8753 8753 HSEI 934827
VIA TRIP TANKS AND BREAK CIRCULATION EVERY 30 MIN, DOWN
STRING; WELL STATIC.
1930 - 2230 3 0 22 N DRLG CIRC MPMP RIG 8753 8753 HSEI 934827
CIRCULATE AND CONDITION MUD WITH 500 GPM, 620 PSI.

RIG SHUTDOWN FOR SAFETY INVESTIGATION. MONITOR WELL


2230 - 0459 6.5 0 22 N DRLG OTH NA RIG 8753 8753 HSEI 934827
VIA TRIP TANKS AND BREAK CIRCULATION EVERY 30 MIN, DOWN
STRING; WELL STATIC.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
16 Jun 0400 24 49 934827 HSEI UNKN NA RIG 7950 SHUT DOWN FOR INCIDENT INVESTIGATION.
Foreman Remarks

HSBH-35, WILL BE DRILLED AS GAS-WILDCAT IN HSBH FIELD. PRIMARY TARGETS ARE: BASAL KHUFF CLASTICS AND KAHFAH RESERVOIRS. SECONDARY
TARGETS: MARRAT AND KHUFF-D RESERVOIRS.
-

RIG ARRIVED ON LOCATION ON 14 MARCH 2024


-

PLATFORM LOCATION
- HSBH-35, LAT 28DEG 10.947' N, LONG 049DEG 57.774' - RIG HEADING: 007 DEG
- AIRGAP: 55 FT, WATER DEPTH 160 FT
- DFE: RKB TO MSL 140 FT, RKB TO MUDLINE 300 FT
-

- ADM 339 SPEED CAST NO: +966138198018 (RADIOROOM) - +966138198010 (OIM) IN CASE ARAMCO VSAT DOWN
-

CASING POINTS:
- 36'' PLANNED = 520' MD/TVD; ACTUAL = 535' MD/ 535' TVD
- 32"X 30'' PLANNED = 300'/2005 MD/TVD; ACTUAL = 303'/1,981' MD. 303'/1,981' TVD
- 24'' PLANNED = 4,706' MD / TVD. ACTUAL = 4,732' MD. 4,732' TVD
- 18-5/8'' PLANNED = 10,200' MD/TVD.
- 16" X 18-5/8'' EXPANDABLE LINER PLANNED = 11,122' MD/TVD.
- 13-3/8'' PLANNED = 12,955' MD/TVD.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HSBH-35 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 03/05/2024 - 01/20/2025
Report ID: OPERLMTDMRREP

- 9-5/8'' PLANNED = 15,120' MD/TVD.


- 7" LINER PLANNED = 16,725' MD/TVD
-

PERSONNEL:
-ARAMCO CLERK, MAGHRABI, FADI A MI, ID#820709, ONBOARD 07-JUN-2024.
-ARAMCO GEOLOGIST, ALRASHDI, FAISAL H, ID#819431, ONBOARD 31-MAY-2024.
-ARAMCO HSE, TITUS, WAYNE, ID#8568036, ONBOARD 17-JUN-2024.

SAFETY:
- MEDIVAC ACTIVATED FOR INJURED IP -16/06/2024
- HOLD TOURLY SAFETY MEETING AS PER ADES AND SAUDI ARAMCO.
- RESPOND TO DAILY ARAMCO RADIO CHECK WITH ECC: OK
- TEST CALL MADE TO DAHRAN DRILLING ECC VIA THURAYA SAT PHONE @ 20:09 HRS ON 16-JUN-2024. RECEIVED ACKNOWLEDGEMENT.
- PERFORMED WEEKLY H2S & ABANDON DRILL WITH MAN DOWN AND RESCUE ON 15-JUN-2024.
- RUN E-GENERATOR FOR 2 HOURS OFFLINE ON 17-JUN-2024
-

RENTAL TOOLS:
-9-1/2" DRILLING JAR, S/N 0542, ONBOARD 14-MAY-2024
-9-1/2" DRILLING JAR, S/N DM 398, ONBOARD 14-MAY-2024
-9-1/2" PBL SUB, S/N WES950BP318, ONBOARD 13-APRIL-2024
-9-1/2" PBL SUB, S/N SMB950BP286MB, ONBOARD 25-MAY-2024
-

- WAIT ON WEATHER: TODAY 0 HRS / CUMULATIVE 12.75 HRS


- WAIT ON PRODUCING: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON MARINE: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON TOOL HOUSE: TODAY 0 HRS / CUMULATIVE 0 HRS
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
71 PCF 2 4.8 API 0 0 Volts 1.99 9.6 29,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 15 HTHP 94 26 0 8 / 11 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 15 6 7/8 0 480 0
51
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
71 PCF 2 5 API 0 0 Volts 1.94 9.5 29,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 15.2 HTHP 94 25 0 8 / 11 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 15 6 7/8 0 520 0
50

MUD BENT BCTRN CAUST


TREATMENT 100 ( 100LB ) 8 ( 5GL ) 8 ( 50LBP )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
12 8,753 8,753 DP Av DC Av Bit HHP 20 80 425 22 REED
Pressure GPM Jet Vel 59.98 65.48 0 I-Row O-Row DC Location Bearings
2,724 1,100 N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
T298130 TH42A POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 111.5 297 310 300 18,000 48
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
111.5

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit REED 22 1 2.08 T298130
2 Near Bit Roller Reamer ARM 22 1 9.5 3 9.79 7 5/8 REG 7 5/8 REG 1 3 POINT 130376073
DRILL STRING
3 Drillcollar RIG 9.625 1 9.625 2.813 30.42 7 5/8 REG 7 5/8 REG 1 SPRL 48776
4 Roller Reamer ARM 22 1 9.5 3 9.47 7 5/8 REG 7 5/8 REG 1 3 POINT 1303686659
5 Roller Reamer RIG 22 1 22 2.8 9.47 7 5/8 REG 7 5/8 REG 300 3 POINT 130368654
6 Stabilizer SDM 22 1 9.5 3 1.3 7 5/8 REG 7 5/8 REG 1 573938
7 Measurement While Drilling (MWD) SDM 9.5 1 9.5 25.14 188.5 PR7149
8 Saver Sub SDM 9.25 1 9.25 4 1.49 7 5/8 H90 7 5/8 H90 1 507113
9 Roller Reamer ARM 22 1 9.5 3 9.47 7 5/8 REG 7 5/8 REG 1 3 POINT 130368654
10 Float Sub SDM 9.5 1 9.5 3.75 2.74 H90 7 5/8 REG 1 64681
11 FIlter Sub SDM 9.5 1 9.5 4 2.47 7 5/8 REG 7 5/8 REG 1 950-8019

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HSBH-35 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 03/05/2024 - 01/20/2025
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
12 PBL (Multiple Activation By Pass) SAM 9.5 1 9.5 3.5 10.46 7 7/8 REG 7 5/8 REG 1 HYD950BP26
13 Drillcollar RIG 9.5 9 9.5 3 276.42 7 5/8 REG 7 5/8 REG 1 SPRL ON FILE
14 Hydraulic Jar SJS 9.5 1 9.5 3.188 24.16 7-5/8" REG B 7-5/8" REG P 1 DM140
15 Drillcollar RIG 9.5 3 9.5 3 90.99 7 5/8 REG 7 5/8 REG 1 SPRL ON FILE
16 Crossover RIG 9.5 1 9.5 2.813 2.56 6 5/8 REG 7 5/8 REG 1 15-0256-1
17 Drillcollar RIG 8.5 6 8.5 3 184.67 6 5/8 REG 6 5/8 REG 1 SPRL ON FILE
18 Crossover RIG 8 1 8 2.813 2.62 6 5/8 FH 6 5/8 REG 1 1004970
19 Heavy Weight Drillpipe (HWDP) RIG 6.625 9 6.625 5 272.25 6-5/8FH 6-5/8FH 58.1 CONV ON FILE
20 Drillpipe RIG 5.875 1 5.875 5.153 1 XT57 XT57 27 S135 NEW ON FILE

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/27/2024 TOURLY 9-10 KTS W 1 FT SEASONAL 4,069 DAILY WEEKLY

Company RIG SDM RIG BDF XLG ARM HCM BSC ARM SAM

Category CTRG DPDS RIG DFMS MLS OTHR PCS SCS WSC WBCS
PERSONNEL
13 4 57 2 5 3 2 1 2 1
Total
AND SERVICES No. of Persons
90
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24 24 24

Standby/Tankers Others
TRUCKS/BOATS
Caspian server rawabi 62

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
4469 3033 1981 7432 1127 2047

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-912 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 05/27/2024 - 09/11/2024
Report ID: OPERLMTDMRREP

ADM-504 @ ZULF-912 Limited Morning Report for 06/18/2024


Objective : (OFFSHORE OIL- Foreman(s)DAAS, SAMIR / KHAMEES, MAJD AHMED
D&WO Morning Report (Service Providers View) Charge #: DELINEATION WELL IN ZULF) Engineer REY MARQUEZ, HENRY DAVID
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (75-24062-0912) Manager HAWSAWI, ABDULLAH OMAR
ADM-504
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 77711308 673-1396 673-3652
Date: Tuesday 06/18/2024 ZULF-912 (0) ZULF_912_0 CONTRACTOR /CLERK VSA T
673-3259

Last 24 hr operations Next 24 hr plan


CON'T N/U & P-TEST 18-3/4" BOPE. L/D EXCESS TUBULARS. P/U & RUN 12" C/OUT ASSY. DRILL OUT CMT/DVT/ SHOE TRACK & PT CSG. DRILL RATHOLE & 10'
NEW FORMATION. POOH & L/D C/OUT ASSY.
Location Next Location
N-3144413.00, E-321262.00 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
1,692 Last Csg Size MD TVD Size Top
13 3/8 1686 1678 Formations Comments
Depth
RUS 1,640 1633' TVD (58' DEEPER)
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
1692 (Date) 100 0 252
10.2 (06/08/2024@0000 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CON'T N/UP 18-3/4" 15M BOP'S STACK:

> INSTALLED ARAMCO 13-5/8" 10M X 18-3/4" 15M DSA.


0500 - 0930 4.5 0 16 N BOP NU BOP RIG 1692 1692
> TRANSVERSED 18-3/4" BOP'S & LANDED OFF ONTO DSA.
> N/UP CHOKE AND KILL CO-FLEX HOSES.
> N/UP E-KILL COFLEX HOSE ON 18-3/4" BOP'S..
> TORQUE UP ALL BOLTS AT DSA & BOP.
0930 - 1100 1.5 0 16 N BOP NU BNIP RIG 1692 1692
INSTALLED BELL NIPPLE & OVERSHOT.
1100 - 1230 1.5 0 16 N BOP NU DVRT RIG 1692 1692
P/UP & INSTALLED KFDJ DIVERTER.

PRESSURED UP SYSTEM & ENERGIZED SEALS. FILLED STACK W/WATER. HYDRO-


1230 - 1315 0.75 0 16 N BOP OTH DVRT RIG 1692 1692 TESTED SAME.
CONNECTED BOP CONTROL/HYDRAULIC LINES.
FUNCTION TESTED BOP RAM'S & HCR'S.
1315 - 1345 0.5 0 16 N BOP OTH BOP RIG 1692 1692
CLEANED & CLEARED RIG FLOOR.

M/UP BOP TEST ASSY, RIH & SET TEST PLUG. R/UP SURFACE LINES.
1345 - 1615 2.5 0 16 N BOP OTH BOP RIG 1692 1692
FLUSHED THRU ALL SURFACE LINES & EQUIPMENT, CHOKE & KILL LINES
W/SEAWATER.
1615 - 1630 0.25 0 16 N BOP PJSM BOP RIG 1692 1692
HELD PRE-JOB SAFETY MEETING PRIOR TO TESTING BOP.

P/TEST 18-3/4" BOPE AS FOLLOWS:


1630 - 2100 4.5 0 16 N BOP BOPT BOP RIG 1692 1692
> 18-3/4" BOP AND RELATED EQUIPMENT TO 300/10,000 PSI.
> BOP & DSA/CSG SPOOL CONNECTIONS INTEGRITY TO 300/10,000 PSI.
> KELLY HOSE, STANDPIPE DOWN TO MUD PUMP MANIFOLD TO 300/7,000 PSI.
2100 - 2230 1.5 0 16 N BOP OTH BOP RIG 1692 1692
POH WITH FMC BOP TEST PLUG & L/D SAME. M/UP 13-3/8" CUP TESTER ASSY.
2230 - 0100 2.5 0 16 N BOP BOPT BOP RIG 1692 1692
P/TEST WELLHEAD & SIDE OUTLET VALVES TO 300/5,000 PSI.
0100 - 0130 0.5 0 16 N BOP OTH BOP RIG 1692 1692
PERFORMED ACCUMULATOR DRAWDOWN TEST.
0130 - 0200 0.5 0 16 N BOP OTH BOP RIG 1692 1692
POH & L/D 13-3/8" CUP TESTER ASSY.
0200 - 0230 0.5 0 16 N WH SET WBSH RIG 1692 1692
SET 13-5/8" FMC WEAR BUSHING. L/D RUNNING TOOL.
0230 - 0300 0.5 0 16 N DRLG PJSM NA RIG 1692 1692
CLEAN & CLEAR RIG FLOOR. HPJSM BEFORE START L/D EXCESS TUBULARS.

LAY DOWN FROM DERRICK 12 JTS X 9 1/2" DC'S & 15 JTS X 5-1/2" HWDP.
0300 - 0459 2 0 16 N DRLG HT STRG RIG 1692 1692
*** ONGOING ***
Foreman Remarks

ZULF-912 WILL BE DRILLED AS A DEVIATED OFFSHORE OIL EXPLORATION AND DELINEATION WELL. THE WELL IS LOCATED IN THE NORTHERN
ARABIAN GULF, NORTH OF ZULUF FIELD. THE PRIMARY OBJECTIVE OF THE WELL IS TO DELINEATE THE DOWNDIP POTENTIAL OF THE AHMADI
RESERVOIR ON THE NORTHWESTERN FLANK OF THE ZULUF ANTICLINE, AND BEYOND THE BOOKING LIMIT.
==============================RIG MOVE OPERATIONS=======================================================
BRRI-907 LOCATION COORDINATES: 3009260 N 372890 E
ZULF-912 LOCATION COORDINATES: 3144413 N 321262 E

===========================RIG FINAL POSITION============================================================


- RIG HEADING: 11 DEG.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-912 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 05/27/2024 - 09/11/2024
Report ID: OPERLMTDMRREP

- WATER DEPTH: 128 FT.


- AIR GAP: 53 FT.
- ADM-504 RKB TO MSL: 116 FT.
- PORT LEG PENETRATION: 10.9 FT.
- STB LEG PENETRATION: 5.6 FT.
- BOW LEG PENETRATION: 8.6 FT.
=========================CASING/LINER=================================================
- 24" CONDUCTOR PLAN SET AT 426'. ACTUAL AT 454.
- 18 5/8" CASING PLAN SET AT 950' . ACTUAL AT 940'. MLL @ 270'.
- 13-3/8" CASING PLAN SET AT 1,630', 50' INTO RUS FORMATION. ACTUAL AT 1686. MLL @ 273.
- 9-5/8" CASING PLAN SET AT 5,050'. 30' INTO LWHH. ACTUAL AT XXXX. 9-5/8" MLL @ XXX.
- 7" LINER PLAN SET AT 5,965'. 100' INTO LOWER MAUDDUD. ACTUAL AT XXXX & TOL AT XXXX.
================================PERSONNEL===========================================
- ARAMCO CLERK FAYSAL YAQOOB, ID#8613447 ON LOCATION SINCE 1/15/2024
- ARAMCO WELLSITE GEOLOGIST BADR ALQAHTANI ON LOCATION SINCE 6/7/2024.
================================RIG MANAGEMENT VISIT ===================================
- NONE
================================NEARBY FACILITIES===========================================
- NEAREST FACILITY: TANAJIB CLINIC.
- NEAREST MEDICAL FACILITY: ARAMCO CLINIC AT TANAJIB .
- ONBOARD MEDICAL RESPONDER: RIG MEDIC.
================================LC-50 ==============================================
- LC-50 WBM SAMPLE: XXXX.
- LC-50 OBM SAMPLE: XXXX.
================================RENTAL TOOLS=========================================
- RECEIVED WFD 8-1/2" DRLG JAR ON 6/16/2024 (MNF#2100916180).
- RECEIVED WFD 8-1/2" PBL SUB ON 6/16/2024 (MNF#2100915843).
================================RIG MOVE INFORMATION==================================
-
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 1,692 13.9 102 0 1,684 -7.26 30.33 102.3 0.98

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
69 PCF 0 12 API 0 0 Volts 2.23 9.8 15,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 95.5 37 0 14 / 22 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 13 4.5 12 / 13 20 240 0
66
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
69 PCF 0 12 API 0 0 Volts 2.23 10 15,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 95.5 34 0 13 / 20 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 16 4.5 12 / 13 20 200 0
65

MUD
TREATMENT
BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit CDB 16 1 1.22 261937
2 Mud Motor SDM 9.625 1 9.625 7.875 32.71 7-5/8 REG 7-5/8 REG 0 FS96B0160
3 Stabilizer SDM 16 1 16 3 6.54 7 5/8 REG 7 5/8 REG 0 OSS11-00228
4 Pony Collar SDM 9.59 1 9.59 3.063 5.23 7-5/8 REG 7-5/8 REG 0 SDT-8993
5 Saver Sub SDM 9.688 1 9.5 2.813 1.26 7 5/8 REG 7 5/8 REG 0 5728951A-1
6 Measurement While Drilling (MWD) SDM 9 1 9 24.81 7-5/8 REG 7-5/8 REG 159 021DB7
7 Saver Sub SDM 9.156 1 9.156 3 1.16 7 5/8 REG 7 5/8 REG 0 GTF-4997-1-
8 Non Magnetic Drill Collar ( NMDC ) SDM 9.5 1 9.5 3 20.25 7 5/8 REG 7 5/8 REG 216 SPRL LM-53
DRILL STRING
9 Float Sub SDM 9.5 1 9.5 3.75 2.06 H90 7 5/8 REG 0 NAP-6211-1
10 FIlter Sub SDM 9.531 1 9.531 3.5 7.46 7 5/8 REG 7 5/8 REG 0 950-8011
11 Drillcollar RIG 9.5 8 9.5 3 239.59 7 5/8 REG 7 5/8 REG 216 SPRL
12 Hydraulic Jar WJS 9.5 1 9.5 3 32.11 7-5/8" REG 7-5/8" REG 5,500 1549-5006
13 Drillcollar RIG 9.5 3 9.5 3 90.71 7 5/8 REG 7 5/8 REG 216 SPRL
14 Crossover RIG 9.5 1 9.5 3 2.83 7 5/8 REG 6 5/8 REG 0 WCX-6
15 Crossover RIG 8.312 1 8.313 3 3.58 NC50 6 5/8 REG 0 WCX-37-2
16 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 462.72 5-1/2FH 5-1/2FH 57.57 CONV
17 Drillpipe RIG 5.5 22 5.5 4.67 695 5-1/2 FH 5-1/2 FH 24.7 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A WNW 8-10 WSW 1-2 FT SEASONAL 3,552 N/A
KTS

Company BCR GOS SDM RIG EMC TSF WJS RIG SGR ARM SCM MI2 ARM FME GEP

PERSONNEL Category CSR CTRG DPDS RIG DFMS H2S JST MED MLS OTHR PCS SCS WSC WHES WHES
Total
AND SERVICES
3 14 3 51 2 1 0 1 4 2 2 1 2 1 1 88
INFORMATION No. of Persons

Personnel on Loc. Hrs. 24 24 24 24 24 24 0 24 24 24 24 24 24 24 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-912 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 05/27/2024 - 09/11/2024
Report ID: OPERLMTDMRREP

Operating Hours. 0 0 0 24 24 0 0 0 24 12 0 0 24 0 0

Standby/Tankers
TRUCKS/BOATS
JUZOR

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2195 1616 2006 5289 750 3635

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-2047 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 10/28/2023 - 02/18/2026
Report ID: OPERLMTDMRREP

ADM-505 @ MRJN-2047 Limited Morning Report for 06/18/2024


Objective : (DUAL LATERALS; Foreman(s)BENDIRY, MAHMOUD RAGAB
D&WO Morning Report (Service Providers View) Rig Charge #: WATER INJECTOR - RTWI) Engineer OLATUNBOSUN, AYOOLA OLANREWAJU
Copyright 2024 Saudi Aramco. All Rights Reserved ADM-505 (66-23073-2047) Manager DAHMOUSH, ABDULLATEEF AHMAD
Daily OffShore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14197 6739595 /CLERK VSA
Date: Tuesday 06/18/2024 MRJN-2047 (0) MRJN_2047_0 T
6739593

Last 24 hr operations Next 24 hr plan


PERFORM 1ST STAGE CMT JOB, WOC, HANG DIVERTER & INSTALL CSG SLIPS. PERFORM 2ND N/D DIVERTER. SUSPEND OPERATIONS ON WELL MRJN-2047, SKID OVER WELL MRJN-2049 &
STAGE CMT JOB, CUT 13 3/8" CSG. COMMENCE 16" HOLE SECTION DRILLING OPERATIONS.
Location Next Location
MRJN-2040/2049 MRJN-2049
Current Depth (ft) Liner TOL MD TVD Formation Tops
5,644 Last Csg Size MD TVD Size Top
13 3/8 5642 5606 Formations Comments
Depth
UMER 2,770 2760 TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ARUM 4,472 4453 TVD
5644 (Date) 100 0 231 LAMS 5,320 5289' TVD
16.8 (06/09/2024@0730 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

PERFORMED 13-3/8"" 1ST STAGE CMT JOB AS FOLLOWS:

- HALL DV ENG. DROPPED BTM BYPASS PLUG


- RIG PUMPED 150 BBL SEA WATER SPACER.
- HALL CMT MIXED ON FLY & PUMPED 340 BBLS OF 105 PCF LEAD SLURRY.
- HALL CMT MIXED ON FLY & PUMPED 75 BBLS OF 112 PCF TAIL SLURRY.
- HAL DV ENG. DROPPED TOP SHUT OFF PLUG, HALL CMT FOLLOWED PLUG WITH
0500 - 0900 4 0 16 N CSG CMC CSG HCM 5644 5644
10 BBLS OF TAIL SLURRY AND 20 BBLS OF 80 PCF SPACER.
- RIG DISPLACED CMT WITH 398 BBLS OF 70 PCF WBM + 60 BBLS OF 80 PCF
SPACER + 339 BBLS OF 70 PCF WBM.
- NO BUMP PLUG , FINAL D.P 650 PSI/ 2BPM & BLEED OFF, CHECKED FLOATS, OK.

- HAD NO RETURNS THROUGHOUT CEMENT JOB. CMT IN PLACE @ 08:00.


- DROPPED HAL DV OPENING DART, WAITED FOR 25 MINS TO GRAVITATE,
INFLATED PACKER WITH 770 PSI, OPENED DV PORTS WITH 2210 PSI.

0900 - 1800 9 0 16 N CSG WOC CSG HCM 5644 5644 WOC, MEANWHILE CIRCULATE THROUGH DV PORTS EVERY 30 MINS.
- HAD COMPLETE RETURN, HAD NO CMT AT SURFACE.
1800 - 1900 1 0 16 N BOP ND DVRT RIG 5644 5644
HPJSM, N/D 21-1/4" DIVERTER AND HANG-OFF SAME.

1900 - 2000 1 0 16 N CSG SET SLIPS RIG 5644 5644 INSTALLED BAKER 13-3/8" X 20-3/4" CASING SLIPS AND ENERGIZED SAME.
FLUSHED RETURN LINES THROUGH CSG VALVES. NO LEAKS THROUGH CSG SLIPS.

2000 - 2030 0.5 0 16 N CSG CIRC MPMP RIG 5644 5644 CIRCULATED THROUGH DV PORTS MEANWHILE HPJSM FOR 2ND STAGE CMT JOB
WITH ALL INVOLVED PERSONNEL.

PERFORMED 2ND STAGE CMT JOB AS FOLLOWS:


- RIG PUMPED 100 BBLS 80 PCF SPACER.
- HAL CMT MIXED ON FLY & PUMPED 330 BBLS 105 PCF SLURRY .
- DROPPED HAL DV TOOL CLOSING PLUG AS PER HAL ENGINEER.
2030 - 0030 4 0 16 N CSG CMC CSG HCM 5644 5644 - HAL CMT UNIT PUMPED 10 BBLS 105 PCF SLURRY FOLLOWED BY 20 BBLS 80 PCF
SPACER.
- RIG DISPLACED CEMENT WITH 339 BBLS 70 PCF WBM.
- BUMPED DV CLOSING PLUG, CLOSED PORTS WITH 2200 PSI AND HELD PRESSURE
FOR 10 MINS & BLEED OFF, OK.
- HAD 50 BBLS OF CMT RETURN AT SURFACE.

0030 - 0130 1 0 16 N CSG CIRC MPMP RIG 5644 5644 FLUSHED ALL SURFACE LINES. R/D HALL 13-3/8" CMT HEAD & ALL SURFACE
LINES.

0130 - 0459 3.5 0 16 N CSG HT PEL GOC 5644 5644 ROUGH CUT 13-3/8" CSG, L/D CUT OFF JOINTS, R/D CASING HANDLING
EQUIPMENT.
Foreman Remarks

WELL OBJECTIVE:
*MRJN-2047
*DUAL LATERAL
*WATER INJECTOR
*TARGET RESERVOIR: UPPER RATAWI

MRJN-2047 WILL BE DRILLED TO MAINTAIN POTENTIAL AS A DUAL LATERAL WATER INJECTION WELL IN MRJN-2040/2049 PLATFORM. THE WELL IS LOCATED IN THE EAST FLANK OF MARJAN
MAIN DOME AND WILL BE TARGETING RTWI RESERVOIR WITH 5,000 FT RESERVOIR CONTACT. THE WELL IS EXPECTED TO ADD 10 MBWD TO MARJAN COMPLEX WATER INJECTION CAPACITY.
==============================================================================
PLATFORM WELLS:
MRJN-2040 TIED BACK AND SUSPENDED FOR COMPLETION
MRJN-2042: P & A.
MRJN-2048: P & A.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-2047 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 10/28/2023 - 02/18/2026
Report ID: OPERLMTDMRREP

MRJN-2041: SUSPENDED AT 13-3/8" CSG.


MRJN-2043: SUSPENDED AT 13-3/8" CSG.
MRJN-2047: CURRENT WELL.
MRJN-2049: SUSPENDED AT 18-5/8" CSG.
MRJN-2046: SUSPENDED AT 18-5/8" CSG.
MRJN-2044: SUSPENDED AT 18-5/8" CSG.
==============================================================================
CASING POINTS:
32" CONDUCTOR SET 55' BELOW SEA BED - +/- 337' FROM RKB
18-5/8" PLANNED CASING POINT 2667' MD/ 2658' TVD (50' TVD INTO RUS) , ACTUAL DEPTH 2665' MD / 2651' TVD.
13-3/8" PLANNED CASING POINT 5,702' MD/5,603' TVD (50' TVD ABOVE LAWHAH.) ,ACTUAL DEPTH 5644' MD / 5605' TVD.
9-5/8" PLANNED CASING POINT 9,301' MD/8,166' TVD (100' MD INTO SFNY AQUIFER)' ,ACTUAL DEPTH XXXX' MD / XXXX' TVD.
7" LINER TD PLANNED POINT 12,391' MD/ 8,324' TVD (100' MD INTO SFNY AQUIFER) ,ACTUAL DEPTH XXX' MD / XXXX' TVD.
LATERAL 0 PLANED TD 17,362' MD /8,416' TVD (+/- 5000' MD INTO UPPER RATAWI AQUIFER), ACTUAL DEPTH XXXX' MD / XXXX' TVD.
LATERAL 1 PLANED TD 16,346' MD / 8,334' TVD (+/- 6000' MD INTO UPPER RATAWI AQUIFER), ACTUAL DEPTH XXXX' MD / XXXX' TVD.

========================H.S.E.====================================================================
*HELD H2S, AND ABANDON DRILL ON 18-JUN-2024 , FIRE DRILL ON 25-MAY-2024.
*OTHER DRILLS: 1 X SWA, 1 X LOF.
*DISCUSSED HSE ALERT 69-24, 70-24, 71-24 & 72-24, EXT ALERT 06-24 & OPERATIONAL ALERT 06-24.
*WEEKLY SAFETY MEETING: 6/16/2024.
*SAFETY STAND DOWN EVERY PRE-TOUR MEETING & DISCUSSED: SWA, LOF, PTW, RED ZONE MANAGEMENT, H2S HAZARDS, TRIP HAZARDS, CRITICAL LIFTING PROCEDURES. TDS ANTI COLLISION
SYSTEM, DROP OBJECTS, LIFE SAVING RULES, MANAGEMENT SUPERVISION IN THE WORK PLACE, HANDS FREE OPERATIONS & RECENT SATIRWAY INCIDENTS FOCUSING ON TRAILING HAND
TECHNIQUE.
===========================PERSONNEL=============================================================
- NAIF AL-AMMARI MAT EXPD ID # 8552735 IS ON BOARD SINCE 04-JUNE-2024.
- ALMUHAYSH MOHAMMED ARAMCO PDP ID # 819826 IS ON BOARD SINCE 06-JUNE-2024.
- ARAMCO BROAD BAND TEAM (3 PERSONS) ID # 8039447, ID # 8040319 & ID # 8610304 ARE ON BOARD SINCE 11-JUNE-2024 & LEFT ON 14-JUNE.
===========================RENTAL TOOLS=============================================================
- 2 EA 9 1/2" NAPESCO JAR ONBOARD
- 2 EA 9 1/2" SAMAA PBL ONBOARD
========================RIG DATA========================
LOCATION: MRJN-2040/2049 PF
LATITUDE: 28 DEG 21.5" N, LONGITUDE: 049 DEG 42.7 E
HEADING = 331 DEG
WATER DEPTH = 155.2 FT
RKB TO MSL = 127.61 FT
RKB TO PLATFORM = 85.5 FT
AIR GAP = 48 FT
FINAL LEG PENETRATION: STBD 13.05 FT./ BOW 13.70 FT./ PORT 12.73 FT.
NEAREST GOSP: 8.45 MILES

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 0 6.8 API 2 0 Volts 0.32 9.7 47,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 82 44 0 14 / 17 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 12 16 13 / 16 2.5 480 0
128

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 0 6.6 API 2 0 Volts 0.28 9.8 48,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 0 HTHP 82 46 0 14 / 18 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 14 16 13 / 17 2.5 480 0
126

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 0 6.8 API 2 0 Volts 0.32 9.6 47,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 82 45 0 14 / 18 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 14 16 13 / 17 2.5 480 0
124

MUD CAUST BACT


TREATMENT 4 ( 50LBP ) 4 ( 5GL )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A 4-6 KNTS SW 1-2 FT SEASONAL 274 AS REQUIRED &
EVERY TOUR

PERSONNEL Company GOC GOS HDV BHI RIG BDF NPC ARM HCM MI2 ARM SAM GEP CAM
Total
AND SERVICES
CSR CTRG DV DPDS RIG DFMS JST OTHR PCS SCS WSC WBCS WHES WHES 81
INFORMATION Category

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-2047 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 10/28/2023 - 02/18/2026
Report ID: OPERLMTDMRREP

No. of Persons 3 13 1 2 50 2 0 2 3 1 1 1 1 1

Personnel on Loc. Hrs. 24 24 24 24 24 24 0 24 24 24 24 24 24 24

Operating Hours. 24 0 24 0 24 24 0 12 24 0 24 0 0 0

Standby/Tankers Others Others


TRUCKS/BOATS
TOPAZ KARAMA anderson TIDE LESSE TIDE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1006 2082 1937 1265 0 2746

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-682 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 06/07/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

ADM-506 @ ZULF-682 Limited Morning Report for 06/18/2024


Objective : (ZULF-682 WILL Foreman(s)BADR, AMR HESHAM
D&WO Morning Report (Service Providers View) Charge #: BE WORKED OVER FOR Engineer ALENIZI, FAYEZ RADI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved ADM-506 (72-24062-0682) INITIAL ESP INSTALLATION.) Manager GHAMDI, MAGID ABDULLA
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +88 2167 7 71 4163 673-1506 673-1575
Date: Tuesday 06/18/2024 ZULF-682 (0) ZULF_682_0 CONTRACTOR /CLERK VSA T
673-1571

Last 24 hr operations Next 24 hr plan


PUNCH TBG, BULLHEAD TCA & TBG, SET TWO RBP, N/D X-MASS TREE & BONNET. N/U BOP STACK, P/T SAME, PUNCH TBG BELOW PKR, BULLHEAD TCA, SET 2 PUMP THROUGH
PLUGS, BULLHEAD TBG, STING OUT, BULLHEAD TCA, TBG & POOH WITH COMPLETION STRING.
Location Next Location
ZULF 680/689 PF ZULF-681
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,004 Last Csg Size MD TVD Size 6,747 9,658 5,961 Top
9 5/8 7045 5940 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
10004 (Date) 100 0 246
1.6 (06/16/2024@1330 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

S/L OPERATION:
0500 - 0830 3.5 0 POST N DCOM SET PLUGT EX1 10004 10004
- RIH WITH NESR RAZOR BLADE, PUNCH TBG @ 5515 FT O.R.K.B. [80 FT ABOVE
PKR] - OK, [CONFIRMED PUNCH BY TCA PRESSURE DROP].

KILL WELL BY BULLHEADING, FLOW CHECK - OK.


- BULLHEAD TCA WITH 400 BBL'S 66 PCF VISCOUS BRINE [FLOW RATE: 100-200
0830 - 1330 5 0 POST N DCOM CIRC MPMP RIG 10004 10004
GPM, PUMP PRESSURE: 1800 PSI].
- BULLHEAD TBG BY 50 BBL'S 66 PCF HI-VIS BRINE FOLLOWED BY 400 BBL'S 66
PCF VIS BRINE [FLOW RATE: 300 GPM, PUMP PRESSURE: 300 PSI].

S/L OPERATION:
- RIH WITH SLB RBP, SET SAME @ 5655 FT O.R.K.B. & POOH TO SURFACE.
1330 - 2230 9 0 POST N DCOM SET PLUGT EX1 10004 10004 - RIH WITH SLB RBP PRONG, SET SAME & POOH TO SURFACE.
- RIH WITH SLB RBP, SET SAME @ 5535 FT O.R.K.B. & POOH TO SURFACE.
- RIH WITH SLB RBP PRONG, SET SAME & POOH TO SURFACE.
- R/D S/L, PCE & S/L SHEAVES.
2230 - 0030 2 0 POST N WH SET BPV RIG 10004 10004
SET B.P.V. IN TBG HGR & P/T SAME FROM PUNCH DEPTH TO 1000 PSI - HOLD.
0030 - 0300 2.5 0 POST N WH ND TREE RIG 10004 10004
N/D X-MASS TREE.
0300 - 0459 2 0 POST N WH ND WH RIG 10004 10004
N/D BONNET.
Workover Objectives
Foreman Remarks

ZULF-682 WAS DRILLED AND COMPLETED AS A SINGLE HORIZONTAL PRODUCER WELL ACROSS KHFJ RESERVOIR
========================================SAFETY & DRILLS=====================================================
- RE-ENFORCE STOP WORK AUTHORITY & HANDS-FREE OPERATIONS IN PRE-TOUR MEETINGS.
- DISCUSS ARAMCO & ADES HSE ALERTS IN PRE TOUR-MEETINGS & WEEKLY SAFETY MEETING.
- DISCUSS HAZARD INDENTIFICATION & AWARENESS.
- DISCUSS LATEST ALERTS WITH ALL CREW.
- RESCUE FROM DRILL FLOOR DRILL 29-APRIL-2024
- HELD FIRE & ABANDON DRILL ON 10-JUN-2024.
- HELD H2S RELEASE & ABANDON DRILL ON 02-JUNE-2024.
- HELD CONFINED SPACE RESCUE DRILL ON 5-APRIL-2024.
- HELD MAN OVERBOARD DRILL ON 9-MAY-2024.
- HELD WEEKLY SAFETY MEETING ON 01-JUNE-2024.
=======================================ARAMCO PERSONNEL===================================================
- ARAMCO MATERIALS EXPEDITER, MUHAMMAD SULEMAN ID#8619350 ARRIVED RIG ON 23-APRIL-2024.
- ARAMCO PDP MAJED ALARFAJ ID#832250 ARRIVED RIG ON 04-JUNE-2024.
========================================RENTAL TOOLS =======================================================
========================================WAITING TIME=======================================================
- WAIT ON WEATHER: TODAY 0 HRS / CUMULATIVE 0 HRS.
- WAIT ON PRODUCING: TODAY 0 HRS / CUMULATIVE 0 HRS.
- WAIT ON MARINE: TODAY 0 HRS / CUMULATIVE 0 HRS.
=========================================================================================================
- RIG HEADING = 330 DEG.
- FINAL POSITION: 28" 20.13' N / 49" 12.14' E.
- FINAL LEG PENETRATION: BOW: 9.19 FT, STBD: 7.87 FT & PORT: 9.84 FT.
- RIG FLOOR (RF) TO SEA BED = 290.85 FT.
- WATER DEPTH (MEAN SEA LEVEL) = 159.12 FT.
- ELEVATION RF TO SEA (MSL) = 131.73 FT.
===========================================NEXT RIG MOVE ===================================================
- FIELD SERVICES ATTEND ZULF-1200/1209 PLATFORM, ACCEPT HANDOVER TO PRODUCTION
- FIELD SERVICES AND ARAMCO FOREMAN ATTEND ZULF 680/689 PLATFORM - ADM-506 ACCEPT HANDOVER READY FOR RIG MOVE AND WORK OVER
- NEXT LOCATION: ZULF-680/689.
- SUBMITTED RIG MOVE REQUEST RM-2024-4010733 ON 5/23/2024

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-682 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 06/07/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

- SUBMITTED SEABED SURVEY REQUEST NO. 8000647255 7TH APR 2024. REPORT RECEIVED 5/12/2024
- BOREHOLE DATA SENT TO ADES ON 5/24/2024.
- LA AND LPA RECEIVED FROM ADES ON 5/29/2024.
- PLATFORM DEPRESSURIZED (CONFIRMATION EMAIL RECEIVED FROM FIELD SERVICE).
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
66 PCF 0 0 API 0 0 Volts 0 10 169,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 22 0 4/5 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 17 0 3/5 0 0 0
58
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
66 PCF 0 0 API 0 0 Volts 0 9.5 167,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 23 0 4/5 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 17 0 4/5 0 0 0
59

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A NW 6-10 KTS 1 FT SEASONAL 344 TOURLY

Company SCP SBA HCB SCB WCR HTD GOS HCO RIG EMC WI1 ARM SCM EX1 NSL ARM EX2 SAM CAM DEL BAW

Category PSSC ALS BRCR BRCR CSR CSV CTRG PSSC RIG DFMS WMFE OTHR PCS SLS SLS WSC WTSE WBCS WHES WHES WLS
PERSONNEL
1 6 1 1 2 1 13 1 53 1 1 2 1 2 1 1 2 1 1 1 3
Total
AND SERVICES No. of Persons
96
INFORMATION
Personnel on Loc. Hrs. 18 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 7 0 0 12 0 0 0 0 24 12 0 12 24 15 3.5 24 0 0 7 7 0

Standby/Tankers
TRUCKS/BOATS
PACIFIC PYTHON

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1610 1182 1428 2706 N/A 2599

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-2006 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 03/09/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

ADM-507 @ ZULF-2006 Limited Morning Report for 06/18/2024


Objective : (HORIZONTAL Foreman(s)RANDALL, RONDALL LAMAR
PWI ACROSS SFNY Engineer SUBRAMANIAM, ASHOK KUMAR
D&WO Morning Report (Service Providers View) Rig Charge #: RESERVOIR) Manager DAHMOUSH, ABDULLATEEF AHMAD
Copyright 2024 Saudi Aramco. All Rights Reserved ADM-507 (66-23062-2006)
THURAYA RIG FORMAN VSAT OTHER VSAT
Daily OffShore
+882167771 4148 3788591 3788588 (H SE TECH)
(0500-0500) Saudi Aramco Well Wellbores:
ZULF-2006 (0) ZULF_2006_0 OTHER VSAT CONTRACTOR /CLERK VSA T CONTRACTOR
Date: Tuesday 06/18/2024 /CLERK VSA T
3788590 (R R) 3788589 (C LERK)
8167250 (O IM)

Last 24 hr operations Next 24 hr plan


PERFORM FLOWBACK OPEARTION WITH C/T USING NITROGEN LIFTING & WAIT ON DAY LIGHT. FLOWBACK OPERTION.
Location Next Location
ZULF-2000/2009 ZULF-2000
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
18,392 Size 10706 5568 Size 10,226 15,278 5,812 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
18392 (Date) 100 0 247
73.7 (06/15/2024@0530 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD PRE JOB SAFETY MEETING WITH ALL PERSONNEL FOR FLOWBACK
0500 - 0530 0.5 0 EOW E TEST PJSM NA RIG 18392 18392 OPERATIONS ON ZULF-2002 , DISCUSSED RISKS AND HAZARDS.
- STANDBY BOAT RAWABI-30 SURVEY 360 DEGREE AROUND RIG BEFORE FLARING
OPERATIONS AND CONFIRMED ALL CLEAR.

HELD SAFETY STAND DOWN MEETING WITH ALL CREW DISCUSSED PRE-ALERT
0530 - 0600 0.5 0 EOW E TEST PJSM NA RIG 18392 18392 INCIDENT FROM ADM 695 AND ADM 339 DISCUSSED PTW AND TBRA PROCEDURE ,
RED ZONES AND LINE OF FIRE RECOGNITION, SWA AND ALL THE HAZARD
RELEATED TO THESE INCIDENTS AND HOW TO AVOID THEM.

0600 - 0615 0.25 0 EOW E TEST OTH NA MWT 18392 18392 LINE UP WELL FOR FLOWBACK OPERATION THROUGH AL MANSOORI WELL TEST
PACKAGE, LIGHT STARBOARD SIDE FLARE BOOM.

RIH WITH 2" COIL TUBING MEANWHILE LIFTING WELL WITH NITROGEN TO 7100
FT.
- FLOWBACK ZULF-2006 WITH NITROGEN LIFTING:
- CHOKE SIZE: 26/64.
0615 - 1830 12.25 0 EOW E TEST LIFT CTU NCT 18392 18392
- DAILY/TOTAL FLUID RECOVERED: 266/423 BBL'S.
- PH VALUE: 6, WEIGHT: 70 PCF , CL: 110,000 PPM, SAL: 160,000 MG/L, CA:
8,000 MG/L, TOTAL HARDNESS: 88,00 MG/L.
- DAILY FLOWING HRS: 12.25 HR.
- CUMMULATIVE FLOWING HRS: 24.75 HR.

1830 - 2130 3 0 EOW E TEST LIFT CTU NCT 18392 18392 STOP NITROGEN PUMPING, SHUT-IN WELL AT CHOKE MANIFOLD & POOH WITH CT
TO SURFACE.

2130 - 0459 7.5 0 EOW E TEST WO NA SSR 18392 18392 MONITOR WELL ON AL MANSOORI CLOSED CHOKE, WAITING ON DAYLIGHT TO
CONTINUE NITROGEN LIFTING AND FLOW WELL TO STORAGE TANK.
Foreman Remarks

ZULF-2006 WILL BE DRILLED AS OIL-WATER INJECTOR IN ZULF.


THE WELL IS LOCATED 0.002 KM S30E OF ZULF-2004 AND 0.002 KM N8E OF ZULF-2000. ZULF-2006 IS A HORIZONTAL WELL THAT WILL BE
UTILIZED AS WATER INJECTOR IN PF-2000/2009 IN THE WESTERN FLANK OF ZULUF FIELD, AS PART OF ZULUF ARAB MEDIUM MAINTAIN
POTENTIAL PLAN TARGETING SAFANIYA RESERVOIR FOR PERIPHERAL POWER WATER INJECTION.
==============================================================================
* WELL NAME: ZULF 2006
* WATER INJECTION.
* COMPLETION TYPE: STANDALONE SAND SCREENS (350 MICRONS) AND PACKERS
==============================================================================
CASING POINTS:
32" CONDUCTOR SET 48 FT BELOW SEA BED +/- 248 FT FROM RKB SET @ 248 FT
18 5/8" PLANNED CASING POINT 1579 FT (50 FT INSIDE RUS)/ ACTUAL @ 1579 FT.
13 3/8" PLANNED CASING POINT 5276 FT (50 FT ABOVE LHHR)/ ACTUAL @ 5290 FT.
9 5/8" PLANNED CASING POINT 10300 FT / ACTUAL @ 10706 FT.
8 1/2" PLANNED CASING POINT 15414 FT / ACTUAL @ 15281 FT.
6 1/8" PLANNED TD @ 18512 FT/ ACTUAL @ 18392 FT.
==============================================================================
PLATFORM WELLS:
ZULF-2000 - COMPLETED AND SUSPENDED FOR FLOWBACK.
ZULF-2001 - COMPLETED AND SUSPENDED FOR FLOWBACK.
ZULF-2002 - CURRENT WELL FOR FLOWBACK.
ZULF-2005 - COMPLETE FLOWBACK.
ZULF-2006 - COMPLETED AND SUSPENDED FOR FLOWBACK.
ZULF 2007.. COMPLETED WITH TEMP ESP AND FLOWBACK.
=========================NEXT WELLS========================================
ALL WELLS BATCH FLOWBACK ON ZULF-2002, ZULF-2006, ZULF-2001, ZULF-2000.
ALL WELLS BATCH INJECTIVITY TEST ACROSS SFNY RES ON ZULF-2005, ZULF-2002, ZULF-2006.
ZULF 2007.. COMPLETE AS PWI COMPLETION & FLOWBACK.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-2006 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 03/09/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

NEXT : ZULF-1480 MLS.


========================H.S.E.====================================================================
13-JUNE-24 H2S RELEASE DRILL WITH MAN DOWN, ABANDON DRILL.
30-MAY-24 FIRE DRILL.
30-MAY-24 SEARCH AND RESCUE DRILL.
15-MAY-24 RIG FLOOR RESCUE DRILL.
20-MAY-24 ACCUMULATOR DRILL.
08-APRIL-24 CONFINED SPACE RESCUE DRILL.
07-FEB-24 RESCUE BOAT / LIFEBOAT & MAN OVERBOARD.
22-FEB-24 OIL SPILL DRILL.
30-MAY-24 CONDUCT ANNUAL SECONDARY EMERGENCY DRILL.
* SWA DRILL 1; LOF DRILL 1.
===============================================================================================
* CONDUCTED DRILLS: 0 X PIT DRILL, 0 X TRIP DRILL.
===========================PERSONNEL=============================================================
* ARAMCO MATERIAL EXPEDITOR HUSSEIN BOUKHEDER #813619 ARRIVED RIG ON 11/06/2024.
* ARAMCO MATERIAL EXPEDITOR NASSIR AL YAMI #8280776 ON RIG FROM 11/06/2024.
========================RIG DATA========================
AIR GAP - 42.35 FT
RKB TO MSL: 105.91 FT
WATER DEPTH AT LAT: 86.00FT
AFT HULL TO FRONT CONDUCTOR ROW: 37.5
===========================WAIT ON==============================================================
* WAIT ON WEATHER: TODAY 0 HRS, TOTAL 0 HRS
* WAIT ON PRODUCING: TODAY 0 HRS, TOTAL 0 HRS
* WAIT ON MARINE: TODAY 0 HRS, TOTAL 0 HRS
* WAIT ON TOOL HOUSE: TODAY 0 HRS, TOTAL 0 HRS
==========================NEXT LOCATION==========================================================
NEXT LOCATION:
ZULF-1480 MLS
GEOPHYSICAL AND GEOTECHNICAL REPORT PASSED TO ADES AND AWAITING FEEDBACK.
SITE SPECIFIC SURVEY CONDUCTED ON 2ND FEB 2024.

ZULF-1904 MLS.
SITE SPECIFIC SURVEY SUBMITTED UNDER CRM#8800020523 ON 10-08-2023.
SOIL BORE ANALYSIS PASSED TO ADES ON 3/7/2024 AND CURRENTLY UNDER REVIEW BY ADES.
==============================================================================================
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 18,392 89 5.8 0 5,873 4301.43 -1042.19 14,520.62 1.19
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/15/2024 NA 8-14 KNT W 1-4 FT 1002 HPA 398 TOURLY

Company SWA GOS NCT NOV RIG BDF ARM HCM ARM MWT

Category ALS CTRG COIL DRF RIG DFMS OTHR PCS WSC WTSE
PERSONNEL
4 13 8 1 49 1 3 2 1 9
Total
AND SERVICES No. of Persons
91
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 24 24 24 12 24 24 24

Standby/Tankers Others
TRUCKS/BOATS
PACIFIC PYTHON RAWABI 30

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1239 1087 1593 3579 0 2788

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1240 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 04/21/2023 - 06/22/2024
Report ID: OPERLMTDMRREP

ADM-510 @ ZULF-1240 Limited Morning Report for 06/18/2024


Objective : (OIL Foreman(s)ELKALASHY, SOLIMAN AHMED
D&WO Morning Report (Service Providers View) Charge #: OBSERVATION WELL) Engineer BALSEIRO GUERREIRO, PRUDENCIO
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (72-22062-1240) Manager JURASHI, MOHAMMED NASSIR
ADM-510
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 8821677712 654 673-5694 673-2139 R ADIO ROOM
Date: Tuesday 06/18/2024 ZULF-1240 (0) ZULF_1240_0 CONTRACTOR /CLERK VSA T
673-2772

Last 24 hr operations Next 24 hr plan


RUN SLB SMART COMPLETION. RUN SLB SMART COMPLETION.
Location Next Location
ZULF 1240-1249 PLATFORM RBYN-126
Current Depth (ft) Liner TOL MD TVD Formation Tops
8,863 Last Csg Size MD TVD Size 7,516 8,860 8,860 Top
9 5/8 7820 7820 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
8863 (Date) 100 0 249
18.4 (06/03/2024@1415 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 1100 6 0 EOW C COMP HT PDHMS SCP 8863 8863 M/U TIW, PERFORM TERMINATION FOR PDHMS#3 AS PER SLB.
- MONITORING WELL ON TRIP TANK, WELL STATIC.
1100 - 1145 0.75 0 EOW C COMP HT PDHMS SCP 8863 8863
RIH W/ SLB SMART COMPL. AS PER TALLY.
1145 - 1245 1 0 EOW C COMP DTU DRFT EX1 8863 8863
R/U EXPRO S/L TOOLS, TAG SSD#3 W/ DRIFT SIZE 2.867", POH & R/D S/L.

1245 - 1945 7 0 EOW C COMP HT PDHMS SCP 8863 8863 M/U TIW, PERFORM TERMINATION FOR PDHMS#4 AS PER SLB.
- MONITORING WELL ON TRIP TANK, WELL STATIC.
1945 - 2045 1 0 EOW C COMP HT PDHMS SCP 8863 8863
RIH W/ SLB SMART COMPL. AS PER TALLY.
2045 - 2130 0.75 0 EOW C COMP DTU DRFT EX1 8863 8863
R/U EXPRO S/L TOOLS, W/ DRIFT SIZE 2.867", POH & R/D S/L.

2130 - 0459 7.5 0 EOW C COMP HT PDHMS SCP 8863 8863 M/U TIW, PERFORM TERMINATION FOR PDHMS#5 AS PER SLB.
- MONITORING WELL ON TRIP TANK, WELL STATIC.
Workover Objectives
Foreman Remarks

ZULF 1240 WILL BE TIE BACK FROM 13-3/8" & 9-5/8" CSG, PERFORATE AND INSTALL MULTI-RESERVOIRS MONITORING SYSTEM. THE WELL WILL BE UTILIZED AS OBSERVATION WELL TO
MONITOR FOUR RESERVOIRS WARE, SAFANIYA AND ZUBAIR RESERVOIRS
====================================================
DRILLS: 2 X TRIP, 1 X PIT, 2 X SWA, 2 X LOF,
REINFORCE STOP WORK AUTHORITY, HANDS-FREE OPERATIONS & LINE OF FIRE AWARENESS IN ALL PRE-TOUR MEETINGS.
WEEKLY EMERGENCY DRILLS ON JUNE 16TH, 2024.
HELD WEEKLY SAFETY MEETING ON JUNE 11TH, 2024.
====================================================
LC-50 SAMPLE - SENT ON MAY 06, 2023. MANIFEST # 2400617892- WBM
LC-50 SAMPLE - SENT ON AUG 07, 2023. MANIFEST # 2400633392- OBM
====================================================
RIG POSITION: 28 DEG 22' 2.1"N LATITUDE, 49DEG 07' 15.0" E LONGITUDE, RIG HEADING 329 DEG.
ELEVATION RF TO SEA (MSL) = 107.8 FT ; WATER DEPTH (MEAN SEA LEVEL) = 99 FT ; RIG FLOOR (RF) TO SEA BED = 206.8 FT
====================================================
CASING POINTS PLANNED:
13-3/8" CASING AT 4,532 FT SET @ 4,532 FT
9-5/8" CASING AT 7,820 FT SET @ 7,820 FT
7" HOLE TD AT 8,860 FT ; SET @ 8,860 FT
====================================================
CURRENT WELL:
ZULF-1240 TIE BACK
NEXT:
RBYN-126 DRILL 16" HOLE
====================================================
RENTAL TOOLS:
====================================================
BATCH DRILLING SEQUENCE:
22" HOLE: ZULF-1241, ZULF-1247, ZULF-1242 , ZULF-1245, ZULF-1248 , ZULF-1243, ZULF-1249 (DONE).
16" HOLE: ZULF-1248 , ZULF-1249, ZULF-1247, ZULF-1245, ZULF-1243, ZULF-1241, ZULF-1242 (DONE).
12-1/4" HOLE: ZULF-1241, ZULF-1243 (DONE), ZULF-1245, ZULF-1247, ZULF-1249, ZULF-1248, ZULF-1242 (DONE).
S/L 8-1/2" & EOW: ZULF-1241, ZULF-1243 ,ZULF-1247, ZULF-1245 (DONE).
D/L 8-1/2", 6-1/8", EOW: ZULF-1249, ZULF-1242, ZULF-1248 (DONE).
OIL OBSERVATION WELL COMPLETION ZULF-1240 (CURRENT)
EXPECTED DATE TO FINISH THIS PF: JUNE 18TH.
====================================================
PERSONNEL ON LOCATION:
ARAMCO MATERIAL EXPIDATOR NASEEM ALAM NAYEEM ID#8618650 ON RIG SINCE 04/28/2024.
ARAMCO MATERIAL EXPIDATOR AHMED AL OBIDE ID#821406 ON RIG SINCE 06/11/2024.
====================================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1240 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 04/21/2023 - 06/22/2024
Report ID: OPERLMTDMRREP

CONTRACTOR MANAGEMENT VISITS:


RIG MANAGER EHAB AHMED ID# 8282004 LEFT RIG ON 05/24/2024.
ASSISTANT RIG MANAGER LAKHAN KAPOOR ID# 8612383 LEFT RIG ON 10/21/2023.
ADES HSE SUPERVISOR KARIM MOHAMED ID#8218376 LEFT RIG ON 05/21/2024.
====================================================
RIG MOVE TO NEXT LOCATION: RBYAN-120/129 ON JUNE 18TH
PLATFORM DEBRIS SURVEY: CRM-SR 8800022077 SUBMITTED ON APR 30TH 2024
RIG MOVE REQUEST: RM-2024-4010173 FROM ZULF TO SEA; RM-2024-4010627 FROM SEA TO RBYN
RIG MOVE MEETINGS: RM MEETING HELD ON MAY 16TH 2024
BORE HOLE DATA: PROVIDED TO RIG OIM ON MAY 8TH 2024
RIG MOVE BOATS DRSS: 1004333283

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 8,863 3.66 152.57 0 8,863 -6.67 6.89 31.47 0

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 0 0 API 0 0 Volts 0 9.4 285,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 87 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 13 0/0 0 0 0
28

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 0 0 API 0 0 Volts 0 9.5 285,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 0 HTHP 87 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 13 0/0 0 0 0
28

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 0 0 API 0 0 Volts 0 9.3 284,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 87 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 13 0/0 0 0 0
28

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/04/2024 TOURLY 2-8 NE 1-3 FT SEASONAL 914 TOURLY

Company GOC GOS SCP RIG EMC BR1 ARM SCM EX1 HSL BC ARM SAM FME SWL

Category CSR CTRG ICE RIG DFMS MLS OTHR PCS SLS SLS SSSV WSC WBCS WHES WLS
PERSONNEL
4 14 6 47 1 0 2 1 3 1 1 1 1 1 3
Total
AND SERVICES No. of Persons
86
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 0 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 24 24 24 0 0 24 24 0 24 0 0 0

Standby/Tankers Others
TRUCKS/BOATS
PACIFIC PYTHON RAWABI 56

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
3211 1680 2284 4942 592 3039

Instrumentation Other
REPAIR ASAP NONE NONE Reporter
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JANA-11 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 01/09/2024 - 07/02/2024
Report ID: OPERLMTDMRREP

ADM-511 @ JANA-11 Limited Morning Report for 06/18/2024


Objective : (OFFSHORE OIL Foreman(s)MANRIQUE, BERTIE / SAMSUDIN, SYAHRIZAL BIN
D&WO Morning Report (Service Providers View) Charge #: EXPLORATION AND Engineer REY MARQUEZ, HENRY DAVID / ALKUHAILI, AHMED ABDULAZIZ
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved DELINEATION WELL) Manager HAWSAWI, ABDULLAH OMAR
ADM-511 (75-23529-0011)
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12826 378-8384 378-8386 ( RADIO ROOM )
Date: Tuesday 06/18/2024 JANA-11 (0) JANA_11_0 CONTRACTOR /CLERK VSA T
378-8385 ( CLERK)

Last 24 hr operations Next 24 hr plan


POOH WITH WBCO BHA. CHANGED UPR TO 5-1/2" & TESTED. MADE PREPARATION TO RUN DST COMMENCE RUNNING DST STRING WITH SLB ESP.
STRING RUN #3 WITH SLB ESP.
Location Next Location
LAT: 27 DEGS 27.85' N; LONG: 50 DEGS 02.85' E ZULF-910
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,304 Last Csg Size MD TVD Size Top
9 5/8 7489 7489 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
7304 (Date) 100 0 128
142.4 (01/27/2024@1830 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0715 2.25 0 EOW E CT CIRC MPMP RIG 7802 7802
CONTINUED CIRCULATING HOLE CLEAN.
0715 - 0815 1 0 EOW E CT WCNT NA RIG 7802 7802
PERFORMED FLOW CHECK - 2BPH LOSSES.
0815 - 1400 5.75 0 EOW E CT HT STRG RIG 7802 7802
POOH WBCO BHA AT CONTROLLED SPEED.
1400 - 1415 0.25 0 EOW E CT WCNT NA RIG 7802 7802
PERFORMED FLOW CHECK AT BHA - WELL STATIC.

1415 - 1630 2.25 0 EOW E CT HT BHA RIG 7802 7802 CLEANED STRING MAGNETS. RECOVERED 2.8KG OF FINE SWARF, NO LARGE
DEBRIS. L/D SAMAA WBCO BHA.
1630 - 2030 4 0 EOW C BOP BOP RAMS RIG 7802 7802
CHANGED UPR TO 5-1/2".

2030 - 2230 2 0 EOW C BOP BOPT RAMS RIG 7802 7802 RAN TEST ASSEMBLY & PRESSURE TESTED 5-1/2" RAMS TO 300/5,000 PSI, 10 MINS
EACH. RETRIEVED TEST ASSEMBLY.

CLEARED CANTILEVER DECK & BACKLOADED EXCESS EQUIPMENT. R/U FRANKS.


2230 - 0459 6.5 0 EOW E TEST HT STRG RIG 7802 7802 0 900
P/U 9 JTS 3-1/2" TUBING, FLUSHED & RACKED BACK FOR THE NEXT DST STRING.
R/U SLB ESP PRIOR TO RUNNING DST STRING.
Foreman Remarks

WELL OBJECTIVE:
OFFSHORE OIL EXPLORATION AND DELINEATION WELL TO TEST THE OIL ACCUMULATION EXTENT IN THE NORTHERN PART OF JANA FIELD
PRIMARY TARGET: UPPER RATAWI UPPER SECTION AND UPPER RATAWI LOWER SECTION, HITH STRINGER AND ARAB-B RESERVOIRS
SECONDARY TARGET: LOWER RATAWI AND MANIFA RESERVOIRS
============================================================================================
FINAL POSITION: 27 DEG 27 51.30'N, 050 DEG 02 51.15'E
HEADING: 11.2 DEG
WATER DEPTH: 196 FT
RIG FLOOR TO MSL: 114 FT
RIG FLOOR TO MUD LINE: 310 FT
FINAL AIR GAP: 46 FT
INITIAL LEG PENETRATION BOW 12.79 FT, STARBOARD 12.95 FT, PORT 13.12 FT
FINAL LEG PENETRATION BOW 14.27 FT, STARBOARD 13.94 FT, PORT 13.94 FT
=============================================================================================
ADM-511 RIG LOCATION RELATED TO ARAMCO FACILITIES:
DISTANCE TO RAS TANURA CLINIC: 89 KM - ONBOARD MEDICAL RESPONDER: RIG MEDIC
DISTANCE TO KARN-TP-1: 26 KM NE
=============================================================================================
PLANNED CASING POINTS:
32'' X 30'' CONDUCTOR: 565 FT - ACTUAL 543 FT - LANDING RING AT 336 FT
24'' CASING: 1000 FT - ACTUAL 1007 FT
18 5/8'' CASING: 1427 FT - 50 FT TVD INSIDE RUS. ACTUAL 1,383 FT.
13 3/8'' CASING: 4712 FT - 50 FT TVD INSIDE AHMADI. ACTUAL 4,695 FT.
9 5/8'' CASING: 30 FT TVD ABOVE ARAB-A, ACTUAL 7,489 FT.
7'' LINER: 150 FT TVD BELOW BASE OF ARAB-B.
TOP OF 9-5/8" EZSV AT 7,370 FT, TESTED TO 4,000 PSI.
PBTD TOP OF FISH 7,304 FT.
=============================================================================================
SAFETY: HSE ALERTS: 69-24, 70-24, 71-24, WEEKLY EDD HSE CONF CALL 6/12
DRILLS: H2S AND ABANDON DRILL JUNE 15TH, MAN OVER BOARD DRILL MAY 26TH
=============================================================================================
EXTRA REQUIREMENT FOR LOGGING IN 12" HS: TOTAL 217.75 HRS
=============================================================================================
PERSONNEL:
ARAMCO RIG CLERK UMAIR IRSHAD BADGE# 8613444, ONBOARD RIG SINCE 03/01/2024
=============================================================================================
RENTAL TOOLS ONBOARD:

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JANA-11 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 01/09/2024 - 07/02/2024
Report ID: OPERLMTDMRREP

=============================================================================================
LC-50 SAMPLE: WBM SAMPLE SENT IN ON 2/21/2024 VIA ZAMIL-11. MNF#2400668677
LC-50 SAMPLE: OBM SAMPLE SENT IN ON 3/2/2024 VIA BGMS SPLENDOR, MNF# 2400671532
=============================================================================================

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
78 PCF 0 0 API 0 Volts 0 9.2 218,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
75 0 HTHP 100 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
27
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
78 PCF 0 0 API 0 Volts 0 9 218,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
75 0 HTHP 100 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
27

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
11 7,802 7,802 DP Av DC Av Bit HHP N/A N/A 117 8.375 SMT
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
N0182 XR+C POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 8.375 1 0.83 N0182
DRILL STRING 2 Bit Sub RIG 6.5 1 6.5 2.75 2.84 NC50 NC50 24.7 RIG
3 Drillcollar RIG 1 6.5 2.875 31.1 NC50 NC50 91.68 SPRL
4 String Mill SAM 1 8.375 2.813 6.08 NC50 NC50 91.68 RIG
5 String Mill SAM 1 8.375 2.813 5.63 NC50 NC50 24.7 SAMAA
6 String Magnet SAM 8.375 1 5.5 2.5 24.61 NC50 NC50 24.7 SAMAA
7 Crossover RIG 6.25 1 6.25 2.625 3 XT54 NC50 24.7 RIG
8 Drillpipe RIG 5.5 1 5.5 4.67 42 XT54 XT54 24.7 S135 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/08/2024 N/A 8-11 KNTS 0.3 FT N/A 1,697 TOURLY
SW

Company SWA FMC GOS NCT RIG EMC TSF RIG BCM SLL ARM HTS SWT SAM CAM

Category ALS CSR CTRG COIL RIG DFMS H2S MED PCS SLS WSC WTDS WTSE WBCS WHES
PERSONNEL
6 4 14 2 51 1 1 1 2 3 3 5 11 1 1
Total
AND SERVICES No. of Persons
106
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 24 24 0 0 24 0 24 0 0 12 0

Standby/Tankers Others Others Others Others


TRUCKS/BOATS
rawabi-5 pacific avenger rawabi-20 rawabi-205 aaron mccall

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1402 2358 1784 4651 1359 3282

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1003 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:20 06/10/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

ADM-655 @ SFNY-1003 Limited Morning Report for 06/18/2024


Objective : (ESP CHANGE Foreman(s)BAYAT, HESHAM SALAM
D&WO Morning Report (Service Providers View) Charge #: OUT ) Engineer MUHAIDIB, OMAR SAUD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (64-23013-1003) Manager OTAIF, HASSAN WAFI
ADM-655
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 00 88 216 777 110 74 378-7471 378-7473
Date: Tuesday 06/18/2024 SFNY-1003 (0) SFNY_1003_0 CONTRACTOR /CLERK VSA T
378-7472

Last 24 hr operations Next 24 hr plan


CONT POOH & L/D ESP COMP. CHANGE & PT UPR RAMS, P/U DP & RIH W/ MFIV SHIFTING TOOL CONT RIH W/ CO BHA, CHC, STING INTO MFIV, BH, POOH. N/D BN, N/U SN, R/U E-LINE &
WITH CO BHA. CORROSION LOGS.
Location Next Location
SFNY-1003 SFNY-1047
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,186 Last Csg Size MD TVD Size 5,486 5,674 4,958 Top
9 5/8 6086 5028 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9186 (Date) 100 0 258
4.5 (06/13/2024@1800 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0600 1 0 POST N DCOM RPCS SPCOM RIG 9186 9186 1050 379 POOH & L/D OLD ESP COMP ON 4-1/2" TBG. RESPOOL ALL OLD CL.
NOTE: MONITOR WELL ON TRIP TANK WELL STATIC.
0600 - 0630 0.5 0 POST N DCOM CIRC MPMP RIG 9186 9186
FLOW CHECK BEFORE L/D ESP COMP - WELL STATIC.

CONT POOH AND L/D OLD ESP PKR & MFIV SHIFTING TOOL SEAL ASSY - FULL
RECOVERY.
0630 - 1130 5 0 POST N DCOM HT TBG RIG 9186 9186 - MOTOR P-P 1.5 OHMS - BALANCED, P-G: GROUNDED.
- PUMP SUB ROTATION IS FREE.
- TOTAL RECOVERED BANDS 54.

1130 - 1230 1 0 POST N DCOM HT TBG RIG 9186 9186 CLEAN AND CLEAR RIG FLOOR - R/D BAKER TOOLS.

1230 - 1300 0.5 0 POST N DCOM OTH NA RIG 9186 9186


CLOSE BLIND & SHEAR RAM, PT WELL AGAINST MFIV T/ 500 PSI - GOOD TEST.

1300 - 1530 2.5 0 POST N BOP BOP RAMS RIG 9186 9186 WITH BLIND/SHEAR RAMS CLOSED, CHANGE UPPER PIPE RAMS FORM 4-1/2" TO 4".
-MONITOR WELL ALL TIME FROM TRIP TANK WELL STATIC.

M/U & RIH 4" BOP TESTING ASSY. P/T UPR AND ANNULAR TO 300/3,000 PSI FOR
1530 - 1730 2 0 POST N BOP BOPT RAMS RIG 9186 9186
10 MINS EACH - GOOD TESTS. POH & L/D SAME.

HPJSM, P/U 9-5/8'' CO ASSY AS FOLLOWS: SLB MFIV SHIFTING TOOL, BIT SUB W/
1730 - 2030 3 0 POST N CT HT BHA RIG 9186 9186
FLOAT, WFD SCRAPER 3X WFD MAGNETS, 2X JUNK BASKETS, 3X JTS 4'' HWDP,
JAR, 2X JNTS HWDP.

P/U 4'' DP FROM CANTILEVER & RIH W/ CO BHA ON 4'' DP SINGLE BY SINGLE.
2030 - 0459 8.5 0 POST N CT LDP SPDP RIG 9186 9186 280 3250
- CONTINUOUSLY RUNNING TRIP TANK WITH 63 PCF BRINE.
- BREAK CIRCULATION EVERY 15 STD.
Workover Objectives
Foreman Remarks

ODF TO TBG SPOOL = 52.92 FT, PRT TO TBG SPOOL = 47.95 FT, PRT CORRECTION = 4.97 FT.
====================================================================================
ARAMCO MATR'L EXPEDITOR ALSAEDI, IBRAHIM H #8513907 ON BOARD SINCE 5/21/2024.
ARAMCO FOREMAN #808690 ZAKRI, KHALID LEFT RIG ON 06-16-2024.
====================================================================================
CURRENT LOCATION: SFNY-1000/1009
- 1 WELL TO WORKOVER SFNY-1003 (ESP CHANGE OUT).
===================================================================================
NEXT PF: SFNY-1040/1049
- 2 WELLS TO WORKOVER SFNY-1047 & SFNY-1042 (ESP CHANGE OUT).
- HSU REQUEST #8800021642 SUBMITTED ON FEB 13, 2024. RECEIVED FINAL REPORT ON MAY 6, 2024. NO REQUIREMENT FOR DEBRIS REMOVAL.
- RIG MOVE REQUEST # 4010708 SUBMITTED ON 28-MAY-24. RMM RECEIVED ON 5-JUNE-2024.
- BHD SHARED WITH RIG ON 28-MAY-24 FOR LA & LPA. RECEIVED ON 29-MAY-24.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

MISCELLANEOUS BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1003 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:20 06/10/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

06/15/2024 AS NEEDED 8 KNTS 1-2 FT SEASONAL 5,194 TOURLY

Company BAL SCP RIG GDF RIG ARN MSL ARM SWL

Category ALS PSSC RIG DFMS OTHR OTHR SLS WSC WLS
PERSONNEL
5 1 43 1 16 1 2 1 3
Total
AND SERVICES No. of Persons
73
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 1 1 24 24 0 12 0 24 0

Standby/Tankers
TRUCKS/BOATS
HADI-22

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
749 974 536 N/A N/A 457

Instrumentation Other
REPAIR ASAP NONE NONE Reporter
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABSF-110 WORKOVER-3 BI-90
Print Date: 06/18/2024 06:20 06/05/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

ADM-656 @ ABSF-110 Limited Morning Report for 06/18/2024


Objective : (ESP CHANGE Foreman(s)ANDREWS, DAVID RICHARD
D&WO Morning Report (Service Providers View) Charge #: OUT) Engineer ALGHANIM, NAWAF ABDULRAHMAN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Manager OTAIF, HASSAN WAFI
ADM-656 (64-23019-0110)
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 11086 378-6304 378-6325
Date: Tuesday 06/18/2024 ABSF-110 (0) ABSF_110_0 CONTRACTOR /CLERK VSA T
378-6331

Last 24 hr operations Next 24 hr plan


RIH ESP COMP ON 3-1/2" TBG, M/U TRSSSV, M/U TBG HGR, M/U LANDING JNT, TERMINATE LINES, SET BARRIER, N/D BOPE, N/U TBG BONNET & P/TEST, N/U TREE & P/TEST, RETRIEVE BARRIERS,
LAND HGR, SET PLUG & P/TEST, SET PKR, P/TEST TCA SECURE WELL, R/U FLOWBACK EQUIPMENT & P/TEST, FLOWBACK/FUNCTION TEST ESP
Location Next Location
ABSF 63, 110/116, 194 ABSF-95
Current Depth (ft) Liner TOL MD TVD Formation Tops
14,695 Last Csg Size MD TVD Size Top
7 7598 6625 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
14695 (Date) 0 0 82
8.8 (06/09/2024@1030 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

RIH WITH UPPER ESP COMPLETION ON DRIFTED 3-1/2", 9.3#, J-55, EUE TUBING.
0500 - 0600 1 0 EOW C COMP RPCS SPCOM RIG 14695 14695 4745 5180 INSTALLED CROSS COUPLING CLAMPS ON EACH COUPLING.
- FILL AND MONITOR WELL CONTINUOUSLY VIA TRIP TANK.
- FILL STRING EVERY 10 JTS.

0600 - 0630 0.5 0 EOW C COMP HT ESPL KSC 14695 14695 ALKHORAYEF CHECK ESP CABLE ELECTRICAL INTEGRITY: P-P 6.1 OHMS, P-G 2.96
GOHMS 10 MINS.

RIH WITH UPPER ESP COMPLETION ON DRIFTED 3-1/2", 9.3#, J-55, EUE TUBING.
INSTALLED CROSS COUPLING CLAMPS ON EACH COUPLING.
0630 - 0745 1.25 0 EOW C COMP RPCS SPCOM RIG 14695 14695 5180 5616
- FILL AND MONITOR WELL CONTINUOUSLY VIA TRIP TANK.
- FILL STRING EVERY 10 JTS.

R/U EXPRO SLICKLINE AND PERFORM THE FOLLOWING:


- DRIFT TUBING WITH 2.876" TO 1,800 FT.
- R/D SLICKLINE.
0745 - 0945 2 0 EOW C COMP DTU DRFT EX1 14695 14695
- FILL AND MONITOR WELL CONTINUOUSLY VIA TRIP TANK - STATIC LOSSES AT
45 BPH.
CONCURRENTLY ALKHORAYEF CHECK ESP CABLE ELECTRICAL INTEGRITY: P-P 6.1
OHMS, P-G 3.04 GOHMS 10 MINS.

M/U HALL 3-1/2" WRSSSV AND 1 JOINT 3-1/2", 9.3#, J-55 EUE TBG. HALL
TERMINATE WRSSSV CONTROL LINE, FUNCTION CHECK WRSSSV (OPEN AT 1,200
PSI AND OBSERVE CORRECT BLEED BACK OF 80 ML) AND P/TEST WRSSSV TO
0945 - 1115 1.5 0 EOW C COMP HT SSSV HCO 14695 14695
4,500 PSI FOR 15 MINS - GOOD TEST. OPEN WRSSSV AND MAINTAIN 3,000 PSI ON
CONTROL LINE.
- FILL AND MONITOR WELL CONTINUOUSLY VIA TRIP TANK - STATIC LOSSES AT
45 BPH.

1115 - 1200 0.75 0 EOW C COMP HT SSSV HCO 14695 14695 RIH WITH 6 X JNTS 3-1/2", 9.3#, J-55, EUE TBG.
- FILL AND MONITOR WELL CONTINUOUSLY VIA TRIP TANK.

M/U NEW 11" X 3-1/2" 3M FMC TBG HANGER WITH DRIFTED 3-1/2", 9.3#, J-55,
1200 - 1230 0.5 0 EOW C COMP HT TBG RIG 14695 14695
EUE PUP JOINT.
- FILL AND MONITOR WELL CONTINUOUSLY VIA TRIP TANK.

R/U EXPRO SLICKLINE AND PERFORM THE FOLLOWING:


- DRIFT TUBING WITH 2.867" TO TOP OF WRSSSV AT 204 FT.
- R/D SLICKLINE.
1230 - 1315 0.75 0 EOW C COMP DTU DRFT EX1 14695 14695 - FILL AND MONITOR WELL CONTINUOUSLY VIA TRIP TANK - STATIC LOSSES AT
45 BPH.
CONCURRENTLY ALKHORAYEF CHECK ESP CABLE ELECTRICAL INTEGRITY: P-P 6.1
OHMS, P-G 3.1 GOHMS 10 MINS.

1315 - 1345 0.5 0 EOW C COMP HT TBG RIG 14695 14695


M/U 3-1/2", 9.3#, J-55, EUE LANDING JOINT WITH FOSV TO TUBING HANGER.

HALL TERMINATE WRSSSV CONTROL LINE THROUGH TUBING HANGER. FUNCTION


CHECK WRSSSV (OPEN AT 1,200 PSI AND OBSERVE CORRECT BLEED BACK OF 70
1345 - 1500 1.25 0 EOW C COMP HT SSSV HCO 14695 14695
ML) AND P/TEST WRSSSV TO 4,500 PSI FOR 10 MINS - GOOD TEST.
- FILL AND MONITOR WELL CONTINUOUSLY VIA TRIP TANK - STATIC LOSSES AT
45 BPH.

QCI TERMINATE ESP CABLE THROUGH TUBING HANGER AND CONFIRM


1500 - 1715 2.25 0 EOW C COMP HT ESPL KSC 14695 14695 ELECTRICAL INTEGRITY OK: P-P 5.5 OHMS, P-G 3.4 GOHMS 10 MINS.
- FILL AND MONITOR WELL CONTINUOUSLY VIA TRIP TANK - STATIC LOSSES AT
45 BPH.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABSF-110 WORKOVER-3 BI-90
Print Date: 06/18/2024 06:20 06/05/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONFIRM ALL TUBING HANGER TIE DOWN BOLTS FULLY RETRACTED AT 4-3/4".
RIH SLOWLY WITH NEW FMC 11" X 3-1/2" TUBING HANGER AND LAND TUBING
HANGER IN TUBING SPOOL. LOCK DOWN TUBING HANGER TIE DOWN BOLTS (3-
1715 - 1815 1 0 EOW C COMP HT TBG RIG 14695 14695 7/8" FULLY ENGAGED). ALKHORAYEF CONFIRM ELECTRICAL INTEGRITY OF ESP
CABLE: P-P 6.2 OHMS, P-G 3.08 GOHMS 500V/10 MINS. ESP SENSOR READINGS: PI
2,481 PSI, PD 2,478 PSI. LAY OUT X/OVER AND 4" DP PUP.
- FILL TCA CONTINUOUSLY VIA E-KILL LINE WITH 64 PCF BRINE WHILE LANDING
TUBING HANGER.

R/U EXPRO SLICKLINE AND P/TEST LUBRICATOR TO 2,000 PSI. EXPRO SLICKLINE
PERFORM THE FOLLOWING:
- RIH AND RETRIEVE FLAPPER FROM WRSSSV AT 247 FT.
- RIH AND RETRIEVE HALL 3-1/2" PUMP-THRU PLUG FROM ABOVE ESP PACKER AT
5,588 FT.
- RIH AND SET PXN PLUG IN 2-7/8" XN-NIPPLE (2.205" NO-GO) AT 5,715 FT.
- RIH WITH CHECK-SET TO PXN PLUG AT 5,715 FT, POH AND CONFIRM CHECK-
SET SHEARED.
1815 - 0300 8.75 0 EOW C COMP SET PLUGN EX1 14695 14695 5715 5715
- RIH AND SET PRONG IN PXN PLUG AT 5,715 FT.
- P/TEST PLUG TO 300 PSI/10 MINS - GOOD TEST.
- RIH AND SET FLAPPER IN WRSSSV AT 247 FT.
- RIH WITH CHECK-SET TO WRSSSV AT 247 FT, POH AND CONFIRM CHECK-SET
SHEARED.
- FUNCTION TEST WRSSSV AND OPEN SAME - OK.
PARTIALLY R/D EXPRO SLICKLINE AND INSTALL PRESSURE CAP ON TOP OF
SLICKLINE SIDE ENTRY SUB.
- CONCURRENTLY DISPLACE TCA WITH INHIBITED 64 PCF BRINE VIA E-KILL LINE.

0300 - 0400 1 0 EOW C COMP SET PKR KSC 14695 14695 5645 5645 P/TEST SURFACE LINES TO 3,500 PSI. SET 7" PRAXIS ESP PACKER (WITH TCA
VENTED) AS PER ALKHORAYEF SUPERVISOR, HELD 3,500 PSI FOR 10 MINS.

TOP OFF TCA WITH 64 PCF INHIBITED BRINE. P/TEST TCA TO 1,000 PSI/10 MINS
(WITH TUBING VENTED) - GOOD TEST. BLEED TCA PRESSURE GRADUALLY TO 0
PSI AFTER SETTING PACKER AS PER ALKHORAYEF SUPERVISOR, WHILE
0400 - 0459 1 0 EOW C COMP PTST PKR RIG 14695 14695
MONITORING CCA'S - OK. ALKHORAYEF CHECK ESP CABLE ELECTRICAL
INTEGRITY: P-P 6.4 OHMS, P-G 2.48 GOHMS 500V/10 MINS.
- MAJORITY OF EXPRO ZERO-FLARING PACKAGE RIG UP HAS BEEN COMPLETED
OFFLINE.
Workover Objectives
Foreman Remarks

ODF TO TBG SPOOL: 42.9 FT, PRT TO TBG SPOOL: 62.7 FT, ODF CORRECTION: -19.8 FT
======================================================================================================
REVIEWED: ADES RECENT FALL FROM CASING AND MAN RIDING INCIDENTS.
======================================================================================================
RIG POSITION: 26 DEG 57.06' N, 050 DEG 33.53' E
RIG HEADING DEG 330 DEG, WATER DEPTH 135 FT, AIR GAP 53 FT
LEG PENETRATIONS: ALL LEGS 11 FT
ANCHORING RESTRICTIONS: NO ANCHORING ON PORTSIDE AND WITHIN 100M OF PIPELINE ON STARBOARD SIDE.
======================================================================================================
RIG CLERK, MOHAMMAD IQUBAL, BADGE# 8597765 ON BOARD SINCE 05/06/23.
FCT, MOHAMMED IBRAHEM, BADGE# 783760 ON BOARD SINCE 06/04/24.
======================================================================================================
CURRENT PLATFORM: ABSF 63, 110/116, 194 (ONE WELL TO WORKOVER: ABSF-110 ESP CHANGE OUT)
======================================================================================================
NEXT PLATFORM: ABSF 90/98 (ONE WELL TO WORKOVER: ABSF-95 ESP CHANGE OUT)
- RAISED PLATFORM DE-PRESSURIZATION REQUEST VIA EMAIL TO ABSF FIELD SERVICES ON 06/10/24.
- SUBMITTED HSU SBS REQUEST# 8800022155 ON 05/16/24. RECEIVED COPY OF SURVEY CONDUCTED ON 03/18/24.
- RECEIVED COPY OF LOCATION APPROVAL ON 05/18/24, LPA ALREADY IN PLACE ON 01/13/22.
- SUBMITTED RIG MOVE REQUEST# RM-2024-4010811 ON 06/10/24. RECEIVED COPY OF MINUTES ON 06/12/24.
======================================================================================================
SUBSEQUENT PLATFORM: ABSF 17/22 (ONE WELL TO WORKOVER: ABSF-17 ESP CHANGE OUT)
- RECEIVED COPY OF LOCATION APPROVAL & LPA ON 05/22/24.
- SUBMITTED HSU SBS REQUEST# 8800022152 ON 05/16/24. RECEIVED COPY OF SURVEY ON 06/13/24.
- SUBMITTED DEBRIS REMOVAL REQUEST# DP-2024-16143 ON 06/13/24.
======================================================================================================
SLB 4-3/4" HYDRO-MECH JAR WITH XT-39 CONN, S/N OSC107449A RECEIVED ON MANIFEST# 2100894492 ON 05/20/24.
======================================================================================================
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
64 PCF 0 0 API 0 0 Volts 0 9.7 23,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 0 HTHP 99 0 0 0/0 CACL 0
MUD DATA
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 1 0/0 0 0 0
27

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABSF-110 WORKOVER-3 BI-90
Print Date: 06/18/2024 06:20 06/05/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

64 PCF 0 0 API 0 0 Volts 0 9.4 22,000


FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 0 HTHP 99 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 1 0/0 0 0 0
39

MUD CAOH2 BCTRN O-3670R OXYGON


TREATMENT 2 ( 55LB ) 5 ( 5GL ) 5 ( 55GL ) 4 ( 50LBP )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/11/2024 WEEKLY 9 - 11 0.75 - 1.5 SEASONAL 5,536 TOURLY
KNOTS FT

Company KSC GOS RIG EMC RIG ARM EX1 HSL HCO ARM EX2

Category ALS CTRG RIG DFMS OTHR OTHR SLS SLS SSSV WSC WTSE
PERSONNEL
6 13 48 1 1 2 2 1 1 1 6
Total
AND SERVICES No. of Persons
82
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 12 0 24 24 12 12 12 4 6 24 0

Standby/Tankers
TRUCKS/BOATS
RAWABI-206

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
828 585 1180 N/A N/A 889

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1297 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/06/2024 - 11/08/2024
Report ID: OPERLMTDMRREP

ADM-657 @ SFNY-1297 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL Foreman(s)HAYWARD, KIERAN / EITERNES, ANDERS OLAI
D&WO Morning Report (Service Providers View) Charge #: HORIZONTAL PRODUCER) Engineer ALDAWSARI, SALLAL ARAR / MANDEL, CHRISTIAN MARKUS
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-24013-1297) Manager JURASHI, MOHAMMED NASSIR
ADM-657
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0882162370 0035 378-6561 378-6563 ( RR)
Date: Tuesday 06/18/2024 SFNY-1297 (0) SFNY_1297_0 CONTRACTOR /CLERK VSA T
378-6562 ( CLERK)

Last 24 hr operations Next 24 hr plan


PU AND RB DC/HWDP. COMPLETED PRE-SPUD CHECK LIST. MU AND RIH WITH 22" MOTOR/GWD DRILL 22" SECTION TO TD. PERFORM WIPER TRIP. SPOT CSG. GO PILL.
BHA. CLEANED OUT 32" CONDUCTOR. DRILLED 22" SEC.
Location Next Location
SFNY-19, PLATFORM SFNY-1296
Current Depth (ft) Liner TOL MD TVD Formation Tops
213 Last Csg Size MD TVD Size Top
32 184 184 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
184 (Date) 100 29 236
0.2 (06/18/2024@0130 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

PU/MU AND RB DC AND HWDP. PREPARED FOR SPUD 22" SEC.:


0500 - 1500 10 0 PRE N RM OTH NA RIG 0 0 *MIXED 120 PCF MUD CAP.
*CLEANED AND CLEARED RIG FLOOR.
*CLOSED OUT PRE-SPUD CHECK LIST.

1500 - 1630 1.5 0 CP N DRLG HT BHA RIG 0 0 HPJSM. PU & FUNCTION TESTED SAMAA 9-1/2' PBL SUB, RECOVERED ACTIVATION
BALLS & LD.
1630 - 1700 0.5 0 CP N DRLG PJSM NA RIG 0 0
HPJSM PRIOR TO PU AND MU 22" BHA.

1700 - 2030 3.5 0 CP N DRLG HT BHA SPS 0 0 PU/MU AND RIH WITH 22" SPS MM/GWD BHA T/83', SCRIBE & ORIENTED MM
W/GWD.

2030 - 2115 0.75 0 CP N DRLG HT BHA SCD 0 0 PU/MU 5'' HWDP PUP, SHALLOW TESTED GWD TOOLS, 380 GPM / 180PSI. LD 5"
HWDP PUP

2115 - 2215 1 0 CP N DRLG HT BHA SPS 0 0 PU/MU WFD 12" SHOCK SUB & SAMAA PBL, RIH WITH 22" SPS MM/GWD BHA
T/118', MU AND RIH ON 5" HWDP STAND, TAGGED AT 132'.
2215 - 2245 0.5 0 CP N DRLG PJSM NA RIG 0 0
HPJSM PRIOR TO DISPLACE WELL TO WBM.

2245 - 0130 2.75 0 CP N DRLG CIRC MPMP RIG 0 0 DISPLACED TO 67 PCF WBM & CLEAN OUT 32" CONDUCTOR T/184' WITH REDUCED
DRILLING PARAMETERS.
0130 - 0130 0 0 PRE S OT SPUD NA RIG 184 184
SPUD IN WELL SFNY-1297 @ 01:30 AM.

0130 - 0459 3.5 0 22 N DRLG DMS MMOT SPS 184 213 DRILLED & SLID 22" SECTION WITH REDUCED DRILLING PARAMETERS, PUMP
SWEEPS AS REQUIRED.
Foreman Remarks

SFNY-1297 WILL BE DRILLED AS SINGLE LATERAL HORIZONTAL OIL PRODUCER TARGETING SFNY RESERVOIR TO A TOTAL DEPTH OF +/- 10,264 FT MD WITH
+/-3000 FT OF RESERVOIR CONTACT. THIS WELL WILL BE DRILLED FROM SLOT #4 ON SFNY-3, 573 PFM. THE WELL WILL BE COMPLETED WITH 5-1/2" ICD'S
AND 350 MICRON SAND SCREENS, OPEN HOLE SWELL PACKERS FOR ZONAL ISOLATION,MFIV, DOWN HOLE PACKER, ESP AND 4-1/2" TUBING WITH FLAPPER
TYPE SUBSURFACE SAFETY VALVE,
BATCH DRILLING SEQUENCE:
- 22" SFNY-1297, 1296, 1298
- 16" SFNY-1296, 1297, 1298
- SFNY-1296 8.5" PILOT HOLE, LWD, MDT, PP. PLUG BACK & ST.
- 12-1/4" SFNY-1296, 1297, 1298
- 8-1/2" & EOW SFNY-1296, 1297, 1298.
- FLOW BACK SFNY-1296, 1297, 1298.

***HELD PRE-SPUD & STUCK PIPE PREVENTION PRESENTATION WITH DE CHRISTIAN MANDEL ON JUNE 13, 2024

===================================HSE ALERTS, DRILLS, & INCIDENTS===========================


* HELD H2S EMERGENCY MUSTER DRILL, ABANDON RIG DRILL ON 6/15/2024.
* REVIEW HSE ALERTS #69-24, #70-24, #71-24, & #72-24 WITH ALL PERSONNEL ON RIG.
* SWA DRILL: 1 & LOF DRILL : 1
===========================================PERSONNEL====================================
* RIG CLERK MOHAMED MUJAMMIL ID #8618648 ON-BOARD 07-11-2023.
=======================================================================================
* PLANNED 18-5/8" CSG J/K-55 115# BTC @ 806' MD / 804' TVD, ACTUAL XXX' MD / XXX' TVD (+/-50' TVD INSIDE RUS)
* PLANNED 13-3/8" CSG @ 4,614' MD / 4,363' TVD, ACTUAL XXXX' MD / XXXX' TVD (+/-100' TVD INSIDE LAMS)
* PLANNED 9-5/8" CSG @ 7,265' MD / 5,387' TVD, ACTUAL XXXX ' MD / XXXX' TVD (TE INSIDE SFNY)
* PLANNED 8-1/2" TD @ 10,264' MD / 5,367' TVD, , ACTUAL XXXXX' MD / XXXX' TVD (INSIDE SFNY).
========================================CURRENT LOCATION==================================
CURRENT LOCATION SFNY-3 PLATFORM:

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1297 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/06/2024 - 11/08/2024
Report ID: OPERLMTDMRREP

** LAT: 28 DEG, 01.69 N & LONG: 048 DEG 43.53 E


** WATER DEPTH: 17'
** RIG HEADING: 351 DEG
** AIR GAP: 46'
** RKB - LAT = 112'
** FINAL PENETRATIONS: BOW 13.9', PORT 11.7', STBD 12.6'
===========================================RENTAL TOOLS==================================
WFD 12" SHOCK SUB, S/N 1038957-1, MN# 2100914864 ONBOARD 06-14-2024
WFD 9-1/2" DRILLING JARS, S/N 1549-1039, MN# 2100914864 ONBOARD 06-14-2024
===========================================NEXT PLATFORM==================================

==========================================SKIP & SHIP==================================


* EMPTY SKIPS ONBOARD: 28
* FULL SKIPS ON BOARD: 2
* TOTAL SKIPS USED FOR WELL: 0
* TOTAL TONNAGE SHIPPED: 0 T
* TOTAL EMPTY SKIP ON BOAT: 15
* TOTAL FULL SKIP ON BOAT: 0
===========================================FUEL CONSUMPTION=============================
DIESEL CONSUMPTION FOR ENGINES: DAILY: 27 BBL . CUMULATIVE DIESEL CONSUMPTION SFNY-1297: 541 BBL.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
67 PCF 0 10 API 0 0 Volts 4.69 9 13,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 95 31 0 14 / 16 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 17 5 12 / 14 20 0 0
70
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
67 PCF 0 10.5 API 0 0 Volts 4.69 9.5 13,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 95 33 0 16 / 18 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 17 5 13 / 15 20 0 0
65

MUD CAUST MRBL-M SODASH HYSTAR-P XANPLEX-D BCTRN


TREATMENT 14 ( 50LBP ) 2 ( 2200L ) 12 ( 100LB ) 50 ( 50LB ) 40 ( 25KG ) 18 ( 5GLD )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
1RR 0 29 DP Av DC Av Bit HHP 15 40 435 22 SMT
Pressure GPM Jet Vel 18.69 20.83 12 I-Row O-Row DC Location Bearings
260 350 84 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
RV1272 GSI12 3 x 18 / 3 x 16 / 1.335
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 3.5 N/A N/A N/A 3,500 Shock Sub Serial # Shock Sub Hrs
3.5
Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 22 1 1.94 RV1272
2 Mud Motor SPS 11.25 1 11.25 34.66 240.03 11254031
3 Stabilizer SPS 22 1 22 3 5.94 7 5/8 REG 7 5/8 REG 192.45 14014801
DRILL STRING
4 Float Sub SPS 9.5 1 19.875 3.5 3.5 7 5/8 REG 7 5/8 REG 210 14136304
5 Gyro MWD SCD 9.5 1 22 3 30.54 7 5/8 REG 7 5/8 REG 208.4 84-621
6 Pulse Sub SCD 9.5 1 9.5 3 6.25 7 5/8 REG 7 5/8 REG 211.8 91-083
7 Shock Sub WJS 12 1 12 3 27.63 7 5/8 REG 7 5/8 REG 347.8 10392573-02
8 PBL (Multiple Activation By Pass) SAM 9.5 1 9.5 3 8.27 7 5/8 REG 7 5/8 REG 217.48 WES950BP221
9 Drillcollar RIG 9.5 6 9.5 2.813 183.54 7 5/8 REG 7 5/8 REG 220 SPRL RIG
10 Crossover RIG 9.5 1 9.5 2.813 1.4 6 5/8 REG 7 5/8 REG 213.29 RIG
11 Drillcollar RIG 8.5 3 8.5 2.813 90.05 6 5/8 REG 6 5/8 REG 171.8 SPRL RIG
12 Crossover RIG 8 1 8 3 3.67 NC50 6 5/8 REG 147.22 RIG
13 Heavy Weight Drillpipe (HWDP) RIG 5 12 5 3 364.8 NC50 NC50 50.38 CONV RIG
14 Drillpipe RIG 5 3 5 4.276 21.92 NC50 NC50 19.5 G105 PREMIUM RIG

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A 6-8 SW 1-2 FT SEASONAL 1,666 TOURLY

PERSONNEL WJS BCR LIG SCD SPS RIG OES ARM HCM HSS ARM SAM
Total
Company
AND SERVICES 78
INFORMATION

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1297 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/06/2024 - 11/08/2024
Report ID: OPERLMTDMRREP

Category JST CSR CTRG DPDS DPDS RIG DFMS OTHR PCS SKSHS WSC WBCS

No. of Persons 0 2 14 2 2 46 2 1 2 4 2 1

Personnel on Loc. Hrs. 0 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 8 0 0 12 12 24 24 12 12 24 24 10

Standby/Tankers
TRUCKS/BOATS
posh gemsbok

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1743 800 1364 4730 450 2730

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1298 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 03/07/2023 - 06/22/2024
Report ID: OPERLMTDMRREP

ADM-680 @ ZULF-1298 Limited Morning Report for 06/18/2024


Objective : (DUAL LATERAL Foreman(s)LUKPANOV, ZHASLAN / AHMED, ABDELREHIM ABDELRAHMAN
D&WO Morning Report (Service Providers View) Charge #: OIL HORIZONTAL PRODUCER) Engineer LIBREROS MUNOZ, CAMILO ERNESTO
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22062-1298) Manager RAJHI, MOHAMMAD ALI
ADM-680
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14130 673-2850 849-9969
Date: Tuesday 06/18/2024 ZULF-1298 (1) ZULF_1298_1 CONTRACTOR /CLERK VSA T
673-5773

Last 24 hr operations Next 24 hr plan


CHC. POOH 9-5/8" WBCO ASSY. L/D EXCESS DP. POOH & L/D 9-5/8" WBCO ASSY. BOP TEST. BOP TEST. RUN HALL MIDDLE COMPLETION.
Location Next Location
ZULF-1290/1299 ZULF-1903
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,070 Last Csg Size MD TVD Size 5,004 7,072 5,603 Top
9 5/8 7122 5523 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
10070 (Date) 100 0 251
65.2 (06/06/2024@1300 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0630 1.5 1 EOW C CT CIRC MPMP RIG 10070 10070
CIRCULATE HOLE CLEAN. CONDITION INHIBITED FILTERED BRINE.
0630 - 0645 0.25 1 EOW C CT CIRC MPMP RIG 10070 10070
FLOW CHECK - STATIC.
0645 - 0745 1 1 EOW C CT HT STRG RIG 10070 10070
POOH 10 STANDS.
0745 - 0800 0.25 1 EOW C CT CIRC MPMP RIG 10070 10070
FLOW CHECK - STATIC.
0800 - 0900 1 1 EOW C CT HT STRG RIG 10070 10070
POOH 9-5/8" WBCO ASSY #3 ON 5-1/2" DP STANDS.
0900 - 0915 0.25 1 EOW C CT PJSM STRG RIG 10070 10070
HPJSM PRIOR TO L/D EXCESS 5-1/2" DP BY SINGLES.
0915 - 1600 6.75 1 PRE N RM LDP SPDP RIG 10070 10070 4510 890
POOH WHILE L/D 5-1/2" DP TO 5 STANDS ABOVE BHA.
1600 - 1615 0.25 1 EOW C CT CIRC MPMP RIG 10070 10070
FLOW CHECK -STATIC.
1615 - 1700 0.75 1 PRE N RM LDP SPDP RIG 10070 10070 890 427
POOH WHILE L/D 5-1/2" DP TO TOP OF BHA.
1700 - 1715 0.25 1 EOW C CT CIRC MPMP RIG 10070 10070
FLOW CHECK -STATIC

1715 - 2115 4 1 EOW C CT HT BHA RIG 10070 10070 POOH & L/D 9-5/8" WBCO ASSY #3. RECOVERED TOTAL FROM STRING AND DITCH
MAGNETS 0.2 KG OF FINE METAL.
2115 - 2200 0.75 1 EOW C WH RTRV WBSH RIG 10070 10070
RETRIEVE 11" DELTA WEAR BUSHING.
2200 - 2215 0.25 1 EOW C BOP PJSM BOP RIG 10070 10070
HPJSM PRIOR TO BOP TEST.
2215 - 2315 1 1 EOW C WH BOP BOP RIG 10070 10070
P/U CUP TESTER ASSY, FLUSH STRING AND RIH BELOW WELL HEAD.
2315 - 2345 0.5 1 EOW C WH BOP BOP RIG 10070 10070
PRESSURE TEST WELLHEAD & OUTLET VALVES AS PER ARAMCO STANDARD.
2345 - 0030 0.75 1 EOW C WH BOP BOP RIG 10070 10070
POOH & L/D 9-5/8" CUP TESTER ASSY.
0030 - 0145 1.25 1 EOW C BOP BOP BOP RIG 10070 10070
P/U 11" DELTA TEST PLUG ASSY AND LAND SAME IN TBG SPL. M/U TEST LINE.
0145 - 0459 3.25 1 EOW C BOP BOPT BOP RIG 10070 10070
PRESSURE TEST BOPE AS PER ARAMCO STANDARD-------ONGOING AT RT.
Foreman Remarks

ZULF-1298 OBJECTIVE: DUAL LATERAL HORIZONTAL OIL PRODUCER TARGETING SFNY RESERVOIR TO A TOTAL DEPTH OF +/- 9683 FT.
===========================================CURRENT LOCATION DATA========================================
** PLATFORM: ZULF-1290/ 1299.
** RIG POSITION: LATITUDE: 28 DEG 26.15 N, LONGITUDE: 049 DEG 16.37E, RIG HEADING: 330 DEG.
** LEG PENETRATIONS: BOW 6.9 FT, PORT 6.9 FT, STBD 6.9 FT.
** WATER DEPTH: 131 FT.
** AIR GAP: 42.5 FT.
** RKB TO PLATFORM MAIN DECK: 77.5 FT.
** RKB TO MSL (WATER LINE): 112 FT.
** RKB TO MUD LINE (SEABED): 243 FT.
=====================================PF WELLS STATUS============================================
* ZULF-1290: SUSPENDED FOR FLOWBACK.
* ZULF-1291: SUSPENDED FOR FLOWBACK.
* ZULF-1292: SUSPENDED FOR FLOWBACK.
* ZULF-1293: SUSPENDED FOR FLOWBACK.
* ZULF-1294: SUSPENDED FOR FLOWBACK.
* ZULF-1295 (DUAL LATERAL): SUSPENDED FOR FLOWBACK.
* ZULF-1297 (DUAL LATERAL): SUSPENDED FOR FLOWBACK.
* ZULF-1298 (DUAL LATERAL): CURRENT WELL.
* ZULF-1299 (DUAL LATERAL): SUSPENDED FOR FLOWBACK.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1298 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 03/07/2023 - 06/22/2024
Report ID: OPERLMTDMRREP

======================================NEXT LOCATION============================================
* ZULF-1903 MLS WELL.
=============================================SAFETY================================================
* HELD FOREMAN SUPERVISORS MEETING, 2 PRE-TOUR MEETINGS, 2 TOOLBOX MEETINGS.
* HELD MAN DOWN SAFETY DRILL WITH RIG CREW MEMBERS.
* DRILLS: 1 X FIRE DRILL, 1 X H2S DRILL AND 1 X ABONDON DRILL.
=================================================PERSONNEL==========================================
* ARAMCO MATERIAL EXPEDITOR THAMER ALTOMAIS (ID # 8493759) ONBOARD SINCE 06/07/2024.
* ARAMCO PDP SAIF ALKHUDAYDI (ID #812443) ON BOARD SINCE 06/11/2024.
* ARAMCO PDP EVALUATOR ROBERT DAVIES ID# 162553 ONBOARD SINCE 06/15/2024.
=========================================LC-50 SAMPLE=================================================
* WBM LC-50 MUD SAMPLE SENT ON 20/12/2022 ON LEESE TIDE MN #2400595957. PASSED LAB TEST (POLYMER MUD LAB # SA3217).
* OBM LC-50 MUD SAMPLE SENT ON 31/12/2022 ON BRASHER TIDE MN #2400598405. PASSED LAB TEST RESULT (RHELIANT OIL BASED MUD LAB # SA3233).
==============================================RENTAL TOOLS===========================================
* 6-1/2" NPS JAR (SN #HJ-DA-650-0010) W/ XT-54 CONNS ONBOARD SINCE 05/07/2024.
* 6-1/2" NPS JAR (SN #HJ-DA-650-0028) W/ XT-54 CONNS ONBOARD SINCE 05/07/2024.
* 1 X 9-5/8" HALLIBURTON EZ-SV MST TOOL.
=====================================CASING POINTS PLANNED / ACTUAL: ==========================================
ZULF-1298 MOTHER BORE L-0:
* 18-5/8" CSG PLANNED AT 1800' MD / SET ACTUAL AT 1802' MD (1791' TVD).
* 13-3/8" CSG PLANNED AT 4899' MD / SET ACTUAL AT 4907' MD (4633' TVD).
* 9-5/8" CSG PLANNED AT 6616' MD/SET ACTUAL AT 7122' MD (5523' TVD).
* 5-1/2" LOWER COMPLETION PLANNED AT 10128 FT MD/ ACTUAL 10276' MD.
ZULF-1298 LATERAL L-1:
* TOW PLANNED AT 4979 FT MD / ACTUAL 5003'.
* 7" LINER PLANNED AT 6779' MD / ACTUAL 7072'.
* 4-1/2" LOWER COMPLETION PLANNED AT 9775' MD / ACTUAL 10052'.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
1 10,070 88.1 58.2 0 5,675 671.86 1642.3 5,821.56 1.2

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
84 PCF 0 0 API 0 0 Volts 0 9.5 301,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 85 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 15 0/0 0 0 0
28
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
84 PCF 0 0 API 0 0 Volts 0 9.6 299,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 86 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 14 0/0 0 0 0
28

MUD ECCO-TEMP CAOH2 BCTRN S-SCAV S CORRIHB-AMINE


TREATMENT 2 ( 100LB ) 4 ( 55LB ) 5 ( 5GL ) 1 ( 55GL ) 1 ( 50GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
10RR 10,070 10,070 DP Av DC Av Bit HHP N/A N/A 117 8.5 SMT
Pressure GPM Jet Vel 175.07 245.1 0 I-Row O-Row DC Location Bearings
700 300 N/A 1 1 WT A E
BIT DATA
Serial Number Type Jets TFA
RV1322 XR+C POOH Reason N/A
Gauge Other
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 61
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
61

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 05/31/2024 TOURLY SSE 10-12 1-2 FT SEASONAL 439 TOURLY
KTS.

Company SBA FMC LIG BC HCO RIG OES BFS ARM SCM SPL ARM SAM DEL CAM

Category ALS CSR CTRG PSSC ICE RIG DFMS FILT OTHR PCS SLS WSC WBCS WHES WHES
PERSONNEL
8 6 15 1 6 50 1 1 3 3 3 2 1 1 1
Total
AND SERVICES No. of Persons
102
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 20

Operating Hours. 0 0 0 0 0 24 12 12 12 0 0 24 0 0 0

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1298 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 03/07/2023 - 06/22/2024
Report ID: OPERLMTDMRREP

Standby/Tankers
TRUCKS/BOATS
ZAMIL-11

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1200 1256 1993 3132 1348 2345

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-2119 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/18/2023 - 09/22/2024
Report ID: OPERLMTDMRREP

ADM-681 @ ZULF-2119 Limited Morning Report for 06/18/2024


Objective : (OIL-POWER Foreman(s)DAVIDSON, HARLEY WILLIAM MARTIN
D&WO Morning Report (Service Providers View) Charge #: WATER INJECTOR IN ZULF. Engineer ALOTAIBI, ABDULLAH HAMDAN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23062-2119) ) Manager FAIFI, MUSAAD HASSAN
ADM-681
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0087167771 4159 673-4452 RADIO ROOM 673-4454
Date: Tuesday 06/18/2024 ZULF-2119 (0-1) ZULF_2119_1 CONTRACTOR /CLERK VSA T
673-4453

Last 24 hr operations Next 24 hr plan


CHC, POH, M/U & RIH 8 1/2" BAKER (RSS/ LWD) BHA RIH 8 1/2" BAKER (RSS/ LWD) BHA. DRILL 8.5'' HOLE SECTION
Location Next Location
ZULF-2110/2119 PF ZULF-2119
Current Depth (ft) Liner TOL MD TVD Formation Tops
8,614 Last Csg Size MD TVD Size Top
9 5/8 8604 6337 Formations Comments
Depth
ZKB2 7,862
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
8607 (Date) 100 0 240
69.5 (06/14/2024@0000 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0730 2.5 0-1 8 1/2 N CT WBCO WBCL CRT 8614 8614
WORK 9-5/8" SCRAPER ACROSS 9 5/8" LINER HANGER PLANNED DEPTH..
0730 - 0830 1 0-1 8 1/2 N CT CIRC MPMP RIG 8614 8614
PUMP 30 BBL SWEEP AND CHC.
0830 - 0930 1 0-1 8 1/2 N CT CIRC MPMP RIG 8614 8614
EXTENDED FLOW CHECK PRIOR TO POH -WELL STATIC. PUMP SLUG.
0930 - 1300 3.5 0-1 8 1/2 N CT TO STDP RIG 8614 8614 8604 1178
POOH W/ 9 5/8" CORETRAX WBCO ASSY ON 5 1/2'' DP.
1300 - 1315 0.25 0-1 8 1/2 N CT CIRC MPMP RIG 8614 8614
FLOW CHECK PRIOR TO BHA - WELL STATIC
1315 - 1400 0.75 0-1 8 1/2 N DRLG RR TDS RIG 8614 8614
RIG SERVICE - TDS - OK.
1400 - 1430 0.5 0-1 8 1/2 N CT TO STHDP RIG 8614 8614 1178 702
POOH W/ 9 5/8" CORETRAX WBCO ASSY ON 5 1/2'' HWDP.

HPJSM, L/D 9-5/8" CORETRAX WBCO BHA.


1430 - 1815 3.75 0-1 8 1/2 N CT WBCO WBCL CRT 8614 8614
* RECOVERED 1.0 KG FINE DEBRIS FROM STRING MAGNETS AND JUNK BASKET 1.0
KG FROM DITCH MAGNETS,
1815 - 1830 0.25 0-1 8 1/2 N CT WBCO WBCL CRT 8614 8614
CLEAN AND CLEAR RIG FLOOR.
1830 - 2115 2.75 0-1 8 1/2 N DRLG HT BHA RIG 8614 8614
HPJSM. M/UP RHINO SLB UNDER-REAMER, SURFACE TEST & R/B SAME.

2115 - 0400 6.75 0-1 8 1/2 N DRLG HT BHA BHI 8614 8614 M/UP BKR 8 1/2" X 9 1/2" RSS/LWD/ RHINO UR BHA.
** BKR LOADED R/A SOURCE IN LWD TOOL.
0400 - 0459 1 0-1 8 1/2 N DRLG CIRC MPMP RIG 8614 8614
PERFORM SHALLOW TEST W/400 GPM & 900 PSI. TEST OK.
Foreman Remarks

ZULF-2119 IS A HORIZONTAL WELL THAT WILL BE COMPLETED ACROSS KHFJ AQUIFER AND UTILIZED AS WATER INJECTOR IN PF-2110/2119 IN
THE SOUTHERN FLANK OF ZULUF FIELD.
THIS WELL WILL BE COMPLETED WITH 5-1/2- IN STAND-ALONE SAND SCREENS FOR KHFJ RESERVOIR (250 MICRONS) WITH MECHANICAL PACKERS AND UPPER COMPLETION WITH 4-1/2-IN GRE
TUBING AND CR. TRSSSV.
======================================================================================================
* DISCUSSED HSE ALERTS IN PRE-TOUR MEETINGS.
* DISCUSSED -SHIELD CARDS PARTICIPATION, EMERGENCY RESPONSE PLAN AND TOFS / SWA IMPLEMENTATION IN PRE-TOUR MEETINGS.
* PERFORMED H2S AND ABANDON DRILL ON 7-JUNE-2024
* DISCUSSED STAIRSWAY HANDLING, HEAT STRESS, HAZARD HUNT, DROPS AND SWA CAMPAIGN IN PRE-TOUR MEETINGS,
======================================================================================================
LC-50 SAMPLES:
** WBM LC-50 SAMPLE SENT ON TROUNSON TIDE 15-MAY-2023, MN# 2400619521.
** OBM LC-50 SAMPLE SENT ON RAWABI-26 ON 19-SEPTEMBER, 2023. MN#2400641232
** OBM LC-50 SAMPLE SENT ON RAWABI-61 ON 22-03-2024 MN# 2400674248.
======================================================================================================
* COORDINATES: N-3135481.31 E-330764.24 (UTM )
* RIG HEADING: 331 DEG
* WATER DEPTH:128 FT
* RKB TO MSL: 114 FT
* RKB TO MUDLINE: 241.5 FT
======================================================================================================
DIRECTIONAL PLAN:
======================================================================================================
PLANNED VS ACTUAL CASING POINTS (L-0)
ZULF-2116 CASING POINTS:
32" CONDUCTOR AT 297'.
18-5/8" CASING AT 1802' (50'TVD INTO RUS): ACTUAL : 1813
13-3/8" CASING AT 4841' (50' TVD ABOVE LAWHA): ACTUAL 4850
9-5/8" CASING AT 5630' (TE +/- 100' MD INSIDE KHFJ SAND AQUIFER)
7" LINER AT 8794' (6368' TVD).

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-2119 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/18/2023 - 09/22/2024
Report ID: OPERLMTDMRREP

7'' CSG WINDOW (L-1) @ ( 8122-8132')


WELL TD (L-1) @ 11965'.
======================================================================================================
ZULF-2110/ 2119 PF BATCH SEQUENCES:
* DRILL ZULF-2110 -L0: 22", 16", 12-1/4", 8-1/2", 6 1/8" EOW.
* BATCH DRILL 22": ZULF-2111, ZULF-2113, ZULF-2119, ZULF-2115, ZULF-2116, ZULF-2114, ZULF-2117
* BATCH DRILL 16": ZULF-2111, ZULF-2113, ZULF-2119, ZULF-2115, ZULF-2116, ZULF-2114, ZULF-2117
* BATCH DRILL 12-1/4": ZULF-2119, ZULF-2116, ZULF-2113, ZULF-2117, ZULF-2111, ZULF-2115, ZULF-2114
* BATCH DRILL 8.5, 6 1/8 & EOW IN ZULF-2117, 8.5 & EOW IN ZULF-2116, 8.5 & EOW IN ZULF-2119, 8.5 & EOW IN ZULF-2113, 8.5 & EOW IN ZULF-2115,
8.5, 6 1/8'' & EOW IN ZULF-2114, 8.5, 6 1/8'' & EOW IN ZULF-2111,
* FLOWBACK: ZULF-2119, ZULF-2116, ZULF-2117, ZULF-2111, ZULF-2113, ZULF-2115, ZULF-2114, ZULF-2110
======================================================================================================
RENTAL TOOLS ON BOARD:
** RECEIVED 1 X 6 3/4'' NESR JARS SN ( GE-DJ-00116 ) ON 30-MAY-2024 MN#2100902267
** RECEIVED 1 X 6 3/4'' NESR JARS SN (1899915-2 ) ON 13-JUNE-2024 MN#2100912492
======================================================================================================
ARAMCO PERSONNEL:
** ARAMCO RIG CLERK MANU KODURU ID# 8618641 ONBOARD SINCE 11-JUNE-2024.
======================================================================================================
CONTRACTOR RIG MANAGEMENT VISITS:
* ADES RIG MANAGER: ON RIG 19-MAY-2024.
======================================================================================================
* NEXT LOCATION: MRJN-506 (2001-2009) PLATFORM.
* RIG MOVE PROJECTED ON +/- 1ST, OCT, 2024.
* SEA BED SURVEY REQUEST# CRM-8800022212. CREATED 20 MAY, 2024 APPROVED 22ND MAY
* RIG MOVE REQUESETS# RM-2024-4010722/RM-2024-4010723.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 1 0 API 55 347 Volts 3.6 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
110 1.8 HTHP 21 22 0 11 / 15 INOVRT 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 31 24 9 / 10 0 0 2.8
71

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 1 0 API 55 255 Volts 3.6 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 110 1.8 HTHP 21 21 0 11 / 15 INOVRT 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 32 24 9 / 10 0 0 2.8
69

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 1 0 API 55 340 Volts 3.6 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
110 1.8 HTHP 21 21 0 10 / 14 INOVRT 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 31 24 9 / 10 0 0 2.4
70

MUD MRBL-M MRBL-F


TREATMENT 3 ( 2200L ) 2 ( 2200L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/13/2024 TOURLY 7-10 KNTS - 2 SEASONAL 443 TOURLY
SE

Company INW NRC LIG HCO MAX BHI RIG BAR EMC NFT SRT BLH ARM WCS EX1 MI2 ARM FME

Category BRCR CSR CTRG PSSC PSSC DPDS RIG DFMS DFMS FILT HO LHES OTHR PSIE SLS SCS WSC WHES
PERSONNEL
1 4 16 2 1 3 52 2 1 2 1 1 1 2 2 1 1 1
Total
AND SERVICES No. of Persons
94
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 0 10 24 12 12 0 10 0 12 0 0 0 13 0

Standby/Tankers
TRUCKS/BOATS
PACIFIC PYTHON

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
910 1479 1437 4840 N/A 3848

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-2119 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/18/2023 - 09/22/2024
Report ID: OPERLMTDMRREP

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1285 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 07/09/2023 - 07/19/2024
Report ID: OPERLMTDMRREP

ADM-682 @ ZULF-1285 Limited Morning Report for 06/18/2024


Objective : (DUAL Foreman(s)HASHAD, ABDELHADY ABDELRAZEK / ATTIA, ABDELKARIM ABDULLAH
D&WO Morning Report (Service Providers View) Charge #: LATERAL OIL PRODUCER Engineer ALJINDAN, KHALID ADEL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22062-1285) INTO THE SAFANIYAH Manager FAIFI, MUSAAD HASSAN
ADM-682
RESERVOIR ) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily OffShore
(0500-0500) Saudi Aramco Well Wellbores: 8821677714 147 013-673-97 76 013-816727 1 (RADIO R OOM)
Date: Tuesday 06/18/2024 ZULF-1285 (0) ZULF_1285_0 CONTRACTOR /CLERK VSA T
013-673-97 74

Last 24 hr operations Next 24 hr plan


POOH & L/D INNER STRING . RIH & SET 9-5/8" HALL RBP. SPOT SAND ON TOP OF RBP. DISPLACE RIH 9-5/8" HALL MLT LATCH CLEANING TOOL. ORIENT STRG. ENGAGE & CLEAN LATCH
HOLE TO 94 PCF BARITE RHELIANT OBM.POOH & L/D 9-5/8" RBP S.TOOL. COUPLING. POOH & L/D ASSY. RIH 9-5/8" MILLING MACHINE ASSY. MILL 1ST PASS WINDOW.
Location Next Location
28.4328292LAT- 49.2019754LONG ZULF-1285
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,795 Last Csg Size MD TVD Size Top
9 5/8 6572 5640 Formations Comments
Depth
SFNY 5,920 5,450 TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SCFS 6,093 5,528 TVD
9795 (Date) 100 0 252 SEFS 6,327 5,601 TVD
33.4 (06/13/2024@0500 ) SGFS 6,634 5,643 TVD
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0730 2.5 0 EOW C COMP HT TBG BCR 9795 9795
POOH & L/D 2-7/8" INNER STRING TBG.
0730 - 0900 1.5 0 EOW C COMP HT PEL BCR 9795 9795
R/D BAKER 2 7/8" HANDLING TOOLS. R/U 5-1/2" HANDLING TOOLS.
0900 - 0930 0.5 0 EOW C COMP OTH TBG RIG 9795 9795
CLEAN & CLEAR RIG FLOOR.
0930 - 0945 0.25 0 POST N TINL PJSM NA RIG 9795 9795
HPJSM PRIOR TO M/U 9-5/8" HALL RBP ASSY.
0945 - 1115 1.5 0 POST N TINL HT BHA RIG 9795 9795
M/U 9-5/8" HALL RBP ASSY.

1115 - 1415 3 0 POST N TINL HT STRG RIG 9795 9795 RIH 9-5/8'' HALL RBP ASSY AT CONTROLLED SPEED TO SETTING DEPTH @5214' FT
(TOP OF RBP @5206').

1415 - 1545 1.5 0 POST N TINL SET RBP HCB 9795 9795 5214 5214 SET 9-5/8" HALL RBP AND RELEASE RUNNING TOOL OVERSHOT ASSY AT 5214'
(TOP OF RBP @5206'). PRESSURE TEST RBP TO 1000 PSI -OK.
1545 - 1645 1 0 POST N TINL CIRC MPMP RIG 9795 9795
DUMPED & SPOT COARSE SAND INTO DRILL STRING.

1645 - 1815 1.5 0 POST N TINL HT STRG RIG 9795 9795 PULL STRING 2 STANDS ABOVE TOP OF RBP. DISPLACE WITH STG VOLUME. AND
WAIT FOR SAND SETTLING DOWN.
1815 - 1830 0.25 0 POST N TINL HT STRG RIG 9795 9795
RIH AND TAG TOP OF COARSE SAND AT 5,146'.
1830 - 1845 0.25 0 POST N TINL HT STRG RIG 9795 9795
POOH 9-5/8" HALL RBP R/T ON 5-1/2" DP STANDS TO 5000 FT.
1845 - 1900 0.25 0 POST N TINL PJSM NA RIG 9795 9795
HPJSM PRIOR TO DISPLACE HOLE TO 94 PCF BARITE OBM.

DISPLACE HOLE & CONDITION MUD TO 94 PCF BARITE RHELIANT OBM. CLEAN AND
1900 - 2230 3.5 0 POST N TINL CIRC MPMP RIG 9795 9795
FLUSH ALL SURFACE LINES. PERFORM PITS MANAGEMENT.
- EXTENDED FLOW CHECK-WELL STATIC.
2230 - 2245 0.25 0 POST N TINL TO STDP RIG 9795 9795 5000 4500
POOH 9-5/8'' HALL RBP R/T ON 5-1/2" DP STANDS.
2245 - 2300 0.25 0 POST N TINL CIRC MPMP RIG 9795 9795
FLOW CHECK AFTER PULLING 5 STANDS-WELL STATIC.
2300 - 0000 1 0 POST N TINL TO STDP RIG 9795 9795 4500 2550
POOH 9-5/8'' HALL RBP R/T ON 5-1/2" DP STANDS.

POOH 9-5/8'' HALL RBP R/T ON 5-1/2" DP MEANWHILE L/D 27 JTS X 5-1/2"DP FOR
0000 - 0330 3.5 0 POST N TINL LDP SPDP RIG 9795 9795 2550 470
INSPECTION.

0330 - 0345 0.25 0 POST N TINL CIRC MPMP RIG 9795 9795
FLOW CHECK @5 STDS PRIOR TO HALL RBP R/T : WELL STATIC.

POOH W/ 9-5/8'' HALL RBP BHA ON 5-1/2" DP MEANWHILE L/D 5-1/2"DP FOR
0345 - 0430 0.75 0 POST N TINL LDP SPDP RIG 9795 9795 470 110
INSPECTION.
- FLOW CHECK : WELL STATIC.
0430 - 0459 0.5 0 POST N TINL HT BHA RIG 9795 9795
POOH & L/D 9-5/8'' HALL RBP BHA. **ONGOING AT RPT**
Foreman Remarks

ZULF-1285 OBJECTIVE: DRILLED AS A DUAL LATERAL OIL PRODUCER TARGETING SAFANIYA RESERVOIR TO A TOTAL DEPTH OF 9,795 FT MD (L-0) AND 10,130 FT MD (L-1) WITH TOTAL OF +/-
6,000 FT OF RESERVOIR CONTACT.
====================================================
* DISCUSSED PREVENTION OF PHOTOGRAPHY AT ANY OF ARAMCO UTILITIES.
* DISCUSSED DANGER ZONES CAMPAIGN AT PRE-TOUR, OPERATIONS & WEEKLY MEETING.
* DISCUSSED SHIFT HANDOVER REQUIREMENT.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1285 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 07/09/2023 - 07/19/2024
Report ID: OPERLMTDMRREP

* DISCUSSED HEAT STRESS CAMPAIGN & HYDRATION AT PRE-TOUR, OPERATIONS & WEEKLY MEETING.
* DISCUSSED STAIRWAYS CAMPAIGN AT PRE-TOUR, OPERATIONS & WEEKLY MEETING.
* HSE ALERTS: REVIEWED HSE ALERTS# 69-24, 70-24, 71-24 & 72-24 WITH ALL PERSONNEL ON THE RIG.
* DRILLS: 1 SWA & 1 LINE OF FIRE DRILL.
=======================================================================
ZULF-1285 CASING POINTS PLANNED:
18-5/8" CASING AT 1,758 FT (50 FT TVD INTO RUS). SET @ 1,760 FT.
13-3/8" CASING AT 4,778 FT (100 FT TVD INTO LAMS). SET @ 4,780 FT.
9-5/8" CASING AT 6,747 FT. TARGET ENTRY(SFNY RESERVOIR). SET @ 6,585 FT
8-1/2" HOLE SECTION & WELL TD (L-0) @ 9,795 FT.
8-1/2" HOLE SECTION (L-1) @ 7,045FT.
6-1/8" HOLE SECTION & WELL TD (L-1) @ 10,130 FT.
====================================================
ZULF-1280/1289 PF BATCH SEQUENCES:
* ZULF-1280: RETRIEVE CORROSION CAP AND TIEBACK 18-5/8", 13-3/8" AND 9-5/8"
* ZULF-1284: DRILL 22", 16 AND 12-1/4" HOLE SECTION.
* 22" HOLE: ZULF-1281, ZULF-1283, ZULF-1282, ZULF-1285, ZULF-1287, ZULF-1289, ZULF-1288 (DONE).
* 16" HOLE: ZULF-1288, ZULF-1289, ZULF-1287 , ZULF-1285, ZULF-1283 , ZULF-1281, ZULF-1282 (DONE).
* 12-1/4" HOLE: ZULF-1282, ZULF-1288, ZULF-1289, ZULF-1287, ZULF-1285, ZULF-1283, ZULF-1281 (DONE).
* 8-1/2" HOLE & EOW: ZULF-1281, ZULF-1283, ZULF-1282, ZULF-1288, ZULF-1284. SINGLE LATERAL WELLS (DONE).
* 8-1/2" HOLE & 6 1/8" HOLE & EOW: ZULF-1289 (DONE), ZULF-1287 (DONE), ZULF-1285.(DUAL LATERAL WELLS).
====================================================
PERSONNEL:
* ARAMCO MATERIAL EXPEDITOR ALROJITH PITCHAIAH ID#8618645 ON BOARD.ON 06/11/2024.
* ARAMCO DRILLING ENGINEER KHALID ALJINDAN ID# 747712 ON BOARD 06/14/2024.
====================================================
CONTRACTOR MANAGEMENT VISITS
* RIG MANAGER HUSSIEN ELMARZOUK VISITED RIG ON 05/18/2024.
* OPERATIONS MANAGER EHAB MOHAMED VISITED RIG ON 05/06/2023.
* RIG HSE SUP TAREK ATTIA VISITED RIG ON 02/23/2024 .
======================================================
RENTAL TOOLS ON BOARD:
* 1EA X 6-1/2" WFD HDJ JAR ON BOARD FROM 04/08/2024, MF# 2100860196/ S.N#1760-2322 BY ARON MCCALL.
* 1EA X 6-1/2" WFD HDJ JAR ON BOARD FROM 05/23/2024, MF# 2100896571/ S.N#1760-5285 BY RJ COCO.
* 1EA X 4-3/4" NAPESCO HDJ JAR ON BOARD FROM 05/06/2024, MF# 2100883907 / S.N# HJDA-500-0009 BY TROUNSON TIDE.
======================================================
LC 50 WBM SAMPLE MANIFEST # 2400619423 SENT ON 05/15/2023 ON WISE TIDE II VESSEL.
LC 50 OBM SAMPLE MANIFEST # 2400625348 SENT ON 06/19/2023 ON ALEXANDER MCCALL.
=======================================================
NEXT LOCATION:
* ABSF-320/329 (10 NEW WELLS & 1 WO WELL). CRM# # 8800022376 SUBMITTED ON JUNE-13-2024 .
* ZULF-360/368 (8 WO WELLS). CRM# # 8800022200 SUBMITTED ON MAY-19-2024 & APPROVED MAY-20-2024.
* SFNY-685 ( PLATFORM- SFNY-676/685) : CRM-8000646841 SFNY-676/685 SUBMITTED AND APPROVED.
* SFNY-1139 (PLATFORM : SFNY-1130/1139) CRM-SR 8000646841 SFNY1130-1139 SUBMITTED AND APPROVED.
* EXPECTED RIG MOVE DATE: +/- JULY-30-2024.
====================================================
RIG HEADING: 28 DEG, LAT. 26.08 N, LONG : 49DEG 14.21" E.
ELEVATION RF TO MSL =116 FT; WATER DEPTH =141 FT; RF TO SEA BED = 257 FT.
====================================================
WELL PLAN:
ZULF-1285 L-0 P8-DATED ON 05/15/2024.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 9,795 87.6 268.5 0 5,701 -240.55 -1688.1 5,594.32 0.37

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
84 PCF 0 0 API 0 0 Volts 0 10.5 292,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 88 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 12 0/0 0 166,000 0
27
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
84 PCF 0 0 API 0 0 Volts 0 10.5 292,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 88 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 12 0/0 0 166,000 0
27

MUD HEC
TREATMENT 5 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/06/2024 TOURLY 10-13 KNTS 1-2 FT SEASONAL 412 TOURLY

PERSONNEL HCB BCR LIG SCP SPS RIG OES SMI NFT WJS HML ARM HCO SJC GU1 ARM CRW
Total
Company
AND SERVICES 99
INFORMATION

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1285 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 07/09/2023 - 07/19/2024
Report ID: OPERLMTDMRREP

Category BRCR CSR CTRG PSSC DPDS RIG DFMS DFMS FILT JST MULS OTHR PSIE PCS SCS WSC WBCS

No. of Persons 1 4 14 1 4 61 1 1 1 0 2 2 1 2 1 2 1

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 0 24 24 24 24 24 24 24

Operating Hours. 24 4 0 0 0 24 12 12 0 0 0 0 0 24 0 24 0

Standby/Tankers
TRUCKS/BOATS
juzor

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1230 451 1794 5680 N/A 3619

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-2107 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/23/2023 - 09/20/2024
Report ID: OPERLMTDMRREP

ADM-683 @ ZULF-2107 Limited Morning Report for 06/18/2024


Objective : (SINGLE PWI ) Foreman(s)DAVIDSON, SIMON / ABDELMONEIM, ISLAM ABDELTAWWAB
D&WO Morning Report (Service Providers View) Charge #: Engineer ALAKEEL, KHALID WALEED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22062-2107) Manager HARBI, SALEH MOHAMMAD
ADM-683
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882-16777 -14167 862-1632 13-849-997 1 (RADIO R OOM)
Date: Tuesday 06/18/2024 ZULF-2107 (0) ZULF_2107_0 OTHER VSAT CONTRACTOR /CLERK VSA T
862-1992 862-2870 ( RIG CLERK)

Last 24 hr operations Next 24 hr plan


RIH W/ REAMING RUN. SPOT LUBRAGLIDE W/ PST MUD. POOH. L/D REAMING BHA. RETRIEVE WB. JET BOP. RUN LOWER COMPLETION.
Location Next Location
ZULF-2100/2109 PF ZULF-2107
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,228 Last Csg Size MD TVD Size Top
9 5/8 9357 6241 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12228 (Date) 100 0 240
46.4 (06/08/2024@1830 )

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Lt Type Lt ID Summary of Operations
OP Co Start End Start End

0500 - 0730 2.5 0 8 1/2 N DRLG HT BHA BHI 12228 12228 L/D 8-1/2" X 9-1/2" DRLG BHA, CHECK TOOLS , BREAK BIT AND
DULL GRADE SAME, 1-1-WT-A-X-NO-TD.

0730 - 0800 0.5 0 8 1/2 N CT SDR1 NA RIG 12228 12228 CLEAN AND CLEAR RIG FLOOR AND PREPARE TOOLS FOR
PICKING UP 8 1/2'' REAMER ASSY.

0800 - 0945 1.75 0 8 1/2 N CT HT BHA RIG 12228 12228 HELD PJSM, M/U 8 1/2'' REAMER BHA STIFF ASSY, 8 1/2''
WELDED BIT, REAMERS AND DLR.

RIH W/ 8-1/2" REAMING STIFF ASSY IN CASED HOLE.


0945 - 1330 3.75 0 8 1/2 N CT TI STDP RIG 12228 12228 1176 9334
MONITOR THE WELL ON TRIP TANK. DISPLACEMENT GOOD.
FILL STRING EVERY 20 STANDS.

1330 - 1430 1 0 8 1/2 N CT SDR1 NA RIG 12228 12228 HELD SAFETY STAND DOWN WITH ADES, ARAMCO & ALL 3RD
PARTY TO DISCUSS RECENT INCIDENTS.

1430 - 1530 1 0 8 1/2 N CT RR TDS RIG 12228 12228 SERVICE TDS, CHANGE SEALS ON WASHPIPE AND PRESSURE
TEST SAME.

1530 - 1630 1 0 8 1/2 N CT RR TDS RIG 12228 12228 RR 934854 OBSERVED ADDITIONAL SEAL DAMAGE ON WASHPIPE REPAIR
AND TEST SAME, GOOD.

1630 - 1900 2.5 0 8 1/2 N CT TI STDP RIG 12228 12228 9334 12228 RIH W/ 8-1/2" REAMING STIFF ASSY IN OPEN HOLE. HOLE
GOOD. DISP GOOD.

PUMPED SWEEP & CHC.


1900 - 2100 2 0 8 1/2 N CT CIRC MPMP RIG 12228 12228
SPOTTED LUBRAGLIDE W/ PST MUD. FLOW CHECKED, WELL
STATIC.

2100 - 2330 2.5 0 8 1/2 N CT ST STDP RIG 12228 12228 12228 9334 POOH W/ 8-1/2" REAMING STIFF ASSY IN OPEN HOLE. HOLE
GOOD. DISP GOOD.

2330 - 0200 2.5 0 8 1/2 N CT CIRC MPMP RIG 12228 12228 PERFORMED PST AS PER WFD ENG, ALL GOOD.
FLOW CHECKED, WELL STATIC.

0200 - 0459 3 0 8 1/2 N CT TO STDP RIG 12228 12228 9334 3300 POOH W/ 8-1/2" REAMING STIFF ASSY IN CASED HOLE. DISP
GOOD. ON GOING.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 1530 1 1 934854 RR FOT SWVL RIG 12228 OBSERVE LEAKING WASH PIPE SEALS
Foreman Remarks

WELL DATA:
ZULF-2107 IS A HORIZONTAL WELL THAT WILL BE COMPLETED ACROSS KHFJ AQUIFER AND UTILIZED AS WATER INJECTOR IN PF-2100/2109 IN THE EASTERN FLANK OF ZULUF FIELD, AS PART
OF AM MAINTAIN POTENTIAL, AND WILL BE COMPLETED WITH 5-1/2" STAND-ALONE SAND SCREENS (250 MICRONS) AND PACKERS.
===================================================================================================
* PIT DRILLS: 0, TRIP DRILLS: 2.
* HELD H2S, & ABANDONMENT DRILLS ON 06/17/2024.
* HELD MAN DOWN DRILL ON 05/29/2024.
* RUN E-GEN FOR 2 HRS ON 06/16/2024
===================================================================================================
* CURRENT LOCATION: PLATFORM: ZULF-2100/ 2109.
* RIG POSITION: LATITUDE: 28.20'. 98" N, LONGITUDE: 049.19'.20"E, RIG HEADING: 330 DEG.
===================================================================================================
* FOLLOWING WELL PLAN ZULF-2107 REV A-0 DATED 21 FEB 2024.
* WELL POSITION: 0.75 FT LEFT & 74 FT ABOVE THE PLAN.
===================================================================================================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-2107 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/23/2023 - 09/20/2024
Report ID: OPERLMTDMRREP

*ZULF-2107 PLANNED CASING POINTS L-0:


*32" CP PRE-SET AT 308'.
*18-5/8" PLANNED: 1883' MD. ACTUAL: 1881' MD.
*13-3/8" PLANNED: 5102' MD. ACTUAL: 5141' MD.
*9-5/8" PLANNED; 9181' MD. ACTUAL: 9359' MD.
*8-1/2" TD PLANNED: 12227' MD. (KHAFJI RSVR) ACTUAL: 12228' MD.
===================================================================================================
* PF WELLS STATUS:
* ZULF-2108: SUSPENDED FOR FLOWBACK & INJECTION TEST [CERAMIC DISK NOT BROKEN]
* ZULF-2101: SUSPENDED FOR FLOWBACK & INJECTION TEST [CERAMIC DISK NOT BROKEN]
* ZULF-2102: SUSPENDED FOR FLOWBACK & INJECTION TEST [CERAMIC DISK NOT BROKEN]
* ZULF-2104: SUSPENDED FOR FLOWBACK & INJECTION TEST [CERAMIC DISK NOT BROKEN]
* ZULF-2105: SUSPENDED FOR FLOWBACK & INJECTION TEST [LBFV NOT BROKEN]
* ZULF-2106: SUSPENDED FOR FLOWBACK & INJECTION TEST [LBFV IS BROKEN]
* ZULF-2107: CURRENT
* ZULF-2100: TIED BACK & SUSP
===================================================================================================
* BATCH DRILLING SEQUENCE:
* CURRENT: ZULF-2107 (8-1/2")
* ZULF-2107 EOW [LOWER COMPL].
* ZULF-2100 EOW.
* ALL WELLS FLOWBACK.
* ZULF-2107 [EOW-ESP]
* ALL WELLS INJECTIVITY TEST.
* ZULF-2107 DECOMPLETION.
* ZULF-2107 EOW.
===================================================================================================
ARAMCO PERSONNEL:
* ARAMCO MATERIAL EXPEDITOR KHALID M.AL SHEHRI ID# 821491ON BOARD SINCE 06/11/2024.
===================================================================================================
CONTRACTOR MANAGMENT VISITS:
* ADES HSE SUPERVISOR KAREEM YOUSSEF #8218372 LEFT RIG ON 05/24/24.
* ADES RIG MANAGER MAHMOUD YOUSSEF #8348890 LEFT RIG ON 05/21/24.
* ADES OPS MANAGER AHMED LOTFY #8317925 LEFT RIG ON 03/05/24.
===================================================================================================
LC-50 SAMPLES:
* WBM SAMPLE SENT ON TROUNSON TIDE 02/03/2023, MN# 2400603285.
* OBM SAMPLE SENT ON VALLIANZ COMMANDER 03/03/2023, MN# 2400607751.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 1 0 API 61 810 Volts 3.51 0 257,347
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
138 1.2 HTHP 17 20 0 11 / 15 RELIANT 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 32 22 9 / 10 0 0 1.2
69

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 1 0 API 62 840 Volts 3.51 0 256,775
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 1 HTHP 16 21 0 13 / 18 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 34 22 10 / 11 0 0 0
71

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 1 0 API 60 810 Volts 3.51 0 253,524
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.2 HTHP 18 20 0 12 / 16 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 33 22 9 / 10 0 0 0
69

MUD ALP-BDS-C-MI MRBL-M CACL2-98 CAOH2 CACO3-25 CACO3-50


TREATMENT 22 ( 55LB ) 1 ( 2200L ) 1 ( 2200L ) 10 ( 50KG ) 20 ( 55LB ) 30 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
9RR 9,369 12,228 DP Av DC Av Bit HHP 0 0 M222 8.5 SMT
Pressure GPM Jet Vel 0 0 0 I-Row O-Row DC Location Bearings
0 0 0 1 1 WT A X
Serial Number Type Jets TFA
BIT DATA SM3321 MS616C 6 x 14 / 0.902
Gauge Other POOH Reason
0

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
8RR 12,228 12,228 DP Av DC Av Bit HHP 0 0 117 8.5 SMT
Pressure GPM Jet Vel I-Row O-Row DC Location Bearings

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-2107 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/23/2023 - 09/20/2024
Report ID: OPERLMTDMRREP

0 0 N/A 0 0 0 N/A N/A N/A N/A N/A


Serial Number Type Jets TFA
RV1357 XR+C POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 74 0 0 0 0 109
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 22 0 0 0 0 133
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 8.5 1 0.83 4 1/2 REG RV1357
2 Near Bit Roller Reamer RIG 8.5 1 6.5 2.813 5.44 NC50 4 1/2 REG 54 3 POINT RR-84-0011
3 Drillcollar RIG 6.5 1 6.5 2.813 30.9 NC50 NC50 75 SPRL DSS2202282
4 String Reamer RIG 8.5 1 8.5 2.75 5.1 NC50 NC50 54 DEP-18-0865
5 Drillcollar RIG 6.5 2 6.5 2.813 61.95 NC50 NC50 75 SPRL RIG
6 String Reamer RIG 8.5 1 8.5 2.75 4.15 NC50 NC50 54 DSS20125006
7 Drillcollar RIG 6.5 1 6.5 2.813 30.78 NC50 NC50 75 SPRL DSS17095021
8 Crossover RIG 6.75 1 6.75 3.25 3.03 XT54 NC50 40 H5-193
9 Heavy Weight Drillpipe (HWDP) RIG 5.5 2 5.5 3.25 62.71 XT54 XT54 61.6 CONV RIG
10 Hydraulic Jar NPJ 6.5 1 6.5 30.69 30 HJDA 650001
11 Heavy Weight Drillpipe (HWDP) RIG 5.5 4 5.5 3.25 125.42 XT54 XT54 61.6 CONV RIG
12 Drillpipe RIG 5.5 1 5.5 4.67 30 5-1/2 FH 5-1/2 FH 24.7 S135 PREMIUM RIG

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/10/2024 TOURLY 14 KTS NW 2-3 FT SEASONAL 533 TOURLY

Company INW FMC MAX SCP BHI RIG OES SMI NRT BLH XLG ARM WCS NCS EX1 BRD ARM SAM GEP

Category BRCR CSR PSSC PSSC DPDS RIG DFMS DFMS HO LHES MLS OTHR PSIE PCS SLS SCS WSC WBCS WHES
PERSONNEL
1 6 1 1 3 64 1 1 1 1 6 1 2 1 2 1 2 1 1
Total
AND SERVICES No. of Persons
97
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 4 24 12 12 4 0 24 12 0 24 0 0 24 0 0

Standby/Tankers
TRUCKS/BOATS
PACIFIC PYTHON

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1508 1455 1209 3290 0 3138

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1665 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 09/25/2023 - 06/30/2024
Report ID: OPERLMTDMRREP

ADM-684 @ SFNY-1665 Limited Morning Report for 06/18/2024


Objective : ( SFNY-1665 Foreman(s)ALLSOP, COURTNEY BYRON / AGUIRRE BARRIOS, ENGELBERT
D&WO Morning Report (Service Providers View) Charge #: WILL BE DRILLED AS A Engineer ALAHMADI, RAYAN KHALID
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23013-1665) SINGLE LATERAL Manager FAIFI, MUSAAD HASSAN
ADM-684
PRODUCE WELL ) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily OffShore
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14158 013-875904 1 013-872740 5 (RADIO R OOM)
Date: Tuesday 06/18/2024 SFNY-1665 (0) SFNY_1665_0 CONTRACTOR /CLERK VSA T
013-873929 0 (CLERK)

Last 24 hr operations Next 24 hr plan


CONTINUED DRILLING 8.5" L-0 HS WITH SLB RSS/LWD/MWD/GR BHA TO TD POH & L/D 8.5" SBL RSS DRILLING BHA, END DRILLING ACTIVITIES ON WELL SFNY-1665 & START
COMPLETIONS ACTIVITIES ON SAME WELL
Location Next Location
WELL IS LOCATED 0.002 KM S31E OF SFNY-1667 AND 0.002 KM N31W OF SFNY-1663 SFNY-1665
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,323 Last Csg Size MD TVD Size Top
9 5/8 7921 5457 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9670 (Date) 80 653 248
30.1 (06/10/2024@1000 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT. DRILLING L-0 HS W/ 8.5" SLB RSS/LWD/MWD/GR BHA TO TD @ 10,323 FT

0500 - 1500 10 0 8 1/2 N DRLG D RSS SDM 9670 10323 - APPLIED "DOWN LINKS" DURING DRILLING
- RECORDED SURVEY EVERY STAND
- REAM & BACKREAMING EVERY STAND
- NO LOSSES MONITORED

OBSERVED LOSSES, P/U FROM BTTM HOLE & ASSESS RATE LOSSES TO 200 BPH

1500 - 1700 2 0 8 1/2 N DRLG CIRC MPMP RIG 10323 10323 - PUMPED 1ST PILL OF LCM (100 BBLS W/ 40 PPB CONCENTRATION), FLOW
CHECKED & MONITORED RATE LOSSES TO 40 BPH ON TRIP T.
- PUMPED 2ND PILL OF LCM (100 BBLS W/ 40 PPB CONCENTRATION), FLOW
CHECKED & MONITORED RATE LOSSES TO 40 BPH ON TRIP T.

1700 - 1745 0.75 0 8 1/2 N DRLG ST STDP RIG 10323 10323 10323 9850 POH 8.5" SLB RSS BHA TO 9,850 FT (FREELY), PERFORMED FLOW CHECK &
MONITORED RATE LOSSES TO 40 BPH ON TRIP T.

1745 - 2045 3 0 8 1/2 N DRLG ST STDP RIG 10323 10323 9850 7921 CONT. POH 8.5" SLB RSS BHA (FREELY) WITH CAUTION AND CONTROLLED SPEED
TO CSG SHOE @ 7,921 FT

WITH 8.5" SLB BHA INSIDE CSG SHOE:

2045 - 2245 2 0 8 1/2 N DRLG CIRC MPMP RIG 10323 10323 - PERFORMED FLOW CHECK, MONITORED RATE LOSSES TO 60 BPH ON TRIP T.
- PUMPED & SPOTTED 100 BBLS OF LCM (W/ 40 PPB CONCENTRATION).
- PERFORMED "EXTENDED" FLOW CHECK, MONITORED RATE LOSSES TO 90 BPH
ON TRIP T.

KEPT MONITORING WELL WITH DRILLING STRING AT CSG SHOE, MONITORED


2245 - 0459 6.25 0 8 1/2 N DRLG CIRC MPMP RIG 10323 10323 RATE LOSSES TO 60 BPH

- WHILE BUILD MUD VOLUME


Foreman Remarks

SFNY-1665 WILL BE DRILLED AS A SINGLE LATERAL PRODUCER TARGETING WARA RESERVOIR. THE WELL WILL BE DRILLED FROM SLOT# 5 ON
SFNY-1660/1669 PF. THE WELL WILL BE COMPLETED WITH 5-1/2" ICD & 4-1/2"ICD AND 350 MICRON SCREEN, OPENHOLE SWELLABLE
PACKERS FOR ZONAL ISOLATION, MFIV, SMART COMPLETION ICV VALVES FOR EACH LATERAL WITH WET CONNECT, DOWNHOLE PACKER, ESP
AND 4-1/2" TUBING WITH FLAPPER TYPE SUBSURFACE SAFETY VALVE.
*** RKB TO ML= 104 FT, WATER DEPTH 14.6M. RIG ELEVATION 43.01 AIR GAP.
==================================================================================================
BATCH DRILLING SEQUENCE:
* SFNY-1660 SUSPENDED AFTER TIE-BACK ON 09/16/2023 @ 15:00 HRS.
* 22" HOLE: ALL COMPLETED
* SFNY-1663: DRILL 16" HOLE, 8-1/2" PILOT HOLE, 12-1/4" HOLE, SUSPEND WELL.
* 16" HOLE: ALL COMPLETED
* 12.25" HOLE: SFNY-1663 SUSPENDED, SFNY-1664 SUSPENDED, SFNY-1665 SUSPENDED, SFNY-1666 SUSPENDED, SFNY-1667 SUSPENDED, SFNY-1668 SUSPENDED, SFNY-1669 SUSPENDED.
* 8.5" HOLE: SFNY-1669 SUSPENDED, SFNY-1668 SUSPENDED, SFNY-1667 SUSPENDED. SFNY-1666 SUSPENDED, SFNY-1665 ON GOING
* EOW: SFNY-1669 COMPLETED, SFNY-1668 COMPLETED, SFNY-1667 COMPLETED, SFNY-1666 CPMPLETED.
==================================================================================================
PLANNED CASING POINT.
18-5/8" @ +/- 1178' (50' TVD INTO RUS) - SET AT 1,176'.
13-3/8" @ +/- 4,965' (100' TVD INTO LAMS) - SET AT 4,990'.
9-5/8" @ +/- 6,560' (TARGET ENTRY) - SET AT 7921'.
===================================================================================================
COMPARE PLAN: 61.4 FT BELOW & 8.5 FT RIGHT OF THE DIRECTIONAL PLAN
===================================================================================================
* CONDUCTED H2S & ABANDONSHIP DRILLS ON 12/30/2023.
* HELD SWA DRILL, DISSCUSED WITH RIG CREW THE IMPROTANCE OF THE DRILL.
===================================================================================================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1665 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 09/25/2023 - 06/30/2024
Report ID: OPERLMTDMRREP

* WELL SFNY-1660/1669.
* COORDINATES: LAT: 28*11.378' N & LONG: 048*46.08' E, HEADING 331 DEG.
* WATER DEPTH: 47 FT (MSL)
===================================================================================================
PERSONNEL ON LOCATION:
* ARAMCO CLERK: NIRAJ KUMAR RAI ID#8321443 ON BOARD SINCE 03/29/2024.
* ARAMCO PDP ABDULAZIZ ALZAHRANI ID#816704 ON BOARD SINCE 06/11/2024
===================================================================================================
* CONTRACTOR MANAGEMENT VISITS:
* RIG MANAGER MAHMOUD YOUSEF VISITED RIG ON 13.MAY.2024.
* ADES HSE MANAGER KARIM YOUSSEF VISITED RIG ON 13.MAY.2024.
===================================================================================================
S&S MANAGEMENT:
- SKIPS ON RIG = 0 FULL & 24 EMPTY
- SKIPS ON BOAT = 10 FULL & 06 EMPTY
- SKIPS BACKLOADED IN LAST 24 HRS = 09
- SKIPS USED FOR SFNY-1665 TO DATE= 215
- SKIP TOTAL TONS FOR SFNY-1666 TO DATE= 858.7
===================================================================================================
* CURRENT LOCATION: SFNY-1665
* NEXT LOCATION: SFNY-1664
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 9,756 87.93 197.48 94 5,457 -1743.27 -680.34 6,139.51 0.15
0 9,852 87.85 197.75 96 5,461 -1771.14 -689.18 6,235.24 0.3
0 9,948 88.85 197.95 96 5,463 -1798.98 -698.15 6,331.03 1.07
DAILY SURVEY
0 10,042 88.91 198.11 94 5,465 -1826.22 -707.01 6,424.87 0.18
0 10,136 88.48 197.89 94 5,467 -1853.46 -715.86 6,518.71 0.52
0 10,230 88.5 197.6 94 5,470 -1880.74 -724.59 6,612.51 0.31
0 10,323 87.5 197.6 93 5,473 -1907.74 -733.16 6,705.29 1.08
MUD DATA
MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
8RR 7,935 10,323 DP Av DC Av Bit HHP 10 150 M222 8.5 REED
Pressure GPM Jet Vel 379.32 N/A 267 I-Row O-Row DC Location Bearings
3,350 650 269 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
S308056 TK66M1A 6 x 13 / 0.778
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 29 180 212 152 12,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit REED 8.5 1 0.83 S308056
2 RSS SDM 6.75 1 6.75 4.2 13.25 4 1/2" IF 5-1/2 FH 92 96066G
3 Float Sub SDM 6.906 1 6.906 2.875 2.55 NC50 NC50 92 4605-3-4
4 Sub TK3 6.75 1 6.75 2.875 8.43 NC50 5 1/2 FH 92 82934SAT
5 Logging While Drilling (LWD) SDM 6.75 1 6.75 13.67 5-1/2 FH 5-1/2 FH 124.71 ZZ218221
DRILL STRING 6 Logging While Drilling (LWD) SDM 6.75 1 6.75 25.95 5-1/2 FH 5-1/2 FH 102.27 3215
7 Logging While Drilling (LWD) SDM 6.75 1 6.75 14.32 5-1/2 FH 5-1/2 FH 124.71 C0170/1
8 Measurement While Drilling (MWD) SDM 6.75 1 6.75 27.52 5-1/2 FH 5-1/2 FH 83 N000022
9 Logging While Drilling (LWD) SDM 6.75 1 6.75 13.73 5-1/2 FH 5-1/2 FH 124.71 G8453/2
10 Crossover SDM 6.75 1 6.75 2.875 1.3 5 1/2 FH NC50 85 NTS-SA-3867
11 Non Magnetic Drill Collar ( NMDC ) SDM 6.75 1 6.75 2.5 9.56 NC50 NC50 85 SPRL 1188836
12 Float Sub SDM 6.75 1 5 3 2.66 NC50 NC50 85 6237-1
13 FIlter Sub SDM 6.844 1 6.75 2.875 6.52 NC50 NC50 85 675-8018
14 Crossover RIG 6.75 1 6.75 3.25 3.04 XT54 NC50 85 ZHR20221203
15 Heavy Weight Drillpipe (HWDP) RIG 5.5 3 5.5 3.25 93.06 XT54 XT54 54 CONV RIG
16 Hydro-Mechanical Jar CDS 6.75 1 6.75 2.625 32.17 XT54 XT54 1,500 DJ6-650-244
17 Heavy Weight Drillpipe (HWDP) RIG 5.5 6 5.5 3.25 188.95 XT54 XT54 54 CONV RIG
18 Drillpipe RIG 5.5 250 5.5 4.67 7,500 XT54 XT54 24.7 S135 PREMIUM RIG

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/11/2024 N/A 06-08 KTS 1-3 FT SEASONAL 513 DAILY PRE TOUR
SW MEETING

Company HCB OCS GOS HCO SDM RIG OES SMI NFT HLH ARM BCM GD1 BSC BRD ARM CRW GEP

PERSONNEL Category BRCR CSR CTRG PSSC DPDS RIG DFMS DFMS FILT LHES OTHR PCS SLS SCS SCS WSC WBCS WHES
Total
AND SERVICES
1 3 13 3 4 50 1 1 1 2 2 1 3 4 1 2 1 1 94
INFORMATION No. of Persons

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1665 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 09/25/2023 - 06/30/2024
Report ID: OPERLMTDMRREP

Operating Hours. 0 0 0 0 24 24 12 12 0 0 0 24 0 12 24 24 0 0

Standby/Tankers Others Others


TRUCKS/BOATS
HADI-21 rawabi-10 rawabi-52

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2006 1144 1248 3426 0 2181

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR RBYN-18 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 12/26/2023 - 07/29/2024
Report ID: OPERLMTDMRREP

ADM-685 @ RBYN-18 Limited Morning Report for 06/18/2024


Objective : (OIL Foreman(s)SIMPSON, SHANE MICHEL / GHABBOUR, SHADY EHAB
D&WO Morning Report (Service Providers View) Charge #: PRODUCTION WELL Engineer ALOTAIBI, ABDULLAH HAMDAN / MANSOUR, MOHAMMED MANSOUR
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved TARGETING SAFANIYA Manager GHAMDI, NAWAF AHMED
ADM-685 (66-23062-0018)
RESERVOIR) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily OffShore
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14210 013-677162 8 013-673916 5 (RADIO R M)
Date: Tuesday 06/18/2024 RBYN-18 (0) RBYN_18_0 CONTRACTOR /CLERK VSA T
013-673144 9

Last 24 hr operations Next 24 hr plan


P.TEST BOP & RUN UPPER ESP COMPLETION. RUN UPPER ESP COMPLETION, LAND TBG, DISPLACE WELL WITH INHIBITED BRINE
Location Next Location
RBYN 10-19 P/F RBYN-16
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,844 Last Csg Size MD TVD Size Top
9 5/8 7477 5750 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9844 (Date) 100 0 240
35.4 (06/11/2024@1400 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0700 2 0 EOW N BOP OTH RAMS RIG 9844 9844
CHANGE TPR FROM 5-1/2" TO 4-1/2".
0700 - 0830 1.5 0 EOW N BOP OTH BOP RIG 9844 9844
MAKE UP & RIH 4-1/2" TBG W/ TEST CUP ASSY.
0830 - 0915 0.75 0 EOW N BOP BOPT BOP RIG 9844 9844
P.TEST 4-1/2" RAM & ANNULAR
0915 - 1000 0.75 0 EOW N BOP OTH BOP RIG 9844 9844
PULL & L/DN TEST ASSY
1000 - 1030 0.5 0 EOW N CT HT BHA RIG 9844 9844
CLEAN & CLEAR DRILL FLOOR
1030 - 1230 2 0 EOW C COMP HT PEL NRC 9844 9844
RIG UP NAPESCO TUBING HANDLING EQUIPMENT.
1230 - 1300 0.5 0 EOW C COMP PJSM TBG RIG 9844 9844
HPJSM FOR RUNNING UPPER ESP COMPLETION.
1300 - 1400 1 0 EOW C COMP RPCS SPCOM NRC 9844 9844 0 255
RIH WITH 3-1/2" TBG PER TALLY.

1400 - 1445 0.75 0 EOW C COMP DTU DRFT EX1 9844 9844 R/UP EXPRO SLICKLINE & DRIFT TUBING WITH 2.867".

1445 - 2030 5.75 0 EOW C COMP HT ESP SBA 9844 9844 MAKE UP 2-7/8" BYPASS ASSY, ESP PUMP ASSY, Y-TOOL ASSY AS PER SAWAFI
BORETS, PERFORM ELECTRICAL CHECKS.
2030 - 2130 1 0 EOW C COMP HT ESPL SBA 9844 9844
INSTALL CABLE SHEAVES ON DERRICK.

2130 - 2215 0.75 0 EOW C COMP HT PLUGN HCO 9844 9844 P/U AND M/U 1 JT 4.5"11.6# N.VAM, HAL "X" NIPPLE (3.813") ASSY, 2 JT
4.5"11.6# N.VAM
2215 - 2330 1.25 0 EOW C COMP HT PKR SBA 9844 9844
P/U & M/U 9 5/8" PRAXIS ISOPAX ESP PACKER.

2330 - 0315 3.75 0 EOW C COMP HT ESPL SBA 9844 9844 FEED FLAT ELECTRICAL CABLE TROUGH PRAXIS PACKER ADAPTOR AND PERFORM
CABLE ELECTRICAL CHECKS, TEST.

R/UP EXPRO SLICKLINE & DRIFT TUBING:


0315 - 0459 1.75 0 EOW C COMP DTU DRFT EX1 9844 9844
* 3.833" DRIFT TO X-NIPPLE
* 3.800" DRIFT TO Y-TOOL
Foreman Remarks

RBYN-18 IS A HORIZONTAL SINGLE LATERAL OIL PRODUCTION WELL TARGETING SAFANIYA RESERVOIR THAT WILL BE DRILLED FROM RBYN 10-19 PLATFORM LOCATED IN WESTERN FLANK OF
ZULUF FIELD. THE WELL WILL BE COMPLETED WITH INFLOW CONTROL DEVICES (ICDS) AND ELECTRICAL SUBMERSIBLE PUMP (ESP).
===================================================================================================
SAFETY:
* CONDUCT H2S & ABANDON DRILL ON (13-JUNE-2024).
* CONDUCT MAN DOWN DRILL ON (05-JUNE-2024)
* CONDUCT DRILLS TO REINFORCE STOP WORK AUTHORITY & LINE OF FIRE AWARENESS FOR DRLG CREW,
* REINFORCE HANDS-FREE OPERATIONS & HEAT STRESS AWARENESS IN ALL PRE-TOUR MEETINGS WITH ALL DRLG & THIRD PARTY CREWS.
* CONFIRMED THAT SSDM & PJSM IS NOT HELD IN ANY RED ZONE & LINE OF FIRE AREAS.
* DISCUSS AND EMPHASIZE RED ZONE MANAGEMENT WITH CREWS.
* CONDUCTED 3 STOP WORK AUTHORITY(SWA) DRILLS + 2 LINE OF FIRE (LOF) DRILLS WITH CREWS.
* HSE ALERTS DISCUSSED : NONE.
===================================================================================================
* RIG HEADING: 331 DEG, RIG POSITION: LAT: 28 15.49' N LONG: 49 04.11' E.
* ELEVATION RF TO SEA (MSL) = 107.6 FT, WATER DEPTH (MSL) = 91 FT, RIG FLOOR TO SEA BED = 198.6 FT.
* LEG PENETRATION: BOW LEG 9', PORT LEG 8.4', STARBOARD LEG 9.3'
===================================================================================================
RBYN-10/19 PF BATCH SEQUENCES:
* BATCH DRILL 22": RBYN-14, RBYN-16, RBYN-18, RBYN-17, RBYN-15... (ALL DONE).
* BATCH DRILL 16": RBYN-15, RBYN-17, RBYN-18, RBYN-16, RBYN-14.... (ALL DONE).
* BATCH DRILL 12-1/4": RBYN-14, RBYN-16, RBYN-18, RBYN-17, RBYN-15...(ALL DONE).

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR RBYN-18 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 12/26/2023 - 07/29/2024
Report ID: OPERLMTDMRREP

* BATCH DRILL 8-1/2" & EOW: RBYN-15, RBYN-17.... DONE, RBYN-18 ...ONGOING, RBYN-16, RBYN-14.
* FLOWBACK: RBYN-14, RBYN-15, RBYN-16, RBYN-17 & RBYN-18.
===================================================================================================
RBYN-18 : PLANNED VS ACTUAL CASING POINTS (L-0)
- 32" CONDUCTOR AT 248 FT (55.8 FT BELOW MUD LINE).
- 18 5/8" CASING (50 FT INTO RUS FM) : 1416' VS 1414' (1408' TVD).
- 13-3/8" CASING (100 FT INTO LAMS) : 4920' VS 4882' (4672' TVD).
- 9-5/8" CASING (TE SFNY RESERVOIR) : 6801' VS 7477'(5750' TVD).
- 8.5" HOLE SECTION : 10605' VS 9844' ( 5773' TVD).
===================================================================================================
PERSONNEL ON LOCATION:
* ARAMCO MATERIAL EXPEDITOR SAIF ALYAMI ID#8594435 ON RIG SINCE 04 JUNE 2024.
===================================================================================================
RENTAL TOOLS :
* 6.5" NAPESCO JAR (HMDA-650-0029) ON RIG SINCE 10 MAY 2024.
==================================================================================================
* LC 50 SAMPLE MANIFEST # 2400671771 SENT ON 03/04/2024 ON RAWABI-27 VESSEL.
* LC 50 SAMPLE MANIFEST # 2400689226 SENT ON 06/06/2024 ON RAWABI-41 VESSEL.
===================================================================================================
* NEXT LOCATION: JANA-20.
* RIG MOVE +/- 1-AUG-2024
* RIG MOVE RBYN-10/19 TO SEA: RMM RM-2024-4010851 (PROPOSED DATE 1-JUL-2024)
* RIG MOVE SEA TO JAN-20: RMM RM-2024-4010852 (PROPOSED DATE 1-JUL-2024)
* SITE SPECIFIC SURVEY # 8800022369 SUBMITTED 16-JUN-2024

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 9,844 91 130 0 5,773 -1150.98 1337.22 5,788.54 0.51

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
84 PCF 0 0 API 0 0 Volts 0 0 257,541
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 92 5 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 2 8 1/2 0 0 0
28
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
84 PCF 0 0 API 0 0 Volts 0 0 257,311
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 92 5 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 2 8 1/2 0 0 0
27

MUD CAOH2 BCTRN O-3670R ECCO-TEMP S-SCAV W CACL2-98


TREATMENT 3 ( 25KG ) 5 ( 5GLD ) 4 ( 55GL ) 2 ( 50LBP ) 1 ( 55GL ) 15 ( 2200L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/04/2024 DAILY 8-10 KNOTS 2 FT SEASONAL 273 TOURLY
NW

Company SBA SCB NRC ABE BC SPS RIG BAR EMC BFL ARM SJC EX1 BRD ARM CRW FME

Category ALS BRCR CSR CTRG PSSC DPDS RIG DFMS DFMS FILT OTHR PCS SLS SCS WSC WBCS WHES
PERSONNEL
9 1 4 14 1 1 49 1 1 1 1 2 2 1 2 1 1
Total
AND SERVICES No. of Persons
92
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 7 0 7 0 0 0 24 12 12 12 0 24 6 0 24 0 0

Standby/Tankers
TRUCKS/BOATS
HADI-22

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1585 1037 1228 2350 N/A 2250

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1327 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/25/2024 - 05/11/2025
Report ID: OPERLMTDMRREP

ADM-686 @ ZULF-1327 Limited Morning Report for 06/18/2024


Objective : (ZULF-1327 Foreman(s)LAPOINT, RICHARD BRYANT / GARAS, RIMON ADEL
D&WO Morning Report (Service Providers View) Charge #: WILL BE DRILLED AS A Engineer AUBRY, PIERRE-ALAIN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23062-1327) DUAL LATERAL Manager GHAMDI, NAWAF AHMED
ADM-686
HORIZONTAL PRODUCER THURAYA RIG FORMAN VSAT OTHER VSAT
Daily OffShore
Wellbores: TARGETING SAFANIYA
(0500-0500) Saudi Aramco Well +882 167 7 71 4216 013-677-63 02 013-663-48 23 RADIO
RESERVOIR AND WIL)
Date: Tuesday 06/18/2024 ZULF-1327 (0) ZULF_1327_0 CONTRACTOR /CLERK VSA T
013-673-36 95 CLERK

Last 24 hr operations Next 24 hr plan


SET WEAR BUSHING. M/U & RIH 16" DRILLING BHA, CLEAN OUT 18-5/8" CSG. DRILL AHEAD 16" DRILL 16" HOLE SECTION.
HOLE SECTION.
Location Next Location
ZULF-1320-1329 ZULF-1325
Current Depth (ft) Liner TOL MD TVD Formation Tops
2,250 Last Csg Size MD TVD Size Top
18 5/8 2082 Formations Comments
Depth
PNGU 1,275
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 2,012
2084 (Date) 100 166 252
5.2 (06/17/2024@0300 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 1100 6 0 PRE N BOP NU DVRT RIG 2084 2084
(CONT) N/U BELL NIPPLE. INSTALL OVERSHOT PACKER AND DIVERTER HOUSING.
1100 - 1130 0.5 0 16 N WH SET WBSH RIG 2084 2084
RUN/SET WEAR BUSHING IN WELLHEAD.

1130 - 1200 0.5 0 16 N BOP BOPT DVRT RIG 2084 2084 RIH 1 STD 5-1/2" HWDP. FUNCTION & PRESSURE TEST 21-1/4" DIVERTER AND
OVERBOARD VALVES TO 200 PSI - OK.
1200 - 1400 2 0 16 N DRLG HT BHA CDS 2084 2084
L/D JAR & MUD MOTOR FROM DERRICK.
1400 - 1800 4 0 16 N DRLG HT BHA CDS 2084 2084
P/U, M/U 16" BIT AND TAQA MUD MOTOR/MWD BHA F/ SURFACE T/ 780'.
1800 - 1830 0.5 0 16 N DRLG CIRC MPMP RIG 2084 2084
SHALLOW TEST MWD.
1830 - 1845 0.25 0 16 N DRLG TI BHA CDS 2084 2084 781 1061
RIH W/ 16" TAQA MUD MOTOR/MWD BHA ON 5-1/2" HWDP.
1845 - 1900 0.25 0 16 N DRLG TI STDP RIG 2084 2084 1061 1910
TIH W/ 16" TAQA MUD MOTOR/MWD BHA ON 5-1/2" DP.

1900 - 2130 2.5 0 16 N DRLG DC MMOT CDS 2084 2084 1937 2072 WASH DOWN, TAC CMT AT 1937'. DRILL OUT CMT AND FC TO 2,072', WORK
ACROSS FC SEVERAL TIMES.

2130 - 2230 1 0 16 N DRLG CIRC MPMP RIG 2084 2084 PUMP 50 BBL HI-VIS AND CIRCULATE HOLE CLEAN. DISPLACE WELL TO 72 PCF
WBM.
2230 - 2245 0.25 0 16 N DRLG PTST MPMP RIG 2084 2084
PRESSURE TEST 18-5/8" CSG TO 500 PSI/15 MIN - OK.
2245 - 2300 0.25 0 16 N DRLG DFS MMOT CDS 2084 2084 2072 2082
DRILL OUT FLOAT SHOE AND CLEAN OUT RAT HOLE.
2300 - 0459 6 0 16 N DRLG DMR MMOT CDS 2084 2250
SLIDE/ROTARY DRILL 16" HOLE W/ TAQA MUD MOTOR/MWD BHA.
Foreman Remarks

ZULF-1327 WILL BE DRILLED AS A DUAL LATERAL HORIZONTAL PRODUCER TARGETING SAFANIYA RESERVOIR AND WILL BE DRILLED TO A TOTAL
DEPTH OF +/- 10,421 FT MD (L-0) AND +/- 11,022 FT MD (L-1) WITH +/-6,000 FT OF RESERVOIR CONTACT. THE WELL WILL BE COMPLETED
WITH ICD'S AND 350 MICRON SAND SCREENS, OPENHOLE PACKERS FOR ZONAL ISOLATION, MFIV, DOWN HOLE PACKER, ESP, AND 4-1/2"
TUBING WITH TRSSSV (SUBSURFACE SAFETY VALVE) AND SMART COMPLETION.
===================================================================================================
DAILY SAFETY:
* REINFORCE STOP WORK AUTHORITY, HANDS-FREE OPERATIONS & LIFE SAVING RULES IN ALL PRE-TOUR MEETINGS.
* CONDUCTED H2S & ABANDON SHIP DRILLS ON 11/JUN/2024.
* CONDUCTED RESCUE AT HEIGHTS DRILL ON 14/MAY/2024.
* DISCUSSED D&WO HSE ALERTS 69-24, 70-24, & 71-24.
* EMPHASIZE THE IMPORTANCE OF HAND & BODY PLACEMENT.
* PERFORM SWA AND LINE OF FIRE DRILL DAILY.
===================================================================================================
* RIG HEADING: 329 DEG, RIG POSITION: LAT: 28 28.65' N LONG: 49 21.75 E.
* ELEVATION RKP TO SEA (MSL) = 112.62 FT, AIR GAP 47 FT, WATER DEPTH (MSL) = 138 FT, RIG FLOOR TO SEA BED = 250.62 FT.
===================================================================================================
- 32" CONDUCTOR SET AT 300'.
- 18 5/8" CASING SET AT 2082'/2076'.
- 13-3/8" CASING POINT AT 4848'/4719'.
- 9-5/8" CASING POINT AT 7319'/5668'.
===================================================================================================
PRESPUD, DWOP AND STUCK PIPE AWARENESS MEETING WAS HELD ON LOCATION WITH DE AND ALL KEY PERSONNEL ON 03/25/2024.
===================================================================================================
PERSONNEL ON LOCATION:
* ARAMCO CLERK: MOHAMED AKHLAD ANWAR #8618643.
===================================================================================================
CONTRACTOR MANAGEMENT VISITS:

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1327 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/25/2024 - 05/11/2025
Report ID: OPERLMTDMRREP

* ADES RIG MANGER: EHAB AHMED MAHMOUD AHMED (#8282004) WAS ONBOARD RIG FROM 04/22/2024 TO 04/26/2024.
==================================================================================================
* NEXT LOCATION:
* PLATFORM ZULF-1320/1329 BATCH SEQUENCE:
* BATCH DRILL 22" : ZULF-1321, ZULF-1323, ZULF-1325, ZULF-1327, ZULF-1329, ZULF-1328, ZULF-1324, ZULF-1322.
* BATCH DRILL 16" : ZULF-1322, ZULF-1324, ZULF-1328, ZULF-1329, ZULF-1327, ZULF-1325, ZULF-1323, ZULF-1321.
* BATCH DRILL 12 1/4" : ZULF-1321, ZULF-1323, ZULF-1325, ZULF-1327, ZULF-1329, ZULF-1328, ZULF-1324, ZULF-1322.
* BATCH DRILL 8 1/2" : ZULF-1322, ZULF-1324, ZULF-1328, ZULF-1329, ZULF-1327, ZULF-1325, ZULF-1323, ZULF-1321.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 2,137 0.78 228.49 2,134 -15.22 -25.78 98.21 0.18

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
72 PCF 0 6 API 0 0 Volts 0.6 9.6 75,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 93 23 0 9 / 13 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 13 7 8 / 10 0 200 0
47

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
72 PCF 0 6 API 0 0 Volts 0.6 9.5 75,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 0 HTHP 93 23 0 10 / 13 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 13 7 8 / 10 0 200 0
48

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
72 PCF 0 6 API 0 0 Volts 0.6 9.6 75,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 93 23 0 9 / 13 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 13 7 8 / 10 0 200 0
47

MUD NACL CAUST PACLV HYSTAR-P BCTRN SODASH DUOVIS-NS


TREATMENT 20 ( 2200L ) 12 ( 50LBP ) 40 ( 50LB ) 100 ( 55LB ) 6 ( 5GLD ) 4 ( 100LB ) 32 ( 55LB )

BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit ULTR 16 1 1.4 72155
2 Mud Motor CDS 9.625 1 9.625 32.54 900 1125-40-003
3 Float Sub CDS 9.5 1 19.875 3.5 3.85 7 5/8 REG 7 5/8 REG 210 1125-40-005
4 Stabilizer CDS 16 1 16 3 7.16 7 5/8 REG 7 5/8 REG 100 SR-1500-02
5 Non Magnetic Drill Collar ( NMDC ) CDS 9.5 1 9.5 3 14.88 7 5/8 REG 7 5/8 REG 198 SPRL 561014-2A
6 Measurement While Drilling (MWD) CDS 9.5 1 9.5 30.97 180 39534.00
7 Pulse Sub SCD 9.5 1 9.5 3 5.35 7 5/8 REG 7 5/8 REG 210 15943326.00
DRILL STRING 8 Non Magnetic Drill Collar ( NMDC ) CDS 9.5 1 9.5 3 15.28 7 5/8 REG 7 5/8 REG 198 SPRL NTS-SA-3619
9 Drillcollar RIG 9.5 9 9.5 3 277.17 7 5/8 REG 7 5/8 REG 184 SPRL D5517106005
10 Hydraulic Jar NPJ 9.5 1 9.5 29.71 110 HJDA9500002
11 Drillcollar RIG 9.5 3 9.5 3 91.79 7 5/8 REG 7 5/8 REG 184 SPRL D5517106002
12 Crossover RIG 9.5 1 9.5 3 3 7 5/8 REG 6 5/8 REG 150 1/3/4349
13 Drillcollar RIG 8.5 3 8.5 2.813 92.62 6 5/8 REG 6 5/8 REG 143.91 SPRL D552204398
14 Crossover RIG 8.5 1 8.5 2.813 3 6 5/8 REG XT54 57.03 4349-8-2
15 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 469.08 XT54 XT54 54 CONV JH2233044
16 Drillpipe RIG 5.5 0 5.5 4.67 0 DSTJ DSTJ 24.7 S135 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A 10 KNOTS 2 FT SEASONAL 237 TOURLY
NW

Company OCS ABE FET CDS RIG BDF CDS ARM HCM MI2 ARM CAM

Category CSR CTRG DV DPDS RIG DFMS LWD OTHR PCS SCS WSC WHES
PERSONNEL
4 13 1 2 46 2 2 1 2 1 2 1
Total
AND SERVICES No. of Persons
77
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 12 24 24 12 0 0 0 24 12

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
3441 1010 1773 4195 N/A 2621

REPAIR ASAP Instrumentation Other Reporter

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1327 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/25/2024 - 05/11/2025
Report ID: OPERLMTDMRREP

Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-2204 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/14/2024 - 11/10/2025
Report ID: OPERLMTDMRREP

ADM-687 @ MRJN-2204 Limited Morning Report for 06/18/2024


Objective : (DUAL LATERAL Foreman(s)REGIER, NOLAN JONATHAN / SALEH, AHMED MAHMOUD
D&WO Morning Report (Service Providers View) Charge #: WATER INJECTOR WELL Engineer JUBRAN, MOHAMMED HUSSAIN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-24073-2204) TARGETING RTWI Manager HUSSAIN, MOATH YOSEF
ADM-687
RESERVOIR) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily OffShore
(0500-0500) Saudi Aramco Well Wellbores: +882167771 4215 0136737829 0136739297
Date: Tuesday 06/18/2024 MRJN-2204 (0) MRJN_2204_0 OTHER VSAT CONTRACTOR /CLERK VSA T
0136738616 RADIO ROO M 0136739209

Last 24 hr operations Next 24 hr plan


DRILL 22" HOLE SECTION WITH BHI MUD MOTOR / SLB GWD MWD DRLG ASSY. CONT. DRILL 22" HOLE SECTION TO 18-5/8" CASING POINT, CHC, WIPER TRIP TO CONDUCTOR
SHOE, RIH CHECK TRIP TO TD, PUMP SWEEPS & CHC, SPOT CASING GO PILL.
Location Next Location
MRJN-2204, 2201/2209 PF, N-3140649.00, E-378282.00 MRJN-2202
Current Depth (ft) Liner TOL MD TVD Formation Tops
2,570 Last Csg Size MD TVD Size Top
32 341 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
341 (Date) 100 1,020 233
3.3 (06/14/2024@2115 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0459 24 0 22 N DRLG DMR MMOT BHI 1550 2570 DRILL 22" HOLE SECTION WITH BHI MUD MOTOR / SLB GWD MWD DRLG ASSY.
- SWEEP HOLE WITH 50 BBL HI-VIS PILL, AS REQUIRED.
Foreman Remarks

MRJN-2204 WILL BE DRILLED AS OIL-WATER INJECTOR IN MRJN.


THE WELL IS LOCATED 0.002 KM N27W OF MRJN-2202 AND 0.002 KM S27E OF MRJN-2206.

MRJN-2204 OBJECTIVE IS TO DRILL A MAINTAIN POTENTIAL AS DUAL LATERALS WATER INJECTION WELL TARGETING RTWI RESERVOIR WITH TOTAL
10,000 FT RESERVOIR CONTACT . THE WELL LOCATED IN THE NORTH EAST FLANK OF MARJAN MAIN DOME AND EXPECTED TO ADD 10 MBWD TO
MARJAN COMPLEX WATER INJECTION CAPACITY.

THE WELL WILL BE DRILLED FROM SLOT#4 ON MRJN-508 / 2201 - 2209 WATER INJECTOR PLATFORM.
=========================================================================
PLATFORM SEQUENCE:
MRJN-508 WELL: TIE BACK COMPLETED.
MRJN-2201 PILOT HOLE + SIDETRACK TARGETING SFNY, 22" HOLE SECTION: COMPLETED.
MRJN-2203 SINGLE LATERAL TARGETING SFNY, 22" HOLE SECTION: COMPLETED.
MRJN-2207 DUAL LATERALS TARGETING RATAWI. 22" HOLE SECTION: COMPLETED.
MRJN-2204 DUAL LATERALS TARGETING RATAWI: CURRENT.
MRJN-2202 SINGLE LATERAL TARGETING SFNY.
=========================================================================================================
SUSPENSION DSA INSTALLED:
- 11" X 4-1/16" 3M SUSPENSION CAP ON MRJN-508.
- 20-3/4" X 4-1/16" 3M SUSPENSION CAP ON MRJN-2201.
- 20-3/4" X 4-1/16" 3M SUSPENSION CAP ON MRJN-2203.
- 20-3/4" X 4-1/16" 3M SUSPENSION CAP ON MRJN-2207.
=======================CURRENT LOCATION====================================================================
- LOCATION: MRJN-508- 2201/2209 PF
- LATITUDE: 28 DEG 23' 11.2" N
- LONGITUDE: 49 DEG 45' 27.852' E
- HEADING = 331 DEG
- WATER DEPTH = 162 FT
- RKB TO MUD LINE= 277 FT
- AIR GAP = 40 FT
============================ DRILLS & HSE ===================================================================
- DRILLS:
- FIRE & ABANDON DRILLS ON 06/11/2024.
- H2S & ABANDON SHIP DRILLS ON 06/14/2024.
- REVIEWED & DISCUSSED ARAMCO HSE ALERTS: 69-24, 70-24, 71-24 AND 72-24.
===================== LC-50 SAMPLES =========================================================================
- LC-50 SAMPLE FOR 22" HOLE SECTION WBM LOADED ON VALLIANZ COMMANDOR VESSEL ON 05/30/2024 WITH BACKLOAD MANIFEST# 2400687886.
======================= PERSONNEL==========================================================================
- ARAMCO CLERK OLIVER TANDINGAN #8112855 ON BOARD SINCE 04/19/2024.
- ARAMCO MATERIAL EXPIDATOR MOHAMMAD AL-QAHTANI #8625964 ON BOARD SINCE 06/04/2024 & LEFT ON 06/17/2024.
- ARAMCO TRAINEE FOREMAN OTHMAN A ALSUWAIYEL #793921 ON BOARD SINCE 06/07/2024 & LEFT ON 06/17/2024.
- ARAMCO TRAINEE FOREMAN FAISAL ALNAJJAR # 779103 ON BOARD SINCE 06/11/2024.
=========================================================================================================
RENTAL TOOLS ONBOARD:
- 9 1/2" NOV HM-JAR SN# HMJ-950-4326078, MANIFEST 2100884704 SINCE 05/09/2024.
- 12" NOV SHOCK SUB SN# CW-1028300-1, MANIFEST 2100884704 SINCE 05/09/2024.
- 9-1/2" NOV HM-JAR SN# HMJ-381-95173, MANIFEST 2100909752 SINCE 06/08/2024.
=========================================================================================================
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 1,583 4.08 21.25 93 1,578 20.36 24.95 105.64 1.58
DAILY SURVEY 0 1,680 4.33 16.15 97 1,675 22.41 25.64 111.72 0.46
0 1,775 4.38 10.35 95 1,769 24.55 26.14 117.65 0.47
0 1,870 4.06 16.59 95 1,864 26.62 26.63 123.53 0.59

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-2204 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/14/2024 - 11/10/2025
Report ID: OPERLMTDMRREP

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 1,966 3.47 14.84 96 1,960 28.47 27.16 129.07 0.63
0 2,059 3.12 12.11 93 2,053 30.05 27.54 133.72 0.41
0 2,156 3.28 12.2 97 2,150 31.66 27.89 138.42 0.17
0 2,252 3.63 12.11 96 2,246 33.39 28.26 143.5 0.36
0 2,344 3.68 15.36 92 2,337 35.12 28.68 148.77 0.23
0 2,439 4.27 12.55 95 2,432 37.07 29.16 154.74 0.65

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 0 9.2 API 0 0 Volts 2.06 9.8 25,800
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 94 25 0.2 10 / 14 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 16 6 9 / 11 5 240 0
54

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 0 8.4 API 0 0 Volts 2.38 9.6 25,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 120 0 HTHP 94 29 0.5 12 / 16 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 17 6 11 / 12 5 280 0
59

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 0 8.2 API N/A 0 Volts 2.39 9.7 25,400
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 95 26 0.5 11 / 15 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 18 5 10 / 11 5 280 0
58

OXYGON RAPIDSWEEP CAUST DUOVIS-NS BCTRN PACR SODASH


MUD 1 ( 25KG ) 2 ( 25LB ) 8 ( 55LB ) 20 ( 50LB ) 2 ( 5GLD ) 10 ( 55LB ) 1 ( 50KG )
TREATMENT PENETREX SAFE-SCAV PALFLC STARCH
4 ( 55GL ) 1 ( 55GL ) 35 ( 25KG )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
1 0 2,570 DP Av DC Av Bit HHP 50 45 425 22 SMT
Pressure GPM Jet Vel 52.4 57.74 0 I-Row O-Row DC Location Bearings
2,100 970 N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
RV1582 GSI06 POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 46 278 280 260 8 220
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
220

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 22 1 1.82 RV1582
2 Mud Motor BHI 11.75 1 11.75 35.82 114 14687162
3 Stabilizer BHI 22 1 9.5 3 9.28 7 5/8 REG 7 5/8 REG 114 TOTAE301169
4 Gyro MWD SDM 9.688 1 9.688 3 3 7 5/8 H90 7 5/8 H90 110 P0001435
5 Measurement While Drilling (MWD) SDM 9.5 1 9.5 29.88 186 G0002
DRILL STRING
6 FIlter Sub SDM 9.5 1 9.5 3 7.46 7 5/8 REG 7 5/8 REG 103 8013
7 Drillcollar RIG 9.5 1 9.5 2.813 31.7 7 5/8 REG 7 5/8 REG 76 SPRL
8 Shock Sub NOJ 12 1 12 2.81 11.52 7-5/8" REG 7-5/8" REG 3,400 CW-10283001
9 PBL (Multiple Activation By Pass) CRW 1 17.85 65 CM-111214
10 Drillcollar RIG 9.5 8 9.5 3 245.57 7 5/8 REG 7 5/8 REG 76 SPRL
11 Hydro-Mechanical Jar NOJ 9.5 1 9.5 29 236 950-4326078
12 Drillcollar RIG 9.5 3 9.5 2.813 91.99 7 5/8 REG 7 5/8 REG 20 SPRL
13 Crossover RIG 9.5 1 9.5 3 3.55 7 5/8 REG 6 5/8 REG 219 545
14 Drillcollar RIG 8.5 3 8.5 2.813 92.39 6 5/8 REG 6 5/8 REG 169 SPRL
15 Crossover RIG 8.5 1 8.5 2.813 3.6 XT54 6 5/8 REG 169 545Y
16 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 470.5 XT54 XT54 54 CONV
17 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 XD105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A 5-7 KNOTS 1-2 FT CLEAR 172 PRE-TOUR &
NE WEEKLY

PERSONNEL ITS HTD RIG BHI GC1 RIG BDF NOJ ARM HCM MI2 ARM CRW CAM
Total
Company
AND SERVICES 87

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-2204 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/14/2024 - 11/10/2025
Report ID: OPERLMTDMRREP

INFORMATION CSR CSV CTRG DPDS DPDS RIG DFMS JST OTHR PCS SCS WSC WBCS WHES
Category

No. of Persons 3 2 14 2 2 53 2 0 2 2 1 2 1 1

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 0 24 24 24 24 24 24

Operating Hours. 0 0 0 24 24 24 24 0 12 12 12 24 0 0

Standby/Tankers Others
TRUCKS/BOATS
topaz karama rawabi-40

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2428 949 95 3383 1062 5552

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1268 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 03/05/2024 - 05/13/2025
Report ID: OPERLMTDMRREP

ADM-688 @ ZULF-1268 Limited Morning Report for 06/18/2024


Objective : (OIL DRILLING) Foreman(s)OMENI-NZEWUIHE, LUGARD CHIASA / ALSHEHRI, SAAD KHALID
D&WO Morning Report (Service Providers View) Charge #: Engineer RIZA, ISKANDAR
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22062-1268) Manager MAJDI, SULAIMAN AL HASSAN
ADM-688
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0021677714 162 0136734459 0138167257
Date: Tuesday 06/18/2024 ZULF-1268 (0) ZULF_1268_0 CONTRACTOR /CLERK VSA T
0136734458

Last 24 hr operations Next 24 hr plan


DRILL 12-1/4" HOLE TO CP@7674 FT. CHC. POH; RIH WITH WCB/DLR REAMING BHA. RIH. CONDITION HOLE. POH FOR 9-5/8" CASING
Location Next Location
ZULF 1260/1269 PF ZULF-1269
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,674 Last Csg Size MD TVD Size Top
13 3/8 4880 4627 Formations Comments
Depth
LHHR 4,960 MD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUML 5,234 MD
6865 (Date) 100 809 254 AMDR 5,417 MD
26.1 (06/09/2024@1300 ) CPCK 5,573 MD
WARA 5,928 MD
MDDD 6,145 MD
SFNY 6,373 MD
SFNC 6,659 MD
SFNE 7,115 MD
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0800 3 0 12 1/4 N DRLG CIRC MPMP RIG 6865 6865
SWEEP & CIRC HOLE CLEAN. CONDITION MUD
0800 - 1830 10.5 0 12 1/4 N DRLG D RSS SPS 6865 7500
CONTINUE DRILL 12-14" HOLE WITH SPERRY ICRUISE/MWD ASS'Y
1830 - 2130 3 0 12 1/4 N DRLG CIRC MPMP RIG 7500 7500
SWEEP & CIRC HOLE CLEAN WHILE WATING ON GOC DECISION ON CP
2130 - 0030 3 0 12 1/4 N DRLG D RSS SPS 7500 7674
CONTINUE DRILL 12-14" HOLE WITH SPERRY ICRUISE/MWD ASS'Y TO CP@7674FT
0030 - 0459 4.5 0 12 1/4 N DRLG CIRC MPMP RIG 7674 7674
SWEEP & CIRC HOLE CLEAN. CONDITION MUD TO 98 PCF
Foreman Remarks

ZULF-1268 OBJECTIVE: OIL PRODUCER WELL THAT WILL BE DRILLED AS A SINGLE LATERAL TARGETING SAFANIYA RESERVOIR TO TOTAL DEPTH OF 10261 FT MD.
=============================================================================================
* DRILLS: PIT ,TRIP.
* HELD SWA DRILL.
=============================================================================================
* RIG POSITION: LAT: 28* 26.14 N & LONG: 049* 09.91 E. RIG HEADING: 330 DEG
=============================================================================================
* ZULF-1268 PLANNED CASING POINTS L-0:
* 32" CP PRE-SET AT 294'.
* 18-5/8" ACTUAL: 1635' MD.
* 13-3/8" ACTUAL: 4880' MD.
* 9-5/8" PLANNED; 7521' MD.
* 8-1/2" TD PLANNED: 10,522' MD.
=============================================================================================
12 1/4'' SECTION DRILLING SEQUENCE:
* ZULF-1268. (CURRENT)
* ZULF-1269.
* ZULF-1267.
* ZULF-1265.
* ZULF-1263.
* ZULF-1264.
* ZULF-1262.
* ZULF-1261.
=============================================================================================
* 22'' SECT COMPLETED & SUSPENDED: ZULF-1261, 1263, 1265, 1267, 1269, 1268, 1264, 1262
* 16'' SECT COMPLETED & SUSPENDED: ZULF-1262, 1264, 1268, 1269, 1267, 1265 ,1263 ,1261
=============================================================================================
DIRECTIONAL PLAN: ZULF-1268 L-0
=============================================================================================
* ARAMCO ASSIGNED FOREMAN SAAD ALSHERI #795046 ONBOARD SINCE 06/04/24.
* ARAMCO PDP ASEEL T. ALABDULJABBAR #794734 ONBOARD SINCE 06/11/24.
* ARAMCO MATERIAL EXPEDITOR JABER ALHAWASILAH#8531825 ONBOARD SINCE 06/11/24.
=============================================================================================
RENTAL TOOLS
1. 6.75 DRILLING JAR#HMJ675-240 FROM OILSERV. PU ON 6/15/2024
2. 8" DLR #G300726 FROM NOV . PU ON 6/15/2024
3. 12" DLR FRM NOV
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 6,935 81.7 75.07 95 5,669 191.54 871.56 2,927.67 2.46
DAILY SURVEY 0 7,030 84.06 74.86 95 5,681 198.99 899.3 3,021.84 2.49
0 7,125 86.23 74.52 95 5,689 206.61 927.13 3,116.38 2.31
0 7,220 87.02 74.28 95 5,694 214.38 954.97 3,211.08 0.88

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1268 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 03/05/2024 - 05/13/2025
Report ID: OPERLMTDMRREP

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 7,315 86.91 73.8 95 5,699 222.33 982.77 3,305.8 0.52
0 7,410 87.01 74.12 95 5,704 230.32 1010.56 3,400.51 0.35
0 7,505 88.41 73.59 95 5,708 238.37 1038.35 3,495.28 1.57
0 7,601 86.9 73.78 96 5,712 246.58 1066.41 3,591.03 1.58
0 7,674 89 73.75 73 5,715 252.8 1087.76 3,663.87 2.87

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
96 PCF 1 0 API 62 0 Volts 4.04 0 167,220
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
155 1.6 HTHP 15 26 0 14 / 19 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 33 23 12 / 14 0 0 0
96

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
96 PCF 1 0 API 62 0 Volts 4.06 0 164,316
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 155 1.4 HTHP 15 26 0 14 / 20 RELIANT 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 34 23 13 / 14 0 0 2
94

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
98 PCF 1 0 API 61 0 Volts 4.17 0 166,640
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
155 1.2 HTHP 15 26 0 14 / 20 RELIANT 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 35 24 13 / 14 0 0 2
93

STELSL50 CACO3-50 POROSEAL STELSEALFN MRBL-M CAOH2 ECOTROL-RD


MUD 12 ( 55LB ) 24 ( 55LB ) 2 ( 55GL ) 12 ( 55LB ) 1 ( 2200L ) 20 ( 55LB ) 20 ( 55LB )
TREATMENT VG-PL VG-SUP SUREMUL SUREWET
2 ( 55LB ) 2 ( 55LB ) 4 ( 55GL ) 1 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
5 4,895 7,674 DP Av DC Av Bit HHP 25 150 S423 12.25 REED
Pressure GPM Jet Vel 184.11 N/A 322 I-Row O-Row DC Location Bearings
3,260 900 232 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
S308282 TK66S1A 4 x 14 / 5 x 13 / 1.249
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 72 135 260 184 10,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit REED 12.25 1 1.05 S308282
2 RSS SPS 8 1 8 5.45 35.05 6-5/8" REG 6-5/8" REG 116 13762061
3 Stabilizer SPS 11.875 1 8.25 3 5.11 6 5/8 REG 6 5/8 REG 13951001
4 Measurement While Drilling (MWD) SPS 8 1 8 3.25 9.78 6-5/8" REG 6-5/8" REG 145.2 12665494
DRILL STRING
5 Screen sub SPS 8 1 8 4 6.45 6 5/8 REG 6 5/8 REG 147 13517992
6 Float Sub SPS 8 1 19.875 3.5 2.29 7 5/8 REG 7 5/8 REG 149 13232170
7 Float Sub SPS 8 1 19.875 3.5 1.6 7 5/8 REG 7 5/8 REG 150 13232172
8 PBL (Multiple Activation By Pass) CRW 8 1 20.61 147 DVBB5-1019
9 Crossover RIG 8.375 1 8.375 2.813 3 XT54 6 5/8 REG 147 ZHR-2022-12
10 Heavy Weight Drillpipe (HWDP) RIG 5.5 1 5.5 3.25 31.35 XT54 XT54 55.24 CONV
11 Dogleg Reamer NRT 8 1 12.43 3 6.5 XT54 XT54 145 G300726
12 Heavy Weight Drillpipe (HWDP) RIG 5.5 2 5.5 3.25 62.71 XT54 XT54 52.51 CONV
13 Hydro-Mechanical Jar OJR 6.75 1 6.75 2.75 31.57 XT-54 XT-54 106 HMJ675-240
14 Heavy Weight Drillpipe (HWDP) RIG 5.5 3 5.5 3.25 94.02 XT54 XT54 55.24 CONV
15 Drillpipe RIG 5.5 1 6.625 5.901 31 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/11/2024 N/A 13 KTS. 1 FT. SEASONAL 163 TOURLY
NNW

PERSONNEL Company GOC GOC WDV SPS NOV RIG EMC SMI OJR ARM BCM MI2 ARM CAM
Total
AND SERVICES
CSR CTRG DV DPDS DRF RIG DFMS DFMS JST OTHR PCS SCS WSC WHES 94
INFORMATION Category

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1268 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 03/05/2024 - 05/13/2025
Report ID: OPERLMTDMRREP

No. of Persons 4 13 1 4 0 60 1 2 0 2 3 1 2 1

Personnel on Loc. Hrs. 24 24 24 24 0 24 24 24 0 24 24 24 24 24

Operating Hours. 0 0 0 24 24 24 24 24 24 0 24 0 0 0

Standby/Tankers
TRUCKS/BOATS
JUZOR

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1421 2805 1647 6270 0 5052

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-4008 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/25/2024 - 09/20/2024
Report ID: OPERLMTDMRREP

ADM-689 @ SFNY-4008 Limited Morning Report for 06/18/2024


Objective : (WATER ) Foreman(s)GARGIS III, JACK DEMPSEY / ADELSALAM, KHALED MOHAMED
D&WO Morning Report (Service Providers View) Charge #: Engineer GUEVARA LISTA, ILDEMARO HUMBERTO
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23013-4008) Manager ALRASHEEDI, ABDULMAJEED NASSER
ADM-689
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14206 013 673 99 63 013 673 91 18 (FCT/HS E)
Date: Tuesday 06/18/2024 SFNY-4008 (0) SFNY_4008_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
013 673 91 18 (MAT. E XP) 013 673 91 48 (RADIO ROOM)

Last 24 hr operations Next 24 hr plan


RIH W/ 8.5'' C/O BHA , C/O CMT AT DVTOOL, PRESS. TEST CSG, RIH W/ 8.5'' C/O ASSY, C/O SHOE REFER TO SFNY-4008 (8.5'' HOLE SECTION), DRILL 10 FT NEW FM, PERFORM F/C, POOH WITH
TRACK CMT, PRESS TEST CSG, DISP TO 84 PCF OBM, DRILL FS & RH, F/C. 8.5'' C/O BHA, M/U AND RIH WITH 8.5'' WBCO RUN.
Location Next Location
N-3126800.00, E-299530.00 SFNY-4008
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,156 Last Csg Size MD TVD Size Top
9 5/8 10144 5741 Formations Comments
Depth
4858' TVD "62 FT
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) LAMS 5,324
SHALLOWER"
10156 (Date) 100 0 245 5235' TVD "33 FT
47.1 (05/23/2024@2030 ) PAMU 5,879
SHALLOWER"
5323' TVD "26 FT
PLVL 6,059
SHALLOWER"
5381' TVD "19 FT
AHMD 6,201
SHALLOWER"
CPCK 6,977 5490' TVD "3 FT DEEPER"
5656' TVD "8 FT
WARA 8,973
SHALLOWER"
5735' TVD "10 FT
WARR 9,829
SHALLOWER"
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0500 - 0730 2.5 0 12 1/4 N DRLG LDP SPDP RIG 10156 10156 3210 4560
RIH WITH 8.5'' C/O BHA WHILE P/U AND M/U NEW 5.5'' DP.
0730 - 0745 0.25 0 12 1/4 N DRLG CIRC MPMP RIG 10156 10156
FILL STRING AND BREAK CIRCULATION.

0745 - 0845 1 0 12 1/4 N DRLG RW BIT RIG 10156 10156 4560 5058 RIH WITH 8.5'' C/O BHA ON 5.5'' DP STANDS, WASH DOWN LAST TWO STANDS
UNTIL TAG TOC AT 5058'.
0845 - 0930 0.75 0 12 1/4 N DRLG DFS TDS RIG 10156 10156 5058 5138
DRILL OUT CEMENT ABOVE DVTOOL.

0930 - 1000 0.5 0 12 1/4 N DRLG DFS TDS RIG 10156 10156 5138 5140 DRILL OUT DVTOOL PLUGS, WORK STRING THREE TIMES ACROSS DVTOOL
DEPTH.
1000 - 1030 0.5 0 12 1/4 N DRLG CIRC MPMP RIG 10156 10156
CIRCULATE HOLE CLEAN WITH SWEEP.
1030 - 1100 0.5 0 12 1/4 N DRLG PTST MPMP RIG 10156 10156
PERFORM CASING PRESSURE TEST TO 1,000 PSI, TEST OK.
1100 - 1145 0.75 0 12 1/4 N DRLG TI STDP RIG 10156 10156 5140 6600
RIH WITH 8.5'' C/O BHA ON 5.5'' DP STANDS, HAD SLACK AT 6600'.
1145 - 1300 1.25 0 12 1/4 N DRLG RW BIT RIG 10156 10156 6600 6680
REAM DOWN WITH 8.5'' C/O BHA, CHC.
1300 - 1345 0.75 0 12 1/4 N DRLG TI STDP RIG 10156 10156 6680 8110
RIH WITH 8.5'' C/O BHA ON 5.5'' DP STANDS.
1345 - 1415 0.5 0 12 1/4 N DRLG CIRC MPMP RIG 10156 10156
FILL STRING AND BREAK CIRCULATION.
1415 - 1445 0.5 0 12 1/4 N DRLG TI STDP RIG 10156 10156 8110 9415
RIH WITH 8.5'' C/O BHA ON 5.5'' DP STANDS.
1445 - 1630 1.75 0 12 1/4 N DRLG RW BIT RIG 10156 10156 9415 9978
WASH DOWN WITH 8.5'' C/O BHA, UNTIL TAG TOC 9978'.

1630 - 2145 5.25 0 12 1/4 N DRLG DC TDS RIG 10156 10156 9978 10124 DRILL OUT SHOE TRACK CEMENT FROM 9978' TO 10,124' (20 FT ABOVE CASING
SHOE DEPTH).
2145 - 2300 1.25 0 12 1/4 N DRLG CIRC MPMP RIG 10156 10156
CIRCULATE HOLE CLEAN WITH SWEEP UNTIL HAVE CLEAN RETURN.
2300 - 2330 0.5 0 12 1/4 N DRLG PTST MPMP RIG 10156 10156
PERFORM CASING PRESSURE TEST TO 1,000 PSI, TEST OK.
2330 - 2345 0.25 0 12 1/4 N DRLG PJSM NA RIG 10156 10156
HELD PJSM FOR DISPLACING THE HOLE TO 84 PCF BARITE FREE RHELIANT OBM.
2345 - 0300 3.25 0 12 1/4 N DRLG CIRC MPMP RIG 10156 10156
DISPLACE THE HOLE TO 84 PCF BARITE FREE RHELIANT OBM.
0300 - 0415 1.25 0 12 1/4 N DRLG DC TDS RIG 10156 10156 10124 10156
CONT. DRILL OUT 9-5/8" SHOE TRACK CEMENT, FLOAT SHOE AND RAT HOLE.
0415 - 0445 0.5 0 12 1/4 N DRLG CIRC MPMP RIG 10156 10156
CIRCULATE HOLE CLEAN PRIOR FLOW CHECK.
0445 - 0459 0.25 0 12 1/4 N DRLG CIRC MPMP RIG 10156 10156
FLOW CHECK, WELL STATIC.
Foreman Remarks

SFNY-4008 WILL BE A HORIZONTAL SINGLE LATERAL POWER WATER INJECTOR WELL, TARGETING WARA RESERVOIR IN THE EASTERN FLANK OF
SAFANIYA FIELD.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-4008 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/25/2024 - 09/20/2024
Report ID: OPERLMTDMRREP

==========================================================================================================
CURRENT LOCATION DATA:
** PLATFORM: SFNY-4000/ 4009.
** RIG HEADING: 330 DEG.
** LEG PENETRATIONS: BOW 3.8 FT, PORT 4.8 FT, STBD 6.8 FT.
** WATER DEPTH: 45.29 FT.
** AIR GAP: 48.7 FT.
** RKB TO PLATFORM MAIN DECK: 75.8 FT.
** RKB TO MSL (WATER LINE): 115.16 FT.
** RKB TO MUD LINE (SEABED): 160.45 FT.
=========================================================================================================
PLATFORM STATUS:
**SFNY-4002 / 22" & 16" HOLE - COMPLETED.
**SFNY-4008 / 22" & 16" HOLE - COMPLETED.
**SFNY-4007 / 22" & 16" HOLE - COMPLETED.
**SFNY-4004 / 22" HOLE - COMPLETED.
**SFNY-4005 / 22" HOLE - COMPLETED.
**SFNY-4003 / 22 & 16" HOLE - COMPLETED.
**SFNY-4001 / 22 & 16" HOLE - COMPLETED.
**SFNY-4008 / 12.25" HOLE - COMPLETED.
**SFNY-4008 / 8.5" HOLE - NEXT.
==========================================================================================================
DRILLING SEQUENCE
**SFNY-4008: 12-1/4" HOLE, 8-1/2" HOLE, & EOW
**SFNY-4007: 12-1/4" HOLE, 8-1/2" HOLE, & EOW
**SFNY-4002: 12-1/4" HOLE, 8-1/2" HOLE, & EOW
==========================================================================================================
DIRECTIONAL DATA:
* FOLLOW PLAN: SFNY-4008 L0 PLAN-3.1 16-MAR-24.
* ACTUAL WELLPATH VS PLAN: 11.67 FT CT-CT, 11.42 FT BELOW, 2.42 FT RIGHT.
==========================================================================================================
* ADES RIG MANAGER MARWAN HEFNY ID# 8563881 LAST VISITED RIG ON 6/6/2024.
==========================================================================================================
* HELD 2 PRE-TOUR MEETINGS, 2 JUNIOR CREW MEETING.
* HOLD SAFETY CAMPAIGN FOR FINGERS/HANDS INJURY.
* HELD H2S, FIRE & ABANDON DRILL ON 06/11/2024.
* DRILLS: 2 X SWA, 2 X LOF.
==========================================================================================================
CASING POINTS PLANNED / ACTUAL:
* 18-5/8" CSG AT 1,395' MD PLANNED / 1,400' MD ACTUAL ( 50 FT IN RUS FORMATION ).
* 13-3/8" CSG AT 5,416' MD PLANNED / 5,453' MD ACTUAL (+/-100 FT TVD INSIDE LAMS )
* 9-5/8" CSG AT 9,624' MD PLANNED / 10,144' MD ACTUAL ( INSIDE WARA FORMATION).
* 5-1/2" COMPLETION AT 13,216' MD PLANNED / XXXX' MD ACTUAL.
==========================================================================================================
SKIP & SHIP OPERATIONS:
EMPTY SKIPS ONBOARD = 20
EMPTY SKIPS ON BOAT= 24
FULL SKIPS ONBOARD = 0
FULL SKIPS ON BOAT = 3
SKIPS USED FOR WELL = 165
TOTAL TONNAGE SHIPPED = 1155 TON
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 10,156 89.33 58.3 0 5,742 270.17 1915.13 6,345.44 0.06

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 2 0 API 60 420 Volts 2.04 0 242,037
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
165 3.2 HTHP 16 17 0 10 / 14 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 29 24 9 / 10 0 0 0
68

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
101 PCF 2 0 API 52 518 Volts 3.8 0 181,709
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 170 3.4 HTHP 22 26 0 14 / 19 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 52 26 13 / 14 0 0 0
92

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
101 PCF 2 0 API 54 520 Volts 3.84 0 224,888
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
172 3 HTHP 19 26 0 14 / 18 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 51 27 13 / 14 0 0 0
100

MUD SUREMUL SUREWET


TREATMENT 4 ( 55GL ) 2 ( 55GL )

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-4008 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/25/2024 - 09/20/2024
Report ID: OPERLMTDMRREP

BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit VAR 1 8.5 0.83 4 1/2 REG 7500247
2 Bit Sub RIG 6.5 1 6.5 2.813 3 NC50 4 1/2 REG 85 164678-1-3
3 Drillcollar RIG 6.5 6 6.5 2.813 185.76 NC50 NC50 85 SPRL RB
DRILL STRING 4 Crossover RIG 6.75 1 6.75 3.25 3 XT54 NC50 85 164662-1-3
5 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 5.5 3.25 280.96 XT54 XT54 54 CONV RB
6 Hydro-Mechanical Jar NOJ 6.5 1 6.5 2.75 34.7 XT54 XT54 1,300 650-4666992
7 Heavy Weight Drillpipe (HWDP) RIG 5.5 6 5.5 3.25 187.61 XT54 XT54 52 CONV RB
8 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 S135 PREMIUM RB

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/15/2024 TOURLY 8-10 KNOTS 2 FT SEASONAL 148 TOURLY
NW

Company LIG SDM RIG EMC SMI SRT NOJ ARM HCM MI2 ARM CRW

Category CTRG DPDS RIG DFMS DFMS HO JST OTHR PCS SCS WSC WBCS
PERSONNEL
14 3 57 1 1 1 0 1 1 5 2 2
Total
AND SERVICES No. of Persons
88
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 0 24 24 24 24 24

Operating Hours. 0 0 24 12 12 0 24 12 0 24 24 0

Standby/Tankers Others
TRUCKS/BOATS
posh oribi rawabi-202

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2061 1376 1557 4410 350 926

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-372 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 06/18/2024 - 11/18/2024
Report ID: OPERLMTDMRREP

ADM-690 @ ZULF-372 Limited Morning Report for 06/18/2024


Objective : (NEW ESP Foreman(s)KOLKAS, MOHAMED HEMDAN / FATAH, NASREDDINE
D&WO Morning Report (Service Providers View) Charge #: INSTALLATION) Engineer ALGHAMDI, KHALID OMAR / ALQAHTANI, MOHAMMED HADI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (72-23062-0372) Manager GHAMDI, MAGID ABDULLA
ADM-690
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12633 013-673932 9 013-673732 1
Date: Tuesday 06/18/2024 ZULF-372 (0) ZULF_372_0 CONTRACTOR /CLERK VSA T
013-673572 6

Last 24 hr operations Next 24 hr plan


RIG DOWN WELL TEST PACKAGE AND PREPARE FOR RIG MOVE TO ZULF-370/379 PF CONT RIG DOWN AND BACKLOAD FLOWBACK PACKAGE, PREPARE FOR RIG MOVE TO ZULF-
370/379 PF.
Location Next Location
ZULF 1370/1379 PF ZULF-376
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
9,900 Size 7402 6062 Size 7,142 10,393 6,097 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9900 (Date) 100 0 246
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
1300 - 1330 0.5 0 PRE N RM OTH NA NWT 10403 10403
HELD PJSM PRIOR R/D WELL TEST SURFACE EQUIP.

R/D NPS WELL TEST SURFACE EQUIP.


* R/D UPSTREAM LINES TO STORAGE TANKS AND SURGE TANKS
* REMOVE CONTROL HOSES
* REMOVE COFLEX HOSE X MAX TREE
* BACKLOAD NPS TANKS, COMPRESSORS -IN PROGRESS
RIG OFFLINE WORK:
- INSTALL ALL GAUGES ON PRODUCTION TREES - 36 PC TOTAL
1330 - 0459 15.5 0 PRE N RM OTH NA NWT 10403 10403 - RIG DOWN SCAFFOLD AND REMOVE FROM PLATFORM
- RAISE 2 X COFLEX HOSES AND SECURE BELOW RIG FLOOR
- REMOVE ALL EQUIPMENT FROM PLATFORM:
- CLEANING PLATFORM AND WELLHEADS
- RIG DOWN STBD SIDE FLARE BOOM AND PREPARE FOR RAISING
- CONNECT BOP WINCHES TO BOP IN PREPARATION FOR RIG MOVE
- CONNECT CABLE TO SHACKLES ON BAILS FOR RAISING TEXAS DECK
- PREPARE FOR CANTILEVER SKIDDING

Workover Objectives
Foreman Remarks

==============PLATFORM ZULF-1220/1229==============
ZULF-372 WAITING FOR WORKOVER DE-COMPLETION / RUN NEW ESP COMPLETION
ZULF-376 WAITING FOR WORKOVER DE-COMPLETION / RUN NEW ESP COMPLETION
ZULF-377 WAITING FOR WORKOVER DE-COMPLETION / RUN NEW ESP COMPLETION
ZULF-379 WAITING FOR WORKOVER DE-COMPLETION / RE-ENTRY / RUN NEW ESP COMPLETION
==================================================================================================
* HSE*
- CONDUCT H2S RESCUE & ABANDON DRILLS ON 16 JUNE 2024.
- CONDUCT MAN DOWN DRILL ON 16-JUNE-2024.
- REINFORCE STOP WORK AUTHORITY, HANDS-FREE OPERATIONS & ADVERSE WEATHER CONDITIONS RISKS IN ALL PRE-TOUR MEETINGS.
- PERFORM DAILY SWA & LOF DRILLS
===================================================================================================
* RIG HEADING: 331 DEG.
* ELEVATION RF: 79.57'.
* RKB TO TBG SPOOL = 69 FT, ODF TO TBG SPOOL = 73.8 FT, CORRECTION = 4.8 FT.
===================================================================================================
RENTAL TOOLS:
** RECIVECD 6 1/2" NOV JAR 6 1/2" HYDRO-MECHANICAL, SN# HMJ650-4385078 ON LOCATION 8 JUNE,2024
===================================================================================================
PERSONNEL ON LOCATION:
* ARAMCO MATERIAL EXPEDITOR KHALDI FAHAD A ID# 8499685 ARRIVED THE RIG ON 14 JUNE-2024.
* ARAMCO MATERIAL EXPEDITOR SALEH ALSALEM ID# 824605 ARRIVED THE RIG ON 4 JUNE-2024.
===================================================================================================
CONTRACTOR MANAGEMENT VISITS:
* RIG MANAGER HOSSAM ELKHOLY LEFT RIG THE RIG ON 28-MAY-2024.
===================================================================================================
* NEXT LOCATION: ZULF-370/379
* EXPECTED RIG MOVE: 20 JUNE 2024
* PLATFORM DEBRIS SURVEY: CRM#8800022107 ISSUED ON 09TH MAY 2024 & DEBRIS REMOVED ON 23TH MAY 2024.
* RIG MOVE REQUESTS: RM-2024-4010654 ISSUED ON 09TH MAY 2024.
* RIG MOVE MEETINGS HELD ON 18TH MAY 2024.
* LOCATIN APPROVAL AND LPA HAS BEEN RECEIVED FROM ADES ON 16TH MAY 2024.
* DE-PRESSURIZATION: PLATFORM DEPRESSURIZED (RECEIVED CONFIRMATION EMAIL FROM FIELD SERVICE).
* PLATFORM VISIT: DONE ON 24TH MAY 2024.
DAILY SURVEY
MUD DATA

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-372 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 06/18/2024 - 11/18/2024
Report ID: OPERLMTDMRREP

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A 11-14 KTS 1 FT SEASONAL 332 TOURLY

Company HCO BC RIG EMC BFS RAC ARM BCM HSL SLL ARM NWT SAM CAM SBA GOS NCT ITS

Category PSSC PSSC RIG DFMS FILT WMFE OTHR PCS SLS SLS WSC WTSE WBCS WHES ALS CTRG COIL CSR
PERSONNEL
1 1 50 1 1 2 2 1 1 3 2 8 1 1 1 14 6 4
Total
AND SERVICES No. of Persons
100
INFORMATION
Personnel on Loc. Hrs. 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16

Operating Hours. 0 4 16 4 0 0 0 16 0 0 16 16 0 0 4 0 0 0

Standby/Tankers Others
TRUCKS/BOATS
pacific python RAWABI-320

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
673 1346 1629 1608 0 4056

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1225 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 04/21/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

ADM-690 @ ZULF-1225 Limited Morning Report for 06/18/2024


Objective : (FLOWBACK) Foreman(s)KOLKAS, MOHAMED HEMDAN / FATAH, NASREDDINE
D&WO Morning Report (Service Providers View) Charge #: Engineer ALGHAMDI, KHALID OMAR / ALQAHTANI, MOHAMMED HADI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (72-23062-1225) Manager GHAMDI, MAGID ABDULLA
ADM-690
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12633 013-673932 9 013-673732 1
Date: Tuesday 06/18/2024 ZULF-1225 (0) ZULF_1225_0 CONTRACTOR /CLERK VSA T
013-673572 6

Last 24 hr operations Next 24 hr plan


BURN OUT OIL FROM NSER SURGE TANKS, FLUSH & R/D UPSTREAM, DOWNSTREAM CONFLEX & SEE ZULF-372 REPORT.
EQUIP, RIG RELEASE TO ZULF-1370/1379 PF
Location Next Location
ZULF 1220/1229 PF ZULF-372
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,790 Last Csg Size MD TVD Size Top
9 5/8 8100 5682 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9790 (Date) 100 0 243
12.5 (06/15/2024@0500 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM WITH ALL INVOLVED PERSONELL FOR FLOW BACK FLARING OPERATION.
0500 - 0530 0.5 0 EOW E TEST PJSM NA RIG 9790 9790
- PACIFIC PAYTHON SURVEY AROUND THE RIG BEFORE FLARING OPERATIONS,
CONFIRMED ALL CLEAR.
0530 - 0630 1 0 EOW E TEST OTH NA NWT 9790 9790
LINE UP TO PORT SIDE FLARE BOOM
0630 - 0830 2 0 EOW E TEST OTH NA NWT 9790 9790
BURN OUT THE RESIDUE OIL FROM STORAGE TANKS THROUGH THE FLARE BOOM.
0830 - 0900 0.5 0 EOW E TEST OTH NA NWT 9790 9790
HELD PJSM PRIOR FLUSHING WELL TESTING SURFACE LINES.

0900 - 1300 4 0 EOW E TEST OTH NA NWT 9790 9790 FLUSHED NSER SURFACE LINES, SEPARATOR, STORAGE AND SURGE TANKS.
BACKLOAD 30 BBLS CONTAMINATED BRINE TO FLOWBACK VESSEL.
1300 - 1300 0 0 EOW S OT RELS NA RIG 9790 9790
RIG RELEASED FROM ZULF-1225 TO ZULF-372 ON 17-JUNE-2024 AT 13:00 HRS.
Workover Objectives
Foreman Remarks

==============PLATFORM ZULF-1220/1229==============
ZULF-1222 ESP FUNCTION TEST , FLOWBACK & WELL DELIVERED
ZULF-1221 ESP FUNCTION TEST , FLOWBACK & WELL DELIVERED
ZULF-1227 ESP FUNCTION TEST , FLOWBACK & WELL DELIVERED
ZULF-1223 ESP FUNCTION TEST , FLOWBACK & WELL DELIVERED
ZULF-1226 ESP FUNCTION TEST , FLOWBACK & WELL DELIVERED
ZULF-1229 ESP FUNCTION TEST , FLOWBACK & WELL DELIVERED
ZULF-1225 ESP FUNCTION TEST , FLOWBACK & WELL DELIVERED
ZULF-1224 ESP FUNCTION TEST , FLOWBACK & WELL DELIVERED
==================================================================================================
* HSE*
- DISCUSSED ARAMCO HSE ALERTS IN THE PRE-TOWER SAFETY MEETINGS 69, 70, 71 & 72-24.
- CONDUCT H2S RESCUE & ABANDON DRILLS ON 16 JUNE 2024.
- CONDUCT MAN DOWN DRILL ON 16-JUNE-2024.
- REINFORCE STOP WORK AUTHORITY, HANDS-FREE OPERATIONS & ADVERSE WEATHER CONDITIONS RISKS IN ALL PRE-TOUR MEETINGS.
- PERFORM DAILY SWA & LOF DRILLS
===================================================================================================
* RIG HEADING: 331 DEG.
* ELEVATION RF: 79.57'.
* RKB TO TBG SPOOL = 69 FT, ODF TO TBG SPOOL = 73.8 FT, CORRECTION = 4.8 FT.
===================================================================================================
RENTAL TOOLS:
** RECIVECD 6 1/2" NOV JAR 6 1/2" HYDRO-MECHANICAL, SN# HMJ650-4385078 ON LOCATION 8 JUNE,2024
===================================================================================================
PERSONNEL ON LOCATION:
* ARAMCO MATERIAL EXPEDITOR KHALDI FAHAD A ID# 8499685 ARRIVED THE RIG ON 14 JUNE-2024.
* ARAMCO MATERIAL EXPEDITOR SALEH ALSALEM ID# 824605 ARRIVED THE RIG ON 4 JUNE-2024.
===================================================================================================
CONTRACTOR MANAGEMENT VISITS:
* RIG MANAGER HOSSAM ELKHOLY LEFT RIG THE RIG ON 28-MAY-2024.
===================================================================================================
* NEXT LOCATION: ZULF-370/379
* EXPECTED RIG MOVE: 19 JUNE 2024
* PLATFORM DEBRIS SURVEY: CRM#8800022107 ISSUED ON 09TH MAY 2024 & DEBRIS REMOVED ON 23TH MAY 2024.
* RIG MOVE REQUESTS: RM-2024-4010654 ISSUED ON 09TH MAY 2024.
* RIG MOVE MEETINGS HELD ON 18TH MAY 2024.
* LOCATIN APPROVAL AND LPA HAS BEEN RECEIVED FROM ADES ON 16TH MAY 2024.
* DE-PRESSURIZATION: PLATFORM DEPRESSURIZED (RECEIVED CONFIRMATION EMAIL FROM FIELD SERVICE).
* PLATFORM VISIT: DONE ON 24TH MAY 2024.
DAILY SURVEY

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1225 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 04/21/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A 11-14 KTS 1 FT SEASONAL 332 TOURLY

Company SBA ITS GOS NCT HCO BC RIG EMC BFS RAC ARM BCM HSL SLL ARM NWT SAM CAM

Category ALS CSR CTRG COIL PSSC ICE RIG DFMS FILT WMFE OTHR PCS SLS SLS WSC WTSE WBCS WHES
PERSONNEL
1 4 14 6 1 1 50 1 1 2 2 1 1 3 2 8 1 1
Total
AND SERVICES No. of Persons
100
INFORMATION
Personnel on Loc. Hrs. 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

Operating Hours. 8 0 0 0 0 8 8 8 0 0 0 8 0 0 8 8 0 0

Standby/Tankers
TRUCKS/BOATS
rawabi-320

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
673 1346 1668 1608 0 4056

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-421 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 01/12/2024 - 09/07/2024
Report ID: OPERLMTDMRREP

ADM-692 @ MRJN-421 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL Foreman(s)VAN LEEUWEN, MARK OLAF / LAWLESS-PYNE, CLEMENT RICHARD
D&WO Morning Report (Service Providers View) Charge #: PHZ TARGETING SFNY) Engineer ALJINDAN, KHALID ADEL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23073-0421) Manager ALSAFI, YOUSEF MOHAMMAD
ADM-692
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14218 678 3528 678 9829
Date: Tuesday 06/18/2024 MRJN-421 (0-1) MRJN_421_1 CONTRACTOR /CLERK VSA T
678 5527

Last 24 hr operations Next 24 hr plan


POH 8-1/2" RSS BHA. R/U & RIH 7" LINER RIH & CMT 7" LINER.
Location Next Location
MRJN-420/429 MRJN-421
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,401 Last Csg Size MD TVD Size Top
9 5/8 6436 6035 Formations Comments
Depth
CPCK 5,994 5763' TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) WARA 6,466 6052' TVD
10401 (Date) 100 0 259 MDDD 6,571 6103' TVD
112.5 (04/29/2024@0500 ) SFNY 7,285 6309' TVD
SFNR 9,037 6404' TVD
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0515 0.25 0-1 8 1/2 N DRLG CIRC MPMP RIG 10401 10401
FLOW CHECK PRIOR TO BHA - STATIC

0515 - 0900 3.75 0-1 8 1/2 N DRLG LDP BHA RIG 10401 10401 511 175 POOH 5-1/2" HWDP & JAR. L/D JAR & P/U EXTRA HWDP FOR LINER RUN. RACK
BACK STDS HWDP.
0900 - 1030 1.5 0-1 8 1/2 N DRLG LDP BHA RIG 10401 10401 175 100
L/D BHA COMPONENTS.
1030 - 1045 0.25 0-1 8 1/2 N DRLG PJSM NA RIG 10401 10401
HPJSM FOR HANDLING RA SOURCES
1045 - 1115 0.5 0-1 8 1/2 N DRLG HT BHA BHI 10401 10401
RETRIEVE RA SOURCES FROM BHI LWD TOOLS.
1115 - 1215 1 0-1 8 1/2 N DRLG HT BHA BHI 10401 10401
BHI PLUG IN & RETRIEVE MEMORY FROM TOOLS.
1215 - 1500 2.75 0-1 8 1/2 N DRLG LDP BHA RIG 10401 10401 100 0
L/D 6-1/2" DC & NOV UNDEREAMER. BREAK OUT BIT.
1500 - 1530 0.5 0-1 8 1/2 N DRLG OTH NA RIG 10401 10401
CLEAN & CLEAR RIG FLOOR.

HELD SAFETY STAND DOWN MEETING AND DISCUSSED MANRIDER & FALL FROM
1530 - 1615 0.75 0-1 8 1/2 N DRLG PJSM NA RIG 10401 10401 CASING INCIDENTS. DISCUSSED SWA & LOF. DISCUSSED PROCEDURAL DISCIPLINE
AND IMPORTANCE OF GOOD TBT AND JSA. REMINDED PERSONNEL OF HEAT
STRESS AND DEHYDRATION.

1615 - 1715 1 0-1 8 1/2 N DRLG CIRC MPMP RIG 10401 10401 RIH 1 X STD 5-1/2" DP AND FLUSHED SURFACE LINES AS PER TURBOCASER
REQUIREMENTS.
1715 - 1845 1.5 0-1 8 1/2 N WH SET WBSH RIG 10401 10401
RETRIEVE 11" FMC WEAR BUSHING AS PER FMC ENGINEER INSTRUCTIONS.
1845 - 1900 0.25 0-1 8 1/2 N CSG PJSM LINR RIG 10401 10401
HPJSM FOR M/U CMT HEAD
1900 - 2015 1.25 0-1 8 1/2 N CSG HT PEL BCR 10401 10401
M/U BAKER CMT HEAD
2015 - 2030 0.25 0-1 8 1/2 N CSG PJSM LINR RIG 10401 10401
HPJSM FOR RIG UP CASING RUNNING EQUIPMENT.
2030 - 2215 1.75 0-1 8 1/2 N CSG HT PEL NRC 10401 10401
RIG UP NAPESCO CASING RUNNING EQUIPMENT.

HPJSM FOR RIH 7" LINER.


2215 - 2245 0.5 0-1 8 1/2 N CSG PJSM LINR RIG 10401 10401 *DISCUSSED SWAP AND FUNCTIONED INTERLOCK SYSTEMS.
*DISCUSSED PINCH POINTS AND HANDLING EQUIPMENT DISCUSSED LOF, SWA AND
REDZONE.

2245 - 0000 1.25 0-1 8 1/2 N CSG RCSG CSTR NRC 10401 10401 0 48 M/U & TEST TURBOCASER.
* BAKERLOCK CONNECTIONS.

P/U & RIH 7" SHOE TRACK


0000 - 0415 4.25 0-1 8 1/2 N CSG RCSG CSTR NRC 10401 10401 48 290
* P/U 2 X FLOAT COLLAR
* BAKERLOC 8 X JOINTS.
0415 - 0459 0.75 0-1 8 1/2 N CSG RCSG CTRQ NRC 10401 10401 290 728
RIH 7" LINER AS PER PROGRAM.
Foreman Remarks

MRJN-421 WILL BE DRILLED AS A SINGLE-LATERAL HORIZONTAL OIL PRODUCER TARGETING SFNY RESERVOIR TO A TOTAL DEPTH (TD) OF 15,684' MD/6,494' TVD AND COMPLETED WITH
LOWER, MIDDLE AND UPPER COMPLETION (ESP).

==============MRJN-421 WELL DESIGN==============


32" CONDUCTOR PIPE AT 342 FT
PLANNED 18-5/8" CASING AT 2,793 FT (50' TVD INTO RUS) - ACTUAL AT 2798 FT.
PLANNED 13-3/8" CASING AT 5,661 FT (100' TVD INTO LAMS) - ACTUAL AT 5568 FT.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-421 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 01/12/2024 - 09/07/2024
Report ID: OPERLMTDMRREP

PLANNED 9-5/8" CASING AT 8,069 FT - ACTUAL AT 6438 FT.


PLANNED 7" LNR AT 10,570 FT
PLANNED 6-1/8" HORIZONTAL HOLE AT 15,684 FT

==================HSE=========================
FIRE DRILL: 05/22/2024
ABANDON DRILL: 06/14/2024
H2S DRILL: 06/14/2024
OTHER DRILLS: 1 X SWA, 1 X LOF, 2 X PIT, 2 X TRIP.
WEEKLY SAFETY MEETING: 06/13/2024.
DISCUSSED SAFETY ALERTS: DISCUSS ALERT: 69-24, 70-24, 71-24, 72-24, 04-24 FLOOR MAN HIT BY ELEVATOR ROTOR.

==========================PERSONNEL==========================
ARAMCO MATERIAL EXPEDIATOR "ABDUL AZEEZ, MOHAMMED (ID #8608823) ON BOARD SINCE 11/03/2023.
ARAMCO MATERIAL EXPEDIATOR ALMALKI, AHMED N (ID #8647620) ON BOARD SINCE 05/31/2024, LEFT RIG ON 06/14/2024
ARAMCO HSE "BABAIDHAN, MOHAMMED N ( ID# 768399 ) ON BOARD SINCE 06/04/2024.
ARAMCO DOECD "NELLERI, DIJITH ( ID# 8559001 ) ON BOARD SINCE 06/16/2024
ARAMCO DOECD "MENKABO, MOHAMMED T ( ID# 782440 ) ON BOARD SINCE 06/16/2024

===================CONTRACTOR MANAGEMENT VISIT=================


RIG MANGER HOSSAM ELKHOLY ( ID# 8600651) ON BOARD FROM 04/23/2024 & LEFT RIG ON 4/26/2024.
ASSISTANT RIG MANGER MOSLEH ABDULLAH ALDOSSARY ( ID#1083451722) ON BOARD FROM 5/27/2024 & LEFT RIG ON 05/28/2024.
HSE MANAGER HASSAN ABDELRAHMAN (ID# ) ON BOARD FROM 6/10/2024 - LEFT RIG ON 6/11/2024

=========================RENTAL TOOLS==========================
* OIL SERV 6 1/2" HMJ (S.N: 675-239) RECEIVED ON 05/09/2024.
* OIL SERV 6 1/2" HMJ (S.N: HMJ-675-0009) RECEIVED ON 06/11/2024.
* OIL SERV 6 1/2" HMJ (S.N: HM-66201014) RECEIVED ON 05/29/2024.
* OIL SERV 2 X 4 3/4" HMJ- XT-39 CONN. (S.N: DS-047) & (SN: DS001-1) RECEIVED ON 05/13/2024.
* WFD 2 X 4 3/4" PBL - NC-38 CONN. (S.N: SEM475BP196 -NOR475BP104MB ) RECEIVED ON 5/13/2024.
* WFD 2 X 6 3/4" PBL - NC-50 CONN. RECEIVED ON 5/26/2024.
* 6 1/8" NOV DOG LEG REAMER, 3 1/2" IF CONN. ( SN: CL 16275606 ) RECEIVED ON 5/13/2024.
* 8 1/2" NOV DOG LEG REAMER, 4 1/2" IF CONN. ( SN: G279555 ) RECEIVED ON 5/19/2024.
* 2 X 9-1/2" NOV ANDEREAMER, NC-50 CONNECTION, RECEIVED ON 5/26/2024.

====================================================================
- LC 50 WBM SAMPLE MANIFEST # 2400653117 SENT ON 11/22/2023 ON RAWABI-57 VESSEL.
- LC 50 OBM SAMPLE MANIFEST # 2400659751 SENT ON 12/28/2023 ON RAWABI-23 VESSEL.

===============PLATFORM MRJN-420/429 WELL STATUS==========================


MRJN-421: TO BE DRILLED
MRJN-422: EXISTING WELL
MRJN-423: EXISTING WELL
MRJN-424: EXISTING WELL
MRJN-425: EXISTING WELL
MRJN-426: EXISTING WELL
MRJN-427: TO BE DRILLED
MRJN-428: TO BE DRILLED
MRJN-429: EXISTING WELL

WELL SEQUENCE:
MRJN-427: DRILL 22", 16", 12-1/4" HOLE SECTIONS
MRJN-421: DRILL 22", 16" HOLE SECTIONS
MRJN-428: DRILL 22", 16", 12-1/4" HOLE SECTION.
MRJN-421: DRILL 12 1/4", 8 1/2'' & 6 1/8" HOLE SECTION, EOW (ONGOING)
MRJN-428: DRILL 8-1/2" & 6 1/8'' HOLE SECTION. EOW
MRJN-427: DRILL 8 1/2" HOLE SECTION, EOW.
MRJN-420: EOW
MRJN-421: FLOWBACK
MRJN-427: FLOWBACK
MRJN-428: FLOWBACK

NEXT LOCATION INFORMATION: NOT NAMED YET.


=======================================================================================================
** WAITING ON WEATHER TODAY: 0 HRS / CUMULATIVE = 0 HRS
** WAITING ON PRODUCING TODAY: 0 HRS / CUMULATIVE = 0 HRS
** WAITING ON MARINE TODAY 0 HRS: / CUMULATIVE = 0 HRS
** WAITING ON TOOL HOUSE TODAY: 0 HRS / CUMULATIVE = 0 HRS
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
96 PCF 1 0 API 61 855 Volts 3.34 0 259,679
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.2 HTHP 13 20 0 12 / 18 DELTADR 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 39 26 11 / 12 0 0 2.2
MUD DATA 80

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
96 PCF 1 0 API 61 852 Volts 3.38 0 253,713
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.2 HTHP 13 19 0 12 / 17 DELTADR 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC)

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-421 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 01/12/2024 - 09/07/2024
Report ID: OPERLMTDMRREP

78 0 39 26 11 / 12 0 0 2.2

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
96 PCF 1 0 API 61 848 Volts 3.48 0 253,713
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.6 HTHP 13 19 0 11 / 16 DELTADR 0.3
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 38 26 10 / 11 0 0 1.3
77

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
15RR 6,625 10,401 DP Av DC Av Bit HHP 30 150 M223 8.5 HTC
Pressure GPM Jet Vel 385.16 539.22 0 I-Row O-Row DC Location Bearings
3,625 660 N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7918317 DD506XV1 POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A 222 290 145 13 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 8.5 1 8.5 0.83 4 1/2" REG 7918317
2 RSS BHI 8.5 1 6.75 1.5 10.5 4 1/2"T2 4 1/2" REG 85 ZATEX157292
3 Logging While Drilling (LWD) BHI 6.75 1 6.75 4.4 137.17 15360016
4 Measurement While Drilling (MWD) BHI 6.75 1 6.75 16.94 132.13 15648224
5 Measurement While Drilling (MWD) BHI 6.75 1 6.75 4.28 132.13 15836716
6 Measurement While Drilling (MWD) BHI 6.75 1 6.75 16.14 132.13 16122139
7 Logging While Drilling (LWD) BHI 6.75 1 6.75 9.97 93.75 15560509
DRILL STRING 8 Logging While Drilling (LWD) BHI 6.75 1 6.75 8.91 93.75 12927676
9 Stop Sub BHI 6.5 1 6.5 2.8 1.73 NC50 T2 24.7 15901305
10 Stabilizer BHI 8.5 1 6.5 2.313 4.82 NC50 NC50 65 ZSTB0702129
11 Float Sub BHI 6.75 1 6.75 2.25 3.42 NC50 T2 65 15785891
12 FIlter Sub BHI 6.5 1 6.438 2.8 5.63 NC50 NC50 65 15597523
13 Drillcollar RIG 6.5 1 6.5 2.25 30.57 NC50 NC50 85.3 SPRL
14 Under Reamer NRT 6 1 8.5 2.813 13.78 6 5/8 REG 6 5/8 REG 65 SPRL W964744-1
15 Drillcollar RIG 6.5 1 6.5 2.25 31.05 NC50 NC50 85.3 SPRL
16 PBL (Multiple Activation By Pass) WWB 6.5 1 6.5 2.813 8.25 NC50 NC50 65 SBM675SP113
17 Crossover RIG 6.75 1 6.75 2.813 3 NC50 XT54 24.7 RIG
18 Heavy Weight Drillpipe (HWDP) RIG 5.5 4 5.5 3.25 125.39 XT54 XT54 52 CONV RIG
19 Hydro-Mechanical Jar OJR 6.75 1 6.75 2.75 31.65 XT-54 XT-54 65 HMJ662-01-0
20 Heavy Weight Drillpipe (HWDP) RIG 5.5 4 5.5 3.25 125.4 XT54 XT54 55.24 CONV RIG
21 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 CYX105 PREMIUM RIG

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/05/2024 PIT DRILL 17-18 KNTS 1-2 FT SEASONAL 220 TWO STAND DOWN
/N MEETING

Company NRC LIG BHI RIG BDF NRT OJR BLH DEP ARM BCM MI2 ARM WWB FME

Category CSR CTRG DPDS RIG DFMS HO JST LHES OTHR OTHR PCS SCS WSC WBCS WHES
PERSONNEL
3 13 3 52 3 0 0 2 1 4 4 1 2 1 1
Total
AND SERVICES No. of Persons
90
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 0 0 24 24 24 24 24 24 24 24

Operating Hours. 10 0 10 24 24 10 10 8 8 12 24 0 24 0 2

Standby/Tankers
TRUCKS/BOATS
TOPAZ KHUbayb

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
3189 1975 1339 3812 0 3845

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-4036 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 01/18/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

ADM-693 @ SFNY-4036 Limited Morning Report for 06/18/2024


Objective : (HORIZONTAL Foreman(s)ELSAIY, EHAB ABDELAATY AHMED
D&WO Morning Report (Service Providers View) Charge #: WELL, ACROSS AQUIFER FOR Engineer ALAHMADI, RAYAN KHALID
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23013-4036) WATER INJECTION) Manager ALSAFI, YOUSEF MOHAMMAD
ADM-693
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14261 0136788914 0136788917
Date: Tuesday 06/18/2024 SFNY-4036 (0) SFNY_4036_0 CONTRACTOR /CLERK VSA T
0136788915

Last 24 hr operations Next 24 hr plan


DRILL 8-1/2" PILOT HOLE SECTION. CONTINUE DRILLING 8-1/2" PILOT HOLE SECTION.
Location Next Location
0.003 KM S82W OF SFNY-4030 AND 0.002 KM S11W OF SFNY-4034. PLTF SFNY 4030/4039 ZULF-1277
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,070 Last Csg Size MD TVD Size Top
13 5/8 5073 4769 Formations Comments
Depth
T.V.D @ 1438' & TVDSS @
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 1,443
1333'
5555 (Date) 100 1,515 251 T.V.D @ 1547' & TVDSS @
31.2 (06/13/2024@0300 ) RUSA 1,553
1442'
T.V.D @ 1721' & TVDSS @
RUSG 1,728
1616'
T.V.D @ 1858' & TVDSS @
UMER 1,867
1753'
T.V.D @ 3,647' & TVDSS @
ARUM 3,755
3,540'
T.V.D @ 4,677' & TVDSS @
LAMS 4,958
4570'
T.V.D @ 4951' & TVDSS @
PAMU 5,314
4844'
T.V.D @ 5057' & TVDSS @
PLVL 5,468
4950'
T.V.D @ 5114' & TVDSS @
AHMD 5,557
5007'
T.V.D @ 5216' & TVDSS @
CPCK 5,733
5109'
T.V.D @ 6374' & TVDSS @
WARA 6,067
5267'
T.V.D @ 5537' & TVDSS @
MDDD 6,772
5430'
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 1230 7.5 0 8 1/2 N DRLG D RSS SDM 5555 6060
DRILL 8-1/2" PILOT HOLE WITH SLB RSS/MWD/LWD ASSY.

HELD SAFETY STAND DOWN MEETING WITH CREW, DISCUSSING SWA, HAND
1230 - 1300 0.5 0 8 1/2 N DRLG PJSM NA RIG 6060 6060 INJURY, SAFE LIFTING OPS, LOF & PINCH POINT, IMPROVE SAFETY CULTURE
DISCUSSED HEAT INDEX SAFETY CONTROLS, DISCUSSED INCIDENTS FROM SOC
MEETING.
1300 - 0030 11.5 0 8 1/2 N DRLG D RSS SDM 6060 6840
DRILL 8-1/2" PILOT HOLE WITH SLB RSS/MWD/LWD ASSY.

HELD SAFETY STAND DOWN MEETING WITH CREW, DISCUSSING SWA, HAND
0030 - 0100 0.5 0 8 1/2 N DRLG PJSM NA RIG 6840 6840 INJURY, SAFE LIFTING OPS, LOF & PINCH POINT, IMPROVE SAFETY CULTURE
DISCUSSED HEAT INDEX SAFETY CONTROLS, DISCUSSED INCIDENTS FROM SOC
MEETING.

DRILL 8-1/2" PILOT HOLE WITH SLB RSS/MWD/LWD ASSY.


0100 - 0459 4 0 8 1/2 N DRLG D RSS SDM 6840 7070
- WELL TRAJECTORY VS PLAN: 11.1 FT ABOVE & 5.68 FT LEFT.
- PUMP TANDEM SWEEPS AS REQUIRED.
Foreman Remarks

SFNY-4036 IS A HORIZONTAL WELL THAT WILL BE COMPLETED ACROSS SFNY AQUIFER AND UTILIZED AS WATER INJECTOR IN PF SFNY-4030/4039 IN THE EASTERN FLANK OF SAFANIYA FIELD.
SFNY-4036 WILL BE COMPLETED W/ STAND ALONE SAND SCREENS & PACKERS.

========================RIG POSITION & DATA=================================================================


* LATITUDE 028 DEG 21.41' NORTH, LONGITUDE 049 DEG 2.70' EAST
* RIG HEADING= 330 DEG
* AIR GAP= 43'
* WATER DEPTH= 96.8'
* RKB TO MSL = 107'
* RKB TO ML= 203.8'

======================PLANNED CASING POINTS SFNY-4036 =========================================================


38" CONDUCTOR AT 258'.
18 5/8" CASING AT1,483' MD/ 1,479' TVD (50 FT RUS): SET AT 1,482'
13 3/8" CASING AT 5,047' MD/ 4,763' TVD (100' INTO LAMS) : SET AT 5083' MD & 4777' TVD.
8 1/2" PILOT HOLE AT 9,548' MD/ 5,938' TVD ( SAFANIYA MEMBER): SET AT XXX
8.5" WELL TD AT 9,548' MD/ 5,938' TVD.

======================PLATFORM SFNY-4030/4039 WELL STATUS:======================================================


SFNY-4030 SECURED AFTER TIE BACK.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-4036 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 01/18/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

SFNY-4036: 22'' SECTION, 16'' HOLE SECTION - WELL SUSPENDED


SFNY-4030/4039 PF BATCH SEQUENCES:
* BATCH DRILL 22": SFNY-4034 , SFNY-4032, SFNY-4031, SFNY-4033, SFNY-4035 ALL DONE.
* BATCH DRILL 16": SFNY-4035 DONE, SFNY-4033 DONE, SFNY-4031 DONE, SFNY-4032 DONE, SFNY-4034 DONE.
* PILOT HOLE 8-1/2" SFNY-4036...ONGOING.

===================== DRILLS & HSE ==========================================================================


- DRILLS:
* H2S DRILL ON 13-JUNE-2024.
* MAN DOWN DRILL FROM MONKEY BOARD ON 03-JUNE-2024.
* SPILL DRILL ON 25-MAY-2024
* FIRE, ABANDON DRILLS ON 13-JUNE-2024.
* 2 X CONFINED SPACE DRILL 20 -MAY-2024.
* ANNUAL SECONDARY DISASTER DRILL ON 14-APRIL-2024.

===================== LC-50 SAMPLES =========================================================================


- LC-50 SAMPLE WBM SENT TO TANAJIB BY MNF # 2400667137 ON POSH PELICAN BOAT ON 08-FEB.-2024.
- LC-50 SAMPLE INNOVERT OBM SENT TO TANAJIB BY MNF # 2400691071 ON RAWABI-29 ON 13-JUNE.-2024.

===================== RENTAL EQUIPMENT:-=====================================================================


* OILSERV 6 3/4" HM JAR ( S/N# HMJ-675-0007 ) ON BOARD SINCE 10 JUNE 2024.
* SAMAA 6 3/4" PBL SUB ( S/N# SPM675SBP300 ) ON BOARD SINCE 10 JUNE 2024.

===================CONTRACTOR MANAGEMENT VISIT=================

======================= PERSONNEL ONBOARD==================================================================


- ARAMCO CLERK JOBIN, THOMAS #8618642 ONBOARD SINCE 04/23/2024.
- ARAMCO MATERIAL EXPEDITOR ALAMRI, FAISAL #8656349 ONBOARD SINCE 06-11-2024.

-==========================NEXT RIG MOVE DATA================================================================


* NEXT LOCATION: ZULF-1270/1279 PLATFORM.
* RIG MOVE PROJECTED ON +/- 20 JUNE 2024.
* RIG MOVE REQUESTS RM-2024-4010478 & RM-2024-4010479 SUBMITTED IN THE SYSTEM.
* POSITIONING REQUEST #8800021997 SUBMITTED IN THE SYSTEM.

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 5,643 54.43 40.68 95 5,166 439.66 331.33 1,806.2 3.7
0 5,739 57.99 41.76 96 5,219 457.94 347.36 1,885.75 3.82
0 5,834 59.7 42.29 95 5,268 476.35 363.95 1,966.77 1.87
0 5,930 62.38 43.43 96 5,315 495.11 381.36 2,050.39 2.98
0 6,025 65.2 44.14 95 5,357 513.86 399.34 2,135.14 3.03
0 6,120 68.14 44.69 95 5,394 532.86 417.94 2,221.81 3.15
0 6,215 71.63 45.98 95 5,427 551.96 437.28 2,310.32 3.89
DAILY SURVEY
0 6,310 75.08 46.99 95 5,454 571.06 457.4 2,400.45 3.77
0 6,404 78.43 47.46 94 5,476 590 477.87 2,490.96 3.6
0 6,500 80.06 47.51 96 5,493 609.42 499.06 2,584.28 1.7
0 6,596 80.65 47.49 96 5,510 628.91 520.33 2,677.99 0.61
0 6,690 81.03 47.34 94 5,525 648.05 541.15 2,769.96 0.44
0 6,786 81.58 47.46 96 5,539 667.63 562.44 2,864.06 0.58
0 6,881 81.57 47.58 95 5,553 686.97 583.57 2,957.28 0.13
0 6,976 81.54 47.7 95 5,567 706.27 604.73 3,050.51 0.12

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 1 0 API 55.9 420 Volts 4 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
145 2.6 HTHP 25.7 23 0 14 / 17 INOVRT 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 29 18.4 10 / 11 0 44,800 2.6
81

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 1 0 API 55.8 390 Volts 3.8 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 145 2.6 HTHP 25.8 23 0 14 / 18 OBM 0.9
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 30 18.4 9 / 10 0 44,800 2.7
82

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 1 0 API 54.9 360 Volts 4.3 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
140 3 HTHP 26 22 0 14 / 18 OBM 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 32 19.1 9 / 11 0 44,800 2.6
84

MUD
ADAPTA CACO3-5 MRBL-M BDF 489 FACTANT LESUPERMUL CAOH2
TREATMENT

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-4036 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 01/18/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

6 ( 55LB ) 24 ( 100LB ) 3 ( 2200L ) 6 ( 55LB ) 1 ( 55GL ) 2 ( 50GL ) 30 ( 55GL )


RHEMODL STELSL50
1 ( 100LB ) 24 ( 25LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
5 5,083 7,070 DP Av DC Av Bit HHP 27 150 M422 8.5 VAR
Pressure GPM Jet Vel 379.32 N/A 293 I-Row O-Row DC Location Bearings
2,800 650 269 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7001104 V616PG2XA 6 x 13 / 0.778
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 34 245 264 217 21,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit VAR 1 0.92 7001104
2 RSS SDM 6.75 1 6.75 13.39 4-1/2 IF 4-1/2" REG 0 N18M0130
3 Logging While Drilling (LWD) SDM 6.75 1 6.75 7.81 5-1/2" FH 4-1/2 IF 104.53 49212SAT
4 Logging While Drilling (LWD) SDM 6.75 1 6.75 1.21 5-1/2 FH 5-1/2 FH 98.6 AOTC-N-0291
5 Logging While Drilling (LWD) SDM 6.75 1 6.75 18.12 5-1/2 FH 5-1/2 FH 98.36 V3878
6 Drillpipe RIG 5.5 294 5.5 4.67 9,308 XT54 XT54 24.7 XD105 PREMIUM
DRILL STRING
7 Measurement While Drilling (MWD) SDM 6.75 1 6.75 0.92 5-1/2 FH 5-1/2 FH 83 34589
8 Measurement While Drilling (MWD) SDM 6.75 1 6.75 25.18 5-1/2 FH 5-1/2 FH 83 H4845
9 Measurement While Drilling (MWD) SDM 6.75 1 6.75 1.15 5-1/2 FH 5-1/2 FH 83 5081-1-2
10 Logging While Drilling (LWD) SDM 6.75 1 6.75 0.88 5-1/2" FH 97.14 NTS-32204
11 Logging While Drilling (LWD) SDM 8.25 1 8.25 17.41 5-1/2" FH 5-1/2" FH 209.09 H7429-2
12 Float Sub SDM 6.75 1 5 3 1.93 NC50 NC50 92 ITS340811
13 Float Sub SDM 6.75 1 5 3 6.86 NC50 NC50 92 675-1030
14 PBL (Multiple Activation By Pass) SAM 6.75 1 5.5 3 8.3 NC50 NC50 92 SBM675SBP30
15 Crossover RIG 6.625 1 6.625 2.813 3.02 XT54 NC50 92 ZHR20230104
16 Heavy Weight Drillpipe (HWDP) RIG 5.5 2 5.5 3.25 62.71 XT54 XT54 52.51 CONV RIG
17 Hydraulic Jar OJR 6.75 1 32.1 XT54 XT54 92 9359611
18 Heavy Weight Drillpipe (HWDP) RIG 5.5 6 5.5 3.25 187.31 XT54 XT54 54 CONV RIG
19 Drillpipe RIG 5.5 294 5.5 4.67 9,308 XT54 XT54 24.7 XD105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/13/2024 N/A 12-14 4-5 FT CLEAR 173 2 X SAFETY STAND
KNOTS SE DOWN MEETING

Company SPR LIG SDM SAM RIG BAR OES ARM HCM MI2 ARM

Category CSR CTRG DPDS DRF RIG DFMS DFMS OTHR PCS SCS WSC
PERSONNEL
2 15 4 1 57 1 1 2 2 1 1
Total
AND SERVICES No. of Persons
87
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 12 24 12 12 12 12 12 24

Standby/Tankers Others
TRUCKS/BOATS
HADI-22 qms neptune

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1172 687 1008 10976 0 4408

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1386 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 06/17/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

ADM-694 @ ZULF-1386 Limited Morning Report for 06/18/2024


Objective : (CHANGE UPPER Foreman(s)BOSHNAK, AHMED MAHMOUD / BIN DAKHEIL, ABDULAZIZ IBRAHIM
D&WO Morning Report (Service Providers View) Rig Charge #: COMPLETION, CLEAN OUT, RUN Engineer ALHAMID, OMAR MOHAMMED
Copyright 2024 Saudi Aramco. All Rights Reserved ADM-694 (72-24062-1386) ESP) Manager OTAIF, HASSAN WAFI
Daily OffShore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 1677714217 0136739152 /CLERK VSA
Date: Tuesday 06/18/2024 ZULF-1386 (0) ZULF_1386_0 T
0136733489

Last 24 hr operations Next 24 hr plan


BH TBG, SET DEEP BARRIER, PT, CIRCULATE, SET SHALLOW BARRIER,PT, ND TREE & BONNET, PT BOPE AS REQUIRED, RETRIEVE SHALLOW BARRIER, PUNCH BELOW PACKER, BH TCA,
NU BOPE. CIRCULATE, RETRIEVE DEEP BARRIER, BH TBGS, UNSET HANGER, BH TCA, CIRCULATE.
Location Next Location
ZULF-1380/13389 ZULF-1388
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,071 Last Csg Size MD TVD Size 6,485 6,568 5,527 Top
9 5/8 6773 5545 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
10071 (Date) 100 0 243
1.5 (06/16/2024@1800 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

WITH TCA SIDE CLOSED, CONTINUE BULLHEAD TBGS SIDE WITH 50 BBLS HIVIS
PILL FOLLOWED BY 205 BBLS 74 PCF CACL2 VISCOUS BRINE, FORMATIONS
0500 - 0830 3.5 0 POST N DCOM CIRC MPMP RIG 10071 10071
LOCKED UP ON 0.5 BPM/1000 PSI, FLOW CHECK WELL DEAD AND STATIC.

-MONITOR ALL CCA PRESSURES DURING BULL HEADING OPERATIONS, ALL ZERO.

AL MANSOURI SLICKLINE PERFORM THE FOLLOWING RUNS:


-RIH W 3.81" PX-PLUG SET SAME AT X-NIPPLE BELOW 9-5/8" PACKER AT 5328
FT.
-RUN CHECK SET.
0830 - 1230 4 0 POST N DCOM DTU GAUG MSL 10071 10071 -RUN AND SET EQUALIZATION PRONG IN PX PLUG BODY.
-PRESSURE TEST PX-PLUG & PRONG TO 300/1000 PSI ON STAGES-GOOD TEST.
-FIRST MECHANICAL BARRIER IN PLACE.
-PRESSURE TEST 9-5/8" CSG SLIPS & LOWER THS SEALS TO 1,500 PSI-GOOD
TEST.
-PRESSURE TEST TBG BONNET SEALS & HANGER SEALS 1,500 PSI-GOOD TEST.

CIRCULATE WELL CONVENTIONALLY FOR 2 X BOTTOMS UP W 74 PCF CACL2


1230 - 1600 3.5 0 POST N DCOM CIRC MPMP RIG 10071 10071
VISCOUS BRINE IN/OUT THROUGH MGS ON 3.5 BPM/400 PSI, 100% CIRCULATION,
NO CONTAMINATION OBSERVED, FLOW CHECK WELL DEAD AND STATIC.

AL MANSORI SLICKLINE PERFORM THE FOLLOWING RUNS:


-RUN AND SET PX PLUG W SHORT SUB ON TRSSSV PROFILE AT 252 FT.
-RUN CHECK SET.
1600 - 1845 2.75 0 POST N DCOM DTU GAUG MSL 10071 10071 -RUN AND SET EQUALIZATION PRONG IN PX PLUG BODY.
-PT PLUG & PRONG VIA BACK SIDE AND TUBING SIDE TO 300/1,000 PSI -GOOD
TEST.
-SECOND MECHANICAL BARRIER IN PLACE.
-RD AL MANSORI SLICKLINE RISER, LUBRICATOR & BOP.

HPJSM. N/D OLD 4-1/16" 3K CAMERON PRODUCTION TREE, ND OLD 11"X 4-1/16"
3K CAMERON ROTATING TUBING BONNET, SECURE 1/4" CONTROL LINE OF BAKER
HUGHES 4-1/2" TRSSSV, INSTALL REQUIRED FITTING THROUGH CL WITH NEEDLE
1845 - 2330 4.75 0 POST N WH ND TREE RIG 10071 10071
VALVE, LOCK OPEN TRSSSV AT 5,000 PSI, SECURE & WRAP SAME AROUND 11" X
4-1/2" FMC HANGER NECK, CLEAN HANGER THREAD, CHECK SAME AND CONFIRM
4-1/2" N-VAM THREAD, CHECK AND WORKOUT ALL LOCK DOWN PINS ONE BY
ONE, ENGAGED AT 3-3/4'', FLUSH ON BOWL AT 4-3/4''.

SECURE AND ARRANGE MORE SCAFFOLDING AROUND WELLHEAD AREA, N/U 13-
2330 - 0130 2 0 POST N BOP BOP BOP RIG 10071 10071
5/8"-10K HI PRESSURE RISER WITH DSA ON THS.
NOTE: NO PRODUCTION DECK ON PLATFORM.

0130 - 0400 2.5 0 POST N BOP BOP BOP RIG 10071 10071 TRANSFER 13-5/8"-10K BOP STACK FROM TEST STUMP TO WELL CENTER, N/U
13-5/8" 10M BOP, SECURE KILL & CHOKE LINES.

0400 - 0459 1 0 POST N BOP BOP BOP RIG 10071 10071 N/U BELL NIPPLE, OVERSHOT EXTENSION AND DIVERTER SYSTEM...INCOMPLETE
AT REPORT TIME.
Workover Objectives
Foreman Remarks

-ODF TO THS AT 52.18 FT, PRT TO THS AT 61.2 FT, ODF CORRECTION AT - 9.02 FT.
===========================================================
-BOP DRILLS NONE DUE TO OPERATIONS
-SAFETY ALERTS NONE
===========================================================
-TOTAL FLUID PUMPED TO WELL 74 PCF CACL2 BRINE FOR BOTH BH AND LOSSES = 620 BBLS.
-ARAMCO CLERK MOHAMED AZARUDEEN BN# 8599343 ONBOARD SINCE 05/11/2024.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1386 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 06/17/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

-ARAMCO HSE ADVISOR PREM BENIL BN#8601444 ONBOARD SINCE 06/14/2024.


============================================================
-NPS 4-3/4" DRILLING JAR ONBOARD SINCE 5/31/2024, SN#GE-DJ-0031.
=============================================================
CURRENT PLATFORM PLAN AND OPERATIONS
----------------------------------------------------------
-FIVE WELLS PLANNED FOR ESP INSTALLATION ALL CONVENTIONAL COMPLETION.
-WELLS SEQUENCES (ZULF-1387 / ZULF-1389 / ZULF-1386 / ZULF-1388 / ZULF-1385).
-SUSPENDED FOR FLOWBACK (ZULF-1387, ZULF-1386)
-TESTED TCA OF (ZULF-1389 / ZULF-1388 / ZULF-1386 / ZULF-1385) TO 300/1,000 PSI ALL CHARTED GOOD TESTS.
=================================================================================
CURRENT PLATFORM DETAILS
-----------------------------------------
-NO ANCHORAGE RESTRICTION ON CURRENT LOCATION.
-AIR GAP 45 FT, WATER DEPTH 136 FT, RT TO MSL 109 FT, RIG HEADING 330 DEG.
-LEGS PENETRATION (BOW 8.0 FT, PORT 8.2 FT, STBD 8.0 FT).
===============================================================================
NEXT PLATFORM DETAILS AND MARINE REQUESTS
--------------------------------------------------------------
-PLATFORM ZULF 204/209,289
-EXPECTED RIG MOVE DATE 1ST OF AUGUST.
-SENT TO ZULF FIELD SERVICE FOR PLATFORM DEPRESSURIZATION ON 6/3/2024.
-SUBMITTED RIG MOVE REQUEST IN SYSTEM NO. RM-2024-4010755.
-SUBMITTED SEABED SURVEY NO. 8800022238.
-BORE HOLE DATA SHARED WITH ADES ON 06/07/2024 FOR LA & LPA.
--------------------------------------------------------------------------------------------------
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 10,071 89 69.5 0 5,681 777.85 1690.51 6,105.24 0.02

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 0 0 API 0 0 Volts 0 9.6 159,600
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 95 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 5 0/0 0 0 0
50
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 0 0 API 0 0 Volts 0 9.5 159,800
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 95 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 5 0/0 0 0 0
50

MUD UTG-XG
TREATMENT 20 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A 5 KNOTS 1 TO 2 FT SEASONAL 176 EVERY TOUR
NNW

Company SBA OCS LIG BC RIG OES NPJ RIG ARM HSL MSL ARM WWB

Category ALS CSR CTRG PSSC RIG DFMS JST OTHR OTHR SLS SLS WSC WBCS
PERSONNEL
4 2 13 0 49 1 0 5 2 1 3 2 0
Total
AND SERVICES No. of Persons
82
INFORMATION
Personnel on Loc. Hrs. 24 24 24 0 24 24 0 24 24 24 24 24 0

Operating Hours. 0 0 0 0 24 24 0 0 12 0 7 0 0

Standby/Tankers
TRUCKS/BOATS
juzor

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2969 1221 1737 0 0 1600

Instrumentation Other
REPAIR ASAP NONE NONE Reporter
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-471 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 05/22/2024 - 07/20/2024
Report ID: OPERLMTDMRREP

ADM-695 @ MRJN-471 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK) Foreman(s)BOERS, ALEXANDER / IBRAHIM, AHMED KHALIL
D&WO Morning Report (Service Providers View) Charge #: Engineer ALENIZI, FAYEZ RADI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24073-0471) Manager OTAIF, HASSAN WAFI
ADM-695
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 00882-1677 714213 6734606 6739175 (R ADIO ROOM)
Date: Tuesday 06/18/2024 MRJN-471 (1-1) MRJN_471_2 CONTRACTOR /CLERK VSA T
6739203

Last 24 hr operations Next 24 hr plan


RIG SHUT DOWN FOR MANRIDING INCIDENT INVESTIGATION. NIPPLE UP DIVERTER SYSTEM, P/T BOP STACK, R/U SLICKLINE, RETRIVE BARRIERS.
Location Next Location
MRJN 470-479 MRJN-472
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
10,990 Size 6098 5854 Size 7,708 10,849 6,854 Top
Formations Comments
9 5/8 4 1/2 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
10990 (Date) 100 0 242
20 (05/29/2024@0200 )

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End

RIG SHUT DOWN FOR INCIDENT INVESTIGATION. RIG HAD MAN-


0500 - 0459 24 1-1 POST N BOP NU BOP RIG 10990 10990 HSEI 934829 RIDING INCIDENT WITHOUT INJURY WHILE ATTEMTING TO
REMOVE DIVERTER MANDREL HANDLING SLINGS FROM BELOW
RIG FLOOR.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
17 Jun 0800 24 45 934829 HSEI UNKN NA RIG 0 RIG SHUT DOWN FOR MAN-RIDING INCIDENT
INVESTIGATION.
Workover Objectives
Foreman Remarks

=========================================================
- MRJN-471 IS CLASSIFIED AS A CRITICAL WELL DUE TO HIGH GOR: 9502 WITH POTENTIAL LOSS CIRCULATION IN EXISTING LATERAL
=========================================================
- ODF TO TBG SPOOL: 60.9 FT, PRT TO TBG SPOOL: 74.1 FT, PRT=ODF+13.2 FT. ODF CORRECTION: +13.2 FT
===================CURRENT PLATFORM:=======================
- MRJN-470/479. WELLS MRJN-471 (SIDETRACK), MRJN-472 (SIDETRACK).
===================NEXT PLATFORM===================
- MRJN-176/185.
- SUBMITTED SBS REQUEST (CRM-SR 8800022010) ON APRIL 16, 2024.
- SHARED BHD WITH THE RIG FOR ISSUING LPA & LA ON APRIL 19, 2024.
- SUBMITTED MARINE RIG MOVE REQUEST RM-2024-4010552, ON APRIL 04/23/2024.
- DRAS WORK FLOW IS DOWN, SENT AN EMAIL TO MRJN FIELD SERVICE FOR DE-PRESSURIZATION STATUS ON APRIL, 23, 2024.
===================HIGHLIGHTS======================
- 4-3/4" HYD. DRLG JAR SN: GE-DJ-00019 RECEIVED ON 25 APRIL 2024 VIA SKIPSEY TIDE #2100872298.
====================SAFETY==========================
- HSE ALERT: 69-24 - INJURY DURING ENGINE MAINTENACE.
- HSE ALERT: 70-24 - PIPE HANDLER MAIN ARM UNCONTROLLED DECENT.
- HSE ALERT: 71-24 - TRIP AND FALL INCIDENT.
- HSE ALERT: 72-24 - SNAKE BITE AND SCORPION STING INCIDENTS.
====================PERSONNEL=======================
- ARAMCO CLERK MUHAMMAD YAWAR ABRAR SIDDIQUI BN: 8619348 JOINED ON 12/12/2023.
- ARAMCO FCT YOUSEF A ROUBLAH BN: 790377 JOINED ON 6/08/2024.

MANRIDING INCIDENT INVESTIGATION TEAM:


- ADES RIG MANAGER JULIO C MELENDEZ BN: 8569300, ON BOARD 06/17/2024.
- ADES QHSE SUPERVISOR EMAD RAMADAN BN: 8061172, ON BOARD 06/17/2024.

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
1-1 10,990 91.5 249.54 0 6,851 -433.14 -1628.38 5,528.22 1.12

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 0 API 0 0 Volts 0 9 249,001
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 88 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 12 0/0 0 0 0
MUD DATA 60

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 0 API 0 0 Volts 0 9 249,001
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 88 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-471 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 05/22/2024 - 07/20/2024
Report ID: OPERLMTDMRREP

Vis.(SEC) 0 0 12 0/0 0 0 0
60

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 0 API 0 0 Volts 0 9 249,001
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 88 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 12 0/0 0 0 0
60

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A 4 NNW 1 FT SEASONAL 147 TOURLY

Company HCB HTD LIG BCT SCP RIG BDF SMI RIG ARM SJC HSL MSL WTS GOC ARM RWC FME SWL

Category BRCR CSV CTRG COIL ICE RIG DFMS DFMS OTHR OTHR PCS SLS SLS SLS PRS WSC WTSE WHES WLS
PERSONNEL
1 1 14 6 4 48 1 1 4 2 4 1 3 1 2 2 4 1 4
Total
AND SERVICES No. of Persons
104
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 0 24 12 12 0 12 24 0 0 0 0 24 0 0 0

Standby/Tankers
TRUCKS/BOATS
TOPAZ khuwair

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1981 1220 969 2548 0 1266

Instrumentation Other
REPAIR ASAP NONE NONE Reporter
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-527 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 06/17/2024 - 12/22/2024
Report ID: OPERLMTDMRREP

ARO-2001 @ MRJN-527 Limited Morning Report for 06/18/2024


Objective : (CASING SCAB-OFF Foreman(s)POLOWY, BRENT / AZAHARI, SAIFUL AZMI
D&WO Morning Report (Service Providers View) Rig Charge #: & INSTALL GLM) Engineer MUHAIDIB, OMAR SAUD
Copyright 2024 Saudi Aramco. All Rights Reserved ARO-2001 (72-23073-0527) Manager ALRUWAILI, MOHAMMED NAZAL
Daily OffShore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 8821677712 601 6737394 /CLERK VSA
Date: Tuesday 06/18/2024 MRJN-527 (0) MRJN_527_0 T
6737401

Last 24 hr operations Next 24 hr plan


, N/U E-KILL, PT E-KILL,RU DE-COMP WELL TEST EQUIPMENT P-T WELL TEST EQUIP, RU SLICKLINE, COMMENCE OPERATIONS.
Location Next Location
MRJN-521/529 MRJN-329
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,681 Last Csg Size MD TVD Size Top
9 5/8 8670 6820 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12681 (Date) 0 0 231
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

POSITION AND RIG UP TETRA DE-COMPLETIN WELL TEST EQUIPMENT


- R/U WELL TEST CHOKE MANIFOLD
- R/U 100 BBLSS SURGE TANK, RUN VENT LINES TO BOOM
0500 - 0459 24 0 PRE N RM RU NA RIG 12681 12681 - SPOT AND R/U SEPERATOR
- SPOT AND R/U 500 BBLS STORAGE TANK, HOSE AND TRANSFER PUMP
- GENERAL UP DE-COMPLETION EQUIPMENT,
- MEANWHILE PRESSURE TEST TCA TO 1000 PSI, GOOD TEST
- FLUSH H2O, PRESSURE TEST TETRA EQUIPMENT.
Workover Objectives
Foreman Remarks

RKB TO THS = ??? RKB TO NEW THS = ***


ODF TO THS = 51.25' ODF TO NEW THS = ???'
ODF CORRECTION = -???'

=======================ARAMCO PERSONNEL=======================================================
ARAMCO MAT EXP NASSER AL-KHALDI ID# 8337564 ON BOARD SINCE 13 JUNE 24.

==================OBB, NEAR MISS, HSE ALERTS AND DRILLS=============================================


** OBSERVATION SUBMITTED IN SLS =28
**D&WO HSE ALERTS :

=======================RENTAL EQUIPMENT===================================================================

==========================================================================================================
CURRENT LOCATION: MRJN 521/529
CURRENT WELL: MRJN-527
9 WELLS PLANNED:
MRJN -521 -DECOMPLETE WELL, TIE-BACK 7" TO SURFACE, AND DEPLOY GAS LIFT COMPLETION.... NEW COMPLETION RUN, PENDING FLOWBACK
MRJN-522 - DECOMPLETE WELL, TIE-BACK 7" TO SURFACE, AND DEPLOY GAS LIFT COMPLETION.... NEW COMPLETION RUN, PENDING FLOWBACK
MRJN-526 - DECOMPLETE WELL, TIE-BACK 7" TO SURFACE, AND DEPLOY GAS LIFT COMPLETION.... NEW COMPLETION RUN, PENDING FLOWBACK
MRJN-527 - DECOMPLETE WELL, TIE-BACK 7" TO SURFACE, AND DEPLOY GAS LIFT COMPLETION.....IN PROGRESS
MRJN-523 - DECOMPLETE WELL, TIE-BACK 7" TO SURFACE, DEPLOY GAS LIFT COMPLETION, SMART COMPLETION
MRJN-524 - DECOMPLETE WELL, TIE-BACK 7" TO SURFACE, DEPLOY GAS LIFT COMPLETION, SMART COMPLETION
MRJN-525 - DECOMPLETE WELL, TIE-BACK 7" TO SURFACE, DEPLOY GAS LIFT COMPLETION, SMART COMPLETION
MRJN-528 - DECOMPLETE WELL, TIE-BACK 7" TO SURFACE, DEPLOY GAS LIFT COMPLETION, SMART COMPLETION. REQUIRE HEAT EXCHANGER
MRJN-329 - DECOMPLETE WELL, TIE-BACK 7" TO SURFACE, AND DEPLOY GAS LIFT COMPLETION.

MRJN-524 - 4-1/2" ME PLUG INSTALLED @ 127'


==========================================================================================================
NEXT LOCATION:

======================DIESEL CONSUMPTION=================================================================
** DAILY DIESEL CONSUMPTION FOR ENGINES (RIG): 41 BBLS, CUMULATIVE CONSUMPTION FOR CURRENT WELL MRJN-527 = 102 BBLS
** DIESEL CONSUMPTION FOR COMPLETION = 0 BBL
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
66 PCF 0 0 API 0 0 Volts 0 9 58,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 96 0 0 0/0 WBM-NAC 0
MUD DATA Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 4 0/0 0 0 0
55

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
66 PCF 0 0 API 0 0 Volts 0 9 58,000

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-527 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 06/17/2024 - 12/22/2024
Report ID: OPERLMTDMRREP

FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 96 0 0 0/0 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 4 0/0 0 0 0
55

MUD NACL CAOH2


TREATMENT 6 ( 2200L ) 4 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A 10-12KNTS, 0.6 FT 31 DEG 5NM 4,072 PRE-TOUR
NW VIS

Company INW FMC GOS HCO RIG BDF ARM HSL BC HCO ARM TTR

Category BRCR CSR CTRG ICE RIG DFMS OTHR SLS SSSV SSSV WSC WTSE
PERSONNEL
1 3 12 1 49 1 1 3 1 1 2 7
Total
AND SERVICES No. of Persons
82
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 24 12 12 0 0 0 12 0

Standby/Tankers Others
TRUCKS/BOATS
TOPAZ Karama CHRISTINA TIDE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2420 359 1378 1546 1200 1867

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-234 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:20 05/23/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

ARO-2003 @ SFNY-234 Limited Morning Report for 06/18/2024


Objective : (SLIM HOLE ESP Foreman(s)DCRUZ, ERROL CHRISTOPHER / KHAFAGY, BASSEM AHMED
D&WO Morning Report (Service Providers View) Rig Charge #: INSTALLATION AND FUNCTION Engineer ALQAHTANI, MOHAMMED HADI
Copyright 2024 Saudi Aramco. All Rights Reserved ARO-2003 (72-22013-0234) TEST) Manager ALRUWAILI, MOHAMMED NAZAL
Daily OffShore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 00-88-216- 777-111-01 6737407 /CLERK VSA
Date: Tuesday 06/18/2024 SFNY-234 (0) SFNY_234_0 T
6737408

Last 24 hr operations Next 24 hr plan


SCRAP PKR SETTING DEPTH. CHC. DISPLACE TO 71 PCF SFNY KILL BRINE. POH 3-7/8" SCRAPER CONT POH 3-7/8" SCRAPER ASSY. ND BELL NIPPLE & FLOW LINE. NU SHOOTING NIPPLE. RUN SLB
ASSY WHILE LD DP. 2-7/8" GUNS & FIRE. POH SLB WL.
Location Next Location
SFNY-234/239 PLATFORM LOCATED IN SFNY SOUTH FIELD SFNY-239
Current Depth (ft) Liner TOL MD TVD Formation Tops
6,940 Last Csg Size MD TVD Size 879 6,980 5,856 Top
7 6590 5547 Formations Comments
4 1/2 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
6940 (Date) 100 0 245
21.4 (05/27/2024@2000 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

RIH W/ 4-1/2" CORETRAX SCRAPER ASSY WHILE PICKING UP 2-3/8" DP SINGLES TO


4250FT.
0500 - 1130 6.5 0 POST N CT HT STRG RIG 6940 6940
- PASSED FREELY THROUGH TOL @ 879 FT.
- MONITOR WELL ON TRIP TANK,WELL STATIC.
- FILL STRING AND BREAK CIRCULATION WHILE RIH.

1130 - 1230 1 0 POST N CT HT STRG RIG 6940 6940 M/U TDS, WORKED SCRAPER F/ 3550' TO/ 3750' (BIT DEPTH 4250').
- PRAXIS PACKER PROPOSED SETTING DEPTH 3637 FT.

CONTINUE RIH W/ 4-1/2" CORETRAX SCRAPER ASSY WHILE PICKING UP 2-3/8" DP


1230 - 1530 3 0 POST N CT HT STRG RIG 6940 6940 SINGLES TO 6168 FT.
- MONITOR WELL ON TRIP TANK,WELL STATIC.
- FILL STRING AND BREAK CIRCULATION WHILE RIH.
1530 - 1600 0.5 0 POST N CT HT PEL RIG 6940 6940
CHANGE HANDLING EQUIPMENT F/2-3/8" TO 4".

1600 - 1630 0.5 0 POST N CT HT STRG RIG 6940 6940 RIH W/ 4-1/2" CORETRAX SCRAPER ASSY ON 4" DP FROM DERRICK TO 6740 FT.

1630 - 1730 1 0 POST N CT RW BIT RIG 6940 6940 6740 6940 M/U TDS, WORKED SCRAPER F/ 6240' TO/ 6440' (BIT DEPTH 6940 FT-PBTD).
- HALLIBURTON TWR PACKER PROPOSED SETTING DEPTH 6371 FT.

1730 - 1930 2 0 POST N CT CIRC MPMP RIG 6940 6940 SWEEP HOLE W/H VIS & CIRCULATE CLEAN, IN/OUT 64 PCF NACL VISCOUS BRINE.
- WORKED JUNK BASKETS.
1930 - 2000 0.5 0 POST N CT CIRC MPMP RIG 6940 6940
FLOW CHECK , WELL STATIC.
2000 - 2200 2 0 POST N CT CIRC MPMP RIG 6940 6940
DISPLACE HOLE TO 71 PCF NACL CLEAR BRINE & CIRCULATE CLEAN.
2200 - 2230 0.5 0 POST N CT CIRC MPMP RIG 6940 6940
FLOW CHECK, WELL STATIC.
2230 - 2300 0.5 0 POST N CT HT STRG RIG 6940 6940
POOH W/ 4-1/2" CORETRAX SCRAPER ASSY ON 4" DP TO 6168 FT.
2300 - 2315 0.25 0 POST N CT HT PEL RIG 6940 6940
CHANGE HANDLING EQUIPMENT F/4" TO 2-3/8".

POOH W/ 4-1/2" CORETRAX SCRAPER ASSY WHILE L/D 2-3/8" DP SINGLES TO 3000
2315 - 0459 5.75 0 POST N CT HT STRG RIG 6940 6940
FT.....INC @ RPT.
- MONITOR WELL ON TRIP TANK, WELL TAKING PROPER DISPLACEMENT.
Workover Objectives
Foreman Remarks

SFNY-234/239 PLATFORM
** ANCHORING RESTRICTION: NO ANCHORING AT STBD SIDE OF RIG.
- GOR: 100 SCF/STB.
- RIG HEADING 348 DEG, WATER DEPTH 30.8 FT, FINAL AIR GAP 52 FT.
- ODF TO TUBING SPOOL DIST = 31 FT
- RIG FLOOR TO TBG SPL DIST = 64.4 FT, CORRECTION = - 33.4 FT
=======================================================================
** NEXT PLATFORM SFNY-252/257 (2 WELLS)
** RIG TEAM VISITED PF SFNY 252/257 ON 6/12/24.
** CONFIRMED 26 MARCH 2024
** ACCOUNT NUMBER# 72240130257 RECIEVED ON 5TH OF JUNE 2024.
** BOREHOLE DATA SENT TO ARO ON 4TH OF JUNE, 2024.
** FIELD REPORT FOR SURVEY CONDUCTED AROUND SFNY 252 PF #8000646828(240310) RECIEVED AND FORWARD TO ARO ON MAY 14 2024.
** SUBMITTED DIVING REQUEST FOR DEBRIS REMOVAL #DP-2024-16095 ON JUNE 05, 2024, DEBRIS REMOVED ON JUNE 10 2024 AND RECEIVED COPY OF DIVING REPORT.
** CANDIDATE WELLS ACCESSIBILITY, SENT EMAIL TO WOE ON JUNE 05, 2024.
=======================================================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-234 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:20 05/23/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

** NEXT PLATFORM SFNY-1130/1135 (1 WELL)


** CONFIRMED 26 MARCH 2024
** ACCOUNT NUMBER#64240131135 RECIEVED ON 7TH OF APRIL.
** SUBMITTED SEA BED SURVEY REQUEST #CRM-SR-8800021985 ON APRIL 07, 2024 , AGREED WITH HSU TO PROCEED WITH CRM-SR-88000646840 REQUESTED BY ADM-655. FIELD REPORT FOR
SURVEY CONDUCTED AND RECIEVED ON 25TH OF APRIL AND FORWARD ARO ON MAY 15 2024.
** BOREHOLE DATA SENT TO ARO ON 8TH OF APRIL.
==========================================================================
** NEXT PLATFORM SFNY-1081/1089 (1 WELL)
** CONFIRMED 26 MARCH 2024
** ACCOUNT NUMBER#64230131085 RECIEVED ON 7TH OF APRIL.
** SUBMITTED SBS REQUEST#CRM-SR-8800021987 ON APR 07, 2024, AGREED W HSU TO PROCEED W CRM-SR-8000646551 REQUESTED BY ADM-655 ON 17- MARCH-2024.FORWARD TO ARO MAY
15 2024.
** BOREHOLE DATE SENT TO ARO ON 8TH OF APRIL.
==========================================================================
** EXPECTED NEXT RIG MAINTENANCE SHIP YARD AT END OF WORKED OVER SFNY-234/239 PF 2 WELLS.
** ARO SCAFFOLDING BUILT IN AROUND THE ASSIGNED WELLS ON SFNY-234/239 PLATFORM ON 29 MAY 2024.
===========================================================================
** ARAMCO CLERK DEEPAK NAIR ID#: 8643531 ONBOARD SINCE MAY 28, 2024.
===========================================RENTALS==========================
** NESR STORAGE TANK ARRIVE ONBOARD 02 JAN 2024.
** RECEIVED NPS 3-3/8" JARS HJDA-338-0006 MANIFEST# 21008809 ON 04 MAY 2024.
** RECEIVED CORETRAX 4-1/2" SCRAPPER ON BOARD MAY 30, 2024 & 7" SCRAPERS ON BOARD JUNE 5, 2024.
===========================================================================
** ARO SUBMITTED 39 OBSERVATIONS IN SLS.
** DIESEL FOR ENGINES = (DAILY: 42 BBLS /CUM WELL: 696 BBLS).
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
64 PCF 0 0 API 0 0 Volts 0 9.8 19,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
51
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
71 PCF 0 0 API 0 0 Volts 0 9.9 81,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
29

MUD CAUST NACL


TREATMENT 4 ( 50LBP ) 9 ( 2200L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/14/2024 N/A 16-18 KTS 1-2 FT 36 DEG C 3- 1,144 TOURLY
WNW 4 NM

Company HCB GOS HCO SCP RIG GDF NPJ SWL ARN HCM SPL GOC ARM

Category BRCR CTRG PSSC PSSC RIG DFMS JST LPS OTHR PCS SLS PRS WSC
PERSONNEL
1 10 1 2 49 1 0 3 1 2 3 2 2
Total
AND SERVICES No. of Persons
77
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 0 24 24 24 24 24 24

Operating Hours. 0 0 0 0 24 12 24 0 12 0 0 0 24

Standby/Tankers
TRUCKS/BOATS
bgms success

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
198 331 264 N/A N/A 570

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-569 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/14/2024 - 08/30/2025
Report ID: OPERLMTDMRREP

ARO-3001 @ MRJN-569 Limited Morning Report for 06/18/2024


Objective : (MRJN-569 Foreman(s)SAID, AHMED MAGDY
D&WO Morning Report (Service Providers View) Charge #: WILL BE DRILLED AS DUAL Engineer SABER, RAYAN NABIL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved LATERAL OIL PRODUCER Manager MAJDI, SULAIMAN AL HASSAN
ARO-3001 (66-24073-0569)
IN MRJN-560/569 THURAYA RIG FORMAN VSAT OTHER VSAT
Daily OffShore
Wellbores: PLATFORM TARGETING
(0500-0500) Saudi Aramco Well 8821623700 034 013-378-56 71 +966-13-51 0-5842
RATAWI )
Date: Tuesday 06/18/2024 MRJN-569 (0) MRJN_569_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
013-378-56 72 013-378-56 73

Last 24 hr operations Next 24 hr plan


POOH WITH 16'' DRLG BHA, L/D BHA, RETRIEVE WEAR BUSHING, RIH WITH 13 3/8'' CSG. COMPL. RIH WITH 13 3/8'' CSG AND CMT SAME, LAND 13 X18'' CAM CSG HGR, INST CAM P/OFF.
N/D DIVERTER.
Location Next Location
MRJN 560/569 PLTF MRJN-565
Current Depth (ft) Liner TOL MD TVD Formation Tops
5,595 Last Csg Size MD TVD Size Top
18 5/8 2430 2420 Formations Comments
Depth
RUS 2,367
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UMER 2,649 ACTUAL AT 2576 FT
5595 (Date) 0 0 228 ARUM 4,481 ACTUAL AT 4459 FT MD
10.7 (06/12/2024@2000 ) LAMS 5,228 ACTUAL AT 5271 FT
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

FLOW CHECK, POOH WITH 16'' BHI MMT/ MWD ON DC


0500 - 0830 3.5 0 16 N DRLG HT BHA RIG 5595 5595
- PUMP 90 PCF MUD FROMBACK SIDE WITH 1.5 BPM + METAL DISPL.
- L/D JAR

0830 - 1130 3 0 16 N DRLG LDP BHA ARM 5595 5595 95 0 L/D 16'' BHI MMT/MWD BHA.
- PUMP 90 PCF MUD FROMBACK SIDE WITH 1 BPM + METAL DISPL.

1130 - 1215 0.75 0 16 N DRLG OTH NA RIG 5595 5595 CLEAR RIG FLOOR AND DROP SURVEY.
- PUMP 90 PCF MUD FROMBACK SIDE WITH 1 BPM.

1215 - 1345 1.5 0 16 N WH RTRV WBSH IWS 5595 5595 RETRIEVED WEAR BUSHING.
- PUMP 90 PCF MUD FROMBACK SIDE WITH 1 BPM

1345 - 1500 1.25 0 16 N WH OTH NA IWS 5595 5595 P/UP, M/UP CAMEROM JETTING ASSY, JET WH.
- PUMP 90 PCF MUD FROMBACK SIDE WITH 1 BPM

1500 - 1530 0.5 0 16 N CSG RR TDS RIG 5595 5595 SERVICE TOP DRIVE SYSTEM.
- PUMP 90 PCF MUD FROMBACK SIDE WITH 1 BPM

P/UP, M/UP 13 3/8'' CSG JT+ P.JT+ CAMERON CSG HGR ASSY, PERFORMED DUMMY
1530 - 1730 2 0 16 N CSG HT PEL BCR 5595 5595
RUN, R/B SAME.
- PUMP 90 PCF MUD FROMBACK SIDE WITH 1 BPM

1730 - 2045 3.25 0 16 N CSG HT PEL BCR 5595 5595 CHANGE LINKS, R/UP BAKER CSG CRT, POWER TONG, SPIDER SLIPS.
- PUMP 90 PCF MUD FROMBACK SIDE WITH 1 BPM.

HPJSM, M/U 13-3/8" SHOE TRACK & TACK WELD 5 JTS.


2045 - 0045 4 0 16 N CSG RCSG CTRQ BCR 5595 5595 0 209 - CHECK FLOATS AT SURFACE.
- INSTALL HALL. SHUT OFF BAFFLE PLATE AND BY-PASS BAFFLE PLATE.
- PUMP 90 PCF MUD FROMBACK SIDE WITH 1 BPM.

0045 - 0130 0.75 0 16 N CSG RCSG CRT BCR 5595 5595 209 495 RIH WITH 13-3/8" 72# VM 95HC, VAM TOP CASING.
- PUMP 90 PCF MUD FROMBACK SIDE WITH 1 BPM.

P/UP X.O & RIH WITH 13-3/8" 68# J-55 FBE-EPC BTC CASING.
0130 - 0459 3.5 0 16 N CSG RCSG CRT BCR 5595 5595 495 1800
- PUMP 90 PCF MUD FROMBACK SIDE WITH 1 BPM.

Foreman Remarks

MRJN-569 WILL BE DRILLED AS A DUAL LATERAL OIL PRODUCER IN MRJN-560/569 PLATFORM TARGETING RATAWI RESERVOIR
========================SAFETY==========================
PIT AND TRIP DRILLS: 03/24/2024
ACCUMULATOR DRILL: 12/31/2023
ABANDON SHIP DRILL: 06/14/2024
H2S RELEASE EMERGENCY DRILL: 06/14/2024
FIRE DRILL: 06/14/2024
RESCUE BOAT/LIFEBOAT DRILL: 3/08/2024
CONFINED SPACE DRILL: 3/17/2024
MAN DOWN DRILL : 5/28/2024

============== PLATFORM MRJN 560/569 PF PRODUCER ==============


7 X WELLS (2 X SL + 5 X DL) | 2 X PH REQUIRED:

MRJN-561 DL / PROD / RTWI (RUN & CMT 18 5/8'' CSG+SUSPENDED)


MRJN-562 DL / PROD / RTWI (RUN & CMT 18 5/8'' CSG+SUSPENDED)
MRJN-563 DL / PROD / RTWI (RUN & CMT 18 5/8'' CSG+SUSPENDED)
MRJN-565 DL / PROD / RTWI + PH (RUN & CMT 18 5/8'' CSG+RUN AND CMT 13 3/8'' CSG+SUSPENDED)

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-569 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/14/2024 - 08/30/2025
Report ID: OPERLMTDMRREP

MRJN-567 SL / PROD / RTWI (RUN & CMT 18 5/8'' CSG+SUSPENDED)


MRJN-568 DL / PROD / RTWI (RUN & CMT 18 5/8'' CSG+SUSPENDED)
MRJN-569 DL / PROD / RTWI + PH (RUN & CMT 18 5/8'' CSG+CURRENT)
MRJN-560 WO (TIE-BACK/CMT, WH WORK) (FINISH + SUSPENDED)

============== DRILLING SEQUENCE =============

1.MRJN-560 WO (TIE-BACK/CMT, WH WORK, DONE).


2. BATCH DRILLING 7 WELLS 22" HS
2.MRJN-565 (16" + 8.5" PH + SUSPEND)
3.MRJN-569 (16" + 8.5" PH + SUSPEND)
5.BATCH DRILLING 5 REMAINING WELLS 16" HS
6.BATCH DRILLING 7 WELLS 12.25" HS
7.DRILLING RESERVOIR SECTION & COMPLETING ALL 8 WELLS

CASING POINTS PLANNED:


CASING POINTS PLANNED:
L0 18-5/8": 2,425 FT MD (50FTTVD INTO RUS), ACTUAL FT.
L0 13-3/8": 5477 FT MD (100 FT ABOVE LHHR), , ACTUAL FT.
L0 9-5/8" : 8788 FT MD (30 FT TVD IN YAMM)
L0 7'' LNR: 11900 FT MD TARGET ENTRY IN RATAWI RESERVOIR)
L0 TD AT 16,547' MD
6 1/8'' TOW @10100
========================CURRENT LOCATION====================
PLATFORM : MRJN 560/569
LATITUDE: 28 DEG 19.16 N
LONGITUDE: 049 DEG 39.49 E
HEADING = 331 DEG
WATER DEPTH = 145 FT
RKB TO WL = 106.8 FT
RKB TO PLATFORM = 62 FT
AIR GAP = 46.5 FT
FINAL LEG PENETRATION: STBD 8.5 FT./ BOW 5 FT./ PORT 10.5 FT.
NEAREST GOSP: 2.44 MILES

================ NEXT LOCATION =================================

================ PERSONNEL =====================================


ABDULAZIZ AL JABER, ARAMCO HSE, BADGE#818119, ON BOARD SINCE 12-JUNE 2024
WAYNE TIHUS, ARAMCO HSE, BADGE#8568036, ON BOARD SINCE 12-JUNE 2024
=================WAIT ON ======================================
WAIT ON WEATHER: DAILY 0 HRS / TOTAL 0 HRS.

=================LC-50======================================
* LC-50 SAMPLE: WBM, SPUD MUD, BACKLOADED ON QMS DELTA W/ MNF#2400684060 ON 10 MAY 2024.

=================== ACKNOWLEDGEMENT ============================


DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 0 5.6 API 0 0 Volts 1 9.8 62,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 84 26 0 10 / 13 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 19 16 9 / 10 0 0 0
72

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
64 PCF 0 0 API 0 0 Volts 0 9.6 31,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 0 HTHP 98 0 0 0/0 SEAWTR 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 2 0/0 0 0 0
29

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 4 API 0 0 Volts 0 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 12 / 15 WBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 0 0 0/0 0 0 0
0

MUD BCTRN BARITE CAUST H2S-SCAV-L NEWDRLPLUS SODASH DUOVIS-NS


TREATMENT 6 ( 5GL ) 3,160 ( 100LB ) 7 ( 50LB ) 1 ( 55GL ) 5 ( 55LB ) 5 ( 50KG ) 60 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
2 2,430 5,595 DP Av DC Av Bit HHP N/A N/A M423 16 ULTR
BIT DATA
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A 1 4 BT A X

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-569 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/14/2024 - 08/30/2025
Report ID: OPERLMTDMRREP

Serial Number Type Jets TFA


67537 U716 10 x 13 / 1.296
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 0
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0 0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A 8-11 1-2 SEASONAL 2,534 N/A

Company ULT BCR A20 HDV BHI RIG BDF RIG ARM HCM ARM IWS

Category BITS CSR CTRG DV DPDS RIG DFMS OTHR OTHR PCS WSC HHCWD
PERSONNEL
1 2 11 1 3 46 2 5 1 2 1 1
Total
AND SERVICES No. of Persons
76
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 0 12 24 24 24 12 12 24 24 12

Standby/Tankers
TRUCKS/BOATS
TOBAZ KARAMA

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1442 461 2109 3759 786 5571

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MAINTENANCE BI-RM
Print Date: 06/18/2024 06:20 11/27/2018 - 04/30/2025
Report ID: OPERLMTDMRREP

ARO-3002 @ *RIG MAINTENANCE* Limited Morning Report for 06/18/2024


Objective : (RIG Foreman(s)
D&WO Morning Report (Service Providers View) MAINTENANCE) Engineer
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Charge #: Manager ALSAFI, YOUSEF MOHAMMAD
ARO-3002
() THURAYA RIG FORMAN VSAT OTHER VSAT
Daily
(0500-0500) Saudi Aramco Well +882167771 2433 378-8311 378-8315
Wellbores:
Date: Tuesday 06/18/2024 *RIG MAINTENANCE* CONTRACTOR /CLERK VSA T
378-8312

Last 24 hr operations Next 24 hr plan


RIG MAINTENANCE. RIG MAINTENANCE.
Location Next Location
RIG MAINTENANCE ZULF-2079
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date)
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0459 24 PRE M MAIN OTH NA RIG
RIG MAINTENANCE.
Foreman Remarks

RIG MOVE REQUESTS CREATED WITH RM-2024-4010734 ( RT TO SEA), RM-2024-4010735 (SEA TO ZULF-2070)
* PROPOSED RIG MOVE MEETING DATE: 12TH JUNE 2024.
* PROPOSED RIG MOVE DATE: 20TH JUNE 2024
* RIG MOVE BOAT REQUEST: 1004318847
* SBS CRM-SR 880002195. SURVEY PERFORMED ON 18TH APRL 2024 (SWO: 8000647245(240480)
* V-SAT DEMOBILIZATION REQUEST # 4045194993 CREATED ON 9/FEB/2024.
** RIG IS PLANNED FOR 79 DAYS RIG MAINTENACE IN BAHRAIN.
==========================================================================================
RIG CONTACT:
* RADIO RM: +966-135105792, ARAMCO PHONE AT RADIO RM: +966-133788315
* VHF RADIO CHANNEL: 11 & 68
* RIGNET SATELLITE PHONE: +00870773929015
==========================================================================================
THURAYA WEEKLY CALL TEST WAS UNSUCCESSFULLY DUE TO BATTERY ISSUE, NEED BATTERY.
* CONDUCTED DRILL VERTICAL RESCUE AT HIGHT ON 14/11/2023.
* CONDUCTED ABANDONE SHIP DRILL ON 14-FEB-2024.
* CONDUCTED OIL SPILL EQUIPMENT CLEANUP DRILL ON 10TH JAN, 2024.
* CONDUCTED FLOODING DRILL ON 27-FEB-23
====================================================================================

ARAMCO PERSONNEL ONBOARD:


=======================
* ARAMCO CLERK JOBIN THOMAS, ID-8618642 ONBOARD, FROM 21ST NOV, 2023 TO 20TH FEB, 2024.
====================================================================================
NEXT PLATFORM LOCATION: ZULF-1410/1419

* SEA BED SURVEY REQUESTED : SWO: 8000647331

DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 1,761 EVERY TOUR

Company

Category
PERSONNEL
AND SERVICES No. of Persons Total
INFORMATION
Personnel on Loc. Hrs.

Operating Hours.

Standby/Tankers
TRUCKS/BOATS
N/A

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MAINTENANCE BI-RM
Print Date: 06/18/2024 06:20 11/27/2018 - 04/30/2025
Report ID: OPERLMTDMRREP

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1153 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/04/2023 - 11/17/2024
Report ID: OPERLMTDMRREP

ARO-3003 @ SFNY-1153 Limited Morning Report for 06/18/2024


Objective : (DUAL LATERAL Foreman(s)SEYFRIED III, EDWARD LEE
D&WO Morning Report (Service Providers View) Charge #: OIL PRODUCER TARGETING Engineer DOLCIANI, GREGORY JEAN-MARIE
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23013-1153) KHFJ WITH ESP Manager JURASHI, MOHAMMED NASSIR
ARO-3003
COMPLETION) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily OffShore
(0500-0500) Saudi Aramco Well Wellbores: 00882-1677 7-12180 378-8396 378-8398
Date: Tuesday 06/18/2024 SFNY-1153 (1) SFNY_1153_1 CONTRACTOR /CLERK VSA T
378-8397

Last 24 hr operations Next 24 hr plan


CONTINUE RUN SMART COMP W/ ESP PUMPS, SET HALLIBURTON PACKER, DISSCONNECT, CONTINUE DISPLACE, SPACE OUT, P/U TRSSV, RIH, P/U TBG HANGER, TERMINATE SAME, LAND
DISPLACE 74 PCF BRINE. OUT IN WELL HEAD, INSTALL PLUGS.
Location Next Location
SFNY-1150/1159 *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,322 Last Csg Size MD TVD Size 4,543 7,320 5,391 Top
9 5/8 6871 5412 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
10322 (Date) 100 0 259
94.9 (05/27/2024@1145 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONTINUE SAWAFI CONNECT ESP ROUND TO MLE CABLES AT TOP OF ESP


0500 - 0545 0.75 1 EOW C COMP HT ESP SBA 10322 10322
PACKER.
STATIC LOSS RATE 15 BPH.

0545 - 0615 0.5 1 EOW C COMP DTU GAUG SLL 10322 10322 R/U SL AND DRIFT 45' FT. WITH 3.875'' . LAY DOWN SL
STATIC LOSS RATE 15 BPH.

RIH W/ HALLIBURTON COMPLETION ON 4-1/2'' 11.6# J-55 NEW VAM TUBING F/


0615 - 0930 3.25 1 EOW C COMP HT TBG FMC 10322 10322 1379' TO 2414' ,
INSTALL CLAMP ON EACH TOOL JOINT AND TORQUE SAME.
STATIC LOSS RATE 15 BPH.
0930 - 1000 0.5 1 EOW C COMP HT ESP SBA 10322 10322
SAWAFI BORETS CHECK ESP SIGNAL AT 2414'.

RIH W/ HALLIBURTON COMPLETION ON 4-1/2'' 11.6# J-55 NEW VAM TUBING F/


1000 - 1115 1.25 1 EOW C COMP HT TBG FMC 10322 10322 2414' TO 3025'.
INSTALL CLAMP ON EACH TOOL JOINT AND TORQUE SAME.
STATIC LOSS RATE 18 BPH..

1115 - 1200 0.75 1 EOW C COMP DTU GAUG SLL 10322 10322 R/U SL AND DRIFT 1710' FT. WITH 3.875''.
STATIC LOSS RATE 18 BPH.
1200 - 1215 0.25 1 EOW C COMP PJSM TBG RIG 10322 10322
HPJSM RUNNING COMPELTION, AND DLICK LINE.

1215 - 1245 0.5 1 EOW C COMP DTU GAUG SLL 10322 10322 RIG DOWN SLICK LINE.
STATIC LOSS RATE 18 BPH.

RIH W/ HALLIBURTON COMPLETION ON 4-1/2'' 11.6# J-55 NEW VAM TUBING F/


3,025' TO 3,425'.
1245 - 1400 1.25 1 EOW C COMP HT TBG FMC 10322 10322
INSTALL CLAMP ON EACH TOOL JOINT AND TORQUE SAME.
STATIC LOSS RATE 16 BPH.

1400 - 1430 0.5 1 EOW C COMP HT ESP SBA 10322 10322 SAWAFI BORETS CHECK ESP SIGNAL AT 3,425'.
STATIC LOSS RATE 8 BPH.

RIH W/ HALLIBURTON COMPLETION ON 4-1/2'' 11.6# J-55 NEW VAM TUBING F/


1430 - 1730 3 1 EOW C COMP HT TBG FMC 10322 10322
3,425' TO 4,422' .
STATIC LOSS RATE 8 BPH.

1730 - 1815 0.75 1 EOW C COMP HT ESP SBA 10322 10322 SAWAFI BORETS CHECK ESP SIGNAL AT 4,422'.
STATIC LOSS RATE 7 BPH.

TIH W/ HALLIBURTON COMPLETION ON 4-1/2'' 11.6# J-55 NEW VAM TUBING F/


1815 - 1945 1.5 1 EOW C COMP HT TBG FMC 10322 10322
4,423' TO 4,782'.
STATIC LOSS RATE 6 BPH.

R/U SL AND DRIFT 1800 FT. WITH 3.875'' L/D SL , DURING SL , SAWAFI CHECK
1945 - 2100 1.25 1 EOW C COMP DTU GAUG SLL 10322 10322
ESP SIGNAL.
STATIC LOSS RATE 4 BPH.

HAL TEST L-1 AND CC 6000 PSI MONITORING L-2 ,


2100 - 0000 3 1 EOW C COMP HT PKR HCO 10322 10322 TEST L-2 6000 PSI MONITORING L-1 AND CC,
FUNCTION ICV'S AS PER HAL REP.
STATIC LOSS RATE 4 BPH.
0000 - 0015 0.25 1 EOW C COMP PJSM TBG RIG 10322 10322
HPJSM RUNNING COMPELTION.
0015 - 0045 0.5 1 EOW C COMP HT TBG FMC 10322 10322

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1153 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/04/2023 - 11/17/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
RIH W/ HALLIBURTON COMPLETION ON 4-1/2'' 11.6# J-55 NEW VAM TUBING F/
4,782' TO 4,850' .
UP WT 152K & DOWN WT 147K.
STATIC LOSS RATE 4 BPH.

0045 - 0115 0.5 1 EOW C COMP HT PKR HCO 10322 10322 HAL FUNCTION ICVS PRIOR TO SET PACKERS: ICV-1 CLOSE.ICV-2 CLOSE.
STATIC LOSS RATE 4 BPH.

HAL SET PACKERS AND ACTIVATE SOFT RELEASE:APPLY 4000 PSI/15 MIN TO
0115 - 0330 2.25 1 EOW C COMP SET PKR HCO 10322 10322 4718 3997 PACKER LINE TO SET
PACKERS BY HPU.TEST L-2 6000 PSI /10 MIN L-1 AND CC 6000 PSI /10 MIN
MONITORING L-2.

0330 - 0400 0.5 1 EOW C COMP HT PKR HCO 10322 10322 ENSURE TCA & TBG ARE FULL. UN-STING HDT MALE SUB FROM RECEPTACLE
WITH 5-10 KLBS OVERPULL.

0400 - 0459 1 1 EOW C COMP CIRC MPMP RIG 10322 10322 P/U STRING 30' & DISPLACE HOLE WITH 74 PCF BRINE. ABOVE HALLIBURTON
PACKER.
Foreman Remarks

***SFNY-1153 WELL OBJECTIVE ***


SFNY-1153 IS A DUAL LATERAL HORIZONTAL PRODUCER WELL TARGETING KHAFJI RESERVOIR MEMBER. WELL IS TO BE DRILLED TO A TOTAL TD OF +/- 9415'MD (5412' TVD).
COMPLETION WILL BE ICD SCREENS AND WELL WILL BE EQUIPPED WITH ESP.
CASING POINTS (ACTUAL) :
38" CASING DRIVEN AT 232'
30" CASING AT 707' MD/ 706'TVD
24" CASING AT 1306' MD/1301' TVD
18-5/8" CASING AT 1,714' MD / 1,707' TVD
13-3/8" CASING AT 4212'MD / 4119 TVD
9 5/8" CASING AT 6,871' MD / 5,412' TVD
9-5/8" TOW @4552', BOW @4567'
CASING POINT: 7" LINER L-1 AT 7320' MD/ 5391' TVD.
---------------------------------------------------
WELL SEQUENCE :
- DUAL LATERALS: SFNY-1153, SFNY-1154, SFNY-1151.
-----------------------------------------------
ONGOING BATCH DRILLING:
SFNY-1158 (SL) COMPLETED, SUSPENDED FOR FUTURE FLOWBACK
SFNY-1156 (SL) COMPLETED, SUSPENDED FOR FUTURE FLOWBACK
SFNY-1152 (SL) COMPLETED, SUSPENDED FOR FUTURE FLOWBACK
SFNY-1159 (SL) COMPLETED, SUSPENDED FOR FUTURE FLOWBACK
SFNY-1153 (DL) CURRENT WELL
SFNY-1154 (DL) SUSPENDED AT 9-5/8" CASING FOR COMPLETION
SFNY-1151 (DL) SUSPENDED AT 9-5/8" CASING FOR COMPLETION
SFNY-1150 OBSERVATION WELL, SUSPENDED FOR FUTURE FLOWBACK
SFNY-1157 (SL) COMPLETED, SUSPENDED TO RETRIEVE STUCK RBP.
=========================
CCA MONITORING
DAILY CHECKED:
SFNY-1156: 38"X30"= 0 PSI, 30"X24" = 0 PSI.24"X18-5/8"= 0 PSI, 18-5/8"X13-3/8" = 0 PSI, 13-3/8"X9-5/8"= 0 PSI.
SFNY-1150: 38"X30"= 0 PSI, 30"X24" = 0 PSI, 24"X18-5/8"= 0 PSI, 18-5/8"X13-3/8" = 0 PSI, 13-3/8"X9-5/8"= 0 PSI.
SFNY-1157: 38" X 30"= 0 PSI, 30"X 24"= 0 PSI 24" X 18 5/8"= 0 PSI, 18-5/8"X13-3/8"=0 PSI, 13-3/8"X9-5/8"= 0 PSI.
SFNY-1159: 38" X 24"= 0 PSI, 24"X18-5/8"= 0 PSI, 18-5/8"X13-3/8" = 0 PSI, 13-3/8"X9-5/8"= 0 PSI.
SFNY-1151: 38" X 30"= 0 PSI, 30"X 24"= 0 PSI 24" X 18 5/8"= 0 PSI, 18-5/8"X13-3/8"=0 PSI. 13-3/8"X9-5/8"= 0 PSI.
SFNY-1153: 38" X 30"= 0 PSI, 30"X 24"= 0 PSI, 24"X18-5/8"= 0 PSI, 18-5/8"X13-3/8" = 0 PSI, 13-3/8"X9-5/8"= 0 PSI.
SFNY-1158: 38" X 30"= 0 PSI, 30"X 24"= 0 PSI, 24"X18-5/8"= 0 PSI, 18-5/8"X13-3/8" = 0 PSI, 13-3/8"X9-5/8"= 0 PSI.
SFNY-1152: 38" X 30"= 0 PSI, 30"X 24"= 0 PSI, 24"X18-5/8"= 0 PSI, 18-5/8"X13-3/8" = 0 PSI, 13-3/8"X9-5/8"= 0 PSI.
SFNY-1154: 38" X 30"= 0 PSI, 30"X 24"= 0 PSI, 24"X18-5/8"= 0 PSI, 18-5/8"X13-3/8" = 0 PSI, 13-3/8"X9-5/8"= 0 PSI.
=========================
LC-50 SAMPLE: JAN 01-12-2023: BL MANIFEST 2400599917, TOPAZ MAMLAKA
===============PERSONNEL==========
ARAMCO MATERIAL EXPEDITER MOUSTAFA A QALLAF #821411 ON BOARD SINCE 6/11/2024.
ARAMCO CLERK MUKESH SYANGTAN #8643545 ON BOARD SINCE 12/12/2023.

==============================================================
RENTAL TOOLS
===============================

===============================
PRESENT RIG POSITION: PT SFNY-1150/1159.
LAT : 28 22.99' N
LONG: 048 55.59' E
RIG HEADING: 329 DEG
WATER DEPTH: 64'
AIR GAP: 52'
RKB TO WATER: 112'
RKB TO MUDLINE: 176'
DISTANCE TO TANAJIB - 77.3 NM
NEAREST GOSP IS SFNY-4: 1.7 NM
FINAL LEG PENETRATION: BOW LEG: 9.5', PORT LEG: 9.5', STARBOARD LEG 9.5'.
--------------------------------------------------------------------------------------------------------

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1153 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/04/2023 - 11/17/2024
Report ID: OPERLMTDMRREP

NEXT LOCATION SHIP YARD.


RIG MOVE EXPECTED ON 10/10/2024
---------------------------------------------------------------------
** DRILLS CONDUCTED: H2S, FIRE & ABANDON DRILLS HELD ON 06/09/2024.

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
1 10,322 91.8 264 0 5,379 -366.9 -1857.32 6,211.34 0.28
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/05/2024 DAILY 10-14 KNT 2-4 FT SEASONAL 553 TOURLY
SE

Company SBA SCB FMC A20 HCO RIG EMC BFS ARM BCM SLL BC ARM FME

Category ALS BRCR CSR CTRG ICE RIG DFMS FILT OTHR PCS SLS SSSV WSC WHES
PERSONNEL
8 1 4 11 6 63 1 1 2 1 3 1 1 1
Total
AND SERVICES No. of Persons
104
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 0 24 24 12 24 12 24 24 0 24 0

Standby/Tankers
TRUCKS/BOATS
HADI-22

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1764 1318 1792 2798 0 2125

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1521 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/29/2024 - 05/28/2025
Report ID: OPERLMTDMRREP

ARO-3004 @ SFNY-1521 Limited Morning Report for 06/18/2024


Objective : (DRILL & Foreman(s)KING, RALPH WILLIAM / ADZIC, MARKO
COMPLETE DUAL LATERAL Engineer MOREIRA, GUSTAVO ALVES
D&WO Morning Report (Service Providers View) Rig Charge #: HORIZONTAL PRODUCER) Manager HUSSAIN, MOATH YOSEF
Copyright 2024 Saudi Aramco. All Rights Reserved ARO-3004 (66-21013-1521) THURAYA RIG FORMAN VSAT CONTRACTOR /CLERK VSA
Daily OffShore T
0088216777 12179 3786513
(0500-0500) Saudi Aramco Well Wellbores:
9661351058 32 RADIO R OOM
Date: Tuesday 06/18/2024 SFNY-1521 (0) SFNY_1521_0
CONTRACTOR /CLERK VSA T
3786514 MA T. MAN

Last 24 hr operations Next 24 hr plan


R/U HAL CMT UNIT. PJSM. P/T 500/5000 PSI. PERFORM 1ST STAGE CMT JOB 13-3/8" CSG. WOC. N/D BOP, ROUGH CSG CUT. B/O AND L/D CSG JOINTS. STAMP AND SECURE BOP.
SLIP CSG. PERFORM 2ND STAGE CMT JOB 13-3/8" CSG.
Location Next Location
SFNY-1520_1529 PLATFORM, N-301439.80 , E-3144241.95 SFNY-1527
Current Depth (ft) Liner TOL MD TVD Formation Tops
4,510 Last Csg Size MD TVD Size Top
18 5/8 1872 1862 Formations Comments
Depth
UMER 1,720 1708' TVD (21' SHALLOW)
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ARUM 3,491 3393.2' TVD (9' SHALLOW)
4510 (Date) 100 0 260 LAMS 4,393 4306TVD (22' SHALLOW)
43.9 (05/05/2024@0645 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONTINUE TO RIG DOWN WFD CONTROL UNIT, RIG DOWN SERVICE LOOP AND
0500 - 0600 1 0 16 N CSG CIRC MPMP RIG 4510 4510
CRT. RIG UP CEMENTING HEAD AND SURFACE LINES.
HES PREPARE MIX WATER

0600 - 0645 0.75 0 16 N CSG CIRC MPMP RIG 4510 4510 ESTABLISH CIRCULATION AND STAGE TO16BPM THROUGH TWO LINES AND
RECORD PRESSURES. SLOW AND STOP TO ALLOW INSTALLATION OF CSG BAILS
0645 - 0800 1.25 0 16 N CSG CIRC MPMP RIG 4510 4510
INSTALLATION OF 500TON CSG BAILS.
0800 - 0900 1 0 16 N CSG CIRC MPMP RIG 4510 4510
CIRCULATE AT 16BPM AND HOLD PJSM WITH ALL PARTIES INVOLVED.
0900 - 1000 1 0 16 N CSG CMC CSG HCM 4510 4510
FLUSH SURFACE LINE & PRESSURE TEST SURFACE LINE TO 300/5,000 PSI.

PUMP 200 BBL LOW RHEOLOGY MUD AHEAD


PUMP 150 BBL SPACER
1000 - 1200 2 0 16 N CSG CMC CSG HCM 4510 4510
DROP WELLTEC BY-PASS PLUG
MIX & PUMP CEMENT 301 BBL 105 PCF LEAD
PUMP 75 BBL 118 PCF TAIL SLURRY.

OPEN CEMENT HEAD CAP AND DROP HALLIBURTON SHUT-OFF PLUG. CEMENTER
PUMP 15 BBLS CEMENT & 20 BBLS MUD PUSH SPACER, SWITCH TO RIG PUMP &
1200 - 1345 1.75 0 16 N CSG CMC CSG HCM 4510 4510 DISPLACE CEMENT @ 14 BPM W 74 PCF WBM.
BUMP THE PLUG AND PRESSURE UP 500 PSI OVER CIRCULATING PRESSURE TO
1000 PSI AND HELD FOR 5 MIN, BLEED OFF PRESSURE TO ZERO AND CONFORM
FLOAT HOLDING.
1345 - 1445 1 0 16 N CSG SET CHAMP WTC 4510 4510 332 352
SET WAB PACKER AS PER WELLTEC PROCEDURE, THRU CEMENT UNIT.

OPEN CEMENT HEAD CAP, DROP HALLIBURTON DV OPENING PLUG AND ALLOW
1445 - 1500 0.25 0 16 N CSG SET CHAMP WTC 4510 4510 328 332 PRESSURE UP AS PER
HALLIBURTON AND INFLATE DV AND OPEN CIRCULATION PORTS FROM 0 TO 400
PSI.

1500 - 0030 9.5 0 16 N CSG WOC CSG HCM 4510 4510 WOC. CIRCULATE THROUGH DV PORTS @ 4 BPM. MEANTIME PREPARE FOR SET
SLIPS AND 2ND STAGE CMT JOB

BREAK BOLTS AND LIFT 26 3/4" BOP'S. DELTA ENGINEER SET SLIPS. BREAK CIRC.
0030 - 0315 2.75 0 16 N CSG SET SLIPS RIG 4510 4510 8 BPM AND VERIFY SEALS HOLDING ON CASING SLIPS. GOOD TEST. STAB 26 3/4"
BOP'S ONTO WELLHEAD AND SECURE SAME. MEANTIME HALLIBURTON MIX
CEMENTING FLUID.
0315 - 0345 0.5 0 16 N CSG CMC CSG HCM 4510 4510
HPJSM WITH ALL PARTIE INVOLVED.
0345 - 0415 0.5 0 16 N CSG CMC CSG HCM 4510 4510
P/T HALLIBURTON LINES 300/5000PSI.

2ND STAGE CMT JOB:


BATCH MIX 16 BBLS, 118 PCF TAIL SLURRY, WHILE RIG CIRC. @ 12 BPM
0415 - 0445 0.5 0 16 N CSG CMC CSG HCM 4510 4510
RIG PUMP TUNED SPACER 100 BBLS, 85 PCF @10 BPM - ONGOING @RT

0445 - 0459 0.25 0 16 N CSG CMC CSG HCM 4510 4510

Foreman Remarks

WELL OBJECTIVE: SFNY-1521 TO BE DRILLED AS DUAL LATERAL PRODUCER (TOTAL 6000' RESERVOIR CONTACT) ACROSS KHAFJI RESERVOIR.
-CASING POINTS:

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1521 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/29/2024 - 05/28/2025
Report ID: OPERLMTDMRREP

38" CONDUCTOR 51' BELOW SEABED-256' MD BRT


24" PLAN DEPTH TO 570 MD . ACTUAL- 572' MD
18-5/8" PLAN DEPTH TO 1,891' MD (150' INTO UMER FORM). ACTUAL-1,874' MD
13-3/8" PLAN DEPTH TO 4,480' (+/-50' INTO LAMS FORM). ACTUAL- 4510' MD
9-5/8" PLAN DEPTH TO 7,223' MD (INTO BASE DAIR LMST FORM). ACTUAL
TOTAL DEPTH L-O 10,268'
-----------------------------
PLATFORM WELL STATUS:-
SFNY-1521 CURRENT WELL TO BE DRILL DUAL LATERAL AND RUN COMPLETION.
SFNY-1525 6-1/8'' TD 11168'. RUN DUAL LATERAL LOWER & UPPER ESP COMPLETION. SUSPENDED FOR FLOW BACK.
SFNY-1522 DRILLED 8-1/2'' TO WELL TD 9,822'. RUN LOWER & UPPER ESP COMPLETION. SUSPENDED FOR FLOW BACK.
SFNY-1526 DRILLED 8-1/2'' TO WELL TD @ 10,565'. RUN LOWER & UPPER ESP COMPLETION. SUSPENDED FOR FLOW BACK.
SFNY-1529 DRILLED 8-1/2'' TO WELL TD @ 10,856'. RUN LOWER & UPPER ESP COMPLETION. SUSPENDED FOR FLOW BACK.
SFNY-1520 DRILLED BY ADC-60 TO TD & SUSPENDED TO BE COMPLETED AS AN OBSERVATION WELL LATER
SFNY-1524 / 1527 / 1528 TO BE BATCH DRILLED
---------------------------------
SAFETY:
- DISCUSS ALL HSE ALERTS W/ ALL POB AT PRE-TOUR MEETING
- THURAYA CHECK- # 008821677712179 CHECKED WITH DHAHRAN ECC- JUNE-17 ACKNOWLEDGED BY DHCC
- HELD SECONDARY DRILL FIRE & ABANDON RIG, JUNE 4 , 2024
- HELD FIRE DRILL, EMERGENCY MUSTER, H2S DRILL & ABANDON RIG DRILL JUNE 10
- MAN DOWN DRILL MAY 26TH SIMULATED MAN DOWN ON FIRE DRILL MAIN DECK CARRY TO MUSTER STATION MAY 30.
- RAWABI-44 - SHALLOW GAS STANDBY BOAT AT LOACTION 08:30HRS ON 13TH MAY.
-----------------------------------
RIG DATA:
- WATER DEPTH: 101' (HSU), AIR GAP: 44'; RKB TO MSL 104'. RKB TO SEABED 205'.
- FINAL RIG POSITION CONFIRMED: N-301441.98, E-3144238.35 / RIG HEADING 329DEG.
- FINAL LEG PENETRATION: BOW 12', PORT 11' & STBD 11'.
- ARO CONTACT RHB-57A: RIG NET RADIO+966135105832 - USA NUMBER RADIO: 1-281 560-8802
- LAST 26-3/4" BOP CAVITY CHECK: MAY. 09, 2024
- SENT LC-50 WBM MUD SAMPLE IN MM# 2400690501-50 JUNE 9, 2024, TAXI REQUEST 3000140734
------------------------------------
PERSONNEL:
- ARAMCO PDP - ABDULAZIZ H ALSHEHRI ID #830257 ON BOARD 12TH, JUNE 2024
- ARAMCO MAT EXPERDITOR : ABDULRAHMAN AL HARBI, ID# 818537 LEFT RIG ON 04TH, JUNE 2024
- ARAMCO MAT EXPERDITOR : ABDULLAH ALMOUGAIES, ID# 741753 LEFT RIG ON 11TH, JUNE 2024
- ARAMCO MAT EXPERDITOR : MOHAMMED ALREHAILI, ID# 812481 ON BOARD JUNE 4TH 2024
-----------------------------------
- RENTAL TOOLS: OIL SERVE JAR 1 X 9.5"
-----------------------------------
CCA MONITORING -
SFNY-1520 WELL: 30"X 24"=20 PSI, 24"X 18-5/8"=0 PSI, 18-5/8"X 13-3/8"=0 PSI, 13-3/8"X 9-5/8"=0 PSI, 9-5/8" X TBG=0 PSI.
SFNY-1529 WELL: 38"X 30"=20 PSI, 30"X 24"=0PSI, 24" X 18-5/8"=130PSI, 18 5/8" X 13 3/8"=200PSI, 13-3/8"X 9-5/8"=0 PSI. TCA=0 PSI. BLED OFF 27.01.24
SFNY-1522 WELL: 38"X 30"=80 PSI, 30"X 24"=10 PSI, 24 X 18-5/8"=0 PSI, 18 5/8" X 13 3/8"=300 PSI. 13-3/8"X 9-5/8"= PSI. TCA=20 PSI
SFNY-1526 WELL: 38"X 30"=75 PSI, 30"X 24"=190 PSI, 24 X 18-5/8"=65 PSI,18 5/8" X 13 3/8"=260 PSI,13-3/8"X 9-5/8"=60 PSI. TCA=0 PSI
SFNY-1525 WELL: 38"X 30"=65 PSI, 30"X 24"=110 PSI, 24 X 18-5/8"= 160 PSI, 18 5/8" X 13 3/8"= 270 PSI. 13-3/8"X 9-5/8"=60 PSI.
SFNY-1521 WELL: 38"X 24"=10 PSI, 24" X 18 5/8"=30PSI BLEED OFF JUNE 11
---------------------------------
- WAIT ON WEATHER: TODAY 0 HRS / CUMULATIVE 3.75 HRS
- WAIT ON PRODUCING: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON MARINE: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON TOOL HOUSE: TODAY 0 HRS / CUMULATIVE 0 HRS
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 4,510 29.8 335 0 4,309 309.46 -156.12 1,137.17 0.93

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 0 4.2 API 2 0 Volts 0.9 9.8 65,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 91 29 0.25 14 / 17 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 22 7 13 / 15 2.5 360 0
73

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 0 4 API 2 0 Volts 0.9 9.8 65,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 0 HTHP 91 30 0.25 14 / 17 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 21 7 13 / 15 2.5 360 0
73

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 0 3.8 API 2 0 Volts 0.9 9.7 65,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 91 29 0.25 13 / 15 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 21 7 12 / 14 2.5 280 0
71

MUD BCTRN CAUST


TREATMENT 4 ( 5GL ) 4 ( 50LB )

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1521 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/29/2024 - 05/28/2025
Report ID: OPERLMTDMRREP

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
6 1,884 4,510 DP Av DC Av Bit HHP 30 60 M323 16 HTC
Pressure GPM Jet Vel 92.29 113.38 264 I-Row O-Row DC Location Bearings
1,650 850 248 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
7918076 DD607X 10 x 12 / 1.104
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 71 210 310 270 22 71
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0 71

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/06/2024 N/A 8 KNOTS NE 1 FT SEASONAL 2,537 PRE TOUR

Company WCR A20 SDM RIG BDF MSI OJR XLG ARM WTC HCM SCM ARM CAM DEL

Category CSR CTRG DPDS RIG DFMS ISPCT JST MLS OTHR OTHR PCS PCS WSC WHES WHES
PERSONNEL
4 11 1 48 2 1 0 3 2 2 4 1 2 1 1
Total
AND SERVICES No. of Persons
83
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 0 24 24 24 24 24 24 24 24

Operating Hours. 24 0 0 24 24 12 0 24 12 24 24 24 24 0 4

Standby/Tankers Others
TRUCKS/BOATS
Hadi-22 RAWABI-44 (shallow gas boat)

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1976 1193 1617 5760 N/A 3496

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1400 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/10/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

ARO-4001 @ SFNY-1400 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL Foreman(s)TEODORESCU, NICOLAE-RAZVAN / TAYLOR, MATTHEW PRESTON
D&WO Morning Report (Service Providers View) Charge #: OIL-PRODUCER IN SFNY) Engineer DOLCIANI, GREGORY JEAN-MARIE
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22013-1400) Manager FAIFI, MUSAAD HASSAN
ARO-4001
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12217 378-7484 378-7486
Date: Tuesday 06/18/2024 SFNY-1400 (0) SFNY_1400_0 CONTRACTOR /CLERK VSA T
378-6616/ 378-8390

Last 24 hr operations Next 24 hr plan


L/D 28" REAMING BHA, RUN 24" CSG, RIH INNER STRING, PERFORM CMT JOB, UN STING & CHC POH W/ INNER STRING, R/D DIVERTER SYSTEM, CUT 24" CSG. INSTALL SOW
Location Next Location
SFNY 58,600-6004, 1400-1405 SFNY-1403
Current Depth (ft) Liner TOL MD TVD Formation Tops
756 Last Csg Size MD TVD Size Top
24 756 755 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
756 (Date) 100 0 260
4 (06/14/2024@0530 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0730 2.5 0 28 N CT HT BHA RIG 756 756
L/D 28'' WELDED CONE ASSEMBLY
0730 - 0800 0.5 0 28 N CSG HT PEL RIG 756 756
CLEAN AND CLEAR RIG FLOOR
0800 - 0915 1.25 0 28 N CSG HT PEL GOC 756 756
R/U CSG EQUIPMENT

PJSM W/ CSG, RIG CREW AND FOREMAN.


0915 - 0930 0.25 0 28 N CSG PJSM CSG RIG 756 756
NOTE: SWAP IS COMPLETED AND EQUIPMENT HAS BEEN CHECKED BY ALL
RELEVANT PERSONNEL.

0930 - 1045 1.25 0 28 N CSG RCSG CSTR GOC 756 756 0 165 M/U FLOAT SHOE AND FC JOINTS. VERIFIED FLOATS.
NOTE: JOINTS 3 & 4 ARE ERW CASING
1045 - 1300 2.25 0 28 N CSG RCSG CTRQ GOC 756 756 165 756
RIH WITH 24" CSG. FILL EACH CSG.JOINT WITH 67 PCF WBM
1300 - 1345 0.75 0 28 N CSG HT PEL RIG 756 756
L/D 24" LANDING JOINT AND PERFORM SPACE OUT
1345 - 1430 0.75 0 28 N CSG HT PEL GOC 756 756
R/D CASING EQUIPMENT
1430 - 1500 0.5 0 28 N CSG PJSM CSG RIG 756 756
PJSM W/ RIG CREW FOR INNER STRING

1500 - 1630 1.5 0 28 N CSG HT PEL RIG 756 756 R/U FALSE ROTARY FOR RUNNING ICS INNER STRING ON 5 1/2" DP, M/U ISC
STINGER TO 5 1/2 DP.
1630 - 1800 1.5 0 28 N CSG HT PEL RIG 756 756
M/U CEMENT PUMPING ASSEMBLY
1800 - 1930 1.5 0 28 N CSG TI STDP RIG 756 756 0 756
RIH WITH ISC STINGER ON 5 1/2" DP
1930 - 2000 0.5 0 28 N CSG CIRC MPMP RIG 756 756
STING INTO FLOAT SHOE, BREAK CIRCULATION
2000 - 2215 2.25 0 28 N CSG CIRC MPMP RIG 756 756
UN-STING, DISPLACE INSIDE CASING TO 80 PCF
2215 - 2345 1.5 0 28 N CSG CIRC MPMP RIG 756 756
STING INTO SHOE, CIRCULATE HOLE CLEAN

PERFORM CEMENT JOB AS FOLLOWS:


- PRESSURE TEST CEMENT LINES TO 500 / 2000 PSI, 5 / 10 MIN
-PUMP 200 BBL TUNED SPACER WITH RIG PUMP
2345 - 0300 3.25 0 28 N CSG CMC CSG HCM 756 756
- MIX AND PUMP 450 BBLS (1937 SX) 118 PCF CEMENT SLURRY (10% BWOC
SILICALITE - POWDER, 5% BWOC MICROBOND, 0.01GPS D-AIR 3000L)
- CEMENT AT SURFACE (40 BBLS)
- NO LOSSES DURING CEMENT JOB.

DROP LATCH DOWN WIPER PLUG, DISPLACE SAME IN PLACE, BUMP WITH 500 PSI
0300 - 0330 0.5 0 28 N CSG CIRC MPMP RIG 756 756
ABOVE CIRCULATION PRESSURE, BLEED OFF AND VERIFY FLOATS HOLDING.
PRESSURE UP TO 500 PSI AND STING OUT
0330 - 0459 1.5 0 28 N DRLG CIRC MPMP RIG 756 756
B/O AND L/D CMT. PUMP IN BHA, POH 2 STAND AND CIRCULATE
Foreman Remarks

WELL OBJECTIVE:
SFNY-1400 WILL BE DRILLED AS A SINGLE LATERAL PRODUCER ACROSS SAFANIYA RESERVOIR (3000 FT OF RESERVOIR CONTACT). THE WELL WILL
BE COMPLETED WITH ICD SCREENS, ESP AND Y-TOOL. CHEMICAL TREATMENT WILL BE PERFORMED ACROSS THE RESERVOIR AND FLOWBACK TO
SURFACE FOR WELL CLEANUP.

============================================================================================
HSE:
* PERFORM H2S, FIRE & ABANDON DRILL ON 15-JUNE-2024;
* REINFORCE STOP WORK AUTHORITY, HANDS-FREE OPERATIONS, RED ZONE & HEAT STRESS RISKS IN ALL PRE-TOUR MEETINGS.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1400 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/10/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

* PERFORM SWA & LOF DRILLS


============================================================================================
* LC-50 SAMPLE: MAY 29 2024: OBM BARITE FREE INNOVERT BL MANIFEST 2400687956, RAWABI-52
* LC-50 SAMPLE: DEC. 18 2023: WBM, BL MANIFEST 2400657857, RAWABI-29
============================================================================================
* CCA MONITORING DAILY CHECKED: SFNY-1403: 38"X30"= 0 PSI, 30"X24" = 0 PSI.24"X18-5/8"= 0 PSI, 18-5/8"X13-3/8" = 0 PSI, 13-3/8"X9-5/8"= 0 PSI.
============================================================================================
PLANNED CASING POINTS:
* 28" SECTION: PLANNED TD 758' (120' INTO PNU),
* 22" SECTION: PLANNED TD 1,880' (150' TVD INTO UMER),
* 16" SECTION: PLANNED TD 4,166' (50' TVD INTO LAMS) ,
* 12-1/4" SECTION: PLANNED TD 6,014' (TARGET ENTRY TOP OF SFNY LAYER G)
* 8-1/2" SECTION: PLANNED TD 9,077',
============================================================================================
RIG POSITION:
* SFNY 58, 600/604, 1400/1405 PF;
* LATITUDE: 28DEG 22.96 N; LONGITUDE: 48DEG 54.39 E; RIG HEADING = 349 DEG
* WATER DEPTH = 56 FT; RKB TO MSL = 116 FT; RKB TO ML = 172 FT; RKB TO PLATFORM = 67 FT; AIR GAP = 48.5 FT
============================================================================================
RENTAL TOOLS:
* RECEIVED 12" SHOCK SUB (NOV) SN: 143-12113-02 ON 11-JUNE-2024
* RECEIVED 2 X 9 1/2" & 2 X 6 3/4" PBL'S (SAMAA) ON 11-JUNE-2024
============================================================================================
ARAMCO PERSONNEL:
* RIG CLERK MANOJ KUMAR MALLA ARAMCO ID# 8643501 ON BOARD SINCE 15-DEC-2023
============================================================================================
CONTRACTOR MANAGEMENT VISITS:
* ARO RIG MANAGER OLAV GUSTAD VISIT ON RIG 13TH JUNE 2024
* ARO HSE SPECIALISTS II CLIVE ANDREWS ON RIG 6TH APRIL
* ARO HSE SPECIALISTS II ADAM JONES ON RIG 30TH APRIL 2024
============================================================================================
* NEXT LOCATION : SFNY 960/969 PF, WELL SFNY 969
* SEA BED SURVEY REQUEST: 8800021887 SUBMITTED ON 25TH MAR 2024
* RIG MOVE REQUEST : RM-2024-4010711 APPROVED ON 18TH MAY 2024.
* RIG MOVE MEETING CONDUCTED ON 3 JUNE 2024.
* DIVING REQUEST FOR DEBRIS REMOVAL:
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF N/A 8.2 API 0 Volts 3.33 10.4 20,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 96 33 0 14 / 18 SPUD N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 18 4 13 / 14 20 280 N/A
67

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF N/A 8.3 API 0 Volts 3.39 10.5 19,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 0 HTHP 96 31 0 13 / 17 SPUD N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 18 4 13 / 14 20 240 N/A
68

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF N/A 8.5 API 0 Volts 3.39 10.4 19,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 96 32 0 13 / 18 SPUD N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 18 4 13 / 14 20 280 N/A
67

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A DIVERTER 2-3KTS 0.5M SEASONAL 3,249 TOURLY
DRILL

Company GOC HTD GOC SPS RIG OES GCD NOJ HMS ARM HCM ARM GEP

Category CSR CSV CTRG DPDS RIG DFMS ISS JST MLS OTHR PCS WSC WHES
PERSONNEL
2 3 14 3 50 2 2 0 4 1 3 2 1
Total
AND SERVICES No. of Persons
87
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 0 24 24 24 24 24

Operating Hours. 10 0 0 0 24 24 0 0 24 12 24 24 0

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1400 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/10/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

Standby/Tankers
TRUCKS/BOATS
Hadi-22

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
3329 561 1343 6863 1024 5077

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-3032 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 01/30/2023 - 08/16/2024
Report ID: OPERLMTDMRREP

BB-84A @ MRJN-3032 Limited Morning Report for 06/18/2024


Objective : (GAS PRODUCER Foreman(s)OMAR, AHMED BAHLOUL / SODHI, TARANDEEP SINGH
D&WO Morning Report (Service Providers View) Charge #: SINGLE LAT AT KHAFJI) Engineer ALQAHTANI, ABDULAZIZ AWAD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22073-3032) Manager MAJDI, SULAIMAN AL HASSAN
BB-84A
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088-2167- 771-2655 378-8345 013-5106-4 52 (RR)
Date: Tuesday 06/18/2024 MRJN-3032 (0) MRJN_3032_0 OTHER VSAT CONTRACTOR /CLERK VSA T
378-8346 ( CLERK) 013-510-64 53 (OIM)

Last 24 hr operations Next 24 hr plan


INTSALL WEAR BUSHING, RIH 8-1/2" REAMING BHA TO SHOE, REAM OH W/ 8-1/2" REAMING BHA PUMP OUT TO SHOE, CHC, PST TEST, RIH 8-1/2" REAMING BHA TO TD, CHC, PST TEST, PUMP
TO TD, CHC, PUMP OUT TO SHOE. OUT TO SHOE SPOT LUBRGLIDE, CHC, POOH REAMING ASSY TO RUN SCREENS.
Location Next Location
MRJN-3031/3040 PLATFORM MRJN-3032
Current Depth (ft) Liner TOL MD TVD Formation Tops
13,200 Last Csg Size MD TVD Size Top
9 5/8 8650 6453 Formations Comments
Depth
SFNY 6,742 6,053 FT TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SFNR 6,872 6,130 FT TVD
13200 (Date) 100 0 243 BSFR 7,036 6,212 FT TVD
44 (06/04/2024@2000 ) KHFJ 7,146 6,260 FT TVD
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0500 - 0530 0.5 0 8 1/2 N DRLG OTH NA RIG 13200 13200
CLEANED AND CLEARED RIG FLOOR
0530 - 0645 1.25 0 8 1/2 N WH SET WBSH RIG 13200 13200
MADE UP WEAR BUSHING TOOL ASSY - SET WEAR BUSHING - L/D TOOL ASSY.
0645 - 0830 1.75 0 8 1/2 N CT HT BHA RIG 13200 13200
M/U & RIH 8-1/2" REAMING BHA WITH NOV DLR TO 143'
0830 - 0930 1 0 8 1/2 N CT TI STHDP RIG 13200 13200 143 796
RIH 8-1/2" DLR REAMING BHA ON 5-1/2" HWDP W/ NOV JAR.

0930 - 1400 4.5 0 8 1/2 N CT TI STDP RIG 13200 13200 796 8567 RIH 8-1/2" DLR REAMING BHA ON 5-1/2" DP.
> FILLED UP EVERY 20 STDS.

1400 - 1715 3.25 0 8 1/2 N CT RR DWKS RIG 13200 13200 SLIPPED AND CUT 120' DRILL LINE, CALIBRATED CROWN/FLOOR SAVER, RESET
CROWN-O-MATIC.
1715 - 1745 0.5 0 8 1/2 N CT RR TDS RIG 13200 13200
RIG SERVICE, SERVICED TDS AND RELATED EQUIPMENT

REAMED DOWN 8-1/2" DLR REAMING BHA WITH 600-GPM, 2700-PSI, 60-RPM,
1745 - 0045 7 0 8 1/2 N CT RW BIT RIG 13200 13200 8567 13200 13K TORQUE.
> WASHED DOWN LAST STAND AND TAGGED TD - NO HOLE FILL.
> NO ISSUES WHILE REAMING DOWN.

PUMP SWEEPS 20 BBL HI-WT PILLS & CIRCULATED HOLE CLEAN WITH 600-GPM,
0045 - 0345 3 0 8 1/2 N CT CIRC MPMP RIG 13200 13200
2600-PSI, 90-120 RPM, 13K TORQUE.

0345 - 0415 0.5 0 8 1/2 N CT CIRC MPMP RIG 13200 13200


FLOW CHECKED, WELL STATIC.

0415 - 0459 0.75 0 8 1/2 N CT RW BIT RIG 13200 13200 13200 12700 PUMP OUT OF HOLE WITH 8-1/2" DLR REAMING BHA. **ON-GOING AT REPORT
TIME**
Foreman Remarks

WELL WILL BE DRILLED AS A SINGLE LATERAL HORIZONTAL GAS PRODUCER ACROSS KHFJ RESERVOIR. THIS WELL WILL BE COMPLETED WITH 5-1/2" MTV SCREENS, PACKERS AND 7" TUBING.
==================MRJN-3031/3040 PLATFORM=================================
BATCH DRILLING SEQUENCE:
=======================================================================
MRJN-3035 (DUAL LAT/RATAWI), 22"(FINISHED),16"(FINISHED),12"(FINISHED), 8-3/8"(FINISHED),5-7/8 L0 (FINISHED),5-7/8" L-1 (FINISHED), EOW (FINISHED)
MRJN-3040 (DUAL LAT/RATAWI), 22"(FINISHED),16"(FINISHED),12"(FINISHED), 8-3/8"(FINISHED),5-7/8 L0 (FINISHED),5-7/8" L-1 (FINISHED), EOW (FINISHED)
MRJN-3034 (DUAL LAT/RATAWI), 22"(FINISHED),16"(FINISHED),12"(FINISHED), 8-3/8"(FINISHED),5-7/8 L0 (FINISHED),5-7/8" L-1 (FINISHED), EOW (FINISHED)
MRJN-3037 (DUAL LAT/RATAWI), 22"(FINISHED),16"(FINISHED),12"(FINISHED), 8-3/8"(FINISHED),5-7/8 L0 (FINISHED),5-7/8" L-1 (FINISHED), EOW (FINISHED)
MRJN-3304 (DUAL LAT/RATAWI), 22"(FINISHED),16"(FINISHED),12"(FINISHED), 8-3/8"(FINISHED),5-7/8 L0 (FINISHED),5-7/8" L-1 (FINISHED), EOW (FINISHED)
MRJN-3032 (SNGL LAT/KHFJI), 22"(FINISHED),16"(FINISHED),12"(FINISHED), 8-1/2" (ON GOING) , EOW (NEXT)
MRJN-3036 (SNGL LAT/KHFJI), 22"(FINISHED),16"(FINISHED),12"(FINISHED), 8-1/2" , EOW
=======================================================================
PLATFORM FLOWBACK SEQUENCE BY RIG (MRJN- 3036, 3040, 3035, 3304, 3037, 3032, 3034)
MRJN-3040 FLOWBACK - READY FOR FLOW BACK
MRJN-3035 FLOWBACK - READY FOR FLOW BACK
MRJN-3304 FLOWBACK - READY FOR FLOW BACK
MRJN-3037 FLOWBACK - READY FOR FLOW BACK
MRJN-3032 FLOWBACK
MRJN-3034 FLOWBACK - READY FOR FLOW BACK
MRJN-3036 FLOWBACK
====================PERSONNEL ONBOARD====================================
> ARAMCO PDP ABDULRAHMAN K. ALURAIK ID # 794779 ON-BOARD 14-JUNE-2024.
====================SAFETY & DRILLS =======================================
* DRILLS:
> FIRE DRILL: 06-15-2024
> H2S DRILL: 06-15-2024
> ABANDON SHIP: 06-15-2024

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-3032 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 01/30/2023 - 08/16/2024
Report ID: OPERLMTDMRREP

> H2S MAN DOWN: 03-16-2024


> MAN OVERBOARD: 03-10-2024
======================JAR & SHOCK SUB & RENTAL TOOLS =============
> 1 X NOV 6-1/2" JAR (SN.: HMJ650-4385074) ON BOARD (01ST OF JUNE,2024).
> 1 X NOV 8-1/2" DLR (S.N: G309314 )ON BOARD (08TH OF JUNE,2024)
======================WAITING ON =============================
* WEATHER: TODAY 0 HRS / CUMULATIVE 0 HRS
* WAIT ON PRODUCING: TODAY 0 HRS / CUMULATIVE 0 HRS
* WAIT ON MARINE: TODAY 0 HRS / CUMULATIVE 0 HRS
=====================RIG POSITION & DATA===================
* BB-84 RIG-FLOOR TO PF MAIN DECK: 63'
* LATITUDE 28 DEG 27.87 NORTH, LONGITUDE 49 DEG 40.96 EAST
* UTM NORTHING: 3149350; UTM EASTING: 371077
* RIG HEADING= 330 DEG
* LEG PENETRATION: BOW LEG 9.6 ', PORT LEG 7.6', STARBOARD LEG 15.2'
* AIR GAP= 45'
* WATER DEPTH= 164'
* RKB TO MSL = 105'
* RKB TO ML= 269'
========================DIRECTIONAL DATA============================================
- FOLLOWING PLAN MRJN-3032_0_REV-E.0_(PWP) DATED ON 06-JUNE-2024.
- WELL PATH: 54.89 FT ABOVE, 0.15 FT LEFT OF PLAN.
- PROJECTION @ 13,300' MD, INC 88.5 DEG, AZI 354.3 DEG, TVD 6,543.66 FT.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 2 0 API 61 680 Volts 20.82 N/A 275,122
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2 HTHP 16 20 0 12 / 23 DELTADR 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 34 23 10 / 11 N/A N/A 2.6
84

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 2 0 API 61 659 Volts 20.82 N/A 275,122
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 2 HTHP 16 19 0 11 / 22 DELTADR 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 34 23 9 / 10 0 N/A 0
86

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 2 0 API 61 650 Volts 20.82 N/A 275,122
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2.2 HTHP 16 18 0 12 / 22 DELTADR 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 34 23 9 / 10 0 N/A 0
88

MUD
TREATMENT
BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade ClassSerial #
1 Bit SMT 8.5 1 8.5 0.84 4.5IF RV1147
2 Near Bit Roller Reamer RIG 8.5 1 6.5 2.25 7.47 NC50 4 1/2 REG 139 3 POINT BB84-20
3 Drillcollar RIG 6.5 1 6.5 2.25 29.82 NC50 NC50 99 SPRL J55536
4 String Reamer NRT 8.5 1 8.25 2.5 5.53 NC50 NC50 99 P93282
5 Drillcollar RIG 6.5 2 6.5 2.25 60.85 NC50 NC50 99 SPRL ON FILE
DRILL STRING 6 String Reamer RIG 8.5 1 8.5 2.75 4.08 NC50 NC50 100 309317
7 Drillcollar RIG 6.5 3 6.5 2.25 30.69 NC50 NC50 99 SPRL 20-47-23112
8 Crossover RIG 6.625 1 6.625 2.875 3.58 NC50 VX54 99 BB84-06
9 Heavy Weight Drillpipe (HWDP) RIG 5.5 5 5.5 3.875 154.93 VX54 VX54 46.09 CONV ON FILE
10 Hydro-Mechanical Jar NOJ 6.5 1 6.5 2.75 34.8 XT54 XT54 1,300 HMJ650-4385
11 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.875 463.76 VX54 VX54 46.09 CONV ON FILE
12 Drillpipe RIG 5.5 1 5.5 4.67 31 VX54 VX54 24.7 VM105 PREMIUM ON FILE

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/17/2024 PIT/TRIP 6-8 KTS N 1-2 FT CLEAR 881 PRE JOB / PRE
TOUR

Company GOS BC BHI RIG BDF NOJ ARM BCM FMC ARM SAM

Category CTRG PSSC DPDS RIG DFMS JST OTHR PCS PRS WSC WBCS
PERSONNEL
11 2 1 55 2 0 1 1 4 2 1
Total
AND SERVICES No. of Persons
80
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 0 24 24 24 24 24

Operating Hours. 0 0 0 24 24 24 12 24 0 24 0

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-3032 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 01/30/2023 - 08/16/2024
Report ID: OPERLMTDMRREP

Standby/Tankers Others Others


TRUCKS/BOATS
TOPAZ KHUWIR RAWABI-55 PAULA MCCALL

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
3046 928 1091 3755 0 2665

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1237 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:20 05/28/2024 - 07/01/2024
Report ID: OPERLMTDMRREP

BCTD-3 @ HWYH-1237 Limited Morning Report for 06/18/2024


Objective : (RE-ENTER Foreman(s)ALBOKHEDER, ABDULRAHMAN MOHAMMED
D&WO Morning Report (Service Providers View) Charge #: THE PRE-SET WELL Engineer RAMDHAN, HUSSAIN SALMAN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24053-1237) HWYH-1237 BY Manager TURAIFI, MOHAMMED AHMED
BCTD-3
DRILLING THREE THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: LATERALS IN UNZA
(0500-0500) Saudi Aramco Well 0088216777 11081 577-3979 COIL CAB/ 0135181530
RESERVOIR)
Date: Tuesday 06/18/2024 HWYH-1237 (0-6-1-2) HWYH_1237_9 CONTRACTOR /CLERK VSA T
577-3922

Last 24 hr operations Next 24 hr plan


TURBINE DRILL L-0-6-1-2 UNZA AS PER GOC. POOH. POH. BI WEEKLY BOP TEST. MU & RIH WITH BHA#9. TURBINE DRILL L-0-6-1-2 UNZA AS PER GOC
Location Next Location
194 KM FROM DHAHRAN MAIN GATE HWYH-1223
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
13,920 Size 12530 12494 Size 12,864 13,680 13,336 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
13760 (Date) 100 160 194
15.9 (06/02/2024@0700 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

SINGLE PHASE TURBINE/USMPR DRILL L-0-6-1-2 AS PER GOC.

~ PUMP @ 92 GPM, CIRC PRESSURE @ 870 PSI, WOB @ 1.5 KLB, RPM @ 1,422
RPM.
0500 - 0200 21 0-6-1-2 3 5/8 N DRLG DMS TBINE BHI 13760 13920 ~ BHP @ 2,825 PSI, DIFF PRESSURE @ 1,645 PSI, WHP @ 1,280 PSI, TCA @ 0 PSI.
~ GR @ 13.5 MMSCFD, DTF @ 288 DEG F, H2S @ 0% (0 PPM), CO2 @ 1.0%.
~ TREATMENT: SAMA SCAF 0 BPH, CAUSTIC @ 0 PAIL/HR.
~ WT CHECKS AS REQUIRED, RG AT 0.33%. CLA-WEB @ 0.2%.

** NO PROGRESS. POOH FOR NEW BIT.


0200 - 0459 3 0-6-1-2 3 5/8 N DRLG TO BHA RIG 13920 13920 13920 4000
POH TO SURFACE FOR NEW BIT & BI WEEKLY BOP TEST. ONGOING @ RT.
Workover Objectives
Foreman Remarks

SGA #1: N 1.1 KM.


SGA #2: E 1.1 KM.
------------------------------------------------------------------------------------------------------------------------------------------
~ ELEVATIONS: ODF ADES-173, 35 FT, BCTD-3 DF 38.5 FT, CORRECTION: - 3.5 FT.
------------------------------------------------------------------------------------------------------------------------------------------
COIL STRING #40470-1WL (TENARIS 0.204" HT-110 MONOBORE):
~ COIL LENGTH: 17,634 FT, E-LINE (CAMESA) LENGTH: 18,033 FT, SLACK 2.26%, VOL: 63 BBLS. HIGHEST FATIGUE PT: 38.7% @ 12,739 FT.
~ TTL DRILLED FOOTAGE: 30,458 FT; DAILY RUN FOOTAGE: 1,053 FT; ACCUM RUNNING FOOTAGE: 644,099 FT.
~ TRIPS F/ LAST SLACK MGT: 8.
------------------------------------------------------------------------------------------------------------------------------------------
GENERAL WELL INFO:
~ GAS: DAILY FLARED @ 13.3 MMSCF (TTL: 61.72 MMSCF), DAILY EXPORTED: 0 MMSCF (TTL: 0 MMSCF).
~ CONDI: DAILY PRODUCED: 0 BBLS (TTL: 0 BBLS), DAILY BURNED: 0 BBL (TTL BURNED: 0 BBLS), DAILY EXPORTED: 0 BBLS (TTL: 0 BBLS).
~ H2S @ 0.0 %, CO2 @ 1%.
~ PRODUCTION LINE: AVAILABLE.
~ PRODUCTION LINE: NOT UTILIZED.
~ FLARING REASON: MISSING OF ISOLATION BARRIERS & NO CROSSOVER.
~ N2 ONSITE: 21,000 GAL; DAILY USED: 0 GAL; TOTAL N2 USED IN WELL: 149,000 GAL (4,000 GAL FOR P/T & CALBR.).
~ DAILY CLA-WEB 303 GAL, (TOTAL: 1,968 GAL).
-------------------------------------------------------------------------------------------------------------------------------------------
BHA#8 LATERAL (TURBINE/USMPR):
~ HTC PDC (SN: 7918217) AND CONG #11 TURBINE 1.25 AKO (SN: TTK-034)
- GR @ 51.1 FT, D+I @ 54.68 FT, DPS @ 59.65 FT, ED @ 71.14 FT, NBI @ 28.77 FT, CCL @ 73.45 FT, USMPR @ 41.17 FT.
------------------------------------------------------------------------------------------------------------------------------------------
LATERAL INFO:
~ L-0-6 (UNZA) @ 275 DEG AZM: 120 FT.
~ L-0-6-1 (UNZA) @ 272 DEG AZM: 498 FT.
~ L-0-6-1-1 (UNZA) @ 258 DEG AZM: 972 FT.
~ L-0-6-1-2 (UNZA) @ 279 DEG AZM: 200 FT.
------------------------------------------------------------------------------------------------------------------------------------------
SERVICE SUPPORT: EQUIPMENT/PERSONNEL:
~ DRSS#100432887 (ENJAZ) PLATE#: (4523,4670,4522,3386); & DRSS#1004323894 (ENJAZ) PLATE#: (3775,4760,3369,3772).
~ VACUUM TRUCKS: 8, DAILY LOADS: 16, TOTAL: 136 LOADS.
-------------------------------------------------------------------------------------------------------------------------------------------
~ DRILLS:
-------------------------------------------------------------------------------------------------------------------------------------------
> ARAMCO FCT ALBAKHEET, AQEEL E #780321 ON LOCATION SINCE 06/03/2024.
-------------------------------------------------------------------------------------------------------------------------------------------
NEXT LOCATIONS:
~ 1ST WELL: HWYH-1223: PRE-WORKOVER MEETING CONDUCTED ON 09/05/2023, CIVIL WORK: 100%, STRIP OUT: STRIP OUT REQUIRED FOR OPTF.
~ 2ND WELL: HWYH-971: PRE-WORKOVER MEETING CONDUCTED ON 05/30/2023, CIVIL WORK: 0%, STRIP OUT: STRIP OUT REQUIRED FOR OPTF.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0-6-1-2 13,770 79.02 278.09 -80 13,396 -87.37 -423.67 1,419.23 15.85

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1237 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:20 05/28/2024 - 07/01/2024
Report ID: OPERLMTDMRREP

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0-6-1-2 13,790 79.08 280.4 20 13,400 -86.4 -429.57 1,437.59 11.38
0-6-1-2 13,810 78.57 283.5 20 13,404 -85.17 -435.42 1,455.63 15.39
0-6-1-2 13,830 79.01 286.14 20 13,408 -83.64 -441.2 1,473.3 13.14
0-6-1-2 13,850 79.9 288.99 20 13,412 -81.83 -446.92 1,490.64 14.7
MUD DATA
MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
34 14,196 14,692 DP Av DC Av Bit HHP N/A N/A M233 3.625 HTC
Pressure GPM Jet Vel N/A N/A 0 I-Row O-Row DC Location Bearings
N/A 92 N/A 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
7918187 DD205XYV1 POOH Reason N/A
Gauge Other
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 3.625 1 0.76 7918187
2 Turbine BHI 2.875 1 2.875 1 20.95 2 3/8 PAC 2 3/8 PAC 13 TTK034
3 Float Sub BHI 3 1 19.875 3.5 2.17 7 5/8 REG 7 5/8 REG 13 13832450
4 Hydaulic Power Controller BHI 3 1 9.5 3.125 12.6 7 5/8 REG 7 5/8 REG 13 14321288
DRILL STRING 5 Logging While Drilling (LWD) BHI 3.125 1 3.125 12.85 15.59 14477725
6 Gamma Sub BHI 3 1 9.5 2.75 9.12 9 1/2 T2 9 1/2 T2 13 15388406
7 Drilling Performance Sub BHI 3 1 10 4 5.02 7 5/8 REG 7 5/8 REG 13 15116935
8 Electronic Disconnect & Circulating Sub BHI 3 1 3 1 8.27 13 15062100
9 Power & Communication Sub BHI 3 1 8.25 5.9 6.5 6 5/8 REG 6 5/8 REG 13 15801511
10 Dual Ball Valve Sub BHI 3 1 9.5 2.813 2.4 7 5/8 REG 7 5/8 REG 13 16183497
11 Lower Quick Connect BHI 3 1 9.219 2.85 1.72 6 5/8 REG 6 5/8 FH 13 16187197
12 Upper Quick Connect & Flow Sub BHI 3 1 9.5 3 3.2 7 5/8 REG 7 5/8 REG 13 13898167
13 Coil Tubing Connector BHO 3.13 1 3.125 1 0.98 CDP CDP 13 16021166
14 Coil Tubing RIG 2.375 1 3 1 17,634 CDP CDP 4.7 40470

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/02/2024 TWICE A NORMAL ONSHORE NORMAL 3,534 PRE-TOUR MEETING
WEEK

Company OTH BHO BHI RUE BHO XLG BCT BHO OTH ARM

Category CTRG COIL DPDS H2S IOS MLS PCS UBD VAC WSC
PERSONNEL
22 15 6 8 11 2 8 16 8 1
Total
AND SERVICES No. of Persons
97
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24 24 24

Standby/Tankers Others Others


TRUCKS/BOATS
AB-6926 CREW BUS RIG AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 503 338 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR GHZL-90 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 06/15/2024 - 07/17/2024
Report ID: OPERLMTDMRREP

BCTD-4 @ GHZL-90 Limited Morning Report for 06/18/2024


Objective : (DRILL THREE Foreman(s)FALCON JR, KIRBY ANTHONY / SULAIMANI, ADEL ABBAS
D&WO Morning Report (Service Providers View) Charge #: LATERAL ACROSS UNZA Engineer ALBASRI, MORTADA MOHSEN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24075-0090) RESERVOIR) Manager KHAMEES, SHAKER ABDUL MAJEED
BCTD-4
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12530 0135773906 0135105566
Date: Tuesday 06/18/2024 GHZL-90 (0) GHZL_90_0 CONTRACTOR /CLERK VSA T
0138756424

Last 24 hr operations Next 24 hr plan


PULL BPV, NU BOP'S, RU ALL SERVICES, PERFORM SLACK MNGT. CONTINUE PERFORM SLACK MNGT, PRE-ACCEPTANCE HYDRO TESTING.
Location Next Location
332 KM FROM DH MAIN GATE GHZL-92
Current Depth (ft) Liner TOL MD TVD Formation Tops
13,610 Last Csg Size MD TVD Size 2,980 9,507 9,507 Top
9 5/8 3460 33460 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
13610 (Date) 100 0 323
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0600 1 0 PRE N RM RU NA RIG 13750 13750
CONTINUE TO RIG UP ALL SEVICES

PJSM: RIG UP HRDH GWS (TRUCK #AB-9459) & RETRIEVE BPV.

0600 - 0800 2 0 PRE N RM RU NA RIG 13750 13750 ~ INSTALL 10K LUBRICATOR & P/TEST TO 7,500 PSI.
~ EQUALIZE WHP TO 200 PSI & RETRIEVE 4" BPV, PERFORM INFLOW TEST - 0 PSI.
~ CLOSE LOWER MASTER VALVE, FLUSH & SECURE TREE.
~ SIWHP: 0 PSI.

PJSM: CONTINUE GENERAL RIG UP & PERFORM SLACK MANAGMENT.

~ REMOVE ARAMCO BOWEN CROSS-OVER FROM PRODUCTION TREE.


~ N/U BOP TO TREE, INSTALL R6 LINE.
~ LOOSEN BOP NUTS, ROTATE BOP TO CONNECT FLOWLINE RISER.
~ COMPLETE BULKHEAD.
~ LYNCHPIN CONTINUE INSTALL REEL IRON.
~ HES CONTINUE RIG IN SKIM TANK LINES & FLARE STACK SUITCASES.
0800 - 0459 21 0 PRE N RM RU NA RIG 13750 13750 ~ HES RIG IN PRODUCTION LINE.
~ LYNCHPIN STAB CT INTO INJECTOR.
~ RIG IN LUBRICATOR AND SLACK MGMT. LINE.
~ HES & LYNCHPIN GREASE & CYCLE ALL VALVES.
~ SPOT N2 UNITS & RIG IN PUMPING IRON.
~ ARAMCO WATERLINE CREW INSTALL WATERLINE.
~ BHI MAKE UP TEMP CTC, PULL TEST 25 KLBS - GOOD.
~ FILL CT WITH 67 BBL, REVERSE PUMP 1.5 X CT VOLUME WITH PR AT 3.5 BPM.

ON GOING @ RPT...
Workover Objectives
Foreman Remarks

~ ELEVATIONS: ODF (SSA-46) 36 FT, BCTD-4 INSITU-SUB: -- FT (CORRECTION: -- FT).


~ SGA #1 550 M SE & SGA #2 500 M NW.
----------------------------------------------------------------------------------------------------------------------------------------------
TENARIS COIL # 40747-1WL (MONOBORE 0.204" HT-110 GRADE), LENGTH: 18,000 FT, E-LINE LENGTH: 18,217 FT.
~ MAX FATIGUE: --% AT FT, SLACK: --%, CT CAP: 65 BBL.
~ DRILL FOOTAGE: FT, DAILY CT RUNNING FOOTAGE: FT, TOTAL RUNNING FOOTAGE: FT.
~ TRIPS SINCE LAST SLACK MANAGEMENT:
----------------------------------------------------------------------------------------------------------------------------------------------
~ N2 ON LOCATION: 16,600 GAL. 24 HOUR USAGE: 0 GAL (TTL: 0 GAL).
----------------------------------------------------------------------------------------------------------------------------------------------
NEXT WELLS:
** GHZL-92 CIVIL WORK: 100%
~ SITE VISIT: 6/13/2024
** GHZL-83 CIVIL WORK: 100%
~ SITE VISIT: 5/24/2024
** GHZL-110 CIVIL WORK: 30%
~ SITE VISIT: 6/13/2024
** GHZL-112 CIVIL WORK: 0%
~ SITE VISIT: 6/13/2024
-----------------------------------------------------------------------------------------------------------------------------------------------
SAFETY DRILLS:
-----------------------------------------------------------------------------------------------------------------------------------------------
CONTACTED SECURITY ON --/--/2024 AT --:00 FOR FLARING AND STARTING UNDER-BALANCE OPERATIONS.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 13,750 59 271.5 0 13,446 -0.08 -326.67 1,071.75 1.79
MUD DATA
MUD
TREATMENT

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR GHZL-90 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 06/15/2024 - 07/17/2024
Report ID: OPERLMTDMRREP

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A SEASONAL NA SEASONAL 570 PRE TOUR SAFETY
MEETING

Company OTH BHI RIG RUE BHO BHO BQM HMS RIG BCT BHO OTH BHO ARM

Category CTRG DPDS RIG H2S IOS MED MEON MLS OTHR PCS UBD VAC WSC WSC
PERSONNEL
26 4 7 6 13 1 7 0 7 8 14 7 1 2
Total
AND SERVICES No. of Persons
103
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 0 24 0 24 24 24 24

Operating Hours. 0 0 0 0 0 0 0 0 0 0 0 0 0 24

Standby/Tankers
TRUCKS/BOATS
AB-6429

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2000 533 583 0 0 0

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1999 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 06/03/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

BCTD-5 @ HRDH-1999 Limited Morning Report for 06/18/2024


Objective : (THREE UBCTD Foreman(s)ARSLAN, MEHMET
LATERALS ACROSS KHFB Engineer ALQAHTANI, ABDULLAH NASSER
D&WO Morning Report (Service Providers View) Rig Charge #: RES ) Manager KHAMEES, SHAKER ABDUL MAJEED
Copyright 2024 Saudi Aramco. All Rights Reserved BCTD-5 (71-24058-1999)
THURAYA RIG FORMAN VSAT CONTRACTOR
Daily Onshore /CLERK VSA T
+88216777 14151 0135761003
(0500-0500) Saudi Aramco Well Wellbores:
0135120643 (WSTL)
Date: Tuesday 06/18/2024 HRDH-1999 (1-1) HRDH_1999_2
CONTRACTOR /CLERK VSA T
0135762294 (CLERK)

Last 24 hr operations Next 24 hr plan


TURBINE DRILL L-1-1 BUS, LAND THE WELL. TURBINE DRILL L-1-1 W/ USMPR AS PER GOC. TURBINE DRILL L-1-1 W/ USMPR AS PER GOC.
Location Next Location
243 FROM DMG. HRDH-2013
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
12,860 Size 9975 9972 Size 10,747 11,950 11,856 Top
Formations Comments
9 5/8 4 1/2 Depth
KFB1 12,006 TVD @ 11,893 FT
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12300 (Date) 100 560 243
8.5 (06/09/2024@1800 )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

TURBINE DRILL L-1-1 KFB1 W/ USMPR AS PER GOC.

~ PR: 94 GPM, N2: 0 SCFM, ELV: 94 GPM, BIT RPM: 896, CIRC P: 3,920 PSI, DIFF
P: 1,980 PSI, WOB: 0.5-1.5 KIPS.
~ FWHP: 55 PSI, FBHP: 5,160 PSI, TCA: 555 PSI, DHT: 261 DEG F.
~ GR: 0.1 MMSCFD, H2S: 0%, CO2: 0%.
0500 - 2130 16.5 1-1 3 5/8 N DRLG DMS TBINE BHI 12300 12700 ~ H2S TREAT: 0 BPH, CAUSTIC SODA 0 PAIL/HR.
~ SWEEP HOLE 2 BBL/HR, RG: 0.15%.
~ WEIGHT CHECK AS REQUIRED.
~ SWAP AND INSPECT JC, CLEAN.

* AT 12,532 FT, GOC INSRUCTION TO DROP 2 FT BELOW THE PLAN


* AT 12,595 FT, GOC INSRUCTION TO BUILD AND CATCH THE PLAN
* AT 12,647 FT, GOC INSTRUCTION TO TARGET 85 DEG INC.

PERFORM 500 FT WIPER ABOVE S/T DEPTH


2130 - 2230 1 1-1 3 5/8 N DRLG ST CTBG RIG 12700 12700 12700 12200
~ NO TIGHT SPOT
~ SLICK PASS THRU S/T
~ PU/SO: 64/52 KIPS

TURBINE DRILL L-1-1 KFB1 W/ USMPR AS PER GOC.

~ PR: 94 GPM, N2: 0 SCFM, ELV: 94 GPM, BIT RPM: 896, CIRC P: 3,975 PSI, DIFF
P: 2,020 PSI, WOB: 1.0-1.5 KIPS.
~ FWHP: 55 PSI, FBHP: 5,150 PSI, TCA: 545 PSI, DHT: 266 DEG F.
2230 - 0459 6.5 1-1 3 5/8 N DRLG DMS TBINE BHI 12700 12860 ~ GR: 0.1 MMSCFD, H2S: 0%, CO2: 0%.
~ H2S TREAT: 0 BPH, CAUSTIC SODA 0 PAIL/HR.
~ SWEEP HOLE 2 BBL/HR, RG: 0.15%.
~ WEIGHT CHECK AS REQUIRED.
~ SWAP AND INSPECT JC, CLEAN.

* AT 12,826 FT, GOC INSTRUCTION TO BUILD TO 86 DEG INC.


Workover Objectives
Foreman Remarks

~ RELEASE TO SPUD: 6.9 DAYS


~ RIG MOVE DISTANCE: 20 KM
-----------------------------------------------------------------------------------------------------------------------------------------
~ SGA#1: 0.7 KM NW LOCATION
~ SGA#2: 0.7 KM SE LOCATION
-------------------------------------------------------------------------------------------------------------------------------------------
~ ELEVATIONS: ODF OFF GRND (T-559) 35 FT, BCTD-5 DF 122.95 FT, CORR: -87.95 FT
-------------------------------------------------------------------------------------------------------------------------------------------
COIL STRING #40746-1WL (TENARIS 0.204" WT-110 MONOBORE)
~ COIL LENGTH: 17,970 FT, E-LINE (CAMESA) LENGTH: 18,292 FT, SLACK 1.79%, VOL: 66 BBLS. HIGHEST FATIGUE PT: 4.4% @ 12,500 FT
~ TTL DRILLED FOOTAGE: 3,261 FT, DAILY RUN FOOTAGE: 1,230 FT, CUMM RUNNING FOOTAGE: 49,652 FT.
~ TRIPS SINCE LAST SLACK MANAGEMENT: 4
-------------------------------------------------------------------------------------------------------------------------------------------
GENERAL WELL INFO:
~ GAS: DAILY GAS PRODUCED: 0.1 MMSCF (TTL: 0.3 MMSCF)
~ GAS: DAILY FLARED @ 0.1 MMSCF (TTL: 0.3 MMSCF),
~ GAS : DAILY EXPORTED: 0 MMSCF (TTL: 0 MMSCF).
~ CONDI: DAILY PRODUCED: 0 BBLS (TTL: 0 BBLS),
~ DAILY BURNED: 0 BBL (TTL BURNED: 0 BBLS),
~ DAILY EXPORTED: 0 BBLS (TTL: 0 BBLS).
~ H2S @ NA, CO2 @ NA.
~ PRODUCTION LINE: AVAILABLE.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1999 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 06/03/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

~ FLARING REASON: PRODUCING DEPARTMENT WILL PREPARE NEW PROCEDURE ON EXPORTING/SAFETY PRECAUTION TO EXPORT
~ N2 ONSITE: 27,000 GAL, DAILY/TOTAL USED: 0/5,000 GAL (5,000 GAL FOR P/T & CALBR.)
~ AV IN OH: 320 FPM, CTR: 0.87 / AV IN 4"1/2 TBG: 247, CTR: 0.82
------------------------------------------------------------------------------------------------------------------------------------------
BHA4# SENSOR OFFSETS
NBI: 28.00 FT, GR: 50.49 FT, D&I: 54.00 FT, DPS: 58.97 FT, EDC: 71.25 FT, CCL: 72.77 FT, USMPR: 40.40 FT
-----------------------------------------------------------------------------------------------------------------------------------------
LATERAL INFO:
- L-1 : 2,631 FT, AZ: 274 DEG
- L-1-1: 620 FT, AZ: 233 DEG
-----------------------------------------------------------------------------------------------------
KILL FLUID WT/VOL: N/A
-----------------------------------------------------------------------------------------------------
SERVICE SUPPORT
~ DRSS# 1004326969, 1004326966
~ VACUUM TRUCKS: 7, LOADS HAULED DAILY/TOTAL: 13/81
-------------------------------------------------------------------------------------------------------------------------------------------
~ DRILLS:
~ NEAR MISS:
--------------------------------------------------------------------------------------------------------------------------------------------
~ PRE-TOURS: 2 EA.
--------------------------------------------------------------------------------------------------------------------------------------------
NEXT LOCATIONS:
~ HRDH-2013: PRE-WO MEETING CONDUCTED ON MAY 29. LAST VISITED ON JUNE 17, 95% READY. SAND ACCUMULATION AT THE BOTTOM OF CELLAR TO BE CLEANED.
~ HRDH-1918: LAST VISITED ON JUNE 7, 0% READY. NO STRIP OUT REQUIRED. NO CIVIL WORK YET.
----------------------------------------------------------------------------------------------------------------------------------------------
PERSONNEL:
- ARAMCO GEOLOGIST BARAK ABDULLAH ON LOCATION.
- ARAMCO GEOLOGIST NAHAR ALNASSAR ON LOCATION.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
1-1 12,320 82.15 243.64 -490 11,989 -65.03 -134.06 488.84 17.37
1-1 12,340 83.18 240.38 20 11,992 -67.86 -139.4 508.66 16.98
1-1 12,360 82.64 240.73 20 11,994 -70.84 -144.67 528.47 3.17
1-1 12,380 82.46 242.85 20 11,997 -73.7 -149.99 548.29 10.57
1-1 12,400 82.4 244.9 20 12,000 -76.36 -155.42 568.11 10.18
1-1 12,421 81.99 247.11 21 12,003 -78.94 -161.21 588.9 10.61
1-1 12,441 80.58 248.95 20 12,006 -81.19 -166.8 608.62 11.48
1-1 12,461 81.86 251.37 20 12,009 -83.23 -172.46 628.28 13.56
1-1 12,481 84.16 249.79 20 12,011 -85.25 -178.17 648.01 13.91
1-1 12,501 85.28 246.26 20 12,013 -87.52 -183.8 667.88 18.45
DAILY SURVEY
1-1 12,520 83.99 242.22 19 12,015 -90.02 -188.99 686.8 22.21
1-1 12,540 83.46 238.88 20 12,017 -93 -194.27 706.63 16.82
1-1 12,571 82.68 233.92 31 12,021 -98.19 -202.08 737.1 16.07
1-1 12,601 85.07 230.6 30 12,024 -103.76 -209.26 766.32 13.59
1-1 12,631 87.75 233.48 30 12,026 -109.37 -216.46 795.66 13.11
1-1 12,660 88.12 235.67 29 12,027 -114.49 -223.66 824.33 7.65
1-1 12,690 85.99 237.85 30 12,028 -119.49 -231.29 854.12 10.13
1-1 12,721 86.3 240.99 31 12,030 -124.29 -239.41 885 10.16
1-1 12,750 85.71 243.87 29 12,032 -128.37 -247.22 913.92 10.11
1-1 12,781 84.38 244.64 31 12,035 -132.46 -255.7 944.79 4.96
1-1 12,810 83.18 239.14 29 12,038 -136.6 -263.45 973.61 19.27

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
PCF N/A N/A API N/A Volts 0 N/A N/A
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 N/A HTHP N/A N/A 0 N/A / WATER N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A N/A N/A / N/A N/A N/A
26
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
PCF N/A N/A API N/A Volts 0 N/A N/A
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 N/A HTHP N/A N/A 0 N/A / WATER N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A N/A N/A / N/A N/A N/A
26

MUD CAUST DUOVIS-NS CAOH2 RADIAGREEN


TREATMENT 5 ( 50LBP ) 2 ( 50LB ) 1 ( 50LB ) 5 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
14RR 14,584 15,204 DP Av DC Av Bit HHP 1 896 M233 3.625 HTC
Pressure GPM Jet Vel N/A N/A 0 I-Row O-Row DC Location Bearings
BIT DATA 3,960 94 N/A N/A N/A N/A N/A N/A
Serial Number Type Jets TFA
7918486 DD205XYV1 POOH Reason N/A
Gauge Other

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1999 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:20 06/03/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 68 N/A 64 52 N/A Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 3.625 1 0.76 7918486
2 Turbine TBT 2.875 1 2.875 1 20.9 2 3/8 PAC 2 3/8 REG 21.4 TTK033
3 Float Sub BHI 3 1 3 1 1.5 2 3/8 PAC 2 3/8 PAC 21.4 14621482
DRILL STRING 4 Hydaulic Power Controller BHI 3 1 3 1 12.6 CDP 2 3/8 PAC 21.4 15095988
5 Measurement While Drilling (MWD) BHI 3.125 1 3.125 12.94 CDP CDP 15.59 16059892
6 Gamma Sub BHI 3 1 3 1 9.12 2 3/8 CDP 2 3/8 CDP 21.4 14971890
7 Drilling Performance Sub BHI 3 1 3 1 5.02 CDP CDP 21.4 15866879
8 Electronic Disconnect & Circulating Sub BHI 3 1 3 1 8.27 CDP CDP 21 15497999
9 Power & Communication Sub BHI 3 1 3 1 6.5 CDP CDP 21.4 15627088
10 Lower Quick Connect BHI 3 1 3 1 1.72 CDP CDP 21 10345864
11 Upper Quick Connect & Flow Sub BHI 3 1 3 1 3.2 CDP 2 3/8 PAC 21.4 16045187
12 Coil Tubing Connector BHO 3.125 1 3 1 0.98 2 3/8 PAC 2 3/8 PAC 21 16021181
13 Coil Tubing BHO 2.375 1 2.375 2.05 1 2 3/8 PAC 2 3/8 PAC 1 40746-1

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/09/2024 06/09/2024 N/A N/A N/A 468 PRE-TOUR SAFETY
MEETINGS

Company OTH BHI RIG RUE BHO BHO RIG ARM BCT BHO OTH ARM

Category CTRG DPDS RIG H2S IOS MED OTHR OTHR PCS UBD VAC WSC
PERSONNEL
20 4 12 8 15 2 2 2 7 17 7 1
Total
AND SERVICES No. of Persons
97
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24 24 24 10 24

Standby/Tankers
TRUCKS/BOATS
AB-5554

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 442 531 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
~ NO SUPPORT FOR ONGOING COMPUTER SYSTEM ISSUES. ONGOING FOR MONTHS.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1551 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 03/29/2023 - 07/19/2024
Report ID: OPERLMTDMRREP

BOR-2 @ SFNY-1551 Limited Morning Report for 06/18/2024


Objective : (DUAL ALMUZAINI, ASEM ABDULAZIZ / CORRALES HERNANDEZ, CHRISTIAN
Foreman(s)
LATERAL OIL PRODUCER ARTURO
D&WO Morning Report (Service Providers View) Charge #: IN SFNY) Engineer ALGHAMDI, OMAR MISHAL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23013-1551) Manager RAJHI, MOHAMMAD ALI
BOR-2
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14131 673-9920 673-9919 ( HSE/DE)
Date: Tuesday 06/18/2024 SFNY-1551 (1) SFNY_1551_1 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T CONTRACTOR
013-510-56 11 (OIM) 673-9917 ( RADIO ROOM ) /CLERK VSA T
673-9921 ( CLERK)

Last 24 hr operations Next 24 hr plan


POH & LD HALL RT, POH WITH INNER STRING, PU & RIH WITH 9-5/8" HALL RBP, SET & PT RBP, RUN LC CLEAN TOOL, CLEAN LC PROFILE, ,DISPALCE TO OBM, OBTAIN MWD ORINTATION, POH.
DUMP SAND, POH WITH RBP RT, TEST BOP'S.
Location Next Location
SFNY-1550/1559 PF SFNY-1551
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,890 Last Csg Size MD TVD Size Top
9 5/8 7887 5476 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
10890 (Date) 100 0 254
57.6 (06/12/2024@1900 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 1000 5 1 EOW C COMP TO TBG RIG 10890 10890 2900 0
POH & LD WITH 2-7/8" WASH PIPE
1000 - 1030 0.5 1 EOW C COMP HT PEL RIG 10890 10890
CLEAN & CLEAR RIG FLOOR.

1030 - 1130 1 1 EOW C COMP HT PEL RIG 10890 10890 RD FRANK HANDLING EQUIPMENT. CHANGE OUT HANDLING EQUIPMENT TO 5-
1/2".
1130 - 1200 0.5 1 EOW N SUSP HT BHA RIG 10890 10890
HPJSM. P/U AND M/U HALLIBURTON 9-5/8" RBP.

1200 - 1600 4 1 EOW N SUSP TI STDP RIG 10890 10890 15 5825 RIH WITH HALLIBURTON 9-5/8" RBP ON 5-1/2" DP ON CONTROL SPEED 2MIN/STD
AS PER HALL ENGINEER.
1600 - 1630 0.5 1 EOW N SUSP CIRC MPMP RIG 10890 10890
CIRCULATE HOLE CLEAN AT RBP SETTING DEPTH.
1630 - 1700 0.5 1 EOW N SUSP SET BP HCB 10890 10890 5825 5825
SET HALLIBURTON 9-5/8" RBP AT 5,825 FT AS PER HALLIBURTON PROCUDURE.
1700 - 1730 0.5 1 EOW N SUSP PTST BP RIG 10890 10890
HPJSM; PT RBP TO 1,000 PSI, OK. BLEED OFF PRESSURE.
1730 - 1815 0.75 1 EOW N SUSP CIRC MPMP RIG 10890 10890
CIRCULATE BTM'S UP.

POH ONE STAND & DUMP 50 FT OF SAND ON TO OF RBP WHILE RECIPROCATE


1815 - 2115 3 1 EOW N SUSP OTH NA RIG 10890 10890
PIPE.
GO BACK TO BOTTOM AND TAG @ 5749 FT WITH 10K - 2 TIMES
2115 - 0200 4.75 1 EOW N SUSP TO STDP RIG 10890 10890 5733 15
POH 9-5/8" RBP RUNNING TOOL ON 5.5" DP TO SURFACE.
0200 - 0230 0.5 1 EOW N SUSP HT BHA RIG 10890 10890 15 0
LD HALLIBURTON RBP RUNNING TOOL.

0230 - 0430 2 1 EOW N BOP OTH BOP RIG 10890 10890 RUN FMC TEST PLUG ASSY & SET IN WELLHEAD.
FILL UP BOP STACK AND FLUSH SURFACE LINES WITH SEA WATER
0430 - 0459 0.5 1 EOW N BOP BOPT BOP RIG 10890 10890
PT 13-5/8" BOP TO 300/2,500 PSI AS PER ARAMCO WCM....INC@RPT.
Foreman Remarks

SFNY-1551: DUAL LATERAL OIL PRODUCER TARGETING SFNY RES, DRILL PILOT HOLE TO 7,466'/5,708' MD/TVD TO ASSESS SAND CONTINUITY AND OWC IN SFNY WESTERN FLANK. SFNY-1551
WILL BE COMPLETED AS L-4 DUAL LATERAL PRODUCER IN SFNY.
=========================================================
- ALL DEPTHS IN MR FOR SFNY-1551/1553 ARE IN ODF.
- RKB DIFFERENCE FORM ADM-337 IS 27 FT, WILL USE ADM-337 ODF.
========================CURRENT LOCATION====================
LOCATION: SFNY-1550/1559 PF
LATITUDE: 28 DEG 15.63' N
LONGITUDE: 048 DEG 47.67' E
HEADING = 331 DEG
WATER DEPTH = 57 FT
RKB TO MUD LINE= 159 FT
AIR GAP = 36 FT
FINAL LEG PENETRATION: 7.80 FT BOW LEG - 8.30 FT PORT LEG - 8.40 FT STARBOARD LEG.
========================SFNY-1550/1559 PF WELL STATUS===============================================
BATCH DRILL:
SFNY-1554: SFNY COMPLETED READY FOR FB. SUSPENDED WITH 4-1/2" RBP.
SFNY-1551: COMPLETED 12 1/4"" SECTION. COMPLETING L-1. (ONGOING).
SFNY-1553: COMPLETED 12 1/4"" SECTION, SUSPENDED WITH 4-1/2"" KILL STRING, RUN TBG HGR, BONNET & 2 X 4-1/16"" GV (DISPLACE WELL TO 85 PCF INHIBTED BRINE)
==================== CASING POINTS & WELL DESIGN =================================================
- HOLE SECTIONS: BASED ON L1 PLAN 10.2 DATED 6-JUN-2024

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1551 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 03/29/2023 - 07/19/2024
Report ID: OPERLMTDMRREP

32"" PRESET CONDUCTOR AT 246 FT TVD/MD,


22"" PLANNED DEPTH AT 1,261 FT MD/ 1,251 FT TVD., ACTUAL DEPTH AT 1,259 FT MD/ 1,251 FT TVD., DONE BY RIG ADM-337.
16"" PLANNED DEPTH AT 5,368 FT MD/ 4,529 FT TVD., ACTUAL DEPTH AT 5,368 FT MD/ 4,529 FT TVD., DONE BY RIG ADM-337.
12-1/4"" PLANNED DEPTH AT 7,833 FT MD/ 5,395 FT TVD., ACTUAL DEPTH AT 7,890 FT MD/ 5,475 FT TVD., DONE BY RIG SL-7.
8-1/2"" PLANNED DEPTH AT 10,890 FT MD/ 5,502 FT TVD. TVD, ACTUAL DEPTH AT 10,890 FT MD/ 5,519 FT TVD.
============================== DRILLS & HSE =====================================================
- DRILLS: H2S, FIRE & ABANDONMENT ON 23-MAY-2024.
- ALERTS DISCUSSED WITH CREW:
======================== PERSONNEL ===========================================================
- MATERIAL EXP. AMJAD ALANAZI # 8658039 ON BOARD SINCE 29-MAY-2024.
- ARAMCO PDP ABDULAZIZ ALQARNI # 834165 ON BOARD SINCE 5- JUNE -2024.
- DOE&CD: RUSTAM ABDULLAYEV (ID# 8631872) ON BOARD SINCE 16, JUN 2024 FOR RHSEI & WCE INSPECTION.
- DOE&CD: BEHRAM PATEL (ID# 8865481) ON BOARD SINCE 16, JUN 2024 FOR WCE - 6TH EDITION INSPECTION.
========================= TOOLS ==============================================================
- NAPESCO 6.5" DRLG JAR, SN:HMJ-650-047, ON BOARD SINCE 06-06-2024.
- WFD 6-3/4" PBL SUB SN: HYD675SBP02 ON BOARD SINCE 05-24-2024.
======================= LC-50 SAMPLES ==========================================================
- OBM LC-50 SAMPLE SENT ON WALGAMOTTE TIDE ON 06/05/2024, MANIFEST# 2400688874.

DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/07/2024 N/A SW 15 2 FT CLEAR 594 N/A
KNOTS

Company HCB FMC OTH SDM RIG SMI HML ARM SCM MI2 ARM

Category BRCR CSR CTRG DPDS RIG DFMS MULS OTHR PCS SCS WSC
PERSONNEL
1 0 13 2 52 2 2 3 2 1 2
Total
AND SERVICES No. of Persons
80
INFORMATION
Personnel on Loc. Hrs. 24 0 24 24 24 24 24 24 24 24 24

Operating Hours. 12 0 0 0 12 12 0 12 0 0 24

Standby/Tankers
TRUCKS/BOATS
ZAMIL-504

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
5645 1922 1962 2733 799 1994

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1348 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/06/2024 - 11/11/2024
Report ID: OPERLMTDMRREP

BOR-3 @ ZULF-1348 Limited Morning Report for 06/18/2024


Objective : (OIL Foreman(s)AHMARI, NAYEF MOHAMMED / ABDELHADY, HAMZA AHMED
D&WO Morning Report (Service Providers View) Charge #: PRODUCER IN SFNY Engineer ALAZEB, MOHANAD SAEED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23062-1348) RESERVOIR) Manager RAJHI, MOHAMMAD ALI
BOR-3
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 4195 013-678984 1 RADIO ROOM : 013-6785 521
Date: Tuesday 06/18/2024 ZULF-1348 (0) ZULF_1348_0 CONTRACTOR /CLERK VSA T
013-678128 5

Last 24 hr operations Next 24 hr plan


RIH WITH 12 1/4" CLEAN OUT BHA, CLEAN OUT CMT PLUG,CHC, SPOT LCM, POOH, RIH SCRAPPER, SCRAPE CSG, POOH, P/U & RIH EZSV, SQUEEZE CMT PLUG
Location Next Location
ZULF-1340/1349 PF ZULF-1343
Current Depth (ft) Liner TOL MD TVD Formation Tops
5,025 Last Csg Size MD TVD Size Top
13 3/8 4982 4826 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
5025 (Date) 80 0 249
25.4 (06/10/2024@0900 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0515 0.25 0 12 1/4 N DRLG TO STDP RIG 5025 5025 750 0
POOH WITH 5 1/2" OEDP STRING.
0515 - 0545 0.5 0 12 1/4 N DRLG OTH NA RIG 5025 5025
CLEAN AND CLEAR RIG FLOOR.
0545 - 0645 1 0 12 1/4 N DRLG HT BHA RIG 5025 5025
HPJSM, P/U 12-1/4" CLEAN OUT ASSY WITH NEW EQH16R SECURITY BIT#839243
0645 - 0745 1 0 12 1/4 N DRLG TI STDP RIG 5025 5025 484 2670
RIH WITH 12-1/4" CLEAN OUT ASSY.
0745 - 0815 0.5 0 12 1/4 N DRLG RR TDS RIG 5025 5025
SERVICVE TDS AND RELATED EQUIPMENT
0815 - 0930 1.25 0 12 1/4 N DRLG TI STDP RIG 5025 5025 2670 4625
RIH WITH 12-1/4" CLEAN OUT ASSY. TAG SOFT CMT AT 4625.

0930 - 1230 3 0 12 1/4 N DRLG CIRC MPMP RIG 5025 5025 CIRCULATED HOLE CLEAN AND CONDITIONED MWT TO 95 PCF IN/OUT. OBSERVED
CONTAMINATED SPACER/CMT AT SHAKERS.

1230 - 1500 2.5 0 12 1/4 N DRLG RW BIT RIG 5025 5025 4625 4865 WASHED AND REAM DOWN THROGH SOFT CMT WITH CONTROLLED PARAMETERS,
TAGGED HARD CMT AT 4865 FT.

DRILLED OUT FIRM CMT WITH 7-10 KIPS WOB, 60 RPM AND 500 GPM. CLEANED
1500 - 1915 4.25 0 12 1/4 N DRLG DC TDS RIG 5025 5025 4865 5025 OUT RAT HOLE TO BOTTOM AT 5025FT.
NOTE: NO SIGN OF CMT IN THE LAST 25 FT OF OPEN HOLE (FROM 5000' TO
5025').

1915 - 2100 1.75 0 12 1/4 N DRLG CIRC MPMP RIG 5025 5025 CIRCULATED HOLE CLEAN, CHECKED FOR DYNAMIC LOSSES: 500 GPM - 16 BPH,
600 GPM - 18 BPH, 800 GPM - 23 BPH.
2100 - 2200 1 0 12 1/4 N DRLG OTH NA RIG 5025 5025
PERFORMED EXTENDED FLOW CHECK ON TT: +/- 20 BPH STATIC LOSS
2200 - 2345 1.75 0 12 1/4 N DRLG CIRC MPMP RIG 5025 5025
PUMPED & SPOTTED 200 BBLS OF 230 PPB LCM PILL WITH 250 GPM.
2345 - 0100 1.25 0 12 1/4 N DRLG ST STDP RIG 5025 5025 5025 3330
POOH WITH 12-1/4" CLEAN OUT ASSY ABOVE LCM PILL#4

0100 - 0300 2 0 12 1/4 N DRLG OTH NA ARM 5025 5025 MONITORED WELL ON TT: WELL STATIC, CONNECTED TDS AND CIRCULATED HOLE
CLEAN TO FLUSH STRING WITH 800 GPM AND FULL RETURNS.
0300 - 0459 2 0 12 1/4 N DRLG ST STDP RIG 5025 5025 3330 597
POOH WITH 12-1/4" CLEAN OUT ASSY.
Foreman Remarks

ZULF-1348 IS AN OIL PRODUCTION WELL THAT WILL BE DRILLED FROM PF ZULF-1340/1349 LOCATED IN THE EASTERN FLANK OF ZULUF FIELD. THE WELL WILL BE DRILLED AS A HORIZONTAL
SINGLE LATERAL TARGETING SAFANIYA RESERVOIR AS PART OF ZULUF ARAB HEAVY INCREMENT PLAN. TO BE COMPLETED WITH 4-/12" PRODUCTION TUBING WITH TRSSSV, ESP, Y-TOOL, MFIV,
DOWNHOLE PACKERS, SAND SCREENS (350 MICRONS), ICDS AND MECHANICAL PACKERS.
============================================================================================================
LATEST UPDATED PLATFORM PLAN RECIEVED 3/05/2024:
ZULF-1346: 22"(DONE) + 16" (DONE) + 8.5" PH (DONE) + SUSPEND (DONE)
ZULF-1349: 22" (DONE) + 16" (DONE) + 8.5" PH (DONE)+ SUSPEND (DONE)
BATCH DRILL 22" : ZULF 1344 (DONE), 1348 (DONE), 1343 (DONE), 1347(DONE), 1341 (DONE), 1342 (DONE)
BATCH DRILL 16" : ZULF 1344 (DONE), 1342 (DONE), 1341 (DONE), 1343 (DONE), 1347 (DONE), 1348 (DONE).
BATCH DRILL 12-1/4" : ZULF 1341 (DONE), 1342 (DONE), 1344(DONE), 1348 (CURRENT WELL), 1343, 1347,1346, 1349.
BATCH DRILL 8-1/2" AND COMPLETION : ZULF 1349, 1341, 1342, 1344, 1348, 1343, 1347, 1346.
BATCH FLOWBACK : ZULF 1346, 1349, 1341, 1342, 1344, 1348, 1343, 1347, 1346.
===========================================================================================================
CASING POINTS:
L-0 :
32" CONDUCTOR SET +/- 55' BELOW SEABED +/- 272' FROM RKB SET @ 320'.
18-5/8" PLANNED CASING POINT 2122' (50' TVD INSIDE RUS) SET @ 2121'.
13-3/8" PLANNED CASING POINT 5021' (50' TVD ABOVE LHHR) . SET @ 4982'.
9-5/8" PLANNED CASING POINT 6752' (TE SFNY RESRVIOUR) . SET @ XXXX'.
8-1/2'' PLANNED TD POINT 10,035' TARGETING SFNY RESERVOIR.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1348 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/06/2024 - 11/11/2024
Report ID: OPERLMTDMRREP

============================================================================================================
* RIG LOC- ZULF-1340/1349 PF
* RIG HEADING 329
* AIR GAP = 39 FT
* WATER DEPTH = 150 FT
* RKB TO MSL = 112.5 FT
* RKB TO ML = 262.4
* RKB TO PLATFORM DECK = 76 FT
* LEG PENETRATION: BOW LEG : 8.8 FT, STBD LEG : 6.5 FT, PORT LEG : 5.9 FT
===========================SAFETY & DRILLS========================================
** HSE ALERTS REVIEWED WITH CREWS: 69-24, 70-24, 71-24 AND 72-24
** HELD SECONDARY DRILL ON DEC,24 2023.
** HELD H2S DRILL ON ON JUN,7 2024
** HELD FIRE DRILL ON ON MAY,27 2024
** HELD ABANDON DRILL ON JUN,7 2024
** MAN DOWN DRILL ON APR,18 2024.
** HELD H2S RESCUE DRILL ON MAY.27 2024
** HELD RESCUE AT HEIGHTS DRILL ON MAY.14 2024
** HELD CONFINED SPACE DRILL ON APR.22 2024
===========================================================================================================
ARAMCO CREW ONBOARD:
- MATERIAL EXPEDITOR AQDI ABDULAZIZI ONBOARD BADGE #8519334 SINCE 4/6/2024.
- HSE FADHEL AL-HOMOOD BADGE NUMBER # 827231 ONBOARD SINCE 7/6/2024.
- ARAMCO HSE ADVISOR MAQSOOD U. SAJJAD ID # 8894607 LEFT LOCATION 6/17/2024.
====================RENTAL EQUIPMENT ON BOARD=====================================
- NAPESCO 6.5" HMJ SR#HMJ-650-0028 ONBOARD SINCE 29-MAY-2024
- NAPESCO 6.5" HMJ SR#HMJ-650-0030 ONBOARD SINCE 16-JUN-2024
===========================================
- LC-50 WBM SAMPLE SENT ON NOV 3RD 2023, UNDER MN#2400649436
- LC-50 OBM SAMPLE SENT ON NOV 3RD 2023, UNDER MN#2400649436
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
95 PCF 1 0 API 58 433 Volts 4.4 0 251,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2.8 HTHP 19 24 0 12 / 16 INOVRT 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 29 23 11 / 12 0 0 2.8
67

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
95 PCF 1 0 API 58 423 Volts 4.4 0 251,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 2.8 HTHP 19 23 0 12 / 16 INOVRT 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 30 23 11 / 12 0 0 2.8
67

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
95 PCF 1 0 API 58 419 Volts 4.4 0 251,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2.8 HTHP 19 24 0 12 / 16 INOVRT 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 29 23 11 / 12 0 0 2.8
68

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
8 5,025 5,025 DP Av DC Av Bit HHP N/A N/A 447 12.25 SEC
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
839243 EQH16R POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
DRILL STRING 1 Bit SEC 12.25 1 1.07 6-5/8" reg 839243
2 Near Bit Roller Reamer RIG 12.25 1 12.25 2.75 6.55 6 5/8 REG 6 5/8 REG 176 3 POINT 7797
3 Drillcollar RIG 8.5 2 8.5 2.813 61.95 6 5/8 REG 6 5/8 REG 170 SPRL
4 Roller Reamer RIG 12.25 1 8.5 3 6.14 6 5/8 REG 6 5/8 REG 170 3 POINT 7800
5 Drillcollar RIG 8.5 4 8.5 2.813 123.01 6 5/8 REG 6 5/8 REG 170 SPRL
6 Crossover RIG 8.5 1 8.5 2.813 3.6 XT39 6 5/8 REG 170 0

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1348 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/06/2024 - 11/11/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
7 Heavy Weight Drillpipe (HWDP) RIG 5.5 4 5.5 3.25 122.8 XT54 XT54 52.51 CONV
8 Hydro-Mechanical Jar NPC 6.5 1 6.5 37.92 55 HMDA6500028
9 Heavy Weight Drillpipe (HWDP) RIG 5.5 4 5.5 3.25 122.51 XT54 XT54 53 CONV
10 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/10/2024 N/A 8 - 10 KTS 2 -3 FT ESE 277 PRE-TOUR

Company HCB BCR RIG FET SPS RIG BAR OES NPC ARM HCM MI2 ARM CRW

Category BRCR CSR CTRG DV DPDS RIG DFMS DFMS JST OTHR PCS SCS WSC WBCS
PERSONNEL
1 3 13 1 3 53 1 1 0 2 2 1 2 1
Total
AND SERVICES No. of Persons
84
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 0 24 24 24 24 24

Operating Hours. 0 0 0 0 0 24 12 12 22 12 24 0 24 0

Standby/Tankers Others Others


TRUCKS/BOATS
JUZOR Zamil 506 RAWABI 53

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2189 2141 1196 8061 N/A 5166

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNIF-765 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/20/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

CBS @ MNIF-765 Limited Morning Report for 06/18/2024


Objective : (SINGLE Foreman(s)YOUSSEF, FOUAD SAYED
D&WO Morning Report (Service Providers View) Charge #: LATERAL WELL Engineer FARSHI, AHMAD ABDULLAH / ALSHALAWI, HAMAD ABDULAZIZ
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-19016-0765) TARGETING UPPER Manager DAHMOUSH, ABDULLATEEF AHMAD
CBS
RATAWI) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily OffShore
(0500-0500) Saudi Aramco Well Wellbores: +882167771 4134 013-673-23 37 RADIO/ 013 -673-2332
Date: Tuesday 06/18/2024 MNIF-765 (1) MNIF_765_1 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
013-673-23 34 013-673-23 35

Last 24 hr operations Next 24 hr plan


DRILL 6-1/8" HOLE (RECORD P.POINTS WHILE DRILLING). DRILL 6-1/8" HOLE (RECORD P.POINTS WHILE DRILLING).
Location Next Location
THE WELL IS LOCATED 0.002 KM N17W OF MNIF-762 AND 0.002 KM OF MNIF-764 ON MNIF-758/765 PF *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,490 Last Csg Size MD TVD Size 7,533 10,046 Top
9 5/8 7852 7257 Formations Comments
7 Depth
FT MD / 7495 FT TVD (68 FT
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) BUWB 8,167
DEEPER)
10048 (Date) 100 790 177 FT MD / 7883 FT TVD (59 FT
111.8 (02/27/2024@1000 ) YAMM 8,939
DEEPER)
FT MD / 7908 FT TVD (56 FT
URTR 9,019
DEEPER)

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Lt Type Lt ID Summary of Operations
OP Co Start End Start End

DRILL 6-1/8" HOLE WITH BKR RSS/MWD/LWD. F/11,700' T/


12,022' ( STOP DRILLING DUE TO LEAK IN TDS WASH PIPE).
** RECORDED STICKY TEST & P.POINTS @ 12,050' AND 12,200'.
0500 - 1145 6.75 1 6 1/8 N DRLG DMR HTMTR BHI 11700 12022
** WASH & REAM EVERY STAND.
** PUMP HI-WT PILL EVERY STAND.
** RECORD SURVEY EVERY CONNECTION.
1145 - 1200 0.25 1 6 1/8 N DRLG CIRC MPMP RIG 12022 12022 RR 934856
FLOW CHECK - WELL STATIC.

POOH BKR RSS/MWD/LWD DD BHA ON 5-1/2" & 4" DP TILL 7"


1200 - 1330 1.5 1 6 1/8 N DRLG TI STDP RIG 12022 12022 12022 10046 RR 934856
CSG SHOE.
** CHANGE HANDLING EQUIPMENT FROM 5-1/2" TO 4".

1330 - 1545 2.25 1 6 1/8 N DRLG RR TDS RIG 12022 12022 RR 934856 CHANGE WASH PIPE & TEST TO 4000 PSI/10 MINS, GOOD TEST.

1545 - 1715 1.5 1 6 1/8 N DRLG TI STDP RIG 12022 12022 10046 12022 RR 934856 RIH BKR RSS/MWD/LWD DD BHA ON 4" & 5-1/2" DP TO BTTM.
** CHANGE HANDLING EQUIPMENT FROM 4" TO 5-1/2".

RESUME DRILL 6-1/8" HOLE WITH BKR RSS/MWD/LWD.


F/12,022' T/ 12,490'.
** RECORDED STICKY TEST & P.POINTS @ 11,750' & 11,900'
AND 12,050'.
1715 - 0459 11.75 1 6 1/8 N DRLG DMR HTMTR BHI 12022 12490
** WASH & REAM EVERY STAND.
** PUMP HI-WT PILL EVERY STAND.
** RECORD SURVEY EVERY CONNECTION.

Lost Time Details


From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 1145 5.5 5.5 934856 RR FOT TDS RIG 12022 NOTICED WASH PIPE LEAKING WHILE
DRILLING
Foreman Remarks

======================================OPERATIONAL OBJECTIVE======================================
MNIF-765 WELL WILL BE DRILLED AS POWER WATER INJECTOR WELL TARGETING UPPER RATAWI AQUIFER.
============================================SAFETY============================================
** HELD DAILY SAFETY MEETINGS WITH RIG KEY PERSONNEL & SERIVES SUPERVISORS. DISCUSSED DROP OBJECT INCIDENT ON ADM-505
** WEEKLY SAFETY MEETINGS - 2 TIMES - STOP CARD TRENDS AND SAFETY ISSUES; IN # 6916562 - NEAR MISS-METAL PLATE SLIPPED FROM EMPLOYEES HAND WHILE PLACING IT IN POSITION. IN
- 6933049- NEAR MISS-PRESSURE WASHER WATER HOSE (1/2") BURST WHILE CLEANING THE SHAKER AREA. EMERGENCY DRILL REVIEW ; HSE ALERT 50-24 - FINGER INJURY DURING LAYING
DOWN DRILL PIPES; HSE ALERT 49-24 - PALLET LIFTER SLID OFF & INJURED CREW MEMBER; HSE ALERT 48-24 - ALARMING TREND OF MATERIAL RELEASED INCIDENTS; EXT ALERT 06-24 -
OFFSHORE RIG FLOOR FATALITY; QHSE ALERT- 04-2024-003 PROPERTY DAMAGE - 30" DIVERTER OVERBOARD HCR VALVE STEM CAME IN CONTACT WITH 18-5/8" WELL HEAD; INCIDENT
NOTIFICATION FROM ARAMCO - ADM 505 - MEDEVAC; CONTINUED COSL-HAND INJURY PREVENTION CAMPAIGN; HSE OBSERVATIONS AND HAZARD HUNT FINDINGS
- DRILL: 4 X TRIP DRILLS (05TH MAY, 08TH MAY, 09TH MAY, 10TH MAY)
- HELICOPTER CRASH DRILL: 04-02-2024
- FIRE DRILL: 06-17-2024
- H2S DRILL: 06-17-2024
- ABANDON SHIP DRILL: 06-17-2024
- CONFINED SPACE RESCUE DRILL: 04-05-2024
- MAN DOWN DRILL: 05-12-2024
- MAN OVERBOARD DRILL: 04-05-2024
- RESCUE AT HEIGHTS DRILL/VERTICAL RESCUE DRILL: 05-08-2024
- OIL/CHEMICAL SPILL DRILL: 04-22-2024
- COLLISION DRILL: 02-21-2024
- MEDICAL EMERGENCY DRILL/H2S SEARCH & RESCUE: 05-12-24/05-05-2024

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNIF-765 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/20/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

===========================================PERSONNEL==========================================.
** MATERIAL EXPEDITOR MESHARI ALHUZALI #8600401 ARRIVED ON BOARD 21-05-2024.
** HSE ADVISOR ASKHAT AKHMETOV # 8046610 ARRIVED ON BOARD 7-6-2024
==========================================WELL DETAILS==========================================
** WELL: MNIF-758/765
** RIG POSITION: HDG 345 DEG, LATITUDE: 27 DEG 36.80' N , LONGITUDE: 049 DEG 06.44' E
** WATER DEPTH: 46.44 FT
** AIR GAP: 47.23'
** RKB TO MSL: 110.8'
** LEG PENETRATIONS: BOW 6.2', PORT 5.6', STBD 5.4'
===========================================CSG DETAILS==========================================
MNIF-765
30" CASING SHOE 56 FEET BELOW MUDLINE-220 FEET MD RKB TO SHOE.
18 5/8" PLANNED DEPTH 1,152 FT & ACTUAL @ 1,150 FT MD
13 3/8" PLANNED DEPTH 4,943 FT & ACTUAL @ 4,739 FT MD
9 5/8" PLANNED DEPTH 8,332 FT & ACTUAL @ 8,325 FT MD
8 1/2" (L0) PLANNED DEPTH 9,727 FT & ACTUAL @ 9,727 FT MD (NOTE: PILOT HOLE).
7" LINER DEPTH 9,725 FT & TOL AT 8,007 FT.
6-1/8" (L0) PLANNED DEPTH 10,496 FT & ACTUAL @ 10,397 FT MD (NOTE: PILOT HOLE).
8 1/2" (L1) PLANNED DEPTH 9,808 FT & ACTUAL @ 10,048 FT MD.
7" LINER DEPTH10,046 FT & TOL AT 7,533 FT.
6-1/8" (L1) PLANNED DEPTH 17,307 FT
===========================================SKIP AND SHIP ========================================
** USING HALL. SKIP & SHIP TO TRANSFER CUTTING TO TANAJIB DISPOSAL SITE:
** DAILY USED SKIPS: 5.
** EMPTY SKIPS ON RIG: 47.
** FULL SKIPS ON RIG: 85.
** EMPTY SKIPS ON BOAT: 0.
** FULL SKIPS ON BOAT: 8.
** TOTAL SKIPS FOR WELL: 405.
** TONS SHIPPED FOR WELL: 1,98.5 TON.
=========================================PLATFORM STATUS========================================
PLATFORM MNIF- 758/765 WELL STATUS:
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
1 11,775 90.37 255.37 93 8,103 -540.03 -1756.59 6,029.28 0.22
1 11,870 90.31 255.24 95 8,102 -547.37 -1784.6 6,124.2 0.15
1 11,964 90.34 255.48 94 8,102 -554.61 -1812.32 6,218.11 0.26
DAILY SURVEY
1 12,057 90.31 255.18 93 8,101 -561.79 -1839.74 6,311.04 0.33
1 12,151 90.4 255.55 94 8,100 -569.03 -1867.46 6,404.96 0.41
1 12,245 90.25 255.43 94 8,100 -576.21 -1895.2 6,498.87 0.21
1 12,339 90.31 255.21 94 8,099 -583.47 -1922.91 6,592.8 0.24

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
75 PCF 1 0 API 65 689 Volts 2.56 0 240,383
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
123 1.6 HTHP 18 21 0 12 / 15 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 25 17 10 / 11 0 0 0
74

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
75 PCF 1 0 API 65 714 Volts 2.56 0 249,168
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 1.4 HTHP 18 20 0 11 / 14 RELIANT 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 25 17 9 / 10 0 0 2.6
73

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
75 PCF 1 0 API 65 721 Volts 2.56 N/A 244,788
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
124 1.2 HTHP 18 19 0 10 / 13 RELIANT 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 25 17 9 / 10 N/A N/A 1.8
72

ECOTROL-RD SUREMUL MRBL-F MRBL-M CACO3-50 CACO3-25 SUREWET


MUD 20 ( 55LB ) 2 ( 55GL ) 6 ( 2200L ) 1 ( 2200L ) 18 ( 55LB ) 18 ( 50LB ) 1 ( 55GL )
TREATMENT CAOH2
8 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
9 10,048 12,490 DP Av DC Av Bit HHP 15 130 M233 6.125 HTC
Pressure GPM Jet Vel 1,012.03 N/A 14 I-Row O-Row DC Location Bearings
BIT DATA
3,600 300 93 N/A N/A N/A N/A N/A
Serial Number Type Jets TFA
7916316 DD406V1 3 x 15 / 3 x 15 / 1.035

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNIF-765 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/20/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

Gauge Other POOH Reason


N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 18.5 119 215 175 195 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 1 0.62 7916316
2 RSS BHI 4.75 1 4.75 8.75 0.5 15752137
3 Near Bit Roller Reamer BHI 5.75 1 4.75 1.25 5.14 NC38 3 1/2 REG 0.6 3 POINT 14197573
4 Logging While Drilling (LWD) BHI 4.75 1 4.75 27.09 53.21 15788651
5 Measurement While Drilling (MWD) BHI 4.75 1 4.75 14.1 64.14 13834784
6 Measurement While Drilling (MWD) BHI 4.75 1 4.75 10.84 62.2 12754591
7 BCPM. Bi-directional Communication and BHI 5 1 5 1.25 9.14 4 3/4 T2 4 3/4 T2 0.47 15082904
Power Module
8 Measurement While Drilling (MWD) BHI 4.75 1 4.75 8.9 60.98 14352679
DRILL STRING 9 Measurement While Drilling (MWD) BHI 4.75 1 4.75 9.02 64.14 15187977
10 Measurement While Drilling (MWD) BHI 4.75 1 4.75 11.17 62.2 15187977
11 Measurement While Drilling (MWD) BHI 4.75 1 4.75 6.06 51.52 14990080
12 Measurement While Drilling (MWD) BHI 4.75 1 4.75 2.45 64.14 15216131
13 Sub TK2 4.75 1 4.75 2.25 4.92 NC38 XT39 8 12304755
14 FIlter Sub BHI 4.75 1 4.75 2.125 30.97 NC38 NC38 8 15543637
15 Circ. Valve BC 4.75 1 4.75 1.25 5.82 NC38 NC38 4 14917426
16 Sub RIG 5 1 4.75 2.25 2.04 NC38 NC38 6 CORETTRAX
17 Crossover BHO 4.75 1 4.75 1.5 3.54 NC38 NC31 0.7 ITS336671
18 Heavy Weight Drillpipe (HWDP) RIG 4 2 4 3.34 93.08 XT39 XT39 14 CONV
19 Hydro-Mechanical Jar OJR 8 1 4.75 31.35 4.6 475-0019
20 Heavy Weight Drillpipe (HWDP) RIG 4 3 6.625 5 62.08 6-5/8FH 6-5/8FH 58.1 CONV
21 Drillpipe RIG 4 81 6.625 5.901 5,764.5 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM
22 Crossover RIG 6.063 1 14 4 3.6 7 5/8 REG 7 5/8 REG 0 RIG
23 Drillpipe RIG 5.5 1 6.625 5.901 30 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/14/2024 N/A 8-10 KNT SW 1 FT SEASONAL 585 TOURLY

Company INW SPR RIG WWD BHI RIG BDF SMI WLH ARM BCM HSS MI2 ARM EX2 CRW

Category BRCR CSR CTRG WPSTK DPDS RIG DFMS DFMS LHES OTHR PCS SKSHS SCS WSC WTSE WBCS
PERSONNEL
0 2 14 0 3 60 1 1 0 2 2 3 1 1 0 1
Total
AND SERVICES No. of Persons
91
INFORMATION
Personnel on Loc. Hrs. 0 24 24 0 24 24 24 24 0 24 24 24 24 24 0 24

Operating Hours. 0 0 0 0 24 24 12 12 0 12 24 12 8 24 0 24

Standby/Tankers Others
TRUCKS/BOATS
zamill-11 rawabi-1

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2113 1615 1522 1597 692 1526

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1302 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/07/2024 - 04/11/2025
Report ID: OPERLMTDMRREP

CCF @ ZULF-1302 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL AHMED, MOHAMED ABDELRAHIM MOHAMED / ELSAYED, HANY
Foreman(s)
OIL PRODUCER WELL INTO MOAHMED / BENNETT, PETER JOHN PRICE
D&WO Morning Report (Service Providers View) Rig Charge #: SAFANIYA RES) Engineer ADEKUNLE, KADRI LUKMAN / ALSHEHRI, BASIM HASSAN
Copyright 2024 Saudi Aramco. All Rights Reserved CCF (66-24062-1302) Manager DAHMOUSH, ABDULLATEEF AHMAD
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores:
8821677714 207 673-9130 673-7018
Date: Tuesday 06/18/2024 ZULF-1302 (0) ZULF_1302_0
CONTRACTOR /CLERK VSA T
673-2507

Last 24 hr operations Next 24 hr plan


DRILL 16" W/ SLB MM/MWD/GR BHA TO 13 3/8'' CSG POINT, CHC & POH. POH, L/D SLB BHA ASSY. RIH WITH REAMING BHA, CHC, SPOT CSG GO PILL, POH & RIH 13-3/8"
CSG.
Location Next Location
PF ZULF 1300/1309, 0.002 KM OF ZULF-1300 ZULF-1304
Current Depth (ft) Liner TOL MD TVD Formation Tops
4,910 Last Csg Size MD TVD Size Top
18 5/8 1899 1885 Formations Comments
Depth
PNGU 974
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 1,850
4800 (Date) 100 110 252 2072 FT TVD. MD DIFF 66
9.9 (06/14/2024@2330 ) UMER 2,208 FT. TVD DIFF -50 FT. FROM
PLAN
3770 FT TVD. MD DIFF 14
ARUM 3,931 FT. TVD DIFF 10 FT. FROM
PLAN
4559 FT TVD. MD DIFF 38
LAMS 4,843 FT. TVD DIFF 26 FT. FROM
PLAN
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

COMPLETE DRILL 16" HOLE ROT./SLIDE WITH SLB MMTR/ MWD/GR ASSY. TO 13
3/8'' CSG POINT. ( NO LOSSES)
0500 - 0615 1.25 0 16 N DRLG DMR MMOT SDM 4800 4910
- WELL TRAJECTORY VS PLAN: 22 FT. C-C, 6.88 FT ABOVE & 17.45 FT RIGHT.
- DRILLING MODE: ROTARY 100%, SLIDING 0 %.
- PUMP HI-VIS SWEEP AS REQUIRED.
0615 - 1000 3.75 0 16 N DRLG CIRC MPMP RIG 4910 4910
PUMP HI-VIS SWEEPS & CHC TILL SHAKER CLEAN.
1000 - 1015 0.25 0 16 N DRLG WCNT NA RIG 4910 4910
PERFORMED FLOW CHECK, STATIC.

1015 - 1045 0.5 0 16 N DRLG TO STDP RIG 4910 4910 4910 4773 POH ON ELEVATOR WITH 16'' SLB MMTR/ MWD ASSY. ENCOUNTER TIGHT SPOT AT
4773'.
1045 - 1215 1.5 0 16 N DRLG CIRC MPMP RIG 4910 4910
RIH TO BTM. PUMP SWEEP AND CIRCULATE BTM UP TILL HOLE CLEAN.

HELD SAFETY STAND DOWN MEETING WITH CREW, DISCUSSING SWA, HAND
1215 - 1245 0.5 0 16 N DRLG PJSM NA RIG 4910 4910
INJURY, SAFE LIFTING OPS, LOF & PINCH POINT, IMPROVE SAFETY CULTURE
DISCUSSED HEAT INDEX SAFETY CONTROLS.

1245 - 0459 16.25 0 16 N DRLG BR STRG RIG 4910 4910 4773 4030 BACK REAMING OUT OF HOLE WITH 16'' SLB MMTR/ MWD/GR ASSY.
- PUMP SWEEP AND CIRCULATE HOLE CLEAN EVERY 5 STDS. ONGOING
Foreman Remarks

ZULF-1302, WILL BE DRILLED AS OIL-PRODUCER IN ZULF AS SINGLE LATERAL TARGETING SAFANIYA RESERVOIR. THE WELL IS LOCATED 0.001 KM S69W OF ZULF-1300 AND 0.002 KM N27W OF
ZULF-1304. & WILL BE BATCH DRILLED 16" HOLE ALONG WITH OTHER WELLS ON SAME PLATFORM.

=====================RIG POSITION & DATA=============================


** WELL: ZULF-1300/1309
** RIG POSITION: 28 27' 38" N LATITUDE, 49 18' 02" E LONGITUDE, RIG HEADING 330 DEG.
** SLOT 1304 POSITION, N 28DEG 27' 20.82682"B, E 49DEG 18' 2.75414"
** WATER DEPTH: 150 FT
** AIR GAP: 38
** RKB TO MSL:113 '
** RKB TO MUD LINE:263 '
** LEG PENETRATIONS: BOW 6.9', PORT 7.2', STBD 7.9'.

======================== HSE====================
** HELD FIRE DRILLS: 06/09/2024.
** HELD H2S DRILL: 06/14/2024
** ABANDONMENT DRILLS: 06/14/2024
** OIL/CHEMICAL SPILL DRILL: 04/28/2024
** CONDUCTED HAZARD HUNT ON RIG TO ENHANCE SAFETY AWARNESS 17TH JUNE 2024. SWA: 2 & LOF: 2
** DISCUSS ARAMCO & COSL HSE ALERTS IN PRE TOUR-MEETINGS & WEEKLY SAFETY MEETING.
** DISCUSS HAZARD INDENTIFICATION & AWARENESS.
** REPORTED NEAR MISS# 6941188 IN SLS.
** CONDUCT STAND DOWN MEETING FOR MAN DOWN DRILL ON 05/17/2024 & 05/18/2024.

==============================================
PLANNED CASING POINTS ZULF-1302:
32" CONDUCTOR PIPE AT 327 FT ODF.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1302 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/07/2024 - 04/11/2025
Report ID: OPERLMTDMRREP

PLANNED 18-5/8" CASING @ 1900 FT (50' TVD INTO RUS).


PLANNED 13-3/8" CASING @ 4932 FT (49' TVD ABOVE LHHR).
PLANNED 9-5/8" CASING @ 7337 FT.
PLANNED 7" CASING @ 10336FT.

==============PLATFORM ZULF-1300/1309==============
ZULF-1300 TIE-BACK, FINISHED
ZULF-1301 SUSPENDED AT 18-5/8" CSG.
ZULF-1303 SUSPENDED AT 18-5/8" CSG.
ZULF-1305 SUSPENDED AT 18-5/8" CSG.
ZULF-1307 SUSPENDED AT 18-5/8" CSG.
ZULF-1309 SUSPENDED AT 18-5/8" CSG.
ZULF-1308 SUSPENDED AT 18-5/8" CSG.
ZULF-1304 SUSPENDED AT 18-5/8" CSG.
ZULF-1302 CURRENT WELL.
=======================PERSONNEL ONBOARD: ============================
* MATERIAL EXPEDITOR NASSER ALKHALDI ID# 8581974 ONBOARD SINCE 06/11/2024.

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY 0 4,847 30.57 28.72 92 4,563 373.78 194.7 1,382.7 0.26
0 4,910 30.7 28 63 4,617 382.39 199.35 1,414.8 0.62

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
72 PCF 0 4.7 API 0 0 Volts 0.73 9.2 71,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 93 32 0 15 / 18 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 17 7 13 / 16 5 380 0
62
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
72 PCF 0 4.3 API 0 0 Volts 0.71 9.5 71,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 93 31 0 14 / 17 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 16 7 13 / 15 15 300 0
60

CAUST BCTRN POLY-SAL DFMR RAPIDSWEEP DUOVIS-NS FLO-TROL


MUD 8 ( 55GL ) 1 ( 5GL ) 12 ( 25KG ) 1 ( 55GL ) 2 ( LB ) 25 ( 25KG ) 12 ( 55LB )
TREATMENT GLYCOL-MEG IDCAP D PACLV SODASH ECCO-TEMP PACR MAX-GUARD
4 ( 55GL ) 12 ( 50LB ) 10 ( 50LB ) 10 ( 50KG ) 3 ( 55LB ) 18 ( 50LB ) 4 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
3RR 1,900 4,910 DP Av DC Av Bit HHP 40 80 M223 16 SMT
Pressure GPM Jet Vel N/A N/A 733 I-Row O-Row DC Location Bearings
2,950 1,200 350 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
SM3458 MSI716C 10 x 12 / 1.104
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 13 151 249 217 17 Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 16 1 16 1.35 SM3458
2 Mud Motor SDM 9.625 1 9.625 30.18 184 1389849
3 Float Sub SDM 9.625 1 9.625 3 3.68 7 5/8 REG 7 5/8 REG 220 FS96CS1051
4 Stabilizer SDM 16 1 16 3 6.49 7 5/8 REG 7 5/8 REG 243 XDX-1048
5 Pony Collar SDM 9.625 1 3.81 243 ND90-3
6 Measurement While Drilling (MWD) SDM 9.5 1 9.5 28.83 186 B1683
DRILL STRING 7 Non Magnetic Drill Collar ( NMDC ) SDM 9.625 1 9.625 2.813 24.18 7 5/8 REG 7 5/8 REG 243 SPRL 1560
8 Float Sub SDM 9.625 1 9.625 3 2.11 7 5/8 REG 7 5/8 REG 243 4605-1-8
9 FIlter Sub SDM 9.625 1 9.625 3 7.52 7 5/8 REG 7 5/8 REG 243 950-1066
10 Drillcollar RIG 9.5 3 9.5 2.813 92.93 7 5/8 REG 7 5/8 REG 216 SPRL X
11 Stabilizer SDM 16 1 9.5 3 7.54 7 5/8 REG 7 5/8 REG 222 SBD6756
12 Drillcollar RIG 9.5 4 9.5 3 122.15 7 5/8 REG 7 5/8 REG 216 SPRL
13 Mechanical Jar ARM 1 31.37 129 DJ10750038
14 Drillcollar RIG 9.5 2 9.5 3 61.93 7 5/8 REG 7 5/8 REG 216 SPRL X
15 Crossover RIG 9.5 1 9.5 3 3.63 7 5/8 REG 6 5/8 REG 206 1-459
16 Drillcollar RIG 8.5 3 8.5 2.813 93.56 6 5/8 REG 6 5/8 REG 158 SPRL X
17 Crossover RIG 8.25 1 8.25 2.813 3.6 XT54 6 5/8 REG 306 1-511
18 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 459.86 XT54 XT54 54 CONV
19 Drillpipe RIG 5.5 1 5.5 4.67 30.5 XT54 XT54 24.7 CYX105 PREMIUM X

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1302 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/07/2024 - 04/11/2025
Report ID: OPERLMTDMRREP

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A 8-10 1-2 N/A 200 4

Company SPR CSU FET SDM RIG OES RIG ARM BCM MI2 ARM CAM

Category CSR CTRG DV DPDS RIG DFMS MED OTHR PCS SCS WSC WHES
PERSONNEL
4 13 1 3 64 1 1 1 2 1 3 1
Total
AND SERVICES No. of Persons
95
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 24 24 12 12 12 24 24 24 0

Standby/Tankers
TRUCKS/BOATS
juzor

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1616 1788 822 5187 0 3230

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-480 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 05/05/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

CG-1 @ ZULF-480 Limited Morning Report for 06/18/2024


Objective : ( TIE BACK AND Foreman(s)ABD EL MAGIED, GAMAL FATHY
PERFORATIONS. COMPLETE Engineer AVILA FAULL, ENRIQUE JOSE / ALGHANIM, NAWAF ABDULRAHMAN
D&WO Morning Report (Service Providers View) Rig Charge #: FOR OBSERVATION ) Manager ALRUWAILI, MOHAMMED NAZAL
Copyright 2024 Saudi Aramco. All Rights Reserved CG-1 (72-21062-0480)
THURAYA RIG FORMAN VSAT OTHER VSAT
Daily OffShore
+882 16 77 71 2634 378-7492 RADIO: 866 -2783
(0500-0500) Saudi Aramco Well Wellbores:
ZULF-480 (0) ZULF_480_0 OTHER VSAT OTHER VSAT CONTRACTOR
Date: Tuesday 06/18/2024 /CLERK VSA T
OIM/866-27 84 RADIO 3787 491
378-7449

Last 24 hr operations Next 24 hr plan


RIH W/ CTU. FLOWBACK WELL WITH N2 FROM ZONE-1. RECORD PDHMS READING. PULL CTU. R/D R/U SLICK LINE. SET PXN PLUG. CLOSE SSD CROSSING ZONE-1. OPEN SSD CROSSING ZONE-2. RIH
INJECTOR HEAD. CTU. FLOWBACK WELL WITH N2 FROM ZONE-2
Location Next Location
ZULF-480/489 PLATFORM *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
6,800 Last Csg Size MD TVD Size Top
7 6792 6792 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
6800 (Date) 0 252
19.6 (06/15/2024@1900 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

PRE JOB SAFETY MEETING WITH AL PERSONAL INVOLVED IN COIL TBG, SLICK LINE
0500 - 0545 0.75 0 EOW E TEST PJSM NA RIG 6800 6800 & FLOW BACK OPERATION.
- DISCUSSED RED ZONE MANAGEMENT, CRITICAL LIFT OPERATIONS, REVIEW JSA,
RISK ASSESSMENT & LIFTING PLAN WITH N2.

0545 - 0745 2 0 EOW E TEST LIFT CTU SJT 6800 6800 RIH TO 800'. FLUSH COIL TUBING WITH N2 AT 300 SCF/MIN. RETURN AT SURFACE
100% N2.
0745 - 0845 1 0 EOW E TEST LIFT CTU SJT 6800 6800
RIH WITH TAQA CTU TO 3000'. PERFORM PULL TEST E/ 1000'.

START PUMP N2 AT 300 SCF/MIN. FLOW WELL ON 16 - 20/64" CHOKE THRU


0845 - 1000 1.25 0 EOW E TEST LIFT CTU SJT 6800 6800
EXPRO WELL TEST EQUIP.
- RETURN AT SURFACE 100% N2.

RIH WITH TAQA CTU TO 4000' WHILE PUMPING N2 AT 300 SCF/MIN. FLOW WELL
1000 - 1115 1.25 0 EOW E TEST LIFT CTU SJT 6800 6800
ON 20/64" CHOKE.
- RETURN AT SURFACE 100% N2.

RIH WITH TAQA CTU TO 5000' WHILE PUMPING N2 AT 500 SCF/MIN. FLOW WELL
1115 - 1500 3.75 0 EOW E TEST LIFT CTU SJT 6800 6800
ON 20 - 24/64" CHOKE.
- RETURN AT SURFACE 100% N2.

RIH WITH TAQA CTU TO 6000' WHILE PUMPING N2 AT 500 SCF/MIN. FLOW WELL
1500 - 1830 3.5 0 EOW E TEST LIFT CTU SJT 6800 6800
ON 24/64" CHOKE.
- RETURN AT SURFACE 100% N2.
1830 - 2230 4 0 EOW E TEST LIFT CTU SJT 6800 6800
SHUT-IN WELL. OBSERVE AND RECORD PDHMS READING AS PER RMD.
2230 - 0215 3.75 0 EOW E TEST LIFT CTU SJT 6800 6800
POOH 1.5" TAQA CTU F/ 6000' TO SURFACE.

0215 - 0300 0.75 0 EOW E TEST OTH NA SJT 6800 6800 SHUT IN WELL. LINE UP PURGE N2 AND FLUSH RISER TO EXPRO STORAGE TANK,
BLEED OFF CTU PRESSURE TO 0 PSI.
0300 - 0330 0.5 0 EOW E TEST PJSM NA RIG 6800 6800
HPJSM TO RIG DOWN TAQA CT INJECTOR HEAD AND SECURE AT RIG FLOOR.

BREAK OUT BOLTS BELOW STUFFING BOX. LIFT INJECTOR HEAD. BREAK OUT AND
0330 - 0459 1.5 0 EOW E TEST RD CTU SJT 6800 6800
L/D BHA. INSTALLED FOUR LEGS BELOW INJECTOR HEAD AND SECURE SAME ON
RIG FLOOR....INC.
Workover Objectives
Foreman Remarks

- GOR: 450 SCF/BBL (KHAFJI STRINGER), H2S=0%.

====================DIESEL CONSUMPTION================================
- TRANSFER 0BBL DIESEL TO EXPRO WELL TESTING TANK ON DAILY BASICS FOR FLOWBACK AND FLARING OPERATION.
====================POB================================

- MAT. EXP. ARRIF MOHAMED RIHAN ID# 8631708 ONBOARD SINCE 9TH JAN 2024.
- ARAMCO HSE SAFETY ADVISOR JAMES D SIM ID#8606033 LEFT RIG 15/JUNE/2024 @ 14:30HRS.
- MOHAMED SHADY HSE ADVISOR, ID#8669235 ONBOARD SINCE 15TH JUNE 2024 TO SUPPORT FLOWBACK/FLARING OPERATIONS & COILED TBG OPS.

====================RIG DATA==========================
- RIG LOCATION- ZULF 480/489 PF.
- RIG HEADING 332.5 DEG
- AIR GAP = 44.3 FT
- WATER DEPTH = 101 FT

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-480 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 05/05/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

- LEG PENETRATION: BOW LEG: 8.04 FT, STBD LEG: 7.64 FT, PORT LEG: 8.96 FT.
=======================HSE===========================
- STOP CARD IN SLS: 27.
- DISCUSSED HSE ALERTS 69-24, 70-24, 71-24, 72-24 AT TOURLY MEETINGS

===================CURRENT PLATFORM:===================
- RIG SCHEDULE RECEIVED ON 13 DEC, 2023 FOR ZULF-480/489 PF.
- SCOPE OF WORK: INITIAL ESP INSTALLATIONS STARTING WITH ZULF-487, 481, 489, 484, 485, 482, 483, 488

- ZULF-487 FLOWBACK COMPLETED.


- ZULF-481 FLOWBACK COMPLETED.
- ZULF-489 FLOWBACK COMPLETED.
- ZULF-484 FLOWBACK COMPLETED.
- ZULF-485 FLOWBACK COMPLETED.
- ZULF-482 FLOWBACK COMPLETED.
- ZULF-483 FLOWBACK COMPLETED.
- ZULF-488 FLOWBACK COMPLETED.
- ZULF-480 COMPLETED AND AWAITING FLOWBACK - CURRENT WELL.

===================NEXT PLATFORM====================
- RIG WILL GO SHIPYARD IN RAS AL KHAIR.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A WEEKLY 10 WNW 2-3 PARTLY 2,021 N/A
CLOUDY

Company LIG SJT BC RIG OES ARM SLL HCO ARM EX2

Category CTRG COIL ICE RIG DFMS OTHR SLS SSSV WSC WTSE
PERSONNEL
13 8 1 56 1 2 3 1 1 7
Total
AND SERVICES No. of Persons
93
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 12 24 24 12 0 12 24 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
975 1447 1223 N/A N/A N/A

Instrumentation Other
REPAIR ASAP OK Reporter
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1314 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 10/12/2023 - 07/06/2024
Report ID: OPERLMTDMRREP

CH-1 @ ZULF-1314 Limited Morning Report for 06/18/2024


Objective : (SINGLE Foreman(s)CORREA, DAVID EDUARDO FERNANDEZ / HAMADA, RAMY AHMED
D&WO Morning Report (Service Providers View) Charge #: LATERAL PRODUCER Engineer AUBRY, PIERRE-ALAIN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23062-1314) TARGETTING SFNY.) Manager MAJDI, SULAIMAN AL HASSAN
CH-1
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 4202 3788180 RADIO ROOM # 01387180 60
Date: Tuesday 06/18/2024 ZULF-1314 (0) ZULF_1314_0 OTHER VSAT CONTRACTOR /CLERK VSA T
3788181 3788184

Last 24 hr operations Next 24 hr plan


P/T 13-5/8" 10K BOPE, P/U & RIH C/O BHA, DRILL OUT CMT & DV TOOL. C/O CMT ABOVE F/C, C/O SHOE TRACK, POOH C/O BHA. RIH 9-5/8" SAMAA WBCO BHA.
Location Next Location
ZULF-1310/1319 PF ZULF-1314
Current Depth (ft) Liner TOL MD TVD Formation Tops
8,216 Last Csg Size MD TVD Size Top
9 5/8 8216 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
8216 (Date) 100 0 252
31 (06/16/2024@0300 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0900 4 0 12 1/4 N BOP BOPT BOP RIG 8216 8216
P/T 13-5/8'' 10K BOP & RELATED EQUIPMENT AS PER ARAMCO STANDARD.
0900 - 0945 0.75 0 12 1/4 N BOP OTH BOP RIG 8216 8216
POOH & L/D TEST PLUG ASSEMBLY.
0945 - 1100 1.25 0 12 1/4 N WH OTH NA RIG 8216 8216
MAKE UP AND RIH WITH 9-5/8" CUP TESTER ASSEMBLY.
1100 - 1200 1 0 12 1/4 N BOP BOPT RAMS RIG 8216 8216
PRESSURE TEST WELLHEAD AND SOV AS PER ARAMCO STANDARD.
1200 - 1230 0.5 0 12 1/4 N BOP BOPT BOP RIG 8216 8216
PERFORMED ACCUMULTATOR FUNCTION/DRAWDOWN TEST.
1230 - 1400 1.5 0 12 1/4 N BOP BOPT BOP RIG 8216 8216
POH AND L/D CUP TESTER AND TEST ASSY.
1400 - 1500 1 0 12 1/4 N WH SET WBSH RIG 8216 8216
INSTALL 11" FMC WEAR BUSHING, POH AND L/D RT.
1500 - 1700 2 0 12 1/4 N DRLG HT BHA RIG 8216 8216
P/U & M/U 8-1/2" CLEAN-OUT BHA.
1700 - 1730 0.5 0 12 1/4 N DRLG LDP BHA RIG 8216 8216 286 780
RIH 8-1/2" C/O BHA ON 5-1/2" HWDP AND 6-1/2" JAR.
1730 - 1945 2.25 0 12 1/4 N DRLG TI STHDP RIG 8216 8216 780 4200
RIH 8-1/2" C/O BHA ON 5-1/2" DP STDS.
1945 - 2100 1.25 0 12 1/4 N DRLG RW BIT RIG 8216 8216 4200 4491
WASH DOWN W/ 8-1/2" CO ASSY, TAG TOC.
2100 - 2245 1.75 0 12 1/4 N DRLG DFS TDS RIG 8216 8216 4491 4496
CLEAN OUT CEMENT & DV TOOL.

2245 - 0000 1.25 0 12 1/4 N DRLG TI STDP RIG 8216 8216 4496 7333 RIH 8-1/2'' C/O BHA ON 5-1/2" DP STD. WASH DOWN LAST STD. TAG TOC.
- FILL STRG EVERY 20 STD.
0000 - 0459 5 0 12 1/4 N DRLG DC TDS RIG 8216 8216 7333 7880
CLEAN OUT SOFT TO MEDIUM CEMENT. PUMP HVP AS REQUIRED.
Foreman Remarks

ZULF-1314 IS AN OIL PRODUCER WELL THAT WILL BE DRILLED FROM PF ZULF-1310/1319 LOCATED IN THE NORTHERN FLANK OF ZULUF
FIELD. THE WELL WILL BE DRILLED AS A HORIZONTAL SINGLE LATERAL TARGETING SAFANIYA RESERVOIR . THE WELL WILL BE COMPLETED WITH
4.5" TBG WITH TRSSSV, ESP, DOWNHOLE SWELLABLE PKRS AND SCREENS WITH ICDS.
========================================================================================================
SAFETY AND DRILLS:
- FIRE, H2S, ABANDON DRILLS: 12-JUN-24
- REVIEWED ARAMCO SAFETY ALERTS:
=========================================================================================================
ARAMCO PERSONNEL ONBOARD:
-
=========================================================================================================
LC50 SAMPLE:
- OBM SAMPLE SENT ON "BRASHER TIDE", MN#2400689772, ON 06/06/2024.
============== ===========================================================================================
PLATFORM ZULF-1310/1319 PF SFNR PRODUCER:
- 8 X WELLS (5 X SL + 3 X DL) :
- ZULF-1310 WO / COMPLETED & SUSPENDED FOR FLOW BACK
- ZULF-1312 SL / COMPLETED & SUSPENDED FOR FLOW BACK
- ZULF-1311 SL / COMPLETED & SUSPENDED FOR FLOW BACK
- ZULF-1313 SL / COMPLETED & SUSPENDED FOR FLOW BACK
- ZULF-1318 SL / COMPLETED & SUSPENDED FOR FLOW BACK, (SLB RBP WITH JUNK CATCHER IN WELL).
- ZULF-1314 SL / CURRENT WELL.
- ZULF-1315 DL / SUSPENDED AT 9 5/8" CSG
- ZULF-1319 DL / SUSPENDED AT 9 5/8" CSG
- ZULF-1317 DL / SUSPENDED AT 9-5/8" CSG

** RECORDED GYRO WIRE LINE SURVEY FOR WELLS (ZULF-1318, ZULF-1315, ZULF-1311, SLOT-9, SLOT-12, ZULF-1316)
SWAPPED ZULF-1311 FROM (SLOT#1) TO SPARE SLOT 1 (SLOT#9) + SWAPPED ZULF-1315 FROM (SLOT#5) TO (SLOT#6).

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1314 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 10/12/2023 - 07/06/2024
Report ID: OPERLMTDMRREP

=====================================================================================================
DRILLING SEQUENCE:
1. ZULF-1310 (FISH, TIE-BACK/CMT, SUSPEND)
2. ZULF-1312 (22" + 16" + 8.5" PH +L-1 12 1/4''
4. BATCH DRILLING 7 REMAINING WELLS 22" HS - COMPLETED.
5. BATCH DRILLING 7 REMAINING WELLS 16" HS COMPLETED.
6. BATCH DRILLING 7 REMAINING WELLS 12.25" HS - COMPLETED.
7. PERFORATE & COMPLETE MLS WELL ZULF-1310 - COMPLETED.
8. DRILLING RESERVOIR SECTION & COMPLETING 8 WELLS - (4 COMPLETED).
====================================================================================================
RIG LOCATION DATA:
- RIG LOC- ZULF-1310/1319 PF
- HEADING: 331 DEG
- WATER DEPTH = 153 FT
- RKB TO MSL = 100.35 FT
- RKB TO MUD LINE= 253FT
- ADM-261 ODF= 94 FT + 153 FT = 247 FT.
- RKB TO MUDLINE BY CH-1 = 253.35FT.
- ODF CORRECTION FACTOR = - 6.35 FT
- AIR GAP = 33.03 FT
- RKB TO PLATFORM DECK = 61.35 FT

* LEG PENETRATION:
BOW: 9.41 FT,
PORT: 9.77 FT
STBD: 9.35 FT
====================================================================================================
DRILLING CONTRACTOR MANAGEMENT VISITS:
- SHAOHUI GU, RIG MANAGER LAST VISIT ON 28/MAY/24
====================================================================================================
NEXT LOCATION: ZULF-700
- EXPECTED DATE FOR MOVE: NOVEMBER 10, 2024
- ZULF-700 SITE SPECIFIC SURVEY CRM-SR: 8800022381 SUBMITTED 13/JUN/2024
====================================================================================================
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 8,216 88.7 71.8 0 5,794 761.92 880.51 3,820.21 3.86

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
95 PCF 1 0 API 57 581 Volts 3.74 0 253,524
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2.2 HTHP 18 24 0 15 / 19 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 37 25 11 / 12 0 0 0
78
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
93 PCF 1 0 API 56 549 Volts 3.74 0 245,943
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2.6 HTHP 19 23 0 15 / 19 RELIANT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 39 25 11 / 12 0 0 0
75

BARITE-BULK CACL2-98 ECOTROL-RD CACO3-25 CACO3-50 SUREMUL VG-SUP


MUD 350 ( 100LB ) 1 ( 2200L ) 5 ( 55LB ) 5 ( 55LB ) 5 ( 55LB ) 2 ( 55GL ) 2 ( 55LB )
TREATMENT VG-PL
2 ( 55LB )

BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 8.5 1 0.79 Z362ZT
2 Float Sub RIG 8.5 1 8.5 2.75 6.65 NC46 4 1/2 REG 0 1193231
3 Drillcollar RIG 6.5 9 6.5 2.813 279.43 NC50 NC50 27.7 VM105 SPRL
DRILL STRING 4 Crossover RIG 6.625 1 6.625 2.813 4 XT54 NC50 25 232
5 Heavy Weight Drillpipe (HWDP) RIG 5.5 6 5.5 3.25 184 XT54 XT54 52 CONV
6 Hydro-Mechanical Jar OJR 6.75 1 6.75 29.2 52 HMJ675132
7 Heavy Weight Drillpipe (HWDP) RIG 5.5 8 5.5 3.25 277 XT54 XT54 52 CONV
8 Drillpipe RIG 5.5 202 5.5 4.67 6,265 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A DTO 4-5 KTS. 1 FT. SEASONAL 338 TOURLY

Company CSU SPS RIG EMC SMI BCM EX1 BCR ARM SAM

PERSONNEL Category CTRG DPDS RIG DFMS DFMS PCS SLS PRS WSC WBCS
Total
AND SERVICES
16 4 64 1 2 2 2 4 2 1 98
INFORMATION No. of Persons

Personnel on Loc. Hrs. 15 24 24 24 24 24 24 24 24 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1314 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 10/12/2023 - 07/06/2024
Report ID: OPERLMTDMRREP

Operating Hours. 0 24 24 12 24 24 0 24 24 6

Standby/Tankers
TRUCKS/BOATS
ZAMIL-57

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2101 1593 1271 3494 0 3025

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-615 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/15/2024 - 03/21/2025
Report ID: OPERLMTDMRREP

CP-1 @ QTIF-615 Limited Morning Report for 06/18/2024


Objective : (SL-PWI (HNIF)) Foreman(s)BOUCHENTOUF, MERZAK / OSMAN, MUHANID ISMAIL MOHAMED
D&WO Morning Report (Service Providers View) Charge #: Engineer ALNUTIFAT, MESFER AYEDH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23038-0615) Manager ALSAFI, YOUSEF MOHAMMAD
CP-1
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14208 673-9109 673-0169
Date: Tuesday 06/18/2024 QTIF-615 (0) QTIF_615_0 OTHER VSAT CONTRACTOR /CLERK VSA T
673-9140 673-0139

Last 24 hr operations Next 24 hr plan


PERFORME FIT, DISPLACE TO 94 PCF WBM, POH CLEAN OUT BHA, RIH SAMAA WBCO BHA. CONT. RIH SAMAA WBCO BHA, SCRAPE 13-3/8'' CSG. POH, P/T BOP.
Location Next Location
QTIF-614 PF QTIF-620
Current Depth (ft) Liner TOL MD TVD Formation Tops
3,357 Last Csg Size MD TVD Size Top
13 3/8 3332 3288 Formations Comments
Depth
ARUM 2,479 2449' TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
3357 (Date) 100 0 70
34 (04/17/2024@1400 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0600 1 0 12 1/4 N DRLG HT STRG RIG 3357 3357
P/U & M/U FIT TEST ASSEMBLY
0600 - 0630 0.5 0 12 1/4 N DRLG HT PEL RIG 3357 3357
P/T LINE TO 500/2000 PSI.
0630 - 0745 1.25 0 12 1/4 N DRLG OTH NA NCS 3357 3357
PERFORM FIT TEST TO 96 PCF EMW. GOOD TEST.
0745 - 0800 0.25 0 12 1/4 N DRLG OTH NA RIG 3357 3357
FLOW CHECK, WELL STATIC.
0800 - 0930 1.5 0 12 1/4 N DRLG HT STRG RIG 3357 3357
BREAK DOWN TEST ASSY AND LAY OUT SAME.
0930 - 0945 0.25 0 12 1/4 N DRLG PJSM NA RIG 3357 3357
HELD PJSM FOR DISPLACEMNT HOLE TO NEW 94 PCF WBM.
0945 - 1130 1.75 0 12 1/4 N DRLG CIRC MPMP RIG 3357 3357
DISPLACE HOLE TO 96 PCF NACL POLYMER WBM.
1130 - 1200 0.5 0 12 1/4 N DRLG CIRC MPMP RIG 3357 3357
FLOW CHECK, WELL STATIC.
1200 - 1230 0.5 0 12 1/4 N DRLG TO STDP RIG 3357 3357 3270 2300
POH W/ 12-1/4'' CLEAN OUT BHA ON 5-1/2'' DP.

HELD SAFETY STAND DOWN WITH RIG CREWS AND THIRD PARTY CREW,
1230 - 1300 0.5 0 12 1/4 N DRLG PJSM NA RIG 3357 3357
DISCUSSED LIFTING OPERATIONS, STOP WORK AUTHORITY AND GOOD
COMMUNICATION DURING OPERATION.
1300 - 1345 0.75 0 12 1/4 N DRLG TO STDP RIG 3357 3357 2300 904
POH W/ 12-1/4'' CLEAN OUT BHA ON 5-1/2'' DP.
1345 - 1400 0.25 0 12 1/4 N DRLG OTH NA RIG 3357 3357
FLOW CHECK, WELL STATIC.
1400 - 1415 0.25 0 12 1/4 N DRLG TO STHDP RIG 3357 3357 904 340
POH W/ 12-1/4'' CLEAN OUT BHA ON 5-1/2'' HWDP.
1415 - 1430 0.25 0 12 1/4 N DRLG OTH NA RIG 3357 3357
FLOW CHECK, WELL STATIC.
1430 - 1815 3.75 0 12 1/4 N DRLG HT BHA RIG 3357 3357
POH & L/D CLEAN OUT BHA.
1815 - 1845 0.5 0 12 1/4 N DRLG HT PEL RIG 3357 3357
CLEAN & CLEAR RIG FLOOR.
1845 - 2215 3.5 0 12 1/4 N DRLG CIRC MPMP RIG 3357 3357
P/U JETTING TOOL & JET BOP, L/D JETTINGS ASSY.
2215 - 2300 0.75 0 12 1/4 N DRLG HT PEL RIG 3357 3357
PJSM, P/U & M/U CAM 13-5/8'' WAER BUSHING RETRIEVING TOOL.
2300 - 0030 1.5 0 12 1/4 N WH RTRV WBSH RIG 3357 3357
RIH & RETRIEVE 13-5/8'' WAER BUSHING, & L/D RUNNING TOOL.

HELD SAFETY STAND DOWN WITH RIG CREWS AND THIRD PARTY CREW,
0030 - 0100 0.5 0 12 1/4 N DRLG SDR1 NA RIG 3357 3357
DISCUSSED LIFTING OPERATIONS, STOP WORK AUTHORITY AND GOOD
COMMUNICATION DURING OPERATION.
0100 - 0130 0.5 0 12 1/4 N DRLG RR TDS RIG 3357 3357
SERVICE TDS.
0130 - 0200 0.5 0 12 1/4 N DRLG HT PEL RIG 3357 3357
CLEAN & CLEAR RIG FLOOR.
0200 - 0215 0.25 0 12 1/4 N DRLG PJSM NA RIG 3357 3357
HPJSM FOR P/U SAMAA WBCO BHA.

0215 - 0445 2.5 0 12 1/4 N DRLG HT BHA RIG 3357 3357 P/U & RIH W/ SAMAA WBCO BHA. (12.25'' RC BIT, B.S W/ FV, 13-3/8'' STRING
MILL, 6JT X 8'' DC, 13-3/8'' SCRAPPER, X/O, 15JT X 5.5 HWDP).
0445 - 0459 0.25 0 12 1/4 N DRLG TI STHDP RIG 3357 3357 236 665
RIH W/ SAMAA WBCO BHA ON 5-1/2'' HWDP.
Foreman Remarks

WELL OBJECTIVE:QTIF-615 WILL BE DRILLED AS A SINGLE LATERAL PWI WELL TARGETTING HNIF RESERVOIR WITH A PILOT HOLE TO BE DRILLED TO BASE OF LFDR. THE PH WILL BE DRILLED

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-615 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/15/2024 - 03/21/2025
Report ID: OPERLMTDMRREP

TO A DEPTH OF 10,024 FT MD/9,372 FT TVD WHILE THE LATERAL WILL BE DRILLED TO A DEPTH OF 19,666 FT MD/ 8,286 FT TVD.
=============================================================================================
- RIG POSITION: LAT: 26DEG 55.800 N LONG049DEG 59.763 ERIG HEADING 349.4 DEG..
- WATER DEPTH: 39.31 FT. AIR GAP: 35.43 FT RKB TO PLATFORM : 75.8 FT & RKB TO SEABED: 149 FT RKB TO MSL 111 FT .
- FINAL LEG PENETRATIONS: BOW 5.57 FT, PORT 5.57 FT & STBD 5.90 FT.
=============================================================================================
QTIF-615 CASING POINTS PLANNED VS ACTUAL (MD-RKB):
- 32'' CONDUCTOR PRESET AT 205 FT.
- 24'' CSG SHOE AT 367 FT VS 380' (ACTUAL).
- 18-5/8" CSG SHOE AT 860 FT (50 FT TVD INTO RUS) VS 869' (ACTUAL).
- 13-3/8" CSG SHOE AT 3444 FT (100 FT TVD INTO LAMS) VS 3332' (ACTUAL).
- 9-5/8" CSG SHOE AT 6176 FT (300 FT TVD INTO BYDH) VS XXX.
- L1 7'' LINER SHOE AT 13666 FT (HNIF) VS XXX.
- L1 TD AT 19666 FT VS XXX.
=============================================================================================
DRILLING SEQUENCE:
QTIF-615 (CURRENT, SURFACE TO TD), QTIF-620 (SURFACE TO TD). QTIF-621 (SURFACE TO TD).
=============================================================================================
PERSONNEL ONBOARD:
- ARAMCO HSE ADVISOR HOUSSINE CHEBILI BADGE #8637937 ON BOARD FOR INVESTIGATION SINCE 05-JUNE- 2024.
- ARAMCO MATERIAL EXPEDITOR SULTAN T ALDOUSRI BADGE # 814141 ON BOARD SINCE 4-JUNE- 2024.
=============================================================================================
RENTAL TOOLS:
- 9.5'' NOV JAR SN#381-95169 ON BOARD SINCE 14-APRIL-2024, MNF#2100861814.
- 8'' NOV JAR SN#336-81184 ON BOARD SINCE -25-MAY-2024, MNF#2100897812.
- 6.5'' NOV JAR SN#HMJ650- 4666990 ON BOARD SINCE 05-JUNE-2024, MNF#2100906343.
=============================================================================================
HSE:
- H2S, FIRE & ABANDON DRILL CONDUCTED ON 06/14/2024.
- HELD MAN DOWN DRILL ON 05/14/2024.
- ANNUAL SECONDARY DRILL CONDUCTED ON 05/20/2024.
- HSE ALERTS DISCUSSED AS RECEIVED.
=============================================================================================
- SKIP & SHIP:
- TOTAL SKIPS ONBOARD: 40
- FULL SKIPS ONBOARD: 27
- EMPTY SKIPS ONBOARD: 13
- TOTAL FULL SKIPS BACKLOADED:93
=============================================================================================
MUD SAMPLES: * LC 50 SAMPLES NOT APPLICABLE DUE TO ZERO DISCHARGE LOCATION.
=============================================================================================
TRAJECTORY: QTIF-615 L0 PH PLAN#6 12APRIL-2024 PROPOSAL REPORT
=============================================================================================
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
94 PCF 0 3.4 API 0 0 Volts 3.3 9.5 136,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 81 26 0 10 / 15 WBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 19 19 10 / 11 0 280 0
62
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 10.6 API 0 0 Volts 1.19 9.8 26,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
70 0 HTHP 94 31 0 14 / 17 WBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 17 6 13 / 15 0 840 0
61

MUD CITRICACID BICB


TREATMENT 2 ( 100LB ) 8 ( 55LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/03/2024 TOURLY 04-06 KTS S 0-1 FT SEASONAL 62 TOURLY & PRE JOB

Company HCB FMC SLC RIG SPS RIG OES SMI ARM NCS MI2 ARM SAM

Category BRCR CSR CSR CTRG DPDS RIG DFMS DFMS OTHR PCS SCS WSC WBCS
PERSONNEL
1 3 1 14 4 75 2 1 2 2 5 2 1
Total
AND SERVICES No. of Persons
113
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 0 24 24 0 0 24 24 24 9

TRUCKS/BOATS Standby/Tankers Others

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-615 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/15/2024 - 03/21/2025
Report ID: OPERLMTDMRREP

PACIFIC PANDA posh steenbok

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2120 2768 1032 4939 0 3190

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR TINT-93 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/29/2024 - 07/04/2024
Report ID: OPERLMTDMRREP

DPS-4 @ TINT-93 Limited Morning Report for 06/18/2024


Objective : (MK-1 DEVIATED Foreman(s)WANG, YICHEN / ALSULIMANI, HASSAN WADEI
D&WO Morning Report (Service Providers View) Charge #: ACROSS UNZA) Engineer GHANNAM, HATEM ABDULMOHSEN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23096-0093) Manager DHAFEERI, BADER NASSER
DPS-4
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12602 577-3963 013-880-76 61
Date: Tuesday 06/18/2024 TINT-93 (0) TINT_93_0 CONTRACTOR /CLERK VSA T
577-9692

Last 24 hr operations Next 24 hr plan


DIRECTIONAL DRLG 8-3/8" HOLE TO 7" LP @ 15,217' MD/14,825' TVD (40' TVD INTO PKFU). CHC. CHC, POOH & L/D 8-3/8" DIR DRLG BHA. R/U BAKER TRS CSG GEAR. P/U & RUN 7" LINER, P/U &
WIPER TRIP. M/U HALL XTREMEGRIP LNR HGR. RUN 7" LNR ON 5-1/2" DP.
Location Next Location
298 KM FROM DH MG, RIGHT TURN BEFORE HRDH GAS PLANT GATE, CONT DRIVE 60 KM. THEN LEFT 8 KM SKID ROAD TINT-95
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
15,217 Size 11566 11566 Size 6,810 11,566 11,566 Top
Formations Comments
9 5/8 9 5/8 Depth
MDJR 11,791 AS PER DRLG PROGRAM
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SUDR 12,590 AS PER DRLG PROGRAM
15030 (Date) 100 187 298 SDDM 12,947 9' SHALLOWER
44.5 (05/04/2024@1600 ) BSRD 12,974 11' SHALLOWER
KHFF 13,327 12' SHALLOWER
KFAC 13,346 13' SHALLOWER
KFBC 13,460 20' SHALLOWER
KFCC 13,916 9' SHALLOWER
KFDA 14,172 36' SHALLOWER
PKFU 14,785 25' SHALLOWER

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Lt Type Lt ID Summary of Operations
OP Co Start End Start End

DIRECTIONAL DRLG 8-3/8" HOLE AS PER DIRECTIONAL PLAN L-


0 REV 01 WITH 113 PCF OBM, FULL RETURNS.
0500 - 0700 2 0 8 3/8 N DRLG DMS MMOT SDM 15030 15063 > PUMP TANDEM PILLS EACH 90' DRILLED.
> REAM UP & DOWN FULL STAND EACH CONNECTION.
> TAKE SURVEY 30 FT OFF BOTTOM.
> QUICK FLOW CHECK ON CONNECTIONS
0700 - 0730 0.5 0 8 3/8 N DRLG RR TDS RIG 15063 15063
SERVICE TOP DRIVE. OBSERVED KELLY HOSE LEAKING.

PJSM. POOH & RACK BACK ONE STD 5-1/2" DP. R/U 2"
CHICKSAN AND SWIVEL TO DP, CIRC AT 210 GPM WHILE
0730 - 0900 1.5 0 8 3/8 N DRLG RR CSYS RIG 15063 15063 RR 934842
ROTATING DP STRING BY ROTARY TABLE. CHANGE OUT
LEAKING KELLY HOSE TO BACKUP ONE, PRESSURE TEST SAME
TO 3500 PSI, OK.

DIRECTIONAL DRLG 8-3/8" HOLE AS PER DIRECTIONAL PLAN L-


0 REV-01 WITH 113 PCF OBM. GOC CONFIRMED 7" CASING
POINT AT 15,217' MD/14,825' TVD WITH 40' TVD INTO PKFU.
> PUMP TANDEM PILLS EACH 90' DRILLED.
> REAM UP & DOWN FULL STAND EACH CONNECTION.
> TAKE SURVEY 30 FT OFF BOTTOM.
> QUICK FLOW CHECK ON CONNECTIONS.
0900 - 0230 17.5 0 8 3/8 N DRLG DMS MMOT SDM 15063 15217
> SLIDING FOOTAGE: 0 FT (0%). ROTATING FOOTAGE: 183 FT
(100%).
> LAST SURVEY: MD: 15,063 FT, INC: 49.31 DEG, AZM: 252.32
DEG, TVD: 14,724.77 FT, V.SEC: 628.57 FT, DLS: 1.2 DEG/100
FT.
> PROJECTION TO BIT: MD: 15,217 FT, INC: 49.25 DEG, AZM:
251.5 DEG, TVD: 14,825 FT, V.SEC: 697.16 FT, DLS: 0.41
DEG/100 FT, 2.85 FT ABOVE, 7.1 FT LEFT.

PUMP LOW VIS & HIGH WEIGHTED PILLS, CIRC 2 X BTTM-UP


0230 - 0430 2 0 8 3/8 N DRLG CIRC MPMP RIG 15217 15217
TILL TO SHALE SHAKERS CLEAN WHILE RECIPROCATING DP.
> FLOW CHECK-STATIC.

PERFORM WIPER TRIP, POOH 8-3/8" DIR DRLG BHA ON 10 STDS


0430 - 0459 0.5 0 8 3/8 N DRLG ST STDP RIG 15217 15217 15217 14320 5-1/2" DP TO 14,320'(5 STDS OVERLAP WITH OLD HOLE), RUN
BACK TO BOTTOM, WASH DOWN LAST STD AND TAG BOTTOM,
ONGOING AT RPT....
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 0730 1.5 1.5 934842 RR FOT CSYS RIG 15063 OBSERVED KELLY HOSE LEAKING.
Foreman Remarks

TINT-93 IS PLANNED TO BE DRILLED AS A DEVIATED MK-1 WELL TARGETING UNZA RESERVOIR IN THE SOUTH OF TINAT FIELD. THE WELL WILL
BE COMPLETED WITH CONVENTIONAL SAND SCREENS.

========================================ARAMCO PERSONNEL===========================================
> ARAMCO MATERIAL EXPEDITOR SFOOG BADER #8495999 ON LOCATION SINCE 06/10/2024.
> ARAMCO MATERIAL EXPEDITOR ALYAMI MESHAAL #777117 ON LOCATION 06/17/2024.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR TINT-93 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/29/2024 - 07/04/2024
Report ID: OPERLMTDMRREP

========================================SERVICE COMPANY=============================================
> EMC MUD ENGINEER ON LOCATION.
> BAROID MUD ENGINEER ON LOCATION.
> SLB DIRECTIONAL DRLG CREW ON LOCATION.
> TAQA CEMENTING ON LOCATION.
> HAL LINER HANGER ON LOCATION.
> BAKER CSG RUNNING ON LOCATION.
> HAL FRAC TANK ON LOCATION.

=================================DIRECTIONAL INFORMATION TINT-93 L0=====================================


> WELL PATH FOLLOWING DIRC PLAN 01 REV 01 DATED 08 JUN 24.
> KOP IN 8-3/8" @ 12,980'.
> 8-3/8" DIREC BHA SENSORS' OFFSET FROM BIT: MWD GR @ 58.47 FT. MWD (D&I) @ 60.59 FT.
> LAST SURVEY: MD: 15,063 FT, INC: 49.31 DEG, AZM: 252.32 DEG, TVD: 14,724.77 FT, V.SEC: 628.57 FT, DLS: 1.2 DEG/100 FT.
> PROJECTION TO BIT: MD: 15,217 FT, INC: 49.25 DEG, AZM: 251.5 DEG, TVD: 14,825 FT, V.SEC: 697.16 FT, DLS: 0.41 DEG/100 FT, 2.85 FT ABOVE, 7.1 FT LEFT.

========================================= RENTAL TOOLS ===============================================


> IMPLEMENTING CLOSED LOOP DRILLING PRACTICE (MI-SWACO SHAKERS).
> WELLLINK LAPTOPS INSTALLED ON 12/08/2023.
> SLB BARITE SILO ON LOCATION SINCE 12/11/2023.
> 2 X 500 BBL HALL FRAC TANKS ON LOCATION SINCE 06/14/2024.
> 6-1/2" NOV HM DRILLING JAR S/N: CW-1919859-1 ON LOCATION SINCE 06/14/2024.
> 4-3/4" NOV HM DRILLING JAR S/N: 380-471040 ON LOCATION SINCE 06/17/2024.

============================================HSE====================================================
> HSE SAFETY TOPIC: HAZARD RECOGNITION, RISK ASSESSMENT.
> DAILY DRILLS: 2X PIT DRILL.
> NEAR MISS: NONE.
> SAFETY OBSERVATIONS: 21 CARDS.
> ARAMCO HSE ALERT: 69-24, 70-24, 71-24, 72-24.
> 2X SAFE GATHERING AREAS. 1X KM NE AND 1X 1.2 KM NW OF WELLHEAD.

============================================RIG VISIT===================================================

========================================AUDIT FINDINGS =================================================


> 2024: 3-MCI 2ND QUARTER 2024: TOTAL FINDING: 18, CLOSED: 18, OPEN:00.
> 2024: 1ST CEHA AUDIT 2024: TOTAL FINDINGS: 25, CLOSED: 25, OPEN: 00.
> 2024: WCI AUDIT FINDINGS: 04, CLOSED: 04, OPEN: 00.
> 2024: RHSEI AUDIT TOTAL FINDINGS: 29, CLOSED: 27, OPEN: 02.

==========================================NEXT WELL================================================
> NEXT WELL: TINT-95, 100% READY.

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY 0 15,063 49.31 252.32 93 14,728 -117.61 -320.7 1,120.69 1.2
0 15,217 49.75 251.5 154 14,828 -128.7 -354.65 1,237.78 0.49

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
113 PCF 1 0 API 56 622 Volts 5.5 0 16,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
160 1 HTHP 12 14 0 9 / 15 OBM 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 39 32 8/9 0 10,000 2.8
54
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
113 PCF 1 0 API 56 665 Volts 5.6 0 16,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
160 1.2 HTHP 12 15 0 9 / 16 OBM 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 39 32 8/9 0 10,000 1.2
54

CACO3-5 CACO3-25 CACO3-50 CAOH2 CARBOTROL STELSEALFN LCLUBE


MUD 20 ( 55LB ) 40 ( 55LB ) 40 ( 55LB ) 20 ( 55LB ) 20 ( 55LB ) 30 ( 55LB ) 30 ( 55LB )
TREATMENT MRBL-M MAXSHIELD PRIM-EMUL
1 ( 2200L ) 1 ( 55GL ) 1 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
10RR 14,694 15,217 DP Av DC Av Bit HHP 22 45 M432 8.375 ULTR
Pressure GPM Jet Vel 282.64 N/A 74 I-Row O-Row DC Location Bearings
3,400 460 143 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
72857 U616MD1 6 x 15 / 1.035
Gauge Other POOH Reason
N/A

DRILL STRING Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR TINT-93 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/29/2024 - 07/04/2024
Report ID: OPERLMTDMRREP

Y 48 320 340 310 8 Shock Sub Serial # Shock Sub Hrs


Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit ULTR 8.375 1 8.375 0.86 4-1/2" REG 72857
2 Mud Motor SDM 6.75 1 7 5.5 31.25 4-1/2" IF 4-1/2" REG 58.1 2053750
3 Non Magnetic Drill Collar ( NMDC ) SDM 6.5 1 6.5 2.813 2.31 NC50 NC50 58.1 SPRL SBMC449-2
4 Measurement While Drilling (MWD) SDM 6.75 1 6.75 5.109 12.78 6-5/8" FH NC50 96 1935
5 Non Magnetic HWDP SDM 5 1 6.625 5 30.15 6-5/8FH 6-5/8FH 58.1 CONV V1425
6 Float Sub SDM 6.875 1 6.875 2.875 9.28 NC50 NC50 58.1 675-1078
7 FIlter Sub SDM 6.5 1 6.5 2.875 6.88 NC50 FH 58.1 6751080
8 Crossover RIG 6.5 1 6.5 2.875 2.65 XT54 NC46 58.1 5052-2B
9 Heavy Weight Drillpipe (HWDP) RIG 5.5 3 6.625 5 90.07 6-5/8FH 6-5/8FH 58.1 CONV
10 Hydro-Mechanical Jar NOJ 6.5 1 6.5 2.75 30.26 XT54 XT54 1,300 W1376267-1
11 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 5.5 3.25 273.56 XT54 XT54 52 CONV
12 Drillpipe RIG 5.5 54 5.5 4.67 1,696.47 XT54 XT54 24.7 S135 PREMIUM
13 Heavy Weight Drillpipe (HWDP) RIG 5.5 21 5.5 3.25 636.99 XT54 XT54 52 CONV
14 Drillpipe RIG 5.5 1 5.5 4.67 30 XT54 XT54 24.7 S135 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/15/2024 06/15/2024 SEASONAL N/A SEASONAL 3,562 2 TIMES DAILY

Company BCR RZT SDM RIG BAR EMC SMI HLH RIG ARM HPE OTH MI3 ARM SJC

Category CSR CTRG DPDS RIG DFMS DFMS DFMS LHES OTHR OTHR SFS VAC WMS WSC PCS
PERSONNEL
4 14 4 50 1 1 1 2 5 1 2 2 4 2 3
Total
AND SERVICES No. of Persons
96
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 12

Operating Hours. 12 0 24 24 12 12 12 12 12 12 24 10 24 24 0

Standby/Tankers Others
TRUCKS/BOATS
AB-6311 RIG AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 234 157 93 1450

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
RIG THURAYA PHONE WAS SENT TO DHAHRAN FOR REPAIR.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1290 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/14/2024 - 08/10/2024
Report ID: OPERLMTDMRREP

DPS-43 @ SDGM-1290 Limited Morning Report for 06/18/2024


Objective : (SDGM-1290 IS Foreman(s)YANG, NING / THAQFAN, AHMED SAAD
D&WO Morning Report (Service Providers View) Charge #: PLANNED TO BE DRILLED AS Engineer MARQUINA RAMIREZ, DANIEL LEONARDO / KHAYYAT, AHMAD TARIQ
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved DPS-43 (66-23054-1290) A K-2 S-SHAPE TARGETING Manager SHAIKH, ALI JAFER
UNYZ RESERVOIR.) THURAYA RIG FORMAN VSAT FAX VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 8821677711 062 5722-799 880-5117
Date: Tuesday 06/18/2024 SDGM-1290 (0) SDGM_1290_0 CONTRACTOR /CLERK VSA T
5722-885

Last 24 hr operations Next 24 hr plan


BOPE PRESSURE TEST. P/U & M/U AND RIH 16" SLB RSS/MWD BHA. CONT. RIH W/ SLB RSS/MWD BHA. RSS DRILL 16" HOLE SECTION TO 10.932' (30 FT INTO BJDM).
Location Next Location
SDGM-1290, FOLLOW BLACKTOP TO SDGM GOSP-4 +/- 11 KM, TAKE RIGHT TO ENTER SKID ROAD +/- 8 KM SDGM-1227
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,754 Last Csg Size MD TVD Size Top
18 5/8 4587 4587 Formations Comments
Depth
AHMD 2,855 27' SHALLOWER.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SFNY 3,175 37' SHALLOWER
7754 (Date) 95 0 84 SHUB 3,995 10' DEEPER
30.2 (05/19/2024@0130 ) BYDH 4,290 25' SHALLOWER
MDTM 5,028 27' DEEPER
SULY 5,534 AS PER PLAN
HITH 6,063 30' SHALLOWER
ABAR 6,574 22' SHALLOWER
ARBB 6,606 26' SHALLOWER
ABBR 6,654 52' SHALLOWER
ARBC 6,685 50' SHALLOWER
ABCR 6,773 40' SHALLOWER
ARBD 6,851 42' SHALLOWER.
PADS 6,940 40' SHALLOWER.
BPDS 6,946 40' SHALLOWER
ABD1 6,962 33' SHALLOWER.
AD2A 6,971 34' SHALLOWER
AD2B 7,040 32' SHALLOWER.
AD3A 7,138 35' SHALLOWER
AD3B 7,190 34' SHALLOWER
ADR4 7,252 31' SHALLOWER
BADR 7,290 64' SHALLOWER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0600 1 0 16 N BOP BOP BOP RIG 7754 7754
P/U AND M/U WH JETTING TOOL, JETTING WELLHEAD AND BOP.
0600 - 0645 0.75 0 16 N WH RTRV WBSH RIG 7754 7754
RETRIEVE 18-3/4" CIW WEAR BUSHING.

0645 - 0815 1.5 0 16 N BOP BOP BOP RIG 7754 7754 P/U & M/U BOPE TEST ASSY WITH 18-3/4" CIW TEST PLUG AND LAND SAME ON
WH. FLUSH BOPE AND CHOKE MANIFOLD W/ WTR.

P/T 26-3/4" 3M CLASS 'A' BOPE AS PER ARAMCO STANDARDS. ANNULAR TO


0815 - 1415 6 0 16 N BOP BOPT BOP RIG 7754 7754
300/1,400 PSI, RAMS & ALL RELATED VALVES TO 300/3,000 PSI.
- HELD ACCUMULATOR DRILL.
1415 - 1515 1 0 16 N BOP BOP BOP RIG 7754 7754
L/D TEST PLUG ASSY.
1515 - 1545 0.5 0 16 N WH SET WBSH RIG 7754 7754
SET 18-3/4" CIW WEAR BUSHING.
1545 - 1615 0.5 0 16 N DRLG RR TDS RIG 7754 7754
RIG SERVICE TDS.

HPJSM, P/U AND M/U 16" SLB RSS/MWD BHA WITH 16" SEC PDC BIT MMD86DH-1
1615 - 2245 6.5 0 16 N DRLG HT BHA RIG 7754 7754 (S/N: 13970775).
- SHT TEST MWD TOOL - OK.
- P/U JAR @ 20:00 HRS.

2245 - 0015 1.5 0 16 N DRLG TI STDP RIG 7754 7754 840 4587 RIH 16" SLB RSS/MWD BHA TO SHOE.
- FILL STRING EA 20 STD.
0015 - 0145 1.5 0 16 N DRLG CIRC MPMP RIG 7754 7754
ACCUMULATIVE TIME TO TEST SLB RSS/MWD MID WAY - GOOD TEST
0145 - 0330 1.75 0 16 N DRLG TI STDP RIG 7754 7754 4587 6580
RIH 16" SLB RSS/MWD BHA IN OPEN HOLE.

CONT. RIH 16" SLB RSS/MWD BHA, REAM DOWN AND WASH TIGHT INTERVALS.
0330 - 0459 1.5 0 16 N DRLG RW BIT RIG 7754 7754 6580 7000
ONGOING.

Foreman Remarks

SDGM-1290 IS PLANNED TO BE DRILLED AS A K-2 S-SHAPE TARGETING UNYZ RESERVOIR.

================== ARAMCO PERSONNEL =====================


- SAIF ALAM #8145073 RIG CLERK ON LOCATION ON 03/17/24.
- MOHAMMED AL.RASHEEDI #740259, FCT, OFF LOCATION SINCE 05/08/2024.
- ABDULLAH ALABDULKARIM #790096, ARAMCO PDP, ON LOCATION 06/12/2024

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1290 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/14/2024 - 08/10/2024
Report ID: OPERLMTDMRREP

- METHEW K.THOOVONU HSE COORDINATOR ON LOCATION SINCE 5/23/2024


- ALI MORIA #794749, ARAMCO PDP OFF LOCATION 06/09/2024.
- HAMZA A. MULLA # 827330, ARAMCO FCT OFF LOCATION 05/08/2024.
- REDA ABDELHADY ARAMCO MUD SPECIALIST VISITED LOCATION ON 6/17/2024.

============== DPS PERSONNEL & VISITORS ===================


- DPS SUPERINTENDENT KAREEM ASAL LAST RIG VISIT 05/18/2024
- DPS SUPERINTENDENT AMR MOSELHY LAST RIG VISIT 06/09/2024
- DPS HSE SECTION HEAD MAHMOUD ZAHRA LAST RIG VIST 03/17/2024
- DPS GENERAL MANAGER HAYTHAM ELGOHARY VISITED LOCATION ON 3/21/2024.
- DPS OPS MANAGER AMR SAAD VISITED LOCATION ON 3/21/2024.
- DPS QMHSE MANAGER MOHAMED ELSAEED LAST RIG VISIT 01/10/2024
- DPS HSE SECTION HEAD AMR ELHEBAISHY LAST RIG VISIT 06/03/2024

=================== 3RD PARTY SERVICES PERSONNEL ===================


- EMEC MUD ENGINEER ON LOCATION 10/22/2023.
- SLB CLOSED LOOP SYSTEM CREW ON LOCATION 10/22/2023.
- MI SWACO BARITE BULKERS CREW & EQUIPMENT 06/05/24.
- SLB MWD CREW ON LOCATION 06/04/2024 @ 12:00HRS
- SAMAA PBL SUB ENG. ON LOCATION 06/10/2024 @ 11:00HRS

==================== RENTAL EQUIPMENT ==========================


- RECEIVED 9.5" NOV JAR SN: BOT95155DJ ON 06/08/2024 @ 15:00 HRS. P/U ON 06/09/2024 @ 11:15 HRS. L/D ON 06/11/2024 @ 02:00HRS. P/U AGAIN ON 06/11/2024 @ 07:00HRS L/D ON
06/17/2024 @ 00:30 HRS
- RECEIVED 9" NOV JAR SN: 354-90226 ON 6/14/2024 @ 10:00 HRS. P/U ON 6/17/2024 @ 20:00 HRS.
- RECEIVED 2 X 9-1/2" SAMAA PBL SUB ON 06/04/2024 @ 00:00HRS. P/U SN: 950BP316 ON 6/11/2024 @ 05:00 HRS, L/D SN: 950BP316 ON 06/16/2024 @11:00 HRS.
P/U SN: HYD950BP47 ON 6/17/2024 @ 20:00 HRS.
- SAMAA 18-5/8" SCRAPER ON LOCATION 06/09/2024 @ 21:00HRS. L/D ON 06/17/2024 @ 1:00 HRS. RELEASED SAME DATE

================= ERP NOTIFICATIONS ====================

=============== PRE-TOUR MEETING TOPICS ================


- CURRENT OPERTION AND FORWORD PLAN.
- RECENT HSE ALERTS

=============== NEAR MISS/SWA =================


- NONE

============= WATER CONSERVATION ========


- NOT USING WATER PIT
- CLOSED LOOP SYSTEM W/ SLB.

================= NEXT WELL ===================


- TBC

============= PLAN VS ACTUAL CSG SETTING DEPTHS , ROP & FLAT TIME ==================
> 30'' CSG PT PLAN AT 745' /ACTUAL 775' (50' INTO RUS FM), PLANNED ROP 14.7 FPH/ACTUAL 17.8 FPH, FLAT TIME PLAN: 50.4 HR/ACTUAL 12.9 HRS.
> 24'' CSG PT PLAN AT 2,932' /ACTUAL 2,911' (50' INTO RUS FM), PLANNED ROP 27,93 FPH/ACTUAL 28.11 FPH, FLAT TIME PLAN: 81.6 HR/ACTUAL 85 HRS.
> 22" CSG PT PLAN AT 5,051'/ACTUAL 4594' (304' INTO BYDH), PLANNED ROP 25.25 FPH/ACTUAL 27.59 FPH, FLAT TIME PLAN: 111.9 HR/ACTUAL 130.75 HR.

========GDD COST OPTIMIZATION=========


KILL MUD: NONE.
FRAC TANK: NONE.
ACID FOR STUCK: NONE.
BARITE SILOS: YES
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
88 PCF 0 4 API 3 0 Volts 6.17 10 60,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 88 30 0 6/9 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 21 9 7/8 0 320 0
55
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
88 PCF 0 3.4 API 3 0 Volts 6.17 10 60,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 88 28 0 6/9 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 20 9 6/8 0 320 0
55

MUD PACLV XC WELL-SEAL M MICA-FINE BFIBRE-SF ARC-FIBER-M


TREATMENT 10 ( 50LB ) 4 ( 50LB ) 40 ( 55LB ) 40 ( 50LB ) 25 ( 25LB ) 56 ( 25LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
6 7,754 7,754 DP Av DC Av Bit HHP 0 0 M223 16 SEC
BIT DATA Pressure GPM Jet Vel 86.86 106.71 219 I-Row O-Row DC Location Bearings
2,100 800 212 N/A N/A N/A N/A N/A
Serial Number Type Jets TFA

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1290 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/14/2024 - 08/10/2024
Report ID: OPERLMTDMRREP

13970775 MMD85DH1 11 x 12 / 1.215


Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 0 245 250 240 2,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 16 1 1.46 13970775
2 RSS SDM 11 1 11 37.95 0 N004227
3 Measurement While Drilling (MWD) SDM 9.5 1 9.5 26 186 1117B173584
4 Stabilizer SDM 16 1 16 3 26 7 5/8 REG 7 5/8 REG 0 10458013
5 Float Sub SDM 9.5 1 9.438 3 9 6 5/8 REG 6 5/8 REG 0 0
DRILL STRING 6 Float Sub SDM 9.5 1 9.5 3.75 1.67 H90 7 5/8 REG 0 0
7 PBL (Multiple Activation By Pass) SAM 9.5 1 9.5 3.5 8.6 6 1/4 REG 6 1/4 REG 0 HYD050BP47
8 Crossover RIG 9.375 1 9.375 2.75 2.16 6 5/8 REG 7 5/8 REG 0 0
9 Drillcollar RIG 8.5 3 8.5 2.813 90 6 5/8 REG 6 5/8 REG 0 SPRL RECORDED
10 Hydro-Mechanical Jar NOJ 9.5 1 9.5 2.81 31 7-5/8" REG 7-5/8" REG 3,000 354-90226
11 Drillcollar RIG 8.5 2 8.5 2.813 58.7 6 5/8 REG 6 5/8 REG 0 SPRL RECORDED
12 Crossover RIG 8.5 1 14 4 3.6 7 5/8 REG 7 5/8 REG 0 43-0043
13 Heavy Weight Drillpipe (HWDP) RIG 6.625 9 6.625 4 276.6 6-5/8FH 6-5/8FH 82.748 CONV RECORDED
14 Crossover RIG 8.5 1 8.5 2.813 3.6 6 5/8 REG 6 5/8 FH 0 RECORDED
15 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 5.5 3.5 275 DSTJ DSTJ 31 CONV RECORDED
16 Drillpipe RIG 5.5 0 5.5 4.67 1 XT54 XT54 24.7 CYX105 PREMIUM RECORDED

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/17/2024 2 SEASONAL N/A SEASONAL 6,199 PRE TOUR

Company SEC RZT RIG EMC SDM HMS RIG ARM MI2 ARM SAM

Category BITS CTRG RIG DFMS LWD MLS OTHR OTHR SCS WSC WBCS
PERSONNEL
1 14 38 2 4 1 15 2 5 2 1
Total
AND SERVICES No. of Persons
85
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 24 12 0 12 24 0 24 12

Standby/Tankers Others
TRUCKS/BOATS
ab-6317 rig ambulance

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
0 1000 780 332 128 6500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1358 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 03/07/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

DPS-44 @ HWYH-1358 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (K-2 VERTICAL Foreman(s)GHOTO, SHABIR AHMED / BACHOUCHE, NADIR
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23053-1358) WELL DEEPENED TO PRE- Engineer MARQUINA RAMIREZ, DANIEL LEONARDO / KHAYYAT, AHMAD TARIQ
DPS-44
KHUFF WITH KHUFF-C AS Manager SHAIKH, ALI JAFER
Daily Onshore
Wellbores: A PRIMARY TARGET.)
(0500-0500) Saudi Aramco Well THURAYA RIG FORMAN VSAT CONTRACTOR /CLERK VSA T
Date: Tuesday 06/18/2024 HWYH-1358 (0) HWYH_1358_0 00-882-167 -771-1063 013-378-64 54 013-378-64 56/013-378 -6455

Last 24 hr operations Next 24 hr plan


RUN BAKER WL LOGS RUN#3 (PRESSURE POINTS) & POOH WITH LOGGING TOOLS. CON'D POOH WITH L/D LOGGING TOOLS. RUN BAKER WL LOGS RUN#4 ON PCL FOR SAMPLING &
POOH WITH L/D LOGGING TOOLS. RUN 4-1/2" LINER.
Location Next Location
HWYH-1358 IS LOCATED 0.105 KM N83E OF HWYH-1349 AND 0.885 KM N30W OF HWYH-1334. HWYH-1311
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
16,060 Size 11255 11253 Size 10,792 13,382 13,379 Top
Formations Comments
9 5/8 7 Depth
89' SHALLOWER (13,369'
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KHFF 13,366
MD)
16060 (Date) 100 0 180 80' SHALLOWER (13,417'
99.2 (03/11/2024@0000 ) KFAC 13,413
MD)
72' SHALLOWER (13,529'
KFBC 13,525
MD)
91' SHALLOWER (14,028'
KFCC 14,024
MD)
109' SHALLOWER (14,315'
KFDA 14,310
MD)
113' SHALLOWER (14,918'
BKDC 14,912
MD)
125' SHALLOWER (14,946'
PKFU 14,940
MD)
167' SHALLOWER
UNZC 15,139
(15,146'MD)
100' SHALLOWER
PUZU 15,506
(15,513'MD)
320' SHALLOWER (15945'
JAUF 15,938
MD)
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

RIH W/ BAKER W/L RUN #3 & RECORD PRESSURE POINTS AS PER RDD. TOTAL 20
POINTS
0500 - 0400 23 0 5 7/8 E LOG LOG WLT BAW 16060 16060 0 15500 > PERFORM STICKY TEST FOR EACH FM PRIOR TO RECORDING PRESSURE POINTS
FOR 5 & 10 MINS.
> TOOK PRESSURE POINTS ACROSS KHFB, KHFC, UNZA & UNZC FORMATION GOT
TOTAL VALID POINTS 8 FROM 20.
0400 - 0459 1 0 5 7/8 E LOG OTH NA BAW 16060 16060
POOH W/L RUN #3 TO SURFACE ...ON GOING @ RPT.
Foreman Remarks

HWYH-1358 IS LOCATED IN THE EASTERN FLANK OF HWYH FIELD, TO BE DRILLED AS K-2 (CONVERTED TO K-1) VERTICAL WELL DEEPENED TO PRE-KHUFF WITH
KHUFF-C AS A PRIMARY TARGET.THE WELL WILL BE DRILLED TO TOTAL DEPTH OF 17,517' FT MD/TVD (100' ABOVE SARAH FORMATION) TO
ASSESS MID-QUSAIBA. FUTURE SIDETRACK ACROSS KHUFF-C WILL BE CONTINGENT ON OH LOG RESULTS.

========================================ARAMCO PERSONNEL================================================
- RIG CLERK RAGHIB AHSAN ID# 8059526 ON DAYS OFF 06/15/24.
- ARAMCO FCT AHMED AL HARBI ID# 740732 OFF LOCATION 6/12/24.
- ARAMCO HOT II PDP SAEED ALMUDHRY ID# 790431 OFF LOCATION 6/13/24.
- ARAMCO HOT I PDP OSAMA AL-GHAMDI ID# 794801 ON LOATION 6/14/24.
- ARAMCO MCO AHMED AYDHEY ID# 776185 OFF LOCATION 6/12/24.
- ARAMCO FDP SAUD ALKHALDI ID# 834910 OFF LOCATION 6/13/24.
- KUMAR, SUVESH FROM RTOC TECHNICAL DEPARTEMENT VISITED THE RIG AND DISCUSSED RTOC SUPPORT & AREA TO IMPROVE OPERATIONS.
=========================================-DPS PERSONNEL-=============================================
- DPS RIG SUPT. AMR ABDELHAMEED # 8603300 LAST RIG VISIT 06/01/24.
- DPS QMHSE MANAGER MOHAMMED ELSAEED LAST RIG VISIT ON 02/26/24.
- DPS OPERATION MANAGER AMR IBRAHIM ON LOCATION 05/08/24.
- DPS ELECTICAL SUPERVISOR AHMED HASSAN LAST RIG VISIT 04/06/24.
- DPS HSE SECTION HEAD AMR EL HEBAISHY ON LOCATION 06/03/24.
================================================================================================
- OES MUD ENGINEERS ON LOCATION 02/29/24.
- MI SWACO CUTTING DRYER SYSTEM CREW & EQUIPMENT 03/10/24.
- MI SWACO BARITE BULKERS CREW & EQUIPMENT 03/10/24.
- SCH MUD ENGINEER ON LOCATION ON 04/30/24.
- SLB TWO FRAC TANKS ON 05/10/24. RELEASED ON 06/03/24.
==============================================HSE==================================================
SAFETY TOPICS:
- MOST RECENT HSE ALERTS.
==================== RENTAL EQUIPMENT ===========================
- RECEIVED SLB 4-3/4" DRLG JAR SN# DJR-DRLG-HYDRA-OSC108795A ON 05/22/24 @ 21:00 HRS. P/U ON 05/29/24 @ 07:00 HRS. L/D ON 6/6/24. @ 18:00 HRS.
- RECEIVED SLB 4-3/4" DRLG JAR SN# DJR-DRLG-HYDRA-07189D ON 06/05/24 @ 17:00 HRS. P/U ON 6/7/24 @ 01:00 HRS.
- BACKLOADED CORETRAX 5" PBL SUB ON 06/16/24 @ 22H00.
========================================NEXT LOCATION================================================
- HWYH-1311: 95% READY.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1358 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 03/07/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 16,060 2.36 311.8 0 16,053 54.61 -86.39 335.31 0.08

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
98 PCF 2 0 API 62 1,100 Volts 5.03 0 35,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.8 HTHP 14 16 0 7 / 11 RELIANT 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 40 24 6/7 0 0 3.4
63
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
98 PCF 2 0 API 62 1,100 Volts 5.03 0 35,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.6 HTHP 14 16 0 7 / 11 RELIANT 1.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 41 24 6/7 0 0 5.2
64

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
13 15,217 16,060 DP Av DC Av Bit HHP 14 90 M333 5.875 SMT
Pressure GPM Jet Vel 1,350.29 481.87 45 I-Row O-Row DC Location Bearings
3,990 235 168 2 2 BT G X
BIT DATA
Serial Number Type Jets TFA
SA00407 MR613C 3 x 14 / 0.451
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 216.5 326 335 318 4,500 0
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/14/2024 N/A NORMAL ONSHORE DUSTY 4,310 PRE-TOUR
MEETINGS

Company RZT RIG OES SMI MJH NFT XLG RIG ARM MI2 ARM BAW SCM CRW HLH

Category CTRG RIG DFMS DFMS SEC FILT MLS OTHR OTHR SCS WSC WLS PCS WBCS LHES
PERSONNEL
14 40 1 1 8 3 3 10 1 4 2 6 3 1 2
Total
AND SERVICES No. of Persons
99
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 12 24 24

Operating Hours. 0 24 24 24 0 0 24 0 24 24 24 24 0 0 0

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 319 233 82 900

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2392 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/31/2024 - 07/26/2024
Report ID: OPERLMTDMRREP

DPS-45 @ UTMN-2392 Limited Morning Report for 06/18/2024


Objective : (MK-1 KHUFF-C Foreman(s)BOUHADJA, SID AHMED / ALSAIKHAN, IBRAHIM HUSSAIN
D&WO Morning Report (Service Providers View) Charge #: PRE-SET WELL IN THE Engineer ALDOSSARY, MAJED ABDULAZIZ
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23057-2392) SOUTHERN PART OF THE Manager SHAIKH, ALI JAFER
DPS-45
UTMN FIELD.) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 882-167-77 1-1064 013-577-61 60 013-577-61 43
Date: Tuesday 06/18/2024 UTMN-2392 (0) UTMN_2392_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
013-577-61 30 013-829-38 89

Last 24 hr operations Next 24 hr plan


WH WORK, N/U & P/T 26-3/4" BOP. P/U & M/U 16" ROT. BHA & RIH. CHC, C/O CMT+ S.T., ROTARY DRILL 16" HOLE SECTION TO CP AT +/-4,858' (50' INTO MDTM).
Location Next Location
THE WELL IS LOCATED 169 KM FROM DH MAIN GATE. UTMN-3056
Current Depth (ft) Liner TOL MD TVD Formation Tops
2,565 Last Csg Size MD TVD Size Top
18 5/8 2565 2565 Formations Comments
Depth
AHMD 2,505 3' DEEP
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
2565 (Date) 100 0 169
11.8 (06/06/2024@0830 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0600 1 0 22 N WH OTH NA RIG 2565 2565
CONT' ALLOWING WELL HEAD TO COOL

0600 - 0800 2 0 22 N WH NU WH CAM 2565 2565 INSTALL 2 X 3-1/8" 5M GATE VALVES, PRESSURE TEST SAME W/ 5000 PSI - OK.
(PN: 141553-31-49-15), (SN: 122149722002, 12214972208).

0800 - 1200 4 0 22 N BOP NU BOP RIG 2565 2565 PJSM, N/U 26-3/4" 3M CLASS"A" BOP AND RELATED EQUIPMENT & FUNCTION TEST
BOPE - OK.
1200 - 1330 1.5 0 22 N DRLG HT BHA RIG 2565 2565
L/D REST OF OLD 22" BHA FROM DERRICK.

RIH 3 STD X 5-1/2" HWDP, P/U & M/U CAM TEST PLUG ASSY. LAND TEST PLUG ON
1330 - 1500 1.5 0 22 N BOP BOPT BOP RIG 2565 2565
WH.
> FILLED BOP & FLUSHED BOP, CHOKE LINE, KILL LINE, POOR BOY WITH WATER.

PRESSURE TEST 26-3/4", 3M BOPE RAMS 300/3000 PSI, HYDRILL 300/1400 PSI AS
1500 - 1930 4.5 0 22 N BOP BOPT BOP RIG 2565 2565
PER ARAMCO STANDARDS.
- PERFORM ACCUMULATOR DRILL.
1930 - 2030 1 0 22 N DRLG HT BHA RIG 2565 2565
POOH & L/D TEST ASSY. L/D 9 JTS X 5-1/2" HWDP.
2030 - 2100 0.5 0 22 N WH SET WBSH RIG 2565 2565
P/U & M/U CIW RUNNING TOOL ASSY, INSTALL WB, R/D RUNNING TOOL ASSY.
2100 - 2230 1.5 0 22 N DRLG RR DWKS RIG 2565 2565
PJSM; SLIP AND CUT DRILL LINE.

P/U AND M/U 16'' NEW PDC REED BIT "E1426-1A", RIH WITH P/U 16" INSPECTED
2230 - 0345 5.25 0 22 N DRLG HT BHA RIG 2565 2565
ROTARY BHA FROM RACK.
- P/U JAR AT 01:15 HRS.
0345 - 0415 0.5 0 22 N DRLG TI STDP RIG 2565 2565 1192 2300
CONT'D RIH 16" RTRY BHA ON 5-1/2" DP.
0415 - 0459 0.75 0 22 N DRLG RW BIT RIG 2565 2565 2300 2433
WASH DOWN & TAG TOC AT 2,433 FT ... ONGOING AT RT.
Foreman Remarks

UTMN-2392 WILL BE DRILLED AS MK-1 KHUFF-C PRE-SET WELL IN THE SOUTHERN PART OF THE UTMN FIELD. THE WELL WILL BE DRILLED TO A TOTAL DEPTH OF 13,110' MD/11,826' TVD AT 67
DEG INCLINATION INTO +/- 10 FT TVD INTO KFCC.

======================= ARAMCO PERSONNEL ON LOCATION ====================================================


- ARAMCO CLERK HASAN HUSSAIN MOHMMED # 796578 LEFT LOCATION ON 06/12/24.
- ARAMCO CLERK MOHAMMED AL-SHAMMARI #814099 LEFT LOCATION ON 06/12/2024.
- AHMAD AL MUTAIRI PDP ARAMCO #794589 HOT-1 LEFT LOCATION ON 06/16/24.
- FERAS AL-MULHIM, ARAMCO TRAINING FOREMAN #894006 ON LOCATION 06/12/24.

=======================THIRD PARTY PERSONNEL ON LOCATION ==================================================


- EMEC MUD ENGINEER ON LOCATION.

=======================DPS VISITOR======================================================================
- HAYTEM AL GOHARI DPS GM VISITED RIG ON 04/18/24
- AMR IBRAHIM DPS OM VISITED RIG ON 04/18/24
- DPS HSE MANAGER MOHAMED ELSAEED VISITED RIG ON 04/30/24
- FAHAD ALDOSSARI DPS HR VISITED RIG ON 7/19/23
- DPS HSE SUPERVISOR AHMED MAGID VISITED RIG 11/21/23
- AMR ABDELHAMEED DPS RIG SUPT VISITED LOCATION ON 06/17/24.
- DPS HSE SUPERVISOR; MAHMOUD ZAHRA VISITED LOCATION 11/17/23.
- AMR ELHEBAISHY DPS HSE SECTION HEAD VISITED LOCATION 05/19/24.

====================== HSE ============================================================================


DISCUSSED:
- LINE OF FIRE

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2392 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/31/2024 - 07/26/2024
Report ID: OPERLMTDMRREP

- DISCUSSED RIG OSS


- HSE ALERT: 72-24 SNAKE BITE & SCORPION STING INCIDENTS
- MIXING PPE.
- DRILLING OPERATION.

NEAR MISS:
DRILLS:
====================== EQUIPMENT ON LOCATION ============================================================

=======================VACUUM TANKERS =================================================================

=======================RENTAL DOWNHOLE================================================================
- RECEIVED NOV 9-1/2" HMJ SN: HMJ950-4326074 ON 06/17/24 @ 03:45 HRS. P/U ON 06/18/24 @ 01:15 HRS.

=======================OPTIMIZATION====================================================================
- GDD COST OPTIMIZATION: NONE.
- KILL MUD: NONE.
- WATER CONSERVATION:

=======================CASING POINT=====================================================================
> 24" CSG PT, (740' VS. 819' PLAN). ROP (13.62 FT/HR VS. 15.7 FT/HR PLAN. FLAT TIME (91 HRS VS. 31.5 HRS PLAN)
> 18-5/8" CSG PT, (2565' VS. 2551' PLAN). ROP 34.11X FT/HR VS. 37.7 FT/HR PLAN. FLAT TIME (XX HRS VS. 77.3 HRS PLAN)
> 13-3/8" CSG PT, (XXXX' VS. 4858' PLAN). ROP (XXXX FT/HR VS. 40.5 FT/HR PLAN. FLAT TIME (XX HRS VS. 130.3 HRS PLAN)
> 9-5/8" CSG PT, (XXXX VS. 10,392' PLAN). ROP (XXXX FT/HR VS. 42.4 FT/HR PLAN. FLAT TIME (XX HRS VS. 142.1 HRS PLAN)
> 7" LN PT, (XXXX' VS. 12,259' PLAN). ROP (XXXX FT/HR VS. 20.3 FT/HR PLAN. FLAT TIME (XX HRS VS. 145.3 HRS PLAN)
> 4-1/2" LN PT, (XXXX' VS. 13,110' PLAN). ROP (XXXX FT/HR VS. 16.9 FT/HR PLAN. FLAT TIME (XX HRS VS. 20.2 HRS PLAN)
> EOW FLAT TIME PLAN: XXX HRS.
=======================NEXT LOCATION====================================================================
UTMN-3056
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 4 API 0 0 Volts 4.29 10.5 500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
85 0 HTHP 89 28 0 12 / 18 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 22 11 8 / 10 10 200 0
70
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 4 API 0 0 Volts 4.29 10.5 500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
85 0 HTHP 89 28 0 12 / 18 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 22 11 8 / 10 10 200 0
70

MUD BENT UTG-XG


TREATMENT 23 ( 2500L ) 5 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
3 2,565 2,565 DP Av DC Av Bit HHP N/A N/A S423 16 REED
Pressure GPM Jet Vel 86.86 106.71 216 I-Row O-Row DC Location Bearings
N/A 800 220 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
S308269 E14261A 9 x 13 / 1.167
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit REED 1 1.15 S308269
2 Near Bit Roller Reamer RIG 16 1 16 3 9.1 7 5/8 REG 7 5/8 REG 0 3 POINT 45-16-001
3 Drillcollar RIG 9.5 1 9.5 2.813 29.73 7 5/8 REG 7 5/8 REG 0 SPRL
4 String Reamer RIG 16 1 9 3.06 8.91 7-5/8" REG 7-5/8" REG 0 1005-1-1
DRILL STRING 5 Drillcollar RIG 9.5 1 9.5 2.813 30.55 7 5/8 REG 7 5/8 REG 0 SPRL
6 String Reamer RIG 16 1 9 3.06 8.61 7-5/8" REG 7-5/8" REG 0 45-16-003
7 Drillcollar RIG 9.5 12 9.5 2.813 362.03 7 5/8 REG 7 5/8 REG 0 SPRL
8 Hydro-Mechanical Jar NOJ 9.5 1 9.5 28.64 0 9504326074
9 Drillcollar RIG 9.5 2 9.5 2.813 56.86 7 5/8 REG 7 5/8 REG 0 SPRL
10 Crossover RIG 9.5 1 9.5 2.813 2.25 6 5/8 REG 7 5/8 REG 0 45-6
11 Drillcollar RIG 8.5 3 8.5 3 90.77 6 5/8 REG 6 5/8 REG 0 SPRL
12 Crossover RIG 8.25 1 14 4 2.26 7 5/8 REG 7 5/8 REG 0 300-74-7
13 Heavy Weight Drillpipe (HWDP) RIG 6.625 9 6.625 5 279.63 6-5/8FH 6-5/8FH 58.1 CONV
14 Crossover RIG 8 1 8 2.875 3.27 XT54 6 5/8 FH 0 45-69-1A

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2392 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/31/2024 - 07/26/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
15 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 5.5 3.25 279.42 XT54 XT54 54 CONV
16 Drillpipe RIG 5.5 1 5.5 4.67 30 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/17/2024 N/A N/A N/A N/A 3,908 N/A

Company RTC RZT RIG EMC MJH RIG RIG RIG ARM MI2 ARM CAM

Category BITS CTRG RIG DFMS SEC SEC MED OTHR OTHR SCS WSC WHES
PERSONNEL
1 14 40 1 8 2 1 11 1 3 2 2
Total
AND SERVICES No. of Persons
86
INFORMATION
Personnel on Loc. Hrs. 11 24 24 24 24 24 24 24 24 24 24 3

Operating Hours. 1 0 24 24 0 0 0 12 12 24 24 3

Standby/Tankers Others
TRUCKS/BOATS
ARAMCO PICK UP AB-5435 RIG AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 517 156 65 1850

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2212 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 06/17/2024 - 08/26/2024
Report ID: OPERLMTDMRREP

DPS-46 @ UTMN-2212 Limited Morning Report for 06/18/2024


Objective : (MILL 706' OF 7" Foreman(s)KICINSKI, KAROL / MOKHTARI, RAOUF
D&WO Morning Report (Service Providers View) Charge #: LINER, SIDETRACK & DRILL Engineer MEJIAS, ERNESTO JOSE
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved DPS-46 (71-24057-2212) TWO HOLE SIZE IN KHFB PRE- Manager NAJIM, KHALID YOUSEF
SET.) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 00-88-216 -777110-65 5721864 HSE 572-07 27
Date: Tuesday 06/18/2024 UTMN-2212 (0) UTMN_2212_0 OTHER VSAT
CLERK 877- 2217

Last 24 hr operations Next 24 hr plan


RIG DOWN ON SDGM-1174, RIG MOVE AND RIG UP ON UTMN-2212. RIG DOWN ON SDGM-1174, RIG MOVE AND RIG UP ON UTMN-2212.
Location Next Location
THE WELL IS LOCATED 0.704 KM N8E OF UTMN-1383 AND 1.013 KM N16E OF UTMN-1364. SDGM-1041
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size 9,832 12,667 12,333 Top
9 5/8 10338 10336 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 100 0 172
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

GENERAL RIG DOWN @ SDGM-1174, RIG MOVE TO UTMN-2212.


> HOLD PRE-MOVE SAFETY MEETING ALL RIG CREW & MOVE SUPERVISORS,
DISCUSSED MOVE PLAN AND RISK ASSESSMENT.
> DISMENTLE & MOVE MAIN CAMP,
> R/D ROTARY TABLE.
> PREPARE AND LOWER DRAWWORKS.
> PREPARE AND LOWER MAST.
0500 - 0459 24 0 PRE M RM RD NA RIG 14681 14681
> R/D MONKEY BOARD.
> DISASSEMBLE CROWN SECTION, DISMANTLE MAST SECTION.
> R/D A-LEG.
> REMOVE RAISING LINE SHEAVES.
> CONT'D GENERAL RIG DOWN, MOVE MISC. EQUIPMENT & BOXES.

> DAILY LOADS: 46, TOTAL LOADS: 146.


> RIG DOWN: 70%, RIG UP: 20%, RIG MOVE: 60%
Workover Objectives
Foreman Remarks

================================WELL OBJECTIVE================================================================
TO MILL 706' OF SMITH 7" LINER, SIDETRACK THE WELL AS DEVIATED KHFC PRE-SET WELL FOR FUTURE UBCTD INTERVENTION WITH KHFB AS SECONDARY OBJECTIVE IN TWO HOLE SIZES THEN
COMPLETE THE WELL WITH 4-1/2" CEMENTED LINER AND 4-1/2" UPPER COMPLETION.
================================ODF CORRECTION===============================================================
> ODF FOR RIG DPS-46 = 31.0 FT
> ODF CORRECTION FROM RIG PD-787 (29 FT) = -2.0 FT.
===============================ARAMCO PERSONNEL ==============================================================
> ARAMCO MATERIAL EXPEDITOR ALI ALGHAMDI #814796 ON LOCATION SINCE 06/17/2024.
========================================= RIG VISIT=================================
>
=============================== SERVICE COMPANIES ===============================================================
> EMEC MUD ENGINEER.
========================RENTAL TOOL ==========================================================================
>
========================CLOSED LOOP SYSTEM====================================================================
> NOV CUTTING DRYER SYSTEM.
> CONSERVE WATER BY USING VACUUM TANKERS TO CLEAN MUD SYSTEMS.
=============================== RIG HSE=======================================================================
> DRILLS: NONE
> NEAR MISS: NONE
> AUDIT STATUS: NO OPEN ITEMS, ALL CLOSED.
> DISCUSSED HSE ALERT: HSE ALERT 31-24 - SUPER SACK HOIST CHAIN PARTED.
================================NEXT LOCATIONS===============================================================
> UTMN-2212, STRIP OUT DONE, PRE WORK OVER MEETING DONE, LOCATION READNESS 100%.
> SDGM-1052, PRE WORKOVER MEETING WAS DONE ON 04/25/2024, STRIP OUT IS REQUIRED.
===============================WELLSITE SERVICES==============================================================
> 6 VACUUM TANKER F/ AL MADEED ON LOCATION, DRSS# 1004327069.
=============================== RIG MOVE DATA ===================================
> MOVE RESOURCES: 6 CRANE, 30 FLAT TRUCKS, 6 X LOW BED, 2 EXTENDED LOW BED, 2 SIDE REACK, 2 FORK LIFT, 2 CREW BUS, 1 ESCORT CAR, DOZER.
> PRE-MOVE LOADS: 48 | DAILY LOADS: 46 | TOTAL LOADS: 146.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A 2 PER WEEK NORMAL ONSHORE SUMMER 1,628 PRE TOUR MEETING

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2212 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 06/17/2024 - 08/26/2024
Report ID: OPERLMTDMRREP

Company RZT RIG EMC RIG ARM ARM

Category CTRG RIG DFMS OTHR OTHR WSC


PERSONNEL
14 45 1 29 1 2
Total
AND SERVICES No. of Persons
92
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24

Operating Hours. 0 24 12 12 12 24

Standby/Tankers Others
TRUCKS/BOATS
ARAMCO TRUCK AB-5589. DPS AMBULANCE 4211-XUB.

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 330 160 N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2380 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/06/2024 - 06/21/2024
Report ID: OPERLMTDMRREP

DPS-5 @ HRDH-2380 Limited Morning Report for 06/18/2024


Objective : (MK-2 S-SHAPE Foreman(s)IBRAHIM, ALI ABDULRAZAK / ALSAIHATI, ABDULLAH ZUHAIR
TO 150 FT TVD INTO PUZU) Engineer KHAN, KAFAYAT ULLAH
D&WO Morning Report (Service Providers View) Rig Charge #: Manager ALSHAIKH, SABER YASSEN
Copyright 2024 Saudi Aramco. All Rights Reserved DPS-5 (66-23058-2380)
THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
+882167771 2714 013-577-39 81 DPS 013-57 7-3555
(0500-0500) Saudi Aramco Well Wellbores:
HRDH-2380 (0) HRDH_2380_0 OTHER VSAT OTHER VSAT CONTRACTOR
Date: Tuesday 06/18/2024
013-875-64 85 013-829-38 35(CLINIC) /CLERK VSA T
013-577-35 55

Last 24 hr operations Next 24 hr plan


NEGATIVE TEST. REVERSE OUT WATER, POOH & LD SAMAA FSC PKR. CONT. POOH & LD SAMAA FSC PKR. P/U, M/U & RIH W/SAMAA WBCO ASSY ON HALB POLISH MILL.
CHC, PIKLING JOB. SHORT TRIP, CHC FOR NTU
Location Next Location
HRDH-2380 IS 285 KM F/ DMG, 20 KM AFTER HRDH BRIDGE ON KHARKHEER ROAD, RIGHT TURN 6 KM SKID. HRDH-2533
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
14,286 Size 12337 11841 Size 12,016 14,283 13,783 Top
Formations Comments
9 5/8 7 Depth
KC12 12,562 56' SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KFDA 12,582 55' SHALLOWER
14286 (Date) 100 0 285 BKDC 13,088 47' SHALLOWER
68.5 (04/10/2024@1630 ) UNZA 13,165 37' SHALLOWER
PUZU 13,636 52' DEEPER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

ALLOW PRESSURE TO STABILIZE & RECORD FINAL DISPLACEMENT PRESSURE FOR


0500 - 0615 1.25 0 EOW N CT CIRC MPMP RIG 14286 14286
45 MINS, SET THE LINER TOP TEST TOOL BY LANDING ON THE LINER TOP AND
SETTING DOWN THE SAME AMOUNT OF WEIGHT USED PREVIOUSLY.

PERFORM INFLOW NEGATIVE TEST FOR MINIMUM 4 HOURS AS PER ARAMCO


0615 - 1115 5 0 EOW N CT CIRC MPMP RIG 14286 14286
PROCEDURE. RECORD THE RESULTS & PLOT ON HORNER PLOT & EMAIL RESULTS
TO DE & DRLG/SI, GOOD TEST, CONFIRMED.

RE-PRESSURE THE DRILL STRING TO EQUALIZE DIFFERENTIAL PRESSURE IN THE


1115 - 1215 1 0 EOW N CT CIRC MPMP RIG 14286 14286 ANNULUS & DRILL PIPE, UNSET THE LINER TOP TEST TOOL PACKER ELEMENT BY
P/UP STRING SLOWLY TO THE PICKUP WEIGHT AS PER SAMAA ENGINEER
INSTRUCTION & ALLOW THE RUBBER ELEMENT TO RELAX.
1215 - 1445 2.5 0 EOW N CT CIRC MPMP RIG 14286 14286
REVERSE CIRCULATE WATER & HI-VIS PILL @ MAX 3 BPM.

1445 - 1530 0.75 0 EOW N CT WCNT NA RIG 14286 14286 FLOW CHECK, WELL STATIC.
> PUMP SLUG.
1530 - 1600 0.5 0 EOW N CT HT PEL RIG 14286 14286
LAY DOWN TEST ASSEMBLEY.
1600 - 2200 6 0 EOW N CT WBCO WBCL SAM 14286 14286
POOH SAMAA FSC PKR ASSEMBLY W/CONTROL SPEED TO 7552'.

PJSM, SECURE BLOCK & TDS. SLIP & CUT DRLG LINE, RESET CROWN SAVER.
2200 - 0000 2 0 EOW N CT RR DWKS RIG 14286 14286
SECURE DEADLINE ANCHOR, FUNCTION TEST SAME - OK.
> MONITOR WELL ON TRIP TANK, WELL STATIC.

0000 - 0330 3.5 0 EOW N CT WBCO WBCL SAM 14286 14286 POOH SAMAA FSC PKR ASSEMBLY W/CONTROL SPEED TO 2162'.
> FLOW CHECK, WELL STATIC.

HPJSM, LD 9-5/8" SAMAA FSC PKR, CHANGE ELVATOR TO 4" & CONT'D POOH 16
0330 - 0430 1 0 EOW N CT HT BHA RIG 14286 14286
JT X 4" DP TO 1635'.
> FLOW CHECK, WELL STATIC.
0430 - 0459 0.5 0 EOW N CT HT PEL RIG 14286 14286
R/U ITS 2-7/8" TBG HANDLING EQUIPMENT. ONGOING AT REPORT TIME.
Foreman Remarks

HRDH-2380 IS PLANNED AS MK-2 WELL TO BE DRILLED WITH VERTICAL S-SHAPE PROFILE HOLE ACROSS UNYZ-B/C RESERVOIR AS A PRIMARY
TARGET AND UNZA AS A SECONDARY TO WELL TD 150 FT INTO PUZU. THE WELL WILL BE COMPLETED WITH 15K CEMENTED LINER.
--------------------------------------------------------ARAMCO PERSONNEL-----------------------------------------------------------------------
> ARAMCO CLERK NOORUL RILWAN SULTHAN ARIEF ID# 8393134 ON LOCATION SINCE 05/11/2024.
> ARAMCO PDP FAHAD ALMULHEM #817961 ON LOCATION SINCE 06/16/2024.
> SGGDD SAFETY ADVISOR KALADHAR TEEK ID# 803265 ON LOCATION ON 06/15/2024 TO PERFORM HAZCOM AUDIT, PTW ASSESSMENT.
----------------------------------------------------- SCE CO. PERSONNEL---------------------------------------------------------------------------
> EMEC MUD ENGINEER ON LOCATION ON 4/10/2024.
> SLB CLOSED LOOP SYSTEM CREW ON LOCATION 4/10/2024.
> SLB BARITE BULK ENGINEER ON LOCATION 4/10/2024.
> ITS CASING RUNNING CREW ON LOCATION ON 06/12/2024.
> BAKER FILTRATION ENGINEER ON LOCATION ON 06/14/2024.
> SAMAA WBCO ENGINEER ON LOCATION ON 06/14/2024.
> HALLIBURTON LINER HANGER ENGINEER ON LOCATION ON 06/17/2024.
> OILSERV CEMENTING CREW ON LOCATION ON 06/17/2024.
------------------------------------------------------- RENTAL EQPT----------------------------------------------------------------------------
> BAKER FRAC TANKS R/U ON 06/17/2024 @12:00 AM.
----------------------------------------------------------------- HSE ----------------------------------------------------------------------------------
> SAFETY OBS: 20.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2380 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 04/06/2024 - 06/21/2024
Report ID: OPERLMTDMRREP

> DRILLS: TRIP DRILL.


> NEAR MISS: 06/10/2024. ID: 7195107.
> HSE ALERTS: -'HSE ALERT 67-24 - STRUCK BY MANUAL TONG.
> HSE INSPECTION STATUS:
- 2ND Q-3MCI-24: TOTAL FINDINGS (19) : CLOSED ITEMS (19) & OPEN ITEMS ( 0 ).
- WCI-2024 : TOTAL FINDINGS (4) : CLOSED ITEMS (4) & OPEN ITEMS (0)
- RHSEI-24 Q1": TOTAL FINDINGS ( 36 ) : CLOSED ITEMS ( 36 ) & OPEN ITEMS ( 0 ).
--------------------------------------------------------WELLSITE SERVICES------------------------------------------------------------------------------
> NONE.
------------------------------------------------------------ RIG VISIT--------------------------------------------------------------------------------------
> NONE.
------------------------------------------------------------ NEXT WELL------------------------------------------------------------------------------------
> HRDH-2533 100% READY.
----------------------------------------------------------MISCELLANEOUS -------------------------------------------------------------------------------
> NONE.
------------------------------------------------------------ DIRECTIONAL --------------------------------------------------------------------------------
> FOLLOWING DIRECTIONAL HRDH-2380_L0_PLAN-3.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 14,286 2.43 304.41 0 13,786 -534.49 -391.25 2,173.17 0.01
MUD DATA
MUD
TREATMENT
BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 3.625 1 3.625 0 0.55 2-3/8"REG 7913874
2 Bit Sub RIG 2.88 1 12 4.813 3 8 5/8 REG 6 5/8 REG 8.7 13096805
3 Drillpipe RIG 2.875 52 6.625 5.901 1,630.89 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM
4 Crossover ARM 3.5 1 3.5 1 1.37 NC26 2 3/8 REG 0 130594069
5 Drillpipe RIG 4 16 6.625 5.901 487.84 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM
DRILL STRING 6 Component Not listed SAM 5 1 4.88 2.5 1.53 3-1/2 IF XT-39 14 98496-1-4
7 Component Not listed SAM 8.25 1 8.25 1.5 1.62 4.5"IF 3-1/2 IF 0 1805052-3
8 Component Not listed SAM 8.2 1 8.2 1.5 7.41 4.5"IF 4.5"IF 0 1805052-3
9 String Magnet SAM 8.25 1 5.5 3 6.22 NC50 NC50 14 WBS9-72133
10 Junk Basket SAM 8.25 1 16 3.5 19.88 6 5/8 REG 6 5/8 REG 14 WBS9-121620
11 Crossover RIG 5.5 1 5.5 3.813 1.64 4 1/2 VAM 4 1/2 VAM 24.7 44698-1A
12 Drillpipe RIG 5.5 1 6.625 5.901 30.5 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/15/2024 06/15/2024 N/A N/A NORMAL 3,640 N/A

Company ITS RZT RIG EMC SMI BFS RIG ARM OTH MI3 ARM SAM OCT HLH

Category CSR CTRG RIG DFMS DFMS FILT OTHR OTHR VAC WMS WSC WBCS PCS LHES
PERSONNEL
4 14 42 1 1 2 7 3 2 2 2 1 3 1
Total
AND SERVICES No. of Persons
85
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 12 24 24 24 12 12

Operating Hours. 0 0 24 12 12 12 0 12 10 0 24 24 0 0

Standby/Tankers
TRUCKS/BOATS
ARAMCO PICKUP AB-6305

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 1121 91 71 1800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NJYN-18 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 05/14/2024 - 08/02/2024
Report ID: OPERLMTDMRREP

DPS-74 @ NJYN-18 Limited Morning Report for 06/18/2024


Objective : (RE-ENTER & MILL Foreman(s)CASAVANT, DAVID ALLAN / ALFONZO BRICENO, LUANI ALEJANDRO
D&WO Morning Report (Service Providers View) Rig Charge #: 942 ' OF 7" LINER, SIDETRACK Engineer WIJANARKO, MUHAMMAD
Copyright 2024 Saudi Aramco. All Rights Reserved DPS-74 (71-24535-0018) & DRILL TWO HOLE SIZE.) Manager NAJIM, KHALID YOUSEF
Daily Onshore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 88-216-777 1-2839 013-577-96 70 /CLERK VSA
Date: Tuesday 06/18/2024 NJYN-18 (0-2) NJYN_18_3 T
013-577-96 69

Last 24 hr operations Next 24 hr plan


CONT POOH W/ RAWABI MILLING ASSY, PRESSURE TEST BOP'S, P/U, M/U & RIH W/ HALLIBURTON CONT RIH, HALLIBURTON RSS/MWD/GR DIR DRILL 8-3/8" HOLE SECTION TO 7" LINER POINT.
8-3/8" RSS/MWD/GR DIR DRILLING BHA. (17210' MD/14493' TVD @ 74 INC & 303 AZM (5'TVD INTO UNZA S3)
Location Next Location
40 KM SOUTH OF HARADH BRIDGE ON KHARKHIR ROAD, LEFT 11 KM ON SKID ROAD. TINT-55
Current Depth (ft) Liner TOL MD TVD Formation Tops
11,288 Last Csg Size MD TVD Size Top
9 5/8 11165 11165 Formations Comments
Depth
11140' TVD (AS PER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) BJDM 11,142
PROGRAM)
11288 (Date) 100 0 294
31.5 (05/17/2024@1800 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0845 3.75 0-2 8 3/8 N DRLG TO STDP RIG 11288 11288 8450 1497
POOH W/ RAWABI 8-3/8" OH WHIPSTOCK ASSY & 5-1/2" DP.
0845 - 0900 0.25 0-2 8 3/8 N DRLG WCNT NA RIG 11288 11288
FLOW CHECK 5 STANDS ABOVE BHA - WELL STATIC.
0900 - 0915 0.25 0-2 8 3/8 N DRLG TO STDP RIG 11288 11288 1497 1024
POOH W/ RAWABI 8-3/8" OH WHIPSTOCK ASSY & 5-1/2" DP.
0915 - 0930 0.25 0-2 8 3/8 N DRLG WCNT NA RIG 11288 11288
FLOW CHECK @ TOP OF BHA - WELL STATIC.

POOH & L/D 8-3/8" RAWABI MILLING ASSY. BREAK OUT & L/D HALLIBURTON
0930 - 1130 2 0-2 8 3/8 N DRLG HT BHA RIG 11288 11288 UBHO & RAWABI BI-MILLS.
> LEAD MILL: 1/32" UNDER-GAUGE.
> FOLLOW MILL: FULL-GAUGE.
1130 - 1200 0.5 0-2 8 3/8 N DRLG RR CSYS RIG 11288 11288
RIG SERVICE. CHANGE WASH-PIPE.

1200 - 1230 0.5 0-2 8 3/8 N DRLG OTH NA SPS 11288 11288 INSTALL HALLIBURTON DIRECTIONAL DRILLING SENSOR ON STANDPIPE
GOOSENECK.
1230 - 1315 0.75 0-2 8 3/8 N WH RTRV WBSH RIG 11288 11288
RETRIEVE 11" WEAR BUSHING.

1315 - 1415 1 0-2 8 3/8 N BOP BOP BOP RIG 11288 11288 P/U & M/U JETTING TOOL.
> JET ACROSS WELLHEAD & BOPS.

1415 - 1545 1.5 0-2 8 3/8 N BOP BOP BOP RIG 11288 11288 RIH 5 STANDS 5-1/2" HWDP. M/U TEST PLUG ASSY & SET SAME. FLUSH BOP &
CHOKE MANIFOLD W/ WATER.

PRESSURE TEST 13-5/8" 10K BOP AND RELATED EQUIP TO 300PSI LOW /
1545 - 1945 4 0-2 8 3/8 N BOP BOPT BOP RIG 11288 11288
10000PSI HIGH X 10 MIN EA TEST; TEST ANN PREVENTOR 300PSI LOW / 7000PSI
HIGH.
1945 - 2015 0.5 0-2 8 3/8 N BOP BOPT BOP RIG 11288 11288
LAY DOWN TEST PLUG ASSY. POOH 5 STANDS 5-1/2" HWDP.
2015 - 2100 0.75 0-2 8 3/8 N WH SET WBSH RIG 11288 11288
SET 11" WEAR BUSHING.

HPJSM. M/U BIT #26: 8-3/8" REED PDC BIT (TYPE: SK616M4D, SER #S308420)
> P/U & M/U NEW HALLIBURTON RSS/MWD/GR 8-3/8" DIRECTIONAL DRILLING
2100 - 0115 4.25 0-2 8 3/8 N DRLG HT BHA SPS 11288 11288 BHA.
> RIH 2 STDS 5-1/2" HWDP & NEW 6-3/4" NAPESCO DRILLING JAR SER #HMJ-650-
065.
> SHALLOW TEST HALLIBURTON MWD TOOLS.

RIH W/ HALLIBURTON 8-3/8" RSS/MWD/GR DIR DRLG BHA & 5-1/2" HWDP.
0115 - 0200 0.75 0-2 8 3/8 N DRLG HT BHA RIG 11288 11288
> FILL PIPE & BREAK CIRC.
> DIRECTIONAL CALLIBRATE BLOCK HEIGHT.

RIH W/ 8-3/8" HALLIBURTON RSS/MWD/GR BHA & 5-1/2" DP. (CASED HOLE)
0200 - 0430 2.5 0-2 8 3/8 N DRLG TI STDP RIG 11288 11288 647 4436
> FILL PIPE & BREAK CIRC EVERY 20 STDS.
> TEST MWD EVERY 40 STANDS.
0430 - 0459 0.5 0-2 8 3/8 N DRLG SURV MWD SPS 11288 11288
CIRCULATE & CHECK SPERRY MWD/RSS.
Workover Objectives
Foreman Remarks

====================================ARAMCO PERSONNEL===========================================================
> ARAMCO CLERK YUBARAJ KHATRI #8961425 ON LOCATION.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NJYN-18 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 05/14/2024 - 08/02/2024
Report ID: OPERLMTDMRREP

> ARAMCO SAFETY FIELD COMPLIANCE ENEZI, NAWAF F #792058 ON LOCATION SINCE 06/17/2024.
> ARAMCO PDP BASSAM S. ALHARBI #819071 ON LOCATION SINCE 06/17/2024.
====================================RIG VISIT ===================================================================
> NONE.
====================================SAFETY & HSE FINDINGS STATUS ===================================================
> DRILLS: 2 X PIT DRILLS, 2 X TRIP DRILLS, 1 X H2S DRILL, 1 X ACCUMULATOR DRILL.
> NEAR MISS: NONE.
> OBSERVATIONS: NONE.
> REVIEWED HSE ALERTS: NONE.
============================================WELL INFO==========================================================
> TOP OF 8-3/8" OPEN HOLE WINDOW @ 11265'.
> BOTTOM OF 8-3/8" OPEN HOLE WINDOW @ 11278'.
> BOTTOM OF 8-3/8" RATHOLE @ 11288'.
> WHIPSTOCK SETTING DEPTH @ 11293' @ 332 DEG.

> MILLED 7" TOL @ 11319'. (154' BELOW 9-5/8" CSG SHOE)
> OLD 7" TOL @ 10377'.
> EZSV-BP SET IN 4-1/2" TBG @ 13091'.
> 4-1/2" TBG CUT @ 11671'.
=============================================DIRECTIONAL DATA===========================================
> FOLLOWING APPROVED DIRECTIONAL PLAN: NJYN-18 L-0-2 PLAN #7.
> SENSOR OFFSET TO BIT: GR: 44', DIRECTIONAL: 48'.
===============================================ON LOCATION===========================================
> 100 BBLS OF NESR VDA 20% ACID ON LOCATION SINCE 06/07/2024 @ 17:30.
> 1000 BBLS OF 140 PCF OBM KILL MUD ON LOCATION.

> 2ND BAROID MUD ENGINEER TRAINEE ON LOCATION. NO CHARGE.


====================================RENTAL EQUIPMENT & TOOLS =====================================================
> AL-MADEED WATER SPRAY TANKER ON LOCATION FOR DUST CONTROL.
> 6-1/2" HYD-MECH DRILLING JAR S/N: HMJ-650-065 ON LOCATION 06/16/2024 @ 08:00 HRS. RIH 06/18/2024 @ 01:00 HRS.
============================ SAGWD COST OPTIMIZATION & CLOSED LOOP DRILLING PRACTICE====================================
> NOT USING WATER PIT OR WASTE PIT. ONLY USING LINED CMT PIT & LINED DRIED OBM CUTTING PIT.
> 1 X SLB FRAC TANK USED FOR WASTE FLUID STORAGE.
> NOV DRYER SYSTEM (VERTI-G+AUGER+3 SIDED CUTTING BIN) RIGGED UP 06/12/2024 @ 17:00 HRS. (3 PERSONNEL)
> NOV CENTRIFUGES RIGGED UP 06/13/2024 @ 14:00 HRS. (1 PERSONNEL)

> TRANSFERRED 500 BBLS OF 106 PCF WBM MILLING FLUID TO T-517. 6/3/24
> TRANSFERRED 1500 BBLS OF 106 PCF WBM MILLING FLUID TO T-568. 6/11/24
> RECEIVED 1000 BBLS OF 140 PCF OBM KILL MUD FROM RIG NBR-196.
> RECEIVED 1000 BBLS OF 106 PCF OBM MUD FOR 8-3/8" HOLE SECTION FROM RIG SND-2008. 6/3/24

====================================NEXT WELLS=================================================================
> RIG PLANNED MAINTENANCE 7 DAYS PLANNED BEFORE NEXT WELL.
> 1ST NEXT WELL: TINT-55, ONE HOLE SIZE, UNZA DEVIATED, CCA-1 REPAIR, PRE-WO MEETING DONE 12/27/2023, STRIP-OUT DONE. LOCATION 100% READY, WOCP IS RUNNING.
> 2ND NEXT WELL: NJYN-21, TWO HOLE SIZE, UNZA DEVIATED, PRE-WO MEETING DONE 06/10/24, STRIP-OUT REQUIRED. LOCATION 0% READY, WOCP IS NOT ISSUED YET.
> 3RD NEXT WELL: MDRK-48, TWO HOLE SIZE, UNZA DEVIATED, PRE-WO MEETING DONE 06/10/24, STRIP-OUT REQUIRED. LOCATION 0% READY, WOCP IS NOT ISSUED YET.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
115 PCF 1 0 API 56 665 Volts 5 0 172,642.03
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.2 HTHP 12 14 0 9 / 10 INOVRT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 39 32 7/8 0 0 0
68
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
115 PCF 1 0 API 56 664 Volts 5 0 172,642.03
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.2 HTHP 12 15 0 9 / 11 INOVRT 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 38 32 7/8 0 0 0
67

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
26 11,288 11,288 DP Av DC Av Bit HHP N/A N/A M423 8.375 REED
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
S308420 SK616M4D 1 x 15 / 5 x 14 / 0.924
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 0 N/A N/A N/A N/A 1
DRILL STRING
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NJYN-18 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 05/14/2024 - 08/02/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit REED 8.375 1 8.375 0 0.73 4-1/2" REG 0 0 0 S308420
2 RSS SPS 6.75 1 6.75 26.65 0 13417516
3 Flex Joint SPS 5 1 6.75 3.813 9.2 NC50 NC50 59.09 14107415
4 Pony Collar SPS 6.75 1 10.22 99.7 13007869
5 Stabilizer SPS 6.25 1 4.75 2.25 3.41 NC38 NC38 97.86 10458039
6 Screen sub SPS 6.75 1 6.75 3 6.02 5 1/2 FH NC50 100.82 13409676
7 Float Sub SPS 6.75 1 6.531 2.8 2.98 NC50 NC50 0 13813050
8 Crossover RIG 6.25 1 6.25 2.625 3 XT54 NC50 90 3643613B
9 Heavy Weight Drillpipe (HWDP) RIG 5.5 3 5.5 3.25 93.02 XT54 XT54 52 CONV
10 Hydro-Mechanical Jar NPC 6.5 1 6.5 2.25 26.3 XT-54 XT-54 0 HMJ-650-065
11 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 465.75 XT54 XT54 52 CONV
12 Drillpipe RIG 5.5 1 5.5 4.67 1 XT54 XT54 24.7 XD105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/17/2024 N/A N/A N/A SEASONAL 1,634 DAILY OPERATIONS

Company NPC RWD SPS RIG RZT BAR EMC RIG ARM BRD OTH ARM

Category JST WPSTK DPDS RIG CTRG DFMS DFMS OTHR OTHR SCS VAC WSC
PERSONNEL
0 1 4 41 14 2 1 15 3 4 1 2
Total
AND SERVICES No. of Persons
88
INFORMATION
Personnel on Loc. Hrs. 0 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 4 6.5 14.5 24 0 12 12 0 12 24 10 24

Standby/Tankers
TRUCKS/BOATS
ARAMCO TRUCK AB-6312

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 512 195 13 1200

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-1037 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/04/2024 - 07/16/2024
Report ID: OPERLMTDMRREP

DQ-47L @ KHRS-1037 Limited Morning Report for 06/18/2024


Objective : (KHRS-1037 Foreman(s)ABORSHAID, MOHAMMAD ABDULHAMEED
D&WO Morning Report (Service Providers View) Charge #: WILL BE DRILLED AS S- Engineer GUIZA MEDINA, MAURICIO / DAHLAWI, ABDULILAH MAZEN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-24051-1037) SHAPE Manager SHAMMARY, FAHAD SALEM
DQ-47L
EVALUATION/OBSERVATION THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK)
Wellbores: TARGETING HNIF
(0500-0500) Saudi Aramco Well 0088216777 11193 0135784190 BAKER 0138 137813
RESERVOIR.)
Date: Tuesday 06/18/2024 KHRS-1037 (0) KHRS_1037_0 OTHER VSAT CONTRACTOR /CLERK VSA T
DQ 013880 7799 0135784184

Last 24 hr operations Next 24 hr plan


ROTARY DRILL 22" HOLE TO 18 5/8" CP @ 1500' WITH PARTIAL LOSSES, WHIPER TRIP, CHC, R/U BAKER 18-5/8" CRT, RUN 18 5/8" CSG TO CP & CMT IN ONE STAGE, WOC, TOP CMT JOB, CUT
POOH & L/D 22" BHA ASSY, CUT & N/D 24" RISER. 18 5/8" CSG, WELD RISER, P/U & RIH 17" C/O BHA.
Location Next Location
248 KM F/ DH MG, HASA/KHRS ROAD, AT OLD KHRS TAKE RIGHT FOR 5 KM, THEN LEFT FOR 2 KM SKID ROAD. *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
1,500 Last Csg Size MD TVD Size Top
24 173 173 Formations Comments
Depth
19' SHALLOWER AS PER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ARUM 400
RCC.
1253 (Date) 70 247 249 38' SHALLOWER AS PER
5.8 (06/12/2024@0900 ) WASI 860
RCC.
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0530 0.5 0 22 N DRLG RR TDS RIG 1253 1253
SERVICE TDS & PERFORM DROPPED OBJECT SURVEY.

ROTARY DRILL 22" HOLE F/ 1,250' T/ 1,500' WITH 64 PCF INHIBITED POLY MUD &
PARTIAL RETURNS 70%.
- WOB: 45-70 KLBS, RPM: 40-100, TRQ: 7-17 KFT-LB, FR: 700-800 GPM, SPP:
0530 - 1900 13.5 0 22 N DRLG D TDS RIG 1253 1500 1200-1900 PSI.
- SWEPT HOLE WITH 50 BBLS HI-VIS PILL EVERY SINGLE DRILLED.
- REAM UP & REAM DOWN EACH STD DRILLED.
- ADJUST PARAMETERS TO MITIGATE HIGH VIBRATIONS.
- PERFORM TDS VISUAL DROP SURVEY INSPECTION EVERY KELLY DOWN.

1900 - 2030 1.5 0 22 N DRLG CIRC MPMP RIG 1500 1500 SWEPT HOLE W/ 2 X 50 BBLS HVP & CHC .
- SPOTTED 350 BBLS 90 PCF INHIBITED HI-VIS PILL @ BTM.

2030 - 2200 1.5 0 22 N DRLG ST STDP RIG 1500 1500 1500 525 WIPER TRIP POOH 22" BHA F/ 1,500' T/ TOP OF BHA @ 525'.
- PUMP MUD CAP @ 2-3 BPM.

RIH BACK W/ 22" BHA TO BTM. REAM DOWN LAST STD.


2200 - 2300 1 0 22 N DRLG ST STDP RIG 1500 1500 525 1500
- HOLE IN GOOD CONDITION.
- PUMP MUD CAP @ 2-3 BPM.

SWEPT HOLE W/ 2 X 50 BBLS HVP & CHC.


2300 - 0030 1.5 0 22 N DRLG CIRC MPMP RIG 1500 1500
- SPOTTED 350 BBLS 90 PCF INHIBITED LUBRICATE HI-VIS PILL @ BTM.
- DROP TOTCO.

POOH & W/ 22" ROTARY DRILLING BHA F/ 1,500' T/ TOP OF BHA @ 525', HOLE IN
0030 - 0130 1 0 22 N DRLG ST STDP RIG 1500 1500 1500 525
GOOD CONDITION.
- PUMP MUD CAP @ 2-3 BPM.

POOH & L/D 22" ROTARY DRILLING BHA TO SURFACE.


- BIT DULL: 1-1-WT-A-E-I-NO-TD.
0130 - 0430 3 0 22 N DRLG HT BHA RIG 1500 1500
- RETRIEVE TOTCO: 0.75 DEG.
- PUMP MUD CAP @ 2-3 BPM.
- LOSSES 35 BPH.

CUT & N/D 24" RISER.


0430 - 0459 0.5 0 22 N DRLG OTH NA RIG 1500 1500
- INSTALL CELLAR PUMP.
- PUMP MUD CAP @ 2-3 BPM.
Foreman Remarks

================================ WELL OBJECTIVE ====================================================


KHRS-1037 WILL BE DRILLED AND COMPLETED AS AN S-SHAPE EVALUATION/OBSERVATION TARGETING HNIF RESERVOIR.

- WELL KHRS-1037 IS NOT LOCATED ON THE CELLAR COLLAPSE LOW-VELOCITY AREA.


- THERE ARE CELLAR COLLAPSE WELLS WITHIN 6 KM.

- HNIF GOR: 306 SCF/BBL, H2S: 0.01%, RER 1/2 LFL: 125 M.

================================ WELL DESIGN ======================================================


- 30" CP PLANNED / ACTUAL: 75' / 75'.
- 24" CP PLANNED / ACTUAL: 150' / 174'.
- 18 5/8" CP PLANNED / ACTUAL: 1,463' / XX' (+/-100' ABOVE SHUA'IBA FM).
- 13-3/8" CP PLANNED / ACTUAL: 2,677' / XX' (+/- 50' TVD INSIDE BUWAIB FM).
- 9-5/8" CP PLANNED / ACTUAL: 5,327'/ XX' (+/-15' ABOVE HANIFA FM).
- 8-1/2" OH TD PLANNED/ACTUAL: 5,749'/ XX'.

=============================== ARAMCO PERSONNEL ON LOCATION =======================================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-1037 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/04/2024 - 07/16/2024
Report ID: OPERLMTDMRREP

- ARAMCO CLERK: HASSAN ALQURAISHI BADGE #816191 ON LOCATION SINCE 06/04/2024.

================================= BAKER LSTK OR CONTRACTOR =========================================


- BKR DSV: CHRIS / EUGEN.
- BKR HSE: ABDERNOUR.

============================================ SAFETY=============================================
- CONDUCTED AWARENESS SESSION ON HEAT STRESS AND HEAT RELATED ILLNESS & PREVENTION MEASURES. HELD PRE JOB SAFETY MEETING PRIOR CASING & CEMENTING JOB. DISCUSSED
ABOUT HIGH PRESSURE HAZARDS AND SAFETY PRECAUTIONS. EMPHASIS ON MAINTAINING GOOD COMMUNICATION AND SWA.

===========================================NEXT WELL=============================================
NEXT WELL: KHRS-246.
APPROVED PROGRAM: NO.
APPROVED ERP: NO.
LOCATION READINESS:
LAST VISIT:
WATER WELLS:
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
110 PCF 0 0 API 0 0 Volts 0 9.2 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 80 22 0 9 / 11 MMX-WBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 23 20 8/9 0 0 0
71

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
64 PCF 0 0 API 0 0 Volts 0 10 200
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 90 0 HTHP 98 25 0 8 / 10 INPHPA 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 8 2 8 / 10 5 200 0
44

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
64 PCF 0 0 API 0 0 Volts 0 9.5 200
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
90 0 HTHP 98 24 0 8 / 10 INPHPA 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 8 2 8 / 10 5 200 0
45

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
2RR 75 174 DP Av DC Av Bit HHP 55 85 113 28 VAR
Pressure GPM Jet Vel 22.6 24.73 47 I-Row O-Row DC Location Bearings
1,000 700 122 1 1 WT A N
BIT DATA
Serial Number Type Jets TFA
Z744WT E113 6 x 20 / 1.841
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A 12,000 Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 22 1 22 0 1.8 7.625REG 625 Z579YT
2 Near Bit Roller Reamer RIG 22 1 22 3.125 10.8 7 5/8 REG 7 5/8 REG 216.3 3 POINT 1436
3 Shock Sub NPC 12 1 12 3 11.7 7-5/8" REG 7-5/8" REG 3,900 ST-1200-010
4 Roller Reamer BHI 22 1 22 3.125 8.25 7 5/8 REG 7 5/8 REG 216.3 3 POINT 1437
DRILL STRING 5 Drillcollar RIG 9.5 1 9.5 2.813 30.09 7 5/8 REG 7 5/8 REG 216.3 SPRL 817
6 Roller Reamer BHI 22 1 22 3.125 7.6 7 5/8 REG 7 5/8 REG 216.3 3 POINT 1438
7 Drillcollar RIG 9.5 3 9.5 2.813 89 7 5/8 REG 7 5/8 REG 216 SPRL 1804593
8 Crossover RIG 9.5 1 9.5 2.813 3.3 6 5/8 REG 7 5/8 REG 216.3 BFA131627
9 Drillcollar RIG 8.5 9 8.5 2.813 270.14 6 5/8 REG 6 5/8 REG 169.6 SPRL 994
10 Hydraulic Jar NPC 9 1 9 3 34.41 6 5/8 REG 6 5/8 REG 195.2 HJDA950-010
11 Drillcollar RIG 8.5 1 8.5 2.813 30.04 6 5/8 REG 6 5/8 REG 169.6 SPRL 912
12 Drillcollar RIG 8.5 1 8.5 2.813 30.02 6 5/8 REG 6 5/8 REG 169.6 SPRL 814
13 Crossover RIG 8.5 1 8.5 2.813 3 NC50 6 5/8 REG 169.6 183335
14 Heavy Weight Drillpipe (HWDP) RIG 5 27 5 3 817.11 NC50 NC50 50.14 CONV
15 Drillpipe RIG 5 1 5 4.276 0 NC50 NC50 19.5 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A NORMAL N/A HOT 3,542 N/A

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-1037 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/04/2024 - 07/16/2024
Report ID: OPERLMTDMRREP

Company TGC RIG BDF TK2 RIG ARM BCM TK2 ARM BCR BHI

Category CTRG RIG DFMS OTHR OTHR OTHR PCS WSC WSC CSR DPDS
PERSONNEL
16 53 1 2 8 1 4 2 1 2 3
Total
AND SERVICES No. of Persons
93
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24 24 0 0

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 333 N/A N/A 3900

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABJF-666 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/05/2024 - 07/19/2024
Report ID: OPERLMTDMRREP

DQ-48L @ ABJF-666 Limited Morning Report for 06/18/2024


Objective : (ABJF-666 Foreman(s)OSMAN, AHMED OSMAN
D&WO Morning Report (Service Providers View) Charge #: WILL BE DRILLED AS A Engineer GUIZA MEDINA, MAURICIO / DAHLAWI, ABDULILAH MAZEN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-24087-0666) DUAL LATERAL POWER Manager SHAMMARY, FAHAD SALEM
DQ-48L
WATER INJECTOR (PWI) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK)
Wellbores: TARGETING ARAB-D
(0500-0500) Saudi Aramco Well 8821677712 588 5784257 BAKER 013 813 7816
RESERVOIR.)
Date: Tuesday 06/18/2024 ABJF-666 (0) ABJF_666_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
5784256 5784254

Last 24 hr operations Next 24 hr plan


ROTARY DRILL 17" HOLE SECTION FROM 1,915' TO 2,690' WITH FULL RETURN. CONTINUE ROTARY DRILL 17" HOLE SECTION TO CP AT +/- 3,063', CHC, WIPER TRIP, CHC,
POOH, RUN & CEMENT 13-3/8" CASING IN TWO STAGES.
Location Next Location
FROM KHRS HW TO KHRS TOWN, THEN TURN LEFT TO ABJF 41 KM BLACK TOP THEN TURN RIGHT 8 KM SKID ROAD. KHRS-272
Current Depth (ft) Liner TOL MD TVD Formation Tops
2,690 Last Csg Size MD TVD Size Top
18 5/8 1604 1604 Formations Comments
Depth
ARUM 310 4' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) WASI 860 1' SHALLOWER
1915 (Date) 100 775 287 SHUB 1,700 12' SHALLOWER
7 (06/11/2024@0500 ) BYDH 1,795 1' DEEPER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

ROTARY DRILL 17" HOLE SECTION FROM 1,915' TO 2,690' WITH 64 PCF INHIBITED
POLYMER MUD & 100% RETURN.
0500 - 0459 24 0 22 N DRLG D TDS RIG 1915 2690
- WOB: 30-65 KLB, RPM: 90-110, FR: 850 GPM, TQ: 7-12 KLB.FT, SPP: 2,000 PSI.
- SWEEP HOLE WITH 50 BBL HVP EVERY 45' DRILLED.
- REAM-UP & REAM-DOWN EVERY STAND DRILLED.
Foreman Remarks

ABJF-666 WILL BE DRILLED AS A DUAL LATERAL POWER WATER INJECTOR (PWI) TARGETING ARAB-D RESERVOIR.

===============================================================================================
- RER 1/2 LFL: 193 M , RER 100 PPM: 534 M, RER 30 PPM: 935 M.
- GOR ARBD: 253 SCF/BBL ,H2S ARBD: 3.60 MOL%,

===================================== WELL DESIGN =================================================


- 30" CASING POINT PLAN / ACTUAL: 75 FT / 75 FT.
- 24" CASING POINT PLAN / ACTUAL: 200 FT / XXX FT (CONTINGENCY).
- 18 5/8" CASING POINT [ +/- 100' TVD ABOVE SHUA'IBA ] PLAN / ACTUAL: 1612 FT / 1605 FT.
- 13 3/8" CASING POINT [ +/- 50' TVD INTO BUWAIB ] PLAN / ACTUAL: 3063 FT / XXXX FT.
- 9 5/8" CASING POINT (4' TVD INSIDE BPDS FM)PLAN / ACTUAL: MD/5101' TVD/5748' FT / XXXX' FT.
- 7" LINER PLAN / ACTUAL: 6409' MD/5130' TVD / XXXX FT.
- 6 1/8" OH PLAN / ACTUAL: 10429' MD /5231' TVD / XXXX FT.
- 6 1/8" L1 OH PLAN / ACTUAL: 11241' MD/5599' TVD / XXXX FT

=============================== ARAMCO PERSONNEL ON LOCATION =======================================


- ARAMCO CLERK NAGARAJAN SIVANATHAM ID #8049997 ON LOCATION SINCE 23-MAY-2024.

================================= BAKER LSTK OR CONTRACTOR =========================================


- BAKER DSV: DJAMAL / ABDALMOHSEN.
- BAKER HSE: IBRAHIM.

======================================= SAFETY===================================================
- INJURY PREVENTION (ON & OFF-JOB): STOP OBSERVATION CYCLE, CRUSH INJURY AWARENESS, HAZARD RECOGNITION AND RESPONSE, ACCIDENT PREVENTION, HAZARD CONTROL,
REPORTING OF OFF JOB HAZARDS. H2S DRILL PROCEDURE, HOUSEKEEPING, OPERATIONAL PLAN AND RELATED SAFETY MEASURES.
- CONDUCTED H2S DRILL WITH GOOD RESPONSE FROM ALL CREW & PERSONNEL.

===================================== VACUUM TANKERS==============================================

=======================================NEXT WELL=================================================
- WELL NAME: KHRS-272.
- LOCATION READINESS: 95%.
- APPROVED PROGRAM: NO & ERP: NO.
- WATER WELLS: N/A.

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
64 PCF 0 4.6 API 0 0 Volts 1.83 9.8 14,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 96 29 0 10 / 12 INPHPA 0
MUD DATA Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 12 4 10 / 11 7.5 360 0
67

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
64 PCF 0 4.8 API 0 0 Volts 1.83 10 14,000

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABJF-666 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/05/2024 - 07/19/2024
Report ID: OPERLMTDMRREP

FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 96 28 0 10 / 12 INPHPA 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 11 4 10 / 11 7.5 360 0
66

MUD MARBLE-FINE CAUST DRIL-STARCH DUOVIS-NS


TREATMENT 6 ( 2200L ) 14 ( 50LBP ) 45 ( 55LB ) 26 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
4RR 1,605 2,690 DP Av DC Av Bit HHP 65 110 435 17 HTC
Pressure GPM Jet Vel 78.91 96.12 202 I-Row O-Row DC Location Bearings
2,000 850 231 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
Z520YT VGAT3C10MH 3 x 15 / 3 x 17 / 1.183
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A 200 205 200 8 1
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 17 1 17 1.3 7 5/8 REG 315.7 Z520YT
2 Near Bit Roller Reamer BHI 17 1 9.5 3.062 7.27 7 5/8 REG 7 5/8 REG 216.3 3 POINT 2020004
3 Drillcollar RIG 12 1 9.5 2.813 10.92 7 5/8 REG 7 5/8 REG 216.3 SPRL CT-1200-000
4 String Reamer BHI 17 1 17 3.125 7.41 7-5/8" REG 7-5/8" REG 216.3 2020006
DRILL STRING 5 Drillcollar RIG 9.5 1 9.5 2.813 29.5 7 5/8 REG 7 5/8 REG 216.3 SPRL
6 String Reamer BHI 17 1 17 3.125 7.11 7-5/8" REG 7-5/8" REG 216.3 2020010
7 Drillcollar RIG 9.5 3 9.5 2.813 87.8 7 5/8 REG 7 5/8 REG 216.3 SPRL
8 Crossover RIG 9.5 1 9.5 2.813 3.3 6 5/8 REG 7 5/8 REG 216.3 1316
9 Drillcollar RIG 8.5 9 8.5 2.813 274.92 6 5/8 REG 6 5/8 REG 169.6 SPRL
10 Hydraulic Jar BFW 9.5 1 9 3 28.3 6-5/8"REG 6-5/8"REG 169.6 DJ10-950-04
11 Drillcollar RIG 8.5 2 8.5 2.813 61.09 6 5/8 REG 6 5/8 REG 169.6 SPRL
12 Crossover RIG 8.5 1 8.5 2.813 2.65 NC50 6 5/8 REG 169.6 892
13 Heavy Weight Drillpipe (HWDP) RIG 5 27 5 3 811.03 NC50 NC50 50.14 CONV
14 Drillpipe RIG 5 1 5 4.276 0 NC50 NC50 19.5 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A NORMAL N/A HOT 1,501 PRE-MOVE SAFETY
MEETING.

Company BCR TGC BHI RIG BDF TK2 RIG ARM BCM TK2 ARM

Category CSR CTRG DPDS RIG DFMS OTHR OTHR OTHR PCS WSC WSC
PERSONNEL
2 16 2 50 1 1 14 1 4 2 1
Total
AND SERVICES No. of Persons
94
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 24 24 12 12 12 0 24 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 438 N/A N/A 4150

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-1032 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/02/2024 - 07/25/2024
Report ID: OPERLMTDMRREP

DQ-49L @ KHRS-1032 Limited Morning Report for 06/18/2024


Objective : (VERTICAL Foreman(s)SOPOTEAN, GHENADIE
D&WO Morning Report (Service Providers View) Rig Charge #: EVALUATION/ OBSERVATION Engineer GUIZA MEDINA, MAURICIO / DAHLAWI, ABDULILAH MAZEN
Copyright 2024 Saudi Aramco. All Rights Reserved DQ-49L (66-21051-1032) WELL TARGETING HNIF Manager SHAMMARY, FAHAD SALEM
Daily Onshore (LSTK) RESERVOIR) THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12662 013-576-32 16 (FOREMA N) /CLERK VSA
Date: Tuesday 06/18/2024 KHRS-1032 (0) KHRS_1032_0 T
013-576-32 17

Last 24 hr operations Next 24 hr plan


P/U, M/U & RIH W/ 17" ROTARY BHA, C/O SHOE TRACK, HYDRO TEST, C/O FLOAT SHOE. DRLG. POOH FOR 13-3/8" CSG, L/D BHA, M/U & RIH W/ 13-3/8" CSG & CMT SAME IN 2 STAGES. WOC.
17" VERTICAL HOLE TO 2580 FT. SWEEP, CHC, POOH FOR 13-3/8" CSG.
Location Next Location
F/HOFUF-KHRS HW, JUST BEFORE KHRS VILLAGE, TURN RIGHT 9.5 KM BLACK TOP, TURN LEFT, 7.5 KM SKID ROAD KHRS-1434
Current Depth (ft) Liner TOL MD TVD Formation Tops
2,580 Last Csg Size MD TVD Size Top
18 5/8 1450 1450 Formations Comments
Depth
WASI 840 62' DEEPER AS PER RCC
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SHUB 1,595 106' DEEPER AS PER RCC
1450 (Date) 100 1,130 249 BYDH 1,730 142' DEEPER AS PER RCC
6.3 (06/11/2024@2200 ) BUWB 2,535 20' DEEPER AS PER RCC
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0630 1.5 0 22 N DRLG HT BHA RIG 1450 1450
HPJSM, L/D 22" BIT, 22" NBRR & 2 X 22" STRR

HPJSM, P/U, M/U & RIH W/ 17" ROTARY DRLG BHA.


17" PDC BIT (TD606K, S/N : 7916462, 6X15 NOZZLES), 17" NBRR (W/ FLOAT &
0630 - 0930 3 0 22 N DRLG HT BHA RIG 1450 1450
TOTOCO RING), 1 JT X 9-1/2" D/C, 17" STRR, 1 JT X 9-1/2" D/C, 17" STRR, 3 JTS X
9-1/2" D/C, X/O, 9 JTS X 8-1/2" D/C, 9-1/2" JAR, 2 JTS X 8-1/2" D/C, X/O, 27 JTS
X 5" HWDP.
0930 - 1000 0.5 0 22 N DRLG RR TDS RIG 1450 1450
SERVICE TDS.
1000 - 1030 0.5 0 22 N DRLG CIRC MPMP RIG 1450 1450
WASH DOWN & TAG TOC @ 1,373'.

1030 - 1400 3.5 0 22 N DRLG DFS TDS RIG 1450 1450 1373 1420 DRILL OUT HARD CMT, TOP PLUG & FLOAT COLLAR TO 1,420' (30' ABOVE SHOE)
- WOB: 5-40 KLB, FR: 400 - 500 GPM, SPP: 200 - 500 PSI, RPM: 40 - 60.
1400 - 1430 0.5 0 22 N DRLG CIRC MPMP RIG 1450 1450
SWEEP HOLE WITH 50 BBLS HVP & CHC. HYDRO TEST 18 5/8" CSG - OK..

DRILL OUT CMT, FLOAT SHOE & RAT HOLE T/ 1,450' MEANWHILE DISPLACE WELL
1430 - 1530 1 0 22 N DRLG DFS TDS RIG 1450 1450 1420 1450
TO FRESH 64 PCF INHIBITED POLY MUD.
- WOB: 10-25 KLB, FR: 500 GPM, SPP: 550 PSI, RPM: 60, TQ: 4-6 KLB.FT.

ROTARY DRILL 17" VERTICAL HOLE F/ 1,450' TO CP@2580' W/ 64 PCF POLY MUD
& 100% RETURN.
- WOB: 5-25 KLB, RPM: 110, TQ: 5-15 KFT.LB, FR: 850 GPM, SPP: 1000- 1,500
1530 - 0100 9.5 0 17 N DRLG D TDS RIG 1450 2580
PSI
- SWEEP HOLE W/ 50 BBLS HVP EVERY 30' DRILLED.
- BACKREAM, REAM DOWN EVERY STAND DRILLED.
- DRILLED WITH CONTROLLED PARAMETERS TILL LAST STRR OUT OF SHOE.

0100 - 0300 2 0 17 N DRLG CIRC MPMP RIG 2580 2580 SWEPT HOLE W/ 2 X 100 BBL HI-VIS PILLS & CHC. SPOT 250 BBLS 80 PCF CSG-GO
PILL ON BTM.

POOH W/ 17" DRLG BHA WIPER TRIP FROM BTM @ 2580' TO 18-5/8" CSG SHOE @
0300 - 0459 2 0 17 N DRLG ST STDP RIG 2580 2580 2580 1450 1,450'
- HOLE IN GOOD CONDITION.

Foreman Remarks

KHRS-1032 WILL BE DRILLED AS VERTICAL EVALUATION/ OBSERVATION WELL TARGETING HNIF RESERVOIR. THE WELL WILL BE DRILLED BY DQ-49L AND COMPLETED WITH BAKER PDHMS (P&T
GAUGES), 9 5/8'' PACKER WITH 4 1/2'' TUBING.
NOTE: THE WELL IS LOCATED IN THE CELLAR COLLAPSE LOW VELOCITY AREA AND REQUIRE EXTRA CASINGS.

==============================WELL DESIGN ============================


** 30" CP PLANNED/ACTUAL: 75' / 75'
** 24" CP PLANNED/ ACTUAL: 150' / 150'
** 18-5/8" CP PLANNED/ACTUAL: 1384' / 1450' (100' TVD ABOVE SHU'AIBA)
** 13-3/8" CP PLANNED/ACTUAL: 2560'/ XXX' (50 FT TVD INTO BUWAIB)
** 9-5/8" CP PLANNED/ACTUAL: 5221'/ XXX' (10 FT ABOVE HNIF RESERVOIR)
** 8-1/2" TD PLANNED/ACTUAL: 5609' / XXX'

======================= ARAMCO PERSONNEL ON LOCATION ==============


- ARAMCO CLERK: ALSHAMMRI NAHAR #798254 ON LOCATION SINCE 06/11/24

====================== LSTK PERSONAL ON LOCATION=====================


* RIG MANAGER : WU , BAKER DSV: ASHRAF/ MAHMOUD, HSE: ALI, BH SUPERINTENDENT: NO

=============================== NEXT WELL ======================


- KHRS - 1434 LOCATION

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-1032 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/02/2024 - 07/25/2024
Report ID: OPERLMTDMRREP

- WATER WELL: N/A


- APPROVED ERP: N/A
- APPROVED DRILLING PROGRAM: N/A
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
64 PCF 0 6 API 0 0 Volts 4.17 9.5 600
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 95 29 0 13 / 16 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 10 5 12 / 14 5 320 0
50
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
64 PCF 0 6 API 0 0 Volts 4.17 9.5 16,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 95 27 0 13 / 15 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 10 5 12 / 13 5 320 0
48

BENT CAUST HYSTAR-P XC NACL NEWDRLPLUS MICA-FINE


MUD 7 ( 2200L ) 10 ( 25KG ) 80 ( 55LB ) 65 ( 55LB ) 6 ( 2200L ) 30 ( 55LB ) 40 ( 50LB )
TREATMENT MRBL-F MRBL-M
6 ( 2200L ) 2 ( 2200L )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
3 150 1,450 DP Av DC Av Bit HHP 65 110 435 22 HTC
Pressure GPM Jet Vel 42.72 47.62 652 I-Row O-Row DC Location Bearings
1,060 800 428 1 1 WT A E
BIT DATA
Serial Number Type Jets TFA
Z468ZT VGAC310H 1 x 14 / 3 x 14 / 0.601
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 50 188 190 186 10,400 10
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
4

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 17 1 1.55 7916586
2 Near Bit Roller Reamer RIG 17 1 16 2.813 7.53 7 5/8 REG 7 5/8 REG 28.72 3 POINT 202005
3 Drillcollar RIG 9.5 9.5 2.813 30.08 7 5/8 REG 7 5/8 REG SPRL 209
DRILL STRING 4 String Reamer RIG 17 1 17 2.75 7.13 7-5/8" REG 7-5/8" REG 0 2020008
5 Drillcollar RIG 9.5 1 9.5 3 30.27 7 5/8 REG 7 5/8 REG 28 SPRL 1804754
6 String Reamer RIG 17 1 17 2.75 7.2 7-5/8" REG 7-5/8" REG 0 2020009
7 Drillcollar RIG 9.5 3 9.5 3 90.7 7 5/8 REG 7 5/8 REG 28 SPRL
8 Crossover RIG 9.5 1 14 4 3 7 5/8 REG 7 5/8 REG 28 3312
9 Drillcollar RIG 8.5 9 8.5 3 270.68 6 5/8 REG 6 5/8 REG 28 SPRL 33996
10 Hydro-Mechanical Jar NPC 8.5 1 9 3 30.55 6-5/8" REG 6-5/8" REG 3,200 HJDA-950-00
11 Drillcollar RIG 8.5 2 8.5 3 60.18 6 5/8 REG 6 5/8 REG 28 SPRL
12 Crossover RIG 6.625 1 6.625 2.813 2.6 XT54 6 5/8 REG 28 A-180
13 Heavy Weight Drillpipe (HWDP) RIG 5 27 6.625 5 833.68 6-5/8FH 6-5/8FH 58.1 CONV
14 Drillpipe RIG 5 1 6.625 5.901 30.96 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 1,584 N/A

Company BCR TGC RIG BDF TK2 RIG ARM BCM TK2 ARM BHI

Category CSR CTRG RIG DFMS OTHR OTHR OTHR PCS WSC WSC DPDS
PERSONNEL
2 15 51 1 3 8 1 4 2 1 2
Total
AND SERVICES No. of Persons
90
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 12

Operating Hours. 0 0 24 24 12 12 12 0 24 24 0

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

REPAIR ASAP Instrumentation Other Reporter

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-1032 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 06/02/2024 - 07/25/2024
Report ID: OPERLMTDMRREP

Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-1547 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/26/2024 - 08/09/2024
Report ID: OPERLMTDMRREP

DQ-50L @ ANDR-1547 Limited Morning Report for 06/18/2024


Objective : (PH+PHZ WELL Foreman(s)MOMEN, JAFAR ABDULKAREEM
D&WO Morning Report (Service Providers View) Charge #: (ARAB-D RESERVOIR)) Engineer CHERESHNIUK, VITALII
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-24056-1547) Manager MUTAIRI, NAIF MUTLAQ
DQ-50L
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12365 5784360 (F OREMAN) 8137807 (B AKER)
Date: Tuesday 06/18/2024 ANDR-1547 (0) ANDR_1547_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
5784362 (C LINIC) 5784361 (C LERK)

Last 24 hr operations Next 24 hr plan


PERFORM WIPER TRIP, CHC, SPOT CSG-GO PILL, POOH & L/D 12-1/4" BHA TO SURFACE. RUN 9- PERFORM 1ST STG CMT, OPEN DVT, WOC, HANG BOP, SET 9-5/8'' CSG SLIP, PERFORM 2ND STG
5/8" CSG. CHC. CMT JOB. CUT CSG , N/D BOP, N/U & P/T 13-5/8" X 11" 3M THS, N/U & P/T BOP.
Location Next Location
99.12 KM FROM DHAHRAN MAIN GATE ANDR-1503
Current Depth (ft) Liner TOL MD TVD Formation Tops
5,165 Last Csg Size MD TVD Size Top
13 3/8 2850 2850 Formations Comments
Depth
RUS 585 79' SHALLOW, RCC
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UMER 805 17' SHALLOW, RCC
5165 (Date) 0 0 100 ARUM 1,785 23' SHALLOW, RCC
9.7 (06/08/2024@1200 ) LAMS 2,380 101' SHALLOW, RCC
AHMD 2,795 86' SHALLOW, RCC
SFNY 3,065 129' SHALLOW, RCC
SHUB 3,840 135' SHALLOW, RCC
BYDH 4,050 124' SHALLOW, RCC
MDTM 4,845 71' SHALLOW, RCC
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

POOH WIPER TRIP W/ 12-1/4" ROTARY BHA FROM BTM AT 5,165 FT TO 13-3/8"
CSG SHOE @ 2,849 FT.
0500 - 0700 2 0 12 1/4 N DRLG ST STDP RIG 5165 5165 5165 2850
- HOLE IN GOOD CONDITION.
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.

RIH BACK W/ 12 1/4" ROTARY BHA FROM 2,849 FT TO BTM AT 5,165 FT.
0700 - 0845 1.75 0 12 1/4 N DRLG ST STDP RIG 5165 5165 2850 5165 - HOLE IN GOOD CONDITION.
- WASH DOWN LAST STD TO BTM.
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.

SWEEP HOLE WITH 2 X 50 BBL HVP & CHC TO LCZ.


0845 - 1015 1.5 0 12 1/4 N DRLG CIRC MPMP RIG 5165 5165 - SPOT 250 BBL 90 PCF CSG GO PILL ACROSS OPEN HOLE.
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.

POOH 12-1/4" ROTARY BHA FROM 5,165 FT TO 13-3/8" CSG SHOE @ 2,849 FT.
1015 - 1130 1.25 0 12 1/4 N DRLG ST STDP RIG 5165 5165 5165 2850
- HOLE IN GOOD CONDITION.
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.

1130 - 1230 1 0 12 1/4 N DRLG TO STDP RIG 5165 5165 2850 476 CONT. POOH W/ 12-1/4" ROTARY BHA F/ 2,849 FT TO TOP OF BHA AT 476 FT.
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.

CONT. POOH W/ 12 1/4" ROTARY BHA FROM 476 FT TO SURFACE.


1230 - 1515 2.75 0 12 1/4 N DRLG HT BHA RIG 5165 5165 - BIT DULL GRADING: 1-1-CT-N-X-I-LC-TD.
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.

1515 - 1545 0.5 0 12 1/4 N WH RTRV WBSH RIG 5165 5165


RETRIEVE 13-3/8" DELTA WEAR BUSHING.

HPJSM. R/D DP HANDLING EQUIPMENT, CHANGE BAILS & R/U 9-5/8" TRS RUNNING
1545 - 1700 1.25 0 12 1/4 N CSG HT PEL RIG 5165 5165 EQUIPMENT AND CRT.
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.

1700 - 1715 0.25 0 12 1/4 N CSG PJSM CSG RIG 5165 5165
HPJSM, DISCUSSED 9-5/8" CSG RUNNING JOB HAZARDS & MITIGATION.

PU & MU 9-5/8" (43.5#, L-80, BTC, FBE) CSG SHOE TRACK (9-5/8" DHP F/S + 2 JT
+ DHP F/C W/ BY PASS BAFFLE + 1 JT W/ SHUT OFF BAFFLE PLATE + 1 JT) AND
1715 - 1800 0.75 0 12 1/4 N CSG RCSG CSTR BCR 5165 5165 0 165
RIH TO 165 FT (4/128 JTS).
- TEST FLOATS-OK, THREAD LOCK FIRST 5 CONNECTIONS.
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.

RIH W/ (9-5/8", 43.5 PPF, L-80, BTC, FBE) CSG F/ 165 FT T/ 2,568 FT.
- TOTAL: 63/128 JTS.
1800 - 2215 4.25 0 12 1/4 N CSG RCSG CTRQ BCR 5165 5165 165 2568
- FILL CSG EVERY JOINT W/ CRT.
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.

HPJSM, PU & MU HALL 9-5/8" DVT TOOL W/ 2 PUP JT'S, CHECKED SAME OK, RIH
2215 - 2245 0.5 0 12 1/4 N CSG RCSG DV HDV 5165 5165 FROM 2,568 FT TO 2,588 FT.
- RIH ACROSS ROTARY TABLE & BOPE CAREFULLY.
- INSTALL 3 RIGID CENERALIZER ABOVE & BELOW DV TOOL.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-1547 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/26/2024 - 08/09/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT. RIH W/ (9-5/8", 43.5 PPF, L-80, BTC, FBE & BARE) CSG FROM 2,568 FT TO
13 3/8" CSG SHOE @ 2,849 FT.
2245 - 2315 0.5 0 12 1/4 N CSG RCSG CTRQ BCR 5165 5165 2588 2849
- TOTAL: 69/128 JTS.
- FILL CSG EVERY JOINT.
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.

BREAK CIRCULATION @ 13 3/8" CSG SHOE W/ 420 GPM @ 20 PSI W/ 0% RETURN.


2315 - 2345 0.5 0 12 1/4 N CSG CIRC MPMP RIG 5165 5165
- RECORD FREE PARAMETERS; P/U WT: 173 KLB, S/O WT: 172 KLB.
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.

CONT. RIH W/ (9-5/8", 43.5 PPF, L-80, BTC, FBE & BARE) CSG FROM 2,850 FT TO
BTM @ 5,165 FT.
2345 - 0430 4.75 0 12 1/4 N CSG RCSG CTRQ BCR 5165 5165 2849 5165 - TOTAL: 128/128 JTS.
- FILL CSG EVERY JOINT.
- WASH DOWN TIGHT INTERVAL FROM 4,680 TO 4,730 FT
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.

CIRC. 1.2 CSG CAPACITY W/ 420 GPM @ XXXXPSI W/ 0% RETURN


0430 - 0459 0.5 0 12 1/4 N CSG CIRC MPMP RIG 5165 5165
- R/D BAKER TRS POWER TONG.
- KEEP PUMPING 2 BPM 78 PCF INHIBITED POLYMER MUD CAP FROM BACKSIDE.
Foreman Remarks

ANDR-1547 WHICH IS TO BE DRILLED AS A SINGLE LATERAL HORIZONTAL OIL PRODUCER TARGETING ARAB-D RESERVOIR.
A VERTICAL PILOT HOLE WILL BE DRILLED TO EVALUATION ACROSS ARAB-D. THE PILOT HOLE WILL BE P&A AND PERFORM AN OPEN HOLE SIDETRACK TO DRILL A SINGLE HORIZONTAL LATERAL
ACROSS ARAB D.
THE WELL WILL BE COMPLETED WITH LOWER COMPLETION WITH ICD'S AND UPPER COMPLETION ON 4-1/2" TUBING.
=================================WELL DATA==================================
- 24" CSG PLAN/ACTUAL: 110' / 123'.
- 18-5/8" CSG PLAN/ACTUAL: 714' / 640' (+/- 50' TVD INTO RUS).
- 13-3/8" CSG PLAN/ACTUAL: 2,932' / 2,850 (+/- 50' TVD INTO AHMADI).
- 9-5/8" CSG PLAN/ACTUAL: 5,216' / XXXX (+/- 300' TVD INTO MID-THAMAMMA).
- 8-1/2" L-0 VERTICAL PILOT HOLE PLAN/ACTUAL: 7,273' / XXXX (+/- 150 FT MD BELOW BADR FM).
- OPEN HOLE ST PLAN/ACTUAL: 5,451' / XXXX (ST FROM SULY FM).
- 7" L-1 LINER PLAN//ACTUAL: 7,401' MD, 6,784' TVD // XXXX, XXXX (2' TVD ABOVE ABD-1 FM).
- 6-1/8" OPEN HOLE PLAN//ACTUAL: 11,729' MD, 6,805' TVD // XXXX, XXXX.
============================== ARAMCO PERSONNEL ON LOC. ===========================
- ARAMCO CLERCK PUSPARAJ ID#8957137 ON LOCATION SINCE 5/8/2024.
- ARAMCO MATERIAL EXPEDITOR MOAYAD ALSUDANI ID#818685 LEFT LOCATION 6/17/2024.
============================== SIMOPS===========================================
- ON 6-5-2024 CONDUCTED A SIMOPS MEETING WITH TEAM OF ADC-63L & ESTABLISH COMMUINCATION PROTOCAOL.
- INSTALLED 4 EA STANDALONE SENSOR STATIONS (H2S/LEL) AS PER ERP REQUIRMENT.
==============================LSTK BAKER CONTRACTOR DSV============================
- LSTK BH DSV: MAHMOUD GEBALY / AMR GHAYOUBA, HSE: HUSSAIN, BAKER SUPT: N/A.
=============================NEXT LOCATION ============================
NEXT WELL: ANDR-1504.
- LOCATION STATUS: W3 REQUEST CREATED ON 6/11.
- CHARGE ACCOUNT: N/A.
- DRLLING PROGRAM: N/A.
- ERP: N/A.
- WATER WELL: N/A.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 0 0 API 0 0 Volts 1 9.5 1,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 96 9 0 4/4 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 8 4 4/5 0 400 0
30
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 0 0 API 0 0 Volts 1 10 87,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 0 HTHP 96 9 0 4/4 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 8 4 4/5 0 400 0
30

MUD BARITE MRBL-F NEWDRLPLUS XANPLEX-D NACL


TREATMENT 11 ( 1500K ) 32 ( 2200L ) 55 ( 55LB ) 60 ( 55LB ) 96 ( 2200L )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
5RR 2,850 5,165 DP Av DC Av Bit HHP N/A N/A M223 12.25 HTC
BIT DATA Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A 1 1 CT N X
Serial Number Type Jets TFA

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-1547 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/26/2024 - 08/09/2024
Report ID: OPERLMTDMRREP

7916635 DD606TX 6 x 15 / 1.035


Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 0
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/15/2024 N/A SEASONAL N/A SEASONAL 1,712 PRIOR EACH JOB

Company HDV BCR TGC BHI RIG BDF TK2 RIG ARM BCM TK2 ARM

Category DV CSR CTRG DPDS RIG DFMS OTHR OTHR OTHR PCS WSC WSC
PERSONNEL
1 2 17 3 57 1 5 12 2 5 2 1
Total
AND SERVICES No. of Persons
108
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 12 10 0 0 24 24 12 12 12 0 24 24

Standby/Tankers Others
TRUCKS/BOATS
AB-4941 AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 2650

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-399 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:20 06/13/2024 - 07/30/2024
Report ID: OPERLMTDMRREP

DQ-57L @ KHRS-399 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK Foreman(s)BOUFFAGHAR, YOUCEF
D&WO Morning Report (Service Providers View) Charge #: THE WELL AS A SINGLE Engineer ASHRAF, RAJU RUHAIL / ALHUDAIF, MOHAMMAD KHALID
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24051-0399) LATERAL IN ARBD) Manager ABU RASAIN, AMER MANE
DQ-57L
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT RIG FORMAN VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 2825 013 578 41 85 013 578 40 79
Date: Tuesday 06/18/2024 KHRS-399 (0) KHRS_399_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
053 137 05 12 RM 013 838 93 64 HALL DS V

Last 24 hr operations Next 24 hr plan


RIG UP ON KHRS-399. COMMENCE WO #3 OPERATION. TEST LOWER COMPLETION ICV #1 & #2, CONT. BULLHEAD TBG L-0, PUNCH TBG ABOVE PKR, BULLHEAD TCA, SET SL PLUG BELOW
BULLHEAD TBG L-0 MOTHER BORE. PUNCH, SET WFD PLUG @ 200', UT INSPECT. ND WELLHEAD, NU & PT BOPE, UNSET PKR.
Location Next Location
242 KM FROM DHAHRAN MAIN GATE. KHRS-567
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
7,857 Size 6233 5286 Size 5,995 11,205 5,424 Top
Formations Comments
9 5/8 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
7857 (Date) 100 0 242
0.3 (06/17/2024@2200 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0530 0.5 0 PRE N RM PJSM NA RIG 11490 11490 HPJSM WITH MOVING CREW AND RIG CREW, DISCUSSED RIG MOVE HAZARDS &
DEHYDRATION.

RIG UP ON KHRS-399:
===============
CHECKED MUD SYSTEM INSTRUMENTATION.
CHECKED TRIP TANK INSTRUMENTATION & ALRAM.
PRESSURE TEST CHOKE MANIFOLDS.
SET MUD PUMP PULSATION DAMPENER T/ 600 - 700 PSI.
FUNCTION TEST MPS PRESSURE RELIEF VALVES & SET POP-OFF T/ 4500 PSI.
ALIGNMENT ROTARY TABLE WITH CENTR OF WELL.
P/T 5M BOPS STACK ON TEST STUMP, 300- 3000 PSI ON TEST STUMP OK.
FUNCTION TESTED IGNITION SYSTEM.
PRESSURE TESTED FIRE PUMP LINES TO 250 PSI.
P/T HP SURFACE LINES, STD PIPE & ROTARY HOSE TO 300/5000 PSI - OK.
P/T TDS HYDRAULIC & MANUAL BOP 300/5000 PSI - OK.
P/T FLARE LINES TO 1200 PSI. OK., HYDRO TEST VENT LINE, OK.
CHECKED CASCADE SYSTEM, TESTED H2S AND LEL ALARM SYSTEM.
COMPLETED MIXING 2000 BBLS 63 AND 65 PCF VISCOUS WATER.

PJSM, OPENED THE BOP STACK, CHECKED THE ELEMENT FOR VBR & CHANGE
PIPE RAM TO 5", CHECK PIPE RAM & SHEAR RAM CONDITION..
CONNECTED SURFACE KILL LINES TO BOTH TBG & TCA SIDE & PT 2500 PSI OK.
FUNCTION TEST ROTARY TABLE, TDS & RIG POWER TONG.
0530 - 2200 16.5 0 PRE N RM RU NA RIG 11490 11490 FUNCTION TEST BOP HOIST.
FUNCTION TEST COM, CROWN SAVER, FLOOR SAVER, ACS, MONKEY BOARD
SAVER.
FUNCTION TEST ESD, CHECKED EMERGENCY GENERATOR - OK.
CHECKED RIG FOR ACCEPTANCE AGAINST WFD & ARAMCO CHECKLISTS.
======================
RIG MOVE CREW & EQUIPMENT:
======================
22 TRUCKS (16 LOW BED, 6HIGH BED, CRANE (75 TON*360 TON*2), FORKLIFT
(10 TON*1). MANLIFT (1)
RIG-MOVE CREW2 RIGGER-1 AND 2 TRUCK-PUSHERS & 5 CRANE OPERATORS &1
FORKLIFT OPERATOR & 1 SAFETY
==================================================

R/D AT KHRS-458: 100%, R/M TO KHRS-399: 100%, R/U AT KHRS-399: 100%


DISTANCE: 10.50 KM
DAYS SINCE RIG RELEASE: 5.25 DAYS.

OFFLINE OPERATION BEFORE ACCEPTANCE:


=============================
- HPJSM. R/U QEMAT NAJD S/L BOP & LUBRICATOR AND P/T TO 2,000 PSI.
- S/L RIH&RETRIEVED 4 1/2" SLICK PLUG WITH JUNK CATCHER @ 210' (3 RUNS).
- WHP AFTER RETRIEVE THE PLUG = 0 PSI.
2200 - 2200 0 0 PRE S OT COMM NA RIG 11490 11490
ACCEPTED RIG AND SPUD IN WELL KHRS-399 ON JUNE 17, 2024 @ 22:00 HRS.

CONDUCTED PRE- SPUD MEETING WITH ALL PERSONNE INVOLVED.


- CONDUCTED H2S DRILL, HAD GOOD RESPONSE FROM ALL CREW.
- RECORD WELL HEAD PRESSURE = 0 PSI.
- CCA PRESSURE = 0 PSI.
2200 - 2230 0.5 0 POST N DCOM OTH NA RIG 11490 11490
- R/U KILL LINES. P/T KILL LINES TO 2,000 PSI FOR 10 MIN. - MEASUREMENTS:
- MID CROWN VALVE TO GROUND = 8.27 FT.
- MID 4 1/16" WING VALVE TO GROUND = 6.89 FT.
- MASTER VALVE TO GROUND = 5.51.
- WING VALVE FACE TO EAST.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-399 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:20 06/13/2024 - 07/30/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
- RIG FLOOR TO GROUND = 30.2'.

2230 - 0030 2 0 POST N DCOM OTH NA HCO 11490 11490 (OOS) HALLIBURTON COMPLETION ENGINEER OPEN ICV#1 (MAIN BORE) AND
CLOSED ICV#2 (LATERAL#1).

HPJSM, APPLIED 500PSI IN TCA &ATTEMPTED TO BULL HEAD MAIN BORE L-0,
0030 - 0100 0.5 0 POST N DCOM CIRC MPMP RIG 11490 11490
PRESSURE BUILD UP TO 1000 PSI AFTER PUMPING TOTAL :- 0. 5 BBL'S
- MONITORED TCA & CCA PRESSURES, NO PRESSURE BUILD UP.

0100 - 0300 2 0 POST N DCOM OTH NA HCO 11490 11490 (OOS) HALLIBURTON COMPLETION KEEP ICV#1 (MAIN BORE) OPENED AND OPEN
ICV#2 (LATERAL#1).

HPJSM, APPLIED 500 PSI IN TCA & ATTEMPTED TO BULL HEAD MAIN BORE &
0300 - 0330 0.5 0 POST N DCOM CIRC MPMP RIG 11490 11490
LATER# 1 ,PRESSURE BUILD UP TO 1200 PSI AFTER PUMPING TOTAL :- 0. 5 BBL'S
- MONITORED TCA & CCA PRESSURES, NO PRESSURE BUILD UP UP.

PRESSURE TEST TCA TO 1,000 PSI WITH 63 PCF VISCOUS WATER .


0330 - 0400 0.5 0 POST N DCOM PTST MPMP RIG 11490 11490
- MONITOR TBG, 9 5/8" X 13-3/8" CCA WHILE P/T TCA, NO LEAK OBSERVED,
- CCA = 0 PSI.

R/U Q/N LUB. & P/T SAME T/2,000 PSI, OK.


- RIH 3.80" GC DRIFT, TAG X-OVER 4-1/2" X 3-1/2" (ID = 2907") BELOW THE
PACKER AT 4550' (34DEG INCLINATION),
0400 - 0459 1 0 POST N DCOM DTU DRFT QEM 11490 11490
- RIH 4-1/2", 11.6# TBG MECHANICAL PUNCHER, PUNCH 4-1/2" 11.6#, J-55
TUBING JOINT AT 4525' (74' BELOW THE PACKER AND 27' ABOVE 3-1/2" X-
NIPPLE).
........... ONGOING.
Workover Objectives
Foreman Remarks

ODF CORRECTION : + 0.20FT.


======================================================
KPI :
TRIPPING DP: ACTUAL: XX STD /HR VS 18 STD/HR.
RUNNING COMPLETION: ACTUAL XX JT./HR VS 10 JT/HR.
SECTION 1 ROP : ACTUAL XX FT/DAY VS 836 FT/DAY.
SECTION 2 ROP : ACTUAL XX FT/ DAY VS 645 FT/DAY.
======================================================
ERP:
GOR: 277 SCF/STB, H2S: 1.12 % & RER 1/2 LFL: 102 M, RER 30 PPM: 534M, RER 100 PPM: 287 M.
==============================================
WINDOW DATA :

======================================================
HSE SAFETY :
- PRE-TOUR SAFETY MEETINGS: (02) WEEKLY SAFETY MEETINGS: (00)
- STOP CARDS (20) PTW: (05) JSA: (09), NEAR MISS (00), INCIDENTS: (00),
- DRILLS: SWA DRILL (00), PIT DRILL (00), TRIP DRILL (00) H2S DRILL (01), FIRE DRILL (00),
- MAN, DOWN DRILL (00), ACCUMULATOR DRILL (00), - CONFINED SPACE DRILL (00), VERTICAL RESCUE DRILL (00).
=====================================================
AUDIT
- 1ST WCI 2024 , TOTAL=6, ALL CLOSED.
- 1ST RSI 2024, TOTAL ITEMS=39; CLOSED= 39, STILL OPEN=00.
- 1ST QSI 2024, TOTAL ITEMS=42; CLOSED=42, STILL OPEN=00.
- 2ND QSI 2024, TOTAL ITEMS=45; CLOSED=45, STILL OPEN=00.
======================================================
JOURNEY MANAGEMENT PLAN:
- RIG IS LOCATED ON KHRS FIELD 2 KM SKID ROAD .
- IF NEEDED CALL RIG DQ-57L AT (0135784185) .
- ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
- ALL VEHICLES SHOULD BE 4 X 4 & DRIVERS SHOULD FOLLOW DRIVING SPEED.
- THERE IS SIGNAL IN THE SKID ROAD BUT IS BETTER TO HAVE THURAYA PHONE IF AVAILABLE.
- DISTANCE FROM DMG : 245 KM.
======================================================
POB:
- LSTK DSV: ABDULLAH MAYHOUB / HOSSAM ELKALA , WFD HSE: POOVAN SHARAN.
- LSTK SI: HOSSAM KHALED.
======================================================
WELL CONTROL DATA
MUD WT: 63 PCF WBM.
TBG VOLUME : 69 BBLS
TCA VOLUME : 244 BBLS.
CSG BELOW PKR : 133 BBLS
OPEN HOLE L-0 : 131 BBLS
OPEN HOLE L-0-1 : 159 BBLS
TOTAL VOLUME : 736 BBLS
======================================================
WATER DATA
- WATER SOURCE: KHRS-871.
- CLEAN WATER PIT: 0 %.
- DAILY WATER RECEIVED/CONSUMED: 00 BBL.

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-399 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:20 06/13/2024 - 07/30/2024
Report ID: OPERLMTDMRREP

=======================
WATER CONSERVATION IMPLEMENTED INITIATIVES
- REDUCED WATER PITS: N
- DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: N
- CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION: N
======================================================
NEXT LOCATIONS:
- KHRS-XXX (KOM: NOT DONE , STRIP/O: 0%, LOCATION READINESS: 0%).
======================================================
RENTAL EQUIPMENT ON LOCATIONS
- NONE
======================================================
- ECC HAS RADIO COMMUNICATION FUNCTIONAL,
======================================================
ARAMCO VEHICLE SERVICE DETAILS.
- ARAMCO CAR DOOR NUMBER DH-4313 SERVICED ON 04/25/2024, NEXT SERVICE DUE 06/25/2024.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF 0 0 API 0 0 Volts 0 10 700
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 WATER 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
40
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF 0 0 API 0 0 Volts 0 10 700
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 WATER 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
39

MUD DUOVIS-NS CAOH2 NACL


TREATMENT 23 ( 25KG ) 20 ( 40LB ) 5 ( 2200L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 1,668 N/A

Company SBA TGC HCO RIG EMC TK4 RIG QEM WTS TK4 ARM WWW

Category ALS CTRG ICE RIG DFMS OTHR OTHR SLS SLS WSC WSC WTSE
PERSONNEL
7 15 2 50 1 1 14 3 1 2 1 4
Total
AND SERVICES No. of Persons
101
INFORMATION
Personnel on Loc. Hrs. 12 24 24 24 24 24 24 24 24 24 24 12

Operating Hours. 0 0 0 24 24 24 0 3 3 24 24 0

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 700

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-176 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:20 05/21/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

DQ-58L @ KHRS-176 Limited Morning Report for 06/18/2024


Objective : (TO PERFORM Foreman(s)ELSAWI, IBRAHIM MOHAMED
D&WO Morning Report (Service Providers View) Charge #: ACID STIMULATION IN 2 Engineer CHE JAFFAR, NOOR CHOZIN ALI / OMAIR, MOHAMMED ABDULLAH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (72-24051-0176) EXISTING LATERAL AND Manager ABU RASAIN, AMER MANE
DQ-58L
COMPLETE WITH ESP) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK)
(0500-0500) Saudi Aramco Well Wellbores: +882167771 4201 578 4851 578 4501
Date: Tuesday 06/18/2024 KHRS-176 (0-1-4) KHRS_176_5 CONTRACTOR /CLERK VSA T
578 4791

Last 24 hr operations Next 24 hr plan


ENGAGE FISH, WORKED ON FISH, RELEASE FROM FISH, POH, LD FISHING ASSY, MU & RIH WITH MILL TO 7" PKR, POH T/ SURFACE, MU AND RIH WITH CO ASSY. WITH VACS TOOLS
MILLING ASSY
Location Next Location
243 KM FROM DHAHRAN MAIN GATE. KHRS-157
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,383 Last Csg Size MD TVD Size 3,744 6,681 5,463 Top
9 5/8 6218 5469 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9383 (Date) 95 0 243
23 (05/26/2024@0500 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth OOS ID Summary of Operations
OP Co
Start End Start End

0500 - 0530 0.5 0-1-4 POST N FISH OTH NA RIG 9167 9167 13153 CHANGE HANDLING TOOL TO 5''.
- STATIC LOSSES 5 BPH.

CONT RIH WFD FISHING ASSY W/ 2-5/16" SPEAR ON 5''DP FROM 3415 FT
0530 - 0645 1.25 0-1-4 POST N FISH TI STDP RIG 9167 9167 3415 6440 13153
T/ 6440 FT.
- STATIC LOSSES 5 BPH.

WASHING DOWN T/ 6531' AND ENGANGED FISH:


- RECORD PARAMETERS, Q=210 GPM/ 410 PSI, P/W=159 KBS, S/O=135
KBS.
- HAD INDICATION OF CATCH; PRESSURE INCREASE TO 400 PSI AND
0645 - 1800 11.25 0-1-4 POST N FISH FISH FISHT WFS 9167 9167 13153
OVERPULL.
- WORKED TO UNSET 7" HALL. PACKER WITH MAX OVERPULL AND
JARRING - NO PROGRESS.
- RELEASED FROM THE FISH.
- FLOW CHECK, 5 BPH STATIC LOSSES.

1800 - 1930 1.5 0-1-4 POST N FISH FISH FISHT WFS 9167 9167 13153 RELEASED FROM THE FISH.
- FLOW CHECK, 5 BPH STATIC LOSSES.
1930 - 2000 0.5 0-1-4 POST N FISH RR TDS RIG 9167 9167 13153
SERVICE TDS AND PERFORM DROPS SURVEY.

2000 - 2115 1.25 0-1-4 POST N FISH TO STDP RIG 9167 9167 6531 3415 13153 POH WFD FISHING ASSY ON 5''DP FROM 6531 FT T/ 3415 FT .
- MONITOR WELL ON TT, STATIC LOSSES 5.0 BPH.

2115 - 2145 0.5 0-1-4 POST N FISH OTH NA RIG 9167 9167 13153 CHANGE HANDLING TOOL TO 4''.
- MONITOR WELL ON TT, STATIC LOSSES 5.0 BPH.

2145 - 2300 1.25 0-1-4 POST N FISH TO STDP RIG 9167 9167 3415 485 13153 CONT POH WFD FISHING ASSY ON 4''DP FROM 3415 FT T/ 485 FT.
- MONITOR WELL ON TT, STATIC LOSSES 5.0 BPH.
2300 - 2330 0.5 0-1-4 POST N FISH CIRC MPMP RIG 9167 9167 13153
FLOW CHECK, 5 BPH STATIC LOSSES

2330 - 0030 1 0-1-4 POST N FISH HT BHA RIG 9167 9167 13153 HPJSM, POH & L/D WFD FISHING ASSY.
- MONITOR WELL ON TT, STATIC LOSSES 5.0 BPH.
0030 - 0130 1 0-1-4 POST N MILL HT BHA RIG 9167 9167 13153
HPJSM, P/U & M/U WFD 7" MILLING ASSY T/ 503 FT.

CONT RIH WFD MILLING ASSY ON 4''DP FROM 503 FT T/ 3333 FT.
0130 - 0245 1.25 0-1-4 POST N MILL TI STDP RIG 9167 9167 503 3333 13153
- FILL STRING AND BREAK CIRCULATION EVERY 20 STANDS.
- KEEP RUNNING TT - STATIC LOSSES 5 BPH.

0245 - 0315 0.5 0-1-4 POST N MILL OTH NA RIG 9167 9167 13153 CHANGE HANDLING TOOL TO 5''.
- KEEP RUNNING TT - STATIC LOSSES 5 BPM.

CONT RIH WFD MILLING ASSY ON 5''DP FROM 3333 FT T/ 6439 FT.
0315 - 0430 1.25 0-1-4 POST N MILL TI STDP RIG 9167 9167 3333 6439 13153 - FILL STRING AND BREAK CIRCULATION EVERY 20 STANDS.
- KEEP RUNNING TT - STATIC LOSSES 5 BPH.

0430 - 0459 0.5 0-1-4 POST N MILL CIRC MPMP RIG 9167 9167 13153
CUMULATIVE TIME TO FILL STRING.
Out Of Scope Details
From Hrs Cum. Hrs Doos Id Type Category Out Of Scope Summary
27 May 0530 24 495.25 13153 OOS DCOM DECOMPLETE EXISTING HALLIBURTON SMART LOWER COMPLETION STRING.
Workover Objectives
Foreman Remarks

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-176 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:20 05/21/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

ODF CORRECTION : -0.37 FT


======================================================
KPI:
TRIPPING DP: ACTUAL STD /HR VS 18 STD/HR.
RUNNING COMPLETION: ACTUAL JT/HR VS 10 JT/HR.
===================================================
WINDOW DATA :
- TOW AT 6476 FT
- BOW AT 6485 FT
======================================================
RER & STAGING AREA:
- RER: 100 PPM (199 M), 30 PPM (347 M), 1/2 LFL (69 M).
- GOR HANIFA RESERVOIR: 270 SCF/STB & H2S: 1 %.
======================================================
HSE SAFETY:
- LTI FREE DAYS- 294 DAYS
- PRE-TOUR SAFETY MEETINGS: (02) WEEKLY SAFETY MEETINGS: (00) RIG MOVE MEETING:(00)
- STOP CARDS (25) PTW: (10) JSA: (14), NEAR MISS :(00,) INCIDENTS: (0),
- DRILLS: SWA DRILL (00). PIT DRILL (00) TRIP DRILL (00) H2S(00) RESCUE DRILL (00), FIRE DRILL (00), MAN DOWN DRILL (00), ACCUMULATOR DRILL (00)
- CONFINED SPACE DRILL (00), VERTICAL RESCUE DRILL (00)
========================================================
AUDIT STATUS:
-PCI AUDIT TOTAL ITEMS:155,CLOSED ITEMS:154,OPEN ITEMS:1
=========================
WATER DATA
- WATER SOURCE: KHRS-871.
- TOTAL WATER IN WATER PIT: 2000 BBL.
======================================================
- MUD/COMPLETION DIESEL IN BBLS:
- STOCK: 0 BBL
- CONSUMED: 0
- RECEIVED: 0 BBL
======================================================
WELL CONTROL DATA:
TBG VOL. : 80 BBLS.
TCA VOL: 182 BBLS
CSG BELOW PKR: 151 BBLS
OPEN HOLE L-0-1-4 : 90 BBLS.
OPEN HOLE L-0-1-4-1 : 105 BBLS.
TOTAL VOLUME: 608 BBLS.
======================================================
JOURNEY MANAGEMENT PLAN:
- RIG IS LOCATED ON KHRS FIELD 1 KM SKID ROAD FROM KHURAIS ROAD .
- IF NEEDED CALL RIG DQ-58L AT (013-578-4851) .
- ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
- ALL VEHICLES SHOULD BE 4 X 4.
- ALL VEHICLES SHOULD FOLLOW ROAD ALLOWED DRIVING SPEED.
- THERE IS NO SIGNAL IN THE SKID ROAD. IT IS BETTER TO HAVE THURAYA PHONE IF AVAILABLE.
- DISTANCE FROM DAMMAM TO RIG: 243 KM.
======================================================
POB:
- WFD LSTK DSV: MOHAMMED AOUICHAT / MOHAMED ELDREE, SAFETY : ALESSANDRO.
======================================================
NEXT LOCATIONS:
KHRS-157, KOM DONE
======================================================
RENTAL EQUIPMENT ON LOCATIONS
======================================================
- ECC HAS RADIO COMMUNICATION FUNCTIONAL,
- RADIO COMMUNICATION ARE OK, THURAYA: 008821677714201.
======================================================
ARAMCO VEHICLE SERVICE DETAILS
- ARAMCO CAR WITH NUMBER DYA-4596 NEXT SERVICE DUE JUNE 24, 2024.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0-1-4 9,167 87 294 0 5,596 700.29 -1174.18 4,485.41 0.73
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/16/2024 N/A NORMAL NA SUNNY 1,643 MILLING

Company NRC RIG RIG GDF WFS RIG OTH TK4 SAM ARM

Category CSR CTRG RIG DFMS WMFE OTHR VAC WSC WBCS WSC
PERSONNEL
2 16 50 1 2 17 2 2 1 1
Total
AND SERVICES No. of Persons
94
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 24 12 12 12 24 12 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-176 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:20 05/21/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

Standby/Tankers Others Others


TRUCKS/BOATS
AB-5579 DQ AMBULANCE WATER WELL KHRS-871

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1234 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 01/11/2023 - 07/11/2024
Report ID: OPERLMTDMRREP

ED-85A @ ZULF-1234 Limited Morning Report for 06/18/2024


Objective : (DE- Foreman(s)GAMEA, MOHAMED MOUSTAFA
D&WO Morning Report (Service Providers View) Charge #: COMPLETION.) Engineer MANDEL, CHRISTIAN MARKUS / TAYAR, ABDULRAHMAN AHMED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22062-1234) Manager GHAMDI, NAWAF AHMED
ED-85A
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12818 378-6581 OIM: 013-5 10-6463
Date: Tuesday 06/18/2024 ZULF-1234 (0) ZULF_1234_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
378-6582 013-510646 2

Last 24 hr operations Next 24 hr plan


M/U TBG HGR. FEED CABLES & C/L THROUGH HGR. LAND TBG HANGER. FUNCTION TSET ICV'S. SET ESP PKR. SET 2ND RBP. INSTALL BPV. N/D BOP. N/U BNT & X-TREE. RTRV BARRIERS. SECURE
SET 4-1/2'' ME RBP. WELL. SUSPEND WELL FOR FB.
Location Next Location
ZULF-1230/1239 PF ZULF-1236
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
10,487 Size Size 4,967 7,481 5,537 Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
10487 (Date) 100 0 246
110.4 (05/14/2024@1745 )

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End
0500 - 0530 0.5 0 EOW C COMP HT TBG FMC 10487 10487 TF 933710
RIH W/ 5 JTS X 4-1/2" 11.6# J-55 NEW-VAM TUBING
0530 - 0600 0.5 0 EOW C COMP HT ESPL SBA 10487 10487 TF 933710
SAWAFI-BORETS PERFORMED ELECTRICAL CHECKS.
0600 - 0700 1 0 EOW C WH HT TBGHR GEP 10487 10487 TF 933710
P/U & M/U 11" VG TUBING HANGER ASSY.

R/U AND TEST EXPRO S/L EQUIPMENT. RUN 3.875'' TO TOP OF


0700 - 0830 1.5 0 EOW C COMP DTU DRFT EX1 10487 10487 TF 933710
TRSSSV. RUN 3.795" DRIFT THROUGH TRSSSV. R/D S/L
EQUIPMENT.

0830 - 1015 1.75 0 EOW C COMP HT SSSV BC 10487 10487 TF 933710 BAKER TERMINATED & FEED TRSSSV CONTROL LINE THROUGH
TBG HGR.

1015 - 1345 3.5 0 EOW C COMP HT SSD HCO 10487 10487 TF 933710 HLB FEED AND TERMINATED CONTROL LINES THROUGH TBG
HGR. FLUSH AND SECURE HALL LINES WITH SPLICE TUBES.

1345 - 1800 4.25 0 EOW C COMP HT ESPL SBA 10487 10487 TF 933710 SAWAFI-BORETS TERMINATED & FEED ESP CABLES
PENETRATOR THROUGH TBG HGR.
1800 - 1830 0.5 0 EOW C COMP HT ESPL SBA 10487 10487 TF 933710
SAWAFI-BORETS PERFORMED ELECTRICAL CHECKS.

1830 - 2015 1.75 0 EOW C WH PTST TBGHR GEP 10487 10487 TF 933710 VG WH ENGINEER TEST TUBING HANGER PORTS TO 2,500 PSI /
10 MIN EACH.

LANDED 11''VG TBG HGR MEANWHILE STING INTO HLB


2015 - 2115 1 0 EOW C WH HT TBGHR GEP 10487 10487 TF 933710
RECEPTACLE.
* SECURED TUBING HANGER WITH LOCK DOWN SCREWS.

TEST ICV-1 & CC LINES T 6000PSI /10MIN WHILE MONITOR ICV-


2115 - 2330 2.25 0 EOW C COMP HT ESPL SBA 10487 10487 2. THEN TEST ICV-2 T 6000PSI /10MIN WHILE MONITOR ICV-1 &
CC LINES.
- FUNCTION ICVS.

2330 - 0130 2 0 EOW C COMP PTST PKR RIG 10487 10487 P/T TCA TO 1000 PSI AGAINST HALL PACKERS-OK. BLEED OFF
SLOWLY AS PER SB.

0130 - 0459 3.5 0 EOW C COMP SET PLUGT SLL 10487 10487 4514 4514 R/U & TEST EXPRO S/L EQUIPMENT. RUN & SET 4-1/2" RPB AT
4514 FT... IN PROGRESS @R/T.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
27 May 2000 16.25 515 933710 TF FOT TBACC HCO 4860 HLB UNABLE TO CONFIRM POSITION OF ICV.
Foreman Remarks

ZULF-1234 WORKOVER OBJECTIVES: DE-COMPLETE HALLIBURTON UPPER SMART COMPLETION INCLUDING FUZION-H MALE SUB, ESP, X-NIPPLE, ESP PACKER AND TRSV THAT WAS INSTALLED IN
JULY 2023. THEN RECOMPLETE THE WELL WITH S.BORETS ESP WITH WET MATE CONNECT ON 41/2" 11.6# TUBING.
===================================================================================================
* LAT; 28 DEG 29.88' N, LONG; 049 DEG 20.60' E.
* NO ANCHORING RESTRICTIONS ON EITHER SIDE
* RIG HEADING= 330 DGS
* AIR GAP= 40 FT MSL
* RKB TO MSL= 104 FT MSL
* WATER DEPTH= 148 FT.
* RKB TO MUDLINE= 252 FT
========================ZULF 1230-1239 PF OPERATION SEQUENCE===============================================
ZULF-1234- ( DE- COMPLETION ).

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1234 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 01/11/2023 - 07/11/2024
Report ID: OPERLMTDMRREP

ZULF-1236 - ( DE- COMPLETION ).


FLOWBACK BOTH ( ZULF-1234 & 1236).
==================SAFETY & DRILLS==========================================
HELD H2S DRILL, FIRE DRILL & ABANDONMENT DRILL ON JUNE 16, 2024
SWO - LINE OF FIRE DRILLS DAILY.
REVIEW HSE ALERTS: HSE ALERTS: HSE ALERT 69-24 - INJURY DURING ENGINE MAINTENANCE, HSE ALERT 70-24 - PIPE HANDLER MAIN ARM UNCONTROLLED DECENT,HSE ALERT 71-24 - TRIP
AND FALL INCIDENT, HSE ALERT 72-24 - SNAKE BITE & SCORPION STING INCIDENTS.
===================================================================================================
ARAMCO PERSONNEL:
ARAMCO MATERIAL EXPIDITOR MAJID AL ALOTIABI #8464261 ONBOARD SINCE 4.JUNE.24
===================================================================================================
NEXT LOCATION.
SFNY-210/215, 1340/1345.
PDS SUBMITTED 23/05/24 #8800022186
RIG MOVE REQUEST #RM-2024-4010760 ESTIMATED 20/06/24
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF N/A N/A API 0 Volts 0 9.4 266,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 N/A HTHP 88 N/A N/A N/A / CACL N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A N/A 12 / N/A N/A N/A
29
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF N/A N/A API 0 Volts 0 9.5 266,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 N/A HTHP 88 N/A N/A N/A / CACL N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A N/A 12 / N/A N/A N/A
30

MUD CACL2-80
TREATMENT 18 ( 2200L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/02/2024 N/A 9 KTS NW 1 FT SEASONAL 1,671 PRE-TOUR SAFETY
MEETING

Company SBA SCB GOS HCO RIG OES MIF ARM EX1 BC FMC ARM GEP MI2

Category ALS BRCR CTRG ICE RIG DFMS FILT OTHR SLS SSSV PRS WSC WHES SCS
PERSONNEL
8 1 13 5 51 1 2 1 3 1 4 1 1 1
Total
AND SERVICES No. of Persons
93
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 12 0 24 24 12 0 0 24 12 24 24 12 0

Standby/Tankers
TRUCKS/BOATS
ZAMIL-504

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
3674 1456 1453 415 0 700

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR BRRI-59 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 04/28/2024 - 06/30/2024
Report ID: OPERLMTDMRREP

EXL-IVA @ BRRI-59 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK THE Foreman(s)DASANNA, JEEVARAJ / AHMED, AYMAN AHMED
D&WO Morning Report (Service Providers View) Charge #: WELL INTO HDRY) Engineer ELSOKKARY, OSSAMA AHMED / ALHAMAM, ABDULLATIF ARIF
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Manager ALRUWAILI, MOHAMMED NAZAL
EXL-IVA (71-24024-0059)
Daily OffShore THURAYA RIG FORMAN VSAT RIG FORMAN VSAT
(0500-0500) Saudi Aramco Well Wellbores: 00966 88 2 16 777 12 631 378-6575 378-6576
Date: Tuesday 06/18/2024 BRRI-59 (0-2) BRRI_59_2 OTHER VSAT CONTRACTOR /CLERK VSA T
378-6577 378-6578

Last 24 hr operations Next 24 hr plan


COMPLETE RIH WITH 5-7/8 LIB ASSY ON 4'' DP, WASHOVER & TAG TOP OF FISH, CHC, FLOW COMPLETE POH & LAY DOWN 5-7/8'' LIB ASSY AND CHECK STAMP, M/UP & RIH W/ NEW FISHING
CHECK, POH W/ 5-7/8'' LIB ASSY. STRING.
Location Next Location
BRRI 58/63,138/139 PLATFORM *RIG MAINTENANCE*
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
10,399 Size 7565 Size 7,322 10,399 Top
Formations Comments
7 4 1/2 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
10399 (Date) 100 0 114
28.7 (05/20/2024@1500 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

RIH W/ 5-7/8'' LIB ASSY WHILE P/U 4" DRILL PIPE FROM PIPE DECK TO 2200 FT.
0500 - 0800 3 0-2 POST N FISH OTH NA RIG 10615 10615
- FLUSH STRING EVERY 500' WHILE RIH.
- MONITOR WELL THRU TRIP TANK, GOOD DISPLACMENT.
0800 - 0900 1 0-2 POST N FISH CIRC MPMP RIG 10615 10615
COMMULATIVE TIME TAKEN TO FILL & FLUSH STRING EVERY 500' WHILE RIH.

0900 - 1200 3 0-2 POST N FISH RR DWKS RIG 10615 10615 HPJSM, SLIP AND CUT DRILLING LINE, SET AND TEST F.O.M & C.O.M -GOOD TEST.
MONITOR WELL ON TRIP TANK-WELL STATIC.

CONTINUE RIH W/ 5-7/8'' LIB ASSY WHILE P/U 4" DRILL PIPE FROM PIPE DECK,
1200 - 1900 7 0-2 POST N FISH OTH NA RIG 10615 10615
TAGGED T.O.FISH AT 6722' W/ 5 KLBS (445' ABOVE PBR DEPTH AT 7167').
- FLUSH STRING EVERY 500' WHILE RIH.
1900 - 2130 2.5 0-2 POST N FISH CIRC MPMP RIG 10615 10615
COMMULATIVE TIME TAKEN TO FILL & FLUSH STRING EVERY 500' WHILE RIH.
2130 - 2300 1.5 0-2 POST N FISH CIRC MPMP RIG 10615 10615
CONNECT TDS, CHC THRU MGS TILL CONFIRM IN/OUT 80 PCF VISCOUS BRINE.

CONTINUE RIH & WASHOVER W/ 5-7/8'' LIB ASSY ON 4" DRILL PIPE TILL TAG &
2300 - 2330 0.5 0-2 POST N FISH OTH NA RIG 10615 10615 STAMP TOP OF FISH AT 6722 FT W/ 8 KLBS.
- MONITOR WELL THRU TRIP TANK, GOOD DISPLACMENT.

2330 - 0100 1.5 0-2 POST N FISH CIRC MPMP RIG 10615 10615
PUMP 30 BBLS HI-VIS SWEEP & CHC TILL SHAKER CLEAN.
0100 - 0130 0.5 0-2 POST N FISH CIRC MPMP RIG 10615 10615
FLOW CHECK, WELL STATIC.

POH W/ 5-7/8'' LIB ASSY ON 4'' D/P TO 2000 FT..........INC@RT


0130 - 0459 3.5 0-2 POST N FISH OTH NA RIG 10615 10615
- MONITOR WELL THRU TRIP TANK, GOOD DISPLACMENT.

Workover Objectives
Foreman Remarks

** CURRENT LOCATION -BRRI 58/63, 138/139.


** SCOPE OF WORK: BRRI-59 ST, BRRI-61 NDE, BRRI-62 ST, BRRI-63 ST.
** RIG POSITION: 27DEG 15.93' N LATITUDE, 49DEG 43.01 E LONGITUDE, RIG HEADING 168DEG.
** WATER DEPTH: 44 FT.
** FINAL LEG PENETRATIONS: BOW - 12.9', PORT - 12.9', STARBOARD - 12.9'.
** FINAL AIR GAP: 45 FT.
-

** CURRENT WELL: BRRI-59, SCOPE OF WORK: SIDE TRACK ACROSS HDRY FM.
** RKB TO TBG SPOOL = 74.5 FT, ODF TO TBG SPOOL = 24.5 FT, CORRECTION = -50 FT.
-

** NEXT PLATFORM: BRRI-34/39.


** RIG SCHEDULE RECEIVED ON 28/04/2024 FOR BRRI-34/39.
** SCOPE OF WORK: SIDETRACK WELL BRRI-34.
** EMAIL SENT TO RIG MOVE MASTER FOR FEASIBILITY & SURVEY AREA ON 30/04/2024.
** EMAIL SENT TO RIG FOR LPA & LOCATION APPROVAL ON 01/05/2024.
-

** RIG CLERK HAROON BASHA ID# 8145412 ON BOARD SINCE 07/11/2023.


-

DAILY SURVEY
MUD DATA Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR BRRI-59 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 04/28/2024 - 06/30/2024
Report ID: OPERLMTDMRREP

80 PCF N/A N/A API 0 Volts 0 9 238,000


FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
138 N/A HTHP 88 13 N/A 8 / 12 CACL N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A 21 12 7/8 N/A N/A N/A
69

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF N/A N/A API 0 Volts 0 9 238,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
138 N/A HTHP 88 14 N/A 9 / 13 CACL N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A 21 12 8/9 N/A N/A N/A
70

MUD CAOH2 RD HEC


TREATMENT 4 ( 55LB ) 1 ( 55GL ) 2 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/14/2024 REGULAR 6-7 KTS NW 1-2 FT 30 DEGC, VIS 2,092 TOURLY
5-6 NM

Company HCB SCB GOS SCP RIG OES BFW ARM BCM HSS NSL SPL BCR ARM BAW

Category BRCR BRCR CTRG PSSC RIG DFMS WMFE OTHR PCS SKSHS SLS SLS PRS WSC WLS
PERSONNEL
1 1 13 1 52 1 1 1 2 1 1 3 2 2 4
Total
AND SERVICES No. of Persons
86
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 0 12 12 0 24 0 0 0 12 24 0

Standby/Tankers
TRUCKS/BOATS
BoUTROS TIDE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1684 1353 1497 2431 1143 1836

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NFES-801 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:20 06/11/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

HESP1A-1 @ NFES-801 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (P&A ) Foreman(s)HASSAN, MOSTAFA THARWAT
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Engineer ALHELAL, MOHAMMED ALI
HESP1A-1 ()
Manager KHALDI, FALAH ALI
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: THURAYA RIG FORMAN VSAT
Date: Tuesday 06/18/2024 NFES-801 (0) NFES_801_0 0088216777 12088 013-378182 6

Last 24 hr operations Next 24 hr plan


WORKING ON CLEANING SKID ROAD OF WELL NFES-801 WORKING ON CLEANING SKID ROAD OF WELL NFES-801
Location Next Location
NFES-801 STWW-5301
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 572
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 1700 12 0 PLGABN N PA OTH NA HCM 1600 1600
WORKING ON CLEANING SKID ROAD OF WELL NFES-801.
1700 - 0459 12 0 PLGABN N PA OTH NA HLH 1600 1600
WAIT ON DAY LIGHT.
Workover Objectives
Foreman Remarks

PLUG AND ABANDON (P&A) WATER SUPPLY WELLS.


P&A CHARGE ACCOUNT (61-21737-0007).
=======================================

HALLIBURTON COMMUNICATION THURAYA NUMBER : (+881677715181 / +8821677715194).

=======================================================

NEAREST HOSPITAL FOR EMERGENCY & CONTACT:


** HOSPITAL NADEC, HARADH ( 400 KM FROM CAMP SITE), PH.: 00966 13 5849009.
- CAMP LOCATION : +/- 700 KM FROM DMG , 126 KM AFTER HRDH BRIDGE ON KHARKHIR RD, T/L 265 KM SKID RD, FOLLOW THE SIGN BOARD OF UNIT HESP1A-1

===================================================================

* MOVE DETAILS:
- MOVE DISTANCE FROM MAIN CAMP TO WELL NFES-801 : 270 KM. ( SKID ROAD )
===================================================================

SAFETY:
- HELD A DAILY SAFETY MEETING WITH ALL PERSONNEL ON WELL LOCATION & DISCUSS JSA & WORK PERMIT.
- OPEN JOURNEY MANAGEMENT FOR ALL HALLIBURTON CARS BEFORE MOVE TO JOB.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 1,211 N/A

Company

Category
PERSONNEL
AND SERVICES No. of Persons Total
INFORMATION
Personnel on Loc. Hrs.

Operating Hours.

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 1 of 1


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNIF-729 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 10/29/2023 - 06/19/2024
Report ID: OPERLMTDMRREP

HI-2 @ MNIF-729 Limited Morning Report for 06/18/2024


Objective : (DUAL PWI Foreman(s)LABRECHE, FAYCAL / MAHMOUD, MOHAMED ELSAYED
D&WO Morning Report (Service Providers View) Charge #: (URTR)) Engineer CHIU, CHEE YANG
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23016-0729) Manager GHAMDI, MAGID ABDULLA
HI-2
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088-2162- 3700032 673 7320 673 2881
Date: Tuesday 06/18/2024 MNIF-729 (0) MNIF_729_0 FAX VSAT CONTRACTOR /CLERK VSA T
673 7324 673 3650

Last 24 hr operations Next 24 hr plan


PERFORM INJECTIVITY TEST. CONT. INJECTIVITY TEST. SECURE WELL. R/D. PREPRARE FOR RIG MOVE TO ZULF-1370.
Location Next Location
MNIF-726/733 PLATFORM ZULF-1370
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
18,995 Size 9770 7491 Size 1,412 13,993 8,194 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
18995 (Date) 100 0 195
94.9 (06/12/2024@1400 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

PERFORM INJECTIVITY TEST WITH FRESH WATER


0500 - 1130 6.5 0 EOW E STIM STIM CTU BCT 18995 18995
- INJECTION RATE: 4.86 BPM/ 5,000 BPD, WHP: 615 PSI, TOTAL VOLUME: 1,575
BBLS
1130 - 1230 1 0 EOW E STIM STIM CTU BCT 18995 18995
PREPARE FOR COMMINGLE INJECTIVITY TEST. OPEN L1 ICV

CONDUCTED MAN DOWN (INJURY) DRILL ON RIG FLOOR WITH MEDICAL


1230 - 1300 0.5 0 EOW E STIM STIM CTU BCT 18995 18995
EVACUATION BY STRETCHER USING A CRANE. IP (USING DUMMY) TRANSFERRED
FROM RIG FLOOR TO CLINIC.

PERFORM INJECTIVITY TEST COMMINGLE L0 & L1 WITH FRESH WATER


1300 - 1830 5.5 0 EOW E STIM STIM CTU BCT 18995 18995 - INJECTION RATE: 9.7 BPM/ 14,000 BPD, WHP: 1,347 PSI, TOTAL VOLUME:
2,885 BBLS
- SECURE WELL. SUSPEND COMMINGLED INJECTIVITY TEST TO FILL UP MUD PITS

1830 - 2200 3.5 0 EOW E STIM STIM CTU BCT 18995 18995 FILL UP MUD PITS WITH FRESH WATER
IN PARALLEL. CONT. R/D CT INJECTOR HEAD , R/D CT & WELL TEST EQUIPMENT

CONT. PERFORM INJECTIVITY TEST COMMINGLE L0 & L1 WITH FRESH WATER


2200 - 0030 2.5 0 EOW E STIM STIM CTU BCT 18995 18995 - INJECTION RATE: 9.7 BPM/ 14,000 BPD, WHP: 1,300 PSI, TOTAL VOLUME 2ND
PHASE: 990 BBLS

CONDUCTED MAN DOWN (INJURY) DRILL ON RIG FLOOR WITH MEDICAL


0030 - 0100 0.5 0 EOW E STIM STIM CTU BCT 18995 18995
EVACUATION BY STRETCHER USING A CRANE. IP (USING DUMMY) TRANSFERRED
FROM RIG FLOOR TO CLINIC.

CONT. PERFORM INJECTIVITY TEST COMMINGLE L0 & L1 WITH FRESH WATER


0100 - 0459 4 0 EOW E STIM STIM CTU BCT 18995 18995
- INJECTION RATE: 9.7 BPM/ 14,000 BPD, WHP: 1,377 PSI, TOTAL VOLUME 2ND
PHASE: 3,600 BBLS
Foreman Remarks

WELL OBJECTIVES: MNIF-729 WILL BE DRILLED AS OIL-WATER INJECTOR ACROSS UPPER RATAWI RESERVOIR AS A HORIZONTAL DUAL LATERAL PWI WITH EQUIPPED SMART COMPLETION ICV.
=======================================================================================================
- CURRENT LOCATION:
* MNIF-726/733 PF
* LATITUDE: 27 DEG 45.384 N LONGITUDE: 49 DEG 01.378 E
* WATER DEPTH = 24.3 FT RKB TO MSL = 97 FT
* RKB TO ML = 121.3 FT RKB TO PLATFORM = 60.7 FT
* AIR GAP = 48 FT HEADING = 343 DEG
=======================================================================================================
- MNIF-729 CSG WELL DESIGN:
* PLANNED 18-5/8" AT 971 FT (50' TVD IN RUS), ACTUAL @ 981 FT.
* PLANNED 13-3/8" AT 4,454 FT (100' TVD INTO LAMS), ACTUAL @ 4,500 FT.
* PLANNED 9-5/8" AT 9,391 FT (100' TVD INTO BUWB), ACTUAL @ 9,770 FT.
* PLANNED 7" LINER @ 13,567 FT (TE AT URTW), ACTUAL @ 13,993 FT, 7" SCAB LINER , ACTUAL AT (9,460 FT-1,412 FT).
* PLANNED 6-1/8" LATERAL-0 TD @ 19,00 FT MD / 7,939 FT TVD , ACTUAL @ 18,995 FT.
================ ==========MNIF 726-733 BATCH DRILLING SEQUENCE===================================
- MNIF-730 (22", 16", 12-1/4",8-1/2", 6-1/8" & EOW SECTIONS) DONE.
- MNIF-729 (22", 16" 12-1/4" 8-1/2" & 6-1/8" L_0 & L_1 & EOW SECTIONS) DONE.
- MNIF-728 (22", 16"& 12-1/4" & 8-1/2" & 6-1/8" SECTIONS, EOW) DONE.
- MNIF-729 (EOW) CURRENT OPERATION.
=======================================================================================================
- SAFETY:
* CONDUCTED TWO MAN DOWN DRILLS (ONE WITH EACH CREW).
* SENSORS CHECKED BY RIG FOREMAN WEEKLY.
* LC 50 SAMPLES: NOT APPLICABLE DUE TO ZERO DISCHARGE LOCATION..
=======================================================================================================
- PERSONNEL:

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNIF-729 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 10/29/2023 - 06/19/2024
Report ID: OPERLMTDMRREP

* MATERIAL EXPEDATOR MOHAMMED ALSALEM ID# 8594439 ON BOARD SINCE 06/04/2024.

========================================================================================================
RENTAL TOOLS:
NOV CT AGITATOR ON LOCATION JUNE 1,2024
=== ============================================================================
VISITS:

=======================================================================================================
* RIG MOVE TO PLATFORM: ZULF 1370-1379.
- CRM #8000647270 FOR ZULF 1370-1379 PLATFORM DEBRIS SURVEY APPROVED, RECEIVED ON 04/26/2024.
- RIG MOVE MEETING #RM-2024-4010600 FROM SEA TO ZULF 1370/1379 PF ISSUED ON 04/26/2024., CONDCUTED ON 05/15/2024.
- RECEIVED CONFIRMATION E-MAIL FROM ZULF FIELD SERVICE CONFIRMS THAT ALL WELLS ON ZULF 1370/1379 ARE ZERO PRESSURE ON 05/05/2024.
- DEBRIS REMOVAL REQUEST #DP-2024-15966 ISSUED ON 05/06/2024, RECEIVED ON 05/13/2024.
- PLATFORM VISIT 06/11/2024.
- RIG MOVE TO ZULF 1370-1379 EXPECTED ON +/- 06/20/2024
* RIG MOVE TO PLATFORM: SFNY 1100-1109.
- PLATFORM DEBRIS SURVEY CRM #8800022128 FOR SFNY-1100-1109 ISSUED ON 05/10/2024, RECEIVED ON 05/12/2024.
- DEBRIS REMOVAL REQUEST #DP-2024-16035 ISSUED ON 05/26/2024
* RIG MOVE TO PLATFORM: SFNY 1070-1079.
- CRM #8000647162 FOR SFNY 1070-1079 SITE SURVEY ISSUED ON 06/03/2024
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/12/2024 N/A 8 3 CLEAR 4,243 TOURLY

Company GOS BCT SCP SCP NOV RIG BDF BFS RAC ARM HCT ARM SWT

Category CTRG COIL PSSC ICE DRF RIG DFMS FILT WMFE OTHR PCS WSC WTSE
PERSONNEL
12 10 1 1 1 54 1 1 1 1 1 2 9
Total
AND SERVICES No. of Persons
95
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 0 24 0 24 24 0 0 0 0 24 24

Standby/Tankers
TRUCKS/BOATS
Rawabi 207

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2870 819 1220 1698 463 0

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1239 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/05/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

HI-4 @ SFNY-1239 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL Foreman(s)ABDELWAHAB, MOHAMED RABIE
D&WO Morning Report (Service Providers View) Charge #: OIL PRODUCER) Engineer ALHAJRI, SAAD GHANEM
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23013-1239) Manager FAIFI, MUSAAD HASSAN
HI-4
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12212 673-9356 673-9201
Date: Tuesday 06/18/2024 SFNY-1239 (0) SFNY_1239_0 CONTRACTOR /CLERK VSA T
673-9123

Last 24 hr operations Next 24 hr plan


CONT' RD & BACKLOAD SLB WELL TEST SURFACE EQUIPMENT. LD 5'' HWDP AND DC'S. COMPLETE SKID OVER SFNY-1233 WELL FOR TRSSSV TROUBLESHOOTING.
OPERATION ON SFNY-1239 AND RELEASE WELL.
Location Next Location
SFNY-324/329,1233/1239 PF. SFNY-1233
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,268 Last Csg Size MD TVD Size Top
9 5/8 6592 5286 Formations Comments
Depth
RUSA 1,172 1171 TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUSG 1,442 1441 TVD
9268 (Date) 100 0 243 UMER 1,600 1598 TVD
43.7 (05/04/2024@1630 ) LAMS 4,463 4312 TVD
PLVL 4,942 4728 TVD
AHMD 4,997 4771 TVD
CPCK 5,171 4897 TVD
WARA 5,284 4970 TVD
MDDD 5,583 5128 TVD
SFNY 5,628 5147 TVD
SCFS 5,747 5192 TVD
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0930 4.5 0 EOW E TEST RD WTSE SWT 9268 9268
RD & BACKLOAD SLB SURFACE WELL TEST & ALKHORIF ESP TESTING EQUIPMENT.
0930 - 1500 5.5 0 PRE N RM LDP SPDP RIG 9268 9268 1395 0
LD 6 X 6 1/2" DC, 33 X 5" HWDP, & 6 X 5" DP FROM DERRICK.
1500 - 1500 0 0 EOW S OT RELS NA RIG 9268 9268
COMPLETE OPERATION ON SFNY-1239 AND RELEASE WELL.
Foreman Remarks

SFNY-1239 WILL BE DRILLED AS SINGLE LATERAL HORIZONTAL OIL PRODUCER TARGETING SFNY RESERVOIR TO A TOTAL DEPTH OF +/- 9,420 FT MD WITH +/-3,000 FT OF RESERVOIR CONTACT.
THE WELL WILL BE COMPLETED WITH 5-1/2" ICD'S AND 350-MICRON SAND SCREENS, OPEN HOLE PACKERS FOR ZONAL ISOLATION, DOWN HOLE PACKER, Y-TOOL ESP, AND 4-1/2" TUBING WITH
FLAPPER TYPE SUBSURFACE SAFETY VALVE.
==================================================================================================
* ALL ACTIVITIES ARE ZERO DISCHARGE (SKIP & SHIP) AS PER SAES-A-103 DUE TO SHALLOW WATER DEPTH
==================================================================================================
HSE:
* PERFORM H2S, FIRE & ABANDON DRILL 15-JUNE-2024
* CONDUCTED MAN DOWN (HEAD INJURY) MONKEY BOARD, WITH MEDICAL EVACUATION BY STRETCHER AND MEDI-VAC. 19-MAY-2024
* REINFORCE STOP WORK AUTHORITY, HANDS-FREE OPERATIONS & ADVERSE WEATHER CONDITIONS RISKS IN ALL PRE-TOUR MEETINGS.
* PERFORM DAILY SWA & LOF DRILLS
==================================================================================================
* LC-50 SAMPLE: (WELL SFNY 1239) IS ZERO DISCHARGE, NO LC-50 SAMPLE REQUIRED (AS PER D&WO-LC-50-001-R0)
==================================================================================================
PLAN CASING POINT.
18-5/8" @ 1,128' (50' TVD INTO RUS) ACTUAL.
13-3/8" @ 4,582' (100' TVD INTO LAMS) ACTUAL.
9-5/8" @ 6,592' ACTUAL.
==================================================================================================
RIG POSITION:
* SFNY-324/329,1233/1239 PF
* LAT 28 DEG 08.20 N LONG 048 DEG 46.52 E
* RIG HEADING 349
* AIRGAP 51 FT, WATER DEPTH 28 FT, RKB-MSL 100 FT, RKB-M.LINE 128 FT
==================================================================================================
RENTAL TOOLS:

==================================================================================================
ARAMCO PERSONNEL:
* RIG CLERK: CHITHAMUTHU MANIVANNAN (ID# 8608825) ON BOARD SINCE 3, MAY 2024.

==================================================================================================
CONTRACTOR MANAGEMENT VISITS:
* RIG MANAGER TAREK METWALLY DEP. RIG ON 2-MAY-2024.
* HSE MANAGER DEP. RIG ON 7-MARCH-2024.
==================================================================================================
S&S MANAGEMENT:
* SKIPS ON RIG = 0 FULL & 4 EMPTY
* SKIPS ON BOAT: = 0 FULL & 0 EMPTY
* SKIPS IN STAGING = 40
* SKIPS TOTAL USED TO DATE= 177
* SKIP TOTAL TONS TO DATE= 809.4
* SKIP TOTAL BBLS TO DATE= 2198
===================================================================================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1239 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 05/05/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

* NEXT LOCATION: ABSF 240/249.


Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 9,268 90.7 147.25 0 5,299 -1394.68 799.2 5,273.72 0.51
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A 10-12 KN 1-2 FT SEASONAL 3,639 TOURLY

Company KSC INW SCB GOS SCP RIG EMC ARM SCM EX1 ARM SWT

Category ALS BRCR BRCR CTRG PSSC RIG DFMS OTHR PCS SLS WSC WTSE
PERSONNEL
3 1 1 12 2 50 1 1 1 3 1 8
Total
AND SERVICES No. of Persons
84
INFORMATION
Personnel on Loc. Hrs. 10 10 10 10 10 10 10 10 10 10 10 10

Operating Hours. 0 0 0 0 0 10 10 10 10 0 10 10

Standby/Tankers
TRUCKS/BOATS
BGMS-Success

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
3011 819 1329 5662 0 1434

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1233 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:20 06/18/2024 - 06/20/2024
Report ID: OPERLMTDMRREP

HI-4 @ SFNY-1233 Limited Morning Report for 06/18/2024


Objective : (SINGLE Foreman(s)ABDELWAHAB, MOHAMED RABIE
D&WO Morning Report (Service Providers View) Charge #: HORIZONTAL PRODUCER) Engineer ALHAJRI, SAAD GHANEM
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (64-24013-1233) Manager FAIFI, MUSAAD HASSAN
HI-4
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12212 673-9356 673-9201
Date: Tuesday 06/18/2024 SFNY-1233 (0) SFNY_1233_0 CONTRACTOR /CLERK VSA T
673-9123

Last 24 hr operations Next 24 hr plan


CENTER RIG OVER SFNY-1233. RU SL. RTRV RBP. TROUBLESHOOT TRSSSV. INFLOW TEST. TROUBLESHOOT TRSSSV. CENTER RIG OVER SFNY-1236. RU SL. RTRV RBP.
TROUBLESHOOT TRSSSV.
Location Next Location
SFNY-324/329,1233/1239 PF. SFNY-1236
Current Depth (ft) Liner TOL MD TVD Formation Tops
8,968 Last Csg Size MD TVD Size 6,147 8,965 5,317 Top
9 5/8 6459 5257 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
8968 (Date) 100 0 243
0.4 (06/17/2024@1830 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
1500 - 1530 0.5 0 PRE N RM RD NA RIG 8968 8968
FOR TRANSVERS RIG PACKAGE & SKIDDING CANTILEVER OVER SFNY-1233.

PREPARE FOR TRANSVERSE RIG FLOOR TO CENTER. TRANSVERSE DRILLING


1530 - 1730 2 0 PRE N RM RD NA RIG 8968 8968
PACKAGE TO CENTER. SECURE & RIG PREPARE TO SKID IN CANTILEVER. SKID IN
CANTILEVER 13 FT.
1730 - 1830 1 0 PRE N RM RM NA RIG 8968 8968
TRANSVERSE DRILLING PACKAGE TO PORT 6 FT AND SECURE RIG.
1830 - 1830 0 0 PRE S OT COMM NA RIG 8968 8968
COMMENCE OPERATIONS ON SFNY-1233 @ 18:00 HRS.
1830 - 1915 0.75 0 POST N DCOM HT TBG RIG 8968 8968
CLEAN & CLEAR RIG FLOOR.

SPOT SLICKLINE UNIT ON CANTILEVER, RIG UP EXPRO SLICK LINE RISER, BOP AND
1915 - 2115 2 0 POST N DCOM PTST LUB EX1 8968 8968
LUBRICATOR. EXPRO SLIP AND CUT SLICK LINE. PRESSURE TEST LUBRICATOR TO
300/2000 PSI, GOOD TEST.
2115 - 2215 1 0 POST N DCOM OTH NA RIG 8968 8968
ARAMCO FIELD SERVICE SUPERVISOR OPEN ACTUATOR VALVE AND SECURED.
2215 - 2245 0.5 0 POST N DCOM CIRC MPMP RIG 8968 8968
OPEN MASTER VALVE, HAD ZERO PSI SIWHP.

EXPRO SLICKLINE PERFORM THE FOLLOWING SLICK LINE WORK:


- RIH W 3" GS & TAG INTERWELL 4-1/2" RBP AT 179'.
2245 - 0000 1.25 0 POST N DCOM CIRC MPMP RIG 8968 8968
- RIH AND LATCH INTERWELL 4-1/2" RBP @ 179' APPLY 800 PSI WHILE
RETRIEVING PLUG.
- POH W 4-1/2'' RBP TO INSIDE LUBRICATOR.
0000 - 0100 1 0 POST N DCOM CIRC MPMP RIG 8968 8968
BULLHEADING TBG W 80 BBLS 69 PCF INHIBITED BRINE.

SLB TROUBLESHOOTING 4-1/2" TRSSSV AS BELOW:


- FUNCTION TRSSSV, FLOW TUBE MOVING OK.
- PT TRSSSV CONTROL LINE TO 6,000 PSI, HOLD.
0100 - 0459 4 0 POST N DCOM OTH NA SCP 8968 8968
- RIH W 3.875" DRIFT & TAG TRSSSV AT 290'.
- RIH W BRUSH, TAG TRSSSV NO-GO, & WORK BRUSH 50 TIMES UP & DOWN.
- RIH W CHEMICAL JETTING TOOL AND PUMP 10 BBLS DIESEL.
- RIH W 4-1/2'' INTERWELL RBP TO 1,300'.......... INC@RT.
Workover Objectives
Foreman Remarks

SFNY-1233 WILL BE TROUBLESHOOTING MALFUNCTIONING TUBING RETRIEVABLE SUB-SURFACE SAFETY VALVES..


==================================================================================================
* ALL ACTIVITIES ARE ZERO DISCHARGE (SKIP & SHIP) AS PER SAES-A-103 DUE TO SHALLOW WATER DEPTH
==================================================================================================
HSE:
* PERFORM H2S, FIRE & ABANDON DRILL 15-JUNE-2024
* CONDUCTED MAN DOWN (HEAD INJURY) MONKEY BOARD, WITH MEDICAL EVACUATION BY STRETCHER AND MEDI-VAC. 19-MAY-2024
* REINFORCE STOP WORK AUTHORITY, HANDS-FREE OPERATIONS & ADVERSE WEATHER CONDITIONS RISKS IN ALL PRE-TOUR MEETINGS.
* PERFORM DAILY SWA & LOF DRILLS
==================================================================================================
* LC-50 SAMPLE: (WELL SFNY 1233) IS ZERO DISCHARGE, NO LC-50 SAMPLE REQUIRED (AS PER D&WO-LC-50-001-R0)
==================================================================================================
PLAN CASING POINT.
NA
==================================================================================================
RIG POSITION:
* SFNY-324/329,1233/1239 PF
* LAT 28 DEG 08.20 N LONG 048 DEG 46.52 E
* RIG HEADING 349

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-1233 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:20 06/18/2024 - 06/20/2024
Report ID: OPERLMTDMRREP

* AIRGAP 51 FT, WATER DEPTH 28 FT, RKB-MSL 100 FT, RKB-M.LINE 128 FT
==================================================================================================
RENTAL TOOLS:

==================================================================================================
ARAMCO PERSONNEL:
* RIG CLERK: CHITHAMUTHU MANIVANNAN (ID# 8608825) ON BOARD SINCE 3, MAY 2024.

==================================================================================================
CONTRACTOR MANAGEMENT VISITS:
* RIG MANAGER TAREK METWALLY DEP. RIG ON 2-MAY-2024.
* HSE MANAGER DEP. RIG ON 7-MARCH-2024.
==================================================================================================
S&S MANAGEMENT:
NA
===================================================================================================
* NEXT LOCATION: ABSF 240/249.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 8,968 87.5 283 5,319 177.96 -1461.09 4,829.04 0.33
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 3,639 N/A

Company KSC INW SCB GOS SCP RIG EMC ARM SCM EX1 ARM SWT

Category ALS BRCR BRCR CTRG PSSC RIG DFMS OTHR PCS SLS WSC WTSE
PERSONNEL
3 1 1 12 2 50 1 1 1 3 1 8
Total
AND SERVICES No. of Persons
84
INFORMATION
Personnel on Loc. Hrs. 14 14 14 14 14 14 14 14 14 14 14 14

Operating Hours. 0 14 0 0 14 14 2 2 14 14 14 0

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABSF-130 WORKOVER-5 BI-90
Print Date: 06/18/2024 06:20 06/15/2024 - 06/29/2024
Report ID: OPERLMTDMRREP

HI-5 @ ABSF-130 Limited Morning Report for 06/18/2024


Objective : (ESP CHANGE NOAMAN, AHMED ALY / ALTWAIRQI, HUSAIN TARIQ / DAKHIL, FAHAD
Foreman(s)
OUT) AHMED
Engineer AVILA FAULL, ENRIQUE JOSE / ABUZAID, KHALED WALEED
D&WO Morning Report (Service Providers View) Rig Charge #: Manager SHEHRI, TALAL HASAN
Copyright 2024 Saudi Aramco. All Rights Reserved HI-5 (64-24019-0130)
THURAYA RIG FORMAN VSAT CONTRACTOR
Daily OffShore /CLERK VSA
8821677711 181 3786301
(0500-0500) Saudi Aramco Well Wellbores:
T
Date: Tuesday 06/18/2024 ABSF-130 (0) ABSF_130_0
3786302
CONTRACTOR /CLERK VSA T
3786303

Last 24 hr operations Next 24 hr plan


CONT PRE-LOAD. INSTALL MOORING ROPES. JACK UP. INSTALL DROP-DECK. SKID OUT. GENERAL R/U E-KILL & PT. PT TCA. R/U SL & PT. COMMENCE OPERATIONS. BULLHEAD TBG. SL
R/U & TRANSFER MATERIALS TO PF. R/U E-KILL ASSY. OPERATIONS. PUNCH TBG. BULLHEAD TCA. SET PXN-PLUG & PT. CIRC. INSTAL BPV. N/D TREE.
Location Next Location
ABSF-62,130/137 PF ABSF-31
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
9,652 Size 5150 5113 Size 5,027 7,611 6,625 Top
Formations Comments
7 4 1/2 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9652 (Date) 0 79
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

COMPLETED PRELOAD STBD LEG & PORT LEG SIMULTANEOUSLY. HOLD PRELOAD
0500 - 0730 2.5 0 PRE N RM OTH NA RIG 3434 3434
FOR 1 HR. DUMP BALLAST.
- FINAL PRE LOAD PENETRATION = BOW = 6.1 FT, PORT = 5.1 FT, STB = 5.1 FT.
0730 - 0900 1.5 0 PRE N RM OTH NA RIG 3434 3434
REMOVE DOCKING PLUGS. DISCONNECT BOW BOAT ZAMIL-504.

0900 - 1100 2 0 PRE N RM OTH NA RIG 3434 3434 HPJSM. PREPARE & JACK-UP RIG TO 15 FT AIR GAP. INSTALL MOORING ROPES ON
BOW LEG & PORT LEG.
1100 - 1300 2 0 PRE N RM OTH NA RIG 3434 3434
HPJSM. JACK HULL UP TO WORKING HEIGHT AT 76 FT.

HPJSM, UNFOLD & LOWER DROPS DECK. MODIFY & INSTALLED STAIRS FROM MAIN
1300 - 1630 3.5 0 PRE N RM OTH NA RIG 3434 3434
DECK TO DROPS DECK. INSTALL HANDRAILS ON DROPS DECK. INSTALL GANGWAY
FROM DROPS DECK TO PLTF HELIDECK.

1630 - 2000 3.5 0 PRE N RM RU NA RIG 3434 3434 HPJSM. R/U DROPS DECK PANELS TO ACCESS ABSF-130. TRANSFER SAFETY
EQUIPMENTS TO PLATFORM.

HPJSM. SKID OUT CANTILEVER 21 FT. TRANSVERSE SKID DRILLING PACKAGE 7 FT


2000 - 2200 2 0 PRE N RM OTH NA RIG 3434 3434
TO STBD SIDE & CENTER RIG OVER WELL ABSF-130. INSTALL ACCESS LADDERS
FROM CANTILEVER TO MAIN DECK.
2200 - 0000 2 0 PRE N RM RU NA RIG 3434 3434
HPJSM. R/U SERVICE LINES TO RIG FLOOR.

GENERAL RIG-UP PREPARATION.


- R/U BULK HOSES.
0000 - 0200 2 0 PRE N RM RU NA RIG 3434 3434
- RE-ARRANGE CANTILEVER & MAIN DECK TO OFFLOAD CARGO.
- MIX VISCOUS BRINE.
- RE-ARRANGE CANTILEVER TO SPOT SLICKLINE EQUIPMENT.

0200 - 0330 1.5 0 PRE N RM RU NA RIG 3434 3434 HPJSM. TRANSFER E-KILL ASSY, TOOLS & EQUIPMENT'S TO PLATFORM. INSTALL
GAS DETECTORS & ALARMS ON PLATFORM.

0330 - 0459 1.5 0 PRE N RM RU NA RIG 3434 3434 R/U E-KILL MANIFOLD ASSY ON ABSF-130. R/U E-KILL LINE TO KILL MANIFOLD.
R/U EXPORT LINE HOSE TO GOSP.
Workover Objectives
Foreman Remarks

* CURRENT PLATFORM ABSF-62,130/137 PF


* RIG HEADING: 331 DEG, LAT: 26 DEG 57.22 N, LONG: 50 DEG 28.81 E, WATER DEPTH: 60 FT.
-

* NEXT PLATFORM ABSF-30/35,138/139,233,235 PF (WORKOVER ABSF-31 & ABSF-32 ESP REPLACEMENT. WELLS ASSIGNED TO RIG ON 12 JUNE 2024)
- HSU REQUEST # 8800022367 SUBMITTED ON 13 JUNE 2024.
- RMM REQUEST RM-2024-4010850 SUBMITTED ON 13 JUNE 2024.
- BH REPORTS W/ SHELF SINCE 12 JUNE 2024.
-

* 2ND PLATFORM ABSF-2,182/189 PF (WORKOVER ABSF-182. ESP REPLACEMENT)


- HSU REQUEST # 8800021944 RECIEVED ON 19-MAY-2024.
- DIVING REQUEST DP-2024-16063 RECEIVED REPORT ON 06 JUNE, 2024.
- RMM REQUEST NOT SUBMIIED YET.
- BH REPORTS W/ SHELF SINCE 01 APRIL 2024.
-

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABSF-130 WORKOVER-5 BI-90
Print Date: 06/18/2024 06:20 06/15/2024 - 06/29/2024
Report ID: OPERLMTDMRREP

* 3RD PLATFORM ABSF-23/28 PF (WORKOVER ABSF-24. ESP REPLACEMENT)


- HSU REQUEST # 8800022202 SUBMITTED ON 19 MAY 2024.
- RMM REQUEST NOT SUBMITTED YET.
- BH REPORT W/ SHELF SINCE 20 MAY 2024.
-

* 4TH PLATFORM ABSF-10/15,142 PF (WORKOVER ABSF-10. ESP REPLACEMENT).


-

* OBSERVATIONS SUBMITTED: 20 CARDS.


-

* NOV 4-3/4" HM JAR BACKLOAD ON 15 JUNE 2024, MANIFEST #2400691642 BY BOAT RAWABI-11R.
-

* RIG CLERK, SENTHILRAJA KRISHNAMOORY ID#8613230 ON BOARD.


* ARAMCO FCT, FARIS ALASLANI ID#790749 ON LOCATION SINCE 04 JUNE, 2024.
* ARAMCO PDP ALGHAMDI, ABDULLAH, BADGE# 812960 ON RIG SINCE 11 JUNE 2024.
* ARAMCO PDP MUJARRI, MOHAMMED, BADGE# 816710 ON RIG SINCE 11 JUNE 2024.
* VSAT TECHNICIAN ARISTOTLE LEONARDO BADGE# 8538484 ON LOCATION SINCE 17 JUNE 2024.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
64 PCF 0 0 API 0 0 Volts 0 9.5 28,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 99 33 0 3/4 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 3 1 3/4 0 0 0
50
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
64 PCF 0 0 API 0 0 Volts 0 9.5 28,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 99 33 0 3/4 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 3 1 3/4 0 0 0
50

MUD CACL2-80 HEC CAOH2


TREATMENT 2 ( 2200L ) 20 ( 55LB ) 4 ( 55LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A REGULAR 8-10 KTS N 1 FT CLEAR 704 TOURLY

Company KSC GOS RIG EMC ARM INW SPL ARM SWL NSL

Category ALS CTRG RIG DFMS OTHR SLS SLS WSC WLS SLS
PERSONNEL
5 12 55 1 5 1 3 3 4 1
Total
AND SERVICES No. of Persons
90
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 12 12 0 0 24 0 0

Standby/Tankers
TRUCKS/BOATS
rawabi-206

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2372 616 1152 37 0 57

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1258 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 03/30/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

HI-9 @ ZULF-1258 Limited Morning Report for 06/18/2024


Objective : (DUAL OIL Foreman(s)AGARWAL, LALIT / MCMAHON, ERRAL FRANCISCO
D&WO Morning Report (Service Providers View) Charge #: PRODUCER FROM Engineer AHMAD, TAUSIF
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (72-24062-1258) SAFANIYA MEMBER) Manager SHEHRI, TALAL HASAN
HI-9
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167770 0037 3786351 3786353(RA DIO ROOM)
Date: Tuesday 06/18/2024 ZULF-1258 (0) ZULF_1258_0 OTHER VSAT CONTRACTOR /CLERK VSA T
8212931 (R ADIO ROOM) 3786352 (R IG CLERK)

Last 24 hr operations Next 24 hr plan


FLARE OIL FROM WFD TANKS, CONTINUE ESP FUNCTION TEST & FLOWBACK/FLARING FLARE OIL FROM WFD TANKS, CONTINUE ESP FUNCTION TEST & FLOWBACK/FLARING
OPERATION ON ZULF-1258 (MOTHER BORE). WAIT ON WEATHER & DAYLIGHT. OPERATION ON ZULF-1258 (MOTHER BORE).
Location Next Location
ZULF- 1250/1259 PLATFORM ZULF-1259
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,230 Last Csg Size MD TVD Size 4,971 8,347 5,656 Top
9 5/8 7226 5689 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
10230 (Date) 100 0 252
12.2 (06/15/2024@0200 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0600 1 0 EOW E TEST CPT SEPR WWW 10230 10230
WAIT ON FAVOURABLE WIND DIRECTION AND SPEED TO START FLARING OPERS.

0600 - 0800 2 0 EOW E TEST CPT SEPR WWW 10230 10230 HPJSM, LINED UP FROM WFD FLARING PACKAGE TO PORT SIDE FLARE BOOM,
PUMP & FLARE 250 BBLS OIL FROM SURGE TANKS TO FLARE BURNER.

SAWAFI BORETS FUNCTION TEST ESP PUMP & FLOWBACK WELL (LAT-0)
THROUGH WFD FLARING WELL TEST PACKAGE. (LAST BS&W = 45%)
0800 - 1630 8.5 0 EOW E TEST CPT SEPR WWW 10230 10230 - DETAILED ESP FUNCTION TEST & FLOWBACK REPORT SENT TO RMD, ALU AND
WO ENGINEER.
- POLLUTION STANDBY BOAT RAWABI-33 TAKE A SWEEP AROUND THE RIG
BEFORE & AFTER FLARING OPERATIONS, CONFIRMED ALL CLEAR.

SHUT IN WELL DUE TO UNFAVOURABLE WIND SPEED AND DIRECTION.


1630 - 1830 2 0 EOW E TEST CPT SEPR WWW 10230 10230
- AT 16:30 HRS, WIND SPEED: 0-2 KNOTS - SOUTH EAST.
- AT 17:30 HRS, WIND SPEED: 3-4 KNOTS - SOUTH EAST.

WAIT ON DAY LIGHT TO CONTINUE FUNCTION TEST ESP PUMP & FLOWBACK
MOTHERBORE WELL ZULF-1258 THROUGH WFD FLARING WELL TEST PACKAGE.
1830 - 0430 10 0 EOW E TEST WO NA ARM 10230 10230
- TOTAL FLOW BACK OPERATION - 2.6 DAYS, ESP FUNCTION TEST AND FLARING
WELL TEST 0PERATION - 15 HRS.
- TRANSFER CONTAMINATED BRINE TO STORAGE TANKS ON BOAT RAWABI-33.

0430 - 0459 0.5 0 EOW E TEST CPT SEPR WWW 10230 10230 HELD PRE-JOB SAFETY MEETING WITH ALL PARTIES PRIOR TO ESP FUNCTION
TEST AND FLARING OPERATIONS.
Workover Objectives
Foreman Remarks

* RIG HEADING = 331 DEG, LATITUDE: 28 DEG 24.23' NORTH. LONGITUDE: 049 DEG 08.01' EAST. WATER DEPTH = 126 FT.
* NO ANCHORING RESTRICTIONS.
* ODF TO TBG SPOOL = 63.58', RKB TO TBG SPOOL = 59.58', ODF CORRECTION=+ 4'
-

* OBSERVATIONS SUBMITTED: 28
* RADIO CHECK ON DRLG-EMR ACKNOWLEDGED BY ECC @ 20:05 HRS.
-

** CURRENT PLATFORM : ZULF 1250/1259 (WORKED ON EIGHT WELLS ZULF-1252, 1251, 1253, 1255, 1257, 1258,1259 AND 1254 FOR INITIAL ESP INSTALLATION.
-

** CURRENT WELL:- ZULF-1258


-- ESP FLOWBACK AND FLARING OF LAT-0 - ON GOING.
-

** COMPLETED WELLS:-
- ZULF-1252 COMPLETED ON MAY 12, 2024 AT 24:00 HRS.
- ZULF-1251 COMPLETED ON MAY 18, 2024 AT 24:00 HRS .
- ZULF-1253 COMPLETED ON MAY 24, 2024 AT 24:00 HRS .
- ZULF-1255 COMPLETED ON MAY 29, 2024 AT 20:00 HRS .
- ZULF-1254 COMPLETED ON JUN 02, 2024 AT 22:00 HRS.
- ZULF-1257 COMPLETED ON JUN 14, 2024 AT 19:00 HRS.
-

* SUSPENDED WELLS:-
- SUSPENDED OPERATIONS ON ZULF-1259 AT 11:00 HRS APRIL 19, 2024. FOR ESP FUNCTION TEST WILL BE DONE AFTER COMPLETE ALL WELLS ON PLATFORM.
-

* DAILY DIESEL CONSUMPTION= 110 BBLS ( 41 BBLS FOR RIG ENGINES + 69 BBLS FOR FLARING OPERATION ).

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-1258 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:20 03/30/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

NEXT RIG MOVE:- RIG MAINTENANCE


* RECIEVED MAIL FROM WOE ON MAY 16, 2024 CONFIRMING THAT RIG HI-9 WILL GO TO SHIPYARD FOR MAINTENANCE AFTER COMPLETING ESP FUNCTION T
* RM-2024-4010754 CREATED ON 01-JUNE-2024 PROPOSED RIG MOVE MEETING DATE 05-JUNE-2024. RMM CONDUCTED ON JUNE 10, 2024.
-

* ARAMCO FCT SAAD ALSHAMMARI BADGE# 796775 ON RIG SINCE JUNE 4, 2024.
* ARAMCO MATERIAL CLERK SAUD AL-ANAZI, BADGE #816294 ON RIG SINCE JUNE 11, 2024.
-

DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A NA 5 KNOTS SE 2 FT 38 C, VIS 5 4,159 FLARING OPERS
MILES

Company SBA GOS SCP RIG EMC RIG ARM ARM WWW

Category ALS CTRG ICE RIG DFMS OTHR OTHR WSC WTSE
PERSONNEL
2 12 1 46 1 4 2 2 9
Total
AND SERVICES No. of Persons
79
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 24 24 0 12 24 24

Standby/Tankers Others
TRUCKS/BOATS
JUZOR RAWABI-33

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1189 736 1167 0 0 0

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HMYM-462714 EXPLORATION DRILLING-1 BI-1514
Print Date: 06/18/2024 06:20 06/16/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

HWU-1 @ HMYM-462714 Limited Morning Report for 06/18/2024


Objective : (DEPLOY 2-7/8" HAUGHIAN, BRADLEY DOUGLAS / SMITH, DARNELL CORVELL /
Foreman(s)
D&WO Morning Report (Service Providers View) VELOCITY STRING) MENASCO, ROY CHANCE
Rig Charge #: Engineer RUMAIH, JEHAD FAWZI
Copyright 2024 Saudi Aramco. All Rights Reserved HWU-1 (83-24710-8178) Manager GARNI, HUSAM MANSOUR
Daily Onshore
Wellbores: THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well
8821677712 861 3788215 /CLERK VSA
Date: Tuesday 06/18/2024 HMYM-462714 (0) HMYM_462714_0
T
3788216

Last 24 hr operations Next 24 hr plan


RETRIEVE 2 X RBP, RIG-UP HWU-1 R/U HWU UNIT,CFT, PRESSURE TEST BOPE
Location Next Location
HMYM-462714 HMYM-462702
Current Depth (ft) Liner TOL MD TVD Formation Tops
18,053 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
18053 (Date) 0 70
0 (06/18/2024@0530 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM W/ ALL PERSONNEL INVOLVED IN LIFTING SNUBBING UNIT


RU HWU-1 HYDRAULIC SNUBBING UNIT IN SINGLE-LIFT SYSTEM @ TOP OF BOPE
STACK.
0500 - 1500 10 0 PRE M RM RM NA RIG 18192 18192 INSTALL GUIDE-LINE CABLES & SECURE/LEVEL UNIT.
RU & SECURE HWU-1 COMPLETE PRIMARY STAIR-TOWER NEXT TO SNUBBING
UNIT.
INSTALL TWO ACCESS WALK-WAYS F/ STAIR-TOWER TO SNUBBING WORK BASKET
LEVEL, SNUBBING JACK-BASE BASKET LEVEL, & STRIPPING BOPE STACK LEVEL

START HYD POWER UNIT


1500 - 1630 1.5 0 PRE M RM RM NA RIG 18192 18192 SCOPE OUT GIN POLE
TEST ALL UNIT FUNCTIONS
BUILD PIPE RACK AND PREPARE PUSH/PULL AND PRESSURE TEST JOINTS.

P/U PUSH PULL 2-7/8" PH-6 JOINT


PERFORM PUSH PULL TEST AND CFT PUSH 30K PULL 60K @ 1000 PSI
1630 - 1730 1 0 PRE M RM RM NA RIG 18192 18192
L/O PUSH PULL 2-7/8" PH6 JOINT
PREPARE UNIT FOR PRESSURE TESTING OPERATIONS

PU & MU 2.875" PRESSURE TEST ASSEMBLY / TIW VALVE W/ KELLY-HOSES @


SNUBBING WORK BASKET LEVEL.
FILL BOPE STACK AND START PRESSURE TESTING OPERATIONS OF THE SNUBBING
BOPE STACK, PUMP/CHOKE MANIFOLDS, HP LINES, & FLARE LINES TO FLARE-PIT
1730 - 0459 11.5 0 PRE M RM RM NA RIG 18192 18192 AS PER ARAMCO REQUIREMENTS: (300 PSI. LOW-10 MINS & 9,500 PSI. HIGH-10
MINS)
CYCLE TEST
R/U FRANKS TONGS AND TEST
L/O PRESSURE TESTING JOINTS
FUNCTION TEST DRILLERS AND REMOTE BOP PANELS
Foreman Remarks

JOURNEY MANAGEMENT: CALL HWU-1 RIG 013 378 8215 OR LEAD FOREMEN PRIOR TO TRAVELING TO HMYM-4627 WELL PAD. LOCATION IS 70KM. FROM DMG. TAKE HALF-MOON BAY ROAD TO
UQAIR ROAD, GO LEFT AT ROUND ABOUT, TAKE FIRST SKID-ROAD ON LEFT & FOLLOW (HWU-1) SIGNS TO WELL PAD HMYM-4627 PROVIDE THE FOLLOWING INFORMATION: NAME OF COMPANY,
NUMBER OF PERSONNEL, COLOR OF VEHICLE AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL. NIGHT DRIVING IS NOT ALLOWED WITHOUT PROPER APPROVED JOURNEY MANAGMENT,
STAY TO THE RIGHT SIDE OF SKID ROAD ON ALL HILLS.
==================================================================================================
==================================================================================================
** ARAMCO RIG CLERK: SATHIK BATCHA #8544198 ON LOCATION 1/20/2024**
** ARAMCO RIG CLERK: TARIQ ALSHAMMARI #8260173 ON LOCATION 5/30/2024**
==================================================================================================
DRILLS: 0
NEAR MISS: 0
STOP WORK AUTH0RITY: 1
OBSERVATIONS: 11
LTI FREE DAYS-1843
JSA - 8
PTW - 8
==================================================================================================
DIESEL CONSUMPTION FOR ENGINES (RIG+CAMP): DAILY: 9,503LT/ TOT: 70,974LT.
==================================================================================================

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 18,192 89.88 167.75 0 10,075 -2477.5 752.88 8,495.32 0.42
MUD DATA
MUD
TREATMENT

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HMYM-462714 EXPLORATION DRILLING-1 BI-1514
Print Date: 06/18/2024 06:20 06/16/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/17/2024 2 N/A N/A N/A 1,969 2

Company INW OTH RIG ARM HSL ARM CAM GEP

Category BRCR CTRG RIG OTHR SLS WSC WHES WHES


PERSONNEL
1 13 54 2 4 3 1 1
Total
AND SERVICES No. of Persons
79
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24

Operating Hours. 12 0 12 12 12 12 12 12

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HZEM-162204 EXPLORATION DRILLING-1 BI-1514
Print Date: 06/18/2024 06:20 06/17/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

HWU-3 @ HZEM-162204 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (RUN VELOCITY Foreman(s)WATSON, DAVID ALLISON / KENDRICKS II, JERLYNN ATLAS
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (83-24541-8191) STRING) Engineer RUMAIH, JEHAD FAWZI
HWU-3
Manager GARNI, HUSAM MANSOUR
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: THURAYA RIG FORMAN VSAT
Date: Tuesday 06/18/2024 HZEM-162204 (0) HZEM_162204_0 8821677714 222 013-576-51 38

Last 24 hr operations Next 24 hr plan


MOVE MAIN CAMP, PT PROD TREE, RETRIEVE BPV, SL DRIFT, SBHP, SET 5.5" RBPS CONT RIH 5 1/2" INT PLUGS, SET BPV, N/D 5 1/2" 10M TREE
Location Next Location
HZEM-162204 HZEM-162202
Current Depth (ft) Liner TOL MD TVD Formation Tops
18,160 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
18160 (Date) 0 171
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

- CONT SPOTTING EQUIPMENT AND PREPARING FOR RIG UP HWU-3.


- BREAKDOWN AND MOVE MAIN CAMP.
0500 - 1330 8.5 0 PRE M RM RM NA RIG 18160 18160
- PRESSURE TEST PROD TREE AS PER ARAMCO PROGRAM. 300 PSI LOW & 8500
PSI HI. GOOD.
- PUMP 5BBL THROUGH BPV @ 1.5 BPM, RECORD WHP 5,200 PSI. S/D PUMP AND
SECURE WELL.

1330 - 1600 2.5 0 PRE M RM RM NA RIG 18160 18160 - RU B&C BPV LUBRICATOR @ X-TREE / PT / RETRIEVE 5.5'' BPV, & RD BPV
LUBRICATOR.

- SPOT AND RU HES SLU UNIT AND PCE EQUIPMENT PRESSURE TEST AS PER
1600 - 0000 8 0 PRE M RM RM NA RIG 18160 18160 ARAMCO STANDARDS. RIH W/ 4.41' GC TO 10,610'.
- RIH W/ SBHP TO 10,560', POOH AND RECORD DATA IN 500' INTERVALS TO
SURFACE.
0000 - 0230 2.5 0 PRE M RM RM NA RIG 18160 18160
- WHP - 5,200 PSI. BULLHEAD 250 BBL 85 PCF CACL FINAL PRESS 4,050 PSI

- RU HES SL PCE / LUBRICATOR & TOOL-STRING. LOAD SL LUBRICATOR / PT PCE


& LUBRICATOR AS PER PROGRAM. EQAULIZE X-TREE TO WHP: 4,050 PSI.
0230 - 0459 2.5 0 PRE M RM RM NA RIG 18160 18160
- RIH WITH INTERWELL RBP #1 TO A SETTING DEPTH OF 3,000'
- POOH WITH SL @ RT.

Foreman Remarks

========================================== WELL OBJECTIVE ====================================================


- RUN TAPERED 2-7/8" X 2-3/8" VELOCITY STRING.
========================================== JOURNEY MANAGEMENT ==============================================
- CALL HWU-3 RIG 013 576 5138 OR LEAD FOREMEN PRIOR TO TRAVELING TO RIG LOCATION, WELL PAD. LOCATION IS APPROXIMATELY 176 KM. FROM DMG.
**NOTE: PHONE HWU-3 SNUBBING UNIT PRIOR TO TRAVELING THE SKID ROAD DUE TO THE POOR SIGNAL ALONG THE SKID ROAD. PROVIDE THE FOLLOWING INFORMATION: NAME OF COMPANY,
NUMBER OF PERSONNEL, COLOR OF VEHICLE AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL. NIGHT DRIVING IS NOT RECOMMENDED, STAY TO THE RIGHT SIDE OF SKID ROAD ON ALL
HILLS.
============================================== RIG DIRECTION ================================================
1- TAKE SALWA ROAD TOWARDS HZEM. AT THE SIGN SHOWING 80KM TO SALWA TRAVEL ANOTHER 7.3KM AND TURN RIGHT AT HWU-3 SIGNS
2- FOLLOW SKID ROAD TO BLACKTOP FOR 1.8KM AND TURN LEFT ONTO BLACKTOP
3- TRAVEL ON BLACKTOP FOR 31.9KM AND TURN RIGHT ONTO SKIDROAD AT HWU-3 SIGN
4- CONTINUE ON THE SKID ROAD FOR 6.6KM AND TURN RIGHT AT THE HWU-3 SIGN
5- FOLLOW THE ROAD FOR 3.8 KM SITE IS ON LEFT HAND SIDE
=========================================== SAUDI ARAMCO PERSONNEL ==========================================
** ARAMCO CLERK JERROLD RAMOS # 8274080 ON LOCATION SINCE 5-1-2024
** ARAMCO FOREMAN ABDULLAH ALKASSAB #768637 ON LOCATION SINCE 6-14-2024
=========================================== DAILY SAFETY REPORT ===============================================
-STOP WORK AUTH0RITY: 3
-OBSERVATIONS - 12
-DRILLS: 00
-LTI FREE DAYS- 123
-PTW: 12
-JSA: 12
-NEAR MISS: 0
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 18,160 90.1 347.7 0 10,712 2338.44 -281.92 7,727.6 0.68
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 74 N/A

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HZEM-162204 EXPLORATION DRILLING-1 BI-1514
Print Date: 06/18/2024 06:20 06/17/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

Company OTH RIG ARM HSL ARM

Category CTRG RIG OTHR SLS WSC


PERSONNEL
13 53 2 4 4
Total
AND SERVICES No. of Persons
76
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24

Operating Hours. 0 12 12 12 12

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3141 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:20 05/22/2024 - 07/15/2024
Report ID: OPERLMTDMRREP

HWU-5 @ UTMN-3141 Limited Morning Report for 06/18/2024


Objective : (RECOVER 2- GAUTREAUX, KENNETH THOMAS / MUHAISH, FAISAL FAHD /
Foreman(s)
3/8" CT LIH TO REGAIN ALMUSALLAM, ALI ABDULHADI
D&WO Morning Report (Service Providers View) Rig Charge #: WELL BORE ACCESSIBILITY) Engineer ALSHAHRANI, YASSER ALI
Copyright 2024 Saudi Aramco. All Rights Reserved HWU-5 (72-24057-3141) Manager OTAIBI, MUKHLED FARAH
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores:
8821677713 779 013-576-51 37 013-576-51 38
Date: Tuesday 06/18/2024 UTMN-3141 (0-1) UTMN_3141_1
CONTRACTOR /CLERK VSA T
013-378-82 14

Last 24 hr operations Next 24 hr plan


RIH WFD 2.31" OD 'SCREW-GRAB' FISHING BHA #23, ENGAGE TOF, POH, RECOVER 7/16" WL MU WFD 3.625" OD DRESS-OVER BHA # 24, RIH WASH-OVER/DRESS TOF, POH TO SURFACE, &
CABLE, M/U WFD (3-PRONG) FISHING BHA #24, RIH, LATCH TOF, & POH TO SURFACE. INSPECT BHA.
Location Next Location
UTMN-3141 GZLN-1
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,360 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12360 (Date) 0 148
18 (05/31/2024@0400 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

RIH WITH WFD 2.31" OD 'SCREW-GRAB' FISHING BHA #23 WITH 3.625" WIRE-
STOP / DUAL-FLAPPER-VALVE & MHA ASSEMBLY.
>> PICK UP DRIFTED 2-7/8" PH-6 (8.7 PPF) WORK-STRING FROM PIPE RACK USING
HALL LAY-DOWN-LINE SYSTEM.
0500 - 0830 3.5 0-1 POST N FISH TI SPDP RIG 14807 14807 0 3268
>> FILLING WORK-STRING EVERY 25 JTS. RIH WITH 63 PCF. VISCOSIFIED FLUID.
>> MONITIOR WELL ON TRIP-TANK / FILLING WELL WITH 63 PCF. VISCOSIFIED
FLUID. (20 BPH STATIC-LOSSES)

M/U KELLEY-VALVE ASSEMBLY WITH 2" HP HOSE, & FOSV ON JT. #103 @ A
DEPTH OF 3,268' FT.
COMMENCE FISHING OPERATIONS OF 7/16" WL CABLE WITH WFD 2.31" OD
'SCREW-GRAB' FISHING BHA #23 WITH 3.625" WIRE-STOP / DUAL-FLAPPER-VALVE
& MHA ASSEMBLY.
>> BREAK CIRCULATION & ESTABLISH FREE WORKING PARAMETERS.
~> SET ROTARY-TABLE TORQUE VALVE @ MAX 600 FT/LBS. WITH 60 RPM.
~> FREE/ROTATING/STRING/TORQUE (FRST) @ 100 FT/LBS. WITH 12 RPM.
0830 - 1000 1.5 0-1 POST N FISH TI SPDP RIG 14807 14807 3268 3319 >> RIH 'SLOWLY' PUMPING 2 BPM. @ 350 PSI. / ROTATING 15 RPM. @ 220 FT/LBS
TORQUE.
>> ENGAGE WL TOF @ 3,316' FT. WITH 2K. SOW / ATTEMPT TO WORK 'SCREW-
GRAB' INTO WL TOF.
>> PENETRATE 3' FT. PAST ORIGINAL TOF @ 3,316' FT. TO 3,319' FT. / OBSERVE
ROTARY STALL-OUT.
>> POH 20'FT. 'SLOWLY' & OBSERVE 2K. DRAG ON PUW.
>> DECISION MADE TO POH 'CONTROL-SPEED' MONITORING PUW CLOSELY.

POH TO SURFACE 'CONTROL-SPEED' WFD 2.31" OD 'SCREW-GRAB' FISHING BHA


#23 WITH 3.625" WIRE-STOP / DUAL-FLAPPER-VALVE & MHA ASSEMBLY.
>> LAY-DOWN 2-7/8" PH-6 (8.7 PPF) WORK-STRING TO PIPE RACK USING HALL
1000 - 1400 4 0-1 POST N FISH TO SPDP RIG 14807 14807 3319 0 LAY-DOWN-LINE SYSTEM.
>> MONITIOR WELL ON TRIP-TANK / FILLING WELL WITH 63 PCF. VISCOSIFIED
FLUID. (20 BPH STATIC-LOSSES)

HPJSM / JSA TO DISCUSS WFD BHA RECOVERY-PROCEDURE & SNUBBING CREW


MEMBERS ROLES & RESPONSIBILITIES.
>> B-OUT / INSPECT WFD 'SCREW-GRAB' FISHING BHA RUN #23 @ SURFACE.
1400 - 1530 1.5 0-1 POST N FISH HT BHA RIG 14807 14807
>> NOTE: (RECOVERED 41' FT. OF 7/16" WL CABLE) ~ (LOWER SECTION OF WL
BELOW 'SCREW-GRAB' TO GOOD CONDITION)

HPJSM & JSA TO DISCUSS WFD BHA M/U PROCEDURE, & CREW WELL-CONTROL
RESPONSIBILITIES DURING RIH OPERATIONS.
>> PICK-UP / MAKE-UP WFD 3.5" WIRE-GRAB (3-PRONG) FISHING BHA #24 WITH
3.625" WIRE-STOP / DUAL-FLAPPER-VALVE & MHA ASSEMBLY.
1530 - 1700 1.5 0-1 POST N FISH HT BHA RIG 14807 14807 >> INSTALL KELLY-VALVE WITH 2" HP HOSE / PUMP 5BBLS. THROUGH BHA @ 2
BPM @ 300 PSI. (ALL-GOOD).
>> PRESSURE-TEST WFD DUAL-FLAPPER VALVE ASSEMBLY THROUGH KILL-LINE
AS PER WELL-PROGRAM. (GOOD-TEST)

1700 - 2130 4.5 0-1 POST N FISH TI SPDP RIG 14807 14807 0 3268
RIH WITH WFD 3.5" WIRE-GRAB (3-PRONG) FISHING BHA #22 WITH 3.625" WIRE-

Saudi Aramco: Confidential Page 1 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3141 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:20 05/22/2024 - 07/15/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
STOP / DUAL-FLAPPER-VALVE & MHA ASSEMBLY TO TOF.
>> PICK UP DRIFTED 2-7/8" PH-6 (8.7 PPF) WORK-STRING FROM PIPE RACK USING
HALL LAY-DOWN-LINE SYSTEM.
>> FILLING WORK-STRING EVERY 25 JTS. RIH WITH 63 PCF. VISCOSIFIED FLUID.
>> MONITIOR WELL ON TRIP-TANK / FILLING WELL WITH 63 PCF. VISCOSIFIED
FLUID. (20 BPH STATIC-LOSSES)

M/U KELLEY-VALVE ASSEMBLY WITH 2" HP HOSE, & FOSV ON JT. #103 @ A
DEPTH OF 3,268' FT.
COMMENCE FISHING OPERATIONS OF 7/16" WL CABLE WITH WFD 3.5" OD (3-
PRONG) 'WIRE-GRAB' BHA #24 WITH 3.625" WIRE-STOP / DUAL-FLAPPER-VALVE &
MHA ASSEMBLY.
>> BREAK CIRCULATION & ESTABLISH FREE WORKING PARAMETERS.
>> RIH 'SLOWLY' LOCATE WL TOF @ 3,348' FT. WITH 1K. SOW.
>> POH 3' FT. WITH NO OVER-PULL OBSERVED.
>> RIH 'SLOWLY' LOCATE WL TOF 2' FT. DEEPER @ 3,350' FT. WITH 2K. SOW.
>> POH 10' FT. WITH NO OVER-PULL OBSERVED.
>> RIH 'SLOWLY' LOCATE WL TOF 3' FT. DEEPER @ 3,353' FT. WITH 2.5K. SOW.
2130 - 2330 2 0-1 POST N FISH TI SPDP RIG 14807 14807 3268 3353
>> POH 15' FT. WITH NO OVER-PULL OBSERVED.
>> RIH 'SLOWLY' LOCATE WL TOF @ 3,340' FT. WITH 2K. SOW. NOTE: (8' FT.
ABOVE ORIGINAL TAG DEPTH)
>> POH 20' FT. WITH NO OVER-PULL OBSERVED.
>> RIH 'SLOWLY' LOCATE WL TOF @ 3,328' FT. WITH 2K. SOW. NOTE: (20' FT.
ABOVE ORIGINAL TAG DEPTH)
>> POH 93' FT. TO A DEPTH OF 3,235' FT. WITH NO OVER-PULL OBSERVED.
>> RIH 'SLOWLY' LOCATE WL TOF @ 3,250' FT. WITH 2K. SOW. NOTE: (98' FT.
ABOVE ORIGINAL TAG DEPTH)
>> DECISION MADE TO POH 'CONTROL-SPEED' MONITORING PUW CLOSELY.

POH FROM TOF TO SURFACE @ 'CONTROL-SPEED' WITH WFD 3.5" OD (3-PRONG)


'WIRE-GRAB' FISHING BHA #24 WITH 3.625" WIRE-STOP / DUAL-FLAPPER-VALVE
& MHA ASSEMBLY.
>> LAY-DOWN 2-7/8" PH-6 (8.7 PPF) WORK-STRING TO PIPE RACK USING HALL
2330 - 0430 5 0-1 POST N FISH TO SPDP RIG 14807 14807 3353 0
LAY-DOWN-LINE SYSTEM.
>> MONITIOR WELL ON TRIP-TANK / FILLING WELL WITH 63 PCF. VISCOSIFIED
FLUID. (20 BPH STATIC-LOSSES)

HPJSM / JSA TO DISCUSS WFD BHA RECOVERY-PROCEDURE & SNUBBING CREW


MEMBERS ROLES & RESPONSIBILITIES.
>> B-OUT / INSPECT WFD (3-PRONG) 'WIRE-GRAB' FISHING BHA RUN #24 @
SURFACE.
0430 - 0459 0.5 0-1 POST N FISH HT BHA RIG 14807 14807
>> MONITOR WELL ON TRIP-TANK.
>> RECOVERED 39' FT. OF 7/16" WL CABLE.
>> HANDLE WL CABLE @ SURFACE......ON GOING @ REPORT-TIME.........

Workover Objectives
Foreman Remarks

============================================ARAMCO=========================================================

===================================3RD. PARTY SERVICES ON LOCATION===============================================


** EMC MUD ENGINEER & EQUIPT ON LOCATION 28/05/2024
** TSS FLOW-BACK PERSONNEL & EQUIPT ON LOCATION 29/05/24
** SLB EQUIPT ON STAND-BY @ LOCATION 06/02/24
==============================================BHA==========================================================
** WFD BHA #1: WFD 3.5" WIRE-GRAB (3-PRONG) FISHING BHA #1.
-> NO FISH
** WFD BHA #2: WFD 3.5" WIRE-GRAB (2-PRONG) FISHING BHA #2.
-> NO FISH
** WFD BHA #3: WFD 3.625" BLIND-BOX BHA #3.
** WFD BHA #4: WFD 3.625" OD SKIRTED-MILL BHA WITH 'R' & 'RN'-NIPPLES.
-> MILLED 11" IN. TOF
** WFD BHA #5: WFD 3.625" WAVY-SHOE / 2.5" INTERNAL CONCAVE-MILL / 5K. RUPTURE-DISC / HYDRA. JAR / DUAL-FLAPPER / MHA.
-> DRESS-OVER TOF 7' FT
** WFD BHA #6: 3.625" XSH OVERSHOT FISHING WITH 'R' & 'RN'-NIPPLES.
-> RECOVER 70' FT CT
** WFD BHA #7: WFD 3.5" WIRE-GRAB (3-PRONG) FISHING BHA #7.
-> NO FISH
** WFD BHA #8: WFD 3.75" LIB.
** WFD BHA #9: 3.625" XSH OVERSHOT FISHING WITH 'R' & 'RN'-NIPPLES.
-> NO FISH / LIH 2-3/8" BASKET GRABBLE.
** WFD BHA #10: WFD 3.625" SKIRT-MILL BHA WITH 'R' & 'RN'-NIPPLES.
-> DRESS 1.5' FT CT
** WFD BHA #11: 3.625" FS OVERSHOT FISHING WITH 'R' & 'RN'-NIPPLE PROFILES.

Saudi Aramco: Confidential Page 2 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3141 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:20 05/22/2024 - 07/15/2024
Report ID: OPERLMTDMRREP

-> RECOVER 1,332' FT. CT


** WFD BHA #12: WFD 3.5" WIRE-GRAB (3-PRONG) FISHING BHA / DUAL-FLAPPER.
-> RECOVER 1,120' FT. WL
** WFD BHA #13: WFD 3.5" WIRE-GRAB (3-PRONG) FISHING BHA / DUAL-FLAPPER.
-> RECOVER 19' FT. WL
** WFD BHA #14: WFD 3.5" WIRE-GRAB (3-PRONG) FISHING BHA / DUAL-FLAPPER.
-> RECOVER 14' FT. WL
** WFD BHA #15: WFD 3.5" WIRE-GRAB (3-PRONG) FISHING BHA / DUAL-FLAPPER.
-> NO FISH
** WFD BHA #16: WFD 3.5" WIRE-GRAB (2-PRONG) FISHING BHA / DUAL-FLAPPER.
-> RECOVER 6' FT. WL
** WFD BHA #17: WFD 3.5" WIRE-GRAB (2-PRONG) FISHING BHA / DUAL-FLAPPER.
-> NO FISH
** WFD BHA #18: WFD 2.5" WL CRANK-SPEAR FISHING BHA / DUAL-FLAPPER.
-> NO FISH
** WFD BHA #19: WFD 2.5" WL CRANK-SPEAR FISHING BHA / DUAL-FLAPPER.
-> RECOVER 7' FT. WL
** WFD BHA #20: WFD 2.5" WL CRANK-SPEAR FISHING BHA / DUAL-FLAPPER.
** WFD BHA #21: WFD 2.31" WL SCREW-GRAB FISHING BHA / DUAL-FLAPPER.
-> RECOVER 10' FT. WL
** WFD BHA #22: WFD 3.5" WIRE-GRAB (2-PRONG) FISHING BHA / DUAL-FLAPPER.
-> NO FISH
** WFD BHA #23: WFD 2.31" WL SCREW-GRAB FISHING BHA / DUAL-FLAPPER.
-> RECOVER 41' FT. WL
** WFD BHA #24: WFD 3.5" WIRE-GRAB (3-PRONG) FISHING BHA / DUAL-FLAPPER.
-> RECOVER 39' FT. WL
===========================================TOTAL FISH LIH DEPTHS================================================
** TOTAL 2-3/8" CT LIH = 12,755' FT.
** TOTAL 7/16" WL CABLE LIH = 12,940' FT.
===========================================TOTAL FISH RECOVERED================================================
-> ESTIMATED WL TOF = 3,319' FT.
-> ESTIMATED CT TOF = 3,384' FT.
** TOTAL 2-3/8" CT DRESS/RECOVERED = 1,405' FT.
** TOTAL 7/16" WL CABLE RECOVERED = 1,256' FT.
============================================RIG-ELEVATION====================================================
** HWU-5 RIG ELEVATION FROM SNUBBING WORK BASKET HAND-RAIL TO GROUND LEVEL = 107' FT.
=================================================ERP=======================================================
** ERP POSTED IN ARAMCO FOREMAN OFFICE.
** ESTABLISHED DAILY COMMUNICATION WITH NEARBY FACILITIES.
================================================DRILLS======================================================
** STOP WORK AUTHORITY: 1
** OBSERVATIONS: 10
** NEAR MISS: 0
** DRILLS: 0
** PTW: 5
** JSA: 5
** LTI FREE DAYS: 623
============================================NEXT-WELLS======================================================
1ST. NEXT WELL: GZLN-01
>> WELL LOCATION READINESS 100% COMPLETED.

2ND. NEXT WELL: ABJF-3007.


>> WELL LOCATION READINESS 0% COMPLETED, PLAN FOR PRE-WO MEETING ON 6/10/2024.

3RD. NEXT WELL: UTMN-2204


>> WELL LOCATION READINESS 100% COMPLETED.

DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/15/2024 N/A N/A N/A N/A 610 N/A

Company OTH RIG EMC WTS ARM HTS

Category CTRG RIG DFMS SLS WSC WTSE


PERSONNEL
13 51 1 2 2 4
Total
AND SERVICES No. of Persons
73
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24

Operating Hours. 0 12 24 12 24 12

Standby/Tankers
TRUCKS/BOATS
DH-4797

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 2000 N/A N/A N/A 0

REPAIR ASAP Instrumentation Other Reporter

Saudi Aramco: Confidential Page 3 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3141 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:20 05/22/2024 - 07/15/2024
Report ID: OPERLMTDMRREP

Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 4 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JZSO-802 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 06/03/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

JACK-201 @ JZSO-802 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (WATER SUPPLY ) Foreman(s)EID, AHMED HABIB / ALMATRAFI, AHMED SAAD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Engineer ALHELAL, MOHAMMED ALI
JACK-201 (63-24876-0802)
Manager SARRANI, HASSAN FAHAD
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: THURAYA RIG FORMAN VSAT RIG FORMAN VSAT
Date: Tuesday 06/18/2024 JZSO-802 (0) JZSO_802_0 +882167771 2537 013-378784 1 013-378784 4

Last 24 hr operations Next 24 hr plan


CONT. DRLG 12-1/4" HOLE, CHC, WIPER TRIP TO CSG SHOE-BTM, CHC, POOH, RIH W/ 7" SCREENS EMPLACE GRAVEL PACK 1.2 MM TO 1.9 MM.
ON GRAVEL LINER HANGER., SET HNGR, GRAVEL JOB.
Location Next Location
JAZAN JZSO-803
Current Depth (ft) Liner TOL MD TVD Formation Tops
848 Last Csg Size MD TVD Size 396 838 838 Top
18 5/8 128 128 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
848 (Date) 100 73 1314
6.5 (06/11/2024@1700 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

ROTARY DRILL 12 1/4" HOLE W/ 65 PCF NON-DAMAGING NACL POLYMER MUD


0500 - 0900 4 0 12 1/4 N DRLG D KELLY RIG 775 848 (100 % CIRC, RETURN).
-PUMP 2 X 20 BBLS HVP FOR EACH JOINT.
-WASH & REAM TWICE BEFORE MAKING CONNECTION.

0900 - 1100 2 0 12 1/4 N DRLG CIRC MPMP RIG 848 848 SWEEP HOLE W/ 2X50 BBLS HVP, CHC.

1100 - 1300 2 0 12 1/4 N DRLG TO STDP RIG 848 848 848 848 HPJSM, POOH W/ 12 1/4" BHA WIPER TRIP TO 18 5/8" CSG SHOE-BTM.
-HOLE IN NORMAL CONDITION.

1300 - 1600 3 0 12 1/4 N DRLG CIRC MPMP RIG 848 848 SWEEP HOLE W/ 2X50 BBLS HVP, CHC, DISPACE HOLE WITH 67 BRINE.

FLOW CHECK-STATIC, HPJSM, POOH W/ 12 1/4" BHA TO SURFACE FREELY & R/B
1600 - 1800 2 0 12 1/4 N DRLG TO BHA RIG 848 848 848 0 BHA.
-HOLE IN GOOD CONDITION.
-TOTCO READING= 1.00 DEG.

1800 - 1900 1 0 EOW C COMP PJSM SCRN RIG 848 848 HPJSM, R/U HANDLING TOOLS & POWER TONG TO RUN 7" SCREENS.

HPJSM, RIH W/ 7" SCREENS (J-55, #26, BTC ) AS FOLLOWS:


- 1 EA 7" BULL PLUG BTC .
1900 - 2200 3 0 EOW C COMP OTH SCRN RIG 848 848 - 8JTS 7" SCREEN (J-55, #26, BTC ).
- 1 JTS CROSSOVER ( BTC PIN X LTC BOX, J-55, #26,)
- 3 JT 7" BLANK CSG (J-55, #26, LTC).

2200 - 2230 0.5 0 EOW N CSG HT PEL RIG 848 848 HPJSM, M/U 13-3/8" X 7" LTC NOV GRAVEL LINER HANGER WITH PACKER AS TTR
BY NOV.

HPJSM, RIH W/ 7" SCREEN ON 13-3/8" X 7" NOV GRAVEL LINER HANGER WITH
2230 - 0030 2 0 EOW N CSG TI STDP RIG 848 848 450 820
PACKER ON 10 JTS X 8.5" 6.5"DC, & 4 JTS 5" HWDP TO 820'.
- RUNNING SPEED 2 MIN/STAND.

SET 13-3/8" X 7" NOV GRAVEL LINER HANGER WITH PACKER (85' ABOVE 13-3/8"
0030 - 0100 0.5 0 EOW N CSG OTH LINR ARM 848 848 CSG SHOE).
- T.O.L @ 396' RKB.
- BULL PLUG (END OF SCREEN) @ 838'.
0100 - 0200 1 0 EOW C COMP GP GP NC1 848 848
BREAK CIRC. WITH NOV GRAVEL PACK TOOL. & P/U HAJJAN GRAVEL HOPPER.

HPJSM, EMPLACEMENT GRAVEL PACK 1.2 MM TO 1.9 MM BY DIRECT CIRCULATION


0200 - 0459 3 0 EOW C COMP GP GP NC1 848 848
W/ LOW FLOW RATE FROM RIG PUMP.
-TOTAL INJECTION: 2.5 OUT OF 10 BIG BAGS (10.5 BBL).
Foreman Remarks

THE FOLLOWING IS THE RECOMMENDED DRILLING PROGRAM FOR JZSO-802, WHICH WILL BE DRILLED AS WATER-WATER SUPPLY IN JZSO.
THE WELL IS LOCATED 0.247 KM S54E OF JZSO-2 AND 0.517 KM S44E OF JZSO-801. THE WELL SHOULD BE COMPLETED WITH +/-320 FT
OF 7" SCREEN SPACED ACROSS THE ALVM AQUIFER SAND AT TOTAL DEPTH OF 848 FT RKB (820 FT BGL). 1.24 MM TO 1.86 MM GRAVEL PACK
SHOULD BE INSTALLED AROUND THE 7" SCREEN TO STOP ANY SAND FILL THAT MAY OCCUR DURING PUMPING.

WELL DESIGN:
- 22'' HOLE: SET 18-5/8'' CSG @ 128' RKB (100' BGL). SET @ 128 FT.
- 17'' HOLE: SET 13-3/8'' CSG @ 528' RKB (500' BGL). SET @ 528 FT.
- 12-1/4" HOLE: SET 9-5/8" LINER @ 848' RKB (820' BGL).
** ELEVATION FROM RIG FLOOR TO GROUND LEVEL: 28 FT.
==============================================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JZSO-802 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 06/03/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

RIG LOCATION: JIZAN.


==============================================
NEXT LOCATION:
- WELL NAME: JZSO-803.
- REQUEST DATE:
- LOCATION READINESS:
==============================================
SAFETY:
DISCUSSED:
- SAFETY AWARENESS WHILE RIH 7''LINER ETC
- HAZARDS & RISK ASSOCIATED WITH POWER TONG OPERATIONS
- POSITION OF PEOPLE/ LINE OF FIRE
- REFRESHER ON JSA -JOB SAFETY ANALYSIS - JOB STEP, HAZARD, CONTROLS
- HEAT STRESS, STAY HYDRATED, BEAT THE HEAT

- DRILL: PIT/BOP
==============================================
ARAMCO:
- ADMIN CLERK MUHAMMAD USMAN (8614592) ON LOCATION SINCE 12/05/2023.
- DRILLING ENGG MOHAMMAD MUBARAK (751091) ON LOCATION SINCE 06/13/2024.
- ARAMCO SAFETY ADVISOR JEREMY MAULEON (8327694) ON LOCATION SINCE 06/16/2024.
==============================================
RENTAL TOOLS:
==============================================
SERVICE COMPANY:
- OES MUD ENGINEE ON LOCATION DATED 06/08/2024.
- NOV CLOSE LOOP SYSTEM CREW AND EQUIPMENT ARRIVED ON LOCATION SINCE 06/08/2024.
- NOV LINER HANGER ENGG ARRIVED ON LOCATION ON 06/15/2024 @ 16:00 HRS.
==============================================
- HAJJAN TANKERS, HEAVY EQUIPMENT & VEHICLES ON LOCATION:

* 1 SWEET WATER TANKERS.


* 8 RAW WATER TANKERS.
* 1 HAJJAN 4X4 AMBULANCE CAR.
* 2 HAJJAN PICK-UP CAR.
==============================================
WASTE MANAGEMENT KPI:
- DRILLING WASTE CUTTINGS: DAILY = 6.72 M3 / TOTAL = 33.04 M3.
- DRILLING WASTE FLUIDS: DAILY = 63.6 M3 / TOTAL = 516.75 M3.
- REUSED WATER: DAILY = 0 M3 / TOTAL = 0 M3.
==============================================
WATER SOURCE:
- THE WATER SOURCE: LOCAL SOURCE (REEF FARM), 84 KM ROUND TRIP
- DAILY NUMBER OF TRIPS: 3 TRIPS, TOTAL = 29 TRIPS.
- DAILY VOLUME = 96 M3, TOTAL = 928 M3.
==============================================
- 12 GECAT VACUUM TANKER ON LOCATION

- 6400 GRA: DAILY TRIP = 0 TRIP, TOTAL= 1 TRIPS


- 5781 SSA: DAILY TRIP = 0 TRIP, TOTAL= 1 TRIPS
- 6363 ARQ: DAILY TRIP = 0 TRIP, TOTAL= 1 TRIPS
- 2869 ASD: DAILY TRIP = 0 TRIP, TOTAL= 1 TRIPS
- 9419 KSA: DAILY TRIP = 0 TRIP, TOTAL= 1 TRIPS
- 9522 GSA: DAILY TRIP = 0 TRIP, TOTAL= 1 TRIPS
- 9284 KSA: DAILY TRIP = 0 TRIP, TOTAL= 1 TRIPS
- 9223 KSA: DAILY TRIP = 0 TRIP, TOTAL= 1 TRIPS
- 9512 EJA: DAILY TRIP = 0 TRIP, TOTAL= 1 TRIPS
- 4283 DSA: DAILY TRIP = 0 TRIP, TOTAL= 1 TRIPS
- 5800 SSA: DAILY TRIP = 0 TRIP, TOTAL= 1 TRIPS
- 5779 SSA: DAILY TRIP = 0 TRIP, TOTAL= 1 TRIPS

- TOTAL TRIPS = 12
==============================================

DIESEL:
- DAILY RIG CONSUMPTION = 9 BBLS
- RIG DIESEL IN STOCK = 100 BBLS
- DAILY CAMP CONSUMPTION = 7 BBLS

DIESEL:
- DAILY ARAMCO CONSUMPTION 9 BBLS, REMAINING= 100 BBL, TOTAL ARAMCO DIESEL CONSUMPTION /WELL: 47 BBLS
- DAILY JACK-201 DIESEL CONSUMPTION 7 BBLS, REMAINING: = 35 BBL, TOTAL JACK-201 DIESEL CONSUMPTION / WELL: 106 BBLS
- TOTAL DAILY CONSUMPTION = 16 BBLS, TOTAL DIESEL CONSUMPTION / WELL: 153 BBLS
NOTE: TRANSFER DIESEL (21 BBL) FROM LAST WELL TO ARAMCO STOCK, RECEIVED 20000 LITERS (126 BBLS) FROM HAJJAN TO ARAMCO STOCK ON 06/12/2024.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 5 API 0 0 Volts 1.28 10 9,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
80 0 HTHP 98 22 0 9 / 14 INPHPA 0
MUD DATA
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 9 2 8/9 7.5 200 N/A
50

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JZSO-802 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 06/03/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

65 PCF 0 5 API 0 0 Volts 1.28 10 9,500


FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 98 22 0 9 / 14 INPHPA 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 9 2 8/9 7.5 200 N/A
49

MUD XC SODASH ME-LUBE NACL POLY-SAL CAUST


TREATMENT 8 ( 50LB ) 1 ( 100LB ) 5 ( 55GL ) 5 ( 2200L ) 36 ( 55LB ) 3 ( 55LB )

BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 12.25 1 12.25 1 RV1350
2 Bit Sub RIG 8.5 1 8.5 2.813 3.1 6 5/8 REG 6 5/8 REG 0 0
DRILL STRING 3 Drillcollar RIG 8.5 10 8.5 2.813 301.32 6 5/8 REG 6 5/8 REG 0 SPRL
4 Crossover RIG 8.5 1 8.5 2.813 2.6 6 5/8 REG NC50 0 0
5 Heavy Weight Drillpipe (HWDP) RIG 5 6 5 3.063 181.94 NC50 NC50 45.2 CONV
6 Drillpipe RIG 5 1 5 4.276 30.3 NC50 NC50 19.5 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 2,266 DAILY MEETINGS

Company RZT RIG OES VRA RIG ARM SJC ARM

Category CTRG RIG DFMS OTHR OTHR OTHR PCS WSC


PERSONNEL
11 48 1 3 15 2 3 2
Total
AND SERVICES No. of Persons
85
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24

Operating Hours. 0 12 12 4 12 12 12 12

Standby/Tankers Others Others


TRUCKS/BOATS
ab-7102 1 HAJJAN 4X4 AMBULANCE CAR.
2 HAJJAN PICK-UP CAR.

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 18 73 88 1900

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MAINTENANCE BI-RM
Print Date: 06/18/2024 06:20 08/14/2019 - 06/20/2024
Report ID: OPERLMTDMRREP

JACK-202 @ *RIG MAINTENANCE* Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Objective : (WATER SUPPLY) Foreman(s)MASSOUD, RAMY MOUNIR
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Charge #: Engineer MOUSTAFA, AHMED MOUSTAFA
JACK-202
() Manager SARRANI, HASSAN FAHAD
Daily
(0500-0500) Saudi Aramco Well THURAYA RIG FORMAN VSAT OTHER VSAT
Wellbores:
Date: Tuesday 06/18/2024 *RIG MAINTENANCE* +882167771 3737 0133786378 0133786376

Last 24 hr operations Next 24 hr plan


RIG MAINTENANCE, WORKING ON CAT-III & CAT-IV INSPECTION., RIG MOVE F/ FYDH-804 T/ CONT. RIG MAINTENANCE, RIG MOVE F/ FYDH-804 T/ ATNB-804
ATNB-804
Location Next Location
AFTER PASSING YABRIN TOWN & BEFORE AL HAFAYER TOWN TURN RIGHT SKID ROAD 363 KM FOLLOW SIGN BOARD. ATNB-804
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date)
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD SAFETY MEETING WITH ALL INVOLVED PERSONNEL:

* RIG DOWN ON FYDH-804 .............. 100 %.


* RIG MOVE TO ATNB-804..................15 %. (175 KM)
* RIG UP ON ATNB-804 ......................0 %

- WAITNG FOR HAJJAN MOVING TRUCKS TO START MOVING FROM FYDH-804 TO


ATNB-804 (DELAY 11 DAYS).

- RIG MAINTENANCE AND INSPECTION (12 DAYS):

- SENT THE FOLLOWING TO HAJJAN YARD FOR INSPECTION:


- DRAWWORKS FOR CAT-IV INSPECTION.... DONE
0500 - 1700 12 PRE M MAIN OTH NA RIG - MAST FOR CAT-III INSPECTION.... DONE.
- SUB-STRUCTURE FOR CAT-III INSPECTION.... DONE.
- CROWN BLOCK FOR CAT-III INSPECTION...DONE
- TRAVELLING BLOCK FOR CAT-III INSPECTION....DONE
- ROTARY TABLE FOR CAT-III INSPECTION....DONE
- DEAD LINE ANCHOR FOR CAT-III INSPECTION....DONE.
- SENT TRIPOD WINCH & CLIMP ASSIST TO HAJJAN YARD FOR OVERHAULING.
- SENT 4X CENTRIFUGAL MIXING PUMPS, FIRE PUMP REEL, PIPE SPINNER TO
HAJJAN YARD FOR REPAIR...INPROGRESS 20%
- SENT BHA (DC, HWDP, XO, REAMERS) TO HAJJAN YARD FOR INSPECTION.... IN
PROGRESS 50%.
- SENT RIG CARRIER, SUB-STRUCTURE, PONY BASE TO HAJJAN YARD FOR
MODIFICATION.
- SENT 6X MUD TANKS & TRIP TANK TO HAJJAN YARD FOR BLASTING & INSIDE
PAINTING...DONE.
1700 - 0459 12 PRE M MAIN OTH NA RIG
WAIT ON DAYLIGHT
Foreman Remarks

- ATNB-804 WILL BE USED AS DRILLING WATER SUPPLY WELL SUPPORTING EXPLORATORY UNCONVENTIONAL WELL ATNB-80.
AQUIFER FORMATION IS : UMM ER RADHUMA AQUIFER (UMER).
======
ELEVATION 28'.
WELL DESIGN:
- 28" HOLE: 24" CSG @ 128 FT RKB,
- 22" HOLE: 18 5/8" CSG @ 1028 FT RKB,
- 17'' HOLE: 13-3/8'' CSG @ 2318 FT RKB'.
- 12-1/4" OPEN HOLE: TO DEPTH 3228 FT RKB.
=====
NEXT LOCATION: N/A
LOCATION READINESS: N/A
REQUEST DATE:
=====
- CONDUCATED A DAILY COMMUNICATION BY PHONE WITH DHAHRAN DRILLING ECC AT @ 17:00 HRS.
- ARAMCO LINK DATA TRANSMISSION SERVICE WILL BE USED FOR THIS WELL TO PICK UP CSG POINTS AND FORMATION TOPS BY RCC TEAM.
- WIRELINE LOGGING IS REQUIRED FOR THIS WELL.
- CUSTOMIZED MUD LOGGING SERVICES ARE REQUIRED IN THIS WELL FROM SURFACE TO TD.
======
NEARST HOSPITAL:
- HEALTH CENTER YABRIN 370 KM, PH # 013 5990893.
- ARAMCO CLINIC IN HRDH 475 KM, PHONE # 013-576-1660.
======
LOCATION:
DAMMAM-HARADH HIGH WAY, EXIT TO BATHA-AL KHARJ ROAD, BEFORE NADEC CHECK POINT TAKE U-TURN SLOT, EXIT TO HRDH-YABRIN ROAD 100 KM, AFTER PASSING YABRIN TOWN &
BEFORE AL HAFAYER TOWN TURN RIGHT SKID ROAD 363 KM FOLLOW SIGN BOARD.
======
JOURNEY MANAGEMENT PLAN:

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MAINTENANCE BI-RM
Print Date: 06/18/2024 06:20 08/14/2019 - 06/20/2024
Report ID: OPERLMTDMRREP

CALL JACK-202 OFFICE AT 013-3786378 PRIOR TO TURNING ON SKID ROAD, PROVIDE - NAME OF COMPANY, NUMBER OF PERSONNEL, COLOR OF VEHICLE AND EMERGENCY CONTACT NUMBER
OF BASE PERSONNEL. ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER & GASOLINE.
======
MOVE DETAILS:
- MOVE FROM FYDH-804 TO ATNB-804, 175 KM SKID ROAD.
======
SAFETY TOPICS:
1. DISCUSSED HSE ALERT 51-24 - CREW HIT BY FORKLIFT LOAD
2. REVIEWED NEAR MISS NO. 7226911.
3. CONDUCTED SAFETY AWARENESS SESSION ON "LINE OF FIRE"
4. DISCUSSED SAFELY WORKING PROCEDURE LIFTING OPERATION.
5. DISCUSSED ALWAYS MAINTAIN AWARENESS OF THE SURROUNDINGS AVOID BEING DISTRACTED FOR ANY REASON.
6. DISCUSSED SAFELY WORKING PROCEDURE FOR WORKING IN HOT WEATHER AND HEAT STRESS AVOIDANCE.
7. DISCUSSED STOP WORK IMMEDIATELY IF CONDITIONS CHANGE OR A WORKER IS IN AN UNSAFE LOCATION AND NOTIFY THE SUPERVISOR.
8. DISCUSSED SAFELY WORKING PROCEDURE FOR SECURING THE LOADS ON THE TRUCKS.
9. DISCUSSED PARTICIPATE FOR PERFORMING STOP WORK PROGRAM..

OTHER:0
NEAR MISS:00
DRILLS: NILL
STOP CARDS: 10.
SAFETY ALERTS: 1
======
ARAMCO:
- ADMIN CLERK TEHRIR HASMULLAH ANSARI (8643514) ON LOCATION SINCE 1/09/2024.
======
SERVICE COMPANY:
GECAT TANKER RELEASED ON 13/JUNE/2024 @ 12:00 HRS
======
-HAJJAN TANKERS, HEAVY EQUIPMENT & VEHICLES ON LOCATION:
* 1 SWEET WATER TANKERS.
* 1 RAW WATER TANKERS.03 DOWN
* 1 HAJJAN 4X4 AMBULANCE CAR.
* 2 HAJJAN PICK-UP CAR.
* 1 HAJJAN BUS
=====
WATER SOURCE:
FYDH-803 STRAIGHT DISTANCE: KM; TOTAL DISTANCE: KM
DAILY: NUMBER OF TRIPS: 0 TRIPS, TOTAL= 0 TRIPS
DAILY KM = 0 KM, TOTAL= 0 KM.
DAILY VOLUME = 0 GAL; TOTAL VOLUME= 0 GAL
=====
WATER SOURCE:
MDRK-803 STRAIGHT DISTANCE: KM; TOTAL DISTANCE: KM
DAILY: NUMBER OF TRIPS: 0 TRIPS, TOTAL= 0 TRIPS.
DAILY KM = 0 KM, TOTAL= 0 KM.
DAILY VOLUME = 0 GAL; TOTAL VOLUME= 0 GAL
=====
WASTE MANAGEMENT KPI:
- DRILLING WASTE CUTTINGS: DAILY= 0 M3 / TOTAL= 0 M3.
- REUSED WATER: DAILY= 0 M3 / TOTAL = 0 M3
- DUMPING WATER= 0 M3 TOTAL= 0 M3.
=====
4 VACUUM TANKERS ARRIVED LOCATION 05/31/2024 UNDER DRSS #1004317147 RELEASED ON 06/13/2024 @ 12 HRS
- PLATE NO. 4548 LRA DAILY = 0 TRIP TOTAL= 5 TRIPS
- PLATE NO. 4357 BRA DAILY = 0 TRIP TOTAL= 6 TRIPS
- PLATE NO. 8546 ZSA DAILY = 0 TRIP TOTAL= 6 TRIPS
- PLATE NO. 1740 JAA DAILY = 0 TRIP TOTAL= 6 TRIPS
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A NO NO VERY HOT 1,923 DAILY

Company RZT RIG RIG ARM ARM

Category CTRG RIG OTHR OTHR WSC


PERSONNEL
11 28 8 1 1
Total
AND SERVICES No. of Persons
49
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24

Operating Hours. 0 12 12 12 12

Standby/Tankers Others Others Others


TRUCKS/BOATS
HAJJAN 4X4 ANBULANCE 1 SWEET WATER 2 HAJJAN PICK-UP CAR 1 BUS

BULK Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MAINTENANCE BI-RM
Print Date: 06/18/2024 06:20 08/14/2019 - 06/20/2024
Report ID: OPERLMTDMRREP

N/A N/A 0 46 3 200

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UQBN-801 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 06/04/2024 - 07/09/2024
Report ID: OPERLMTDMRREP

JACK-203 @ UQBN-801 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (WATER SUPPLY) Foreman(s)MUTAIRI, DHAIFALLAH KHULAIF
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Engineer ELESAWI, ELMAHDI / MOUSTAFA, AHMED MOUSTAFA
JACK-203 (63-24885-0801)
Manager SARRANI, HASSAN FAHAD
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: THURAYA RIG FORMAN VSAT OTHER VSAT
Date: Tuesday 06/18/2024 UQBN-801 (0) UQBN_801_0 +882167771 3735 0135788566 0135788567

Last 24 hr operations Next 24 hr plan


MOVING CAMP AND OFFICES TO UQBN-801, WAIT ON DAYLIGHT, R/U ON UQBN-801 , WAIT ON DAYLIGHT,
Location Next Location
UQBN-801 ANDR-972
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 445
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD SAFETY MEETING WITH ALL INVOLVED PERSONNEL.

* RIG DOWN ON HZEM-851 .................. 100%.


* RIG MOVE TO UQBN-801 .................... 100%.
* RIG UP ON UQBN-801 ......................... 20 %
0500 - 1700 12 0 PRE N RM RM NA RIG 0 0
** SET MAIN CAMP AND OFFICES... IN PROGRESS
** SENT HANDLING TOOLS TO DHAHRAN FOR INSPECTION ON 6/4/2024.
** ALMUTLAQ INSPECTION COMPANY ON LOCATION FOR BHA & TUBULARS
INSPECTION...COMPLETED.
** CAT III INSPECTION (PERFORMED BY VELOSI COMPANY) FOR CROWN BLOCK AND
DEADLINE ANCHOR... COMPLETED.
1700 - 0459 12 0 PRE N RM RM NA RIG 0 0
WAIT ON DAYLIGHT
Foreman Remarks

THE FOLLOWING IS THE RECOMMENDED DRILLING PROGRAM FOR UQBN-801, WHICH WILL BE DRILLED AS WATER-WATER SUPPLY IN UQBN.
UQBN-801 WILL BE USED AS DRILLING WATER SUPPLY WELL SUPPORTING EXPLORATORY CONVENTIONAL UQBN-1.
AQUIFER FORMATION IS : MINJUR AQUIFER.
====
- NEXT LOCATION:
* WELL NAME: N/A
* REQUEST DATE: N/A
* LOCATION READINESS: N/A.
====
NEAREST HOSPITAL FOR EMERGENCY & CONTACT:
** GENERAL HOSPITAL PH: DISTANCE: KM.
====
WELL DESIGN:
- 24" CSG ( 28" HOLE SECTION) @128' RKB.
- 18-5/8" CSG (22" HOLE SECTION) @ 978' RKB +/- 25 FT INTO HITH.
- 13-3/8" CSG (17" HOLE SECTION) @ 2,278' RKB +/- 25 FT INTO HNIF..
- 9-5/8" CSG LINER ( 12-1/4" HOLE SECTION ) @ 4,248' RKB +/- 25 FT INTO MNJR.
- 7" PRE-PERFORATED( 8-1/2" HOLE SECTION) @ 5,128' RKB TD.
====
- ELEVATION FROM RIG FLOOR TO GROUND LEVEL: 28 FT.
- ARAMCO ONSITE LINK WILL BE PROVIDED TO PICK CASING POINT AND FORMATION TOPS REMOTELY.
====
RIG LOCATION: AFTER HOWTAH TOWN 15 KM TURN LEFT, 28 KM BLACK TOP, THEN FOLLOW SIGN BOARD FOR LOCATION (SKID ROAD IS 10 KM).
====
SAFETY TOPICS:
1.HOUSEKEEPING SHALL BE MAINTAINED TIME WHILE PERFORMING THE JOB TO AVOID INCIDENTS.
2. AVOID MANUAL HANDLING AS LOW AS REASONABLY PRACTICABLE.
3.UNDERSTAND LINES OF FIRE AND FOLLOW PRECAUTIONS ASSOCIATED WITH HAZARDOUS OBJECTS, EQUIPMENT.
4.SUBSTANCES, AND OTHER CONDITIONS. ONLY RIGGER GIVES SIGNAL TO THE CRANE OPERATOR.
5. ALWAYS USE A TAGLINE ATTACHED TO THE LOAD DURING LIFTING OPERATION AND MAKE PROPER COMMUNICATION WITH THE CRANE AND FORKLIFT OPERATORS.
6. COMMUNICATE WORK PERMIT INFORMATION TO ALL INVOLVED IN THE WORK, AS WELL AS THOSE AFFECTED BY THE WORK.
7. BANKS MAN SIGNALING TO IN COMING TRUCKS, CRAIN, & FORKLIFT MOMENT INSIDE THE LOCATION.
8. CONFIRM THAT ALL HAZARDS ARE IDENTIFIED AND ASSOCIATED RISKS ARE CONTROLLED, INCLUDING THOSE INVOLVING SIMULTANEOUS OPERATIONS.
9. IMMEDIATELY STOP WORK IF UNSAFE ACTS AND CONDITIONS ARISE AND INFORM THE SUPERVISOR, PARTICIPATE IN THE STOP CARD PROGRAM.
-STOP CARDS 10
-DRILL-NILL
====
ARAMCO:
- ARAMCO CLERK SYED FURQAN ALI ON LOCATION SINCE 4/19/2024.
====
RENTAL TOOLS:
====
SERVICE COMPANY:
====
CONDUCTED A DAILY COMMUNICATION CHECK WITH DHAHRAN DRILLING ECC BY PHONE @ 16:00.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UQBN-801 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 06/04/2024 - 07/09/2024
Report ID: OPERLMTDMRREP

====
HAJJAN TANKERS, HEAVY EQUIPMENT & VEHICLES ON LOCATION:
- 1 SWEET WATER TANKER.
- 2 RAW WATER TANKERS.
- 1 HAJJAN 4X4 AMBULANCE CAR.
- 1 HAJJAN BUS.
- 2 HAJJAN PICK-UP CARS.
- 2 CRANES.
- 1 FORKLIFT.
====
WASTE MANAGEMENT KPI:
- DRILLING WASTE CUTTINGS: DAILY: 0 M3 / TOTAL= M3
- DRILLING WASTE FLUIDS: DAILY= 0 M3/ TOTAL = M3
- REUSED WATER: DAILY= 0 M3 / TOTAL= M3
=======
THE WATER SOURCE: NYYM-804 (STRAIGHT DISTANCE: 21 KM; ROUND TRIP: 42 KM).
- DAILY: NUMBER OF TRIPS: TRIPS, TOTAL= TRIPS.
- DAILY KM=KM, TOTAL= KM.
- DAILY VOLUME= M3, TOTAL= M3.
====
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 1,172 PRE TOUR MEETING

Company RZT RIG RIG ARM ARM

Category CTRG RIG OTHR OTHR WSC


PERSONNEL
11 38 13 1 2
Total
AND SERVICES No. of Persons
65
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24

Operating Hours. 0 12 12 12 12

Standby/Tankers Others Others Others Others


TRUCKS/BOATS
AB-7101 AMBULANCE 1 BUS 1 SWEET WATER TRUCK 2 HAJJAN P/U

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 0 46 69 1000

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-2032 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/05/2024 - 12/22/2025
Report ID: OPERLMTDMRREP

KINGDOM-1 @ MRJN-2032 Limited Morning Report for 06/18/2024


Objective : (SINGLE Foreman(s)TAHA SOLIMAN FADL, MOHAMED AHMED / FAKEEHA, BASIM ANIS
D&WO Morning Report (Service Providers View) Charge #: LATERAL HORIZONTAL Engineer OGUNWALE, ADEDOTUN BABATUNDE
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved SFNY WATER INJECTION) Manager HUSSAIN, MOATH YOSEF
KINGDOM-1 (66-22073-2032)
Daily OffShore THURAYA RIG FORMAN VSAT RIG FORMAN VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 4214 0136739315 0136739319
Date: Tuesday 06/18/2024 MRJN-2032 (0) MRJN_2032_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
0136739318 0135106367

Last 24 hr operations Next 24 hr plan


PERFORME WIPER TRIP, POOH AND L/D C/OUT BHA. R/UP AND RIH WIRLINE LOG. RECORD OPEN HOLE LOGGING BY HALLIBURTON W/L, CONFIRM DATA, POOH FOR SECOND LOG
RUN .
Location Next Location
MRJN MRJN-2036
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,789 Last Csg Size MD TVD Size Top
9 5/8 9511 8212 Formations Comments
Depth
YAMM 9,471 8184 FT TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) URTR 9,582 8262 FT TVD
10789 (Date) 100 0 245 SULY 9,909 8494 FT TVD
75.3 (05/31/2024@1415 ) LRTR 9,973 8539 FT TVD
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0500 - 0530 0.5 0 8 1/2 N DRLG CIRC MPMP RIG 10789 10789
CONTINUE CIRCULATE HOLE CLEAN.
0530 - 0545 0.25 0 8 1/2 N DRLG CIRC MPMP RIG 10789 10789
FLOW CHECK - WELL STATIC.
0545 - 0745 2 0 8 1/2 N DRLG ST STDP RIG 10789 10789 10789 9400
POH FREELY ON ELEVATOR WITH 8-1/2" REAMING ASSY TO CASING SHOE.
0745 - 0800 0.25 0 8 1/2 N DRLG CIRC MPMP RIG 10789 10789
FLOW CHECK - WELL STATIC.
0800 - 0830 0.5 0 8 1/2 N DRLG RR TDS RIG 10789 10789
SERVICE TDS.
0830 - 0915 0.75 0 8 1/2 N DRLG CIRC MPMP RIG 10789 10789
CIRCULATE COMPLETE CYCLE.
0915 - 0930 0.25 0 8 1/2 N DRLG CIRC MPMP RIG 10789 10789
FLOW CHECK - WELL STATIC.
0930 - 1000 0.5 0 8 1/2 N DRLG CIRC MPMP RIG 10789 10789
PUMP SLUG & DROP DRIFT.
1000 - 1200 2 0 8 1/2 N DRLG ST STDP RIG 10789 10789 9400 7754
POH ON CONTROLLED SPEED WITH 8-1/2" REAMING ASSY ON 5-1/2" D/P.
1200 - 1230 0.5 0 8 1/2 N DRLG PJSM NA RIG 10789 10789
HPJSM WITH CREW TO TRIP OUT MANUALLY.
1230 - 1945 7.25 0 8 1/2 N DRLG ST STDP RIG 10789 10789 7754 624
POH ON CONTROLLED SPEED WITH 8-1/2" REAMING ASSY ON 5-1/2" D/P.
1945 - 2000 0.25 0 8 1/2 N DRLG CIRC MPMP RIG 10789 10789
FLOW CHECKED AT BHA, WELL STATIC.

2000 - 2045 0.75 0 8 1/2 N DRLG HT BHA RIG 10789 10789 POH ON CONTROLLED SPEED WITH 8-1/2" REAMING ASSY ON 5-1/2" HWDP FROM
624' TO 148'.
2045 - 2215 1.5 0 8 1/2 N DRLG HT BHA RIG 10789 10789
POOH AND R/BACK 8-1/2" C/OUT BHA.
2215 - 2300 0.75 0 8 1/2 N DRLG OTH NA RIG 10789 10789
CLEAR RIG FLOOR AND CHANGE HANDLING TOOLS TO 3-1/2".
2300 - 2330 0.5 0 8 1/2 E LOG PJSM NA RIG 10789 10789
HPJSM FOR R/UP AND RIH WITH HAL WIRLINE.
2330 - 0030 1 0 8 1/2 E LOG OTH NA HWP 10789 10789
R/UP HAL WIRLINE SHEAVES AND PREPARE TOOLS ON RIG FLOOR.

0030 - 0145 1.25 0 8 1/2 E LOG OTH NA HWP 10789 10789 R/UP FIRS RUN BHA (ACRT-MSFL-AST-IDT-ICT-GR- HYDRAULIC JAR) AND TEST
TOOLS.
0145 - 0330 1.75 0 8 1/2 E LOG OTH NA RIG 10789 10789
RIH WITH HAL WIRLINE TO CSG SHOE.
0330 - 0400 0.5 0 8 1/2 E LOG LOG WLT HWP 10789 10789 9500 10789
DOWN LOG TO BTM.
0400 - 0459 1 0 8 1/2 E LOG LOG WLT HWP 10789 10789 10789 9600
START MAIN LOG UP TO CSG SHOE.... ON GOING AT REPORT TIME.
Foreman Remarks

- MRJN-2032 WILL BE DRILLED AS SINGLE LATERAL WATER INJECTION WELL TARGETING SFNY RESERVOIR WITH A PILOT HOLE FROM MRJN-2030/2039 PLATFORM WHICH IS LOCATED WEST OF
MARJAN MAIN DOME
- WATER DEPTH: 144'; RKB TO MSL (ELEVATION): 112' ; RKB TO ML: 256'; AIR GAP: 46 FT
- FINAL POSITION: LAT - 28DEG 27.89' N ; LONG - 049DEG 34.58' E; RIG HEADING: 329
- LEGS PENETRATION: BOW 14.4 FT - PORT 13.9 FT - STBD 13.9 FT
======================================================================================================
BATCH DRILLING AND OPERATIONS SEQUENCE:
BATCH 22" SECTION: 2033 (DONE), 2035 (DONE), 2037 (DONE), 2039 (DONE), 2038 (DONE), 2036 (DONE), 2034 (DONE), 2032(DONE)
PILOT HOLE 16" SECTION: 2032 (DONE), 2036 (DONE).
PILOT HOLE 12-1/4"SECTION: 2036 (DONE), 2032 (DONE)
PILOT HOLE 8-1/2" SECTION: 2032 (ONGOING), 2036
BATCH 16" SECTION: 2034, 2033, 2035, 2037, 2039, 2038

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-2032 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/05/2024 - 12/22/2025
Report ID: OPERLMTDMRREP

BATCH 12-1/4" SECTION: 2038, 2034, 2033, 2035, 2037, 2039


8-1/2" & 6-1/8" SECTIONS TO COMPLETION: 2039, 2038, 2036, 2034, 2032, 2033, 2035, 2037

CASING POINTS PLANNED:


L0 18-5/8": 2,693FTMD (50FTTVD INTO RUS), ACTUAL 2,695 FT.
L0 13-3/8": 6,117FTMD (50FT ABOVE LHHR), ACTUAL 6,079 FT.
L0 9-5/8" : 9,441FTMD (30FT TVD IN YAMM), ACTUAL 9,520 MD FT, 8218.22 TVD FT

SAFETY:
- HOLD PRE SECTION MEETING FOR 12-1/4" HOLE & 8-1/2" WITH DE AND KINGDOM-1 TEAM ON 13-MARCH-24.
- HOLD TOURLY SAFETY MEETING AS PER ARO AND SAUDI ARAMCO.
- DAILY ARAMCO RADIO CHECK WITH ECC.
- TEST CALL MADE TO DAHRAN DRILLING ECC VIA THURAYA SAT PHONE ON 9-JUNE-24.
- PERFORM WEEKLY FIRE, H2S, & ABANDON DRILL ON 16-JUNE-24.
- PERFORM BASIC HELI-DECK CRASH RESCUE DRILL ON 07-JAN-24.
- RUN E-GEN 2 HRS ON 8-JUNE-24.
- PERFORM MOB & CONFINED SPACE RESCUE DRILL ON 05-MAY-24.
- CARRIED OUT CASUALTY EVACUATION / RESCUE FROM DRILL FLOOR DRILL ON 13-MAY-24.

PERSONNEL:
- ARAMCO HSE JOHANN JONKER ID# 8161412 ARRIVED LOCATION 4/6/2024
- ARAMCO HSE ISSATAY TUYAKOV ID# 8303286 LEFT LOCATION ON 6/17/2024
- ARAMCO CLERK ALSHEHRI ABDULLAH ID# 8650408 ARRIVED ON LOCATION 11 JUNE 2024.
- ARAMCO PDP ABDULLAH AL-SOWIYGH ID#794944 ARRIVED ON LOCATION 11 JUNE 2024.

RENTAL TOOLS:
- WFD 9-5/8" CSG RUNNING EQUIPMENT ON BOARD 09-MAY-024, B/L ON 25-MAY-024
- 6-1/2" NAPESCO DRILLING JAR ON BOARD 16-MAY-024.
- WFD 2 X 6.5" PBL SUB ON BOARD ON BOARD 18-MAY-024

- WAIT ON WEATHER: TODAY 0 HRS / CUMULATIVE 03 HRS; - WAIT ON MARINE: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON TOOL HOUSE: TODAY 0 HRS / CUMULATIVE 0 HRS; - WAIT ON PRODUCING: TODAY 0 HRS / CUMULATIVE 0 HRS

- LC-50 SAMPLE FOR WBM SENT ON 6/12/2023 MANIFEST # 24006556


- LC-50 SAMPLE FOR OBM SENT ON 5/28/2024 MANIFEST # 2400687646 .

- HALL 9-5/8'' RTTS , SSCV AND OPERATOR STBY ON BOARD .


DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 2 3.4 API 0 0 Volts 4.18 10 40,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 12.2 HTHP 90 25 0 9 / 10 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0.5 20 10 8/9 0 200 0
60
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 2 3.5 API 0 0 Volts 4.18 10 40,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 12.2 HTHP 90 25 0 9 / 10 NCPOL 1.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0.5 19 10 8/9 0 200 12.8
57

MUD H2S-SCAV-L MAXSHIELD FLO-TROL SOLFLKF PACLV


TREATMENT 1 ( 55GL ) 8 ( 55GL ) 15 ( 25KG ) 20 ( 50LB ) 15 ( 50LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
9 10,789 10,789 DP Av DC Av Bit HHP N/A N/A 517 8.5 SEC
Pressure GPM Jet Vel 0 0 0 I-Row O-Row DC Location Bearings
N/A 0 N/A 1 1 WT A N
BIT DATA
Serial Number Type Jets TFA
839561 EQH20R POOH Reason N/A
Gauge Other
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 0
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/15/2024 N/A 2-4 KNOTS 1-2 FT N/A 208 N/A

PERSONNEL WCR RIG BHI RIG BDF FPI ARM HCO SJC MI2 ARM WWB FME HWP
Total
Company
AND SERVICES 93
INFORMATION

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-2032 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:20 02/05/2024 - 12/22/2025
Report ID: OPERLMTDMRREP

Category CSR CTRG DPDS RIG DFMS FBGLS OTHR PRTS PCS SCS WSC WBCS WHES WLS

No. of Persons 1 14 1 57 2 1 3 1 2 1 2 1 1 6

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 24 24 24 24 24 24 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
Water tide

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1812 1716 1597 6605 N/A 3615

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NEW RIG MOBILIZATION BI-MOB
Print Date: 06/18/2024 06:20 06/07/2024 - 06/21/2024
Report ID: OPERLMTDMRREP

LB-7 @ *MOBILIZATION* Limited Morning Report for 06/18/2024


Objective : (MOBILIZATION) Foreman(s)WILLIAMSON, AILAN COLE
D&WO Morning Report (Service Providers View) Engineer MOUSA, MOHAMMAD ADEL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Charge #: Manager ALRASHEEDI, ABDULMAJEED NASSER
LB-7
() THURAYA RIG FORMAN VSAT OTHER VSAT
Daily
(0500-0500) Saudi Aramco Well +882 16 77 71 4281 0136739974 0136739975 (RADIO RM )
Wellbores:
Date: Tuesday 06/18/2024 *MOBILIZATION* CONTRACTOR /CLERK VSA T
0136739971 (CLERK)

Last 24 hr operations Next 24 hr plan


BARGE UNDER MOBILIZATION WORKING TO CLOSE-OUT PCI FINDINGS BARGE UNDER MOBILIZATION WORKING TO CLOSE-OUT PCI FINDINGS
Location Next Location
MOBILIZATION ZULF-1403
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date)
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

BARGE MOBILIZATION AND CLOSE-OUT PCI FINDINGS:

- PCI FINDINGS PRIORITY 1 OPEN : 7


- PCI FINDINGS PRIORITY 2 OPEN : 9
- PCI FINDINGS PRIORITY 3 OPEN : 10
0500 - 0459 24 PRE M MAIN OTH NA RIG - PCI FINDINGS PRIORITY 4 OPEN : 1

- CONTINUE TO FINE TUNE FLARE BOOM NOZZLE ACTUATORS


- PREPARE TO RECEIVE 2" COIL TUBING REEL INSPECT LANDING AREA, REVISED
RA, JSA
- WILL CHANGE OUT ALL HALLIBURTON AIR COMPRESSORS FOR NEW UNITS
ARRIVING
Foreman Remarks

- ARAMCO MATERIAL EXPEDITOR MOHAMMED ALJOWHER #8538429 ARRIVED ON BOARD 11 JUNE, 2024
- ARAMCO MATERIAL EXPEDITOR AHMED HALHUMAIDI #765798 DEPARTED 11 JUNE, 2024
- ARAMCO MATERIAL EXPEDITOR SULTAN A ALDHIRGHAM #821673 DEPARTED 11 JUNE, 2024
======================================================================
- SEABED SURVEY REQUESTED FOR ZULF 1290/1299 ON 10 JUNE 2024 (8000647938)
- SEABED SURVEY REQUESTED FOR MRJN 740/749 ON 10 JUNE 2024 (8800022337)
- SEABED SURVEY REQUESTED FOR SFNY 1550/1559 ON 10 JUNE 2024 (8800022336)
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A SE 06 - 08 1-2 FT SEASONAL PRETOUR/ARAMCO
KTS MANAGMENT

Company SBA RIG HCT RIG RUE ARM SCP ARM HTS

Category ALS CTRG COIL RIG H2S OTHR SSSV WSC WTSE
PERSONNEL
2 15 7 48 1 1 1 1 16
Total
AND SERVICES No. of Persons
92
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 24 0 12 0 0 0

Standby/Tankers Others
TRUCKS/BOATS
PACIFIC PYTHON RAWABI-322

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 1740 1130 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 1 of 1


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWAM-1 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 03/29/2024 - 11/03/2024
Report ID: OPERLMTDMRREP

NA-128S @ HWAM-1 Limited Morning Report for 06/18/2024


Objective : (HAWAM-1 Foreman(s)KHEDR, MOHAMED IBRAHIM MAHMOUD
D&WO Morning Report (Service Providers View) Charge #: (HWAM-1) IS VERTICAL Engineer SLATEWALA, HUZEFA SHABBIR
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved EVALUATION WELL FOR CO2 Manager HARBI, MAGBEL MENAWER
NA-128S (75-23879-0001)
SEQUESTRATION) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 11116 6791840 8807846
Date: Tuesday 06/18/2024 HWAM-1 (0) HWAM_1_0 FAX VSAT CONTRACTOR /CLERK VSA T
8807847 6791842

Last 24 hr operations Next 24 hr plan


SET TOP PAKER. POOH AND L/D EXCESS DRILL PIPE. P/T BOPE. P/U AND RIH WITH 5-7/8" P/U AND RIH WITH 5-7/8" ROTARY DRILLING BHA. CLEAN OUT SHOE TRACK. PERFORM FIT. DRILL
ROTARY DRILLING BHA. 5-7/8" HOLE.
Location Next Location
DAMMAM RIYADH H/W,GO TO RUMAH CITY THEN RUMHYAH ROAD, TURN LEFT 3 KM SKID ROAD *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,465 Last Csg Size MD TVD Size 4,420 7,462 7,462 Top
9 5/8 4710 4710 Formations Comments
7 Depth
JUBL 4,460 169 FT SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) HNFR 5,014 31 FT SHALLOWER
7465 (Date) 100 0 314 BUHR 5,350 40 FT SHALLOWER
66.8 (04/12/2024@0830 ) TQMN 5,395 47 FT SHALLOWER
DHRM 5,890 21 FT SHALLOWER
LFDR 6,214 40 FT SHALLOWER
BLFR 6,388
FRDR 6,810 106 FT SHALLOWER
DRMS 7,435 86 FT SHALLOWER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0530 0.5 0 8 3/8 N CSG SET HGRL TIL 7465 7465 4438 4442 TIW SET TOP LINER PACKER AS FOLLOWING. PICK STRING UP 12'. SLACK WEIGHT
TO 60 KLB. HAVE GOOD SHEAR INDICATION. PULL STRING 35' MORE.

0530 - 0630 1 0 8 3/8 N CSG CIRC MPMP RIG 7465 7465 REVERSE CIRCULATION 3 STRING VOLUME. HAD 24 BBL NET CEMENT ON
SURFACE.

0630 - 0700 0.5 0 8 3/8 N CSG PJSM LINR RIG 7465 7465 HELD PRE-JOB SAFETY MEETING SHARE HSE ALERT: 68-24 STRUCK BY CHICKSAN
ASSEMBLY AND HSE ALERT: 67-24 STRUCK BY MANUAL TONG.

0700 - 0830 1.5 0 8 3/8 N CSG OTH LINR ARM 7465 7465 HPJSM. R/D CEMENT LINE AND TIW CEMENT MANIFOLD ASSEMBLY. MONITOR
WELL ON TRIP TANK - STATIC. SLUG PIPE.
0830 - 0900 0.5 0 8 3/8 N CT TO STDP RIG 7465 7465 4420 3185
POOH AND RACK BACK 5-1/2" DRILL PIPE STANDS ON DERRICK.

0900 - 1330 4.5 0 8 3/8 N CT TO SPDP RIG 7465 7465 3185 0 POOH WITH TIW RUNNING TOOL TO SURFACE. L/D EXCESS 5-1/2" DRILL PIPE AND
HWDP.

1330 - 1430 1 0 8 3/8 N CSG OTH LINR ARM 7465 7465 HPJSM. L/D TIW RUNNING TOOL. CHECK TOOL AT SURFACE - OK. P/U & L/D TIW
CEMENT MANIFOLD ASSEMBLY.
1430 - 1500 0.5 0 8 3/8 N WH RTRV WBSH RIG 7465 7465
HPJSM. RETRIEVE 11" WEAR BUSHING.

1500 - 1600 1 0 8 3/8 N BOP OTH BOP RIG 7465 7465 M/U 5 STANDS OF 5 1/2" DP TIW, FLUSHED BOPE, LINES, MANIFOLD GAS BUSTER
& FLARE LINES WITH WATER.

HPJSM. SECURE THE WELL BY CLOSING 5-1/2" BOTTOM MASTER RAM. MONITOR
1600 - 1800 2 0 8 3/8 N BOP BOP RAMS RIG 7465 7465
THE WELL VIA WELLHEAD VALVES - STATIC. CHANGE TOP MASTER RAM FROM
BLIND TO 4" SIZE.

1800 - 0115 7.25 0 8 3/8 N BOP BOPT BOP RIG 7465 7465 HPJSM. P/T 13-5/8" 10M CLASS "A" BOPE & RELATED LINES AS PER ARAMCO
STANDARDS.
0115 - 0215 1 0 8 3/8 N BOP SDR1 NA RIG 7465 7465
PERFORM ACCUMULATOR DRILL. L/D TEST ASSEMBLY.
0215 - 0300 0.75 0 8 3/8 N WH SET WBSH RIG 7465 7465
LAND 11" WEAR BUSHING IN TUBING HEAD SPOOL.

HPJSM, P/U, M/U & RIH 5-7/8" SPS MWD-GR ROTARY DRILIING ASSEMBLY.
0300 - 0459 2 0 8 3/8 N DRLG HT BHA RIG 7465 7465 ONGOING.
- SHALLOW TEST SPS MWD-GR. FR: 220 GPM, SPP: 730 PSI.
- SENSOR OFFSET: GR: 20.23 FT AND DIRECTION SURVEY: 24.96 FT.
Foreman Remarks

HAWAM-1 (HWAM-1) IS VERTICAL EVALUATION WELL FOR CO2 SEQUESTRATION. LOCATED 80 KM NW FROM KHURAIS FIELD. OBJECTIVE OF HWAM-1 WELL IS TO MITIGATE STRUCTURAL
CLOSURE UNCERTAINTIES TO THE SOUTH WEST OF THE LCC IN THE STRUCTURE. ALSO TO EVALUATE THE RESERVOIR PRESENCE AND UALITY, SEAL CAPACITY, UNDERSTAND PRESSURE
COMMUNICATION WITH NEIGHBORING WELLS AND TEST THE INJECTIVITY OF THE TARGETED FORMATIONS.
===================================PLANNED CASING DEPTHS=============================================
- 30" PLANNED CP @ 120' (80' BELOW GL). ACTUAL: 120 FT.
- 24" PLANNED CP @ 410' (50 FT INSIDE ARUMA). ACTUAL: 380 FT.
- 18-5/8" PLANNED CP @ 1660' (BASE OF SHUB). ACTUAL: 1,455 FT.
- 13-3/8" PLANNED CP @ 3,760' (BASE OF MNFR). ACTUAL: 3,450 FT.
- 9-5/8" PLANNED CP @ 5,000' (BASE OF JUBL). ACTUAL: 4,710 FT.
- 7" PLANNED LP @ 7,550'. (30FT INSIDE DHRM SHALE). ACTUAL: 7,465 FT.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWAM-1 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 03/29/2024 - 11/03/2024
Report ID: OPERLMTDMRREP

- 4-1/2" PLANNED LP @ 11,000' (BASE MNJR-3).


===================================EXTRA REQUIREMENTS===============================================
EXTRA REQUIREMENT: TOTAL 52.0 HRS.
- GEOLOGICAL CIRCULATION TO CONFIRM 24" CASING POINT: 2.25 HRS.
- GEOLOGICAL CIRCULATION TO CONFIRM 18-5/8" CASING POINT: 1.25 HRS.
- GEOLOGICAL CIRCULATION TO CONFIRM 13-3/8" CASING POINT: 1.0 HRS.
- OPEN HOLE LOGGING OPERATIONS 12" HOLE SECTION EXTRA HOURS ABOVE PLANNED): 43 HRS.
- GEOLOGICAL CIRCULATION TO CONFIRM 9-5/8" CASING POINT: 3.0 HRS.
- GEOLOGICAL CIRCULATION TO CONFIRM 8-3/8" CORING POINT: 1.5 HRS.
======================================= PERSONNEL ===================================================
- ARAMCO FOREMAN TRAINEE MOHAMMED ALSHALAN #782886 ON LOCATION SINCE 06/09/2024.
- ARAMCO DRILLING ENGINEER SLATEWALA, HUZEFA SHABBIR #897285 ON LOCATION SINCE 06/14/2024.
======================================== HSE =======================================================
*** SAFETY MEETING TOPIC: CONTINUE RUNNING IN HOLE WITH CORING TOOLS.
- NEAR MISS: NONE.
- DRILLS:
- HSE ALERTS:
- EDD HSE ALERT 018-24 UNAUTHORIZED HOT WORK RESULTED IN FIRE
- ALERT KINGDOM 1 - PSE - WC - WELL SHUT IN ON 5.5" DP WITH ANNULAR, 0 SICP, 0 SIDDP
- EDD SAFETY BULLETIN 22-2024 JOURNEY MANAGEMENT PROGRAM
-HSE ALERT 65-24 - FINGERS INJURY DURING FLARE LINE RIG UP
-HSE ALERT 66-24 - FINGERTIP AMPUTATION INCIDENT
-HSE ALERT 67-24 - STRUCK BY MANUAL TONG
-HSE ALERT 68-24 - STRUCK BY CHICKSAN ASSEMBLY
==============JOURNEY MANAGEMENT PLAN =================================================
- CREATE JOURNEY MANAGEMENT PLAN BEFRORE LEAVING YOUR COMPANY BASE.
- ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
- DISTANCE FROM DAMMAM TO RIG: 314 KM INCLUDING "SKID ROAD 2 KM".
- SKID ROAD HAS ALL MOBILE SIGNAL: STC, MOBILY ZAIN.
===================================================================================================
NEXT WELL: AWSQ-1.
- LOCATION PROGRESS: CONSTRUCTION IN PROGRESS APROX 60% READY.
- WATER WELL: AWSQ-801. NOT DRILLED YET.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 7,465 2.09 216.24 0 7,462 -42.47 -23.32 158.95 0.01

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 1 3.2 API 0 0 Volts 2.88 10.4 39,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 11 HTHP 87 22 0.2 7 / 10 NCPOL 2.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 24 13 6/7 0 240 14.8
69
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 1 2.8 API 0 0 Volts 2.88 10.5 39,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 10.6 HTHP 87 21 0.2 7 / 10 NCPOL 2.3
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 24 13 6/7 0 240 14.6
67

MUD BARITE ENVIROTHIN


TREATMENT 8 ( 5000L ) 20 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
10 7,465 7,465 DP Av DC Av Bit HHP N/A N/A M333 5.875 SMT
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
JP0646 MR613C 3 x 14 / 0.451
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 5.875 1 5.875 0.65 3.5 REG JP0646
DRILL STRING 2 Near Bit Roller Reamer RIG 5.875 1 4.75 2.25 6.65 NC38 NC38 56 3 POINT HDH21830
3 Measurement While Drilling (MWD) SPS 4.75 1 4.75 2 30.64 NC38 NC38 15.6 HDH-21813
4 FIlter Sub SPS 4.75 1 4.75 2.125 6.9 NC38 NC38 82 14119947
5 String Reamer RIG 5.875 1 5.875 2.25 6.32 NC38 NC38 55 HD
6 Drillcollar RIG 4.75 1 4.75 2.25 31.15 NC38 NC38 46.73 SPRL P794
7 String Reamer RIG 5.875 1 5.875 1 6.34 NC38 NC38 46.3 HDH-21807
8 PBL (Multiple Activation By Pass) SAM 4.75 1 4.75 2.25 10 NC38 NC38 46.3 00
9 Drillcollar RIG 4.75 21 4.75 2.25 642.73 NC38 NC38 46.3 SPRL

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWAM-1 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:20 03/29/2024 - 11/03/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
10 Hydro-Mechanical Jar NPC 4.75 1 4.75 29.62 46 111
11 Drillcollar RIG 4.75 2 4.75 2.25 61.1 NC38 NC38 46.3 SPRL
12 Crossover RIG 4.75 1 4.75 2.25 2.67 NC38 XT39 46 1
13 Heavy Weight Drillpipe (HWDP) RIG 4 15 4 2.56 456.38 XT39 XT39 28.24 CONV
14 Drillpipe RIG 4 183 4 3.34 5,760.31 XT39 XT39 14 XD105 PREMIUM
15 Crossover RIG 6.5 1 6.5 2.875 2.13 XT54 NC46 26 11
16 Drillpipe RIG 5.5 1 5.5 4.67 30 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/28/2024 06/28/2024 MEDIUM N/A SEASONAL 2,933 N/A

Company GOS RIG EMC MJH TIL SPS RO1 RIG ARM OTH ARM SAM SCM

Category CTRG RIG DFMS SEC LHES LWD MLS OTHR OTHR VAC WSC WBCS PCS
PERSONNEL
17 42 1 8 2 2 6 6 3 1 1 1 3
Total
AND SERVICES No. of Persons
93
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 11 24 24 24 24 24 24 15 24

Operating Hours. 0 24 24 0 10 2 24 12 12 10 24 0 0

Standby/Tankers
TRUCKS/BOATS
AB5118

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 608 N/A N/A 2050

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-1894 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 04/04/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

NA-18S @ UTMN-1894 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK Foreman(s)LANGE, KENNETH ALAN / KHALIL, ALAA IBRAHIM
WELL, 2 HOLE SIZES INTO PINHO, DANILO ARAUJO CARIBE DE A / ALARFAJ, MOHAMMED
D&WO Morning Report (Service Providers View) Charge #: Engineer
Rig KHFF B AS PRESET FOR KHALED
Copyright 2024 Saudi Aramco. All Rights Reserved NA-18S (71-22057-1894) UBCTD & COMPLETE Manager SHUBBAR, GHASSAN DHIYA
Daily Onshore W/HLB XTRMGRP 10K THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: SYSTEM)
+88 216 77 7 113 77 574-4325 880-5514 ( CLINIC)
Date: Tuesday 06/18/2024 UTMN-1894 (0-2) UTMN_1894_2
OTHER VSAT CONTRACTOR /CLERK VSA T
572-8868 ( CLERK) 880-5513 ( CONTRACTO R)

Last 24 hr operations Next 24 hr plan


CHANGE RAMS, PT. PU/MU PAKER PLUS UPPER COMPLETION W/ DRIFT. RIH W/ PAKER PLUS UPPER COMPLETION W/ DRIFT, REV CIR, RIH, PT, SHEAR, PT, SPACE OUT,
PICKLE TBG, DISPLACE.
Location Next Location
THE RIG IS LOCATED 0.186 KM N70E OF UTMN-1602 AND 0.277KMS N84E OF UTMN-665 SDGM-1178
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
12,818 Size 10933 10933 Size 10,299 12,439 12,167 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12818 (Date) 100 0 127
59 (04/20/2024@0515 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

PU/MU AND RIH W/BIT, BIT SUB W/ FLOAT AND CLEANED 5 STDS OF 5.5" DP,
INSTALL FOSV IN DRILL STRING AND SECURE WELL ON LOWER MASTER RAMS.
0500 - 0945 4.75 0-2 EOW N BOP BOP RAMS RIG 12818 12818
> FLUSH CHOKE MANIFOLD AND ALL SURFACE LINES WITH FRESH WATER.
> RECONFIGURE BOP"S AS PER ARAMCO POLICY.

0945 - 1015 0.5 0-2 EOW N DRLG HT PEL RIG 12818 12818
CHANGE HANDLING TOOLS FROM 5.5" TO 4.5" TBG.

1015 - 1045 0.5 0-2 EOW N BOP BOP BOP RIG 12818 12818 PU/MU AND RIH W/ TEST PLUG ASSY. FLUSH BOP, CHOKE MANIFOLD AND
SURFACE LINES W/ FRESH WATER.

1045 - 1215 1.5 0-2 EOW N BOP BOPT BOP RIG 12818 12818 HPJSM: PRESSURE TEST 13-5/8" CLASS "A" 10K BOPE AS PER ARAMCO
PROCEDURES.

1215 - 1245 0.5 0-2 EOW N BOP BOP CTRL RIG 12818 12818 PERFORM ACCUMULATOR DRAW DOWN TEST. -OK. FUNCTION TEST FROM BOTH
REMOTE PANELS.

1245 - 1515 2.5 0-2 EOW N CT LDP SPDP RIG 12818 12818 465 0 POOH LAYOUT 15 JTS 5.5" DP, LAY DOWN TEST ASSEMBLY AND LD BIT SUB W/
FLOAT AND BIT.

1515 - 1545 0.5 0-2 EOW C COMP SDR1 NA RIG 12818 12818 HELD H2S MAN DOWN DRILL WITH RIG CREW AND SERVICE COMP"S. GOOD
RESPONSE FROM ALL PERSONNEL.

HPJSM: R/U WFD 4.5" TBG HANDLING, RUNNING EQUIPMENT, JAM UNIT AND AL-
1545 - 1700 1.25 0-2 EOW C COMP HT PEL ITS 12818 12818 MASOOD PICK UP MACHINE AND FUNCTION TEST SAME.
> MONITOR WELL ON TRIP TANK.

HPJSM, DISCUSSED RUNNING PACKER PLUS 4.5" PRIMESET PACKER/PBR ASSY


1700 - 1730 0.5 0-2 EOW C COMP SDR1 NA RIG 12818 12818
(ONE TRIP SYSTEM) ON 4.5" 13.5# TN-95HS 3SB PROD TBG.
> MONITOR WELL ON TRIP TANK.

HPJSM: PU/MU PACKER PLUS 4.5" PRIMESET PACKER/PBR ASSY (ONE TRIP
SYSTEM) AND RIH F/ 0" - 86" AS FOLLOWS: 1 X 4.5" PACKER PLUS PRIMESET 10"
ANCHOR LATCHED SEAL ASSY. (INSIDE TBR) W/MULE SHOE, PACKER PLUS 3O"
1730 - 1800 0.5 0-2 EOW C COMP RPCS UPCOM ITS 12818 12818 0 86
PBR ASSY, PACKER PLUS LANDED(LOCATOR) 30" SEAL ASSY (INSIDE PBR), 1 X
4.5" 13.5# TN-95HS 3SB PUP JT, 1 X 4.5" 13.5# TN-95HS 3SBJT.
> TOTAL JTS RUN 1 JTS/290 JNTS 4.5" 13.5# TN-95HS 3SB.
> MONITOR WELL ON TRIP TANK.

R/U GDMC S/L LUBRICATOR AND TEST LUBRICATOR TO 2000PSI.


> SL DRIFTED STRING W/ 3.700" DRIFT TO @ 86" - GOOD AND L/D SLICKLINE.
1800 - 1915 1.25 0-2 EOW C COMP DTU DRFT GD1 12818 12818 > DRIFT OFFLINE: TBG HGR AND PUP JT W/ 3.795", R-NIPPLE 3.650", LATCH AND
LANDED SEAL ASSY W/ 3.65", CROSSOVER AND 15.2" PUP W/ 3.750".
> MONITOR WELL ON TRIP TANK.

PU/MU AND RIH W/ PACKER PLUS 4.5" PRIMESET PACKER/PBR ASSY (ONE TRIP
SYSTEM) F/ 86 FT - 4,762 FT ON 4.5" 13.5# TN-95HS 3SB TBG,
1915 - 0200 6.75 0-2 EOW C COMP RPCS UPCOM ITS 12818 12818 86 4762 > AT CONTROLLED SPEED 1 JT/MIN.
> TOTAL JTS RUN 114 JTS/290 JNTS 4.5" 13.5# TN-95HS 3SB.
> MONITOR WELL ON TRIP TANK.

R/U GDMC S/L LUBRICATOR AND DRIFT TO 4,718 FT.


0200 - 0345 1.75 0-2 EOW C COMP DTU DRFT GD1 12818 12818
> SL DRIFTED STRING W/3.795" DRIFT- GOOD.
> MONITOR WELL ON TRIP TANK.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-1894 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 04/04/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

PU/MU AND RIH W/ PACKER PLUS 4.5" PRIMESET PACKER/PBR ASSY (ONE TRIP
SYSTEM) F/ 4,762 FT - 6,600 FT ON 4.5" 13.5# TN-95HS 3SB TBG, +1 X CROSS
OVER (13.5# TN-95HS 3SB PIN X 13.5# VM-95HCSS VTHC BOX) + 1 PUP JT 13.5#
0345 - 0459 1.25 0-2 EOW C COMP RPCS UPCOM ITS 12818 12818 4762 6600
VM-95HCSS VTHC)
> AT CONTROLLED SPEED 1 JT/MIN.
> TOTAL JTS RUN 130 JTS/290 JNTS 4.5" 13.5# TN-95HS 3SB.
> MONITOR WELL ON TRIP TANK.
Workover Objectives
Foreman Remarks

===============================ARAMCO PERSONNEL============================
> MATERIAL CLERK HASSAN ALSADIQ ID#821420 ON LOCATION JUNE 10 2024.
> SAFETY ADVISOR DONGMIN JO #8358240 ON LOCATION .
> PINHO DANILO ID# 897920 ON LOCATION FOR UPPER COMPLETION.
================================3RD PARTY SERVICES & EQUIPMENT=================
> PACKERS PLUS ON LOCATION MAY 31/24.
> 2 X 500BBL HLB BRINE FRAC TANKS & CREW ON LOCATION 5/31/2024 & 2X FRAC TANKS ON 6/4/24.
> ITS TRS ON LOCATION JUNE 2/2024.
> SAMAA ENGS ON LOCATION 06/03/2024 & WBCO TOOLS ON 06/04/2024.
> NPS STIMULATION UNIT & CREW ON LOCATION JUNE 06/2024.
> NOV FILTERATION CREW ON LOCATION 16:00 HRS JUNE 7 2024
====================================QHSE=================================
> DRILLS: ACCUMULATOR DRAW DOWN TEST, 1 X H2S MAN DOWN DRILL.
> OBSERVATIONS: 4X SWA & 4X HAZARDS HUNT.
> NEAR MISS: 0.
> IMPLEMENTING CLOSED LOOP DRILLING PRACTICE & NOT USING WATER PIT.
================================WELLHEAD DATA===========================
> CCA 9-5/8" X 13-3/8" = 0 PSI, CCA 13-3/8" X 18-5/8" = 0 PSI
=============================SAGWOD COST OPTIMIZATION====================
> RECEIVED 700 BBLS OF WBM 146 PCF FROM ADES-173. (APRIL 22/24)
> RECEIVED 500 BBLS OF OBM 140 PCF FROM T-701. (MAY 01/24)
> RECEIVED 500 BBLS OF OBM 103 PCF FROM SINO-48. (MAY 04/24)
> RECEIVED 470 BBLS OF RHELIANT OBM 125 PCF FROM SND-3002. (MAY 05/24)
> RECEIVED 370 BBLS OF DELTA DRILL OBM 120 PCF FROM ED GENERATOR INCIDENT WITH BOTH CREWS.
> SAFETY STAND DOWN W/ ADES-157. (MAY 06/24)
> TRANSFER 800 BBLS OF WBM 125 PCF TO SP-96. (MAY 16/24)
> RECEIVED 500 BBLS OF OBM 95 PCF FROM ADC-14. (MAY 25/24)
> TRANSFER 500 BBLS OF OBM 145 PCF TO SND-2002. (MAY 26-27/24)
> TRANSFER 420 BBLS OF OBM 125 PCF TO SND-2002. (MAY 30-31/24)
> RECEIVED 800 BBLS OF CACL2/CABR2 BRINE 95PCF FROM NBR-304.(MAY 31/24)
> TRANSFER 500 BBLS OF OBM 125 PCF TO SND-2002. (JUNE 02/24).
> TRANSFER 400 BBLS OF OBM 125 PCF & 100BBLS OF 101PCF TO ADES-174. (JUNE 04/24).
> TRANSFER 500 BBLS OF OBM 101PCF TO ADES-174. (JUNE 07/24).
> TRANSFER 800 BBLS OF OBM 101PCF TO T-701. (JUNE 08/24).

====================================TRUCKING=========================
> VACUUM TANKERS FOR HAULING WASTEWATER FROM UTMN-2022:(0 LOADS TODAY) & (TOTAL 66 LOADS)
> DRSS #: 1004298665, 100433449
> PLATE #: 1323-TRA,1546 RRA WORKING HOURS PER TRUCK =10HR

> SPRAY WATER TANKER FOR LOCATION, DRSS# 1004201567


> PLATE#: 2781-XRA, WORKING HOURS FOR TRUCK = 10HR.
======================================MISCELLANEOUS & NEXT WELL =============================
>> WATER WELL : UTMN-983
>> 1ST NEXT WELL : SDGM-1178, ONE HOLE SIZE, JAUF J-SHAPE, WORKOVER MEETING DONE. STRIPPING OUT DONE. LOCATION 100% AND WILL BE COMPLETED AS PER WELLSITE ENG. JUNE
06/2024. W4 CREATED FOR SKID ROAD MAY 31/24.
>> 2ND NEXT WELL : UTMN-2215, 1 HOLE SIZE, KHFC PRE-SET, WORKOVER MEETING DONE. STRIPPING OUT IS REQUIRED. LOCATION 0%. WOCP ISSUED.
>> 3ND NEXT WELL : UTMN-2220, 1 HOLE SIZE, KHFC PRE-SET, WORKOVER MEETING DONE. STRIPPING OUT IS REQUIRED. LOCATION 0%. WOCP ISSUED.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0-2 12,818 68 61.3 0 12,346 179.36 283.19 1,099.77 4

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
101 PCF 0 0 API 0 0 Volts 0 9.5 213
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
175 0 HTHP 100 5 0 3/4 WBM-CAB 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 1 0 2/3 0 376 0
26
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
101 PCF 0 0 API 0 0 Volts 0 9.5 213
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
175 0 HTHP 100 5 0 3/4 WBM-CAB 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 1 0 2/3 0 376 0
26

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-1894 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 04/04/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

MUD CAUST NACL BCTRN O-3670R OXYGON


TREATMENT 4 ( 50LBP ) 22 ( 2200L ) 4 ( 5GL ) 12 ( 55GL ) 2 ( 50LBP )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/11/2024 N/A CALM N/A WARM 2,814 2X PRE TOUR
SAFETY MEETING

Company GD1 RIG RZT RIG EMC MJH BFL PKP BR1 RIG ARM BRD NST OTH ARM

Category SLS CSR CTRG RIG DFMS SEC FILT LHES MLS OTHR OTHR SCS SFS VAC WSC
PERSONNEL
3 7 14 43 1 7 2 2 0 12 3 2 4 1 2
Total
AND SERVICES No. of Persons
103
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 0 24 24 24 24 24 24

Operating Hours. 24 24 0 24 24 0 24 24 24 24 24 24 0 10 24

Standby/Tankers Others
TRUCKS/BOATS
AMBULANCE 8382-DRJ ARAMCO TRUCK RY5455

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 227 45 12 N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-315 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:21 06/07/2024 - 07/06/2024
Report ID: OPERLMTDMRREP

NA-207S @ SHYB-315 Limited Morning Report for 06/18/2024


Objective : (ELIMINATING HIGH Foreman(s)ROUBY, EMAD ABDELFATTAH
D&WO Morning Report (Service Providers View) Rig Charge #: TCA & CCA) Engineer MONDRAGON ALFONSO, JOSE LUIS
Copyright 2024 Saudi Aramco. All Rights Reserved NA-207S (61-23072-0315) Manager AKBAR, HUSSAIN QASSIM
Daily Onshore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 11339 5741722 /CLERK VSA
Date: Tuesday 06/18/2024 SHYB-315 (0) SHYB_315_0 T
5741723

Last 24 hr operations Next 24 hr plan


CONTINUE SLICK LINE WORK TO RETRIEVE PLUG. RIH W/ BKR PKR RET. TOOL. ATTEMPT TO UN- CONTINUE RIH. MILL & RETRIEVE 7" PKR. POOH. RIH WITH 7" CLEAN-OUT ASSY., CHC.
SET 7" TWD PKR. NO SUCCESS. POOH. RIH W/ WFD BKR MILLING W/ RET. TOOL. POOH.R/UP & RIH WITH BKR W.LINE GR-CCL DRIFT RING.
Location Next Location
SHYB-315 (838 KM FROM DHAHRAN MAIN GATE) SABKAH#94 SHYB-466
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,533 Last Csg Size MD TVD Size Top
7 5699 4913 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9533 (Date) 100 0 584
5 (06/13/2024@0500 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONTINUE EXPRO SLICK LINE OPERATION:


> RUN#18: RIH WITH 3" GS RETRIEVING TOOL, TAGGED TOP PKR AT 4,680', 49
DEG INC. ATTEMPTED TO PASS, NO PROGRESS. POOH.
> RUN#19: RIH WITH 3" SP RETRIEVING TOOL, TAGGED TOP PKR AT 4,680', 49
DEG INC. ATTEMPTED TO PASS, NO PROGRESS. POOH.
0500 - 1200 7 0 POST N DCOM OTH NA EX1 9916 9916
> RUN#20: RIH WITH 3.5" L.B TOOL, TAGGED TOP PRONG AT 4,765', 49 DEG INC.
POOH.
> RUN#21: RIH WITH 3.56" HLB TBG PUNCHER, PUNCH 4.5" TBG AT 4,760', 49
DEG INC. POOH.
BULLHEAD 100 BBLS WITH 2-3 BPM/1100 PSI.
RIG DOWN EXPRO SLICK LINE EQUIPMENT.
1200 - 1330 1.5 0 POST N BOP NU BNIP RIG 9916 9916
NIPPLE DOWN SHOOTING NIPPLE. NIPPLE UP BELL NIPPLE.

HOLD PRE-JOB SAFETY MEETING. MAKE UP BAKER PKR RETRIEVING TOOL BHA AS
1330 - 1400 0.5 0 POST N DCOM OTH NA RIG 9916 9916 FOLLOW: 5 7/8" PKR RETRIEVING TOOL - X/O- F-SUB WITH FLOAT- 4" DP. RIH TO
38'.
- MONITOR WELL OVER TRIP TANK. WELL STATIC.

CONTINUE RIH W/ BAKER PKR RETRIEVING TOOL ASSEMBLY ON 4" DP TO 4,600'.


1400 - 1630 2.5 0 POST N DCOM OTH NA RIG 9916 9916
> BREAK CIRC EVERY 15 STDS.
- MONITOR WELL OVER TRIP TANK. WELL STATIC.
1630 - 1730 1 0 POST N DCOM CIRC MPMP RIG 9916 9916
CUMULATIVE TIME FOR FILL UP & BREAK CIRC WHILE RIH.

HOLD PRE-JOB SAFETY MEETING. MAKE UP TOP DRIVE AND RECORD


PARAMETERS. LATCHED 7" TWB PKR@ 4,670'.
ATTEMPT TO UN-SET 7" TWB PACKER WITH MAX. 40-50 KLBS OVERPULL, THE 6
1730 - 1900 1.5 0 POST N DCOM OTH NA RIG 9916 9916 SHEAR PINS OF THE SUPPORT RING {6 X 7=42 KLBS} FOR THE COLLET TO
RELEASE OF SLEEV OF PKR AND PKR STILL UN-SET.
RELEASED THE RETRIEVING TOOL BY ROTATE THE STRING TO THE RIGHT 6-8
TURNS.

1900 - 1930 0.5 0 POST N DCOM CIRC MPMP RIG 9916 9916
FLOW CHECK. STATIC LOSSES: 4 BBLS/HR. PUMP SLUG.

POOH W/ BAKER PKR RETRIEVING TOOL ASSEMBLY ON 4" D/P FROM 4,670' TO 93'.
1930 - 2200 2.5 0 POST N DCOM OTH NA RIG 9916 9916
- MONITOR WELL OVER TRIP TANK. STATIC LOSSES: 4 BBLS/HR.

2200 - 2230 0.5 0 POST N DCOM CIRC MPMP RIG 9916 9916
FLOW CHECK AT BHA. STATIC LOSSES: 4 BBLS/HR.

CONTINUE POOH BAKER PKR RETRIEVING TOOL BHA TO SURFACE. BREAK OUT &
2230 - 2330 1 0 POST N DCOM OTH NA BC 9916 9916 LAY-DOWN BKR PKR RETRIEVING TOOL.
- MONITOR WELL OVER TRIP TANK. STATIC LOSSES: 4 BBLS/HR.

HOLD PRE-JOB SAFETY MEETING. MAKE UP WFD BKR MILLING W/ RETRIEVEING


2330 - 0130 2 0 POST N MILL HT BHA RIG 9916 9916 TOOL BHA AS FOLLOW: 6 1/8" WFD BKR MILLING W/ RETRIEVEING TOOL - 2 EA X
4 3/4" JUNK BASKETS - BIT SUB W/ FLOAT - 2 STD X 4-3/4" DC- XO . RIH TO 205'
- MONITOR WELL OVER TRIP TANK. STATIC LOSSES: 4 BBLS/HR.

0130 - 0300 1.5 0 POST N MILL TI SPHDP RIG 9916 9916 205 1120 CONTINUE RIH WITH WFD BKR MILLING W/ RETRIEVEING TOOL ASSEMBLY ON 4"
HWDP FROM 205' TO 1,120' PICKED UP FROM PIPE RACK.

CONTINUE RIH W/ WFD BKR MILLING W/ RETRIEVEING TOOL ASSEMBLY ON 4" DP


0300 - 0459 2 0 POST N MILL TI STDP RIG 9916 9916 1120 4600
TO 4,600'. OPERATION INCOMPELETE AT TIME OF REPORT.
> BREAK CIRC EVERY 15 STDS.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-315 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:21 06/07/2024 - 07/06/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
- MONITOR WELL OVER TRIP TANK. STATIC LOSSES: 4 BBLS/HR.

Workover Objectives
Foreman Remarks

- ODF CORRECTION= +7.68'


- WH DIR: OPERATING VALVES TO NORTH & WING VALVE TO WEST.
- WING VALVE HEIGHT FROM GROUND = 5.85'

--------------------------CCA PRESSURES-----------------------------
RECORDED CCA PRESSURE.
> 7" * 9" CCA#1: 0 PSI, ( 0 PPM H2S, 0 % LEL, 0 PPM CO).
> 9 5/8" * 13 3/8" CCA#2: 0 PSI, ( 0 PPM H2S, 0 % LEL, 0 PPM CO).
> 18 5/8" * 13 3/8" CCA#3: 0 PSI, ( 0 PPM H2S, 0 % LEL, 0 PPM CO).
> PRESSURE TESTED ON (14-JUNE-2024) 7" * 9 5/8" CCA & TCA TOGETHER TO 500 PSI WITH INHIBITED WATER, GOOD TEST.
--------------------------- WELL DATA -----------------------
7" LINER SHOE @ 5,699'. 6 1/8"OPEN HOLE MB TO TD @ 9,533'.
OHST L-0-2: 6 1/8" LATERAL KOP @ 6,100, OPEN HOLE TO TD @ 10,823'.
OHST L-0-3: 6 1/8" LATERAL KOP @ 5,895, TERMINATED @ 6,012'.
OHST L-0-1: 6 1/8" LATERAL KOP @ 5,850, OPEN HOLE TO TD @ 9,916'

----------------------- RIG WELL SCHEDULE & READINESS ----------------------


1) SHYB-466, SABKAH # 38 (BI-60 WO). KOM HELD 05-FEB-2024. 50% STRIP-OUT & 0% LOCATION READINESS.
2) SHYB-503, SABKAH # 43 (BI-60 REN, TL)). KOM HELD 26-MAY-2024. 0% STRIP-OUT & 0% LOCATION READINESS.
3) SHYB-467, SABKAH # 38 (BI-60 WO). KOM HELD 29-MAY-2024. 50% STRIP-OUT & 0% LOCATION READINESS.
4) SHYB-589, SABKAH # 44 (NDE). KOM HELD 20-SEP-2023. 0% STRIP-OUT & 0% LOCATION READINESS.
============== SAFETY & ERP ===============
- H2S CONCENTRATION: 0.35% MOLE, GOR: 3600 SCF/BBL, RER 100 PPM = 0 M, 30 PPM = 100 M, 1/2 LFL: 700 M.
- PRE TOUR-SAFETY MEETING RIG CREWS & DISCUSSED ALL RECEIVED HSE ALERTS ON DAILY BASIS.

-------------- ERP EQUIPMENT & CONTINGENCY PLAN ---------------


- AL MANSOORI INSTALLED 4 STATIONS H2S/LEL ON 11-JUNE-2024.
- FIRE FLY UNIT RIGGED UP ON 11-JUNE-2024 @ 10:00 HRS.
- STAGING AREA #1 LOCATED 900 M NORTH/EAST OF RIG.
- STAGING AREA #2 LOCATED 900 M NORTH/WEST OF RIG.

------------ SAFETY DRILLS AND SAFETY OBSERVATIONS---------


- OBSERVATIONS SUBMITTED: 15.

------------------- PERSONNEL ON RIG ----------------------


- ADEEL FAZAL ARAMCO CLERK #8564787 ON LOCATION 25-FEB-2024.
- SCOMI MUD ENGINEER ON LOCATION ON 06-MAR-2023 AT 09:00 HRS.
- TAQA H2S OPERATOR ON LOCATION 25-APRIL-2024 @ 17:00 HRS.
-------------------------- RENTAL EQUIPMENT -----------------------------
- EXPRO SLICKLINE UNIT AND CREW ON LOCATION 12-JUNE-2024 @ 17:00 HRS
- HLB ENGINEER, DPU & TUBING PLUG ON LOCATION 13-JUNE-2024 @ 17:00 HRS.
- BAKER E-LINE TOOLS & CREW ON LOCATION 13-JUNE-2024 @ 15:00 HRS.
- ALHAJRI {TUBESTAR} TUBULAR INSPECTION CREW ON LOCATION 13-JUNE-2024 @ 15:00 HRS.
- WFD FISHING ENGINEER & TOOLS ON LOCATION 14-JUNE-2024 @ 10:00 HRS.
- BAKER DE-COMPLETION ENGINEER & TOOL ON LOCATION 14-JUNE-2024 @ 10:00 HRS.
- CORETRAX 9 * 7" MGS & BRUSH TOOLS ON LOCATION 14-JUNE-2024 @ 13:00 HRS.
- NPS 4 3/4" JAR SN# HJDA-475-0021 ON LOCATION 14-JUNE-2024 @ 15:00 HRS.
- SILIXA TOOL & CREW ON LOCATION 17-JUNE-2024@ 10:00 HR.

--------------------- INFORMATION FOR DISPATCHING GROUP -----------------------


- 2 * WATER TRUCK AL-HABBAS # HB-1928 /1927 ON LOCATION SINCE 10-FEB-2023.
- 2 * WATER TRUCK CUC (RSA 4526/4531 ON LOCATION SINCE 15-JULY-2023.
- 2 * WATER TRUCK AL-SHURIE (6273/5837) ON LOCATION ON 23-MAY-2024.

---------------------- WELLSITE EQUIPMENT ON LOCATION ---------------------------


- 2 * BALHARITH VACUUM TANKER (7089 JZA / 1732 ENA) ON LOCATION 01-FEB-2024.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
69 PCF 0 0 API 0 0 Volts 0 9.5 120,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 VB 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
62
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
69 PCF 0 0 API 0 0 Volts 0 9.5 120,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 VB 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
64

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-315 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:21 06/07/2024 - 07/06/2024
Report ID: OPERLMTDMRREP

MUD XC NACL
TREATMENT 8 ( 50LB ) 14 ( 2200L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/13/2024 N/A WINDY N/A HOT 3,269 EACH TOUR

Company TGC BC RIG GDF MJH WFS ASH MH2 TUB KCT RIG ARM EX1 HSL BHE ARM BAW

Category CTRG ICE RIG DFMS SEC WMFE FLD H2S ISPCT MEON OTHR OTHR SLS SLS VAC WSC WLS
PERSONNEL
18 1 42 1 4 1 5 1 4 39 10 1 3 1 1 1 10
Total
AND SERVICES No. of Persons
143
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 15 24 24 0 0 12 24 24 0 12 12 8 8 12 24 0

Standby/Tankers Others Others Others Others


TRUCKS/BOATS
DH-7534 PICK-UP 1 * RIG NA-207S AMBULANCE CAMP DIESEL: 49 BBLS GASOLINE: 125 BBLS DIESEL FOR MUD = 300 BBLS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 400 595 26 15 1500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-1884 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:21 06/10/2024 - 08/03/2024
Report ID: OPERLMTDMRREP

NA-393S @ UTMN-1884 Limited Morning Report for 06/18/2024


Objective : (DE- Foreman(s)HALVERSON, DALE ANTHONY / ALTURAIFI, MOHAMMED SAUD
D&WO Morning Report (Service Providers View) Charge #: COMPLETE, SIDETRACK Engineer ALARFAJ, MOHAMMED KHALED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24057-1884) AND DRILL THE WELL AS A Manager SHUBBAR, GHASSAN DHIYA
NA-393S
PRESET IN ONE HOLE SIZE THURAYA RIG FORMAN VSAT FAX VSAT
Daily Onshore
Wellbores: AS PRE-SET KHUFF-B
(0500-0500) Saudi Aramco Well 0882167771 1383 576-5784 880-5187
RESERVOIR )
Date: Tuesday 06/18/2024 UTMN-1884 (0-1) UTMN_1884_1 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
CLERK 577- 9614 NABORS 804 -9605

Last 24 hr operations Next 24 hr plan


CLEAN UP HWYH-1138 & RIG UP ON UTMN-1884. RIG UP ON UTMN-1884.
Location Next Location
158 KM F/DMG. SOUTH OF UDLYHA BRIDGE 3.5 KM, LEFT ON BLACK TOP 1.5 KM. RIGHT INTO LOCATION UTMN-1837
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
0 Size 11322 11322 Size 10,986 12,653 12,476 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 158
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD SAFETY MEETING WITH ALL RIG MOVE CONTRACTORS, RIG CREW, RIGGERS,
TRUCK PUSHERS & DRIVERS.
DISCUSSED:
> HAZARDS POTENTIAL & CONCERNED SAFETY ISSUES DURING R/D, LIFTING &
MOVING OPERATIONS.
0500 - 0530 0.5 0-1 PRE N RM PJSM NA RIG 13427 13427
> THE PROPER WAY OF LIFTING, WORK AT HEIGHT & USE THE CORRECT
EQUIPMENT.
> WORK PERMIT FOR EACH HEAVY LIFTING, ELECTRICAL & SIMILAR OPERATION.
> STOP WORK AUTHORITY.
> OBLIGATION TO ROAD MAP (NO SHORT CUT).
> PPE & HOUSEKEEPING.

MOVE TO & RIG UP ON UTMN-1884.


> CONT RIG UP MUD TANKS SYSTEMS.
> CONT RIG UP CEMENT TANKS & TRANSFER LINES.
> CONT RIG UP FRAC TANKS.
> CONNECT CHOKE MANIFOLD HYD LINES & SENSORS.
> MIX 1,500 BBLS OF VISCOUS WATER.
> MIX 300 BBLS OF HI-VIS.
> MIX 100 BBLS OF GLYCOL/WATER
> RIG UP FLARE IGNITION SYSTEM.
> MOVE & SPOT TUBULARS.
> HOUSEKEEPING.
> WELLLINK SET UP & COMMENCE DATA TRANSFER

**ON GOING MAINTENENCE**


0530 - 0459 23.5 0-1 PRE N RM RU NA RIG 13427 13427
> WORK ON BUILDING RIG CLOSED LOOP FRAC TANKS.
> WORK ON MODIFYING MUD TANK DUMP LINES FOR CLOSED LOOP.
> WORK ON CEMENT TANK MODIFICATIONS. 100% COMPLETED.
> CANRIG INSTALL HALO CROWN LIGHTS. 100% COMPLETED.

RIG DOWN: 100 %


RIG MOVE: 100 % (LOCATION CLEANED & SECURED)
RIG UP: 90 %

PRE MOVED LOADS: 0


RIG LOADS TODAY : 0
RIG LOADS TOTAL : 200
ARAMCO LOADS TODAY: 0
ARAMCO LOADS TOTAL: 25
TOTAL LOADS MOVED: 200
Workover Objectives
Foreman Remarks

=====ODF CORRECTION=====
NA-393 36.7' VS ADES-157 30.0'= +6.7 FT

===== ERP=====
> ERP POSTED IN ARAMCO FOREMAN OFFICE; EMERGENCY CONTACT NUMBERS VERIFIED.
> STAGING AREA #1: N 2779380.98, E 331212.38 M, DISTANCE FROM WELL CENTER (2.1 KM) NORTH-EAST.
> STAGING AREA #2: N 2778199.20, E 328749.60, DISTANCE FROM WELL CENTER (1.9 KM) NORTH-WEST.
> RELIEF WELL: UTMN-1937 PRIMARY
> NEAR BY RIGS OR FACILITIES WITHIN 5 KM: UDHALIYAH MAIN GATE 4.38 KM

===== SAFETY =====


> LTI FREE DAYS: 4560
> DRILLS: NONE
> OBSERVATION: 21 X SOC, 0 X HAZARD HUNT & 4 X STAR, 3 X SWA
> NEAR MISS: N/A

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-1884 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:21 06/10/2024 - 08/03/2024
Report ID: OPERLMTDMRREP

> HSE ALERTS: N/A

=====DIRECTIONAL DATA=====
>

===== ARAMCO PERSONNEL ON LOCATION=====


> ARAMCO MATERIAL EXPEDITOR SAAD ALJOHAR #8107696 ON LOCATION 6/17/2024 @ 9:00 AM.
> ARAMCO MATERIAL EXPEDITOR RAED ALMUTAWA # 8515887 OFF LOCATION 6/17/2024 @ 11:00 AM.

====== SERVICE COMPANY PERSONNEL & EQUIPS =====


> EMEC MUD ENGINEER ON LOCATION. RELEASED 6/9/2024 5:00 HRS
> BAKER WELL LINK ENG ON LOCATION 6/16/2024 9:30 HRS

======SAGWOD COST OPTIMIZATION=====


>

===== WELLSITE SERVICES=====


> SPRAY TANKER FOR RIG MOVE
* DRSS# 1004340678
* PLATE# 2008-39
* ON LOCATION 17: 00 HRS 6/15/2024

> VACUUM TANKERS FOR HAULING WASTE WATER FROM UTMN-1884 (0 LOADS TODAY) & (0 TOTAL LOADS )
* DRSS# JUNE 2024
* PLATE #
* NUMBER OF TRIPS: 0 EA PER DAY

> DUMP TRUCK FOR GARBAGE FROM UTMN-1884


* DRSS # JUNE 2024
* NUMBER OF TRIPS : 0

=====WATER WELL=====
> UTMN-938 (SHARED WITH ADC-46L)
> WATER METER SER #A21034725 5/2/2024

===== CLOSED LOOP SYSTEM =====


> LINED CEMENT PIT, NO WATER PIT, NOT USING WASTE PIT, LINED CUTTING PIT.

===== NEXT WELL =====

> HWYH-1292: KHUFF-C LATERAL , TWO HOLE SIZE, PRE-WORKOVER MEETING HELD 5/28/2024, STRIPPING-OUT IS NOT REQUIRED, WELLSITE PREPARATION 0% COMPLETE. WOCP ISSUED (NO).

> UTMN-2277, JAUF DEVIATED, TWO HOLE SIZE, PRE-WORKOVER MEETING NOT HELD, STRIPPING-OUT IS REQUIRED, WELLSITE PREPARATION 0% COMPLETE. WOCP ISSUED (NO).

> UTMN-1837: PRE-SET KHUFF-B , ONE HOLE SIZE, PRE-WORKOVER MEETING DONE ON 04/30/2024, STRIPPING-OUT IS REQUIRED. DE-SCALING IS REQUIRED, WELLSITE PREPARATION 0%
COMPLETE. WOCP ISSUED (YES).
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A SEASONAL 4,581 EACH TOUR

Company SWK RIG EMC MJH RIG BR1 RIG ARM NBS ARM

Category CTRG RIG DFMS SEC MED MLS OTHR OTHR RINS WSC
PERSONNEL
15 38 1 8 1 1 72 1 0 2
Total
AND SERVICES No. of Persons
139
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 0 24

Operating Hours. 0 24 0 24 0 24 0 12 24 24

Standby/Tankers
TRUCKS/BOATS
AB-7155

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 250 216 127 22 0

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
1. NEED IT TECH TO RIG FOR COMPUTER CLEANING & DE FRAG. TROUBLE TICKET ISSUED INC000045538591. 2. BROAD BAND ANTENNA SENT FOR REPAIR &
NOT RETURNED YET. BEEN REPAIRED & WAITING 1-1/2 MONTHS FOR RE INSTALL. ***WAITING ON PRINTER INK FOR 15 DAYS****

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2403 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/15/2024 - 08/29/2024
Report ID: OPERLMTDMRREP

NBR-115S @ HRDH-2403 Limited Morning Report for 06/18/2024


Objective : ( MMK-1 PRE-SET Foreman(s)GHERNOUG, YOUCEF
D&WO Morning Report (Service Providers View) Charge #: WELL TARGETING KHUFF-B Engineer OTAIF, SHEHAB MAHMOUD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-24058-2403) RESERVOIR) Manager JALLAL, FAISAL ALI
NBR-115S
Daily Onshore THURAYA RIG FORMAN VSAT FAX VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088-21677 712116 574-7873 880-5237
Date: Tuesday 06/18/2024 HRDH-2403 (0) HRDH_2403_0 CONTRACTOR /CLERK VSA T
572-6095

Last 24 hr operations Next 24 hr plan


MOVE RIG TO HRDH-2403 AND RIG UP. RIG DOWN AND MOVE FROM HRDH-2328 TO HRDH-2403.
Location Next Location
HRDH-2403 HRDH-2540
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 275
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM WITH ALL PERSONNEL DISCUSSED FOLLOWING TOPICS:


* STOP WORK AUTHORITY.
* GOOD COMMUNICATION & TEAM WORK.
* PROPER LIFTING PROCEDURES & PRECAUTIONS.
* WORKING AT HEIGHT HAZARDS & PRECAUTIONS.
* REVIEW RIG DOWN & RIG MOVE ACTIVITIES:
- PTW, JSA & CRITICAL LIFT PLANS,
- ALL HAZARDS INCLUDING OVERHEAD LOADS.

R/D OPERATION AT HRDH-2328.


- DISCONNECT RIG ENGINES
- DISCONNECT DERRICK TO SUB BASE AND SET ON PIPE RACK.
- RIG DOWN DRAWWORKS AND SET ON TRUCK.
- RIG DOWN DRAWWORKS MASTER SKID.
0500 - 0315 22.25 0 PRE M RM RM NA RIG 0 0 - RIG DOWN FLOOR PLATE AROUND DRAWWORKS
- RIG DOWN GRASS HOPPER
- RIG DOWN TEXAS DECK.
- DIG DOWN AND LOAD SUB BASE BEAM
- DIS-MANTLE DERRICK MAST.
- CLEAN LOCATION, WELL HEAD, CELLAR.
- GENERAL HOUSEKEEPING.

RIG MOVE AND R/U ON NEW LOCATION:


- MOVE AND SPOT RIG ENGINES.
- RIG UP AND CONNECT MUD SYSTEM.
- MOVE DOG-HOUSE, GRASS-HOOPER.
- MOVE CHEMICAL.
- GENERAL R/D

- R/D= 75%, R/M= 50%, R/U= 10%

TIME FOR STAND MEETINGS WITH RELEVANT PARTIES AND DISCUSSED:


- THE IMPORTANCE OF SAFE WORK ENVIRONMENT
- STOP WORK AUTHORITY.
- ALL HAZARDS INCLUDING OVERHEAD LOADS
0315 - 0459 1.75 0 PRE M RM PJSM NA RIG 0 0
- FALL PROTECTION WHILE WORKING AT HEIGHTS, SLIPS, TRIPS & SAFETY
CONTROL MEASURES,
- SAFE LIFTING AND LOAD SLINGING
- ADVERSE WEATHER CONDITION/HEAT STRESS, IMPORTANCE OF BREAKS.
- GOOD COMMUNICATION
Foreman Remarks

HRDH-2403 IS AN MMK-1 PRE-SET WELL TOWARD 295 DEG AZI AND 65 DEG INCLINATION, TARGETING KHUFF-B RESERVOIR.THE WELL IS LOCATED SOUTH OF HRDH FIELD.
=====ARAMCO PERSONNEL=======
* ARAMCO PDP SUHAYB ALGHAMDI ( 824510 ) OFF LOC.
* ARAMCO PDP AMR DAJANI (794823) OFF LOC. 6/10/2024.
* ALI ALSULIMAN (815561) TRAINEE MATERIALS EXPEDITOR OFF LOC. 6/05/2024
* ARAMCO ME WALEED AL-AHMEDI (820843) TRAINEE MATERIALS EXPEDITOR ON LOC. 06/05/2024.
=====RIG VISIT========
* JORDAN, SWIDNICKI- SANAD SUPT VISITED THE RIG ON 6/16/2024
* MEDINA LEONIDAS- SANAD SUPT VISITED THE RIG ON 5/11/2024
=====SERVICE PERSONNEL========
* EMEC MUD ENGINEER
=====SAFETY===============
1) PROCEDURE OF THE WEEK: OIL SPILL CONTROL
2) RHSEI CHECKLIST: ORIENTATION & SHORT SERVICE EMPLOYEE PROGRAM
3) LESSON LEARNT OF THE WEEK (OPERATIONS / HSE ALERT): SANAD OA 05-21 - PIPE TALLY MISTAKE.
4) HSE MEETING TOPIC: RIG MOVES SAFETY PRECAUTIONS.
- RIG MOVERS:

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2403 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/15/2024 - 08/29/2024
Report ID: OPERLMTDMRREP

> CHECK BRAKES/ LIGHTS/ TYRES/STEERING & NO SPEEDING ON LOCATION AND ON RIG MOVE ROUTE.
> CRANES/ FORKLIFTS/ TRUCKS WATCH OUT FOR PERSONNEL WORKING ON GROUND.
> STRICTLY FOLLOW 3 BASIC RULES: NO SPEEDING, NO CELL PHONE IN USE WHILE DRIVING, ALWAYS USE SEAT BELT.
==================== PLAN VS ACTUAL CSG SETTING DEPTHS ================
> 24" CSG PT PLAN AT 497' (50' INTO RUS) / ACTUAL AT XXX ((PLANNED ROP 22.5 FPH/ACTUAL XX FPH)) - FLAT TIME PLAN: 33 HR / ACTUAL XX HRS.
> 18-5/8" CSG PT PLAN AT 2540' (50' INTO AHMADI) / ACTUAL AT XX ((PLANNED ROP 45.04 FPH/ACTUAL XX FPH)) - FLAT TIME PLAN: 77.4 HR / ACTUAL XXHRS.
> 13-3/8" CSG PT PLAN AT 5077' (50' INTO MID TAMAMA)/ACTUAL AT XX ((PLANNED ROP 42.6 FPH/ACTUAL XX FPH)) -FLAT TIME PLAN: 104.2 HR/ACTUAL XX HR
> 9 5/8" CSG PT PLAN AT 9890' (30' INTO BJDM) / ACTUAL AT XX ((PLANNED ROP 30.67 FPH/ACTUAL XX FPH)) - FLAT TIME PLAN: 130.5 HR/ ACTUAL XX HRS.
> 7" LP PLAN AT 10,611' MD (+/-5 FT INTO KFBC)/ ACTUAL AT XX MD (PLANNED ROP 17.56 FPH/ACTUAL XX FPH) - FLAT TIME PLAN: 153.9 HR/ ACTUAL XX HRS.
> TIME TO LOG PLAN 24 HRS / ACTUAL XX HRS
> TIME TO COMPLETE PLAN 276 HRS / ACTUAL XXX HRS
====================
NEAR MISS : N/A
====NEXT LOCATION=====
* SDGM-1171.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 2,594 N/A

Company RIG EMC RIG ARM ARM

Category RIG DFMS OTHR OTHR WSC


PERSONNEL
41 1 80 1 1
Total
AND SERVICES No. of Persons
124
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24

Operating Hours. 24 12 12 12 24

Standby/Tankers Others
TRUCKS/BOATS
AB-6320 PICK UP 2 X SANAD AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 397 101 81 0

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HZEM-182604 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:21 03/13/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

NBR-16S @ HZEM-182604 Limited Morning Report for 06/18/2024


Objective : (HORIZONTAL MOHAMMED, MOHAMMED BEDAIR / WESTGARD, TYSON
Foreman(s)
D&WO Morning Report (Service Providers View) DEVELOPMENT TIGHT GAS CLARENCE
Rig Charge #: WELLS) Engineer ALGHAMDI, SAEED MOHAMMAD
Copyright 2024 Saudi Aramco. All Rights Reserved NBR-16S (87-23541-8016) Manager JAHDALI, OMAR HAMEED
Daily Onshore
Wellbores: THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well
882-167-77 1-2587 577-6136 /CLERK VSA
Date: Tuesday 06/18/2024 HZEM-182604 (0) HZEM_182604_0
T
577-6139

Last 24 hr operations Next 24 hr plan


DRILLING 8 1/2" LATERAL HOLE SECTION. DRILLING 8 1/2" LATERAL HOLE SECTION TO WELL TD 18,343 FT, CIRCULAED CLEAN UP CYCLES,
POOH WITH 8.5" BHA TO SURFACE.
Location Next Location
TAKE SALWA ROAD INTO HZEM MAIN SKID ROAD, FOLLOW RIG SIGN BOARDS SKID ROAD. HZEM-182614
Current Depth (ft) Liner TOL MD TVD Formation Tops
17,170 Last Csg Size MD TVD Size Top
9 5/8 7637 7637 Formations Comments
Depth
DMMM 714 19 FT SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 1,019 11 FT SHALLOWER
11730 (Date) 100 2,980 165 UMER 1,412 9 FT DEEPER
29.1 (05/20/2024@0200 ) ARUM 2,651 6 FT SHALLOWER
LAMS 3,242 9 FT SHALLOWER
AHMD 4,900 12 FT SHALLOWER
SFNY 5,566 27 FT DEEPER
SHUB 6,275 AS PER PROGRAM
BYDH 6,590 12 FT SHALLOWER
MDTM 7,608 1 FT DEEPER
SULY 8,070 12 FT DEEPER
HITH 8,613 12 FT SHALLOWER
ABAR 9,082
ABBR 9,175
ABCR 9,256
ABDR 9,424 11 FT SHALLOWER
JUBL 9,587 13 FT SHALLOWER
JBSR 10,416 3 FT SHALLOWER
HNIF 10,529 3 FT SHALLOWER
HNFA 10,558 3 FT SHALLOWER
HNFB 10,578 3 FT SHALLOWER
HNFC 10,630 2 FT SHALLOWER
HNFD 10,655 3 FT SHALLOWER
TQMA 10,665 1 FT SHALLOWER
TQMB 10,677 4 FT SHALLOWER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0515 0.25 0 8 1/2 N DRLG D RSS SDM 14190 14220 SLB NEO-STEER DRILLED 8 1/2" LATERAL HOLE SECTION WITH (91) PCF OBM,
FULL RETURNS.

0515 - 0615 1 0 8 1/2 N DRLG CIRC MPMP RIG 14220 14220 CIRCULATED HOLE CLEAN.
> TORQUE REDUCED FROM 12 TO 7 KIPS-FT.

SLB NEO-STEER DRILLED 8 1/2" LATERAL HOLE SECTION WITH (91) PCF OBM,
0615 - 0459 22.75 0 8 1/2 N DRLG D RSS SDM 14220 17170 FULL RETURNS.
> LAST SURVEY (17,013' MD, 10,709' TVD, 89.78 INC, 346.83 AZM).
> SURVEY OFFSET FROM PLAN( 27.34' CT-CT, 26.73' BELOW, 5.71' RIGHT ).
Foreman Remarks

HZEM-182604 IS THE 1ST SLOT ON PAD 1826 TO BE DRILLED BY RIG NBR16 AS A HORIZONTAL DEVELOPMENT TIGHT GAS WELL TARGETING TUWAIQ MOUNTAIN SOURCE ROCKS RESERVOIR B
(TQMB) BELOW THE HIGH GR ZONE. THE WELL IS PLANNED TO LAND AT +/- 17 FT. INSIDE TQMA FORMTION AND DRILL TO TD OF 18,407 FT. (MD)/ 10,718 FT. (TVD) WITH A TOTAL LATERAL
LENGTH OF 6871 FT AT 347 DEGREE AZIMUTH. THE WELL WILL BE COMPLETED WITH 5-1/2" CEMENTED LONG STRING MONO-BORE COMPLETION. THE TOTAL PLANNED DURATION FROM SPUD
TO RIG RELEASE IS 22 DAYS.
===================================================================================================
ARAMCO PERSONNEL:
> URDD MATERIAL EXPEDITOR HUSSAM AL GHAMDI #8520497 ON LOCATION SINCE 06/07/2024.
> URDD FCT MOHAMED ALSHAHARANI #795366 ON LOCATION SINCE 06/13/2024.
==================================================================================================
RENTAL TOOLS:
> NOV 6-1/2'' HMDJ XT54 SN# 474-65891 ON LOCATION SINCE 13-JUNE-2024.
> CORETRAX 7'' PBL SUB NC50 SN# DVSA4-1011 / CC1A1125 ON LOCATION SINCE 13-JUNE-2024.
> TAQA 6-3/4" MECHANICAL THRUSTER NC50 SN# DSMT 6675058 ON LOCATION SINCE 13-JUNE-2024.
==================================================================================================
WELL SITE CONTRACTOR EQUIPMENT'S ON LOCATION:
> 1 X SPRAY TANKER PLATE #1168 AXA.
==================================================================================================
> LTI FREE DAYS: 510.
> SOC: 23.
> PTW: 07.
> LOTO: 03.
> REVIEWED JSA: 10.
> INDUCTION: 05.
> DRILLS: 02 .

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HZEM-182604 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:21 03/13/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

> SWAD: 0.
> NEAR MISS: 01.
> INCIDENT: 0.
> STOP WORK AUTHORITY: 04.
> HAZARD HUNT: 02.
==================================================================================================
========================= WATER CONSUMPTION PROVIDED BY ALG WATER TANK ===================================
> WATER SERVICES INCLUDING PUMPS AND FLEXIBLE HOSES PROVIDED BY ALG 80K BBL WATER TANK.
> WATER WELL: HZEM-807 & HZEM-845.
> ALG TANK SIZE: 80K BBLS.
> BOOSTER PUMP: ONE PUMPS.
> DAILY/CUM WATER CONSUMPTION: 53,363 / 6,355,714 GALLONS.
==================================================================================================
> ACTUAL: 24" CASING SHOE AT 536'.
> ACTUAL 18-5/8" CASING POINT AT 1,062'.
> ACTUAL 13-3/8" CASING POINT AT 4,329'.
> ACTUAL 9-5/8" CASING POINT AT 7,637'.
> ACTUAL KOP AT 9,636 MD
> ACTUAL LP AT 11,438' MD, 10,681' TVD
> PLANNED WELL TD AT 18,343' MD/ 10,717' TVD.
==================================================================================================
DIRECTION TO HZEM-1826 PAD:
> TRAVEL 68KM FROM HOFUF TOWARDS HZEM AND TURN RIGHT AT HZEM RIG SIGN SKID ROAD.
> TRAVEL 197KM FROM DAMMAM TOWARDS HZEM AND TURN RIGHT AT RIG SIGN SKID ROAD.
> FROM SALWA ROAD TRAVEL 33KM BLACK TOP UNTIL NEXT SIGN OF THE RIG.
> THEN TURN RIGHT AND TRAVEL FOR 43 KM SKID TO RIG NBR-16S AND FOLLOW SIGN BOARDS.
==================================================================================================
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 14,232 89.66 347.24 89 10,696 1228.21 -139.68 4,055.52 0.37
0 14,329 89.79 347.04 97 10,696 1257.03 -146.26 4,151.93 0.25
0 14,438 89.12 347.24 109 10,697 1289.42 -153.66 4,260.3 0.64
0 14,533 89.12 346.96 95 10,699 1317.64 -160.12 4,354.77 0.29
0 14,632 89.29 346.52 99 10,700 1347.01 -167.04 4,453.17 0.48
0 14,729 89.71 346.73 97 10,701 1375.77 -173.88 4,549.59 0.48
0 14,829 89.78 346.62 100 10,701 1405.43 -180.91 4,649.03 0.13
0 14,925 89.79 346.57 96 10,702 1433.89 -187.69 4,744.5 0.05
0 15,026 89.64 346.57 101 10,702 1463.83 -194.84 4,844.96 0.15
0 15,118 89.83 346.92 92 10,703 1491.13 -201.27 4,936.52 0.44
0 15,208 89.75 346.77 90 10,703 1517.84 -207.51 5,026.11 0.19
0 15,290 89.81 346.97 82 10,703 1542.18 -213.19 5,107.76 0.25
0 15,396 89.91 346.48 106 10,703 1573.62 -220.61 5,213.3 0.47
0 15,485 89.94 346.24 89 10,704 1599.99 -227.01 5,301.87 0.27
DAILY SURVEY 0 15,577 89.94 345.77 92 10,704 1627.2 -233.79 5,393.39 0.51
0 15,671 90 346.43 94 10,704 1655.01 -240.67 5,486.93 0.71
0 15,784 89.8 347.23 113 10,704 1688.54 -248.52 5,599.52 0.73
0 15,878 89.84 347.12 94 10,704 1716.48 -254.88 5,693.24 0.12
0 15,985 89.64 347.28 107 10,705 1748.28 -262.11 5,799.94 0.24
0 16,083 89.73 347.24 98 10,705 1777.42 -268.7 5,897.68 0.1
0 16,185 89.78 347.4 102 10,706 1807.75 -275.52 5,999.42 0.16
0 16,292 89.78 347.07 107 10,706 1839.56 -282.73 6,106.15 0.31
0 16,410 89.67 347.19 118 10,707 1874.62 -290.74 6,223.85 0.14
0 16,519 89.74 347.2 109 10,707 1907.01 -298.1 6,332.59 0.06
0 16,617 89.74 347.19 98 10,708 1936.14 -304.72 6,430.36 0.01
0 16,716 89.59 347.08 99 10,708 1965.56 -311.44 6,529.13 0.19
0 16,821 89.71 347.06 105 10,709 1996.75 -318.6 6,633.88 0.12
0 16,921 89.69 346.83 100 10,709 2026.44 -325.49 6,733.64 0.23
0 17,013 89.78 346.83 92 10,710 2053.74 -331.88 6,825.42 0.1
0 17,120 89.73 347.17 107 10,710 2085.52 -339.22 6,932.18 0.32

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
91 PCF 1 0 API 62.7 688 Volts 10.5 0 35,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
147 3 HTHP 14.4 20 0 7 / 11 OBM 1.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 29 22.9 7/9 0 0 5.4
56

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
91 PCF 1 0 API 62.4 680 Volts 10.2 0 35,000
MUD DATA
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
147 3 HTHP 14.9 20 0 7 / 10 OBM 1.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 28 22.7 7/9 0 0 5.2
54

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
91 PCF 1 0 API 62.4 620 Volts 10 0 35,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
147 3.4 HTHP 15 21 0 7 / 11 OBM 1.8

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HZEM-182604 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:21 03/13/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 28 22.6 7/9 0 0 5.4
55

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 2 4.1 API 0 0 Volts 4.8 10.5 139,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 11 HTHP 83 23 0 8 / 12 NCPOL 5.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 22 17 7/9 0 280 12.8
54

MUD MAXSHIELD MRBL-M CACL2-98 CAOH2 STELSEALFN STELSL50 CARBOTROL


TREATMENT 2 ( 55GL ) 2 ( 2200L ) 6 ( 2200L ) 48 ( 25KG ) 24 ( 50LB ) 24 ( 50LB ) 48 ( 50LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
9 9,518 17,170 DP Av DC Av Bit HHP 45 170 M423 8.5 SMT
Pressure GPM Jet Vel 320.96 N/A 372 I-Row O-Row DC Location Bearings
4,600 550 327 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
SM3567 MDSI516PIPC 5 x 9 / 3 x 10 / 0.541
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 111 225 225 220 26 111
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
111

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 8.5 1 8.5 0.65 SM3567
2 RSS SDM 6.75 1 6.75 2.5 12.81 NC50 4-1/2" REG 50 141
3 Vibration Mitigation Tool SDM 6.75 1 6.82 2 20.6 5-1/2" FH NC50 604 MT6-675-058
4 Power & Communication Sub SDM 6.906 1 6.906 2.81 7.1 5 1/2 FH NC50 50 N001158
5 Saver Sub SDM 6.906 1 6.5 3.875 1.18 5 1/2 FH 5 1/2 FH 50 4759-2-2
DRILL STRING
6 Measurement While Drilling (MWD) SDM 6.75 1 6.75 2 25.18 5-1/2 FH 5-1/2 FH 97.14 9577
7 Saver Sub SDM 6.906 1 6.25 2.813 1.58 NC50 5 1/2 FH 50 SA-40060
8 Non Magnetic Drill Collar ( NMDC ) SDM 6.75 1 6.75 2.5 8.61 NC50 NC50 50 SPRL 1188834
9 Float Sub SDM 6.969 1 6.969 2.875 1.67 NC50 NC50 100 6131-03
10 Float Sub SDM 6.969 1 6.969 2.875 2.18 NC50 NC50 100 338597
11 FIlter Sub SDM 6.781 1 6.781 2.75 6.02 NC50 NC50 50 675-1023
12 PBL (Multiple Activation By Pass) CRW 6.75 1 6.781 2.75 20.9 NC50 NC50 50 SA4-1011
13 Crossover RIG 6.25 1 6.25 2.625 2.65 XT54 NC50 50 NAP-698227
14 Heavy Weight Drillpipe (HWDP) RIG 5.5 21 5.5 3.25 658.2 XT54 XT54 53.3 CONV ON FILE
15 Hydro-Mechanical Jar NOJ 6.5 1 6.5 2.75 33.74 XT54 XT54 1,300 474-65871
16 Heavy Weight Drillpipe (HWDP) RIG 5.5 3 5.5 3.25 94.02 XT54 XT54 53.3 CONV ON FILE
17 Drillpipe RIG 5.5 1 5.5 4.67 31.3 XT54 XT54 24.7 XD105 PREMIUM ON FILE

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/01/2024 6/11/2024 N/A N/A SEASONAL 510 2 X DAILY

Company SJC GOS SDM RIG BAR SNS RIG ARM OTH ARM CRW

Category PCS CTRG DPDS RIG DFMS H2S OTHR OTHR VAC WSC WBCS
PERSONNEL
3 17 3 45 15 2 9 2 1 2 1
Total
AND SERVICES No. of Persons
100
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 24 24 12 0 12 10 24 12

Standby/Tankers
TRUCKS/BOATS
DH-7579

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 873 453 42 4650

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1268 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/22/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

NBR-196S @ SDGM-1268 Limited Morning Report for 06/18/2024


Objective : (HORIZONTAL Foreman(s)CLARKE, CHESLEY HAROLD / PICKETT, DOUGLAS FREDRICK
D&WO Morning Report (Service Providers View) Charge #: KHUFF B) Engineer ROJAS BRITO, JOSE OCTAVIO
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23054-1268) Manager MOUSA, NEDAL ADEL
NBR-196S
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 882-167-77 1-2724 013-577-11 02 013-577-14 38 CLERK
Date: Tuesday 06/18/2024 SDGM-1268 (0) SDGM_1268_0 OTHER VSAT
013-577-12 32

Last 24 hr operations Next 24 hr plan


ROTARY RSS DRILL 5 7/8" LATERAL SECTION W/SPERRY RSS/MWD/LWD WITH 90PCF RHELIANT ROTARY RSS DRILL 5 7/8" LATERAL SECTION W/SPERRY RSS/MWD/LWD WITH 90PCF RHELIANT
OBM MUD TOWARDS TD @ 17,901 FT/MD = 12,755 TVD. OBM MUD TOWARDS TD @ 17,901 FT/MD = 12,755 TVD.
Location Next Location
SDGM-1268 SDGM-1300
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
17,475 Size 10942 10942 Size 10,646 13,433 12,726 Top
Formations Comments
9 5/8 7 Depth
BJDM 10,920 4 FT. HIGH.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) MDJR 11,229 1' HIGH.
17085 (Date) 100 390 114 SUDR 11,953 8' HIGH
64.5 (04/14/2024@1800 ) SDDM 12,227 10' LOW
KHFF 12,526 4' LOW
KFAC 12,567 15' LOWER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

ROTARY RSS DRILL 5 7/8" LATERAL SECTION W/SPERRY RSS/MWD/LWD WITH


90PCF RHELIANT OBM MUD.

** FOLLOWING ARAMCO INTEGRATED HOROZANTAL DRILLING PRACTICES &


CONNECTION PROCEDURE.
0500 - 1630 11.5 0 5 7/8 N DRLG D RSS SPS 17085 17300 ** FOLLOWING ARAMCO INTEGRATED HOROZANTAL SEALING PILL REQUIREMENTS
PUMP 40 BBLS EVERY STD BEFORE CONNECTION.
** PUMP HI WT SWEEPS AS REQUIRED EVERY 3 STDS.
** FLOW CHECK ON CONNECTIONS.
** MITIGATE DRILLING PARAMETERS AS PER SPS TOOLS VIBRATIONS.
** LAST SAMPLE 100% DOLOMITIC LIMESTONE @ 17,240 FT.MD, MAX DRILLED
GASES 4.10% @ 17,194' MD
1630 - 1700 0.5 0 5 7/8 N DRLG RR TDS RIG 17300 17300
RIG SERVICE GREASE TOP DRIVE SYSTEM.

ROTARY RSS DRILL 5 7/8" LATERAL SECTION W/SPERRY RSS/MWD/LWD WITH


90PCF RHELIANT OBM MUD.

** FOLLOWING ARAMCO INTEGRATED HORIZONTAL DRILLING PRACTICES &


CONNECTION PROCEDURE.
1700 - 0459 12 0 5 7/8 N DRLG D RSS SPS 17300 17475
** FOLLOWING ARAMCO INTEGRATED HORIZONTAL SEALING PILL REQUIREMENTS
PUMP 40 BBLS EVERY STD BEFORE CONNECTION.
** PUMP HI WT. SWEEPS AS REQUIRED EVERY 3 STDS.
** FLOW CHECK ON CONNECTIONS.
** MITIGATE DRILLING PARAMETERS AS PER SPS TOOLS VIBRATIONS.
** LAST SAMPLE 100% DOLOMITIC LIMESTONE @ 17,380 FT.MD.
Foreman Remarks

SDGM 1268 DRILLED HORZ K SLIM WELL DESIGN, DRILLED HORIZONTAL IN KHUFF B. THE WELL IS LOCATED OUT OF SHALLOW GAS AREA. THE WELL IS PLANNED
TO BE COMPLETED WITH 4-1/2" MSF CEMENTED LINER.

**JOURNEY MANAGEMENT PLAN**


- PRIOR ENTERING THE SKID ROAD CALL YOUR COMPANY BASE & FILL YOUR VEHICLE WITH FUEL.
- CALL RIG NBR-196S AT (013-5771102 OR 0135771438) PRIOR ENTERING SKID ROAD, PROVIDE NAME COMPANY, # PERSONNEL, EMERGENCY CONTACT NUMBER OF BASE PERSONNEL.
- ALL VEHICLES MUST HAVE A SUPPLY OF DRINKING WATER/CAR SURVIVAL KIT & VEHICLES MUST BE 4X4.
- ALL VEHICLES MUST FOLLOW THE ALLOWED ROAD DRIVING SPEED.
- IF THERE IS NO SIGNAL ON THE SKID ROAD IT IS BETTER TO HAVE THURAYA PHONE IF AVAILABLE.

** ARAMCO FOREMAN AHMAD AMOUDI OFF DUTY.


** ARAMCO PDP ENGINEER ZIYAD AL-DAKHEEL ID#823078 OFF DUTY 6/15/24.
** ARAMCO RIG CLERK YAHYA ABDOULFAZAL ON LOCATION 02/11/23.
** ARAMCO CLERK MOHAMMED ELBESHER ON DUTY 6/16/24.
** ARAMCO FCT MOHAMMED AL SHEHRI #791379 OFF DUTY 6/15/24.
==STAGING AREAS==
** STAGING AREA #1- LAT; 25.58380, LONG: 49.35193
** STAGING AREA #2- LAT: 25.55559, LONG: 49.35183
===HSE===
** DAILY PRE-TOUR MEETING.
** OBSERVATIONS: 11 EA.
** FIRST AID CASE: .
** NEAR MISS: SLS #7227901.
** DRILLS: PIT DRILL (0), TRIP DRILL (2), BOP/WELL CONTROL (0); H2S DRILL (0); MANDOWN DRILL (0); ACCUMULATOR DRILL (0), FIRE DRILL (0); SWA DRILL (2) CONFINED SPACE RESCUE DRILL
(0), FIRE PUMP (1).
** SAUDI ARAMCO & SANAD ALERTS: HSE ALERT. 1. SAO&GDD, ALERT # 08-24, FINGER INJURY-CAUGHT BETWEEN. 2. SAO&GDD, ALERT # 09-24, HAND INJURY-CAUGHT BETWEEN PONY &
PISTON ROD. 3. LPD, PROCESS SAFETY BULLETIN, SKIN BURNS DURING SULFUR POURING ACTIVITY. 4. NBR-196S, NEAR MISS, MY HSE # 1806017 / SLS # 7227901.
** RIG MOVE KPI: 9.8 DAYS, ACTUAL 9.7

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1268 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/22/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

** DP TRIPPING KPI: 19 STDS/HR/ ACTUAL TBD.


** 30" CSG KPI: 3JTS/HR/ ACTUAL 3 JTS/HR. ACT 3 JTS/HR.
** 24" CSG KPI: 4JTS/HR/ ACTUAL 4 JTS/HR. ACT 4 JTS/HR.
** 18 5/8" CSG KPI: 7JTS/HR/ ACT 9 JTS/HR.
** 13 3/8" CSG KPI: 11.5JTS/HR/ ACTUAL 14.24 JTS/HR.
** 9 5/8" CSG KPI: 14JTS/HR/ ACTUAL 15JTS/HR.
** 7" LINER KPI:14JTS/HR/ ACTUAL 16 JTS/HR.
** 4 1/2" UPPER COMPLETION KPI: 13.5JTS/HR/ ACTUAL TBD
** INSTALL 18 5/8" X 26 3/4" 3M WELLHEAD KPI: 5HRS/ ACTUAL TBD
** INSTALL 18 5/8" FMH WELLHEAD KPI: 5HRS/ 4 HRS.
** INSTALL 13 5/8" WELLHEAD KPI: 4HRS/ 4 HRS.
** INSTALL 11" TBG SPOOL KPI: 4HRS/ ACTUAL 4HRS.
===CASING SETTING DEPTHS====
** 34" SECTION: 120' / ACTUAL 120'.
** 28" SECTION: 580' (50 FT INTO RUS) / ACTUAL 590 FT.
** 22" SECTION: 2,845' (50FT INTO AHMADI)/ ACTUAL 2,865 FT.
** 16" SECTION: 5,096' (50 FT INTO MDTM)/ ACTUAL 5050 FT.
** 12" SECTION: 10,954' (30FT INTO BJDM/ ACTUAL 10.950'FT.
**8 3/8" SECTION 13,160' ABOVE KHUFF B RESERVOIR ACTUAL 13,346'MD.
**5 7/8" SECTION: 17,715'MD HORIZONTAL KHUFF B) ACTUAL TBD
====THIRD PARTY EQUIPMENT & GENERAL INFO.=====.
*** REC 4 3/4" HYD JAR SN#1860-5028 3.5" IF CONN & 1420-7647 XT-39 CONN.
*** REC 4 3/4" HYD JAR SN# 1400-1050 XT-39 CONN ON 15 JUN 24.
====DIESEL FOR MUD====
** ARAMCO MUD DIESEL TANKS 344 BBLS.
==== CURRENT LOCATION====
** REDUCED WATER PITS- YES NO WATER PIT INSTALLED. LINED OBM PIT USED AS WATER PIT.
** DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEM- YES
** CLS- CUTTINGS DRYER SYSTEM SLB INSTALLED.
====FUTURE LOCATION=====
** NEXT LOCATION: SDGM-1300 IS 100% READY, SDGM-1298 100% READY.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 17,119 89.34 187.46 94 12,709 -1549.91 -168.59 5,115.01 0.25
DAILY SURVEY
0 17,213 89.88 187.33 94 12,710 -1578.32 -172.28 5,208.98 0.59
0 17,307 90.49 187.34 94 12,710 -1606.74 -175.94 5,302.97 0.66

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 1 0 API 60 678 Volts 5.5 0 38,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
125 1 HTHP 16 17 0.2 9 / 11 RELIANT 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 43 24 8/9 0 0 1.6
67
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 1 0 API 60 310 Volts 5.5 0 38,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
125 1 HTHP 16 16 0.2 9 / 11 RELIANT 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 43 24 8/9 0 0 0.6
65

BARACRB150 NF-5 STELSL50 SUREMUL STELSEALFN CAOH2 SLTX


MUD 24 ( 50LB ) 24 ( 55LB ) 24 ( 55LB ) 6 ( 55GL ) 24 ( 55LB ) 12 ( 50KG ) 12 ( 55LB )
TREATMENT ONETROL HT
12 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
12 16,053 17,475 DP Av DC Av Bit HHP 19 145 M432 5.875 SMT
Pressure GPM Jet Vel 309.76 N/A 45 I-Row O-Row DC Location Bearings
3,850 234 175 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
SA00283 MDSI613C 2 x 14 / 1 x 13 / 0.43
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 91.5 275 290 250 6,800 91.5
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
DRILL STRING 1 Bit SMT 5.875 1 5.875 0.65 SA00283
2 RSS SPS 4.75 1 6.75 36.42 NC50 4-1/2" REG 55.05 13338758
3 Measurement While Drilling (MWD) SPS 4.75 1 4.75 52.48 HAL40 3 1/2" IF 15.6 90762976
4 Logging While Drilling (LWD) SPS 4.75 1 4.75 19.79 48.17 90756153
5 Logging While Drilling (LWD) SPS 4.75 1 4.75 11.19 5.18 13809740
6 Screen sub SPS 4.75 1 4.5 2.8 5.67 NC38 NC38 49.69 13172767

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1268 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/22/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
7 Float Sub SPS 4.75 1 4.75 2.25 3.21 NC38 NC38 49.69 14138403
8 Crossover RIG 4.75 1 4.75 2.25 3.02 XT39 NC38 28.23 16218-195
9 Heavy Weight Drillpipe (HWDP) RIG 4 2 4 2.563 61.32 XT39 XT39 28 CONV TALLEY
10 Hydraulic Jar WJS 4.75 1 6.54 3.25 31 XT-54 XT-54 28.38 1420-7647
11 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.563 91.78 XT39 XT39 28 CONV TALLEY
12 Drillpipe RIG 4 1 4 3.24 31 XT39 XT39 15.7 G105 PREMIUM TALLEY

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/10/2024 N/A N/A N/A SEASONAL 2,676 N/A

Company TGC RIG EMC SMI WJS SPS SGR RIG ARM NRT OTH MI3 ARM

Category CTRG RIG DFMS DFMS JST LWD MLS OTHR OTHR RENT VAC WMS WSC
PERSONNEL
16 45 1 2 0 4 5 2 2 4 2 3 2
Total
AND SERVICES No. of Persons
88
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 0 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 12 12 24 12 24 24

Standby/Tankers Others Others Others


TRUCKS/BOATS
AB 5350 NABORS AMBULANCE NABORS BUS nABORS TRUCK

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
200 200 287 130 71 1300

Instrumentation Other Reporter


Computer, Communication & V-Sat Issues
VSAT ISSUES INTERMITTENT ISSUES WITH CONTINUAL LOSS OF CONNECTIVITY FROM 30TH MARCH 2024, INC000045557730 WAS CLOSED WITH NO
REPAIR ASAP ACTUAL IT SUPPORT PROVIDED. VSAT MAINTENANCE DONE 8 APRIL & NO CHANGE WITH SYSTEM ISSUE NOT RESOLVED. ONGOING ISSUES. VSAT REMOTE
SERVICE TECHNICIAN CHANGE SYSTEM CONFIGURATION ON 23RD APRIL AND SYSTEM IS NOW EVEN SLOWER & MORE FREQUENT HANGING. NO UPDATES
OR ADVISE FROM IT OR VSAT GROUP. WE HAVE ISSUES WITH OUR PRINTER FOR OVER 2 YEARS AND REQUIRE REPLACEMENT. NO HELP TO REPLACE,
PRINTER CONTINUALLY JAMMING PAPER & DOES NOT WORK FOR US TO DO OUR JOB EFFECTIVELY.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JLMN-26 EXPLORATION DRILLING-1 BI-1514
Print Date: 06/18/2024 06:21 05/09/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

NBR-20S @ JLMN-26 Limited Morning Report for 06/18/2024


Objective : (DECOMPLETE Foreman(s)HANNA, MURRAY ROBERT
D&WO Morning Report (Service Providers View) Charge #: THE LONG STRING Engineer ALHARBI, WALEED SALEM
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved COMPLETION, IDENTIFY AND Manager GARNI, HUSAM MANSOUR
NBR-20S (82-23714-1307)
FIX LEAK , RUN 4-1/2" LOWER THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: AND UPPER COMPLETION)
(0500-0500) Saudi Aramco Well 0088216777 12893 011-285-85 30 011-285-85 31
Date: Tuesday 06/18/2024 JLMN-26 (0) JLMN_26_0 CONTRACTOR /CLERK VSA T
8049640

Last 24 hr operations Next 24 hr plan


RIG UP ON JLMN-26 & CLOSE OUT AUDIT ITEMS CONT TO RIG UP ON JLMN-26 & CLOSE OUT AUDIT ITEMS
Location Next Location
1129 KM FROM DHAHRAN GATE, 53 KM FROM ARAR, 223 KM FROM TURAIF JLMN-28
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 1101
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD PRE-JOB SAFETY MEETING WITH ALL PERSONNEL ON SAFETY DURING RIG
UP OPERATIONS.
GENERAL RIG UP ON JLMN-26.
========================================================
GENERAL ITEMS & AUDIT ITEMS ONGOING TO BE CLOSED BEFORE SPUD
> WAIT ON CARD IN SCR FOR MUD PUMP #1, ELECTRICAL ISSUE -(WAIT ON
PARTS)
> COMPLETE FLARE PRESSURE TEST. (WAIT ON EQUIPMENT)
> COMPLETE INSTALLATION OF FLARE LINE IGINITION. (WAIT ON PARTS)
> BOTH MAN RIDING WINCHES NOT IN COMPLIANCE WITH ARAMCO
REQUIREMENTS - (ONE FUNCTIONABLE & ONE WAITING ON E STOP)
> WORK TO COMPLETE BOP & DOWN STREAM MASTER LIST - (ON GOING WAITING
ON EQUIPMENT)(97% COMPLETE)
> MOC WITH FULL PACKAGE OF DOC'S, INCLUDING RE-CERT REPORT TO BE
PROVIDED FOR MODIFICATION DONE ON MGS 4" SPOOL. (ON GOING)
> WAIT ON OEM COC'S FOR ALL HANDLING TOOLS & EQUIPMENT (ELEVATOR
LINKS, SLIPS, DP ELEVATORS, SAFETY CLAMPS, TONGS)- (ON GOING)
> WAIT ON OEM COC'S FOR HIGH PRESSURE MUD LINES, GROUND MANIFOLD
EQUIP, JUMPER HOSES, KELLY HOSES, STAND PIPE, CHICKSANS & LOOPS.
0500 - 1300 8 0 PRE N RM RU NA RIG 14860 14860
> WAIT ON STAND PIPE ANNUAL INSPECTION REPORT (UT/MPI/VISUAL) -(ON
GOING)
> WAIT ON CATWALK SR#400068 CAT III INSPECTION DOCUMENT, WIRE ROPE
SLING HST-087717-001 MISSING COC & INSTALL DATE - (ON GOING)
> WAIT FOR DOECD TO VERIFY RECERTS ON COC'S FOR TRAVELING BLOCK, DEAD
LINE ANCHOR, CROWN BLOCK & CROWN SHEAVES (PENDING DOECD)
> WAIT ON COC'S FOR DELTA PLATES ON BOP HOISTING (ON GOING)
> WAIT ON VISUAL & MPI INSPECTION REPORTS FOR BOP LIFTING PLATES (ON
GOING)
> WAIT ON COC'S & INSPECTION REPORT FOR TURNBUCKLES & SWIVELS (ON
GOING)
> WAIT ON MPI REPORTS FOR ALL LIFT LUGS (ON GOING)
> WAIT ON COC'S FOR AIR HOIST AT MONKEY BOARD SN #K211123BU02 (ON
GOING)
> WAIT ON LOAD TEST CERTIFICATE FOR FALL ARREST PAD EYES (ON GOING)
> WAIT ON COC'S FOR ALL SUBSTRUCTURE RAISING CYLINDERS
> WAIT ON COC'S FOR ALL MAST RAISING CYLINDERS
> WAIT ON REPLACEMENT TIRES FOR ALL SANAD VEHICLES ON LOCATION.
NOTED 2 OUT OF 12 TIRES ACCEPTABLE.
> ST-80 NOT FUNCTIONABLE - WAITING ON BOLTS

CONTINUED GENERAL ITEMS & AUDIT ITEMS ONGOING TO BE CLOSED BEFORE


SPUD
> WAIT ON COC'S FOR SUPER SACK WINCHES. (ON GOING)
> WAIT ON RIG CRANE TO CONFORM WITH TOTAL COMPLIANCE TO ARAMCO
1300 - 0459 16 0 PRE M MAIN RU NA RIG 14860 14860 REQUIREMENTS - (ARRIVED WAITING ON PAPER WORK TO ARRIVE)

RIG UP ON JLMN -26 - 97%


OFF LINE OPERATIONS:
- EXTENDED MONITOR PRESSURE RESPONSE IN TCA, CCA, AND TUBING.
- AT RT PRESSURE GAUGES READINGS : CCA1 = CCA2 = TCA = TBG = 0 PSI.
Foreman Remarks

JLMN-26 LOCATED IN JLMN FIELD AND WAS DRILLED VERTICALLY TO TD OF 14,860 FT TARGETING THE GAS POTENTIAL OF SARAH FORMATION.
THE SCOPE OF THE WORKOVER IS TO LOCATE AND REPAIR THE LEAKS IN THE WELL AS FOLLOWS:
- DE-COMPLETE THE LONGSTRING COMPLETION.
- IDENTIFY THE LEAK INTERVAL AND FIX THE SAME.
- RUN 4-1/2" INVERTED PBR WITH 4-1/2" 15.1# X 7" 32# X 9-5/8" 53.5# LINER HANGER LOWER COMPLETION.
- RUN 4-1/2" TIEBACK SEALS UPPER COMPLETION.
THE TOTAL PLANNED DURATION FROM SPUD TO RIG RELEASE IS 25 DAYS.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JLMN-26 EXPLORATION DRILLING-1 BI-1514
Print Date: 06/18/2024 06:21 05/09/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

================================================================================================
ARAMCO PERSONNEL:
> CLERK AKBAR KHAN #8524376 ON LOCATION SINCE 04/12/2023.
================================================================================================
> NEAR MISS: 0.
> DRILLS: 0.
================================================================================================
SAFETY :
** DAYS SINCE LOSS TIME INJURY (DSLTI): 659 DAYS.
** JSA REVISED: 2, JSA REVIEWED: 18, PTW: 16.
** TOTAL SOCS: 14, SAFE ACT: 5, UNSAFE ACT: 3, SAFE CONDITION: 3, UNSAFE CONDITION: 3.
** ARAMCO IHA & EOH: IN PROGRESS
** LPD AUDIT: OPEN 5, CLOSED 28.
** RHSEI AUDIT: OPEN 5, CLOSED 11.
================================================================================================
ARAMCO TRUCK RT-5366 ON LOCATION SINCE 06/02/2024.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A NORMAL N/A SEASONAL 667 2

Company INW SWK RIG BDF SNS RIG ARM SCM NSL OTH ARM GEP HWP

Category BRCR CTRG RIG DFMS H2S OTHR OTHR PCS SLS VAC WSC WHES WLS
PERSONNEL
1 22 45 2 1 22 2 3 3 1 1 1 5
Total
AND SERVICES No. of Persons
109
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 24 24 24 24 0 0 24 24 0 0

Standby/Tankers
TRUCKS/BOATS
RT-5366

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 927 150 0 0

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNIF-373 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:21 05/26/2024 - 08/02/2024
Report ID: OPERLMTDMRREP

NBR-210S @ MNIF-373 Limited Morning Report for 06/18/2024


Objective : (KILL, DE- Foreman(s)NESHOUKY, WALEED MOHAMMED / ALMUHANA, ABDULELAH AHMED
D&WO Morning Report (Service Providers View) Charge #: COMPLETE WELL, P&A, Engineer ALGHAMDI, MOHAMMED SALEH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved SET WHIPSTOCK, SIDE- Manager SAUD, MAHER IBRAHIM
NBR-210S (71-24026-0373)
TACK NEW HOLE, RUN ICD THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: & ESP.)
(0500-0500) Saudi Aramco Well 8821677712 188 577-3954 F OREMAN 577-9360 S AFETY ADVI SOR
Date: Tuesday 06/18/2024 MNIF-373 (0) MNIF_373_0 CONTRACTOR /CLERK VSA T
577-3978 C LERK

Last 24 hr operations Next 24 hr plan


P/U 4" & 5"DP FROM PIPE RACK, P/U & M/U HAL EZSV-CR RIH &SET, POH & L/D RUNNING TOOL. RIH STINGER ASSY TO EZSV, CHC, PERFORM INJECTIVITY TEST, FLY MIX & PUMP CEMENT
SLURRY.
Location Next Location
MANIFA *RIG MAINTENANCE*
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
14,384 Size 7898 4950 Size 7,567 10,327 8,635 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
14384 (Date) 0 0 213
6.8 (06/11/2024@1100 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT P/U - M/U AND RACK BACK REQUIRED DRILL STG COMPONENETS FOR THE
WELL:
>> RE-ARRANGE 5"DP AND 5"HW AT DERRICK BOARD.
>> P/U 6 STDS (18JTS) 5"DPS AND RACK BACK AT DERRICK.
0500 - 1200 7 0 POST N CT LDP SPDP RIG 14384 14384 0 4250
>> P/U 75JTS X 4"DPS AND RACK BACK AT DERRICK.
>> CLEAN, DRIFT AND FLUSH ALL TUBULARS.
>> CONT'D MONITORED WELL AT TRIP TANK AND FILL UP CACL2 BRINE - 75PCF -
60BPH.
>> W.O. HALCO EZSV HAND TO ARRIVE LOCATION.

1200 - 1230 0.5 0 POST N CT PJSM STRG RIG 14384 14384 HOUSEKEEPING & CLEANING RIG FLOOR, PREJOB SAFETY MEETING FOR P/U &
RIH 9 5/8" EZSV.

P/U HALCO 9 5/8" EZSV-CR ASSY:9 5/8"EZSV + MST + PORTED SUB + D.PIN + BIT
1230 - 1300 0.5 0 POST N PA HT BHA RIG 14384 14384
SUB (FLOAT) + X-OVER.
>> CONTINUOUSLY FILLING BACK SIDE WITH 75 CACL2 BRINE @ 60 BPH.

AT CONTROLLED SPEED CONT'D RIH HALCO 9 5/8" EZSV-CR ASSY ON 5"DPS.


>> ASSY: 9 5/8"EZSV + MST + PORTED SUB + D.PIN + BIT SUB (FLOAT) + X-OVER.
1300 - 2000 7 0 POST N PA HT STRG RIG 14384 14384
>> CONT RUNNING TO SETTING DEPTH CLOSE TO 7"TOL - @ 7565FT
>> CONTINUOUSLY FILLING BACK SIDE WITH 75 CACL2 BRINE @ 60 BPH.
>> FILL UP AND BREAK CIRCULATION EVERY 15STDS.
2000 - 2130 1.5 0 POST N PA CIRC MPMP RIG 14384 14384
CUMMULATIVE TIME TO FILL UP AND BREAK CIRCULATION.

RECORDED PICK UP AND SLACK OFF WT'S, BREAK CIRCULATION BELOW SETTING
DEPTH AS PER HALCO PROCEDURES.
SPOT PLUG AT 7,565FT, APPLY 35 TURNS CLOCK-WISE TO SET THE PACKER.
P/U AND APPLY 10KLBS OVERPULL 1MINS, APPLY MORE OVERPULL TO 20KLBS.
2130 - 2230 1 0 POST N PA SET BP HCB 14384 14384 7565 7564 SHEAR TENSION SLEEVE AT 50KLBS AND SET THE 9 5/8"EZSV-CR AS PER HALCO
HAND.
APPLY 35 TURNS CLOCK-WISE TO FREE THE MANDREL AND RELEASE MST, P/U
10FT FREE.
TAG ON TOP OF THE PLUG WITH 30KLBS AND CONFIRMED SETTING.
P/U 15FT ABOVE THE PLUG - PLAN TO PERFORM PRESSURE TEST.

2230 - 0030 2 0 POST N PA CIRC MPMP RIG 14384 14384 FILL UP THE WELL AND CONFIRM RETURNS AT SURFACE,
CIRCULATED CONDITION BRINE & CONFIRMED SAME 75PCF BRINE IN/OUT.
0030 - 0100 0.5 0 POST N PA WCNT NA RIG 14384 14384
FLOW CHECK AS PER ARAMCO PROCEDURES - WELL STATIC.
0100 - 0130 0.5 0 POST N PA PTST RETNR RIG 14384 14384
CLOSE BOP AND PERFORM PRESSURE TEST THE PLUG WITH 1000PSI/15MIN - OK.

AT CONTROLLED SPEED POH EZSV MST ASSY ON 5"DPS TO SURFACE.


0130 - 0415 2.75 0 POST N PA HT STRG RIG 14384 14384
>> MONITOR WELL AT TRIP TANK ALL TIME.
>> L/D HALC EZSV RUNNING TOOL MST.
0415 - 0445 0.5 0 POST N PA RR TDS RIG 14384 14384
SERVCIE TOP DRIVE SYSTEM AND DRAW-WORKS.

PJSM, P/U & M/U 2 1/4" CMT STINGER TO 5"DPS, RIH TO TOP OF EZSV.... ON
0445 - 0459 0.25 0 POST N PA HT BHA RIG 14384 14384
GOING WRT.
>> MONITOR WELL ALL TIME AT TRIP TANK - OK.
Workover Objectives
Foreman Remarks

>> ODF - TBG SPOOL = 34FT, NBR-210S RKB-TBG SPL= 28.5FT, ODF CORRECTION= +5.5 FT; ALL DEPTHS REFER TO ODF.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNIF-373 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:21 05/26/2024 - 08/02/2024
Report ID: OPERLMTDMRREP

======================SAFETY & DRILLS ======================


SAFETY MEETING:MOC AND RISK ASSESSMENT
DRILL: NIL
INCD/NM: NONE
SAFETY OBSERVATION: 24.
==============================AUDITS================================
4TH QUARTER 2023 QSI (INTERNAL) - ALL CLOSED
RHSEI 2024 - ALL CLOSED
=====================================ARAMCO PERSONNEL===============================================
>> SADIQ ALIBRAHIM ARAMCO MATERIAL CLERK # 821433 ON LOCATION SINCE 06/10/2024.
===============================THIRD PARTY PERSONNEL/EQUIPMENT================================
>> OES MUD ENGINEERS ON LOCATION.
>> TASMAN HM DRILLING JAR 6-1/2" (DJ6-650-319) ON LOCATION SINCE 6/14/2024 19:00HRS.
>> SAMAA CLEAN OUT PACKAGE ON LOCATION SINCE 6/14/2024 19:00HRS.
>> WELLBORE INTEGRITY - WHIPSTOCK TOOLS ON LOCATION SINCE 6/14/2024.

========================= NEXT WELLS =========================================


>> HELD KOM FOR MNIF-372 ON 2/21/24 (STRIP OUT 100 % / WELL SITE 100 %).
>> HELD KOM FOR MNIF-371 ON 2/21/24 (STRIP OUT 100 % / WELL SITE 100 %).
>> HELD KOM FOR MNIF-375 ON 2/21/24 (STRIP OUT 100 % / WELL SITE 100 %).
>> HELD KOM FOR MNIF-369 ON 2/21/24 (STRIP OUT 100 % / WELL SITE 100 %).
==================WATER / VACUUM TANKERS======================
>> 1 WATER TANKERS ON LOCATION.
>> 2 VACCUM TANKERS ON LOCATION.
================== RIG VISITORS======================
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/13/2024 N/A NORMAL N/A SEASONAL 2,942 N/A

Company SWK BHI RIG OES SMI BFL SNS RIG ARM BCM OTH ARM

Category CTRG DPDS RIG DFMS DFMS FILT H2S OTHR OTHR PCS VAC WSC
PERSONNEL
15 3 46 1 1 2 2 7 1 1 4 1
Total
AND SERVICES No. of Persons
84
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 12 24

Operating Hours. 0 0 12 12 0 12 12 12 12 0 10 24

Standby/Tankers Others Others Others


TRUCKS/BOATS
ARAMCO P/U AB-5183 CAMP DIESEL: 82 BBLS GASOLINE: 81 BBLS MUD DIESEL: 296 BBLS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 369 N/A N/A 1650

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2441 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/04/2024 - 07/28/2024
Report ID: OPERLMTDMRREP

NBR-263S @ HRDH-2441 Limited Morning Report for 06/18/2024


Objective : (K-2 S-SHAPE TO KAOUA, ABDELKHALEK / MOHAMED, KHALED ISMAIL / ALOTAIBI,
Foreman(s)
150 FT TVD INTO PUZU.) SAAD ABDALLAH
D&WO Morning Report (Service Providers View) Rig Charge #: Engineer ALJARALLAH, MOHAMMED JARALLAH
Copyright 2024 Saudi Aramco. All Rights Reserved NBR-263S (66-23058-2441) Manager DHAFEERI, BADER NASSER
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores:
8821677713 915 673-2749 673-8847
Date: Tuesday 06/18/2024 HRDH-2441 (0) HRDH_2441_0
CONTRACTOR /CLERK VSA T
804-9622/8 04-9200

Last 24 hr operations Next 24 hr plan


D/O CEMENT. DISPLACE. PT CSG. D/O SHOE TRACK & 10' NEW FORMATION. CHC. FIT . F/C. ROTARY DRILL 12" HOLE SECTION TO CP @11,843' (+/-10' TVD INTO KFBC).
ROTARY DRILL 12" HOLE SECTION W/BAKER MWD.
Location Next Location
281 KM FROM DHAHRAN MAIN GATE,FR/HARAD,SOUTH (15 KM ON KHARKHIR ROAD, THEN RIGHT 5 SKID ROAD). HRDH-2553
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,130 Last Csg Size MD TVD Size Top
13 3/8 10080 9687 Formations Comments
Depth
LAMS 1,780 149' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) AHMD 2,390 12' DEEPER
10085 (Date) 100 45 281 SFNY 2,730 23' DEEPER
36 (05/13/2024@0459 ) SHUB 3,565 2' SHALLOWER
BYDH 3,800 29' DEEPER
MDTM 4,890 5' SHALLOWER
SULY 5,464 19' SHALLOWER
HITH 6,112 10' SHALLOWER
ABAR 6,623 13' DEEPER
ABBR 6,658 75' SHALLOWER
ABCR 6,776 82' SHALLOWER
AD2A 7,030 134' DEEPER
BADR 7,270 28' DEEPER
UHFR 7,616 35' DEEPER
BUHR 7,767 34' DEEPER
HDRR 7,930 25' DEEPER
DHRM 8,392 20' DEEPER
LFDR 8,456 18' DEEPER
BLFR 8,564 45' DEEPER
HURN 9,011 23' DEEPER
MRRT 9,127 26' DEEPER
MNJR 9,230 21' DEEPER
JLDM 9,520 20' DEEPER
BJDM 9,657 22' DEEPER
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0500 - 0600 1 0 16 N DRLG DC TDS RIG 10085 10085 9730 9760
CLEAN OUT CEMENT F/9,730' T/9,760'.

HPJSM. SECURE BLOCK & TDS. SLIP & CUT DRLG LINE. SECURE DEADLINE
0600 - 0900 3 0 16 N DRLG RR DWKS RIG 10085 10085
ANCHOR.
> MONITOR WELL ON TRIP TANK - WELL STATIC.
0900 - 0930 0.5 0 16 N DRLG OTH NA RIG 10085 10085
SERVICE TDS.
0930 - 1330 4 0 16 N DRLG DC TDS RIG 10085 10085 9760 9905
CONT. CLEAN OUT CEMENT F/9,760' T/9,905' (10' ABOVE LC).
1330 - 1630 3 0 16 N DRLG CIRC MPMP RIG 10085 10085
DISPLACE WELL TO 123 PCF OBM & CIRC MWT IN = MWT OUT.
1630 - 1715 0.75 0 16 N DRLG CIRC MPMP RIG 10085 10085
P/T CSG TO 1820 PSI, OK. (EMW 150 PCF).

1715 - 2015 3 0 16 N DRLG DFS TDS RIG 10085 10085 9905 10085 CLEAN OUT LANDING COLLAR & HARD CMT, CLEAN 13-3/8" SHOE TRACK & RAT
HOLE TO BTM.
2015 - 2130 1.25 0 12 N DRLG D TDS RIG 10085 10095
DRILL 10' OF NEW FORMATION F/ 10085' TO 10095'.
2130 - 0030 3 0 12 N DRLG CIRC MPMP RIG 10095 10095
PUMP HI-VIS AND CHC MWT IN = MWT OUT.

0030 - 0130 1 0 12 N DRLG PTST MPMP RIG 10095 10095 PULL BACK INTO SHOE & PRESSURE TEST CASING SHOE FORMATION INTEGRITY
TO 1,820 PSI, OK. (EMW 150 PCF).
0130 - 0200 0.5 0 12 N DRLG WCNT NA RIG 10095 10095
FLOW CHECK - WELL STATIC.

0200 - 0459 3 0 12 N DRLG D TDS RIG 10095 10130 ROTARY DRILL 12" HOLE SECTION W/BAKER MWD W/ 123 PCF OBM.
> CONTROL RPM UNTIL REAMERS PASS 13-3/8" CSG SHOE.
Foreman Remarks

HRDH-2441 IS PLANNED TO BE DRILLED AS A K-2 S-SHAPE TO 150 FT TVD INTO PUZU. THE WELL WILL BE COMPLETED WITH A 15K CEMENTED LINER . THE WELL WILL BE CONNECTED TO HRDH
GAS PLANT WITH AN EXPECTED RATE OF 5 MMSCFD.
THE WELL IS UNDER DCIP PROGRAM, TARGET DAYS ARE 74.2 DAYS INCLUDING DRILLING WELL TO TD, LOGGING AND COMPLETING THE WELL
WITH 15K CEMENTED LINER.
========================================ARAMCO PERSONNEL & VISIT===================================
- ARAMCO HSE ADVISOR INNOCENT OKWUDIRE #8635799 ON LOCATION SINCE 06/15/2024.
- ABDULRAHMAN ALSAAD #815858 ON LOCATION SINCE 06/07/2024.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2441 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/04/2024 - 07/28/2024
Report ID: OPERLMTDMRREP

- ARAMCO MATERIAL EXPEDITOR SULTAN AL-QAHTANI #8556289 ON LOCATION SINCE 06/10/2024.


=============================SAFETY =============================================================
- CONDUCT DAILY SAFETY & PRE-TOUR MEETING
- SAFETY TOPICS: MOC AWARENESS CAMPAIGN, FOOD SAFETY AWARENESS CAMPAIGN & ELECTRICAL SAFETY.
- SAFETY DRILLS: 1 X STOP WORKING AUTHORITY DRILL, 2 X H2S RESCUE DRILL & 2 X TRIP DRILL.
- NEAR-MISS: NONE.
- INCD #: NONE.
- HSE ALERTS : 71-24 - TRIP AND FALL INCIDENT & 72-24 - SNAKE BITE & SCORPION STING INCIDENTS.
======================================SERVICE PERSONNEL ===========================================
> 1 X OES MUD ENGINEER ON LOCATION.
> 1 X BAKER MUD ENGINEER ON LOCATION.
> SLB CLOSED LOOP SYSTEM PERSONNEL ON LOCATION.
> SLB BARITE SILOS PERSONNEL ON LOCATION.
> BAKER DIRECTIONAL TOOLS & PERSONNEL ON LOCATION.
=====================================RENTAL TOOLS ===============================================.
- 8" HYD-MECH DA JAR SN: DJ10-800-86 ON LOCATION SINCE 06/13/2024 @ 10:30 HRS.
========================================AUDIT FINDINGS =============================================
> WC: FINDING 07 (0 OPEN).
> RHSEI AUDIT TOTAL FINDINGS: 35, OPEN: 0.
==================================VACUUM TANKERS================================================
> VACUUM TANKERS (6000 GAL) ON LOCATION:
> DRSS #:
> WORKING HOURS PER TRUCK = 10 HRS.
================================== RIG VISIT======================================================

================================== NEXT LOCATION=================================================


> NEXT WELL: HRDH-2553 (100% READY).
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
84 PCF 1 0 API 60 600 Volts 5.72 0 23,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 2.4 HTHP 21 14 0 9 / 12 OBM 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 19 19 7/8 0 0 3.4
51
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
123 PCF 1 0 API 54 750 Volts 8.69 0 16,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 1 HTHP 8 25 0 10 / 12 OBM 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 49 38 9 / 12 0 0 2.2
55

MUD BARITE BARITE-BULK PRIM-EMUL CAOH2 SEC-EMULS GELTONE CARBOTROL


TREATMENT 22 ( 5000L ) 80 ( 2200L ) 16 ( 55GL ) 80 ( 25KG ) 16 ( 55GL ) 35 ( 55LB ) 80 ( 50LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
7 10,085 10,130 DP Av DC Av Bit HHP 35 70 M423 12 ULTR
Pressure GPM Jet Vel 129.28 204.96 131 I-Row O-Row DC Location Bearings
3,000 600 160 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
366995R U716M 7 x 15 / 1.208
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 48 290 340 255 15,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit ULTR 1 1.1 6 5/8 REG 366995R
2 Bit Sub RIG 8.5 1 8.5 2.813 3 6 5/8 REG 6 5/8 REG 0 H235687H
3 Pony Collar RIG 8.5 1 8.5 2.875 15.3 6 5/8 REG 6 5/8 REG 0 575-1
4 Roller Reamer RIG 12 1 8.5 2.813 8.98 6 5/8 REG 6 5/8 REG 0 3 POINT HDH20382
DRILL STRING 5 Measurement While Drilling (MWD) BHI 8 1 8 31.81 144.45 ZDHP1510522
6 FIlter Sub BHI 8 1 8 3 7.05 6 5/8 REG 6 5/8 REG 164 13981528
7 Roller Reamer RIG 12 1 8.5 2.813 7.62 6 5/8 REG 6 5/8 REG 0 3 POINT HDH1310RR14
8 Drillcollar RIG 8.5 15 8.5 3 454.63 6 5/8 REG 6 5/8 REG 0 SPRL
9 Hydro-Mechanical Jar CTC 5 1 5 4.276 32.19 VAM-EIS NC50 VAM-EIS NC50 19.5 G105 PREMIUM HMJ850-0005
10 Drillcollar RIG 8.5 3 8.5 2.813 90.82 6 5/8 REG 6 5/8 REG 0 SPRL
11 Crossover RIG 8.5 1 8.5 2.813 2.7 6 5/8 FH 6 5/8 REG 0 170309
12 Heavy Weight Drillpipe (HWDP) RIG 6.625 6 6.625 4.5 188.09 6-5/8FH 6-5/8FH 70.8 CONV
13 Crossover RIG 8.5 1 8.5 2.813 3 XT54 6 5/8 FH 0 17-1572
14 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 6.625 5 271.79 6-5/8FH 6-5/8FH 58.1 CONV
15 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 XD105 PREMIUM

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2441 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/04/2024 - 07/28/2024
Report ID: OPERLMTDMRREP

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/16/2024 06/16/2024 N/A N/A SEASONAL 623 2 X MEETING DAILY

Company SWK BHI RIG BDF OES MJH SGR RIG ARM MI3 ARM TUB ULT

Category CTRG DPDS RIG DFMS DFMS SEC MLS OTHR OTHR WMS WSC ISPCT BITS
PERSONNEL
14 2 35 1 1 7 4 15 1 6 4 4 1
Total
AND SERVICES No. of Persons
95
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 0 24 24 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 951 150 75 N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1313 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/01/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

NBR-304S @ HWYH-1313 Limited Morning Report for 06/18/2024


Objective : (MK-1 VERTICAL Foreman(s)ALANAZI, MAMDOUH SALEH
D&WO Morning Report (Service Providers View) Charge #: WELL TARGETING KHUFF- C Engineer ALAWAD, SULTAN YAQOUB / UWE, JONATHAN SOLA CHIBOGWU
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved NBR-304S (66-23053-1313) RESERVOIR AS A PRIMARY Manager MARRY, MOHAMMAD JABER
TARGET AND KHUFF-B AS THURAYA RIG FORMAN VSAT FAX VSAT
Daily Onshore
Wellbores: SECONDARY TARGET)
(0500-0500) Saudi Aramco Well 0088-216-7 77-12718 013-577-39 05 013-875-61 73
Date: Tuesday 06/18/2024 HWYH-1313 (0) HWYH_1313_0 CONTRACTOR /CLERK VSA T
013-577-39 19

Last 24 hr operations Next 24 hr plan


RIG MAINTENANCE & CONTINUE RIG UP ON HWYH-1313 RIG MAINTENANCE & CONTINUE RIG UP ON HWYH-1313
Location Next Location
HWYH-1313 IS LOCATED IN THE EASTERN FLANK OF HAWIYAH FIELD HWYH-1320
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 180
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD PJSM PRIOR TO R/U OPERATIONS:


- REVIEWED JSA, HAZARDS & RISKS DURING RIG MOVE & RIG UP.
0500 - 0530 0.5 0 PRE N MAIN RR DWKS RIG 0 0 - DISCUSSED HSE ALERTS RELATED TO RIG MOVE OPERATIONS.
- REITERATED ON PPE REQUIREMENTS, PINCH POINTS, HANDLING LOADS PROCESS
(BANKS MAN, TAG LINES), LINE OF FIRE, ETC.
- CHECKED ALL LIFTING EQUIPMENT & RIGGER CERTIFICATES.

RIG UP ON HWYH-1313:
- REVIEW FALL PROTECTION PLAN WITH ALL CREW MEMBERS

> RIG DOWN: 100%.


> RIG MOVE: 100%.
> RIG UP: 70%

R/U OPERATIONS:
> FUNCTION TEST DEGASSER.
0530 - 1800 12.5 0 PRE N MAIN RR DWKS RIG 0 0 > CONTINUE CLEANING ON MAST AND SUB BASE.
> CHECK SOLID CONTROL EQUIPMENT ONGOING.
> CHANGE VALVES ON MUD TANKS ONGOING.
> CHANGE GUN LINES ON MUD TANKS ONGOING.
> CHANGE PIPE RAMS ON 13-5/8" BOP.
> CONNECT ELECTRICAL CABLES ONGOING.
> GENERAL RIG UP AND HOUSEKEEPING.

RIG MAINTENANCE PLAN:


1- LOAD TEST ALL PAD EYES IN MAST.
2- SEND DRAWORKS TO DAMMAM BASE FOR TRACTION MOTOR UPGRADE.
1800 - 0459 11 0 PRE N TSMF WO NA RIG 0 0
WAIT ON DAY LIGHT MEANWHILE PERFORM HOUSEKEEPING & GENERAL RIG UP.
Foreman Remarks

WELL OBJECTIVE:
HWYH-1313 IS PLANNED TO BE DRILLED AS MK-1 VERTICAL WELL TARGETING KHUFF-C RESERVOIR AS A PRIMARY TARGET AND KHUFF-B AS SECONDARY TARGET AND WILL BE COMPLETED WITH
4-1/2" CEMENTED LINER. HWYH-1313 IS OUTSIDE OF THE SHALLOW GAS AREA.
==================================================================================================
ARAMCO PERSONNEL:-
> ARAMCO ME HUSSAIN A ALSAQER #818673 ON LOCATION 06/05/2024.
> ARAMCO ME AMJAD A ALMARZOOG #825001 ON LOCATION 06/12/2024.
> ARAMCO FCT MOHAMMAD A ALDURAYWISH #765638 ON LOCATION 06/05/2024.
=================================================================================================
SERVICE COMPANYS ON LOCATION:
> MI-SWACO CUTTINGS DRYER- ON LOCATION.
> EMEC MUD ENGINEER ON LOCATION.
==================================================================================================
RENTAL TOOLS:
> NOV 9-1/2" H. MEC JAR SN#381-95178-08 ON LOCATION 06/10/2024.
> NOV 12" SHOCK SUB SN#SHT120-4514573 ON LOCATION 06/10/2024.
==================================================================================================
HSE:
PROCEDURE TOPIC OF THE WEEK # 25 (16 TO 22 JUN 2024)
1) PROCEDURE OF THE WEEK: OIL SPILL CONTROL SND HSE WIN 056 (2)
2) LESSON LEARNT OF THE WEEK (ALERT): PIPE TALLY MISTAKE SANAD OA 05 21
3) HSE GAP AUDIT WEEKLY FOCUS: ORIENTATION & SHORT SERVICE EMPLOYEE PROGRAM

> DRILLS CONDUCTED: 0


> NEAR MISS YTD: 1

> CONDUCTED (DWOP) MEETING DISCUSSED ON HWYH-1313 WITH MG, DRILLING ENGINEER ,OPREATION FOREMAN, SANND AND SERVICE COMPANIES.
==================================================================================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1313 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/01/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

PLAN VS ACTUAL CSG SETTING DEPTHS , ROP & FLAT TIME:


28'' SECTION: 765' (20' INTO RUS) & ACTUAL: XXXX', ROP PLAN 31.4 FPH/ ACTUAL XX FPH, FLAT TIME PLAN: 35.9 HR/ ACTUAL XX HRS.
22'' SECTION: 2,961' (50' INTO AHMDI) & ACTUAL: XXXX', ROP PLAN 44 FPH/ ACTUAL XX FPH, FLAT TIME PLAN: 80.3 HR/ ACTUAL XX HRS.
16" SECTION: 5,474' (50' INTO MDTM) & ACTUAL: XXXX', ROP PLAN 59.5 FPH/ ACTUAL XX FPH, FLAT TIME PLAN: 114.5 HR/ ACTUAL XX HRS.
12" SECTION: 10,869' (30' INTO BJDM) & ACTUAL: XXXX', ROP PLAN 34.47 FPH/ ACTUAL XX FPH, FLAT TIME PLAN: 136.3 HR/ ACTUAL XX HRS.
8-3/8" SECTION: 12,982' (10' INTO KFBC) & ACTUAL: XXXX', ROP PLAN 27.5 FPH/ ACTUAL XX FPH, FLAT TIME PLAN: 165.2 HR/ ACTUAL XX HRS.
5-7/8" SECTION: 14,142' (300' INTO KFDA) & ACTUAL: XXXX', ROP PLAN 21.2 FPH/ ACTUAL XX FPH, FLAT TIME PLAN: 338 HR/ ACTUAL XX HRS.
==================================================================================================
GDD COST OPTIMIZATION:

==================================================================================================
WELL SITE SUPPORT:
> VACUUM TANKERS: DOOR # 8714 / 8965 (DRSS# 1004300730) ON LOCATION 06/01/2024.
==================================================================================================
NEXT LOCATION:

DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
N/A N/A SEASONAL N/A SEASONAL 2,852 WORK WITH A
MISCELLANEOUS VALID WORK
PERMIT WHEN
REQUIRED

Company SWK RIG EMC MJH FRS RIG ARM SUD MI3 ARM

Category CTRG RIG DFMS SEC MEON OTHR OTHR OTHR WMS WSC
PERSONNEL
16 44 2 8 8 8 3 1 3 1
Total
AND SERVICES No. of Persons
94
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 0 0 12 12 12 0 0 24

Standby/Tankers Others Others Others Others


TRUCKS/BOATS
ARAMCO AB-5573 COASTER BUS AMBULANCE NABORS PICK UP MECHANIC TRUCK

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 300 425 72 113 5400

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SUHL-6 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 04/10/2024 - 09/06/2024
Report ID: OPERLMTDMRREP

NBR-575S @ SUHL-6 Limited Morning Report for 06/18/2024


Objective : (A VERTICAL GAS Foreman(s)AHMED, WALID ABDELRAZIK WAHBA / OSMAN, HAYTHAM SAYED
D&WO Morning Report (Service Providers View) Rig Charge #: EXPLORATION WELL Engineer ALKUHAILI, AHMED ABDULAZIZ / JAAFARI, FAROOG KHALED
Copyright 2024 Saudi Aramco. All Rights Reserved NBR-575S (75-23737-0006) TARGETING HANIFA & JILH Manager BENAICHA, MOHAMED
Daily Onshore DOLOMITE AS PRIMARY THURAYA RIG FORMAN VSAT CONTRACTOR
Well Wellbores: OBJECTIVES.) /CLERK VSA
(0500-0500) Saudi Aramco 0088216777 11371 013-577969 7
Date: Tuesday 06/18/2024 SUHL-6 (0) SUHL_6_0 T
013-577960 9

Last 24 hr operations Next 24 hr plan


CONT'D 9 5/8" CSG. CHC. PERFORM 1ST STAGE CMT. OPEN DV. PERFORM 2ND STAGE CMT. R/D CONT'D R/D ALMASAOOD CSG RUNNING TOOLS & EQUIPMENT. INSTALL FMH P/OFF & P/T. N/D
LANDING JT & FMH R/T. R/D ALMASAOOD CSG RUNNING TOOLS & EQUIPMENT. 13-5/8" 15M BOP. INSTALL 13-3/8 X 11" VG THS & P/T. N/U BOP.
Location Next Location
601 KM F/DMG TO RIG- NBR-575S, 80 KM BEFORE SHAYBAH MAIN GATE, 145 KM SKID ROAD. *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,803 Last Csg Size MD TVD Size Top
13 3/8 8023 8023 Formations Comments
Depth
DMMM 740 18' DEEPER.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 1,080 50' DEEPER.
10803 (Date) 100 0 601 UMER 1,920 32' SHALLOWER
56.6 (04/22/2024@1400 ) ARUM 3,280 18' SHALLOWER
LAMS 3,420 39' SHALLOWER
RWYD 3,626 NOT IN PROGRAM
TWYL 3,801 NOT IN PROGRAM
MSRF 3,860 30' DEEPER
RUML 4,539 46' DEEPER
AHMD 4,789 35' SHALLOWER
SFNY 5,236 NOT IN PROGRAM
SFNR 5,426 181' DEEPER
KHFJ 5,561 NOT IN PROGRAM
SHUB 6,110 24' SHALLOWER
SHBR 6,217 NOT IN PROGRAM
BYDR 6,451 NOT IN PROGRAM
BUWB 7,130 12' SHALLOWER
BWBR 7,338 NOT IN PROGRAM
CRLD 7,411 23' DEEPER
URTR 7,591 29' DEEPER
SULY 8,015 34' DEEPER
HITH 8,530 1' SHALLOWER
HSRG 8,592 NOT IN PROGRAM
ABAR 8,900 AS PROGREAM
BAAR 8,921 NOT IN PROGRAM
ABBR 8,987 NOT IN PROGRAM
BABR 9,000 NOT IN PROGRAM
ABCR 9,170 10' DEEPER
ABDR 9,252 11' DEEPER
BADR 9,401 NOT IN PROGRAM
UJBR 9,520 14' DEEPER.
BUJR 9,549 NOT IN PROGRAM
HNFR 10,124 29' DEEPER
HDRR 10,486 20' DEEPER.
BHDR 10,603 14' DEEPER

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Lt Type Lt ID Summary of Operations
OP Co Start End Start End

RIH W/ 9-5/8" CSG (53.5#, JEP-95HS, JPC-4, BARE & 53.5#


AM-95HCSS, AM-HBC-A, BARE) T/ 8,570' (264/264 JTS)
> WASH DOWN LAST TWO JTS , NO HOLE FILL
0500 - 0930 4.5 0 12 N CSG RCSG CTRQ MSD 10803 10803 8000 10753 >FILL-UP EACH 5 JOINT WHILE RIH.
> CONTROL RIH SPEED TO AVOID SURGING FORMATION.
> M/U CSG TO OPTIMUM TORQUE VALUE & RECORDED WITH
JAM UNIT.
> MONITOR WELL ON TRIP TANKS-OK.
0930 - 1100 1.5 0 12 N CSG CIRC MPMP RIG 10803 10803
CIRCULATE STRING VOLUME

1100 - 1300 2 0 12 N CSG RCSG CTRQ MSD 10803 10803 10750 10794 M/U FMC FMH ASSY. WASH DOWN & LAND IN WELL HEAD.
> FS @ 10,794', FC @ 10,625' & DV @ 7,294'.

HAD MALFUNCTION IN TANK CALIBRATION READINGS DURING


1300 - 1400 1 0 12 N CSG CIRC MPMP RIG 10803 10803 TF 934862
PUMP EFFICIENCY TEST- FIXED SAME OK. PERFORMED PUMP
EFFICIENCY TEST.

M/UP CEMENT HEAD AND 2 CEMENT LINES.


> CIRCULATE 2 X BTMS-UP PRIOR CEMENT JOB W/100%
1400 - 1900 5 0 12 N CSG CIRC MPMP RIG 10803 10803
CIRCULATION, MEANWHILE R/D AL- P/U & L/D MACHINE.
> PUMP WITH 8 BPM & PRESSURE STABLE @ 850 PSI.
> TEST CEMENT LINES TO 300/5,600 PSI GOOD TEST.

HPJSM; PERFORM 9-5/8" CSG 1ST STAGE CMT JOB AS


1900 - 0000 5 0 12 N CSG CMC CSG NCS 10803 10803 FOLLOWS:
- RIG PUMP 400 BBL LOW RHEOLOGY MUD 97 PCF @ 6 BPM
MEANWHILE BATCH MIX 128 PCF TAIL CMT SLURRY.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SUHL-6 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 04/10/2024 - 09/06/2024
Report ID: OPERLMTDMRREP

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Lt Type Lt ID Summary of Operations
OP Co Start End Start End
- DROP WFD 1ST STAGE BOTTOM BY-PASS PLUG .
- RIG TO PUMP 200 BBL 110 PCF NESR SHIELD BOND SPACER
AHEAD @ 6 BPM.
- NESR MIX AND PUMP 100 BBLS LEAD CMT 118 PCF @ 6 BPM.
- NESR PUMP 210 BBLS BATCH MIXED TAIL CMT 128 PCF @ 6
BPM.
- DROP WFD 1ST STAGE TOP DISPLACMENT (SHUTOFF) PLUG.
- NESR PUMP AND DISPLACE 10 BBLS 128 PCF TAIL CMT
SLURRY BEHID PLUG @ 6 BPM.
- NESR PUMP 20 BBL SPACER 105 PCF BEHIND @ 6 BPM.
- RIG PUMP 151 BBLS WBM 97 PCF @ 6 BPM.
- RIG PUMP 25 BBLS NESR SPACER 105 PCF @ 6 BPM.
- DROP WFD DVT OPENING PLUG.
- RIG PUMP 25 BBLS NESR SPACER 105 PCF
- RIG PUMP 491 BBLS WBM 97 PCF. SLOW DOWN TO 3 BPM
PRIOR TO BUMP DV OPENING PLUG LAST 10 BBLS.
- BUMP PLUG @ 1,300 PSI WITH 500 PSI OVER FINAL
DISPLACEMENT PRESSURE, CONFIRMED INFLATE WFD DV PKR
W/ 2,200 PSI & OPEN DV PORTS W/ 3,100 PSI. CHECKED MUD
LEVEL IN ANNULUS STATIC.
- DUMP 147 BBLS SPACER, 66 BBLS CONTAMINATED CMT WITH
SPACER & 52 BBLS PURE CMT AT SURFACE.
- NO LOSSES WHILE CMT JOB.

0000 - 0200 2 0 12 N CSG CMC CSG NCS 10803 10803 CIRCULATE 2 TIMES BTTM UPS TILL CIRCULATE OUT EXCESS
CEMENT VIA WFD DVT PORTS. PRIOR 2 STAGE CEMENT JOB.

HPJSM; PERFORM 9-5/8" CSG 2ND STAGE CMT JOB:


- RIG PUMP 100 BBLS NESR SPACER 105 PCF @ 6 BPM.
- NESR MIX AND PUMP ON FLY 466 BBLS LEAD CMT SLURRY
112 PCF CLASS "G" @ 6 BPM.
- DROP WFD DVT CLOSING PLUG FOLLOWED BY 10 BBLS LEAD
CMT SLURRY BEHIND PLUG 112 PCF @ 6 BPM & NESR PUMP 10
0200 - 0430 2.5 0 12 N CSG CMC CSG NCS 10803 10803
BBLS NESR SPACER BEHIND 105 PCF @ 6 BPM.
- RIG PUMP AND DISPLACE W/ 496 BBLS MUD 97 PCF @ 12 BPM.
SLOW DOWN TO 3 BPM PRIOR TO BUMP PLUG LAST 10 BBLS.
- BUMP PLUG GENTLY WITH 2,600 PSI @ 1,000 PSI FDP).
BLEED OFF PRESSURE. CHECK DV TOOL IS CLOSED PROPERLY
& CHECK FLOAT FOR HOLDING - OK.
- DUMP 40 BBLS PURE CMT AT SURFACE.

FLUSH WELLHEAD SOV'S, R/D NESR CEMENT HEAD AND


0430 - 0459 0.5 0 12 N CSG HT PEL RIG 10803 10803
SURFACE LINES, R/D CRT. BACK OFF FMC LANDING SUB W/
LANDING JT AND L/D SAME.....ONGOING @ RT.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 1300 1 1 934862 TF FOT SFLN RIG 10803 HAD MALFUNCTION IN TRIP TANK
CALIBRATION.
Foreman Remarks

SUHL-6 WILL BE DRILLED AS A VERTICAL GAS EXPLORATION WELL TARGETING HANIFA & JILH DOLOMITE AS PRIMARY OBJECTIVES & SAFANIYA,
CHRYSALIDINA, UPPER RATAWI, SULAIY, ARAB-A, ARAB-C, HDRR & UFDR RESERVOIRS AS SECONDARY OBJECTIVES. THE PLANNED TOTAL
DEPTH OF THE WELL IS 13,838' MD/TVD (-13,446' TVDSS) OR +/- 70 FT INTO BASE JILH DOLOMITE.
-========================================CASING SETTING DEPTH =============================
- PLANNED 30" CSG SET AT 200 FT, / ACTUAL: 206 FT.
- PLANNED 24" CSG SET AT 1080 FT,(50 FT INTO RUS) / ACTUAL: 1130 FT.
- PLANNED 18-5/8" CSG SET AT 3509 FT, (50 FT INTO LAMS) / ACTUAL: 3,470 FT.
- PLANNED 13-3/8" CSG SET AT 7991 FT, (10 FT INTO SULIAY) / ACTUAL: 8,025 FT.
- PLANNED 9-5/8" CSG SET AT 10789 FT, (200 FT INTO BHDR) / ACTUAL: 10,803 FT.
- PLANNED 7" LINER SET AT 13,347 FT, (30 FT INTO JILH) / ACTUAL: XXXX' FT, TOL XXXX FT.
- PLANNED 4-1/2" LINER TO BE SET AT 13,838 FT, (70 FT INTO BJDM) / ACTUAL: XXXXX FT, TOL XXXXX.
================================== ====PERSONNEL =======================================
** ARAMCO MATERIAL EXPEDITER MOHAMMAD A ALFALAH #8589419 ON LOCATION SINCE 06-03-2024.
** ARAMCO DRILLING ENGINEER DRAGAN GRUJOVIC #727559 ON LOCATION SINCE 06/14/2024.
** ARAMCO GEOLOGIST BADR ALMARGHLAI #785932 & KHALID ALZAHRANI #790750 ON LOCATION SINCE 06/15/2024.
================================== ====SERVICE PERSONNEL==================================
** EMEC MUD ENGINEER ON LOCATION.
** SLB MUD LOGGERS CREW & MUD LOGGING UNIT ON LOCATION SINCE 04-19-2024.
** NPS CMT CREW ON LOCATION SINCE 04-22-2024.
** SCOMI CENTRIFUGE CREW ON LOCATION SINCE 5/4/2024.
** SLB FRAC TANK CREW ON LOCATION SINCE 5/18/2024.
** WFD DV ENGINEER ON LOCATION SINCE 06/01/2024.
** BAKER WELLHEAD ENGINEER ON LOCATION SINCE 06/09/2024.
** FMC WELLHEAD ENGINEER ON LOCATION SINCE 06/10/2024.
** HALLIBURTON BAROID MUD ENGINEER ON LOCATION ON 06/09/2024.
================================== ====RENTAL TOOLS ====================================
** NAPESCO 2EA X 8-1/2" D-JAR (S/N:HMJ-850-0003) & (S/N:HMJ-850-8496801) ON LOCATION ON 05-19-2024.
** NAPESCO 1EA X 6-1/2" D-JAR (S/N:HMJ-850-0003) & (S/N:HMJ-650-134) ON LOCATION ON 06-04-2024.
==============JOURNEY MANAGEMENT PLAN =================================================
> CREATE JOURNEY MANAGEMENT PLAN BEFRORE LEAVING YOUR COMPANY BASE.
> ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
> DISTANCE FROM DAMMAM TO RIG: 601 KM INCLUDING "SKID ROAD 140 KM".

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SUHL-6 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 04/10/2024 - 09/06/2024
Report ID: OPERLMTDMRREP

> SKID ROAD HAS NO MOBILE SIGNAL, CALL RIG FOREMAN OR RIG CONTRACTOR BEFORE ENTERING SKID ROAD.
================================== AUDIT FINDINGS ========================================

======================================== SAFETY ========================================


> NEAREST ARAMCO FACILITY - SHAYBAH CLINIC/CAMP - 295 KM FROM LOCATION. MEDIC ON LOCATION.
> RER 1/2 LFL: 200 M, RER 100 PPM: 5300 M, RER 30 PPM: 11000 M.
> PRIMARY SGA#1: 11 KM & SECONDARY SGA#2: 11 KM,01 X H2S DRILL.
> DRILLS: 01X MAN DOWN (INJURY)/ CASUALTY HANDLING/ FIRST AID DRILL & 01X RESCUE FROM CONFINED SPACE.
> D&WO HSE ALERTS: 65-24 / 66-24 & 67-24/68-24.
> OPERATIONAL ALERT: 06-24.
> EDD SAFETY BULLETIN: 23-2024.
========================================ON LOCATION SUPPORT TANKERS======================
> VACUUM TANKERS: DRSS# 1004321159 & 1004321157 FOR THE MONTH OF JUNE 2024.
> SPRAY WATER TANKERS: DRSS #1004321162 FOR THE MONTH OF JUNE 2024.
> DUMP TRUCK: DRSS #1004321239 FOR THE MONTH OF JUNE 2024.
======================================== NEXT WELL=====================================
> NEXT WELL:SUHL-7 / 80% PREPARATION.
> WATER WELL: SUHL-811 WITH 630 GPM & 100 PPM H2S.
> LAST VISIT:
> PRE-MOVE MEETING:
=======================================TOTAL EXTRA REQUIRMENT 2 DAYS =====================================
> 8-3/8" CLEAN OUT OPERATIONS FOR CEMENT LOG & CEMENT LOG OPERATION.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
97 PCF 1 3.2 API 2 0 Volts 4.69 10.1 77,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 13.6 HTHP 77 16 0.2 9 / 15 NCPOL 3.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 40 21 8/9 5 320 13.6
71
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
97 PCF 1 2.8 API 2 0 Volts 4.59 10 79,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 13.2 HTHP 77 26 0.2 9 / 15 NCPOL 3.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 42 21 9 / 10 5 340 13.6
76

MUD S-THIN
TREATMENT 80 ( 55LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/14/2024 N/A N/A N/A EXTREMELY 3,123 TWICE PER DAY
HOT

Company MSD TGC WDV RIG BAR EMC MJH SGR RIG ARM NCS OTH RIG ARM FME GEP

Category CSR CTRG DV RIG DFMS DFMS SEC MLS OTHR OTHR PCS RENT SCS WSC WHES WHES
PERSONNEL
9 16 2 44 2 1 4 4 22 4 5 1 2 2 1 2
Total
AND SERVICES No. of Persons
121
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 12 0 12 24 12 12 12 24 12 12 24 0 0 24 12 0

Standby/Tankers Others Others


TRUCKS/BOATS
AB-5448 SANAD AMBULANCE SANAD 2 EVACUATION BUSES / PICK UP

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 500 470 218 70 5300

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2505 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/16/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

NBR-591S @ HRDH-2505 Limited Morning Report for 06/18/2024


Objective : (MK-1 Foreman(s)AKANDE, OLUSHOLA SUNDAY
HORIZONTAL PRESET 10 FT Engineer FAHMI, MOHAMMED MAMDOUH
D&WO Morning Report (Service Providers View) Charge #: TVD INTO KHUFF-C Manager ALSHAIKH, SABER YASSEN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved NBR-591S (66-23058-2505) CARBONATE ) THURAYA RIG FORMAN VSAT CONTRACTOR
Daily Onshore +882167771 3753 013-576-31 15 /CLERK VSA
(0500-0500) Saudi Aramco Well Wellbores: T
Date: Tuesday 06/18/2024 HRDH-2505 (0) HRDH_2505_0 013-576-31 23
CONTRACTOR /CLERK VSA T
013-804964 9 (CLINIC )

Last 24 hr operations Next 24 hr plan


PEREFORM 2-STAGE CMT JOB, WASH HGR NECK, SET PACK OFF & PT, N/D BOP, INSTALL CIW N/U BOP, CHANGE RAM & PT BOP, SET WB, MU & RIH 8-3/8" SLB MWD ROTARY ASSY WHILE P/U
TBG SPOOL, N/U BOP. BHA/5-1/2" DP.
Location Next Location
N-2721782.08, E-309210.02 217 KM FROM DH WAQR-201
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,323 Last Csg Size MD TVD Size Top
9 5/8 9312 9308 Formations Comments
Depth
BYDH 3,200 19 SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) MDTM 4,150 17' SHALLOWER
9323 (Date) 0 0 217 SULY 4,700 2' DEEPER
24.2 (05/25/2024@0000 ) HITH 5,340 17' DEEPER
ABAR 5,710 11' DEEPER
ABBR 5,830 13' DEEPER
ABCR 5,970 22' DEEPER
ABDR 6,250 2' SHALOWER
HDRR 7,355 52' DEEPER
DHRM 7,600 7' SHALOWER
LFDR 7,750 84' DEEPER
HURN 8,205 92 SHALOWER
MRRT 8,390 29' SHALOWER
MNJR 8,710 3' SHOLOWER
JILH 8,940 43' SHALOWER
JLDM 9,120 49' SHALOWER
BJDM 9,268 25' SHALOWER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT TO PERFORM 1ST STAGE CMT JOB AS :


3- TAQA MIX-ON FLY & PUMP: LEAD SLURRY: 351 BBL (872 SX) X 101 PCF, TAIL
SLURRY: 85 BBL (308 SX) X 118 PCF
4- WFD DROP TOP PLUG (SHUT-OFF PLUG).
0500 - 0700 2 0 12 N CSG CMC CSG SJC 9323 9323 5- TAQA PUMP 10 BBL (36 SX) X 118 PCF CMT SLURRY & 10 BBL MIX WATER,
6- RIG DISPLACE W/341 BBL X 76 PCF WBM MUD, 40 BBL X 97 PCF TUNED
SPACER, 261 BBL X 83 PCF MUD.
> BUMP PLUG W/500 PSI OVER DISPLACEMENT PR & PR UP TO 2200 PSI. BLEED-
OFF -OK.
>NO LOSSES DURING CMT JOB.

DROP WEATHERFORD FREE FALL OPENING PLUG & ALLOW SAME TO GRAVITATE
0700 - 0845 1.75 0 12 N CSG PTST DV RIG 9323 9323
TO DV TOOL. PR UP & INFLATE DV AS PER WFD REP W/1400 PSI, PR UP & OPEN
DV PORTS W/3700 PSI.

CIRC 2 X ANN VOLUME THRU DV TOOL PORTS UNTIL CLEAN RETURNS ON SURF.
0845 - 1045 2 0 12 N CSG CIRC MPMP RIG 9323 9323 > HAD 102 BBLS CONTAMINATED SPACER RETURNS & 98 BBL CMT ON SURF.
> FLUSH BOP CAVITY, WELLHEAD PROFILE, FUNCTION ANNULAR.
> HOLD PJSM FOR 2ND STAGE CMT JOB.

2ND STAGE CMT JOB AS FOLLOWS: HOLD PJSM.


1- RIG PUMP 150 BBL X 97 PCF TUNED SPACER @ 12 BPM.
2- TAQA MIX/PUMP ON FLY: LEAD SLURRY: 202 BBL (732 SX) X 118 PCF @ 5 BPM
& TAIL SLURRY: 70 BBL (263 SX) X 120 PCF @ 5 BPM
3- DROP WFD TOP(CLOSING) PLUG.
1045 - 1330 2.75 0 12 N CSG CMC CSG SJC 9323 9323
4- TAQA PUMP 10 BBL X 97 PCF TUNED SPACER BEHIND PLUG.
5- RIG DISPLACE WITH 270 BBL X 76 PCF MUD @ 12 BPM, SLOW DOWN LAST 10
BBL MUD @ 3 BPM
> BUMP PLUG W/1400 PSI & CLOSE DV PORTS W/3100 PSI. BLEED-OFF PREESURE
& CHECK FOR BACKFLOW -OK.
> OBSERVE 18 BBL CONTANMINATED FLUID, 39 BBL CMT RETURNS ON SURF.

1330 - 1500 1.5 0 12 N CSG HT PEL RIG 9323 9323 R/D CEMENT LINES & TAQA CEMENT HEAD MEANWHILE FLUSH BOP THRU WELL
HEAD VALVES WITH WATER. FUNCTION ANNULAR.

1500 - 1630 1.5 0 12 N CSG SET FMH CAM 9323 9323 CIW RELEASE CSG HGR RUNNING TOOL. BREAKOUT L/D JT, L/D SAME & RUNNING
TOOL. R/D AL-MASAOOD POWER TONG.
1630 - 1800 1.5 0 12 N CSG HT PEL MSD 9323 9323
R/D AL-MASAOOD CRT, CHANGE BAILS & CHANGE HANDLING TOOLS TO 5-1/2".

1800 - 1900 1 0 12 N WH OTH NA RIG 9323 9323 RIH W/ CIW WASH TOOL, WASH WELL HEAD & HANGER NECK W/ WATER TILL
CLEAN WATER FROM SOV'S AS PER CIW REP. POOH & L/D SAME.
1900 - 2030 1.5 0 12 N CSG SET FMH CAM 9323 9323

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2505 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/16/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
P/U CIW PACK OFF SEAL ASSY, PACK OFF RUNNING TOOL. RIH W/ 5-1/2" DP STD &
SET PACK OFF. PRESSURE TEST PACKOFF SEAL TO 7100 PSI - OK GOOD TEST,
PERFORM 5 KLB PULL TEST - OK. L/D RUNNING TOOL & RACK BACK 5-1/2" DP STD
IN DERRICK.

HPJSM, N/D 13-5/8" 10M CLASS "A" BOP STACK & SPACER SPOOL.
2030 - 2330 3 0 12 N BOP BOP BOP RIG 9323 9323
>BARRIER IN-PLACE: MECHANICAL (BACKSIDE -CMT/DV/HGR PACK-OFF), INSIDE -
CMT/FS/FC); HYDRAULIC: MW: 76 PCF)

2330 - 0300 3.5 0 12 N WH NU WH CAM 9323 9323 N/U CIW 13-5/8" X 11" 10M TUBING SPOOL W/VG 4 EA 3-1/16" 10M VALVES(PRE-
INSTALLED). PT VOID TO 7100 PSI & BETWEEN SEALS 7100 PSI AS PER CIW REP.

HOLD PJSM. N/U 13-5/8" 10M CLASS "A" BOPE & ASSOCIATED EQUIPMENT AS PER
0300 - 0459 2 0 12 N BOP BOP BOP RIG 9323 9323
ARAMCO STANDARDS -ONGOING @ RT.
> INSTALLED FLOW LINE & BELL NIPPLE.
Foreman Remarks

HRDH-2505 IS MK-1 PRESET WELL TO KFCC


==================================[ARAMCO]=================================== =
> AHMED AL-WABARI #820878 -ARAMCO MATERIAL EXPEDITER ON LOCATION FROM 06/10/2024
> ALI ALFARHAN #819818 - ARAMCO PDP ON LOCATION FROM 06/13/2024.
==================================[RIG VISIT]=================================== =

===============================[SERVICE COMPANY PERSONNEL]========


> EMEC MUD ENGINEER.
> SLB SILOS OPERATOR.
>SLB MWD ENGEENER ON LOC 06/10/2024
>TAQA CMT CREW ON LOC 06/13/2024
>CAMERON WELLHEAD ENGR ON LOC @ 06/13/2024
>SLB CUTTINGS DRYER CREW ON LOC FROM 06/15/2024
>SMITH (SLB) BIT RUNNER ON LOC FROM 06/17/2024
===============================RENTAL TOOLS ===========================
>COUGAR 8" JAR RECEIVED SN:DJ10800-114 ON 06/06/2024 @ 1940 HRS
============[CLOSED LOOP DRILLING PRACTICE]=========================
> IMPLEMENTING CLOSED LOOP DRILLING PRACTICE (3 SIDE TANK ONLY )
===================================[RENTAL TOOLS]===============================
> SPRAY TANKER ( DRSS # 1004325142 ) ON LOCATION 6/1/24
===========================[SAFETY & HSE FINDINGS STATUS]=========================
> FINDINGS STATUS RHSEI: ALL CLOSED, CEHA: ALL CLOSED OPEN, 3MCI: ALL CLOSED, WCI: ALL CLOSED
>DISCUSSED ARAMCO SAFETY GUIDELINES ON HEAT STRESS.
=================================[WELLSITE SERVICES]=============================
>
====================================[NEXT WELL]================================
> WAQR-201 100% COMPLETE
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
76 PCF 0 4 API 0 0 Volts 4 9.8 28,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 89 21 0 8 / 10 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 37 11 7/8 10 200 0
73
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
76 PCF 0 4 API 0 0 Volts 4 9.8 28,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 89 21 0 8 / 10 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 37 11 7/8 10 200 0
73

MUD TNATHN
TREATMENT 15 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/07/2024 N/A NORMAL N/A NORMAL 2,880 DAILY

Company MSD RIG WDV RIG BAR EMC SDM HMS RIG ARM SJC MI2 MI3 ARM CAM SMI

PERSONNEL Category CSR CTRG DV RIG DFMS DFMS LWD MLS OTHR OTHR PCS SCS WMS WSC WHES DFMS
Total
AND SERVICES
6 15 2 42 2 1 2 2 12 3 8 2 10 1 2 2 112
INFORMATION No. of Persons

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2505 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/16/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

Operating Hours. 15 0 15 24 24 12 0 24 12 12 15 24 24 24 20 12

Standby/Tankers
TRUCKS/BOATS
AB-0037

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 664 140 133 4000

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MTMN-2 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 02/04/2024 - 07/10/2024
Report ID: OPERLMTDMRREP

NBR-633S @ MTMN-2 Limited Morning Report for 06/18/2024


Objective : (PRIMARY Foreman(s)KACED, TAREK
D&WO Morning Report (Service Providers View) Charge #: OBJECTIVE OF MTMN-2 WELL IS Engineer KHALIL, ANAR
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved TO EVALUATE THE QUALITY OF Manager BENAICHA, MOHAMED
NBR-633S (75-23882-0002)
THE BYDH, ARAB-D & HNIF THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: RESERVOIRS)
(0500-0500) Saudi Aramco Well 882 1677 7 12 783 5779691 5779690
Date: Tuesday 06/18/2024 MTMN-2 (0) MTMN_2_0 OTHER VSAT
5779668 CL ERK

Last 24 hr operations Next 24 hr plan


SLB PERFORM W/L PLT LOGGING, POOH & R/D LOGGING TOOLS, CO2 INJECTION. CONT CO2 INJECTION, FALL-OFF TEST (12HR), POST CO2 WATER INJECTION.
Location Next Location
F/DDM TO A.HADRIA, RIGHT TO NAIRYIA RD 60 KM, RIGHT TO ALIYIA RD 80KM, ELQARA ROAD 15 KM, SKID 14 KM *EXPLORATION DRILLING*
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,820 Last Csg Size MD TVD Size 5,811 8,997 8,997 Top
9 5/8 6517 6517 Formations Comments
7 Depth
BUWB 5,610 28' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) YAMM 5,838 11' DEEPER
10820 (Date) 100 0 338 SULY 5,995 24' DEPPER
114.7 (02/24/2024@1300 ) HITH 6,470 26' DEEPER
ABAR 6,915 2' DEEPER
ARBB 6,973
ABBR 7,015 13 SHALLOWER
ABCR 7,218 4' DEEPER
ABDR 7,440
UJBR 7,800 29' DEPPER
BUJR 7,830
HNIF 8,010 4' DEEPER
UFDR 8,850 5' DEEPER
DHRM 8,940 25' SHALLOWER
LFDR 9,020 10' SHALLOWER
FRAR 9,590 19' SHALLOWER
BFAR 9,915
DRMS 10,520 34' SHALLOWER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0630 1.5 0 EOW E TEST OTH NA SWL 10820 10820 CONT HPJSM, R/U SLB. W/L LUBRICATOR & PCE, P/T TO 3000 PSI.
- M/U & RIH SLB. PLT BHA.

0630 - 0830 2 0 EOW E TEST OTH NA SWL 10820 10820 RIH SLB. PLT BHA TO 7170'. & SHUT IN THE WELL.
- RECORD PRESSURE & TEMPERATURE WHILE RIH.

SCHLUMBERGER W/L STARTED SHUT IN SURVEY.


- WAIT FOR SHUT-IN PRESSURE STABILIZATION FOR 1 HOUR.
- RECORD 3 DOWN & 3 UP SHUT IN PASSES WITH 30/60/90 FT/MIN FROM 7170'
0830 - 1145 3.25 0 EOW E TEST LOG CORRL SWL 10820 10820 7170 7300 TO 7300'.
- TAKE STATIONARY MEASURMENTS AT 7170', 7225', 7230', 7240', 7250',7260',
7275', 7300'.
- SENT DATA TO RDD & CONFIRMED THEY ARE OK.

1145 - 1930 7.75 0 EOW E TEST OTH NA SWL 10820 10820 INJECTION WITH WATER AT 12 BPM AND WAIT FOR WHP STABILIZATION
WHP=850 PSI.

SLB PERFORM PLT LOGGING, PERFORM 4 DOWN AND 4 UP PASSES OVER 7960 -
8340 FT AT 30, 60, 90 &110 FT/MIN.
1930 - 2300 3.5 0 EOW E TEST LOG CORRL SWL 10820 10820 7170 7300
TAKE STATIONARY MEASUREMENTS WHILE LOGGING THE UP PASS AT: 7960,
8020, 8040, 8070, 8100, 8130', 8160', 8220', 8250', 8280', 8310' AND 8340FT.
- SENT DATA TO RDD & CONFIRMED THEY ARE OK.

POOH WITH SLB W/L PLT LOGGING TOOLS TO SURFACE & L/D TOOLS & W/L
2300 - 0145 2.75 0 EOW E TEST OTH NA SWL 10820 10820
EQUIPMENTS.
- STOP WATER INJECTION.

0145 - 0215 0.5 0 EOW E TEST OTH NA HTS 10820 10820 HOLD PRE JOB SAFETY MEETING REVIEW CO2 INJECTION OPERATIONS.

HALLIBURTON PRESSURIZED THE WELL BY WATER INJECTION WITH 12 BPM TILL


0215 - 0400 1.75 0 EOW E TEST OTH NA HTS 10820 10820 STABLIZE PRESSURE TO 800 PSI.
- TOTAL WATER PUMPED ON: 1300 BBLS.
- PUMP 25 BBLS OF GLYCOL.

0400 - 0459 1 0 EOW E TEST OTH NA HTS 10820 10820 HALLIBURTON PERFORMED CO2 INJECTION WITH 10 BPM, AVERAGE PRESSURE
WHILE PUMPING: 580 PSI......ON GOING @RPT
Foreman Remarks

MTMN-2 WILL BE DRILLED AS A VERTICAL EVALUATION WELL FOR CO2 SEQUESTRATION. THE PRIMARY OBJECTIVE OF MTMN-2 WELL IS TO REDUCE THE STRUCTURAL UNCERTAINTY AND TO
EVALUATE THE RESERVOIR QUALITY OF THE BYDH, ARAB-D, AND HNIF RESERVOIRS. IN ADDITION TO THIS, EXPLORATION TEAM WILL EVALUATE FRDR RESERVOIR AS THIS IS A BOOKING FOR
HABA.
============================ ==========WELL DESIGN =================================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MTMN-2 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 02/04/2024 - 07/10/2024
Report ID: OPERLMTDMRREP

- 30" CSG (34" HOLE SECTION) @120' (80' BELOW GL), ACTUAL @ 120'.
- 24" CSG (28" HOLE SECTION) @ 360' (+/- 50' INTO RUS), ACTUAL @ 370'.
- 18-5/8" CSG (22" HOLE SECTION) @ 2,550' (+/- 100' INTO LAMS), ACTUAL @ 2,380'.
- 13-3/8" CSG (16" HOLE SECTION) @ 4,180' (+/- 10' INTO SHUAIBA), ACTUAL @ 4,200'.
- 9-5/8" CSG (12" HOLE SECTION) @ 6,500' (+/- 50' INTO HITH), ACTUAL @6520'.
- 7" LNR (8 3/8" HOLE SECTION) @ 9,000' (+/- 150' INTO UPPER FADHILI), ACTUAL @9000'.
- 4-1/2" LNR ( 5-7/8" HOLE SECTION) @ +/-10,860' MD/TVD (300' INTO DHRUMA SHALE MEMBER ) ACTUAL @10820'.
========================================ARAMCO PERSONNEL ON LOCATION=============================================
> ARAMCO CLERK - M USMAN KHALID ID # 8545531 ON LOCATION SICE 26 FEB 2024.
> ARAMCO HSE ADVISOR RONALD TORRES P/N# 8205385 ON LOCATION SINC 06/14/2024.
========================================LITHOLOGY =================================================

======================================== RIG VISIT ==================================================

========================================= HSE =====================================================


> DRILL: NONE.
> HSE ALERTS: NONE.
> NEAR MISS: NONE.
> SAFETY OBSERVATIONS: 22.
======================================= THIRD PARTY ================================================
* 17 X TAQA CTS CREW AND EQUIPMENT ON THE RIG SINCE 17:00 19 MAY 2024.
* 8 X HALLIBURTON PUMPING EQUIP AND CREW ON THE RIG SINCE 17:00 19 MAY 2024.
* 3 X TAQA SLICK LINE CREW AND EQUIPMENT ON LOCATION SINCE 19 MAY 2024.
* 3 X SLB PERFORATION CREW.
======================================WELLSITE SERVICES==============================================
> NEXT WELL: AWSQ-3 (100% READY).
> APPROVED PROGRAM: NO.
> APPROVED ERP: YES.
> LAST VISIT: 06/13/2024
> WATER WELL: AWSQ-805 -NOT READY-
===============================RIG NBR-633S JOURNEY MANAGEMENT=======================================
> CREATE JOURNEY MANAGEMENT PLAN BEFORE LEAVING COMPANY BASE.
> ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
> DISTANCE FROM DHAHRAN TO RIG: 338 KM INCLUDING "SKID ROAD 14 KM"
>14 KM SKID ROAD LEADDING TO RIG NBR-633S HAS NO MOBILE SIGNAL.
===================================EXTRA REQUIREMENTS===============================================
EXTRA REQUIREMENT (TOTAL 23 HRS):
- CIRC. BTM UP AS PER GEOLOGIST TO CONFIRM TOP OF HANIFA FM.: (TOTAL 11 HRS).
- 4TH STEP-RATE WATER INJECTION TEST AS PER WELL TESTING ENGINEER. (TOTAL 12 HRS).
=============================================NOTES=================================================
- SENT TOTAL 750 BBLS OF 130 PCF WBM TO SUPPORT SP-70 IN THIER WELL CONTROL SITUATION .
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 10,820 0.36 189.53 0 10,819 -16.2 16.36 75.54 0.01
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/07/2024 N/A NORMAL N/A SEASON 3,197 N/A

Company TGC SJT RIG EMC MJH RIG ARM HPE MSL OTH ARM MWT

Category CTRG COIL RIG DFMS SEC OTHR OTHR PCS SLS VAC WSC WTSE
PERSONNEL
15 16 41 2 8 4 2 8 3 2 1 4
Total
AND SERVICES No. of Persons
106
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 24 24 24 24 24 0 10 24 24

Standby/Tankers
TRUCKS/BOATS
AB-5533

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 699 201 75 750

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
CHARGE ACCOUNT FOR NEXT WELL AWSQ-3 NOT ACTIVATED ON DILIP.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1323 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/24/2024 - 09/16/2024
Report ID: OPERLMTDMRREP

NBR-654S @ HWYH-1323 Limited Morning Report for 06/18/2024


Objective : (VERTICAL MK-1 Foreman(s)GULIYEV, MURAD
D&WO Morning Report (Service Providers View) Charge #: GAS-PRODUCER TARGETING Engineer OLORUNTOBI, OLALERE SUNDAY
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved NBR-654S (66-23053-1323) KHUFF-C RESERVOIR AS THE Manager SHAIKH, ALI JAFER
PRIMARY TARGET AND THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: KHUFF-B RESERVOIR A)
(0500-0500) Saudi Aramco Well 0088216777 11370 577-9321 577-9320 ( FCT)
Date: Tuesday 06/18/2024 HWYH-1323 (0) HWYH_1323_0 OTHER VSAT CONTRACTOR /CLERK VSA T
804-9636 ( SANAD) 577-9307

Last 24 hr operations Next 24 hr plan


DRILL 22" HOLE SECTION DRILL 22" HOLE SECTION TILL +/- 3318 FT (50 FT TVD INTO AHMDI)
Location Next Location
176 KM FROM DMG, *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
2,800 Last Csg Size MD TVD Size Top
24 797 Formations Comments
Depth
RUS 750 52' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) LAMS 2,410 62' SHALLOWER
2100 (Date) 0 700 176
9 (06/06/2024@0900 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

DRILL 22" HOLE WITH PHPA MUD, HVP SWEEPS & 0% RETURNS.
- SWEEP HOLE WITH 100 BBLS HVP EVERY 30 FT.
0500 - 1130 6.5 0 22 N DRLG D TDS RIG 2100 2315
- SPOT 100 BBLS HVP ON BTM PRIOR CONNECTION.
- PUMP 2 BPM 80 PCF MUD CAP.
- WASH UP & REAM DOWN EACH STAND.
1130 - 1200 0.5 0 22 N DRLG RR DRRK RIG 2315 2315
SERVICE TDS AND DROPS INSPECTION

DRILL 22" HOLE WITH PHPA MUD, HVP SWEEPS & 0% RETURNS.
- SWEEP HOLE WITH 100 BBLS HVP EVERY 30 FT.
1200 - 0459 17 0 22 N DRLG D TDS RIG 2315 2800
- SPOT 100 BBLS HVP ON BTM PRIOR CONNECTION.
- PUMP 2 BPM 80 PCF MUD CAP.
- WASH UP & REAM DOWN EACH STAND.
Foreman Remarks

=============================WELL OBJECTIVE =============================


HWYH-1323 IS A K-1 VERTICAL GAS PRODUCER WEL TARGETING KHUFF-C RESERVOIR AS THE PRIMARY TARGET AND KHUFF-B RESERVOIR AS THE SECONDARY TARGET. THE WELL IS LOCATED IN
THE NORTH EAST OF HWYH FIELD

===========================ARAMCO PERSONNEL==========
* ARAMCO RIG CLERK MAJID ABBASI#8407471 ON LOC 05/17.
* ARAMCO MC ALI ALGHAMDI #821448 OFF LOC SINCE 05/15.
* ARAMCO FCT MOHAMMED ALRASHEDI#740259 ON LOC SINCE 06/05.
* ARAMCO FCT HAMZA ALMALLA #827330 ON LOC SINCE 06/05.OFF LOC 06/10
* ARAMCO FMN DAVOR IVIC #730214 OFF LOCATION 6/11 TO NBR-797
========================SERVICE PERSONNEL==========
* EMEC ME OL
* OILSERV CMT OFF LOC 06/11@17:00
* NABORS CSG CREW OFF LOC 06/11@12:00
===================== SANAD MANAGEMENT VISIT =========
* SANAD DIRECTOR VISIT LOCATION 04/22.
====================== SAFETY===================
PROCEDURE OF THE WEEK : OIL SPILL CONTROL
HSE GAP AUDIT WEEKLY FOCUS: ORIENTATION & SHORT SERVICE EMPLOYEE PROGRAM
LESSON LEARNT OF THE WEEK (OPERATIONS / HSE ALERT) : SANAD OA 05-21 - PIPE TALLY MISTAKE

HSE ALERT:
1SANAD OA 05-21 - PIPE TALLY MISTAKE
HSE ALERT 67-24 - STRUCK BY MANUAL TONG

=====================NEAR MISS/INCIDENT=============
* DAILY: 0---- YTD-4.
========================DRILLS====================
*
=======================AUDITS===============

=======================RIG SHORTAGE ==========


*
===============================RENTAL TOOLS=====
* RECEIVE 12" NPS SHOCK SUB S/N: SHT-120-52817895 ON 06/04/2024 @ 16:30. P/U 06/06/2024 @ 06:00. L/D 06/08/2024 @ 10:00. P/U 06/09/2024 @ 12:00. L/D 06/10/2024 @ 05:00. B/L
06/10/2024 @ 20:30.
* RECEIVE 12" NPS SHOCK SUB S/N: GE-5500027 ON 06/08/2024 @ 17:00.
* RECEIVE 9.5" NPS D/JAR S/N: HDJA-9500026 ON 06/08/2024 @ 17:00.
============MUD RECEIVED/ TRANSFERRED============

==================================COST OPTIMIZATION===============================

===============================VACUUM TANKER=======================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1323 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/24/2024 - 09/16/2024
Report ID: OPERLMTDMRREP

* VACUUM TANKER PLATE# DSB 8852 DRSS# 1004326072


===============================NEARBY SITES=================================================

============================== NEXT LOCATION ===================================


*

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 0 API 0 0 Volts 0 10 600
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 100 28 0 16 / 28 INPHHVG 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 14 0 14 / 16 0 200 0
80
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 0 API 0 0 Volts 0 10 600
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 100 29 0 16 / 28 INPHHVG 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 14 0 14 / 16 0 200 0
80

MUD CAUST NEWDRLPLUS XC NACL DEXT BARITE BENT


TREATMENT 96 ( 50LBP ) 240 ( 55LB ) 45 ( 50LB ) 6 ( 2200L ) 80 ( 55LB ) 23 ( 5000L ) 5 ( 2500L )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
2 800 2,800 DP Av DC Av Bit HHP 30 80 425 22 SMT
Pressure GPM Jet Vel 54.02 59.53 746 I-Row O-Row DC Location Bearings
1,350 1,000 410 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
RV1578 GSI06 4 x 16 / 0.785
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 60 175 180 170 175 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
36.7

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 1 22 1.87 Reg RV1578
2 Near Bit Roller Reamer RIG 22 1 9.5 3 8.9 7 5/8 REG 7 5/8 REG 208 3 POINT 24797-12
3 Shock Sub NPJ 12 1 12 3 14.24 7 5/8 REG 7 5/8 REG 208 GE-55-00027
4 String Reamer NDS 22 1 22 3 8.9 7-5/8" REG 7-5/8" REG 208 0611343-36
DRILL STRING 5 Drillcollar RIG 9.5 1 9.5 3 30.31 7 5/8 REG 7 5/8 REG 208 SPRL 125006-35
6 String Reamer NDS 22 1 22 3 9.02 7-5/8" REG 7-5/8" REG 208 22184-83
7 Drillcollar RIG 9.5 11 9.5 2.813 325.96 7 5/8 REG 7 5/8 REG 208 SPRL RIG
8 Hydraulic Jar NPJ 9.5 1 9.5 3.25 28.03 7 5/8"Reg 7 5/8"Reg 208 9500002
9 Drillcollar RIG 9.5 3 9.5 2.813 89.21 7 5/8 REG 7 5/8 REG 208 SPRL RIG
10 Crossover RIG 9.375 1 9.375 2.75 1.35 6 5/8 REG 7 5/8 REG 208 58676
11 Drillcollar RIG 8.5 6 8.5 2.813 180.28 6 5/8 REG 6 5/8 REG 165 SPRL RIG
12 Crossover RIG 8 1 8 2.75 1.91 XT54 6 5/8 REG 165 ACO-101170
13 Heavy Weight Drillpipe (HWDP) RIG 6.625 6.625 4.5 275.259 6-5/8FH 6-5/8FH 85.5 CONV RIG
14 Crossover RIG 8 1 8 2.813 2.42 6 5/8 FH XT54 100 RIG
15 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 5.5 3.25 276.22 XT54 XT54 56 CONV RIG
16 Drillpipe RIG 5.5 1 5.5 4.67 0.1 VX54 VX54 24.7 VM105 NEW

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A NONE N/A SEASONAL 4,309 02 PER DAY

Company SBT TGC RIG EMC SMI RIG ARM OTH ARM

Category BITS CTRG RIG DFMS DFMS OTHR OTHR VAC WSC
PERSONNEL
1 15 47 1 4 4 2 1 1
Total
AND SERVICES No. of Persons
76
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 24 12 12 12 12 24

Standby/Tankers
TRUCKS/BOATS
AB-7363

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1323 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/24/2024 - 09/16/2024
Report ID: OPERLMTDMRREP

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
300 N/A 724 263 94 3700

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NJYN-99 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/06/2024 - 08/18/2024
Report ID: OPERLMTDMRREP

NBR-783S @ NJYN-99 Limited Morning Report for 06/18/2024


Objective : (MK-1 VERTICAL Foreman(s)MEKHALFIA, AHMED / METWALY, AHMED AMER
D&WO Morning Report (Service Providers View) Charge #: PILOT HOLE WITH Engineer ALABDULMOHSIN, MAHDI NAYIF
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved TWINING/SIDETRACK Manager JALLAL, FAISAL ALI
NBR-783S (66-23535-0099)
OPTIONS TARGETING UNZA THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: RESERVOIR IN THE SOUTH
(0500-0500) Saudi Aramco Well 8821677711 016 FOREMAN 01 35779324 0135779319
OF NJY)
Date: Tuesday 06/18/2024 NJYN-99 (0) NJYN_99_0 CONTRACTOR /CLERK VSA T
0135779323

Last 24 hr operations Next 24 hr plan


CHC , PT CSG , -VET TEST ,POOH WBCO /-VET TEST ASSY . POOH WBCO /-VET TEST ASSY , P/U & RIH 5 7/8" MWD DRLG ASSY , DOC & 10' FM , FLOW CHECK
, DRILL 5 7/8" HOLE TO CORING POINT @ 15,932' (15 FT ABOVE UNZC).
Location Next Location
300 KM FROM DH MAIN GATE NJYN-116
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
15,597 Size 12010 12010 Size 11,797 15,594 15,594 Top
Formations Comments
9 5/8 7 Depth
BJDM 11,990 19' SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) MDJR 12,284 4' SHALLOWER
15597 (Date) 100 0 300 SUDR 13,137 1' DEEPER TVD
55.9 (04/23/2024@0700 ) SDDM 13,546 15' SHALLOWER TVD
KHFF 13,977 8' SHALLOWER TVD
KHFA 13,999 8' SHALLOWER TVD
KHFB 14,130 9' DEEPER TVD
KHFC 14,595 4' DEEPER TVD
KFDA 14,875 12' DEEPER TVD
BKDC 15,404 13' DEEPER TVD
PKFU 15,481 8' SHALLOWER TVD
UNZA 15,592 4' DEEPRER
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

CON'T RIH WITH CORETRAX WBCO & NEGATIVE TEST ASSY. ON 5 1/2" D/P WITH
CONTROLLED SPEED TO 14,800'
>> BREAK CIRC. E/10 STDS WHILE RIH TO REMOVE ANY DEBRIS AROUND WBCO
ASSY.
0500 - 0800 3 0 8 3/8 N CT HT STRG RIG 15597 15597
>> RECIPROCATE STRING UP & DOWN E/ 10 STDS, RECORD P/U & SLACK OFF
WT.
>> WASH DOWN E/5 STDS WHILE RIH
>> RUNNING SPEED AS PER CORETRAX REP.
>> MONITOR WELL ON TRIP TANK, OK

CONNECT TOP DRIVE , BREAK CIRC. , WASH & REAM DOWN WITH 5 7/8" CLEAN
0800 - 0900 1 0 8 3/8 N CT RW BIT RIG 15597 15597 14800 15350
OUT ASSY. TILL TAG TOP OF CEMENT AT 15,350'

CLEAN OUT CMT UP TO LANDING COLLAR @ 15,427' .


0900 - 1000 1 0 8 3/8 N CT RW BIT RIG 15597 15597 15350 15427
>> SWEEP HOLE WITH HV PILLS AS REQUIRED WHILE CLEAN OUT CMT DEBRIS
>> RECORD STRING WT. UP & DOWN.

DRILL OUT WIPER PLUGS & L.C AT 15,427' , DRILL OUT HARD CMT TO 15,560'
(34' ABOVE 7'' SHOE ) , DRILL OUT F.C AT 15,510', TILL LANDING SUB TAG TOP
OF 7" LINER AT 11,797'
1000 - 1500 5 0 8 3/8 N DRLG DC TDS RIG 15597 15597 15427 15560 >> CONTROL DRILLING PARAMETERS AS PER CORETRAX RECOMMENDATIONS
>> SWEEP HOLE WITH HV PILLS AS REQUIRED WHILE DRILL OUT CMT AND
FLOATS
>> RECORD STRING WT. UP & DOWN.
>> RECOVERED JUNKS OF PLUGS & LC / FC METAL ON SHAKERS.

CONFIRM TOP OF LINER WITH LANDING SUB AT 11,797' WHILE THE BIT AT
1500 - 1700 2 0 8 3/8 N CT CIRC MPMP RIG 15597 15597
15,560', PICK UP STRING, PUMP HI VIS PILL, CIRC. HOLE CLEAN TILL SHAKER
OK, CONDITION MUD WT. IN & OUT TO 110 PCF.

CLOSE BOP. PT 7" LINER & 9-5/8" CSG TO 1750 PSI SURFACE PR W/ 110 PCF
1700 - 1730 0.5 0 8 3/8 N CSG PTST HGRL RIG 15597 15597
OBM. GOOD TEST.
>> TEST EQUIVALENT TO 5,000 PSI WITH 70 PCF AT 7" TOL TVD.

1730 - 1830 1 0 8 3/8 N CT HT PEL RIG 15597 15597 SPACE OUT WITH 5.1/2" DP PJ'S. R/U TEST ASSEMBLY , RECORD PU / SO WTS.
>> PU / SO WTS @ 250K / 240K RESPECTIVELY.

SET CORETRAX 9-5/8" LTTT PACKER, PT BACK SIDE 1000 PSI FOR 10 MINS - OK.
UNSET PKR.
>> BLEED OFF. ALLOW PKR TO RELAX FOR 45 MINS WHILE UNSET IN STAGES
1830 - 2000 1.5 0 8 3/8 N CT WBCO WBCL CRW 15597 15597
PER CORETRAX.
>> HPJSM, REVIEW JSA / PROCEDURES FOR INFLOW-TEST 7" TOL WITH WATER.
>> FLUSH SURFACE LINES THRU NPS PUMP UNIT / CHK MNF / STANDPIPE & PT
7000 PSI.

DISPLACE STRING: 240 BBL 63 PCF WATER @ 2 BPM W/ NPS PUMP UNIT.
2000 - 2215 2.25 0 8 3/8 N CT CIRC MPMP RIG 15597 15597
> FINAL DYNAMIC / STATIC PRESSURES: PSI 4200 PSI /3750 PSI RESPECTIVELY.
> ALLOW THERMAL EFFECT FOR 30 MINS. RECORD NEW STRING WT @280K.
2215 - 2315 1 0 8 3/8 N CT WBCO WBCL CRT 15597 15597
SET CORETRAX 9.5/8" LTTT PACKER @ 7" TOL. BLED STRING TO ZERO (IN 500

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NJYN-99 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/06/2024 - 08/18/2024
Report ID: OPERLMTDMRREP

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
PSI STAGES) THRU RIG CHOKE.

OPEN WELL AND OBSERVE ON INFLOW TEST AT 7" TOL. UPDATED HORNER PLOT
2315 - 0400 4.75 0 8 3/8 N CSG PTST HGRL RIG 15597 15597
PER ARAMCO PROCEDURES.
>> VERIFIED TEST DATA WITH ARAMCO OFFICE TEAM.

PRESSURE STRING TO 3750 PSI TO EQUALIZE. UNSET PKR PER CORETRAX.


0400 - 0459 1 0 8 3/8 N CT WBCO WBCL CRT 15597 15597
ALLOW 45 MINS TO RELAX ELEMENT.

Foreman Remarks

** WELL OBJECTIVE
NJYN-99 IS PLANNED TO BE DRILLED AS AN MK-1 VERTICAL PILOT HOLE WITH TWINING/SIDETRACK OPTIONS TARGETING UNZA RESERVOIR IN THE SOUTH OF NJYN FIELD. THE WELL WILL BE
COMPLETED WITH CONVENTIONAL SAND SCREENS AND IT WILL BE CONNECTED TO HARADH GAS PLANT .
===============================================================
** ARAMCO PERSONNEL ON LOCATION
>> MATERIAL EXP IBRAHIM M ALHADRI #8334164 ON LOCATION 6/5/24
===============================================================
** SERVICE ON LOCATION
>> EMEC MUD ENGINEER ON LOCATION .
>> HALL.MUD ENGINEER ON LOC 5/5/24
>> SCHL. SILO OPERATOR ON LOC. 4/14/24
>> SLB CLOSE LOOP CREW ON LOC. 4/15/24
>> SLB FRAC TANK ON LOCATION 5/3/2024 @ 17:00 HRS
>> HLB MUD LOGGING CREW ON LOC 5/7/24
>> SLB CENTRIFUGE OP. & EQUIPT'S ON LOC. 5/15/24 @ 17:00 HRS
>> BAKER MWD & CREW ON LOC. 5/24/24 @ 17:00 HRS
>> NPS CMT CREW & UNIT ON LOC. 6/10/24 @ 10:00 HRS
>> CORETRAX CLEANING ENGINEER ON LOCATION 6/14/24 @18:00 HRS.
=============================================================
**SAFETY NOTES
>> HSE ALERT:
>> DRILLS: 1,FIREFIGHTING
>> NEAR MISS : 13
>> RHSEI: TOTAL ITEMS 25, CLOSED 25, OPEN 00
>> W.C : TOTAL ITEMS 07, CLOSED 07, OPEN 00
==============================================================
**PLAN VS ACTUAL CSG SETTING DEPTHS
> 24" CP PLAN AT 1,085' ACTUAL 1,036' (46' TVD INTO RUS FM), PLAN ROP 25.5 FPH/ACTUAL 56 FPH, FLAT TIME PLAN: 38 HR/ACTUAL 35.5HRS.
> 18-5/8" CP PLAN AT 4,120' (50' TVD INTO AHMADI FM),PLAN ROP 46.3 FPH/ACTUAL 57.5 FPH, FLAT TIME PLAN: 83.6 HR/ACTUAL 109 HRS.
> 13-3/8" CP PLAN AT 7,288' MD / TVD (+/- 50' TVD IN MDTM FM), PLAN ROP 58.6 FPH/ACTUAL 101 FPH, FLAT TIME PLAN: *** HR/ACTUAL 164.5 HRS.
> 9 -5/8" CP PLAN AT 12,038' MD / TVD (+/- 30 TVD IN BJDM), PLAN ROP 41.49 FPH/ACTUAL 36.83 , FLAT TIME PLAN: 129.5 HR/ACTUAL 250 HRS.
> 7" LP PLAN AT 15,593' MD/TVD ( +/- 5 FT TVD INTO UNZA - S3 LAYER), PLAN ROP ** FPH/ACTUAL ** FPH, FLAT TIME PLAN: 155 HR/ACTUAL *** HRS.
> 4-1/2'' LP PLAN AT 16,011' MD / TVD (***' INTO PUZU), PLAN ROP XX FPH/ACTUAL ***FPH, FLAT TIME PLAN: 18.8 HR/ACTUAL ** HRS.
===============================================================
**RENTAL TOOLS .
>> REC. 4 3/4" SLB JAR 3-1/2" IF CONN. SN: 02132K ON 6/14/24 @ 22:00 HRS .
>> REC. 4 3/4" SLB JAR XT-39 CONN. SN:41717K ON 6/14/24 @ 22:00 HRS , P/U 6/16/24 @ 12:00 HRS.
>> REC. CORETRAX 5" PBL SUB SN:00101069 ON LOC. 6/13/24 @17:00 HRS .
===============================================================
**NGGDD COST OPTIMIZATION
>> CLOSED LOOP SYSTEM : ON LOC. 4/15/24
>> BARITE SILOS : 2 SILO ON LOC. 4/14/24
>> FRAC TANKS : 2 FRAC TANKS ON LOC. 5/4/24, 2 FRAC TANKS ON LOC. 5/5/24
>> KILL MUD : 1000 BBLS 130 PCF OBM
>> ACID : 100 BBLS 20% VDA NPS ACID ON LOC. 5/26/24
==============================================================
**MISC
>> WATER WELL FOR NJYN-99 IS NJYN-802 & 803
>> EXCAVATOR DOOR#32-0063 ON LOC. 4/15/24 ,RELEASED 6/11/24
>> NEXT LOCATION NJYN-116 COMPLETED 100% AS PER WELLSITE
=============================================================
**RIG VISIT
>> NBR SUPERVISOR VISIT RIG: 1/2 , 2/6 , 2/12 , 4/3 , 4/4 , 4/6, 4/11,4/15,4/16 , 5/22 ,5/23,6/11
>> NBR HSE MANAGER & SUPV: 2/12 , 4/4, 5/20 , 5/22 , 5/23
>> NBR DIRECTOR VISIT RIG: 3/12/24 , 4/4 , 6/11

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
110 PCF 2 0 API 58 650 Volts 6.5 0 212,795
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
135 1 HTHP 11 16 0 10 / 15 INOVRT 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
MUD DATA Vis.(SEC) 0 42 31 7/8 0 0 2.6
61

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
110 PCF 2 0 API 58 630 Volts 6.5 0 206,873
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NJYN-99 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/06/2024 - 08/18/2024
Report ID: OPERLMTDMRREP

135 1 HTHP 11 17 0 10 / 15 INOVRT 0.4


Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 41 31 7/8 0 0 2
60

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
8 15,597 15,597 DP Av DC Av Bit HHP N/A N/A 216 5.875 HTC
Pressure GPM Jet Vel 0 0 0 I-Row O-Row DC Location Bearings
N/A 0 N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
Z359ZT RC216 POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
N N/A N/A N/A N/A N/A 5
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 5.875 1 0.6 Z359ZT
2 Bit Sub RIG 4.75 1 4.75 2.25 3.61 NC38 3 1/2 REG 1 16199-34
3 Drillcollar RIG 4.75 6 4.75 2.25 184.22 NC38 NC38 47 SPRL
4 String Mill CRT 5.875 1 4.75 2.25 5.8 NC38 NC38 6.27 CX1784
5 Drillcollar RIG 4.75 3 4.75 2.25 92.43 NC38 NC38 47 SPRL
6 String Mill CRT 5.875 1 5.875 2.25 31.1 NC38 NC38 28 CX1412
7 String Magnet CRT 5.875 1 4.75 2 30.58 NC38 NC38 28 CX3059
8 Junk Filter Sub CRT 5.875 1 5.875 2.25 30.73 NC38 NC38 28 CX1766
DRILL STRING 9 Sub RIG 4 1 4 2 2.67 NC38 XT39 28 933610774-1
10 Heavy Weight Drillpipe (HWDP) RIG 4 15 4 2.562 457.1 XT39 XT39 26.24 CONV
11 Hydraulic Jar SJS 4.75 1 29.49 47 41717K
12 Heavy Weight Drillpipe (HWDP) RIG 4 6 4 2.56 185 XT39 XT39 28.24 CONV
13 Landing Sub CRW 1 4.9 3 3.7 NC50 XT39 1 CX4136
14 Landing Sub CRW 9.625 1 8.25 3 3.7 NC50 XT39 4 CX1550
15 String Mill CRT 9.625 1 4.75 2.375 8 NC50 NC50 1 CX1645
16 Scraper CRW 5.875 1 5.875 1.875 7.2 NC50 NC50 28 CX1744
17 Packer CRW 1 3.77 2.96 CX1310
18 Circulation Sub CRW 4.75 1 4.75 3 3.77 NC50 NC50 28 CX2019
19 Circulation Sub CRW 4.75 1 4.75 3 5 NC50 NC50 28 CX1605
20 String Magnet CRT 5 1 5 2.5 7 NC50 NC50 28 CX1869
21 Junk Filter Sub CRT 5.5 1 5.5 4.762 6 NC50 NC50 28 CX2074
22 Sub RIG 5.5 1 5.5 3.25 6 XT54 XT54 28 783-2
23 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/16/2024 N/A CALM N/A HOT 1,606 TOURLY

Company GOS BHI RIG BAR EMC MJH MIF HMS RIG ARM NCS MI2 ARM CRW

Category CTRG DPDS RIG DFMS DFMS SEC FILT MLS OTHR OTHR PCS SCS WSC WBCS
PERSONNEL
16 1 45 1 1 8 1 4 5 1 3 3 2 1
Total
AND SERVICES No. of Persons
92
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 12 12 0 0 24 12 12 3 0 24 24

Standby/Tankers
TRUCKS/BOATS
AB-5146

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 N/A 322 233 72 2500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2363 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/26/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

NBR-797S @ UTMN-2363 Limited Morning Report for 06/18/2024


Objective : (UTMN-2363 IS Foreman(s)IVIC, DAVOR / ABBAS, HAMID
A MK-1 VERTICAL WELL Engineer BHANOT, RAHUL CHETAN
D&WO Morning Report (Service Providers View) Rig Charge #: TO BE DRILLED IN SOUTH Manager DOSSARY, AYEDH HAMAD
Copyright 2024 Saudi Aramco. All Rights Reserved NBR-797S (66-23057-2363) OF UTMN TARGETING THURAYA RIG FORMAN VSAT CONTRACTOR /CLERK
Daily Onshore KHUFF-C AS PRIMARY VSA T
8821677712 772 5779329
(0500-0500) Saudi Aramco Well Wellbores: TARGET)
5779328 (A RAMCO CLER K)
Date: Tuesday 06/18/2024 UTMN-2363 (0) UTMN_2363_0
CONTRACTOR /CLERK VSA T
8049652 (N ABORS OFFI CE)

Last 24 hr operations Next 24 hr plan


CONT POOH W/ FISH, L/D AND CHECK FISH TOOLS, RIH 5-7/8'' CO ASSY ( CUT/SLIP DRLG LINE), CONT RIH, CHC, POOH FOR 4-1/2'' LINER. RIH 4.5'' LINER.
CHC
Location Next Location
THE WELL IS LOCATED 0.119 KM N84E OF UTMN-2237 AND 0.575 KM N26E OF UTMN-2266. SDGM-1277
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
13,584 Size 10595 10595 Size 10,210 12,525 12,515 Top
Formations Comments
9 5/8 7 Depth
MNJR 9,822 32' DEEP
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) BJDM 10,570 73' SHALLOWER
13584 (Date) 100 0 170 MDJR 10,866 NOT ON PROGRAM
42.7 (05/06/2024@1300 ) 11661' TVD ( 49'
SUDR 11,665
SHALLOWER)
11,983' TVD ( 37'
SDDM 11,990
SHALLOWER )
12016' TVD ( NOT
BSRD 12,022
PROGNOSED IN DP )
KHFF 12,392 12,381' TVD ( 14' DEEPER )
KFAC 12,431 12,419' ( 3' SHALLOWER 0
KFBC 12,552 12,539' ( 6' DEEPER )

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Lt Type Lt ID Summary of Operations
OP Co Start End Start End

POOH FISHING ASSY ON WET PIPE W/ENGAGED FISH AT


0500 - 0900 4 0 EOW N FISH TO SPDP RIG 13584 13584 6600 3680 STUK 934820
CONTROLLED SPEED TO 3680'.
> MONITOR WELL THROUGH TRIP TANK

0900 - 0930 0.5 0 EOW N FISH WCNT NA RIG 13584 13584 STUK 934820 FLOW CHECK - WELL STATIC. CHANGE HANDLING TOOLS AND
ELEVATOR TO 4"

POOH FISHING ASSY ON WET PIPE W/ENGAGED FISH AT


0930 - 1430 5 0 EOW N FISH TO SPDP RIG 13584 13584 3680 0 STUK 934820
CONTROLLED SPEED TO SURFACE'. FISH FULLY RETRIEVED.
> MONITOR WELL THROUGH TRIP TANK

RELEASE SLB OVERSHOT AND L/D LOGGING TOOLS ( CHECK


1430 - 1730 3 0 EOW N FISH HT FISHT RIG 13584 13584 STUK 934820
TOOLS, OK).
> MONITOR WELL TO TRIP TANK.
1730 - 1800 0.5 0 EOW N CT RR TDS RIG 13584 13584
TDS SERVICE AND RIG FLOOR HOUSKEEPING.

PJSM, P/U M/U RR SECURITY PDC BIT GT64DH SN#13697054


ON CLEAN OUT BHA ( 5-7/8'' PDC BIT 5-7/8'' NBR + 1 JT 4-3/4''
1800 - 2100 3 0 EOW N CT HT BHA RIG 13584 13584 DC +5-7/8'' STRR + 1 JT 4-3/4' DC + 5-7/8'' STRR + 24 JS 4-3/4''
DC'S + 4-3/4'' WFD D/JAR (1400+1332)+2 JTS 4-3/4'' DC'S+XO +
15 JTS 4'' HWDP..
> MONITOR WELL TO TRIP TANK.

RIH 5-7/8'' CO BHA ON 4'' STD/DP.


2100 - 2200 1 0 EOW N CT TI STDP RIG 13584 13584 1360 3820
> MONITOR WELL TO TRIP TANK.
> FILL UP EVERY 20 STDS.

2200 - 0030 2.5 0 EOW N CT RR DWKS RIG 13584 13584 PJSM, CUT AND SLIP DRLG LINE, SET CROWN-O MATIC.
>MONITOR WELL TO TRIP TANK.

CONT RIH 5-7/8'' CO BHA ON 5.5'' STD/DP.


0030 - 0459 4.5 0 EOW N CT TI STDP RIG 13584 13584 3820 12010
> MONITOR WELL TO TRIP TANK.
>FILL UP EVERY 20 STDS.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
16 Jun 1900 12.5 46.5 934820 STUK HINW WLT SWL 13584 STUCK WITH SLB MDT LOG TOOL
Foreman Remarks

=================ARAMCO PERSONNEL=================
- MATERIAL EXPEDITOR: EISSA A. AL-ANAZI #8352195 OFF LOCATION SINCE 06/13/2024.
- ARAMCO MATERIAL EXPEDITOR HASSAN ALZAHER #821938 OFF LOCATION 05/29/24.
- ARAMCO MATERIAL EXPEDITOR HASSAN ALSALEH #8555230 ON LOCATION 06/12/24.
=========== ARAMCO SERVICE PERSONNEL& EQUIPMENT ===========
- 1 X EMEC MUD ENG. ON LOCATION.
- BAROID MUD ENGINEER ON LOCATION.
- MI-SWACO CLOSED LOOP CREW ON LOCATION.
- SLB SILOS CREW AND EQUIPMENT ON LOCATION.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2363 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/26/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

- SLB WL CREW ON LOC 06/14/2024


=====================SAFETY==================
SAFETY TOPICS REVIEWED:
STOP WORK AUTHORITY, SANAD TEN RULES TO LIVE BY AND ARAMCO LIFESAVING RULE, HEAT STRESS PREVENTION
================NBR-797 TOOLPUSHERS================
- DAY: JASON/ NIGHT: NAZAR.
====================RENTAL TOOLS====================
- NONE.
===================NEXT LOCATION===================
- SDGM-1277.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 13,584 39.3 60.28 0 13,469 108.91 144.99 594.96 2.75

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
92 PCF 1 0 API 61 490 Volts 6.2 0 18,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
160 1 HTHP 18 14 0 8 / 12 INOVRT 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 30 21 6/7 0 22,500 1
58
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
92 PCF 1 0 API 61 500 Volts 6.2 0 18,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
160 1.2 HTHP 18 14 0 8 / 12 INOVRT 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 30 21 6/7 0 22,500 2.8
58

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
6RR 13,584 13,584 DP Av DC Av Bit HHP N/A N/A M435 5.875 SEC
Pressure GPM Jet Vel 0 0 0 I-Row O-Row DC Location Bearings
N/A 0 N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
13697054 GT64DH POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 5.875 1 0.83 13697054
2 Near Bit Roller Reamer RIG 5.875 1 4.75 1.25 5.59 NC38 NC38 47 3 POINT XM3511
3 Drillcollar RIG 4.75 1 4.75 2.25 30.85 NC38 NC38 47 SPRL
4 String Reamer RIG 4.75 1 4.75 1 5.3 NC38 NC38 47 XM3356
DRILL STRING 5 Drillcollar RIG 4.75 1 4.75 2.25 30.3 NC38 NC38 47 SPRL
6 String Reamer RIG 5.875 1 5.875 1 5.28 NC38 NC38 47 XM3521
7 Drillcollar RIG 4.75 24 4.75 2.25 735.85 NC38 NC38 47 SPRL
8 Hydraulic Jar WJS 4.75 1 4.75 2.25 30 3-1/2" IF 3-1/2" IF 1,200 1400-1332
9 Drillcollar RIG 4.75 2 4.75 2.25 61.57 NC38 NC38 47 SPRL
10 Crossover RIG 4.75 1 4.75 2.25 3 NC38 XT39 47 55221-1
11 Heavy Weight Drillpipe (HWDP) RIG 4 15 4 2.562 456.97 XT39 XT39 26.24 CONV
12 Drillpipe RIG 4 75 4 3.34 2,361.34 XT39 XT39 14 S135 PREMIUM
13 Crossover RIG 4.875 1 4.875 2.563 3.02 VX39 VX54 25 131058-1
14 Drillpipe RIG 5.5 1 5.5 4.67 30.5 XT54 XT54 24.7 S135 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/08/2024 WEEKLY SEASONAL ONSHORE SEASONAL 1,684 EACH TOUR

Company TGC RIG BAR EMC SMI MJH WJS BR1 RIG ARM MI2 ARM SWL

Category CTRG RIG DFMS DFMS DFMS SEC JST MLS OTHR OTHR SCS WSC WLS
PERSONNEL
16 41 1 1 3 8 0 0 8 1 2 2 7
Total
AND SERVICES No. of Persons
90
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 0 0 24 24 24 24 16

Operating Hours. 0 24 24 24 24 0 12 24 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
ARAMCO TRUCK

BULK Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2363 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/26/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

N/A N/A 575 148 92 N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-69 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:21 04/27/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

NBR-982S @ HWYH-69 Limited Morning Report for 06/18/2024


Objective : (ST AS SINGLE Foreman(s)TAWADROS, REMOON GAMIL / SAEED, ABDELLATIF FOUAD
LATERAL OIL PRODUCER Engineer ALI, AMIN TAHA AMIN
D&WO Morning Report (Service Providers View) Rig Charge #: AD2A ) Manager KHALDI, MOHAMMED SALEH
Copyright 2024 Saudi Aramco. All Rights Reserved NBR-982S (71-24053-0069) THURAYA RIG FORMAN VSAT CONTRACTOR
Daily Onshore /CLERK VSA T
0088216777 14140 013-577029 8
(0500-0500) Saudi Aramco Well Wellbores:
013-804962 8 RIG MGR
Date: Tuesday 06/18/2024 HWYH-69 (0-1-1) HWYH_69_2
CONTRACTOR /CLERK VSA T
013-577092 0

Last 24 hr operations Next 24 hr plan


CONT SPS DRILL 6-1/8" LATERAL SECTION TO +/- 11,160 FT. (51' REMAINING). CONT SPS DRILL 6-1/8" LATERAL SECTION TO 11,211 FT, CIRCULATE, POOH & L/D DIR DRLG
BHA, M/U & RUN WFD IMAGE/CALIPER LOG.
Location Next Location
N: 2747783.26 E: 321829.04, LOCATED AT 188 KM FROM DHAHRAN MAIN GATE HRDH-510
Current Depth (ft) Liner TOL MD TVD Formation Tops
11,160 Last Csg Size MD TVD Size Top
7 6980 Formations Comments
Depth
HITH 6,012 6015' (MD), 15.2' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ABAR 6,459 6504 (MD), 3.1' DEEPER
10210 (Date) 100 950 188 ARBB 6,504 6561' (MD), 1.3' DEEPER
38.2 (05/14/2024@1000 ) ABBR 6,576 6657' (MD), 0.7' DEEPER
ARBC 6,600 6691' (MD), 1.5' DEEPER
ABCR 6,688 6824'(MD) 5.9' DEEPER
ARBD 6,791 7021' (MD), 9.1' SHALLOWER
PADS 6,913 7738' (MD), 4.3' DEEPER
BPDS 6,916 7807' (MD), 2.7' DEEPER
ABD1 6,933 8198' (MD) 4.1 FT DEEPER
AD2A 6,939 8412' (MD), 5.3' DEEPER
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

CONT SPS DRILL 6-1/8" LATERAL SECTION W/ ICRUISE/LWD/MWD F/ 10210' TO


10608' W/ 85 PCF POLYMER MUD, WITH 90 % RETURN.
- 85 PCF KMW FOR ABDR AS PER WOP SUPPLEMENT#1.
0500 - 1530 10.5 0-1-1 6 1/8 N DRLG D RSS SPS 10210 10608
- HAD PARTIAL LOSS WHILE DRILLING 30 BPH W/ 260 GPM.
- TREAT MUD WITH LCM 20 LB/BBL.
- WASH UP & REAM DOWN EVERY STD DRILLED.
- SWEEP HOLE W/ TANDEM PILL ( LO-VIS / HI-WT PILL) AS REQUIRED.

1530 - 1630 1 0-1-1 6 1/8 N DRLG RW BIT RIG 10608 10608 10514 10608 WHILE WASH UP HAD TIGHT SPOT @ 10567', WORKED ON SAME WITH WASH UP /
REAM DOWN TILL PASS SMOOTH.

SPS DRILL 6-1/8" LATERAL SECTION W/ ICRUISE/LWD/MWD F/ 10608' TO 11160'


W/ 85 PCF POLYMER MUD, WITH 100 % RETURN.
1630 - 0430 12 0-1-1 6 1/8 N DRLG D RSS SPS 10608 11160
- HAD PARTIAL LOSS WHILE DRILLING DECREASED GRADUALLY TILL NO LOSSES.
- WASH UP & REAM DOWN EVERY STD DRILLED.
- SWEEP HOLE W/ TANDEM PILL ( LO-VIS / HI-WT PILL) AS REQUIRED.
0430 - 0459 0.5 0-1-1 6 1/8 N DRLG RR TDS RIG 11160 11160
SERVICE TDS.
Workover Objectives
Foreman Remarks

- ODF CORRECTION: -13'


========================================= DIR DATA =========================================
- TOW @ 5,900 FT
- BOW @ 5,909 FT
- KOP = 6,300 FT (L-0-1-1).
- FOLLOWING PLAN#5 HWYH-69_L-0-1-1, JUNE,9 , 2024 & GOC INSTRUCTIONS.
- SENSORS OFFSET (DISTANCE FROM THE BIT): (ABG:14.15', ABI: 17.55', DENSITY: 42.79', PROSITY: 51.61', RESISTIVITY: 61.62', GR: 84.81', DIRECTIONAL: 92.40').
- ACTUAL WELL PATH 8.5 FT BELOW & 60 FT TO THE LEFT OF THE PLAN.
================================RPKU-3 (HWYH-69 OPERATION) ON 5/4/2024===================================
- RPKU-3 OPERATION TIME : 3.5 DAYS.
- KILL THE WELL, PERFORM CORROSION LOG, PERFORM WH INSPECTION.
- SECURED W/ 4-1/2 "PX" PLUG @ 6706' IN "X" NIPPLE BELOW PACKER.

================================= NEARBY PWI WELL ==========================================


NEARBY PWI (HWYH-462) TO HWYH-69 @ 2.29 KM WAS SHUT IN ON 05/06/2024, LAST CHECK ON 06/11/2024 (SIWP=2293 PSI)

============================== ARAMCO PERSONNEL ON LOCATION================================


> ARAMCO ME, ABDULLAH ALSHEHRI ID# 818531 ON LOCATION SINCE 06/11/2024.
> ARAMCO ME, MUSTAFA ALGHAMDI, ID#819221, ON LOCATION SINCE 06/16/2024.
============================SAFETY, AUDITS & DRILLS :========================
- HELD TOURLY SAFETY MEETINGS.

1ST RSI AUDIT 2023: TOTAL ITEMS: (40), CLOSED: (40), OPEN: (0)
1ST SAWOD IN-HOUSE INSPECTION 2024: TOTAL ITEMS (51), CLOSED (51), OPEN: (0)
1ST RHSEI 2024 : TOTAL ITEMS=47; CLOSED ITEMS=47; OPEN ITEMS=0
WCI 2024: TOTAL ITEMS=17; CLOSED ITEMS=17; OPEN ITEMS=0
1ST QSI 2024: TOTAL ITEMS=40; CLOSED ITEMS=40; OPEN ITEMS=0

=====================================DIESEL CONSUMPTION===============================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-69 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:21 04/27/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

> DIESEL CONSUMPTION FOR ENGINES (RIG / CAMP/ OTHERS): (DAILY: 48/8/3 BBLS) TOTAL: 1732 BBLS).

============================================WATER TRUCKS==============================================
> 6 RAW WATER TANKERS (#TRA-1471 & RRA-1831 AL-ASKAR), (#LJA-3615 AL OTAISHAN) (#RSA-4521, #RSA-4528, #RSA-4530 CUC )ON LOCATION.

===================================== NEXT WELLS ===================================


HRDH-510, KOM HELD ON 04/29/2024, STRIP OUT 100%, LOCATION READINESS : 70%
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 1 2.4 API 3 0 Volts 5.13 9 165,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
130 12 HTHP 84 37 0 10 / 13 WBM 2.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 31 13 8/9 0 0 12.2
56
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
87 PCF 1 2 API 2 0 Volts 6.03 9 165,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
130 12 HTHP 84 35 0 9 / 12 WBM 2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 30 14 7/8 0 0 12
56

CACL2-80 CACO3-50 SOLFLKM CACO3-25 CAOH2 HYPERGLIDE DUOVIS-NS


MUD 24 ( 2200L ) 120 ( 25LB ) 60 ( 50LB ) 120 ( 25LB ) 3 ( 50LB ) 3 ( 55GL ) 18 ( 50LB )
TREATMENT MRBL-F FLO-TROL MRBL-M
30 ( 2200L ) 130 ( 55LB ) 4 ( 2200L )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
3RR 10,137 11,160 DP Av DC Av Bit HHP 13 140 M334 6.125 SEC
Pressure GPM Jet Vel 284.79 N/A 47 I-Row O-Row DC Location Bearings
3,100 250 178 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
14160192 GT64KHO 3 x 14 / 0.451
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 25 125 190 100 9,500 Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 6.125 1 0.72 14160192
2 RSS SPS 4.75 1 4.75 3.98 35.09 55.31 13605544
3 Logging While Drilling (LWD) SPS 4.75 1 4.75 1.571 18.21 HAL40 HAL40 45.57 90762444
4 Logging While Drilling (LWD) SPS 4.75 1 4.75 24.54 88 90760457
5 Stabilizer SPS 6 1 4.75 2.25 3.59 NC38 NC38 56.21 90764115
DRILL STRING 6 Logging While Drilling (LWD) SPS 4.75 1 4.75 12.37 5.18 90759395
7 Power & Communication Sub SPS 5.125 1 4.75 3.75 10.13 NC38 NC38 50.86 90763884
8 Measurement While Drilling (MWD) SPS 4.75 1 4.75 11.19 NC38 NC38 46.3 13108441
9 Screen sub SPS 4.75 1 4.75 2 6.39 NC38 NC38 39.41 13555954
10 Float Sub SPS 4.75 1 4.75 2.25 1.94 NC38 NC38 49.69 13642909
11 Crossover RIG 4.75 1 4.75 2.25 2.57 NC38 XT39 49.69 982-2-2
12 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.562 91.49 XT39 XT39 28.38 CONV
13 Dogleg Reamer NRT 6.125 1 6.125 2.125 4.25 XT39 XT39 41.95 G302089
14 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.563 91.69 XT39 XT39 25.16 CONV N/A
15 Hydro-Mechanical Jar NPC 4.75 1 4.75 31.02 42 500-003
16 Heavy Weight Drillpipe (HWDP) RIG 4 2 4 2.562 61.35 XT39 XT39 28.38 CONV
17 Drillpipe RIG 4 1 4 3.34 31 XT39 XT39 14 G105 PREMIUM N/A

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/12/2024 N/A 11 KM/HR N/A TEMP: 4,279 HEAT STRESS, SWA.
(DIRC:NW) 47H/41L

Company TGC SPS RIG OES RIG ARM OTH ARM

Category CTRG DPDS RIG DFMS OTHR OTHR VAC WSC


PERSONNEL
17 4 45 2 4 2 9 2
Total
AND SERVICES No. of Persons
85
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 12 12 0 24

TRUCKS/BOATS Standby/Tankers

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-69 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:21 04/27/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

AB-7197

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 900

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABLZ-1 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:21 03/23/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

NBR-987S @ ABLZ-1 Limited Morning Report for 06/18/2024


Objective : (SARAH HAZEL, WADE ALAN / DYER, ROBERT WALTER / MCCAGE,
Foreman(s)
EXPLORATION) JAMES DAVID /
ZAREA, AHMED
D&WO Morning Report (Service Providers View) Charge #: MOHAMMED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved FETHIZA TEDJANI, HAMZA / ALMASLOOM, ABDULTAYEB
NBR-987S (85-23880-1306) Engineer
MOHAMMED
Daily Onshore
Wellbores: Manager GARNI, HUSAM MANSOUR
(0500-0500) Saudi Aramco Well
ABLZ-1 (0) ABLZ_1_0 THURAYA RIG FORMAN VSAT OTHER VSAT
Date: Tuesday 06/18/2024
0088216777 12135 577-6145 577-6135
CONTRACTOR /CLERK VSA T
577-6141

Last 24 hr operations Next 24 hr plan


POH & L/D CORING BHA, P/U & M/U SLB DRILLING BHA & RIH RIH SLB DRILLING BHA, DISP WELL, PERFORM PPT, DRILL 8-3/8" HOLE SECTION TO 16,216' +/-
Location Next Location
RIG LOCATION 1039 KM F/DMG. IN ARAR TAKE THE JADEEDATH EXIT GO 10KM PERFORM U-TURN FOLLOW RIG SIGNS *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
15,962 Last Csg Size MD TVD Size Top
9 5/8 13545 13545 Formations Comments
Depth
KHFF 1,450 44' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UNYA 2,507 371' SHALLOWER
15962 (Date) 100 0 1039 BRTH 4,603 942' DEEPER
67 (04/12/2024@0100 ) JUBH 5,531 130' DEEPER
JAUF 7,160 390' DEEPER
TWLF 8,195 540' DEEPER
SHRR 12,370 437 DEEPER
QUSB 13,060 456' DEEPER
SARH 15,559 25' DEEPER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0600 1 0 8 3/8 E CORE TO BHA RIG 15962 15962 1312 840 POOH 8-3/8" NOV CORE BARRELS AT 10 MIN/STAND AS PER NOV.
*L/D COUGAR 6-1/2" DRIILING JAR DJ6-650-559 @ 06:00 HRS ON 6/17/24
0600 - 0630 0.5 0 8 3/8 E CORE OTH CORC RIG 15962 15962
VENT CORE @ 500'
0630 - 0815 1.75 0 8 3/8 E CORE TO BHA RIG 15962 15962 500 0
POOH 8-3/8" NOV CORE BARRELS AT 12 MIN/STAND AS PER NOV.
0815 - 1100 2.75 0 8 3/8 E CORE HT CORC RIG 15962 15962
HPJSM. CHECK GASES, L/D CORE #3. RECOVERED 61.2' (100% RECOVERY).
1100 - 1130 0.5 0 8 3/8 E CORE OTH CORC RIG 15962 15962
CLEAN RIG FLOOR.
1130 - 1300 1.5 0 8 3/8 N DRLG TI BHA RIG 15962 15962 0 1300
HPJSM, M/U RR BIT BIT SUB AND RIH WITH 6-1/2" DC & 5-1/2" HWDP BHA.
1300 - 1730 4.5 0 8 3/8 N DRLG LDP BHA RIG 15962 15962 1300 0
POH L/D 8-3/8" BHA, 15X 5-1/2" HWDP, 21X 6-1/2" DC DUE TO HRS.

P/U & M/U NEW 8-3/8" PDC SMITH BIT SN: SA00023 FITTED W/ 4 X 12 , 4 X 13
JETS, MUD MOTOR, MWD , 2 X MPD FLOAT SUBS.

21 X 6-1/2"DC, 6-1/2"HM JAR, 3 X 6-1/2' DC, XO, 15 X 5-1/2"HWDP. IN SINGLE


1730 - 0015 6.75 0 8 3/8 N DRLG HT BHA RIG 15962 15962
FROM PIPE RACK. DRIFT & FLUSHED EACH JOINT .

* P/U COUGAR 6.5" HYDRA-MECHANICAL DRLG JAR SN# DJ6-650-313 @ 22:30


HRS.

TIH WITH 8-3/8" SLB MUD MOTOR & MWD DRILLING ASS'Y ON 5-1/2" DP.
0015 - 0045 0.5 0 8 3/8 N DRLG TI STDP RIG 15962 15962 1345 1803

0045 - 0115 0.5 0 8 3/8 N DRLG CIRC MPMP RIG 15962 15962
**SHALLOW TESTED MWD TOOL -OK.

0115 - 0459 3.75 0 8 3/8 N DRLG TI STDP RIG 15962 15962 1803 8555 TIH WITH SLB SLB MOTOR ASSEMBLY IN CASED HOLE ON 5-1/2" DP.
*FILLING EVERY 20 STANDS.
Foreman Remarks

WELL OBJECTIVES: ABLZ-1 IS A VERTICAL SARAH EXPLORATION WELL WITH TD AT 350' INTO KAHFAH MEMBER
===========================================================================================================
RIG LOCATION & JOURNEY MANAGEMENT: 1039 KM F/DMG. IN ARAR TAKE THR JADEEDATH EXIT GO 10KM PERFORM U-TURN, TAKE SECOND RIGHT YOU WILL SEE SIGN,GO 10KM TAKE RIGHT
TURN ONTO SKID ROAD FOLLOW SIGNS TO RIG 20KM
PROVIDE CLERK - NAME OF COMPANY, NUMBER OF PERSONNEL, COLOR OF VEHICLE AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL.
NIGHT DRIVING BY 3RD PARTY PERSONNEL IS NOT RECOMMENDED.
===========================================================================================================
LTI FREE DAYS: 1717
JSA REVISED 0, JSA REVIEWED: 12, PTW: 10, LOTO: 3
TOTAL SOC'S: 26, STOP WORK: 9, NM: 0, DRILLS: 0
IN-HOUSE AUDIT - 08-APR-24: AUDIT ITEMS: 51, CLOSED ITEMS: 43. REMAINING OPEN: 08
2ND QUARTER 3MCI ON 08-MAY-2024: AUDIT ITEMS: 53, CLOSED ITEMS: 51, REMAINING OPEN: 2
RHSE INSPECTION - 19-MAY-24: AUDIT ITEMS: 41, CLOSED: 40, REMAINING OPEN: 1
=======================================================================================================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABLZ-1 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:21 03/23/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

ARAMCO PERSONNEL:
* ARAMCO CLERK - ABDUL RAHMAN ALI LIAQAT- BADGE #8157053 - ARRIVED ON LOCATION - 03/16/24.
* ARAMCO GEOLOGIST - OTHMAN ALSHARIF- BADGE #786187 - ARRIVED ON LOCATION - 06/02/24.
* HSE ADVISOR RAULAN ORTAYEV #8554141 ON LOCATION SINCE 06/14/2024.
======================================================================================================
RENTAL TOOLS:
*RECEIVED COUGAR 6-1/2" DRIILING JAR DJ6-650-559 ON 5/23/24
*RECEIVED COUGAR 6-1/2" DRIILING JAR DJ6-650-313 ON 6/08/24
=======================================================================================================
SANAD CREW SHORTAGE: NONE
=======================================================================================================
SANAD EQUIPMENT REPAIR:
SANAD CRANE AT BASE FOR REPAIR
RENTAL CRANE AND OPERATORS ON LOCATION.
=======================================================================================================
LITHOLOGY:
15,908-15,962' 90-100% SILTSTONE, TR-10% SANDSTONE
MAX GAS: 51.6 UNITS @ 15,962'
MIN GAS: 38.4 UNITS @ 15,909'
=======================================================================================================
VACUUM TANKERS DRSS# 1004292611, GECAT PLATE # 1907VRA & 4817LRA 3/06/24 @ 17:00 HRS
=======================================================================================================
CASING PLAN/ACTUAL:
30" CSG 120'/30"CSG 124'
24" CSG 730'/24" CSG @ 779'
18-5/8 "CSG 1,500', CSG @ 1498'
13-3/8" CSG 6,020', CSG @ 5,680'
9-5/8" CSG 13,100, CSG @ 13,545'
7" LINER CSG 15,793'
4-1/2" CSG 18,500'
======================================================================================================
PLAN WELL TD: -/+18,500'MD/TVD (350' IN KAHFAH MEMBER)
=======================================================================================================
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
98 PCF 1 0 API 64 920 Volts 4.5 0 39,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2.2 HTHP 12 14 0 10 / 19 DELTADR 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 35 24 7/8 0 0 3.2
69
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
108 PCF 1 0 API 59 870 Volts 4.6 0 39,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2.8 HTHP 12 13 0 10 / 18 DELTADR 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 44 29 7/8 0 0 3.6
77

MUD BENT NACL


TREATMENT 2 ( 2500L ) 9 ( 2200L )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
12 15,962 15,962 DP Av DC Av Bit HHP 10 60 M433 8.375 SMT
Pressure GPM Jet Vel 159.75 228.49 18 I-Row O-Row DC Location Bearings
1,900 260 102 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
SA00023 ZR813C 2 x 14 / 4 x 13 / 0.819
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 12.5 418 450 405 4,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 8.375 1 0.92 SA00023
DRILL STRING
2 Mud Motor SDM 7 1 7 33.36 4-1/2 REG 4-1/2 REG 95.92 FS70B0496
3 Float Sub SDM 7.25 1 7.25 2.813 3.02 NC50 4 1/2 REG 132.4 B0496
4 Stabilizer SDM 8.25 1 6.5 2.875 6.03 NC46 NC46 99.5 XDX1035
5 Saver Sub SDM 6.875 1 6.875 2.875 1.21 5 1/2 FH NC50 82.6 5150-7-7
6 Measurement While Drilling (MWD) SDM 6.75 1 6.75 24.71 5-1/2 FH 5-1/2 FH 83 N003871
7 Saver Sub SDM 6.875 1 6.875 2.875 1.32 NC50 5 1/2 FH 75.75 NTS-32792
8 Non Magnetic Drill Collar ( NMDC ) SDM 8.25 1 8.25 2.813 25.83 6 5/8 REG 6 5/8 REG 112.2 SPRL SDT-9233
9 Float Sub SDM 6.969 1 6.969 2.875 3.96 NC50 NC50 180 OA65005-2-5

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABLZ-1 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:21 03/23/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
10 Float Sub SDM 6.969 1 6.969 2.875 3.95 NC50 NC50 180 WO5260-2-3
11 FIlter Sub SDM 6.719 1 6.719 3 6.82 NC50 NC50 127.65 675-1079
12 Crossover RIG 6.375 1 6.375 2.813 2.77 NC46 NC46 90.78 16240-176
13 Drillcollar RIG 6.5 21 6.5 2.813 680.77 NC46 NC46 92 SPRL RIG
14 Hydro-Mechanical Jar CTC 5 1 5 4.276 30.23 VAM-EIS NC50 VAM-EIS NC50 19.5 G105 PREMIUM DJ6650313
15 Drillcollar RIG 6.5 3 6.5 2.813 95.3 NC46 NC46 92 SPRL RIG
16 Crossover RIG 6.5 1 6.5 2.875 2.64 XT54 NC46 92 64658-4-1
17 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 458.3 XT54 XT54 52.51 CONV RIG
18 Drillpipe RIG 5.5 1 5.5 4.67 30 XT54 XT54 24.7 XD105 PREMIUM RIG

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/07/2024 N/A SEASONAL N/A SEASONAL 1,728 2 X DAILY

Company HWP NOC GOS SDM RIG BDF MJH CTC WUD XLG SGR RIG ARM SCM OTH OTH ARM

Category WLS CEQS CTRG DPDS RIG DFMS SEC JST MPD MLS MLS OTHR OTHR PCS RENT VAC WSC
PERSONNEL
6 4 17 3 38 2 8 0 6 5 5 11 4 1 2 2 4
Total
AND SERVICES No. of Persons
118
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 0 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 12 24 24 24 12 24 0 24 12 12 0 24 10 24

Standby/Tankers
TRUCKS/BOATS
DH-7507

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 300 766 249 8 3350

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MDRK-65 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/15/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

PA-218S @ MDRK-65 Limited Morning Report for 06/18/2024


Objective : (MK-1 VERTICAL Foreman(s)BELHAIN, OMAR
D&WO Morning Report (Service Providers View) Charge #: PILOT HOLE TO 150' INTO Engineer KHAN, KAFAYAT ULLAH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved BUZA WITH SIDETRACK Manager DHAFEERI, BADER NASSER
PA-218S (66-22514-0065)
OPTION) THURAYA RIG FORMAN VSAT FAX VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12367 6739089 880-6107
Date: Tuesday 06/18/2024 MDRK-65 (1) MDRK_65_1 CONTRACTOR /CLERK VSA T
6771163

Last 24 hr operations Next 24 hr plan


ROTARY DRLG 5-7/8" HOLE SECTION. ROTARY DRLG 5-7/8" HOLE TO TD @17,514' MD/15,835' TVD, CHC, F/C, W/TRIP, RIH,
CHC,F/C,SPOT,POOH FOR LOGGING.
Location Next Location
306 KM FROM DH M.G, 40 KM ON KHARKHIR ROAD, THEN LEFT 20 KM & RIGHT 8.5 KM SKID ROAD MDRK-76
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
17,135 Size 12017 12014 Size 11,600 16,686 15,683 Top
Formations Comments
9 5/8 7 Depth
16121' MD / 15567' TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) PKFU 15,567
(34' SHALLOWER)
16850 (Date) 100 285 306 16660.8' MD / 15678' TVD
113.2 (02/26/2024@0000 ) UNZA 15,678
(26' SHALLOWER)
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

ROTARY DRLG 5-7/8" HOLE W/81 PCF INNOVERTED MUD & C/W MWD SURVEY.
PUMP SWEEP AS REQUIRED.
0500 - 1900 14 1 5 7/8 N DRLG D TDS RIG 16850 17085 >> REAM EACH STAND & TAKE MWD SURVEY 30 FT OFF BTM.
>> PUMP 25 BBLS WEIGHTED PILL EVERY STAND DRILLED.
>> FOLLOW INTEGRATED HORIZONTAL DRILLING PRACTICES VER 3.0.
>> FLOW CHECK EVERY CONNECTION.
1900 - 1930 0.5 1 5 7/8 N DRLG RR TDS RIG 17085 17085
SERVICE TDS

ROTARY DRLG 5-7/8" HOLE W/81 PCF INNOVERTED MUD & C/W MWD SURVEY.
PUMP SWEEP AS REQUIRED.
>> REAM EACH STAND & TAKE MWD SURVEY 30 FT OFF BTM.
>> PUMP 25 BBLS WEIGHTED PILL EVERY STAND DRILLED.
1930 - 0459 9.5 1 5 7/8 N DRLG D TDS RIG 17085 17135
>> FOLLOW INTEGRATED HORIZONTAL DRILLING PRACTICES VER 3.0.
>> FLOW CHECK EVERY CONNECTION.

> LAST SURVEY: MD: 17013FT, INC.: 81.95 DEG, AZM: 325.22 DEG, TVD:
15737.23 FT, DLS: 1.30 DEG/100 FT.
Foreman Remarks

MDRK-65 WILL BE DRILLED AS AN MK-1 VERTICAL PILOT HOLE WELL TO 150' INTO BUZA. BASED ON THE OPEN-HOLE LOG, THE WELL WILL BE
SIDETRACKED TARGETING THE MOST DEVELOPED ZONES OF UNAYZAH-A. THE WELL WILL BE COMPLETED WITH CONVENTIONAL SAND SCREENS.
======================================= ARAMCO PERSONNEL======================================
>> ARAMCO MATERIAL EXPEDITOR ABDULLAH AL-ALI #813625 ON LOCATION SINCE 06/10/2024.
================================================= HSE ====================================
>> SAFETY TOPIC: DO NOT SMOKE OUTSIDE DESIGNATED SMOKING AREAS.
>> DISCUSSED HSE ALERT: OBTAIN AUTHORIZATION BEFORE OVERRIDING OR DISABLING SAFETY CRITICAL EQUIPMENT.

>> NEAR MISS: NIL.


>> HSE ALERTS: HSE ALERT: 71-24 TRIP AND FALL INCIDENT.
>> DRILLS: PIT DILL.
>> SOC ENTERED IN SLS: 6.
>> SAFETY OBS: 20.
>> RHSI/WC 9 MARCH-2024 AUDIT; TOTAL FINDING 46 ITEMS & 45 ITEMS CLOSE & 1 ITEM STILL OPEN.
>> IMPLEMENTING CLOSED LOOP DRILLING PRACTICE.
======================================= DIRECTIONAL DRILLING =================================
>> SLB MWD SENSOR OFFSET:- D&I=47.85' & GR=44.19'.
>> LAST SURVEY: MD: 16734 FT, INC.: 79.25 DEG, AZM: 323.66 DEG, TVD: 15691 FT, DLS: 0.67 DEG/100 FT..
======================================= 3 RD PARTY PERSONNEL & EQUIPMENT === =====================
>> MI MUD ENG ON LOCATION.
>> SLB SILO OPERATOR ON LOCATION.
>> HALLIBURTON MUD LOGGING ON LOCATION.
>> SLB MI WASTE MANAGEMENT SRVICE ON LOCATION.
>> SLB CENTRIFUGE SERVICE ON LOCATION.
>> BAROID MUD ENGINEER ON LOCATION.
===================================JOURNEY MANAGEMENT============================================
>> RIG LOCATION DIRECTIONS: 306 KM FROM DH MAIN GATE, 45 KM FROM HRDH BRIDGE ON KHARKHIR RD. TURN LEFT 20 KM BLACK ROAD, TURN RIGHT 8.5 KM SKID ROAD TO RIG LOCATION.
=========================================== RENTAL TOOLS =====================================
>> MI SWACO CLOSED LOOP SYSTEM ON LOCATION.
>> TAQA TANKER WITH 100 BBL 20% HCL ACID ON LOCATION SINCE 05/15/2024 @ 13:00 PM.
====================================== RIG CREW SHORTAGE =====================================
>> MANPOWER SHORTAGE: 1 FLOOR HAND.
=========================================== WELLSITE =========================================
>> NEXT WELL MDRK-76; 100% READY.
>> 2ND NEXT NJYN-114.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
1 16,917 80.8 324.74 95 15,723 567.84 -476.6 2,432.23 0.9

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MDRK-65 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/15/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
1 17,013 81.95 325.22 96 15,737 591.53 -493.2 2,526.79 1.29

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
81 PCF 1 0 API 62 495 Volts 3.5 0 26,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 1.2 HTHP 21 13 0 8 / 14 INOVRT 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 32 17 6/7 0 0 3.2
61
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
81 PCF 1 0 API 62 495 Volts 3.5 0 25,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 1.2 HTHP 21 12 0 8 / 14 INOVRT 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 32 17 6/7 0 0 3.2
61

CACO3-25 MRBL-M CACO3-50 STELSEALFN STELSL50 RHEMODL ADAPTA


MUD 36 ( 55LB ) 10 ( 55LB ) 36 ( 55LB ) 36 ( 50LB ) 36 ( 50LB ) 1 ( 55GL ) 3 ( 25KG )
TREATMENT FACTANT
1 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
14 16,689 17,135 DP Av DC Av Bit HHP 18 80 M333 5.875 SMT
Pressure GPM Jet Vel 397.12 N/A 45 I-Row O-Row DC Location Bearings
3,400 300 164 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
SM3503 MR613C 3 x 16 / 0.589
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 15.5 324 330 318 8,500 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class
Serial #
1 Bit SMT 5.875 1 0.65 SM3503
2 Near Bit Roller Reamer RIG 5.875 1 5.875 1.26 6.65 NC38 3 1/2 REG 53.87 3 POINT HBH-21822
3 Pony Collar RIG 1 15.13 3-1/2IF 3-1/2IF 43 96561
4 String Reamer RIG 5.875 1 5.875 1.25 6.34 NC38 NC38 53.87 HBH-21752
DRILL STRING 5 Measurement While Drilling (MWD) BHI 4.75 1 4.75 38.1 64.14 ZDHP1340528
6 FIlter Sub BHI 4.75 1 4.75 2.125 5.67 NC38 NC38 64.14 15789567
7 String Reamer RIG 5.875 1 5.875 1.25 6.25 NC38 NC38 53.87 HDH-21897
8 FIlter Sub BHI 4.75 1 4.75 2.125 7.38 NC38 NC38 64.14 CX2937
9 Heavy Weight Drillpipe (HWDP) RIG 4.875 3 4.875 2.55 90.9 XT39 XT39 28.38 CONV TALLY
10 Hydro-Mechanical Jar GUL 4.75 1 4.75 2.25 30.07 3-1/2" IF 3-1/2" IF 800 GEDJ-00020
11 Heavy Weight Drillpipe (HWDP) RIG 4.875 9 4.875 2.55 182.54 XT39 XT39 28.38 CONV
12 Drillpipe RIG 4 57 4 3.34 1,794.13 XT39 XT39 14 XD105 PREMIUM
13 Heavy Weight Drillpipe (HWDP) NRT 4.875 18 4.875 2.55 547.09 XT39 XT39 28.38 CONV
14 Drillpipe RIG 4 1 4 3.34 31.5 XT39 XT39 14 XD105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/11/2024 06/11/2024 N/A N/A GOOD 1,768 N/A

Company SWK RIG BAR SMI BHI HMS RIG ARM MI2 MI3 ARM

Category CTRG RIG DFMS DFMS LWD MLS OTHR OTHR SCS WMS WSC
PERSONNEL
15 45 2 1 2 4 3 2 2 4 1
Total
AND SERVICES No. of Persons
81
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 12 24 24 12 12 12 24 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 150 549 55 8 2450

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
>> NEEDED TO REPLACE UPS UNINTERRUPTED POWER SUPPLY OF V-SAT INDOOR UNIT. >> UPS BATTERS DOES NOT ACCEPT CHARGING ANY MORE.

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MDRK-65 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/15/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDON-5 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/17/2024 - 08/19/2024
Report ID: OPERLMTDMRREP

PA-326S @ SDON-5 Limited Morning Report for 06/18/2024


Objective : (GAS EVALUATION Foreman(s)MAAMAR, MOURAD SLIMANE / ZITOUNE, BRAHIM
D&WO Morning Report (Service Providers View) Charge #: / DELINEATION.) Engineer ALHAJRI, KHALID DAKHEEL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Manager MOUSA, NEDAL ADEL
PA-326S (66-23829-0005)
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 1275 577-9327 577-9306
Date: Tuesday 06/18/2024 SDON-5 (0) SDON_5_0 CONTRACTOR /CLERK VSA T
577-9315

Last 24 hr operations Next 24 hr plan


TRIP OUT, HANDLE BHA, CHANGE TOP RAMS & PRESS TEST, RUN 9-5/8" CASING. RUN 9-5/8" CASING & CMT JOB.
Location Next Location
SDON-5 INTO SHUDON FIELD *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,826 Last Csg Size MD TVD Size Top
13 3/8 4130 4130 Formations Comments
Depth
MDTM 4,090 105' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SULY 4,669 332' DEEPER
9826 (Date) 100 0 341 HITH 5,289 193' DEPPER
24 (05/25/2024@0400 ) ABAR 5,649 132' DEPPER
ABBR 5,859 137' DEPPER
ABCR 5,949 90' DEPPER
ARBD 6,279 188' DEPPER
UHFR 6,759 130' DEPPER
DHRM 7,739 191' DEEPER
MNJR 8,629 170' DEEPER
JILH 9,215 199' DEEPER
JLDM 9,625 145' DEEPER
BJDM 9,795 147' DEEPER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0600 1 0 12 N CT TO STDP RIG 9826 9826 4130 1161
TRIP OUT 12" REAM ASSY TO TOP BHA.
0600 - 0630 0.5 0 12 N CT WCNT NA RIG 9826 9826
FOLW CHECK, WELL STATIC.
0630 - 0900 2.5 0 12 N CT HT BHA RIG 9826 9826
HANDLING 12' BHA, LAY DOWN JAR, 2 DC 8.5", 2 RMR, SDC 8.5", BIT SUB & BIT.

0900 - 1000 1 0 12 N WH RTRV WBSH IWS 9826 9826 PU/MU CIW WEAR BUSHING RETRIEVE TOOLS ON 5-1/2" DP, RETREIVED 13-3/8"
WEAR BUSHING. L/D SAME.
1000 - 1100 1 0 12 N WH OTH NA IWS 9826 9826
PU/MU CIW JETTING TOOL, RUN JET BOP & WELL HEAD FOR FMH LANDING AREA.

PJSM & REV JSA. RUN 10 STANDS 5-1/2" DP THAN PU/MU 13 5/8" 10M CIW TEST
PLUG ASSY. LAND INTO CASING SPOOL.
1100 - 1430 3.5 0 12 N BOP OTH RAMS RIG 9826 9826
SECURE WELL. CHANGE 5-1/2" TOP RAMS TO 9-5/8" CASING RAMS.
PRESS TEST ANNULAR TO 300/7000 PSI & CSG RAMS TO 300/7100 PSI.
LAY DOWN TEST PLUG ASSY & RACK BACK 10 STANDS 5-1/2" DP IN DERRICK.

1430 - 1700 2.5 0 12 N CSG HT PEL MSD 9826 9826 PJSM & REV JSA. RIG DOWN RIG BAILS. RIG UP AL-MASAOOD 9-5/8" RUNNING
GEAR, POWER TONG, CRT, FMS , JAM UNIT & FUNCTION TEST.

1700 - 1900 2 0 12 N WH OTH NA IWS 9826 9826 DUMMY RUN. PU/MU CIW 9-5/8" FMH ASSY WITH LANDING JOINT. LAND INTO
CASING SPOOL & CONFIRM SPACE OUT. THAN RIG DOWN SAME.

PJSM & REV JSA. PU/MU SHOE TRACK BARE 9-5/8" 53.5# VM95HCS VTHC : FS + 2
1900 - 2130 2.5 0 12 N CSG RCSG CSTR MSD 9826 9826 0 166
JTS + FC + 1 JT + LC + 1 JT & RUN TO 166'.
- CHECK FLOAT EQUIPMENT. THAN BAKER LOCK SHOE TRACK.

TRIP IN 26 JTS BARE 9-5/8" 53.5# VM95HCS VTHC + 72 JTS FBE 9-5/8" AM95HCS
2130 - 0430 7 0 12 N CSG RCSG CTRQ MSD 9826 9826 166 4130
AMHBC. TOTAL RUN 102 / 242 JTS.
FILL UP EACH JOINT.
0430 - 0459 0.5 0 12 N CSG CIRC MPMP RIG 9826 9826
CIRCULATE CASING CAPACITY AT 13-3/8" SHOE ....ONGOING.
Foreman Remarks

SDON-5 IS AN MK-1 GAS EVALUATION & DELINATION WELL INTO SHUDON FIELD, WILL BE DRILLED VERTICALLY AS PILOT HOLE (200 FT INTO PUZU) & BASED ON OPEN HOLE LOGS, THE WELL
WILL BE EITHER COMPLETED WITH 15K CEMENTED LINER OR SIDE-TRACKED.

ERP:
SDON-4 IS IN NON-POPULATED AREA, OUTSIDE SHALLOW GAS AREA.
1/2 LFL @ 99 M, RER 100 PPM @ 0 M & RER 30 PPM @ 0 M.
GOR: 31,250 & 8,181 SCF/STB & H2S IS 0 MOLE % IN RESERVOIR.
RELIEF WELL: SDON-1 AT N-2.623,999.92 M / E-227.999.37 M.
SDON-1 IS LOCATED AT 1.6 KMS SW OF SDON-5 .
DISTANCE TO COMMUNITY: +/- 95 KMS FROM HARADH TOWN.

JOURNEY MANAGEMENT PLAN:


PRIOR ENTERING SDON FIELD CALL YOUR COMPANY BASE, FILL YOUR VEHICLE WITH FUEL.
CALL RIG AT 5779315 PRIOR ENTERING SDON FIELD.
ALL VEHICLES SHOULD HAVE A CAR SURVIVAL KIT.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDON-5 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/17/2024 - 08/19/2024
Report ID: OPERLMTDMRREP

SKID ROAD DISTANCE 55 KM WITHOUT MOBILE COVERAGE.

POB:
RIG CLERK NAEEM AKHTAR ID# 8282413 ON LOCATION SINCE 1/17/2023.
ARAMCO FCT HUSSAIN ID 796753 ON LOCATION SINCE 6/7/2024.
ARAMCO CLERK ZYAD SHTEIFI ID 821424 ON LOCATION SINCE 6/10/2024.
ARMACO DE KHALID ALHAJRI ID#888000 ON LOCATION FOR 9-5/8" JOB
SAOGDD FIELD COMPLIANCE ADVISOR MIHAI NAUT ID# 8598223 ON LOCATION SINCE 06/15/2024

MUJAHEDEEN ON LOCATION SINCE 2/23/2023.


CREW SHORTAGE: 0
SAUDIZATION: 51%

FLAT TIME KPI:-


DP TRIPPING KPI: 19 STD/HR / ACTUAL: XX STD/HR.
30" CSG KPI: 3 JT/HR / ACTUAL: 0 JT/HR.
24" CSG KPI: 4 JT/HR / ACTUAL: 4 JT/HR.
18-5/8" CSG KPI: 7 JT/HR / ACTUAL: 7 JT/HR.
13-3/8" CSG KPI: 11.5 JT/HR/ ACTUAL: 12 JTS/HR.
9-5/8" CSG KPI: 14 JT/HR/ACTUAL: XX JTS/HR.
7" LINER KPI: 14 JT/HR/ACTUAL: XX JTS/HR.
4-1/2" TBG KPI: 13 JT/HR / ACTUAL: XX JT/HR.
4-1/2" UPPER COMPLETION KPI: 13.5 JT/HR / ACTUAL: XX JT/HR.

CASING SETTING DEPTHS:-


PLANNED 30'' SECTION TO 120 FT / ACTUAL : 0 FT.
PLANNED 24'' SECTION TO 444 FT (20 FT INTO UER WTR) / ACTUAL : 538 FT.
PLANNED 18-5/8'' SECTION TO 1,293 FT (50 FT INTO AHMADI) / ACTUAL : 1,375 FT.
PLANNED 13-3/8" SECTION TO 4,035 FT (50 FT INTO MDTM) / ACTUAL : 4,140 FT.
PLANNED 9-5/8" SECTION TO 9,678 FT (30 FT INTO BJDM) / ACTUAL : 9,826 FT.
PLANNED 7" SECTION TO 13,590 FT (400 FT INTO KFDA) / ACTUAL : XX FT.
PLANNED 4-1/2" SECTION TO 15,300 FT MD (200 FT INTO PUZU) /ACTUAL : XX FT.

1 EA ENJAZ WATER SPRAY TANKER ON LOCATION SINCE 1/6/2024 DRSS 1004327184


4 EA ENJAZ VACUUM TANKER 3799BDA/4171ADA/7810RRA/3373HDA ON LOCATION SINCE 6/12/2024 DRSS 1004333671

RECEIVED OIL SERV 03 CEMENT TRIPODS ON 5/22/2024.


RECEIVED TAQA 8" JAR SN: DJ10-800-106 ON 6/5/2024 AT 9:30 AM.
RECEIVED TAQA 11-7/8" GDR REAMER DRSS 3000138458 ON 6/5/2024.
RECEIVED OILSERV 100% VDA ACID 20% DRSS 1004328605 ON 6/6/2024 AT 10:00 AM

DRILLS: 2 PIT DRILL,2TRIP DRILL.


JSA: 16 / PTW: 12 / NEAR MISS: 7222329 / OBB: 10.
HSE ALERT : NONE.

AUDITS:
4TH QSI 2023 TOTAL 60 / 59 CLOSED - 1 OPEN ITEMS: (P3=1).
WCEI TOTAL 14/14 CLOSED - 0 OPEN ITEM.
2ND RHSEI TOTAL 63 / 63 CLOSED - 0 OPEN ITEM.
1ST QTR 3MCI 2024 TOTAL 51 / 46 CLOSED - 5 OPEN ITEMS: (P3=5)

WATER CONSERVATION IMPLEMENTED INITIATIVES: RIG DOWN & RELEASED ON 5/16/2024.


REDUCED WATER PITS: NO.
DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS:
CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION SLB ON LOCATION FOR DRYER SYSTEM.

ANNULAR BOP SIZE 13-5/8" 10K TYPE HYDRIL SN: 1008092-1. EXP DATE: 1/29/2027.
PACKER ELEMENT SN: 1022-0723. ELEMENT INSTALLATION DATE: 6/16/2024. EXP DATE: 6/16/2025.

NEXT LOCATION GHZL-104 READY, BUT ONLY 1 WATER WELL GHZL-813 & FAR AWAY, NEED DRILL 2ND WATER WELL + REPAIR LOCATION & SKID ROAD.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 9,826 0.9 233.96 0 9,825 -32.85 -15.44 119.09 0

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 1 3.3 API 0 0 Volts 1.81 9.4 53,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 14.2 HTHP 87 28 0 9 / 11 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 22 13 8/9 7.5 400 0
46
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 1 3.3 API 0 0 Volts 1.81 9.4 53,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 14.2 HTHP 87 28 0 9 / 11 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 22 13 8/9 7.5 400 0
46

MUD BARITE
TREATMENT 2 ( 5000L )

BIT DATA

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDON-5 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/17/2024 - 08/19/2024
Report ID: OPERLMTDMRREP

DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/06/2024 06/06/2024 NORMAL N/A SEASONAL 3,720 DAILY SAFETY
MEETING

Company MSD SWK MI3 WDV RIG EMC SMI MJH BFL HMS RIG ARM OCT OTH ARM CAM GEP

Category CSR CTRG CRI DV RIG DFMS DFMS SEC FILT MLS OTHR OTHR PCS VAC WSC WHES WHES
PERSONNEL
7 14 4 1 45 1 1 8 1 4 3 5 6 5 2 1 1
Total
AND SERVICES No. of Persons
109
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 24 12 12 0 24 24 12 12 0 10 24 0 0

Standby/Tankers
TRUCKS/BOATS
AB-6306

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 1000 158 213 98 5500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-215 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:21 03/28/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

PA-529S @ SHYB-215 Limited Morning Report for 06/18/2024


Objective : (ELIMINATE Foreman(s)JOSHY, AINIKKAL LONAPPEN
D&WO Morning Report (Service Providers View) Charge #: COMMUNICATION BETWEEN Engineer MONDRAGON ALFONSO, JOSE LUIS
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (61-23072-0215) TCA &CCA) Manager AKBAR, HUSSAIN QASSIM
PA-529S
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12151 578 8501 578 8504
Date: Tuesday 06/18/2024 SHYB-215 (0) SHYB_215_0 FAX VSAT CONTRACTOR /CLERK VSA T
578 8506

Last 24 hr operations Next 24 hr plan


N/U BONNET & TREE, RETRIEVE PLUGS, SECURE WELL & RELEASE RIG TO SHYB-327. RIG DOWN ON SHYB-215, RIG MOVE & RIG UPON SHYB-327.
Location Next Location
SABKHA-83, SHYB-215 WELL, 825 KM AWAY FROM DMM *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
16,054 Last Csg Size MD TVD Size 3,044 7,897 5,020 Top
9 5/8 5033 4670 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
16054 (Date) 100 0 582
76.3 (04/02/2024@2100 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0730 2.5 0 EOW C BOP ND BOP RIG 16054 16054
CONT. ND BOP & RELATED EQUIPMENTS IN 3 STAGES.

NU TBG BONNET, FEEDING LINES THROUGH.


0730 - 1130 4 0 EOW C WH NU WH RIG 16054 16054 PRESSURE TEST CONTROL LINES 7,500 PSI/10 MIN. CHECK PDHMS SIGNAL.
MAKE UP PDHMS WELL HEAD OUT LET & ICV CONTROL LINE NEEDLE VALVES.
TEST BONNET 2,500 PSI/10 MIN, GOOD.

1130 - 1500 3.5 0 EOW C WH NU TREE RIG 16054 16054 NU X-MASS TREE, RETREIVE BPV, INSTALL TWCV, PT SAME TO 2,500 PSI, OK.
RETREIVE TWCV.

RU TAQA SL, PT SAME TO 2,000 PSI.


1500 - 2200 7 0 EOW C COMP RTRV PLUGN MSL 16054 16054
- SL RETRIEVE ME PLUGS AT 1,000 FT.
- SL RETRIEVE 4-1/2" & 3-1/2" PX-PLUGS. R/D SL.
2200 - 0100 3 0 EOW C COMP HT TBG RIG 16054 16054
RD SURFACE LINES.
0100 - 0459 4 0 EOW C COMP CIRC MPMP RIG 16054 16054
DUMP AND CLEAN MUD SYSTEM.
0459 - 0459 0 0 EOW S OT RELS NA RIG 16054 16054
RELESAE RIG FROM SHYB-215 ON 18 JUNE 05:00 HRS.
Workover Objectives
Foreman Remarks

PA-529S RKB = 28`


ORKB = 33.5'
CORRECTION = +5.5`
PRODUCTION WING ORIENTATION TO THE EAST.
================= CCA PRESSURES =================
> 9-5/8" X 13-3/8" CCA-01: 40 PSI.
> 18-5/8" X 13-3/8" CCA-02: 0 PSI.
> 18 5/8" X 24" CCA3: 80 PSI.

(APRIL3) BLEED OFF CCA 1 FROM 950 PSI TO 0 PSI IN 15 MINUTES WITH THE FOLLOWING GAS READINGS: H2S 0 PPM,CO 100 PPM, LEL OVER LIMIT %.
(APRIL7) BLEED OFF CCA 1 FROM 550 PSI TO 0 PSI IN 4 MINUTES WITH THE FOLLOWING GAS READINGS: H2S 4 PPM, CO 100 PPM, LEL OVER LIMIT %.
(APRIL 24) BLEED OFF CCA FROM 610 PSI TO 0 PSI IN 45 SECOND WITH THE FOLLOWING GAS READINGS: H2S 0 PPM, CO 100 PPM, LEL OVER LIMIT
(MAY 2) BLEED OFF CCA 1 DURING RECORDING NOISE LOG, DROPPED FROM 580 PSI TO ZERO IN 90 SECONDS, WITH GAS READINGS: H2S 0 PPM, CO 32 PPM, LEL OVER LIMIT
(MAY 9) BLEED OFF CCA 1 DURING CMT SQUEEZE JOB, DROPPED FROM 400 PSI TO ZERO IN 70 SECONDS, WITH GAS READINGS: H2S 0 PPM, CO 32 PPM, LEL OVER LIMIT
(MAY 12) BLEED OFF CCA 1 DURING RECORDING NOISE LOG ,DROPPED FROM 350 PSI TO ZERO IN 45 SECONDS, WITH GAS READINGS: H2S 0 PPM, CO 32 PPM, LEL OVER LIMIT
(MAY 14) BLEED OFF CCA 1 DURING CMT SQUEEZE JOB, DROPPED FROM 400 PSI TO ZERO IN 45 SECONDS, GAS READINGS: H2S 0 PPM, CO 32 PPM, LEL OVER LIMIT
(MAY 16) BLEED OF CCA-1 TO 0 PSI IN 30 SECOND, DURING RESIN SQUEEZE JOB & CLOSED AGAIN @ 01:00 AM 17 MAY
(MAY 19) BLEED OFF DURING NOISE LOG, DROPPED FROM 400 PSI TO ZERO IN 20 SECONDS, WITH GAS READINGS: H2S 0 PPM, CO 18 PPM, LEL OVER LIMIT
(MAY 20) BLEED OFF CCA 1 DROPPED FROM 220 PSI TO ZERO IN 25 SECONDS, WITH GAS READINGS: H2S 0 PPM, CO 16 PPM, LEL OVER LIMIT
(MAY 22) BLEED OFF CCA 1 DROPPED FROM 250 PSI TO ZERO IN 30 SECONDS, WITH GAS READINGS: H2S 0 PPM, CO 17 PPM, LEL OVER LIMIT
(MAY 23) BLEED OFF CCA 1 AFTER MILLED SECTION, DROPPED FROM 200 PSI TO ZERO IN 20 SECONDS, WITH THE FOLLOWING GAS READINGS: H2S 0 PPM, CO 53 PPM, LEL OVER LIMIT
(MAY 25) BLEED OFF CCA 1 DURING SQUEEZE JOB, DROPPED FROM 140 PSI TO ZERO IN 20 SECONDS, CLOSED AGAIN AT 4:00 AM ON MAY26.
(MAY 27) BLEED OFF CCA 1 DROPPED FROM 90 PSI TO ZERO IN 15 SECONDS WITH GAS READINGS: H2S 0 PPM, CO 0 PPM, LEL OVER LIMIT. CLOSED AGAIN AT 6:00 AM ON MAY28.
(JUNE 3) BLEED OFF CCA1 FROM 40 PSI TO ZERO. CLOSED @6:00 ON JUNE 4.
===============================================================================
WELL SEQUENCE AFTER SHYB-215.

- SHYB-327 (BI-60) SABK-91 KOM ON 06/14/2023, STRIP OUT 100% & WELL SITE 70%. (WELLSITE NEED TO BUILD ACCESS ROAD AWAY FROM EXISTING WELLS IN SABKHA-91 TO SHYB-327
LOCATION PLUS CREATE ESCAPE ROAD FOR LOCATION).
- SHYB-911 (NDE WO) SABK-28 KOM ON 18 OCT 2023, STRIP OUT 100 % & WELL SITE 100%.
- SHYB-305 (NDE WO) SABK-83 KOM ON 19 SEPT. 2023, STRIP OUT 100% & WELL SITE 5% .
- SHYB-547 (PLUG STUCK ) SABK-10 KOM ON 05/15/2024, STRIP OUT 0% & WELL SITE 0%. (LOCATION REJECTED BY PA-529S RIG FORMAN AND SANAD CONTRACTOR DUE TO CELLAR FULL OF
FLUID WITH ALOT OF GAS BUBBLES COMING FROM GROUND LEVEL), NOT SAFE FOR RIG ACCESS BASED ON EXISTING CONDITION.

======================================PERSONNEL========================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-215 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:21 03/28/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

- ========================PA-529 SAFETY DRILLS AND SAFETY OBSERVATIONS======================


OBSERVATIONS SUBMITTED: 7.

DISCUSSED WITH CREW DURING TOUR MEETING THE FOLLOWING HSE ALERTS

- HSE ALERT: 69-24 INJURY DURING ENGINE MAINTENANCE


- HSE ALERT: 70-24 PIPE HANDLER MAIN ARM UNCONTROLLED DECENT
- HSE ALERT: 71-24 TRIP AND FALL INCIDENT
- HSE ALERT: 72-24 SNAKE BITE & SCORPION STING INCIDENTS
==================== INFORMATION FOR DISPATCHING GROUP=================================================
- DAILY DIESEL CONSUMPTION FOR ENGINES (RIG + CAMP): 57 BBLS.
- CUMULATIVE FOR CURRENT WELL: 3414 BBLS.
- TOTAL DIESEL FOR MONTH JUNE 24: 669 BBLS.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
52 PCF 0 0 API 100 0 Volts 0 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 0 0 0 0/0 DSEL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
26
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
52 PCF 0 0 API 100 0 Volts 0 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 0 0 0 0/0 DSEL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
26

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
05/12/2024 N/A N/A N/A N/A 6,112 N/A

Company INW GOS HCO RIG GDF MJH ASH MH2 RIG MSL ARM

Category BRCR CTRG ICE RIG DFMS SEC FLD H2S OTHR SLS WSC
PERSONNEL
1 14 2 74 1 4 11 1 8 3 1
Total
AND SERVICES No. of Persons
120
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 12 0 12 12 12 0 12 12 12 9 12

Standby/Tankers
TRUCKS/BOATS
SY-1488

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2405 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/18/2024 - 07/23/2024
Report ID: OPERLMTDMRREP

PA-604S @ HRDH-2405 Limited Morning Report for 06/18/2024


Objective : (HRDH-2405 IS Foreman(s)BULBUL, AHMET HAKAN / ELSHAER, AHMED TAREK
D&WO Morning Report (Service Providers View) Charge #: PLANNED TO BE DRILLED AS Engineer ROJAS BRITO, JOSE OCTAVIO
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23058-2405) MK-1 PRE-SET WELL Manager HARTHI, HUSSAIN AHMAD
PA-604S
TARGETING KHUFF-B THURAYA RIG FORMAN VSAT FAX VSAT
Daily Onshore
Wellbores: RESERVOIR)
(0500-0500) Saudi Aramco Well 0088216777 12894 577-9338 577-9331
Date: Tuesday 06/18/2024 HRDH-2405 (0) HRDH_2405_0 CONTRACTOR /CLERK VSA T
577-9333

Last 24 hr operations Next 24 hr plan


CONT. ROTARY DRILL 16" HOLE TO CP. CHC. POOH TO SURFACE. PERFORM DUMMY RUN. RUN 13-3/8" CSG. CEMENT SAME WITH TWO STAGE
Location Next Location
HRDH FIELD, 258 KM F/ DMG *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
4,267 Last Csg Size MD TVD Size Top
18 5/8 1915 1915 Formations Comments
Depth
AHMD 1,845
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) 21' SHALLOWER THAN
4205 (Date) 0 62 258 SFNY 2,150
PROGNOSIS
10.8 (06/07/2024@1000 ) 57' DEEPER THAN
SHUB 3,060
PROGNOSIS
83' DEEPER THAN
BYDH 3,285
PROGNOSIS
10' SHALLOWER THAN
MDTM 4,195
PROGNOSIS.
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

BLIND DRILL 16" SECTION W/ NO RETURN W/ 67 PCF PHPA MUD TO CP.


* SWEEP HOLE AS REQUIRED.
0500 - 0945 4.75 0 16 N DRLG D TDS RIG 4205 4267 * TAKING TELEDRIFT SURVEYS AS PER PROGRAM.
* PUMP 85 PCF MUD CAP W/ 2 BPM
* FOLLOW BLIND DRILLING PROCEDURES F/ DRILLING FLUID ENG GUIDELINES.
** DURING DRILLING TIME TO TIME OBSERVED HOLE IS FULL BUT NO RETURN.
0945 - 1100 1.25 0 16 N CT CIRC MPMP RIG 4267 4267
PUMP 3 X 100 BBL HI-VIS PILLS AND CHC FOR 3 B/UP TO THE LZ.

1100 - 1345 2.75 0 16 N CT ST STDP ARM 4267 4267 4267 1915 POOH W/ 16" ROTARY DRILLING ASSEMBLY ON 5-1/2" DP FR 4,267 FT TO 18-5/8"
SHOE @ 1,915 FT. HOLE SLICK.
1345 - 1415 0.5 0 16 N DRLG RR TDS RIG 4267 4267
RIG SERVICE AT CSG SHOE.

1415 - 1545 1.5 0 16 N CT ST STDP RIG 4267 4267 1915 4267 RIH FREELY W/ 16" ROTARY ASSEMBLY TO BOTTOM, WASH DOWN LAST STAND.
HOLE SLICK.

PUMP 3 X 100 BBL HI-VIS PILLS AND CHC FOR 3 B/UP TO THE LZ.
1545 - 1800 2.25 0 16 N DRLG CIRC MPMP RIG 4267 4267
* PUMP & SPOT 95 PCF CASING GO PILL IN OPEN HOLE.
** FOUND PARTIAL RETURN WHILE CIRCULATION (40-50%)

POOH WITH 16" ROTARY BHA TO 18-5/8" CSG SHOE.


1800 - 2000 2 0 16 N DRLG TO STDP RIG 4267 4267 4267 1915
* MONITOR WELL THRU TRIP TANK.
2000 - 2030 0.5 0 16 N DRLG TO SPDP RIG 4267 4267 1915 1104
CON'T POOH TO TOP OF 16" ROTARY BHA.

CONT. POOH TO SURFACE & R/B 3 X 5-1/2" HWDP STD'S. L/D 6 JNTS X 6-5/8"
HWDP, 6 JNTS X 8-1/2" D/C, 11 JNTS X 9-1/2" D/C, SLB 9.5" JAR, 16" STRR, 9.5"
TELEDRIFT MWD, 16" STRR, 9-1/2" D/C , 16" NBRR AND 16" BEST BIT.
2030 - 0230 6 0 16 N DRLG HT BHA RIG 4267 4267
* L/D SLB JAR SN: 79979JA @ 6/17/2024 23:30 HRS.
* L/D TELEDRIFT MWD @ 6/18/2024 01:30 HRS.

0230 - 0315 0.75 0 16 N WH RTRV WBSH RIG 4267 4267


RETRIVE CIW WEAR BUSHING. JET & CLEAN WELL HEAD AND BOP.
0315 - 0445 1.5 0 16 N CSG HT PEL FMC 4267 4267
HPJSM, R/U FRANKS CSG RUNNING TOOLS.
0445 - 0459 0.25 0 16 N WH OTH NA RIG 4267 4267
PERFORM 18-5/8 FMH DUMMY RUN.... ONGOING AT RT
Foreman Remarks

HRDH-2405 IS PLANNED TO BE DRILLED AS MK-1 PRE-SET WELL TARGETING KHUFF-B RESERVOIR. THE PRE-SET POINT WILL BE 5 FT TVD IN TO KHF-B AFTER WHICH UBCTD WILL DRILL FOUR
LATERALS IN TO THE RESERVOIR. WELL IS PLANNED TO BE COMPLETED WITH 10K CEMENTED LINER.
================PLAN VS ACT ===============
- 30" CP PLAN @ 120' (120' INTO RUS FM), ACT @ 163' - FLAT TIME PLAN / ACTUAL: 26.25/21.25 HR
- 24" CP PLAN @ 496' (20' INTO UER FM), ACT @ 520' - FLAT TIME PLAN / ACTUAL:31/30.5 HR
- 18-5/8" CP PLAN @ 1,924' (50' INTO AHMADI FM), ACT @ 1,915' -FLAT TIME PLAN / ACTUAL: 71.2/ 88 HR
- 13-3/8" CP PLAN @ 4,255' (50' INTO MDTM), ACT @ XXX' -FLAT TIME PLAN / ACTUAL: 99 / XXXX HR
- 9-5/8" CP PLAN @ 9,056' (30' INTO BJDM), ACT @ XXXX' -FLAT TIME PLAN / ACTUAL: 125.8 / XXX HR
- 7" CP PLAN @ 10,753' (05' TVD INSIDE KFCC), ACT @ XXXX' -FLAT TIME PLAN / ACTUAL: 132.1 / XX HR
- 4.5"LNR @ 11,022' (250 FT INSIDE KFDA), ACT @ XXXX' -FLAT TIME PLAN / ACTUAL: 23.1 / XX HR

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2405 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/18/2024 - 07/23/2024
Report ID: OPERLMTDMRREP

==============================ARAMCO PERSONNEL========================
- PDP HISHAM ALSOWAIGH #831193 LEFT LOCATION 06/11/2024.
- MAT EXP RASHED ALQAHTANI # 8428880 LEFT LOCATION ON 6/11/2024.
============================= RIG VISITS ===========================
* PRE-SPUD DWOP, ERP MEETING AND STUCK PIPE CAMPAIGN. DONE WITH DE MUHAMMAD ALI QURESHI AND 3RD PARTY ON 30/05/2024.
=====================HSE ===================================
DISCUSSED THE INCIDENT WITH INJURY FOR RIG ADM 339-OFFSHORE.
YELLOW STICKER'S INSPECTION, WINCHES AND MAN RIDERS PERFORMED BY THIRD PARTY.
WALK AROUND AT RIG SITE FOR HAZARD HUNT AND SOC.
DISCUSSED DAILY OPERATION AND SAFETY REQUIREMENTS
DISCUSS THE PTW AUDIT FINDINGS WITH CREW AND FOLLOW UP ON ELIMINATION OF ERRORS.
DISCUSSED THE PLAN OF THE DAY WITH CREW MEMBERS AND SPECIFIC TASKS WERE GIVEN.
USE OF SWA WHEN UNSAFE BEHAVIOR / UNSAFE CONDITION. DISCUSS LINE OF FIRE AND HAND AND FINGER PLACEMENT

DRILLS: 1 X TRIP DRILL & 1 X BOP DRILL


AUDIT STATUS:
RHSEI: 21ST JAN 2024, TOTAL = 62, OPEN = 00.
WELL CONTROL:17TH JAN 2024, TOTAL = 13, OPEN = 00

STOP CARD: 40
NEAR-MISS:
=============================VACCUM TANKERS============================
SPRAY TANKER DRSS#1004330551, DOOR#2546, PLATE#3183
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 7.6 API 0 0 Volts 3.2 10 400
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
80 0 HTHP 96 31 0.1 11 / 15 PHPA 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 11 4 11 / 12 0 200 0
72
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 7.4 API 0 0 Volts 3.2 10 400
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
80 0 HTHP 96 30 0.1 11 / 16 PHPA 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 13 4 10 / 11 0 200 0
73

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
4 1,918 4,267 DP Av DC Av Bit HHP 30 120 S423 16 CDB
Pressure GPM Jet Vel 108.57 133.39 0 I-Row O-Row DC Location Bearings
1,500 1,000 N/A 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
267425 TS716MB POOH Reason N/A
Gauge Other
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 41 245 250 240 17,000 41
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit CDB 16 1 1.8 267425
2 Near Bit Roller Reamer RIG 16 1 16 3.125 8.88 7 5/8 REG 7 5/8 REG 240 3 POINT 24390-7
3 Drillcollar RIG 9.5 1 9.5 3 30.52 7 5/8 REG 7 5/8 REG 215 SPRL RIG
4 Roller Reamer RIG 16 1 16 3.125 8.64 7 5/8 REG 7 5/8 REG 240 3 POINT 185746-18
5 Non Magnetic Drill Collar ( NMDC ) NRT 9.5 1 9.5 3 13.98 7 5/8 REG 7 5/8 REG 217 SLCK 950102P
DRILL STRING 6 Pony Collar NRT 9.5 1 17.6 7 5/8 REG 7 5/8 REG 216 P751
7 Roller Reamer RIG 16 1 16 3.125 8.72 7 5/8 REG 7 5/8 REG 240 3 POINT RIG
8 Drillcollar RIG 9.5 9 9.5 3 264.38 7 5/8 REG 7 5/8 REG 215 SPRL
9 Hydraulic Jar SJS 9.5 1 9.5 3 32.77 7-5/8" REG 7-5/8" REG 5,600 79979JA
10 Drillcollar RIG 9.5 3 9.5 3 88.07 7 5/8 REG 7 5/8 REG 215 SPRL
11 Crossover RIG 8.5 1 8.5 2.813 3.56 6 5/8 REG 7 5/8 REG 172 RIG
12 Drillcollar RIG 8.5 6 8.5 2.813 179.18 6 5/8 REG 6 5/8 REG 172 SPRL
13 Crossover RIG 8.5 1 8.5 2.813 3.02 6 5/8 FH 6 5/8 REG 172 RIG
14 Heavy Weight Drillpipe (HWDP) RIG 6.625 6 6.625 5 184.63 6-5/8FH 6-5/8FH 58.1 CONV
15 Crossover RIG 6.625 1 6.625 2.813 2.6 XT54 6 5/8 REG 58 RIG
16 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 5.5 3.25 271.11 XT54 XT54 52.51 CONV
17 Drillpipe RIG 5.5 1 5.5 4.67 30 XT54 XT54 24.7 XD105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A SEASONAL NA SEASONAL 880 N/A

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2405 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/18/2024 - 07/23/2024
Report ID: OPERLMTDMRREP

Company SCC RIG EMC SMI MJH KSB RIG MI2 SWF OTH ARM CAM FMC NCS

Category CTRG RIG DFMS DFMS SEC LWD OTHR SCS SFS VAC WSC WHES CSR PCS
PERSONNEL
15 39 1 1 8 2 7 4 1 1 2 1 9 5
Total
AND SERVICES No. of Persons
96
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 9 12 12

Operating Hours. 0 24 24 0 0 24 12 0 0 10 24 3 3 12

Standby/Tankers
TRUCKS/BOATS
AB-6514

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 389 179 51 6477

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MDRK-900 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 03/02/2024 - 08/08/2024
Report ID: OPERLMTDMRREP

PA-622S @ MDRK-900 Limited Morning Report for 06/18/2024


Objective : (TO EVALUATE Foreman(s)PARASCIUC, SERGIU / ALY, ZAKARIA RAMADAN
D&WO Morning Report (Service Providers View) Rig Charge #: TARGETS ACROSS UNAYZAH Engineer GRUJOVIC, DRAGAN
Copyright 2024 Saudi Aramco. All Rights Reserved PA-622S (75-23514-0900) 'A', BASAL KHUFF CLASTICS, Manager HARBI, MAGBEL MENAWER
Daily Onshore UNAYZAH 'A2', UNAYZAH 'B/C' THURAYA RIG FORMAN VSAT CONTRACTOR
Well Wellbores: RESERVOIRS) /CLERK VSA
(0500-0500) Saudi Aramco 0088216777 12241 577-6190
Date: Tuesday 06/18/2024 MDRK-900 (0) MDRK_900_0 T
577-6188

Last 24 hr operations Next 24 hr plan


POOH BAKER SETTING TOOLS, SINGLE OUT 5 1/2" EXCESS DP, CHG RAMS, BOPE PT, L/D EXCESS PU 4" SINGLE IN D.P, RIH COMBINED 5 7/8" C/O BHA ALONG W/ INFLOW TEST ASSY, PERFORM
BHA. INFLOW TEST.
Location Next Location
F/DMG: 270 KM TO HRDH BRIDGE, SOUTH 40 KM KHARKHIR RD, LEFT 30KM MADRIKAH RD, RIGH 23 KM SKID RD. *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
15,570 Last Csg Size MD TVD Size Top
9 5/8 12116 12116 Formations Comments
Depth
KFDA 15,170 124' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
15570 (Date) 100 0 319
95.1 (03/15/2024@0200 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0700 2 0 8 3/8 N DRLG TO STDP RIG 15570 15570 9290 7542 POOH BAKER SETTING TOOL WHILE SINGLE OUT, L/D EXCESS 5-1/2" DP TO THE
RACKS (102 JTS). MONITOR WELL @ TRIP TANK. FLOW CHECK - WELL STATIC.

0700 - 1015 3.25 0 8 3/8 N CSG TO STDP RIG 15570 15570 7542 7542 POOH BAKER SETTING TOOL ON 5-1/2" DP STD. MONITOR WELL @ TRIP TANK.
FLOW CHECK - WELL STATIC.

1015 - 1200 1.75 0 8 3/8 N CSG HT PEL RIG 15570 15570 L/D BAKER RUNNING TOOL IN GOOD CONDITION. P/U BAKER CEMENT HEAD,
BROKE OUT PUPS & L/D TO THE RACKS.
1200 - 1230 0.5 0 8 3/8 N DRLG RR TDS RIG 15570 15570
RIG SERVICE - TOP DRIVE

1230 - 1530 3 0 8 3/8 N DRLG LDP BHA RIG 15570 15570 0 0 PJSM. RIH & L/D 6 STDS 6-1/2" DC FROM DERRICK TO THE RACKS. MONITOR THE
WELL ON TT.

PJSM, RIH 5 STD 5-1/2" HWDP & 11" GE TEST PLUG. FLUSH BOPE WITH FRESH
1530 - 1800 2.5 0 8 3/8 N BOP BOP RAMS RIG 15570 15570 WATER, SECURE THE WELL CLOSING 5-1/2" LOWER MASTER RAMS & CHANGE
BLIND RAMS TO 4" RAMS. P/T BONNET - OK.
* MONITOR WELL @ WH VALVES - STATIC.

PJSM. PRESSURE TESTED 13-5/8" 10K CLASS "A" BOP STACK AS PER ARAMCO
POLICY: ANNULAR BOP 300/7,000 PSI LOW/HIGH (WITH 5 1/2" & 4" D.P) EACH 10
MIN, 4" & 5-1/2" RAMS, SHEAR RAMS, SAFETY VALVES, UPPER & LOWER IBOP
1800 - 0200 8 0 8 3/8 N BOP BOPT BOP RIG 15570 15570 300/10,000 PSI LOW/HIGH EACH 10 MIN, STANDPIPE MANIFOLD TO 300/7,500
PSI LOW/HIGH EACH 10 MIN. PRESSURE TESTED GREY VALVE AND CHOKE
MANIFOLD OFFLINE TO 300/10,000 PSI LOW/HIGH. PERFORMED ACCUMULATOR
& IGNITION FUNCTIONAL TEST. L/D TESTING ASSY.
* MONITOR WELL @ WH VALVES - STATIC.

RIH TO 90' W/ 9-5/8" 53.5# CUP TESTER, CLOSED UPPER PIPE RAM, P/T OUTLET
VALVES ON 11" GE 10K THS & CSG INTEGERITY TO 300/7,500 PSI/10 MIN EACH
0200 - 0459 3 0 8 3/8 N WH PTST WH RIG 15570 15570 (80% OF 9-5/8" 53.5# CSG BURST). POOH & L/D CUP TESTER ASSY.

* OBSERVED HOSE CONNECTED BETWEEN MI-SWACO AND C.M WAS PLUGGED,


CHANGED SAME OK.
Foreman Remarks

MDRK-900 IS LOCATED 50 KM SOUTH FROM HRDH FIELD & 20 KM WEST FROM TINAT FIELD. WELL IS PLANNED TO BE DRILLED VERTICALLY TO WELL TD @ 300 FT INTO UBCU (16,456 FT). MAIN
OBJECTIVE OF THIS WELL IS TO EVALUATE PRIMARY TARGETS ACROSS BASAL KHUFF CLASTICS & UNAYZAH 'A' RESERVOIRS & SECONDARY TARGETS ACROSS UNAYZAH 'A2' & 'B/C' RESERVOIRS.
TARGET TIME IS 83 DAYS, WHICH INCLUDES WIRELINE LOGGING REQUIREMENTS ACROSS 5-7/8" HOLE SECTION.
=============================================================================================================
* 30" CONDUCTOR CASING SET@ 150'.
* 24" CASING SET@ 1,087' (50' INTO RUS).
* 18-5/8" CASING SET@ 4,299' (29' INTO AHMDI).
* 13-3/8" CASING SET@ 7,311' (56' INTO MDTM).
* 9-5/8" CASING TO BE SET@ 12,120' (30' INTO BJDM).
* 7" LINER TO BE SET@ 15,570' (400' INTO KFDA).
* 4-1/2" LINER TO BE SET@ 16,456' (300' INTO UBCU).
=============================================================================================================
* ARAMCO CLERK VIPIN SAMUEL JACOB (BADGE# 8625229) IS ON LOCATION SINCE 10/10/2023.
* ARAMCO GEOLOGIST MR. SAEED SHAHRANI, ID# 263946 ON LOC. SINCE 15TH JUNE, 2024
* ARAMCO GEOLOGIST MR. HUSSIN BARRAK, ID#810331 ON LOC. SINCE 15TH JUNE, 2024
* ARAMCO FCT SALMAN ASSAF ON LOCATION SINCE 06/4/2024.
* ARAMCO PDP AHMED TULBAH, ID#794706 ON LOCATION SINCE 06/14/2024.
=============================================================================================================
* EXTRA REQUIREMENT: 79 HRS.
* WIRE LINE LOGS IN 12" HOLE: 47 HRS
* CONDITION TRIP: 32 HRS.
=============================================================================================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MDRK-900 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 03/02/2024 - 08/08/2024
Report ID: OPERLMTDMRREP

* MUD LOGGING UNIT:


=============================================================================================================
* HSE & DRILLS:
* NEAR MISS: NONE
* DAILY RIG CREW MEETING: HSE ALERT: 69-24 INJURY DURING ENGINE MAINTENANCE, HSE ALERT: 70-24 PIPE HANDLER MAIN ARM UNCONTROLLED DECENT, HSE ALERT: 71-24 TRIP AND FALL
INCIDENT, HSE ALERT: 72-24 SNAKE BITE & SCORPION STING INCIDENTS
=============================================================================================================
* 2 VACUUM TANKER ON LOCATION SINCE APR. 8TH (DRSS#1004294088, PLATE# 9977, 6921KBA)
* 1 EA SPRAY WATER TANKER: PLATE NO-9637AKK (DRSS#1004294119).
=============================================================================================================
* NEXT LOCATION:
* NJYN-900 (UNDER CONSTRUCTION).
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
111 PCF 1 0 API 53 897 Volts 13.69 0 273,186
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.2 HTHP 13 19 0 11 / 17 OBM 1.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 48 34 10 / 12 0 0 2.4
57
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
111 PCF 1 0 API 53 970 Volts 13.7 0 270,829
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.4 HTHP 13 18 0 10 / 16 OBM 1.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 47 34 9 / 11 0 0 2.4
53

MUD
TREATMENT
BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit ULTR 8.375 1 8.375 1 0.8 4 1/2" REG 55 70474
2 Near Bit Roller Reamer RIG 8.375 1 6.5 1.75 7.1 4 1/2 REG NC46 80 3 POINT HDH21797
3 Drillcollar RIG 6.25 1 6.25 2.813 31.67 NC46 NC46 80 SPRL S868655
4 String Reamer RIG 8.375 1 8.375 2.375 8.7 NC46 NC46 120 130362115
DRILL STRING 5 Drillcollar RIG 6.25 18 6.25 2.813 558 NC46 NC46 80 SPRL ON FILE
6 Hydro-Mechanical Jar CDS 6.55 1 6.55 2.5 31.78 4" IF 4" IF 1,400 DJ10-650-31
7 Drillcollar RIG 6.25 2 6.25 2.813 62 NC46 NC46 80 SPRL ON FILE
8 Crossover RIG 6.438 1 6.438 2.75 2.65 XT54 NC46 50 931869781
9 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 543.85 XT54 XT54 52 CONV
10 Drillpipe RIG 5.5 1 5.5 4.67 31.5 XT54 XT54 24.7 S135 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
05/31/2024 N/A CALM N/A SEASONAL 3,253 DAILY

Company SAM NCS SWK MI3 RIG EMC SMI MJH HMS RIG ARM MI2 OTH ARM

Category WBCS PCS CTRG CRI RIG DFMS DFMS SEC MLS OTHR OTHR SCS VAC WSC
PERSONNEL
1 5 16 4 42 2 5 8 6 5 5 1 1 2
Total
AND SERVICES No. of Persons
103
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 24 24 24 24 24 24 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
C252

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
5000 100 550 96 75 2800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2526 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/30/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

PA-70S @ HRDH-2526 Limited Morning Report for 06/18/2024


Objective : (MK-1 S-SHAPE Foreman(s)MOHAMED, REDA KAMAL
D&WO Morning Report (Service Providers View) Charge #: TO 250 FT INTO KFDA) Engineer FAHMI, MOHAMMED MAMDOUH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23058-2526) Manager ALSHAIKH, SABER YASSEN
PA-70S
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 00-88-216- 777-110-67 013-577-96 10 013-577-96 98
Date: Tuesday 06/18/2024 HRDH-2526 (0) HRDH_2526_0 OTHER VSAT CONTRACTOR /CLERK VSA T
013-804963 2(CLINIC) 013-577-96 11

Last 24 hr operations Next 24 hr plan


RIH SLB WL WITH DARK VISION & RE-LOG ACROSS PC, POOH & LD W/L TOOLS, RE-CONFIGURE & RUN PACKERS PLUS UPPER COMPLETION, REVERSE CIRCULATION TO WTR, SET ANCHOR, SHEAR
P/T BOP, RIH 4-1/2" PAKERS PLUS UPPER COMPLETION. PBR, TEST TCA & TBG, SPACE OUT, TBG PICKLE, DISPLACE TO BRINE, LAND TBG HGR.
Location Next Location
244 KMS F/ DH MAIN GATE, 13 KMS BEFORE HARADH GAS STATION RIGHT, 5 KMS SKID ROAD. HRDH-2572
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
11,960 Size 9334 9180 Size 10,782 11,957 11,806 Top
Formations Comments
9 5/8 4 1/2 Depth
27 FT SHALLOWER, 11,301
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KFCC 11,454
FT TVD
11960 (Date) 100 0 244 54 FT SHALLOWER, 11,308
69.5 (04/09/2024@1700 ) KC01 11,461
FT TVD
38 FT SHALLOWER, 11,347
KC02 11,500
FT TVD
41 FT SHALLOWER, 11,362
KC03 11,515
FT TVD
47 FT SHALLOWER, 11,377
KC04 11,530
FT TVD
43 FT SHALLOWER, 11394
KC05 11,548
FT TVD
37 FT SHALLOWER, 11412
KC06 11,565
FT TVD
41 FT SHALLOWER, 11426
KC07 11,580
FT TVD
46 FT SHALLOWER, 11445
KC08 11,599
FT TVD
44 FT SHALLOWER, 11469
KC09 11,623
FT TVD
38 FT SHALLOWER, 11488
KC10 11,641
FT TVD
61' SHALLOWER, 11,556'
KFDA 11,710
TVD
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

RIH SLB RUN#2 WITH DARK VISION LOGGING TOOLS ON W/L TO 4,200 FT. (200
0500 - 0600 1 0 EOW E LOG LOG WLT SWL 11960 11960 4200 3780 FT BELOW 9-5/8" PC).
- RECORDED CSG LOG ACROSS 9-5/8" PORT COLLAR F/ 4,200 FT TO 3780'.
- MONITOR WELL ON TRIP TANK & RECORDED TRIP SHEET.

0600 - 0730 1.5 0 EOW E LOG OTH NA SWL 11960 11960 POOH SLB RUN#2 WITH DARK VISION LOGGING TOOLS TO SURFACE & R/D
WIRELINE SHEAVE AND TOOLS.
0730 - 0830 1 0 EOW C BOP OTH WBSH RIG 11960 11960
M/U CIW WEAR BUSHING RETRIEVAL TOOL, RIH & RETRIEVE WEAR BUSHING.

HPJSM, RIH 7 STDS 5-1/2" DP, INSTALL TIW VALVE & SECURE THE WELL ON BTM
0830 - 1000 1.5 0 EOW C BOP BOP RAMS RIG 11960 11960
MASTER RAMS, RECONFIGURE BOP, CHANGED 5-1/2" UPPER & 4" RAMS TO 4-1/2"
RAMS.

M/U BOPE TEST ASSY. 11" CIW TEST PLUG & LAND SAME IN WELL HEAD,
1000 - 1045 0.75 0 EOW C BOP OTH BOP RIG 11960 11960
FLUSHED BOP, CHOKE MANIFOLD, POOR BOY DEGASSER, LINES TO SHAKERS &
FLARE PIT WITH WATER.

PRESSURE TEST 13-5/8" 10K CLASS "A" BOP'S AS PER ARAMCO STANDARDS:
1045 - 1315 2.5 0 EOW C BOP BOPT BOP RIG 11960 11960
> P/T ANNULAR PREVENTER TO 300/7,000 PSI, P/T RAMS TO 300/8,500 PSI W/
WATER FOR 10 MINS EACH ON CHART.
1315 - 1445 1.5 0 EOW C BOP OTH BOP RIG 11960 11960
POOH & L/D TEST ASSY. 11" CIW TEST PLUG & L/D 21 X 5-1/2" JT DPS.

L/D EXTRA 4" DP & 5.5 DP STDS FROM DRK.


1445 - 1745 3 0 EOW N CT LDP SPDP RIG 11960 11960 0 0
> L/D 33 JTS X 4" DP & 57 JTS X 4" DP.
> MONITOR THE WELL ON TRIP TANK.

R/U ITS POWER TONGS, TUBING RUNNING TOOLS AND HANDLING EQUIPMENT,
1745 - 1915 1.5 0 EOW C COMP HT PEL RIG 11960 11960
JAM UNIT, & R/UP ITS PICK UP MACHIME.
> TEST POWER TONGS AND JAM UNIT ON 4-1/2" PUP JOINT.

1915 - 1945 0.5 0 EOW C COMP PJSM TBG RIG 11960 11960 HPJSM WITH ALL INVOLVED PERSONNEL PRIOR TO RUN UPPER COMPLETION,
DISCUSSED DNGER ZONE, PINCH POINT & HAND PLACEMENT.

M/U PACKERS PLUS UPPER COMPLETION ASSY. AS FOLLOWING:


1945 - 2045 1 0 EOW C COMP HT SEAL PPC 11960 11960
- PRIMESET ANCHOR SEAL ASSY + LOCATOR SEAL ASSY. + X.O 4.5'' 15.2 TSH
BLUE X 4.5" 13.5# 3SB + 1 X 4-1/2" TBG (13.5#, TN95HS, 3SB).

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2526 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/30/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
> INSTALL FLOATING DRIFT.

CONT. RIH 4-1/2" PACKERS PLUS UPPER COMPLETION ON 4-1/2" TBG (13.5#, TN-
2045 - 0145 5 0 EOW C COMP RPCS UPCOM ITS 11960 11960 88 2160
95HS, 3SB) TO 2,160' (TOTAL: 52/ 263 JTS).
> USED 3.795" FLOATING DRIFT.

0145 - 0459 3.25 0 EOW C CSG OTH CSG ARM 11960 11960 CUMULATIVE TIME CONSUMED TO RE-TORQUE JTS OR REPLACE SAME TILL HAVE
GOOD AND ACCEPTABLE GRAPH FOR THE CONNECTION.
Foreman Remarks

OBJECTIVE:-
> HRDH-2526 IS PLANNED TO BE DRILLED AS A MK-1 S-SHAPE WELL TARGETING KHFC AS PRIMARY TARGET AND KHFA & KHFB AS SECONDARY.
THE WELL WILL BE COMPLETED WITH 15K CEMENTED LINER.
=================================== ARAMCO PERSONNEL =====================================================
> ARAMCO MATERIALS EXPEDITOR YOUSEF N ALNUKHAYLAN (ID# 8381443) ON LOCATION ON 06/03/2024.
============================ SCE CO.================================================================
> EMEC MUD ENGINEER (01).
> SLB MI/SWACO DRY CUTTINGS CREW & SVP.
> SLB MI/SWACO BARITE SILOS OPERATOR.
> SLB MI/SWACO FRAC TANKS OPERATOR.
> ITS CREW ON LOCATION ON 08/06/2024.
> PACKERS-PLUS ENG. ON LOCATION ON 08/06/2024.
> BAKER CMT CREW ON LOCATION ON 06/09/2024, RELEASED ON 06/16/2024.
> HALL FILT. CREW ON LOCATION ON 06/11/2024.
> W.FORD WBCO ENG. ON LOCATION ON 06/11/2024.
> TAM ENG. ON LOCATION ON 06/12/2024, RELEASED ON 06/17/2024.
> SLB WIRELINE CREW ON LOCATION ON 06/15/2024, RELEASED ON 06/17/2024.
> (02) DARK VISION ENG. ON LOCATION ON 06/15/2024, RELEASED ON 06/17/2024.
> SAJA FLOATING DRIFT CREW ON LOCATION ON 06/17/2024.
========================================DIRECTIONAL L0 PLAN-11===========================================
> KOP @ 5,100 FT (SULAY FORMATION).
==================================== RIG VISIT=======================================================
> NONE.
===================================RENTAL EQPT ======================================================
> HOOKED UP WELL-LINK REAL TIME DATA ON 06/02/2024, SINCE 04/09/2024
> IMPLEMENTING CLOSED LOOP DRILLING PRACTICE (3 SIDE TANK), SINCE 04/09/2024
> 2 X SLB BULK BARITE SILOS ON LOCATION SINCE 04/09/2024.
=================================== SAFETY SUMMARY =======================================================
> DRILLS: 2X TRIP DRILL.
> NEAR MISS: NONE.
> SAFETY OBSERVATIONS: 21.
> ALERTS: 01 HSE ALERT.
================================= NEXT LOCATION ============================================================
> HRDH-2572, 100% READY.
============================== MISCELLANEOUS===============================================================
> ROBUA ALSMAN SPRAY TANKER WORKING ON LOCATION SINCE 04/06/2024.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 11,960 2.41 91.93 0 11,806 -154.65 231.58 913.61 0

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 0 API 0 0 Volts 0 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 16 0.01 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 29 0 7/8 0 0 0
70
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 0 API 0 0 Volts 0 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 16 0.01 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 29 0 7/8 0 0 0
70

MUD CCT-8051 S-BSURF CAUST DUOVIS-NS CABR2


TREATMENT 16 ( 55GL ) 12 ( 55GL ) 2 ( 50LBP ) 20 ( 55LB ) 5 ( 275GL )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/13/2024 06/13/2024 NORMAL NA SEASONAL 4,391 DAILY

PERSONNEL Company ITS GOS RIG EMC SMI MJH BFL PKP RIG ARM MI3 ARM WWB SWL CAM
Total
AND SERVICES
CSR CTRG RIG DFMS DFMS SEC FILT LHES OTHR OTHR WMS WSC WBCS WLS WHES 96
INFORMATION Category

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2526 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/30/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

No. of Persons 3 15 46 1 2 8 3 1 4 1 3 1 1 6 1

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 5 12

Operating Hours. 18 0 12 24 12 0 12 18 0 12 12 24 0 3 0

Standby/Tankers
TRUCKS/BOATS
AB-5327

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 487 160 54 1000

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-366 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 04/24/2024 - 07/14/2024
Report ID: OPERLMTDMRREP

PA-785S @ QTIF-366 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK AND Foreman(s)ALAWI, RAKAN ABDULLAH / BAJWA, AMMER SAEED
D&WO Morning Report (Service Providers View) Charge #: DRILL DUAL LATERAL Engineer ALAHMAD, BADER MOHAMMED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-23012-0366) ACROSS LFDL) Manager AKBAR, HUSSAIN QASSIM
PA-785S
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 00-882-167 -771-1131 673-5729 673-5723
Date: Tuesday 06/18/2024 QTIF-366 (0-1) QTIF_366_1 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
CONTRACTOR : 804-9631 673-5723

Last 24 hr operations Next 24 hr plan


BAKER DRILL L-0-1 6-1/8" CURVE HOLE SECTION TO 17,070'. BAKER DRILL L-0-1 6-1/8" CURVE HOLE SECTION TO 18,500'.
Location Next Location
38 KM FROM DMG QTIF-189
Current Depth (ft) Liner TOL MD TVD Formation Tops
17,070 Last Csg Size MD TVD Size Top
7 14216 8428 Formations Comments
Depth
DHRM 8,328 13368.75 FT MD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) LFDR 8,442 14914.56 FT MD
15575 (Date) 100 985 38
42.7 (05/06/2024@1200 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

BAKER CONT DRILLING 6-1/8" L-0-1 CURVE SECTION USING RSS/LWD/MWD AND
79 PCF OBM, 100% CIRC.
0500 - 0459 24 0-1 6 1/8 N DRLG D RSS BHI 16085 17070 > WASH-UP AND REAM DOWN 30 FT DRILLED.
> SWEEP HOLE WITH LO VIS/HI-WT TANDEM PILLS EVERY STAND.
> ACTUAL ECD: 95 PCF
> WELL PATH VS PLAN: 8.6 FT BELOW AND 5.4 FT RIGHT OF PLAN.
Workover Objectives
Foreman Remarks

ODF CORRECTION: - 0.57 FT.


W/L TO DP CORRECTION: -1.58 FT
------------------------------------ WELL DATA --------------------------
- TOW @13,478 FT MD; BTW: 13,487 FT MD, DAHRUMA FORMATION.
---------------------------------PAD STATUS------------------------------
QTIF-371 - OIL PRODUCER - LFDL - SHUT-IN.
QTIF-373 - OIL PRODUCER - ARBD - SHUT-IN, BPV INSTALLED.
QTIF-367 - OIL PRODUCER - ARBD - ONLY COMPLETED.
QTIF-366 - OIL PRODUCER - LFDL - SHUT-IN, BPV INSTALLED.
QTIF-368 - OIL PRODUCER - ARBD - ONLY COMPLETED.
QTIF-370 - OIL PRODUCER - ARBC - SIMOPS.- SHUT-IN
QTIF-374 - OIL PRODUCER - ARBD - SIMOPS. - SIMOPS.
QTIF-362 - OIL PRODUCER - ARBD - SHUT-IN, BPV INSTALLED.
QTIF-361 - OIL PRODUCER - LFDL - SHUT-IN, BPV INSTALLED.
QTIF-363 - OIL PRODUCER - LFDL - SUSPENDED.
QTIF-360 - OIL PRODUCER - ARBD - SHUT-IN, BPV INSTALLED.
QTIF-364 - OIL PRODUCER - ARBD - SHUT-IN.
QTIF-67 IS THE RELIEF WELL AND IS LOCATED 1.65 KM AWAY (N 2945860.95, E 396501.06 UTM 39).

-----------------------------------------SIMOPS------------------------------
- STARTED SIMOPS @ 5/23/2024 ON WELL QTIF-374, WHP = 800 PSI, DAILY PRODUCTION = 4000 BBLS.
- LAST ESD FUNCTION TEST DONE ON 6/10/2024.
- DOE&CD CONDUCTED SIMOPS REVIEW ON 06/13/2024

------------------------------ 4-1/2" OBL DETAILS ------------------------

-------------------------------PERSONAL ON BOARD----------------------
- MATERIAL EXPEDITOR RAYAN ALGHAMDI #8337907 ON LOCATION SINCE 22ND APRIL, 2024.
- MATERIAL EXPEDITOR SHLASH ALAJAMI #8460877ON LOCATION SINCE MAY 13, 2024.

------------------------------- RENTAL TOOLS & EQUIPMENT ------------


- NAPESCO 6-1/8" DOG LEG REAMER SN# 1001 ON LOCATION SINCE 06/06/2024.
- OILSERV 4-3/4" DRLG JAR SN#HJDA-475-0063 ON LOCATION SINCE 06/15/2024.
- WEATHERFORD 4-3/4" PBL SUB ON LOCATION SINCE 06/09/2024.

--------------------------MUD DATA -------------------------


HPHT: 1.8 CC PPT SPURT LOSS: 0.2 CC
HPHT DIFF PRESS: 500 PSI PPT TOTAL: 2.2 CC
HPHT TEMP: 250 DEGF PPT DISK SIZE: 55 MICRON
PPT DIFF PRESS: 2500 PSI
PPT TEMP: 250 DEGF

----------------------EMERGENCY EQUIPMENT ON LOCATION----------


- SANAD 55-SEATER BUS W/ DRIVER FOR 24 HR COVERAGE.
- RTPD. EMR PORTABLE WALKIE TALKIE DEVICE IN ARAMCO FOREMAN OFFICE.
- RAWABI H2S/ LEL STAND-ALONE SENSORS ON LOCATION SINCE 12/23/2023.
- FIREFLY UNIT ON LOCATION SINCE 05/08/2024
- BAKER PUMP UNIT ON LOCATION SINCE 5/20/2024.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-366 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 04/24/2024 - 07/14/2024
Report ID: OPERLMTDMRREP

---------------------NEXT LOCATION READINESS: --------------------


- QTIF-189: KOM HELD ON 01/10/ 2024.
- QTIF-192: KOM HELD ON 01/10/ 2024.
- QTIF-406: KOM HELD ON 1/17 /2024, POSTPONED BY RMD.
- QTIF-44: KOM HELD 1/18/2024, REJECTED DUE TO CHIKEN FARM INSIDE 100 RER.
- QTIF-41: KOM HELD 1/24/2012, WASTE PIT NEED TO BE HAND DIGGING.

-------------------------DRILLS, ORBITS & SAFETY TOPICS: ----------------


- DAILY SAFETY MEETING WITH RIG CREW: SUMMER SAFE WORK PRACTICE
- NEAR MISS: SLS# -
- SAFETY DRILLS: 1X PIT DRILLS.
- HSE SAFETY ALERTS DISCUSSED AND SHARED WITG CREW:

------------------------ INFORMATION FOR DISPATCHING GROUP --------------


* ALHABAS RAW WATER TRUCK: DOOR NO (HB1906, HB1908) ON LOCATION.
---------------------------RIG CREW------------------------------------------------

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0-1 16,140 90.14 351.36 96 8,453 1842.31 2033.2 9,001.7 0.72
0-1 16,234 89.96 351.42 94 8,453 1870.63 2028.91 9,054.01 0.2
0-1 16,327 88.9 351.32 93 8,453 1898.66 2024.66 9,106.41 1.14
0-1 16,421 87.98 351.32 94 8,456 1926.97 2020.34 9,159.94 0.98
DAILY SURVEY 0-1 16,515 87.14 351.51 94 8,460 1955.28 2016.06 9,214.21 0.91
0-1 16,609 87.15 351.5 94 8,465 1983.58 2011.84 9,269.21 0.02
0-1 16,705 87.09 351.43 96 8,470 2012.48 2007.5 9,325.96 0.09
0-1 16,801 87.86 351.41 96 8,474 2041.38 2003.14 9,383.32 0.8
0-1 16,895 88.82 351.26 94 8,476 2069.69 1998.82 9,440 1.03
0-1 16,989 89.4 351.27 94 8,478 2098.01 1994.47 9,497.2 0.62

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
79 PCF 2 0 API 60 790 Volts 18.99 0 67,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
155 1.8 HTHP 18 20 0 10 / 14 INVER 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 21 22 9 / 10 0 N/A 2
60
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
79 PCF 2 0 API 60 785 Volts 18.99 0 67,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
155 1.8 HTHP 18 21 0 11 / 14 INVER 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 22 22 10 / 11 0 N/A 2
63

MUD CARBOTROL CACO3-25 CACO3-50 CAOH2 ASPHALT MRBL-F MRBL-M


TREATMENT 24 ( 25KG ) 24 ( 25KG ) 24 ( 25KG ) 24 ( 25KG ) 24 ( 25KG ) 3 ( 2200L ) 1 ( 2200L )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
12RR 15,575 17,070 DP Av DC Av Bit HHP 20 140 M233 6.125 HTC
Pressure GPM Jet Vel 273.4 N/A 0 I-Row O-Row DC Location Bearings
3,100 240 N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7917723 DD406VX POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 8 16 206 137 10,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 6.125 1 0.63 7917723
2 RSS BHI 4.75 1 4.75 1.024 8.2 NC38 3.5 REG 7.3 13844906
3 Gamma Sub BHI 5 1 5 1.5 4.26 4 3/4 T2 4 3/4 T2 22.6 14124666
4 Variable Gauge Stabiliser BHI 5 1 5 1.024 10.24 NC38 NC38 7.8 15326204
DRILL STRING 5 Measurement While Drilling (MWD) BHI 4.75 1 4.75 1.339 20.15 4 3/4 T2 4 3/4 T2 64.14 12672585
6 Modular Stabilizer BHI 5.875 1 5.875 1.5 3.12 3 1/2 T2 3 1/2 T2 20 14784946
7 BCPM. Bi-directional Communication and BHI 4.75 1 4.75 2.25 17.01 4 3/4 T2 4 3/4 T2 45 12911419
Power Module
8 Modular Stabilizer BHI 5.875 1 5.875 1.5 2.38 3 1/2 T2 3 1/2 T2 23 15068947
9 Logging While Drilling (LWD) BHI 4.75 1 4.75 1.5 14.39 4 3/4 T2 4 3/4 T2 68.32 13522859
10 Stop Sub BHI 4.75 1 4.75 1.5 1.76 NC38 3 1/2 T2 45 14336070
11 Stabilizer BHI 5.875 1 4.75 2.25 5.28 NC38 NC38 55 ZIBSSD10464
12 Float Sub BHI 4.75 1 4.75 2.25 3.31 NC38 NC38 45 15673369
13 FIlter Sub BHI 4.75 1 4.75 2.125 5.67 NC38 NC38 45 15543667

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-366 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 04/24/2024 - 07/14/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
14 FIlter Sub BHI 4.75 1 4.75 2.125 8.02 NC38 NC38 46.8 0 0 CX2355
15 PBL (Multiple Activation By Pass) WWB 4.75 1 4.75 2.25 8.11 NC38 NC38 45 DTM475BP100
16 Crossover RIG 4.75 1 4.75 2.25 2.67 XT39 NC38 46.8 0 0 4516-4
17 Heavy Weight Drillpipe (HWDP) RIG 4 2 4 2.56 60.74 XT39 XT39 25.16 0 CONV TALLY
18 Dogleg Reamer NPD 6.125 1 6.125 2 6.61 XT39 XT39 40 1001
19 Heavy Weight Drillpipe (HWDP) RIG 4 2 4 2.56 61.12 XT39 XT39 25.16 CONV TALLY
20 Hydro-Mechanical Jar OJR 4.75 1 4.75 2.25 30.4 XT39 XT39 44 0 0 HJDA4750064
21 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.56 91.13 XT39 XT39 25.16 0 CONV TALLY
22 Drillpipe RIG 4 0 4 3.34 0 XT39 XT39 14 G105 PREMIUM TALLY

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/15/2024 N/A N/A N/A N/A 1,736 N/A

Company TGC BHI RIG BDF MJH MIF ASH RUE XLG RIG ARM BCM ARM EX2

Category CTRG DPDS RIG DFMS SEC FILT FLD H2S MLS OTHR OTHR PCS WSC WTSE
PERSONNEL
16 3 40 2 8 1 2 2 4 6 2 1 2 1
Total
AND SERVICES No. of Persons
90
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 0 24 0 24 24 12 12 0 24 0

Standby/Tankers Others Others Others


TRUCKS/BOATS
DH-8947 ARAMCO MUD DIESEL = 615 BBL
ARAMCO GASOLINE = 72 BBL MAIN CAMP DIESEL = 89

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
81 119 215 N/A N/A 1600

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3181 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/16/2024 - 09/13/2024
Report ID: OPERLMTDMRREP

PA-861S @ UTMN-3181 Limited Morning Report for 06/18/2024


Objective : (DE-COMPLETE, Foreman(s)KADYROV, ELMIR
D&WO Morning Report (Service Providers View) Charge #: SIDETRACK THE WELL AND Engineer SIREGAR, VERDY LUNARDIANSYAH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24057-3181) DRILL TWO HOLE SIZE S- Manager SHUBBAR, GHASSAN DHIYA
PA-861S
SHAPE TARGETING UNYZ) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 00-88-216- 777-110-80 577-3942 577-3945
Date: Tuesday 06/18/2024 UTMN-3181 (0) UTMN_3181_0 CONTRACTOR /CLERK VSA T
577-3915

Last 24 hr operations Next 24 hr plan


RIG DOWN ON SDGM-1043 AND MOVE TO UTMN-3181 RIG DOWN ON SDGM-1043 AND MOVE TO UTMN-3181
Location Next Location
DHA M/GATE 136 (KM) *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 100 0 136
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD DAILY SAFETY MEETING WITH ALL PERSONNEL INVOLVED IN RIG DOWN &
MOVE.
DISCUSSED RIG DOWN & MOVE & RIG UP OPERATIONS HAZARDS,
COMMUNICATION, JOB SPECIFIC JSA & LIFT PLANS FOR RIG EQUIPMENT.
DISCUSSED SAFETY PRECAUTION AND HAZARDS OF RIG MOVE LIKE FALL
PROTECTION, OVER HEAD LOADS, SLIPS, TRIPS & FALLS.
===================================================
> RIG DOWN MAIN CAMP AND MOVE TO NEW LOCATION AND SPOT
> CONT R/D MUD TANKS
0500 - 0459 24 0 PRE M RM RM NA RIG 15342 15342 > CONT ELECT R/D POWER
> LOAD & MOVE RESERVE TANKS,WATER TANK,SHAKER TANK,CHOKE
MANIFLOD,GAS BUSTER,COMPLETION TANKS TO NEW LOCATION
> BRIDLE LINE ON MASE & SET MAST ON TRUCK AND DISMANTLE
> R/D CABLE TRAYS & GRASSHOPPER
> R/D DOG HOUS, R/D DRILLER CONSOL&SPOT SHAKER TANK, ACTIVE TANK
> NO ANY CRITICAL LIFTING OPERATIONS DURING NIGHTTIME.
===================================================
RIG DOWN ON SDGM-1043: 50%
RIG MOVE TO UTMN-3181: 40%
RIG UP ON UTMN-3181: 10%
Workover Objectives
Foreman Remarks

> ORKB FOR RIG NBR-196S IS 36', CURRENT RKB FOR RIG PA-861S IS 36.5' (0.5 FT DIFFERENCE).
=======================================ARAMCO PERSONNEL=======================================
> ARAMCO RIG CLERK, SURESH DHAKAL #8147919 ON LOCATION.
===========================================RIG-MOVE===============================================
> DISTANCE FROM SDGM-1043 TO UTMN-3181 = 60 KM .
> PRE-MOVE LOADS TRANSFERRED TO NEW LOCATION: 4 LOADS.
> DAILY MOVED LOADS / TOTAL: 49/108.
> DAYS SINCE RIG RELEASED = 2.5
===========================================RIG MOVE===============================================
> RIG MOVE EQUIPMENT: - 5-CRANES, 2-FORKLIFTS, 0-SUPER TRUCKS, 1-HI BED, 11-LOW BED, 2-WINCH TRUCKS, 3-TRUCK PUSHERS, , 1-RIGGER1.
> COPY OF CERTIFICATES FOR DRIVERS, CRANES & FORKLIFT IN ARAMCO OFFICE.
====================================THIRD PARTY PERSONNEL & EQUIPMENT=============================
> EMEC MUD ENGINEER.
==================================JOURNEY MANAGEMENT PLAN==================================
> RIG IS FULLY COVERED W/ SIGNAL.
> ALL VEHICLES SHOULD FOLLOW APPROVED ROAD W/ NO SHORT CUT & FOLLOW DRIVING SPEED LIMIT.
==================================SAFETY AND HSE FINDINGS STATUS===============================
> DRILLS:
> STOP WORK AUTHORITY (SWA): 4, HAZARD HUNT: 2
> NEAR MISS: 0
> RHSEI: 0 OPENED, ALL CLOSED, CEHA: ONE OPEN, 3MCI: ALL CLOSED, WCI: ALL CLOSED.
====================================CLOSED LOOP SYSTEM ==========
> IMPLEMENTING CLOSED LOOP DRILLING PRACTICE.
> NOT USING EITHER WATER PIT & WASTE PIT.
> USING CMT PIT W/ PLASTIC LINER.
==================================== DIRECTIONAL DRILLING ========================================

======================================SAGWOD COST OPTIMIZATION==============================

========================================= ERP-STAGING AREA ==================================


> ERP POSTED IN ARAMCO FOREMAN OFFICE; EMERGENCY CONTACT NUMBERS VERIFIED.
=========================================TRUCKING========================================
NA
============================================NEXT WELLS====================================
> 1ND WELL: HWYH-1361, TWO HOLE SIZES, KHFC LATERAL, NEED PRE-WO MEETING, NO NEED STRIP OUT, LOCATION PREPARATION 0%, WOCP NOT YET ISSUED.
> 2RD WELL: ANDR-606, TWO HOLE SIZES, KHUFF-B PRESET, NEED PRE-WO MEETING, NO NEED FOR STRIP OUT, LOCATION READY 100%, WOCP APPROVED FOR NA-18S.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3181 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/16/2024 - 09/13/2024
Report ID: OPERLMTDMRREP

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 0 API 0 0 Volts 0 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
30
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 0 API 0 0 Volts 0 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
30

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 2,083 N/A

Company GOS RIG EMC MJH ARM ARM

Category CTRG RIG DFMS SEC OTHR WSC


PERSONNEL
15 42 1 8 1 1
Total
AND SERVICES No. of Persons
68
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24

Operating Hours. 0 24 0 0 12 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 274 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DMDA-1 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 03/29/2024 - 08/12/2024
Report ID: OPERLMTDMRREP

PA-866S @ DMDA-1 Limited Morning Report for 06/18/2024


Objective : (PRIMARY Foreman(s)NORTHEY, LAYTON JAMES / RUSU, OVIDIU
D&WO Morning Report (Service Providers View) Charge #: OBJECTIVE TO TEST GAS IN Engineer GARCIA VILLALOBOS, JAIRO ENRIQUE
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved HADRIYA RES. & SECONDARY Manager ALKHALDI, HAMAD AZZAM
PA-866S (75-22858-0001)
TEST ARAB C, ARAB D, UPPER THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: JUBAILA RES.)
(0500-0500) Saudi Aramco Well 0088216777 11072 577-6186 577-6184
Date: Tuesday 06/18/2024 DMDA-1 (0) DMDA_1_0 CONTRACTOR /CLERK VSA T
577-6183

Last 24 hr operations Next 24 hr plan


ROTARY DRILL 8 3/8" SECT, W/ WFD MWD-GR BHA ROTARY DRILL 8 3/8" SECT TO CP @ 13529' ( REMAINING:1349' )
Location Next Location
F/BATHA, 153KM ON SHAYBAH HWY, TURN RIGHT & PROCEED 83KM SKID ROAD *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,180 Last Csg Size MD TVD Size Top
9 5/8 10415 10415 Formations Comments
Depth
SULY 10,400 323 FT HIGH
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) HITH 11,095 374 FT HIGH
11735 (Date) 100 445 475 ARAB 11,690 393 FT HIGH
55 (04/24/2024@0500 ) ABCR 11,990 372 FT HIGH
ABDR 12,080 357 FT HIGH
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

ROTARY DRILL 8 3/8" HOLE W/ MWD-GR BHA W/ 112 PCF WBM GRADUALLY
INCREASING TO 116 PCF - 100% RETURN
CON GAS @ 11743' 3.0%, BG: 0.9% INCREASE MWT TO 114 PCF
CON GAS @ 11839' 2.9%, BG: 0.85% INCREASE MWT TO 116 PCF
CON GAS @ 12122' 1.4%, BG: 0.7%, MW: 116 PCF
- NORMAL TORQUE AND DRAG
0500 - 0459 24 0 8 3/8 N DRLG D TDS RIG 11735 12180 - NORMAL SIZE CUTTINGS AND VOLUME ON SHAKERS
- 9 PPB H2S SCAV IN ACTIVE ( NO DEPLETION)
- MAINTAIN BRIDGING MATERIAL AS PER PROG
- WORK EACH STAND TWO TIMES
- FLOW CHECKS ON EACH CONNECTION
- TOOK SURVEY ON SINGLE OFF-BTM EVERY STD, LAST SURVEY @ 12048', INC:
0.57 DEG, AZIMUTH: 8.27 DEG
- MWD BTM HOLE CIRC TEMP: 242 DEG F
Foreman Remarks

DAMDA-1 IS AN EXPLORATION VERTICAL GAS WELL LOCATED IN THE WESTERN RUB' AL-KHALI AREA SOUTH WEST OF AMAD AND SHAYBAH FIELDS 475 KM S23E OF DHAHRAN, THE WELL IS
PROPOSED TO BE DRILLED TO A TOTAL DEPTH OF 14,105 FT TVD-MD (100 FT INTO DHRUMA FORMATION).
THE PRIMARY OBJECTIVE OF DAMDA-1 IS TO TEST GAS IN HADRIYA RESERVOIR (HDRR) AND THE SECONDARY OBJECTIVES ARE ARAB-C, ARAB-D AND UPPER JUBAILA RESERVOIRS.
THE ESTIMATED DURATION IS 112 DAYS FOR DRILLING THIS WELL INCLUDES LOGGING, CORING AND 4-1/2" LINER RUNNING & CEMENTING OPERATIONS, WELLBORE CLEANOUT AND WELL
TESTING.
*************************************************************************************************************************************
======EXTRA REQUIREMENTS ( TOTAL: 378.75 HRS )======
28" HOLE SECTION
- WIPER TRIP PRIOR 24" CSG, CIRC, POOH & L/D 28" BHA - TOTAL 3.5 HRS
22" HOLE SECTION
- WIPER TRIP PRIOR 18-5/8" CSG, CIRC - TOTAL 5.5 HRS
12" HOLE SECTION
-PERFORM 12" OPEN HOLE LOGGING, WIPER TRIPS - TOTAL 369.75 HRS
*************************************************************************************************************************************
24" CONDUCTOR SET @ 185' (CONSOL FORM) / ACTUAL 199'
18-5/8" CASING SET @ 1,745' (50' INTO RUS) / ACTUAL 1680'
13-3/8" CSG SET @ 6356' (100' INTO LAFFAN ) / ACTUAL 6054'
9-5/8" CSG SET @ 10,743' (20' INTO SULAIY) / ACTUAL 10415'
7" LINER SET @ 13,299' (20' INTO HANIFA)
4-1/2" LINER SET @ 14105' (100' INTO DHRUMA)
*************************************************************************************************************************************
PERSONNEL:
ARAMCO CLERK BHIM BAHADUR MALLA # 8652330 ON LOCATION 03/09/2024
ARAMCO GEOLOGIST ABDULAZIZ ALMUTAIRI #747779 ON LOCATION 06/12/2024
*************************************************************************************************************************************
SLB: 2 X 6-1/2" HYD JAR S/N: 00827KA & 44533K ON LOCATION 05/25/2024 17:00 HRS
*************************************************************************************************************************************
55 KM WATER LINE FROM AMAD-814 H2S PIT - COMPLETED, FLOW RATE: 400 GPM
*************************************************************************************************************************************
CREATE JOURNEY MANAGEMENT PLAN BEFORE LEAVING COMPANY BASE
ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT / FULL TANK OF FUEL.
DISTANCE FROM DHAHRAN TO RIG 558 KM INCLUDING "SKID ROAD 83 KM"
SKID ROAD HAS NO MOBILE SIGNAL
CALL RIG BEFORE ENTERING THE SKID ROAD ARAMCO FOREMAN'S OFFICE (013) 577-6186, CLERK OFFICE (013) 577-6183.
STAY RIGHT ON ALL HILLS AND NIGHTTIME DRIVING IS NOT ADVISABLE, 4X4 IS REQUIRED.
153KM ON BATHA-SHAYBAH HWY. TURN RIGHT, SKID ROAD DISTANCE 83 KMS TO DMDA-1.
*************************************************************************************************************************************
1 MEDIC & 1 DOCTOR ON LOCATION
*************************************************************************************************************************************
LITHOLOGY: ANHYDRITE 20-90%, LIMESTONE 10-80%
MAX GAS: 1.9% @ 11703 FT, BG GAS: 0.7-0.9%
*************************************************************************************************************************************

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DMDA-1 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 03/29/2024 - 08/12/2024
Report ID: OPERLMTDMRREP

DRILLS: 2 X PIT DRILL


HSE ALERT:
*************************************************************************************************************************************
WATER WELL: DMDA-802; AMAD-814
PRODUCTIVITY: 150- 200 GPM DMDA-802; 400 GPM AMAD-814
*************************************************************************************************************************************
NEXT WELL: ARAK-1
LOCATION READINESS:
NEXT WATER WELL: ARAK-801 (PRODUCTIVITY 560 GPM)
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 11,795 0.51 350.19 95 11,795 1.79 8.9 29.79 0.07
DAILY SURVEY 0 11,889 0.72 357.85 94 11,889 2.09 8.87 29.91 0.24
0 11,954 0.75 351.83 65 11,954 2.35 8.85 30.04 0.13
0 12,048 0.57 8.27 94 12,048 2.67 8.84 30.31 0.28

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
112 PCF 1 4 API 1 Volts 4.04 10.1 158,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
165 16 HTHP 69 32 0 10 / 13 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 29 30 9 / 11 0 0 N/A
55
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
116 PCF 1 4 API 1 Volts 4.61 10.1 150,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
165 16 HTHP 67 32 0 10 / 13 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 30 32 9 / 11 0 0 N/A
60

BARITE CAUST CACO3-50 NF25 SOURSCAV MRBL-M SODASH


MUD 6 ( 5000L ) 48 ( 50GL ) 48 ( 50LB ) 50 ( 50LB ) 25 ( 50LBP ) 4 ( 2200L ) 50 ( 25KG )
TREATMENT S-P-EXTEND ECCO-TEMP MAXSHIELD STELSL50
8 ( 55GL ) 4 ( 100LB ) 3 ( 55LB ) 50 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
7 10,430 12,180 DP Av DC Av Bit HHP 20 120 M443 8.375 SEC
Pressure GPM Jet Vel 307.22 439.39 128 I-Row O-Row DC Location Bearings
3,280 500 178 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
13870631 MM65DH 6 x 14 / 0.902
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 96 285 294 283 5,600 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 8.375 1 8.375 0.94 4.5" REG 13870631
2 Near Bit Roller Reamer RIG 8.375 1 8.375 2.25 7.83 NC46 NC46 80 3 POINT HDH-21617
3 Pony Collar RIG 6.25 1 14.8 80 A-417-C
4 String Reamer RIG 8.375 1 8.375 2.25 7.12 NC46 NC46 80 20524
DRILL STRING 5 Crossover RIG 6.25 1 6.25 2.25 2.29 NC50 NC46 80 225
6 Measurement While Drilling (MWD) WDS 6.75 1 6.75 24.76 101.12 AK240465
7 FIlter Sub WDS 6.75 1 6.75 2 2.86 NC50 T2 80 16090498-3
8 Crossover RIG 6.75 1 6.75 2.5 2.58 NC50 NC46 80 K800-L
9 Roller Reamer RIG 8.375 1 6.25 2.82 7.26 NC50 NC50 0 3 POINT HDH-21670
10 Drillcollar RIG 6.5 24 6.5 2.813 732.08 NC46 NC46 80 SPRL
11 Hydraulic Jar SJS 6.5 1 31.07 80 44533K
12 Drillcollar RIG 6.5 2 6.5 2.813 60.44 NC46 NC46 80 SPRL 0
13 Crossover RIG 6.812 1 6.813 3 2.66 NC50 XT54 0 3104-12
14 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 457.52 XT54 XT54 52 CONV
15 Drillpipe RIG 5.5 1 5.5 4.67 30 XT54 XT54 24.7 S135 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/11/2024 N/A N/A N/A N/A 4,728 TOURLY

Company SEC SWK WDS RIG EMC MJH MH2 PW SGR RIG ARN ARM SCM MI2 SWF OTH ARM

PERSONNEL Category BITS CTRG DPDS RIG DFMS SEC H2S ISPCT MLS OTHR OTHR OTHR PCS SCS SFS VAC WSC
Total
AND SERVICES
1 16 2 46 2 4 1 4 5 6 4 2 3 1 1 1 2 101
INFORMATION No. of Persons

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DMDA-1 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 03/29/2024 - 08/12/2024
Report ID: OPERLMTDMRREP

Operating Hours. 24 0 24 24 24 24 24 0 24 24 24 24 0 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
DH-8993

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 787 189 142 1950

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-781 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 08/12/2023 - 07/05/2024
Report ID: OPERLMTDMRREP

PN-11 @ MRJN-781 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL Foreman(s)ALSHLAYAN, MOHAMMED AYESH / MUDHI, ABDURRAHEEM FAISAL
D&WO Morning Report (Service Providers View) Charge #: HORIZONTAL KHAFJI OIL Engineer BASARI, EFFENDHY ABIT
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22073-0781) PRODUCER (GAS LIFT) ) Manager GHAMDI, NAWAF AHMED
PN-11
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 4150 013-378 82 83 013-378 82 86
Date: Tuesday 06/18/2024 MRJN-781 (0) MRJN_781_0 CONTRACTOR /CLERK VSA T
013-378 82 84

Last 24 hr operations Next 24 hr plan


RUN 4-1/2" UPPER COMPLETION, SET PACKER, M/U TRSSSV, M/U TUBING HANGER AND DISPLACE LAND SAME, SET 4-1/2" TUBING PLUG, INSTALL BPV, N/D BOP, TERMINATE ACROSS BONNET,
TCA. INSTALL TREE, RETRIEVE 4-1/2" TBG PLUG, R/D SLICK LINE AND SKID TO MRJN-782.
Location Next Location
MRJN-780/789 MRJN-781
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,985 Last Csg Size MD TVD Size Top
9 5/8 8961 6942 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12985 (Date) 100 0 235
50.1 (05/22/2024@1300 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 1015 5.25 0 EOW C COMP RPCS UPSCO ITS 12985 12985 6107 8643 P/U & RIH 4-1/2" 12.6# L-80 NEW VAM TUBING.
- MONITOR WELL ON TRIP TANK.

1015 - 1130 1.25 0 EOW C COMP DTU DRFT GD1 12985 12985 R/U GULF SLICKLINE LUBRICATOR AND DRIFT TUBING WITH 3.833".
- POOH AND R/D SLICK LINE.
1130 - 1215 0.75 0 EOW C COMP RPCS UPSCO ITS 12985 12985 8643 8692
CONTINUE TO RIH TO 8,692' (10' ONTO PBR).
1215 - 1300 0.75 0 EOW C COMP PTST MPMP RIG 12985 12985
PERFORM PRESSURE TEST SURFACE LINES TO 4,500 PSI (OK).

SET MFR PACKER AS PER HAL REPRESENTATIVE AS FOLLOW:


- CIRCULATE TO PRESSURE UP TUBTING TO 1,000 PSI AND CLOSE SCT.
- PRESSURE UP TO 2,200 PSI (HOLD FOR 5 MINUTES).
1300 - 1545 2.75 0 EOW C COMP SET PKR HCO 12985 12985 6465 6465 - SLACK 30K & PRESSURE UP TO 3,000 PSI (HOLD FOR 5 MINUTES).
- SLACK 10K MORE & PRESSURE UP TO 4,000 PSI (HOLD FOR 15 MINUTES).
- BLEED OFF PRESSURE TO ZERO, P/U 10K OVER STRING WEIGHT AND CONFIRM
PACKER SET.
- PACKER SETTING DEPTH AT 6,465' & END OF UPPER COMPLETION AT 8,692'.

1545 - 1630 0.75 0 EOW C COMP HT PBR HCO 12985 12985 PRESSURE UP TUBING TO 2,000 PSI AND APPLY 40K OVERPULL AND SHEAR OUT
SEAL ASSEMBLY FROM PBR.
1630 - 1700 0.5 0 EOW C COMP PTST PKR RIG 12985 12985
CLOSE ANNULAR AND PRESSURE TEST ANNULUS TO 1,000 PSI (OK).

1700 - 1815 1.25 0 EOW C COMP HT TBG ITS 12985 12985 POOH 8 JOINTS OF 4-1/2" FOR SPACE OUT.

1815 - 1900 0.75 0 EOW C COMP HT SSSV BC 12985 12985 P/U & M/U BAKER TRSSSV AND CONTROL LINE.
- PRESSURE TEST CONTROL LINE TO 5,000 PSI (OK).
1900 - 2130 2.5 0 EOW C COMP HT TBG ITS 12985 12985
RIH 2 X 4-1/2" TUBING + PUP JOINT + 2 X 4-1/2" TUBING + FMC TBG HANGER.

2130 - 2245 1.25 0 EOW C COMP DTU DRFT GD1 12985 12985 R/U GULF SLICKLINE LUBRICATOR AND DRIFT TUBING WITH 3.833" & 3.800".
- POOH AND R/D SLICK LINE.

2245 - 0200 3.25 0 EOW C COMP OTH SSSV BC 12985 12985 BAKER TERMINATE TRSSSV CONTROL LINE ACROSS TBG HGR.
- FUNCTION TEST AND PRESSURE TEST TO 5,000 PSI (OK).

0200 - 0300 1 0 EOW C COMP HT TBG ITS 12985 12985 P/U & M/U LANDING JOINTS AS FOLLOW: X/O + 2 X 5-1/2" TUBING + 2 X 5-1/2"
PUP JOINTS.
0300 - 0315 0.25 0 EOW C COMP PJSM TBG RIG 12985 12985
HPJSM WITH ALL INVOLVED PERSONNEL FOR DISPLACEMENT JOB.

0315 - 0459 1.75 0 EOW C COMP CIRC MPMP RIG 12985 12985 DISPLACE ANNULUS TO INHIBITED DIESEL AND TUBING TO 84 PCF INHIBITED
BRINE AS PER COMPLETION PROGRAM. ONGOING AT REPORT TIME....
Foreman Remarks

MRJN-781 WILL BE DRILLED AS A SINGLE LATERAL HORIZONTAL OIL PRODUCER TARGETING KHFJI. THE LATERAL WILL BE 4,000 FT LONG AND WILL
BE DRILLED FROM MRJN-780/789 PLATFORM LOCATED IN THE SOUTHWEST OF MARJAN COMPLEX. THE WELL WILL BE COMPLETED WITH
PDHMS, GAS LIFT SYSTEM, ICD WITH SANDSCREENS.
=======================================================
RIG POSITION: MRJN-780/789 PF.
LAT : 28 DEG 21.62' N
LONG: 049 DEG 31.54' E
RIG HEADING: 331 DEG
WATER DEPTH: 130'
AIR GAP: 54.3'

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-781 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 08/12/2023 - 07/05/2024
Report ID: OPERLMTDMRREP

RKB TO WATER: 157'


RKB TO MUDLINE: 270'
DISTANCE TO TANAJIB - 50 NM
NEAREST GOSP IS MRJN-3: 3.95 NM
FINAL LEG PENETRATION: BOW LEG: 6.23', PORT LEG: 5.57', STARBOARD LEG 5.57'
======================================================
PLATFORM MRJN-780/789: 8-1/2'' & EOW BATCH DRILLING PROPOSED SEQUENCE:
1. MRJN-781 - CURRENT- ONGOING....
2. MRJN-782 - SUSPENDED ON 9-5/8" CSG.
3. MRJN-786 - SUSPENDED ON 9-5/8" CSG.
4. MRJN-784 - SUSPENDED ON 9-5/8" CSG.
5. MRJN-785 - SUSPENDED ON 9-5/8" CSG.
6. MRJN-783 - SUSPENDED ON 9-5/8" CSG.
7. MRJN-787 - SUSPENDED ON 9-5/8" CSG.
8. MRJN-788 - SUSPENDED ON 9-5/8" CSG.
=================================================================================
PLANNED CASING POINTS:
2" CONDUCTOR AT 56' BELOW MUDLINE-270' MD RKB TO SHOE @ 326'.
18 5/8" PLANNED DEPTH AT 2,398' MD/ 2,392' TVD (50' INTO RUS FORMATION) : ACTUAL DRILLED AT 2415', CASING SET @ 2412'.
13-3/8" PLANNED DEPTH AT 5,780' MD/ 5,687' TVD (50 FT TVD ABOVE LAWHAH) : ACTUAL DRILLED AT 5772', CASING SET @ 5771'.
9-5/8" PLANNED DEPTH AT 8,083' MD/ 6,900' TVD (TARGET ENTRY SAFANIYA RESERVOIR) : ACTUAL DRILLED AT 8962', CASING SET @ 8961'.
8 1/2" (TD): PLANNED DEPTH AT 12,058' MD/ 6,910' TVD: ACTUAL DRILLED @ 12,985'.
=================================================================================
HSE:
* REINFORCE STOP WORK AUTHORITY, HANDS-FREE OPERATIONS & LIFE SAVING RULES IN ALL PRE-TOUR MEETINGS.
* PERFORMED H2S, FIRE & ABANDON RIG DRILL 30-MAY-2024
* PERFORMED MAN DOWN DRILL (INJURY) 14-APR-24
* DISCUSSED D&WO HSE ALERTS 65-24, 66-24, 67-24 & 68-24.
* EMPHASIZE THE IMPORTANCE OF HAND & BODY PLACEMENT.
* PERFORM SWA AND LINE OF FIRE DRILL DAILY.
=================================================================================
* WBM LC-50 SAMPLE SENT OCT 12, 2023 ANDERSON TIDE MNF #2400645403.
* OBM LC-50 SAMPLE SENT JUNE 04, 2024 SEACORE 888 MNF # 2400688990.
=================================================================================
** PERSONNEL ONBOARD:
* ARAMCO CLERK MINHAJ AALAM (ID# 8618646) TRAVEL TO RIG 4-APR. ONBOARD SINCE 5-APR-2024.
* ARAMCO FCT WAEL EID (ID# 295319) ONBOARD SINCE 11-JUNE-2024.
=================================================================================
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
84 PCF 0 0 API 0 0 Volts 0 9 290,303
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 96 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 4 0/0 0 164,026 0
28
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
84 PCF 0 0 API 0 0 Volts 0 9 290,303
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 96 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 4 0/0 0 164,026 0
28

MUD CACL2-80 BCTRN CAOH2 OXYGON O-3670R COAT-415


TREATMENT 37 ( 2200L ) 2 ( 5GL ) 3 ( 55LB ) 1 ( 40LB ) 1 ( 55GL ) 4 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
06/01/2024 05/08/2024 5 - 7 SSE 0-1M SEASONAL 398 PERFORM SWA AND
MISCELLANEOUS
KNOTS LINE OF FIRE DRILL
DAILY.

Company ITS LIG HCO RIG BDF BLH RIG ARM BHO GD1 HSL BC ARM SAM WWB FME

Category CSR CTRG PSSC RIG DFMS LHES MED OTHR PCS SLS SLS SSSV WSC WBCS WBCS WHES
PERSONNEL
4 16 5 74 2 0 1 2 1 3 1 1 2 0 1 1
Total
AND SERVICES No. of Persons
114
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 0 24 24 24 24 24 24 24 0 24 24

Operating Hours. 0 0 24 24 24 0 12 12 24 24 0 0 24 0 0 0

Standby/Tankers
TRUCKS/BOATS
TOPAZ KARAMA

BULK Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-781 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 08/12/2023 - 07/05/2024
Report ID: OPERLMTDMRREP

2334 2392 1719 5011 0 4498

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-712 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 05/31/2024 - 11/12/2024
Report ID: OPERLMTDMRREP

PN-12 @ MRJN-712 Limited Morning Report for 06/18/2024


Objective : (WELLHEAD & COUSIK, SUMAN KALYAN / HELAM, EHAB ADEL / FALLATAH,
Foreman(s)
GAS LIFT COMPLETION) ABDULAZIZ ABDULRAHMAN
D&WO Morning Report (Service Providers View) Rig Charge #: Engineer AHMAD, TAUSIF
Copyright 2024 Saudi Aramco. All Rights Reserved PN-12 (72-24073-0712) Manager SHEHRI, TALAL HASAN
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores:
+882167771 4262 6739170 6739199
Date: Tuesday 06/18/2024 MRJN-712 (1) MRJN_712_1
CONTRACTOR /CLERK VSA T
6739212

Last 24 hr operations Next 24 hr plan


M/U 2200' KILL STRG. R/U & PT S/L. COMM OPS. S/L DRIFT & RTRV PX PLUG. B/H TBG. S/L CIRC TBG & TCA. SET & PT ME PLUGS. R/D S/L. INSTALL BPV. N/D X-TREE & BONNET. LOCK
DRIFT. PUNCH TBG. B/H TCA & TBG. SET PXN PLUG IN TAIL PIPE & PT. OPEN TRSSSV. N/U RISER, BOPE, OVERSHOT & DIVERTER. PT BOP. S/L RTRV ME PLUGS.
Location Next Location
MRJN-712 LOCATED IN 12 WELL PLATFORM OF MRJN-710/719 MRJN-711
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
12,125 Size 8405 6711 Size 8,099 11,611 6,856 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12125 (Date) 20 0 242
0.7 (06/17/2024@1300 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 1100 6 1 PRE N RM LDP SPDP RIG 12125 12125 0 0 M/U 15 STDS X 4" HWDP + 9 STDS X 4" DP IN MOUSE HOLE & RACK BACK ON
DERRICK.

1100 - 1300 2 1 PRE N RM RU NA RIG 12125 12125 PJSM. R/U SAPESCO RISERS ON X-TREE, BOP & LUBRICATORS W/ PUMP IN SUB. PT
PCE TO 300/ 2000 PSI AGAINST CROWN VALVE.
1300 - 1300 0 1 PRE S OT COMM NA RIG 12125 12125
COMMENCED OPERATIONS AT MRJN-712 ON 17 JUNE 2024 @ 13:00 HRS.
1300 - 1330 0.5 1 POST N WH OTH NA RIG 12125 12125
OPENED WELL. SIWHP = 600 PSI, TCA = CCA = 0 PSI.

S/L OPS:
- RIH W/ 3.833" GC & TAG 4 1/2" SLB TRSSSV @ 259 FT.
1330 - 1430 1 1 POST N DCOM RTRV PLUGN SPL 12125 12125
- RIH & RETRIEVE PRONG & 4-1/2" PX PLUG F/ 4 1/2" SLB TRSSSV @ 259 FT
(SAPESCO 4-1/2" PX-PLUG SET INSIDE SLB TRSSSV ON 7-MARCH-2024 BY RAWABI-
607 BARGE).
1430 - 1500 0.5 1 POST N DCOM OTH NA RIG 12125 12125
OPENED 4-1/2" SLB TRSSSV, SIWHP = 650 PSI.

BULLHEAD TBG SIDE WITH VOLUME BELOW PKR W/ 140 BBLS OF 76 PCF CLEAR
BRINE AT 6.5 BPM / 100 PSI.
1500 - 1700 2 1 POST N DCOM KILL MPMP RIG 12125 12125 PUMP 50 BBLS HI VIS AHEAD. BULLHEAD 1.2 X WELLBORE VOLUME (TBG + CSG
BELOW PKR + LOWER COMPLETION) W/ 370 BBLS OF 76 PCF VISCOUS BRINE @ 6
BPM / 100 PSI.
- NO PRESSURE BUILD UP IN TCA DURING BULL HEADING.

1700 - 1730 0.5 1 POST N DCOM CIRC MPMP RIG 12125 12125 FLOW CHECK WELL THRU S/L LUBRICATOR NEEDLE VALVE FOR 30 MINS. WELL
ON VACUUM.

S/L OPS:

- RIH 1-7/8" BRUSH & WORK THROUGH 4-1/2" TRSSSV PROFILE.


1730 - 2130 4 1 POST N DCOM DTU DRFT SPL 12125 12125
- RIH 3.795" DRIFT & TAG 4-1/2" XN-NIPPLE IN TAIL PIPE @ 6987 FT (42 DEG).
- RIH HALLIBURTON 3.59" DPU PUNCHER & PUNCH 4 1/2", 11.6# TBG AT 6795 FT
(127' ABOVE 9-5/8" PACKER, 39 DEG).
- FILL TUBING SIDE W/ 76 PCF VISCOUS BRINE REGULARLY AT 80 BPH.

2130 - 0000 2.5 1 POST N DCOM KILL MPMP RIG 12125 12125 BULLHEAD TCA SIDE WITH 1.2 X TCA ABOVE PKR VOLUME W/ 445 BBLS OF 76
PCF VISCOUS BRINE AT 6 BPM / 900 PSI W/ TBG SIDE CLOSED.

0000 - 0130 1.5 1 POST N DCOM KILL MPMP RIG 12125 12125 BULLHEAD TUBING SIDE WITH 1.2 X WELLBORE VOLUME W/ 370 BBLS OF 76 PCF
VISCOUS BRINE AT 7 BPM / 100 PSI W/ TCA SIDE IS CLOSED.

FLOW CHECK WELL FOR 30 MIN THRU TRIP TANK W/ 76 PCF VISCOUS BRINE.
0130 - 0200 0.5 1 POST N DCOM CIRC MPMP RIG 12125 12125
WELL ON TOTAL LOSSES.

S/L OPS:
- RIH 4-1/2" PXN PLUG & SET IN 4 1/2" XN-NIPPLE AT 6987 FT.
- RIH CHECK SET TOOL, CONFIRMED PLUG IN PLACE.
0200 - 0459 3 1 POST N DCOM SET PLUGN SPL 12125 12125
- RIH & SET PRONG.
- PT 4-1/2" PXN PLUG TO 1000 PSI FOR 15 MINS ON CHART.
- KEEP FILLING WELL WITH 76 PCF VISCOUS BRINE AT 80 BPH. WELL ON TOTAL
LOSSES PRIOR TO SETTING PLUG.
Workover Objectives

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-712 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 05/31/2024 - 11/12/2024
Report ID: OPERLMTDMRREP

Foreman Remarks

* CURRENT LOCATION: LAT 28 DEG 26.69'N, LONG 049 DEG 37.17'E, HEADING 323.7 DEG, WATER DEPTH 159 FT.
* NO ANCHOR RESTRICTIONS ON ALL SIDES OF RIG.
-----------------------------------------------------------------------------------------------------------------------------------------
* CURRENT PLATFORM: MRJN-710/719 PF (8 WELLS TO WORKOVER. MAJOR WELL HEAD WORK IN 8 WELLS. MRJN-710- DECOMPLETE & RUN NEW PKR, MRJN-711, 712, 713, 714, 715 & MRJN-
716 DECOMPLETE, RUN NEW GLV COMPLETION & MRJN-718 -DECOMPLETE, SIDETRACK & RUN NEW GLV COMPLETION.
- MRJN-712, 713 & 714 WELLS SECURED WITH PX PLUG IN TRSSSV PROFILE FOR RIG APPROACH.
- COMPLETED & SUSPENDED WELLS: MRJN-715, MRJN-716 & MRJN-714 . FLOW BACK AFTER COMPLETING ALL WELLS.
-----------------------------------------------------------------------------------------------------------------------------------------
* NEXT PLATFORM: N/A.
------------------------------------------------------------------------------------------------------------------------------------------
* OBSERVATIONS SUBMITTED: 34.
------------------------------------------------------------------------------------------------------------------------------------------
* DAILY DIESEL CONSUMPTION FOR ENGINES: 52 BBLS & CUMULATIVE FOR MRJN-712 = 783 BBLS.
------------------------------------------------------------------------------------------------------------------------------------------
* ARAMCO PDP YOUSEF ALTULAYHI, BADGE# 798737 ON RIG SINCE 11 JUNE 2024.
* ARAMCO PDP ABDULAZIZ ALSHAHRANI, BADGE# 823643 ON RIG SINCE 04 JUNE 2024.
* ARAMCO PDP EVALUATOR EDUARDO ARBOLEDA BADGE #806945 ON RIG SINCE 14 JUNE 24.
------------------------------------------------------------------------------------------------------------------------------------------
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
76 PCF N/A N/A API N/A Volts 0 N/A N/A
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 N/A HTHP N/A N/A N/A N/A / CACL N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A N/A N/A / N/A N/A N/A
56
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
76 PCF N/A N/A API N/A Volts 0 N/A N/A
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 N/A HTHP N/A N/A N/A N/A / CACL N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A N/A N/A / N/A N/A N/A
53

MUD CACL2-80
TREATMENT 25 ( 2200L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A REGULAR 3-4 NW 2-3 FT CLEAN 153 TOURLY

Company LIG RIG BDF ARM HSL INW SPL ARM FME

Category CTRG RIG DFMS OTHR SLS SLS SLS WSC WHES
PERSONNEL
15 74 1 4 1 1 3 3 1
Total
AND SERVICES No. of Persons
103
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 12 2 0 8 24 0

Standby/Tankers
TRUCKS/BOATS
TOPAZ KHUBAYB

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1019 962 1502 3000 N/A 2800

Instrumentation Other
OK Reporter
REPAIR ASAP
Computer, Communication & V-Sat Issues
OK

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-949 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/25/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

PN-13 @ SFNY-949 Limited Morning Report for 06/18/2024


Objective : (OIL PRODUCER) Foreman(s)YAMI, SALEH ABDULLAH / ALJAMAAN, ALI HASSAN
D&WO Morning Report (Service Providers View) Charge #: Engineer BETANCOURT JOYA, MAURICIO GIOVANNI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23013-0949) Manager GHAMDI, NAWAF AHMED
PN-13
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14283 013-673256 1 013-673256 4
Date: Tuesday 06/18/2024 SFNY-949 (0) SFNY_949_0 CONTRACTOR /CLERK VSA T
013-673256 3

Last 24 hr operations Next 24 hr plan


CONT. ND DIVERTER. NU CSG SPOOL AND PT. REPAIR RIG EQUIPMENT. REPAIR RIG EQUIPMENT.
Location Next Location
SFNY-940/949 PF SFNY-1349
Current Depth (ft) Liner TOL MD TVD Formation Tops
4,765 Last Csg Size MD TVD Size Top
13 3/8 4755 4558 Formations Comments
Depth
RUS 1,269 1264 FT TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUSA 1,326 1321 FT TVD
4765 (Date) 0 0 253 RUSG 1,584 1576 FT TVD
23.9 (05/24/2024@2330 ) UMER 1,741 1731 FT TVD
ARUM 3,631 3548 FT TVD
LAMS 4,640 4459 FT TVD

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End
0500 - 1315 8.25 0 16 N BOP ND DVRT RIG 4765 4765
CONT' N/D & LIFT 21 1/4'' DIVERTER.
1315 - 1445 1.5 0 16 N WH OTH NA RIG 4765 4765
N/D 20-3/4"-3M X 20-3/4"-3M CAMERON HANGER GUIDE DSA.

1445 - 2115 6.5 0 16 N WH NU WH CAM 4765 4765 INSTALL CAMERON 20-3/4" 3M X 13-5/8" 3M CASING SPOOL.
-PRESSURE TEST CAVITY TO 3000 PSI. OK

SHUT DOWN OPERATIONS TO REPAIR:


-THE LIMITATION ON SACK CUTTER AND HOPPERS MIXING
CAPACITY.
2115 - 0459 7.75 0 16 N DRLG RR CSYS RIG 4765 4765 UPRA 934843 -MUD CROSS TO BE INSTALLED FOR 13-5/8" BOP STACK TO
SATISFY WCM 7TH EDITION REQUIREMENT.
-HMH TO PERFORM GENERAL CHECKS FOR DRILLING EQUIPMENT
DUE TO FREQUENT FAILURES OBSERVED.
-WATER MAKER AND RAW WATER PUMP TO BE REPAIRED.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 2115 7.75 7.75 934843 UPRA OTH NA RIG 4765 SHUT DOWN OPERATIONS TO REPAIR RIG
EQUIPMENT.
Foreman Remarks

==============================WELL OBJECTIVE============================
SFNY-949 WILL BE DRILLED AS A HORIZONTAL WELL TARGETING SFNY RESERVOIR. THIS WELL WILL BE COMPLETED WITH ICD SCREENS AND EQUIPPED WITH ESP AND Y-TOOL.
ESP WILL BE FUNCTION TESTED AFTER RUNNING COMPLETION. CHEMICAL TREATMENT IS REQUIRED TO REMOVE FORMATION DAMAGE.
===================== ======PERSONNEL ======================================
ARAMCO CLERK RAJU GOPALI ID #8638153 ONBOARD SINCE 8-APRIL-2024.
ARAMCO HSE ADVISOR GIORGI GORGADZE ID#8744322 ON LCATION 27-MAY-2024.
ARAMCO FCT ABDULLAH ALZID ID #796948 ONBOARD SINCE 4-JUNE-2024.
MATERIAL EXPEDITOR ZAIED ALKHALDI ID #8582991 ONBOARD SINCE 17-JUNE-2024.
============================SAFETY=========================================
HELD FIRE & ABANDONMENT DRILLS ON 16-MAY-2024.
*PERFORM SWA AND LINE OF FIRE DRILLS DAILY.
===================================RIG DATA================================
* RIG HEADING: 333.0DEG
* RIG POSITION: LATITUDE: 28 DEG 16.24' N / LONGITUDE: 048 DEG 48.99' E
* AIR GAP: 53.8 FT
* WATER DEPTH: 61.7 FT
* RKB TO MSL (ELEVATION): 139.2 FT
* RKB TO ML: 200.9 FT
* PORT LEG PENETRATION: 6.6 FT
* STB LEG PENETRATION: 3.9 FT
* BOW LEG PENETRATION: 5.9 FT
* ANCHORING RESTRICTIONS IN SOUTHERN CORRIDOR OF PF
========================SFNY-949 CASING POINTS================================
30" CONDUCTOR: 56' BELOW MUD LINE.
18-5/8" CSG: 50' TVD INTO RUS PLANNED AT 1316' MD/ 1312' TVD, ACTUAL DRILLED TO 1316' MD, CASING SET @ 1315' MD.
13-3/8" CSG: 100' TVD INTO LAMS PLANNED AT 4734' MD/4545' TVD, ACTUAL DRILLED TO 4765' MD, CASING SET @ 4755' MD.
9-5/8 CSG: TARGET ENTRY PLANNED AT 6336' MD/ 5349' TVD.
8-1/2" HS TD: 3000' OH LATERAL PLANNED AT 9338' MD/ 5349' TVD
===================================EQUIP. FAILURES================================
- ONE WATER MAKER
- ONE DEEP WELL PUMP
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 4,765 29.2 145.62 0 4,567 -286.04 205.39 1,155.34 0.35
MUD DATA

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-949 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/25/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A 5-6 KNTS 1-2 FT CLEAR 25 TOURLY
WN

Company LIG SPS RIG BDF GDF ARM NCS BRD ARM CAM

Category CTRG DPDS RIG DFMS DFMS OTHR PCS SCS WSC WHES
PERSONNEL
16 4 79 1 1 4 2 1 2 1
Total
AND SERVICES No. of Persons
111
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 12 12 24 24 0 24 10

Standby/Tankers
TRUCKS/BOATS
MV BGMS SUCCESS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
383 1097 1311 2498 1690 3349

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
FOREMAN PRINTER WAS SENT FOR REPLACEMENT ON 3-JUNE-2024. STILL NOT RECEIVED REPLACEMENT PRINTER.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABSF-279 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/06/2024 - 07/29/2024
Report ID: OPERLMTDMRREP

PN-7 @ ABSF-279 Limited Morning Report for 06/18/2024


Objective : (OIL-PRODUCER Foreman(s)SALAM, MOHAMED MOHIELDIN MOHAMED
D&WO Morning Report (Service Providers View) Charge #: IN ABSF,ARBA RESERVOIR.) Engineer AKPAMA, GEORGE ARCHIBONG / ALABDULHADI, MUSAAD MAHER
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22019-0279) Manager RAJHI, MOHAMMAD ALI
PN-7
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088-2167- 771-2104 378-6380 013-378-63 81 (CLERK)
Date: Tuesday 06/18/2024 ABSF-279 (0) ABSF_279_0 OTHER VSAT CONTRACTOR /CLERK VSA T
013-378-63 82 (RR) +39 02010 24052 (RR)

Last 24 hr operations Next 24 hr plan


RIH W/ C/O ASSY. FOR SECOND RUN, POOH, RIH W/ C/O FOR DISPLACE, DISPLACED HOLE WITH CHANGE UPPER RAMS TO 4 1/2" PIPE, BOP TEST. , RIH W/BOP TEST ASSY., P/T BOP & WELL
INHIBITED FILTRATED BRINE, POH, HEAD, RIH W/ UPPER COMPLETION ASSY.
Location Next Location
ABSF- 270/279, 503 PF. ABSF-272
Current Depth (ft) Liner TOL MD TVD Formation Tops
11,719 Last Csg Size MD TVD Size 6,880 8,685 6,125 Top
9 5/8 7166 5830 Formations Comments
7 Depth
5777' TVD (86.26'
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) HITH 7,024
SHALLOWER)
11719 (Date) 100 0 79 ABAR 8,595 6124' TVD
36.6 (06/12/2024@1900 ) ARBA 8,841 6116' TVD
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0530 0.5 0 EOW C CT TI STDP RIG 11719 11719 7200 8310
RIH WITH SAMAA C/O ASSY ON 5 1/2" DP.
0530 - 0730 2 0 EOW C CT CIRC MPMP RIG 11719 11719
CIRCULATED WELL WITH 2 X HI-VIS SWEEPS, CHC.

0730 - 0845 1.25 0 EOW C CT TO STDP RIG 11719 11719 8310 6880 POH WITH TANDEM 7" X 9-5/8" SAMAA C/O ASSY ON 5 1/2" DP TO ABOVE OF 7"
T.O.L.
0845 - 0900 0.25 0 EOW C CT CIRC MPMP RIG 11719 11719
FLOW CHECK-WELL STATIC.
0900 - 1000 1 0 EOW C CT TO STDP RIG 11719 11719 6880 1565
POH WITH TANDEM 7" X 9-5/8" SAMAA C/O ASSY ON 5 1/2" DP.
1000 - 1115 1.25 0 EOW C CT CIRC MPMP RIG 11719 11719
P/U, M/U SAMAA JETTING ASSY, JET BOP, B/O AND L/D SAME.
1115 - 1130 0.25 0 EOW C CT TO STDP RIG 11719 11719 1565 1503
POOH WITH TANDEM 7" X 9-5/8" SAMAA C/O ASSY ON 5 1/2" DP.

POOH WITH SAMAA 9-5/8" WBCO ASSY, B/O 9-5/8" WBCO, CLEAN & INSPECT
1130 - 1245 1.25 0 EOW C CT HT BHA RIG 11719 11719
WBCO & L/D SAME.
- COLLECT 1.5 KG FINE DEBRIS FROM MAGNETS & 2 KG FROM DITCH MAGNETS.
1245 - 1300 0.25 0 EOW C CT HT BHA RIG 11719 11719
CHANGE HANDLING EQUIPMENT TO 4".
1300 - 1330 0.5 0 EOW C CT TO STDP RIG 11719 11719 1503 143
POOH WITH SAMAA 7" WBCO ASSY ON 4" DP TO 143'.
1330 - 1345 0.25 0 EOW C CT CIRC MPMP RIG 11719 11719
FLOW CHECK-WELL STATIC.

POOH WITH SAMAA 7" WBCO ASSY TO SURFACE, B/O, CLEAN & INSPECT 7" WBCO
1345 - 1415 0.5 0 EOW C CT HT BHA RIG 11719 11719
BHA, L/D SCRAPER, BRUSH & DRIFT SUB.
- COLLECT 2.0 KG FINE DEBRIS.

P/U, M/U SAMAA 7" WBCO BHA AS FOLLOWS:-


1415 - 1500 0.75 0 EOW C CT TI BHA RIG 11719 11719 0 143
6 1/8" BIT + BIT SUB + STD 4 3/4'' DC + 6 X 7'' MAGNETS + 7'' JUNK BASKET + 7''
DRIFT SUB (6.14" OD) + X/O
1500 - 1530 0.5 0 EOW C CT TI STDP RIG 11719 11719 143 1503
RIH WITH SAMAA C/O ASSY ON 4" DP.
1530 - 1545 0.25 0 EOW C COMP HT PEL RIG 11719 11719
CHANGED DP HANDLING TOOLS FRON 4" TO 5 1/2" SIZE.

1545 - 1700 1.25 0 EOW C CT TI STDP RIG 11719 11719 1503 1565 P/U, M/U 9-5/8" WBCU ASSEMBLY AS FOLLOWS:-
X/O + 4 X 9 5/8'' MAGNET + JUNK BASKET + 9 5/8'' DRIFT SUB (8.599" OD) + X.O.
1700 - 1830 1.5 0 EOW C CT TI STDP RIG 11719 11719 1503 8310
RIH WITH SAMAA C/O ASSY ON 5 1/2" DP.

1830 - 2230 4 0 EOW N CT CIRC MPMP RIG 11719 11719 CIRCULATED WELL WITH 2 X HI-VIS SWEEPS, CHC, DISPLACE WELL TO 69 PCF
INHIBITED BRINE, FLOW CHECK-WELL STATIC.

2230 - 2345 1.25 0 EOW C CT TO STDP RIG 11719 11719 8310 6880 POH WITH TANDEM 7" X 9-5/8" SAMAA C/O ASSY ON 5 1/2" DP TO ABOVE OF 7"
T.O.L.
2345 - 0000 0.25 0 EOW C CT CIRC MPMP RIG 11719 11719
FLOW CHECK-WELL STATIC.
0000 - 0130 1.5 0 EOW C CT TO STDP RIG 11719 11719 6880 1503
POH WITH TANDEM 7" X 9-5/8" SAMAA C/O ASSY ON 5 1/2" DP.

POOH WITH SAMAA 9-5/8" WBCO ASSY, B/O 9-5/8" WBCO, CLEAN & INSPECT
0130 - 0245 1.25 0 EOW C CT HT BHA RIG 11719 11719
WBCO & L/D SAME.
- COLLECT 1 KG FINE DEBRIS FROM MAGNETS & 2 KG FROM DITCH MAGNETS.
0245 - 0300 0.25 0 EOW C CT HT BHA RIG 11719 11719
CHANGE HANDLING EQUIPMENT TO 4".

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABSF-279 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/06/2024 - 07/29/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0300 - 0330 0.5 0 EOW C CT TO STDP RIG 11719 11719 1503 143
POOH WITH SAMAA 7" WBCO ASSY ON 4" DP TO 143'.
0330 - 0345 0.25 0 EOW C CT CIRC MPMP RIG 11719 11719
FLOW CHECK-WELL STATIC.

POOH WITH SAMAA 7" WBCO ASSY RUN#3 TO SURFACE, B/O, CLEAN & INSPECT
0345 - 0415 0.5 0 EOW C CT HT STRG RIG 11719 11719
7" WBCO BHA, L/D SAME
- COLLECT 1.0 KG FINE DEBRIS.
0415 - 0459 0.75 0 EOW C CT HT STRG RIG 11719 11719
CLEAN AND CLEAR RIG FLOOR, CHANGE HANDLING EQUIPMENT TO 5-1/2".
Foreman Remarks

ABSF-279 WILL BE COMPLETED AS A SINGLE LATERAL OIL PRODUCER TARGETING ARBD RESERVOIR FROM SLOT#9, WELL WILL BE COMPLETED WITH MTV L.COMPLETION, U.COMPLETION WITH
DUAL ESP AND PDHMS GAUGES.
==================ABSF-270/279,503 PLATFORM=========================================================
COMPLETION & EOW AS FOLLOWS:
ABSF-272...COMPLETED & SUSPENDED FOR FLOWBACK
ABSF-274...COMPLETED & SUSPENDED FOR FLOWBACK
ABSF-276...COMPLETED & SUSPENDED FOR FLOWBACK
ABSF-270...COMPLETED & SUSPENDED FOR FLOWBACK
ABSF-277...COMPLETED & SUSPENDED FOR FLOWBACK
ABSF-275...COMPLETED & SUSPENDED FOR FLOWBACK
ABSF-273...COMPLETED & SUSPENDED FOR FLOWBACK
ABSF-271...COMPLETED & SUSPENDED FOR FLOWBACK
ABSF-278...COMPLETED & SUSPENDED FOR FLOWBACK
CURRENT WELL:
EOW SECTION ABSF-279... ON GOING.
===========================================================
RIG HEADING: 330 DEG
LAT. 26 DEG 57.29' N, LONG 050 DEG 29.67' E
FINAL LEG PENETRATION: BOW 5.58', PORT 4.59', STBD 5.90'.
AIR GAP: 39.37'
WATER DEPTH: 74.8'
RKB TO MUD LINE: 189'
===========================================================
SAFETY:
** HELD WEEKLY H2S, FIRE & ABANDON RIG DRILLS 06/17/2024
=============================================================
ALERTS DISCUSS WITH CREWS:
HSE ALERT 65-24, 66-24, 67-24 & 68-24.
=============================================================
PERSONNEL:
* ANEEZ AHAMED HUSSAIN ARAMCO CLERK ONBOARD SINCE 04/04/2024.
* NASSER AL-ARJANI ARAMCO I.D#821244 MATERIAL EXPEDITOR ONBOARD SINCE 06/04/2024.
* GEORGE AKPAMA ARAMCO I.D#722487 DRILLING ENGINEER ONBOARD SINCE 06/13/2024.
* GEORGE AKPAMA ARAMCO I.D#722487 DRILLING ENGINEER DEPART THE RIG ON 06/17/2024.
=======================================================================
RENTAL TOOLS ONBOARD:
RECEIVED 6-3/4" OILSERVE HMJ, SN#HMJ-662-01-03 ON 31-MAY-2024
=======================================================================
> WAIT ON WEATHER: 0 HRS; CUMULATIVE: 0 HRS
> WAIT ON MARINE BOAT: 0 HRS; CUMULATIVE: 0 HRS.
> WAIT ON PRODUCING 0 HRS; CUMULATIVE: 0 HRS
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 0 0 API 0 0 Volts 0 9 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
6 0 HTHP 94 0 0 0/0 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 6 0/0 0 0 0
27
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 0 0 API 0 0 Volts 0 9 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 94 0 0 0/0 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 6 0/0 0 0 0
27

MUD ECCO-TEMP BCTRN CAUST SAFE-SCAV O-3670R HEC


TREATMENT 5 ( 100LB ) 26 ( 5GLD ) 20 ( 50LBP ) 2 ( 55GL ) 12 ( 55GL ) 9 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

MISCELLANEOUS BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABSF-279 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/06/2024 - 07/29/2024
Report ID: OPERLMTDMRREP

06/01/2024 N/A N 13 KNOT 1 FOGGY 5,702 TOURLY AND


PREJOB

Company BAL HCB LIG RIG SMI MIF ARM WCS SCM SPL MI2 SCP ARM SAM DEL

Category ALS BRCR CTRG RIG DFMS FILT OTHR PDHMS PCS SLS SCS SSSV WSC WBCS WHES
PERSONNEL
10 1 14 65 2 2 2 6 1 3 1 1 1 1 1
Total
AND SERVICES No. of Persons
111
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 12 0 0 12 0 0 0 0 0 24 12 0

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
994 3006 1235 905 530 3162

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-2097 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 01/21/2023 - 07/29/2024
Report ID: OPERLMTDMRREP

PN-8 @ ZULF-2097 Limited Morning Report for 06/18/2024


Objective : (POWER WATER Foreman(s)MARTIN, JOSEPH NORTEYE
D&WO Morning Report (Service Providers View) Charge #: INJECTOR) Engineer ADEKUNLE, KADRI LUKMAN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22062-2097) Manager MAJDI, SULAIMAN AL HASSAN
PN-8
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088-2167- 771-4133 673-6990 673-3858 ( CLERK)
Date: Tuesday 06/18/2024 ZULF-2097 (0-1) ZULF_2097_1 OTHER VSAT CONTRACTOR /CLERK VSA T
673-9950 ( RR) 003-902102 1303 (OIM)

Last 24 hr operations Next 24 hr plan


CHC, POH & LD SLB 8-1/2'' RSS BHA. RIH W/ 9-5/8" SCRAPER ASSY, SCRAPE LH SETTING DEPTH, POH. RIH W/ 8-1/2" REAMING ASSY., CHC, WIPER TRIP, CHC, SPOT CSG GO PILL, POH. RUN 7"
CHC, POH. LINER.
Location Next Location
ZULF-2090/2099 PF ZULF-2097
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
13,715 Size 8710 6057 Size 8,383 13,916 6,411 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
13715 (Date) 100 0 242
72.9 (06/07/2024@0500 )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0500 - 0600 1 0-1 8 1/2 N DRLG CIRC MPMP RIG 13715 13715
PUMP 3 X 20 BBLS HIS-VIS SWEEPS. CHC
0600 - 0615 0.25 0-1 8 1/2 N DRLG CIRC MPMP RIG 13715 13715
FLOW CHECK, STATIC.
0615 - 0815 2 0-1 8 1/2 N DRLG ST STDP RIG 13715 13715 13715 10567
POH WITH SLB RSS/MWD/LWD 8-1/2'' BHA.

ENCOUNTER TIGHT SPOT @ 10567', WORK STRING SEVERAL TIMES WITH NO


0815 - 0830 0.25 0-1 8 1/2 N DRLG OTH NA RIG 13715 13715
SUCCESS.

0830 - 0845 0.25 0-1 8 1/2 N DRLG ST STDP RIG 13715 13715 10567 10784
RIH W/ 2 STDS 8-1/2" DIRECTIONAL BHA ON 5-1/2" DP.

0845 - 0945 1 0-1 8 1/2 N DRLG CIRC MPMP RIG 13715 13715 CIRCULATE HOLE CLEAN WITH GPM: 550, PRESS: 3020 PSI, RECIPROCATE
STRING WITH 100 RPM.
0945 - 1000 0.25 0-1 8 1/2 N DRLG CIRC MPMP RIG 13715 13715
FLOW CHECK - WELL STATIC.
1000 - 1200 2 0-1 8 1/2 N DRLG ST STDP RIG 13715 13715 10784 8034
POH WITH SLB RSS/MWD/LWD 8-1/2'' BHA TO TOW.
1200 - 1215 0.25 0-1 8 1/2 N DRLG CIRC MPMP RIG 13715 13715
FLOW CHECK - WELL STATIC.
1215 - 1245 0.5 0-1 8 1/2 N CT CIRC MPMP RIG 13715 13715
CIRCULATE BTMS UP AT WINDOW.
1245 - 1315 0.5 0-1 8 1/2 N DRLG CIRC MPMP RIG 13715 13715
FLOW CHECK - WELL STATIC. SLUG PIPE.
1315 - 1600 2.75 0-1 8 1/2 N DRLG TO STDP RIG 13715 13715 8034 363
POH 8-1/2" RSS DIRECTIONAL BHA ON 5-1/2'' DP.
1600 - 1615 0.25 0-1 8 1/2 N DRLG CIRC MPMP RIG 13715 13715
FLOW CHECK - WELL STATIC.
1615 - 1645 0.5 0-1 8 1/2 N DRLG TO SPHDP RIG 13715 13715 363 147
POH 8-1/2'' RSS DIRECTIONAL BHA ON 5-1/2'' HWDP. LD JAR.

1645 - 2015 3.5 0-1 8 1/2 N DRLG HT BHA RIG 13715 13715 LD 6.75'' SAMAA PBL SUB, 6.5'' DC, RSS MWD/LWD DIRECTIONAL BHA, 8-1/2''
PDC BIT SN#SA00387 (1-1-WT-A-X-I-NO-TD).
2015 - 2045 0.5 0-1 8 1/2 N CT HT BHA RIG 13715 13715
CLEAN AND CLEAR RIG FLOOR.

P/U, DRIFT & RIH 6 JTS 5 1/2" DP FROM SURFACE TO 190 FT., FLUSH THRU
2045 - 2130 0.75 0-1 8 1/2 N CT LDP SPDP RIG 13715 13715 0 190
STRING. POH & RACK BACK IN DERRICK.

2130 - 0015 2.75 0-1 8 1/2 N CT HT BHA RIG 13715 13715 0 92 HPJSM. P/U, M/U AND RIH 9 5/8" SCRAPER BHA AS PER SAMAA ENGINEER.

0015 - 0045 0.5 0-1 8 1/2 N CT TI SPHDP RIG 13715 13715 92 490
RIH 9-5/8" SCRAPER ASSY ON 5-1/2'' HWDP.
0045 - 0215 1.5 0-1 8 1/2 N CT TI STDP RIG 13715 13715 490 4295
RIH 9-5/8" SCRAPER ASSY ON 5-1/2'' DP.

FILL UP STRING & BREAK CIRCULATION W/ 300 GPM, 420 PSI AS PER SAMAA ENG
0215 - 0315 1 0-1 8 1/2 N CT CIRC MPMP RIG 13715 13715
INSTRUCTION.

0315 - 0459 1.75 0-1 8 1/2 N CT RR SWVL RIG 13715 13715 HELD PJSM, CHANGE SAVER SUB ON TDS......@RT

Foreman Remarks

=====================CURRENT WELL DATA=====================


ZULF-2097 IS A HORIZONTAL WELL THAT WILL BE COMPLETED ACROSS KHFJ AQUIFER AND UTILIZED AS WATER INJECTOR IN PF-

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-2097 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 01/21/2023 - 07/29/2024
Report ID: OPERLMTDMRREP

2090/2099 IN THE SOUTH-EASTERN FLANK OF ZULUF FIELD, AS PART OF ZULF ARAB MEDIUM MAINTAIN POTENTIAL PLAN FOR
PERIPHERAL WATER INJECTION.

THE WELL WILL BE COMPLETED AS A H/PWI


WELL TARGETING KHFJ SAND AQUIFER WITH STAND-ALONE SAND SCREENS (250 MICRONS), OH PACKERS AND UPPER COMPLETION WITH 4-1/2"
GRE PRODUCTION TUBING.

========================SAFETY==========================
- DRILLS:
- FIRE DRILL: 06-16-2024
- H2S DRILL: 06-16-2024
- ABANDON SHIP: 06-16-2024
-HSE ALERTS 69-24, HSE ALERTS 70-24, HSE ALERTS 71-24, HSE ALERTS 72-24.
========================PERSONNEL==========================
* HASHAM, ALJARRI, MATERIAL EXPEDITOR # 8537918 ON BOARD RIG 06/11/2024
=====================RENTAL TOOLS========================
*4-3/4" TAQA JAR SN# DJ6-500-116 BACKLOADED ON 6/09/2024 ON MN# 2400689589.
*4-3/4" TAQA JAR SN# DJ6-500-346 RECEIVED ON 5/07/2024 ON MN# 2100884060
*6-3/4" TAQA JAR SN# DJ6-675-195 RECEIVED ON 5/29/2024 ON MN# 2100901259.

============== PLATFORM ZULF-2090/2099 DATA ==============


32" CONDUCTOR PIPE AT 312 FT
7 X WELLS (6 NEW WELLS AND 1 TIE-BACK)
3 TARGETING KHFJ AND 3 TARGETING SFNY.
ZULF-2090 (COMPLETED) 06/07/2024.
ZULF-2099 (COMPLETED AND SUSPENDED WITH TEMPORARY COMPLETION)
ZULF-2096 (COMPLETED) 05/21/2024.
ZULF-2097 (CURRENT WELL).
ZULF-2095 (COMPLETED) RIG 04/05/2024.
ZULF-2098 (COMPLETED AWAITING FLOWBACK)
ZULF-2094 SUSPENDED WITH LOWER & UPPER COMPLETION.

====================DRILLING SEQUENCE===================
1)ZULF-2097 (CURRENT WELL )
2)BATCH DRILLED ALL 22'' HS (2099, 2094, 2096,2098,2097 AND 2095).
3)BATCH DRILLING 2099, 2094 AND 2097 16'' HS TO TD.
4)BATCH DRILLING 2097 AND 2094 12-1/4'' HS TO TD.
5)BATCH DRILL 2095, 2096 AND 2098 16'' TO TD.
6)TIE-BACK AND COMPLETION OF ZULF-2090.
7)FLOW BACK AND INJECTIVITY OF 7 WELLS.

========================RIG DATA========================
AIR GAP - 35.56 FT
RKB TO MSL: 103.6 FT
RKB TO SEA BED: 257.9 FT
INITIAL PENETRATION:
BOW LEG - 10.78 FT
STBD LEG - 10.24 FT
PORT LEG - 10.04 FT
FINAL PENETRATION:
BOW LEG - 11,42 FT
STBD LEG - 10,89 FT
PORT LEG - 10,70 FT
COORDINATES:
LAT N 28.23'.15"
LON E 049.23'.12"
HEADING 336.8

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0-1 13,715 85.6 208.85 0 6,509 -2877.3 75.21 9,443.18 0.13

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
83 PCF 1 0 API 59 921 Volts 4.12 0 256,431
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1 HTHP 17 23 0 12 / 21 RELIANT 0.1
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 38 24 11 / 12 0 33,000 1.2
85

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
83 PCF 1 0 API 59 936 Volts 4.12 0 257,347
MUD DATA FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.2 HTHP 17 22 0 12 / 20 RELIANT 0.1
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 38 24 11 / 12 0 33,000 1.2
86

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
83 PCF 1 0 API 59 917 Volts 4.12 0 258,262
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1 HTHP 17 23 0 12 / 20 RELIANT 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZULF-2097 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 01/21/2023 - 07/29/2024
Report ID: OPERLMTDMRREP

Vis.(SEC) 0 37 24 11 / 12 0 33,000 1.4


83

MUD CACO3-25 CACO3-50 CAOH2 MRBL-F STELSL50 STELSEALFN


TREATMENT 5 ( 50LB ) 5 ( 50LB ) 10 ( 55LB ) 12 ( 2200L ) 5 ( 50LB ) 5 ( 50LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
12 8,355 13,715 DP Av DC Av Bit HHP N/A N/A M222 8.5 SMT
Pressure GPM Jet Vel 379.32 531.05 0 I-Row O-Row DC Location Bearings
N/A 650 N/A 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
SA00381 MDI616C POOH Reason N/A
Gauge Other
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 93 N/A N/A N/A N/A 0
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/08/2024 N/A 7-12 KNOTS 2-4 FT SEASONAL 564 N/A

Company LIG SDM RIG OES SMI SRT BLH ARM SCM BRD ARM SAM

Category CTRG DPDS RIG DFMS DFMS HO LHES OTHR PCS SCS WSC WBCS
PERSONNEL
13 4 66 1 1 1 1 1 2 1 1 1
Total
AND SERVICES No. of Persons
93
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 15 24 12 12 15 0 12 24 0 24 15

Standby/Tankers
TRUCKS/BOATS
PACIFIC PYTHON

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1666 1161 1531 3910 529 3297

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-797 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 11/12/2022 - 06/24/2024
Report ID: OPERLMTDMRREP

QMS-MARYAH @ MRJN-797 Limited Morning Report for 06/18/2024


Objective : (DUAL Foreman(s)NAWWAR, MOHAMED MOKHTAR
D&WO Morning Report (Service Providers View) Charge #: LATERAL OIL PRODUCER Engineer MOUSA, MOHAMMAD ADEL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved IN SAFANIYAH RESERVOIR) Manager ALRASHEEDI, ABDULMAJEED NASSER
QMS-MARYAH (66-20073-0797)
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0096688216 77714155 673-5585 673-5735 ( RADIO ROOM )
Date: Tuesday 06/18/2024 MRJN-797 (0) MRJN_797_0 CONTRACTOR /CLERK VSA T
673-9957

Last 24 hr operations Next 24 hr plan


CONT R/U CT INJ HEAD. P/T SAME. OPEN TRSSSV. OPEN MB FCV. RIH W/ CT. FLOWBACK MB RBIH WITH CT AND LIFT MB FOR CLEAN UP. FLOWBACK MB FOR CLEAN UP AS PER PROGRAM.
WHILE PUMPING N2. SHUT IN. POOH W/ INJ HEAD. TRANSFER BRINE. R/U CT INJ HEAD.
Location Next Location
MRJN-790/799 PF MRJN-795
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
14,810 Size 9077 8033 Size 8,786 12,130 8,120 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
14810 (Date) 0 227
74.5 (06/16/2024@2300 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONTINUE N/U CT INJ HEAD & RISER ON CT BOPE.


- SECURE INJ CHAINS.
0500 - 0800 3 0 EOW E TEST RU CTU SCT 17132 17132 - PT INJ HEAD/ RISERS & SWT UPSTREAM LINES TO 300/2500 PSI FOR 10/10 MIN-
OK.
- PURGE CT W/ N2.
- SLB COMPLETION OPEN TRSSSV & MB ICV.

0800 - 1000 2 0 EOW E TEST LIFT CTU SCT 17132 17132 PJSM. OPEN CROWN & MASTER VLV'S, SLB CT START RIH W/ N2 LIFT ASSY ON 2"
CT TO 500 FT, PUMP 350 SCF/MIN WHILE RIH TO 2000 FT.

SLB CT STATIONARY @ 2000 FT, PUMP N2 WITH 350 SCF/MIN, OPEN WELL AT
1000 - 1130 1.5 0 EOW E TEST LIFT CTU SCT 17132 17132
CHOKE 20/64", BRINE & N2 AT SURFACE. CONT RIH W/ CT TO 7000 FT WHILE
PUMPING N2 WITH 500 SCF/MIN, CHOKE UP GRADUALLY TO 28/64",

FLOWBACK OPERATIONS MB AS FOLLOWING:


> OPENED THE WELL WITH CHOKE SIZE 20/64", INCREASED GRADUALLY TO 28/
64" ADJ CHOKE.
> FLOWBACK MOTHERBORE.
1130 - 1730 6 0 EOW E TEST LIFT CTU SCT 17132 17132 > N2 LIFT W/ 400- 500 SCF/M.
> SLB CT STATIONARY @ 7000 FT.
> DAILY FLOWING TIME: 10:17 HRS.
> CUMULATIVE FLOWING TIME: 10:17 HRS.
> BRINE AND N2 RETURN, NO OIL TRACES.
> REFER TO WELL TESTING REPORT.

SHUT-IN WELL AT SWT CHOKE. HPJSM. SLB CT POOH W/ N2 LIFT ASSY TO


SURFACE. ONCE CT AT SURF, CLOSE CROWN VALVE THEN OPEN SAME. CLOSE
1730 - 2115 3.75 0 EOW E TEST LIFT CTU SCT 17132 17132 MASTER VALVE. FLUSH CT RISER TO CM. CLOSE CT BOP.
- POLLUTION SURVEILLANCE BOAT SURVEY BARGE SURROUNDINGS AND
CONFIRMED ALL CLEAR
- SLB COMP CLOSED MB ICV #1 .

2115 - 2230 1.25 0 EOW E TEST RD CTU SCT 17132 17132 SLB R/D CT INJECTOR HEAD & RISER. SECURED INJECTOR HEAD ON MAIN DECK.
- SLB OPENED ICV#1. CONFIRM FULLY OPEN.

2230 - 0215 3.75 0 EOW E TEST OTH NA ARM 17132 17132 WAITING ON DAYLIGHT, MEANWHILE TRANSFER 240 BBLS CONT BRINE TO QMS
MARIMBA, OFFLOAD N2 TANK & CHEMICALS.

R/U SLB CT 10' RISER & INJ HEAD.


0215 - 0430 2.25 0 EOW E TEST RU CTU SCT 17132 17132
> PT BOP & INJ/RISER TO 300/2500 PSI
> SECURE THE INJECTOR BY CHAINS

OPEN WELL FOR CLEAN UP ON 20/64" ADJ CHOKE. START RIH W/ CT.
- HOLD SAFETY BRIEFING PRIOR TO OPENING WELL FOR CLEAN UP AND
0430 - 0459 0.5 0 EOW E TEST LIFT CTU SCT 17132 17132
FLOWBACK
- PRIOR TO OPENING WELLRAWABI-11 COMPLETED SAFETY/POLLUTION CHECK
INSIDE 500M ROUND THE BARGE AND CONFIRMED ALL CLEAR
Foreman Remarks

FLOWBACK PF'S COMPLETED ON 14 PF WITH 90 WELLS (27 WELLS DELIVERED IN 2022, 47 WELLS DELIVERED IN 2023 AND 17 WELLS IN 2024):
- ZULF-1330/1339 PF (5 WELLS COMPLETED).
- ABSF-198, 210/219 PF (11 WELLS COMPLETED).
- ZULF-690/699 PF (7 WELLS COMPLETED).
- MRJN-770/779 PF (7 WELLS COMPLETED).
- MRJN-580/589 PF (8 WELLS COMPLETED)
- MRJN 810/819 PF (5 WELLS COMPLETED)
- MRJN 530/539 PF (6 WELLS COMPLETED)

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-797 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 11/12/2022 - 06/24/2024
Report ID: OPERLMTDMRREP

- ZULF 1380/1389 PF(6 WELLS COMPLETED)


- RBYN- 60/69 PF (7 WELLS COMPLETED)
- ZULF-630, 1390/1399 PF (5 WELLS COMPLETED)
- ZULF-650/659 PF (8 WELLS COMPLETED)
- MRJN 2000, 851/ 859 PF (5 WELLS COMPLETED)
- ZULF-1230/1239 PF (7 WELLS COMPLETED OUT OF 9 WELLS)
- SFNY 20, 1330/1332 PF (3 WELLS COMPLETED)
- MRJN 790/799 PF (2 OUT OF 6 WELLS COMPLETED )
==========================================
ODD2 SAFETY STAND DOWN MEETING ON 12-JUNE-2024.
HELD H2S DRILL WITH RESCUE ON 17-JUNE-2024
HELD ABANDON DRILL ON 17-JUNE-24
HELD FIRE DRILL ON 27 MAY 2024
HELD WEEKLY SAFETY MEETING ON 15-JUNE-2024
PERFORMED 2 X SWA AND 1 LOF DRILLS ON 17-JUNE-2024
========================================================
- ARAMCO MATERIAL EXPEDITOR RAED ALJURBUA #8389808 ON BOARD SINCE 26 MAY, 2024
- ARAMCO MATERIAL EXPEDITOR MUSAB ALSHERI #8586485 OFF DUTY.
========================================================
- SEABED SURVEY REQUESTED FOR ZULF 1240/1249 ON 01 NOV 2023 (8800021057).
- SEABED SURVEY REQUESTED FOR MRJN 760/769 ON 01 NOV 2023 (8800021059).
- SEABED SURVEY REQUESTED FOR ZULF 1400/1409 ON 30 NOV 2023 (8000646134) RECEIVED FIELD REPORT ON 20 FEB 2024 .
- SEABED SURVEY REQUESTED FOR ZULF 1370/1379 ON 25 MAR 2024 (8800021910).
- SEABED SURVEY REQUESTED FOR ABSF 270/279, 503 ON 12 MAY 2024 (8800022129)
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A 1-6 KTS NW 0-1 FT SEASONAL 632 PRETOUR/WEEKLY/DAILY

Company LIG SCT RIG TSF ARM SCP ARM SWT

Category CTRG COIL RIG H2S OTHR PDHMS WSC WTSE


PERSONNEL
12 9 27 1 1 1 1 15
Total
AND SERVICES No. of Persons
67
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24

Standby/Tankers Others
TRUCKS/BOATS
QMS MARIMBA RAWABI-11

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 1425 10019 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ARBI-2 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/07/2024 - 09/04/2024
Report ID: OPERLMTDMRREP

RBP-50A @ ARBI-2 Limited Morning Report for 06/18/2024


Objective : (TIE-BACK) Foreman(s)WELLS JR., ROBERT JOSEPH
D&WO Morning Report (Service Providers View) Charge #: Engineer MATA LEON, GILBERTO ELIECER
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Manager HARBI, SALEH MOHAMMAD
RBP-50A (72-24543-0002)
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12115 378-6327 013-378-63 35 (RR)
Date: Tuesday 06/18/2024 ARBI-2 (0) ARBI_2_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
013-510-62 22 (OIM) 013-378 63 26 (CLERK)

Last 24 hr operations Next 24 hr plan


FINISH WELDING SEAL PLATE, ALLOW SEAL PLATE TO COOL, INSPECT EVERY 6 HRS. ALLOW SEAL PLATE TO COOL, FINISH INSPECTION, FINAL CUT 18-5/8" WELD STARTER
WELLHEAD.
Location Next Location
ARBI-2 PLATFORM *RIG MAINTENANCE*
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
14,360 Size 11608 11608 Size 11,082 13,958 13,958 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
14360 (Date) 100 0 172
4.4 (06/13/2024@2015 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0830 3.5 0 POST N WH OTH NA IWS 14360 14360
IWS WELD UP 1.5" X 60" X 18-5/8" LOWER SEAL PLATE AS PER WELDING MAP.

ALLOW WELD TO COOL DOWN FOR FINAL INSPECTION. PWS INSPECT EVERY 6
HOURS WHILE WAITING FOR 24 HOURS. (HELD MAN DOWN DRILL AT MONKEY
0830 - 0459 20.5 0 POST N WH OTH NA IWS 14360 14360 BOARD WITH RESCUE TEAM, HELD WEEKLY H2S DRILL, FIRE DRILL, EMERGENCY
MUSTER & ABANDONMENT DRILL). PWS COMPLETE INSPECTION ON WELD ON
FLANGE AFTER 24 HRS OF WELDING, RIG INSTALL 2 X 3-1/8" 3M CAMERON GATE
VALVES.
Workover Objectives
Foreman Remarks

WATER DEPTH: 187 FT, FINAL AIRGAP: 35 FT, RKB TO TOP OF PLATFORM 80.6' FT.
-

RIG ARRIVED ON LOCATION ON 6/8/24, RIG CONTACTS: (ARO) RIG NET NO: +966135106222 - USA 1-2815602892 IN CASE ARAMCO V-SAT DOWN.824
-

DISCUSS RELEVANT STOPS CARDS & HSE ALERTS IN DAILY AND WEEKLY SAFETY MEETINGS.
HELD MAN DOWN DRILL @ MONKEY BOARD, HELD H2S DRILL, FIRE DRILL, EMERGENCY MUSTER & ABANDONMENT DRILL.
-

EXPEDITOR MOAYAD ALBAQSHI ID # 8656317 ON BOARD RIG 6/11/24.


ARAMCO DRLG ENGINEER GILBERTO MATALEON ID# 725334 ON BOARD RIG 6/16/24.
EV CAMERA HANI ALMUHISEN ID# 8804643 ON BOARD RIG 6/15/24.
-

- WAIT ON WEATHER: TODAY 0HRS / CUMULATIVE 0 HRS.


- WAIT ON PRODUCING: TODAY 0HRS / CUMULATIVE 0HRS.
- WAIT ON MARINE: TODAY 0HRS / CUMULATIVE 3HRS.
- WAIT ON TOOL HOUSE: TODAY 0HRS / CUMULATIVE 0HRS.
- WAIT ON AVIATION: TODAY 0HRS / CUMULATIVE 0HRS.
-

- NEXT LOCATION KARN-35/43


- PLANNED RIG MOVE DATE 9/7/24.
- SEABED SURVEY FOR KARN-35 # 8800022248
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A NW 4 KTS 1 FT 26 C 4,466 PRE-TOURS

Company FMC GOS GTC RIG BAR PW ARM HCM ARM CAM FME GEP IWS

Category CSR CTRG EVCAM RIG DFMS ISPCT OTHR PCS WSC WHES WHES WHES HHCWD
PERSONNEL
2 14 1 49 2 1 2 1 1 1 1 3 5
Total
AND SERVICES No. of Persons
83
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 24 24 22 12 24 24 0 0 0 24

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ARBI-2 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/07/2024 - 09/04/2024
Report ID: OPERLMTDMRREP

Standby/Tankers Others
TRUCKS/BOATS
POSH SANDPIPER (RIG) RAWABI-54 (RIG)

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2872 1618 2517 14020 N/A 2087

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HSBH-70 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/16/2024 - 03/26/2025
Report ID: OPERLMTDMRREP

RM-74A @ HSBH-70 Limited Morning Report for 06/18/2024


Objective : (GAS PRODUCER) Foreman(s)QI, XIAOLONG / KOREVAAR, TEUNIS
D&WO Morning Report (Service Providers View) Charge #: Engineer MONYEI, AUGUSTINE IKENNA
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23023-0070) Manager HARBI, SALEH MOHAMMAD
RM-74A
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12704 013-378-83 65 013-378-83 67 (RR)
Date: Tuesday 06/18/2024 HSBH-70 (0) HSBH_70_0 CONTRACTOR /CLERK VSA T
013-378 83 66 (CLERK)

Last 24 hr operations Next 24 hr plan


CONTINUE DRILL 22" HOLE SECTION WITH MUD CAP. CONTINUE DRILL 22" HOLE SECTION WITH MUD CAP. ROUND TRIP FOR BHA CHANGE.
Location Next Location
HSBH 68/71 PLATFORM *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
5,598 Last Csg Size MD TVD Size Top
24 4272 4266 Formations Comments
Depth
AHMD 4,218 4224' MD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) WARA 4,465 4471' MD
5303 (Date) 0 295 206 MDDD 4,493 4499' MD
67.1 (06/04/2024@1800 ) SFNY 4,664 4670' MD
SHUB 5,045 5053'MD
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

DIRECTIONALLY DRILL 22" HOLE (ROTARY DRILL), WITH SEAWATER & HI-VIS 72
0500 - 0515 0.25 0 22 N DRLG DMR MMOT SDM 5303 5305
PCF WBM SWEEPS.
- PUMP @ 1-1.5 BPM 73 PCF MUD CAP DOWN ANNULUS.

OBSERVED RETURN ON SURFACE, PICK UP OFF BOTTOM, STOP PUMPING, FLOW


0515 - 0545 0.5 0 22 N DRLG CIRC MPMP RIG 5305 5305
CHECK, OBSERVED FLUID LEVEL SLOWLY DROPPING THEN OUT OF SIGHT (BAKER
XACT TOOL SUGGEST ANNULUS FLUID LEVEL +/-490')

0545 - 0730 1.75 0 22 N DRLG OTH NA RIG 5305 5305 INCREASE MUD CAP TO 80PCF AND PUMP 200BBLS 80PCF DOWN BACKSIDE
(BAKER XACT TOOL SUGGEST ANNULUS FLUID LEVEL +/-400')

DIRECTIONALLY DRILL 22" HOLE (ROTARY DRILL), WITH SEAWATER & HI-VIS 72
0730 - 1030 3 0 22 N DRLG DMR MMOT SDM 5305 5342
PCF WBM HI VIS SWEEPS.STAGE PUMPS FROM 800GPMTO 1000GPM
- PUMP @ 1.5 BPM 80 PCF WBM MUD CAP DOWN ANNULUS.

OBSERVED FLUID LEVEL STEADY INCREASING AND RETURNS ON FLOW LINE, PICK
1030 - 1200 1.5 0 22 N DRLG CIRC MPMP RIG 5342 5342
UP OFF BOTTOM AND STOP PUMPING, FLUID LEVEL DROP DOWN TO +/- 400FT.
LINE UP AND PUMP 500 BBLS 80 PCF MUD CAP DOWN BACKSIDE.

DIRECTIONALLY DRILL 22" HOLE (ROTARY DRILL), WITH SEAWATER & HI-VIS 72
1200 - 1230 0.5 0 22 N DRLG DMR MMOT SDM 5342 5346
PCF WBM HI VIS SWEEPS
- PUMP @ 1.5 BPM 80 PCF WBM MUD CAP DOWN ANNULUS.

WASH UP & REAM DOWN. PERFORM SURVEY 30FT OFF BOTTOM, PUMP & SPOT
1230 - 1315 0.75 0 22 N DRLG SURV MWD SDM 5346 5346
100 BBLS HI-VIS AROUND BHA, DROP 4 X RAPID SWEEP STICKS IN PIPE
(PREMIXED), MAKE CONNECTION.

DIRECTIONALLY DRILL 22" HOLE (ROTARY DRILL), WITH SEAWATER & HI-VIS 72
1315 - 1900 5.75 0 22 N DRLG DMR MMOT SDM 5346 5440
PCF WBM HI VIS SWEEPS EACH SINGLE , PUMP @ 1.5 BPM 80 PCF WBM MUD CAP
DOWN ANNULUS.

WASH UP & REAM DOWN. PERFORM SURVEY 30FT OFF BOTTOM, PUMP & SPOT
1900 - 1945 0.75 0 22 N DRLG SURV MWD SDM 5440 5440
100 BBLS HI-VIS AROUND BHA, DROP 4 X RAPID SWEEP STICKS IN PIPE
(PREMIXED), MAKE CONNECTION.

DIRECTIONALLY DRILL 22" HOLE (ROTARY DRILL), WITH SEAWATER & HI-VI54S 72
1945 - 0045 5 0 22 N DRLG DMR MMOT SDM 5440 5534
PCF WBM HI VIS SWEEPS EACH SINGLE , PUMP @ 1.5 BPM 80 PCF WBM MUD CAP
DOWN ANNULUS.

WASH UP & REAM DOWN. PERFORM SURVEY 30FT OFF BOTTOM, PUMP & SPOT
0045 - 0130 0.75 0 22 N DRLG SURV MWD SDM 5534 5534
100 BBLS HI-VIS AROUND BHA, DROP 4 X RAPID SWEEP STICKS IN PIPE
(PREMIXED), MAKE CONNECTION.

DIRECTIONALLY DRILL 22" HOLE (ROTARY DRILL), WITH SEAWATER & HI-VIS 72
PCF WBM HI VIS SWEEPS EACH SINGLE , PUMP @ 1.5 BPM 80 PCF WBM MUD CAP
0130 - 0459 3.5 0 22 N DRLG DMR MMOT SDM 5534 5598 DOWN ANNULUS.

NOTE: ARO CONTINUES INSTALLATION OF K-BOS BOP CONTROL SYSTEM - 65%


COMPLETION.
Foreman Remarks

CASING POINTS PLANNED:


48'' DRIVE PIPE = 310' MD / 310' TVD.
36'' CP= 493' MD/ 493' TVD .
30" CP =1892' MD / 1887' TVD. (70' INTO RUS FM)
24" CP =4272' MD / 4,266' TVD. (56' INTO AHMADI FM)
18-5/8" CP +/- 6,487' MD / 6,446' TVD. (50' INTO HITH FM)

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HSBH-70 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/16/2024 - 03/26/2025
Report ID: OPERLMTDMRREP

13-3/8" CP +/- 10,014' MD / 9,832' TVD. (20' INTO JILH FM)


9-5/8" CP +/- 11,627' MD / 11,445' TVD. (5' INTO KHUFF FM)
WELL TD +/- 13,065' MD / 12,764' TVD. (100' INTO KFDA)
-

PLATFORM LOCATION:
- HSBH-68/71 PLATFORM, LAT 28DEG 09.96 "N, LONG 050DEG, 00.02"E
- RIG HEADING: 330 DEGREES - AIRGAP: 52 FT, WATER DEPTH 139 FT
- DFE: RKB TO PLATFORM MAIN DECK 74.84 FT, RKB TO MSL 119 FT, RKB TO MUDLINE 256 FT
-

- RM-74A (ARO) RIG NET NO: +966135106322 - USA 1-2815608352 IN CASE ARAMCO VSAT DOWN
- CONDUCT H2S & ABANDON DRILLS: 12 JUNE 2024
- CONDUCT WEEKLY THURAYA CHECK #8628293 @ 20:08 HRS READING 5/5 ON 16 JUNE 2024
- CONDUCT MAN DOWN CASUALTY HANDLING SEARCH AND RESCURE ON 5 JUNE 2024
- CONDUCT MAN DOWN DRILL IN CONFINED SPACE (SAND TRAP), CASUALTY HANDLING TO SICKBAY ON 23 MAY 2024
- CONDUCT RESCUE FROM HEIGHT DRILL 29 APRIL 2024
- REVIEW AND DISCUSS SAUDI ARAMCO HSE ALERTS
-

PERSONNEL:
- ARAMCO CLERK, ALGHAMDI, MOHAMMED ID#8625963 ON BOARD 11-JUNE-2024
-

- WAIT ON WEATHER: TODAY 0 HRS / CUMULATIVE 0 HRS


- WAIT ON PRODUCING: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON MARINE: TODAY 0 HRS / CUMULATIVE 0 HRS
- WAIT ON TOOL HOUSE: TODAY 0 HRS / CUMULATIVE 0 HRS
-

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY 0 5,348 9.97 59.21 93 5,335 1.02 66.84 219.33 0.18
0 5,442 10.37 58.49 94 5,427 3.64 71.18 233.82 0.45
MUD DATA
MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
6 4,290 5,598 DP Av DC Av Bit HHP 15 30 S423 22 CDB
Pressure GPM Jet Vel 54.02 58.36 249 I-Row O-Row DC Location Bearings
2,100 1,000 223 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
265872 TS816 6 x 12 / 6 x 13 / 1.44
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 143 320 325 315 15,000 143
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit CDB 22 1 22 1.79 7-5/8 REG 265872
2 Mud Motor SDM 11.25 1 11.25 9.25 37.19 7-5/8 REG 7-5/8 REG 0 B0065
3 Float Sub SDM 9.5 1 9.5 3 2.55 7 5/8 REG 7 5/8 REG 0 0098
4 Stabilizer SDM 22 1 9.5 3 7.6 7 5/8 REG 7 5/8 REG 0 8220
5 Pony Collar SDM 9.5 1 9.5 3.5 5.81 7-5/8" REG B 7-5/8" REG P 0 183095-6
6 Saver Sub SDM 9.625 1 9.625 3.5 1.35 7 5/8 H90 7 5/8 REG 0 2840-5-4
DRILL STRING
7 Measurement While Drilling (MWD) SDM 9.5 1 9.5 6.25 24.44 7-5/8 H90 7-5/8 H90 186 G6888
8 Saver Sub SDM 9.625 1 9.625 3.5 1.3 7 5/8 REG 7 5/8 H90 0 5150-3-3
9 Non Magnetic Drill Collar ( NMDC ) SDM 9.5 1 9.5 3 20.55 7 5/8 REG 7 5/8 REG 0 SPRL 78504-4
10 FIlter Sub SDM 9.5 1 9.5 4 6.82 7 5/8 REG 7 5/8 REG 0 950-1040
11 PBL (Multiple Activation By Pass) SAM 9.5 1 9.5 3.5 11.38 7 7/8 REG 7 5/8 REG 0 WES950BP326
12 Drillcollar RIG 9.5 8 9.5 3 243.21 7 5/8 REG 7 5/8 REG 0 SPRL ON FILE
13 Hydraulic Jar SJS 9.5 1 9.5 3.188 28.95 7-5/8" REG B 7-5/8" REG P 0 0527
14 Drillcollar RIG 9.5 3 9.5 3 92.92 7 5/8 REG 7 5/8 REG 0 SPRL ON FILE
15 Crossover RIG 9.5 1 9.5 3 2.64 7 5/8 REG 6 5/8 REG 0 74-742
16 Drillcollar RIG 8 8 2.813 91.8 6 5/8 REG 6 5/8 REG 0 SPRL ON FILE
17 Crossover RIG 8.25 1 8.25 2.813 2.6 VX54 6 5/8 REG 0 74-001
18 Crossover RIG 5.5 1 8.25 2.813 459.93 VX54 6 5/8 REG 42 ON FILE
19 Drillpipe RIG 5.5 1 6.625 5.901 1 6-5/8FH 6-5/8FH 27.7 VM105 PREMIUM ON FILE

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/05/2024 N/A 8-10 KNOTS 1 FT N/A 2,096 N/A
NW

PERSONNEL Company GOS BC SDM RIG BDF PW SGR ARM HCM ARM SAM
Total
AND SERVICES
CTRG ICE DPDS RIG DFMS ISPCT MLS OTHR PCS WSC WBCS 85
INFORMATION Category

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HSBH-70 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/16/2024 - 03/26/2025
Report ID: OPERLMTDMRREP

No. of Persons 12 2 3 55 2 2 4 1 1 2 1

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 0 24 0 0 24 24

Standby/Tankers Others
TRUCKS/BOATS
posh shearwater (rig) allison tide (rig)

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2057 1403 2402 8831 N/A 6706

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABQQ-246 WORKOVER-4 BI-90
Print Date: 06/18/2024 06:21 06/13/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

RPKU-3 @ ABQQ-246 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (KILL AND SECURE Foreman(s)ADAM, IBRAHIM OMER IBRAHIM / ATTIA, ISLAM AHMED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (61-24050-0246) THE WELL. PERFORM MAJOR Engineer ALASKAR, ABDULLAH ADEL
RPKU-3
WELLHEAD WORK ) Manager HAJRI, ASKAR SAUD
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: RIG FORMAN VSAT
Date: Tuesday 06/18/2024 ABQQ-246 (0) ABQQ_246_0 0135726889

Last 24 hr operations Next 24 hr plan


MAJOR WELLHEAD WORK. CONT MAJOR WELLHEAD WORK, SL RETRIEVE JUNK CATCHER, 2 ME PLUGS, DRIFT, BH W/
INHIBITED WTR, SECURE WELL, RELEASE UNIT.
Location Next Location
62 KM FROM DHAHRAN MAIN GATE GOSP-3 HRDH-1716
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,425 Last Csg Size MD TVD Size 2,399 7,119 7,119 Top
9 5/8 4928 4928 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
7500 (Date) 0 38
2.5 (06/15/2024@1800 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

>> CONTD, MAJOR WELLHEAD WORK ( CONDUCT GAS SURVEY ALL TIME ) :
- TUBESTAR UT INSPECT 13-3/8" SURFACE CSG, FOUND 3' BELOW LB BADLY
CORRODED & REMANING 3' HAD GOOD READINGS.
- HOTHED PERFORM HOT TAPING ON ALL CSG'S, 13-3/8 ,9-5/8" & 7", CHECKED
GAS READING; NO GASES.
- HOTHED OPEN WIDOWS IN ALL CSG'S AND CHECKED GOOD CEMENT IN ALL
CCA'S.
- TUBESTAR PERFORM UT INSPECTION FOR 9-5/8" & 7" CASING FOUND GOOD
READING
- ROUGH CUT 20", 13-3/8", 9-5/8" & 7" CSGS, N/D OLD LANDING BASE & OLD
WELL HEAD.
- HOTHEAD FINAL CUT AND REDRESS 18-5/8, 13-3/8", 9-5/8" & 7" CASINGS.
- HOTHED WELD RE-STUB 7" 26#, 9-5/8" 40#, 13-3/8" 61# & 18-5/8" 115# FBE
0500 - 0459 24 0 POST N WH OTH NA RIG 0 0
COATED CSG'S, WAIT WELD COOL.
- TUBESTAR MPI INSPECTED ALL WELDING AREA-OK.
- HOT HED WELDED NEW 18-5/8" X13-3/8", 3M DELTA LANDING BASE W/ 2-1/16"-
3M DELTA GATE VALVE AS ORIGINAL DIRECTION.
- TUBESTAR PERFORM MPI INSPECTION ON WELDING AREA-OK
- RE-STUB & WELD 18-5/8" CSG, FILL UP 18-5/8" X 13-3/8" WITH 118 PCF CMT
SLURRY.
- FILL 13" X 9" WITH CEMENT, INSTALLED DELTA 13-5/8" X 9-5/8" 3M MANUAL
CSG SLIPS.
- HOTHED FINAL CUT & DRESS 9-5/8" CSG STUB.
- N/U NEW 13-5/8" X 13-5/8" CAM CSG SPOOL TO SAME ELEVATION, WITH 9-5/8"
INTERFERENCE SEALS W/ NEW 2-1/16"-3M CAM GATE VALVE.
- PT SEALS & 13-5/8" CSG SLIPS TO 1000 PSI-OK.
- FILL UP 9-5/8" X 7" CCA WITH 118 PCF CMT SLURRY ... INC @ RPT.
Workover Objectives
Foreman Remarks

OIL SERV. PUMPING UNIT & CREW.

>> TOTAL WELLS COMPLETED SINCE (MAR-05-2024) = 13 WELLS.


===============================DIESEL REPORT==========================
>> DIESEL CONSUMPTION FOR ENGINES: ZERO (PROVIDING BY RPKU-3).
============================ NEXT LOCATIONS ===========================
>> HRDH-704, STRIP OUT 0 %, KOM DONE ON 06/05/2024.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 103 N/A

Company HTD RIG TUB ARM

Category CSV RIG ISPCT WSC


PERSONNEL
3 17 1 2
Total
AND SERVICES No. of Persons
23
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24

Operating Hours. 24 24 6 24

TRUCKS/BOATS Standby/Tankers

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABQQ-246 WORKOVER-4 BI-90
Print Date: 06/18/2024 06:21 06/13/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DEMOBILIZATION BI-DEM
Print Date: 06/18/2024 06:21 01/01/2020 - 08/05/2025
Report ID: OPERLMTDMRREP

RTC-1 @ *DEMOBILIZATION* Limited Morning Report for 06/18/2024


Objective : (RIG-DOWN Foreman(s)PALTRINIERI, EMANUELE / HATHYAH, HUSSAIN ALI
D&WO Morning Report (Service Providers View) AND DEMOBILIZE SLB Engineer SAMBASIVAM, PUVENESVARAN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Charge #: TESTING PACKAGE & Manager ALKHALDI, HAMAD AZZAM
RTC-1
() SERVICE COMPANIES THURAYA RIG FORMAN VSAT OTHER VSAT
Daily
EQUIPMENT TO TOWN. )
(0500-0500) Saudi Aramco Well 0088216777 12660 0135788570 0135788572 DRLG ENG.
Wellbores:
Date: Tuesday 06/18/2024 *DEMOBILIZATION* OTHER VSAT CONTRACTOR /CLERK VSA T
0135788573 TEST ENG. 013-813-78 08 HALLI

Last 24 hr operations Next 24 hr plan


DEMOBILIZE RTC-1 UNIT FROM HRDH-6009 WELL LOCATION TO TOWN. DEMOBILIZE RTC-1 UNIT FROM HRDH-6009 WELL LOCATION TO TOWN.
Location Next Location
HRDH-6009 *MOBILIZATION*
Current Depth (ft) Liner TOL MD TVD Formation Tops
14,560 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
14560 (Date)
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

RIG-DOWN AND DEMOBILIZE RTC-1 UNIT FROM HRDH-6009 WELL LOCATION TO


TOWN.

0500 - 0459 24 PRE M MAIN OTH NA SWT * MINI- CAMP: 50% RIG-DOWN - 50% DEMOBILIZATION.

* 11 LOADS FROM ARAMCO CHEMICALS TO BE BACKLOAD.


* 1 FLARE GUN & 10 CARTRIDGES TO BE RETURNED BACK TO ABQAIQ EXPLOSIVE
MAGAZINES.
Foreman Remarks

----------------------------------------------------------------- -------OBJECTIVES ----------------------------------------------------------------------------------


RIG-DOWN AND DEMOBILIZE SLB TESTING PACKAGE & SERVICE COMPANIES EQUIPMENT TO TOWN.

-------------------------------------------------------------------- ARAMCO PERSONNEL -------------------------------------------------------------------------

------------------------------------------------------------------------- THIRD PARTY ------------------------------------------------------------------------------


* SLB MAIN CAMP & MINI CAMP FUNCTIONALLY WORKING ON 05/12/2024.
* SLB TESTING CREW ON LOCATION FROM 05/12/2024 - 100% OF THE EQUIPMENT MOBILIZED ON 05/13/2024. RELEASED ON 06/10/2024.
* SWT SUCCESSFULLY COMPLETED TESTING UPSTREAM AND DWON STREAM WITH WATER ON 05/20/2024 @14:00 HRS. RELEASED ON 06/10/2024.
* 100% OF SLB COILED TUBING CREW ON LOCATION FROM 05/14/2024 - 100% OF THE EQUIPMENT MOBILIZED ON 05/16/2024. RELEASED ON 06/10/2024.
* 100% OF HALLIBURTON BACK-SIDE/MIXING TANKS CREW ON LOCATION FROM 05/12/2024 - 100% OF THE EQUIPMENT MOBILIZED ON 03/14/2024. RELEASED ON 06/10/2024.
* 100% OF HALLIBURTON SLICK-LINE CREW ON LOCATION FROM 05/16/2024 -100% OF THE EQUIPMENT MOBILIZED ON 05/16/2024. RELEASED ON 06/10/2024.
* 100% OF HALLIBURTON WIRE-LINE CREW ON LOCATION FROM 05/17/2024 - 100% OF THE EQUIPMENT MOBILIZED ON 03/17/2024. RELEASED ON 06/10/2024.
* RAWABI MUD ENGINEER ON LOCATION SINCE 05/15/2024.
* BAKER WELLLINK ENGINEER ON LOCATION SINCE 05/16/2024. RELEASED ON 06/10/2024.

------------------------------------------------------------------- JOURNEY MANAGEMENT ----------------------------------------------------------------------


- HRDH-6009 IS LOCATED 251 KM FROM DHA MAIN GATE: BEFORE HARADH GAS STATION TURN LEFT INTO SKID ROAD & FOLLOW THE SIGN BOARDS.
- CALL ARAMCO FOREMAN (013-578-8570) & RTC-1 SCHLUMBERGER 013-813-7226) OFFICES BEFORE ENTERING THE SKID ROAD.
- LOW TO ABSENT CELL PHONE COVERAGE ON SKID ROAD. BARE IN MIND THAT NIGHT DRIVING IS NOT ADVISABLE.
- ALL VEHICLES SHOULD BE 4X4, EQUIPPED WITH SURVIVAL KIT, FUEL SHOULD BE SUFFICIENT TO REACH THE RIG, PROVIDE SUFFICIENT WATER & FOOD.
- ALL VEHICLES SHOULD FOLLOW APPROVED ROAD WITH NO SHORT CUT & FOLLOW DRIVING SPEED LIMIT.
-

- NEAREST ARAMCO FACILITY: HARAD CLINIC AT 31 KM. NEAREST HOSPITAL: KING FAHAD HOSPITAL AT 186 KM FROM LOCATION. RTC-1 HAS ONE MEDIC ON LOCATION.
-

- NEXT WELL: NOT YET ASSIGNED.


DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 3,935 N/A

Company OTH EMC RIG RIG ARM

Category CTRG DFMS OTHR RENT WSC


PERSONNEL
2 1 2 4 2
Total
AND SERVICES No. of Persons
11
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24

Operating Hours. 0 24 24 24 24

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR DEMOBILIZATION BI-DEM
Print Date: 06/18/2024 06:21 01/01/2020 - 08/05/2025
Report ID: OPERLMTDMRREP

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 600 120 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3036 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 06/01/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

SCTD-1 @ UTMN-3036 Limited Morning Report for 06/18/2024


Objective : (TO DRILL Foreman(s)AITHAN, ABDULLAH IBRAHIM / GUMSANI, ABDULLAH MUSTAFA
D&WO Morning Report (Service Providers View) Charge #: THREE LATERALS Engineer BIN AMMAR, YOUSEF ABDULMOHSEN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24057-3036) ACROSS KHUFF-B Manager KHAMEES, SHAKER ABDUL MAJEED
SCTD-1
RESERVIOR .) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: +882167771 1178 577-3573 COIL CAB: 013-664-89 06
Date: Tuesday 06/18/2024 UTMN-3036 (0-1-2) UTMN_3036_3 CONTRACTOR /CLERK VSA T
013-664-89 01

Last 24 hr operations Next 24 hr plan


TURBINE DRILL KHUFF-B1 L-0-1-2 AS PER GOC. POH TO CHANGE BHA. RIH. TURBINE DRILL KHUFF-B1 L-0-1-2 AS PER GOC.
Location Next Location
THE WELL IS LOCATED 0.448 KM S61E OF UTMN-129 AND 0.777 KM N35W OF UTMN-305. UTMN-3092
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
14,021 Size 10651 10651 Size 11,628 13,310 12,213 Top
Formations Comments
9 5/8 4 1/2 Depth
KFB1 12,254 13489 FT MD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
13855 (Date) 100 166 135
12.3 (06/05/2024@2100 )

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Lt Type Lt ID Summary of Operations
OP Co Start End Start End

TURBINE DRILLING KB01 L-0-1-2 AS PER GOC.

~ PR: 105 GPM, 2,341 RPM, CP: 2,205 PSI. DIFF= 1,414 PSI.
~ WEIGHT CHECKS & SWEEPS AS REQU'D. RG AT: 0.33%.
~ G/R: 4.1 MMSCFD, WHP: 185 PSI, TCA: 2,005 PSI, BHP:
0500 - 1200 7 0-1-2 3 5/8 N DRLG DMS TBINE SDM 13855 13960
3,216 PSI, BHT: 296 F
~ H2S: 2.2%, CO2: 3.0%. TREAT WITH: D-SULFR= 1 BPH:
CAUSTIC 1 BPH.

* AT 0630 HRS, INCREASE RG TO 0.33% DUE TO STACKING


WEIGHT.

PERFORM 350 FT WIPER TRIP WITH NO ISSUSE (PU/SO: 71/52


1200 - 1300 1 0-1-2 3 5/8 N DRLG RW BIT RIG 13960 13960 13960 13600 KLBS).

~ INSPECT JUNK CATCHER : CLEAN.

TURBINE DRILLING KB01 L-0-1-2 AS PER GOC.

~ PR: 113 GPM = 2,341 RPM, CP: 2,850 PSI. DIFF= 1,600 PSI.
~ WEIGHT CHECKS & SWEEPS AS REQU'D. RG AT: 0.33%.
~ G/R: 3.2 MMSCFD, WHP: 180 PSI, TCA: 1,965 PSI, BHP:
3,360 PSI, BHT: 296 F
1300 - 1830 5.5 0-1-2 3 5/8 N DRLG DMS TBINE SDM 13960 14021
~ H2S: 2.0%, CO2: 3.0%. TREAT WITH: D-SULFR= 1 BPH:
CAUSTIC 1 BPH.

* MULTIPLE TURBINE STALLS AT DIFF SPOTS, PU 30 FT TO


RESET PARAMETERS (70 K LBS UP / 50 K LBS DN).
** TURBINE STALLED AT BOTTOM WHILE DRILLING, UNABLE TO
MOVE CT - STUCK ON BOTTOM.

(LT: ARAMCO) WORK ON STUCK.

** AT 14,021 FT MD -TURBINE STALL ON BOTTOM , UNABLE TO


MOVE CT UP, LOST VIBES - GOT STUCK ON BOTTOM.
1830 - 2030 2 0-1-2 3 5/8 N DRLG WOS STRG RIG 14021 14021 14021 14021 BHS 934867 ** WORK TO FREE CT -NO SUCCESS.
** MIX 1% RG. WORK ON COIL TO FREE CT -NO SUCCESS.
** CONTINUE WORK TO FREE CT MULTIPLE TIMES WITH
DIFFERENT PR & MAXIMUM OVERPULL- NO SUCCESS
** AFTER 2% RG OUT FROM BIT WITH CONTINUE WORK TO
FREE CT - GOT FREE.

POOH TO SURFACE TO CHANGE BHA. (SIWHP 2,770 PSI).


2030 - 0300 6.5 0-1-2 3 5/8 N DRLG TO CTBG RIG 14021 14021 14021 0
~ SHUT IN WELL AT 10,000 FT, SIWHP = 514 PSI.
~ ENGAGE X-TAG& TAG STRIPPER
~ INSPECT JUNK CATCHER: CLEAN.

HPJSM, UNDEPLOY BHA#3 (APP).

~ FLUSH STACK WITH 20 BBLS CAUSTIC WATER.


0300 - 0459 2 0-1-2 3 5/8 N DRLG HT BHA RIG 14021 14021 ~ CHANGE STRIPPER RUBBERS AND INSPECT M-SEALS -GOOD.
~ RUN COIL TO GROUND AND CHECK MINIMUM COIL THICKNESS
ON UTT READING: 0.185" (ABOVE MINIMUM).
~ D&M BENCH TEST NEW TOOL COMMUNICATION THRU COIL
ON GROUND - GOOD.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 1830 2 2 934867 BHS CFFM NA ARM 14021 TURBINE STALLED AT BOTTOM 14,021 FT,

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3036 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 06/01/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Lt Type Lt ID Summary of Operations
OP Co Start End Start End
UNABLE TO MOVE CT UP, LOST VIBES - CT
GOT STUCK.
Workover Objectives
Foreman Remarks

SGA1: 1.5 KM NW , SGA2: 1.6 KM NE.


-----------------------------------------------------------------------------------------------------------------------
COIL STRING # 40651-1
~ COIL LENGTH = 19,195', E-LINE LENGTH = 19,670', SLACK =2.47 %, CT VOLUME= 68.1 BBL.
~ TOTAL DRILLED FOOTAGE: 4,321 FT, DAILY RUN FOOTAGE: 1,263 FT, ACCUM RUNNING FOOTAGE: 84,246 FT, HIGHEST FATIGUE: 8.3% AT 13,375 FT.
-----------------------------------------------------------------------------------------------------------------------
* RUNS SINCE LAST SLACK MANAGEMENT: 4.
-------------------------------------------------------------------------------------------------------------------------
BHA#4: RR SEC BIT (SN: 14036258) & 1.15 DEG AKO XTH MOTOR (SN: 1633611), 3.54 REV/GAL, DCD 25K.
~ D+I @ 25.74 FT, GR @ 29.62 FT.

BHA#3: RR HTC BIT (SN: 7918014) & 1.25 DEG AKO XTO TURBINE (SN: 53142K/39157K), 22.3 REV/GAL, DCD 25K.
~ D+I @ 38.91 FT, GR @ 42.79 FT.
-------------------------------------------------------------------------------------------------------------------------
LATERAL FOOTAGE:
~ L 0-1 KHUFF-B1 122.14 DEG AZIM = 1,855 FT.
~ L 0-1-1 KHUFF-B1 131.25 DEG AZIM = 882 FT.
~ L 0-1-2 KHUFF-B1 111.65 DEG AZIM = 388 FT.
-----------------------------------------------------------------------------------------------------------------------
05:00 GAS RATE: 0 MMSCF.
~ DAILY FLARED: 2.9 MMSCF, (TTL: 27.9 MMSCF)
~ DAILY CONDENSATE PRODUCED: 2.0 BBLS (TTL: 154.0 BBLS); BURNED: 70 BBLS (TTL: 110 BBLS)
~ H2S @ 2.0%, CO2 @ 3.0%
~ TREAT WITH: D-SULFR= 1 BPH ; CAUSTIC 1 BPH,
~ EXPORT LINE PRESSURE: NOT UTILIZED.
~ FLARING REASON: MANIFOLD IS NOT READY.
-------------------------------------------------------------------------------------------------------------------------
~ N2 ON LOCATION: 14,000 GALLONS, DAILY N2 USAGE = 0 GALLONS, CUMULATIVE N2 USAGE = 36,700 GALLONS.
-----------------------------------------------------------------------------------------------------------------------------------
VACUUM TANKERS ON LOCATION: 8, DAILY LOADS: 8 LOADS (WELL TTL: 100 LOADS)
~ DRSS #1004326455-1004326457. TANKERS FROM AL-FUWAILEH EST:
+ 2388 DHA/ 8-01,+ 9323 ELA/ 8-05
+ 1905 NLA/ 8-02, + 9241 ZEA/ 8-06
+ 5352 BAA/ 8-03, + 5843 HTA/ 8-07
+ 9681 JAA/ 8-04, + 4336 HAD/ 8-08
------------------------------------------------------------------------------------------------------------------------
* NEXT WELLS:
+ UTMN-3092: PRE-WORKOVER MEETING HELD ON 05/30/2024. NO STRIP OUT REQUIRED, CIVIL WORK: 60%.
+ UTMN-2086: PRE-WORKOVER MEETING HELD ON 05/08/2024. NO STRIP OUT REQUIRED, CIVIL WORK: 0%.
+ UTMN-1988: PRE-WORKOVER MEETING HELD ON 05/08/2024. STRIP OUT REQUIRED, CIVIL WORK: 0%.
------------------------------------------------------------------------------------------------------------------------
~ DRILLS:
------------------------------------------------------------------------------------------------------------------------
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF N/A N/A API 0 Volts 0 N/A N/A
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
118 N/A HTHP 100 N/A 0 N/A / WATER N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A N/A 0 / N/A N/A N/A
32
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF N/A N/A API 0 Volts 0 N/A N/A
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
118 N/A HTHP 100 N/A 0 N/A / WATER N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A N/A 0 / N/A N/A N/A
32

MUD RADIAGREEN CAUST DUOVIS-NS D-SULFR


TREATMENT 8 ( 55GL ) 5 ( 50LBP ) 3 ( 25KG ) 25 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
19RR 13,630 14,021 DP Av DC Av Bit HHP N/A N/A M233 3.625 HTC
Pressure GPM Jet Vel N/A N/A 0 I-Row O-Row DC Location Bearings
BIT DATA N/A 105 N/A 1 4 WT G X
Serial Number Type Jets TFA
7918014 DD205XYV1 POOH Reason N/A
Gauge Other

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3036 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 06/01/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
20RR 14,021 14,021 DP Av DC Av Bit HHP N/A N/A M444 3.625 SEC
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A N/A N/A N/A N/A N/A
Serial Number Type Jets TFA
14036258 MMD53DH2 POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 102 N/A N/A N/A N/A Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 0.5 N/A N/A N/A N/A Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
DRILL STRING
1 Bit SEC 3.625 1 3.625 0 0.54 0 14036258
2 Turbine NTH 1 2.875 11.24 2-3/8 REG 2-3/8 REG 16.54 1633611
3 Drilling Cycle Disconnector SDM 3.125 1 3.125 1.75 3.95 2 3/8 REG REG 0 CRE1005
4 Float Sub SDM 3.125 1 3.125 1 1.37 2 3/8 REG 2 3/8 REG 0 027
5 Measurement While Drilling (MWD) SDM 3.125 1 3.125 17.92 18.86 SN022
6 Orienter SDM 3.125 1 3.125 1 16.5 ACME ACME 0 025
7 Dual Ball Valve Sub SDM 3.125 1 3.125 1 4 ACME ACME 0 CRE1023
8 Drilling Head SDM 3.125 1 3.125 1.3 7.73 ACME ACME 0 CA-014
9 HUK (Head-up Kit) SDM 3.125 1 3.125 1.3 2.02 ACME ACME 0 SN041
10 Coil Tubing ARM 2.375 1 2.375 1.94 19,195 ACME ACME 4.75 40651-1

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/05/2024 06/05/2024 SEASONAL N/A SEASONAL 3,510 2X PRE-TOUR +
PJSMS

Company TGC SCT SDM RUE STO RIG ARM STO OTH ARM

Category CTRG COIL DPDS H2S IOS OTHR OTHR UBD VAC WSC
PERSONNEL
25 19 4 6 2 10 3 16 9 2
Total
AND SERVICES No. of Persons
96
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24 10 24

Standby/Tankers
TRUCKS/BOATS
AB-6307

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 508 358 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3199 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/06/2024 - 07/07/2024
Report ID: OPERLMTDMRREP

SCTD-2 @ UTMN-3199 Limited Morning Report for 06/18/2024


Objective : (DRILLING THREE Foreman(s)ALELWEET, SULAIMAN ABDULLAH
D&WO Morning Report (Service Providers View) Rig Charge #: LATERALS ACROSS KHUFF-C Engineer MULHIM, YOUSEF FAHAD
Copyright 2024 Saudi Aramco. All Rights Reserved SCTD-2 (71-24057-3199) RESERVOIR IN THE MAXIMUM Manager TURAIFI, MOHAMMED AHMED
Daily Onshore STRESS DIRECTION OF 225- THURAYA RIG FORMAN VSAT CONTRACTOR
Well Wellbores: 285 DEG AZIM) /CLERK VSA
(0500-0500) Saudi Aramco +882167771 2366 576-3027
Date: Tuesday 06/18/2024 UTMN-3199 (0-1) UTMN_3199_1 T
013-664-89 98

Last 24 hr operations Next 24 hr plan


TURBINE DRILL L-0-1 AS PER GOC TURBINE DRILL L-0-1 AS PER GOC
Location Next Location
ON UDH BRIDGE GO EAST, FOLLOW SIGN BOARD UTMN-3047
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
14,985 Size 10750 10744 Size 12,096 13,617 13,202 Top
Formations Comments
9 5/8 4 1/2 Depth
KC07 13,297 13834 FT MD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KC08 13,303 14500 FT MD
14550 (Date) 100 435 151 KC09 13,309 14742 FT MD
7.8 (06/10/2024@0900 )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

TWO PHASE TURBINE DRILL L-0 -1 AS PER GOC.

~ PUMP @ 71 GPM, N2 @ 700 SCFM, ELV @ 105 GPM, CIRC PRESSURE @ 2,080
PSI, WOB @ 0.7 KLB
0500 - 1230 7.5 0-1 3 5/8 N DRLG DMS TBINE SDM 14550 14700
~ BHP @ 2,700 PSI, DIFF PRESSURE @ 1,060 PSI, WHP @ 157 PSI, TCA @ 2,260
PSI.
~ GR @ 4.0 MMSCFD, DTF @ 311 DEG F, H2S @ 4% (40,000 PPM), CO2 @ 1.3%.
~ TREATMENT: G-SCAV 2 BPH, CAUSTIC @ 1 BPH.
~ PUMP 2 BBLS SWEEP EVERY 1 HR, WT CHECKS AS REQUIRED, RG AT 0.33%.

1230 - 1330 1 0-1 3 5/8 N DRLG ST CTBG RIG 14700 14700 14700 14350 PERFORM SHORT WIPER
** UBD SWAP JUNK CATCHER - FOUND CLEAN

TWO PHASE TURBINE DRILL L-0 -1 AS PER GOC.

~ PUMP @ 71 GPM, N2 @ 700 SCFM, ELV @ 105 GPM, CIRC PRESSURE @ 2,060
PSI, WOB @ 0.7 KLB
1330 - 0459 15.5 0-1 3 5/8 N DRLG DMS TBINE SDM 14700 14985
~ BHP @ 2,700 PSI, DIFF PRESSURE @ 1,060 PSI, WHP @ 160 PSI, TCA @ 2,260
PSI.
~ GR @ 4.0 MMSCFD, DTF @ 311 DEG F, H2S @ 4% (40,000 PPM), CO2 @ 1.3%.
~ TREATMENT: G-SCAV 2 BPH, CAUSTIC @ 1 BPH.
~ PUMP 2 BBLS SWEEP EVERY 1 HR, WT CHECKS AS REQUIRED, RG AT 0.33%.
Workover Objectives
Foreman Remarks

SG#1: 2.6 KM NE.


SG#2: 2.7 KM NW.
____________________________________________________________________________________
REEL INFO:
~ COIL# PT-40271-1, COIL LENGTH = 18,775 FT, E-LINE LENGTH = 19,243 FT, COIL VOLUME = 66.5 BBL, SLACK= 2.4%, MAX COIL LIFE = 23.3% @ 13,062 FT.
~ COIL DRILLING FT = 16,969 FT, COIL RUNNING FT = 282,574 FT.
~ TRIPS SINCE LAST SLACK MANAGEMENT: 4 RUNS.
~ CT REEL SAWP COMPLETED ON 03/27/2024.
_________________________________________________________________________________________
GAS INFO AT 5:00 HR.
~ GAS: DAILY FLARED @ 3.94 MMSCFD (TTL: 19.60 MMSCF).
~ CONDI: DAILY PRODUCED: 81 BBLS (TTL: 164 BBL). EXPORTED: 0 BBL (TOTAL: 0 BBL) , FLARED: 0 BBLS (TTL: 72 BBL).
~ PRODUCTION LINE: THE PRODUCTION LINE IS AVAILABLE BUT NOT READY.
~ FLARING REASON: OPTF AREA IS NOT READY TO EXPORT THE GAS. (WAITING ON PRODUCTION TO DE-PRESSURIZE LINE).
_________________________________________________________________________________________
LATERAL INFO:
~ L-0 KC-7/9 (FROM 13,620 FT MD) (248 DEG AZIM): 1,807 FT.
~ L-0-1 KC-7 (FROM 14,070 FT MD) (239 DEG AZIM): 915 FT.
_________________________________________________________________________________________
BHA:
~ BHA#1 (C/O, BUS, LATERAL): NEW HTC PDC BIT (S/N#7918303) & 1.5 TURBINE.
~ D+I @ 39.02 FT, GR @ 42.90 FT.
_________________________________________________________________________________________
N2 :
~ N2 ON LOCATION= 26,000 GAL, DAILY N2 USAGE= 11,500 GAL, RECEIVED= 13,000 GAL, CUMULATIVE N2 USAGE= 85,300 GAL (N2 FOR PT=3,800 GAL, PURGE=0 GAL).
_________________________________________________________________________________________
SERVICE SUPPORT FOR JUNE 2024:
~ DRSS#1004320157 & 1004320158 (TAMIMI).
~ VACUUM TRUCKS: 8, DAILY TRIP: 8, TOTAL: 210 LOADS.
________________________________________________________________________________________
SAFETY:
~ ETSABLISH COMMUNICATION PROTOCOL WITH SCTD-9 RIG TEAM.
_________________________________________________________________________________________
> ARAMCO HSE ADVISOR DUTTA, ANIRBAN #8387675 ON LOCATION SINCE 06/16/2024.
________________________________________________________________________________________

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3199 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/06/2024 - 07/07/2024
Report ID: OPERLMTDMRREP

NEXT WELLS:
~ UTMN-2025 PRE-WORKOVER MEETING HELD ON 04/23/2024. WORK STARTED ON 05/21/2024. IN PROGRESS 85%. SCTD-9 WILL MOVE TO UTMN-2025.
~ UTMN-3047 PRE-WORKOVER MEETING HELD ON 05/29/2024, SKID ROAD DRSS: 1004339344, LINING DRSS: 1004339334, GREASE WH DRSS: 1004339390.
~ UTMN-3169 PRE-WORKOVER MEETING HELD ON 04/23/2024. NOT READY DUE TO THE ONGOING ACTIVITY OF PIPING PROJECT (+ STORING TIRES INSIDE THE LOCATION).
~ UTMN-3077 PRE-WORKOVER MEETING HELD ON 04/23/2024, NO STRIP OUT REQUIRED, TCA = 1,100 PSI.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0-1 14,570 93.44 238.74 30 13,358 -219.62 -595.65 2,082.84 16.58
0-1 14,600 93.02 234.59 30 13,356 -224.64 -603.28 2,112.02 13.88
0-1 14,630 92.73 229.55 30 13,355 -230.25 -610.48 2,140.6 16.81
0-1 14,660 91.21 227.76 30 13,354 -236.28 -617.34 2,168.67 7.82
0-1 14,692 91.84 233.04 32 13,353 -242.5 -624.85 2,198.99 16.61
0-1 14,720 89.55 236.42 28 13,353 -247.42 -631.81 2,226.16 14.58
DAILY SURVEY 0-1 14,751 88.93 240.97 31 13,353 -252.33 -639.88 2,256.69 14.81
0-1 14,781 87.81 245.44 30 13,354 -256.45 -648.04 2,286.55 15.35
0-1 14,810 87.6 250.18 29 13,355 -259.79 -656.22 2,315.51 16.35
0-1 14,841 89.01 247.69 31 13,356 -263.18 -665.03 2,346.5 9.23
0-1 14,870 90.71 243.66 29 13,356 -266.82 -673.08 2,375.46 15.08
0-1 14,900 90.51 238.6 30 13,356 -271.23 -681.09 2,405.21 16.88
0-1 14,930 90.87 233.49 30 13,355 -276.34 -688.67 2,434.52 17.07
0-1 14,960 90.7 229.39 30 13,355 -282.04 -695.82 2,463.27 13.68

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
PCF N/A N/A API 0 Volts 0 N/A N/A
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
180 N/A HTHP 100 N/A 0 N/A / WATER N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A N/A 0 / N/A N/A N/A
28
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
PCF N/A N/A API 0 Volts 0 N/A N/A
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
180 N/A HTHP 100 N/A 0 N/A / WATER N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A N/A 0 / N/A N/A N/A
28

MUD RADIAGREEN DUOVIS-NS G-SCAV AR CAUST


TREATMENT 8 ( 55GL ) 2 ( 25KG ) 48 ( 55GL ) 8 ( 50LBP )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
7RR 14,070 14,985 DP Av DC Av Bit HHP N/A N/A M233 3.625 HTC
Pressure GPM Jet Vel N/A N/A 0 I-Row O-Row DC Location Bearings
N/A 71 N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7918303 DD205XYV1 POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 3.625 1 3.625 1 0.75 REG 7918303
2 Turbine NEY 3.125 1 3.125 2.625 24.26 2 3/8 PAC 2 3/8 PAC 1 59018K59022
DRILL STRING 3 Drilling Cycle Disconnector SDM 3.125 1 3.125 1.75 3.93 2 3/8 REG REG 35 CRE1010
4 Float Sub SDM 3.125 1 3.125 1 1.45 2 3/8 REG 2 3/8 REG 35 4
5 Measurement While Drilling (MWD) SDM 3.125 1 3.125 17.92 18.86 CRE1014
6 Orienter SDM 3.125 1 3.125 1 16.5 ACME ACME 35 013
7 Dual Ball Valve Sub SDM 3.125 1 3.125 1 4 ACME ACME 35 4
8 Drilling Head SDM 3.125 1 3.125 1.3 7.73 ACME ACME 35 21
9 HUK (Head-up Kit) SDM 3.125 1 3.125 1.3 2.02 ACME ACME 35 30
10 Coil Tubing ARM 2.375 1 2.375 1.94 18,795 ACME ACME 1 40271-1

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/10/2024 06/10/2024 NORMAL NA NORMAL 415 DAILY

Company OTH SCT SDM RUE STO RIG ARN STO OTH ARM

PERSONNEL Category CTRG COIL DPDS H2S IOS OTHR OTHR UBD VAC WSC
Total
AND SERVICES
21 15 5 7 2 10 3 18 8 1 90
INFORMATION No. of Persons

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3199 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/06/2024 - 07/07/2024
Report ID: OPERLMTDMRREP

Operating Hours. 0 24 24 24 24 0 24 24 24 24

Standby/Tankers Others
TRUCKS/BOATS
AB-5310 RIG AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 500 372 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
NEED NEW BATTERY FOR RADIO RX457125 MOTOROLA DP4801E & DESKTOP HYTERA RADIO CHARGER FOR RADIO RX-446542.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1867 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/20/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

SCTD-6 @ HRDH-1867 Limited Morning Report for 06/18/2024


Objective : (DRLG 3 UBCTD Foreman(s)DUBAIS, ABBAS MOHAMMAD / ELMOWAFY, GHAZI ALI
D&WO Morning Report (Service Providers View) Charge #: LATERALS ACROSS UNZC Engineer ALMAGHTHAWI, ABDULAZIZ SALEM
Rig (71-24058-1867)
Copyright 2024 Saudi Aramco. All Rights Reserved SCTD-6 RESERVOIR ) Manager KHAMEES, SHAKER ABDUL MAJEED
Daily Onshore Wellbores: THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well (0-1-1-1) HRDH_1867_3 +882167771 4152 013-577-43 28 /CLERK VSA
Date: Tuesday 06/18/2024 HRDH-1867 T
(0-1-1-1-1) HRDH_1867_4
013-577-43 29

Last 24 hr operations Next 24 hr plan


2 PHASE TURBINE DRLG L 0-1-1-1 AS PER GOC, WORK ON COIL STUCK TILL FREE, UNABLE TO 2 PHASE TURBINE DRLG L 0-1-1-1-1 AS PER GOC
RESUME DRLG, SIDETRACK LAT 0-1-1-1-1
Location Next Location
20 KM SOUTH ON YABRIN RD, TURN RIGHT ON SKID. DRIVE 5 KM ON SKID TO LOCATION WAQR-9
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
17,403 Size 13079 13079 Size 13,091 16,824 15,274 Top
Formations Comments
9 5/8 4 1/2 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
17338 (Date) 100 81 287
22.8 (05/26/2024@1100 )

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Lt Type Lt ID Summary of Operations
OP Co Start End Start End

PATTERN THE BIT & 2 PHASE TURBINE DRILL L-0-1-1-1 UNZC


AS PER PLAN:

~ PUMP @ 63 GPM, N2 @ 400 SCF, ELV @ 80 GPM, RPM @


1787, CP @ 1035 PSI, WOB @ 0.5-1.0 KLB.
~ BHP @ 3705 PSI, DIFF PRESSURE @ 675 PSI, WHP @ 65 PSI,
TCA @ 35 PSI, DTF @ 288 DEG F.
0500 - 0930 4.5 0-1-1-1 3 5/8 N DRLG DMS TBINE SDM 17338 17388
~ GR @ 0.6 MMSCFD, H2S @ 0 PPM, CO2@ 1.4% (TREATMENT:
SAMAA SCAF 0 BPH; CAUSTIC @ 0 PAIL/HR).
~ PUMP 2 BBLS SWEEP EVERY HR, RADIA-GREEN AT 0.33%,
CLA-WEB @ 0.2%.

** OBSERVED ANNULAR PACK-OFF, ATTEMPT TO PICK-UP; COIL


STUCK WITH TURBINE STALL.

WORK ON STUCK:

~ WHILE DRILLING, OBSERVED ANNULAR PACK-OFF.


~ ATTEMPT TO PICK-UP; TURBINE STALLED & COIL STUCK
WITH 5 KLB OP.
~ WORK STRING GRADUALLY TO 10 KLB OP.
~ GAMMA RAY AT BTM SHOWS INCREASE TILL SENSOR DEPTH
0930 - 1030 1 0-1-1-1 3 5/8 N DRLG CIRC MPMP RIG 17388 17388 STUK 934855 (42' ABOVE BIT).
~ ANNULAR PRESSURE FLUCTUATING WITH CELAR INDICATION
OF PACK-OFFS
~ LINE UP 1.0% RG.
~ STOP N2 & INCREASE PR GRADUALLY TO 101 GPM; NO VIB.
~ CONT WORKING STRING SLOWLY TILL GAIN MINOR VIB.
~ MOVE STRING IN SWEET ZONE WITH VIB.
~ NOTICED IMPROVEMENT IN VIB & STRING BECAME FREE.
~ POH SLOWLY & GRADUALLY INCREASE SPEED.

POH WITH BHA#17 TO VERTICAL SECTION:

~ POH WITH NO ISSUES THRU OPEN HOLE.


~ CONT POH WITH SINGLE PHASE.
1030 - 1245 2.25 0-1-1-1 3 5/8 N DRLG TO CTBG RIG 17388 17388 17388 13300 ~ PASS THRU WINDOW SMOOTHLY.
~ NOTICED SUDDEN PACK-OFF WITH 3 KLB OP @ 14,887' (61
DEG INC)
~ RIH 50' WITH NO ISSUES.
~ RESUME POH GRADUALLY & PASS 14,887' AGAIN; OK.
~ CONT POH TILL VERTICAL SECTION.

RIH WITH BHA#17 & ATTEMPT TO RESUME DRILLING:

~ RE-LOG FROM 16,100 FT TO 16,200 FT. CORRECTION: +18


FT.
1245 - 1500 2.25 0-1-1-1 3 5/8 N DRLG TI CTBG RIG 17388 17388 13300 17388
~ PASS THRU WINDOW FREELY.
~ WT CHECK AT 17,300 FT; 76 UP/ 56 DN.
~ WASH DOWN TILL TAG BTM AT 17,388 FT. (NOTICE DECLINE
IN VIB, THEN RECOVERED)
~ ESTABLISH DRILLING PARAMETERS.

TURBINE DRILL L-0-1-1-1 UNZC AS PER PLAN:


1500 - 1700 2 0-1-1-1 3 5/8 N DRLG DMS TBINE SDM 17388 17403
~ PUMP @ 88 GPM, RPM @ 1976, CP @ 2945 PSI, WOB @ 0.2-
0.8 KLB.
~ BHP @ 6690 PSI, DIFF PRESSURE @ 945 PSI, WHP @ 100 PSI,

Saudi Aramco: Confidential Page 1 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1867 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/20/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Lt Type Lt ID Summary of Operations
OP Co Start End Start End
TCA @ 30 PSI, DTF @ 289 DEG F.
~ GR @ 0.0 MMSCFD, H2S @ 0 PPM, CO2@ 1.2% (TREATMENT:
SAMAA SCAF 0 BPH; CAUSTIC @ 0 PAIL/HR).
~ PUMP 2 BBLS SWEEP EVERY HR, RADIA-GREEN AT 0.33%,
CLA-WEB @ 0.2%.

* INSPECT JC @ 1535HRS: COLLECTED 0.5 KG OF DEBRIS


(MOSTLY METAL)

** OBSERVE LOW VIB. PICK-UP; 5 KLB OP WITH TURBINE


STALL.

WORK ON STRING:

~ WHIL DRILLING, OBSERVED LOW VIB.


~ WHEN PICK-UP 10'; TURBINE STALL WITH 5 KLB OP.
~ WORK STRING; ANNULAR PACK-OFF WITH 5-7 KLB OP.
~ POH & NOTICED VIB RECOVERED PARTIALY, CONT PICK-UP; 7
KLB OP.
1700 - 1730 0.5 0-1-1-1 3 5/8 N DRLG CIRC MPMP RIG 17403 17403
~ RIH & OBSERVED 550 ANNULAR SPIKES ACROSS 17,388'
(PREVIOUS STUCK AREA).
~ WORK STRING ACROSS PACK-OFF AREA TILL MANAGED TO
POH.
~ CONT POH ABOVE STUCK AREA FREELY.

** TD L 0-1-1-1 @ 17,403' MD/ 15,124 TVD, 92.4 DEG INC &


117.5 DEG AZM DUE TO HOLE INSTABILITY ISSUES.

POH WITH BHA#17 TO 16,000'


1730 - 1830 1 0-1-1-1 3 5/8 N DRLG TO CTBG RIG 17403 17403 17403 16000
* GRMD DECIDED NEW LATERAL L4 PLAN3 17JUN24 YMA.

RIH WITH BHA#17:

~ RE-LOG FROM 16,100 FT TO 16,200 FT. CORRECTION: +1


1830 - 2000 1.5 0-1-1-1 3 5/8 N DRLG TI CTBG RIG 17403 17403 16000 16835 FT.
~ WT CHECK AT 16,300 FT; 79 UP/ 63 DN.
~ PASS THRU WINDOW FREELY.
~ WASH DOWN TO SIDETRACK POINT AT 16,835 FT.
~ ESTABLISH DRILLING PARAMETERS.

2000 - 2130 1.5 0-1-1-1 3 5/8 N DRLG RW BIT BHT 17403 17403 16825 16835 CUT TROUGH FROM 16,825 FT TO 16,835 FT MULTIPLE TIMES
(AS PER D&M).

2130 - 2200 0.5 0-1-1-1 3 5/8 N DRLG OTH NA RIG 17403 17403 PARK COIL AT 16,695 FT. D&M SET UP NEW DATA BASE FOR L
0-1-1-1-1
0-1-1-
2200 - 2200 0 3 5/8 S OT TINL NA RIG 16835 16835
1-1 TIE IN NEW LATERAL L 0-1-1-1-1

TIME DRILL FOR LATERAL L-0-1-1-1-1 UNZC AS PER PLAN:

~ PUMP @ 80 GPM, RPM @ 1,787 RPM, CP @ 2494 PSI, WOB @


0-1-1- 0- 0.25 KLB.
2200 - 0459 7 3 5/8 N DRLG DMS TBINE SDM 16835 16851
1-1 ~ BHP @ 6625 PSI, DIFF PRESSURE @ 778 PSI, WHP @ 145 PSI,
TCA @ 154 PSI, DTF @ 289 DEG F.
~ GR @ 0.0 MMSCFD, H2S @ 0 PPM, CO2@ 0% (TREATMENT:
SAMAA SCAF 0 BPH; CAUSTIC @ 0 PAIL/HR).
~ PUMP 2 BBLS SWEEP EVERY HR, RG AT 0%, CLA-WEB @ 0%.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 0930 1 1 934855 STUK SDIR MWD ARM 17388 OBSERVED ANNULAR PACK-OFF WHILE
DRILLING. PICK-UP; COIL STUCK WITH
TURBINE STALL.
Workover Objectives
Foreman Remarks

TOW: 16,330 FT.


BOW: 16,338 FT.
BTM OF WHIPSTOCK: 16,342 FT.
===============================================================================================================================================
~ SGA #1: 0.5 KM NW FROM LOCATION.
~ SGA #2: 0.5 KM NE FROM LOCATION.
===============================================================================================================================================
~ ELEVATIONS: SSA-5868 ODF 30.9 FT, SCTD-6 DF 113.0 FT, CORRECTION: -82.1 FT.
===============================================================================================================================================
COIL STRING # 40454-1 (TENARIS 0.204" HT-110 MONOBORE).
~ COIL LENGTH: 18,909, FT, E-LINE LENGTH: 19,484 FT, SLACK 3.04%, VOL: 67 BBLS. HIGHEST FATIGUE PT: 10.5% @ 16249 FT.
~ TTL DRILLED FOOTAGE: 1,935 FT; DAILY RUN FOOTAGE: 6,517 FT; ACCUM RUNNING FOOTAGE: 332,716 FT.
~ TRIPS F/ LAST SLACK MGT: 5.
===============================================================================================================================================
GENERAL WELL INFO:

Saudi Aramco: Confidential Page 2 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1867 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/20/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

~ GAS: DAILY PRODUCED @ 0.22 MMSCF (TTL: 7.24 MMSCF).


~ GAS: DAILY FLARED @ 0.22 MMSCF (TTL: 7.24 MMSCF).
~ DAILY EXPORTED: 0.0 MMSCF (TTL: 0.0 MMSCF).
~ CONDI: DAILY CONDI PRODUCED: 0.0 BBLS (TTL: 0.0 BBLS)
~ CONDI; DAILY FLARED: 0.0 BBLS, TTL FLARED: 0.0 BBLS.
~ DAILY EXPORTED: 0.0 BBLS (TTL: 0.0 BBLS).
~ FLARING REASON: PRODUCTION LINE WAS NOT READY TO EXPORT (WAITING ON PRODUCTION TO DE-PRESSURIZE LINE).
~ N2 ONSITE: 29,500 GAL; DAILY USED: 2000 GAL; TTL TO DATE: 60,400 (+5,200 GAL FOR P/T, CALB & PURGE).
~ AV IN 4-1/2" TBG @ 342 FPM, CTR @ 0.94; AV IN OH @ 368 FPM, CTR @ 0.95.
===============================================================================================================================================
BHA #17 (TURBINE LATERAL BHA):
- HTC PDC TURBINE BIT SN#(7918171) 1.25 DEG AKO XP TURBINE.
- GR @ 42.31 FT, D+I @ 38.4 FT.
===============================================================================================================================================
LATERAL INFO:
~ L 0-1-1 (UNZ-C) @ 95 DEG AZM: 1,211 FT.
~ L 0-1-1-1 (UNZ-C) @ 106 DEG AZM: 708 FT.
~ L 0-1-1-1-1 (UNZ-C) @ 106 DEG AZM: 16 FT.
===============================================================================================================================================
SERVICE SUPPORT: EQUIPMENT/PERSONNEL (DRSS# 1004305735 & 1004305740, 1004317923 & 1004317925, 1004326915 & 1004326921).
~ VACUUM TRUCKS: 8 TRUCKS - DAILY LOADS HAULED: 8 TOTAL DAILY VOLUME: 1136 BBLS; TTL: 157 LOADS HAULED.
===============================================================================================================================================
~ DRILLS:
===============================================================================================================================================
NEXT LOCATION:
~ WAQR-09: PRE-WORKOVER MEETING CONDUCTED ON (N/A). LAST VISIT 04/07/2024, NO STRIP OUT WORK NEEDED. 0% CIVIL WORK PROGRESS. TCA= NA PSI & CCA= NA PSI.
~ KSAB-01: PRE-WORKOVER MEETING CONDUCTED ON (N/A). LAST VISIT 01/16/2024, NO STRIP OUT WORK NEEDED. 0% CIVIL WORK PROGRESS. TCA= NA PSI & CCA= NA PSI.
~ HRDH-1844: PRE-WORKOVER MEETING CONDUCTED ON (N/A). LAST VISIT 06/07/2024, NO STRIP OUT WORK NEEDED. 0% CIVIL WORK PROGRESS. TCA= NA PSI & CCA= NA PSI.
===============================================================================================================================================
DAILY SURVEY
MUD DATA

MUD RADIAGREEN CAUST DUOVIS-NS CLAYSEAL


TREATMENT 6 ( 55GL ) 4 ( 50LBP ) 2 ( 25KG ) 90 ( GAL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
31 17,338 17,419 DP Av DC Av Bit HHP N/A N/A M233 3.625 HTC
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7918171 DD205XYV1 5 x 12 / 0.552
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 3.625 1 0.75 2-3/8 PAC 7918171
2 Turbine NEY 3.125 1 3.125 2.12 23.84 2 3/8 REG 2 3/8 PAC 0.5 53499/53503
DRILL STRING 3 Drilling Cycle Disconnector SDM 3.125 1 3.125 1 3.95 2 3/8 REG 2 3/8 REG 1 0715-01
4 Float Sub SDM 3.125 1 3.125 1 1.38 2 3/8 REG 2 3/8 REG 1 SN025
5 Measurement While Drilling (MWD) SDM 3.125 1 3.125 17.92 18.86 SN024
6 Orienter SDM 3.125 1 3.125 1 16.5 ACME ACME 2.2 016
7 Dual Ball Valve Sub SDM 3.125 1 3.125 1 4 ACME ACME 0 SN021A
8 Drilling Head SCT 3.125 1 3.125 1.3 7.73 ACME ACME 2.5 SN001
9 HUK (Head-up Kit) SDM 3.125 1 3.125 1.3 2.02 ACME ACME 0 SN050
10 Coil Tubing SCT 2.375 1 3 1 18,971 CDP CDP 0 40454-1

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/11/2024 N/A N/A N/A N/A 444 PRE-TOUR

Company TGC SDM RUE STO XLG RIG STO OTH ARM

Category CTRG DPDS H2S IOS MLS OTHR UBD VAC WSC
PERSONNEL
28 5 7 14 2 15 17 8 2
Total
AND SERVICES No. of Persons
98
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 12 24 24 5 24

Standby/Tankers
TRUCKS/BOATS
AB-0712

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1200 295 487 N/A N/A N/A

REPAIR ASAP Instrumentation Other Reporter

Saudi Aramco: Confidential Page 3 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1867 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/20/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 4 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1114 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:21 06/04/2024 - 07/04/2024
Report ID: OPERLMTDMRREP

SCTD-7 @ SDGM-1114 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (TO DRILL THREE Foreman(s)ALZOWAYED, ALAA JASSIM
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24054-1114) LATERALS ACROSS KHUFF-B Engineer BIN AMMAR, YOUSEF ABDULMOHSEN
SCTD-7
RESERVOIR) Manager KHAMEES, SHAKER ABDUL MAJEED
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: RIG FORMAN VSAT CONTRACTOR /CLERK VSA T
Date: Tuesday 06/18/2024 SDGM-1114 (0-3) SDGM_1114_3 577-4765 577-4763

Last 24 hr operations Next 24 hr plan


RIH W/ MOTOR BHA, MOTOR DRILL KHUFF-B L 0-3 AS PER GOC. POH RIH W/ TURBINE BHA, TURBINE DRILL KHUFF-B L 0-3 AS PER GOC.
Location Next Location
THE WELL IS LOCATED 0.1 KM S87E OF SDGM-1115 AND 0.325 KM N60E OF SDGM-57. SDGM-1223
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
13,345 Size 12397 11470 Size 11,354 12,615 12,408 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
13285 (Date) 100 60 96
8.6 (06/09/2024@1500 )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

UNDEPLOY BHA #7 (APP) FLUSH STACK WITH 20 BBLS CAUSTIC WATER.


0500 - 0600 1 0-3 3 5/8 N DRLG HT BHA RIG 13285 13285
~ RUN COIL TO GROUND AND UTT COIL: 0.199": (ABOVE MINIMUM).
~ DSM MILL CAME OUT IN GAUGE.

0600 - 0730 1.5 0-3 3 5/8 N DRLG HT BHA RIG 13285 13285 PJSM, DEPLOY BHA#8 MOTOR ASSY APP, WHP @ 0 PSI.
~ D&M TEST TOOLS IN RISER - OK.

RIH WITH BHA#8 APP.


~ OPEN WELL AT SURFACE & SET PR AT 0.25 BPM.
~ PUMP COIL TREATMENTS APP.
~ WEIGHT CHECK EVERY 3,000 FT MD.
~ TEST TOOLS AT 1,000 FT, 5,000 FT, 10,000 FT (GOOD TEST).
0730 - 1300 5.5 0-3 3 5/8 N DRLG TI CTBG RIG 13285 13285 0 13285 ~ CORRELATION @ 12,100 -12,170' (CORRECTION: +27 FT).
~ WEIGHT CHECK AT 12,400 FT: 54K / 47K (UP/DN).
~ STAGE UP PR TO 2.2 BPM, SLOWLY WASHDOWN, INTERVAL (12,479 - 12,481
FT MD) ** NO HELDUP OBSERVED.
~ MAKE SEVERAL PASSES- NO ISSUE.
~ PASS SHOE WITH NO ISSUE, CONT. RIH TO BTM.
~ INSPECT JUNK CATCHER : CLEAN.

MOTOR DRILLING KB01 L-0-3 AS PER GOC.


~ PR: 101 GPM= 343 RPM, CP: 2,830 PSI. DIFF PRESS: 352 PSI.
~ WEIGHT CHECKS & SWEEPS AS REQU'D. ECO-LUBE@ 0.33%.
~ GR: 0 MMSCFD, WHP: 64 PSI, TCA: 284 PSI, BHP: 5,498 PSI, BHT: 289F, H2S:
0%, CO2: 0%,
1300 - 2000 7 0-3 3 5/8 N DRLG DMS MMOT SDM 13285 13345
~ TREAT WITH: SCAVENGER= 0 BPH: CAUSTIC 0 BPH.

* AT 13,291 FT, MOTOR STALL- PU & REST DRLG PARAMETERS.


* WT CHECK OBSERVED O/P OF 4-6KLBS AT 13,290 FT.
* INCREASED ECO- LUBE TO 0.33% DUE TO WEIGHT STACKING.
* POH FOR NEW BHA DUE TO LOW ROP.

POOH TO SURFACE.
2000 - 0130 5.5 0-3 3 5/8 N DRLG TO CTBG RIG 13345 13345 13345 0 ~ SHUT IN WELL AT 6,000 FT, SIWHP = 0 PSI.
~ ENGAGE X-TAG& TAG STRIPPER
~ INSPECT JUNK CATCHER: CLEAN.

HPJSM, UNDEPLOY BHA#8 (APP).


~ FLUSH STACK WITH 20 BBLS CAUSTIC WATER.
~ CHANGE STRIPPER RUBBERS AND INSPECT M-SEALS -GOOD.
0130 - 0300 1.5 0-3 3 5/8 N DRLG HT BHA RIG 13345 13345
~ RUN COIL TO GROUND AND CHECK MINIMUM COIL THICKNESS ON UTT
READING: "0.199" (ABOVE MINIMUM).
~ D&M BENCH TEST NEW TOOL COMMUNICATION THRU COIL ON GROUND -
GOOD.

0300 - 0400 1 0-3 3 5/8 N DRLG HT BHA RIG 13345 13345 PJSM, DEPLOY BHA#9 TURBINE ASSY APP, WHP @ 0 PSI.
~ D&M TEST TOOLS IN RISER - OK.

RIH WITH BHA#9 APP. ONGOING AT REPORT TIME.


0400 - 0459 1 0-3 3 5/8 N DRLG TI BHA RIG 13345 13345 0 4000
~ OPEN WELL AT SURFACE & SET PR AT 0.25 BPM.
~ PUMP COIL TREATMENTS APP.
~ WEIGHT CHECK EVERY 3,000 FT MD.
Workover Objectives
Foreman Remarks

SGA1: 1.5 KM S, SGA2: 2.5 KM W.


-

COIL STRING # 40588-1

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1114 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:21 06/04/2024 - 07/04/2024
Report ID: OPERLMTDMRREP

~ COIL LENGTH: 18,511 FT, E-LINE LENGTH: 18,921 FT, SLACK: 2.2%, VOL: 65.7 BBLS
~ TTL DRILLED FOOTAGE: 10,268 FT DAILY RUN FOOTAGE: 14,232 FT, ACCUM RUNNING FOOTAGE: 300,285 FT, HIGHEST FATIGUE: 21.90% @ 12,446'.
-

RUNS SINCE LAST SLACK MANAGEMENT: 9


-

LATERAL FOOTAGE:
~ L 0-1 KHUFF-B 288 DEG AZIM = 730 FT
-

BHA:

BHA#8: RR HTC (SN: 7917547) & 1.5 DEG AKO MOTOR (SN: 1385573), 3.4 REV/GAL, DCD 20K.
~ D+I @ 26.02 FT, GR @ 29.93 FT.

BHA#9: BHA#8: RR HTC (SN: 7918517) & 1.5 DEG AKO TURBINE (SN: 53498K/53502K), 23 REV/GAL, DCD 20K.
~ D+I @ 38.50 FT, GR @ 42.41 FT.
-

~ DAILY FLARED: N/A MMSCF, (TTL: N/A MMSCF)


~ DAILY CONDENSATE PRODUCED: N/A BBLS (TTL: N/A BBLS) ; BURNED: N/A BBLS (TTL: N/A BBLS)
~ EXPORT LINE PRESSURE: NA.
~ PRODUCTION LINE: NA.
~ FLARING REASON: OPTF NOT READY.
-

~ N2 ON LOCATION: 37,600 GALLONS, DAILY N2 USAGE = 0 GALLONS, CUMULATIVE N2 USAGE = 16400 GALLONS. (N2 PT = 5000 GAL, PURGE = 0 GAL)
-

SERVICE SUPPORT: EQUIPMENT/PERSONNEL:


~ DRSS# 1004332471 & DRSS# 1004332473
~ VACUUM TRUCKS: 6, DAILY LOADS HAULED: 12 LOADS, TOTAL: 43 LOADS.
-

DRILLS:
-

NEXT LOCATION :
~ SDGM-1185: PRE-WORKOVER MEETING CONDUCTED ON 5/15/2024. CIVIL WORK 70%, STRIP OUT: NOT STARTED - LAST VISIT 6/14/2024
~ SDGM-1225: PRE-WORKOVER MEETING CONDUCTED ON 3/24/2024. CIVIL WORK 0%, STRIP OUT: 90% - LAST VISIT 6/12/2024
~ SDGM-1223: PRE-WORKOVER MEETING CONDUCTED ON 5/15/2024. CIVIL WORK 0%, STRIP OUT: NOT STARTED - LAST VISIT 5/28/2024
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF 0 0 API 0 0 Volts 0 11 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
70 0 HTHP 100 0 0 0/0 WTRGEL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
63
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF 0 0 API 0 0 Volts 0 11 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
70 0 HTHP 100 0 0 0/0 WTRGEL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
63

MUD CAUST DUOVIS-NS ECO-LUBE C-RN477


TREATMENT 1 ( 50LBP ) 6 ( 25KG ) 4 ( 55GL ) 1 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
59 13,345 13,345 DP Av DC Av Bit HHP N/A N/A M233 3.625 HTC
Pressure GPM Jet Vel N/A N/A 0 I-Row O-Row DC Location Bearings
N/A 110 N/A N/A N/A N/A N/A N/A
Serial Number Type Jets TFA
7918517 DD205XYV1 POOH Reason N/A
Gauge Other
BIT DATA N/A

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
53RR 13,285 13,345 DP Av DC Av Bit HHP N/A N/A M233 3.625 HTC
Pressure GPM Jet Vel N/A N/A 0 I-Row O-Row DC Location Bearings
N/A 101 N/A 1 4 BT S X
Serial Number Type Jets TFA
7917547 DD205X POOH Reason N/A

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-1114 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:21 06/04/2024 - 07/04/2024
Report ID: OPERLMTDMRREP

Gauge Other
2

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 7 N/A N/A N/A N/A Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs
0

DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 3.625 1 0.78 7918517
2 Turbine NEY 2.875 1 2.875 1 24.27 2 3/8 PAC 2 3/8 REG 400 53498/53502
3 Drilling Cycle Disconnector SDM 3.125 1 3.125 1.75 3.93 2 3/8 REG REG 0 SN028
4 Float Sub SDM 2.875 1 2.875 1.5 1.45 2 3/8 PAC 2 3/8 REG 0 SN023
5 Measurement While Drilling (MWD) SDM 3.125 1 3.125 17.92 18.86 SN006
6 Orienter SDM 3.125 1 3.125 1 16.5 ACME ACME 0 002
7 Dual Ball Valve Sub SDM 3.125 1 3.125 1 4 ACME ACME 0 SN037
8 Drilling Head SDM 3.125 1 3.125 1.3 7.73 ACME ACME 0 SN027
9 HUK (Head-up Kit) SDM 3.125 1 3.125 1.3 2.02 ACME ACME 0 SN052
10 Coil Tubing SCT 2.375 1 3 1 18,711 CDP CDP 0 40588

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/09/2024 N/A SEASONAL NA SEASONAL 371 2X PRE-TOUR +
PJSMS

Company ARM TGC SCT SDM RUE STO RIG STO OTH ARM

Category OTHR CTRG COIL DPDS H2S IOS OTHR UBD VAC WSC
PERSONNEL
4 29 12 4 6 5 12 20 7 1
Total
AND SERVICES No. of Persons
100
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 24 24 24 0 24 10 24

Standby/Tankers
TRUCKS/BOATS
DH-7584

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2000 201 479 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1052 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:21 05/18/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

SCTD-8 @ HRDH-1052 Limited Morning Report for 06/18/2024


Objective : (DRLG 3 Foreman(s)ALI, ALI MOHAMMAD
D&WO Morning Report (Service Providers View) Rig Charge #: LATERALS IN KHUFF-C Engineer ALQAHTANI, ABDULLAH NASSER
Copyright 2024 Saudi Aramco. All Rights Reserved SCTD-8 (71-24058-1052) RESERVOIR) Manager KHAMEES, SHAKER ABDUL MAJEED
Daily Onshore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: +822167771 4200 013-572-42 59 /CLERK VSA
Date: Tuesday 06/18/2024 HRDH-1052 (0-2-3) HRDH_1052_5 T
013-572-42 52

Last 24 hr operations Next 24 hr plan


TURBINE DRILL L 0-2-3 (KC-8) AS PER GOC. TD WELL. POH. UN-DEPLOY BHA#4.FLOW BACK THE WELL. FLUSH AND PURGE. NIPPLE DOWN TOWER & BOP.
SET BPV. RELEASE RIG.
Location Next Location
HRDH-1052 HRDH-2322
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
14,961 Size 13365 12144 Size 11,320 12,559 12,091 Top
Formations Comments
9 5/8 4 1/2 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
14570 (Date) 100 391 273
18.7 (05/30/2024@1300 )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

TURBINE DRILL LATERAL L-0-2-3 KHUFF (C-8) AS PER PLAN:

~ PR@ 84 GPM, RPM @ 1,875 RPM, CP @ 642 PSI, WOB @ 0.5-1.8 KLB.
~ BHP @ 3,316 PSI, DIFF @ 867 PSI, WHP @ 364 PSI, TCA @ 2,688 PSI, DTF @
269 DEG F.
0500 - 1000 5 0-2-3 3 5/8 N DRLG DMS TBINE SDM 14570 14700
~ GR @ 10.0 MMSCFD, H2S @ 5,000 PPM (0.5 %), CO2@ 0.5%.
~ RETURNS TREATMENT: 0.75 DR/HR SAMMA SCAV, 0.75 PAIL/HR CAUSTIC
SODA.
~ PUMP 3 BBLS SWEEP EVERY 1/2 HR, ECO LUBE AT 0.66%.

NOTE: INCREASE ECO-LUBE TO 0.75% DUE TO STACKING WEIGHT ISSUE.

PERFORM 1,000 FT LONG WIPER TRIP.


1000 - 1200 2 0-2-3 3 5/8 N DRLG ST CTBG RIG 14700 14700 14700 13700
~ UP/DN WT: 72/48 KLB: (GOOD AND CLEAN HOLE)
~ INSPECT JUNK CATCHER: 6 KG OF DRILLED CUTTINGS.

TURBINE DRILL LATERAL L-0-2-3 KHUFF (C-8) AS PER PLAN:

~ PR@ 91 GPM, RPM @ 2,015 RPM, CP @ 1,076 PSI, WOB @ 0.5-1.8 KLB.
~ BHP @ 3,335 PSI, DIFF @ 962 PSI, WHP @ 350 PSI, TCA @ 2,438 PSI, DTF @
269 DEG F.
~ GR @ 10.6 MMSCFD, H2S @ 8,000 PPM (0.8 %), CO2@ 0.5%.
~ RETURNS TREATMENT: 0.75 DR/HR SAMMA SCAV, 0.75 PAIL/HR CAUSTIC
1200 - 2300 11 0-2-3 3 5/8 N DRLG DMS TBINE SDM 14700 14961
SODA.
~ PUMP 3 BBLS SWEEP EVERY 1/2 HR, ECO LUBE AT 0.75%.

** PICK UP SEVERAL TIME DUE TO STACKING WEIGHT ISSUE, NO FURTHURE


PROGRESS.

NOTE: TD L-0-2-3 AT 14,961 FT MD/ 12,281 FT TVD, 89 DEG INC. AND63.6 DEG
AZIM DUE TO STACKING WEIGHT ISSUE.

POH WITH BHA #4 TO SURFACE FOR FLOW-TEST.


2300 - 0400 5 0-2-3 3 5/8 N DRLG TO CTBG RIG 14961 14961 14861 160
~ SHUT-IN WELL @ 5,000 FT.

~ INSPECT JC; 10 KG OF DRLLED CUTTINGS.


0400 - 0459 1 0-2-3 3 5/8 N DRLG TO CTBG RIG 14961 14961 160 0
POH & X-TAG , TAG STRIPPER ==> INC @ RPT.
Workover Objectives
Foreman Remarks

~ SGA #1: 2.7 KM NE FROM LOCATION.


~ SGA #2: 2.7 KM NW FROM LOCATION.
===========================================================================================================================
~ ELEVATIONS: ADC-16 ODF 37.4 FT, SCTD-8 DF 93.57 FT, CORRECTION: -56.43 FT.
===========================================================================================================================
COIL STRING # 40353-1 (TENARIS 0.204" HT-110 MONOBORE).
~ CT LENGTH = 18,913 FT, E-LINE LENGTH = 19,461 FT, SLACK @ 2.90%, CT VOL @ 68 BBL. COIL LIFE @ 16.3% @ 113,438 FT.
~ CT DRLG FT: 11,332 FT, CT DAILY RUNNING FOOTAGE: 2,239 FT, CT CUMULATIVE FT: 364,633 FT.
~ TRIPS F/ LAST SLACK MGT: 4.
===========================================================================================================================
GENERAL WELL INFO:
~ GAS: DAILY GAS PRODUCED: 11.51 MMSCF (TTL: 112.93 MMSCF)
~ GAS: DAILY FLARED @ 11.51 MMSCF (TTL: 112.93 MMSCF).
~ DAILY EXPORTED: 0.0 MMSCF (TTL: 0.0 MMSCF).
~ CONDI: DAILY CONDI PRODUCED: 167 BBLS (TTL: 2,869 BBLS)
~ CONDI; DAILY FLARED: 167 BBLS, TTL FLARED: 2,869 BBLS.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1052 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:21 05/18/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

~ DAILY EXPORTED: 0.0 BBLS (TTL: 0.0 BBLS).


~ PODUCTION LINE: NOT AVAILABLE.
~ FLARING REASON: PRODUCTION LINE ISOLATED AS PER PRODUCING.
~ N2 ONSITE: 11,254 GAL; DAILY USED: 0 GAL; TTL TO DATE: 18,450 (N2 PT = 5,900 GAL, PURGE = 3,900 GAL).
~ AV IN 4-1/2" TBG @ 207 FPM, CTR @ 0.964 AV IN OH @ 276 FPM, CTR @ 0.969.
~ H2S @ 0.5%, CO2 @ 0.5%
~ TREAT WITH: G-SCAV: 0.75 DR/HR ; CAUSTIC 0.75 PPH,
===========================================================================================================================
BHA#4: (TURBINE LAT BHA):
- RR HTC PDC TURBINE BIT # (7918290) & 1.25 DEG AKO XP TURBINE.
- GR @ 40.01 FT, D+I @ 36.13 FT.
===========================================================================================================================
LATERAL INFO:
~ L 0-2 KHUFF (C-4/5) @ 35 DEG AZM; 1,284 FT.
~ L 0-2-1 KHUFF (C-8) @ 35 DEG AZM; 590 FT.
~ L 0-2-2 KHUFF (C-4/5) @ 65 DEG AZM; 1,698 FT.
~ L 0-2-3 KHUFF (C-8) @ 65 DEG AZM; 2,141 FT.
===========================================================================================================================
SERVICE SUPPORT: EQUIPMENT/PERSONNEL: (DRSS# 1004319391: 1152 TRA/1176 TRA/1188 TRA/ 1158 TRA) & (DRSS# 1004319393: 3681 BRA/4358 BRA)
~ VACUUM TRUCKS: 6 TRUCKS - DAILY LOADS HAULED: 18 TOTAL DAILY VOLUME: 3,240 BBLS; TTL: 192 LOADS HAULED.
===========================================================================================================================
~ DRILLS AND SAFETY:
===========================================================================================================================
NEXT LOCATION :
~ HRDH-2322: PWM @ 5/26/2024, LAST VISIT @ 6/11/2024, CIVIL WORK @ 100%, STRIP OUT; N/A, PRODUCTION LINE (LINE READY), PMT WORK: NA. TCA & CCA PRESSURE = ZERO PSI.
~ HRDH-2408: PWM @ 6/11/2024, LAST VISIT @ 6/11/2024, CIVIL WORK @ 0%, STRIP OUT @ 0%, PRODUCTION LINE @ 100%, PMT WORK: NA
~ HRDH-2259: PWM @ 5/26/2024, LAST VISIT @ 5/26/2024, CIVIL WORK @ 0%, STRIP OUT @ 0%, PRODUCTION LINE @ 0%. PMT WORK: NA
~ HRDH-1823: PWM @ 5/23/2024, LAST VISIT @ 5/23/2024, CIVIL WORK @ 0%, STRIP OUT @ NA , PRODUCTION LINE @ 0%.
===========================================================================================================================
DAILY SURVEY
MUD DATA

MUD CAUST DUOVIS-NS ECO-LUBE S-SCAV W


TREATMENT 2 ( 50LBP ) 8 ( 25KG ) 15 ( 55GL ) 17 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
20RR 14,608 16,749 DP Av DC Av Bit HHP 1 1,875 M233 3.625 HTC
Pressure GPM Jet Vel N/A N/A 0 I-Row O-Row DC Location Bearings
880 84 N/A N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7918290 DD205XYV1 POOH Reason N/A
Gauge Other
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 104 N/A 69 45 N/A Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 3.625 1 0.75 7918290
2 Turbine NEY 3.125 1 3.125 2.12 23.84 2 3/8 REG 2 3/8 PAC 0.5 53500K/5350
DRILL STRING 3 Drilling Cycle Disconnector SDM 3.125 1 3.125 1.75 3.95 2 3/8 REG REG 0.5 SN024
4 Float Sub SDM 3.125 1 19.875 3.5 1.38 7 5/8 REG 7 5/8 REG 0.6 SN051
5 Measurement While Drilling (MWD) SDM 3.125 1 28 3.06 17.92 7 5/8 REG 7 5/8 REG 1.8 SN035
6 Orienter SDM 3.125 1 3.125 1 16.5 ACME ACME 2.2 012R
7 Dual Ball Valve Sub SDM 3.125 1 9.5 2.813 4 7 5/8 REG 7 5/8 REG 2.3 SN023
8 Drilling Head SCT 3.125 1 3.125 1.3 7.73 ACME ACME 2.5 CRE1023
9 HUK (Head-up Kit) SDM 3.125 1 8.5 3 2.02 6 5/8 REG 6 5/8 REG 2.6 SN001
10 Coil Tubing SCT 2.375 1 3 1 18,971 CDP CDP 40355-1

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/13/2024 N/A N/A N/A N/A 69 PRE-TOUR

Company TGC SCT SDM RUE STO RIG ARN STO OTH ARM

Category CTRG COIL DPDS H2S IOS OTHR OTHR UBD VAC WSC
PERSONNEL
28 15 4 6 4 14 1 20 6 1
Total
AND SERVICES No. of Persons
99
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24 10 24

Standby/Tankers
TRUCKS/BOATS
dh-3287

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2500 421 220 N/A N/A N/A

REPAIR ASAP Instrumentation Other Reporter

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1052 WORKOVER-4 BI-60
Print Date: 06/18/2024 06:21 05/18/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

Computer, Communication & V-Sat Issues


NO SCANNER ON LOCATION, ONLY MONO-COLOR PRINTER

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NEW RIG MOBILIZATION BI-MOB
Print Date: 06/18/2024 06:21 05/22/2024 - 07/15/2024
Report ID: OPERLMTDMRREP

SCTD-9 @ *MOBILIZATION* Limited Morning Report for 06/18/2024


Objective : (MOBILIZATION) Foreman(s)SEDDIKI, BRAHIM MOHAMED TAYEB
D&WO Morning Report (Service Providers View) Rig Engineer ALMAGHTHAWI, ABDULAZIZ SALEM
Copyright 2024 Saudi Aramco. All Rights Reserved Charge #: Manager KHAMEES, SHAKER ABDUL MAJEED
SCTD-9
()
Daily THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well +882167771 4284 0135774614 /CLERK VSA
Wellbores:
Date: Tuesday 06/18/2024 *MOBILIZATION* T
0135774610

Last 24 hr operations Next 24 hr plan


RIG DOWN SDGM-1058 MOVE MAIN CAMP TO UTMN-2025, CONT RIG DOWN ON SDGM-1058.
Location Next Location
94 KM SW FROM DHAHRAN MAIN GATE SDGM-1058
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
12,960 Size 12957 12516 Size 10,190 12,954 12,516 Top
Formations Comments
4 1/2 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12960 (Date)
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM, RIG DOWN OPERATION SDGM-1058

HELD SAFETY MEETING WITH CREW DISCUSSED SUPERVISION , PINCH POINTS &
FINGER INJURIES, PROPER HANDLING & THE USE OF HAND-FREE TOOLS , LINE OF
FIRE , WORK AT HEIGHT , HEAT STRESS AND STOP WORK AUTHORITY.

UBD:

- RIG DOWN PRODUCTION LINE.


- RIG DOWN COLD FLARE LINE.
0500 - 0459 24 PRE M MAIN PJSM NA RIG - RIG DOWN BURNER AIR AND CONDI LINES.
- RIG DOWN FLARE LINE AND SKIM TANK SUITE CASES.
- LOWER FLARE STACK AND SECURE SAME FOR MOVE.
- GENERAL R/D OPERATION.

CTD:

- CMPLT ADJUSTUNG FVD SETTINGS.


- LAY DOWN AND SECURE INJECTOR FOR MOVE.
- FOLD AND PREPARE BHA HANDLER FOR MOVE.
- LOWER MUD TANK ROOF AND SECURE SAME.
- CONT GENERAL RIG DOWN AND PRAPRE TO MOVE.
Foreman Remarks

SGA# 1 : 5.4 KM N ON BLACK TOP


SGA#2 : 6.4 KM W ON BLACK TOP
----------------------------------------------------------------------------------------------------------------------------------------------
~ MUJAHID MUNIR; ID#8148510; ARAMCO CLERK ON LOCATION SINCE 05/28/2024.
-----------------------------------------------------------------------------------------------------------------------------------------------
~ HELD MEETING FOR SIMOPS AT SCTD-2 ON JUNE 16,2024.
----------------------------------------------------------------------------------------------------------------------------------------------
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A N/A N/A N/A PRE-TOUR
MEETINGS + PJSMS

Company

Category
PERSONNEL
AND SERVICES No. of Persons Total
INFORMATION
Personnel on Loc. Hrs.

Operating Hours.

Standby/Tankers
TRUCKS/BOATS
dh-3292

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NEW RIG MOBILIZATION BI-MOB
Print Date: 06/18/2024 06:21 05/22/2024 - 07/15/2024
Report ID: OPERLMTDMRREP

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-648 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/05/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

SDH @ MRJN-648 Limited Morning Report for 06/18/2024


Objective : (EXTEND 7" CASING Foreman(s)DAWOUD, AHMED MOHAMED / EZZ ELARAB TAHA, AHMED SAMIR
D&WO Morning Report (Service Providers View) Rig Charge #: TO SURFACE AND COMPLETE Engineer BAJUNAID, MUAATH SALEM
Copyright 2024 Saudi Aramco. All Rights Reserved SDH (72-23073-0648) THE WELL WITH 7" Manager SHEHRI, TALAL HASAN
Daily OffShore PRODUCTION PACKER, GLM AND RIG FORMAN VSAT OTHER VSAT CONTRACTOR
Well Wellbores: PDHMS) /CLERK VSA
(0500-0500) Saudi Aramco 3788235 3788237
Date: Tuesday 06/18/2024 MRJN-648 (0) MRJN_648_0 T
3788236

Last 24 hr operations Next 24 hr plan


PERFORM MAJOR WELLHEAD WORK. PERFORM MAJOR WELLHEAD WORK. N/U RISER & BOPE. N/U BELL NIPPLE. PT BOP, UNSET 9-5/8"
RTTS. CHC. POH & L/D RTTS. RIH UNSET 9-5/8" RBP. BULLHEAD. CHC. POH.
Location Next Location
MRJN-648 IS LOCATED IN THE SOUTH-EAST CONDUCTOR OF PLATFORM MRJN-640/649. MRJN-647
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
13,000 Size 9017 6851 Size 8,744 11,704 6,834 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
13000 (Date) 100 0 240
12.1 (06/06/2024@0300 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0630 1.5 0 POST N BOP ND SPOOL RIG 13000 13000 HPJSM, NU 13-5/8" 3K ADAPTOR FLANGE WITH EXISTING WELLHEAD, MU
LANDING JT & TDS

0630 - 0700 0.5 0 POST N WH PJSM NA RIG 13000 13000 HOLD PRE-JOB SAFETY MEETING WITH ALL PERSONNEL INVOLVED IN WELLHEAD
WORK. PERFORM GAS TEST IN WELLHEAD AREA.

HOT HEAD PERFORM THE FOLLOWING:


- CUT 30" CONDUCTOR.
- TAQA PERFORM UT INSPECTION ON 18-5/8" CSG, OK.
- HOT TAPPING 18 5/8" CSG.
- HOT-HED CUT WINDOW THRU 18-5/8" CSG AND CHECK CEMENT BETWEEN 18-
5/8'' & 13 3/8" CSG FOUND SAME AT SURFACE.
- CLEANED OUT CEMENT BETWEEN 18-5/8'' & 13 3/8" CSG.
- TAQA PERFORM UT INSPECTION ON 13-3/8" CSG, OK.
- HOT TAPPING 13 3/8" CSG.
0700 - 1500 8 0 POST N WH OTH NA RIG 13000 13000
- HOT-HED CUT WINDOW THRU 13-3/8" CSG AND CHECK CEMENT BETWEEN 13
3/8" X 9 5/8" CSG, FOUND SAME AT SURFACE.
- CLEANED OUT CEMENT BETWEEN 13 3/8" & 9 5/8" CSG.
- ROUGH CUT 18-5/8" CSG CHECK WELLHEAD NO MOVEMENT.
- ROUGH CUT 13-3/8" CSG CHECK WELLHEAD NO MOVEMENT.
- ROUGH CUT 9-5/8" CSG & PERFORM UT INSPECTION ON 9-5/8" CSG.
- REMOVE WELLHAED.

- EXISTING BARRIERS IN THE WELL: 2 MECHANICAL BARRIERS (9-5/8" RBP AT


6000 ' & 9-5/8" RTTS AT 190').
1500 - 1730 2.5 0 POST N WH NU WH HTD 13000 13000
HOT HED FINAL CUT 18-5/8" CSG, 13-3/8" CSG & 9-5/8" CSG.

LOWER NEW 9-5/8" 40# L-80 CASING SECTION, ALIGN WITH 9-5/8" STUB. HOT
1730 - 2030 3 0 POST N WH OTH NA RIG 13000 13000
HED WELD SAME & ALLOW WELD TO COOL. TAQA INSPECT OK & DRIFT PAST
WELDED AREA WITH 8.5" FBM, NO OBSTRUCTION.

LOWER NEW 13-3/8" 68# L-80 CASING SECTION & ALIGN SAME WITH 13-3/8"
2030 - 2330 3 0 POST N WH OTH NA RIG 13000 13000
STUB. HOT HED WELD CSG STUB AND ALLOW WELD TO COOL. TAQA INSPECT OK.

2330 - 0230 3 0 POST N WH OTH NA RIG 13000 13000 NU 18-5/8" X 20-3/4" CIW LANDING BASE 3K WITH 2' OF 18-5/8" CASING WELDED
TO EXISTING STUB, ALLOW SAME TO COOL & TAQA PERFORM INSPECTION OK.
0230 - 0400 1.5 0 POST N WH OTH NA RIG 13000 13000
SET 13-3/8" CIW MANUAL SLIPS & ENERGIZE SEAL, OK.
0400 - 0459 1 0 POST N WH OTH NA RIG 13000 13000
FINAL CUT 13-3/8" CSG.
Workover Objectives
Foreman Remarks

RIG HEADING 330 DEG.


- WATER DEPTH 160'. AIR GAP = 50'.
- RIG FLOOR TO TUBING SPOOL = 54.15', ODF TO TUBING SPOOL = 51.60'. CORRECTION = -2.55'.
-

CURRENT PLATFORM MRJN 640/649


- SCOPE OF WORK: MRJN-644, 643, 645, 646, 641, 642, 647, 648 (8 WO WELLS GAS LIFT PROJECT)
- CURRENT WELL MRJN-648.
- NEXT WELLS MRJN-647.
- MRJN-646 COMPLETED & SUSPENDED FOR FLOW BACK OPERATION.
- MRJN-645 COMPLETED & SUSPENDED FOR FLOW BACK OPERATION.
- MRJN-644 COMPLETED & SUSPENDED FOR FLOW BACK OPERATION.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MRJN-648 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/05/2024 - 08/16/2024
Report ID: OPERLMTDMRREP

- MRJN-643 COMPLETED & SUSPENDED FOR FLOW BACK OPERATION.


- MRJN-641 COMPLETED & SUSPENDED FOR FLOW BACK OPERATION.
- MRJN-642 COMPLETED & SUSPENDED FOR FLOW BACK OPERATION . BEFORE FLOWBACK OPERATION COILED TUBING WILL CLEAN CEMENT ACCUMULATED
ABOVE JUNK CATCHER AND RETRIEVE TWO 3 1/2" JUNK CATCHER AND TWO ME PLUG WHICH SET AT 5799 FT AND 5829 FT.
-

* RELIEF WELLS:
- MRJN-722 SURFACE COORDINATES: N-3142012.91/ E-359622.58
- MRJN-98 SURFACE COORDINATES: N-3145536.00/ E-362613.00
- ZAMIL-LB-6 BARGE INSTALLED ME PLUG ON MRJN- 648 ON 12/19/2023.
-

* NEXT PLATFORM: MRJN 224/230, 252/254 PLATFORM


- RM-2024-4010656 CREATED ON 5/15/2024 PROPOSED MEETING DATE 5/29/2024 & HELD ON 06/04/2024.
- PLATFORM DEPRESSURIZATION REQUEST SEND EMAIL NOTIFICATION TO MRJN FIELD SERVICE ON 5/15/2024 .
- SEND EMAIL NOTIFICATION TO SHELF CONTRACTOR TO PREPARE FOR RIG MOVE MEETING ON 5/15/2024.
- CREATE CRM 8800022147 FOR SBS ON 5/15/2024.
-

- RIG CLERK MOHAMMED IQBAL MOHAMMED SAGAR BADGE#8288516 SINCE MAY 15, 2024.
-

* DRILLS.
- CONDUCT H2S, FIRE AND ABANDON DRILLS ON 06/08/2024.
- CONDUCT 2 TRIP DRILLS & PIT DRILLS ON 06/13/2024.
-

* PRESSURE TESTED 18 5/8" X 13 3/8" CCA TO 500 PSI DROPPED TO 180 PSI IN 30 MINUTES.
* PRESSURE TESTED 13 3/8" X 9 5/8" CCA TO 500 PSI DROPPED TO ZERO IN 10 MINUTES.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 0 API 0 0 Volts 0 10 373,950
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 82 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 18 0/0 0 135,000 0
62
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 0 API 0 0 Volts 0 10 375,335
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 82 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 18 0/0 0 135,500 0
63

MUD CAOH2 OXYGON


TREATMENT 2 ( 50LB ) 1 ( 50LBP )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/07/2024 N/A 12-14 KTS 3-5 FT CLEAR 350 TOURLY
NNW

Company HCB HCM HTD CSU SCP RIG BDF MSI ARM SJC BCR ARM

Category BRCR BRCR CSV CTRG PSSC RIG DFMS ISPCT OTHR PCS PRS WSC
PERSONNEL
1 2 4 12 2 49 1 1 1 1 2 2
Total
AND SERVICES No. of Persons
78
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 0 0 24 12 12 12 0 0 24

Standby/Tankers
TRUCKS/BOATS
TOPAZ KHUWAIR

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
813 1056 1312 2400 0 2015

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JRBT-16 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 04/05/2024 - 07/22/2024
Report ID: OPERLMTDMRREP

SINO-10 @ JRBT-16 Limited Morning Report for 06/18/2024


Objective : (PRIMARY TARGET IS Foreman(s)OGAGA, MICHAEL OVIE / ABA ALTAHEEN, ALI HADI
D&WO Morning Report (Service Providers View) Rig Charge #: HITH STRINGERS RESERVOIR & Engineer OMINI, PETER ITAM
Copyright 2024 Saudi Aramco. All Rights Reserved SINO-10 (75-24071-0016) UPPER FADILI RESERVOIRS) Manager HAWSAWI, ABDULLAH OMAR
Daily Onshore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 8821677712 222 578-4015 /CLERK VSA
Date: Tuesday 06/18/2024 JRBT-16 (0) JRBT_16_0 T
578-4017

Last 24 hr operations Next 24 hr plan


CONT'D L/D EXCESS DP, RIH W/SAMAA WBCO & NEG ASSY, CO CMT, CIRC, PERF -/+ TEST, REV, POOH W/FSC PACKER, L/D EXCESS DP, P/U & M/U 7" CO ASSY & RIH, CIRC, POOH W/7"
EQUALIZER LINER CO ASSY, PERF CBL LOG
Location Next Location
70KM AFTER AL-NUAIRYIA CITY, TAKE EXIT TO AL-ALYIA VILLAGE BRIDGE,AFTER BRIDG LEFT 41KM SKID ROAD AYFN-2
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,420 Last Csg Size MD TVD Size 7,073 Top
9 5/8 8094 8094 Formations Comments
7 Depth
RMNR 8,300
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ABAR 8,408
10420 (Date) 100 0 251 AB 8,483
64.8 (04/14/2024@1100 ) ABBR 8,525 13 FT DEEPER
BABR 8,606
ABCR 8,715 3 FT DEEPER
ABDR 8,870 8 FT DEEPER
TQMN 9,660
HDRR 9,740
LFDR 10,250 73 FT DEEPER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0700 2 0 EOW N DRLG TO SPDP RIG 10420 10420 837 0 CONT'D L/D BAKER 7" RUNNING TOOL WHILE L/D EXCESS DP & L/D BAKER
RUNNING TOOL
0700 - 0800 1 0 EOW N DRLG HT PEL RIG 10420 10420
P/U BAKER CMT HEAD & SOFT BREAK DP MADE UP AND L/D SAME

0800 - 1000 2 0 EOW N DRLG HT PEL RIG 10420 10420 HPJSM. M/U & RIH W/5 7/8" PDC BIT (NO NOZZLES), BIT SUB (NO FLOAT), 6 X 4"
HWDP, W/SAMAA-TECH 7" TOOLS AND 9 5/8" FSC PACKER AS PER TALLY.

1000 - 1530 5.5 0 EOW N DRLG TI STDP RIG 10420 10420 225 6983 RIH W/SAMAA FSC PACKER ON 5-1/2" @ 90'/MIN & BREAK CIRCULATION EVERY
2000'

1530 - 1630 1 0 EOW N CT CIRC MPMP RIG 10420 10420 WORK THRU 7" TOL AS PER SAMAA REP
*** CONFIRM 7" TOL @ 7073'

PUMP 50 BBL HI-VIS PILL, CIRC & COND MUD IN/OUT: 73 PCF. MEANWHILE R/U
1630 - 1830 2 0 EOW N CT CIRC MPMP RIG 10420 10420
SURFACE STEEL LINES FOR +TEST
*** WORK SCRAPER ACROSS 7" TOL
1830 - 1900 0.5 0 EOW N CT WBCO WBCL SAM 10420 10420
HPJSM. PRESSURE TEST NESR SURFACE LINES TO 6,000 PSI

1900 - 1930 0.5 0 EOW N CT WBCO WBCL SAM 10420 10420 HPJSM. PRESSURE TEST 7" LINER TO EQUIVALENT OF 141 PCF MUD W/73 PCF:
4260 PSI, OK. BLEED OFF IN STAGES

1930 - 2000 0.5 0 EOW N CT WBCO WBCL SAM 10420 10420 SLACK OFF & SET FSC PACKER AS PER SAMAA REP. CLOSE ANNULAR BOP &
APPLY 1000 PSI, OK. BLEED OFF PRESSURE

2000 - 2045 0.75 0 EOW N CT WBCO WBCL SAM 10420 10420 WAIT FOR RUBBER ELEMENT TO RELAX FOR 35 MINUTES AS PER SAMAA REP.
MEANWHILE R/U SES, TIW, PUP JOINT & SURFACE STEEL LINES

PUMP 50 BBL HI-VIS, DISPLACE STRING TO WATER (146 BBL) @ 3 BPM INTO THE
2045 - 2215 1.5 0 EOW N CT CIRC MPMP RIG 10420 10420
DRILL PIPE TO ACHIEVE THE REQUIRED DRAW DOWN FOR THE NEGATIVE LINER
LAP TEST

2215 - 2315 1 0 EOW N CT WBCO WBCL SAM 10420 10420 ALLOW PRESSURE TO STABILIZE AND WAIT FOR 60 MINUTES LET THERMAL
EFFECT TAKE PLACE

2315 - 2345 0.5 0 EOW N CT WBCO WBCL SAM 10420 10420 SET THE FSC PACKER BY LANDING ON 7" TOL AS PER SAMAA ENGINEER
INSTRUCTIONS. BLEED OFF PRESSURE IN STAGE

2345 - 0445 5 0 EOW N CT WBCO WBCL SAM 10420 10420 PERFORM NEGATIVE TEST AS PER ARAMCO PROCEDURE AND SEND SAME TO MGR
FOR APPROVAL

0445 - 0459 0.25 0 EOW N CT WBCO WBCL SAM 10420 10420 EQUALIZE DRILL STRING & UNSET THE PACKER. ALLOW RUBBER ELEMENT TO
RELAX FOR 35 MINUTES...@ MRT
Foreman Remarks

THE OBJECTIVE OF JRBT-16 WILL BE DRILLED AS OIL-DELINATION IN JRBT.


- PRIMARY TARGET IS HITH STRINGERS RESERVOIR & UPPER FADILI RESERVOIRS.
- SECONDARY TARGETS ARE ARAB-A, B, C & D RESERVOIRS.
- THE WELL WILL BE DRILLED TO TD 10.347' (+/-170' INTO LFR).
**************** ESTIMATED GEOLOGICAL HORIZONS INFORMATION *************

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JRBT-16 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 04/05/2024 - 07/22/2024
Report ID: OPERLMTDMRREP

CASING SETTING DEPTHS:


- 24" CSG SET @ 160 FT.
- 18 5/8" CSG SET @ 588 FT. (50 FT INTO RUS) .
- 13 3/8" CSG SET @ 3,840 FT. (50 FT INTO LAMS)
- 9 5/8" CSG SET @ 8,092 FT (50 FT INTO BASE MANIFA).
- 7" LINER TO BE SET @ 10,420 FT (170 FT INTO LOWER FADHILI RESERVOIR)
=================================================POB=====================================================
* ARAMCO FCT KHALID ALQARNI ID# 790706 ON LOCATION SINCE 06/04/2024.
* GHAZI ALOTAIBI ID # 790529 ON LOCATION SINCE 06/08/2024
* ARAMCO EDD HSE ADVISOR SACHIN.P ANAND ID#8034369 ON LOCATION SINCE 06/11/2024
* ARAMCO CLERK MERSHED ELHARBI ID#820792 ON LOCATION SINCE .06/11/2024
* ARAMCO DE OMINI, PETER ID#8616621 ON LOCATION SINCE 06/15/2024.
=============================================EXTRA TIME FOR LOGGING -RMD'S REQUIREMENT============================
* CIRCULATE AND DUMP FORMATION FLUID FROM WELLBORE - 5.5 HOURS
* CUMULATIVE TIME FOR 37 PRESSURE POINTS, 4 PVT, 4 GEOCHEM - 440 HRS (18.3 DAYS)

=============================================VACUUM TANKER ON LOCATION======================================


* VACUUM TANKER: PLATE NO-1115 DRSS# 1004293246
* VACUUM TANKER: PLATE NO-7823 DRSS# 1004293246
=========================================SAFETY ALERTS AND CONTRACTOR RIG VISIT====================================
LAST DISCUSSED HSE/OPERATIONAL ALERTS:
- EDD HSE ALERT 018-24 UNAUTHORIZED HOT WORK
- D&WO HSE ALERTS: WEEK #24 "69/70/71/72-24"
- EXT SAFETY ALERT 05-24 "FINGERS TRAPPED BY WINCH LINE" & "FOCUS ON THE ROAD".
- OPERATIONAL ALERT: 06-24.
-- DRILLS: 1 X PIT DRILL X TRIP DRILL X FIRE DRILL.
- DISCUSSED EDD BULLETIN 23-2024- WELDING AND CUTTING (W&C)
-SAFETY STANDOWN MEETING ON 06/09/2024- PERMIT TO WORK & ELECTRICAL ISOLATION
==========================================================================================================
- DAILY CONSUMED DIESEL= 46 BBLS. - MONTHLY CONSUMED DIESEL= 501 BBLS. WELL, YEARLY JRBT-16 CONSUMED DIESEL= 6842 BBLS.
===========================================================================================================
* NEXT LOCATION AYFN-2 LAST VISIT ON JUNE 3RD, READNESS 90% :
- WATER WELL: RMTN-804 - PREPARATION -ON GOING
- MAJOR WORKS - 90%
- RIZOR WIRE AND LINER FOR PITS NOT INSTALLED. (DRSS# 1004338893/1004338895)
- SKID ROAD MAINTENANCE TO JRBT-16- DONE

======================= RIG SINO-10 JOURNEY MANAGEMENT ===================================================


-CREATE JOURNEY MANAGMENT PLAN BEFORE LEAVING YOUR BASE.
-ALL CARS SHOULD HAVE SUPPLIE OF DRINKING WATER & CAR SURVIVAL KIT.
-48 KM SKID ROAD LEADING TO RIG SINO-10 , SKID ROAD HAS MEDUIM MOBILE SIGNAL.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 1 3.2 API 0 0 Volts 10.17 10 37,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 12 HTHP 88 29 0 10 / 12 NCPOL 2.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 24 12 8/9 0 200 13.4
82
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 1 3.4 API 0 0 Volts 10.17 10 37,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 12.4 HTHP 88 28 0 9 / 11 NCPOL 2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 25 12 8/9 0 200 13.2
80

MUD BICB CITRICACID


TREATMENT 10 ( 55LB ) 2 ( 50KG )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/11/2024 ACCUMULATOR MEDIUM N/A WINDY & 2,437 2 X SAFETY
DRILL X1 SUNNY MEETINGS

Company SPR TGC RIG OES BLH HMS ARM NCS ARM SAM

Category CSR CTRG RIG DFMS LHES MLS OTHR PCS WSC WBCS
PERSONNEL
4 17 54 1 1 2 5 3 2 1
Total
AND SERVICES No. of Persons
90
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 12 4 0 12 4 24 24

Standby/Tankers
TRUCKS/BOATS
AB-6507

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JRBT-16 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 04/05/2024 - 07/22/2024
Report ID: OPERLMTDMRREP

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 500 473 N/A N/A 3500

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
EMERGENCY DESKTOP RADIO NOT WORKING DUE TO NO AREA COVERAGE.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NYYM-508 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:21 05/24/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

SINO-11 @ NYYM-508 Limited Morning Report for 06/18/2024


Objective : (SCAB-OFF 4.5" Foreman(s)OGOKE, VICTOR CHUKWUEMEKA
D&WO Morning Report (Service Providers View) Charge #: LINER TO COVER WATER Engineer ALSHOOQ, ABDULLAH HANI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (61-24068-0508) AQUIFER.) Manager LAHLAH, AZZEDINE
SINO-11
Daily Onshore THURAYA RIG FORMAN VSAT RIG FORMAN VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12327 5746015 5746015
Date: Tuesday 06/18/2024 NYYM-508 (0-3-1) NYYM_508_4 FAX VSAT CONTRACTOR /CLERK VSA T
8807482 5746021/57 46018

Last 24 hr operations Next 24 hr plan


COMPL POOH, P/T BOPE, RIH NESR 3-1/4" BLADED MILL W/2-7/8" MOTOR & CONT CLEAN OUT 4- CONT TO CLEAN OUT 4-1/2" LINER W/3-1/4" CP MILL & MOTOR ASSY TO 12326'
1/2" LINER
Location Next Location
688 KM FROM DHAHRAN MAIN GATE. NYYM-515
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
12,478 Size 9656 8870 Size 9,377 12,427 9,081 Top
Formations Comments
7 4 1/2 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12478 (Date) 100 0 464
21 (05/28/2024@0400 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0900 4 0-3-1 POST N CT HT STRG RIG 12478 12478 CONT. POOH, BREAK OUT & L/D 2-7/8"DP FROM 2186' TO SURFACE
-KEEP FILLING HOLE W/66PCF BRINE FROM TRIP TANK.

0900 - 0930 0.5 0-3-1 POST N CT HT BHA RIG 12478 12478 BREAK OUT & L/D 3-1/4" CP MILL AND NESR 2-7/8" MOTOR ASSY
-OBSVR'D 3-1/4" CP MILL CAME OUT IN GOOD CONDITION.

HELD STAND UP SAFETY MEETING & DISCUSSED:


0930 - 1000 0.5 0-3-1 POST N CT PJSM STRG RIG 12478 12478
-TRIP & FALL HAZARD PREVENTION AWARENESS
-HEAT STRESS & FINGER INJURIES

P/T 13-5/8" 5M CLASS "A" BOPE & ALL RELATED EQUIPMENT AS FF:
- M/U 11''CIW TEST PLUG ON 2-7/8" DP, SET INTO TBG SPL + P/T ANNULAR &
UPPER PIPE RAM TO 300/3000 PSI, L/D 2-7/8" DP
1000 - 1330 3.5 0-3-1 POST N BOP BOPT BOP RIG 12478 12478 - M/U 11''CIW TEST PLUG ON 3-1/2" DP, SET INTO TBG SPL + P/T LOWER PIPE
RAM TO 300/3000 PSI.
- SEPARATELY P/T SHEAR RAM, KILL LINE, CHOKE LINE, SECONDARY KILL LINE,
INNER-KILL LINE & RELATED VALVES TO 300/3000 PSI.
- P/T CHOKE MANIFOLD & VALVES TO 300/3000 PSI

M/U NEW NESR 3-1/4"JUNK MILL CLEAN OUT ASSY AS FF:


NESR 3-1/4'' JUNK MILL+2-7/8'' NESR DH MOTOR W/SUB+2-7/8'' BOWEN CT
1330 - 1530 2 0-3-1 POST N CT HT BHA RIG 12478 12478 ULTRA JAR+2-7/8'' MOTOR HEAD ASSY + 2-7/8" X-OVER. M/U X-OVER AND KELLY,
F/TEST MOTOR AS PER NESR ENGR INSTRUCTIONS,
1 BPM---0 PSI, 1.5 BPM---75 PSI, 2 BPM---167 PSI, 2.5 BPM---300 PSI, 3 BPM---
430 PSI.

P/U & M/U CLEAN/DRIFTED NEW 2-7/8" DP IN SINGLES F/PIPE RACK + RIH W/
1530 - 2300 7.5 0-3-1 POST N CT HT STRG RIG 12478 12478 NESR 3.1/4" JUNK MILL AND NESR MOTOR ASSY. TO 2995'
- BREAK CIRCULATION EVERY 15 JOINTS.
- KEEP TRIP TANK RUNNING WITH 66 PCF BRINE

R/D 2-7/8" DP POWER TONG AND R/U 3-1/2" DP POWER TONG AND HANDLING
2300 - 2330 0.5 0-3-1 POST N CT HT PEL RIG 12478 12478
TOOLS.
-KEEP FILLING 66PCF BRINE FROM TRIP TANK.

HOLD PRE TOUR SAFETY MEETING & DISCUSSED:


2330 - 0000 0.5 0-3-1 POST N CT PJSM STRG RIG 12478 12478
-TRIP & FALL HAZARD PREVENTION AWARENESS
-HEAT STRESS & FINGER INJURIES

0000 - 0030 0.5 0-3-1 POST N CT HT STRG RIG 12478 12478 CONT. RIH WITH 3-1/4" CLEAN OUT ASSY. ON 3-1/2" HWDP FROM 2995' TO 3760'
-KEEP FILLING 66PCF BRINE FROM TRIP TANK.

CONT. RIH WITH 3-1/4" CLEAN OUT ASSY. ON 3-1/2" DP FROM 3760' TO 11591' -
0030 - 0459 4.5 0-3-1 POST N CT HT STRG RIG 12478 12478 ONGOING
-BREAK CIRCULATION EVERY 15 STDS.
-KEEP FILLING THE HOLE W/66PCF BRINE FROM TRIP TANK.
Workover Objectives
Foreman Remarks

ODF CORRECTION: 4.88 FT


======================
GOR: 0 SCF/STB & H2S: 0%
LFL: 0 M, RER: 00 PPM.
======================
HSE
- STOP CARDS: 15, PTW: (1), JSA: (1), NEAR MISS (0), CRITICAL LIFTING PLAN(0)
- DRILLS: SWA DRILL (0). FIRE DRILL(0),TRIP DRILL(1), PIT DRILL (2), H2S DRILL(0), FIRE PUMP TEST(2), MAN LOST DRILL(0), ACCUMULATOR DRILL (0)

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NYYM-508 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:21 05/24/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

PRE-TOUR SAFETY TOPIC DISCUSSED:


-TRIP & FALL HAZARD PREVENTION AWARENESS
-HEAT STRESS & FINGER INJURIES
======================================================================
POB:
- ARAMCO CLERK HASSAN ALMUBARAK #820918 ON LOCATION SINCE 6/12/2024
======================================================================
AUDIT
- 1ST QSI FOUND = 47 CLOSED = 47 OPEN = 0 CONDUCTED ON FEB.14.2024
- RSHEI FOUND = 48 CLOSED = 48 OPEN = 0 CONDUCTED ON MAR.28.2024
- WCI FOUND = 10 CLOSED = 10 OPEN = 0 CONDUCTED ON MAR.28.2024
- 2ND QSI FOUND = 48 CLOSED = 48 OPEN = 0 CONDUCTED ON APR.07.2024
=======================================================================
WATER DATA
- WATER SOURCE: NYYM-802.
- TOTAL WATER IN MUD SYSTEM: 1500 BBLS
- DAILY WATER RECEIVED/CONSUMED: 900/ 900 BBLS
========================================================================
- MUD/COMPLETION DIESEL IN BBLS:
- STOCK: 135 BBL
- CONSUMED: 0 BBL
- RECEIVED: 0 BBL
========================================================================
WELL CONTROL DATA
CP MILL DEPTH 11435 FT
STRING : 56 BBLS
ANULUS : 272 BBLS
4-1/2 LINER: 23 BBLS.
=========================================================================
WATER CONSERVATION IMPLEMENTED INITIATIVES
- REDUCED WATER PITS: N
- DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: N
- CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION: N
=========================================================================
NEXT WELLS:
- NYYM-515, KOM HELD. STRIP OUT: 100%, LOCATION READINESS 10%
- NYYM-500, KOM HELD. STRIP OUT: 0%, LOCATION READINESS 0%
==- ==- ====================================================================
RENTAL TOOLS:
- 120 X 2-7/8" DP FROM WFD ON LOCATION @ 05/27/2024.
- 140 X 2-7/8" DP HT PAC FROM WFD ON LOCATION @ 06/6/2024.
- 85 X 4" HWDP FROM WFD ON LOCATION @ 06/7/2024.
- 4-3/4 DRLG JAR SN# HMJ-475-097 FROM NAPESCO ON LOCATION @ 05/28/2024.
==========================================================================
- ECC HAS RADIO COMMUNICATION FUNCTIONAL,
==========================================================================
ARAMCO VEHICLE SERVICE DETAILS
- ARAMCO CAR WITH NUMBER AB-6417 NEXT SERVICE DUE JUNE 28, 2024.
===========================================================================
JOURNEY MANAGEMENT PLAN:
- PRIOR ENTERING THE SKID ROAD CALL YOUR COMPANY BASE, FILL YOUR VEHICLE WITH FUEL.
- CALL RIG SINO-11 AT (013-574-6015/ 013-574-6021) PRIOR ENTERING THE SKID ROAD,
- PROVIDE NAME OF COMPANY, NUMBER OF PERSONNEL, COLOR OF VEHICLE AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL.
- ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
- ALL VEHICLES SHOULD FOLLOW ROAD ALLOWED DRIVING SPEED.
- THERE IS SIGN IN THE SKID ROAD & IT IS BETTER TO HAVE THURAYA PHONE IF AVAILABLE.
- CELL SIGNAL AND RADIO COVERAGE AT LOCATION.

==========================RIGLESS ACTIVITY============================================

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0-3-1 12,478 90.3 227.5 0 8,945 -1118.83 -1083.14 5,109.04 1.42

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
66 PCF 0 0 API 0 0 Volts 0 9 56,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 0 HTHP 100 15 0 9 / 10 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 7 0 7 / 10 0 400 0
61
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
66 PCF 0 0 API 0 0 Volts 0 9 56,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 0 HTHP 100 15 0 9 / 10 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 7 0 7 / 10 0 400 0
61

MUD
TREATMENT
BIT DATA

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NYYM-508 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:21 05/24/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
05/27/2024 N/A SESONAL N/A SEASONAL 3,606 PRE-TOUR MEETING

Company TGC RIG EMC NFM ASH BLH RIG ARM SJC NSL ARM

Category CTRG RIG DFMS WMFE FLD LHES OTHR OTHR PCS SLS WSC
PERSONNEL
15 47 1 1 4 1 9 1 3 1 1
Total
AND SERVICES No. of Persons
84
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 0 24 24 24 0 24

Operating Hours. 0 24 12 24 0 0 12 12 24 0 24

Standby/Tankers Others Others


TRUCKS/BOATS
ARAMCO P/U AB-6417 SINO AMBULANCE 4X RAW WATER TANKERS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 317 0 4 0

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-110 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/20/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

SINO-12L @ HRDH-110 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK THE Foreman(s)ELFEKI, SHOKRY IBRAHIM
D&WO Morning Report (Service Providers View) Charge #: WELL AS A SINGLE LATERAL Engineer CHE JAFFAR, NOOR CHOZIN ALI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24058-0110) OIL PRODUCER ACROSS Manager KHALDI, MOHAMMED SALEH
SINO-12L
ARAB-D RESERVOIR.) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK)
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12699 (013)578-4 075 (013)578-4 036
Date: Tuesday 06/18/2024 HRDH-110 (0-2) HRDH_110_2 OTHER VSAT CONTRACTOR /CLERK VSA T
(013)813-7 247 MEDIC (013) 813- 7231 WFD D SV

Last 24 hr operations Next 24 hr plan


DISPL INHIBITED DIESEL, SET TBG HGR, PT TBG & TCA, SET WFD SHALLOW PLUG, ND BOPE, NU & RD ON HRDH-110 & RM TO HRDH-156.
PT TREE, S/L RTRV PLUGS & SET WFD SHALLOW PLUG, PT, RELEASE RIG.
Location Next Location
224 KM FROM DHAHRAN MAIN GATE HRDH-156
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,430 Last Csg Size MD TVD Size 1,713 6,538 6,538 Top
9 5/8 3658 3658 Formations Comments
7 Depth
SULY 4,947 (4,951' MD) 1.1 FT DEEPER.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) HITH 5,588 (5,614' MD) 4.9 FT DEEPER.
10105 (Date) 100 0 224 ABAR 6,057 (6,135' MD) 3 FT DEEPER.
23.3 (05/25/2024@1400 ) ARBB 6,111 (6,200' MD) 4.5 FT DEEPER.
ABBR 6,175 (6,284 ' MD) 4.5 FT DEEPER.
ARBC 6,195 (6,311 ' MD) 2 FT DEEPER.
ABCR 6,287 (6,443 ' MD) 4 FT DEEPER.
ARBD 6,424 (6,681' MD) 7.6 FT DEEPER.
PADS 6,558 (7,091 ' MD) 4.1 FT DEEPER.
BPDS 6,563 (7,125 ' MD) 2.3 FT DEEPER.
ABD1 6,597 (7,456' MD) 12.6 FT DEEPER.
AD2A 6,616 (7733' MD) 16 FT DEEPER.
2A05 6,648 8,425' MD
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0530 0.5 0-2 EOW C COMP DTU DRFT QEM 10430 10430 CONT. SL & RIH FINAL 3.875'' DRIFT TBG HGR TO 200 FT.
- POH & L/D S/L EQUIPMENT.

0530 - 0600 0.5 0-2 EOW C COMP HT TBG RIG 10430 10430 HPJSM, M/U 4-1/2" 11.6# J-55 LANDING JOINT TO TBG HANGER, FOSV &
CIRCULATING HEAD.

HPJSM, DISPLACE WELL WITH 210 BBL'S OF INHIBITED DIESEL AT 3 BPM THRU
0600 - 0730 1.5 0-2 EOW C COMP CIRC MPMP RIG 10430 10430
CHOKE IN STAGES.
- FLOW CHECK FOR 15 MINUTES EACH STAGE - WELL STATIC.
0730 - 0800 0.5 0-2 EOW C COMP CIRC MPMP RIG 10430 10430
FLOW CHECK - WELL STATIC.

0800 - 0830 0.5 0-2 EOW C COMP HT TBG WCS 10430 10430 HPJSM, DRAIN BOP, STING SEAL ASSY INTO PBR, LAND VG 11"X 4-1/2" TBG HGR &
TIGHT THS LOCK DOWN SCREWS.

HPJSM, P/T TBG TO 1500 PSI (TCA OPEN) HOLD FOR 10 MIN, P/T TCA (TBG
0830 - 0915 0.75 0-2 EOW C COMP PTST BHA RIG 10430 10430
OPEN) TO 1500 PSI HOLD FOR 10 MIN.
- FLOW CHECK, WELL STATIC.

HPJSM, R/U QEMAT NAJD S/L BOP & LUBRICATOR, P/T PCE TO 2500 PSI HOLD
FOR 10 MIN.
- S/L RIH & SET 4-1/2" WFD SLICK PLUG @ 225'.
0915 - 1100 1.75 0-2 EOW C COMP SET PLUGT QEM 10430 10430 225 225 - P/T 4-1/2" WFD SHALLOW PLUG TO 2500 PSI HOLD FOR 10 MIN.
- BLEED OFF PRESSURE ABOVE 4-1/2" WFD SHALLOW PLUG.
- FLOW CHECK, STATIC.
- S/L RIH & SET JUNK CATCHER ABOVE WFD SLICK PLUG @ 225'.
- R/D S/LINE TOOLS.
1100 - 1130 0.5 0-2 EOW C COMP HT TBG RIG 10430 10430
L/D 4-1/2'' NVAM 11.6# LANDING JOINT & SURFACE HARD LINES.

1130 - 1215 0.75 0-2 EOW C BOP ND BNIP RIG 10430 10430 HPJSM, DISCONNECTED FLOW LINE, EMERGENCY KILL LINE, N/D BELL NIPPLE,
CATWALK & V-DOOR.

ISOLATION BARRIERS:
- TUBING SIDE 2 MECHANICAL BARRIERS: HAL PX PLUG (3.813'') BELOW WFD
1215 - 1315 1 0-2 EOW C BOP ND BOP RIG 10430 10430
PACKER @ 4256' & WFD SLICK PLUG (4-1/2'') @ 225'.
- TCA SIDE 2 MECHANICAL BARRIERS: TUBING HANGER & 7'' WFD PACKER SEALS.
HPJSM, N/D 13-5/8" 5K BOP STACK & RELATED EQUIPMENT.

1315 - 1400 0.75 0-2 EOW C WH NU TREE RIG 10430 10430 HPJSM, N/U BAKER 11" X 4-1/16" 3M ROTATING TUBING BONNET. P/T BONNET
CAVITY AND SEALS TO 2500 PSI- HOLD FOR 10 MIN - OK.

N/U NEW BAKER 4-1/16" 3M X-TREE & ORIENT SAME TO ORIGINAL DIRECTION (
1400 - 1500 1 0-2 EOW C WH NU TREE RIG 10430 10430 WING VALVE TO WEST, OPERATORS TO NORTH), R/U SURFACE LINE TO WING
VALVE.
- P/T TREE AGANIST SLICK PLUG TO 300/2500 PSI, HOLD FOR 10 MIN

1500 - 2030 5.5 0-2 EOW C COMP RTRV PLUGN QEM 10430 10430 HPJSM, R/U QEMAT NAJD S/L LUBRICATOR & BOP, P/T TO 2500 PSI, HOLD FOR
10 MIN.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-110 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/20/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
- S/L RIH & RETRIEVE 4-1/2" WFD SLICK PLUG @ 225' (3 RUNS).
- S/L RIH & RETRIEVE PX-PLUG FROM X-NIPPLE BELLOW PKR (3 RUNS), SIWHP=
700 PSI.
- RIH W/ 3.5" GC, PERFORM FINAL DRIFT TO 6500'.
- RIH & SET 4-1/2" WFD SLICK PLUG @ 225', P/T TO 1000 PSI. HOLD FOR 10 MIN
& SET JUNK CATCHER ABOVE SLICK PLUG.
- BLEED OFF PRESSURE TO ZERO.
- FLOW CHECK - WELL STATIC.
- R/D QNE SLICK LINE.

SECURE WELL, FILL CELLAR WITH SWEET SAND, INSTALLED WELL NAME PLATE.
- DISTANCE FROM MID-CROWN VALVE TO GROUND = 8.15'
- DISTANCE FROM MID WING VALVE TO GROUND = 6.85'
- DISTANCE FROM MID-MASTER VALVE TO GROUND = 5.45'
- WING VALVE TO WEST AND OPERATORS TO NORTH
- WHP = 0 PSI
2030 - 2100 0.5 0-2 EOW C WH OTH NA RIG 10430 10430
- TCA PRESSURE = 0 PSI
- CCA PRESSURE = 0 PSI
------------------------------------------------------
- OLD CIW 13-5/8" X 11" 3M THS.
- NEW CIW 11" X 4-1/2" 3M PORTED TBG HGR.
- NEW V.G (BAKER)11" X 4-1/16" 3M ROTATING TBG BONNET.
- NEW V.G (BAKER) 4-1/16" 3M X-TREE.
2100 - 2100 0 0-2 EOW S OT RELS NA RIG 10430 10430
RELEASED RIG FROM HRDH-110 TO HRDH-156 ON JUNE 17, 2024 @ 21:00 HRS.
Workover Objectives
Foreman Remarks

- ODF CORRECTION -10.1 FT.


- TOW @ 4,479 FT
- BOW @ 4,489 FT
- KOP @ 4,496 FT
- TE @ 7,733 FT
- TD @ 10,430 FT
-

- THE RELIEF WELL FOR HRDH-110 IS WELL HRDH-111, NON-POPULATED LOCATION, 1.75 KM UP WIND OF HRDH-211
- MAIN CAMP IN CENTRAL AREA 4 KM FROM HRDH-110, LOCATED BETWEEN HRDH -1373 GAS WELL (465M W), HRDH-3557 WATER WELL (886M S), HRDH-3573 WATER WELL (565M E),
IMPLEMENT SAFETY CONTROLS.
----------------------------------------------------------------------SAFETY-------------------------------------------------------------------------------------------------------
- HELD PRE-JOB SAFETY MEETING WITH THE CREW.
- WFD QSI#2 (2024): 0 OPEN ITEMS.
- SAOWOD IN HOUSE Q1 2024: 0 OPEN ITEMS.
- WCEI (2024): 0 OPEN ITEMS.
- RHSEI (2024): 0 OPEN ITEMS.
- QSI1 (2024): 0 OPEN ITEMS.
--------------------------------------------------ARAMCO VISIT & PERSONNEL ON BOARD ------------------------------------------------------
- WFD DSV: LALIT#267385 (DAY), AMR#268237 (NIGHT) ON LOCATION.
- WFD HSE ADVISOR: ZEESHAN ASLAM ON LOCATION SINCE 5/14/2024.
-------------------------------------------------------DIESEL CONSUMPTION:-----------------------------------------------------------------------
- DIESEL CONSUMPTION (RIG ENGINES/ CAMP ENGINES / OTHERS): (DAILY: 19/6/6 BBLS), CUMULATIVE ENGINES CONSUMPTION FOR CURRENT WELL: 862 BBLS.
- RIG & CAMP DIESEL PROVIDED BY WEATHERFORD.
-------------------------------------------------------NEXT LOCATION:-----------------------------------------------------------------------------------
NEXT LOCATIONS:
- HRDH-156, KOM DONE ON 4/8/2024 (STRIP OUT: 100%, WELL SITE PREPARATION: 100%).
- HRDH-116, KOM DONE ON 6/5/2024. (STRIP OUT: 0%, WELL SITE PREPARATION: 0%).
------------------------------------------------------WFD/SINO RIG VISIT--------------------------------------------------------------------------------

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0-2 10,430 84.5 36.5 0 6,745 1117.88 816.1 4,540.95 0.23

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
52 PCF 0 0 API 100 0 Volts 0 9 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 0 0 0 0/0 DSEL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
27
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
52 PCF 0 0 API 100 0 Volts 0 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 0 0 0 0/0 DSEL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
27

MUD

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-110 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/20/2024 - 06/18/2024
Report ID: OPERLMTDMRREP

TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/04/2024 06/04/2024 22 KM/H, N- N/A MAX/LOWTEMP:45/28DEG
4,976 ND BOPE & SL
S OPERATIONS.

Company QEM WTS OTH WCS RIG MJH TK4 OTH TK4 ARM

Category SLS SLS CTRG PSSC RIG SEC OTHR VAC WSC WSC
PERSONNEL
3 2 12 1 62 8 2 7 2 1
Total
AND SERVICES No. of Persons
100
INFORMATION
Personnel on Loc. Hrs. 16 16 16 16 16 16 16 16 16 16

Operating Hours. 8 16 0 12 16 0 12 12 16 16

Standby/Tankers Others Others


TRUCKS/BOATS
AB-6421 SINO-12L AMBULANCE#5961 3 RAW WATER TRUCK

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 382 N/A N/A 200

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-156 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 06/18/2024 - 07/18/2024
Report ID: OPERLMTDMRREP

SINO-12L @ HRDH-156 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK THE Foreman(s)ELFEKI, SHOKRY IBRAHIM
D&WO Morning Report (Service Providers View) Charge #: WELL AS A SINGLE LATERAL Engineer CHE JAFFAR, NOOR CHOZIN ALI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24058-0156) ACROSS ARAB-D.) Manager KHALDI, MOHAMMED SALEH
SINO-12L
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12699 (013)578-4 075 (013)578-4 036
Date: Tuesday 06/18/2024 HRDH-156 (0-1) HRDH_156_1 OTHER VSAT CONTRACTOR /CLERK VSA T
(013)813-7 247 MEDIC (013) 813- 7231 WFD D SV

Last 24 hr operations Next 24 hr plan


R/D ON HRDH-110. R/D ON HRDH-110 & R/M TO HRDH-156.
Location Next Location
229.52 KM FROM DHAHRAN MAIN GATE. HRDH-116
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,960 Last Csg Size MD TVD Size 1,943 7,330 6,837 Top
9 5/8 3939 3939 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9960 (Date) 0 230
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM WITH MOVING CREW AND RIG CREW, DISCUSSED MOVING PLAN AND JSA.
R/D ON HRDH-110, R/M TO HRDH-156.
R/D: 10%, R/M: 10% AND R/U: 0%.
- DAYS SINCE RIG RELEASE: 0.33 DAYS.
- RIG MOVE DISTANCE: 11 KM (9 KM SKID ROAD+ 2 KM BLACK TOP).
- DISMANTLE MAST: YES.
- CROSS HIGHWAY: NO.
- TOTAL LOADS TODAY / CUMULATIVE / TOTAL: 36 / 36 / 126.
- PRE-MOVE LOADS: 36.
- RIG RELEASED AT 21:00 HRS ON 17 JUNE 2024 FROM HRDH-110.
- HRDH-110 SECURED W/ 4-1/2" SLICK PLUG ON 17 JUNE 2024 @ 20:00 HRS.
2100 - 0459 8 0-1 PRE N RM RM NA RIG 9960 9960
- CUMULATIVE HOURS SUSPEND OPERATION AT NIGHT DUE TO RIG GENERATORS
POWERED OFF: 0 HOURS.

RIG MOVE ACTIVITIES: -


- R/D TDS, ONGOING.
- R/D CHOKE MANIFOLD & POOR BOY.
- R/M WORKSHOP, CHEMICAL BOX, DRILL PIPE BOX & MUD CHEMICALS.
- R/D MUD SYSTEM...ONGOING.

RIG MOVE EQUIPMENT: 20 TRUCKS LOW-BED, 5 CRANES (2 X 80T + 1 X 90T + 2 X


55T), 1 FORKLIFTS.
RIG-MOVE CREW: 2 TRUCK-PUSHERS + 2 RIGGER-1
Workover Objectives
Foreman Remarks

- THE RELIEF WELL FOR HRDH-110 IS WELL HRDH-150 & HRDH-129.


- MAIN CAMP IN CENTRAL AREA 6 KM FROM HRDH-156, LOCATED BETWEEN HRDH -1373 GAS WELL (465M W), HRDH-3557 WATER WELL (886M S), HRDH-3573 WATER WELL (565M E),
IMPLEMENT SAFETY CONTROLS.
----------------------------------------------------------------------SAFETY-------------------------------------------------------------------------------------------------------
- HELD PRE-JOB SAFETY MEETING WITH THE CREW.
- WFD QSI#2 (2024): 0 OPEN ITEMS.
- SAOWOD IN HOUSE Q1 2024: 0 OPEN ITEMS.
- WCEI (2024): 0 OPEN ITEMS.
- RHSEI (2024): 0 OPEN ITEMS.
- QSI1 (2024): 0 OPEN ITEMS.
--------------------------------------------------ARAMCO VISIT & PERSONNEL ON BOARD ------------------------------------------------------
- WFD DSV: LALIT#267385 (DAY), AMR#268237 (NIGHT) ON LOCATION.
- WFD HSE ADVISOR: ZEESHAN ASLAM ON LOCATION SINCE 5/14/2024.
-------------------------------------------------------DIESEL CONSUMPTION:-----------------------------------------------------------------------
- DIESEL CONSUMPTION (RIG ENGINES/ CAMP ENGINES / OTHERS): (DAILY: 0/0/0BBLS), CUMULATIVE ENGINES CONSUMPTION FOR CURRENT WELL: 0 BBLS.
- RIG & CAMP DIESEL PROVIDED BY WEATHERFORD.
-------------------------------------------------------NEXT LOCATION:-----------------------------------------------------------------------------------
NEXT LOCATIONS:
- HRDH-116, KOM DONE ON 6/5/2024. (STRIP OUT: 0%, WELL SITE PREPARATION: 0%).
------------------------------------------------------WFD/SINO RIG VISIT--------------------------------------------------------------------------------

DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

MISCELLANEOUS BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-156 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 06/18/2024 - 07/18/2024
Report ID: OPERLMTDMRREP

N/A N/A N/A N/A N/A 4,976 RIG DOWN AND RIG
MOVE.

Company WTS OTH QEM RIG MJH RIG TK4 OTH TK4 ARM

Category SLS CTRG SLS RIG SEC OTHR OTHR VAC WSC WSC
PERSONNEL
2 12 3 61 8 27 2 7 2 1
Total
AND SERVICES No. of Persons
125
INFORMATION
Personnel on Loc. Hrs. 8 8 8 8 8 8 8 8 8 8

Operating Hours. 8 0 0 8 0 0 8 0 8 8

Standby/Tankers Others
TRUCKS/BOATS
AB-6421 SINO-12L AMBULANCE#5961

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 200

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-325 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 05/28/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

SINO-15L @ SDGM-325 Limited Morning Report for 06/18/2024


Objective : (ST AS SINGLE Foreman(s)AZIBANI, MUSTAPHA / DINU, VIOREL
D&WO Morning Report (Service Providers View) Charge #: LATERAL OIL PRODUCER Engineer HODANI, MAREE OTAF
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24054-0325) ABD1) Manager ALMUKHTAR, ESSA HAJJI
SINO-15L
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 8821677712 403 0135722894 ARMCO 4MA N 0138387934 HALL DSV
Date: Tuesday 06/18/2024 SDGM-325 (0-1) SDGM_325_1 CONTRACTOR /CLERK VSA T
0135728506 ARAMCO

Last 24 hr operations Next 24 hr plan


CONT'D M/U AND RIH I-CRUISE/LWD/MWD ASSY, RELOG TO BOTTOM. DRILL 6 1/8'' CONT BOP'S TESTS. M/U AND RIH NEW I-CRUISE/LWD/MWD ASSY, RELOG TO BOTTOM. DRILL 6
CURVE/LATERAL SECTION. CHC, POH 6-1/8" RSS ASSY & BOP'S TESTS. 1/8'' CURVE/LATERAL SECTION.
Location Next Location
111 KM FROM DHAHRAN MAIN GATE. SDGM-337
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,431 Last Csg Size MD TVD Size Top
7 7091 7091 Formations Comments
Depth
HITH 6,166 6169 FT MD (0.6 FT DEEPER)
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ABAR 6,683 6708 FT MD (5 FT DEEPER)
7410 (Date) 100 21 111 ARBB 6,715 6744 FT MD (3 FT DEEPER)
16 (06/02/2024@0500 ) ABBR 6,761 6798 FT MD (5 FT DEEPER)
ARBC 6,790 6832 FT MD (2 FT DEEPER)
ABCR 6,888 6953 FT MD (3 FT DEEPER)
7083 FT MD (4.8 FT
ARBD 6,969
SHALLOWER)

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End

CONT'D P/U & M/U NEW 6 -1/8" SPS ICRUISE / LWD / MWD BHA .
- SHALLOW TEST I-CRUISE / LWD PULSE (1950 PSI @ 240 GPM) -
OK.
0500 - 0730 2.5 0-1 6 1/8 N DRLG HT BHA SPS 7410 7410 BHA 934857
- LOAD RA SOURCE.
- MONITOR THE WELL ON TRIP TANK, STATIC.

RIH W/ 6-1/8" SPS ICRUISE/LWD/MWD ASSY TO 3,000 FT.


0730 - 0830 1 0-1 6 1/8 N DRLG TI STDP RIG 7410 7410 317 3000 BHA 934857
- BREAK CIRC EVERY 20 STDS.
- MONITOR THE WELL ON TRIP TANK, STATIC.

0830 - 0930 1 0-1 6 1/8 N DRLG CIRC MPMP RIG 7410 7410 BHA 934857 BREAK CIRC , MID-WAY TEST (2260 PSI @240GPM). CHECK
MWD/LWD SIGNAL & SEND DOWNLINK - OK

RIH W/ 6-1/8" SPS ICRUISE / LWD / MWD ASSY TO 6,160 FT.


0930 - 1030 1 0-1 6 1/8 N DRLG TI STDP RIG 7410 7410 3000 6160 BHA 934857
- BREAK CIRC EVERY 20 STDS.
- MONITOR THE WELL ON TRIP TANK, STATIC.

RIH W/ 6-1/8" SPS ICRUISE/LWD/MWD ASSY TO 7,310 FT.


1030 - 1130 1 0-1 6 1/8 N DRLG TI STDP RIG 7410 7410 6160 7310 BHA 934857
- BREAK CIRC EVERY 20 STDS .

1130 - 1300 1.5 0-1 6 1/8 N DRLG CIRC MPMP RIG 7410 7410 BHA 934857 RE-LOG AS PER GOC INSTRUCTIONS F/7,310 FT TO 7,410 FT
WHILE CUT MW TO 85 PCF.

DRILL 6-1/8" CURVE SECTION W/ SPS I-CRUISE/MWD/LWD ASSY


TO 7431 FT W/ 85 PCF POLYMER MUD & 100 % RETURN.
1300 - 1500 2 0-1 6 1/8 N DRLG D RSS SPS 7410 7431 LROP 934859 - DRILL W/ CONTROLLED ROP.
- WASH & REACH EACH STD DRILLED.
- SWEEP HOLE AS REQUIRED.

1500 - 1600 1 0-1 6 1/8 N DRLG CIRC MPMP RIG 7431 7431 BHA 934860 HAD COMMUNICATION ISSUES WITH I-CRUISE TOOL, CHC WHILE
TROUBLSHOOTING I-CRUISE WITH NO SUCCESS.
1600 - 1630 0.5 0-1 6 1/8 N DRLG CIRC MPMP RIG 7431 7431 BHA 934860
FLOW CHECK, STATIC.

1630 - 1730 1 0-1 6 1/8 N DRLG CIRC MPMP RIG 7431 7431 BHA 934860 CIRCULATE WHILE INCREASE M/WT TO 88 PCF FOR TRIP
MARGIN.
1730 - 1800 0.5 0-1 6 1/8 N DRLG CIRC MPMP RIG 7431 7431 BHA 934860
FLOW CHECK, WELL STATIC

POH SPERRY I-CRUISE/LWD ASSY F/ 7,410 FT T/ 6,900 FT.


1800 - 1830 0.5 0-1 6 1/8 N DRLG TO SPDP RIG 7431 7431 7410 6900 BHA 934860
- HOLE IN GOOD CONDITION
- MONITOR WELL ON TRIP TANK, WELL STATIC
1830 - 1900 0.5 0-1 6 1/8 N DRLG CIRC MPMP RIG 7431 7431 BHA 934860
FLOW CHECK, STATIC.
1900 - 1930 0.5 0-1 6 1/8 N DRLG TO STDP RIG 7431 7431 6900 6130 BHA 934860

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-325 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 05/28/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End
POH SPERRY I-CRUISE/LWD ASSY F/ 6,900 FT T/ 6,130 FT
(TOW).
- HOLE IN GOOD CONDITION
- MONITOR WELL ON TRIP TANK : WELL STATIC
1930 - 2000 0.5 0-1 6 1/8 N DRLG CIRC MPMP RIG 7431 7431 BHA 934860
FLOW CHECK, WELL STATIC.

2000 - 2200 2 0-1 6 1/8 N DRLG TO STDP RIG 7431 7431 6130 700 BHA 934860 POH SPERRY I-CRUISE/LWD ASSY F/ 6,130 FT T/ 700 FT.
- MONITOR WELL ON TRIP TANK : WELL STATIC
2200 - 2230 0.5 0-1 6 1/8 N DRLG CIRC MPMP RIG 7431 7431 BHA 934860
FLOW CHECK, WELL STATIC.

2230 - 2245 0.25 0-1 6 1/8 N DRLG TO STDP RIG 7431 7431 700 246 BHA 934860 POH SPERRY I-CRUISE/LWD ASSY F/ 700 FT T/ BHA 246 FT
- MONITOR WELL ON TRIP TANK , WELL STATIC
2245 - 2315 0.5 0-1 6 1/8 N DRLG CIRC MPMP RIG 7431 7431 BHA 934860
FLOW CHECK, WELL STATIC.

PJSM, RETRIEVE RA SOURCE. DUMP LWD


2315 - 0030 1.25 0-1 6 1/8 N DRLG HT BHA SPS 7431 7431 BHA 934860
MEMORY DATA.
- MONITOR WELL ON TRIP TANK, WELL STATIC

L/D 6-1/8" I-CRUISE/LWD BHA.


0030 - 0300 2.5 0-1 6 1/8 N DRLG HT BHA SPS 7431 7431 BHA 934860
- BIT DULL GRADING: 1-1-WT-A-X-I-NO-DTF.
- MONITOR WELL ON TRIP TANK, WELL STATIC.
0300 - 0330 0.5 0-1 6 1/8 N WH RTRV WBSH RIG 7431 7431
RETRIEVED 11" WEAR BUSHING.

HPJSM. M/U TEST ASSY, PERFORMED FULL BOP P/T TO 300 /


0330 - 0459 1.5 0-1 6 1/8 N BOP BOPT BOP RIG 7431 7431 2550 PSI, OK, L/D TEST ASSY. INC @ RPT TIME...
- CONDUCTED ACCUMULATOR DRILL.
- MONITOR WELL ON TRIP TANK, WELL STATIC.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
17 Jun 1400 8 23 934857 BHA FOT LWD SPS 7410 LWD FAILURE, DENSITY TOOL
MALFUNCTION.
18 Jun 1300 2 2 934859 LROP DFOR NA TK1 7410 LOW ROP
18 Jun 1500 12 12 934860 BHA FOT LWD SPS 7431 COMMUNICATION ISSUES WITH RSS TOOL.
Workover Objectives
Foreman Remarks

>> ODF CORRECTION : -11.5 FT.


>> TOW @6,130 FT, BOW @6,139 FT, KOP @ 6,145 FT.
=====================================SAFETY=================================
>> HELD PRE-JOB SAFETY MEETING WITH THE CREW. DISCUSSED SAFETY ALERTS.
===============================DIRECTIONAL==================================
>> BHA SENSOR OFFSETS: ABI : 6.73', ABG : 15', DENSITY: 79.6', POROSITY: 88.69', RES: 98.56', GR: 64.94', PWD: 70.27', SURVEY: 72.93'.
>> DEVIATION F/ PLAN: 2.0 FT BELOW, 22.0 FT RIGHT.
>> BIT PROJECTION @ 7431 FT MD , 7087 FT TVD, INC 83.5 DEG, AZI 10.5 DEG.
===================================PERSONNEL ===============================
>> HALL DSV DAY: EL-SAWY, NIGHT: HASSAN RAMDANI, HALL SAFETY: AHMED.
=================================STK DIESEL ===================================
>> DIESEL CONSUMPTION FOR ENGINES (RIG + CAMP) = (DAILY: 36 BBL/CUMULATIVE FOR CURRENT WELL: 591 BBL).
===================================NEXT WELLS================================
>> SDGM-337 (SDGM GOSP-5), KOM HELD ON 06/05/2024, STRIP-OUT 100% & LOCATION 0%.
>> SDGM-125 (SDGM GOSP-3), KOM HELD ON 6/10/2024: STRIP-OUT 0% & LOCATION 0%.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
88 PCF 1 3 API 6 0 Volts 22.7 9.5 10,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 12 HTHP 67 30 0 9 / 11 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 24 27 9 / 10 0 0 0
53
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
88 PCF 1 2.8 API 6 0 Volts 22.7 9.5 10,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 12 HTHP 67 29 0 9 / 11 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 24 27 9 / 10 0 0 0
52

MUD MARBLE-FINE NACL


TREATMENT 20 ( 2200L ) 8 ( 2200L )

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SDGM-325 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 05/28/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
10 7,132 7,410 DP Av DC Av Bit HHP 10 140 M332 6.125 SEC
Pressure GPM Jet Vel 284.79 N/A 0 I-Row O-Row DC Location Bearings
2,950 250 N/A 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
14198197 HD54 POOH Reason N/A
Gauge Other
1

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 43 153 176 146 5,500 1
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 6.125 1 4.5 2.25 0.69 3-1/2" REG N/A 14198197
2 RSS SPS 4.75 1 4.75 34.6 NC-38 3-1/2" REG 65.1 IC-4103X
3 Modular Flex BHI 5 1 5 2.813 11.52 NC38 NC38 56.21 90767358
4 Logging While Drilling (LWD) SPS 4.75 1 4.75 15.42 102.71 90765798/90
5 Measurement While Drilling (MWD) SPS 4.75 1 4.75 13.39 46.3 90764923
6 Logging While Drilling (LWD) SPS 4.75 1 4.75 2.61 15.45 3-1/2" IF 3-1/2" IF 45.57 90764936
DRILL STRING 7 Logging While Drilling (LWD) SPS 4.75 1 4.75 18.24 52.2 90764929
8 Stabilizer SPS 5.875 1 4.75 2.25 3.56 NC38 NC38 46.84 90765802
9 Power & Communication Sub SPS 4.75 1 4.75 2.25 10.14 NC38 NC35 50.86 90764917
10 Measurement While Drilling (MWD) SPS 4.75 1 4.75 11.06 46.3 13157780
11 Stabilizer SPS 5.875 1 4.75 2.25 4.08 NC38 NC38 46.84 10610289
12 Screen sub SPS 4.75 1 4.5 2.8 5.77 NC38 NC38 47.61 13172764
13 Float Sub SPS 4.75 1 4.75 2 3.17 NC35 NC38 48.61 13729271
14 Crossover RIG 4.75 1 4.75 2.375 1.79 NC38 NC50 54.37 003
15 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.562 91.59 XT39 XT39 26.24 CONV
16 Hydraulic Jar WJS 4.75 1 4.75 2.31 31.3 XT-39 XT-39 43.66 1420-1645
17 Heavy Weight Drillpipe (HWDP) RIG 4 2 4 2.563 61.21 XT39 XT39 28 CONV
18 Drillpipe RIG 4 147 4 3.24 4,636 VX39 VX39 14 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/01/2024 N/A NORMAL NA SEASONAL 2,778 TOURLY

Company SPS TGC RIG BAR MJH TK1 ARM

Category DPDS CTRG RIG DFMS SEC WSC WSC


PERSONNEL
4 17 51 1 8 4 2
Total
AND SERVICES No. of Persons
87
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24

Operating Hours. 12 0 12 12 12 12 12

Standby/Tankers Others Others


TRUCKS/BOATS
N/A ambulance bus

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 1000

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JLDI-741 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/14/2024 - 07/04/2024
Report ID: OPERLMTDMRREP

SINO-16 @ JLDI-741 Limited Morning Report for 06/18/2024


Objective : (INITIAL ESP Foreman(s)ISMAIL, MAHMOUD ABDELRAZEK
D&WO Morning Report (Service Providers View) Rig Charge #: INSTALLATION) Engineer ALAHMAD, BADER MOHAMMED / ALSAQQAEE, SAEED NASSER
Copyright 2024 Saudi Aramco. All Rights Reserved SINO-16 (72-24034-0741) Manager BUDAIR, SAAD MOHAMMAD
Daily Onshore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 13767 013-378-21 94 /CLERK VSA
Date: Tuesday 06/18/2024 JLDI-741 (0) JLDI_741_0 T
013-378-21 95

Last 24 hr operations Next 24 hr plan


POOH WITH 9-5/8" CLEANOUT ASSY, P/U & RIH WITH NESR TCP GUN ASSY ON 5" DP & RECORD LOSSES, POOH AND LD NESR TCP GUNS ASSY, RUN 9-5/8" CLEAN OUT ASSY, RUN LOWER
PERFORATE ACROSS KHFJ AQUIFER. COMPLETION.
Location Next Location
186 KM FROM DH MAIN GATE / E: 280601.79 & N: 3039946.3 JLDI-742
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
7,910 Size 4964 4610 Size 1,975 7,938 6,919 Top
Formations Comments
13 3/8 9 5/8 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
7938 (Date) 100 0 186
2.8 (06/15/2024@1100 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0530 0.5 0 POST N CT CIRC MPMP RIG 7938 7938
FLOW CHECK- WELL STATIC.

HPJSM, POOH WITH C/O ASSY ON STDS OF 5" DP TO TOP OF 9-5/8" CLEAN OUT
0530 - 0900 3.5 0 POST N CT TO STDP RIG 7938 7938 7888 1520
ASSY. AT 1520'.
>> MONITOR WELL THRU TRIP TANK, FULL & STATIC.

LAY DOWN 9-5/8" CLEAN OUT SCRAPER ASSY.


0900 - 1030 1.5 0 POST N CT HT BHA RIG 7938 7938 >> RECOVERED 1.2 KG OF VERY FINE DEBRIS FROM STRING MAGNETS.
>> L/D 6-1/2" TASMAN HMJ-JAR (S/N: DJ6-650-145 ) AT 09:00 HRS.
>> MONITOR WELL THRU TRIP TANK, FULL & STATIC.

CLEAN & CLEAR RIG FLOOR FROM EXCESS TOOLS & PREPARE HANLING TOOLS TO
1030 - 1100 0.5 0 EOW C STIM HT STRG RIG 7938 7938
RUN NSER TCP GUN ASSY.
>> MONITOR WELL THRU TRIP TANK, FULL & STATIC.

HPJSM, M/U & RIH WITH NESR TCP GUN ASSY AS FOLLOWING:
3-1/8" X 0.27 FT BULL PLUG NOSE + 3-1/8" X 0.5 FT BLANK GUN SECTION + 3-
1/8" X 401 FT LOADED TCP GUN ASSY + 3-1/8" X 14.5 SAFETY SPACER & TOP SUB
1100 - 1630 5.5 0 EOW C STIM HT BHA RIG 7938 7938 + 3-1/8" X 0.97 FIRING HEAD DELAY + 2-7/8" PORTED DEBRIS BARRIOR SUB + 2
JTS 2-7/8" TBG + 2-7/8" PUP JT 4 FT + 1 JT 2-7/8" TBG + 2 X 2-7/8" PUP JT +
X/O.
>> 401 FT TOTAL GUNS LENGTH (19 GUNS) AT 6 SPF 60 DEGREES PHASING &
FIRING HEAD.

HPJSM, START RIH AT CONTROL SPEED WITH 3-1/8" NESR TCP GUN ASSY. ON 5"
1630 - 1930 3 0 EOW C STIM TI STDP RIG 7938 7938 562 7140 DRIFTED DP TO 7140'.
>> MONITORING WELL ON TRIP TANK, WELL STATIC.
>> PERFORATION INTERVAL F/ 6739' T/ 7140' (TOTAL 401 FT).
1930 - 2300 3.5 0 EOW C STIM CIRC MPMP RIG 7938 7938
ACCUMULATIVE TIME TO RIH @ CONTROLLED SPEED & FILL UP PIPE WHILE RIH.

HPJSM, M/U 7" TIW SAFETY VALVE. R/U NSER WL SHEAVES, EQUIPMENT &
GR/CCL/PRESSURE/TEMP TOOLS. PT LUBRICATOR TO 1500 PSI-OK.
>> RIH W/ GR AND CCL BHA INSIDE 5" DP ON WL TO THE 2ND 2-7/8" FULL JOINT
ABOVE TCP GUN AT 6650' MD.
2300 - 0430 5.5 0 EOW C STIM LOG WLT NWL 7938 7938 0 6625
>> LOG UP GR/CCL REPEAT PASS F/ 6650 T/ 6300' MD & CORRELATE REPEAT PASS
WITH REFERENCE GR LOGS.
>> CORRELATE & CONFIRM GR/CCL LOGS WITH ARAMCO DRILLING ENGINEERS.
>> POOH W/ NSER WL GR/CCL TO SURFACE, R/D TOOLS & SHEAVES.
>> MONITOR WELL ON TRIP TANK. STATIC.

HELD STAND DOWN MEETING WITH ALL CREWS, SPACED OUT - 0.7 FT & PLACED
TCP SHOTS ON TARGET INTERVAL ( 6739' - 7140').
0430 - 0459 0.5 0 EOW C STIM PERF PGUN NWL 7938 7938 6739 7140 >> CONNECT TDS, CLOSED BOPE PIPE RAM & PRESSURE UP DOWN DP TO 2,350
PSI & HOLD FOR 1 MIN, BLEED OFF PRESSURE.
>> WAIT FOR FIRING HEAD TO ACTIVATE AFTER 5 MIN , OK. HAD GOOD
INDICATION OF GUNS FIRED ( SHAKE DRILL STRING).
Workover Objectives
Foreman Remarks

>> ODF CORRECTION: +3.45 FT.


>> WL CORRECTION TO DP: - 0.7 FT.
========================== ARAMCO PERSONAL======================================
>> FRANCIS JAY PURIFICACION RIG CLERK ID# 8046539 ON RIG SINCE JAN 10, 2023.
>> NAOD&WOD SAFETY ADVISOR KHUBAB AHMED QURESHI #8599754 ON LOCATION SINCE 16 JUNE 2024 FOR HSE INSPECTION.
>> ARAMCO WOE ENGINEER MARZOOQ, SALEH Y #808586 ON LOCATION TO WITNESS PERFORATION OPREATION.
>> ARAMCO WOE ENGINEER ALFRIADAN, THAMER Y #808746 ON LOCATION TO WITNESS PERFORATION OPREATION.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR JLDI-741 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/14/2024 - 07/04/2024
Report ID: OPERLMTDMRREP

=========================== RENTAL EQUIPMENT =====================================


>> 3 X 150 BBL RAW WATER TANKERS#539/521/522- AL-GAZI ON LOCATION SINCE JUNE 10, 2021.
>> RECIEVED 9 X SGS FRAK TANKS ON 06/10/2024 AND 11 FRACK TANKS ON 06/11/2024. TOTAL 20 FRAK TANKS FOR FLOW BACK SINCE RIG ON JLDI-740.
>> RECEIVED TWO 9-5/8" WFRD STRING MAGNETS S/N# 7211517 & 35150025-1 & ONE 9-5/8" MAX BRUSH S/N#859322 ON 6/15/2024 AT 14:30HRS.
>> RECIEVED 6-1/2" TASMAN HYDRU MECH DRLG JAR S/N: DJ6-650-145 ON 6/15/2024 AT 18:00 HRS.
========================== ERP ============ ======================================
>> 55 PASSENGER EMERGENCY ESCAPE BUS ON LOCATION.
========================CURRENT LOCATION & ADJACENT WELLS STATUS=======================
>> DS #5 SITE HAS 10 WELLS ON LOCATION (JLDI-740,741,742,743,744,745,746,747,748,749).
>> ALL ADJACENT WELLS ARE SHUT-IN, BARRICADED & ISOLATED, X-TREE AND WELLHEAD VLVS ARE CLOSED.
========================NEXT LOCATIONS READINESS====================================
>> JLDI-740-749 (10 WELLS): KOM DONE ON 03/14/2024; READINESS (100% FIELD SERVCES & 100% WELLSITE).
====================================DRILLS & OBB======================================
>> REPORTED IN ORBITS: 15 OBB.
>> CONDUCTED DRILLS: TRIP DRILL X 2.
====================================================================================
>> DAILY DIESEL CONSUMPTION FOR ENGINES (RIG+CAMP): 33 BBLS & CUMMULATIVE PER MONTH OF JUNE,2024 =550 BBL.
>> DAILY POTABLE WATER CONSUMPTION FOR (RIG+CAMP): 182 BBLS & CUMMULATIVE PER MONTH OF JUNE, 2024 =2939 BBL.
====================================================================================
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 0 0 API 0 0 Volts 0 9.5 133,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 97 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 3 0/0 0 0 0
0
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 0 0 API 0 0 Volts 0 9.5 133,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 97 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 3 0/0 0 0 0
0

MUD XC
TREATMENT 3 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A CALM NA HOT 5,724 TOURLY

Company SCC RIG OES ASH ARM ARM SG2 NWL

Category CTRG RIG DFMS FLD OTHR WSC WTSE WLS


PERSONNEL
13 56 1 3 3 1 1 12
Total
AND SERVICES No. of Persons
90
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24

Operating Hours. 0 24 12 12 12 24 0 20

Standby/Tankers Others Others Others Others


TRUCKS/BOATS
AB-6414 3 X WTR TANKERS DIESEL FOR RIG ENGINE REMAIN=126
WTR REMAINS(RIG/CAMP)=
bbl 198
GASOLINE
BBL REMAIN= 9030 LITER

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other
REPAIR ASAP OK Reporter
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QRQS-1 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 05/29/2024 - 08/13/2024
Report ID: OPERLMTDMRREP

SINO-18 @ QRQS-1 Limited Morning Report for 06/18/2024


Objective : (QRQS-1 IS AN OIL Foreman(s)MANNING, LENARD BLAISE
D&WO Morning Report (Service Providers View) Rig Charge #: WELL TO EXPLORE SOUTHERN Engineer FOSTER, HERSCHEL SENLEY
Copyright 2024 Saudi Aramco. All Rights Reserved SINO-18 (75-23890-0001) FLANK OF MARZOUK FIELD IN Manager HARBI, MAGBEL MENAWER
Daily Onshore RUB ALKHALI AREA) THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12582 5776159 /CLERK VSA
Date: Tuesday 06/18/2024 QRQS-1 (0) QRQS_1_0 T
577-6166

Last 24 hr operations Next 24 hr plan


CHC, WIPER TRIP, CHC, SPOT CSG GO PILL, POOH TO RUN 9-5/8" CSG. RUN 9 5/8" CASING, CEMENT IN 2 STAGES, N/D
Location Next Location
FROM BATHA/SHAYBAH JUNCTION, 123KM TOWARDS SHAYBAH, TURN LEFT FOR 54 KM SKID ROAD. *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
5,563 Last Csg Size MD TVD Size Top
13 3/8 1505 1505 Formations Comments
Depth
MDRS 1,320 11' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 1,415 12' DEEPER
5470 (Date) 100 93 409 RUSA 1,430 16' DEEPER
13.8 (06/04/2024@0900 ) UMER 2,060 15' SHALLOWER
ARUM 3,465 7' DEEPER
LAMS 4,565 2' HIGH
LFFN 5,513 29' HIGH
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

ROTARY DRILL 12" HOLE SECTION WITH 73 PCF NACL POLYMER MUD, 100%
CIRCULATION. TD CONFIRMED BY WSG AT 5,563FT 50FT INSIDE LAFFAN
* SWEEP WITH 35 BBLS HI-VIS EVERY 45' DRILLED
0500 - 0730 2.5 0 12 N DRLG DCG TDS RIG 5470 5563 * WASH UP & REAM DOWN EACH STAND
* PRESSURIZED SHALES OBSERVED AT 5470' INCREASE MW TO 78PCF, SHALES
DECREASED
* MAINTAIN BRIDGING MATERIAL IN MUD SYSTEM AS PER PROGRAM
- SURVEY EACH STAND (LAST SURVEYS - 5,490' - 2.2 DEG INCLINATION)

CIRCULATE AND CONDITION MUD INCREASE DENSITY TO 76PCF DUE TO


0730 - 1030 3 0 12 N DRLG CIRC MPMP RIG 5563 5563
PRESSURIZED SHALES. PUMP SWEEPS UNTIL SHALES BELOW 10%. PUMP 30BBL
78PCF PILL AND SPOT ON BTM.

FLOW CHECK, STATIC, WIPER TRIP BACK TO LOGGING DEPTH AT 3000' POH ON
1030 - 1600 5.5 0 12 N DRLG ST STDP RIG 5563 5563 5563 3500 ELEVATORS FREELY FROM 5560FT TO 4500FT, HAD OVERPULL, , WASH AND
BACK REAM EACH STAND FROM 4500FT TO 3800FT PULL ON ELEVATORS FROM
3800FT TO 3000FT. FLOW CHECK, STATIC.

1600 - 1830 2.5 0 12 N DRLG ST STDP RIG 5563 5563 3500 5563 TRIP BACK TO BTM HOLE IN GOOD SHAPE, METAL DIPSLACEMENT CORRECT, 5FT
OF FILL OBSERVED ON BTM.

1830 - 2100 2.5 0 12 N DRLG CIRC MPMP RIG 5563 5563 C&C MUD, PUMP SWEEPS UNTIL SHAKERS CLEAN, PUMP 100BBLS HI WT CASING
GO PILL ON BTM. FLOW CHECK STATIC.
2100 - 0045 3.75 0 12 N DRLG ST STDP RIG 5563 5563 5563 1508
POH FREELY ON ELEVATORS TO RUN CASING.
0045 - 0145 1 0 12 N DRLG WCNT MPMP RIG 5563 5563
EXTENDED FLOW CHECK AT SHOE. 8BPH STATIC LOSSES.

CONTINUE TO POH WITH BHA TO SURFACE, LAY DOWN REAMERS, MWD, JAR AND
0145 - 0459 3.25 0 12 N DRLG HT BHA RIG 5563 5563
BREAK OFF BIT. LAY DOWN 16 JNTS 8.5 JARS ONGOING AT REPORT TIME.
MINIMAL STATIC LOSSES.
Foreman Remarks

QRQS-1 IS A SHALLOW OIL EXPLORATION OPPORTUNITY ON THE SOUTHERN FLANK OF THE MARZOUK FIELD IN THE WESTERN RUB AL KHALI AREA.
WELL OBJECTIVE:
THE PRIMARY OBJECTIVE OF QRQS-1 IS THE MISHRIF C RESERVOIR WHILE RUWAYDHA, MISHRIF D AND SAFANIYA RESERVOIRS ARE SECONDARY
TARGETS.

================================JOURNEY MANAGEMENT===================================
JOURNEY MANAGEMENT: HAVE A JOURNEY MANGEMENT PLAN PRIOR LEAVING TO RIG. CALL ARAMCO FOREMAN'S OFFICE BEFORE ENTERING SKID ROAD AT 577-6159 OR CLERK'S OFFICE AT
577-6156 & MAKE SURE YOUR VEHICLE HAS ENOUGH FUEL, CAR SURVIVAL KIT & ENOUGH DRINKING WATER. STAY RIGHT WHILE DRIVING, NIGHT DRIVING IS NOT RECOMMENDED - NEED UPPER
MANAGEMENT APPROVAL.
RIG LOCATION: 409 KM F/ DHG (54 KM SKIDROAD); 123 KM FROM BATHA-SHAYBAH JUNCTION TOWARDS SHAYBAH, TURN LEFT ON THE SKIDROAD & CONTINUE FOR 39 KM TO THE JUNCTION
FOLLOWING SIGN BOARDS , TURN RIGHT & CONTINUE FOR 15 KM TO SINO-18 RIG. MINIMUM TO NO GSM SIGNAL ON ALL 54 KM LONG SKID ROAD.

==================== ESTIMATED GEOLOGICAL HORIZONS INFORMATION ==========================


- 18-5/8" CASING PLANNED AT 140' IN COMPETENT FORMATION, ACTUAL - 140'.
- 13-3/8" CASING PLANNED AT 1,464', ACTUAL - 1,508' (78' INTO RUS FORMATION).
- 9-5/8" CASING PLANNED 5,592' , ACTUAL 5,563'(50' INTO LAFFAN FORMATION).
- 7" LINER PLANNED AT 7,682' (200' INTO KHAFJI).

================================POB===============================================
- ARAMCO MATERIAL EXPEDITOR ABDULMALIK AHMED ALWASIFAR #818621 ON LOCATION SINCE 6/17/2024
- ARAMCO GEOLOGIST MAJED MOUMEN #756573 ON LOCATION SINCE 06/05/2024
- ARAMCO GEOLOGIST YASAR ALAMOUDI #790178 ON LOCATION SINCE 06/07/2024
- ARAMCO EDD SAFETY ADVISOR RAMON PALMARIA FOR VISIT & HSE CAMPAIGN ON LOCATION SINCE 06/17/2024.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QRQS-1 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 05/29/2024 - 08/13/2024
Report ID: OPERLMTDMRREP

================================ HSE ===============================================


- DRILLS: VERTICAL RESCUE DRILL X 1
- NEAR MISS:
- HSE ALERTS:
HSE ALERT 69-24 INJURY DURING ENGINE MAINTENANCE
HSE ALERT 70-24 PIPE HANDLER MAIN ARM UNCONTROLLED DECENT
HSE ALERT 71-24 TRIP AND FALL INCIDENT
HSE ALERT 72-24 SNAKE BITE & SCORPION STING INCIDENTS
- EDD SAFETY BULLETIN:
EDD SAFETY BULLETIN-23-2024 WELDING AND CUTTING (W&C)
DISCUSS
1. DISCUSS THE JOB PLAN AND WORK - RELATED HAZARDS FOR FURTHER OPERATION&DRILL 12'' HOLE SECTION.
2. SHARE WIRELINE OPERATOR ELECTROCUTED DURING LAY DOWN OF WIRELINE TOOLS (MPC & TRACTOR), NEAR MISS INCIDENT (AGITATOR ACIDENTALLY STARTED DUE TO WRONG AGITATOR
ISOLATED AND VERIFICATION NOT PERFORMED) & HIGHLIGHT THAT ELECTRICAL SAFETY.
3.IMPROVE THE SWA IMPLEMENTATION AND SAFETY SUPERVISION. ENSURE MAINTAIN A SAFE WORK ENVIRONMENT.
4.PRECAUTION THE SUMMER BRINGS INCREASED REPTILE AND ARTHROPOD ACTIVITIES, IMPROVE THE SAFETY AWARENESS FOR SURROUNDING.

===========================EXTRA REQUIREMENTS==========================================

=============================== AUDIT ================================================


- 2ND QSI 2024: FINDINGS: 52, CLOSED: 52 & OPEN: 0.
- RHSEI 2023: FINDINGS: 70, CLOSED: 70 & OPEN: 0.
- WCI 2023: FINDINGS: 13, CLOSED: 13 & OPEN: 0.
- PCI 2022: FINDINGS: 169, CLOSED: 169 & OPEN: 0.

============================ VACUUM TANKERS ==========================================


- 1 X SPRAY TANKER ON LOCATION (DRSS#1004327538)

================================ SERVICE COMPANIES =====================================


- EMEC MUD ENGINEER, HALL CMT CREW, EXLOG, KASAB TELEDRIFT, SAMAA PBL ON LOCATION

================================= RENTAL TOOLS========================================


- NESR 8" HM DRLG JAR X 2

======================================NEXT WELL======================================
- QDQD-11: 50 % READY, WELLSITES WORKS UNDERGOING, NO ROUTE SURVEY.
- LAST VISIT: -
- WATER WELL: QDQD-801, WAITING ON WATER WELL GROUP UPDATES.
- DRILLING PROGRAM: NO
- ERP: NO

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
76 PCF 0 5.8 API 1 0 Volts 1.71 10.1 66,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 90 31 0 9 / 13 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 29 9 8/9 5 360 0
59
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
76 PCF 0 5.6 API 1 0 Volts 1.76 10 65,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 90 29 0 8 / 12 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 27 9 8/9 5 320 0
58

BARITE MARBLE-CRSE NACL SODASH CAUST HYSTAR-P DRILL ZONE


MUD 3 ( 5000L ) 1 ( 2200L ) 13 ( 2200L ) 10 ( 100LB ) 28 ( 50LBP ) 36 ( 25KG ) 1 ( 55GL )
TREATMENT NUTPLUG MICA-CRSE NEWDRLPLUS CITRICACID
22 ( 25KG ) 40 ( 25KG ) 2 ( 25KG ) 1 ( 5GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
4RR 3,665 5,563 DP Av DC Av Bit HHP 10 90 M422 12 REED
Pressure GPM Jet Vel 172.38 273.28 145 I-Row O-Row DC Location Bearings
2,000 800 190 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
S296632 SK616M3D 9 x 14 / 1.353
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
DRILL STRING Y 50 245 245 245 6 71
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QRQS-1 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 05/29/2024 - 08/13/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit REED 12 1 12 1.44 6-5/8"REG N/A S296632
2 Near Bit Roller Reamer RIG 12 1 8.5 2.813 7.49 6 5/8 REG 6 5/8 REG 165 3 POINT ON FILE
3 Drillcollar RIG 8.5 1 8.5 2.813 29 6 5/8 REG 6 5/8 REG 165 SPRL ON FILE
4 String Reamer RIG 12 1 12 2.875 8.71 6-5/8" REG 6-5/8" REG 176 ON FILE
5 Non Magnetic Drill Collar ( NMDC ) NRT 8 1 8 2.813 14.16 6 5/8 REG 6 5/8 REG 165 SPRL P1054
6 Measurement While Drilling (MWD) KSB 8 1 8 15.35 6-5-8" REG 6 5/8" REG 116.1 P999
7 String Reamer RIG 12 1 12 2.875 7.09 6-5/8" REG 6-5/8" REG 176 ON FILE
8 Drillcollar RIG 8.5 1 8.5 2.875 30.05 6 5/8 REG 6 5/8 REG 170 SPRL NA
9 PBL (Multiple Activation By Pass) SAM 8.25 1 8.125 3.5 8.38 6 5/8 REG 6 5/8 REG 165 WES825BP299
10 Drillcollar RIG 8.5 12 8.5 2.875 359.57 6 5/8 REG 6 5/8 REG 170 SPRL ON FILE
11 Hydro-Mechanical Jar NPC 8.5 1 8.5 2.81 29.66 6-5/8" REG 6-5/8" REG 2,700 GE-DJ-00129
12 Drillcollar RIG 8.5 2 8.5 2.813 61.93 6 5/8 REG 6 5/8 REG 165 SPRL ON FILE
13 Crossover RIG 8.5 1 8.5 2.813 2.38 XT54 6 5/8 REG 165 ON FILE
14 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 455.87 XT54 XT54 61.6 CONV ON FILE
15 Drillpipe RIG 5.5 1 5.5 4.67 30 XT54 XT54 24.7 XD105 PREMIUM NA

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
06/09/2024 N/A CALM N/A HOT 6,049 JOURNEY
MANAGEMENT,
MISCELLANEOUS
PTW/LOTO, SWA,
PPE, TRIPPING
OPERATIONS.

Company TGC RIG EMC KSB XLG RIG ARM HCM ARM SAM FET SDM SPR

Category CTRG RIG DFMS LWD MLS OTHR OTHR PCS WSC WBCS DV LWD CSR
PERSONNEL
15 41 1 2 4 20 4 4 1 1 1 2 8
Total
AND SERVICES No. of Persons
104
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 17 17 12

Operating Hours. 0 24 24 24 24 12 12 0 24 24 6 0 12

Standby/Tankers Others Others Others


TRUCKS/BOATS
DH 4880 4 x 4 ambulance coaster bus mini-bus

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1500 500 419 N/A N/A 2400

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-1508 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/06/2024 - 07/14/2024
Report ID: OPERLMTDMRREP

SINO-19L @ UTMN-1508 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK THE Foreman(s)ZEKOUR, NOUREDDINE
D&WO Morning Report (Service Providers View) Charge #: WELL AS SINGLE LATERAL Engineer CHE JAFFAR, NOOR CHOZIN ALI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24057-1508) ACROSS (AD2A)) Manager KHALDI, MOHAMMED SALEH
SINO-19L
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 00-88-216- 777-128-04 (013) 577- 9603/05 (013) 813- 7243 WFD D SV
Date: Tuesday 06/18/2024 UTMN-1508 (0) UTMN_1508_0 MOBILE
055-330-40 61 RIG MGR

Last 24 hr operations Next 24 hr plan


L/D TBG, P/U & M/U 7" CLEAN OUT BHA W/ TANDEM SCRAPERS 7" X 9 5/8" WITH PICK UP 4''DP, PERFORM MULTI CSG CORROSION LOG, RIH & SET 9-5/8'' DLT PKR, WELL HEAD WORK, RETREIVE
CHC, POOH, RIH W/ WFD W/L AND PERFORM CORROSION LOG. DLT PKR, RIH & SET 7" WFD WHIPSTOCK.
Location Next Location
2.84 KM WEST UTMN GOSP-9 UTMN-642
Current Depth (ft) Liner TOL MD TVD Formation Tops
6,890 Last Csg Size MD TVD Size 2,613 6,515 Top
9 5/8 4071 4071 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
6890 (Date) 100 0 140
7 (06/11/2024@0500 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT, POOH & L/D 4-1/2" TBG CUT OFF COMPLETION STRING.
- L/D TOTAL 150 JTS OF 4-1/2" J-55 11.6# NVAM TBG +04 PJ OF 4-1/2" J-55 +
0500 - 0530 0.5 0 POST N DCOM RPCS UPCOM RIG 6890 6890 550 0
15' CUT OF TBG.
- KEEP MONITORED WELL THRU TRIP TANK - WELL STATIC.
- IMPLEMENT NORM PROTECTION REQUIRMENT WHILE POOH.

HPJSM, R/D 4 1/2" TUBING HANDLING EQUIPMENT & R/U 4" DP HANDLING
0530 - 0630 1 0 POST N CT HT PEL RIG 6890 6890 EQUIPMENT.
- KEEP MONITORED WELL THRU TRIP TANK - WELL STATIC.

HPJSM, P/U & M/U 6-1/8'' C/O BHA AS FOLLOWS-


0630 - 0730 1 0 POST N CT HT BHA RIG 6890 6890
- 6 1/8" WELDED CONE BIT+ FLOAT SUB W/ FLOAT VALVE + 6 1/8" STRING MILL +
1 JT 4 3/4" DC + 7" ROTATING SCRAPER + CROSSOVER (3 1/2" IF PIN X 4" XT-39).

RIH W/ 7'' SCRAPER C/O BHA ON 4" HWDP/DP TO 5630 FT,


- P/U 51 JT 4" HWDP AND 128 JT 4" DPS FROM RACK.
0730 - 1300 5.5 0 POST N CT LDP SPDP RIG 6890 6890 0 5630 - FILL STRING & CIRCULATE STRING CAPACITY W/ 80 PCF BRINE EVERY 20
STANDS.
- PASSED CEARFULLY TOL @ 2,163'.
- KEEP MONITORED WELL THRU TRIP TANK - WELL STATIC.

1300 - 1330 0.5 0 POST N CT HT BHA RIG 6890 6890 P/U & M/U 9 5/8" SCRAPER.
- KEEP MONITORED WELL THRU TRIP TANK - WELL STATIC.

RIH W/ TANDEM SCRAPER C/O BHA ON 4" DP F/ 5630 FT T/ 6000 FT.


- SCRAP W/ 9 5/8" SCRAPER ACROSS DLT PKR DEPTH F/ 178- 270 FT.
1330 - 1430 1 0 POST N CT LDP SPDP RIG 6890 6890 5630 6000 - SCRAP W/ 7" SCRAPER F/ 5200 FT - 5600 FT.
- FILL STRING & CIRCULATE STRING CAPACITY W/ 80 PCF VISCOUS BRINE EVERY
20 STANDS.
- KEEP MONITORED WELL THRU TRIP TANK - WELL STATIC.

1430 - 1530 1 0 POST N CT CIRC MPMP RIG 6890 6890 CUMULATIVE STRING FILLING AND BREAK CIRCULATION EVERY 20 STD W/ 80 PCF
KILL FLUID.

1530 - 1630 1 0 POST N CT CIRC MPMP RIG 6890 6890 SWEPT HOLE W/ 50 BBL HI VIS AND CIRCULATE HOLE CLEAN W/ 80 PCF BRINE,
MW IN = -MW OUT = 80 PCF.
1630 - 1700 0.5 0 POST N CT CIRC MPMP RIG 6890 6890
FLOW CHECK - WELL STATIC.

1700 - 1730 0.5 0 POST N CT TO STDP RIG 6890 6890 6000 5630 POOH W/ 6-1/8'' TANDEM SCRAPER C/O BHA F/ 6000 FT T/ 5480FT.
- KEEP MONITORED WELL THRU TRIP TANK - WELL STATIC.

1730 - 1800 0.5 0 POST N CT TO STDP RIG 6890 6890 5460 4040 L/D 9 5/8" SCRAPER.
- FLOW CHECK - WELL STATIC.

1800 - 1930 1.5 0 POST N CT TO STDP RIG 6890 6890 5630 500 CONT, POOH W/ 6-1/8'' TANDEM SCRAPER C/O BHA TO 500 FT.
- KEEP MONITORED WELL THRU TRIP TANK - WELL STATIC.
1930 - 1945 0.25 0 POST N CT CIRC MPMP RIG 6890 6890
FLOW CHECK - WELL STATIC.

1945 - 2045 1 0 POST N CT HT BHA RIG 6890 6890 CONT, POOH AND L/D 6-1/8'' C/O BHA.
- KEEP MONITORED WELL THRU TRIP TANK - WELL STATIC.

2045 - 2215 1.5 0 POST E LOG OTH NA WWL 6890 6890 HPJSM, R/U WFD WIRELINE EQUIP, M/U WIRELINE MULTI CORROSION LOG.
- KEEP MONITORED WELL THRU TRIP TANK - WELL STATIC.
2215 - 0459 6.75 0 POST E LOG LOG WLT WWL 6890 6890 6000 0
WFD W/L RIH WITH MULTI-CASING CORROSION LOG TOOL F/ 5,975 T/ 3,500'...

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-1508 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/06/2024 - 07/14/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
INC@RPT.
- KEEP MONITORED WELL THRU TRIP TANK - WELL STATIC.
Workover Objectives
Foreman Remarks

- ODF CORRECTION: - 0.5 FT.

________________________________________________________________________________________________________________________
>>SAFETY, AUDITS & DRILLS :
- HELD SAFETY MEETINGS WITH ALL INVOLVED PERSONNEL.
_________________________________________________________________________________________________________________________
>>ARAMCO PERSONNEL :
- ARAMCO FCT AMMAR ALMASOUDI #787612 ON LOCATION SINCE 06/09/2024.
- ARAMCO FCT SAAD AL BEDAIWI ID #796949 ON LOCATION SINCE 06/16/2024.
- DOE&CD MOAYID JRFALIY #764237 AND SAEED ALGHAMDI #784339 ON LOCATION FOR (2024 D&WO RIG SAFETY OUTREACH CAMPAIGN)
_________________________________________________________________________________________________________________________
>>ON-BOARD PERSONNEL & SERVICES :
- WFD LSTK4 DSV WALEED (DAY) & RABIE (NIGHT) ON LOCATION.
- WFD LSTK4 HSE ADVISOR : ABBAS, MUHAMMAD ON LOCATION.
_________________________________________________________________________________________________________________________
>>FUEL CONSUMPTION :
- DIESEL CONSUMPTION FOR ENGINES (RIG + CAMP) = (DAILY: 29 BBL / CUMMULATIVE FOR CURRENT WELL UTMN-1508 : 210 BBL).
- RIG & CAMP DIESEL PROVIDED BY WFD LSTK.
_________________________________________________________________________________________________________________________
>>NEXT LOCATIONS :
- UTMN-0642 (GOSP-10) : KOM HELD ON 03/28/2024 (BY SINO-5L), STRIP OUT: 100 %, LOCATION: 10%.
_________________________________________________________________________________________________________________________
>>CONTRACTORS MANAGMENT VISITS :
- WFD SUPT HOSSAM ON LOCATION.
- WFD MUD SUPV, ATTIA ON LOCATION.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 0 API 0 0 Volts 0 9.4 245,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 86 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 14 0/0 0 0 0
44
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 0 API 0 0 Volts 0 9.4 245,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 86 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 14 0/0 0 0 0
45

MUD UTG-XG CACL2-80 MARBLE-FINE FLO-TROL CAOH2


TREATMENT 37 ( 55LB ) 35 ( 2200L ) 36 ( 2200L ) 30 ( 55LB ) 5 ( 40LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
06/15/2024 6/16/2024 NS 19 KM/H NA H: 46 DEG L: 5,142 2024 D&WO RIG
MISCELLANEOUS
29 DEG SAFETY OUTREACH
CAMPAIGN

Company GOC RIG GDF MJH GEI ARM TK4 ARM WWL

Category CTRG RIG DFMS SEC ISPCT OTHR WSC WSC WLS
PERSONNEL
15 59 1 4 4 4 4 1 6
Total
AND SERVICES No. of Persons
98
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 12 12 24 24 5

Standby/Tankers Others
TRUCKS/BOATS
PICK-UP AB-6423 AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 1150

REPAIR ASAP Instrumentation Other Reporter

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-1508 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/06/2024 - 07/14/2024
Report ID: OPERLMTDMRREP

Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MZLJ-306 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/26/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

SINO-1L @ MZLJ-306 Limited Morning Report for 06/18/2024


Objective : (INCREASE Foreman(s)HADDADI, BILAL
D&WO Morning Report (Service Providers View) Charge #: WELL POTENTIAL ABD1.) Engineer ASHRAF, RAJU RUHAIL / ALHUDAIF, MOHAMMAD KHALID
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (72-24086-0306) Manager ABU RASAIN, AMER MANE
SINO-1L
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 8821677712 698 013-578-42 78 013-502-39 66 MEDIC
Date: Tuesday 06/18/2024 MZLJ-306 (0) MZLJ_306_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
013-813-72 50 WFD DSV 013-502-39 66 RIG MGR

Last 24 hr operations Next 24 hr plan


PERFORMED SHUT-IN CALIBRATION PASSES, RUN W/BAKER PLT/CALIPER LOG AND RECORD SAME
ON 8-1/2" OPEN HOLE WHILE FLOWING THE WELL TO PRODUCTION LINE.
Location Next Location
303 KM FROM DHAHRAN MAIN GATE. KHRS-513
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,342 Last Csg Size MD TVD Size Top
9 5/8 6018 5099 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9342 (Date) 100 0 303
16.8 (06/01/2024@0900 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

OILSERV CT RIH WITH BAKER PAI-CAT-HPT STRING TOOLS BHA WHILE WASH
DOWN @ 0.5 BPM FROM 5550' TILL SLB CT PLUG ENTERED THE NIPPLE @ 5604'
0500 - 0600 1 0 POST E LOG OTH NA OZT 9342 9342 (END OF STRING @ 5648').
- SLACK DOWN 5650 LBS WEIGHT, SHEAR OUT CT PLUG AND RELEASE CT FROM
PLUG.
- CONTINUE RIH TO 5750'.

HPJSM, LINED UP TO PRODUCTION LINE & CONTINUED FLOWING WELL THROUGH


WFD ADJUSTABLE CHOKE, MEANWHILE BAKER RECORDED STABILIZATION.
- CHOKE SIZE = 64/64
- FREQUENCY 50 HZ AT 40 AMP
- UP STREAM WHP = 980 PSI
- DOWN STREAM PRESSURE = 900 PSI
0600 - 1130 5.5 0 POST E LOG LOG WLT BAW 9342 9342 5750 5750
- FLOW RATE = 4239 BPD (80% OIL)
- FLOW TIME = 5.5 HR
- FLOW VOLUME = 1094 BBL (TO GOSP)
- TCA PRESSURE= ZERO PSI
- PI = 1885 PSI
- PD = 2903 PSI
- P = 5 PSI/HR (ON BAKER LOGGING TOOL).

1130 - 1230 1 0 POST E LOG LOG WLT BAW 9342 9342 5850 5950 BAKER PERFORMED SPINNER CALIBRATION F/ 5850' T/ 5950' AND SENT DATA TO
RDD/RTS FOR CONFIRMATION.

BAKER RECORDED DOWN MAIN PASS WHILE OILSERV CT RIH BAKER PAI-CAT-HPT
1230 - 1500 2.5 0 POST E LOG LOG WLT BAW 9342 9342 5950 9292 STRING TOOLS BHA (PLT/CALIPER LOG - LIVE RUN) AT 30 FT/MIN FROM 5950' TO
LOCK UP @ 9292' AT FLOWING (HIGH CHOKE) +-4 MBD.
- BAKER SPINNERS ARE NOT WORKING (NO READINGS).

BAKER RECORDED MAIN UP PASS WHILE OILSERV CT POOH WITH BAKER PAI-CAT-
1500 - 1700 2 0 POST E LOG LOG WLT BAW 9342 9342 9292 5950 HPT STRING TOOLS BHA (PLT/CALIPER LOG - LIVE RUN) AT 30 FT/MIN OVER 9292'
TO 5800' AT FLOWING (HIGH CHOKE) +-4 MBD.
- BAKER SPINNERS ARE NOT WORKING (NO READINGS).

1700 - 1800 1 0 POST E LOG OTH NA BAW 9342 9342 SENT DATA TO RDD/RTS FOR CONFIRMATION, MEANWHILE PERFORM CLEAN PASS
BY RECIPRATING CT UP/ DOWN WITH 30/50/70 FT/MIN F/ 5800' T/ 5900'.

BAKER RECORDED REPAT DOWN MAIN PASS WHILE OILSERV CT RIH BAKER PAI-
CAT-HPT STRING TOOLS BHA (PLT/CALIPER LOG - LIVE RUN) AT 45 FT/MIN (FAST
1800 - 1930 1.5 0 POST E LOG LOG WLT BAW 9342 9342 5950 9292
SPEED) FROM 5950' TO 9292' ( LOCK UP @ 9292') AT FLOWING (HIGH CHOKE) +-4
MBD.
- BAKER SPINNERS 3/6 ARE WORKING.

BAKER RECORDED MAIN UP PASS WHILE OILSERV CT POOH WITH BAKER PAI-CAT-
HPT STRING TOOLS BHA (PLT/CALIPER LOG - LIVE RUN) AT 45 FT/MIN (FAST
1930 - 2100 1.5 0 POST E LOG LOG WLT BAW 9342 9342 9292 5950
SPEED) OVER 9270' TO 5800' AT FLOWING (HIGH CHOKE) +-4 MBD.
- BAKER SPINNERS 3/6 ARE WORKING.

SENT DATA TO RDD/RTS FOR CONFIRMATION, MEANWHILE PERFORM SPINNERS


CLEAN PASS BY RECIPRATING CT UP/ DOWN WITH 30/50/70 FT/MIN F/ 5800' T/
2100 - 2200 1 0 POST E LOG OTH NA BAW 9342 9342
5900'.
- BAKER SPINNERS 5/6 ARE WORKING.
- DISPLACE CT WITH 10 BBL DIESEL.

BAKER RECORDED REPEAT DOWN MAIN PASS WHILE OILSERV CT RIH BAKER PAI-
2200 - 0200 4 0 POST E LOG LOG WLT BAW 9342 9342 5800 8017
CAT-HPT STRING TOOLS BHA (PLT/CALIPER LOG - LIVE RUN) AT 50 FT/MIN (FAST
SPEED) FROM 5800' HAD LOCK UP @ 8017', P/U BAKER LOGGING TOOLS AND

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MZLJ-306 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/26/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
POOH 500 FT TO 7517' AND RUN BACK AT 50 FT/MIN HAD LOCK UP AT DEPTH
8018', P/U 300 FT AND TRY TO RUN DOWN AT 40 FT/MIN HAD ALSO LOCK UP AT
THE DEPTH 8048'. OILSERV CT POOH TO 5900'.
- FLOWING THE WELL AT HIGH CHOKE (+-4 MBD).
- TCA PRESSURE= ZERO PSI
- BAKER SPINNERS 4/6 ARE WORKING.

BAKER RECORDED REPEAT DOWN MAIN PASS WHILE OILSERV CT RIH BAKER PAI-
CAT-HPT STRING TOOLS BHA (PLT/CALIPER LOG - LIVE RUN) AT 50 FT/MIN FROM
5900' TILL 7800' THEN REDUCED THE SPEED TO 30 FT/MIN TILL PASSED THE
0200 - 0400 2 0 POST E LOG LOG WLT BAW 9342 9342 5900 9270 LOCK UP POINT AND CONTINUE RECORDED REPAT DOWN MAIN PASS WHILE
OILSERV CT RIH AT 50 FT/MIN TILL 9270'.
- FLOWING THE WELL AT HIGH CHOKE (+-4 MBD).
- TCA PRESSURE= ZERO PSI
- BAKER SPINNERS 4/6 ARE WORKING.

BAKER RECORDED MAIN UP PASS WHILE OILSERV CT POOH WITH BAKER PAI-CAT-
0400 - 0459 1 0 POST E LOG LOG WLT BAW 9342 9342 9270 5900 HPT STRING TOOLS BHA (PLT/CALIPER LOG - LIVE RUN) AT 45 FT/MIN (FAST
SPEED) OVER 9270' TO 5800' AT FLOWING (HIGH CHOKE) +-4 MBD...ON GOING.
- BAKER SPINNERS 4/6 ARE WORKING.
Workover Objectives
Foreman Remarks

- ODF CORRECTION : -4.4 FT.


===================================================
RER: 100 PPM (596 M), 30 PPM (1037M), 1/2 LFL (153 M).
(ARAB-D) GOR = 433 SCF / STB & H2S: 2.55 %
===================================================
HSE
- SAFETY: 980 LTI FREE DAYS
- PRE-TOUR/RIG MOVE SAFETY MEETINGS: (2)
- STOP CARDS (22), PTW: (05)JSA: (09), NEAR MISS (00), INCIDENTS: (0)
- DRILLS: SWA DRILL (00). PIT DRILL (00), TRIP DRILL (00), H2S DRILL(01), FIRE DRILL(00), MAN DOWN DRILL (0), ACCUMULATOR DRILL(0) .
- CONFINED SPACE DRILL (1- CONDUCTED ON 16-MAY-2024), VERTICAL RESCUE DRILL (1 -CONDUCTED ON 02-DEC- 2023).
- ANNUAL SECONDARY EMERGENCY DRILL / MAN LOST - SEARCH AND RESCUE DRILL (1-CONDUCTED ON 07-FEB-2024).

CREW CHANGE MEETING DISCUSSIONS: KEEP GOOD COMMUNICATION WITH THIRD PARTY, DON'T STAND UNDER THE SUSPENDED LOAD, USE THE GAS TEST DURING FLUSH THE FLOW BACK LINE,
KEEP GOOD HOUSEKEEPING ON WORKING AREA , MAKE SURE NO TRIP NO SLIP HAZARD, SWA AWARNESSS, ISOLATION THE COIL TUBING WORKING AREA, KEEP GOOD RECORD WHEN FINISHED
FILLING THE DIESEL.
===============================================================================================
JOURNEY MANAGEMENT PLAN:
- RIG IS LOCATED ON KHRS FIELD 1 KM SKID ROAD ON KHRS ROAD.
- IF NEEDED CALL RIG SINO-1L AT (013-578-4278).
- ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
- ALL VEHICLES SHOULD BE 4 X 4.
- ALL VEHICLES SHOULD FOLLOW ROAD ALLOWED DRIVING SPEED.
- THERE IS SIGNAL IN THE SKID ROAD BUT IS BETTER TO HAVE THURAYA PHONE IF AVAILABLE.
- DISTANCE FROM DHAHRAN MAIN GATE TO RIG: 303 KM.
===============================================================================================
AUDIT
- 1ST QSI DONE ON 13-FEBRUAY-2024 : FINDING = 41, CLOSED = 41, OPEN = 0. (ALL CLOSED)
- 2ND QSI DONE ON 07-MAY -2024: TOTAL FINDINGS =55, CLOSED=55, OPEN=0(P2) (ALL CLOSED)
- 1ST RSI DONE 13-MAY-2024 FINDINGS=48, CLOSED 48, OPEN=0. (ALL CLOSED)
- WCI DONE 16TH-MAY-2024- FINDINGS=4, CLOSED 4, OPEN=0. (ALL CLOSED).
====================================================================================
WEATHERFORD PERSONEL:
- ISP WFD DSV: NASEREDDIN (DAY), ABDULMAJID (NIGHT), HSE: ARUN.
==================================================================================================
SERVICE COMPANIES:
- SINOPEC STANDALONE GAS DETECTOR WITH TECHNICIAN ON LOCATION ON 05/31/2024 @ 10:00 O'CLOCK.
================================================================================================
WATER DATA
- WATER SOURCE: GHZL-804.
- TOTAL BRINE IN MUD SYSTEM: BBL.
====================================================
- MUD/COMPLETION DIESEL IN BBLS:
- STOCK: 0 BBL
- CONSUMED: 0 BBL
- RECEIVED: 0 BBL
====================================================
-WELL CONTROL DATA
- TUBING VOLUME : 86 BBLS
- TCA VOLUME: 318 BBLS
- CASED HOLE VOLUME: 26 BBLS
- OPEN HOLE VOLUME: 233 BBLS
- TOTAL VOLUME: 663 BBLS
====================================================
WATER CONSERVATION IMPLEMENTED INITIATIVES
- REDUCED WATER PITS: N
- DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: N
- CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION: N

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MZLJ-306 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/26/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

=====================================================
NEXT LOCATIONS: NA
=====================================================
ARAMCO VEHICLE:
- ARAMCO CAR (AB-5506) SERVICED ON 05/07/24, NEXT SERVICE DUE 07/07/24.
=====================================================
- ECC RADIO COMMUNICATION FUNCTIONAL .
=====================================================
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 9,342 88 84.5 0 5,157 119.62 1572.61 5,174.39 0.21

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 0 API 0 0 Volts 0 9 37,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
32
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 0 API 0 0 Volts 0 9 37,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
32

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
05/30/2024 05/30/2024 SEASONAL N/A SEASONAL 982 RECORD
MISCELLANEOUS
PLT/CALIPER LOG
WHILE FLOWING.

Company SWA SCC OZT RIG SMI SNS BAW TK4 OTH TK4 ARM WWW

Category ALS CTRG COIL RIG DFMS H2S LPS OTHR VAC WSC WSC WTSE
PERSONNEL
6 12 8 58 1 1 4 1 3 2 1 6
Total
AND SERVICES No. of Persons
103
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 12 0 12 12 12 12 12 12 12 24 24 12

Standby/Tankers Others Others


TRUCKS/BOATS
PICK-UP AB-5506 SINO AMBULANCE SINO AMBULANCE 2

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 1500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-420 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/21/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

SINO-22 @ QTIF-420 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL MAHMOUD, MOHAMED HAMDY / HATHELOOL, MOHAMMED
Foreman(s)
D&WO Morning Report (Service Providers View) OIL PRODUCER TARGETING ABDULRAHMAN
Rig Charge #: ARAB-D RESERVOIR.) Engineer ALROQAIE, ABDULAZIZ ABDULLAH
Copyright 2024 Saudi Aramco. All Rights Reserved SINO-22 (66-23012-0420) Manager ABADA, YASSINE
Daily Onshore
Wellbores: THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well
0088216777 11349 6736632 /CLERK VSA
Date: Tuesday 06/18/2024 QTIF-420 (0-1) QTIF_420_1
T
6739370

Last 24 hr operations Next 24 hr plan


POOH & L/D BAKER RUNNING TOOL, M/U & RIH 4-1/2" SLB MIDDLE COMPLETION ASSY. ON 4" CONT RIH W/SLB 4-1/2" MIDDLE COMPLETION, SET PACKER, POOH & L/D SLB. RUNNING TOOL
D/P'S.
Location Next Location
QATIF, NPD-13 SITE QTIF-212
Current Depth (ft) Liner TOL MD TVD Formation Tops
15,095 Last Csg Size MD TVD Size 4,824 11,302 7,187 Top
7 11302 7187 Formations Comments
7 Depth
SULY 5,931 6188' MD (1.3' TVD DEEPER)
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) 10414' MD (5.3' TVD
15095 (Date) 95 0 45 ABDR 7,163
DEEPER)
112 (02/27/2024@0500 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT. POOH W/ BAKER LOWER COMPLETION SETTING TOOL MEANWHILE L/D


0500 - 0700 2 0-1 EOW C COMP LDP SPDP RIG 15095 15095 6733 5920 EXCESS 4'' DP'S.
-TOTAL 4" D/P'S L/D: TOTAL 45 STDS.
- MONITOR WELL ON TRIP TANK & TRIP SHEET, WELL STATIC.

0700 - 0715 0.25 0-1 EOW C COMP TO STHDP RIG 15095 15095 5920 5370 CONT. POOH W/ BAKER LOWER COMPLETION SETTING TOOL ON STDS OF 4"
HWDP TO 5370'.

CONT. POOH W/ BAKER LOWER COMPLETION SETTING TOOL MEANWHILE L/D


0715 - 1045 3.5 0-1 EOW C COMP LDP SPDP RIG 15095 15095 5370 3970
EXCESS 4'' HWDP (TOTAL 15 STDS).
- MONITOR WELL ON TRIP TANK & TRIP SHEET, WELL STATIC.

CONDUCTED MAN DOWN (INJURY) DRILL ON RIG FLOOR WITH MEDICAL


EVACUATION BY STRETCHER USING A CRANE.
1045 - 1115 0.5 0-1 EOW C COMP SDR1 NA RIG 15095 15095
IP (DUMMY) TRANSFERRED FROM RIG FLOOR TO CLINIC.
HELD STAND DOWN CRITIC MEETING WITH RIG CREW & DISCUSS THE AREA OF
IMPROVEMENT.

CONT. POOH W/ BAKER LOWER COMPLETION SETTING TOOL ON STD OF 4" DP TO


1115 - 1330 2.25 0-1 EOW C COMP TO STDP RIG 15095 15095 3970 0
SURFACE.
- MONITOR WELL ON TRIP TANK & TRIP SHEET, WELL STATIC.

1330 - 1415 0.75 0-1 EOW C COMP HT PKR BC 15095 15095 HPJSM, L/D BAKER LOWER COMPLETION SETTING TOOL.
- CHECK TOOLS IN GOOD CONDITION.

HPJSM, CHANGE TDS BAILS, R/U WFD POWER TONG & 4-1/2" TBG HANDLING
1415 - 1530 1.25 0-1 EOW C COMP HT PEL WCR 15095 15095
EQUIPMENT.

CONDUCTED MAN DOWN (INJURY) DRILL ON RIG FLOOR WITH MEDICAL


EVACUATION BY STRETCHER USING A CRANE.
1530 - 1600 0.5 0-1 EOW C COMP SDR1 NA RIG 15095 15095
IP (DUMMY) TRANSFERRED FROM RIG FLOOR TO CLINIC.
HELD STAND DOWN CRITIC MEETING WITH RIG CREW & DISCUSS THE AREA OF
IMPROVEMENT.

HPJSM, P/U & M/U SCHL MIDDLE COMPLETION ASSY AS FOLLOW:


- 4-1/2" 12.6# L-80 NVAM JT WLEG (MUL SHOE)
- ONE JOINT (4-1/2", 12.6#, L-80, N.VAM).
- ASSY#1: PUP JT (12.6#, L-80, NVAM) + CERAMIC DISK + 4-1/2" PUP JT (12.6#,
L-80, NVAM)
1600 - 1830 2.5 0-1 EOW C COMP HT PKR SCP 15095 15095
- ONE JOINT (4-1/2", 12.6#, L-80, N.VAM).
- ASSY#2: PUP JT (12.6#, L-80, NVAM) + CERAMIC DISK + 4-1/2" PUP JT (12.6#,
L-80, NVAM)
- 3 JOINTS (4-1/2", 12.6#, L-80, N.VAM).
- ASSY#3: 7" QHSB PACKER+ PBR ASSY.
- ASSY#4: SLB PBR ASSY WITH SLB CIRCULATING SUB.

1830 - 1930 1 0-1 EOW C COMP HT PEL WCR 15095 15095 R/D WFD POWER TONG & 4-1/2" TBG HANDLING EQUIPMENT.
- CHANGED HANDLING TOOLS TO RIG 4" SIZE

RIH W/SLB 7" MIDDLE COMPLETION ASSY ON DRIFTED 4" DP STD AT CONTROLLED
1930 - 0459 9.5 0-1 EOW C COMP RPCS LWCOM RIG 15095 15095 280 8300 SPEED TO 8,300'. ON GOING AT REPORT TIME.
- MONITOR WELL ON TRIP TANK - STATIC. OK.
- BREAK CIRC. EVERY 2000' NOT EXCEEDING 300 PSI.
Foreman Remarks

>>WELL OBJECTIVES:

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-420 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/21/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

- QTIF-420 WILL BE DRILLED AS SINGLE LATERAL OIL PRODUCER TARGETING ARAB-D B2 RESERVOIR FROM DRILL SITE NDP-13. TD OF THE WELL IS (15,304 FT MD/ 7,156 FT TVD). THE WELL
WILL BE COMPLETED W/SLB QHSB RETRIEVABLE PACKER, TWO CERAMIC DISKS, TWO PDHMS GAUGES AND WLSSSV ON 4-1/2" TUBING.
- THIS WELL WILL BE DRILLED USING SULAIY OPEN METHOD. THE 6-1/8" HOLE SECTION WILL BE DRILLED ACROSS ARAB-D B2 RESERVOIR TO TD WHILE SULAIY IS OPEN (7" CSG PERFORATED) TO
REDUCE RER VALUES. IN CASE OF UN-CONTROLLED HYDROCARBON FLOW, SULAIY WATER WILL OVERFLOW/DILUTE THE RESERVOIR FLUIDS.
-UPDATE: QTIF-420 WILL BE COMPLETED W/BAKER OPEN HOLE ICDS & MPAS PACKERS (L.COMPLETION), SLB QHSB COMPL PKR, TWO CERAMIC DISCS (MIDDLE COMPL), TWO SLB PDHMS GAUGES,
HLB WLSSSV (U.COMPL) ON 4-1/2" TBG.
==============================HOLE SECTIONS ==========================
- 8-1/2'' HOLE TO 7'' CSG POINT AT +/- 11,304' MD / 7,187.9' TVD. (ARAB-D B2)COMPLETED.
- 6-1/8'' L-0 HOLE TO TD AT +/- 15,304' MD / 7,163.7' TVD (ARAB-D B-3), P&A, CSD ST.
- 6 1/8" L-0-1 TOW @ 10460', BOW 10473' TD AT +/- 15,095' MD/7,227' TVD (ARAB-D).
=============================== NEXT WELL ============================
- QTIF-212 (SAME DS PAD NPD-13)
========================= ERP & SAFETY REQUIREMENT ======================
-AS PER LPD, THIS WELL IS IN A NON-POPULATED AREA,
- GOR: 971 (SCF/STB) & 11.89% H2S, 1/2 LFL: 450 (M), 30 PPM: 0 (M), 100 PPM: 0 (M)
- WELLS ON NPD-13 DRILL SITE: QTIF-419, 307, 365 & 304 (SECURED W/LMV, BPV & WLSSSV)
- LOCATED 114 CONCRETE BARRICADES BLOCKS ON SITE & AROUND WELLS AT QTIF-419/ QTIF-307/ QTIF-365/ QTIF-304 WELLS.
- RAWABI STANDALONE H2S SENSORS ON LOCATION SINCE 03/21/2024.
- BAKER KILL PUMP ON LOCATION SINE 03/21/2024.
- FIRE FLY ON LOCATION SINCE SINCE 03/21/2024.
- SLB MUD LOGGING UNIT/CREW ON LOCATION SINCE 03/16/2024.
====================================ACTIVATE SIMOPS=====================
- NO SIMOPS.
====================================== SAFETY ==========================
- PERFORMED DAILY RADIO CHECK WITH DH ECC.
- CONDUCT DAILY SAFETY & PRE-TOUR MEETING.
- SAFETY DRILL'S: NIL.
- REPORTED OBSERVATIONS IN SLS: 10.
- NEAR MISS: NIL.
- HSE ALERTS: : 69-24 (INJURY DURING ENGINE MAINTENANCE).
============================ ARAMCO PERSONNEL ON LOCATION ==========================
- MAT. EXPEDITOR, TURKI AL-OTAIBI (#8413392) ON LOCATION SINCE 06/10/2024.
=========================== SERVICE COMPANY & RENTAL TOOLS ===========================
- 2 BAKER MUD ENGINEER ON LOC. SINCE 02/28/2024
- SLB ACID TANK ON LOCATION ON 04/26/2024
- HALL RTTS ENGINEER & TOOLS ON LOCATION AT 10:00 ON 06/17/2024
- ODJFELL 2 7/8" HANDLING TOOLS ON LOCATION ON 6/17/2024.
===================================DIRECTIONAL====================================
- FOLLOW QTIF-420_1 REV-D.0 (PWP)
========================= ======"WASTE MANAGEMENT"================================
- 3 VACUUM TANKER FOR JUNE. 2024
================================DRILLING FLUID RECYCLING =============================
- TOTAL MUD RECEIVED: 0 - TOTAL MUD SHIPPED: 500 BBLS OBM (103 PCF).
================================WELLSITE ACTIVITIES==================================

================================NEARBY ACTIVITY====================================

== ================================ RIG VISIT =======================================

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
93 PCF 0 0 API 0 0 Volts 0 10.5 357,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 78 0 0 0/0 MMX-OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 22 8/0 0 0 0
27
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
93 PCF 0 0 API 0 0 Volts 0 10.5 357,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 78 0 0 0/0 MMX-OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 22 0/0 0 0 0
27

MUD CAOH2 BCTRN CABR2 CACL2-98


TREATMENT 6 ( 55LB ) 6 ( 5GLD ) 162 ( 55GL ) 80 ( 2200L )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
16RR 15,095 15,095 DP Av DC Av Bit HHP N/A N/A 447 6.125 HTC
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
Z282YT VMA18H 3 x 32 / 2.356
Gauge Other POOH Reason
0

DRILL STRING Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-420 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/21/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

Y N/A N/A N/A N/A N/A Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/11/2024 06/11/2024 N/A N/A N/A 3,637 DAILY TWICE

Company WCR TGC SCP RIG BDF RUE BLH SGR RIG ARM BCM OTH ARM

Category CSR CTRG PSSC RIG DFMS H2S LHES MLS OTHR OTHR PCS VAC WSC
PERSONNEL
3 17 1 57 3 1 2 4 5 1 1 3 2
Total
AND SERVICES No. of Persons
100
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 10 24

Operating Hours. 0 0 0 24 24 24 24 24 24 24 24 10 24

Standby/Tankers Others Others


TRUCKS/BOATS
ARAMCO DH-8961 PICKUP RIG AMBULANCE RIG 55-SEATER EMERGENCY BUS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 849 N/A N/A 1550

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNIF-162 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:21 06/18/2024 - 06/30/2024
Report ID: OPERLMTDMRREP

SINO-25 @ MNIF-162 Limited Morning Report for 06/18/2024


Objective : (ESP CHANGE Foreman(s)ALI, HUSSEIN MOHAMED MOHAMED
D&WO Morning Report (Service Providers View) Charge #: OUT) Engineer ALSHAMMARI, ABDULAZIZ FADHEL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (61-23026-0162) Manager BUDAIR, SAAD MOHAMMAD
SINO-25
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 2340 379-5683 013-379-56 88
Date: Tuesday 06/18/2024 MNIF-162 (0) MNIF_162_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
379-5685 379-5688

Last 24 hr operations Next 24 hr plan


R/D ON WELL MNIF-344 / DS-25, R/M & R/U ON WELL MNIF-162 / DS-7. CONT R/D ON WELL MNIF-344 / DS-25, R/M & R/U ON WELL MNIF-162 / DS-7.
Location Next Location
185 KM FROM DHAHRAN MAIN GATE MNIF CAUSEWAY DS-7. MNIF-143
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
16,233 Size 7866 7220 Size 7,568 11,737 7,815 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
16233 (Date) 0 185
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM, R/D ON WELL MNIF-344 / DS-25, R/M & R/U ON WELL MNIF-162 / DS-7.
0500 - 1800 13 0 PRE N RM RD NA RIG 16233 16233
>> R/D ON WELL MNIF-344 ( 50 %).
>> R/M TO WELL MNIF-162 ( 40 %).
>> R/U ON WELL MNIF-162 ( 30 %).

1800 - 0459 11 0 PRE N RM RD NA RIG 16233 16233 HPJSM, RIG MAINTENANCE & HOUSE KEEPING, ONLY GENERAL R/D-R/U, NO
CRITICAL LIFTS AFTER DARK.
Workover Objectives
Foreman Remarks

>> ODF CORRECTION:


===============================================================================
>> DIESEL CONSUMPTION FOR ENGINES (RIG + CAMP) =(DAILY: 30 BBLS / CUMULATIVE FOR MONTH OF JUNE = 808 BBLS).
================================= POB ============================================
>> ARAMCO MATERIAL EXPEDITER ABDULAZIZ ALANAZI ID #8506663 ON LOCATION SINCE 05/27/2024.
===============================SAFETY===========================================
>> HOLD DAILY SAFETY MEETING WITH RIG CREW AND THIRD PARTIES.
================================= ERP ============ ===============================
** CONTINGENCY EQUIPMENT ON LOCATION AS PER ERP REQUIREMENTS **
>> STAGING AREA #1 ( 2.1 KM SOUTH OF LOCATION) AND STAGING AREA #2 ( 4.5 KM NORTH OF LOCATION).
>> 55 PASSENGER EMERGENCY ESCAPE BUS ON LOCATION.
>> 55 PASSENGER EMERGENCY ESCAPE TEMPSC WATER VESSEL.
>> RAWABI H2S MONITORING PACKAGE ON LOCATION & CONTINUOUSLY MONITORING.
============================ ADJACENT WELLS STATUS ===========================
>> NO SIMOPS OPERATION ON DS-25, ( 9 ADJACENT WELLS).
>> ADJACENT WELLS: MNIF-160 / 161 / 163 / 164 / 165 / 166 / 167 / 168 / 169.
>> ALL ADJACENT WELLS ARE SHUT-IN & ISOLATED, ALL X-TREE VLV & TRSSSV ARE CLOSED.
>> ALL UPSTREAM LINES, HEADER LINES SECURED & BARRICADED.
========================== NEXT LOCATIONS READINESS =============================
>> HELD KOM FOR MNIF-143 / DS-5 ON 04/23/2024 (FIELD SERVICES 30 % / WELL SITE 70 %).
>> HELD KOM FOR MNIF-286 / DS-19 ON 05/29/2024 (FIELD SERVICES 0 % / WELL SITE 0 %).
>> HELD KOM FOR MNIF-360 / DS-31 ON 06/06/2024 (FIELD SERVICES 0 % / WELL SITE 0 %), TANAJIB.
>> HELD KOM FOR MNIF-351 / DS-31 ON 06/06/2024 (FIELD SERVICES 0 % / WELL SITE 0 %), TANAJIB.
>> HELD KOM FOR MNIF-362 / DS-31 ON 06/06/2024 (FIELD SERVICES 0 % / WELL SITE 0 %), TANAJIB.
=========================== DRILLS & OBB REPORTED ===============================
>> DRILLS PERFORMED:
>> OBB REPORTED: 17.
============================ JARS & RENTAL TOOLS ================================
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 16,233 89.6 137.5 7,851 -1915.76 2491.82 10,312.12 0.87
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A AS PER NORMAL N/A SEASONAL 3,471 PJSM / PRE-TOUR
SCHEDULE

Company RIG TGC BDF RUE PEW ARM ARM


PERSONNEL
RIG CTRG DFMS H2S MEON OTHR WSC
Total
AND SERVICES Category
113
INFORMATION
No. of Persons 62 14 1 2 31 2 1

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNIF-162 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:21 06/18/2024 - 06/30/2024
Report ID: OPERLMTDMRREP

Personnel on Loc. Hrs. 24 24 24 24 24 24 24

Operating Hours. 24 0 0 24 0 12 24

Standby/Tankers
TRUCKS/BOATS
P/U TRUCK DH-7530

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 162 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-307 WORKOVER-5 BI-90
Print Date: 06/18/2024 06:21 06/15/2024 - 07/10/2024
Report ID: OPERLMTDMRREP

SINO-26 @ UTMN-307 Limited Morning Report for 06/18/2024


Objective : (MAJOR Foreman(s)NOFAL, AHMED MOKHTAR
D&WO Morning Report (Service Providers View) Charge #: WELLHEAD WORK) Engineer ALSUBAIE, ABDULAZIZ BANDAR
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (61-24057-0307) Manager KHALDI, MOHAMMED SALEH
SINO-26
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 13973 (013)-577- 5479 0138114917 /EXT-101/R IGMGR
Date: Tuesday 06/18/2024 UTMN-307 (0) UTMN_307_0 OTHER VSAT CONTRACTOR /CLERK VSA T
0138114917 /EXT-102/C LINIC (013)-577- 5241

Last 24 hr operations Next 24 hr plan


R/D ON HWYH-433, R/M & R/U ON UTMN-307. R/D ON HWYH-433, R/M & R/U ON UTMN-307.
Location Next Location
169 KM FORM MAIN DHAHRAN GATE *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
11,031 Last Csg Size MD TVD Size 5,846 7,958 Top
9 5/8 4243 4243 Formations Comments
4 1/2 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
11316 (Date) 0 169
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD SAFETY MEETING WITH ALL RIG & TRANSPORTATION PERSONNEL,


DISCUSSED RIG MOVE OPERATIONS, REVIEW JSA'S AND RISK ASSESSMENT BEFORE
PERFORMING ANY TASK SUCH AS LIFTING OPERATIONS, WORKING AT HEIGHT,
TAG/LOCK OUT SYSTEM, DRIVING POLICY AND IMPLEMENT STOP WORK
AUTHORITY.

> R/D 85%, R/M 75%, R/U 50%

HWYH-433:
>SAFELY MOVED MINI CAMP.

0500 - 0459 24 0 PRE M RM RM NA RIG 6773 6773


UTMN-307:
> SAFELY RAISED SUB-BASE & MAST
> GENERAL RIG UP OPERATION.
-

> CONDUCTED MEETING WITH NEARBY RIG DPS-45 TO SET THE COMMUNICATION
CONTROL & SAFETY MEASURES.
-

> DISTANCE FROM HWYH-433 TO UTMN-307 = 46 KM (35.4 KM ASPHALT ROAD &


10.6 KM SKID ROAD).
> DAYS SINCE RIG MOVE: = 4 DAY
> UTMN-307 SECURED BY 3-1/2'' INTERWELL PTP PLUG AT 500', ON 06/14/2024.
Workover Objectives
Foreman Remarks

ODFC:
===============================================================================================
>> HELD DAILY SAFETY/ OPERATIONAL MEETINGS WITH ALL INVOLVED PERSONNEL.
======================================================================================================
>>SAFETY, AUDITS & DRILLS :
- HELD TOURLY SAFETY MEETINGS WITH RIG CREW. DISCUSSED HOUSKEEPING & USE OF SWA.
- WELL CONTROL AUDIT: OPEN (0).
- 1ST QSI: TOTAL ITEMS: (0), CLOSED: (0), OPEN: (0).
- 2ND QSI: TOTAL ITEMS: (0), CLOSED: (0), OPEN: (0).
- 3RD QSI: TOTAL ITEMS: (0), CLOSED: (0), OPEN: (0).
- SAWOD IN-HOUSE 1ST, 2024: TOTAL ITEMS: (42), CLOSED: (42), OPEN: (0).
- SAWOD IN-HOUSE 2ND, 2024: TOTAL ITEMS: (0), CLOSED: (0), OPEN: (0).
- 1ST RHSEI: TOTAL ITEMS: (47), CLOSED: (46), OPEN: (1).
- DHLPD : TOTAL ITEMS: (0), CLOSED: (0), OPEN: (0).
=================================WELL ON LOCATION SUPPORT===============================================
> 6 WATER TANKERS ON LOCATION. EL ASKAR TRADING & CONTRACTING (1477, 1821, 1828, 1846, 1844, 1839).
===================================== FUEL CONSUMPTION =================================================
> DIESEL CONSUMPTION FOR ENGINES (RIG + CAMP) = (DAILY: 5 BBLS / CUMULATIVE FOR CURRENT WELL: 31 BBLS).
===================================== PERSONNEL ON LOCATION =============================================
> ARAMCO MATERIAL EXPEDITOR INAD AL-ZAHRANI # 8331377 ON LOCATION SINCE 06/11/2024.
> ARAMCO SAFETY ADVISOR SAMKUMAR RAMA CHELLA ID#8563526 ON LOCATION 6/14/2024, FOR RIG MOVE COMPLIANCE
==========================================NEXT WELLS===================================================
> UTMN-558 KOM HELD ON 01/23/2024, STRIP OUT 100, LOCATION 40%. (PWI, BI-90). NEED CELLAR INSTALLATION.
> UTMN-496 KOM HELD ON 03/25/2024, STRIP OUT 0%, LOCATION 0%. (OP, BI-90).
> UTMN-255 KOM HELD ON 03/26/2024, STRIP OUT 0, LOCATION 0%. (OP, BI-90). NEED CELLAR INSTALLATION.
> HWYH-214 KOM HELD ON 04/18/2024, STRIP OUT 100, LOCATION 0%. (OP, BI-90). NEED CELLAR CHANGE.
DAILY SURVEY
MUD DATA
MUD

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-307 WORKOVER-5 BI-90
Print Date: 06/18/2024 06:21 06/15/2024 - 07/10/2024
Report ID: OPERLMTDMRREP

TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A MSPD: 4 N/A NORMAL 1,839 R/M ACTIVITIES
KNOTS, NE

Company TGC RIG GDF RIG ARM OTH ARM

Category CTRG RIG DFMS OTHR OTHR VAC WSC


PERSONNEL
17 76 1 6 2 6 1
Total
AND SERVICES No. of Persons
109
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
ARAMCO CAR AB-9815

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 107 288 139 109 1150

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-760 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/06/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

SINO-27N @ KHRS-760 Limited Morning Report for 06/18/2024


Objective : (PARTIAL Foreman(s)BENAMEUR, BILAL
D&WO Morning Report (Service Providers View) Charge #: ISOLATION BY INSTALLING Engineer ALOTHMAN, ABDULLAH ABDULRAHMAN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved OPEN HOLE ISOLATION Manager LAHLAH, AZZEDINE
SINO-27N (72-22051-0760)
KITS IN TWO ZONES) THURAYA RIG FORMAN VSAT MOBILE
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 13750 (013)-576- 3089 (050)-053- 6788 RIG M GR
Date: Tuesday 06/18/2024 KHRS-760 (0-1) KHRS_760_1 MOBILE CONTRACTOR /CLERK VSA T
(054)-579- 1168 CLINI C (013)-576- 3088

Last 24 hr operations Next 24 hr plan


CONT RIH W/4.75" LIB TO TAG ,BULHEAD WELL ,FLOW CHECK . CONT FLOW CHECK ,CONT RIN W/ LIB 4-3/4,POH W/ LIB 4-3/4 TO SURFACE.RIH W/RAWABI 3.80"
O.SHOT FISHING BHA EQUIPED W/ 1-7/8" GRAPPLE.
Location Next Location
254 KM FROM DHAHRAN MAIN GATE KHRS-1198
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,790 Last Csg Size MD TVD Size 752 6,451 5,676 Top
9 5/8 3079 3079 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9790 (Date) 95 0 254
8.6 (06/09/2024@1400 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT RIH W/ CONTROLED SPEED LIB 4.75" ON 4" DP TO 3043 FT.


0500 - 0745 2.75 0-1 POST N FISH TI STDP RIG 9790 9790 2000 3043
- FILL STRG & BREAK CIRC EVERY 10 STAND.
- MONITOR WELL THRU TRIP TANK & TRIP SHEET.HAD 10 BPH LOSSES.

BULLHEAD BACKSIDE W/ 85 PCF NACL POLYMER , PUMP RATE 6 BPM/148 PSI.


- BULLHEAD DP SIDE W/ 85 PCF NACL POLYMER , PUMP RATE 5 BPM/500 PSI
- FLOW CHECK , HAVE RETURNE
- CIRCULATE HOLE VOLUME MEANWIHLE TREATE AND INCREASE MAUD WAIT TO
92 PCF NACL POLYMER .
- BULLHEAD BACKSIDE W/ 92 PCF NACL POLYMER , PUMP RATE 6 BPM/148 PSI.
0745 - 0459 21.25 0-1 POST N FISH CIRC MPMP RIG 9790 9790 - BULLHEAD DP SIDE W/ 92 PCF NACL POLYMER 5 BPM/560 PSI
- EXTEND FLOW CHECK , MEANWIHLE TREATE AND INCREASE MAUD WAIT TO 95
PCF NACL POLYMER.
- BULLHEAD BACKSIDE W/ 95 PCF NACL POLYMER , PUMP RATE 6 BPM/250 PSI.
- BULLHEAD DP SIDE W/ 95 PCF NACL POLYMER PUMP RAT 5 BPM/530 PSI.
- SICP=SIDP=0
- EXTEND FLOW CHECK..... CONING.
- MONITOR WELL THRU TRIP TANK & TRIP SHEET.
Workover Objectives
Foreman Remarks

ODF: 10.3 FT.


==========================
KPI: KPI 10 JT/HR VS ACTUAL XX JT/HR.
==========================
ERP
- GOR: 260 SCF/STB.
- H2S: 0.3 %
================================================
- ARAMCO CLERK ROMEO PALUGOD ID 8081636 ON LOCATION 1/21/2024.
- SAOGDD FIELD COMPLIANCE ADVISOR STANISLAV KOTSAR ID # 8059257 ON LOCATION SINCE 6/15/2024.
================================================
HSE:
DAYS WITHOUT LTI IS 1722.
SAFETY:
-PRE-TOUR SAFETY MEETING(2), WEEKLY SAFETY MEETING(0), STOP CARDS(15), PTW:(3), JSA:(3), NEAR MISS (0), INCIDENT:(0),
-DRILLS: SWA DRILL(0).PIT DRILL (1),TRIP DRILL(1), H2S DRILL(0), FIRE DRILL(0),MAN DOWN (0), ACCUMULATOR DRILL (0),H2S RESCUE DRILL(0), OIL SPILL DRILL(0), CONFINED SPACE
DRILL(0),VERTICAL RESCUE DRILL(0),
================================================
AUDIT:
- RSI DONE ON MAY 11,2024; FINDING=43, CLOSED=43,OPEN=0.
- WCEI DONE ON MAY 11,2024; FINDING=7, CLOSED=7,OPEN=0.
- RIG INTERNAL AUDIT DONE ON FEB 4, 2024; FINDING = 13, CLOSED = 13, OPEN =0.
- HAZCOM ADUIT DONE ON FEB 2, 2024; FINDING = 10, CLOSED = 10, OPEN = 0.
- 1ST QSI DONE ON FEB 20, 2024;FINDING = 50, CLOSED = 50, OPEN = 0.
- 2ND QSI DONE ON MAY 27, 2024;FINDING = 49, CLOSED = 49, OPEN = 0.
===========================================
RENTAL TOOLS.
- NAPESCO 4-3/4" HYD DRILLING JAR XT-39 PXB CONNECTTON SN# HMJ-500-0007 ON LOCATION 06/10/2024 @ 1:00AM.
- NAPESCO 4-3/4" HYD DRILLING JAR XT-39 PXB CONNECTTON SN# HMJ-500-0002 ON LOCATION 06/11/2024 @ 7:37AM.
- NAPESCO 4-3/4" HYD FISHING JAR W/ NC38 CONNECTN SN# LOG000185587-02 ON LOCATION 06/11/2024 @ 20:00PM.
- NAPESCO 4-3/4" FISHING BUMPER SUB W/ NC38 CONNECTN SN# NAP-475-FBS-1-5-3 ON LOCATION 06/11/2024 @ 20:00PM.
- NOV 5-7/8" 6-1/8" ANDER REAMER SN# W3201978-1 ON LOCATION 06/09/2024 @ 7:30 AM.
- NOV 5-7/8" 6-1/8" ANDER REAMER SN# HYAR 587-52564834 ON LOCATION 06/09/2024 @ 7:30 AM.
- NOV 4-3/4" BULLNOSE ATTACHED W/ SN#CW3200378-5 ON LOCATION 06/09/2024 @ 7:30 AM.
- NOV 5-7/8" DL REAMER W/ 3-1/2" IF CONNECTION SN# G282560 ON LOCATION 06/12/2024 @ 22:00PM.
- NOV 5-7/8" DL REAMER W/ XT-39 CONNECTN SN# G282557 ON LOCATION 06/12/2024 @ 22:00PM.
===========================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-760 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/06/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

WATER DATA
- WATER SOURCE: KHRS-908
- TOTAL WATER IN MUD SYSTEM: XXX BBL .
- DAILY WATER RECEIVED/CONSUMED: XXX BBLS.
===========================================
WELL CONTROL DATA
STRG VOLUME : 125 BBLS.
ANNULUS VOLUME: 372 BBLS..
OPEN HOLE: 291 BBLS.
TOT. VOLUME: 788 BBLS.
===========================================
WATER CONSERVATION IMPLEMENTED INITIATIVES
- REDUCED WATER PITS: N
- DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: N
- CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION: N
===========================================
SERVICE COMPANIES ON LOCATION:
- WEATHERFORD ON ARRIVED ON 4/5/2024 AT 16:00.
===========================================
NEXT WELLS:
- KHRS-1198 KOM DONE LOCATION 100 % READY
- KHRS-174 KOM DONE. STRIP OUT 100%
==- ==- ===================
NO RENTAL TOOLS ON LOCATION.
=======================
- RADIO COMMUNICATION ARE WITHIN COVERAGE, PREFORMING VSAT CHECK WITH ECC ON DAILY BASIS, THURAYA: 008821677713750.
======================
ARAMCO VEHICLE SERVICE DETAILS
- RIG CAR WITH NUMBER DH-7525 IS DONE MAINTENANCE. NEXT WILL BE ON 6/15/2024.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 0 4 API 0 0 Volts 0 9.5 125,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 85 24 0 8 / 12 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 23 15 7/9 0 0 0
75
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 0 4 API 0 0 Volts 0 9.5 125,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 85 24 0 8 / 12 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 23 15 7/9 0 0 0
75

MUD CAUST MRBL-F NACL DUOVIS-NS POLY-SAL


TREATMENT 10 ( 55LB ) 72 ( 2200L ) 65 ( 2200L ) 12 ( 25KG ) 35 ( 25KG )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 1,655 RIG MOVE

Company TGC RIG OES RAC ARM INW OSL OTH ARM

Category CTRG RIG DFMS WMFE OTHR SLS SLS VAC WSC
PERSONNEL
12 66 2 2 1 1 3 7 1
Total
AND SERVICES No. of Persons
95
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 12 0 12 0 0 10 12

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-158 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/10/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

SINO-28L @ SHYB-158 Limited Morning Report for 06/18/2024


Objective : (OIL- Foreman(s)WILKINS, DANIEL ARTHUR
D&WO Morning Report (Service Providers View) Charge #: OBSERVATION) Engineer LINDAHL, CARL DANIEL / ALMOABADI, REEMA MOHAMMED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Manager SHAMMARI, ABDULLAH SHUWAIHAT
SINO-28L (66-23072-0158)
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 88-216-777 -113-43 5788516 5120641 BA KER DSV
Date: Tuesday 06/18/2024 SHYB-158 (0) SHYB_158_0 OTHER VSAT CONTRACTOR /CLERK VSA T
5788556 SI NO RIG MAN AGER 5788515

Last 24 hr operations Next 24 hr plan


PICK UP AND MAKE UP STDS OF 4" DRILL PIPE. P/TES BOPE, S&C DRILL LINE, RIH WITH C/O CLEAN OUT CMT TO 3864' 5 ' ABOVE L/C, POH C/O BHA, RIH WITH WBCO ASSY, SRCAPE PACKER
STRING,WOC UCA REACHED AT 2300HRS. P/TEST TOL. RIH WITH C/O ASSY. SETTING DEPTH, WAIT ON WFD DLT PACKER TO COMPLETE LINER NEGATIVE TEST.
Location Next Location
SABKHAH#72, 1.6 KM FROM GOSP-3, 7.5 KM FROM SHAYBAH AIRPORT SHYB-513
Current Depth (ft) Liner TOL MD TVD Formation Tops
5,078 Last Csg Size MD TVD Size 3,270 5,076 5,076 Top
9 5/8 4618 4617 Formations Comments
7 Depth
RUS 1,495 18' TVD DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UMER 2,268 12' TVD DEEPER
5078 (Date) 100 0 580 ARUM 3,571 6' TVD DEEPER
33.5 (05/15/2024@1400 ) PLVL 3,953 1' TVD SHALLOWER
AHMD 3,979 3'TVD SHALLOWER
CPCK 3,999 4' TVD SHALLOWER
WARA 4,029 2' TVD SHALLOWER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0600 1 0 8 1/2 N DRLG HT STRG RIG 5078 5078 RIH PICKING UP SINGLES OF 4" DRILL PIPE RACKING BACK STANDS OF PIPE. 12
STDS TOTAL

0600 - 0800 2 0 8 1/2 N DRLG HT STRG RIG 5078 5078 POOH KILL STRG. RB 7 STD'S 5" DP & LD 3 STD'S 6 1/2" DC'S.

P/U & M/U DELTA TEST PLUG ASSY (TIW & PUMPING SUB). LANDED IN THS.
FLUSHED BOP'S.
0800 - 1000 2 0 8 1/2 N BOP BOPT RBOP RIG 5078 5078
** FUNCTION TEST BOP'S FROM ALL REMOTE-CONTROL PANELS.
** PERFORM ACCUMULATOR DRILL."

1000 - 1445 4.75 0 8 1/2 N BOP BOP BOP RIG 5078 5078
PRESSURE TEST 13-5/8" 5M BOP AS PER ARAMCO STANDARDS

1445 - 1545 1 0 8 1/2 N DRLG HT STRG RIG 5078 5078 RETRIEVE & LD TEST PLUG, PU & RIH 9 5/8" CUP TESTER ASSY.

1545 - 1730 1.75 0 8 1/2 N WH PTST WH RIG 5078 5078 HPJSM, P/T THS SOV'S TO 300/2800 PSI FOR 10 MIN, L/D CUP TESTER ASSY.

1730 - 1800 0.5 0 8 1/2 N DRLG RR TRVL RIG 5078 5078 SERVICE TDS. CLEAN & CLEAR RIG RF.

HPJSM, PU & MU C/O TRIP BHA.


1800 - 1845 0.75 0 8 1/2 N DRLG HT BHA RIG 5078 5078 6-1/8"" PDC BIT, FV, 9*4 3/4"" DC, X.O, 12*4"" HWDP, 4 3/4"" JAR, 2*4"" HWDP,
4"" DP'S, X.O, 5"" DP'S."

RIH WITH CLEAN OUT BHA ON 4" DRILL PIPE AND 5" DRILL PIIPE TO TAG 1350.
1845 - 2030 1.75 0 8 1/2 N DRLG TI STDP RIG 5078 5078 700 1350
** FILL STRING EVERY 20 STD."

2030 - 2100 0.5 0 8 1/2 N DRLG CIRC MPMP RIG 5078 5078 ACCUMULATED TIME FOR FILL UP PIPE AND CIRCULATE.

2100 - 0030 3.5 0 8 1/2 N DRLG RR TDS RIG 5078 5078 SLIP & CUT DRILLING LINE.

0030 - 0130 1 0 8 1/2 N DRLG RR TRVL RIG 5078 5078 MAINTENANCE TRAVELING BLOCK.

RIH WITH C/O BHA WHILE WASH DOWN TOL TO 3450'.


0130 - 0230 1 0 8 1/2 N DRLG RW BIT RIG 5078 5078 3150 3450
** PASS FREELY THROUGH 7"" LINER HGR.

CIRCULATE & CONDITION MUD. PT TOL TO 1690 PSI. OK (EQUIVALENT TO 2000


0230 - 0330 1 0 8 1/2 N DRLG CIRC MPMP RIG 5078 5078
PSI. WITH WATER).

0330 - 0459 1.5 0 8 1/2 N DRLG TI STDP RIG 5078 5078 3450 4600 CONT RIH WITH C/O BHA TO 4600' TO TAG TOC... ONGOING AT REPORT TIME

Foreman Remarks

SHYB-158, WHICH WILL BE DRILLED AS OIL-OBSERVATION IN SHYB, COMPLETED AS CONVENTIONAL COMPLETEION.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-158 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/10/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

SHU'AIBA TARGET RESERVOIR, GOR (SCF/BBL) 750, H2S (%) 0.35, LOWER FLAMMABLE LIMIT (M) 298.
THE WELL WILL BE COMPLETED WITH CONVENTIONAL COMPLETION WITH ONE FEEDTHROUGH PACKER AND ONE TUBING PDHMS BELOW THE PACKER.
=========================================WELL DESIGN =========================================
** 24" CP PLANNED/ACTUAL: 160'/166'.
** 18-5/8" CP PLANNED/ACTUAL: 1,527' /1546' (50' TVD INTO RUS).
** 13-3/8" CP PLANNED/ACTUAL: 3,720' MD/3726' MD (155' TVD INTO ARUMA).
** 9-5/8" CP PLANNED/ACTUAL: 4,617' MD/4618 MD (2' TVD INTO SHU'AIBA).
** 7" LINER PLANNED/ACTUAL: 5,090' MD/5076 (SHU'AIBA RESERVOIR). 40FT INTO BYAHD FORMATION
** TOTAL WELL FOOTAGE PLANNED / ACTUAL: 5090 FT MD / 5078 MD; TOTAL RC PLAN/ACTUAL: 472 FT/ 421 FT.
=== ============================ ARAMCO PERSONAL ==================================================

===============================LSTK OR CONTRACTOR MANAGEMENT VISIT ===================================


** THIS IS BAKER LUMP SUM TURNKEY WELL SUPERVISOR: YOUSEF/MOHAMED / HSE : ALI.
===================================NEXT WELL =====================================================
SHYB-513 SABK #16
LOCATION READINESS: 100%
DRILLING PROGRAM = NO
WATER WELL = SHYB-854 READY
PIT LINING= YES
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
06/17/2024 ACCUMUALTOR SEASONAL N/A HEAT 1,371 CONDUCT SAFETY
MISCELLANEOUS
DRILL STRESS MEETING TWICE
WARNING

Company BCR OTH RIG BDF MJH SNS TK2 RIG BCM TK2 ARM

Category CSR CTRG RIG DFMS SEC H2S OTHR OTHR PCS WSC WSC
PERSONNEL
2 13 58 1 4 1 2 8 3 2 1
Total
AND SERVICES No. of Persons
95
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 24 24 24 12 12 0 24 24

Standby/Tankers
TRUCKS/BOATS
ARAMCO- DH-7510. RADIO # RX428239

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 461 230 N/A 1600

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR FDHL-133 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 03/02/2024 - 06/28/2024
Report ID: OPERLMTDMRREP

SINO-29N @ FDHL-133 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK Foreman(s)ACHOUR, ALI / PALLEKONDA, RAMESH
D&WO Morning Report (Service Providers View) Charge #: DRILLING WITH PILOT Engineer MOQATI, FAHAD GHAZI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved HOLE) Manager BUDAIR, SAAD MOHAMMAD
SINO-29N (71-24018-0133)
Daily Onshore THURAYA RIG FORMAN VSAT RIG FORMAN VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 14165 (013)378-7 930 (013)378-7 980
Date: Tuesday 06/18/2024 FDHL-133 (0-2-1) FDHL_133_7 CONTRACTOR /CLERK VSA T
(013)378-7 929

Last 24 hr operations Next 24 hr plan


RIH W/ SLICK BHA F/ACID OPS. CHC, WASH/REAM DOWN IN OPEN HOLE DISPLACE WELL TO 73 PCF CACL BRINE,PERFORM ACID OPS.POOH W/SLICK BHA. RIH TO RTRV
WFRD WHIPSTOCK
Location Next Location
NORTHING (M): 2982991.79 , EASTING (M) : 20867.14 ABHD-166
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
15,320 Size 6105 5890 Size 5,813 12,050 7,780 Top
Formations Comments
9 5/8 7 Depth
BUWB 6,253 TVD = 5951'
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) YAMM 6,683 TVD = 6274'
15320 (Date) 100 0 118 SULY 7,176 TVD = 6623'
102 (03/08/2024@0300 ) MNIF 7,812 TVD = 7072'
HITH 7,903 TVD = 7136'
MNFR 7,965 TVD = 7090
ADR4 8,000 TVD = 8206'
PAAS 8,392 TVD = 7481'
ABAR 8,417 TVD = 7498'
BAAR 8,475 TVD = 7536'
ABBR 8,509 TVD = 7557'
BABR 8,582 TVD = 7600'
ABCR 8,676 TVD = 7650'
BACR 8,905 TVD = 7746'
ADR2 9,247 TVD = 7996' (4' DEEP)
ADR3 9,299 TVD = 8033' (1' DEEP)
BADR 9,538 TVD = 8203' (1' SHALLOW)
ABDR 10,750 TVD = 7796'
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

HPJSM, R/U 2-3/8" HANDLING EQUIPMENT.


0500 - 0700 2 0-2-1 6 1/8 N PA OTH NA BLH 15320 15320 > LAY DOWN BAKER SETTING TOOLS.
> LAY DOWN 20 JTS 2-3/8" CS HYDRILL TUBING.

HPJSM,P/U 2-3/8" MULE SHOE , P/U & RIH 110 JTS OF 2-3/8" CS HYDRILL FOR
0700 - 1430 7.5 0-2-1 6 1/8 N CT HT BHA RIG 15320 15320
ACID OPS..
> MONITORING WELL ON TRIP TANK ( STATIC ).
1430 - 1500 0.5 0-2-1 6 1/8 N CT HT PEL RIG 15320 15320
CHANGED OVER HANDLING TOOLS FROM 2-3/8" TO 4".

1500 - 1515 0.25 0-2-1 6 1/8 N CT TI STDP RIG 15320 15320 3500 3911 CONT, RIH 2-3/8" CS HYDRILL ON 4" DP TO 3,911'
> MONITORING WELL ON TRIP TANK WELL STATIC.
1515 - 1645 1.5 0-2-1 6 1/8 N CT RR TDS RIG 15320 15320
HPJSM. CHANGED TDS SAVER SUB FROM 5" TO 4". P/U 4-3/4" DRILLING JAR.

1645 - 2045 4 0-2-1 6 1/8 N CT TI STDP RIG 15320 15320 3911 11830 CONT, RIH 2-3/8" CS HYDRILL ON 4" DP TO 11,830'
> MONITORING WELL ON TRIP TANK WELL STATIC.

2045 - 2230 1.75 0-2-1 6 1/8 N CT CIRC MPMP RIG 15320 15320 CUMULATIVE TIME TAKEN TO RIH IN CONTROLLED SPEED AND BREAK
CIRCULATION AFTER RIH EVERY 15 STDS
2230 - 0015 1.75 0-2-1 6 1/8 N CT CIRC MPMP RIG 15320 15320
CONNECT TDS AND CIRCULATED BOTTOMS UP. OBSERVED NO DYNAMIC LOSSES.

CONT, RIH 2-3/8" CS HYDRILL ON 4" DP FROM 11,830' TO 13,813'( AT


CONTROLLED SPEED INSIDE OPEN HOLE)
0015 - 0130 1.25 0-2-1 6 1/8 N CT TI STDP RIG 15320 15320 11830 13813
>> RUN CAUTIOUSLY AND PASSED C2 SETTING SLEEVE AND MPAS PACKERS
FREELY
> MONITORING WELL ON TRIP TANK. WELL STATIC.

CUMULATIVE TIME TAKEN TO RIH IN CONTROLLED SPEED IN OPEN HOLE AND TO


0130 - 0315 1.75 0-2-1 6 1/8 N CT CIRC MPMP RIG 15320 15320
PASS MPAS ASSY
AND BREAK CIRCULATION AFTER RIH EVERY 10 STDS

HAD HELD UP AT 13,813'. RACK BACK ONE STAND AND M/U 1 SINGLE 4" DP AND
WASH/REAM TO CLEAR DOWN TO 13,845'.
L/D ONE JT AND MADE UP ONE STAND OF 4" DP. HELD UP AGAIN AT THE SAME
0315 - 0459 1.75 0-2-1 6 1/8 N CT RW BIT RIG 15320 15320 13813 14100 DEPTH 13,813'.
REAM DOWN/ WASH UP THE WHOLE STAND. CHECKED THE HELD UP DEPTH
WITH OUT PUMPING AND ROTATION, FREE.
UNABLE TO RIH THE NEXT STAND FREE. CONNECT TDS AND CONTINUE REAM
DOWN/ WASH TO 14,100'.
Workover Objectives
Foreman Remarks

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR FDHL-133 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 03/02/2024 - 06/28/2024
Report ID: OPERLMTDMRREP

ODF/TBG SPL= 31.05', NDF/TBG SPL = 34.4' (DF CORRECTION = -3.35 FT')
L-0-2-1 (TOW @ 11852' & BOW @ 11865', RATE HOLE @ 11878' (ARAB-D FORMATION).

-------------------------------------ARAMCO PERSONNEL------------------------------------------------------------------------------------
- RIG CLERK #8274313 RONALD MACALINTAL ONBOARD SINCE 05/14/2023.

-------------------------------------ERP EQUIPMENT & CONTINGENCY PLAN--------------------------------------------------------------


- STAGING AREA A COORDINATES DISTANCE FROM WELL CENTER (3.75KM) NORTH-EAST N49.180700 E26.989259
- STAGING AREA B COORDINATES DISTANCE FROM WELL CENTER (3.79KM) SOUTH-WEST N49.220202 E26.932389
- SINO 63 SEATER EMERGENCY BUS ON LOCATION
- AL MANSOORI 6-EA STAND ALONE (H2S/LEL) SENSORS W/ 24 HRS COVERAGE TECHNICIANS

-------------------------------------RENTALS, THIRD PARTYS & OTHER EQUIPMENT--------------------------------------------------------


- 2 X ALHABBAS WATER TANKERS
- 2 X ALSHURI WATER TANKERS
- TAQA 4-3/4" HM DRILLING JAR SN: DJ6-500-608 ON LOCATION SINCE 06-JUNE-2024
- RAWABI 350 JTS OF 5" DRILL PIPE ON LOCATION SINCE 15-APRIL-2024.

------------------------------------DRILL SITE STATUS -------------------------------------------------------------------------------------------


- ADJACENT WELLS FDHL- 115 AND FDHL-122 ARE SHUT IN
- PWI WELLS: FDHL-628, FDHL-618, FDHL-606 ALREADY SHUT IN

--------------------------------------NEXT WELLS STATUS --------------------------------------------------


- ABHD - 166 KOM MAY 13, 2024 READINESS ( STRIP OUT 100% , WELLSITE 70%)
- ABHD - 162 KOM MAY 13, 2024 READINESS ( STRIP OUT-100% , WELLSITE 0%)

-------------------------------------- SAFETY DATA-----------------------------------------------------------


- REPORTED ON SAFE LIFE SYSTEM: OBB X 15 ;
- PTW *4
- DRILLS TRIP DRILL*1 H2S DRILL*1

--------------------------------------RIG ON LOCATION SUPPORT--------------------------------------------


- AL MADEED DUMP TRUCK 2565 XRA (1 TRIP )

--------------------------DIESEL & WATER CONSUMPTION-----------------------------------------------------------------------


RIG 43.0BBL + CAMP 9.0 BBL) = TOTAL DAILY: 52.0BBL CUMULATIVE FOR MONTH OF JUN: 903.0 BBL

----------------------------------------MUD PROPERTIES-------------------------------------------------------------------------------------------------
>> LAST PPT TEST: (1500 PSI, 250 DEG F) 22:00 HR'S ON 17/06/2024. DISC SIZE 20 MICRON: PPT SPURT = 1.6 ML. PPT TOTAL = 9.6 ML.
>> HTHP AT 500 PSI = 9.6 ML.TEST TEMP 250 F.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 2 2.8 API 3 0 Volts 4.78 9 60,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 9.6 HTHP 90 20 0.1 8 / 12 WBM-CAC 1.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 11 7 7/8 0 0 9.2
52
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 2 2.8 API 3 0 Volts 4.78 9 60,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 9.6 HTHP 90 22 0.1 8 / 12 WBM-CAC 1.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 12 7 7/8 0 0 9.6
53

MUD CACL2-80 CAOH2 DUOVIS-NS MUSOL SAFE-SCAV SLIK-5-DR


TREATMENT 70 ( 2200L ) 10 ( 25KG ) 12 ( 55LB ) 2 ( 55GL ) 1 ( 55GL ) 1 ( 55GL )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/05/2024 N/A NORMAL N/A SEASONAL 3,630 PRE-TOUR

Company TGC HCO BHI RIG OES ASH MH2 CTC BAL ARM SCM ARM OSL WWD

Category CTRG ICE DPDS RIG DFMS FLD H2S JST ALS OTHR PCS WSC SLS WPSTK
PERSONNEL
16 4 2 59 2 4 2 0 6 1 3 2 3 1
Total
AND SERVICES No. of Persons
105
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 0 24 24 24 24 16 16

Operating Hours. 0 0 0 24 24 24 24 18 0 12 0 24 0 0

Standby/Tankers Others Others Others Others


TRUCKS/BOATS
PICK UP AB-5598 SINO EMERGENCY BUS SINO AMBULANCE gasoline: 3790 ltr 275 bbl mud diesel

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR FDHL-133 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 03/02/2024 - 06/28/2024
Report ID: OPERLMTDMRREP

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 100 75 N/A N/A 600

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-1426 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/14/2024 - 09/08/2024
Report ID: OPERLMTDMRREP

SINO-30L @ KHRS-1426 Limited Morning Report for 06/18/2024


Objective : (DUAL Foreman(s)BENYAMMI, ABDERRAHIM
LATERAL POWER WATER Engineer ALMALEKI, HESHAM ABDULMALEK
D&WO Morning Report (Service Providers View) INJECTOR WELL IN LFDL Manager MUTAIRI, NAIF MUTLAQ
Rig Charge #: RESERVOIR)
Copyright 2024 Saudi Aramco. All Rights Reserved SINO-30L (66-22051-1426) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK) 0088216777 11516 013-578420 5 ARAMCO 013-664881 7 SLB
(0500-0500) Saudi Aramco Well Wellbores: OTHER VSAT MOBILE CONTRACTOR /CLERK VSA T
Date: Tuesday 06/18/2024 KHRS-1426 (0) KHRS_1426_0 013-501207 2-102 CLIN IC 0555129850 SINO 013-578429 5 ARAMCO C LERK
CONTRACTOR /CLERK VSA T
013-501207 2-101 SINO

Last 24 hr operations Next 24 hr plan


100% RIG MOVE, R/U ON KHRS-1426. CONT. R/U, CHECK RIG FOR ACCEPTANCE, SPUD-IN THE WELL, DRILL 28" HOLE, RUN & CMT 24"
CONDUCTOR.
Location Next Location
249.42 KM FROM DHARAN MAIN GATE AND 187.88 KM FROM UDHALIYAH MAIN GATE 123.43 KM. *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 249
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD PJSM WITH CREW, DISCUSS OPERATIONAL & HSE HAZARDS INVOLVED
DURING THE RIG UP ACTIVITIES.
- ALL MOVING CRANES, FORKLIFTS AND OPERATORS.
- DISCUSS RIGGING & SLINGING OPERATIONS.

RIG MOVE FROM KHRS-396 TO NEW WELL LOCATION KHRS-1426.

R/D 100 % , R/M 100 %, R/U 95 %.

0500 - 0459 24 0 PRE N RM RU NA RIG 0 0 R/U MONKEY BOARD , PREPARE AND RAISE UP SUBBASE AND MAST @ 8:00 HRS ,
R/U BOP HOIST, STANDPIPE MANIFOLD, RIG FLOOR PLATE, B-TONG, AIR TUGGERS
AND STAIRS ,PREPARE AND R/U TDS, TDS CABLE RACK AND GUIDE RAIL.

** RIG MOVE DAYS FROM RELEASED: 4.3DAY.


** EXPECTED SPUD IN @ 18-JUN-2024.
** RIG MOVE DISTANCE FROM KRHS-396 TO KHRS-1426 IS 31.2 KM (SKID ROAD
18.9 KM + 12.3 KM BLAKTOP).
** RIG MOVE EQUIPMENTS: 5*CRANES, 1*FORKLIFT, 2*RIGGER ONE, 2*TRUCK
PUSHER, 18*LOW BEDS .
Foreman Remarks

KHRS-1426 WELL WHICH WILL BE DRILLED AND COMPLETED AS A DUAL LATERAL POWER WATER INJECTOR WELL IN LFDL RESERVOIR.
NOTE : "THE WELL IS NOT LOCATED IN LOW VELOCITY AREA NO NEED FOR EXTRA CASING."

===========================WELL DATA ======================================


28" PLAN/ACTUAL: 75' / XX'.
17" PLAN/ACTUAL:1,770' /XXX' (+/- 100 FT TVD ABOVE SHUB).
12-1/4" PLAN/ACTUAL: 3,067' / XXXX' (+/- 50 FT TVD INSIDE BUWB).
8 -1/2" PLAN/ACTUAL: 10,357' MD & 6,910' TVD / XXXX' (+/- 600 FT MD INSIDE LFDL).
6 -1/8" L0 PLAN/ACTUAL: 16,026' MD & 6,972' TVD / XXXX'.
6 -1/8" L1 PLAN/ACTUAL: 16,459' MD & 6,972' / XXXX'.

======================PERSONNEL ON BOARD===================================
LSTK SLB WSL: ROBERTO / MOHAMMED.

=========================NEXT LOCATION=====================================
NEXT WELL: NO.
APPROVED PROGRAM FOR NEXT WELL: NO.
APPROVED ERP FOR NEXT WELL: NO.
LOCATION READINESS OF NEXT WELL: NO .
LAST VISIT: N/A.
WATER WELLS FOR NEXT WELL: NO.

DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A NORMAL N/A SEASONAL 4,065 RIG MOVE

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-1426 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/14/2024 - 09/08/2024
Report ID: OPERLMTDMRREP

Company RIG RIG SMI MJH GEI TK3 TK3 ARM

Category CTRG RIG DFMS SEC ISPCT OTHR WSC WSC


PERSONNEL
13 76 1 8 3 6 2 1
Total
AND SERVICES No. of Persons
110
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
AB-7224

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 385 N/A N/A 3900

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1547 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/09/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

SINO-33L @ HRDH-1547 Limited Morning Report for 06/18/2024


Objective : (SINGLE Foreman(s)MUSA, MOHAMED MAHER
LATERAL HORIZONTAL LINDAHL, CARL DANIEL / ALSADIQ, AHMAD MOHAMMAD / ALMOABADI,
Engineer
D&WO Morning Report (Service Providers View) Charge #: OIL PRODUCER (PHZ) REEMA MOHAMMED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23058-1547) TARGETING ARAB-D Manager MUTAIRI, NAIF MUTLAQ
SINO-33L
RESERVOIR, ZONE 2A. ) THURAYA RIG FORMAN VSAT CONTRACTOR
Daily Onshore (LSTK)
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 11401 (013)578-4 261 (ARAMC O) /CLERK VSA T
Date: Tuesday 06/18/2024 HRDH-1547 (0-1) HRDH_1547_1 (013)664-8 811 (SLB)
CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
(013)880-6 154 (SINO) (013)578-4 053 (CLERK )

Last 24 hr operations Next 24 hr plan


RUN LOWER COMPLETION. DISPLACE TO BRINE & SPOT MUDZYME, SET LOWER COMPLETION, POOH & L/D LC-RT. L/D EXTRA PIPES IN MAST. CHANGE BOP UPR TO 4-1/2" SIZE & P/T SAME.
POOH LC-RT TO 6088 FT WHILE L/D DPS. RUN UPPER COMPLETION.
Location Next Location
HEAD TO HARADH BRIDGE, TAKE KHARKHEER ROAD, 10 KM THEN TURN RIGHT INTO SKID ROAD, 8.5 KM TO RIG. HRDH-1565
Current Depth (ft) Liner TOL MD TVD Formation Tops
6,094 Last Csg Size MD TVD Size 5,033 8,340 6,894 Top
9 5/8 5842 5842 Formations Comments
7 Depth
RUS 228 AS PER PROGRAM
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UMER 349 AS PER PROGRAM
11700 (Date) 0 0 276 ARUM 1,140 45 FT DEEPER AS PER GOC
62.6 (04/16/2024@1400 ) LAMS 1,530 36 FT DEEPER AS PER GOC
AHMD 2,265 12 FT DEEPER AS PER GOC
SFNY 2,590 10 FT DEEPER AS PER GOC
SHUB 3,455 55 FT DEEPER AS PER GOC
BYDH 3,680 60 FT DEEPER AS PER GOC
MDTM 4,772 23 FT DEEPER AS PER GOC
SULY 5,387 49 FT DEEPER AS PER GOC
HITH 6,016 14 FT DEEPER AS PER GOC
ABAR 6,649 31 FT DEEPER AS PER GOC
ARBB 6,730 19 FT DEEPER AS PER GOC
ABD1 6,897 AS PER GOC
ADR1 6,899 AS PER GOC
AD2A 6,906 AS PER GOC
ABBR 6,941 10 FT DEEPER AS PER GOC
ARBC 7,013 10 FT DEEPER AS PER GOC
ABCR 7,243 7 FT DEEPER AS PER GOC
ARBD 7,832
PADS 8,200
BPDS 8,209
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

CONTINUE RIH 6-1/8" L1 LOWER COMPLETION ON 4-1/2" TBG (12.6#,L-80, NEW


VAM) F/ 1963 FT TO 3546 FT (62/62 JTS) AS PER TALLY.
- FILL LOWER COMPLETION STRING EVERY 10 JTS W/ 68 PCF MUD.
- LOWER COMPLETION AS PER BELOW:
0500 - 0845 3.75 0-1 EOW C COMP RPCS LWCOM TSC 11700 11700 1963 3546 * 4-1/2" 12.6#, L80 SLB SHOE ASSY (FLOAT SHOE, TCS, PBR, PJS)
* 17 X 4-1/2" 11.6# L80 PSSD ICD VAGT
* 62 X 4-1/2" TBG JT, 12.6#, L-80, NVAM
* 8 X 4-1/2" PUP JT, 12.6#, L-80, NVAM
* 6 X I-PACK OH HYDRAULIC PKR 12.6# L80 NVAM
- CONT PUMPING 78 PCF MUD CAP@1 BPM IN ANNULUS.

P/U & M/U SLB 5" X 7" LINER HANGER ASSY AND CIRCULATE 1.5 STRING
CAPACITY AND RIH TO 3582 FT.
- CHECK LINER HANGER ON SURFACE - OK.
- M/U X-OVER + 1 STD 4" DP & RIH W/ LINER PASS SLOWLY THROUGH BOP &
WELL HEAD.
0845 - 1000 1.25 0-1 EOW C COMP OTH PKR SCP 11700 11700 3546
- P/U WT: 97 KLBS
- S/O WT: 96 KLBS.
- SPP: 0 PSI @ FR: 3 BPM.
- R/D 4-1/2" HANDLING EQUIPMENT & R/U 4" RIG POWER TONG AND HANDLING
TOOLS.
- CONT PUMPING 78 PCF MUD CAP@1 BPM IN ANNULUS.

RIH W/4-1/2" LOWER COMPLETION ASSY ON DRIFTED 4"DP & 4" HWDPS FROM
3582 FT TO 8290 FT. (ABOVE LS)
1000 - 1530 5.5 0-1 EOW C COMP TI STDP RIG 11700 11700 3582 8290 - MONITOR WELL ON TRIP TANK.
- CONTROLL RIH TO 2 MIN/ STD SLIPS-TO-SLIPS.
- FILL STRING EVERY 10 STDS.
- CONT PUMPING 78 PCF MUD CAP@1 BPM IN ANNULUS.

CIRCULATE 1.5 STRING VOLUME AT 7" LINER SHOE AND RECORD PARAMETERS.
- P/U WT: 178 KLBS.
1530 - 1630 1 0-1 EOW C COMP CIRC MPMP RIG 11700 11700
- S/O WT: 165 KLBS.
- SPP: 120 PSI @ FR: 3 BPM.
- CONT PUMPING 78 PCF MUD CAP@1 BPM IN ANNULUS.

RIH W/4-1/2" LOWER COMPLETION ASSY ON DRIFTED 5" DPS FROM 8290 FT TO
1630 - 1900 2.5 0-1 EOW C COMP TI STDP RIG 11700 11700 8290 11510 11510 FT.
- MONITOR WELL ON TRIP TANK.
- CONTROLL RIH TO 2 MIN/ STD SLIPS-TO-SLIPS.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1547 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/09/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
- FILL STRING EVERY 15 STDS
- CONT PUMPING 78 PCF MUD CAP@1 BPM IN ANNULUS.

WASH DOWN LAST STAND F/11510 TO SETTING DEPTH AT 11594 FT.


1900 - 1915 0.25 0-1 EOW C COMP RW LWCOM RIG 11700 11700 11510 11594 -FR: 126 GPM, SPP: 200 PSI.
- PUW: 228 KLBS, SOW: 163 KLBS.
- CONT PUMPING 78 PCF MUD CAP@1 BPM IN ANNULUS.

DISPLACE HOLE TO BRINE AND SPOT MUDZYME AS PER BELOW:


- PUMP 192 BBL OF 70 PCF HI-VIS BRINE.
- PUMP 50 BBL PRE-FLUSH SPACER 70 PCF.
- PUMP 150 BBL MUDZYME PILL
1915 - 2300 3.75 0-1 EOW C COMP CIRC MPMP RIG 11700 11700 - PUMP 20 BBL HI-VIS BRINE SPACER 70 PCF.
- DROP 1.25" COMPOSITE SETTING BALL.
- PUMP 20 BBL HI-VIS BRINE SPACER 70 PCF.
- CHASE BALL W/ 70 PCF BRINE TILL SEATED.
- FR: 125 GPM, SPP: 240 PSI.
- CONT PUMPING 78 PCF MUD CAP@1 BPM IN ANNULUS.

SET LOWER COMPLETION HANGER & OH PACKERS AS FOLLOW (4-1/2" TOL @


8022 FT):
- INCREASE PRESSURE IN 300 PSI STEPS TO 2100 PSI & SET THE LINER HANGER.
- CHECK HANGER SET BY SLACK OFF LINER WT (40 KLBS) + 40 KLBS.
- INCREASE PRESSURE TO 4000 PSI FOR 10 MIN, RELEASE RT & SET OH PACKERS.
- FILL UP ANNULUS WITH 70 PCF BRINE, WELL STATIC.
- BLEED OFF PRESSURE TO ZERO & P/U 3 FT, CONFIRM RT RELEASED & LOST
2300 - 0045 1.75 0-1 EOW C COMP SET PKR SCP 11700 11700 8022 8022
LINER WT. (P/U WT: 194 KLB, S/O WT: 178 KLBS).
- P/U 6 FT & PULL PKR SETTING DOGS OUT OF TBR.
- ROTATE W/ 20 RPM / 2.6-10 KFT-LBS TRQ & S/O 80 KLBS FOR 10 MIN & SET
TOP PACKER. OBSERVE SURFACE INDICATION.
- CLOSE ANNULAR & TEST TOP PKR TO 1000 PSI/10 MIN, TEST GOOD.
- PULL UP 30 FT AND RETRIEVE RCB, OBSERVE LEVEL IN ANNULUS DROPPING
FAST. FILL UP WITH BRINE @ +/- 9 BPM. QUICK FLOW CHECK, LOSSES AT +/-60
BPH.

CIRCULATE TO DISPLACE ANNULUS WITH 70 PCF BRINE WITH +/- 80% RETURN.
0045 - 0145 1 0-1 EOW C COMP CIRC MPMP RIG 11700 11700
- FR: 250 GPM, SPP: 930-520 PSI
- CIRCULATE TILL MW IN=MW OUT=70 PCF

0145 - 0245 1 0-1 EOW C COMP SDR1 NA RIG 11700 11700 FLOW CHECK, WELL ON PARTIAL LOSSES.
- STATIC LOSSES @ 7 BPH.

POOH W/ LC RUNNING TOOL TO 6088 FT WHILE L/D DP.


- L/D 60 X 5" DP.
0245 - 0459 2.25 0-1 EOW C COMP LDP SPDP RIG 11700 11700 8022 6088
- SLB KPI VS ACTUAL : 21 VS 24 JPH.
- MONITOR WELL ON TRIP TANK AND TRIP SHEET, STATIC
LOSSES @ 4.5 BPH.
Foreman Remarks

================================ WELL OBJECTIVE ====================================================


- HRDH-1547 WHICH WILL BE DRILLED AS SINGLE LATERAL HORIZONTAL OIL PRODUCER (PHZ) TARGETING ARAB-D RESERVOIR, ZONE 2A. THIS WELL WILL BE COMPLETED WITH SLB ICD/PSSD
LOWER COMPLETION AND SLB UPPER COMPLETION WITH PDHMS.
- ARAB-D ZONE-2A GOR: 440 SCF/BBL, H2S ARBD ZONE-2A: 0.88, RER 1/2 LFL: 198 M
================================= WELL DESIGN ======================================================
- 24" CP PLANNED/ACTUAL: 278' / 288' MD\TVD (50' TVD INTO RUS FM)
- 18 5/8" CP PLANNED/ACTUAL: 2,303' / 2,313' MD\TVD (50' TVD INSIDE AHMADI FM).
- 13-3/8" CP PLANNED/ACTUAL: 3,920' / 3,956' MD\TVD (300' TVD INSIDE BIYADH FM).
- 9-5/8" CP PLANNED/ACTUAL: 5,847'/ 5842 MD\TVD (100' TVD ABOVE HITH FM).
- 7" LINER PLANNED/ACTUAL: 8,466' MD/ 6,887' TVD - 8,875' MD / 6,881' TVD (+/- 2' TVD ABOVE ABD1).
- KOP @ 5,916 FT
- 6-1/8" OH TD PLANNED-ACTUAL: 14,567' / 6,922' - 14,567' /6,895'.
=============================== ARAMCO PERSONNEL ON LOCATION =======================================
- ARAMCO ME HUSSAM ALHAMMADY #825271IN THE RIG SINCE 6/04/2024.
================================= SLB LSTK OR CONTRACTOR ============================================
- SLB DSV: ESLAM / GHEORGHE.
- SLB HSE: NO
======================================== SAFETY===================================================

======================================== DIESEL ===================================================


DIESEL CONSUMED (RIG+CAMP+MUD- SLB) DAILY/TOTAL FOR WELL (BBLS): ):----50/4287
TOTAL DAILY FUEL BALANCE(BBLS) : 1045
======================================== ERP =====================================================
- STAGING AREA #1: LOCATED AT 0.74 KM NE FROM WELL HRDH-1547.
- STAGING AREA #2: LOCATED AT 0.74 KM NW FROM WELL HRDH-1547.
=========================== RIG SINO-33L JOURNEY MANAGEMENT ==========================================
- WEAK MOBILE SIGNAL WITH STC/MOBILY NETWORKS.
===================================== NEXT WELL ===================================================
NEXT WELL: HRDH-1565
APPROVED PROGRAM:
APPROVED ERP: NO.
LOCATION READINESS:
LAST VISIT:

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1547 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/09/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

WATER WELLS: HRDH-849


Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0-1 11,700 89.3 107 0 6,918 -1057.14 1285.59 5,460.69 0.88

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 0 API 0 0 Volts 0 7 117,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 94 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 6 0/0 0 0 0
30
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 0 API 0 0 Volts 0 7 117,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 94 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 6 0/0 0 0 0
30

MUD XC NACL S-WELLSURF


TREATMENT 12 ( 25KG ) 60 ( 2200L ) 18 ( 5GLD )

BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 6.125 1 0.62 3 1/2" REG QF8762
2 RSS SDM 4.75 1 4.75 3.64 12.99 0 75432532
3 Component Not listed SDM 4.82 1 4.82 2.25 1.69 NC38 NC38 0 NTS-SA39631
4 Component Not listed SDM 5.25 1 5.25 2.5 5.91 NC38 NC38 1 MNB5466-03
5 Component Not listed SDM 5.25 1 5.25 2.5 2.43 NC35 NC38 1 MNB1393-05
6 Measurement While Drilling (MWD) SDM 4.75 1 4.75 32.28 50 B1445
7 Component Not listed SDM 5.75 1 5.75 2.25 0.92 NC38 NC38 1 OFS-10485
8 Logging While Drilling (LWD) SDM 4.75 1 4.75 2.25 23.63 NC38 NC38 25.4 V9013
DRILL STRING
9 Component Not listed SDM 4.85 1 4.85 7.71 NC38 NC38 1 B2011180
10 Component Not listed SDM 4.875 1 4.875 2.5 7.41 NC38 NC38 1 MNB55904-15
11 Crossover RIG 4.75 1 4.75 2.25 1.62 XT39 NC38 0 33-01
12 Dogleg Reamer NRT 6.125 1 6.125 3.34 4.27 XT39 XT39 1 G302088
13 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.562 91.9 XT39 XT39 28.72 SPRL
14 Hydraulic Jar NOJ 4.75 1 4.75 2.25 29.9 XT39 XT39 1,500 09437K
15 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.562 91.19 XT39 XT39 25.1 CONV
16 Drillpipe RIG 4 246 4 3.34 7,769 XT39 XT39 14 G105 PREMIUM
17 Drillpipe RIG 5 133 5 4.276 4,199 NC50 NC50 19.5 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/09/2024 N/A NORMAL NO SEASONAL 3,973 N/A

Company TGC TSC RIG SMI MJH SLH SDM TK3 ARM SCP TK3 ARM GD1

Category CTRG CSR RIG DFMS SEC LHES LWD OTHR OTHR PSIE WSC WSC SLS
PERSONNEL
17 4 51 2 8 1 2 3 1 1 2 1 4
Total
AND SERVICES No. of Persons
97
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 0 12 0 12 12 24 24 24 0

Standby/Tankers
TRUCKS/BOATS
AB-5451

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 1418 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-1552 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/28/2024 - 07/20/2024
Report ID: OPERLMTDMRREP

SINO-35L @ ANDR-1552 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL Foreman(s)ALHARTHI, TAWFIQ ABDULLAH
D&WO Morning Report (Service Providers View) Charge #: ARAB-D OIL PRODUCER) Engineer CHERESHNIUK, VITALII
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-24056-1552) Manager MUTAIRI, NAIF MUTLAQ
SINO-35L
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 8821677714 145 673-6423 673-3669
Date: Tuesday 06/18/2024 ANDR-1552 (0) ANDR_1552_0 CONTRACTOR /CLERK VSA T
673-8615

Last 24 hr operations Next 24 hr plan


DRILL 8-1/2'' DIRECTION SEC TO 7,626 FT (2' TVD ABOVE ABD1), CHC, PERFORM WIPER TRIP TO PERFORM WIPER TRIP, CHC, POOH & L/D 8-1/2" BHA, RIH 7" LINER.
9 5/8" CSG SHOE.
Location Next Location
DRIVE STRAIGHT IN RIYADH HI-WAY 108 KM, TURN LEFT DRIVE 20.5 KM BLACKTOP, TURN RIGHT 5 KM SKID ROAD. ANDR-1548
Current Depth (ft) Liner TOL MD TVD Formation Tops
6,920 Last Csg Size MD TVD Size Top
9 5/8 5296 5296 Formations Comments
Depth
AS PER RCC (70 FT
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 560
SHALLOWER).
6030 (Date) 100 880 99 UMER 720 AS PER RCC (01 FT DEEPER).
16.6 (06/01/2024@1400 ) AS PER RCC (174 FT
ARUM 1,660
SHALLOWER).
AS PER RCC (43 FT
LAMS 2,490
SHALLOWER).
AS PER RCC (174 FT
AHMD 2,775
SHALLOWER).
AS PER RCC (55 FT
SFNY 3,205
SHALLOWER).
AS PER RCC (27 FT
SHUB 4,005
SHALLOWER).
AS PER RCC (01 FT
BYDH 4,230
SHALLOWER).
MDTM 4,990 AS PER RCC (09 FT DEEPER).
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

MTR DRILL 8 1/2" DIRECTIONAL HOLE IN ROTARY AND SLIDING MODE F/ 6,930 FT
TO 7,695 FT, WITH 82 PCF OBM & 100% CIRC.
0500 - 0015 19.25 0 8 1/2 N DRLG DMR MMOT BHI 6920 7626 - WOB: 20-40 KLB, RPM: 60 + M, TQ: 3/6-8 K.FT-LB OFF/ON BTM, GPM 500 @
2800/3200 PSI OFF/ON BTM PRESSURE.
- WASH UP / REAM DOWN SINGLE EACH STD DRILLED.
- SWEEP HOLE WITH 30 BBLS HI.VIS PILL EVERY 3 STD.

SWEEP HOLE WITH 2 X 20/40 BBL LV/HI.WT PIL, MEANWHILE GOC ANALYZE THE
0015 - 0215 2 0 8 1/2 N DRLG CIRC MPMP RIG 7626 7626
DATA AND DECIDED TO CONT DRILLING.

MTR DRILL 8 1/2" DIRECTIONAL HOLE IN ROTARY AND SLIDING MODE F/ 7,695 FT
TO 7,800 FT, WITH 82 PCF OBM & 100% CIRC.
0215 - 0430 2.25 0 8 1/2 N DRLG DMR MMOT BHI 7626 7800 - WOB: 20-40 KLB, RPM: 60 + M, TQ: 3/6-8 K.FT-LB OFF/ON BTM, GPM 500 @
2800/3200 PSI OFF/ON BTM PRESSURE.
- WASH UP / REAM DOWN SINGLE EACH STD DRILLED.
- SWEEP HOLE WITH 30 BBLS HI.VIS PILL EVERY 3 STD.
0430 - 0459 0.5 0 8 1/2 N DRLG RR TDS RIG 7800 7800
SERVICE TDS.
Foreman Remarks

========================== WELL OBJECTIVE =========================================


ANDR-1552 WILL BE DRILLED AS A SINGLE LATERAL HORIZONTAL OIL PRODUCER TARGETING ARAB-D RESERVOIR. THE WELL WILL BE COMPLETED WITH LOWER COMPLETION REGARDLESS OF
LOSSES AND UPPER COMPLETION ON 4-1/2" TUBING.
========================== WELL DESIGN ===========================================
- MAX GOR ARAB-D & PADS 583 SCF/BBL.
- H2S ARAB-D & PADS : 1.96 %.
- RER 30 PPM @ 1,085 M, RER 100 PPM @ 616 M & 1/2 LFL @ 180 M.
=================================WELL DATA======================================
* 24" CSG PLAN/ACTUAL: 120'/(TVD: 123', MD: 123').
* 18-5/8" CSG PLAN/ACTUAL: 680'/(TVD: 610, MD: 610') ( 50' TVD INTO RUS).
* 13-3/8" CSG PLAN/ACTUAL: 2,999'/(TVD: 2821, MD: 2821')( 46' TVD INTO AHMADI).
* 9-5/8" CSG PLAN/ACTUAL: 5,281'/(TVD: 5,297', MD: 5,297')(307' MD INTO MDTM).
* 7'' LINER PLAN/ACTUAL : 7,626'/(TVD: XXX, MD: XXX') (2' TVD ABOVE ABD1).
* 6-1/8" OPEN HOLE PLAN/ACTUAL : 10,893'/(TVD: XXX, MD: XXX').
========================== ARAMCO PERSONNEL =====================================
========================== LSTK BAKER DSV ========================================
- BAKER DSV: AHMED FAHMY/ FAISAL, BAKER HSE: LUIS.
===============================================================================
NEXT WELL (HRML-91).
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 6,922 59.63 179.46 93 6,658 -234.68 -1.41 769.96 2.84
DAILY SURVEY 0 7,017 64.93 180.5 95 6,702 -260.3 -1.4 854.02 5.66
0 7,111 67.52 180.65 94 6,740 -286.52 -1.67 940.04 2.75
0 7,206 71.66 180.28 95 6,773 -313.65 -1.89 1,029.06 4.38

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-1552 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/28/2024 - 07/20/2024
Report ID: OPERLMTDMRREP

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 7,301 74.27 179.15 95 6,801 -341.33 -1.75 1,119.87 2.97
0 7,396 74.14 178.76 95 6,827 -369.19 -1.24 1,211.26 0.42
0 7,491 79.12 178.14 95 6,849 -397.34 -0.48 1,303.62 5.28
0 7,540 82.58 178.64 49 6,857 -412.08 -0.07 1,351.97 7.13
0 7,587 84.1 178.32 47 6,862 -426.3 0.31 1,398.64 3.31
0 7,642 87.29 177.62 55 6,867 -443.01 0.9 1,453.44 5.92
0 7,682 87.93 177.56 40 6,868 -455.18 1.41 1,493.37 1.63
0 7,729 88.46 177.82 47 6,870 -469.48 1.99 1,540.32 1.24
0 7,776 89.14 177.98 47 6,871 -483.8 2.52 1,587.29 1.49

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 1 0 API 64 627 Volts 10.62 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 4 HTHP 16 21 0 9 / 10 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 20 20 9 / 10 0 0 0
57
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 1 0 API 64 639 Volts 10.62 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 3.8 HTHP 16 23 0 10 / 11 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 21 20 10 / 11 0 0 0
60

MUD CARBOTROL CAOH2 SAFE-SCAV CARBGEL


TREATMENT 42 ( 50LB ) 56 ( 50LB ) 1 ( 55GL ) 57 ( 50LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
4RR 2,824 5,297 DP Av DC Av Bit HHP 30 60 M223 12.25 HTC
Pressure GPM Jet Vel 94.07 151.19 61 I-Row O-Row DC Location Bearings
2,800 480 149 1 1 LT A X
BIT DATA
Serial Number Type Jets TFA
7916605 DD606TX 6 x 15 / 1.035
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 59 N/A N/A N/A 7,000 59
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
59

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 1 0.87 7915842
2 Modular Stabilizer BHI 6.812 1 6.813 2.313 1.98 6 3/4 T2 6 3/4 T2 0 16211483
3 Mud Motor BHI 6.75 1 6.5 3 33.08 4 1/2 I.F 4 1/2 REG 98 16196998
DRILL STRING 4 Measurement While Drilling (MWD) BHI 6.75 1 6.75 35.71 4 1/2 I.F 4 1/2 I.F 102.62 ZDHP1267647
5 FIlter Sub BHI 6.75 1 6.375 2.8 3.44 NC50 NC50 98 14408074
6 Heavy Weight Drillpipe (HWDP) RIG 5 3 5 3 91.74 NC50 NC50 44.99 CONV
7 Hydraulic Jar NPC 6.5 1 6.5 3 26.68 4 1/2 I.F 4 1/2 I.F 19.5 HMJ650064
8 Heavy Weight Drillpipe (HWDP) RIG 5 2 5 3 60 NC50 NC50 50 CONV
9 Drillpipe RIG 5 14 5 4.276 440.27 NC50 NC50 19.5 G105 PREMIUM
10 Agitator NDD 6.5 1 6.5 2.75 25.88 NC50 NC50 0 CW17301801
11 Shock Sub NOJ 6.5 1 6.5 2 12.99 4-1/2" IF 4-1/2" IF 800 CW28333421
12 Drillpipe RIG 5 4 5 4.276 221.56 NC50 NC50 19.5 G105 PREMIUM
13 Heavy Weight Drillpipe (HWDP) RIG 5 45 5 3 1,426 NC50 NC50 50 CONV
14 Drillpipe RIG 5 60 5 4.276 30 NC50 NC50 19.5 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/09/2024 N/A NORMAL NO SEASONAL 2,288 H2S DRILL & STAND
DOWN MEETING

Company OTH BHI RIG BDF TK2 RIG ARM OTH TK2 ARM BCR

Category CTRG DPDS RIG DFMS OTHR OTHR OTHR VAC WSC WSC CSR
PERSONNEL
15 4 59 1 2 4 0 2 2 1 6
Total
AND SERVICES No. of Persons
96
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 0 5 24 24 24

Operating Hours. 0 24 24 24 24 12 0 5 24 24 0

Standby/Tankers Others
TRUCKS/BOATS
DH-1562 AMBULANCE

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-1552 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/28/2024 - 07/20/2024
Report ID: OPERLMTDMRREP

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 550 N/A N/A 3450

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-477 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 05/15/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

SINO-36L @ ANDR-477 Limited Morning Report for 06/18/2024


Objective : (DRILL PILOT Foreman(s)MOHAMMED, ISLAM MOHAMMED
D&WO Morning Report (Service Providers View) Charge #: HOLE & ST AS SINGLE Engineer HODANI, MAREE OTAF
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24056-0477) LATERAL OIL PRODUCER Manager ALMUKHTAR, ESSA HAJJI
SINO-36L
ABD-1.) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK)
(0500-0500) Saudi Aramco Well Wellbores: +882167771 1243 0135727224 0135726041
Date: Tuesday 06/18/2024 ANDR-477 (0-1-1) ANDR_477_2 CONTRACTOR /CLERK VSA T
0138387868 / 0504790 380

Last 24 hr operations Next 24 hr plan


DRILL 6-1/8" LATERAL SECTION TO TD 11201 FT, CHC, DISP TO OBM, CHC, POH & L/D 6-1/8" M/U, RIH & RECORD CALIPER LOG, POH 6-ARMS CALIPER LOG, L/D SAME.
ICRUISE/LWD/MWD BHA, M/U CALIPER LOG TOOL.
Location Next Location
5KM SW OF ANDR GOSP#1. SDGM-130
Current Depth (ft) Liner TOL MD TVD Formation Tops
11,201 Last Csg Size MD TVD Size Top
7 6634 6634 Formations Comments
Depth
5736 FT MD (0.7 FT
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) HITH 5,734
SHALLOW)
10765 (Date) 100 436 105 ABAR 6,234 6271 FT MD (0.7 FT DEEP)
31 (05/18/2024@0500 ) ARBB 6,315 6271 FT MD (4 FT SHALLOW)
ABBR 6,320 6378 FT MD (ON DEPTH)
ARBC 6,355 6423 FT MD (1 FT SHALLOW)
ABCR 6,460 6577 FT MD (5 FT DEEP)
ARBD 6,539 6718 MD (4.7 FT DEEP)
PADS 6,646 6718 MD (5 FT DEEP)
BPDS 6,652 7125 MD (3 FT DEEP)
ABD1 6,662 7296 MD (3 FT DEEP)
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

SPS DRILL 6-1/8" LATERAL SECTION W/ ICRUISE/LWD/MWD FROM 10765 FT TO


0500 - 1100 6 0-1-1 6 1/8 N DRLG D RSS SPS 10765 11201 TD 11201 FT W/83 PCF POLYMER MUD , 100% RETURN
> WASH UP & REAM DOWN LAST SINGLE IN STD DRILLED .
> SWEEP HOLE AS REQUIRED

1100 - 1230 1.5 0-1-1 6 1/8 N DRLG CIRC MPMP RIG 11201 11201 SWEEP HOLE W/ 20/30 BBLS LO-VIS/WT PILL, CHC W/83 PCF POLYMER MUD,
CHECK MWT IN / OUT OK.
1230 - 1300 0.5 0-1-1 6 1/8 N DRLG CIRC MPMP RIG 11201 11201
FLOW CHECK, WELL STATIC.
1300 - 1430 1.5 0-1-1 6 1/8 N DRLG CIRC MPMP RIG 11201 11201
HPJSM, DISPLACE HOLE TO 83 PCF OBM.
1430 - 1630 2 0-1-1 6 1/8 N DRLG CIRC MPMP RIG 11201 11201
CIRC & CONDITION OBM PROPERTIES W/220 GPM, 100% RETURN.
1630 - 1700 0.5 0-1-1 6 1/8 N DRLG CIRC MPMP RIG 11201 11201
FLOW CHECK, WELL STATIC.

POH W/ 6-1/8" ICRUISE/LWD/MWD BHA ON 5 STDS W/CONTROLED SPEED, HOLE


1700 - 1730 0.5 0-1-1 6 1/8 N DRLG ST STDP RIG 11201 11201 11201 10725
IN GOOD CONDITION.
- MONITOR WELL ON TRIP TANK, STATIC.
1730 - 1800 0.5 0-1-1 6 1/8 N DRLG CIRC MPMP RIG 11201 11201
FLOW CHECK, WELL STATIC.

POH W/ 6-1/8" ICRUISE/LWD/MWD BHA ON 4" DP W/CONTROLED SPEED TO TOW


1800 - 2100 3 0-1-1 6 1/8 N DRLG ST STDP RIG 11201 11201 10725 5530 @ 5530 FT.
- HOLE IN GOOD CONDITION.
- MONITOR WELL ON TRIP TANK, STATIC.
2100 - 2130 0.5 0-1-1 6 1/8 N DRLG CIRC MPMP RIG 11201 11201
FLOW CHECK, WELL STATIC. SLUG PIPE.

2130 - 2330 2 0-1-1 6 1/8 N DRLG TO STDP RIG 11201 11201 5530 630 POH W/ SPS RSS/LWD BHA F/ 5530 FT TO 630 FT (5 STDS BEFORE BHA).
- MONITOR WELL ON TRIP TANK, STATIC.
2330 - 0000 0.5 0-1-1 6 1/8 N DRLG CIRC MPMP RIG 11201 11201
FLOW CHECK, WELL STATIC.
0000 - 0015 0.25 0-1-1 6 1/8 N DRLG HT BHA RIG 11201 11201
POOH WITH SPS 6 1/8'' I CRUISE/ LWD ASSY TO BHA DEPTH @ 130 FT.
0015 - 0030 0.25 0-1-1 6 1/8 N DRLG CIRC MPMP RIG 11201 11201
FLOW CHECK, WELL STATIC.

0030 - 0230 2 0-1-1 6 1/8 N DRLG HT BHA SPS 11201 11201 HPJSM, REMOVE RA SOURCES & DUMP LWD DATA.
- MONITOR THE WELL ON TRIP TANK, STATIC.

POOH & L/D SPS ICRUISE RSS/LWD BHA & BREAK OUT 6-1/8" PDC BIT.
0230 - 0430 2 0-1-1 6 1/8 N DRLG HT BHA SPS 11201 11201
- BIT DULL: 1-1-WT-A-X-I-NO-TD.
- MONITOR WELL ON TRIP TANK, WELL STATIC.

0430 - 0459 0.5 0-1-1 6 1/8 E LOG OTH NA HWP 11201 11201 HPJSM, P/U & M/U HES W/L 6-ARMS CALIPER LOGGING TOOLS ... INC @ RPT.
- MONITOR WELL ON TRIP TANK, WELL STATIC.
Workover Objectives
Foreman Remarks

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-477 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 05/15/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

>> ODF CORRECTION = -12.5 FT, TOW = 5530 FT, BOW = 5539 FT, KOP =5650 FT.

>> SENSOR DISTANCE:- ABI : 17.65 FT, GR: 65.39 FT, AFR (RES.): 54.83 FT, DIR.: 72.98 FT, RESISTIVITY: 99.01 FT, ALD (DENSITY): 80.05 FT.
PWD: 70.72 FT, ABG:14.15 FT.

========================================SAFETY================================================
>> HELD SAFETY MEETING WITH ALL INVOLVED PERSONNEL.
=============================================PERSONNEL ========================================
>> HALLIBURTON DSV: SAMEH (DAY), MOHAMED ABDULLAH (NIGHT), YOUSIF (HSE), FAISAL (HSE TRAINEE).
>> DOECD HSE ADVISOR KETAN SHERIGAR # 8071406, MAYACHE ABDERREZEK # 8620422 & MOHAMED AL-ZAID ID# 291470 ON LOCATION FOR RHSEI & WCEI FOLLOW-UP INSPECTION.
======================================== FUEL CONSUMPTION =======================================
>> DIESEL CONSUMPTION FOR ENGINES (RIG + CAMP) = (DAILY: 37 BBL / CUMULATIVE FOR CURRENT WELL: 806 BBL).
========================================= NEXT LOCATION READINESS =================================
>> SDGM-130 (SDGM GOSP-4) KOM HELD ON 04/29/2024, 100% STRIP OUT & 93 % LOCATION.
>> SDGM-488 (SDGM GOSP-4) KOM HELD ON 06/06/2024, 0% STRIP OUT & 0% LOCATION.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
83 PCF 1 0 API 56 380 Volts 0 0 125,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2 HTHP 18 14 0 8 / 12 INVER 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 17 26 6/7 0 0 N/A
55
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
84 PCF 1 3.4 API 4 0 Volts 0 9.5 120,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 12.4 HTHP 73 28 0 8 / 10 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 23 23 6/7 0 800 N/A
54

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
9RR 6,759 11,201 DP Av DC Av Bit HHP 12 120 M332 6.125 SEC
Pressure GPM Jet Vel 290.49 N/A 49 I-Row O-Row DC Location Bearings
2,850 255 182 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
14023086R HD54 3 x 14 / 0.451
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 95 163 225 135 11,000 Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 6.125 1 0.73 14023086R
2 RSS SPS 4.75 1 4.75 3.98 35.12 3-1/2" IF 3-1/2"REG 55.31 4108
3 Logging While Drilling (LWD) SPS 4.75 1 4.75 2.25 11.53 15.6 90755489
4 Logging While Drilling (LWD) SPS 4.75 1 4.75 15.45 45.57 90760179
5 Logging While Drilling (LWD) SPS 4.75 1 4.75 30.11 102.71 90761765
6 Measurement While Drilling (MWD) SPS 4.75 1 4.75 11.17 46.3 90760464
DRILL STRING 7 Stabilizer SPS 5.875 1 4.75 2.25 4.75 NC38 NC38 47.44 12332940
8 Screen sub SPS 4.75 1 4.75 2 6.43 3 1/2 REG 3 1/2 REG 39.41 12889020
9 Float Sub SPS 4.75 1 4.75 1.875 1.77 3 1/2 REG 3 1/2 REG 49.69 13564640
10 Crossover RIG 4.75 1 4.75 2.25 1.81 NC38 XT39 49.69 220747
11 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.56 90.91 XT39 XT39 28.24 CONV
12 Crossover RIG 4.75 1 4.75 2.25 1.66 XT39 NC38 49.69 444
13 String Reamer NRT 5.875 1 5.875 2.125 4.86 XT39 XT39 85.65 44
14 Crossover RIG 4.75 1 4.75 2.25 1.66 NC38 XT39 47.44 44
15 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.563 91.14 XT39 XT39 28 CONV
16 Hydraulic Jar WJS 4.75 1 4.75 2.5 31.25 XT 39 XT 39 31.25 14201645
17 Heavy Weight Drillpipe (HWDP) RIG 4 2 4 2.563 60.47 XT39 XT39 28 CONV
18 Drillpipe RIG 4 144 4 3.476 4,539.8 XT39 XT39 11.85 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/07/2024 N/A WINDY N/A SEASONAL 3,409 TOURELY

Company TGC SPS RIG BAR SPS TK1 TK1 ARM

PERSONNEL Category CTRG DPDS RIG DFMS LWD OTHR WSC WSC
Total
AND SERVICES
13 2 55 2 2 3 3 1 81
INFORMATION No. of Persons

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-477 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 05/15/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

Operating Hours. 0 12 12 12 12 12 12 12

Standby/Tankers Others
TRUCKS/BOATS
DH-7541 RIG AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 1200

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-68 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 05/29/2024 - 06/29/2024
Report ID: OPERLMTDMRREP

SINO-37L @ HRDH-68 Limited Morning Report for 06/18/2024


Objective : (ST AS SINGLE Foreman(s)SHUANGJUN, XUE
D&WO Morning Report (Service Providers View) Charge #: LATERAL OIL PRODUCER Engineer ZAHRANI, OSAMA MAJHOOD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved AD2A) Manager ALMUKHTAR, ESSA HAJJI
SINO-37L (71-24058-0068)
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT RIG FORMAN VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 2317 013-577-96 18 013-577-96 04
Date: Tuesday 06/18/2024 HRDH-68 (0-1) HRDH_68_1 MOBILE CONTRACTOR /CLERK VSA T
HALLIBURTO N/05000408 94 HALLIBURTO N /0138387 869

Last 24 hr operations Next 24 hr plan


POH&LD SPS BHA. M/U & RIH HWL IMAGE/CALIPER LOG, LOG UP TO TE. POOH /LD HWL. MU & RIH W/ 6-1/8" STIFF ASSY, DISPLACE & CONDITION OBM, POOH.
Location Next Location
214.20 KM FROM DHAHRAN MAIN GATE HWYH-373
Current Depth (ft) Liner TOL MD TVD Formation Tops
11,200 Last Csg Size MD TVD Size Top
7 5779 5779 Formations Comments
Depth
6275' MD (3.9 FT TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ABAR 6,244
DEEPER)
11200 (Date) 100 0 215 6329' MD (2.9 FT TVD
16.3 (06/01/2024@2100 ) ARBB 6,289
DEEPER)
6405' MD (5.3 FT TVD
ABBR 6,349
DEEPER)
6436' MD (3.9 FT TVD
ARBC 6,373
DEEPER)
6548' MD (3.4 FT TVD
ABCR 6,454
DEEPER)
6783' MD (11.9 FT TVD
ARBD 6,589
DEEPER)
7267' MD (7.7 FT TVD
PADS 6,708
DEEPER)
7352' MD (11.3 FT TVD
BPDS 6,716
DEEPER)
ABD1 6,727 7500' MD (+11.8' TVD)
AD2A 6,733 7656'MD (+11.3'TVD )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

0500 - 0730 2.5 0-1 6 1/8 N DRLG HT BHA RIG 11200 11200 CONT POOH &REMOVE RA SOURCE, L/D 6-1/8" ICRUISE / LWD / MWD BHA .
>> MONITOR WELL ON TRIP TANK - STATIC.

HPJSM,D P/U & M/U HWL CALIPER/IMAGE LOGGING TOOLS, CHECK CABLE HEAD
0730 - 1000 2.5 0-1 6 1/8 E LOG OTH NA HWP 11200 11200 LATCH WITH TOOL & SIGNAL - OK.
>> F/T LOGGING TOOLS ON SURFACE - OK.
>> MONITOR WELL ON TRIP TANK, STATIC.

RIH W/ XRMI - GR LOGGING TOOLS ON DRIFTED 4" DP TO 5648' (SES DEPTH)


WHILE DRIFT DP W/ 2.38" DRIFT.
1000 - 1330 3.5 0-1 6 1/8 E LOG ST STDP RIG 11200 11200 0 5648
>> FILL STRG & BREAK CIRC USING HALL SCREEN SUB EVERY 10 STDS W/ 81 PCF
MUD.
>> MONITOR WELL ON TRIP TANK - STATIC.

HPJSM, R/D MOUSE HOLE. R/U HES W/L SHEAVES & CIRC 1.5 STRING VOLUME
1330 - 1630 3 0-1 6 1/8 E LOG OTH NA HWP 11200 11200
WITH 81 PCF MUD,100& RETURN.
>>P/U & M/U HES SIDE ENTRY SUB & CONNECT TDS.

HWL RIH WITH CABLE HEAD & CONFIRM LATCH. CIRC. INSTALL CABLE CLAMP
1630 - 1900 2.5 0-1 6 1/8 E LOG OTH NA HWP 11200 11200 AND TENSION TEST FOR 10 MIN, OK. INSTALL 3RD SHEAVE WHEEL & R/U HWL
SPLIT BUSHING.
>> MONITOR WELL ON TRIP TANK, STATIC.

RIH HWL IMAGE/CALIPER LOGGING TOOL WITH CONTROLED SPEED TO 11190'


1900 - 0000 5 0-1 6 1/8 E LOG ST STDP RIG 11200 11200 5648 11190 (10 FT OFF BTM), HOLE IN GOOD CONDITION.
>> FILL STRING WITH 81 PCF MUD EVERY STAND WHILE RIH THRU HWL SCREEN.
>> MONITOR WELL ON TRIP TANK - STATIC.

HWL ACTIVATE LOGGING TOOLS, LOG UP XRMI - GR MAIN PASS F/ 11190' TO


0000 - 0459 5 0-1 6 1/8 E LOG LOG WLT HWP 11200 11200 11190 7650
7600'. RIH & LOG REPEAT PASS F/ 7920' TO 7650' .
>> MONITOR WELL ON TRIP TANK - STATIC.
Workover Objectives
Foreman Remarks

RFC=-13.5'; TOW AT 5770', TE AT 7656' MD(6733' TVD)


======================================
SAFETY; CONDUCT PJSM AND DRILLS AS REQUIRED .
===============================================
POB: HAL DAY DSV IBRAHIM, NIGHT DSV M.HOSNY, HALL HSE DAVID.
==========================================================================
DIESEL CONSUMPTION FOR ENGINES (RIG + CAMP) = (DAILY: 22 BBL / CUMULATIVE FOR CURRENT WELL: 475 BBL).
=================== NEXT LOCATION ==============================================
>> HWYH-373 KOM HELD ON 05-26-2024 , 100% STRIP OUT &30% LOCATION.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0-1 11,200 89.8 195 0 6,692 -1470.28 -397.43 4,996.86 0.59

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-68 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 05/29/2024 - 06/29/2024
Report ID: OPERLMTDMRREP

MUD DATA
MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
7RR 5,787 7,416 DP Av DC Av Bit HHP 20 50 M332 6.125 SEC
Pressure GPM Jet Vel 296.18 N/A 68 I-Row O-Row DC Location Bearings
3,350 260 215 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
13593127R GTD54HO 3 x 13 / 0.389
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 36.7 169 194 148 5,600 0
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/01/2024 AS WINDY N/A HOT 2,597 TOURLY
REQUIRED

Company TGC RIG BAR SPS TK1 TK1 ARM HWP

Category CTRG RIG DFMS LWD OTHR WSC WSC WLS


PERSONNEL
16 55 1 2 5 3 1 6
Total
AND SERVICES No. of Persons
89
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 22

Standby/Tankers Others Others Others


TRUCKS/BOATS
ARAMCO VEHICLE: AB-5112. AMBULANCE BUS & PICK UP CRANE & FORKLIFT

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 1000

Instrumentation Other
REPAIR ASAP OK Reporter
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-365 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/09/2024 - 07/12/2024
Report ID: OPERLMTDMRREP

SINO-42L @ HWYH-365 Limited Morning Report for 06/18/2024


Objective : (ST AS SINGLE Foreman(s)SHEHATA, MOHAMED ELSAYED
LATERAL OIL PRODUCER Engineer ZAHRANI, OSAMA MAJHOOD
D&WO Morning Report (Service Providers View) Rig Charge #: AD2A) Manager ALMUKHTAR, ESSA HAJJI
Copyright 2024 Saudi Aramco. All Rights Reserved SINO-42L (71-24053-0365)
THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK)
8821677711 728 5779665 5779663
(0500-0500) Saudi Aramco Well Wellbores:
HWYH-365 (0) HWYH_365_0 MOBILE MOBILE CONTRACTOR
Date: Tuesday 06/18/2024
0503216586 (SINO) 0504121548 (HAL) /CLERK VSA T
8389305 (H AL)

Last 24 hr operations Next 24 hr plan


POH & L/D CMT STINGER, RUN CORROSION LOG, POH, RUN & SET 9 5/8" RTTS, N/D BOP'S, WELLHEAD WORK,N/U & BOPE, P/T, RETV RTTS, POH, RIH W/ 7" TIE BACK ,HANG BOP
WELLHEAD WORK STACK,SET CSG SLIPS , N/U BOP STACK ,CMT 7" TIE BACK , N/D BOPE , N/U THS,N/U BOP
Location Next Location
192.87 KM FROM DHAHRAN MAIN GATE HWYH-309
Current Depth (ft) Liner TOL MD TVD Formation Tops
6,650 Last Csg Size MD TVD Size 1,735 6,306 6,306 Top
9 5/8 3646 3646 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
6650 (Date) 100 0 193
3.9 (06/14/2024@0800 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM, POH WITH CMT STINGER ON 4" DP'S T/500'.


0500 - 0515 0.25 0 POST N PA TO STDP RIG 5300 5300 1500 500
- MONITOR WELL ON TRIP TANK, WELL STATIC.

0515 - 0545 0.5 0 POST N PA WO NA RIG 5300 5300


FLOW CHECK, WELL STATIC

HPJSM, POH WITH CMT STINGER ON 4" DP'S T/BHA'S'.


0545 - 0615 0.5 0 POST N PA ST STDP RIG 5300 5300 500 0
- MONITOR WELL ON TRIP TANK, WELL STATIC.

0615 - 0645 0.5 0 POST N PA WO NA RIG 5300 5300


FLOW CHECK, WELL STATIC
0645 - 0715 0.5 0 POST N PA OTH NA HCB 5300 5300
L/D HALLI CMT STINGER
0715 - 0815 1 0 POST N LOG NU SNIP RIG 5300 5300
HPJSM , N/D BELL NIPPLE & N/U 9-5/8" SHOOTING NIPPLE .

R/U HES E-LINE SHEAVES & PCE, P/T TO 1000 PSI - OK, - M/U MPET - GR - CCL -
0815 - 0915 1 0 POST E LOG OTH NA HWP 5300 5300 CORROSION LOGGING TOOLS , FUNCTION TEST- OK
- MONITOR WELL ON TRIP TANK - WELL STATIC

HPJSM, HWL RIH WITH MPET MULTI-CASING CORROSION LOGGING TOOL TO 5,850
FT, CORRELATE DEPTH , LOG UP MAIN PASS F/ 5,150' TO SURFACE .
0915 - 2330 14.25 0 POST E LOG LOG WLT HWP 5300 5300 5150 0
- RRECORED REPEAT SECTIONS (5,150' - 4950') & (2400' - 2250').
- POH & L/D LOGGING TOOLS.
- MONITOR WELL ON TRIP TANK - WELL STATIC.

2330 - 0030 1 0 POST E LOG ND SNIP RIG 5300 5300


N/D 9-5/8" LTC SHOOTING NIPPLE , N/U BELL NIPPLE & FLOW LINE .

0030 - 0130 1 0 POST N PA TI STHDP RIG 5300 5300 0 2800 HPJSM , M/U & RIH W/ 4" HWDP TAIL PIPE TO 2800' .
- MONITOR WELL ON TRIP TANK, WELL STATIC.

HPJSM, M/U & RIH W/ HCO 9-5/8" RTTS PKR W/ STORM VALVE ON 4" DP , SET 9-
0130 - 0300 1.5 0 POST N PA SET RTTS HCO 5300 5300 210 210
5/8" RTTS @ 210' , PT TO 1000 PSI, OK, RELEASE SETTING TOOL , POH & L/D
RTTS SETTING TOOL , P/T SAME TO 1000 PSI - OK .

HPJSM , N/D BELL NIPPLE , DISCONNECT EMERGENCY KILL LINES , HANG UP &
SECURE BOP STACK .
0300 - 0400 1 0 POST N BOP ND BOP RIG 5300 5300
>> WELL ISOLATED W/ 3 BARRIERS : 2 MECHANICAL BARRIERS ( 9-5/8" RTTS & 7"
EZSV-CR ) & 1 NON-MECHANICAL BARRIER ( FULL COLUMN OF 86 PCF KILL FLUID )
PRIOR N/D BOPE .

HPJSM , CONDUCT WELLHEAD WORK,


>> CHECK WH & CSG INTEGRITY :
0400 - 0459 1 0 POST N WH OTH NA RIG 5300 5300 >> ISSUE REQUIRED PTW'S & DISCUSSED JSA'S .
>> CHECK 9" X 13" CCA IS ZERO PRESSURE .
>> DIG OUT CELLAR TO 6 FT BELOW LANDING BASE..............INC@RPT.

Workover Objectives
Foreman Remarks

>> ODF CORRECTION = (-14.5 FT)


===================================KEY PERSONNEL ON BOARD===================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-365 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/09/2024 - 07/12/2024
Report ID: OPERLMTDMRREP

>> HALLIBURTON DSV: MOHAMED DARWISH (DAY) , AYMAN (NIGHT) , SURESH (HSE).

===================================LSTK DIESEL ============================================


>> DIESEL CONSUMPTION FOR ENGINES ( RIG + CAMP ) = ( DAILY:20 BBL / CUMULATIVE FOR CURRENT WELL: 137 BBL ) .

==================================NEXT LOCATION ============================================

>> HWYH-309 (HWYH GOSP-4 ) : KOM HELD ON 28-MAY-24- STRIPPING OUT 100% , LOCATION 0% .
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
86 PCF 0 0 API 0 0 Volts 3.4 9.6 335,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 76.5 0 0 0/0 VB 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 23.5 0/0 0 0 0
45
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
86 PCF 0 0 API 0 0 Volts 3.4 9.4 335,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 76.5 0 0 0/0 VB 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 23.5 0/0 0 0 0
44

MUD CACL2-80 BARACORE95


TREATMENT 5 ( 2200L ) 1 ( 55GL )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/13/2024 N/A SEASONAL N/A HOT 3,823 TOURLY

Company HCB TGC RIG BAR HWP TK1 ARM MSI HTD

Category BRCR CTRG RIG DFMS LPS WSC WSC ISPCT CSV
PERSONNEL
1 13 60 2 3 3 1 1 3
Total
AND SERVICES No. of Persons
87
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 6 0 24 24 16 24 24 0 0

Standby/Tankers Others Others


TRUCKS/BOATS
dh-7521 crane forklift

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 450

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
PC MONITORS

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1558 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/23/2024 - 08/07/2024
Report ID: OPERLMTDMRREP

SINO-43L @ HRDH-1558 Limited Morning Report for 06/18/2024


Objective : (VERTICAL Foreman(s)SHOKR, MAHMOUD ELKOTB ABDALLA
D&WO Morning Report (Service Providers View) Charge #: EVALUATION HOLE (EV) Engineer ALSADIQ, AHMAD MOHAMMAD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved SINO-43L (66-24058-1558) WITH A SINGLE LATERAL Manager ALMUSTAFA, AHMED HASSAN
HORIZONTAL OIL THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK)
Wellbores: PRODUCER (PHZ) IN ARAB-
(0500-0500) Saudi Aramco Well 0088216777 12805 578 4016 578-4315 ( CLINIC)
D)
Date: Tuesday 06/18/2024 HRDH-1558 (0) HRDH_1558_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
578 4136 ( CLERK) 813 7801 ( SLB)

Last 24 hr operations Next 24 hr plan


CONT. WOC, PERFORM SECOND STAGE CMT JOB, N/D BOP & CUT CSG, N/U TBG SPOOL & P/T M/U & RIH W/ 8 1/2" C/O BHA, D/OUT 9 5/8" DV TOOL, RIH & C/O SHOE TRACK CMT, DISPLACE
SAME, N/U BOPE & P/T SAME. WELL TO 73 PCF LSND WBM, POOH TO SURFACE, M/U & RIH 8-1/2" MTR BHA.
Location Next Location
DRIVE IN HRDH HI-WAY TO 17 KM AFTER HRDH BRIDGE, TURN RIGHT 6 KM SKID ROAD FOLLOWING SIGN BOARDS HRDH-1563
Current Depth (ft) Liner TOL MD TVD Formation Tops
6,888 Last Csg Size MD TVD Size Top
9 5/8 6886 6885 Formations Comments
Depth
BYDH 3,680 44' DEEPER AS PER RCC
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) 20' TVD DEEPER AS PER
6888 (Date) 100 0 278 MDTM 4,784
GOC, 4786' MD.
18.3 (05/30/2024@2200 ) 20' TVD DEEPER AS PER
SULY 5,369
GOC, 5371' MD.
7' TVD DEEPER AS PER GOC,
HITH 5,974
5977' MD.
3' TVD DEEPER AS PER GOC,
ABAR 6,395
6397' MD.
1' TVD DEEPER AS PER GOC,
ARBB 6,427
6430' MD.
4' TVD SHALLOWER AS PER
ABBR 6,513
GOC, 6515' MD.
3' TVD SHALLOWER AS PER
ARBC 6,538
GOC, 6541' MD.
6' TVD DEEPER AS PER GOC,
ABCR 6,634
6637' MD.
119' TVD DEEPER AS PER
ARBD 6,798
GOC, 6801' MD.
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

WOC TO REACH 500 PSI COMPRESSIVE STRENGTH AS PER UCA CHART (TOTAL 9.5
HRS SINCE CMT IN PLACE).
0500 - 1200 7 0 12 1/4 N CSG WOC CSG SCM 6888 6888 ** MEANWHILE BREAK CIRC THRU DVT PORTS EVERY 30 MIN 100% CIRC.
- SERVIES TDS.
- R/D TESCO CRT & CSG RUNNING TOOLS.
- L/D 4 STANDS X 8-1/4" DC

1200 - 1245 0.75 0 12 1/4 N BOP BOP BOP RIG 6888 6888 HPJSM, DISCONNECTED FLOW LINE, UNSCREW BOP BOLTS, HANGED & SECURED
13-5/8"-5M BOP STACK.

SET 13-5/8" X 9-5/8" DELTA-DOHA CSG SLIPS, GRADUALLY RELEASED CSG WT


1245 - 1345 1 0 12 1/4 N CSG SET SLIPS RIG 6888 6888
(275 KLB). (NO CSG MOVEMENT).
-CIRC. & CHECKED SLIPS SEALS INTEGRITY -OK, NO LEAKS, SET BACK BOP.
1345 - 1400 0.25 0 12 1/4 N CSG PJSM CSG SCM 6888 6888
HELD PJSM PRIOR TO 2ND STAGE CEMENT JOB.
1400 - 1430 0.5 0 12 1/4 N CSG OTH CSG TK3 6888 6888
FLUSH & P/T SURF LINES TO 500/3,000 PSI FOR 10 MINS. - OK.

PERFORM 9-5/8" CSG 2ND STAGE CEMENT JOB AS FOLLOW:


- RIG PUMP 80 BBL 85 PCF SPACER AT 8 BPM.
- SCM FLY MIX & PUMPED 215 BBL (+/-875 SX) OF 101 PCF LEAD SLURRY .
- DROP CLOSING PLUG, PUMP 10 BBL CMT (40 SX) & 15 BBL SPACER.
1430 - 1600 1.5 0 12 1/4 N CSG CMC CSG SCM 6888 6888 - RIG DISPLACE CMT W/ 264 BBL 78 PCF MUD. (TOTAL DISPLACEMENT: 289 BBL).
- FDP 630 PSI/150 GPM, CLOSED DV W/ 1,700 PSI THEN PRESSURE-UP TO 2,200
PSI & CLOSE DV PORTS.
- BLEED OFF & CHECK FOR BACK FLOW, HOLDING.
- HAD SPACER & 20 BBL PURE CEMENT RETURN AT SURFACE & NO LOSSES DURING
JOB.

1600 - 1700 1 0 12 1/4 N CSG OTH CSG TK3 6888 6888 FLUSH WELLHEAD SOV'S, BOP STACK, R/D SLB CMT HEAD & CMT SURFACE LINES.

1700 - 1900 2 0 12 1/4 N BOP ND BOP RIG 6888 6888 HPJSM, HANG BOP STACK, ROUGH CUT 9-5/8'' CSG. L/ D CUT OFF JT, N/D BOP,
FINAL CUT & DRESS 9-5/8'' CSG STUB.

HPJSM, N/U 13-5/8" X 11"- 3M DELTA-DOHA THS W/ 2X 2-1/16"-3M GATE VALVES.


1900 - 2030 1.5 0 12 1/4 N WH NU WH RIG 6888 6888
- P/T CAVITY & SEALS TO 1,500 PSI FOR 10 MIN (TWO TESTS) - OK.
- GATE VALVES DIRECTION EAST/ WEST & OPERATING HANDELS TO NORTH.

HELD PJSM PRIOR TO N/U BOP STACK, ASSIGN ROLES & RESPONSIBILITIES,
2030 - 2045 0.25 0 12 1/4 N BOP PJSM BOP RIG 6888 6888
DISCUSS PROPER USE OF FALL PROTECTION & EMPHASIZE GOOD
COMMUNICATION.
2045 - 2330 2.75 0 12 1/4 N BOP NU BOP RIG 6888 6888

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1558 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/23/2024 - 08/07/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
N/U 13-5/8"- 5M CLASS-A BOP STACK & RELATED EQUIPMENT.
- CONNECT EMERGENCY KILL LINE, N/U BELL NIPPLE & CONNECT FLOW LINE.

M/U 9-5/8" CUP TESTER ASSY, FLUSH BOP, CHOKE MANIFOLD, MGS & FLARE
2330 - 0000 0.5 0 12 1/4 N BOP BOPT BOP RIG 6888 6888
LINES.
- FUNCTION TESTED BOP, FROM ALL 3 PANELS.

HPJSM, P/T 13-5/8" 5M CLASS "A" BOPE AS PER ARAMCO STANDARD (300/3000
PSI):
- PERFORMED DRAWDOWN TEST FOR ACCUMULATOR UNIT.
- PRESSURE TEST WH VALVES USING CUP TESTER AT 300/3000 PSI FOR 10 MINS.
OK. L/D CUP TESTER ASSY., M/U TEST PLUG ASSY.
- PRESSURE TEST 13-5/8" 5M CLASS A BOP STACK AS PER ARAMCO PROCEDURE
0000 - 0459 5 0 12 1/4 N BOP BOPT BOP RIG 6888 6888
(300 PSI /3,000 PSI 10 MIN EACH)
- EMERGENCY KILL LINE AGAINST MANUAL GATE VALVE AT 300/3000 PSI FOR 10
MINS.
- CHOKE MANIFOLD, KILL LINE AGAINST MANUAL GATE VALVE AT 300/3000 PSI
FOR 10 MINS. (OFFLINE)
- FLARE LINES AT 300/1200 PSI FOR 10 MINS. (OFFLINE)
- FUNCTION TESTED IGNITION SYSTEM - OK.
Foreman Remarks

========================== WELL OBJECTIVE ===========================


HRDH-1558 WELL WILL BE DRILLED AS VERTICAL EVALUATION HOLE (EV) WITH A SINGLE LATERAL HORIZONTAL OIL PRODUCER (PHZ) IN ARAB-D RESERVOIR. THIS WELL WILL BE COMPLETED
WITH SLB ICD/PSSD LOWER COMPLETION AND HLB LEVEL-4 UPPER COMPLETION WITH PDHMS.
========================== WELL DESIGN =============================
GOR=440 SCF/STB (ARBD)
H2S : 0.88 MOL %.
RER 30 PPM: 701 M.
RER 100 PPM: 421 M.
RER 1/2 LFL: 211 M.

- 24" CP PLANNED/ACTUAL: 380'/ 409' (59' INTO RUS FM).


- 18-5/8" PLANNED/ACTUAL: 2311'/2314' (34' TVD INTO AHMADI FM).
- 13-3/8" CP PLANNED/ACTUAL: 3936'/ 3,979' (299' TVD INSIDE BIYADH).
- 9-5/8" CP PLANNED/ACTUAL: 6865'/XXXX' (5' TVD ABOVE ABD1).
- L-0 PILOT HOLE TD PLANNED/ACTUAL: 7185'/XXXX' TVD (60' TVD INSIDE BADR).
- CASED HOLE SIDETRACK KICK-OFF POINT PLANNED/ACUTAL: 4300'/XXXX' MD.
- 7" LNR PLANNED/ACTUAL: 8191'/XXXX' (2' TVD ABOVE ARAB-D ZONE-1).
- 6-1/8" OPEN HOLE SECTION PLAN/ACTUAL: 11469'/XXXX' MD.

========================== PERSONNEL ==============================

- ARAMCO MATERIAL EXPEDITOR ABDULHADI ALABBAD # 818862 ON LOCATION 06/7/2024.


- LSTK SLB DSV: CHIRAG/ADESH, HSE: ALI, SLB SUPT: NONE

========================== NEXT WELL DATA ===========================


- HRDH-1563 (WELL CHARGE 66-23058-1563)
APPROVED PROGRAM: NO.
APPROVED ERP: NO.
LOCATION READINESS: 100 % READY (IN SAME PAD OF HRDH-1558)
WATER WELL: HRDH-3567

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
78 PCF 0 4.4 API 6 0 Volts 10.93 10.4 83,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 80 28 0 9 / 10 LS-ND 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 16 14 8/9 0 400 0
54
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
78 PCF 0 4.4 API 6 0 Volts 10.93 10.4 83,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 80 29 0 9 / 11 LS-ND 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 16 14 8 / 10 0 400 0
56

MUD MARBLE-FINE
TREATMENT 18 ( LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

MISCELLANEOUS BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1558 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/23/2024 - 08/07/2024
Report ID: OPERLMTDMRREP

06/08/2024 6/8/2024 NORMAL N/A SEASONAL 416 PRE-TOUR MEETING

Company TSC OTH SDM RIG SMI MJH RIG RIG HML TK3 RIG ARM SCM TK3 ARM

Category CSR CTRG DPDS RIG DFMS SEC SEC MED MULS OTHR OTHR OTHR PCS WSC WSC
PERSONNEL
3 14 2 60 2 4 2 1 1 1 0 1 5 2 1
Total
AND SERVICES No. of Persons
99
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 0 24 24 24 24

Operating Hours. 0 0 0 24 24 24 24 24 0 12 0 12 5 24 24

Standby/Tankers Others
TRUCKS/BOATS
AB-7123 AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 442 N/A N/A 3000

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-119 WORKOVER-7 BI-60
Print Date: 06/18/2024 06:21 05/28/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

SINO-45L @ UTMN-119 Limited Morning Report for 06/18/2024


Objective : (ST AS SINGLE Foreman(s)IBRAHIM, WALID SAYED
D&WO Morning Report (Service Providers View) Charge #: LATERAL OIL PRODUCER Engineer ALABDULQADER, AHMAD FOUAD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24057-0119) AD2A.) Manager ALMUKHTAR, ESSA HAJJI
SINO-45L
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088-216-7 7712563 (013)577-9 666 013838-785 4 HALL
Date: Tuesday 06/18/2024 UTMN-119 (0-2) UTMN_119_2 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
(013)577-9 642 (050545058 9) SINO

Last 24 hr operations Next 24 hr plan


CONT. DRILL 6 1/8" HOLE SECTION AS PER DIRECTIONAL PLAN TO TD AT 10821 FT, CHC,POOH & POOH & LD SPS BHA,RIH 6-1/8" STIFF REAMING BHA AND CHC. POOH 6-1/8" STIFF REAMING BHA,
LD SPS BHA. RIH & SET 4-1/2'' LOWER COMPLETION.
Location Next Location
129 KM FROM DHAHRAN MAIN GATE UTMN-1482
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,822 Last Csg Size MD TVD Size Top
7 7048 7048 Formations Comments
Depth
6119 FT MD ( 8.7 FT
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) HITH 6,115
SHALLOER ).
9850 (Date) 100 972 129 6641 FT MD (8.7 FT
13.4 (06/04/2024@2030 ) ABAR 6,589
SHALLOWER ).
6690 MD ( 2.1 FT
ARBB 6,630
SHALLOWER ).
6951 FT MD ( 4.2 FT
ABCR 6,814
SHALLOWER ).
7147 FT MD ( 6.5 FT
ARBD 6,911
SHALLOWER ).
7582 FT MD ( 0.5 FT DEEPER
PADS 7,024
).
7610 FT MD ( 1.1 FT
BPDS 7,027
SHALLOWER ).
ABD1 7,043 775 FT MD ( 1 FT DEEPER )
7906 FT MD ( 1.4 FT DEEPER
AD2A 7,050
).
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

SPS DRILL 6-1/8" LATERAL SECTION W/ RSS BHA ICRUISE/ LWD FROM 9850 FT.
TO 10822 FT.( TD ) WITH 82 PCF POLYMER MUD , 100% RETURN .
0500 - 1500 10 0-2 6 1/8 N DRLG D RSS SPS 9850 10822 - WASH & REAM 1 SINGLE EACH STD DRILLED.
- SWEEP HOLE AS REQUIRE
- DRILLING PARAMETERS :(15-20 KLB'S WOB , 240 GPM ,PRESS: 3450 PSI, RPM:
130, TQ ON / OFF BTM 9900 /4000 LBS.FT).

1500 - 1700 2 0-2 6 1/8 N DRLG CIRC MPMP RIG 10822 10822 SWEEP HOLE TWICE W/ TANDEM PILLS & CHC W/ 82 PCF POLYMER MUD, 100%
CIRC.
1700 - 2130 4.5 0-2 6 1/8 N DRLG CIRC MPMP RIG 10822 10822
HPJDM,DISPLACE & CONDITION HOLE TO 82 PCF OBM MUD.
2130 - 2200 0.5 0-2 6 1/8 N DRLG OTH NA RIG 10822 10822
FLOW CHECK,WELL STATIC

HPJSM,POOH W/6-1/8" SPS ICRUISE/LWD DRLG ASSY TO 10300' W/CONTROLED


2200 - 2300 1 0-2 6 1/8 N DRLG ST SPDP RIG 10822 10822 10822 10300
SPEED, OPEN HOLE IN GOOD CONDITION.
- MONITOR WELL ON TRIP TANK -STATIC
2300 - 2330 0.5 0-2 6 1/8 N DRLG OTH NA RIG 10822 10822
FLOW CHECK,WELL STATIC

POOH W/6-1/8" SPS ICRUISE/LWD DRLG ASSY IN OPEN HOLE AT CONTROL SPEED
2330 - 0230 3 0-2 6 1/8 N DRLG ST STDP RIG 10822 10822 10300 5910 ON 4" DP/HWDP STD'S TO TOW AT 5910',
W/CONTROLED SPEED,HOLE IN GOOD CONDITION.
- MONITOR WELL ON TRIP TANK -STATIC
0230 - 0300 0.5 0-2 6 1/8 N DRLG OTH NA RIG 10822 10822
FLOW CHECK,WELL STATIC

CONT POOH W/6-1/8" SPS ICRUISE/LWD DRLG ASSY BHA TO 5 STANDS ABOVE
0300 - 0430 1.5 0-2 6 1/8 N DRLG TO STDP RIG 10822 10822 5910 600
BHA.
- MONITOR WELL ON TRIP TANK - STATIC.
0430 - 0459 0.5 0-2 6 1/8 N DRLG HT BHA SPS 10822 10822
FLOW CHECK,WELL STATIC
Workover Objectives
Foreman Remarks

- ODF CORRECTION: - 18.75 FT.


- TOW @ 5910'.
- BOW @ 5923'.
=======================================DIRECTIONAL DATA===============================
>> BIT TO SENSORS DISTANCE: ABG : 14.1', DENS: 59.16', POR: 68.25', RES: 77.07',GR:', DIREC: 109.07', PWD : 106.81'.
>> BIT PROJECTION AT TD 10822 FT : 10822' MD, INC: 90 DEG, AZI: 78 DEG, TVD: 7038.8' .
==================================================================================
>> HALL LSTK1 HUSSIN/ DAY DSV, MAHMOUD KAMAL NIGHT DSV & DINESH HSE.
>> REN HONGLIAN SINO SUPERINTENDENT VISIT THE RIG.
================== ================================================================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-119 WORKOVER-7 BI-60
Print Date: 06/18/2024 06:21 05/28/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

>> DIESEL CONSUMPTION FOR ENGINES (RIG+CAMP) = (DAILY: 35 BBL / CUMULATIVE: 440 BBL).
>> RIG & CAMP DIESEL PROVIDED BY HALLIBURTON LSTK.
==================================================================================
NEXT LOCATON:
>> UTMN-1482 (GOSP-9) KOM HELD ON 05/29/24: STRIP-OUT 100%, LOCATION 5%.
>> UTMN-238 (GOSP-2) KOM HELD ON 06/11/2024: STRIP-OUT 0%, LOCATION 0%.
>> UTMN-612 (GOSP-6) KOM HELD ON 06/11/2024: STRIP-OUT 0%, LOCATION 0%.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0-2 9,919 90.59 78.32 95 7,048 247.18 1027.17 3,466.17 0.71
0-2 10,014 90.67 77.64 95 7,046 253.2 1055.49 3,561.13 0.73
0-2 10,109 90.01 78.49 95 7,046 259.19 1083.82 3,656.09 1.13
0-2 10,204 90.31 78.72 95 7,046 264.91 1112.2 3,751.03 0.39
DAILY SURVEY 0-2 10,299 90.35 78.78 95 7,045 270.56 1140.6 3,845.97 0.08
0-2 10,394 90.48 78.68 95 7,044 276.22 1169 3,940.9 0.17
0-2 10,489 90.53 78.56 95 7,044 281.94 1197.38 4,035.85 0.13
0-2 10,584 90.71 78.33 95 7,043 287.74 1225.75 4,130.8 0.31
0-2 10,679 90.37 77.38 95 7,042 293.83 1254.06 4,225.78 1.06
0-2 10,822 90 78 143 7,041 303.12 1296.64 4,368.76 0.5

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 1 3.1 API 5 0 Volts 0 9.7 125,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
154 12 HTHP 75 30 0 8 / 12 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 23 20 7/9 0 0 N/A
51
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 1 0 API 24 0 Volts 0 0 40,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.2 HTHP 60 15 0 10 / 14 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 22 16 7/8 0 0 0
54

MUD CACO3-25 CAOH2 NACL MRBL-F DEXT MRBL-M BAROLUBE


TREATMENT 16 ( 25KG ) 4 ( 25KG ) 11 ( 2200L ) 3 ( 2200L ) 8 ( 25KG ) 4 ( 2200L ) 2 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
4RR 5,933 10,822 DP Av DC Av Bit HHP 20 130 M332 6.125 SEC
Pressure GPM Jet Vel 273.4 N/A 40 I-Row O-Row DC Location Bearings
2,900 240 171 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
14012911R HD54F 3 x 14 / 0.451
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 78 122 182 131 9,500 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 6.125 1 6.125 2.61 0.7 3-1/2" REG P 14012911R
2 RSS SPS 4.75 1 4.75 3.98 35.12 3-1/2"IF B 55.31 13809226
3 Logging While Drilling (LWD) SPS 4.75 1 4.75 1.25 15.38 102.71 90757105
4 Logging While Drilling (LWD) SPS 4.75 1 4.75 1.571 15.45 45.57 90763872
5 Logging While Drilling (LWD) SPS 4.75 1 4.75 1.262 24.5 45.57 90758332
6 Logging While Drilling (LWD) SPS 4.75 1 4.75 1.5 3.57 52.2 90979392
DRILL STRING 7 Logging While Drilling (LWD) SPS 4.75 1 4.75 1.3 8.26 46.3 90766557
8 Logging While Drilling (LWD) SPS 4.75 1 4.75 1.25 15.28 45.57 90765783
9 Measurement While Drilling (MWD) SPS 4.75 1 4.75 2.5 11.14 46.3 13739752
10 Screen sub SPS 4.75 1 4.75 2.5 7.15 NC38 XT39 46.84 12889020
11 Float Sub SPS 4.75 1 4.75 3 1.96 3 1/2 T2 3 1/2 T2 46.48 13398651
12 Crossover RIG 4.75 1 4.75 2.25 3 NC38 XT39 42.4 45-500
13 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.56 90.91 XT39 XT39 28.24 CONV
14 Hydraulic Jar WJS 4.75 1 4.75 2.25 30.33 4"XT39 B 43.9 1420-1927
15 Heavy Weight Drillpipe (HWDP) RIG 4 2 4 2.56 59.96 XT39 XT39 28.24 CONV
16 Drillpipe RIG 4 153 4 3.34 5,606 XT39 XT39 14 XD105 PREMIUM
17 Heavy Weight Drillpipe (HWDP) RIG 4 42 4 2.56 1,275 XT39 XT39 28.24 CONV
18 Drillpipe RIG 4 1 4 3.34 31 XT39 XT39 14 XD105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/12/2024 N/A N N/A NORMAL 2,253 LD BHA.

PERSONNEL OTH RIG BAR SPS TK1 TK1 ARM


Total
Company
AND SERVICES 90
INFORMATION

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-119 WORKOVER-7 BI-60
Print Date: 06/18/2024 06:21 05/28/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

Category CTRG RIG DFMS LWD OTHR WSC WSC

No. of Persons 16 63 2 1 4 3 1

Personnel on Loc. Hrs. 24 24 24 24 24 24 24

Operating Hours. 0 24 12 12 12 24 24

Standby/Tankers Others
TRUCKS/BOATS
DH7527 AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 700

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-990 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/01/2024 - 08/26/2024
Report ID: OPERLMTDMRREP

SINO-46L @ SHYB-990 Limited Morning Report for 06/18/2024


Objective : (DUAL-LATERAL) Foreman(s)LARBI, KHALIL
D&WO Morning Report (Service Providers View) Charge #: Engineer LINDAHL, CARL DANIEL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Manager SHAMMARI, ABDULLAH SHUWAIHAT
SINO-46L (66-20072-0990)
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12265 578-8512 BAKER DSV 8137803
Date: Tuesday 06/18/2024 SHYB-990 (0) SHYB_990_0 CONTRACTOR /CLERK VSA T
578-8508

Last 24 hr operations Next 24 hr plan


RUN & CEMENT 1ST STAGE 13 3/8" CASING.WOC 9 5/8" 2ND STAGE CEMENT JOB,ND DIVETER, WELLHEAD WORK,NU & P/TEST BOP.
Location Next Location
SHYB-990, SABKHAH#56.SHAYBAH SHYB-916
Current Depth (ft) Liner TOL MD TVD Formation Tops
3,937 Last Csg Size MD TVD Size Top
13 3/8 3934 3855 Formations Comments
Depth
RUS 1,615
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
3937 (Date) 100 0 574
10 (06/08/2024@0500 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0515 0.25 0 16 N CSG RCSG DV HDV 3937 3937
P/U & MU HALL 13 3/8" BTC DV TOOL.

0515 - 0815 3 0 16 N CSG RCSG CTRQ BCR 3937 3937 2404 3872 CONT. RIH WITH 13 3/8" CSG (68 PPF / K55, BTC) TO , (TOTAL 95 JT).
** FS: 4,031', FC: 3,945' & DV: 1,641'

WASH DOWN LAST JNT,,SPACE OUT & TAG BTM AT 3,937', P/U 2 FT OFF BTM,
0815 - 0915 1 0 16 N CSG RW CSG RIG 3937 3937 3872 3937
(TOTAL 96 JT +2 P.JT).
** FS: 3,934', FC: 3,849' & DV: 1,520'
0915 - 1015 1 0 16 N CSG CIRC MPMP RIG 3937 3937
CUMULATIVE TIME FOR FILL UP CASING WITH MUD EVERY JOINT BY CRT
1015 - 1200 1.75 0 16 N CSG CIRC MPMP RIG 3937 3937
CIRCULATE CSG VOLUME @ 350 GPM, 150 PSI.
1200 - 1330 1.5 0 16 N CSG HT PEL BCR 3937 3937
HPJSM, RD CRT. RU & FLUSH SURFACE CMT LINES & CMT HEAD,
1330 - 1415 0.75 0 16 N CSG PTST MPMP RIG 3937 3937
HPJSM. PT SURFACE LINE T/ 4000 PSI. -OK.

PERFORMED 13-3/8" CSG 1ST STAGE CMT JOB:


** PUMP 100 BBL. 75 PCF SPACER W/ RIG PUMP.
** FLY MIX & PUMP 305 BBL. 95 PCF LEAD SLURRY & BATCH MIX &
PUMP 87 BBL. 112 PCF TAIL SLURRY.
** DROP SHUTOFF PLUG.
1415 - 1715 3 0 16 N CSG CMC CSG BCM 3937 3937
** DISPLACE W/ 10 BBL CMT, 20 BBL. WATER. 298 BBL. MUD,
40 BBL SPACER & 208 BBL. MUD.
** FINAL DISPLACEMENT PRESSURE 800 PSI. WITH 4 BBL/MIN.
** BUMPED PLUG W/ 1300 PSI. HOLD PRESSURE FOR 5 MIN.
** BLEED OFF PRESSURE- FLOATS HOLDING.
** CEMENT ON PLACE @ 17:15 HRS.

1715 - 1800 0.75 0 16 N CSG RCSG DV HDV 3937 3937 DROPPED DV OPENING PLUG, WAIT FOR 15 MIN. INFLATED DV PACKER @ 900 PSI,
INCREASE PRESSURE TO 1900 PSI OPEN DV PORTS.

1800 - 1900 1 0 16 N CSG CIRC MPMP RIG 3937 3937 CIRCULATE 2 BTM'S-UP, CIRCULATE & CONDITION MUD.
** 40 BBL NEAT CEMENT @ SURFACE.

WOC FOR 500 PSI COMPRESSIVE STRENGHT (10.5 HR AS PER UCA).


** BREAK CIRCULATION EVERY 30 MIN, MONITOR WELL AT TRIP TANK - WELL
1900 - 0400 9 0 16 N CSG WOC CSG BCM 3937 3937
STATIC, CIRC 2 BTM UP. PREPARE TO HANG DIVERTER
** FLOW CHECK - WELL STATIC
** SURFACE SAMPLE HARD.

HPJSM, LIFT & SECURE 21-1/4'' DIVERTER. SET 20 3/4'' X 13 3/8'' VG CASING
0400 - 0459 1 0 16 N BOP OTH DVRT RIG 3937 3937
SLIPS - CIRCULATE AND CHECK SLIPS INTEGRITY - OK.
** SET BACK DIVERTER ON CHH, PREPARED FOR 2ND STAGE CMT JOB
Foreman Remarks

OBJECTIVE: DRILL A DUAL-LATERAL GAS PRODUCER IN SHU'AIBA RESERVOIR GAS CAP TO PROVIDE THE REQUIRED HYDROCARBON RICH GAS AND THE WELL WILL BE COMPLETED WITH 9-5/8"
PREMIER PACKER WITH 2 PDHMS

----------------------------------------------------------------------------ERP/SIMOPS---------------------------------------------------------------------------------------------------
**THIS WELL TO BE DRILLED THROUGH GAS CAP
** RSVR. H2S MOLAR = 0.045 %, GOR = 752 SCF/STB, RER 30 PPM 700 M, RER 100 PPM 250M, 1/2 LFL 350 M.
** RELIEF WELLS SHYB-432 - PRIMARY SHYB-433 - SECONDARY
============================= WELL DESIGN & WHIPSTOCK==================================================
** REF: SHAYBAH GENERIC DRILLING MANUAL REV-10.3 (WOED-4-360-2021),

24" CONDUCTOR DEPTH: PLAN//ACTUAL: +/- 166/166 FT MD/TVD. BELOW SURFACE


18-5/8" CASING DEPTH: PLAN//ACTUAL: +/- 1657/1666 FT. MD/TVD (50 FT. INTO RUS FORMATION)

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-990 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/01/2024 - 08/26/2024
Report ID: OPERLMTDMRREP

13-3/8" CASING DEPTH: PLAN//ACTUAL: +- 3913 FT. MD (3838 FT. TVD, 155 FT. TVD INTO ARUMA CARBONATE
9-5/8" CASING DEPTH: PLAN//ACTUAL: +/- 5397 FT. MD (4725 FT. TVD, 2 FT. TVD INTO SHU'AIBA FORMATION)
7" LINER DEPTH: PLAN//ACTUAL: +/- 6525 FT. MD (4823 FT. TVD) AS A PRODUCTION LINER.
** L-0 (MB): PLANNED TD: 16,011', ACTUAL TD: , PLANNED RC: ', ACTUAL RC:'
** L-1: PLANNED TD 16,672' , ACTUAL TD .

===============================WELL TRAJECTORY========================================
* DIRECTIONAL PLAN: SHYB-990_0 REV-F.0
* WELLPATH POSITION: 5' ABOVE, 7' RIGHT OF PLAN.
=====================================================================================

===================== ARAMCO PERSONNEL ON LOCATION =======================


* AHMED ALHOWAIJI ARAMCO CLERK ON LOCATION SINCE 06/10/2024
/================================LSTK OR CONTRACTOR MANAGEMENT VISIT =======
** THIS IS BAKER LUMP SUM TURNKEY WELL SUPERVISOR: AHMED/ADEL, HSE: AHMED.
===============================SERVICE COMPANY=========================
** RAC VACUUM TANKERS #3306 ON LOCATION.
****************************************** RIG SINO-46L JOURNEY MANAGEMENT ******************************************************************

======================================== NEXT WELL=====================================


SHYB-916 SAB#35
LOCATION READINESS: NO
DRILLING PROGRAM = NO

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 0 5.6 API 0 0 Volts 0 9.8 56,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 94 22 0 9 / 11 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 9 6 8/9 0 240 0
49
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 0 5.4 API 0 0 Volts 0 9.3 56,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 94 23 0 9 / 11 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 9 6 8/9 0 240 0
51

MUD BARITE CAUST BENT


TREATMENT 9 ( 1500K ) 1 ( 25KG ) 1 ( 2200L )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
3 1,666 3,937 DP Av DC Av Bit HHP 50 60 435 16 HTC
Pressure GPM Jet Vel 90.19 113.38 374 I-Row O-Row DC Location Bearings
2,200 850 305 2 4 WT A E
BIT DATA
Serial Number Type Jets TFA
Z225ZT VGAC10MH 1 x 14 / 3 x 18 / 0.896
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A 220 230 215 8 Shock Sub Serial # Shock Sub Hrs
DRILL STRING Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/13/2024 N/A NORMAL N/A SEASONAL 1,889 N/A

Company BCR OTH RIG BDF RIG TK2 RIG ARM BCM OTH TK2 ARM

Category CSR CTRG RIG DFMS MED OTHR OTHR OTHR PCS VAC WSC WSC
PERSONNEL
4 13 66 1 1 8 11 1 3 1 2 1
Total
AND SERVICES No. of Persons
112
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 7 0 12 24 12 12 12 12 14 10 12 12

Standby/Tankers
TRUCKS/BOATS
AB-5570

BULK Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SHYB-990 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/01/2024 - 08/26/2024
Report ID: OPERLMTDMRREP

N/A N/A 521 N/A N/A 2800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2358 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/08/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

SINO-47 @ UTMN-2358 Limited Morning Report for 06/18/2024


Objective : (MK1 VERTICAL Foreman(s)SAKHRI, LARBI / FARHAN, ABDULELAH MOHAMMED
D&WO Morning Report (Service Providers View) Charge #: GAS WELL) Engineer SILALAHI, ANTON RIKKY
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-24057-2358) Manager AMRI, ABDULLAH SALEH
SINO-47
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12266 013-577-96 72 FOREMAN 013-577-96 53 SAFETY
Date: Tuesday 06/18/2024 UTMN-2358 (0) UTMN_2358_0 OTHER VSAT
013-577-96 52 CLERK

Last 24 hr operations Next 24 hr plan


ROTARY DRILL 5-7/8" HS TO WELL TD, CHC, WT, CHC & SPOT HVP, POOH POH, OH W/L LOGGING
Location Next Location
UTMN -2358 172 KM FROM DMG UTMN-3259
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
13,610 Size 10696 10696 Size 10,257 12,638 12,637 Top
Formations Comments
9 5/8 7 Depth
KFBC 12,631 12630' TVD, 6' SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) KBCR 13,150 13150' TVD 27' DEEPER
12970 (Date) 100 640 172 KFDA 13,360 13360' 21FT SHALLOWER
36.3 (05/12/2024@2230 )
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

ROTARY DRILL 5-7/8" HOLE SECTION W/ MWD/GR WITH 91 PCF OBM & 100%
CIRCULATION TO WELL TD AT 13,610' MD/TVD (250 FT TVD INTO KFDA FMT).
> TOP OF KFDA FMT AT 13,360 AS PER RCC/GOC
0500 - 2000 15 0 5 7/8 N DRLG D TDS RIG 12970 13610 > PUMPED 20-40 BBLS HI-VIS SEALING PILL EVERY STAND
> TAKE SURVEY EVERY STAND AT 30FT OFF BOTTOM.
> FOLLOW VERTICAL CONNECTION PRACTICES.
> BAKER GR SENSOR NOT READING, CALLED FORMATION TOPS USING MUD
LOGGING.
2000 - 2230 2.5 0 5 7/8 N DRLG CIRC MPMP RIG 13610 13610
PUMP SWEEP AND CIRCULATE TILL SHAKERS CLEAN,
2230 - 2300 0.5 0 5 7/8 N DRLG CIRC DSBT RIG 13610 13610
FLOW CHECK -WELL STATIC,

2300 - 0100 2 0 5 7/8 N DRLG TI BHA RIG 13610 13610 13610 12638 WIPER TRIP WITH 5 7/8" ROTARY DRLG ASSY TO 7" LINER SHOE. "HOLE IN GOOD
CONDITION"
0100 - 0115 0.25 0 5 7/8 N DRLG CIRC MPMP RIG 13610 13610
FLOW CHECK -WELL STATIC,
0115 - 0200 0.75 0 5 7/8 N DRLG TI BHA RIG 13610 13610 12638 13610
RUN BACK W/ 5-7/8" ROTARY ASSY TO BOTTOM "HOLE IN GOOD CONDITION"

0200 - 0400 2 0 5 7/8 N DRLG CIRC MPMP RIG 13610 13610 SWEEP HOLE AND CIRCULATE HOLE CLEAN, FLOW CHECK FOR - WELL STATIC.
SPOT 50 BBLS LOGGING GO PILL ON BTM.

POOH W/ 5-7/8" ROTARY DRILG ASSY IN OPEN HOLE FREELY TO 7" LINER SHOE.
0400 - 0459 1 0 5 7/8 N DRLG TO STDP RIG 13610 13610 13610 12638 "HOLE IN GOOD CONDITION"
> FLOW CHECK AFTER 5 STDS - WELL STATIC.
> NO DISCREPANCY IN TRIP SHEET.
Foreman Remarks

UTMN-2358 IS PLANNED TO BE DRILLED AS VERTICAL WELL WITH MK-1 DEISGN, TARGETING KHUFF-C AS PRIMARY TARGET AND KHUFF-B AS SECONDARY TARGET.
=====================================================
JOURNEY MANAGEMENT:
> NIGHT DRIVING IS PROHIBITED. ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER & CAR SURVIVAL KIT.
=====================================================
ERP:
- THE WELL IS LOCATED OUTSIDE THE SHALLOW GAS BOUNDARIES AND NON-POPULATED AREA.
- STAGING AREA #1 (2 KM NNE): (24.925679, 49.273647) & STAGING AREA #2 ( 2.3 KM SE): (24.954970, 49.270627).
=====================================================
CASING SETTING DEPTHS :
* 24" CSG AT 740' (51' INTO RUS)
* 18-5/8" CSG AT 2,782' ( 50 FT INTO AHMADI)
* 13-3/8" CSG AT 6,341' (381' INTO BIYADH)
* 9-5/8" CSG AT 10,698' (30' TVD INTO BJDM)
* 7" LINER AT 12,646' MD (10' TVD INTO KFBC)
* 4-1/2" LINER AT 13,631' MD/TVD (250' INTO KFDA)
=====================================================
RIG KPI'S :
* TRIPPING SPEED KPI: 20 STDS/HR, ACTUAL: N/A.
* 30" CSG: 2.5 JTS/HR, ACTUAL: N/A
* 24" CSG: 4 JTS/HR, ACTUAL: 4.57 JTS/HR
* 18-5/8" CSG: 7 JTS/HR, ACTUAL: 8.4 JTS/HR
* 13-3/8" CSG: 11.5 JTS/HR, ACTUAL: 10.27 JTS/HR
* 9-5/8" CSG: 14 JTS/HR, ACTUAL: 12.2 JTS/HR
* 7" LINER: 14 JT/HR , ACTUAL: 15.7 JTS/HR
* 4-1/2" LINER: 13 JT/HR , ACTUAL:
* 4-1/2" UPPER COMPLETION: 13.5 JT/HR , ACTUAL:
=====================================================
PERSONNEL ON RIG :
* ARAMCO ADMIN CLERK MOHAMED ISASS KALEEL ID#8284747 ON LOCATION SINCE 01/09/2024.
* ARAMCO PDP ALQAHTANI, MOHANAD A, ID#782454 ON LOCATION EFFECTIVE ON 06-14-2024.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2358 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/08/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

* CARLOS PERALTA MUD AVDISOR ID# 279465 VISITED RIG AND CHECK MUD PROPERTIES.
=====SAFETY & DRILLS ====================================
SAFETY MEETING : DISCUSSED ALL HAZARD & PRECAUTION OF DRILLING OPERATION . HIGHLIGHT PINCH POINT .KEEP AWAY LINE OF FIRE. WATCHOUT STEPS. HIGHLIGHT WELL CONTROL,WEAR
H2S SENSOR PROPERLY. SHARED M/U BHA VIDEOS AND DISCUSS SOMEUNSAFE ISSUES. SHARED THE LAST DAYS OBB.
DRILL: PIT DRILL 2 H2S DRILL1
CD/NM: NONE
==================================================================================================
AUDIT: 1ST RSI 2024 TOTAL ITEMS 43 , OPEN : 0 - 1ST WCI 2024 TOTAL ITEMS 4 , OPEN : 0 - 1ST QSI 2024 TOTAL ITEMS 44, OPEN:0
==================================================================================================
RENTAL EQUIPMENT:
======================================================================
WATER CONSERVATION IMPLEMENTED INITIATIVES:
>REDUCED WATER PITS: YES.
>DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: YES
>CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION (MI/SWACO): YES
=============================================================
> SPRAY WATER TANKER PLATE: 1259 (DRSS#1004326947) ON LOCATION ON 06/01/2024.
=============================================================
>VEHICLE ON BOARD: ARAMCO PICKUP AB-7211. MAINTENANCE DUE ON 07-23-2024.
=============================================================
- NEXT LOCATION: UTMN-3259 (75% COMPLETED).
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 13,005 0.95 323.05 94 13,004 11.69 -21.06 79.02 0.06
0 13,098 0.87 327.41 93 13,097 12.06 -21.31 80.34 0.11
0 13,193 0.86 331.13 95 13,192 12.44 -21.54 81.59 0.06
DAILY SURVEY
0 13,288 0.89 327.69 95 13,287 12.82 -21.76 82.85 0.06
0 13,384 1.02 321.88 96 13,383 13.21 -22.04 84.31 0.17
0 13,479 1.27 314.67 95 13,478 13.64 -22.43 86.12 0.3
0 13,551 1.25 317.26 72 13,550 13.98 -22.76 87.64 0.08

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
91 PCF 2 0 API 60 450 Volts 5 0 20,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
140 1.6 HTHP 18 12 0 8 / 11 INOVRT 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 33 22 7/8 0 0 2.2
56
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
91 PCF 2 0 API 60 459 Volts 5 0 20,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
140 1.4 HTHP 18 13 0 8 / 11 INOVRT 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 35 22 7/8 0 0 3.2
58

ADAPTA MRBL-M CACO3-5 CACO3-50 CAOH2 FACTANT GELTONE


MUD 11 ( 55LB ) 55 ( 55LB ) 10 ( 55LB ) 56 ( 55LB ) 48 ( 55LB ) 2 ( 55GL ) 28 ( 50LB )
TREATMENT LESUPERMUL RHEMODL STELSL50 STELSEALFN
1 ( 55GL ) 1 ( 55GL ) 80 ( 55LB ) 64 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
7 12,641 13,610 DP Av DC Av Bit HHP 20 110 M333 5.875 ULTR
Pressure GPM Jet Vel 1,436.48 512.63 50 I-Row O-Row DC Location Bearings
2,100 250 178 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
70199 U713MD 3 x 14 / 0.451
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 39 302 304 293 4,500 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit ULTR 5.875 1 0.67 3-1/2" REG 70199
DRILL STRING 2 Near Bit Roller Reamer RIG 5.875 1 4.75 1.25 6.43 NC38 NC38 47 3 POINT GU5341
3 Pony Collar RIG 14.83 1 14.83 3-1/2" IF 3-1/2" IF 47 1709094
4 String Reamer RIG 5.875 1 5.875 1.062 6.1 NC38 NC38 15 GU5339
5 Measurement While Drilling (MWD) BHI 4.75 1 4.75 35.059 3.5IF 3.5IF 77.59 ZDHP1009258
6 String Reamer RIG 4.75 1 4.75 1.625 6.1 NC38 NC38 47 GU5335
7 FIlter Sub BHI 4.75 1 4.688 2 5.67 NC38 NC38 15 15738258
8 FIlter Sub BHI 4.75 1 4.75 2.125 8.5 NC38 NC38 15 WDS0190
9 PBL (Multiple Activation By Pass) SAM 4.375 1 4.375 2 8.4 NC38 NC38 47 NOR475BP575
10 Drillcollar RIG 4.75 18 4.75 2.25 493.3 NC38 NC38 47 SPRL

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-2358 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/08/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
11 Hydraulic Jar CTC 4.75 1 4.75 2.25 33.93 3.5IF 3.5IF 47 DJ10 500 10
12 Drillcollar RIG 4.75 2 4.75 2.25 61.43 NC38 NC38 47 SPRL
13 Crossover RIG 4.75 1 4.75 2.25 2.68 XT39 NC38 15 88446
14 Heavy Weight Drillpipe (HWDP) RIG 4 9 4 2.562 275.19 XT39 XT39 25.1 CONV
15 Drillpipe RIG 4 93 4 3.34 2,937.58 XT39 XT39 14 XD105 PREMIUM
16 Crossover RIG 6.625 1 6.625 2.563 2.62 XT54 XT39 15 2.65
17 Drillpipe RIG 5.5 0 5.5 4.67 0 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/07/2024 06/07/2024 NORMAL N/A HOT 1,873 2 X DAILY

Company RIG BHI RIG BAR EMC SMI MJH RO1 ARM MI2 OTH ARM SAM

Category CTRG DPDS RIG DFMS DFMS DFMS SEC MLS OTHR SCS VAC WSC WBCS
PERSONNEL
16 2 62 1 1 1 7 4 2 3 3 2 1
Total
AND SERVICES No. of Persons
105
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 12 12 24 0 24 12 24 10 24 24

Standby/Tankers Others
TRUCKS/BOATS
ARAMCO TRUCK AB-7211 SINO AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 450 472 159 70 800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR WDYH-9 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 05/17/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

SINO-48 @ WDYH-9 Limited Morning Report for 06/18/2024


Objective : (TO RECTIFY TCA Foreman(s)MERAGHNI, MOURAD
D&WO Morning Report (Service Providers View) Rig Charge #: PRESSURE & COMPLETE THE Engineer OTUDI, AHMED MOHAMMED
Copyright 2024 Saudi Aramco. All Rights Reserved SINO-48 (72-24094-0009) WELL W/ NEW HLB SEAL Manager NAJIM, KHALID YOUSEF
Daily Onshore ASSEMBLY ON 4-1/2" 15.1# & THURAYA RIG FORMAN VSAT CONTRACTOR
Well Wellbores: 13.5# CS TBG) /CLERK VSA
(0500-0500) Saudi Aramco +882167771 4259 013-576-38 93
Date: Tuesday 06/18/2024 WDYH-9 (0) WDYH_9_0 T
013-576-38 87

Last 24 hr operations Next 24 hr plan


CONT WORK ON STUCK INTERWELL PLUG, PREPARE TO R/U COILED TBG R/U COILED TBG, PULL INTERWELL PLUGS, FINAL DRIFT, SECURE WELL & RELEASE RIG
Location Next Location
AT HRDH BRIDGE, GO WEST ON KHARJ RD FOR 42 KM TO RIG SIGN, TAKE LEFT & FOLLOW SIGN BOARDS SAHB-12
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
0 Size 9888 9888 Size 11,936 16,900 14,001 Top
Formations Comments
9 5/8 4 1/2 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 100 0 313
26.7 (05/22/2024@1200 )

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End
0500 - 0600 1 0 EOW C FISH OTH NA INW 14792 14792 TF 934831
WORK TO RETREIVE STUCK INTERWELL PLUG W/ SL.

0600 - 0800 2 0 EOW C FISH OTH NA INW 14792 14792 TF 934831 HPJSM, SHEAR OFF GS TOOL AND RELEASE FROM INTERWELL
PLUG, POOH TO SURFACE AND L/D S/L.

0800 - 1000 2 0 EOW C CT RR RSYS RIG 14792 14792 TF 934831 HPJSM, R/D IRON ROUGHNECK AND PREPARE RIG FLOOR FOR
COILED TUBING.

HPJSM, SPOT OILSERV COILED TBG UNIT AND RIG UP:

> R/U 2 X 4-1/16", 10K CT BOPE ON TOP OF 4-1/16" 10K TREE.


& CONNECT HYDRAULIC HOSES. FUNCTION TEST SAME - OK
> R/U 2" HIGH PRESSURE LINES TO BOP KILL LINES
> R/U 4-1/16" HARD LINES TO CHOKE MANIFOLD.
> M/U RAWABI CONNECTOR ON 2" COILD TBG, PULL TEST & P/T
1000 - 0100 15 0 EOW C FISH OTH NA OZT 14792 14792 TF 934831 SAME OK.
> PRESSURE TEST KILL LINE TO BOP
> PRESSURE TEST BOP
> PRESSURE TEST GATE VALVE
> PRESSURE TEST BLIND RAM
> PRESSURE TEST CHOKE LINE.
> M/U 5 JTS OF RISER BELOW INJECTOR HEAD
> PREPARE TO PICK UP INJECTOR HEAD TO RIG FLOOR

0100 - 0459 4 0 EOW C FISH WO NA RIG 14792 14792 TF 934831


WAIT ON DAY LIGHT TO P/U INJECTOR HEAD
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
17 Jun 1730 24 35.5 934831 TF FOT PLUGT INW 2500 WORK TO RETREIVE STUCK INTERWELL
PLUG
Workover Objectives
Foreman Remarks

==============================LOCATION DIRECTIONS===================================
AT HRDH BRIDGE, GO WEST ON KHARJ RD FOR 42 KM TO RIG SIGN, TAKE LEFT AND TRAVEL19 KM, TAKE RIGHT AND
TRAVEL 45 KM, TURN RIGHT & TRAVEL 1 KM ON BLACKTOP, TURN LEFT ON SKID ROAD AND TRAVEL 1.6 KM TO WELLSITE
================================ODF CORRECTION====================================
> RKB FOR RIG SINO-48 = 40.8 FT
> ODF CORRECTION F/ SSA-5859 (30 FT) = 10.8 FT
=============================== ARAMCO PERSONNEL ===================================
> ARAMCO MATERIAL EXPEDITOR, JASSEM ALRSHIDAN #8315354, ON LOCATION SINCE 6/10/2024
> ARAMCO MATERIAL EXPEDITOR, ALI AL-JAMAAN # 777273, ON LOCATION SINCE 05/27/2024
> ARAMCO FCT, ABDULAZIZ ALKAYAL #764232, ON LOCATION SINCE 06/15/2024
> ARAMCO PDP, AHMED ALHADHIRA #819113, ON LOCATION SINCE 06/10/2024
===============================SERVICE COMPANIES====================================
> OES MUD ENGINEER
> BAKER FILTRATION
> NABORS CASING CREW.
> SAMAA ENGINEER.
> SAPESCO CREW.
> GE/VETCOGRAY ENG.
================================WELLSITE SERVICES====================================
> VACUUM TANKER F/ AL TAMIMI
> DRSS#: 1004295033 & 1004302429
> TRUCK #: 01-59, 01-53, 01-35 & 01-23
> PLATE #: 6274, 6408, 2335 & 2312
================================CLOSED LOOP SYSTEM===================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR WDYH-9 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 05/17/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

> IMPLEMENTING CLOSED LOOP DRILLING PRACTICE - NOV'S 3-SIDED TANK


> USING CEMENT PIT W/ PLASTIC LINER
> NOT USING WATER AND WASTE PIT
===================================NEXT WELLS=======================================
> 1ST NEXT WELL: SAHB-12, TWO HOLE SIZES, J-SHAPE UNZA, PRE-WORKOVER MEETING CONDUCTED ON 2/20/2024, STRIP OUT NOT REQUIRED, LOCATION 100%,WOCP ISSUED
> 2ND NEXT WELL: SAHB-11, TWO HOLE SIZES, J-SHAPE UNZA, PRE-WORKOVER MEETING CONDUCTED ON 2/20/2024, STRIP OUT NOT REQUIRED, LOCATION 100%, WOCP IS NOT ISSUED YET
> 3ND NEXT WELL: GHZL-67, ONE HOLE SIZE, UNZC PRE-SET, PRE-WORKOVER MEETING NOT YET, LOCATION 0%, WOCP IS NOT ISSUED YET
=================================RIG MOVE DETAILS====================================
> HPJSM, PREMOVED PIPE BOX, MAIN CAMP, TO SAHB-12.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 0 API N/A 0 Volts 0 9 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP N/A 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 N/A 0/0 0 0 0
26
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 0 API N/A 0 Volts 0 9 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP N/A 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 N/A 0/0 0 0 0
26

MUD CACL2-80 CAOH2


TREATMENT 20 ( 2200L ) 3 ( 55LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/09/2024 N/A N/A N/A N/A 174 N/A

Company OTH RIG OES RIG ARM ARM SPL GD1

Category CTRG RIG DFMS OTHR OTHR WSC SLS SLS


PERSONNEL
16 52 1 20 4 1 3 4
Total
AND SERVICES No. of Persons
101
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 10

Operating Hours. 0 12 12 12 12 12 12 0

Standby/Tankers
TRUCKS/BOATS
DH-8107

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 100 N/A N/A 0

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
> NEED 1 X COLORED PRINTER W/ SCANNER

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZMLH-200 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/23/2024 - 07/26/2024
Report ID: OPERLMTDMRREP

SINO-49 @ ZMLH-200 Limited Morning Report for 06/18/2024


Objective : (MMK-1 Foreman(s)USKEMBAYEV, ALIBEK / RAHMANI, LALMI
D&WO Morning Report (Service Providers View) Charge #: VERTICAL PILOT HOLE 200 Engineer MALAEKAH, ALI ABDULHADI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23528-0200) FT INTO TWLF WITH Manager ALSHAIKH, SABER YASSEN
SINO-49
SIDETRACK OPTION.) RIG FORMAN VSAT OTHER VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 013 576786 5 013 576782 5 013 667073 6 ( CLINIC )
Date: Tuesday 06/18/2024 ZMLH-200 (0-1) ZMLH_200_1 CONTRACTOR /CLERK VSA T
013 576786 2

Last 24 hr operations Next 24 hr plan


ROTARY DRILL 8-3/8" HOLE. ROTARY DRILL 8-3/8" HOLE TO +/- 14,100' (450' TVD INTO KFDA),CHC, POOH.
Location Next Location
RIG IS LOCATED AT 460KM FROM DMG, PASS HARDH CITY, TAKE THE 3RD U-TURN, DRIVE 90KM IN YIBRIN ROAD. SHDN-200
Current Depth (ft) Liner TOL MD TVD Formation Tops
11,640 Last Csg Size MD TVD Size Top
9 5/8 10560 10560 Formations Comments
Depth
JILH 10,151 17' SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) JLDM 10,368 9' SHALLOWER
10930 (Date) 100 710 344 BJDM 10,530 3' SHALLOWER
56.6 (04/22/2024@1400 ) MDJR 11,009 41' SHALLOWER

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End

DRILL 8-3/8" HOLE WITH ROTARY MWD/GR BHA WITH 109PCF


OBM AND FULL RETURNS TO 10994FT.
0500 - 0830 3.5 0-1 8 3/8 N DRLG D TDS RIG 10930 10994 BHA 934417 > CONTROL PARAMETERS FOR SEPARATION WITH
MOTHERBORE.
> CT-CT DISTANCE 13.73FT @ 10,994FT OF ORIGINAL
WELLBORE.

CONTINUE DRILL 8-3/8" HOLE WITH ROTARY MWD/GR BHA


WITH 109PCF OBM AND FULL RETURNS.
> EXPERIENCE HIGH ERRATIC TORQUE AT 10,990-11,072FT.
0830 - 0459 20.5 0-1 8 3/8 N DRLG D TDS RIG 10994 11640
> PUMP 40BBLS HIVISC SWEEPS EVERY STAND
> FOLLOW INTEGRATED VERTICAL HOLE CONNECTIONS
PRACTICE.
> SURVEY EVERY STAND 30FT OFF BOTTOM.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
06 Jun 0000 3.5 236.5 934417 BHA ISEQ RM RIG 10994 DUE TO HARD BACK REAM LOST IN HOLE 06
ROLLERS WITH PINS LOCKS OF 02 STRING
REAMERS.
Foreman Remarks

ZMLH-200 WELL IS PLANNED TO BE DRILLED AS AN MMK-1 VERTICAL PILOT HOLE WELL TO 200' INTO TAWIL FORMATION TO EVALUATE UNZ-A, UNZ-C AND JAUF RESERVOIRS.
RER 1/2 LFL = 99 M; 100 PPM = 0 M; 30 PPM = 0 M
=======================JOURNEY MANAGEMENT==================
- THE RIG IS 10 KM SKID ROAD FROM THE BLACK TOP.
- NIGHT DRIVING IS PROHIBITED. ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
=======================ARAMCO PERSONNEL====================

===================================RIG KPI==================
* TRIPPING SPEED KPI: 19 STDS/HR, ACTUAL: - STDS/HR.
* RIG MOVE KPI: - DAYS, ACTUAL: - DAYS.
* RUN 24" CSG KPI: 4 JT/HR, ACTUAL: 4.6 JT/HR.
* RUN 18-5/8" CSG KPI: 7 JT/HR, ACTUAL: 9.3 JT/HR
* RUN 13-3/8" CSG KPI: 11.5 JTS/HR / ACTUAL: 12.2 JTS/HR
* RUN 9-5/8" CSG KPI: 14 JTS/HR / ACTUAL: 9.48 JTS/HR
* RUN 7" CSG KPI:14 JTS/HR / ACTUAL: - JTS/HR.
* RUN 4-1/2" TBG KPI:14 JTS/HR / ACTUAL: - JTS/HR.
* RUN 4-1/2" UPPER COMPLETION KPI: 13.5 JT/HR / ACTUAL: - JT/HR
========================PLANNED VS ACTUAL CASING DEPTHS==========
* 24" CSG-------- PLANNED: 546' (50' IN RUS) VS ACTUAL: 600'
* 18-5/8" CSG--- PLANNED: 2,727' (50' IN AHMADI) VS ACTUAL: 2,765'
* 13-3/8" CSG--- PLANNED: 5,743' (30' IN MID THAMAMA) VS ACTUAL: 4,846' (450' IN BIYADH FRM)
* 9-5/8" CSG---- PLANNED: 10,563' (30' IN BJDL) VS ACTUAL: 10560'
====================================AUDITS===============
- PCI COMPLETED.
- 2ND QSI COMPLETED.
- HAZCOM, CEHA, PTW COMPLETED.
====================================HSE==================
SAFETY MEETING: TOPICS DISCUSSED
> REVIEW OF STOP AUTHORITY/ALERT/NEAR MISS/MAJOR OBBS AND RIG INSPECTION FINDINGS.
> REVIEW OF CRANE AND FORKLIFT SIGNAL MANAGEMENT.
> EMPHASIS ON GENERAL SAFETY.
> DISCUSSION ON PTW&JSA OUTSTANDING FINDINGS AND REFRESHER TRAINING.
> EMPHASIS ON WELL CONTROL FOR PAY ZOON.
> ANALYSIS OF H2S&PIT&TRIP DRILLS PERFORMANCE IMPROVEMENT.
> REVIEW OF SGGDD HEAT STRESS AWARENESS AND SAFETY WORK PRACTICES.
> REMINDER TO WEAR SAFETY HARDNESS, FALL ARRESTOR DEVICE, FACE SHIELD, AND GROUNDING FOR WASHING MACHINES.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZMLH-200 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/23/2024 - 07/26/2024
Report ID: OPERLMTDMRREP

NEAR MISSES TODAY: 0, NEAR MISSES THIS WEEK: 2, OBSERVATION CARDS: 20


WEEK : 24
DRILLS: 1 X FIRE PUMP DRILL/ 1 X SWA DRILL.
DWLTI: 57
=====================DIRECTIONAL SERVICE=============================================================
> DIRECTIONAL PLAN "ZMLH-200_0_1_REV-B.0 (PWP).
> MWD D+I OFFSET FROM BIT -
> WELBORE POSITION AT LAST SURVEY DEPTH OF 11553: 0.97 FT ABOVE, 21.4 FT RIGHT TO PLAN.

=================================MUD LOGGING======================================================
> LAST SAMPLE DEPTH - 11,590 FT, LITHOLOGY: SHALE -10-30%, LMST-70-90%.
> MAX DRILLING GAS: 1.53 % (11568 FT), CONNECTION GAS: N/A, TRIP GAS- N/A.
======================DIESEL CONSUMPTION============================================================

DAILY DIESEL CONSUMPTION FOR ENGINES (RIG+CAMP): 62 BBLS, CUMULATIVE DIESEL CONSUMPTION CURRENT WELL = 2,909 BBLS.
========================================RENTAL TOOLS ===============================================.
- RECEIVE 6-1/2" HJDA-650-0019 ON LOCATION SINCE 06/12/2024
- RECEIVE 6-1/2" HMJ -650-041 ON LOCATION SINCE 06/14/2024
==============================WATER WELLS==========================================================
- ASSIGNED WATER WELL:
1) ZMLH-801
2) ZMLH-802
==============================NEXT WELLS=============
SHDN-200 & SHDN-46
==========================RIG VISITS=================
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
109 PCF 1 0 API 58 790 Volts 4.8 0 14,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
132 0.6 HTHP 12 15 0.1 9 / 13 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 36 30 7/8 0 0 0
63
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
109 PCF 1 0 API 58 790 Volts 4.8 0 14,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
134 0.8 HTHP 12 15 0.1 9 / 13 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 35 30 7/8 0 0 0
60

CAOH2 GELTONE LCLUBEFINE STELSL50 CACO3-50 CACO3-25 CARBOTROL


MUD 24 ( 55LB ) 10 ( 55LB ) 24 ( 55LB ) 24 ( 55LB ) 24 ( 55LB ) 24 ( 55LB ) 24 ( 55LB )
TREATMENT SEC-EMULS
1 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
5RR 10,893 11,640 DP Av DC Av Bit HHP 30 150 M223 8.375 ULTR
Pressure GPM Jet Vel 337.94 483.33 40 I-Row O-Row DC Location Bearings
3,600 550 98 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
72088 U616MD 6 x 14 / 6 x 14 / 1.804
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 37 322 327 318 9,500 29
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit ULTR 8.375 1 8.375 0.84 4-1/2'' REG 0 72088
2 Sub RIG 6.5 1 6.5 2.5 3.02 NC46 4 1/2 REG 0 395-132
3 Pony Collar RIG 6.5 1 6.5 2.875 14.55 4'' IF 4'' IF 0 JSH2206894-
4 Roller Reamer RIG 8.375 1 6.625 1.9 6.34 NC50 NC50 0 3 POINT GU5450
DRILL STRING 5 Crossover RIG 6.5 1 6.5 2.75 2.65 NC46 NC50 0 395-101
6 Measurement While Drilling (MWD) BHI 6.75 1 6.75 3 36.16 4-1/2'' if 4-1/2'' if 132.13 ZDHP1311209
7 FIlter Sub BHI 6.75 1 6.375 2.8 5.05 NC50 NC50 0 14929408
8 FIlter Sub BHI 6.75 1 6.375 2.8 7 NC50 NC50 0 WDS-0110
9 Crossover RIG 6.5 1 6.5 2.75 2.66 NC50 NC46 0 395-102
10 Roller Reamer RIG 8.375 1 6.625 1.9 6.35 NC50 NC50 0 3 POINT GU5442
11 Drillcollar RIG 6.5 18 6.5 2.25 547 NC46 NC46 0 SPRL TALLY
12 Hydraulic Jar NPC 6.5 1 6.5 2.5 30.94 4" IF 4" IF 1,400 HMJ-650-041
13 Drillcollar RIG 6.5 2 6.5 2.25 60.57 NC46 NC46 0 SPRL TALLY
14 Crossover RIG 6.5 1 6.5 2.875 2.66 XT54 NC46 0 395-81

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ZMLH-200 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/23/2024 - 07/26/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
15 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 459 XT54 XT54 54 CONV TALLY
16 Drillpipe RIG 5.5 1 5.5 4.67 30 XT54 XT54 24.7 CYX105 PREMIUM TALLY

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/11/2024 1 N/A N/A N/A 57 DRILL 12" HS

Company ULT RIG BHI RIG BAR EMC RIG SGR OTH ARM

Category BITS CTRG DPDS RIG DFMS DFMS MED MLS VAC WSC
PERSONNEL
1 15 2 62 1 1 1 4 4 2
Total
AND SERVICES No. of Persons
93
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 0 24 24 12 12 0 24 12 24

Standby/Tankers
TRUCKS/BOATS
DH-7557 ARAMCO VEHICLE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 431 350 60 2100

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-4089 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/06/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

SINO-50L @ UTMN-4089 Limited Morning Report for 06/18/2024


Objective : (EVALUATION Foreman(s)HUMIDA, GASIM MOHAMED / ELMAHDY, AMR ADEL
D&WO Morning Report (Service Providers View) Charge #: OBSERVATIONAL OIL Engineer ALSADIQ, AHMAD MOHAMMAD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23057-4089) PRODUCER WELL AS PART Manager ALMUSTAFA, AHMED HASSAN
SINO-50L
OF CO2-EOR) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore (LSTK)
(0500-0500) Saudi Aramco Well Wellbores: +822 16 77 71 3773 013 577 02 42 013 664 88 05
Date: Tuesday 06/18/2024 UTMN-4089 (0) UTMN_4089_0 CONTRACTOR /CLERK VSA T
013 577 56 06

Last 24 hr operations Next 24 hr plan


PERFORM W/L PERFORATION, CHANGE TOP RAM TO 4 1/2'' & TEST, RIH UPPER COMPLETION. RIH UPPER COMPLETION.
Location Next Location
121 KM FROM DHAHRAN MAIN GATE. BEFORE GOSP UTMN-6 TURN RIGHT AND FOLLOW RIG SIGNS UTMN-4088
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
8,386 Size 4566 4524 Size 6,917 8,383 7,588 Top
Formations Comments
9 5/8 4 1/2 Depth
UERA 425 134 FT DEEPER AS PER RCC
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) 23 FT SHALLOWER AS PER
8386 (Date) 100 0 121 RUS 670
RCC
38.7 (05/10/2024@1130 ) 4 FT SHALLOWER AS PER
UMER 765
RCC
ARUM 1,790 39 FT DEEPER AS PER RCC
70 FT SHALLOWER AS PER
LAMS 2,230
RCC
AD3B 2,332 28 FT DEEPER AS PER GOC
17 FT SHALLOWER AS PER
AHMD 2,820
RCC
42 FT TVD SHALLOWER AS
SFNY 3,108
GOC
KHFJ 3,595
38 FT TVD SHALLOWER AS
SHUB 3,979
PER GOC
29 FT TVD SHALLOWER AS
BYDH 4,230
PER GOC
MDTM 5,124 18 FT DEEPER AS PER GOC
12 FT TVD DEEPER AS PER
SULY 5,636
GOC
21 FT TVD DEEPER AS PER
HITH 6,197
GOC
23 FT TVD DEEPER AS PER
ABAR 6,686
GOC
26 FT TVD DEEPER AS PER
ARBB 6,722
GOC
29 FT TVD DEEPER AS PER
ABBR 6,779
GOC
25 FT TVD DEEPER AS PER
ARBC 6,802
GOC
25 FT TVD DEEPER AS PER
ABCR 6,900
GOC
28 FT TVD DEEPER AS PER
ARBD 6,994
GOC
30 FT TVD DEEPER AS PER
PADS 7,099
GOC
33 FT TVD DEEPER AS PER
BPDS 7,105
GOC
27 FT TVD DEEPER AS PER
ABD1 7,113
GOC
26 FT TVD DEEPER AS PER
AD2A 7,117
GOC
26 FT TVD DEEPER AS PER
2A05 7,126
GOC
24 FT TVD DEEPER AS PER
2A06 7,167
GOC
14 FT TVD DEEPER AS PER
AD2B 7,188
GOC
27 FT TVD DEEPER AS PER
2B09 7,216
GOC
26 FT TVD DEEPER AS PER
2B10 7,227
GOC
20 FT TVD DEEPER AS PER
2B11 7,245
GOC
27 FT TVD DEEPER AS PER
2B12 7,263
GOC
26 FT TVD DEEPER AS PER
2B13 7,267
GOC
27 FT TVD DEEPER AS PER
AD3A 7,275
GOC
27 FT TVD DEEPER AS PER
3A15 7,280
GOC
20 FT TVD DEEPER AS PER
3A16 7,287
GOC
20 FT TVD DEEPER AS PER
3A17 7,307
GOC
20 FT TVD DEEPER AS PER
3B21 7,355
GOC

Saudi Aramco: Confidential Page 1 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-4089 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/06/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

Formation Tops
Top
Formations Comments
Depth
27 FT TVD DEEPER AS PER
ABD4 7,382
GOC
52 FT TVD DEEPER AS PER
BADR 7,442
GOC
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth OOS ID Summary of Operations
OP Co
Start End Start End

RIH WITH 3-3/8" HMX 6 SPF 60 DEG PHASING WL CSG GUNS W/ GR -CCL
FOR PERFORATION RUN #1.
- CORRLATED DEPTH FROM 8,002 FT TO 7,545 FT.
- POSITIONED & FIRED PERFORATION GUNS.
0500 - 0730 2.5 0 EOW E LOG LOG WLT SWL 8386 8386 8002 7733 13495
- SHOOTING INTERVAL FROM 7,763 FT TO 7,733 FT.
- OBSERVED WELL FOR 5 MINS - OK, NO LOSSES.
- POOH W/L GUNS TO SURFACE & L/D.
- CONFIRM ALL GUNS FIRED.
- MONITORED WELL ON TRIP TANK.

PREPARED, M/U & RIH WITH 3-3/8" HMX 6 SPF 60 DEG


PHASING WL CSG GUNS WITH GR -CCL FOR PERFORATION RUN #02.
- CORRLATED DEPTH FROM 8,002 FT TO 7,545 FT.
- POSITIONED & FIRED PERFORATION GUNS.
0730 - 1200 4.5 0 EOW E LOG LOG WLT SWL 8386 8386 8002 7733 13495 - SHOOTING INTERVAL FROM 7,733 FT TO 7,708 FT.
- OBSERVED WELL FOR 5 MINS - OK, NO LOSSES.
- POOH WL GUNS TO SURFACE & L/D.
- CONFIRM ALL GUNS FIRED.
- R/D WL SHEAVES & CLEARED RIG FLOOR.
- MONITORED WELL ON TRIP TANK.

N/D 7" SHOOTING NIPPLE (LTC)


1200 - 1300 1 0 EOW E LOG ND SNIP RIG 8386 8386 13495
- INSTALLING BELL NIPPLE.
- R/U FLOW & FILL UP LINES.
1300 - 1330 0.5 0 EOW C WH RTRV WBSH RIG 8386 8386
RETRIEVED WEAR BUSHING.

1330 - 1500 1.5 0 EOW C BOP BOP BOP RIG 8386 8386 M/U JETTING ASSY & JET BOP & WH.
- FR: 200-300 GPM, SPP: 100-180 PSI
1500 - 1630 1.5 0 EOW C BOP BOP BOP RIG 8386 8386
CLOSE BOP SHEAR RAM & CHANGED UPPER PIPE RAMS TO 4-1/2".

M/U & RIH TEST PLUG ASSY WITH 4-1/2'' TUBING TEST JT.
1630 - 1830 2 0 EOW C BOP BOPT RAMS RIG 8386 8386 - P/T ANNULAR TO 300/3000 PSI (10 MIN EACH).
- P/T UPPER PIPE RAM TO 300/3000 PSI (10 MIN EACH).
- L/D TEST PLUG & 4-1/2'' TEST JT.

HPSJM, R/U NABORS 4 1/2" TBG HANDLING EQUIP.


1830 - 2000 1.5 0 EOW C COMP HT PEL TSC 8386 8386 - R/U JAM UNIT.
- R/U PDHMS SHEAVES & CONTROL LINE REEL.
- MOVED GRE TUBING SEALS & PDHMS CLAMPS TO RIG FLOOR.

MU & RIH BAKER UPPER COMPL ASSY #1 ON 4 1/2" TBG (11.60# J-55,
GRE LINED, NEW VAM) TO 1,631 FT.
2000 - 2300 3 0 EOW C COMP HT SEAL BC 8386 8386
- 4 1/2" TIE BACK ASSY (WITH SEALS) + NO GO + X/O + 1XPUP JT + 40
JT'S OF 4 1/2" TBG.
- MONITORED WELL ON TRIP TANK.

R/U QN S/L & P/T LUBRICATOR & PCE TO 1500 PSI 10 MINS -OK.
2300 - 0000 1 0 EOW C COMP DTU DRFT QEM 8386 8386 - RUN#1 - DRIFT TUBING TO 1,620 FT (DRIFT SIZE - 3.469'').
- R/D S/L TOOLS.
- MONITORED WELL ON TRIP TANK. - OK.

MU & RIH SLB UPPER COMPL ASSY #2 & 3 ON 4 1/2" TBG (11.60# J-55,
GRE LINED, NEW VAM) TO 1716 FT.
0000 - 0045 0.75 0 EOW C COMP HT PLUGN SCP 8386 8386
- 4-1/2'' CERAMIC DISC ASSY.
- 4-1/2'' CIRC SUB ASSY.
- 4-1/2'' LOWER X NIPPLE 2.813'' ID.

MU & RIH SLB UPPER COMPL ASSY #4 ON 4 1/2" TBG (11.60# J-55, GRE
LINED, NEW VAM) . TO 1,842 FT.
0045 - 0130 0.75 0 EOW C COMP HT PKR SCP 8386 8386 - 7" PRODUCTION QHSB PACKER.
- 4.5" ANCHOR LATCH.
- PBR ASSY W/GAGUE RING RE W/RE-ENTRY GUIDE.
- LOCATOR SEAL ASSEMBLY (NO GO).

R/U QN S/L & P/T LUBRICATOR & PCE TO 1500 PSI 10 MINS -OK.
- RUN#1 - DRIFT TUBING TO 133 FT TAG X-NIPPLE- OK. (DRIFT SIZE -
3.469'').
0130 - 0230 1 0 EOW C COMP DTU GAUG QEM 8386 8386
- RUN#2 - DRIFT TUBING TO 193 FT PASS X-NIPPLE - OK. (DRIFT SIZE -
2.8'').
- R/D S/L TOOLS.
- MONITORED WELL ON TRIP TANK. - OK.

Saudi Aramco: Confidential Page 2 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-4089 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/06/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth OOS ID Summary of Operations
OP Co
Start End Start End

MU & RIH SLB UPPER COMPL ASSY #5 & 6 ON 4 1/2" TBG (11.60# J-55,
GRE LINED, NEW VAM) TO 1,955 FT.
0230 - 0300 0.5 0 EOW C COMP HT PDHMS SCP 8386 8386
- 4-1/2''U UPPER X NIPPLE 2.813'' ID.
- 4-1/2" SLB 12.6# PDHMS GAUGE (SGM)
- 1 JT OF 11.60# J-55, GRE LINED, NEW VAM TUBING.

R/U QN S/L & P/T LUBRICATOR & PCE TO 1500 PSI 10 MINS -OK.
- RUN#1 - DRIFT TUBING TO 106 FT TAG X-NIPPLE- OK. (DRIFT SIZE -
3.469'').
0300 - 0400 1 0 EOW C COMP DTU GAUG QEM 8386 8386
- RUN#2 - DRIFT TUBING TO 120 FT PASS X-NIPPLE - OK. (DRIFT SIZE -
2.8'').
- R/D S/L TOOLS.
- MONITORED WELL ON TRIP TANK. - OK.

M/U LOWER GAUGE TO MANDREL


- HPSJM, R/U PDHMS SHEAVES & CONTROL LINE REEL.
0400 - 0459 1 0 EOW C COMP HT PDHMS SCP 8386 8386 - CUT PDC & PREPARED CABLE FOR TERMINATION.
- CONNECT PDH TO CABLE.
- MOUNTED GAUGE ON MANDREL. IN PROGRESS
- MONITORED WELL ON TRIP TANK - OK
Out Of Scope Details
From Hrs Cum. Hrs Doos Id Type Category Out Of Scope Summary
17 Jun 0130 8 11.5 13495 OOS PERF OOS. W/L PERFORATION FOR 4 1/2'' LINER.
Foreman Remarks

================================= WELL OBJECTIVE ================================


- UTMN-4089 WILL BE DRILLED AS EVALUATION OBSERVATIONAL OIL PRODUCER WELL AS PART OF CO2-EOR PILOT PROJECT IN UTMN FIELD.
- WELL WILL BE COMPLETED WITH 7" PERMANENT PACKER, 4-1/2" GRE TUBING, AND PDHMS.

================================= WELL INFO ====================================


- RER 1/2 LFL AT 70 M, RER 100 PPM AT 179 M, RER 30 PPM AT 361 M
- GOR ARBD: 515 SCF/BBL
- H2S ARBD: 1.18 MOLAR %

================================= WELL DATA ====================================


- 24" CP PLANNED / ACTUAL: 80' / 80'. - CONDUCTOR.
- 18 5/8" CP PLAN / ACTUAL: 743'/ 747' (77' TVD INTO RUS).
- 13 3/8" CP PLAN / ACTUAL: 2,887'/ 2,881' (61' TVD INTO AHMADI).
- 9 5/8" CP PLAN / ACTUAL: 4,596' MD; 4,559' TVD / 4,567' MD / 4,524' TVD (294' TVD INTO BIYADH)
- 8 1/2" & 7" LINER @ PLAN / ACTUAL 7,724' MD; 7,049' TVD / 7,658' MD / 7,049' TVD (50 FT TVD ABOVE PADS)
- DRILL 6 1/8" L-0 HOLE PLAN / ACTUAL: 8,539' MD 7,655' TVD; 8,386' MD/ 7593' TVD.

================================ ARAMCO PERSONNEL ===============================


- ARAMCO MATERIAL EXPEDITOR: ALHASSAN DARDEER #820751 ARRIVED TO RIG ON JUNE 17, 2024.
- ARAMCO FCT: SULTAN ALDOSSARY #818255 ARRIVED TO RIG ON JUNE 17, 2024.

================================PERSONNEL ON BOARD===============================
- LSTK SLB: WSL JATINDER/ NAEL.
- SINO: RIG MANAGER CHEN HU.

==================================== NEXT WELL ==================================


- WELL NAME: UTMN-4088.
- LOCATION READINESS: 100%
- APPROVED PROGRAM: YES.
- APPROVED ERP: YES.
- WATER WELLS: UTMN-3536.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
6RR 4,571 7,658 DP Av DC Av Bit HHP 30 60 S423 8.5 SMT
Pressure GPM Jet Vel 295.68 N/A 56 I-Row O-Row DC Location Bearings
2,820 570 133 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
SM1030 H516SC 6 x 13 / 4 x 14 / 1.379
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 28 194 228 176 9,000 0
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

Saudi Aramco: Confidential Page 3 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-4089 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/06/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/14/2024 TOURLY E 9 - 19 N/A SEASONAL 419 PRE-TOUR SAFETY
KM/H 29-45 DEG C MEETING

Company SCP PEW AM TSC RIG SMI BLH SCP QEM OTH TK3 ARM MIW

Category PSSC MEON CTRG CSR RIG DFMS LHES PDHMS SLS VAC WSC WSC WBCS
PERSONNEL
1 2 12 4 67 1 2 4 3 3 2 4 1
Total
AND SERVICES No. of Persons
106
INFORMATION
Personnel on Loc. Hrs. 22 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 9 0 0 12 12 12 9 12 12 12 12 12 12

Standby/Tankers Others Others Others Others


TRUCKS/BOATS
F-150 / DH8939 AMBULANCE 4X4 / NSB1440 VACUUM TANKER 6058-NRA VACUUM TANKER 6056-NRA VACUUM TANKER 7126-LRA

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 650

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 4 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-291 WORKOVER-5 BI-60
Print Date: 06/18/2024 06:21 06/01/2024 - 07/08/2024
Report ID: OPERLMTDMRREP

SINO-5L @ UTMN-291 Limited Morning Report for 06/18/2024


Objective : (ST AS SINGLE Foreman(s)HADEF, ADEL
D&WO Morning Report (Service Providers View) Charge #: LATERAL PRODUCER Engineer ALABDULQADER, AHMAD FOUAD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24057-0291) ACROSS AD2A ) Manager ALMUKHTAR, ESSA HAJJI
SINO-5L
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 2548 013-577965 8 013-838946 7 ( CLINIC )
Date: Tuesday 06/18/2024 UTMN-291 (0-2) UTMN_291_2 OTHER VSAT
013-838788 6 ( LSTK H ALL)

Last 24 hr operations Next 24 hr plan


CONT. DRILL 6-1/8'' CURVE SECTION W/I-CUISE RSS/LWD TO 7150'. CONT. DRILL 6-1/8'' LATERAL SECTION W/I-CUISE RSS/LWD TO +/-11398' MD/6517' TVD.
Location Next Location
147 KM FROM DHAHRAN MAIN GATE UTMN-1452
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,150 Last Csg Size MD TVD Size 5,424 7,028 Top
7 5611 5611 Formations Comments
4 1/2 Depth
HITH 5,488 5493' MD (2.2' SHALLOWER)
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ABAR 5,973 6059' MD (2.1' SHALLOWER)
6250 (Date) 100 900 147 ARBB 6,010 6107' MD (2.2' SHALLOWER)
12.5 (06/05/2024@1800 ) ABBR 6,075 6196' MD (1' DEEPER)
ARBC 6,105 6246' (5.2' DEEPER)
ABCR 6,203 6418' (0.8' DEEPER)
ARBD 6,311 6652' (4.9' DEEPER)
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

SPS DRILL 6-1/8" CURVE SECTION W/ RSS/LWD TO 6521' W/ 86 PCF POLYMER


0500 - 1000 5 0-2 6 1/8 N DRLG D RSS SPS 6250 6521
MUD, 100% CIRC.
> ABCR @ 6418' MD/ 6203' TVD ( 0.8' DEEPER ).
1000 - 1100 1 0-2 6 1/8 N DRLG CIRC MPMP RIG 6521 6521
SWEPT HOLE W/TANDEM LO-VIS / HI-DENSITY PILLS & CHC.
1100 - 1130 0.5 0-2 6 1/8 N DRLG CIRC MPMP RIG 6521 6521
FLOW CHECK FOR 30 MIN- WELL STATIC. ( 103' INSIDE ABCR).

SPS DRILL 6-1/8" CURVE SECTION W/ RSS/LWD TO 6704' W/ 86 PCF POLYMER


1130 - 1400 2.5 0-2 6 1/8 N DRLG D RSS SPS 6521 6704
MUD, 100% CIRC.
> ARBD @ 6652' MD/6311' TVD ( 4.9' DEEPER).
1400 - 1500 1 0-2 6 1/8 N DRLG CIRC MPMP RIG 6704 6704
SWEPT HOLE W/TANDEM LO-VIS / HI-DENSITY PILLS & CHC.
1500 - 1600 1 0-2 6 1/8 N DRLG CIRC MPMP RIG 6704 6704
FLOW CHECK FOR 1 HR - WELL STATIC. ( 52' INSIDE BASE OF ABCR)

SPS DRILL 6-1/8" CURVE SECTION W/ RSS/LWD TO 7150' W/ 86 PCF POLYMER


MUD, 100% CIRC.

1600 - 0430 12.5 0-2 6 1/8 N DRLG D RSS SPS 6704 7150 > WASH UP AND REAM DOWN 1 SINGLE EVERY STAND BEFORE CONNECTION.
> SWEEP HOLE W/TANDEM LO-VIS / HI-WEIGHTED PILLS EVERY ONE STAND.

> SENSOR OFFSETS: ABI: 6.67', ABGR: 14.12', ALD: 59.24', CTN : 68.33',
RESISTIVITY: 77.26', GAMMA: 109.91', PWD: 115.24', SURVEY : 117.5'
0430 - 0459 0.5 0-2 6 1/8 N DRLG RR TDS RIG 7150 7150
SERVICE TOP DRIVE.
Workover Objectives
Foreman Remarks

** ODF CORRECTION - 13 FT.


====================PERSONNEL ON BOARD===========================================

> HALLIBURTON: DAY DSV (HUSAM), NIGHT DSV (MAHMUD), HSE (THOMAS).

========================FUEL CONSUMPTION=========================================
> DIESEL CONSUMPTION FOR ENGINES (RIG + CAMP) = (DAILY: 40 BBL / CUMMULATIVE FOR CURRENT WELL: 549 BBL).
> RIG & CAMP DIESEL PROVIDED BY HES LSTK .

================================================================================
> SAFETY, AUDITS & DRILLS :
- HELD TOURLY SAFETY MEETINGS WITH RIG CREW.
- WELL CONTROL AUDIT: OPEN (0).
- GAP ANALYSIS ; JANUARY 2, 2023, TOTAL ITEMS: (34), CLOSED: (34), OPEN: (0).
- 1ST QSI FEBRUARY 20, 2024: TOTAL ITEMS: (40), CLOSED: (40), OPEN: (0).
- RHSEI FEBRUARY 5, 2024: TOTAL ITEMS: (45), CLOSED: (45), OPEN: (0).
- 1ST QSI-2024 , MARCH 8, 2024 TOTAL ITEMS: (43), CLOSED: (43), OPEN: (0)
- 2ND SAOWOD INTERNAL-2024, TOTAL ITEMS: (44), CLOSED: (43), OPEN: ( 01XP4)

================NEXT LOCATION READINESS=============================================


- UTMN-1452 (GOSP-10): KOM HELD ON 6/03/2024. STRIP OUT: 00%, LOCATION: 00%
- UTMN-1301 (GOSP-13): KOM HELD ON 5/27/2024, STRIP OUT: 90%, LOCATION: 00%

===================================================================================
> CONTRACTORS MANAGMENT VISITS :

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-291 WORKOVER-5 BI-60
Print Date: 06/18/2024 06:21 06/01/2024 - 07/08/2024
Report ID: OPERLMTDMRREP

-NONE.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0-2 6,313 54.25 215.95 89 6,146 -134.74 -108.96 568.53 4.61
0-2 6,403 57.95 216.59 90 6,196 -153.1 -122.43 643.15 4.15
0-2 6,495 61.88 218.46 92 6,242 -172.33 -137.22 722.72 4.61
0-2 6,586 64.42 218.83 91 6,283 -191.65 -152.67 803.9 2.82
DAILY SURVEY
0-2 6,681 66.52 220.17 95 6,323 -211.98 -169.42 890.3 2.55
0-2 6,776 69.78 220.86 95 6,358 -232.4 -186.88 978.42 3.5
0-2 6,871 71.86 221.76 95 6,390 -252.94 -204.94 1,068.06 2.37
0-2 6,965 74.53 221.98 94 6,417 -273.37 -223.24 1,157.94 2.85
0-2 7,060 77.99 222.52 95 6,439 -294.18 -242.15 1,250.09 3.68

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
86 PCF 1 3 API 5 0 Volts 16.1 9 145,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 12 HTHP 72 27 0 8 / 12 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 25 23 8 / 10 0 400 0
49
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
86 PCF 1 3 API 5 0 Volts 16.1 9.5 145,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 12 HTHP 72 24 0 7 / 10 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 23 23 7/9 0 400 0
52

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
3 5,173 7,150 DP Av DC Av Bit HHP 18 80 M332 6.125 SEC
Pressure GPM Jet Vel 273.4 N/A 42 I-Row O-Row DC Location Bearings
2,100 240 171 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
14178454 HD54F 3 x 14 / 0.451
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A 135 139 128 1,500 Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade ClassSerial #
1 Bit SEC 6.125 1 1.25 14178454
2 RSS SPS 4.75 1 4.75 35.8 55.31 13213628
3 Flex Joint SPS 5 1 6.75 3.813 11.54 NC50 NC50 42.16 90763827
4 Logging While Drilling (LWD) SPS 4.75 1 4.75 1.571 5.17 HAL40 HAL40 45.57 90759523
5 Logging While Drilling (LWD) SPS 4.75 1 4.75 1.519 18.31 HAL40 HAL40 52.2 90760188
DRILL STRING 6 Stabilizer SPS 6 1 4.75 2.25 3.53 NC38 NC38 49.69 90759174
7 Logging While Drilling (LWD) SPS 4.75 1 4.75 23.41 52.2 90762998
8 Stabilizer SPS 6 1 4.75 2.25 10.13 NC38 NC38 49.69 90757673
9 Measurement While Drilling (MWD) SPS 4.75 1 4.75 11.19 NC38 NC38 46.3 13809736
10 Float Sub SPS 4.75 1 4.75 2.25 2.66 NC38 NC38 49.69 TGM-FS-3569
11 Crossover RIG 4.75 1 4.75 2.25 1.74 NC38 XT39 49.69 N/A
12 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.563 90.91 XT39 XT39 25.16 CONV N/A
13 Hydraulic Jar WJS 4.75 1 31.25 43.66 1420-1689
14 Heavy Weight Drillpipe (HWDP) RIG 4 2 4 2.563 60.47 XT39 XT39 25.16 CONV N/A
15 Drillpipe RIG 4 150 4 3.34 4,725 XT39 XT39 14 G105 PREMIUM N/A
16 Heavy Weight Drillpipe (HWDP) RIG 4 45 4 2.562 1,372 XT39 XT39 26.24 CONV N/A
17 Drillpipe RIG 4 195 4 3.476 31 XT39 XT39 11.85 S135 PREMIUM N/A

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/08/2024 06/08/2024 SPD: 5 KMH/ N/A SEASONAL 2,173 SWA.
DIR: N

Company SCC SPS RIG BAR TK1 ARM

Category CTRG DPDS RIG DFMS WSC WSC


PERSONNEL
12 4 58 1 2 2
Total
AND SERVICES No. of Persons
79
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24

TRUCKS/BOATS Standby/Tankers Others Others

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-291 WORKOVER-5 BI-60
Print Date: 06/18/2024 06:21 06/01/2024 - 07/08/2024
Report ID: OPERLMTDMRREP

PICK-UP DH-8935 AMBULANCE BUS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 240 513 N/A N/A 900

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-4811 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/16/2024 - 07/29/2024
Report ID: OPERLMTDMRREP

SINO-6L @ UTMN-4811 Limited Morning Report for 06/18/2024


Objective : (CO2 INJECTOR Foreman(s)ELNAGGAR, ELKAHLAWY MOHAMED
D&WO Morning Report (Service Providers View) Charge #: WELL AS PART OF CO2-EOR Engineer ALMALEKI, HESHAM ABDULMALEK
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved SINO-6L (66-23057-4811) PROJECT IN UTMN FIELD) Manager ALMUSTAFA, AHMED HASSAN
Daily Onshore (LSTK) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 8821677712 390 013-577966 1 013-880625 8 SLB.
Date: Tuesday 06/18/2024 UTMN-4811 (0) UTMN_4811_0 CONTRACTOR /CLERK VSA T
013-577966 4

Last 24 hr operations Next 24 hr plan


RD ON UTMN-4810, RU & RM ON UTMN-4811. RD ON UTMN-4810, RU & RM ON UTMN-4811.
Location Next Location
SKID ROAD 15 KM AFTER SHEDGUM GOSP-3. TURN RIGHT TO SKID ROAD & FOLLOW SINO-6 SIGN BOARDS. UTMN-4812
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 0 122
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM WITH RIG CREW & THIRD PARTY, DISCUSSED ABOUT RIG MOVE
OPERATIONS, CRITICAL LIFT PLAN, PTW & JSA, PERFORM RISK ASSESMENT FOR
RIG MOVE OPERATIONS.
*********************************************************************
** R/D ON UTMN-4810, R/M & R/U ON UTMN-4811.
- R/D: 70%, R/M: 60%, R/U 40%.
*********************************************************************
** RIG DOWN ACTIVITIES:
- DISMANTLE SUBBASE.
- R/D A-FRAME & DRAWWORKS.
- R/D DRILLER CONSOLE & DOGHOUSES.
- R/D ROTARY TABLE & SET BACK.
*********************************************************************
** RIG MOVE ACTIVITIES:
0500 - 0459 24 0 PRE N RM RM NA RIG 0 0 - MOVED CMT TANKS & CMT SILOS.
- MOVED MUD PUMPS.
- MOVED MAST, SUBSTRUCTURE, DRAWWORKS, DRILLER CONSOLE &
DOGHOUSE,ROTARY TABLE .
*********************************************************************
** RIG UP ACTIVITIES:
- SPOT SUBBASE & CEMENT TANK AND MUD PUMPS.
- R/U DRILLER CONSOLE & DOGHOUSES.
- R/U ROTARY TABLE & RIG FLOOR PLATES.
- SPOT GENERATORS.
*********************************************************************
- EXPECTED SPUD DATE: 6/21/2024.
- DISTANCE BETWEEN TWO LOCATIONS: 1 KM.
- TOTAL/PLAN LOADS: 125/174 LOADS.
- PRE-MOVE LOADS: PIPE BOXES, MUD CHEMICALS, WAREHOUSE & MAIN CAMP
(TOTAL PRE-MOVE 58 LOADS).
Foreman Remarks

UTMN-4811 WILL BE DRILLED AS CO2 INJECTOR WELL AS PART OF CO2-EOR PROJECT IN UTMN FIELD. THE WELL WILL NOT BE COMPLETED AND WILL BE SUSPENDED FOR FURTHER WORKOVER
FOR THE COMPLETION AND WELLHEAD.
===========================WELL DATA ======================================
28" PLAN/ACTUAL: 75' / XX'
22" PLAN/ACTUAL: 735' / XXX' (60 FT TVD INTO RUS).
16" PLAN/ACTUAL: 2885' / XXXX' (50 FT TVD INTO AHMADI MEMBER).
12-1/4" PLAN/ACTUAL: 4565' / XXXX' (300 FT TVD INTO BIYADH).
8-1/2" PLAN/ACTUAL: 7037' / XXXX' (20 FT TVD INTO ARBD).
5-7/8" PLAN/ACTUAL: 7636' / XXXX'.

======================PERSONNEL ON BOARD===================================
** LSTK SLB DSV: ALI / JU.

==============================VISIT===================================

=========================NEXT LOCATION=====================================
NEXT WELL: UTMN-4812.
WELL CHARGE #66-23057-4812.
APPROVED PROGRAM FOR NEXT WELL: NO.
APPROVED ERP FOR NEXT WELL: NO.
LOCATION READINESS OF NEXT WELL: NO.
WATER WELLS FOR NEXT WELL: NO.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-4811 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/16/2024 - 07/29/2024
Report ID: OPERLMTDMRREP

DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 2,917 N/A

Company AM RIG SMI SUD BHE TK3 ARM

Category CTRG RIG DFMS OTHR VAC WSC WSC


PERSONNEL
12 63 1 2 2 2 1
Total
AND SERVICES No. of Persons
83
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24

Operating Hours. 0 24 24 12 12 24 24

Standby/Tankers
TRUCKS/BOATS
DH-8949

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 3300

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR FDHL-616 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/04/2024 - 08/30/2024
Report ID: OPERLMTDMRREP

SINO-7N @ FDHL-616 Limited Morning Report for 06/18/2024


Objective : (ST TO DRILL PH Foreman(s)BOWEN, JOHN RYAN / CHMURA, GRZEGORZ MARCIN
D&WO Morning Report (Service Providers View) Rig Charge #: AND TWO NEW INJECTOR Engineer ALHULAILAH, MUJAHID OTHMAN
Copyright 2024 Saudi Aramco. All Rights Reserved SINO-7N (71-24018-0616) LATERLAS INTO LFDL) Manager BUDAIR, SAAD MOHAMMAD
Daily Onshore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: +88 216777 12815 013 378-74 82 /CLERK VSA
Date: Tuesday 06/18/2024 FDHL-616 (0-1) FDHL_616_4 T
013 378-74 88

Last 24 hr operations Next 24 hr plan


RE-LOG, SPS RSS/MWD/GR ASSY DIRC DRILL 8 1/2" SECTION. RE-LOG, SPS RSS/MWD/GR ASSY DIRC DRILL 8 1/2" SECTION, CHC, POH
Location Next Location
121 KM FROM DAHRAN MAIN GATE FDHL-102
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
11,990 Size 6475 6475 Size 6,457 12,855 10,190 Top
Formations Comments
9 5/8 7 Depth
TVD= 6423 FT (3 FT
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) BUWB 6,424
SHALLOWER)
11320 (Date) 100 670 121 TVD= 6846 FT (1 FT
40.5 (05/08/2024@1700 ) YAMM 6,852
DEEPER)
TVD= 7252 FT (2 FT
SULY 7,276
SHALLOWER)
MNFR 7,807 TVD= 7748 FT
TVD= 7796 FT (6 FT
HITH 7,860
SHALLOWER)
TVD= 8231 FT (1 FT
ABAR 8,352
DEEPER)
TVD= 8276.7 FT (5.3 FT
BAAR 8,406
SHALLWER)
TVD= 8309.3 FT (2.7 FT
ABBR 8,445
SHALLOWER)
TVD= 8360.7 FT (0.3 FT
BABR 8,507
SHALLWER)
TVD= 8416 FT (1 FT
ABCR 8,574
DEEPER)
TVD= 8519 FT (6 FT
BACR 8,701
DEEPER)
TVD= 8672 FT (1 FT
ABDR 8,895
SHALLOWER)
TVD= 8915 FT (21 FT
BADR 9,229
SHALLOWER)
TVD= 9163 FT (6 FT
HNIF 9,600
SHALLOWER)
BUHR 9,868 TVD= 9318 FT (17 DEEPER)
TVD= 9535 FT (19 FT
HDRR 10,274
SHALLOWER)
TVD=9738 FT (-10 F
BUDR 10,744
SHALLOWER)
TVD= 9812 FT (16 FT
UFDR 11,003
SHALLOWER)
TVD= 9877 (25 FT
DHRM 11,317
SHALLOWER)
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

0500 - 0800 3 0-1 8 1/2 N DRLG LOG LWD SPS 11320 11320 11132 11320 HPJSM. RE-LOG AS PER GOC INSTRUCTION F/ 11,132' T/ 11,320'.
100% CIRCULATION

PUMP MULTIPLE LO/HI WT SWEEPS, CIRC HOLE TILL CONFIRMED SHAKER CLEAN,
0800 - 1000 2 0-1 8 1/2 N DRLG CIRC MPMP RIG 11320 11320
W/ 73 PCF OBM MUD, 100% RETURN.
> WASH UP & REAM DOWN WHILE CHC.

CONT'S SPERRY SUN RSS/MWD/GR DIRECTIONAL DRILLING 8-1/2" CURVE SECTION


WITH 73 PCF OBM MUD & 100% CIRCULATION.
> FOLLOWING APPROVED DIRECTIONAL PLAN (L-0-1) P#12 DATED MAY 29,
2024.
> WASH-UP & REAM-DOWN EVERY STD DRILLED & RUN SURVEY EVERY STAND
DRILLED.
> PUMP LOW-VIS/HI- DENISTY PILLS EACH STAND DRILLED AS REQUIRED.
> CURRENT WELL PATH: 30.7' ABOVE PLAN & 0.2' LEFT THE PLAN.
1000 - 0459 19 0-1 8 1/2 N DRLG D RSS SPS 11320 11990
> FOOTAGE DAILY/TOTAL: 670 / 5567 FT.
> ON BTM HRS DAILY/TOTAL: 14 / 14 HRS.
> ROP ON BOTTOM DAILY/TOTAL: 47.8 / 47.8 FPH.
> ROP W/ CONN/SURVEY DAILY/TOTAL: 35.6 /35.6 FPH.
> ROTARY MRSS DAILY/TOTAL: 100% /100%, FOOTAGE 670 FT / 670 FT.

** SENSOR OFFSET:
- DIRECTIONAL SURVEY: 14.22'
- GR: 10.72'
Workover Objectives
Foreman Remarks

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR FDHL-616 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/04/2024 - 08/30/2024
Report ID: OPERLMTDMRREP

> ODF TO THS= 26.4 FT.


> RIG SINO-7N TO THS= 34.34 FT.
> ODF CORRECTION = -7.94 FT.
> WING VALVE ORIENTATION: EAST & HEIGHT: 5.3 FT.
>> 8-1/2" L-0-1 (TOW @ 6404' & BOW @ 6417').
-------------------------------------------PERSONNEL ----------------------------------------------------------------------------------------------
- ARAMCO RIG CLERK: CHRISTOPHER BUENAVENTURA ID#8088593 ON LOCATION SINCE 09/19/2022.
----------------------------------- ERP EQUIPMENT & CONTINGENCY PLAN -------------------------------------------------------------------
- 55 MEN CAPACITY EVACUATION BUS ON STAND-BY.
- LOCATED STAGING AREA #1 AT 4.3 KM WEST OF LOCATION AND STAGING AREA #2 AT 4.4 KM NORTH OF LOCATION.
--------------------------------------------------RENTAL TOOLS------------------------------------------------------------------------------------
- 3 EA RAW WATER TRUCKS (AL-ASKAR) ON LOCATION SINCE MARCH 01, 2023.
- RECEIVED 322 JTS X 5" DP, 5" DP ELEVATOR & IBOP FROM WFD ON 05/16/2024.
- RECIEVED 68 JTS X 5" DP FROM WFD ON 05/21/2024.
- RECIEVED 45 JTS X 5" HWDP FROM WFD ON 05/18/2024.
- RECIEVED 6 JTS X 5" HWDP FROM WFD ON 06/02/2024.
- R/U HALL BAROID 3 EA X 500 BBLS EA FRAC TANKS ON 05/20/2024.
- R/U MI-SWACO CENTRIFUGE ON 05/22/2024.
- RECIEVED NESR 6-1/2" DRLG JAR (S/N: GE-DJ-00062) ON 06/03/2024 @ 08:00 HRS.
- RECIEVED WFD 8.5" DLR SN#G280252 6/12/2024 @ 10:00 HRS.
--------------------------------------DRILL SITE STATUS -------------------------------------------------------------------------------------------
- DRILL SITE (FW-5 ) HAVE TOTAL 4 WELLS (FDHL-616, 609, 608, 620).
- ALL WELLS INSIDE FW-5 SHUT IN & DEPRESSURIZED INJECTION LINE, BARRICADED INJ. LINE , SECURED WITH MV, WV.
- DE-PRESSURIZED & BARRICADED HEADER & FLOW LINES.
- RIG SINO-7N IS INSIDE RIG SP-124 100/30 PPM RER 1.6 KM NORTH EAST .
- HELD DAILY COMMUNICATION & OPERATION UPDATE WITH RIG SP-124.
--------------------------------------NEXT WELLS READINESS ------------------------------------------------------------------------------------
- KOM HELD ON FDHL-102 ON SEPT 03, 2023 FIELD SERVICE 80 % & WELL SITE 80 %.
- KOM HELD ON ABHD-107 ON JAN 22, 2024 FIELD SERVICE 0 % & WELL SITE 0 %.
- KOM HELD ON ABHD-166 ON MARCH 28, 2024 FIELD SERVICE 0 % & WELL SITE 0 %.
- KOM HELD ON FDHL-12 ON MAR 27, 2024 FIELD SERVICE 0 % & WELL SITE 0 %.
------------------------------------------SAFETY DATA----------------------------------------------------------------------------------------------
- DRILLS: 2X PIT DRILL
- REPORTED IN SAFE LIFE SYSTEM: 15 OBB'S.
----------------------------------------DIESEL CONSUMPTION-------------------------------------------------------------------------------------
- DIESEL CONSUMPTION FOR ENGINES (RIG + CAMP) DAILY: 72.79 BBLS / CUMMULATIVE FOR CURRENT WELL: 2339.54 BBLS.
----------------------------------------------------- MUD DATA -------------------------------------------------------------------------------------
>> LAST PPT TEST: (2000 PSI, 250 DEG F) 18:00 HR'S ON 06/17/2024.
>> DISC SIZE 20 MICRON: PPT SPURT AT 2000 PSI = 0.5 ML, PPT TOTAL AT 2000 PSI = 1.7 ML.
>> HTHP AT 500 PSI =1.4 CC.
>> TEST TEMP 250 F.
----------------------------------- WELL SITE SERVICES---------------------------------------------------------------------------------------------
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0-1 11,348 78.1 11.26 9,885 904.26 72.04 2,976.14 3
0-1 11,397 79.3 11.44 49 9,895 918.62 74.92 3,023.86 2.46
0-1 11,442 80.43 11.98 45 9,903 931.84 77.66 3,067.82 2.79
0-1 11,491 81.25 12.38 49 9,911 946.26 80.77 3,115.8 1.85
0-1 11,542 82.77 12.69 51 9,918 961.28 84.11 3,165.86 3.05
0-1 11,585 83.66 13.16 43 9,923 973.97 87.02 3,208.16 2.35
DAILY SURVEY 0-1 11,630 84.48 13.49 45 9,927 987.24 90.16 3,252.46 1.96
0-1 11,679 84.52 13.43 49 9,932 1001.7 93.62 3,300.74 0.15
0-1 11,722 84.85 13.42 43 9,936 1014.39 96.65 3,343.14 0.76
0-1 11,769 86.64 13.12 47 9,940 1028.3 99.93 3,389.58 3.87
0-1 11,822 88.08 13.4 53 9,942 1044 103.63 3,442.04 2.76
0-1 11,866 88.94 13.32 44 9,943 1057.05 106.73 3,485.64 1.97
0-1 11,915 88.85 13.56 49 9,944 1071.57 110.2 3,534.2 0.52
0-1 11,961 88.97 14.47 46 9,945 1085.17 113.6 3,579.73 2.01

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 1 0 API 67 780 Volts 13.78 0 53,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
158 1.4 HTHP 17 24 0 11 / 18 OBM 0.7
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 25 16 9 / 10 0 0 2.7
75
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 1 0 API 67 770 Volts 13.78 0 51,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
160 1.4 HTHP 17 21 0 11 / 17 OBM 0.5
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 25 16 8/9 0 0 1.7
78

CACO3-25 DURATONE EZ-MUL MRBL-M INVERMUL CAOH2 CACO3-50


MUD 6 ( 50LB ) 6 ( 50LB ) 2 ( 55GL ) 1 ( 2200L ) 1 ( 55GL ) 12 ( 50KG ) 6 ( 50LB )
TREATMENT MAXSHIELD SLTX VG6
1 ( 55GL ) 6 ( 55LB ) 3 ( 50LB )

BIT DATA Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR FDHL-616 WORKOVER-2 BI-60
Print Date: 06/18/2024 06:21 05/04/2024 - 08/30/2024
Report ID: OPERLMTDMRREP

14 6,424 11,320 DP Av DC Av Bit HHP 28 130 M423 8.5 SMT


Pressure GPM Jet Vel 285.3 N/A 107 I-Row O-Row DC Location Bearings
3,600 550 196 2 1 CT G X
Serial Number Type Jets TFA
SA00026 MDSI616V1C 6 x 14 / 0.902
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 197 285 310 285 9,500 36
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
14

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit REED 1 8.5 2.75 0.82 4.5 REG 76.12 S309324
2 RSS SPS 6.75 1 6.75 26.58 NC50 4-1/2" REG 89.5 13397140
DRILL STRING
3 Pony Collar SPS 5 1 5 1.713 8.83 4.5 IF 4.5 IF 59.06 90757965
4 Pony Collar SPS 6.75 1 6.75 1.92 10.22 4.5 IF 4.5 IF 108.9 12302179
5 Stabilizer SPS 6.75 1 6.75 3.125 6 NC50 NC50 95.82 12106084
6 Screen sub SPS 6.75 1 6.75 3 5.76 NC50 4 1/2 REG 91.47 12213862
7 Float Sub SPS 6.75 1 6.75 2.875 2.69 NC50 4 1/2 REG 101.36 13773167
8 Heavy Weight Drillpipe (HWDP) RIG 5 3 5 3 91.88 NC50 NC50 44.99 CONV
9 Hydro-Mechanical Jar NPJ 6.5 1 6.5 2.5 32.22 4-1/2" IF 4-1/2" IF 1,300 44535K
10 Heavy Weight Drillpipe (HWDP) RIG 5 3 5 3 92.5 NC50 NC50 44.99 CONV
11 Drillpipe ARM 5 1 5 4.276 30 NC50 NC50 19.5 S135 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/16/2024 AS PER NORMAL N/A SEASONAL 4,374 PRE TOUR SAFETY
SCHEDULE MEETING

Company TGC SPS WRT RIG OES BFL ASH RUE NPJ RIG ARM MI2 ARM TOT

Category CTRG DPDS DRF RIG DFMS FILT FLD H2S JST OTHR OTHR SCS WSC LHES
PERSONNEL
13 4 0 60 2 1 3 1 0 3 1 1 2 1
Total
AND SERVICES No. of Persons
92
INFORMATION
Personnel on Loc. Hrs. 24 24 0 24 24 24 24 24 0 24 24 24 24 12

Operating Hours. 0 24 24 24 12 12 12 12 24 12 12 12 24 0

Standby/Tankers Others Others Others Others


TRUCKS/BOATS
aramco p/u C-254 3 EA RAW WATER TRUCKS AL-ASKAR
MAIN CAMP DIESEL = 73.61 BBL
GASOLINE = 19.22 BBL ARAMCO DIESEL = 720 BBL

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 120 217 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABQQ-241 WORKOVER-3 BI-90
Print Date: 06/18/2024 06:21 04/13/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

SINO-8 @ ABQQ-241 Limited Morning Report for 06/18/2024


Objective : (ELIMINATE TCA Foreman(s)HAWSAWI, MAZEN MOHAMMED / HEMID, METWALLI MOHAMED
D&WO Morning Report (Service Providers View) Charge #: COMMUNICATION) Engineer ALASKAR, ABDULLAH ADEL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (61-24050-0241) Manager HAJRI, ASKAR SAUD
SINO-8
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12120 572-5169 572-6819
Date: Tuesday 06/18/2024 ABQQ-241 (0) ABQQ_241_0 CONTRACTOR /CLERK VSA T
572-7166

Last 24 hr operations Next 24 hr plan


SL WORK DIAGNOSIS TBG/TCA LEAK, RETRIEVE PLUG, DISPLACE BACK TO BRINE, POOH WITH POOH WITH SEAL ASSY & TBG, RIH NEW SEAL ASSY & TBG.
SEAL ASSY & TBG.
Location Next Location
48 KM FROM DHAHRAN MAIN GATE ABQQ-109
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
12,950 Size 5929 5929 Size 5,764 7,740 7,076 Top
Formations Comments
7 5 1/2 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12950 (Date) 95 0 30
35 (05/19/2024@0300 )

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End

CONT'D SL WORK:
==================
>> RUN & SET PX PLUG ON X-NPL ABOVE PKR (PLUG, CHECK
SET, PRONG) @ 5426 ( SLM), PT PLUG TO 1000 PSI - ( 130 PSI
DROP ) IN 10 MIN, HAD SLIGHT CONTINUES RETURN DIESEL
0500 - 1000 5 0 POST N DCOM HT TBG RIG 12800 12800 TRQ 934870 FROM TCA SIDE.
>> RIH & SET PLUG IN TRSSSV, PT PLUG TO 1000 PSI - HOLD,
NO RETURN FROM TCA SIDE
>> RIH AND RETRIEVE PLUG FROM TRSSSV & L/D SAME.
>> RIH AND RETRIEVE PRONG & PX PLUG FROM X-NIPPLE @
5426' ABOVE THE PACKER.
>> R/D NESR SLICKLINE.

STING OUT OUT FROM PBR, P/U TBG HANGER TO RIG FLOOR,
1000 - 1400 4 0 POST N DCOM CIRC MPMP RIG 12800 12800 TRQ 934870
CLOSE BOP AND DISPLACE BACK TO 86 PCF BRINE - FLOW
CHECK FOR 30 MIN - WELL STATIC.

1400 - 1600 2 0 POST N DCOM HT TBG RIG 12800 12800 TRQ 934870 POOH LD 5 JT X 4-1/2" N.VAM TBG , 3 EA X 4-1/2" N.VAM PUP,
4-1/2" TRSSSV, 1 JT X 4-1/2" N.VAM TBG.

1600 - 1630 0.5 0 POST N DCOM CIRC MPMP RIG 12800 12800 TRQ 934870 CLOSE BOP, PT TBG & TCA AGAINST PX IN TAIL PIPE & PKR TO
1000 PSI, WITH 86 PCF BRINE HOLD-OK.

RIG UP NESR SLICK LINE BOP & LUBRICATOR & PT SAME TO


2000 PSI, HOLD, OK.
>> RUN & SET PX PLUG ON X-NPL ABOVE PKR (PLUG, CHECK
SET, PRONG) @ 5102( SLM).
>> PT TBG TO 1000 PSI WITH 86 PCF BRINE, PRESSURE DROP
1630 - 2130 5 0 POST N DCOM DTU GAUG NSL 12800 12800 TRQ 934870
TO 930 IN 20 MIN AND HAD SLIGHT RETURN BRINE FROM TCA
LESS THAN DIESEL RETURN.
>> SL RIH & RETREIEVED PX-PLUG ABOVE PKR, POOH, RD SL.

>> DECISION MADE TO POOH & CHANGE NEW TBG & SEAL ASSY.

PUMPED 20 BBL H.V.PILL, CHC IN/OUT WITH 86 PCF BRINE,


2130 - 2330 2 0 POST N DCOM CIRC MPMP RIG 12800 12800 TRQ 934870 FLOW CHECK WELL STATIC.
>> WELL SECURED WITH PX-PLUG IN TAIL PIPE BELOW PKR &
TESTED TO 1000 PSI.

POOH AND L/D 4-1/2" COMPLETION TBG WITH X-NPL & SEAL
ASSY...INC@RPT...
>> KEEP TRIP TANK RUNNING W/ 86 PCF BRINE; WELL STATIC.
>> FLOW CHECK @ BTM, AFTER POOH 5 JTS, MID WAY, WELL
STATIC.
2330 - 0459 5.5 0 POST N DCOM HT TBG RIG 12800 12800 TRQ 934870
>> KEEP OPEN 7X9 CCA ALL TIME:
- DIRECT READING FROM NEDDLE VALVE: CO = 380 PPM
AVERAGE ( READING VARIABLE FROM 370 TO 800), LEL = 7,
H2S= ZERO.
- READING 5 CM AWAY FROM NEEDLE VALVE: CO= ZERO, LEL=
ZERO, H2S= ZERO.
>> KEEP OPEN 9X13 CCA, NO RETURN
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 0500 24 24 934870 TRQ INTQ BHA RIG 5511 OBSERVIED TBG/TCA COMMUNICATION.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABQQ-241 WORKOVER-3 BI-90
Print Date: 06/18/2024 06:21 04/13/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End
Workover Objectives
Foreman Remarks

ODF CORRECTION = -11 FT.


=====================================================================================
>> HELD DAILY SAFETY MEETING WITH ALL PERSONNEL ON LOCATION.
================================ ARAMCO POB ===========================================
>> ARAMCO MATERIALS CLERK HASSAN ALJUBRAN #813621 ON LOCATION.
>> ARAMCO PDP FAHAD ALQAHTANI #808994 ON LOCATION.
=============================== NEXT LOCATIONS==========================================
- ABQQ-109: KOM DONE ON 05/21/2024, STRIP OUT 100%, WELL SITE 100%.
- ABQQ-217; KOM DONE ON 05/15/2024, STRIP OUT 0%, WELL SITE 0% (LOCATION COVER BY SAND).
- ABQQ-299; KOM DONE ON 05/15/2024, STRIP OUT 0%, WELLSITE 0% (NEED COLD CUT PRODUCTION LINE UNDER GROUND).
- ABQQ-225: KOM DONE ON 05/21/2024, STRIP OUT 0%
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
86 PCF 0 0 API 0 0 Volts 0 10 335,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 86 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 14 0/0 0 0 0
30
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
86 PCF 0 0 API 0 0 Volts 0 10 335,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 86 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 14 0/0 0 0 0
30

MUD CACL2-80
TREATMENT 12 ( 2200L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/03/2024 AS REQUIRD NORMAL N/A COOL 4,459 TOURLY

Company GOS HCO RIG GDF ARM NSL ARM

Category CTRG PSSC RIG DFMS OTHR SLS WSC


PERSONNEL
12 1 61 1 2 3 2
Total
AND SERVICES No. of Persons
82
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 12 6 24

Standby/Tankers
TRUCKS/BOATS
AB-6411

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other
REPAIR ASAP OK Reporter
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABQQ-525 WORKOVER-3 BI-60
Print Date: 06/18/2024 06:21 06/10/2024 - 07/21/2024
Report ID: OPERLMTDMRREP

SINO21 @ ABQQ-525 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK & Foreman(s)GAD, YASSER ABDELKADER / BABES, MOHAMMED MEHDI
D&WO Morning Report (Service Providers View) Charge #: COMPLETE THE WELL IN Engineer ALKHALDI, ABDULMOHSEN FAHAD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24050-0525) HANIFA RESERVOIR) Manager HAJRI, ASKAR SAUD
SINO21
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12271 5721718 5747236 (C )
Date: Tuesday 06/18/2024 ABQQ-525 (0) ABQQ_525_0 OTHER VSAT FAX VSAT
5747236 8807577

Last 24 hr operations Next 24 hr plan


RIG UP RIG UP
Location Next Location
59 KM FROM DAHRAN MAIN GATE ABQQ-428
Current Depth (ft) Liner TOL MD TVD Formation Tops
6,335 Last Csg Size MD TVD Size Top
9 5/8 5924 5924 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
6335 (Date) 100 0 59
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD SAFETY MEETING WITH ALL INVOLVED PERSONNEL.

R/U ON ABQQ-525: 85%

>> RISE MAST & SUB BASE.


0500 - 0459 24 0 PRE N RM RU NA RIG 6335 6335
>> RIG UP TDS.

TIME SINCE RELEASE 8 DAY & 11 HRS.


RIG MOVE DISTANCE 53 KM.

>> ABQQ-525 SECURED WITH TRSSSV WHP = 0 PSI.


Workover Objectives
Foreman Remarks

==================================== SAFETY ============================================


>> HELD RIG SAFETY MEETING WITH ALL PERSONNEL.
==================================== ARAMCO POB =========================================

==================================== NEXT WELLS =========================================


>> ABQQ-428 : KOM HELD ON 5/14/2024, STRIP OUT 0%, LOCATION 0%.
>> ABQQ-464 : KOM HELD ON 6/5/2024, STRIP OUT 0%, LOCATION 0%.
>> ABQQ-500 : KOM HELD ON 6/5/2024, STRIP OUT 0%, LOCATION 0%.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A NORMAL N/A SEAISONAL 4,607 N/A

Company TGC RIG GDF ARM ARM

Category CTRG RIG DFMS OTHR WSC


PERSONNEL
12 63 1 1 2
Total
AND SERVICES No. of Persons
79
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24

Operating Hours. 0 24 0 24 24

Standby/Tankers Others Others


TRUCKS/BOATS
DH-7526 SINO AMBULANCE 2 X RAW WATER TANKERS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 1 of 1


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-285 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:21 06/10/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

SND-1201 @ KHRS-285 Limited Morning Report for 06/18/2024


Objective : (KILL WELL , Foreman(s)ELSHEIKH, AHMED LOTFY
D&WO Morning Report (Service Providers View) Charge #: DE-COMPLETE , RIH W/ Engineer ALKHATEEB, MOHAMMAD ABDULLAH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved CLEAN OUT RUN , RIH Manager ABU RASAIN, AMER MANE
SND-1201 (61-24051-0285)
UPPER COMPLETION ) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 00-88-216- 777-110-91 (013)-578- 4167 (013)-804- 9603 RIG M GR
Date: Tuesday 06/18/2024 KHRS-285 (0) KHRS_285_0 CONTRACTOR /CLERK VSA T
(013)-578- 4037

Last 24 hr operations Next 24 hr plan


P/UP & RIH W/ 9-5/8" C/O RUN , CHC , POH W/ 9-5/8" SCRAPER CO ASSY WHILE L/D ALL 3-1/2" RIH W/NEW BAL ESP ASSY ON 4-1/2" 11.6# TBG, MU TBG HGR, SL WORK, LAND TBG HGR, BH,
DP , MU & P/UP NEW BAKER ESP ASSY . SET PLUG, SET ESP PKR, PT TCA, INST BPV, N/D BOP, NU BNT & PROD TREE.
Location Next Location
275 KM FROM DAHRAN MAIN GATE KHRS-194
Current Depth (ft) Liner TOL MD TVD Formation Tops
10,138 Last Csg Size MD TVD Size Top
9 5/8 6318 5085 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
10138 (Date) 100 0 242
3.4 (06/14/2024@2000 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM, PU, MU & RIH W/ 9-5/8" SCRAPER C/O ASSY AS FOLLOWS: 8-1/2" TAPER
0500 - 0600 1 0 POST N CT HT BHA RIG 10138 10138 MILL, BIT SUB W/FLOAT, PONY COLLAR , 8-1/2" WINDOW MILL, 8-1/2" STRING
MILL , 1 JT X 5" DP, X-O, 9-5/8" ROTATING CSG SCRAPER, XO, 4-3/4" F.JAR, XO.
- CONTINUOUSLY FILL UP WELL WITH TRIP TANK, STATIC LOSSES 6 BPH.

RIH W/ C/O BHA TO 4700 FT WHILE P/U 3-1/2'' DP FROM PIPE RACK.
- DRESS & SCRAPPED 9-5/8" DVT @ 2648 FT , NEW 9-5/8'' ESP PKR @ 4434 FT
0600 - 1530 9.5 0 POST N CT HT STRG RIG 10138 10138
- DRIFT ALL DP WITH API DRIFT.
- FILL STRING AND BREAK CIRCULATION EVERY 10 STD W/ 63 PCF VISC WATER.
- CONTINUOUSLY FILL UP WELL WITH TRIP TANK, STATIC LOSSES 6 BPH.

SWEPT HOLE W/ 50 BBLS HI-VIS, CHC W/ 63 PCF VISC WTR TILL CLEAR RETURN &
1530 - 1800 2.5 0 POST N CT CIRC MPMP RIG 10138 10138
MWT IN/OUT 63 PCF.
- FLOW CHECK, STATIC LOSSES: 6 BPH

1800 - 0200 8 0 POST N CT HT STRG RIG 10138 10138 HPJSM, POOH W/ 9-5/8" SCRAPER C/O ASSY WHILE L/D ALL 3-1/2" DPS.
- CONTINUOUSLY FILL UP WELL WITH TRIP TANK, STATIC LOSSES 6 BPH.

0200 - 0330 1.5 0 POST N CT HT BHA RIG 10138 10138 HPJSM, LD 9-5/8" SCRAPER C/O ASSY.
- CONTINUOUSLY FILL UP WELL WITH TRIP TANK, STATIC LOSSES 6 BPH.

HPJSM, CLEAR & HOUSEKEEPING RIG FLOOR, PU BAKER HANDLING EQUIPMENT'S


0330 - 0415 0.75 0 EOW C COMP HT PEL RIG 10138 10138 & NABORS TRS POWER TONG & HANDLING TOOLS.
- CONTINUOUSLY FILL UP WELL WITH TRIP TANK, STATIC LOSSES 6 BPH.

HPJSM , PU & MU BAKER ESP ASSY (BYPASS TBG LEG, PUMP ASSY, & ZENITH Y-
TOOL) AS PER FINAL TALLY....ON GOING@RT
0415 - 0459 0.75 0 EOW C COMP HT ESP BAL 10138 10138 - CONTINUOUSLY FILL UP WELL WITH TRIP TANK, STATIC LOSSES 6 BPH.

Workover Objectives
Foreman Remarks

ODF: +12 FT.


============================ ====
KPI:
4-1/2" ESP COMPLETION TARGET 10 JOINTS/HR VS *** JTS/HRS ACTUAL .
=========================
RER: 100 PPM (287 M), 30 PPM (534 M), 1/2 LFL (109 M).
GOR ARBD- RESERVOIR: 277 SCF/STB & H2S: 1.84 %.
============================ ====
POB:
- ARAMCO CLERK MOHAMMED ARIF KHAN #8958014 ON LOCATION SINCE 03/9/2023.
==================================
- DEOCD 1ST RHSEI AUDIT: TOTAL 43 ITEMS, CLOSED (40), OPEN (2).
- 01ST QSI 2024: MARCH 2024: TOTAL 69 ITESMS, CLOSED (65) ,OPEN: (4).
- 02ND QSI 2024: MAY 01, 2024: TOTAL 58 ITEMS, CLOSED (55), OPEN (3)
=========================== HSE ==================================
*** LTI DAYS-(3221), WEEKLY SAFETY MEETING: (0), PRE TOUR MEETING: (3), COLD PTW: (5), HOT PTW: (0), CONF.SPACE: (0), DIESEL TRANSFER: (0) LIFTING PERSONNEL: (2), BUFFER ZONE:
(4), RADIOACTIVE: (0), JSA: (12), SOC CARDS SLS: (0), NM (0) / INCD (0), STAR (2)
*** DRILLS: FIRE DRILL (0), MAN DOWN DRILL (0), VERTICAL RESCUE DRILL (0), MAN LOST / SEARCH-RESCUE DRILL (0), CONFINED SPACE RESCUE DRILL (0), H2S RELEASE DRILL (0), H2S RESCUE
DRILL (0), PIT DRILL (0), TRIP DRILL (0), ACCUMULATOR DRILL (0), ANNUAL EMERGENCY DRILL (0), OIL SPILL DRILL (0), PM FWS HTF (0), PM FWS EFT (0), FIRE PUMP (0), SWA DRILL (0),
BOP/WELL CONTROL (0), COVID-19 DRILL (0)
===============================================================
JOURNEY MANAGEMENT PLAN:

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-285 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:21 06/10/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

- JMP SHOULD BE ISSUED AND SHARED WITH RIG FOREMAN.


- RIG IS LOCATED ON KHRS FIELD 275 KM FROM DMG.
- IF NEEDED CALL RIG SND-1201 AT (0135784167) .
- ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
- ALL VEHICLES SHOULD BE 4 X 4.
- ALL VEHICLES SHOULD FOLLOW ROAD ALLOWED DRIVING SPEED.
- THERE IS SIGNAL IN THE SKID ROAD BUT IS BETTER TO HAVE THURAYA PHONE IF AVAILABLE.
================================
WELL CONTROL DATA:
TBG VOLUME: 70BBL.
TCA VOLUME: 246BBL.
CSG VOLUME BELOW ESP PKR: 146 BBL.
OH VOLUME: 268 BBL.
TOTAL VOLUME: 730BBL.
============================
WATER DATA
- WATER SOURCE: KHRS-890.
- DAILY WATER RECEIVED: N/A
- DAILY WATER CONSUMED: N/A.
- TOTAL WATER IN MUD SYTEM: N/A
=============================
- MUD/COMPLETION DIESEL IN BBLS:
- STOCK: 0.
- CONSUMED: 0.
- RECEIVED: 0.
===============================
RENTAL TOOLS:N/A.
===============================
WELLSITE EQUIPMENT:- NONE.
================================
NEXT WELLS:
- KHRS-194 KOM HELD ON 05/08/2024, STRIPPED OUT 100% LOCATION READINESS: 80%.
- KHRS-1211 KOM HELD ON 05/08/2024, STRIPPED OUT 100% LOCATION READINESS: 00%.
- KHRS-201 KOM HELD ON 06/03/2024 , STRIPPED OUT 0% LOCATION READINESS: 00%.
- KHRS-15 KOM HELD ON 06/11/2024 , STRIPPED OUT 0% LOCATION READINESS: 00%.
- ABJF-621 KOM HELD ON 05/15/2024, STRIPPED OUT 00% LOCATION READINESS: 00%.
- ABJF-202 KOM HELD ON 05/15/2024, STRIPPED OUT 00% LOCATION READINESS: 00%.
- MZLJ-314 KOM HELD ON 05/15/2024, STRIPPED OUT 00% LOCATION READINESS: 00%.
===================================
- ECC HAS RADIO COMMUNICATION FUNCTIONAL,
===================================
WATER TANKERS :
- 04 RAW WATER TANKERS ON LOCATION.
=====================================
ARAMCO VEHICLE SERVICE DETAILS: 07/07/2024.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 10,138 88.52 65.11 0 5,046 802.9 1675.1 6,094.44 0

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF 0 0 API 0 0 Volts 0 9 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 99 0 0 0/0 WTRGEL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 1 0/0 0 0 0
50
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF 0 0 API 0 0 Volts 0 9 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 99 0 0 0/0 WTRGEL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 1 0/0 0 0 0
50

MUD DUOVIS-NS CAUST


TREATMENT 15 ( 25KG ) 4 ( 25KG )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
N/A N/A NORMAL NA SEASONAL 3,223 RM ACTIVITES, RD
MISCELLANEOUS
ON KHRS-186, RM
& RU ON KHRS-285.

Company BAL TGC RIG OES RIG ARM OSL OTH ARM

PERSONNEL Category ALS CTRG RIG DFMS OTHR OTHR SLS VAC WSC
Total
AND SERVICES
7 17 44 1 11 1 3 4 1 89
INFORMATION No. of Persons

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KHRS-285 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:21 06/10/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

Operating Hours. 6 0 24 12 12 12 0 12 24

Standby/Tankers
TRUCKS/BOATS
AB-5316

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 400

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-716 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:21 05/14/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

SND-1501 @ SFNY-716 Limited Morning Report for 06/18/2024


Objective : (EPAIR HIGH Foreman(s)TAHARBOUCHT, MAHFOUD / ALHUWAYMIL, ABDULMAJEED ABDULLAH
D&WO Morning Report (Service Providers View) Charge #: ANNULUS PRESSURE: Engineer ALHULAILAH, MUJAHID OTHMAN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved USUALLY ASSOCIATED Manager ALMUSTAFA, AHMED HASSAN
SND-1501 (61-24017-0716)
WITHWELLHEAD OR THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: DOWNHOLE EQUIPMENT
(0500-0500) Saudi Aramco Well 8821677712 080 0135746244 ARAMCO SAF ETY / 574- 6223
REPAIR OR CASING)
Date: Tuesday 06/18/2024 SFNY-716 (0-1-1) SFNY_716_2 OTHER VSAT CONTRACTOR /CLERK VSA T
ARAMCO CL ERK / 574- 6243 0138049645

Last 24 hr operations Next 24 hr plan


C/O CMT CHC & P/T CASING. POH & L/D C/O BHA. RUN SLICK C/O BHA RUN SLICK BHA & CHC. POH & L/D SLICK C/O BHA PERFORM DUMMY RUN WITH INVERTED PBR.
Location Next Location
233 KM FROM DHAHRAN MAIN GATE SFNY-715
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,465 Last Csg Size MD TVD Size 5,737 5,196 6,016 Top
9 5/8 7528 5977 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
7488 (Date) 100 0 233
23 (05/26/2024@0500 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM:
- CONTINUE DRILL OUT HARD CEMENT FROM 2600' TO 2660' WITH 100%
CIRCULATION.
0500 - 0645 1.75 0-1-1 POST N CT RW BIT RIG 13405 13405 2600 2660 - DRILLING PARAMETERS: WOB: 7-10 KLB, PUMP RATE: 235 GPM, 80 RPM,
- TORQUE: 2-5K FT-LB, PUMP PRESSURE: 370- 420 PSI
- NO DYNAMIC LOSSES OBSERVED.
- FLOW CHECK AFTER EACH CONNECTION, WELL STATIC.
- SWEEP HOLE AS REQUIRED.

HPJSM.
0645 - 0745 1 0-1-1 POST N CT CIRC MPMP RIG 13405 13405
- PUMP HI-VIS PILL, CHC WITH 86PCF BRINE & 100% CIRCULATION.
- PRESURE TEST CASING TO 300 PSI FOR 15 MINTS- HOLD

HPJSM:
- CONTINUE DRILL OUT CEMENT FROM 2660' TO 2900' WITH 100% CIRCULATION.
- HARD CEMENT F/ 2660' TO/ 2730', SOFT CEMENT F/ 2730' TO/ 2900'
0745 - 1600 8.25 0-1-1 POST N CT RW BIT RIG 13405 13405 2660 2900 - DRILLING PARAMETERS: WOB: 7-10 KLB, PUMP RATE: 235 GPM, 80 RPM,
- TORQUE: 2-5K FT-LB, PUMP PRESSURE: 370- 420 PSI
- NO DYNAMIC LOSSES OBSERVED.
- FLOW CHECK AFTER EACH CONNECTION, WELL STATIC.
- SWEEP HOLE AS REQUIRED.

HPJSM.
- PUMP HI-VIS PILL, CHC WITH 86 PCF BRINE & 100% CIRCULATION.
1600 - 1830 2.5 0-1-1 POST N CT CIRC MPMP RIG 13405 13405 - SPACE OUT & SECURE WELL. P/T CSG IN 50 PSI INCREMENT, REACH 570 PSI
OBSERVED PRESURES DROP QUICK TO 60 PSI
- FLOW CHECK FOR 30 MINS, WELL STATIC.
- REVIEWED SITUATION W/ OFFICE STAFF.

HPJSM.
1830 - 2230 4 0-1-1 POST N CT HT BHA RIG 13405 13405
- POH W/ 8-1/2" C.O BHA TO SURFACE & L/D SAME.
- MONITOR WELL THROUGH TRIP TANK. WELL STATIC.

HPJSM:
2230 - 0000 1.5 0-1-1 POST N CT HT BHA RIG 13405 13405 - P/U & M/U 8-1/2" SLICK C/O BHA: 8-1/2" RR PDC BIT + B.S W/FLOAT + 45 X 4"
DP+ 6-1/4" DRL JAR + 4" DP TO SURFACE.
- MONITOR WELL THROUGH TRIP TANK. WELL STATIC.

HPJSM.
0000 - 0400 4 0-1-1 POST N CT HT BHA RIG 13405 13405 - RIH W/8-1/2" SLICK C.O BHA ON 4" DP TO 4550' .
- FILL STRING EVERY 15 STANDS.
- MONITOR WELL THROUGH TRIP TANK. WELL STATIC.

HPJSM.
0400 - 0459 1 0-1-1 POST N CT HT BHA RIG 13405 13405
- CONNECTED TDS & START WASH & REAM DOWN...ONGOING @ RPT TIME'.
- PUMP HI-VIS PILL, CHC WITH 86PCF BRINE & 100% CIRCULATION.
Workover Objectives
Foreman Remarks

- ODF =29 FT
- CURRENT DF =29 FT
- ODF CORRECTION = ZERO
=============================POB=============================================================
- CLERK PREM BAHADUR GURUNG ON LOCATION SINCE FEB-5-2024.
=========================NEXT WELLS SCHEDULE ==================================================
-SFNY-715 KOM APR-28-2024. STRIP OUT: 0%, LOCATION: 0%
-SFNY-725 KOM JAN-22-2024. STRIP OUT: 0%, LOCATION: 0%
-SFNY-727 KOM JAN-22-2024. STRIP OUT: 0%, LOCATION: 0%

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-716 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:21 05/14/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
86 PCF 0 0 API 0 0 Volts 0 10 325,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 92 N/A 0 N/A / CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 N/A 8 / 0 0 N/A
83
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
86 PCF 0 0 API 0 0 Volts 0 10 325,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 92 N/A 0 N/A / CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 N/A 8 / 0 0 N/A
80

MUD CACL2-80 CAOH2 XC


TREATMENT 20 ( 2200L ) 3 ( 55LB ) 9 ( 55LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/15/2024 N/A N/A N/A N/A 3,143 R/U OPERATION

Company HCB SWK EN1 TWC RIG OES ASH ARM SCM ARM

Category BRCR CTRG PSSC PSSC RIG DFMS FLD OTHR PCS WSC
PERSONNEL
1 15 2 1 50 1 4 2 3 2
Total
AND SERVICES No. of Persons
81
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 24 24 10 12 0 24

Standby/Tankers
TRUCKS/BOATS
RY-5119

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 644 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1716 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/08/2024 - 07/29/2024
Report ID: OPERLMTDMRREP

SND-1502 @ HRDH-1716 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK AS Foreman(s)RADWAN, ASHRAF ADEL / SHABANAH, MUHANAD SAEED
D&WO Morning Report (Service Providers View) Charge #: SINGLE LATERAL ACROSS Engineer AHMED, IRSHAD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24058-1716) ARAB-D) Manager SAAD, SAAD RASHED
SND-1502
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 1089 0135773559 0135773564
Date: Tuesday 06/18/2024 HRDH-1716 (0) HRDH_1716_0 CONTRACTOR /CLERK VSA T
0135773560

Last 24 hr operations Next 24 hr plan


RIG MAINTENANCE. PRE-SPUD CHECKLIST, COMMENCE OPERATION, S/L RIH W/ 5.5" DRIFT, RIH & SET 2 EA
MONOLOCK PLUGS W/ JUNK CATCHER, N/D WH, N/U BOP & P/T SAME.
Location Next Location
289 KM FROM DHAHRAN MAIN GATE UTMN-487
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,910 Last Csg Size MD TVD Size 2,433 8,295 7,587 Top
9 5/8 4590 4588 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
12910 (Date) 0 0 260
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD DAILY SAFETY MEETING WITH RIG CREW & 3RD PARTY PERSONNEL.
- R/D: 100 %, R/M: 100 %, R/U: 95%.

- CONTINUALLY RIG UP MEANWHILE PERFORM MAINTENANCE ON THE


0500 - 0459 24 0 PRE N MAIN RR PSYS RIG 12940 12940
FOLLOWING:
>> CHANGE RIG ENGINE # 1 & FUNCTION TEST...ONGOING.
>> MODIFY CEMENT TANK...ONGOING.

- HRDH-1716 SECURED WITH TWO 7" HEX PLUGS @ 4300' & 4200'.
Workover Objectives
Foreman Remarks

============================== SAFETY ==========================================


>> HELD DAILY SAFETY/ OPERATIONAL MEETINGS WITH ALL INVOLVED PERSONNEL.
============================= PERSONNEL ========================================
>> ARAMCO MC ABDULLAH ALHUMAIDI #753491 ON LOCATION.
==============================NEXT LOCATION=====================================
>> UTMN-487, KOM HELD ON 4/3/2024. STRIP OUT 100%, LOCATION 0%.
>> UTMN-1407, KOM HELD ON 4/29/2024. STRIP OUT 100 %, LOCATION 0 %.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/16/2024 YES NORMAL N/A SEASONLY 2,476 TOURLY

Company TGC RIG EMC MJH RIG ARM SLL OTH ARM

Category CTRG RIG DFMS SEC OTHR OTHR SLS VAC WSC
PERSONNEL
19 46 1 8 9 1 4 3 2
Total
AND SERVICES No. of Persons
93
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 0 0 12 0 0 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 1 of 1


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1125 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/22/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

SND-2001 @ HWYH-1125 Limited Morning Report for 06/18/2024


Objective : (K-2 DESIGN Foreman(s)AVASTHI, AVADHESH KUMAR / THAWWAB, ALI MOHAMMED
TARGETING MID-QUSAIBA Engineer KAMAL, SYED MUHAMMAD MANSOOR
D&WO Morning Report (Service Providers View) Charge #: SAND RESERVOIR) Manager MARRY, MOHAMMAD JABER
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved SND-2001 (66-19053-1125) THURAYA RIG FORMAN VSAT CONTRACTOR
Daily Onshore 0088-21677 712157 572-8255 /CLERK VSA
(0500-0500) Saudi Aramco Well Wellbores: T
Date: Tuesday 06/18/2024 HWYH-1125 (0) HWYH_1125_0 572-7270
CONTRACTOR /CLERK VSA T
804-9617 ( SANAD)

Last 24 hr operations Next 24 hr plan


L/D DP, RECONFIGURE BOP W/ 4-1/2" RAMS. P/T RAMS, RUN 4-1/2" UPPER COMPLETION.
Location Next Location
HWYH-1125 UTMN-3214
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
14,509 Size 10372 10139 Size 12,329 14,505 14,142 Top
Formations Comments
13 3/8 4 1/2 Depth
RUS 571 92' SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UMER 730 10' SHALLOWER
14509 (Date) 100 0 211 ARUM 1,495 16' DEEPER.
88.6 (03/21/2024@1400 ) LAMS 1,870 54' SHALLOWER.
AHMD 2,245 72' SHALLOWER.
SFNY 2,545 26' SHALLOWER.
BYDH 3,705 4' SHALLOWER.
MDTM 4,705 84' DEEPER
SULY 5,160 19' DEEPER
HITH 5,780 1' SHALLOWER
ABAR 6,240 70' SHALLOWE
ABBR 6,360 17' SHALLOWER
ABCR 6,490 37' SHALLOWER.
HNIF 7,464 149' TVD SHALLOWER
TQMN 7,844 106' TVD SHALLOWER.
HDRR 7,845 98' TVD SHALLOWER.
BHDR 7,996 109' TVD SHALLOWER.
DHRM 8,133 125' TVD SHALLOWER.
LFDR 8,205 127' TVD SHALLOWER.
BLFR 8,340 119' TVD SHALLOWER.
HURN 8,878 149' TVD SHALLOWER.
MRRT 9,000 139' SHALLOWER.
MNJR 9,366 140' SHALLOWER.
JILH 9,702 158' SHALLOWER.
JLDM 9,951 93' SHALLOWER.
BJDM 10,109 78' SHALLOWER.
MDJR 10,377 90' TVD SHALLOWER.
SUDR 11,202 68' TVD SHALLOWER.
SDDM 11,536 61' TVD SHALLOWER.
BSRD 11,616 4' TVD DEEPER.
KFAC 11,979 AS PROGNOSIS
KFBC 12,039 7' TVD SHALLOWER
KFCC 12,554 11' TVD DEEPER.
KFDA 12,838 3' TVD SHALLOWER.
UNZC 13,481 35' TVD DEEPER
PUZU 13,773 263' TVD DEEPER.
MQSB 13,898 180' TVD SHALLOWER.
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

POOH W/ CORETRAX ASSY & LAY DOWN ALL 5-1/2" DP TUBULARS TO SURFACE
0500 - 0530 0.5 0 EOW N CT WBCO WBCL CRW 14509 14509
RACKS.
- MONITOR WELL ON TRIP TANK.

0530 - 0700 1.5 0 EOW N CT RR DWKS RIG 14509 14509 HPJSM WITH CREW PRIOR TO SLIP DRILLING LINE.
SLIP DRILL LINE 150 FT. RESET CROWN & ROTARY SAVER.
0700 - 0730 0.5 0 EOW N CT RR TDS RIG 14509 14509
SERVICE TOP DRIVE SYSTEM

POOH W/ CORETRAX ASSY & LAY DOWN ALL 5-1/2" DP TUBULARS TO SURFACE
0730 - 1515 7.75 0 EOW N CT WBCO WBCL CRW 14509 14509
RACKS.
- MONITOR WELL ON TRIP TANK.
1515 - 1530 0.25 0 EOW N CT CIRC MPMP RIG 14509 14509
FLOW CHECK - WELL STATIC
1530 - 1630 1 0 EOW N CT HT BHA RIG 14509 14509
HPJSM - L/D CORETRAX 9-5/8" WBCO TOOLS

1630 - 1845 2.25 0 EOW N CT HT BHA RIG 14509 14509 L/D 4" PUP JT, X/O, 5 X 4-3/4" DC JTS, CORETRAX 7" WBCO TOOLS + BOT POLISH
MILL ASSY-OBSERVED GOOD MARK ON POLISH MILL.
1845 - 1930 0.75 0 EOW N CT HT PEL RIG 14509 14509
HPJSM, R/U NABORS POWER TONGS AND 2-7/8" TUBING HANDLING EQUIPMENT.

1930 - 0000 4.5 0 EOW N CT HT BHA RIG 14509 14509 L/D CORETRAX 4-1/2" WBCO ASSY: 61 JT'S OF 2-7/8" PH-6 TUBING + X/O+4-1/2"
BRUSH+4-1/2" JUNK FILTER +2-7/8" PH-6 TUBING + X/O + 4-1/2" STRING MILL +

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1125 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/22/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
4-1/2" MAGNET + 4-1/2" SCRAPER+ 4-1/2" MAGNET+ 4-1/2" STRING MILL +X/O+ 1
JT OF 2-7/8" PH-6 TUBING+ BIT SUB+ USED HUGHES 3-5/8" PDC BIT.
0000 - 0030 0.5 0 EOW N CT HT PEL RIG 14509 14509
HPJSM, R/D NABORS POWER TONGS AND 2-7/8" TUBING HANDLING EQUIPMENT.

0030 - 0130 1 0 EOW N WH RTRV WBSH RIG 14509 14509 HPJSM, M/U BAKER RETRIEVING TOOL. RIH & RETREIVE WEAR BUSHING AS PER
BAKER TECH,. L/D SAME.

0130 - 0200 0.5 0 EOW N BOP OTH BOP RIG 14509 14509 RIH WITH 5 STANDS OF 5-1/2" PICKLED DP. SECURE WELL ON BOTTOM PIPE RAM.

RECONFIGURING BOP STACK & CHANGE OUT 5-1/2" TOP PIPE RAM AND 4" TOP
0200 - 0415 2.25 0 EOW N BOP NU RAMS RIG 14509 14509
MASTER RAMS TO 4-1/2" RAMS.
- MONITOR WELL ON TRIP TANK THROUGH TBG SPOOL SIDE OUTLET VALVES.

0415 - 0459 0.75 0 EOW N BOP OTH BOP RIG 14509 14509 RIH WITH TEST PLUG & 5-1/2" TEST ASSY. SET TEST PLUG AND FLUSH BOPE
WITH WATER,
Foreman Remarks

==========================================WELL OBJECTIVE=============================================
HWYH-1125 WILL BE DRILLED AS GAS-PRODUCER IN HWYH, TARGETTING MID-QUISABA AS K-2 DESIGN.
=============================================SAFETY=========================
ARAMCO LIFE SAVING RULE CAMPAIGN -RULE # 2.VERIFYING ISOLATION BEFORE STARTING ANY WORK
SANAD 10 RULES TO LIVE BY -RULE # 2.CONDUCT GAS TESTS WHEN REQUIRED.
NGGDD SAFETY TOPIC: 4. LINE OF FIRE.
================DRILLS==================
* 2 X TRIP / BOP DRILLS.
==============================ARAMCO PERSONNEL============================
* ARAMCO CLERK DESH DEEPAK #8145640 ON LOCATION 05/15/2024.
* ARAMCO FCT MOHAMMED BUSHEHAB #818198 OFF LOCATION 06/12/2024.
* ARAMCO PDP YAZEED TAWFIQ#794637 OFF LOCATION 06/14/2024.
* ARAMCO DE KAMAL, SYED MUHAMMAD ON LOCATION 06/17/2024.
=======================RIG VISIT===============
*NONE.
================================SERVICE COMPANY PERSONNEL=========
* EMEC MUD ENGINEERS ON LOCATION.
* SLB SOLID CONTROL ON LOCATION 03/20/2024.
* SLB FRACK TANK ON LOCATION 04/21/2024.
* BKR UPPER COMPLETION ENG ON LOCATION.
========================================
* LP AUDIT TOTAL FINDINGS 22, CLOSED FINDINGS 22, OPEN 0..
* HSE GAP ANALYSIS 92.1%
* DOECD RHSEI AUDIT TOTAL FINDINGS 32, CLOSED FINDINGS 32, OPEN 0.
* DOECD WCEI TOTAL FINDINGS 4, CLOSED ITEMS 4, OPEN 0.
* 2ND QTR 3MCI AUDIT 61 TOTAL FINDINGS, 0 OPEN.
=====================NEAR MISS & SLS===================
* NONE.
=================RIG SHORTAGE =======================
* NONE.
======================RENTAL TOOLS======================
* 4.75 HMDA JAR SN#488-0004 ON LOCATION 06/03/2024 @ 17:45 HRS. P/U 06/04/2024 AT 13:00HRS. B/L ON 061/16/2024.
=================================ROP & FLAT TIME==================================
PLAN VS ACTUAL CSG SETTING DEPTHS , ROP & FLAT TIME:
** 34'' SECTION: 713' & ACTUAL: 621' (50' INTO RUS), PLANNED ROP 24.16 FPH/ ACTUAL 28.88 FPH, FLAT TIME PLAN: 1.8 DAY/ ACTUAL 2.5 DAYS ( WAIT ON WEATHER + FISHING INSIDE CSG).
** 28'' SECTION: 2367' & ACTUAL: 2295' (50' INTO AHMADI FMN), PLANNED ROP 28.38 FPH/ ACTUAL 42.65 FPH, FLAT TIME PLAN: 3.7 DAY/ ACTUAL 3.8 DAYS ( OBSTRUCTIONS WHILE RIH W/
CSG & TOP JOBS DUE TO LOSSES).
** 22'' SECTION: 4,621' & ACTUAL: 4426' (720' INTO BIYADH FMN), PLANNED ROP 55 FPH/ ACTUAL 72.2 FPH, FLAT TIME PLAN: 5.4 DAY/ ACTUAL 5.2 DAYS.
** 16'' SECTION: 10,464' & ACTUAL: 10,376' (30' INTO BJDM), PLANNED ROP 18 FPH/ ACTUAL 21.87 FPH, FLAT TIME PLAN: 7.1 DAY/ ACTUAL 8.5 DAYS.
** 12'' SECTION: 12,391' & ACTUAL: 12407' (20' INTO KFBC), PLANNED ROP 21 FPH/ ACTUAL 23.6 FPH, FLAT TIME PLAN: 6.6 DAY/ ACTUAL 13.5 DAYS.
** 8-3/8'' SECTION: 13,406' & ACTUAL: 13,634' (450' INTO KFDA), PLANNED ROP 15 FPH/ ACTUAL 55.9 FPH, FLAT TIME PLAN: 4.7 DAY/ ACTUAL 4.2 DAYS.
==================================COST OPTIMIZATION==========================
* 2 X FRAC TANKS ON LOCATION 04/13/2024.
* CLOSE LOOP SYSTEM ON LOCATION 03/20/2024.
* 100 BBLS OF 20% VDA ACID NESR SHARE WITH T-571
================================================================
TYPE OF EQUIPMENT-VACUUM TANKERS (6000 GAL).
* DRSS NUMBER -1004202584 ;DOOR/PLATE NUMBER FOR EACH EQUIPMENT -92,53,60, TOTAL HOURS 10 HOURS EACH TRUCK.
====================================================================
* NEXT WELL UTMN-3214.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 14,509 16 94 0 14,143 -135.58 -467.26 1,596.24 1.26

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
109 PCF 0 0 API 0 0 Volts 0 9.5 330,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 0 HTHP 100 0 0 0/0 WATER 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
26

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1125 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/22/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
109 PCF 0 0 API 0 0 Volts 0 9.5 330,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 WATER 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
26

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/04/2024 N/A N/A N/A SEASONAL 666 EACH TOUR DAILY

Company ZPC TGC RIG EMC MJH RIG BFL BLH RIG RIG ARM SCM MI2 ARM CRW GEP AZ1

Category CSR CTRG RIG DFMS SEC SEC FILT LHES MED OTHR OTHR PCS SCS WSC WBCS WHES WLS
PERSONNEL
6 17 41 1 9 2 5 1 1 10 2 0 13 2 1 2 4
Total
AND SERVICES No. of Persons
117
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 0 24 24 24 24 18

Operating Hours. 12 0 24 12 0 0 0 14 0 12 12 0 0 24 19 18 0

Standby/Tankers
TRUCKS/BOATS
AB-6319

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 541 44 0 2374

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2555 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/14/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

SND-2002 @ HRDH-2555 Limited Morning Report for 06/18/2024


Objective : (S-SHAPE WELL , Foreman(s)SERBU, DANIEL / KHENFER, MOHAMMED LAZHAR
D&WO Morning Report (Service Providers View) Charge #: TARGETING KHUFF-C AS Engineer ALSHEHRI, RAKAN NAIF
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23058-2555) PRIMARY TARGET AND Manager MOUSA, NEDAL ADEL
SND-2002
KHUFF-B AS SECONDARY THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: TARGET)
(0500-0500) Saudi Aramco Well 00-882-167 -771-1388 577-6114 577-9630
Date: Tuesday 06/18/2024 HRDH-2555 (0) HRDH_2555_0 CONTRACTOR /CLERK VSA T
577-9623

Last 24 hr operations Next 24 hr plan


CONT RIH 8-3/8" SLB MWD DRLG ASSY, DISPL TO 115 PCF OBM, ROTARY DRILL 8-3/8" HOLE WITH ROTARY DRILL 8-3/8" HOLE WITH HES MPD TO LP @ +/-11,690' MD/11,594' TVD (10' TVD INTO
HES MPD. KFCC), CHC, DISPL TO 127 PCF OBM, POOH.
Location Next Location
HRDH HWYH-1322
Current Depth (ft) Liner TOL MD TVD Formation Tops
11,500 Last Csg Size MD TVD Size Top
9 5/8 9506 9411 Formations Comments
Depth
BJDM 9,387 5' SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) MDJR 9,660 1' SHALLOWER
11432 (Date) 100 68 258 SUDR 10,361 6' SHALLOWER
55.4 (04/23/2024@2000 ) SDDM 10,641 4' SHALLOWER
BSRD 10,666 4' SHALLOWER
KHFF 10,978 1' SHALLOWER
KFAC 11,011 3' SHALLOWER
KFBC 11,117 6' DEEPER
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0500 - 1030 5.5 0 8 3/8 N DRLG OTH NA RIG 11432 11432
REMOVE HAL BELL NIPPLE, ADJUST ALIGNMENT & INSTALL THE BEARING ASSY.
1030 - 1300 2.5 0 8 3/8 N DRLG CIRC MPMP RIG 11432 11432
CIRCULATE TO FINGERPRINT & CALIBRATE DATA AS HAL MPD ENG.
1300 - 1500 2 0 8 3/8 N DRLG TI STDP RIG 11432 11432 9506 11432
RUN IN OPEN HOLE WITH FILLS TO BTM, NO OBSTRUCTION.

1500 - 2100 6 0 8 3/8 N DRLG CIRC MPMP RIG 11432 11432 HPJSM, DISPLACE HOLE TO 115 PCF OBM WHILE HOLDING 127 PCF ECD AT CSH
SHOE & CONT CIRC TO CONDITION MW IN/OUT 115 PCF.

2100 - 2330 2.5 0 8 3/8 N DRLG WCNT NA RIG 11432 11432 PERFORM STATIC PPT, RECORD FORMATION PRESS @ 527 PSI / 123 PCF EMW &
CIRC B/U, RECORD SCR'S.
2330 - 0130 2 0 8 3/8 N DRLG LOG LWD SDM 11432 11432 11330 11430
RELOG F/11,330' TO 11,430' AS PER GOC.

ROATRY DRILL 8-3/8" HOLE SECTION WITH 115 PCF OBM USING HAL MPD @ 126
PCF EMW.
0130 - 0459 3.5 0 8 3/8 N DRLG D TDS RIG 11432 11500
> PUMP 30 BBLS HI VIS EA STD & TAKE MWD SURVEY AFTER CONNECTION.
> MAINTAIN ECD 126 PCF, SBP=720 PSI DURING CONNECTION & 400 PSI SBP
WHILE DRLG.
Foreman Remarks

OBJECTIIVE: HRDH-2555 IS PLANNED TO BE DRILLED AS S-SHAPE WELL WITH MK-1 DEISGN, TARGETING KHUFF-C AS PRIMARY TARGET AND KHUFF-B AS SECONDARY TARGET. THE WELL IS
LOCATED IN NORTH HARADH FIELD AND WILL BE TIED-IN TO HAWIYAH GAS PLANT. THE WELL IS PLANNED TO BE COMPLETED WITH 15K CEMENTED LINER.
==========================ERP=========================
> STAGING AREA-1: N 24.25253 / E 48.98696 (1.6 KM NNE).
> STAGING AREA-2: N 24.23362 / E 48.97825 (1.1 KM SSW).
> RELIEF WELL: HRDH-1185.
> NEAREST GOSP: HRDH GOSP#2 @ 11.44 KMS S43W.
======================WELL SECTIONS =====================
* PLANNED 28'' SECTION TO 519'MD (20' INTO RUS) / ACTUAL: 490'.
* PLANNED 22'' SECTION TO 2,039'MD (50' INTO AHMD) / ACTUAL: 1,990'.
* PLANNED 16" SECTION TO 4,389'MD (50' INTO MDTM) / ACTUAL: 4,300'.
* PLANNED 12" SECTION TO 9,539'MD (30' TVD INTO BJDM) / ACTUAL: 9,512'.
* PLANNED 8375" SECTION TO 11,711'MD (+/-10' TVD INTO KFCC) / ACTUAL: .....'.
=========================CSG KPI========================
* RIG MOVE KPI: 11.02 DAYS, ACTUAL: 10.3 DAYS.
* RUN 30" CSG KPI: 3 JT/HR, ACTUAL: N/A
* RUN 24" CSG KPI: 4 JT/HR, ACTUAL: 4.8 JT/HR
* RUN 18-5/8" CSG KPI: 7 JT/HR, ACTUAL: 7 JT/HR
* RUN 13-3/8" CSG KPI: 11.5 JTS/HR / ACTUAL: 13.1 JTS/HR
* RUN 9-5/8" CSG KPI: 14 JTS/HR / ACTUAL: 14 JTS/HR (CONTROL SPEED TO AVOID SURGE).
* RUN 7" CSG KPI: 14 JTS/HR / ACTUAL: ......JTS/HR
* RUN 4-1/2" TBG KPI:14 JTS/HR / ACTUAL: .....JTS/HR.
* RUN 4-1/2" UPPER COMPLETION KPI: 13.5 JT/HR / ACTUAL: ......JT/HR
======================WELLHEAD KPI ====================
* INSTALL 24" X 26 3/4" 3M WELLHEAD KPI: 6.5 HR / ACTUAL: N/A.
* INSTALL 18 5/8" X 20 3/4" 5M WELLHEAD KPI: 5 HR / ACTUAL: 5 HR.
* INSTALL 13 3/8" X 13 5/8" 10M WELLHEAD KPI: 4 HR / ACTUAL: ...... HR.
=================VISITORS/PERSONNEL ON RIG ================
> RIG CLERK: BHUWAN GURAGAIN # 8145663 ON LOCATION SINCE 08/17/ 2023.
> SAOGDD FIELD COMPLIANCE TECHNICIAN AZWARI AHMED ID#791085 ON LOCATION 06/07/2024.
> SLB MUD ENG. FOR RHELAINT OBM ON LOCATION FROM 05/18/2024
> HALL RTTS PACKER W/ STORM VLV & OPERATOR ON LOCATION FROM 05/27/2024
> CORETRAX PBL SUB OPERATOR ON LOCATION FROM 05/30/2024.
======================RENTAL TOOLS / EQPTS=====================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2555 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/14/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

> 80 BBLS 20% VDA ACID IN SLB TANKER MIXED ON 5/13/24 AND ON RIG 05/15/2024.
> SLB MWD SN= G6411, SENSORS OFFSAT: GR @ 50.01'; D&I @ 46.98'.
> SPRAY TANKER DRSS# 1004326208- PLATE # 5194 GRA (ON LOCATION FROM 8/1/23).
> 6.5"X2.47" CAUGAR/TAQA HYDR-MECH JAR RECEIVED ON 05/20/24.
> 1 SLB BARITE SILO WITH ONE OPERATOR RECEIVED FROM T-569 AND OPERAIONNAL FROM 6/7/2024; WEIGHT SCALE NOT PROVIDED.
======================CREW SHORTAGE====================
> CREW SHORTAGE: NA.
> SAUDIZATION: 69%
========================HSE===========================
> NEAR MISS: 0, SOC 20, PTW 7, JSA 11, SWA 5, HAZARD HUNT 4.
> SAFETY DRILLS: /.
> DISCUSS SAFETY ALERTS: HSE ALERT 08-24 & 09-24 HAND & FINGER INJURY INCIDENTS.
=======================AUDITS==========================
> 1ST RHSEI ,2024 ON 7-MAY-24: 41 FINDINGS, 35 CLOSED, 6 OPEN ITEMS.
=====================================================
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
127 PCF 1 0 API 50 890 Volts 5.9 0 210,686
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2 HTHP 10 15 0 7/9 RELIANT 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 50 40 7/8 0 0 1.8
57
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
115 PCF 1 0 API 58 670 Volts 5 0 185,578
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2 HTHP 10 14 0 6/8 RELIANT 1
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 32 32 5/6 0 0 3
45

CACO3-50 MRBL-M MARBLE-FINE CAOH2 SUREMUL ECOTROL-RD STELSL50


MUD 15 ( 25KG ) 1 ( 2200L ) 1 ( 25KG ) 20 ( 25KG ) 4 ( 55GL ) 24 ( 25KG ) 15 ( 25KG )
TREATMENT STELSEALFN CACO3-25
15 ( 25KG ) 15 ( 25KG )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
5RR 11,432 11,500 DP Av DC Av Bit HHP 15 130 M423 8.375 REED
Pressure GPM Jet Vel 276.49 354.9 102 I-Row O-Row DC Location Bearings
2,700 450 160 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
S309327 SK616MB4D 6 x 14 / 0.902
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 57.5 240 260 235 3,800 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit REED 8.375 1 0.79 S309327
2 Bit Sub RIG 6.25 1 6.25 2.813 2.96 NC46 4 1/2 REG 90.78 295006
3 Pony Collar RIG 6.25 1 6.25 2.25 15.14 4" IF 4" IF 90.78 HDH30401
4 Roller Reamer RIG 8.375 1 6.5 2.25 7.55 NC50 NC50 90.78 3 POINT 21388 NC46
5 Crossover RIG 6.25 1 6.25 2.25 3.02 NC46 NC50 90.78 153011A
6 Saver Sub SDM 6.75 1 6.75 2.87 1.23 NC46 NC46 90.78 G329711
DRILL STRING 7 Measurement While Drilling (MWD) SDM 6.75 1 6.75 30.48 88.25 H7716
8 Saver Sub SDM 6.75 1 6.75 2.87 1.25 NC46 NC46 90.78 OSS1900794A
9 Float Sub SPS 6.75 1 6.5 2.5 2.4 NC46 NC46 78 TMGFS3425
10 Float Sub SPS 6.75 1 6.5 2.5 2.63 NC46 NC46 78 TMGFS3425
11 Crossover RIG 6.25 1 6.25 2.25 2.75 NC50 NC46 90.78 41432
12 Roller Reamer RIG 8.375 1 8.375 2.25 7.65 NC50 NC50 90.78 3 POINT HDH21382
13 Drillcollar RIG 6.25 21 6.25 2.875 640 NC50 NC50 90.78 SPRL LISTED
14 Hydraulic Jar SFS 6.5 1 30.25 90.78 FX850421
15 Drillcollar RIG 6.25 2 6.25 2.25 60 NC46 NC46 90.78 SPRL LISTED
16 Crossover RIG 7 1 7 2.875 2.1 XT54 NC50 90.78 212
17 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 451.71 XT54 XT54 52.51 CONV LISTED
18 Drillpipe RIG 5.5 1 5.5 4.67 0 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
06/03/2024 06/03/2024 NORMAL NA NORMAL 3,204 PINCH POINTS
MISCELLANEOUS
WHILE PICK UP
BHA.

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2555 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/14/2024 - 07/03/2024
Report ID: OPERLMTDMRREP

Company FMC TGC SDM RIG EMC SMI MJH HUD HMS RIG ARM SCM MI3 ARM

Category CSR CTRG DPDS RIG DFMS DFMS SEC MPD MLS OTHR OTHR PCS WMS WSC
PERSONNEL
3 15 2 45 1 3 8 7 4 1 3 5 4 2
Total
AND SERVICES No. of Persons
103
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 24 12 24 24 24 24 12 12 0 24 24

Standby/Tankers Others Others Others


TRUCKS/BOATS
ARAMCO P/U: DH-4867 SANAD AMBULANCE SANAD BUS SANAD PICKUP

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A 380 65 2050

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR LAHA-1 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 04/11/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

SND-2003 @ LAHA-1 Limited Morning Report for 06/18/2024


Objective : (LAHA-1 IS AN Foreman(s)FARHNA, ABDELRAHMAN OBEDALLAH MOHAMMED
D&WO Morning Report (Service Providers View) Charge #: ONSHORE, STRUCTURAL, Engineer MOUSA, FAWAZ NASSER
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved OIL WILDCAT EXPLORATION Manager BENAICHA, MOHAMED
SND-2003 (75-23888-0001)
WELL) THURAYA RIG FORMAN VSAT FAX VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 0088-216-7 77-11387 378-6451 N/A
Date: Tuesday 06/18/2024 LAHA-1 (0) LAHA_1_0 CONTRACTOR /CLERK VSA T CONTRACTOR /CLERK VSA T
CLERK: 37 8-6453 T.P. 013- 804-9624

Last 24 hr operations Next 24 hr plan


WOC, RIH TAG PLUG #1, CIRC P/T CMT PLUG #1, DISPLACE WELL TO WBM.SPOT CMT PLUGS #2 &3 &4, WOC
Location Next Location
FROM AL-KHARJ GO TO DILM TOWN. AFTER DILM DRIVE STRAIGHT 25 KM THEN TURN RIGHT. FOLLOW SIGN BOARDS *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
8,670 Last Csg Size MD TVD Size Top
9 5/8 7960 7960 Formations Comments
Depth
MRRT 2,780 41 FT SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) MNJR 2,911 144' SHALLOWER
8670 (Date) 100 0 405 JILH 4,678 57' DEEPER
58 (04/21/2024@0530 ) JLDM 4,860 47 DEEPER
BJDM 4,900 N/A
SUDR 5,930 38 DEEPER
KHFF 6,730 37 DEEPER
KFDA 7,810 AS EXPECTED
BKDC 8,000 7 SHALLOWER
BKFC 8,060 8 FT DEEPER
UBCU 8,125 31 FT DEEPER
SARH 8,220 68 FT DEEPER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0630 1.5 0 EOW N PA HT STRG RIG 8670 8670 B/O CMT LINES , POOH 12 STNDS OF 5 1/2" DP , FIRST 6 STANDS AT CONTROLLED
SPEED

0630 - 0830 2 0 EOW N PA CIRC MPMP RIG 8670 8670 REVERSED CIRCULATION 2X STRING VOLUME WITH 72 PCF OBM , RECOVED 45
BBLS OF SPACER ON SURFACE , NO CMT .
0830 - 1100 2.5 0 EOW N PA CIRC MPMP RIG 8670 8670
POOH MORE 5 STNDS , DIRECT CIRC BTU .
1100 - 0230 15.5 0 EOW N PA WOC CSG NCS 8670 8670
WOC AS PER UCA AND OBSERVE SURFACE SAMPLES

RIH WITH 3 1/2" NON METALIC CMT STINGER ON 5 1/2" DP TO TAGE CMT PLUG #1
0230 - 0430 2 0 EOW N PA HT STRG RIG 8670 8670
, WASHED DOWN FROM 6900 FT
TAGGED TOC @ 7670 FT.
0430 - 0459 0.5 0 EOW N PA CIRC MPMP RIG 8670 8670
PUMPED HVP & CIRCULATE PRIOR TO P/T CMT PLUG #1 - ON GOING @RT
Foreman Remarks

WADI LAHA-1 (LAHA-1) WELL IS AN ONSHORE, OIL WILDCAT WELL IN LAHA FIELD.

===================================LAHA-1 OBJECTIVE======================================================
LAHA-1 WELL IS AN ONSHORE, STRUCTURAL, OIL WILDCAT EXPLORATION OPPORTUNITY. THE PRIMARY OBJECTIVE OF THE WELL
IS TO EVALUATE THE HYDROCARBON POTENTIAL OF BASE KHUFF CLASTICS AND SARAH RESERVOIRS AS A PRIMARY TARGETS
====================================WELL DESIGN===========================================
CASING SETTING DEPTH:
- PLANNED 30" CONDUCTOR AT 120 FT, ACTUAL 120 FT.
- PLANNED 18 -5/8" CASING AT 2,871 FT, (50' INTO MRRT) ACTUAL 2850FT.
- PLANNED 13-3/8" CASING AT 4,823 FT, (10' INTO JLDM) ACTUAL 4848 FT.
- PLANNED 9-5/8" CASING AT 7,960 FT, (150' INTO KFDA) ACTUAL 7957 FT.
- PLANNED 7" LINER AT 8,652 FT, (500' INTO SARH) ACTUAL XXX FT.

=====================================RIG LOCATION=============================================================
DIRECTIONS: +/- 405 KM FROM DAMMAM, FROM AL-KHARJ DRIVE TO DILAM TOWN. ON DILAM- HOWTA HIGHWAY DRIVE 12 KM'S. ON RIG SIGN BOARD TURN RIGHT AND DRIVE 9 KM TO HOWTA-
RYIADH HIGHWAY. TURN RIGHT TOWARDS RIYADH AND DRIVE 23 KM. AT THE RIG SIGN BOARD JUST BEFORE THE BRIDGE TURN RIGHT AND DRIVE 1KM. AT LEFT SIDE AT THE FARM GATE PUSH
HORN. GATE MAN WILL OPEN THE GATE. DRIVE 9KM SKID ROAD TO THE RIG. THERE IS NETWORK COVERAGE WHOLE WAY TO THE RIG SITE
==================================HSE=================================================================
CONDUCT STANDDOWN MEETING WITH BOTH CREWS-DISCUSSED PERMIT TO WORK & ELECTRICAL ISOLATION

=============================== EXTRA REQUIREMENTS =================================================


** 00 HRS (00.0 DAYS)

========================================================================================================
ARAMCO CLERK NAWARAJ GURUNG ID#8145019 ON LOCATION SINCE 05/03/2024
ARAMCO FCT MOUHANNAD ON LOCATION SINCE 6/11/2024

=============================== DIESEL CONSUMPTION & WATER WELL =========================================


- DIESEL ENGINE CONSUMPTION (RIG+CAMP): DAILY 58 BBLS / TOTAL (2024): 3906 BBLS.
- WATER WELL : LAHA-801 DRILLED , ENGINE INSTALLED
========================RIG SND-2003 JOURNEY MANAGEMENT================================================
16 KM SKID ROAD LEADING TO SND-2003 HAS MOBILE SIGNAL
------------------------------------------------------------------------------------
NEXT WELL

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR LAHA-1 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 04/11/2024 - 06/27/2024
Report ID: OPERLMTDMRREP

AFLJ-7 - NEED TO EXTEND FLARE LINE DISTANCE WITH 40'.NEED TO REPOSITION MUJAHEDEEN CAMP LOCATION
WATER WELL AFLJ-801- PRODUCTION RATE 700GPM

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
72 PCF 1 0 API 66 820 Volts 2.23 0 34,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
90 2 HTHP 16 18 0 9 / 13 OBM 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 31 18 7/8 0 0 2.8
74
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
72 PCF 1 0 API 66 820 Volts 2.23 0 34,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
90 2 HTHP 16 18 0 9 / 13 OBM 0.8
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 31 18 7/8 0 0 2.8
74

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/11/2024 N/A N/A N/A N/A 4,473 PRE-TOUR MEETING

Company TGC RIG GDF MJH SGR RIG ARM NCS MI3 ARM

Category CTRG RIG DFMS SEC MLS OTHR OTHR PCS WMS WSC
PERSONNEL
18 42 1 8 2 5 2 3 8 1
Total
AND SERVICES No. of Persons
90
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-853 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/29/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

SND-2004 @ SFNY-853 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (DEVIATED SINGLE Foreman(s)ARANDIA TERAN, PABLO HECTOR / DHAFEERI, BANDAR OBAID
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved LATERAL WATER DISPOSAL Engineer MUHANNA, MESHARI HAMAD
SND-2004 (66-20017-0853)
WELL TARGETING KHFJ Manager GARNI, ABDULLAH SALEH
Daily Onshore
Wellbores: AQUIFER)
(0500-0500) Saudi Aramco Well THURAYA RIG FORMAN VSAT OTHER VSAT
Date: Tuesday 06/18/2024 SFNY-853 (0) SFNY_853_0 8821677712 272 3786463 3786464/37 86465

Last 24 hr operations Next 24 hr plan


PERFORM 2ND STAGE CMT JOB. SET AND P/T FMH PACK OFF. N/D BOP, N/U 13-5/8 TBG SPL. N/U COMPLETE BOP PT. P/U & RIH 8-1/2" C/O BHA. D/O DV, C/O SHOE TRACK.
13-5/8" 5K BOP & PT SAME.
Location Next Location
SAFANIYAH, 231 KM FROM DHAHRAN MAIN GATE SFNY-852
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,364 Last Csg Size MD TVD Size Top
9 5/8 7353 6576 Formations Comments
Depth
LAMS 4,947 4,590' TVD (14' SHALLOWER)
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) PAMU 5,750 5,247' TVD (38' SHALLOWER)
7364 (Date) 0 0 231 PLVL 6,003 5,457' TVD (36' SHALLOWER)
28.4 (05/20/2024@2000 ) AHMD 6,064 5,508' TVD (35' SHALLOWER)
CPCK 6,232 5,647' TVD (33' SHALLOWER)
WARA 6,263 5,673' TVD (30' SHALLOWER)
SFNY 6,460 5,836' TVD (26' SHALLOWER)
DAIR 7,053 6328' TVD (36' SHALLOWER)
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0600 1 0 12 1/4 N CSG CIRC MPMP RIG 7364 7364 CIRCULATE 2 X ANNULUS CAPACITY THROUGH DV-PORTS W/82 PCF OBM & FULL
RETURN. RECOVERED 150 CONTAMINATED MUD & SPACER & 40 BBL PURE CMT.

PERFORM 9 5/8" 2ND STAGE CMT JOB.


- PUMPED 100 BBL 90 PCF OILSERV SPACER AHEAD.
- OILSERV FLY MIXED & PUMPED 338 BBLS OF 101 PCF CMT SLURRY (1150 SX,
0.1% BWOC C311, 0.45% BWOC C100, 0.01 GPS C011, 1.8% BWOC BENTONITE).
- DROPPED DV CLOSING PLUG.
0600 - 0845 2.75 0 12 1/4 N CSG CMC CSG OCT 7364 7364
- DISPLACED CMT W/ TOTAL 351 BBLS (10 BBL CMT+ 20 BBL SPACER + 321 BBL
OBM).
- FDP 800 PSI, BUMP DOWN PLUG & CLOSED DV W/ 2400 PSI, HOLD FOR 5 MIN.
- BLEED OFF PRESSURE (NO BACK FLOW)
- RECOVERED 150 BBLS SPACER & 40 BBLS CMT AT SURFACE.
- CMT IN PLACE @ 08:15 HRS.

0845 - 0945 1 0 12 1/4 N WH OTH NA RIG 7364 7364 R/D OILSERV CMT HEAD, HARD LINES & CMT MANIFOLD. REALEASE FMH RUNNING
TOOL. L/D FMH RUNNING TOOL & LANDING JNT.
0945 - 1030 0.75 0 12 1/4 N CSG CIRC MPMP RIG 7364 7364
DRAIN AND FLUSH BOP STACK & WELL HEAD & GATE VLVS WITH WATER.

CONDUCTED MAN DOWN (INJURY) DRILL ON RIG FLOOR WITH MEDICAL


1030 - 1100 0.5 0 12 1/4 N CSG SDR1 NA RIG 7364 7364 EVACUATION BY STRETCHER USING A CRANE. IP (DUMMY 120 KG) TRANSFERRED
FROM RIG FLOOR TO CLINIC. HELD STAND DOWN CRITIC MEETING WITH RIG CREW
& DISCUSS THE AREA OF IMPROVEMENT.

1100 - 1145 0.75 0 12 1/4 N CSG HT PEL NRC 7364 7364 R/D NAPESCO POWER TONGS, CRT & ALL CSG RUNNING EQUIPMENT. CLEAN RIG
FLOOR.

1145 - 1300 1.25 0 12 1/4 N WH OTH NA RIG 7364 7364 P/U & M/U CAMERON WASH TOOL ASSY, FLUSH WELLHEAD AREA WITH WATER,
LAY DOWN JETTING TOOL.

P/U CAMERON 9-5/8" PACK OFF ASSEMBLY & RIH TO SET PACK OFF.
1300 - 1515 2.25 0 12 1/4 N CSG SET FMH CAM 7364 7364 - LAND PACK OFF & PT SEALS TO 3,000 PSI FOR 10 MINS, OK.
- LOCK PACK OFF & PERFORM PULL TEST TO 20 KLBS, OK.
- RELEASE PACK OFF RUNNING TOOL, POOH & L/D TOOLS.

CONDUCTED MAN DOWN (INJURY) DRILL ON RIG FLOOR WITH MEDICAL


1515 - 1545 0.5 0 12 1/4 N BOP SDR1 NA RIG 7364 7364 EVACUATION BY STRETCHER USING A CRANE. IP (DUMMY 120 KG) TRANSFERRED
FROM RIG FLOOR TO CLINIC. HELD STAND DOWN CRITIC MEETING WITH RIG CREW
& DISCUSS THE AREA OF IMPROVEMENT.

HPJSM. N/D FLOW LINE, BELL NIPPLE & 13-5/8" 5K CLASS "A" BOP STACK.
1545 - 1745 2 0 12 1/4 N BOP ND BOP RIG 7364 7364 - BARRIERS IN PLACE (UN-PERFORATED CEMENTED 9 5/8" CASING, CIW PACK-OFF
ASSY, MUD HYDROSTATIC).

1745 - 1945 2 0 12 1/4 N WH NU WH DEL 7364 7364 INSTALL 13-5/8" 3M X 13-5/8" 3M DELTA TBG SPOOL & P/T CAVITY & SEALS @
2,400 PSI FOR 10 MINS EACH - OK.
1945 - 2145 2 0 12 1/4 N BOP NU BOP RIG 7364 7364
HPJSM, N/U 13-5/8" 5K CLASS A BOP STACK & RELATED EQUIPMENT.
2145 - 2245 1 0 12 1/4 N BOP NU BNIP RIG 7364 7364
N/U BELL NIPPLE & FLOW LINE, INSTALL MOUSE HOLE

2245 - 0045 2 0 12 1/4 N BOP OTH BOP RIG 7364 7364 P/U & M/U BOP TEST PLUG ASSY. FLUSH ALL BOP COMPONENTS & FUNCTION
TEST BOP FROM ALL CONTROL PANELS-OK.
0045 - 0459 4.25 0 12 1/4 N BOP BOPT BOP RIG 7364 7364

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-853 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/29/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
HOLD PJSM. P/T 13-5/8" 5M BOP STACK AND RELATED EQUIPMENT AS PER
ARAMCO STANDARD TO 300/3000 PSI...ONGOING @RT.
Foreman Remarks

==================================SFNY-853 WELL OBJECTIVE ================================================


SFNY-853 WILL BE DRILLED AS A DEVIATED SINGLE LATERAL WATER DISPOSAL WELL TARGETING KHFJ AQUIFER. THE WELL TO BE DRILLED TO
7,954 FT MD/7,063 FT TVD. THE WELL TO BE COMPLETED WITH 7" PERFORATED CEMENTED LINER AND 7" TUBING TIED BACK TO SURFACE.
FLOWBACK AND INJECTIVITY TESTS WILL BE PERFORMED.

============================ARAMCO PERSONNEL ON LOCATION======================================


- MATERIAL EXPEDITOR MESFER AL-SHAMRANI ID#8411032 ON LOCATION SINCE 06/11/2024.
- ARAMCO FCT MOHAMMED ALSAIF ID#791458 ON LOCATION SINCE 06/10/2024.

================================SAFETY======================================================

================================DRILLING MUD RECYCLEING========================================


- TOTAL MUD RECEIVED: 4,900 BBL WBM + 5,600 BBL OBM TOTAL MUD SHIPPED: 700 BBLS OBM

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 7,364 34.3 284.3 0 6,585 205.43 -797.55 2,702.03 0.73

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 2 0 API 62 760 Volts 7.07 0 50,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 2 HTHP 20 21 0 14 / 17 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 30 18 13 / 14 0 0 0
71
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
82 PCF 2 0 API 62 760 Volts 7.07 0 50,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 2 HTHP 20 21 0 14 / 17 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 30 18 13 / 14 0 0 0
71

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/18/2024 06/18/2024 NORMAL N/A SEASONAL 3,189 PTSM

Company NRC TGC WDV SDM RIG GDF MJH RIG ARM OCT ARM CAM DEL

Category CSR CTRG DV DPDS RIG DFMS SEC SEC OTHR PCS WSC WHES WHES
PERSONNEL
4 16 2 4 42 2 7 2 2 4 2 2 2
Total
AND SERVICES No. of Persons
91
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 12 12

Operating Hours. 4 0 4 0 24 24 24 24 12 4 24 12 12

Standby/Tankers Others
TRUCKS/BOATS
PU DH-7559 RIG AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 N/A N/A N/A N/A 500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR USKR-9 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 03/15/2024 - 08/07/2024
Report ID: OPERLMTDMRREP

SND-2005 @ USKR-9 Limited Morning Report for 06/18/2024


Objective : (THE PRIMARY Foreman(s)MEZOUAR, IBRAHIM / BOURENANE, ABDELHAFID
D&WO Morning Report (Service Providers View) Charge #: OBJECTIVE IS TO EVALUATE Engineer FOSTER, HERSCHEL SENLEY
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved THE HYDROCARBON Manager BENAICHA, MOHAMED
SND-2005 (75-23767-0009)
POTENTIAL IN HANIFA & JILH THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: DOLOMITE RESERVOIR)
(0500-0500) Saudi Aramco Well 0088216777 12705 578-8525 578-8528
Date: Tuesday 06/18/2024 USKR-9 (0) USKR_9_0 CONTRACTOR /CLERK VSA T
804-9647

Last 24 hr operations Next 24 hr plan


DRILL 8''3/8 HOLE SECTION DRILL 8''3/8 HOLE SECTION TO+/- 13,576' (10' INTO JILH).
Location Next Location
773 KM F/DMG TO SHUBAYTAH, 80 KM BEFORE SHAYBAH GATE, GO RIGHT, 113 KM ON SKID ROAD, RIGHT 2 KM *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,870 Last Csg Size MD TVD Size Top
9 5/8 10970 10970 Formations Comments
Depth
AHMD 4,700 7' LOW
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SHUB 6,084 8' HIGH
12360 (Date) 100 510 584 SHBR 6,200 NOT IN PROGRAM
79.8 (03/30/2024@1100 ) BYDH 6,412 5' HIGH
BYDR 6,440 NOT IN PROGRAM
BBDR 6,939 NOT IN PROGRAM
BUWB 7,157 6' HIGH
BWBR 7,330 NOT IN PROGRAM
CRLD 7,417 4' HIGH
MDTM 7,480 NOT IN PROGRAM
YAMM 7,555 NOT IN PROGRAM
URTR 7,595 6' HIGH
SULY 8,092 6' HIGH
HITH 8,580 20 FT HIGH
ABCR 9,250 13' HIGH
ABDR 9,340 11' HIGH
UJBR 9,560 14' HIGH
HNIF 10,230 7' HIGH
HDRR 10,550 9' HIGH
BHDR 10,710 21' DEEP
UFDR 11,170 2' HIGH
DHRM 11,234 1' HIGH
LFDR 11,365 9' HIGH
DRMS 12,030 11' HIGH
MRRT 12,589 79' DEEP
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

MOTOR DRILL 8"3/8 HOLE SECTION W/ 113 PCF INNOV OBM TO 12,720' W/100%
0500 - 1800 13 0 8 3/8 N DRLG DMR MMOT SPS 12360 12650 RETURNS.
* WASH UP & REAM DOWN PRIOR TO CONNECTION.
* FINGER PRINT EACH CONNECTION.
1800 - 1830 0.5 0 8 3/8 N DRLG RR TDS RIG 12650 12650
HPJSM, TOP DRIVE SERVICE.

MOTOR DRILL 8"3/8 HOLE SECTION W/ 113 PCF INNOV OBM TO 12,870' W/100%
RETURNS.
1830 - 0330 9 0 8 3/8 N DRLG DMR MMOT SPS 12650 12870 * WASH UP & REAM DOWN PRIOR TO CONNECTION.
* FINGER PRINT EACH CONNECTION.
* ROTARY MODE (100%),
* LAST SURVEY AT 12,731' INC= 1.22 DEG.
0330 - 0459 1.5 0 8 3/8 N DRLG SURV MWD SPS 12870 12870
CUMULATIVE TIME TO TAKE SURVEY AND WASH UP & REAM DOWN.
Foreman Remarks

USAYKIRAH-9 IS A GAS DELINEATION WELL, THE PRIMARY OBJECTIVE OF WHICH IS TO EVALUATE THE HYDROCARBON POTENTIAL IN HANIFA AND JILH DOLOMITE RESERVOIRS NORTH OF USKR-
6. THE SECONDARY OBJECTIVE IS THE UPPER FADHILI RESERVOIR.
*

CASING SETTING DEPTH:


DRILL 34" HOLE TO +-200' - ACTUAL 208'
DRILL 28" HOLE TO +-1,221' 50' INTO RUS FORMATION - ACTUAL 1,238'.
DRILL 22" HOLE TO +-4,743' 50' INTO AHMADI FORMATION. ACTUAL 4,750'.
DRILL 16" HOLE TO +-8,118' 50' INTO SULAY FORMATION. ACTUAL 8,112'.
DRILL 12" HOLE TO +-10,939' 250' INTO BASE HADRIYA. ACTUAL 10,980'.
DRILL 8 3/8" HOLE TO +-13,596' 10 FT INTO JILH. ACTUAL XXXX'
DRILL 5-7/8'' HOLE TO +- 14,177' NO MORE THAN 10' OF ANHYDRITE. ACTUAL XXXX',
*

* ARAMCO GEOLOGIST ABDULRAHMANE SAFE ID# 289556 ON LOCATION SINCE 6/8/2024.


* ARAMCO GEOLOGIST JABER AL MOHRIG ID# 752516 ON LOCATION SINCE 6/7/2024.

* OIL SERVE HMJ DRILLING JAR SN: HMJ-675-244 & HMJ-675-243 ON LOCATION AT 06-MAY-2024.
* MT6-675-046-6.75" MECHANICAL THRUSTER TAQA ON LOCATION , JUNE 7 2024

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR USKR-9 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 03/15/2024 - 08/07/2024
Report ID: OPERLMTDMRREP

* LITHOLOGY: LIMESTONE 100%


* MAX GAS: 0.4%

*WATER WELL IN USE IS USKR-801.

*UPCOMING WELLS ARE: USKR-11.


*

*NEAREST ARAMCO FACILITY - SHAYBAH CLINIC/CAMP - 195 KM FROM LOCATION. RIG SND-2005 HAS MEDIC ON LOCATION.
********************************* RIG SAND-2005 JOURNEY MANAGEMENT *******************
-CREATE JOURNEY MANAGMENT PLAN BEFORE LEAVING YOUR BASE.
-ALL CARS SHOULD HAVE SUPPLIE OF DRINKING WATER & CAR SURVIVAL KIT.
-110 KM SKID ROAD LEADING TO RIG SND-2005, SKID ROAD HAS NO MOBILE SIGNAL.(NEED THURAYA PHONE), BEFORE ENTERING SKID ROAD CALL 0138049647 RIG TEL.
-NO RADIO COVERAGE FOR RIG SND-2005, USKR-09
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 12,447 1.01 13.78 94 12,436 69.61 -3.7 228.71 0.35
DAILY SURVEY 0 12,542 0.97 16.34 95 12,531 70.09 -3.57 230.27 0.06
0 12,637 1.15 15.75 95 12,626 70.61 -3.42 231.93 0.2
0 12,731 1.22 19.13 94 12,720 71.18 -3.25 233.76 0.1

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
113 PCF 1 0 API 54.6 515 Volts 4.7 0 254,216
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
188 2.2 HTHP 14.2 22 0 9 / 17 INOVRT 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 56 31.2 7/9 0 0 3.8
66
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
113 PCF 1 0 API 54.6 495 Volts 4.7 0 254,216
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
188 2.6 HTHP 14.4 21 0 9 / 17 INOVRT 0.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 56 31 7/8 0 0 4.2
67

BARITE MRBL-M CACO3-25 CACO3-50 BDF 513 STELSL50 CAOH2


MUD 14 ( 5000L ) 3 ( 2200L ) 20 ( 55LB ) 24 ( 55LB ) 12 ( 50LB ) 24 ( 55LB ) 10 ( 55LB )
TREATMENT MRBL-F LESUPERMUL STELSEALFN S-SCAV S
2 ( 2200L ) 6 ( 55GL ) 19 ( 50LB ) 20 ( 50LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
10 11,230 12,870 DP Av DC Av Bit HHP 35 60 M433 8.375 SMT
Pressure GPM Jet Vel 337.94 -6,390.76 124 I-Row O-Row DC Location Bearings
4,200 550 170 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
SM3513 ZR813V2C 4 x 12 / 4 x 14 / 1.043
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 118.2 300 310 295 5,000 113
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
78

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 8.375 1 0.82 6-5/8" REG SM3513
2 Mud Motor SPS 6.75 1 6.75 31.09 80 13042957
DRILL STRING 3 Measurement While Drilling (MWD) SPS 6.75 1 6.75 32.74 16 13203466
4 Float Sub RIG 8 1 8 2.875 7 6 5/8 REG 6 5/8 REG 0 13546979
5 PBL (Multiple Activation By Pass) SAM 6.75 1 6.75 2.813 10.75 NC50 NC50 80 HYD675SBP64
6 Crossover RIG 6.75 1 6.75 2.875 3 XT54 NC46 80 ON FILE
7 Roller Reamer RIG 8.375 1 6.625 1.9 0.721 NC50 NC50 80 3 POINT ON FILE
8 Drillcollar RIG 6.25 21 6.25 2.875 642.52 NC46 NC46 80 SPRL ON FILE
9 Hydro-Mechanical Jar OJR 6.75 1 8 31.06 80 MJ675-244
10 Drillcollar RIG 8.5 2 8.5 2.812 60.51 6 5/8 REG 6 5/8 REG 164.8 SPRL
11 Crossover RIG 6.75 1 6.75 2.875 2.65 XT54 NC46 80 ON FILE
12 Drillpipe RIG 5.5 1 5.5 4.67 30 XT54 XT54 24.7 XD105 PREMIUM ON FILE

MISCELLANEOUS BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR USKR-9 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 03/15/2024 - 08/07/2024
Report ID: OPERLMTDMRREP

06/07/2024 06/07/2024 NORMAL N/A HOT 3,072 PRE TOUR

Company TGC SPS RIG BAR EMC MJH XLG RIG ARM SCM RIG MI2 OTH ARM SAM

Category CTRG DPDS RIG DFMS DFMS SEC MLS OTHR OTHR PCS RENT SCS VAC WSC WBCS
PERSONNEL
17 5 39 2 1 3 8 11 2 3 3 1 10 2 1
Total
AND SERVICES No. of Persons
108
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
AB-6554

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 500 681 184 77 1150

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNSY-2 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 03/29/2024 - 07/29/2024
Report ID: OPERLMTDMRREP

SND-2006 @ MNSY-2 Limited Morning Report for 06/18/2024


Objective : (GEOTHERMAL- Foreman(s)ATOUSSI, YACINE / KHURAIM, ALHASSAN HUSSAIN
WILDCAT TO EVALUATE THE Engineer ALBAR, HAMZH ABDULLAH
D&WO Morning Report (Service Providers View) Charge #: GEOTHERMAL POTENTIAL IN Manager HARBI, MAGBEL MENAWER
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved SND-2006 (75-23875-0002) THE WEST COAST ) THURAYA RIG FORMAN VSAT CONTRACTOR
Daily Onshore 882-167-77 1-2722 013-577-61 16 /CLERK VSA
(0500-0500) Saudi Aramco Well Wellbores: T
Date: Tuesday 06/18/2024 MNSY-2 (0) MNSY_2_0 013-577-61 17
CONTRACTOR /CLERK VSA T
013-804-96 46

Last 24 hr operations Next 24 hr plan


CHC, DISPLACE TO 85 PCF WBM, REMOVE MPD BEARING, POOH W/8-3/8" DRLG ASSY, R/U W/L WIRELINE OPERATION AS PER PROGRAM, CONDITION TRIP
EQUIPMENT, W/L RUN#1
Location Next Location
DRIVE 7 KM FROM SAUDI ARAMCO JAZAN REFINERY, TAKE RIGHT 6 KM SKID ROAD. *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
8,260 Last Csg Size MD TVD Size Top
9 5/8 6497 6497 Formations Comments
Depth
GHAW 3,140 185 FT DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
8260 (Date) 100 0 1288
54.6 (04/24/2024@1400 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0630 1.5 0 8 3/8 N DRLG CIRC MPMP RIG 8260 8260 SWEEP HOLE WITH 50 BBL HI-VIS AND CIRCULATE HOLE CLEAN WITH 76 PCF WBM
MAINTAINING 85 PCF EMW THRU MPD EQUIPMENT. 100% RETURN

DISPLACE HOLE TO 85 PCF NON DAMAGING POLYMER KILL MUD MAINTAINING 85


0630 - 0915 2.75 0 8 3/8 N DRLG CIRC MPMP RIG 8260 8260
PCF EMW THRU MPD EQUIPMENT AND FOLLOWING MPD DISPLACEMENT STEPS.
100% RETURN
0915 - 0945 0.5 0 8 3/8 N DRLG CIRC MPMP RIG 8260 8260
FLOW CHECK THRU MPD EQUIPMENT - WELL STATIC
0945 - 1145 2 0 8 3/8 N DRLG ST STDP RIG 8260 8260 8260 6497
TRIP OUT W/ 8-3/8" DRLG ASSY THRU RCD BEARING TO 9-5/8" SHOE. HOLE SLICK
1145 - 1215 0.5 0 8 3/8 N DRLG OTH NA RIG 8260 8260
FLOW CHECK THRU MPD EQUIPMENT - WELL STATIC
1215 - 1415 2 0 8 3/8 N BOP ND RCD WUD 8260 8260
PJSM, REMOVE WFD BEARING ASSY & RIG UP BELL NIPPLE, FLOW LINE
1415 - 1545 1.5 0 8 3/8 N DRLG TO STDP RIG 8260 8260 6497 1211
POOH WITH 8-3/8" DRLG ASSY ON 5-1/2" STD DP
1545 - 1615 0.5 0 8 3/8 N DRLG OTH NA RIG 8260 8260
FLOW CHECK - WELL STATIC
1615 - 2000 3.75 0 8 3/8 N DRLG HT BHA SDM 8260 8260
POOH TO SURFACE AND L/D LWD/MWD AND BIT

2000 - 2030 0.5 0 EOW E LOG PJSM NA RIG 8260 8260 PJSM & DISCUSS WIRELINE OPERATION PROCEDURE & HAZARDS AND RISKS
ASSOCIATED.
2030 - 2200 1.5 0 EOW E LOG OTH NA HWP 8260 8260
RIG UP HALLIBURTON WIRELINE EQUIPMENT

HALLIBURTON W/L RIG UP RUN#1 LOGGING TOOLS: ACRT / BHPT / MSFL / XSI /
ICT / IDT / GR (RESISTIVITY/TEMPRATURE/MICRO RESISTIVITY / SONIC / CALIPER /
NAIGATION / GAMMA RAY ).
2200 - 2330 1.5 0 EOW E LOG OTH NA RIG 8260 8260 * TOOL LENGTH : 153.81 FT. MAX OD : 7.25". TOOL WEIGHT IN AIR : 3,390.91
LBS.
* MAX OPERATING TEMPERATURE : 350 DEG F - MAX OPERATING PRESSURE : 20 K
PSI.
* W/L OD : 0.49", MAX OVERPULL 15000 LBS.

HALLIBURTON W/L LOGGING RUN#1 ACRT - BHPT - MSFL - XSI - ICT - IDT - GR.
2330 - 0459 5.5 0 EOW E LOG LOG WLT HWP 8260 8260 0 6497
* RIH TO CASING SHOE
* MONITORING HOLE THRU TRIP TANK.
Foreman Remarks

THE OBJECTIVE OF MNSY-2 WELL IS TO EVALUATE THE GEOTHERMAL POTENTIAL OF THE BASIN, WHICH INCLUDES ESTABLISHING RESERVOIR PRESENCE WITH HIGH WATER FLOW POTENTIAL,
EVALUATING THERMAL PROPERTIES OF THE TARGET FORMATION (RESERVOIR AND FLOWING WELL HEAD TEMPERATURES), EVALUATE SEAL CAPACITY, AND TEST THE INJECTIVITY OF
GHAWWAS FORMATION.
====================================================================================================
- 30" CASING POINT @ 205'.
- 24" CASING POINT @ 1,195'.
- 18-5/8" CASING POINT @ 3,185' (45 FT INTO GHAWWAS).
- 13-3/8" CASING POINT @ 4,797' (+/- 200 FT ABOVE THERMOCLINE DEPTH)
- 9-5/8" CASING POINT @ 6,497'
- 7" LINER POINT PLANNED @ 8,450' (TD +/-100 FT ABOVE MNSY)
=================================EXTRA REQUIREMENT====================================================
* 16" OPEN HOLE LOGGING : 33.5 HRS.
* CIRC SAMPLE UP TO CONFIRM TD: 1.25 HRS
====================================================================================================
HSE TOPICS:HAZARDS, RISKS AND CONTROLS. EDD CAMPAIGNS. SANAD PROCEDURE TOPIC OF THE WEEK. TEN RULES TO LIVE BY. LIFE SAVING RULES. SANAD FLEET HSE EVENTS. HAND AND

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNSY-2 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 03/29/2024 - 07/29/2024
Report ID: OPERLMTDMRREP

FINGER SAFETY. SWA BY CREW MEMBERS. SSE & MENTORING PROGRAM. HEALTH AWARENESS. HAZARD HUNTS. HSE ALERTS & LESSONS LEARNT. HAZARDS AND RISKS RELATED TO MAKING
CONNECTIONS, WORKING AT HEIGHTS IN GENIE MAN-LIFT
HSE ALERT DISCUSSED : HSE ALERT 70-24 - PIPE HANDLER MAIN ARM UNCONTROLLED DECENT
====================================================================================================
PCI 2024 OPEN ITEMS: SAFETY P2: 2, P3: 2, WCI: 0, OPT P2: 1.
====================================================================================================
ARAMCO CLERK ABDUL MAJEED SHIEK UDUMAN ID#8544445 ON LOCATION ON 2/4/2024.
ARAMCO GEOLOGIST MISFER ALGHAMDI ON LOCATION SINCE 6/02/2024.
ARAMCO GEOLOGIST RAKAN KHATTAB ON LOCATION SINCE 6/6/2024.
====================================================================================================
BAKER MUD ENGINEER ON LOCATION.
RENTAL SRACO CAR PLATE#VTR-9008 DRIVER ID#8981189 ON LOCATION SINCE 3/26/2024
NOV CUTTING'S CLOSED LOOP EQUIPMENT AND CREW ON LOCATION ON 4/14/2024
SLB CEMENT UNIT & CREW ON LOCATION 4/14/2024.
GEOLOG STANDARD MUD LOGGING CREW AND EQUIPMENT ON LOCATION ON 4/16/2024
SANAD ADDITIONAL TANKS OPERATIONAL ON 4/28/2024
NOV CENTRIFUGE ON LOCATION SINCE 05/09/2024.
CORTREX PBL 2 X 7" ON LOCATION SINCE 5/25/204.
HAL LOGGING CREW AND EQUIPMENT ON LOCATION.
NOV 2 X 6-1/2" HMJ ON LOCATION
ACID ON LOCATION SINCE 5/24/2024.
BGP CREW ON LOCATION ON 06/16/24 AT 18:00 HRS.
====================================================================================================
LAST FORMATION 8250'-8260': SANDSTONE (50%), CLAYSTONE (50%), ANHYDRITE (TR%)
====================================================================================================
10 EA VACUUM TANKERS ESTIDAMA & ALFAHED COMPANY (GEMS JUHFA FACILTY )
TOTAL VACUUM TRUCKS LOADS / BBLS TO DATE: 75 LOADS/ 7500 BBL TOTAL TRANSPORTED.
DRSS#1004268402 PLATE#9294 ROC SPRY TRUCK
====================================================================================================
- WATER WELL MNSY-801 OPERATIONAL.
- WATER WELL MNSY-802 OPERATIONAL.
- 4 RAW WATER TANKERS ON LOCATION. DISTANCE TO CUC CONTRACTOR WW 25 KM.
- TOTAL TRIPS= 856 TRIPS.
====================================================================================================
NEXT WELL JZSO-2: READY, KOM ON 6/12/2024, PLASTIC LINER NOT INSTALLED.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 8,260 1.6 130 0 8,260 -2.79 4.17 16.47 0.45

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 2 3.8 API 2 0 Volts 3.36 9.9 27,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 19.6 HTHP 80 34 0 10 / 12 PERFLOW 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 40 18 9 / 10 7.5 320 0
94
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 2 3.8 API 2 0 Volts 3.36 9.9 27,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 19.6 HTHP 80 34 0 10 / 12 PERFLOW 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 40 18 9 / 10 7.5 320 0
94

MUD PTS200 CAUST GLYCOL-MEG TKL


TREATMENT 1 ( 55GL ) 3 ( 25KG ) 4 ( 55GL ) 8 ( 5GL )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/04/2024 TRIP CALM N/A SEASONAL 3,036 PRE TOUR

Company GOS RIG BDF MJH NOJ SDM WUD RO1 VRA RIG ARM SCM OTH ARM CRW HWP

Category CTRG RIG DFMS SEC JST LWD MPD MLS OTHR OTHR OTHR PCS VAC WSC WBCS WLS
PERSONNEL
15 44 2 8 0 3 7 13 5 13 4 3 1 2 0 11
Total
AND SERVICES No. of Persons
131
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 0 24 24 24 24 24 24 24 24 24 0 24

Operating Hours. 0 24 24 0 12 12 24 24 24 12 12 0 12 24 12 8

Standby/Tankers
TRUCKS/BOATS
ab5176

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 470 500 250 2200

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MNSY-2 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 03/29/2024 - 07/29/2024
Report ID: OPERLMTDMRREP

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SAHB-130400 EXPLORATION DRILLING-1 BI-1514
Print Date: 06/18/2024 06:21 06/04/2024 - 09/13/2024
Report ID: OPERLMTDMRREP

SND-2007 @ SAHB-130400 Limited Morning Report for 06/18/2024


Objective : (SAHB130400_1 KASHKAL, MOSTAFA ABDELHAMIED / BROWN, JESSIE LAVELLE
Foreman(s)
IS RE-ENTRY SIDETRACK ODIS
D&WO Morning Report (Service Providers View) Rig Charge #: HORIZONTAL WELL Engineer ZHANG, HUA
Copyright 2024 Saudi Aramco. All Rights Reserved SND-2007 (81-24008-4240) TARGETING TIGHT SARAH Manager HAZAWBAR, ALHASSAN FARIS
Daily Onshore FORMATION RESERVOIR .) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores:
8821677712 074 577-6134 875-6048
Date: Tuesday 06/18/2024 SAHB-130400 (0) SAHB_130400_0
FAX VSAT CONTRACTOR /CLERK VSA T
875-6078 577-6133

Last 24 hr operations Next 24 hr plan


GENERAL R/U ON WELL SAHB-130400_1. GENERAL R/U ON WELL SAHB-130400_1.
Location Next Location
FROM SASCO STATION OF HARAD AL-KHARAJ RD, GO 3KM TURN RIGHT OVER THE BRIDGE, FOLLOW RIG SIGN BOARDS MNHZ-3
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
0 Size 17175 17175 Size 10,383 17,390 17,390 Top
Formations Comments
4 1/2 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 100 0 269
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

GENERAL RIG UP ON WELL SAHB-130400_1


CONDUCT DAILY MEETING WITH RIG CREWS.

- HYDRO TEST MUD TANKS-COMPLETED.


- INSTALLING FLARE LINES TO GAS BUSTER.
- R/U SERVICE LOOP AND CONNECT POWER TO TDS.
- BUILD BOPS AND INSTALL KILL AND CHOKE LINES- IN PROGRESS.
- INSTALL PANIC LINES TO CHOKE MANIFOLD.
- HOOK UP HYDRAULIC LINES TO CHOKE MANIFOLD VALVES.
- HOOK UP KELLY HOSE ON TDS.
0500 - 0459 24 0 PRE N RM RU NA RIG 17400 17400 - INSTALL VALVES ON TDS.
- PRESSURE TEST SURFACE LINES TO 5K ALL TESTED GOOD.
- INSTALL IRON ROUGHNECK ON RIG FLOOR.
- SET PRAGMA CATWALK IN PLACE.
- INSTALL RIG TONGS ON FLOOR.
- R/U TRANSFER LINES TO CMT TANKS & TEST FOR LEAKS-IN PROGRESS.

>> RIG UP: 90 %

ESTIMATED SPUD DATE : 06/19/ 2024.

Foreman Remarks

* SAHB-130400_0-1 IS A RE-ENTERY HORIZONTAL APPRAISAL WELL TARGETING TIGHT SARAH RESERVOIR IN THE NORTHERN PART OF SAHBA CORE AREA TO DELINEATE THE LATERAL EXTENT,
DELIVERABILITY AND REPEATABILITY OF THE RESERVOIR AND ADVANCE THIS AREA FOR PILOT AND DEVELOPMENT TO MEET THE GAS TARGET. THE PROPOSED TOTAL DEPTH FOR SAHB-
130400_0-1 HORIZONTAL WELL IS 21,151 FEET (MD) WITH AN EFFECTIVE LATERAL LENGTH OF 4,000 FT. AFTER REACHING TD.
==========================================================
* 269 KM F/ DHARAN MAIN GATE.
* JOURNEY MANAGEMENT: DRIVE FROM SACO STATION OF HARAD AL-KHARAJ RD GO 3KM THEN TURN RIGHT OVER THE BRIDGE AND FOLLOW RIG SIGN BOARDS.CALL SND-2007 MEDIC AT 013-
804-9651 OR ARAMCO OFFICE AT 013-577-6134/013-577-6133 PRIOR TO TURNING OFF MAIN BLACKTOP ROAD (HARADH ROAD). PROVIDE MEDIC/CLERK - NAME OF COMPANY, NUMBER OF
PERSONNEL, COLOR OF VEHICLE AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL.
===================================== SURFACE COORDINATE===================
- N-2684444.38, E-269297.66
================================SAFETY DATA===============================
- JSA REVISED: 00, JSA REVIEWED 08, PTW:06, LOTO:01.
- TOTAL SOC'S: 28, STOP WORK: 08, HH: 01, NM: 00, DRILL: 00.
- INHOUSE AUDIT - TOTAL FINDINGS: 72, CLOSED: 60, OPEN: 12.
- RHSEI 2024 - TOTAL FINDINGS: 37, CLOSED: 37, OPEN: 0.
- WCE 2024 - TOTAL FINDINGS: 7, CLOSED: 7, OPEN: 00.
============================ARAMCO PERSONNEL==========================
- RIG CLERK MOHAMED AZARUDEEN BADGE # 8263356 ON LOCATION SINCE 05/26/24.
=================================RENTAL TOOLS==========================
- N/A.
==============================WELLSITE RENTAL EQUIPMENT===================
- 1 X ROBA AL-SAMAH SPRAY WATER TANKER ON LOCATION SINCE 01/08/24, DOOR #775.
==============================WELL HISTORICAL DATA========================
- 24" CSG SHOE @ 545'
- 18-5/8" CSG SHOE @ 2,672'
- 13-3/8" CSG SHOE @ 5,274'
- 9-5/8" CSG SHOE @ 10,784'
- 7" LINER SHOE @ 17,390' AND TOP LINER @ 10,383'.
- 4-1/2" LOWER COMPLETION SHOE @ 17,175'.
- 4-1/2" UPPER COMPLETION@ 14,157'.
=======================================================================
- NEXT CSG: 4-1/2" SHOE AT 21,151' MD / 16,666' TVD.
- TARGET ENTRY: KOP @ 13,971' MD, LP @ 17,151' MD/16,640' TVD; WELL TD: 21,151' MD/16,666' TVD.
=======================================================================

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SAHB-130400 EXPLORATION DRILLING-1 BI-1514
Print Date: 06/18/2024 06:21 06/04/2024 - 09/13/2024
Report ID: OPERLMTDMRREP

- WATER WELLS -SAHB-802 & SAHB-804.


DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A MILD N/A SEASONAL 2,100 2X DAILY SAFETY
MEETING

Company GOS RIG SMI MJH RIG ARM OTH ARM

Category CTRG RIG DFMS SEC OTHR OTHR VAC WSC


PERSONNEL
16 45 1 8 18 1 1 2
Total
AND SERVICES No. of Persons
92
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24

Operating Hours. 0 24 12 0 24 24 10 24

Standby/Tankers
TRUCKS/BOATS
DH-2398

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 500 378 202 0 280

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1806 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/07/2024 - 08/24/2024
Report ID: OPERLMTDMRREP

SND-2008 @ HRDH-1806 Limited Morning Report for 06/18/2024


Objective : (DE-COMPLETE, Foreman(s)ADEBISI, KAYODE ADEKUNLE / ALJAHDALI, ABDULAZIZ HOMYED
D&WO Morning Report (Service Providers View) Rig Charge #: SIDETRACK AND DRILL THE Engineer BHATTACHARYA, SUDIP
Copyright 2024 Saudi Aramco. All Rights Reserved SND-2008 (71-24058-1806) WELL AS A PRESET IN ONE Manager OTAIBI, MUKHLED FARAH
Daily Onshore HOLE SIZE AS PRE-SET UNZC THURAYA RIG FORMAN VSAT CONTRACTOR
Well Wellbores: RESERVOIR FOR) /CLERK VSA
(0500-0500) Saudi Aramco +882167771 2318 013-577963 7
Date: Tuesday 06/18/2024 HRDH-1806 (1) HRDH_1806_1 T
013-577969 9

Last 24 hr operations Next 24 hr plan


PT PLUG & TCA. SLB W/L PUNCH TBG, DISPLACE TO KILL WBM. S/L SET 4.5" INTERWELL PLUG. CONT N/U 11" 10M BOP. P/T 11"-10M BOP, RETRIEVE BARRIERS, POH & L/D 4-1/2" OLD
GWS SET BPV. N/D 4"10M X-TREE & N/U 11" 10M BOP. COMPLETION STRING.
Location Next Location
283 KM F/ DMG HRDH ROAD, AFTER BRIDGE, 13 KM ON KHARKHIR RD, TURN LEFT, 7 KM SKID ROAD. HRDH-2160
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
15,258 Size 10687 10687 Size 10,350 13,449 13,449 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
15258 (Date) 0 0 283
3 (06/15/2024@0400 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0700 2 1 POST N PA OTH NA SWL 15258 15258
SLB E-LINE POOH TO SURFACE & L/D, CONFIRM PLUG SET - OK.

BLEED OFF PRESSURE. POSITIVE PRESSURE TEST 4.5" BAKER TOMBSTONE BP TO


0700 - 0800 1 1 POST N DCOM OTH NA SJC 15258 15258 1,000 PSI FOR 15 MIN - GOOD TEST.
> VOLUME PUMPED = VOLUME RETURNED = 4 BBLS..
> MONITOR TCA PRESSURE WHILE TEST, NO COMMUNICATION.

PRESSURE TEST TCA TO 1,000 PSI FOR 15 MIN. GOOD TEST. BLEED OFF
0800 - 0830 0.5 1 POST N DCOM OTH NA SJC 15258 15258
PRESSURE TO ZERO.
>> VOLUME PUMPED = VOLUME RETURNED = 2.8 BBLS..

SLB E/L RIH 2.5" PTC TBG PUNCHER. CORRELATE W/ CCL & PUNCH 4.5" TBG AT
0830 - 1330 5 1 POST N DCOM OTH NA SWL 15258 15258 13,073' (MIDDLE 1ST JT ABOVE KTR SEAL ASSY). GOOD INDICATION, POH.
> TOOL SUCCESSFULLY FIRED.
> BREAK CIRC, OK.

HPJSM, PUMP 30 BBLS HI-VIS PILL & DISPLACE THE WELL TO 97 PCF WBM KILL
1330 - 1800 4.5 1 POST N DCOM CIRC MPMP RIG 15258 15258 FLUID WHILE TAKING RETURN THRU CHOKE MANIFOLD. CONTINUE CIRC &
CONDITION WELL TO 97 PCF IN/OUT.
> OFFLINE: R/D SLB W/L TOOLS & EQUIPMENT.
1800 - 1830 0.5 1 POST N DCOM CIRC MPMP RIG 15258 15258
FLOW CHECK, WELL STATIC.

SAPESCO S/L RIH W/ 3.625" GC TO 1,500', POH TO SURFACE. RIH & SET 4-1/2"
1830 - 2100 2.5 1 POST N DCOM SET PLUGT SPL 15258 15258
INTERWELL BP @ 1,000'. POH TO SURFACE.
> P/T PLUG TO 1,000 PSI FROM TCA SIDE, OK. R/D S/L.

R/U GWS, SET 4-1/2" BPV, R/D GWS.

*** BARRIERS IN PLACE FOR N/D X-TREE & N/U BOP:


2100 - 2130 0.5 1 POST N WH SET BPV ARM 15258 15258
> TBG: BAKER TOMBSTONE BP (LOWER COMPLETION), 97 PCF KILL MUD,
INTERWELL PLUG & BPV.
> TCA: BAKER TOMBSTONE BP (LOWER COMPLETION), LOWER COMPL PACKER
SEAL, 97 PCF KILL MUD & TESTED TBG HANGER.
2130 - 2330 2 1 POST N DCOM OTH NA RIG 15258 15258
HPJSM, R/D HARD LINES FROM X-TREE, CHOKE MANIFOLD & TCA.

HPJSM, N/D 4-1/16"-10M WG PRODUCTION TREE & VG TUBING BONNET/LMMV.


2330 - 0300 3.5 1 POST N WH ND TREE GEP 15258 15258 > VG ENGR INSPECT TBG HGR TOP THREAD, INSTALL LANDING SUB, OK. REMOVE
SAME.
> VG ENGR SERVICE LOCK DOWN SCREWS.

0300 - 0459 2 1 POST N BOP NU BOP RIG 15258 15258 HPJSM, N/U 11" 10M CLASS-A BOP STACK & RELATED EQUIPMENT.....ONGOING
AT RT.
Workover Objectives
Foreman Remarks

==========================================SAFETY & DRILLS==========================================


>> DRILLS: 1 (MANDOWN FIRST AID DRILL).
>> SOC TODAY: 25.
>> NEAR MISS: 0.
>> SWA: 2.
===================================ARAMCO PERSONNEL ON LOCATION====================================
>> MATERIAL EXPEDITOR AHMED AL-OTAIBI #8509381 ON LOCATION.
>> MATERIAL EXPEDITOR FAISAL M AL-OTAIBI #8509119 ON LOCATION.
>> ARAMCO SNR FCT MOHAMMED ALSULTAN #291138 OFF LOCATION.
>> ARAMCO FCT IBRAHIM AL SULAMI #796658 OFF LOCATION.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1806 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/07/2024 - 08/24/2024
Report ID: OPERLMTDMRREP

=================================THIRD PARTY PERSONNEL & EQUIPMENT===================================


>> EMEC MUD ENGR ON LOCATION.
>> TAQA CEMENT UNIT AND CREW ON LOCATION 10:00 HRS, 06/14/2024.
>> SAPESCO S/L ON LOCATION 17:00 HRS, 06/15/2024.
>> BAROID MUD ENG ON LOCATION 22:00, 06/15/2024.
>> SLB W/L ON LOCATION 06/16/2024.
>> INTERWELL ENGR & TOOLS ON LOCATION 06/16/2024.
>> WFD TRS HANDLING TOOLS & CREW ON LOCATION 06/17/2024.
==============================================MISC============================================
>> TODAY CREW SHORTAGE: 00 ROUSTABOUT & 00 FLOOR HANDS.
>> WATER PIT IS NOT IN USE AS WATER IS TAKEN TO RIG SURFACE TANKS DIRECTLY.
>> CLOSED LOOP SYSTEM IS IMPLEMENTED.
===================== ==============NEXT WELL====================================================
>> 1ST WELL: HRDH-2160: ONE HOLE SIZE, UNZB/C PRE-SET, PRE-WO MEETING HELD ON 05/22/2024, STRIPPING 0%, LOCATION PREP. 0%, WOCP ISSUED (NO).
>> 2ND WELL: HWYH-949: ONE HOLE SIZE, KHFC PRE-SET, PRE-WO MEETING NOT DONE, STRIPPING 0%, LOCATION PREP. 0%, WOCP (RUNNING).
========================================REMARKS=================================================
ODF = +2 FT
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
97 PCF 0 0 API 0 0 Volts 0 9.5 64,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 80 21 0 9 / 14 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 12 20 9 / 10 5 200 0
62
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF 0 0 API 0 0 Volts 0 9.5 1,600
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 19 0 7/9 WTRGEL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 10 0 7/8 0 200 0
55

MUD SODASH NACL CAUST BENT XC BARITE


TREATMENT 3 ( 100LB ) 14 ( 2200L ) 6 ( 55LB ) 3 ( 2500L ) 40 ( 50LB ) 73 ( 5000L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A NORMAL N/A SUMMER 2,604 PRE-TOUR
MEETINGS

Company BC1 GOS RIG BAR EMC MJH BR1 RIG ARM SJC SPL MI3 ARM SWL INW WCR

Category BRCR CTRG RIG DFMS DFMS SEC MLS OTHR OTHR PCS SLS WMS WSC WLS BRCR CSR
PERSONNEL
1 15 41 1 1 8 1 11 1 3 3 1 2 6 1 3
Total
AND SERVICES No. of Persons
99
INFORMATION
Personnel on Loc. Hrs. 5 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 2 0 24 12 12 0 12 12 12 8 12 0 24 12 12 0

Standby/Tankers
TRUCKS/BOATS
AB-6310 /6338ZDB

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 656 121 24 800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SAHB-42 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/09/2024 - 09/02/2024
Report ID: OPERLMTDMRREP

SND-2009 @ SAHB-42 Limited Morning Report for 06/18/2024


Objective : (GAS Foreman(s)HUSSEIN, BAHGAT ALY / KIBOUB, ALI
D&WO Morning Report (Service Providers View) Charge #: EVALUATION/DELINEATION) Engineer EKHIBISE, OSAGIE AIBUEDEFE
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Manager MOUSA, NEDAL ADEL
SND-2009 (66-23008-0042)
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 00 88 216 7771 2296 577 9645 577 9640
Date: Tuesday 06/18/2024 SAHB-42 (0) SAHB_42_0 CONTRACTOR /CLERK VSA T
577 9662

Last 24 hr operations Next 24 hr plan


RIG MAINTENANCE, R/U ON SAHB-42. R/U ON SAHB-42, COMPLETE PRESPUD CHECKLIST, SPUD SAHB-42 WELL.
Location Next Location
281 KM FROM DMG SAHB-35
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date) 100 0 281
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

PERFORMING RIG MAINTENANCE.

> WELD AND INSTALL ST80 (IRON ROUGHNECK ) SUPPORT.


> PERFORM MPI FOR: HP LINES, DRAWWORKS, ROTARY TABLE, TRAVELING
0500 - 1700 12 0 PRE M MAIN OTH NA RIG 0 0 BLOCK, DEAD LINE ANCHOR, CRAWN BLOCK, TDS & TDS MONORAIL, STABBING
BOARD, ROTARY TABLE MASTER BUSHING, ELEVATOR LINKS, HP LINE CLAMPS
...... ONGOING.
> PERFORM MPI ON PADS EYES AND LIFTING GEARS, LIFTING POINTS FOR POOR
BOY DEGASSER & SUB-BASE LIFTING POINTS, RAISING LINE, SLINGS AND SHEKELS
....ONGOING.

HELD RIG MOVE SAFETY MEETING WITH ALL PARTIES AND DISCUSS WORK PERMIT
SYSTEM, JSA, CRITICAL LIFT PLAN, LIFTING GEAR AND COLOR CODE, USE OF PPE
ALL TIME, RIGGER ONE ROLES AND RESPONSABILITIES, CRANE OPERATORS FOCUS
ON LIFTING WORKS AND CONDUCT DAILY CHECK LIST, TRUCK DRIVER TO MOVE
LOADS SAFELY AND NO SHORT CUT WHILE MOVING.

R/U ON WELL SAHB-42 (R/D 100%, R/M 100% AND R/U 90%).

> INSTALL STANDPIPE MANIFOLD.


> RU AND POWER UP PRAGMA.
1700 - 0459 12 0 PRE N RM RU NA RIG 0 0 > HYDRO TEST MUD TANKS... ONGOING.
> CONNECTED FIRE SYSTEM.
> R/U H2S CASCADE SYSTEM AND TEST SENSORS....ONGOING
> INSTALL FLARE LINES..... ONGOING.
> WORK AND PREPARE BOP STACK..... ONGOING.
> CONNECT HP HARD LINES....ONGOING.
> RIG UP CELLAR PUMP AND TEST SAME...ONGOING.
> WELD AND INSTALL ST80 (IRON ROUGHNECK ) SUPPORT..... ONGOING.
> SLB RIG UP SOLID CONTROL & WASTE MANAGEMENT EQUIPMENT AT SHAKER
AREA.....ONGOING.
> MISCELLANEOUS WORKS & HOUSEKEEPING.
> GENERAL RIGGING DOWN UP SAHB-42.
Foreman Remarks

SAHB-42 WILL BE DRILLED AS A VERTICAL MP WELL IN SOUTHERN HALF OF SAHBA FIELD, 200FT INTO TWLF. THE OBJECTIVE OF THE WELL IS TO
EVALUATE THE POTENTIAL OF UNZC AND JAUF RESERVOIR DEVELOPMENT. BASED ON OPEN HOLE LOGS, PRESSURE POINTS AND SAMPLING
RESULTS, THE WELL WILL EITHER BE COMPLETED VERICALLY WITH 15K 4-1/2" " HIGH STRENGTH CEMENTED LINER OR WILL BE
SIDETRACKED.
========== ==========ERP ==========================================
> STAGING AREA #1: N.24.12334 E.48.76060 - (1.1 KM FROM WELL CENTER /NE).
> STAGING AREA #2: N.24.11666 E.48.75573- (0.46 KM FROM WELL CENTER/ NW).

========== ARAMCO POB & VISITORS ===========

> ARAMCO MATERIAL CONTROLMAN I: HUSSAIN MESHAAL ID#765537 ON LOCATION ON 6/12/2024.

=========== SAFETY, DRILLS, INCD. & ALERTS =======


> DRILLS: 0 PIT DRILL, 0 TRIP DRILL & 0 BOP DRILL,0 H2S DRILL, 0 ACCUMULATOR. 0 STOP WORK AUTHORITY DRILL, 0 WEEKLY FIRE PUMP TEST.
> OBSERVATIONS: 22, PTW: 19, JSA: 23, SWA: 5, HAZARD HUNT: 0.
> NEAR MISS: 0.
> SAFETY MEETING TOPICS: DAILY HAZARD HUNT FINDINGS FROM PREVIOUS DAY REVIEWED.
> SANAD 10 RULES TO LIVE BY: 3RD VERIFY ISOLATION (LOCKOUT / TAGOUT) BEFORE THE WORK BEGINS.
> ARAMCO LIFE SAVING RULES: 7 PPE - USE THE REQUIRED PPE FOR YOUR JOB.
> PROFESSIONAL OILFIELD PRACTICES: OS.49 BEFORE WORKING ON EQUIPMENT ISOLATE POWER AND LOCKOUT SUPPLIES (I.E., AIR, ELECTRICAL, HYDRAULIC) CONNECTED TO THE EQUIPMENT.
TEST LOCK OUT. ENSURE APPROPRIATE PERMIT TO WORK IS IN PLACE. NOTIFY THE DRILLER PRIOR TO TAKING THIS ACTION. MAKE SURE THE EQUIPMENT IS IN A SAFE CONDITION BEFORE RE-
CONNECTING POWER.

HSE ALERTS:

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SAHB-42 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/09/2024 - 09/02/2024
Report ID: OPERLMTDMRREP

> HSE ALERT 69-24 -INJURY DURING ENGINE MAINTENANCE


> HSE ALERT 70-24 - PIPE HANDLER MAIN ARM UNCONTROLLED DECENT
> HSE ALERT 71-24 - TRIP AND FALL INCIDENT
> HSE ALERT 72-24 - SNAKE BITE & SCORPION STING INCIDENTS
> SAOGDD HSE ALERT -08-2024 PINCHED FINGER INJURY
SAOGDD HSE ALERT -09-2024 HAND CAUGHT BETWEEN MP PISTON AND PONY ROD

========== AUDITS ==========================


> 1ST RHSEI - 2024: TOTAL ITEMS: 39, OPEN: 3, CLOSED: 36.
> 1ST WCI - 2024 : TOTAL ITEMS: 7, OPEN: 0, CLOSED: 7.
> 2ND MCI -2023 : TOTAL ITEMS: 50, OPEN: 2, CLOSED:48.
========== FLAT TIME KPI ===========================
> RIG MOVE KPI: 8.41 DAYS, ACTUAL: XXX DAYS.
> TRIPPING KPI: 19 STD/HR / ACTUAL: XX JT/HR.
> 24" CSG KPI: 4 JT/HR / ACTUAL: XXX JT/HR.
> 18-5/8" CSG KPI: 7 JT/HR / ACTUAL: XXX JTS/HR.
> 13-3/8" CSG KPI: 11.5 JT/HR/ ACTUAL: XXX JT/HR.
> 9-5/8" CSG KPI: 14 JT/HR/ACTUAL: XXX JT/HR
> 7" LINER KPI: 14 JT/HR/ACTUAL: XXX JT/HR.
> 4-1/2 LINER KPI: 13 JT/HR / ACTUAL: XXX JT/HR.
> 4-1/2" UPPER COMPLETION KPI: 13.5 JT/HR, ACTUAL: XXX JT/HR.

========== PLANNED VS ACTUAL CASING DEPTHS ===============


> 28'' SECT: 485' (+/- 20' INTO UER WATER LEVEL) / ACTUAL: XXX FT.
> 22'' SECT: 2,501' (+/- 50' INTO AHMDI) / ACTUAL: XXX FT.
> 16" SECT: 5,111' (+/- 50' INTO MDTM) / ACTUAL: XXX FT.
> 12" SECT: 10,633' (30' INTO BJD) / ACTUAL: XXX FT.
> 8 3/8" SECT : 14,235 FT (450 TVD INTO KFDA) / ACTUAL: XXX FT.
> 5 7/8" SECT: 14,954' (200 FT INTO TAWIL) / ACTUAL: XXX FT.
========== ==========PERSONNEL SHORTAGE & SAUDISATION ====================
> SND CREW SHORTAGE: 0.
> SAUDIZATION: 66%.
========== WELLSITE CONTRACTOR EQUIPMENT ON LOCATION & RENTAL EQUIPMENT ========
> SPRAY TANKER: DOOR # 463/ PLATE # 7960 / ON LOCATION FROM 06/01/2024.
> 12" NOV SHOCK SUB SN#CW-1887899-1 ON LOCATION SINCE 6/16/2024 @ 10:30 AM.
========== WATER CONSERVATION IMPLEMENTED INITIATIVES =============
> REDUCED WATER PITS: Y
> DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: Y
> CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION: Y.

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 0 API 0 0 Volts 0 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
0
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 0 API 0 0 Volts 0 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 4 0 0/0 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 1 0 1/2 0 0 0
0

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A N/A NA SEASONAL 2,025 PRE TOUR
MEETING.

Company SWK RIG EMC MJH RIG ARM OTH MI3 ARM

Category CTRG RIG DFMS SEC OTHR OTHR VAC WMS WSC
PERSONNEL
16 39 1 8 27 1 1 4 2
Total
AND SERVICES No. of Persons
99
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 0 0 12 12 12 12 24

Standby/Tankers
TRUCKS/BOATS
AB-5440

BULK Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SAHB-42 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 06/09/2024 - 09/02/2024
Report ID: OPERLMTDMRREP

N/A N/A 220 N/A N/A 4050

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-367 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/22/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

SND-2010 @ HRDH-367 Limited Morning Report for 06/18/2024


Objective : (SINGLE LATERAL Foreman(s)PLEKHANOV, MAXIM
D&WO Morning Report (Service Providers View) Rig Charge #: OIL PRODUCER TARGETING Engineer ALATAWI, HUSSAIN ALI
Copyright 2024 Saudi Aramco. All Rights Reserved SND-2010 (66-24058-0367) ARBD) Manager HAQWI, MOHAMMED MOSA
Daily Onshore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: +882-16-77 71-2819 378-6479 /CLERK VSA
Date: Tuesday 06/18/2024 HRDH-367 (0) HRDH_367_0 T
378-6480

Last 24 hr operations Next 24 hr plan


POOH AND L/D RSS BHA, M/U & RIH REAMING BHA, PERFROM REAMING TRIP, POOH & L/D RIH 7" LNR TO BTM, SET LH, CEMENT 7" LNR, SET LNR TOP PACKER, POOH AND L/D RUNNING
REAMING BHA. TOOL.
Location Next Location
2 KM NORTH OF HRDH GOSP-1. UTMN-4130
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,527 Last Csg Size MD TVD Size Top
9 5/8 4147 4147 Formations Comments
Depth
ARUM 965 50' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) LAMS 1,285 72' SHALLOWER
7527 (Date) 100 0 224 AHMD 1,720 22' SHALLOWER
25.2 (05/24/2024@0000 ) SFNY 1,955 91' SHALLOWER
SHUB 2,860 33' SHALLOWER
BYDH 3,160 68' DEEPER
MDTM 4,030 25' SHALLOWER
SULY 4,607 6' DEEPER
HITH 5,241 7' DEEPER
ABAR 5,701 8' DEEPER
ARBB 5,749 6' DEEPER
ABBR 5,808 2' DEEPER
ARBC 5,835 3' DEEPER
ABCR 5,923 ON DEPTH
ARBD 6,054 1' SHALLOWER
PADS 6,176 6' SHALLOWER
BPDS 6,181 6' SHALLOWER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

POOH & L/D BHI RSS/MWD/LWD BHA & 8-1/2" PDC BIT.
- REVIEW JSA AND REMOVE RADIOACTIVE SOURCES.
0500 - 0900 4 0 8 1/2 N DRLG HT BHA RIG 7527 7527 - CONNECT CABLE AND CHECK TOOLS.
- L/D OILSERV 6-1/2" D. JAR AT 5:00 HRS.
- BIT DULL: 1-1-WT-A-X-I-NO-BHA.
- TOOLS IN GOOD CONDITION.
0900 - 0930 0.5 0 8 1/2 N DRLG RR TDS RIG 7527 7527
SERVICE TDS, CHECKED FOR POSSIBLE DROPPING OBJECTS.

0930 - 1200 2.5 0 8 1/2 N CT HT BHA RIG 7527 7527 HPJSM, P/U & M/U 8-1/2" WELD CONE BIT AND SEMI-STIFF REAMING BHA.
- M/U OILSERV 6-1/2" D. JAR AT 11:30 HRS.

1200 - 1345 1.75 0 8 1/2 N CT TI STDP RIG 7527 7527 800 4147 RIH SEMI STIFF-REAMING BHA TO 9-5/8" CSG SHOE.
- FILL UP STRING EVERY 15 STDS.

CONT. RIH 8-1/2" SEMI-STIFF REAMING BHA ON 5-1/2" DP STDS, WASH DOWN
1345 - 1730 3.75 0 8 1/2 N CT ST STDP RIG 7527 7527 4147 7527 LAST STD & TAG BOTTOM 7527'
- HOLE IN GOOD CONDITION.
- FILL UP STRING EVERY 15 STDS.

SWEEP HOLE WITH 3 X 15/20 LO-VIS/HI-WT PILLS, CHC WITH 83 PCF MUD AND
1730 - 2100 3.5 0 8 1/2 N CT CIRC MPMP RIG 7527 7527
100% RETURNS.
- SPOT 250 BBLS OF LUBRICATED CASING GO PILL.
2100 - 2115 0.25 0 8 1/2 N CT WCNT NA RIG 7527 7527
FLOW CHECK AT BOTTOM, WELL STATIC.

2115 - 2230 1.25 0 8 1/2 N CT ST STDP RIG 7527 7527 7527 6500 POOH 8-1/2" SEMI-STIFF REAMING BHA, ON 5-1/2" DP STDS TO 6500'.
- HOLE IN GOOD CONDITION.
2230 - 2245 0.25 0 8 1/2 N CT WCNT MPMP RIG 7527 7527
FLOW CHECK 10 STDS OFF BTM, WELL STATIC.

POOH 8-1/2" SEMI-STIFF REAMING BHA, ON 5-1/2" DP STDS TO 9-5/8" SHOE @


2245 - 0145 3 0 8 1/2 N CT ST STDP RIG 7527 7527 6500 4147
4147'.
- HOLE IN GOOD CONDITION.
0145 - 0200 0.25 0 8 1/2 N CT WCNT NA RIG 7527 7527
FLOW CHECK AT THE SHOE, WELL STATIC.
0200 - 0330 1.5 0 8 1/2 N CT TO STDP TK4 7527 7527 4147 800
POOH 8-1/2" SEMI-STIFF REAMING BHA, ON 5-1/2" DP STDS TO 800'.
0330 - 0345 0.25 0 8 1/2 N CT WCNT NA RIG 7527 7527
FLOW CHECK AT 5 STDS ABOVE BHA, WELL STATIC.
0345 - 0400 0.25 0 8 1/2 N CT TO STDP RIG 7527 7527 800 300
POOH 8-1/2" SEMI-STIFF REAMING BHA ON 5-1/2" DP STDS TO TOP OF BHA.
0400 - 0415 0.25 0 8 1/2 N CT WCNT NA RIG 7527 7527
FLOW CHECK AT TOP BHA, WELL STATIC.
0415 - 0459 0.75 0 8 1/2 N CT HT BHA RIG 7527 7527

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-367 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/22/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
POOH & L/D SEMI-STIFF REAMING BHA & 8-1/2" WELD CONE BIT.
- L/D OILSERV 6-1/2" D. JAR AT 4:00 HRS.
Foreman Remarks

===============WELL OBJECTIVES=======================================
HRDH-367 WILL BE DRILLED AS SINGLE LATERAL OIL PRODUCER TARGETING ARAB D RESERVOIR ZONE 2 AND WILL BE COMPLETED WITH UPPER
AND LOWER COMPLETION CONSISTED OF SLIDING SLEEVE ICD'S.

==================SAFETY & DRILLS ====================================


PRE-TOUR SAFETY MEETING: 3, WEEKLY SAFETY MEETING 2, COLD WORK PTW: 2; HOT WORK PTW 0; LIFTING PERSONNEL PTW 0; DIESEL TRANSFER PTW 0; CONFINED SPACE PTW 0; BUFFER
ZONE PTW 0, RADIOACTIVE PTW 0; JSA: 6; STOP CARDS: 10 NM: 0.

DRILLS :
FIRE DRILL AT RIG: 0; FIRE DRILL AT MAIN CAMP: 0; MAN DOWN DRILL: 0; VERTICAL RESCUE DRILL: 0; MAN-LOST DRILL: 0; CONFINED SPACE RESCUE DRILL: 0; H2S DRILL AT MAIN CAMP: 0; H2S
DRILL: 0; PIT DRILL:0; TRIP DRILL: 0; BOP FUNCTION TEST: 0; BOP/SPACE OUT DRILL 0; ACCUMULATOR TEST: 0; FIRE WATER SYSTEM EQUIPMENT FUNCTION TESTS: 0; OIL SPILL DRILL: 0;
SWAD: 0.

SAFETY TOPICS:

- OIL SPILL CONTROL.


- ORIENTATION & SHORT SERVICE EMPLOYEE PROGRAM.
- SANAD OA 05-21 - PIPE TALLY MISTAKE.
- REVIEW ALL SAFETY ALERTS FOR THE LAST WEEK.
- REVIEW SOC AND NM WITH CREW.
- HEAT STRESS AWARENESS.
- STOP WORK AUTHORITY.

===============JOURNEY MANAGEMENT PLAN==============================


- RIG LOCATION: DISTANCE FROM DMG TO RIG IS 224 KM, NEAREST CITY IS HARADH.
- GOOD SIGNAL COVERAGE IN THE WELLSITE. CALL RIG SND-2010 AT (013-3786479), PRIOR ENTERING: PROVIDE EMERGENCY CONTACT.
- ALL VEHICLES SHOULD FOLLOW APPROVED ROAD & FOLLOW DRIVING SPEED LIMIT.

================ PERSONNEL ON RIG=====================================


- ARAMCO ME ABDULRAHMAN AL-SHMRANI #850610 ON LOCATION SINCE 6/10/2024.
- ARAMCO FCT AHMED AL-MUSTAFA #784295 ON LOCATION SINCE 06/10/2024.
- SAO&GDD FCA SUNIL SURENDRANATH (ID# 8042189) ON LOCATION SINCE 06/15/2024.

================ RENTAL EQUIPMENT=====================================


- OILSERV 6-3/4" DRILLING JAR S/N HMJ-675-252 RECEIVED ON 6/5/2024, RELEASED ON 6/15/2024.
- OILSERV 6-3/4" DRILLING JAR S/N HMJ-675-247 RECEIVED ON 6/13/2024 @ 20:00.
- SINOPEC 6-3/4" PBL SUB S/N OSC675SBP513 ON LOCATION SINCE 6/7/2024, RELEASED ON 6/17/2024.

========================DIRECTIONAL DATA==============================
FOLLOWING DIRECTIONAL PLAN: HRDH-367_0_REV-D.0 (PWP) (08-JUNE-2024).
SENSORS OFFSET: NBI-6.73', NBGR - 12.92', PWD - 28.52', GR - 29.41', RES - 33.45', DIR - 38.24', DENS - 69.14', AZCAL -71.46', POR - 78.16' .
WELL PATH: 4.75' ABOVE, 5.12' LEFT THE PLAN.

========================VISITS=======================================
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
83 PCF 1 3.4 API 5 0 Volts 2.33 9.5 139,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
105 14.2 HTHP 80 27 0 9 / 11 INPHPA 2.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 22 15 9 / 11 0 280 15.2
54
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
83 PCF 1 3.4 API 5 0 Volts 2.33 9.5 139,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 14.4 HTHP 80 28 0 9 / 11 INPHPA 2.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 21 15 9 / 11 0 280 15.2
55

MUD CAUST SODASH FLO-TROL CACO3-25 CACO3-5 ECCO-TEMP ME-LUBE


TREATMENT 1 ( 50LBP ) 1 ( 100LB ) 5 ( 55LB ) 5 ( 55LB ) 5 ( 55LB ) 1 ( 100LB ) 4 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
7RR 7,025 7,527 DP Av DC Av Bit HHP N/A N/A M222 8.5 SMT
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
BIT DATA N/A N/A N/A 1 1 WT A X
Serial Number Type Jets TFA
SM2790 XS616C 6 x 13 / 0.778
Gauge Other POOH Reason

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-367 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/22/2024 - 07/11/2024
Report ID: OPERLMTDMRREP

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit VAR 8.5 1 8.5 2.25 0.8 4-1/2" REG 150 7500196
2 Near Bit Roller Reamer RIG 8.5 1 8.5 2.25 7.83 NC46 NC46 150 3 POINT 20781
3 Drillcollar RIG 6.25 1 6.25 2.813 31.15 NC46 NC46 80 SPRL 27044
DRILL STRING 4 Crossover RIG 6.75 1 6.75 2.5 2.65 NC50 NC46 100 62504-3-1
5 Eccentric Reamer NRT 8.5 1 8.5 3 3.98 NC50 NC50 100 61283421
6 Crossover RIG 6.75 1 6.75 2.875 2.65 NC46 NC50 100 62504-2-2
7 Drillcollar RIG 6.25 1 6.25 2.813 30.68 NC46 NC46 80 SPRL 15440
8 Crossover RIG 6.75 1 6.75 3.25 1.55 XT54 NC50 100 0
9 Heavy Weight Drillpipe (HWDP) RIG 5.5 18 5.5 3.25 559.39 XT54 XT54 54 CONV
10 Hydro-Mechanical Jar OJR 6.75 1 6.75 29 XT-54 XT-54 80 HMJ-675-247
11 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 5.5 3.25 281.21 XT54 XT54 52.51 CONV
12 Drillpipe RIG 5.5 0 5.5 4.67 0 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/06/2024 06/06/2024 SEASONAL N/A SEASONAL 714 2 SAFETY
MEETINGS

Company TGC BHI RIG GDF MJH SNS RIG ARM ARM HCM BLH ZPC

Category CTRG DPDS RIG DFMS SEC H2S OTHR OTHR WSC PCS LHES CSR
PERSONNEL
18 2 50 2 7 1 4 3 1 4 1 5
Total
AND SERVICES No. of Persons
98
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 12 12 12

Operating Hours. 0 4 24 24 0 24 24 12 24 0 0 0

Standby/Tankers Others
TRUCKS/BOATS
ARAMCO VEHICLE DH7550 RIG AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 816 160 189 2000

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRML-90 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/05/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

SND-2011 @ HRML-90 Limited Morning Report for 06/18/2024


Objective : (OIL- Foreman(s)AMEUR, AMAR
D&WO Morning Report (Service Providers View) Rig Charge #: EVALUATION/PRODUCER ) Engineer HUSSAIN, SAJID REHMATULLAH / ALOWAID, FAISAL KHALED
Copyright 2024 Saudi Aramco. All Rights Reserved SND-2011 (66-23085-0090) Manager HAQWI, MOHAMMED MOSA
Daily Onshore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: +882 16 77 71 4138 013 576 37 43 /CLERK VSA
Date: Tuesday 06/18/2024 HRML-90 (1) HRML_90_1 T
013 576575 3

Last 24 hr operations Next 24 hr plan


CONT. RIH 6-1/8" WFD RSS/MWD DRLG BHA, CO CMT & EQPT, CHC, PT LINER-OK, POOH 6-1/8" POOH 6-1/8" RSS/MWD/LWD BHA. RIH 6-1/8" RSS/MWD/LWD BHA, DISPLACE, CO CMT & RAT
RSS/MWD/LWD BHA. HOLE, RSS/MWD/LWD DRLG 6-1/8" L-1 LATERAL SECTION.
Location Next Location
203 KM FROM DMG. HRML-94
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,383 Last Csg Size MD TVD Size 6,378 9,381 8,255 Top
9 5/8 8340 8220 Formations Comments
7 Depth
RUS 730 39' SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ARUM 1,920 2' SHALLOWER
9383 (Date) 100 0 203 AHMD 3,415 23' DEEPER
83.8 (03/26/2024@0900 ) SHUB 4,740 41' SHALLOWER
BYDH 5,120 64' SHALLOWER
MDTM 6,135 1' SHALLOWER
SULY 6,719 2' SHALLOWER
HITH 7,326 7494' MD 18' TVD DEEPER
ABAR 7,779 8126' MD 24' TVD DEEPER
ARBB 7,826 8201' MD 26' TVD DEEPER
ABBR 7,885 8299' MD 31' TVD DEEPER
ARBC 7,905 8333' MD 24' TVD DEEPER
ABCR 8,018 8539' MD 28' TVD DEEPER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0530 0.5 1 8 1/2 N DRLG HT BHA WDS 9383 9383
HPJSM. P/U & RIH 6-1/8" WFD RSS/MWD/LWD DRLG BHA TO 112'

TEST AND CALIBRATE 6-1/8" WFD RSS/LWD/LWD TOOLS.


- SHALLOW TEST WITH 250 GPM & 960 PSI WITH 79 PCF WBM.
0530 - 0730 2 1 8 1/2 N DRLG HT BHA WDS 9383 9383
- FUNCTION DOWNLINK COMMANDER ON STANDPIPE.
- CALIBRATE DRAWORKS DEPTH SENSOR.
- LOAD RADIOACTIVE SOURCE IN LWD TOOLS.

CONT. P/U & RIH 6-1/8" WFD RSS/MWD/LWD DRLG BHA TO 330'
- 6-1/8" NEW NOV PDC BIT (S/N: S305950, TYPE:SKR613M3D, JETS 3X14). + BIT
GAUGE EXTENDER + WFD RSS 4-3/4" + WFD LWD IDS 4-3/4"+ WFD LWD AZD AND
0730 - 0800 0.5 1 8 1/2 N DRLG HT BHA WDS 9383 9383
TNP4-3/4"+ WFD LWD MFR 4-3/4"+ WFD HEL MWD 4-3/4"+ WFD FLOAT SUB 4-3/4"
+ WFD FILTER SUB 4-3/4"+ X/O 4-3/4" + 3 X 4" HWDP+ OILSERV HYD JAR + 3 X 4"
HWDP.
- P/U OILSERV 4-3/4" HYD JAR AT 8:00 AM.
0800 - 0900 1 1 8 1/2 N DRLG TI STDP RIG 9383 9383 330 2300
RIH 6-1/8" WFD RSS/MWD/LWD DRLG BHA ON 4" DP

0900 - 0930 0.5 1 8 1/2 N DRLG CIRC MPMP RIG 9383 9383 FILL UP STRING & FUNCTION TEST 6-1/8" WFD RSS & LWD TOOLS. OK.
- 250 GPM, 1150 PSI.
0930 - 1030 1 1 8 1/2 N DRLG TI STDP RIG 9383 9383 2300 4180
RIH 6-1/8" WFD RSS/MWD/LWD DRLG BHA ON 4" DP
1030 - 1100 0.5 1 8 1/2 N DRLG CIRC MPMP RIG 9383 9383
FILL UP STRING & FUNCTION TEST 6-1/8" WFD RSS & LWD TOOLS. OK.
1100 - 1230 1.5 1 8 1/2 N DRLG HT BHA RIG 9383 9383
RIH 6-1/8" WFD RSS/MWD/LWD DRLG BHA ON 4" DP & 4" HWDP.
1230 - 1300 0.5 1 8 1/2 N DRLG CIRC MPMP RIG 9383 9383
FILL UP STRING & FUNCTION TEST 6-1/8" WFD RSS & LWD TOOLS. OK.
1300 - 1400 1 1 8 1/2 N DRLG TI STDP RIG 9383 9383 6551 7212
CONT RIH 6-1/8" WFD RSS/MWD/LWD DRLG BHA ON 4" DP
1400 - 1415 0.25 1 8 1/2 N DRLG HT PEL RIG 9383 9383
CHANGE ELEVATORS AND HANDLING TOOLS FROM 4" TO 5.5".
1415 - 1515 1 1 8 1/2 N DRLG TI STDP RIG 9383 9383 7212 9173
CONT RIH 6-1/8" WFD RSS/MWD/LWD DRLG BHA ON 5.5" DP.

HPJSM, WFD RSS/MWD/LWD DRLG OUT LC, CMT, FC & CMT TO 20' ABOVE FS AT
1515 - 2145 6.5 1 8 1/2 N DRLG DFS RSS WDS 9383 9383 9173 9361
9361' WITH 79 PCF MUD.
- RELOG FROM 9212 FT AS PER GOC.

SWEEP HOLE & CHC WITH 79 PCF WBM & P/T 7" LINER TO 580 PSI (EQUIVALENT
2145 - 0045 3 1 8 1/2 N DRLG CIRC MPMP RIG 9383 9383 TO 1500PSI WITH WATER).
- OBSERVED IMPORTANT BACK FLOW, EXPECTED WFD FLOAT VALVE OPEN & NOT
HOLDING.
0045 - 0115 0.5 1 8 1/2 N DRLG CIRC MPMP RIG 9383 9383
FLOW CHECK, WELL STATIC.
0115 - 0245 1.5 1 8 1/2 N DRLG HT PEL RIG 9383 9383
POOH 6-1/8" RSS/LWD/MWD BHA TO 7212 FT WHILE CHECKING ALL 5.5".
0245 - 0315 0.5 1 8 1/2 N DRLG HT PEL RIG 9383 9383
CHANGE ELEVATORS AND HANDLING TOOLS FROM 5.5" TO 4".

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRML-90 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/05/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
- FLOW CHECK, WELL STATIC.
0315 - 0459 1.75 1 8 1/2 N DRLG HT PEL RIG 9383 9383
POOH 6-1/8" RSS/LWD/MWD BHA WHILE CHECKING ALL 4" DP & HWDP.
Foreman Remarks

HRML-90 WILL BE DRILLED AS A PILOT HOLE WITH SINGLE LATERAL PRODUCER AT ARBD ZONE 2. THE PILOT HOLE WILL BE PLUGGED AND ABANDONED AND THE LATERAL WILL BE COMPLETED
AS AN OPEN HOLE (OPEN HOLE PACKERS AND SLIDING SLEEVE ICDS LOWER COMPLETION WILL BE CONSIDERED AS A CONTINGENT OPTION).
- THIS WELL IS NOT IN SHALLOW GAS AREA AND IS NOT IN GAS CAP AREA.

=== ERP ===


- 1/2 LFL @ 190M, RER 100 PPM @ 980 M & RER 30 PPM @ 1753 M.
- STAGING AREA # 1 (N- 24.61067DEG, E- 49.45840DEG, 2.5 KM NE).
- STAGING AREA # 2 (N- 24.57555DEG, E- 49.45637DEG, 2 KM SW).

===JOURNEY MANAGEMENT PLAN===


- RIG LOCATION: DISTANCE FROM DMG TO RIG IS 203 KM, NEAREST CITY IS HARADH.
- AVERAGE SIGNAL COVERAGE IN THE WELLSITE. CALL RIG SND-2011 AT (013-5763743) PRIOR ENTERING: PROVIDE EMERGENCY CONTACT.
- ALL VEHICLES SHOULD FOLLOW APPROVED ROAD & FOLLOW DRIVING SPEED LIMIT.

===PERSONNEL ON RIG===
- ARAMCO PDP SAIF ALSAADOON BADGE# 794863 ON LOCATION SINCE 06/09/2024.
- ARAMCO MATERIAL EXPEDITOR MUHANNAD ALYAMI #8361554 ON LOCATION SINCE 06/09/2024.

===SAFETY & DRILLS===


FIRE DRILL:
FIRE DRILL: (0), MAN DOWN DRILL: (0), VERTICAL RESCUE DRILL: (0), MAN-LOST DRILL: (0), CONFINED SPACE RESCUE DRILL: (0), H2S RELEASE DRILL: (0), H2S RESCUE DRILL: (0), PIT DRILL:
(0), TRIP DRILL: (1), BOP FUNCTION TEST: (0), BOP/SPACE OUT DRILL (2), ACCUMULATOR TEST: (0), FIRE WATER SYSTEM EQUIPMENT FUNCTION TESTS (0), OIL SPILL DRILL: (0), COVID 19
DRILL: (0)ANNUAL SECONDARY EMERGENCY DRILL (0).

PRE-TOUR SAFETY MEETING: (1), WEEKLY SAFETY MEETING (2), COLD WORK PTW:0, HOT WORK PTW 1, BUFFER ZONE 1 LIFTING PERSONNEL PTW 0, DIESEL TRANSFER PTW 1, CONFINED
SPACE PTW 0, RADIOACTIVE PTW 0, LIVE CIRCUIT 0, JSA:(07), STOP CARDS: (20), NM:(0).

SAFETY TOPICS:
DISCUSSED ABOUT DRILLING
DISCUSSED WELL CONTROLL PROCEDURE
DISCUSSED ABOUT H2S DRILL RESPONSIBILITIES AND PROCEDURES
USEFULL HEAT STRESS, KEEP YOUSELF COOL
FOCUS OF THE WEEK : OIL SPILL CONTROL

====AUDIT ITEMS====
3MCI 44 FINDINGS, 44 CLOSED, 0 OPEN.
RHSEI 2023 44 FINDINGS, 43 CLOSED, 1 OPEN.
LPD 29 FINDINGS. 29 CLOSED, 0 OPEN.
WCEI 16 FINDINGS, 16 CLOSED , 0 OPEN
1ST RHSEI 2024 : 123 FINDINGS, 122 CLOSED, 1 OPEN
SAOGDD INTERNAL AUDIT - 126 FINDINGS, 119 CLOSED, 07 OPEN
BI ANNUAL HAZCOM AUDIT -21 FINDINGS, 20 CLOSED, 1 OPEN

===RENTAL EQPT ON LOCATION===


- SLB CLS ON LOCATION SINCE 3/16/2024.
- RECEIVED 6-3/4" OILSERV HDA-JAR SN# HJDA-675-0007 ON 05/31/2024. B/L ON 6/14/24 AT 13H00.
- RECEIVED 4-3/4 OILSERV HAD-JAR SN# HJDA-475-0044 ON 06/14/2024.

=== LATERALS ===


- L-0 : TD @ 10067'MD, 9947' TVD., P&A WITH 3 EA CMT PLUGS TOC 7866'.
- L-0-1 : TOW: 6888', BOW: 6905'. BAKER 9-5/8"HYDRAULIC WHIPSTOCK AT 6910'.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
79 PCF 2 2.5 API 3 0 Volts 6.5 9.5 138,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 14 HTHP 81 33 0 9 / 12 LS-ND 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0.5 15 16 9 / 10 0 220 0
52
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
79 PCF 0 2.5 API 3 0 Volts 6.5 9.5 138,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 14.2 HTHP 81 32 0 9 / 12 LS-ND 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0.5 15 16 9 / 10 0 280 0
49

MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRML-90 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/05/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/15/2024 06/15/2024 NORMAL N/A HOT 545 HANDLING BHA

Company TGC WDS RIG OES RIG ARM MI3 ARM

Category CTRG DPDS RIG DFMS OTHR OTHR WMS WSC


PERSONNEL
16 4 44 2 4 2 4 1
Total
AND SERVICES No. of Persons
77
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24

Operating Hours. 0 24 12 24 12 12 24 24

Standby/Tankers
TRUCKS/BOATS
AB-6467

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 31 90 126 500

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
BROADBAND SYSTEM INSTALLED BUT NOT ACTIVATED YET.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2558 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/24/2024 - 07/26/2024
Report ID: OPERLMTDMRREP

SND-2012 @ HRDH-2558 Limited Morning Report for 06/18/2024


Objective : (HRDH-2558 Foreman(s)GHERAISSA, EL HADI / QURAISH, BAQER YAHYA
D&WO Morning Report (Service Providers View) Charge #: WILL BE DRILLED AS AN MK-1 Engineer UTUNEDI, AWOTU FRIDAY
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved SND-2012 (66-23058-2558) J-SHAPE WELL TARGETING Manager HAQWI, MOHAMMED MOSA
KHUFF-C RESERVOIR) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 11410 574-6057 574-6093
Date: Tuesday 06/18/2024 HRDH-2558 (0) HRDH_2558_0 CONTRACTOR /CLERK VSA T
574-6019

Last 24 hr operations Next 24 hr plan


W.O.C, RIH WITH 16" ROTARY DRILLING BHA, WASH DOWN, HAD TOTAL LOSSES, POOH & L/D ATTEMPT TO CURE LOSSES, P/U & RIH WITH 16" ROTARY DRILLING BHA, DRILL 16" HOLE
BHA, RIH OEDP, SPOT CMT PLUG, WOC. SECTION TO CP @ 4331 FT.
Location Next Location
HRDH-2558 HWYH-1266
Current Depth (ft) Liner TOL MD TVD Formation Tops
2,250 Last Csg Size MD TVD Size Top
18 5/8 2005 2005 Formations Comments
Depth
RUS 162 AS PROGRAM
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UMER 243 AS PROGRAM
2250 (Date) 100 0 261 ARUM 1,065 72' DEEPER
11.6 (06/06/2024@1400 ) LAMS 1,440 28' DEEPER
AHMD 1,965 17' DEEPER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

W.O.C MEANWHILE;
0500 - 1000 5 0 16 N DRLG WOC SQZ SJC 2250 2250
* PREPARE FOR 2ND CMT PLUG.
* P/U & RACK ON DERRICK 10 STANDS 5-1/2" DP.

1000 - 1130 1.5 0 16 N DRLG CIRC MPMP RIG 2250 2250 FILL UP HOLE WITH 468 BBLS OF WATER HAD RETURNS & LEVEL IS STEADY.
* FLOW CHECK, LEVEL STATIC.
1130 - 1200 0.5 0 16 N DRLG TI STDP RIG 2250 2250 900 0
POOH WITH 5-1/2" OEDP TO SURFACE.

1200 - 1530 3.5 0 16 N DRLG HT BHA RIG 2250 2250 P/U & M/U 16" ROTARY DRILLING BHA.
- P/U SLB 9-1/2" JAR SN# 94283HA @ 15:00 HRS.
1530 - 1545 0.25 0 16 N DRLG TI STDP RIG 2250 2250 1235 1580
RIH WITH 16" ROTARY DRILLING BHA ON 5-1/2" DP.

1545 - 1715 1.5 0 16 N DRLG RW BIT RIG 2250 2250 1580 2005 WASH DOWN WITH PHPA MUD TO CSG . HAD LOST CIRCULATE.
- DECISION MADE TO POOH TO SURFACE AND SPOT SECOND CEMENT PLUG.
1715 - 1730 0.25 0 16 N DRLG TO STDP RIG 2250 2250 2005 1235
POOH 16" ROTARY DRILLING BHA ON 5-1/2" DP TO TOP BHA.
1730 - 1800 0.5 0 16 N DRLG TO SPHDP RIG 2250 2250 1235 665
POOH ON 5.5" & 5.625" HWDP.
1800 - 1930 1.5 0 16 N DRLG TO BHA RIG 2250 2250 665 0
POOH & RACK BACK 16" ROTARY BHA.
1930 - 2000 0.5 0 16 N FISH RR TDS RIG 2250 2250
SERVICE TDS & CHECK FOR DROPPED OBJECTS.
2000 - 2100 1 0 16 N DRLG TI STDP RIG 2250 2250 0 2005
RIH WITH 5-1/2" OEDP FROM DERRICK TO 18-5/8" CSG SHOE.
2100 - 2130 0.5 0 16 N DRLG HT PEL RIG 2250 2250
R/U CMT LINE, SES & FOSV.
2130 - 2200 0.5 0 16 N DRLG PJSM NA RIG 2250 2250
HPJSM WITH ALL CREW INVOLVED AND DISCUSS RISKS AND OPERATION.
2200 - 2230 0.5 0 16 N DRLG PTST MPMP RIG 2250 2250
FLUSH LINES & PRESSURE TEST CMT LINES TO 2000 PSI, OK.

PERFORM CEMENT JOB AS FOLLOWS;

2230 - 0000 1.5 0 16 N DRLG CMP OEDP SJC 2250 2250 2005 1497 * RIG PUMP 150 BBLS 250 PPB LMC PILL.
* TAQA MIX AND PUMP 150 BBLS OF 118 PCF CEMENT SLURRY.
* DISPLACE WITH 24 BBLS WATER.
* HOLE IN VACUUM.

0000 - 0115 1.25 0 16 N DRLG HT STRG RIG 2250 2250 POOH 10 STANDS TO ABOVE CALCULATED TOC.
* POOH 6 STD AT SLOW SPEED 2-3 MIN/STD, THEN 4 STANDS AT NORMAL SPEED.
0115 - 0145 0.5 0 16 N DRLG CIRC MPMP RIG 2250 2250
CIRCULATE 1.5 X STRING VOLUME TO FLUSH.

POOH EXTRA 4 STANDS & W.O.C MEANWHILE;


0145 - 0459 3.25 0 16 N DRLG WOC SQZ RIG 2250 2250
* PREPARE FOR 3RD CMT PLUG.
* P/U & RACK BACK 5.5" DP FORM RACK.
Foreman Remarks

HRDH-2558 WILL BE DRILLED AS AN MK-1 J-SHAPE WELL TARGETING KHUFF-C RESERVOIR TO A TOTAL DEPTH OF +/- 12,381 FT MD/ 12,114
FT TVD (+/-250 FT INTO KFDA) IN THE WEST OF HRDH FIELD AND WILL BE COMPLETED WITH 4-1/2" 15K CEMENTED LINER.

- THIS WELL IS OUTSIDE SHALLOW GAS & MEDIUM JILH AREA.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2558 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/24/2024 - 07/26/2024
Report ID: OPERLMTDMRREP

===ERP===
- 1/2 LFL @ 100 M, RER 100 PPM @ 180 M & RER 30 PPM @ 320 M.
- STAGING AREA # 1 N-24.22198, E-48.98329, 1.6 NW.
- STAGING AREA # 2 N- 24.20964, E-48.97174, 1.6 SE.

===JOURNEY MANAGEMENT PLAN===


- RIG LOCATION: DISTANCE FROM DMG TO RIG IS 261 KM, NEAREST CITY IS HARADH.
- GOOD SIGNAL COVERAGE IN THE WELLSITE. CALL RIG SND-2012 AT (013-5746057) PRIOR ENTERING: PROVIDE EMERGENCY CONTACT.
- ALL VEHICLES SHOULD FOLLOW APPROVED ROAD & FOLLOW DRIVING SPEED LIMIT.

===PERSONNEL ON RIG===
- RIG CLERK AMERULLA KHAN # 8615841 ON LOCATION SINCE 8/28/23.
- ARAMCO FCT MESHAL ALQAHTANI ID#796673 ON LOCATION SINCE 06/05/2024.

===SAFETY & DRILLS===


PRE-TOUR SAFETY MEETING: 3, WEEKLY SAFETY MEETING 0, COLD WORK PTW:5, HOT WORK PTW 3, LIFTING PERSONNEL PTW 1, DIESEL TRANSFER PTW 0, CONFINED SPACE PTW 0, BUFFER
ZONE PTW 3, RADIOACTIVE PTW 0, JSA: 14, STOP CARDS: 07, NM: 0.

====DRILLS: ======
FIRE DRILL AT RIG: 0, FIRE DRILL AT MAIN CAMP: 0, MAN DOWN DRILL: 0, VERTICAL RESCUE DRILL: 0, MAN-LOST DRILL: 0, CONFINED SPACE RESCUE DRILL: 0, H2S DRILL -0 , H2S RESCUE
DRILL:0, PIT DRILL: 0, TRIP DRILL: 0, BOP FUNCTION TEST: 0, BOP/SPACE OUT DRILL 0, ACCUMULATOR TEST: 0, FIRE WATER SYSTEM EQUIPMENT FUNCTION TESTS: 0, OIL SPILL DRILL: 0.

====AUDIT ITEMS====
3-MCI (2ND 2024) 50 FINDINGS, 47 CLOSED, 3 OPEN

====SAFETY TOPICS====

- LINE OF FIRE HAZARD - BODY POSITIONING - PROPER HAND PLACEMENT AND FEET PLACEMENT.
- UTILIZING THE HANDS FREE TOOLS AND KEEPING SAFE DSITANCE.
- HEAT RELATED ILLNESSES AND HEAT STRESS AWARENESS CAMPAIGN.
- STOP WORK AUTHORITY & EMPOWERING ALL CREW MEMBERS.
- HOUSEKEEPING.
- MIXING CHEMICALS.
- WIND SPEED AND WEATHER CONDITION.
- CRANE LIFTING OPERATION.
- HANDLING TUBULARS.
- PROEPR HANDOVER OF THE JOB.

====RENTAL EQUIPMENT====
12" SLB SHOCK SUB SN: 90752A ON LOCATION SINCE: 06/07/2024.
9-1/2" SLB DRILLING JAR SN: 0671 ON LOCATION SINCE: 06/07/2024.
9-1/2" SLB DRILLING JAR SN: 94283HA ON LOCATION SINCE: 06/12/2024.

======WATER CONSERVATION IMPLEMENTED INITIATIVES====


- REDUCED WATER PITS: Y.
- DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: N.
- CLS CUTTINGS DRYER SYSTEM INSTALLATION. Y.

=== VISITORS ===


SANAD RIG SUPERINTANDENT TAHA MOHAMED.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF 0 0 API 0 0 Volts 0 9.5 900
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 INPHPA 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
0
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF 0 0 API 0 0 Volts 0 9.5 900
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 INPHPA 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
0

CAUST XC POLY-SAL BENT SODASH MICA-CRSE MICA-FINE


MUD 6 ( 50LBP ) 14 ( 55LB ) 60 ( 55LB ) 2 ( 2500L ) 2 ( 100LB ) 96 ( 50LB ) 96 ( 50LB )
TREATMENT STELSEALFN STELSL50 NUTPLUG
144 ( 50LB ) 96 ( 50LB ) 90 ( 50LB )

BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit CDB 1 1.58 266282
DRILL STRING 2 Bit Sub RIG 9.5 1 9.5 4.813 3.03 7 5/8 REG 7 5/8 REG 1 579024
3 Pony Collar RIG 9.5 1 31.03 206 280731
4 Roller Reamer RIG 16 1 16 3.125 8.66 7 5/8 REG 7 5/8 REG 240 3 POINT 130372159

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2558 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/24/2024 - 07/26/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
5 Drillcollar RIG 9.5 1 9.5 2.813 30.98 7 5/8 REG 7 5/8 REG 206 SPRL
6 Roller Reamer RIG 16 1 16 3.125 8.54 7 5/8 REG 7 5/8 REG 240 3 POINT 3112454
7 Drillcollar RIG 9.5 9 9.5 2.813 278.67 7 5/8 REG 7 5/8 REG 206 SPRL
8 Mechanical Jar SJS 9.5 1 33.32 1 94283HA
9 Drillcollar RIG 9.5 3 9.5 2.813 93.05 7 5/8 REG 7 5/8 REG 206 SPRL
10 Crossover RIG 9.5 1 9.5 3 3.6 7 5/8 REG 8 5/8 REG 1 573012
11 Drillcollar RIG 8.5 6 8.5 2.813 186.12 6 5/8 REG 6 5/8 REG 169 SPRL
12 Crossover RIG 8.5 1 8.5 2.813 3.58 6 5/8 REG 6 5/8 FH 1 77294
13 Heavy Weight Drillpipe (HWDP) RIG 6.625 9 6.625 4.5 284.31 6-5/8FH 6-5/8FH 70.8 CONV
14 Crossover RIG 6.625 1 6.625 2.75 3.61 NC46 XT54 1 NAP77292
15 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 5.5 4 281.32 VX54 VX54 42.9 CONV
16 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/15/2024 06/15/2024 SEASONAL N/A SEASONAL 388 CURRENT
OPERATION & SWA

Company VAR RZT RIG OES RIG ARM SJC MI2 OTH ARM

Category BITS CTRG RIG DFMS OTHR OTHR PCS SCS VAC WSC
PERSONNEL
1 14 49 2 6 2 3 6 1 2
Total
AND SERVICES No. of Persons
86
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 24 12 12 0 0 10 24

Standby/Tankers
TRUCKS/BOATS
DH-7499.

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 531 241 182 3900

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
BROADBAND INSTALLED 1/30/24, IT STILL UNABLE TO ACTIVATE.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NJYN-95 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/19/2024 - 06/21/2024
Report ID: OPERLMTDMRREP

SND-2013 @ NJYN-95 Limited Morning Report for 06/18/2024


Objective : (PILOT + TWIN Foreman(s)KEMP, SHELDON EVERETT / AZROU, ABDELHAFID
D&WO Morning Report (Service Providers View) Charge #: MK-1 WELL TARGETING UNZA Engineer TARIQ, BILAL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved RESERVOIR IN NJYN FIELD) Manager AMRI, ABDULLAH SALEH
SND-2013 (66-23535-0095)
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 3959 576-2525 576-2943
Date: Tuesday 06/18/2024 NJYN-95 (0-1) NJYN_95_1 CONTRACTOR /CLERK VSA T
576-2902

Last 24 hr operations Next 24 hr plan


CONT SL SET PLUG RUNS, SET THT PKR,RTV PRR PLUG, SPACE OUT, PICKLE TBG. CONT.PICKLE TBG & DISPLACED WELL T/ 70 PCF NACL BRINE, LND TBG HGR & P/T, SET
INTERWELL PLUG, BPV & ND BOP, NU LMV & XMASS TREE/PT. L/D DP.
Location Next Location
302 KM FROM DAHRAN MAIN GATE. NJYN-110
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
15,806 Size 12091 12091 Size 11,686 15,690 15,683 Top
Formations Comments
9 5/8 7 Depth
UNZA 15,690 15683' TVD (36' DEEPER)
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UNA2 15,740 15733' TVD (04' DEEPER)
15806 (Date) 100 0 302 UNA1 15,847 15839' TVD
72.7 (04/03/2024@1700 ) BUZA 15,966 15958' TVD (52' DEEPER)
UNZB 16,009 16001' TVD (40' DEEPER)
UNZC 16,061 16053' TVD (36' DEEPER)
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

CONT RIH & SET 3.688" PRR PLUG IN LOWER R-NIPPLE @ 15,161' IN 4 RUNS
0500 - 0800 3 0-1 EOW C COMP SET PLUGN SPL 15806 15806 0 15161
(BRUSH, SET PLUG, CHECK SET & SET PRONG RUNS),
POOH & PT PRR PLUG W/ 300 PSI, OK. R/D SAPESCO S/L.

HPJSM, P/T RIG SERVICE LINES TO 4,500 PSI; OK, M/U X-OVER (4-1/2" VTHC X
XT-54 BOX WITH SES)& TDS & SET HALL THT PKR AS BELOW:
- INCREASE PRESSURE INSIDE TBG T/ 500 PSI TO VERIFY IT IS HOLDING.
- INCREASE PRESSURE INSIDE TBG T/ 2,100 PSI IN 500 PSI INCREMENTS & HOLD
FOR 5 MINS & MONITOR TCA FOR ANY RETURNS.
- SLACK OFF 50 KLBS S/W TO SET THT PACKER.
0800 - 1200 4 0-1 EOW C COMP SET PKR HCO 15806 15806 15107 15107
- INCREASE PRESSURE GRADUALLY T/ 4,500 PSI & HOLD FOR 15 MINS, BLEED
OFF PRESSURE.
- RETURN TO NEUTRAL WT & APPLY 20 KLBS OVER PULL TO CONFIRM THE PKR
IS SET.
- APPLIED 2,300 PSI TO TUBING & P/U 45KLBS OP & SHEARED OUT OF PBR AS
PER HB, BLED TUBING TO 0 PSI.
- SPACE OUT WITH PBR IN 5K COMPRESSION.
1200 - 1300 1 0-1 EOW C COMP PTST TBG RIG 15806 15806
P/T TCA & TUBING EACH TEST 1500 PSI X 15 MIN W/ SANJEL PUMPER.
1300 - 1330 0.5 0-1 EOW C COMP OTH SFLN RIG 15806 15806
R/D SES & HP LINES.

1330 - 1930 6 0-1 EOW C COMP RTRV PLUGN SPL 15806 15806 HPJSM, R/U SAPESCO S/L. RIH / RETRIEVE PRR PLUG FROM LOWER "R" NIPPLE.
POH/LD PLUG. R/D SLICKLINE.

1930 - 2030 1 0-1 EOW C COMP PTST TBG RIG 15806 15806 CLOSE ANN BOP. PT TCA/TBG @ 1500 PSI X 15 MIN WITH 'STRING OPEN' TCS
OPEN- TEST CHARTED. BLED OFF. OPEN BOP.

P/U STRING TO NEUTRAL. WAIT 1HR TO ACHIEVE STATIC GEOTHERMAL


2030 - 2130 1 0-1 EOW C COMP OTH TBG ARM 15806 15806
TEMPERATURE PER HES.
- MEANWILE RIG UP SAPESCO P/UP MACHINE.

2130 - 2200 0.5 0-1 EOW C COMP HT PBR HCO 15806 15806 VERIFY SPACE-OUT POSITION: LOCATE PBR / APPLY 5K SDW ON SEAL ASSY.
MARK PIPE.

SPACE-OUT & M/U CIW TBG HGR: PULL BACK / LD JNTS #384, 383 & 382,381.
MU / RIH 4EA PJ( 9.83 FT +9.83 FT+9.83 FT+1.90 FT ) PUP JT+ #381+ #382+
TBG HGR (0.95')
2200 - 2330 1.5 0-1 EOW C COMP HT TBG HCO 15806 15806
- DRIFT EA JNT & TBG HGR ASSY WITH 3.795" OD (UTILIZING SAJA DT OILS
FLOATING DRIFT) AFTER M/U.
- POSITION STRING WITH SEAL ASSY AT APPRX. 10 FT ABOVE UPPER PBR PRIOR
START FINAL TBG PICKLE.

2330 - 0000 0.5 0-1 EOW C COMP PJSM TBG RIG 15806 15806 HPJSM, REVIEW SOLVENT & ACID PICKLE JSA WITH ALL PARTIES. ASSIGN
SPECIFIC RESPONSIBILITIES.

0000 - 0030 0.5 0-1 EOW C COMP HT SFLN SJC 15806 15806 RU / FLUSH SURFACE LINES THRU CMT LINES & CHK MANIFOLD. PT 5000 PSI X
10 MIN - CHARTED.

PUMP CHEMICAL PICKLE #1 THRU TBG W/ SANJEL CMT UNIT @ 5 BPM X 1600 PSI
FCP.
- 20 BBL H-VIS GEL SWEEP;
0030 - 0130 1 0-1 EOW C COMP CIRC MPMP RIG 15806 15806
- 54 BBL PICKLE (MUTUAL SOLVENT PER CORETRAX / COMPLETION FLUID
RECIPE).
- 20 BBL H-VIS GEL SWEEP;
- DISPLACE TRAIN WITH 146 BBL FRESH WATER (PICKLE @ 5 BBL FROM END OF

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NJYN-95 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/19/2024 - 06/21/2024
Report ID: OPERLMTDMRREP

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
TUBING).

0130 - 0430 3 0-1 EOW C COMP CIRC MPMP RIG 15806 15806 CLOSE ANN BOP. REV CIRC W/ FRESH WATER @ 6BPM. MAINTAIN CIRC UNTIL
CLEAR RETURNS AT SURFACE.

0430 - 0459 0.5 0-1 EOW C COMP PJSM TBG RIG 15806 15806 HELD PRE JOB SAFETY MEETING W/ SANJEL, MUD ENGR, RIG CREW PRIOR TO
PUMPING ACID PICKLE.
Foreman Remarks

==============================================================================================
WELL OBJECTIVE
NJYN-95 WILL BE DRILLED AS A VERTICAL EVALUATION DELINEATION WELL IN THE SOUTH OF NJYN FIELD TO EVALUATE THE DEVELOPMENT
OF UNAYZAH-A. BASED ON OPEN HOLE LOGS & FORMATION TESTING RESULTS, THE WELL WILL BE SIDETRACKED OR TWINNED TARGETING
THE BEST RESERVOIR QUALITY AND WILL BE COMPLETED WITH STAND-ALONE SAND SCREENS. NON-DAMAGING MUD ACROSS RESERVOIR
SECTION IN THE SIDETRACK SECTION. THE WELL WILL BE CONNECTED TO HARADH GAS PLANT.
==============================================================================================
EMERGENCY RESPONSE PLAN (ERP)
- H2S CONTENT FOR UNAYZAH "A2" RESERVOIR IS 0 MOLE %.
- THE WELL IS NOT LOCATED IN THE SHALLOW GAS AREA.
- 1/2 LFL @ 125 M, RER 100 PPM @ 0 M & RER 30 PPM @ 0 M.
- STAGING AREA #1: N: 2,632,229 E: 315,686 & STAGING AREA #2: N: 2,632,122 E: 316,837.
==============================================================================================
JOURNEY MANAGEMENT
- RIG IS APPRX. 29 KM OFF KHAKEER ROAD (SKID ROAD ~4.5 KM).
- ALL VEHICLES CARRY SUPPLY OF DRINKING WATER, CAR SURVIVAL KIT, FOLLOW SPEED LIMIT.
==============================================================================================
PERSONNEL ON BOARD
- FCT JAWAD ALNAKHLI #787687 ON LOCATION EFFECTIVE 06-06-2024.
- MATL EXPEDITOR ALHASSAN ALI ALTALAWAH #820939 ON LOC 06-09-2024.
- PDP MOHAMMAD AL DOSSARY #824509 ON LOC SINCE 12-JUNE-2024.
-ARAMCO DE AWOTU UTUNEDI #896247 ON LOC 6/16/24.
===================================================
RIG CREW SHORTAGE: 1 FLOOR MAN + 2 ROUSTABOUT.
==============================================================================================
PRE-TOUR SAFETY MEETING-2; MAINTENANCE MEETING-1; WEEKLY MEETING : 0 ; STOP CARDS- 30; SWA-3, STAR- 3.
DRILLS: 2 TRIP.
PTW: 10, JSA: 4, LTI FREE DAYS: 171.
RHSEI : 49 CLOSED, 7 OPEN, 1ST 3MCI AUDIT : 76 CLOSED, 3 OPEN
LPD: 33 CLOSED, 4 OPEN, 2ND 3MCI AUDIT : 40 CLOSED, 06 OPEN
HAZCOM: 10 CLOSED, 0 OPEN, WCI AUDIT - 06 OPEN, RIG ACTION LOG: 320 CLOSED, 15 OPEN.
===============================================================================================
FLAT-TIME KPI'S
- RIG MOVE KPI: 7.26 DAYS, ACTUAL: NONE.
- DP TRIPPING KPI: 19 STD/HR / ACTUAL:
- RUN 24" CSG: 4 JT/HR, ACT: 5.5 JT/HR.
- RUN 18-5/8" CSG: 7 JT/HR, ACT: 10.6 JT/HR
- RUN 13-3/8" CSG: 11.5 JT/HR, ACT: 14 JT/HR
- RUN 9-5/8" CSG: 14 JT/HR, ACTUAL: 19 JT/HR
- RUN 7" LINER: 14 JT/HR , ACTUAL: 15.6 JT/HR
- RUN 4-1/2" LINER: 13 JT/HR , ACTUAL:
- RUN 4-1/2" UPPER COMPLETION KPI: 13.5 JT/HR / ACTUAL:
==============================================================================================
RENTAL EQPT & DH TOOLS
- SLB 4 3/4" HYDRA JAR SN:24225E ON LOCATION 05-14-2024.
- WASTE FLUID EVAC: 4 TANKERS DRSS 1004277321, START DATE APRIL 15TH.
- SPRAY WATER TANKER, PLATE #VAA 548, ON LOC F/ 30-OCT-2023.
- 100 BBL 10% VDA TAQA/SANJEL ACID THAT WAS PREPARED 3/22/2024, ON LOCATION 04/16/2024.
==============================================================================================
NEXT WELL @ NJYN-110: LOCATION 100 % READY.
==============================================================================================
- REDUCED WATER PITS: Y.
- DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: Y.
- CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION: Y.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0-1 15,806 7.8 278 0 15,798 24.88 -62.87 221.82 4.2

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
75 PCF 0 0 API 0 0 Volts 0 10.5 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 92 0 0 0/0 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 8 0/0 0 0 0
MUD DATA 27

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
75 PCF 0 0 API 0 0 Volts 0 10.5 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 92 0 0 0/0 WBM-NAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC)

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NJYN-95 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 03/19/2024 - 06/21/2024
Report ID: OPERLMTDMRREP

27 0 0 8 0/0 0 0 0

MUD NACL BCTRN CAUST XC


TREATMENT 32 ( 2200L ) 8 ( 100LB ) 7 ( 50LBP ) 6 ( 55LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/04/2024 2 TRIP / BOP NORMAL N/A SEASONAL 173 2X PTSM, SUPVS SM

Company SPR RZT HCO INW RIG OES NFT RIG ARM SJC OTH SPL OTH MI3 ARM CRW CAM

Category CSR CTRG PSSC CCEXS RIG DFMS FILT OTHR OTHR PCS RENT SLS VAC WMS WSC WBCS WHES
PERSONNEL
9 14 1 1 37 2 4 25 4 4 1 3 1 1 2 1 1
Total
AND SERVICES No. of Persons
111
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 0 12 24 24 12 12 24 24 24 10 0 12 24 24

Standby/Tankers
TRUCKS/BOATS
DH-7463

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A 153 1137 250

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2371 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/27/2024 - 06/30/2024
Report ID: OPERLMTDMRREP

SND-2014 @ HRDH-2371 Limited Morning Report for 06/18/2024


Objective : (HRDH MK-1 , Foreman(s)ZOUATINE, RIAD / HALLAI, SAID
D&WO Morning Report (Service Providers View) Charge #: PKGP-S) Engineer SIAM, ABDELAZIZ
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23058-2371) Manager MOUSA, NEDAL ADEL
SND-2014
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 77714209 5762499 5762752
Date: Tuesday 06/18/2024 HRDH-2371 (0-1) HRDH_2371_1 CONTRACTOR /CLERK VSA T
5762850

Last 24 hr operations Next 24 hr plan


CIRC, SET LNR HGR, CMT JOB, SET PKR, REV CIRC, POOH AND L/D EXCESS PIPE. P/T 13 5/8" 10M BOP"S, RUN 3 5/8" CO/NEG TEST ASSY TO 10' ABOVE PBTD, CIRC, POSITIVE AND
NEGATIVE TEST, POOH.
Location Next Location
HRDH / KHAKHIR ROAD /281 KM FROM DH MAIN GATE HRDH-2412
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
15,639 Size 10827 10569 Size 13,546 15,636 15,376 Top
Formations Comments
9 5/8 4 1/2 Depth
KFDA 13,142 87 FT SHALLOWER IN TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) BKDC 13,720 43 FT SHALLOWER IN TVD
15639 (Date) 100 0 282 PKFU 13,810
100.2 (03/09/2024@2300 ) UNZB 14,154
UNZC 14,186
PUZU 15,229 382' DEEPER IN TVD.
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

CIRC 1.5 BTM'S UP (5 BPM & 1800 PSI) WHILE PREPARE SURFACE LINE FOR
0500 - 0600 1 0-1 EOW C CSG CIRC MPMP RIG 15639 15639
NORMAL AND REVERSE CIRC

SPACE OUT, P/U & M/U PACKER PLUS CMT MANIFOLD, HOOK UP SURAFCE LINES,
0600 - 0800 2 0-1 EOW C CSG OTH LINR ARM 15639 15639
NESR FLUSH AND P/T SURFACE LINES TO 6000 PSI. CIRC THROUGH CMT HEAD.
> 4 1/2" TOL @ 13,546 FT, 4 1/2" LINER SHOE @ 15,636 FT.

HPJSM, DROP 1.75" LINER HANGER SETTING BALL AND CHASE TO BALL SEAT
W/4-1 BPM. SET LINER HGR W/1,500 PSI AND HOLD PRESSURE FOR 5 MINS,
SLACK OFF LINER WT ( 27KLBS ) PLUS 50 KLBS ON TOL TO CONFIRM SET,
PRESSURE UP & EXTRUDE THE BALL SEAT W/ 2,500 PSI-OK.
> CHASE THE 1.75" BALL TO BALL SEAT W/2 BPM, PRESSURE UP TO 4,300 PSI
AND EXTRUDE THE BALL SEAT, BEELD OFF TO 0 PSI.
> TURN CLOCK WISE 15 ROUNDS TO RELEASE RUNNING TOOL.
0800 - 0930 1.5 0-1 EOW C COMP SET PKR PPC 15639 15639 13546 13546
> PU STRING 3 FT TO CONFIRM RUNNING TOOL IS RELEASED-OK, OBSERVED
STRING WT DECREASE BY 27 KIBS ( LINER WT).

CIRCULATE HOLE CLEAN (5 BPM-2060 PSI) MEANWHILE NESR BATCH MIXED 50


BBLS 125 PCF BLEND CMT SLURRY.
0930 - 1045 1.25 0-1 EOW C CSG CIRC MPMP RIG 15639 15639
> NESR BUILD CEMENT SLURRY COMPOSITION: 0.05PGS (NDF_1), 0.2%BWOC
(NFC_4) , 0.3%BWOC (DFR_1), 0.41 %BWOC (NR_12), 0.15 GPS (NFC_7L),
1.5GPS (NFC_6L), 1%BWOC (CXP_12), 35%BWOC (SFA_200).

CMT 4 1/2" LINER: NESR PUMP 75 BBLS 112 PCF NESR SPACER AHEAD, 50 BBLS
(225 SKS) 125 PCF CMT SLURRY, DROP DART PLUG AND NESR DISPLACE CMT W/
40 BBLS NESR SPACER AND 226 BBLS MUD. BUMP PLUG W/ 2,300 PSI (700 PSI
1045 - 1245 2 0-1 EOW C CSG CMC LINR NCS 15639 15639 OVER FDP) AND BLEED OFF PRESS. HAD NO BACK FLOW.
> HAD GOOD INDICATION OF LNR WIPER PLUG SHEARED.
> NO LOSSES DURING CMT JOB.
> FLUSH SURFACE LINES THRU SURFACE CMT LINES MANIFOLD ON RIG FLOOR
BEFORE STARTING DISPLACEMENT.

1245 - 1315 0.5 0-1 EOW C CSG OTH LINR ARM 15639 15639 P/U STRING AND ACTIVATE PKR SETTING DOGS. SET 4 1/2" X 7" PACKER PLUS
PRIME SET W/80 KLBS SET-DOWN WT, HAD GOOD INDICATION OF SHEAR.

STING OUT TO TOL, REVERSE CIRC. 2 TIMES ANNULUS CAPACITY. DUMP ALL
1315 - 1600 2.75 0-1 EOW C CSG CIRC MPMP RIG 15639 15639
SPACER, 10 BBLS GOOD CMT AND 70 BBL CONTAMINATED MUD WITH CMT.
CONT. CIRC AND CONDITION MUD. FLOW CHECK - WELL STATIC.
1600 - 1645 0.75 0-1 EOW C CSG OTH LINR ARM 15639 15639
R/D SURFACE LINES AND L/D PACKER PLUS CMT MANIFOLD ASSY.
1645 - 1745 1 0-1 EOW C CSG TO STDP RIG 15639 15639 13546 11669
POOH W/PACKER PLUS LNR RUNNING TOOL ON 5 1/2" DP'S TO 11,669 FT.
1745 - 2000 2.25 0-1 EOW C CSG RR DWKS RIG 15639 15639
SLIP & CUT 107 FT DRILLING LINE. SET RIG FLOOR AND CROWN SAVERS.

2000 - 0030 4.5 0-1 EOW C CSG TO STDP RIG 15639 15639 11669 3200 CONT. POOH W/PACKER PLUS LNR RUNNING TOOL ON 5 1/2" DP'S TO TOP 4"
DP'S AT 3200FT

0030 - 0100 0.5 0-1 EOW C CT HT STRG RIG 15639 15639 FLOW CHECK - WELL STATIC. CHANGE HANDLING EQUIPMENT FROM 5 1/2" DP
TO 4" DP.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2371 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/27/2024 - 06/30/2024
Report ID: OPERLMTDMRREP

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0100 - 0200 1 0-1 EOW C CT TO STDP RIG 15639 15639 3200 1128
POOH W/PACKER PLUS LNR RUNNING TOOL ON 4" DP'S TO 1128.
0200 - 0459 3 0-1 EOW C CT LDP SPDP RIG 15639 15639 1128 0
L/D 17 STD'S 4" DP AND 05 STND'S HWDP...ONGOING.
Foreman Remarks

HRDH-2371 WILL BE DRILLED AS MK-1 VERTICAL S-SHAPE WELL TARGETING UNZB/C RESERVOIR AS PRIMARY RESERVOIR IN THE SOUTHERN
PART OF HRDH FIELD. BASED ON OH LOGS AND MDT RESULTS, THE WELL WILL BE COMPLETED WITH 15K OH MSF OR CEMENTED LINER. THIS
WELL IS LOCATED OUTSIDE THE SHALLOW GAS AREA.

========== ERP ==========


> STAGING AREA #1: E 312789 - N 2649799 - (0.850 KM FROM WELL CENTER /N).
> STAGING AREA #2: E 312163 - N 2648654 - (0.650 KM FROM WELL CENTER/ SW).

========== ARAMCO POB & VISITORS ==========


> ARAMCO MATERIAL CLERK IMTIAZ NUMAN ID# 8187653 ON LOCATION SINCE 11/28/2023.
> ARAMCO ENGINEER JOSE ROJAS (#722617) ON LOCATION SINCE 06/15/2024.

========== SAFETY, DRILLS, INCD. & ALERTS ==========


> DRILLS: 02 TRIP DRILL.
> OBSERVATIONS: 25, PTW: 08, JSA: 12, SWA: 03, STAR: 04, HAZARD HUNT: 02.
> NEAR MISS: 0.
> SANAD 10 RULES TO LIVE BY 2 : CONDUCT GAS TEST WHEN REQUIRED.
> ARAMCO LIFE SAVING RULES 2 : VERIFY ISOLATION BEFORE STARTING ANY WORK.
> REVIEW AND DISCUSS: WIRE LINE OPERATION.
> HSE ALERT 69-24 - INJURY DURING ENGINE MAINTENANCE.
> HSE ALERT 70-24 - PIPE HANDLER MAIN ARM UNCONTROLLED DECENT.
> HSE ALERT 71-24 - TRIP AND FALL INCIDENT.
> HSE ALERT 72-24 - SNAKE BITE & SCORPION STING INCIDENTS.
> HSE ALERT -08-2024 : PINCHED FINGER INJURY.
> HSE ALERT -09-2024 : HAND CAUGHT BETWEEN MP PISTON AND PONY ROD.
> SAFETY CAMPAIGN: MANAGEMENT OF CHANGE AWARENESS.
** HELD STAND-DOWN MEETING WITH CREW AND DISCUSSED:
> MAJOR INCIDENT ALERT - ELECTRICAL SHOCK RESULTED IN FATALITY
> UPSTREAM MAJOR INCIDENTS AND ON-JOB FATALITIES STATISTICS
> D&WO SR. VICE PRESIDENT'S LETTER ON SAFE WORK PRACTICES.
========== AUDITS ==========
> PCI - 2023: TOTAL ITEMS: 165, OPEN 01, CLOSED: 164.
> WCI - 2024: TOTAL ITEMS: 12, OPEN 0, CLOSED: 12.
> LPD-2024: TOTAL ITEMS:23, OPEN: 01, CLOSED: 22.
> RHSEI APR 2024 TOTAL ITEMS: 44, OPEN: 04, CLOSED: 40.
> HAZCOM: TOTAL ITEMS:14, OPEN: 0, CLOSED: 14.
> 2ND QTR QSI: TOTAL ITEMS:38, OPEN: 01, CLOSED: 37.

========== FLAT TIME KPI ==========


> RIG MOVE KPI: 8.55 DAYS, ACTUAL: 11.9 DAYS.
> TRIPPING KPI: 19 STD/HR / ACTUAL: 20 STD/HR.
> 24" CSG KPI: 4 JT/HR / ACTUAL: 4 JT/HR.
> 18-5/8" CSG KPI: 7 JT/HR / ACTUAL: 7 JTS/HR.
> 13-3/8" CSG KPI: 11.5 JT/HR/ ACTUAL:12 JT/HR.
> 9-5/8" CSG KPI: 14 JT/HR/ACTUAL: 10 JT/HR.
> 7" LINER KPI: 14 JT/HR/ACTUAL: 14 JT/HR.
> 4-1/2 LINER KPI: 13 JT/HR / ACTUAL: XX JT/HR.
> 4-1/2" UPPER COMPLETION KPI:13.5 JT/HR, ACTUAL: XX JT/HR.

========== PLANNED VS ACTUAL CASING DEPTHS ==========


> 28'' SECT: 922' (+/- 50' INTO RUS) / ACTUAL: 915 FT.
> 22'' SECT: 3,069'(+/- 50' INTO AHMDI) / ACTUAL: 3,020 FT.
> 16" SECT: 5,680' (+/- 50' INTO MDTM) / ACTUAL: 5057 FT.
> 12" SECT: 10,781' (30' INTO BJD) / ACTUAL: 10831 FT.
> 8-3/8" SECT: 13,939' (450' INTO KFDA) / ACTUAL: 13850 FT.
> 5-7/8" SECT: 15,281' (150 FT INTO PUZU) / ACTUAL: 15639 FT.

========== PERSONNEL SHORTAGE & SAUDISATION ==========


> SND CREW SHORTAGE: 01 FLOOR HAND.
> SAUDIZATION: 43%.

========== WELLSITE CONTRACTOR EQUIPMENT ON LOCATION & RENTAL EQUIPMENT ==========


> RECEIVED SLB 4-3/4" H-DRILLING JAR CONNECTION 3-1/2'' IF SN#18571J ON 01/06/24 AT 23:00 HR.

========== WATER CONSERVATION IMPLEMENTED INITIATIVES ==========


- REDUCED WATER PITS: Y
- DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: Y.
- CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION: Y.

========== NEXT WELL STATUS ==========


> HRDH-2412. (100% READY)
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
MUD DATA 100 PCF 1 0 API 61 770 Volts 8.58 0 18,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2371 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/27/2024 - 06/30/2024
Report ID: OPERLMTDMRREP

0 1.8 HTHP 10 11 0 7 / 10 MXBROBM 1.2


Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 31 29 6/7 0 32,000 3.6
60

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
100 PCF 1 0 API 61 800 Volts 10.55 0 18,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.8 HTHP 10 9 0 7/9 MXBROBM 1.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 31 29 6/7 0 32,000 3.6
59

MUD OMNI-CTE
TREATMENT 2 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
15RR 15,639 15,639 DP Av DC Av Bit HHP 0 0 M333 5.875 SMT
Pressure GPM Jet Vel 0 0 0 I-Row O-Row DC Location Bearings
0 0 0 1 1 NO A X
BIT DATA
Serial Number Type Jets TFA
SA00416 MR613C 3 x 14 / 0.451
Gauge Other POOH Reason
1

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 0 N/A 0 0 0 Shock Sub Serial # Shock Sub Hrs
DRILL STRING Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/02/2024 06/02/2024 NORMAL NA SEASONAL 176 DAILY OPERATION
MEETING

Company OCS RZT RIG BDF OES NFT SJS PKP BR1 RO1 RIG ARM NCS MI2 OTH ARM

Category CSR CTRG RIG DFMS DFMS FILT JST LHES MLS MLS OTHR OTHR PCS SCS VAC WSC
PERSONNEL
2 14 42 1 1 3 0 2 0 2 8 2 5 2 2 2
Total
AND SERVICES No. of Persons
88
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 0 24 0 24 24 24 24 24 24 24

Operating Hours. 0 0 24 12 12 6 0 24 24 24 12 12 6 0 12 24

Standby/Tankers
TRUCKS/BOATS
DH-4787

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 494 133 52 1670

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
> BROAD BAND SYSTEM INSTALLED ON FEBRUARY 18TH, 2024. BUT STILL NOT ACTIVE. > VSAT HAS VERY SLOW CONNECTION

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2580 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/26/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

SND-2015 @ HRDH-2580 Limited Morning Report for 06/18/2024


Objective : (MK-1 VERTICAL Foreman(s)ROUIDJI, RACHID / TOMULET, ADRIAN FLORIN
D&WO Morning Report (Service Providers View) Charge #: TO 250 FT TVD INTO KFDA.) Engineer ALHELAL, AHMAD TWFIQ
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23058-2580) Manager HAQWI, MOHAMMED MOSA
SND-2015
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 4282 576-7880 576-7819
Date: Tuesday 06/18/2024 HRDH-2580 (0) HRDH_2580_0 CONTRACTOR /CLERK VSA T
576-7849

Last 24 hr operations Next 24 hr plan


R/U & RUN HAL W/L LOGGS #1, 2 & 3. CONTINUE HAL W/L LOGGING, PERFORM WIPER TRIP.
Location Next Location
0.544 KM N20E OF HRDH-1157 AND 0.976 KM S18E OF HRDH-1108. HRDH-2464
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
11,845 Size 9200 9187 Size 8,890 11,326 11,312 Top
Formations Comments
9 5/8 7 Depth
RUS 500
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) ARUM 1,000
11845 (Date) 100 0 243 LAMS 1,470 48' DEEPER
53.7 (04/25/2024@1200 ) AHMD 1,870 18' DEEPER
SFNY 2,196 48' DEEPER
SHUB 2,980 5' DEEPER
BYDH 3,225 58' DEEPER
MDTM 4,195 9' DEEPER
SULY 4,720 20' SHALLOWER
HITH 5,350 21' SHALLOWER
ABAR 5,850 31' DEEPER
ABCR 6,110 60' DEEPER
ABDR 6,290 100' DEEPER
MRRT 6,400 64' SHALLOWER
BADR 6,550 18' SHALLOWER
UHFR 6,980 4' SHALLOWER
BUHR 7,120 31' SHALLOWER
HDRR 7,320 9' SHALLOWER
BHDR 7,550 39' DEEPER.
HURN 8,310 37' SHALLOWER
DHRM 8,400 64' DEEPER.
MNJR 8,660 45' SHALLOWER
JILH 8,847 41' SHALLOWER
JLDM 9,044 34' SHALLOWER
BJDM 9,200 30' SHALLOWER
MDJR 9,454 36' SHALLOWER
SUDR 10,122 30' SHALLOWER
SDDM 10,385 28' SHALLOWER
BSRD 10,410 27' SHALLOWER
KHFF 10,703 3' DEEPER
KFAC 10,738 6' DEEPER
KFBC 10,835 4' DEEPER
KFB1 10,894 15' DEEPER
KFB2 10,987 28' DEEPER
KFB3 11,038 48' DEEPER
KFB4 11,071 59' DEEPER
KFB5 11,116 85' DEEPER
KFB6 11,172 107' DEEPER
KFB7 11,243 143' DEEPER
KFCC 11,322 113' DEEPER
KC01 11,336 115' DEEPER
KC02 11,357 112' DEEPER
KC03 11,377 115' DEEPER
KC04 11,391 116' DEEPER
KC05 11,409 124' DEEPER
KC06 11,426 127' DEEPER
KC07 11,441 118' DEEPER
KC08 11,453 63' DEEPER
KC09 11,474 69' DEEPER
KC10 11,486 76' DEEPER
KC11 11,527 102' DEEPER
KC12 11,560 103' DEEPER
KFDA 11,580 103' DEEPER
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

CONT. POOH WITH 5-7/8" ROTARY DRLG BHA TO SURFACE.


0500 - 0600 1 0 5 7/8 N DRLG HT BHA RIG 11845 11845
- L/D 2 X STRR, NBRR, 5-7/8" BIT, HAL MWD/GR TOOLS.
- MONITOR WELL THROUGH TRIP TANK, WELL STATIC.
0600 - 0700 1 0 EOW E LOG PJSM NA RIG 11845 11845
CLEAN & CLEAR RIG FLOOR, PREPARE TO RUN HAL LOGGING.

HPJSM, R/U HAL W/L SHEAVES. P/U & M/U HAL LOGGING TOOLS RUN#1: ACRT-
AST-IDT-ICT-GR (RESISTIVITY-SONIC-DIRECTIONAL-CALIPER-GR), TEST & CHECK
0700 - 0930 2.5 0 EOW E LOG OTH NA HWP 11845 11845
TOOLS - OK.
- TOOL LENGTH = 106', MAXIMUM OD = 5", TOOL WEIGHT = 2212 LBS.
- MONITOR WELL TROUGH TRIP TANK, WELL STATIC.
0930 - 1100 1.5 0 EOW E LOG OTH NA HWP 11845 11845

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2580 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/26/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
RIH WITH HAL W/L LOGGING TOOLS RUN#1 TO 7" LINER SHOE AT 11326 FT.
- MONITOR WELL TROUGH TRIP TANK.

HAL W/L RIH TO BTM @ 11842' (W/L DEPTH) & RECORD LOG #1 F/11842' TO
11125' (200' INSIDE 7" SHOE). RECORD REPEAT PASS.
1100 - 1500 4 0 EOW E LOG LOG WLT HWP 11845 11845 11842 11125
- AVERAGE CALLIPER: 6.05".
- MAX DOWN HOLE TEMP: 254 DEG F.
- MONITOR WELL TROUGH TRIP TANK, WELL STATIC.

POOH WITH LOG RUN# 1 WHILE PROCESS DATA & CONFIRM SAME WITH RDD.
1500 - 1800 3 0 EOW E LOG OTH NA HWP 11845 11845
- L/D RUN #1 TOOL STRING.
- MONITOR WELL TROUGH TRIP TANK, WELL STATIC

P/U & M/U HAL LOGGING TOOLS RUN#2: DSDL-DSNT-CSNG-GR (DUAL DENSITY-
NEUTRON-SPECTRAL GAMMA-GR), LOAD RADIOACTIVE SOURCE, TEST & CHECK
1800 - 2000 2 0 EOW E LOG OTH NA HWP 11845 11845
TOOLS - OK.
- TOOL LENGTH = 96', MAXIMUM OD = 4.5", TOOL WEIGHT = 2395 LBS.
- MONITOR WELL TROUGH TRIP TANK, WELL STATIC.

2000 - 2200 2 0 EOW E LOG OTH NA HWP 11845 11845 RIH WITH HAL W/L LOGGING TOOLS RUN#2 TO 7" LINER SHOE AT 11326 FT.
- MONITOR WELL TROUGH TRIP TANK.

HAL W/L RIH TO BTM @ 11842' (W/L DEPTH) & RECORD LOG #2 FROM 11842' TO
2200 - 0000 2 0 EOW E LOG LOG WLT HWP 11845 11845 11842 11125
11125' (200' INSIDE 7" SHOE). RECORD REPEAT PASS.
- MONITOR WELL TROUGH TRIP TANK, WELL STATIC.

POOH WITH LOG RUN# 2 WHILE PROCESS DATA & CONFIRM SAME WITH RDD.
0000 - 0330 3.5 0 EOW E LOG OTH NA HWP 11845 11845
- REMOVE RADIOACTIVE SOURCE & L/D RUN #2 TOOL STRING.
- MONITOR WELL TROUGH TRIP TANK, WELL STATIC

HPJSM, P/U AND M/U HAL LOGGING TOOL RUN#3 RDT-GR (PRESSURE POINTS).
0330 - 0430 1 0 EOW E LOG OTH NA HWP 11845 11845
- TOOL LENGTH = 73', MAX TOOL OD = 5", TOOL WEIGHT = 1944 LBS.
- MONITOR WELL THROUGH TRIP TANK WHILE LOGGING OPERATIONS.

0430 - 0459 0.5 0 EOW E LOG OTH NA HWP 11845 11845 RIH WITH HAL W/L LOGGING TOOLS RUN#3 RDT-GR.
- MONITOR WELL TROUGH TRIP TANK.
Foreman Remarks

==========WELL OBJECTIVE=============
HRDH-2580 IS PLANNED TO BE DRILLED AS MK-1 VERTICAL GAS WELL TARGETING KHUFF-C RESERVOIRS AS PRIMARY TARGET AND KHUFF-A &
KHUFF-B AS SECONDARY TARGET. THE WELL WILL BE COMPLETED WITH 15K CEMENTED LINER COMPLETION.
========ERP========
- THE WELL IS LOCATED OUTSIDE THE SHALLOW GAS BOUNDARIES AND NON-POPULATED AREA.
- LFL @ 99 M, RER 100 PPM @ 199 M & RER 30 PPM @ 1085 M.
- H2S IS 0.01 MOLE % THROUGH KHUFF C-1 RESERVOIR.
- STAGING AREA #1 (1.2 KM NNE): (49.0919845 24.354752). - STAGING AREA #2 (1.3 KM SSW): (49.0779845 24.336752 )
- RELIEF WELL: HRDH-1075 (1.2 KM).
===JOURNEY MANAGEMENT PLAN===
- RIG LOCATION: DISTANCE FROM DMG TO RIG IS 243 KM & NEAREST CITY IS HARADH.
- GOOD SIGNAL COVERAGE IN THE WELLSITE. CALL RIG SND-2015 AT (013-576-7880) PRIOR ENTERING: PROVIDE EMERGENCY CONTACT.
- ALL VEHICLES SHOULD FOLLOW APPROVED ROAD & FOLLOW DRIVING SPEED LIMIT.
- THE RIG IS 1.5 KM SKID ROAD FROM THE BLACK TOP, NIGHT DRIVING IS PROHIBITED, ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
===PERSONNEL ON RIG===
- ARAMCO CLERK AKRAM AZIZ KHAN #8437843 ON LOCATION SINCE 05/14/2024.
- ARAMCO MATERIALS CLERK RAYAN ALMUTAIRI #820696. ON DUTY SINCE 6/17/2024 AT 09:00HRS, TAXI REQUEST #3000138608.
========SAFETY========
*PRE-TOUR SAFETY MEETINGS: 2, WEEKLY SAFETY MEETING:0, H2S 0, RESCUE 0, MAN DOWN DRILL: 0, PIT DRILL:02TRIP DRILL: 02 SPILL DRILL: 0, FIRE DRILL: 0, FIRE PUMP DRILL: 0,
CONFINED SPACE RESCUE DRILL: 0, MAN LOST DRILL: 0, ACCUMULATOR DRILL: 0, VERTICAL RESCUE DRILL: 0, SPILL REPONSE DRILL:0.
** STOP CARDS: 35, SWA: 06, JSA: 14, NM: 0.
* PERMITS TO WORK:
COLD WORK:4, HOT WORK: 0, MAN RIDER:0 , CONFINED SPACE: 02 RADIOACTIVE PERMIT: 0, DIESEL TRANSFER PERMIT: 0, LIFTING PERSONAL PERMIT: 0 BUFFER ZONE 02, THIRD PARTY
PERMIT: 0, ISOLATION: 02
SAFETY TOPICS DISCUSSED: HAZARD RISK INVOLVE IN WIRE LINE LOGGING, KEEP SAFE DISTANCE FROM HIGH TENSION LINES, HANDS & FINGERS PLACMENT, PINCH POINT, LINE OF FIRE,
HOUSEKEEPING, CRANE PARKING, STOP WORK AUTHORITY.
====== PCI & WCI FINDING ======
TOTAL PCI FINDINGS: 98 (92 CLOSED, 06 OPEN) (94 % CLOSED)
PRIORITY#1 TOTAL 12 ITEMS, (12 CLOSED, 0 OPEN) (100 % CLOSED)
PRIORITY#2 TOTAL 78 ITEMS, (78 CLOSED, 0 OPEN) (100 % CLOSED)
PRIORITY#3 TOTAL 07 ITEMS, ( 0 CLOSED, 4 OPEN) ( 60 % CLOSED)
PRIORITY#4 TOTAL 01 ITEMS, ( 0 CLOSED, 1 OPEN ( 0% CLOSED)

TOTAL WCI FINDINGS: 12 (09 CLOSED, 03 OPEN) (70% CLOSED)


PRIORITY#1 TOTAL 01 ITEM, (01 CLOSED, 0 OPEN) (100% CLOSED)
PRIORITY#2 TOTAL 09 ITEMS, (08 CLOSED, 01 OPEN) (99% CLOSED)
PRIORITY#3 TOTAL 02 ITEMS, (00 CLOSED, 02 OPEN) (00% CLOSED)
========== WATER CONSERVATION IMPLEMENTED INITIATIVES ==========
- REDUCED WATER PITS: Y
- DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: Y.
- CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION: Y.
===============RENTAL TOOLS ON LOCATION ==============
- SLB 4-3/4" DRILLING JAR (XT39), SN#02131KA ON LOCATION ON 06/09/2024 AT 20:00 HRS.
- SLB 4-3/4" DRILLING JAR (3-1/2" IF), SN#41721K ON LOCATION ON 06/10/2024 AT 19:00 HRS

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-2580 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 04/26/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

========= SPECIAL EQUIPMENT ON LOCATION ===============


- SLB CLS CUTTING DRYER FROM SPUD.
- SLB FRAC TANKS 2 X 500 BBLS ON LOCATION FROM 05/14/2024.
- HALL MUD LOGGER ON LOCATION FROM 05/13/2024.
- NOV CENTRIFUGE START R/U ON 6/4/2024.
====== NEXT LOCATION ======
- GAS WELL HRDH-2464 - 100 % READY.
===VISITORS===
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 11,845 1.7 280.41 0 11,831 35.1 -136.12 461.18 0.01

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
69 PCF 1 0 API 65 615 Volts 6.4 0 30,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.8 HTHP 23 14 0 10 / 13 OBM 0.4
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 18 12 8/9 0 176,000 3.6
57
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
69 PCF 1 0 API 65 630 Volts 6.4 0 30,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.8 HTHP 23 14 0 10 / 13 OBM 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 18 12 8/9 0 176,000 2.2
59

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
7RR 11,329 11,845 DP Av DC Av Bit HHP 0 0 M333 5.875 HTC
Pressure GPM Jet Vel 0 0 0 I-Row O-Row DC Location Bearings
0 0 0 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
7913429 TD407F 3 x 14 / 0.451
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 72 0 0 0 0 43
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/10/2024 06/10/2024 CALM N/A HOT 54 HANDS & FINGERS,
SWA

Company RZT SPS RIG BAR OES SJS HMS RIG ARM OCT OTH MI3 ARM HWP TUB

Category CTRG DPDS RIG DFMS DFMS JST MLS OTHR OTHR PCS VAC WMS WSC WLS ISPCT
PERSONNEL
12 2 40 1 1 1 4 6 2 2 1 6 2 6 4
Total
AND SERVICES No. of Persons
90
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 12

Operating Hours. 0 0 24 12 12 0 24 12 12 0 12 12 24 24 10

Standby/Tankers
TRUCKS/BOATS
jd-6954

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 414 230 65 1800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NEW RIG MOBILIZATION BI-MOB
Print Date: 06/18/2024 06:21 05/24/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

SND-2016 @ *MOBILIZATION* Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Objective : (MOBILIZATION) Foreman(s)HOLLAND, CURTIS DWAIN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Charge #: Engineer ALAWAD, SULTAN YAQOUB
SND-2016
() Manager DOSSARY, AYEDH HAMAD
Daily
(0500-0500) Saudi Aramco Well RIG FORMAN VSAT
Wellbores:
Date: Tuesday 06/18/2024 *MOBILIZATION* 0135767895

Last 24 hr operations Next 24 hr plan


RIG UP & COMMISSIONING RIG UP & COMMISSIONING
Location Next Location
SND-2016 HRDH-2309
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date)
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

WORKING ON CLOSING FINDINGS ON AUDIT. TEST TOP DRIVE, ROTARY TABLE AND
0500 - 1700 12 PRE M MAIN RU NA RIG TOP DRIVE ROTATION. PUTTING PIPE ON PIPE RACKS AND START MEASURING
DRILL PIPE.TEST FLARE IGNITORS.EMERGENCY SHUT DOWN FROM DRILLER
CABIN,CHANGE OVER TO EMERGENCY GEN. FUNCTION TEST KOOMEY
1700 - 0459 12 PRE M SUSP OTH NA RIG
WAIT ON DAYLIGHT.
Foreman Remarks

==================================================RIG VISITS==================================================
- SANAD DIRECTOR LIBAN HUSSEIN ON LOCATION 05/06/2024
- SANAD SUPERINTENDENT KENNETH ROBBINS ON LOCATION 0/08/2024
===========================================================================================================
- NGGDD HSE ADVISOR FREDDY UDEH ON LOCATION
- HASSAN QHATANI FCT ON LOCATION
- MARTIN ELS DOECD ADVISOR ON LOCATION FOR PCI
- MESHARI ALMOHALHAL #782742 DOECD ON LOCATION
- MATHEW THOOVONU #7080091 NGGDD HSE CORDINATOR VISITED RIG.
===========================================================================================================
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A SEASONAL N/A SEASONAL PRE TOUR/PRE OPS

Company RIG ARM ARM

Category RIG OTHR WSC


PERSONNEL
50 3 1
Total
AND SERVICES No. of Persons
54
INFORMATION
Personnel on Loc. Hrs. 24 24 24

Operating Hours. 24 24 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
BOTH RIG COMPUTERS HAVE SOFTWARE ISSUES TROUBLE TICKETS HAVE BEEN MADE RIG PHONES HAVE EXPIRED CERTIFICATES AND TROUBLE TICKETS HAVE BEEN
MADE

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 1 of 1


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MZLJ-202101 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:21 04/25/2024 - 08/10/2024
Report ID: OPERLMTDMRREP

SND-3001 @ MZLJ-202101 Limited Morning Report for 06/18/2024


Objective : (MZLJ-202101 Foreman(s)BELLEMORE, LEVI JOEL / ELSHARKAWY, MOHAMED IBRAHIM
WILL BE DRILLED AS A ALDOSSARY, MOHAMMED ADNAN / ALZAYED, ABDULRAHMAN
D&WO Morning Report (Service Providers View) Charge #: Engineer
Rig HORIZONTAL TARGETING ABDULLAH
Copyright 2024 Saudi Aramco. All Rights Reserved SND-3001 (87-24086-4236) SARAH W/5000 LATERAL Manager HAZAWBAR, ALHASSAN FARIS
Daily Onshore TD @ 19,278' MD) THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores:
8821677712 773 577-6128 013-577-61 31
Date: Tuesday 06/18/2024 MZLJ-202101 (0) MZLJ_202101_0
CONTRACTOR /CLERK VSA T
577-6129

Last 24 hr operations Next 24 hr plan


FLOW CHECK, POOH TO SURFACE & LAY DOWN SPERRY RSS ASSEMBLY, P/U & TORQUE UP BAKER RIG UP BAKER CSG RUNNING EQP, MAKE UP SHOE TRACK, RIH WITH 7" LINER, P/U & RIH W/7"
CMT HEAD ASSY. LINER HANGER ON 5.5" DP STD'S TO BOTTOM, DISPLACE WELL TO 106 PCF.
Location Next Location
299 KM FROM DMM *RIG MAINTENANCE*
Current Depth (ft) Liner TOL MD TVD Formation Tops
14,367 Last Csg Size MD TVD Size Top
9 5/8 9445 9445 Formations Comments
Depth
BJDM 9,415 39' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SUDR 10,618 68' DEEPER
14367 (Date) 100 0 299 SDDM 10,900 32' DEEPER
43.4 (05/05/2024@1900 ) KHFF 11,341 39' DEEPER
KFAR 11,408 44' DEEPER
KFBR 11,571 41' DEEPER
KFCR 12,050 34' DEEPER
KFDA 12,311 29' DEEPER
BKDC 12,747 19' DEEPER
UNZA 12,765 24' DEEPER
QUSB 12,775 27' DEEPER
QBHS 13,703 37' DEEPER
SARH 13,712 38' DEEPER
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0500 - 0530 0.5 0 8 3/8 N DRLG WCNT NA RIG 14367 14367
FLOW CHECK THROUGH MPD WELL STATIC.

0530 - 0630 1 0 8 3/8 N DRLG TO STDP RIG 14367 14367 14367 13902 PULL OUT OF OPEN HOLE 5 STDS. SPERRY SUN DIRECTIONAL I-CRUISE RSS,
BUILD BHA ON ELEVATORS W/ 5-1/2" DP, NO OVERPULL OBSERVED.
0630 - 0645 0.25 0 8 3/8 N DRLG WCNT NA RIG 14367 14367
FLOW CHECK THROUGH MPD WELL STATIC.

0645 - 1200 5.25 0 8 3/8 N DRLG TO STDP RIG 14367 14367 13902 9445 TRIP OUT OF OPEN HOLE WITH SPERRY SUN DIRECTIONAL I-CRUISE RSS, BUILD
BHA ON ELEVATORS W/ 5-1/2" DP TO 9-5/8" SHOE, NO OVERPULL OBSERVED.
1200 - 1230 0.5 0 8 3/8 N DRLG WCNT NA RIG 14367 14367
FLOW CHECK @ 9-5/8" CSG SHOE, WELL STATIC.
1230 - 1530 3 0 8 3/8 N DRLG OTH NA HUD 14367 14367
HPJSM, REMOVE HALLIBURTON MPD BEARING & INSTALL TRIP NIPPLE.
1530 - 1600 0.5 0 8 3/8 N DRLG CIRC MPMP RIG 14367 14367
PUMP SLUG. DROP 2.75" DRIFT AS PER LINER HANGER ENGINEER.

1600 - 2000 4 0 8 3/8 N DRLG TO STDP RIG 14367 14367 9445 2085 TRIP OUT CASED HOLE WITH SPERRY SUN DIRECTIONAL I-CRUISE RSS, BUILD BHA
ON ELEVATORS W/ 5-1/2" DP.
2000 - 2015 0.25 0 8 3/8 N DRLG WCNT NA RIG 14367 14367
FLOW CHECK BEFORE BHA-WELL STATIC.
2015 - 2030 0.25 0 8 3/8 N DRLG TO STDP RIG 14367 14367 2084 1614
CONT TRIP OUT IN CASED HOLE W/5.5" DP STDS.
2030 - 2045 0.25 0 8 3/8 N DRLG WCNT NA RIG 14367 14367
FLOW CHECK AT BHA-WELL STATIC.

2045 - 2215 1.5 0 8 3/8 N DRLG LDP BHA RIG 14367 14367 1614 920 POOH & RACK BACK 3 X 5.5" HWDP STD'S, L/D REMAINING 5.5" HWDP JOINTS TO
THE RACK.
2215 - 2230 0.25 0 8 3/8 N DRLG TO STDP RIG 14367 14367 917 450
CONT TRIP OUT OF HOLE W/ 8-3/8" SPERRY RSS BHA ON 5.5" DP STDS.

2230 - 0000 1.5 0 8 3/8 N DRLG LDP BHA RIG 14367 14367 450 72 CONT POOH & L/D 5.5" HWDP JTS TO THE RACK, L/D 6-1/2"NOV HYDRAULIC
DOUBLE ACTING JAR SN#GFJ650-S2830022.

TRIP OUT OF HOLE W/ LAYING DOWN ALL 8-3/8" SPERRY BHA AS FOLLOWS:
0000 - 0300 3 0 8 3/8 N DRLG LDP BHA RIG 14367 14367 72 0 1 X X/O, 1 X WF MPD FLOAT SUB, 1 X SPERRY DHS, 1 X WF MPD FLOAT SUB, 1 X
SPERRY DHS, MWD TOOLS, I-CRUISE RSS, 8-3/8" KYMERA BIT S.N: 7918147,
DULL GRADING: 2-2-WT-A-E-I-CT-TD.
0300 - 0330 0.5 0 8 3/8 N DRLG RR TDS RIG 14367 14367
PERFORM RIG SERVICE, CLEAN & CLEAR RIG FLOOR.

0330 - 0430 1 0 8 3/8 N DRLG OTH NA RIG 14367 14367 HPJSM, P/U & TORQUE UP BAKER CMT HEAD ASSY ON RIG FLOOR LAY DOWN
SAME.
0430 - 0459 0.5 0 8 3/8 N CSG HT PEL BCR 14367 14367
RIG UP BAKER CASING RUNNING EQUIPMENT .......ONGOING AT REPORT TIME.
Foreman Remarks

THE MZLJ-202101 WELL IS A PART OF THE UNCONVENTIONAL DEVELOPMENT PROGRAM FOR THE SARAH FORMATION IN THE MAZALIJ FIELD.
THE WELL MZLJ-2021010 WILL BE DRILLED WITH A 5000 FT EFFECTIVE LATERAL LENGTH TARGETING LOWER SARH FORMATION TO INCREASE GAS PRODUCTION OF THE MAZALIJ

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MZLJ-202101 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:21 04/25/2024 - 08/10/2024
Report ID: OPERLMTDMRREP

DEVELOPMENT PLAN. THE PLANNED TD FOR MZLJ-202101_0 IS APPROXIMATELY 19,278 FT MD TO BE COMPLETED IN 96 DAYS.
======================================================================================================
299 KM F/ DHARAN MAIN GATE.
JOURNEY MANAGEMENT: FROM UDH, DRIVE TO HARAHD, TURN RIGHT @ HARADH JUNCTION, DRIVE TOWARD KHARJ UNTIL YOU REACH GHAZAL BRIDGE, TAKE RIGHT THEN DRIVE ALMOST 15
KM BLACK TOP THEN TURN RIGHT AND DRIVE 5 KM SKID ROAD TO THE RIG. CALL SND-3001 MEDIC AT 013-804-9614 OR ARAMCO CLERK AT 013-577-6129 PRIOR TO TURNING OFF MAIN
BLACKTOP. PROVIDE CLERK - NAME OF COMPANY, NUMBER OF PERSONNEL, COLOR OF VEHICLE AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL. NIGHT DRIVING BY 3RD PARTY
PERSONNEL IS NOT RECOMMENDED.
======================================================================================================
** SURFACE COORDINATE: N-2693763.79, E-208510.78
======================================================================================================
SAFETY DATA:
JSA REVISED: 00, JSA REVIEWED:09, PTW:05, LOTO:02
TOTAL SOC'S: 20, STOP WORK: 02, HH: 02, NM: 01, DRILL: 04 (2 PIT, 2 TRIP)
3RD INHOUSE AUDIT - TOTAL FINDINGS: 91, CLOSED: 70 OPEN: 21
2ND QTR 3MCI - TOTAL FINDINGS: 60, CLOSED: 60, OPEN: 00
1ST RHSEI 2024 - TOTAL FINDINGS: 69, CLOSED: 67, OPEN: 02
1ST WCE 2024 - TOTAL FINDINGS: 12, CLOSED: 12, OPEN: 00
DISUSSED NEAR MISS (MYHSE # 1806134) WITH BOTH CREWS IN PRE-TOUR SAFETY MEETINGS.
======================================================================================================
ARAMCO PERSONNEL:
ARAMCO URDD SMP FAISAL AYAZ # 8482849 ON LOCATION SINCE 06/05/2024.
ARAMCO MATERIAL EXPEDITOR BADER AL ZUABI, BADGE # 8657517 ON LOCATION SINCE 06/13/2024.
ARAMCO URDD HSE ADVISOR AHMED RAGAB # 8085478 ON LOCATION SINCE 06/13/2024.
======================================================================================================
DOWNHOLE RENTAL TOOLS:
*RECEIVED 6-1/2"NOV HYDRAULIC DOUBLE ACTING JAR SN#GFJ650-S2830022 ON LOCATION ON 06/07/2024 @ 10:00 HRS, RIH ON 06/11/2024 @ 18:00 HRS, L/D ON 06/18/2024 @ 00:00 HRS.
======================================================================================================
**WELLSITE RENTAL EQUIPMENT ON LOCATION
** 1 EA AL MADEED SPRAY TANKERS ON LOCATION: 04/15/2024.--PLATE: VTA3641 - --UNDER DRSS #1004261265
** 1 EA AL MADEED VAC TANKERS ON LOCATION: 05/15/2024.--PLATE: 2787 XRA - --UNDER DRSS # 1004327611
======================================================================================================
LITHOLOGY:
BG GAS:
MAX GAS:
======================================================================================================
24" CASING POINT @ 120'.
18-5/8" CASING POINT @ 1,055'.
13-3/8" CASING POINT @ 4,316'.
9-5/8" CASING POINT @ 9,445'.
7'' LINER SHOE DEPTH ESTIMATED @ 14,275' MD.
4.5" CASING POINT ESTIMATED @ 19,278' MD.
======================================================================================================
WATER WELLS - MZLJ-817 & MZLJ-824.
======================================================================================================
NEXT WELL: RIG MAINTENANCE.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 14,367 89.5 329 0 13,762 292.23 -177.23 1,121.31 7.27

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
114 PCF 2 0 API 56 518 Volts 4.34 0 35,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 4 HTHP 12 10 0 7 / 13 OBM 2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 38 32 6/7 0 0 6
66
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
114 PCF 2 0 API 56 521 Volts 4.34 0 35,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 4.2 HTHP 12 9 0 7 / 13 OBM 1.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 38 32 5/6 0 0 5.4
65

MUD BARITE
TREATMENT 14 ( 5000L )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
6 12,572 14,367 DP Av DC Av Bit HHP N/A N/A HYB 8.375 HTC
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A 2 2 WT A E
BIT DATA
Serial Number Type Jets TFA
7918147 K5M426R 2 x 18 / 2 x 14 / 21.019
x 12 /
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
DRILL STRING Y 85 N/A N/A N/A N/A 85
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MZLJ-202101 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:21 04/25/2024 - 08/10/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 8.375 1 8.375 0.9 4.5 REG 7918147
2 RSS SPS 6.75 1 6.75 34.94 81.72 1346843436
3 Stabilizer SPS 8.25 1 6.5 2.875 5.2 NC46 NC46 83.38 90757967
4 Measurement While Drilling (MWD) SPS 6.75 1 6.75 10.09 103.6 13071170
5 Screen sub SPS 6.75 1 6.75 2.813 6.65 NC50 NC50 101.71 129216964
6 Float Sub WDS 6.75 1 6.688 2.875 2.61 NC50 NC50 101.71 TGM-FS-3290
7 Screen sub SPS 6.75 1 6.656 2.85 6.8 NC50 NC50 101.71 13981544
8 Float Sub WDS 6.75 1 6.531 2.8 2.29 NC50 NC50 101.71 TGM-FS-341
9 Crossover RIG 6.5 1 6.5 2.875 2.65 NC50 XT54 97.86 MJS2361186
10 Heavy Weight Drillpipe (HWDP) RIG 5.5 5 5.5 3.25 153.85 XT54 XT54 52.51 CONV RIG
11 Hydraulic Jar NOJ 6.5 1 6.5 2.75 34.08 XT54 XT54 1,510 JF650-52833
12 Heavy Weight Drillpipe (HWDP) RIG 5.5 5 5.5 3.25 152.07 XT54 XT54 52 CONV RIG
13 Drillpipe RIG 5.5 15 5.5 4.67 473.82 XT54 XT54 24.7 S135 PREMIUM RIG
14 Heavy Weight Drillpipe (HWDP) RIG 5.5 24 5.5 3.25 728.65 XT54 XT54 52.51 CONV RIG
15 Drillpipe RIG 5.5 1 5.5 4.67 0 XT54 XT54 24.7 S135 PREMIUM RIG

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/11/2024 06/11/2024 N/A N/A SEASONAL 4,151 2 X DAILY

Company BCR BHT RZT SPS RIG BAR SMI MJH NOJ BLH HUD HMS ARM SCM MI2 OTH ARM

Category CSR BITS CTRG DPDS RIG DFMS DFMS SEC JST LHES MPD MLS OTHR PCS SCS VAC WSC
PERSONNEL
3 1 15 4 48 2 2 8 0 1 8 4 3 3 1 2 2
Total
AND SERVICES No. of Persons
107
INFORMATION
Personnel on Loc. Hrs. 12 24 24 24 24 24 24 24 0 24 24 24 24 24 24 24 24

Operating Hours. 0 24 0 24 24 24 24 0 24 24 24 24 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
ab-5571

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 890 456 112 2700

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1353 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/12/2024 - 08/06/2024
Report ID: OPERLMTDMRREP

SND-3002 @ HWYH-1353 Limited Morning Report for 06/18/2024


Objective : (GAS PRODUCER) Foreman(s)AHMED ALI, MOHAMED GHALEB / JELWAH, ALI MOHAMMED
D&WO Morning Report (Service Providers View) Charge #: Engineer BAYOUNES, AHMED TAREG
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23053-1353) Manager MOUSA, NEDAL ADEL
SND-3002
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 88-216-777 -12-717 013-87-65- 182 013-87-65- 149
Date: Tuesday 06/18/2024 HWYH-1353 (0) HWYH_1353_0 CONTRACTOR /CLERK VSA T
013-87-65- 189

Last 24 hr operations Next 24 hr plan


JET BOP, R/U CSG RUNNING EQUIP., FMH DUMMY RUN, RUN 18-5/8" CSG, POOH CSG. POOH CSH, M/U & RIH WITH REAMING BHA, REAM HOLE, POOH & L/D BHA, RUN & CMT 18-5/8"
CSG.
Location Next Location
184 KM FROM DMG HWYH-1336
Current Depth (ft) Liner TOL MD TVD Formation Tops
5,295 Last Csg Size MD TVD Size Top
24 2858 2858 Formations Comments
Depth
RUS 785 22' SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UMER 915 67' SHALLOWER
5295 (Date) 0 0 184 ARUM 1,820 88' SHALLOWER
27.8 (05/21/2024@1000 ) LAMS 2,270 44' SHALLOWER
AHMD 2,810 36' SHALLOWER
SFNY 3,140 30' SHALLOWER
SHUB 4,070 18' SHALLOWER
BYDH 4,365 33' DEEPER
MDTM 5,260 38' SHALLOWER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT POOH 22" DRLG BHA TO SURFACE & L/D 2 X 9.5" DC, JAR, STRR, S.SUB,
0500 - 0730 2.5 0 22 N DRLG HT BHA RIG 5295 5295
NBRR, BIT.
> PUMP 80 PCF MUD CAP FROM BACK SIDE @ 2 BPM.
0730 - 0800 0.5 0 22 N DRLG RR TDS RIG 5295 5295
SERVICE TDS.

RETRIEVE CAMERON WEAR BUSHING. JET AND CLEAN BOP'S AND WELLHEAD AREA
0800 - 0915 1.25 0 22 N WH RTRV WBSH RIG 5295 5295
AS PER CAMERON SERVICE HAND.
> PUMP 80 PCF MUD CAP FROM BACK SIDE @ 2 BPM.

HPJSM, R/D TDS LINKS AND R/U PREMIERE 18-5/8" CSG HANDLING TOOLS, CRT, &
0915 - 1100 1.75 0 22 N CSG HT PEL ZPC 5295 5295
POWER TONG.
> PUMP 80 PCF MUD CAP FROM BACK SIDE @ 2 BPM.

P/U CAMERON FMH & M/U TO LANDING JNT, PERFORM DUMMY RUN. L/D FMH
1100 - 1300 2 0 22 N WH OTH NA RIG 5295 5295 ASSEMBLY.
> PUMP 80 PCF MUD CAP FROM BACK SIDE @ 2 BPM.

M/U 18-5/8" CSG SHOE TRACK (F/S + 2 JT 18-5/8" CSG 115# J-55 BC FBE + F/C),
1300 - 1400 1 0 22 N CSG RCSG CSTR ZPC 5295 5295 0 200 CHECK FLOATS ON V-DOOR - OK.
> THREADLOCK FIRST 5 JTS.
> PUMP 80 PCF MUD CAP FROM BACK SIDE @ 2 BPM.

CONTINUE RUNNING 18-5/8" CSG 115# J-55 BC ON CRT (TOTAL 70 JTS FBE) TO
2,750'
1400 - 1900 5 0 22 N CSG RCSG CRT ZPC 5295 5295 200 2750 > CENTRALIZE CSG AS PLANNED.
> FILL UP CSG EVERY JOINT
> PUMP 80 PCF LUBRICATED MUD CAP @ 3 BPM.
> OBSERVED LOSSES STOP AFTER RUNNING 12 JTS, FLOW CHECK - WELL STATIC.
1900 - 1930 0.5 0 22 N CSG OTH CSG ARM 5295 5295
M/U 18-5/8" WFD DV TOOL.

CONTINUE RUNNING 18-5/8" CSG 115# J-55 BC ON CRT (TOTAL 7/63 JTS) TO
1930 - 2030 1 0 22 N CSG RCSG CRT ZPC 5295 5295 2778 3030 3,030' (HAD OBSTRUCTION AT THIS DEPTH)
> CENTRALIZE CSG AS PLANNED.
> FILL UP CSG EVERY JOINT

2030 - 2200 1.5 0 22 N CSG CIRC MPMP RIG 5295 5295 ATTEMPT TO WASH DOWN THROUGH OBSTRUCTION, NO PROGRESS - EXPECTED
HOLE COLLAPSE.

2200 - 0000 2 0 22 N CSG CIRC MPMP RIG 5295 5295 CIRCULATE HOLE WITH 80 PCF LUBRICATED MUD CAP, FLOW CHECK - WELL
STATIC.

0000 - 0215 2.25 0 22 N CSG HT PEL ZPC 5295 5295 POOH 18-5/8" CSG 115# J-55 BC (TOTAL 7 JTS) TO DVT @ 2,750' USING POWER
TOUNG & BACK UP TOUNG.
0215 - 0245 0.5 0 22 N CSG OTH CSG ARM 5295 5295
L/D 18-5/8" WFD DV TOOL

0245 - 0459 2.25 0 22 N CSG HT PEL ZPC 5295 5295 CONT. POOH 18-5/8" CSG 115# J-55 BC FBE USING POWER TOUNG & BACK UP
TOUNG.... ONGOING.
Foreman Remarks

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1353 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/12/2024 - 08/06/2024
Report ID: OPERLMTDMRREP

============ WELL OBJECTIVES ===========================

HWYH-1353 IS PLANNED TO BE DRILLED AS K-2 S-SHAPE WELL TARGETING KHUFF-C AS A PRIMARY TARGET AND PRE-KHUFF AS A SECONDARY
TARGET, THE WELL WILL BE COMPLETED WITH 15K CEMENTED LINER.

============ JOURNEY MANAGEMENT PLAN ======================

- ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
- ALL VEHICLES SHOULD BE 4 X 4.
- ALL VEHICLES SHOULD FOLLOW ROAD ALLOWED DRIVING SPEED.

============ WELL SECTIONS ======================

> 42" SECT: 120' / ACTUAL: 120'


> 34" SECT: 857' (50' INTO RUS) / ACTUAL: 850'.
> 28" SECT: 2,896' (50' INTO AHMDI) / ACTUAL: 2,860'
> 22" SECT: 5,352' (50' INTO MDTM) / ACTUAL: 5,295'
> 16" SECT: 10,743' (30' INTO BJDM) / ACTUAL:
> 12" SECT: 12,915' ( 10' INTO KFBC) / ACTUAL:
> 8-3/8" SECT: XX,XXX'(XX' TVD INTO XXXX) / ACTUAL:
> 5-7/8" SECT: TD AT XX,XXX' (XX' TVD INTO XXXX) / ACTUAL:

============ RUN SPEED KPI VS ACTUAL ============

> TRIPPING KPI: 19 STD/HR / ACTUAL:


> 36" CSG KPI: 0.6 JTS/HR / ACTUAL: 0.6 JTS/HR.
> 30" CSG KPI: 3 JT/HR / ACTUAL: 3.63 JTS/HR.
> 24" CSG KPI: 4 JT/HR / ACTUAL: 7 JTS/HR.
> 18-5/8" CSG KPI: 7 JT/HR / ACTUAL:
> 13-3/8" CSG KPI: 11.5 JT/HR/ ACTUAL:
> 9-5/8" CSG KPI: 14 JT/HR/ACTUAL:
> 7" LINER KPI: 14 JT/HR/ACTUAL:
> 4-1/2 LINER KPI: 13 JT/HR / ACTUAL:
> 4-1/2" UPPER COMPLETION KPI: 13.5 JT/HR / ACTUAL :

============ ARAMCO POB =============================

- AL-MUJAHIDEEN GROUP ON LOCATION SINCE 07/20/2020.


- ARAMCO CLERK SHAKIR SAFEER (ID#8162122) ON DUTY SINCE 3-DEC-2023.

============ SAUDIZATION =============================

> SAUDIZATION : 77%.


> RIG CREW SHORTAGE: N/A.

============ SAFETY =======================

> REVIEW AND DISCUSS: D&WO HSE ALERTS - WEEK # 22

DISCUSSED:

DROP OBJECTS, HAND AND FINGER INJURIES, LACK OF SUPERVISION, STOP WORK AUTHORITY, SITUATIONAL AWARENESS.
MAJOR INCIDENT ALERT - ELECTRICAL SHOCK
HSE ALERT 67-24 - STRUCK BY MANUAL TONG
HSE ALERT 68-24 - STRUCK BY CHICKSAN ASSEMBLY
HEAT STRESS AND FATIGUE MANAGEMENT

* REPORTS - INCIDENTS / NEAR MISS: (0)


- JSA: (8), STOP CARDS: (30). PRE-TOUR SAFETY MEETING: (3), WEEKLY SAFETY MEETING: (0).
- COLD PTW:(0), HOT PTW: (1), CONFINED SPACE: (0), BUFFER ZONE: (0), LIFTING PERSONNEL (2), DIESEL TRANSFER: (1).

- DRILLS: PIT DRILL: (2).

============ AUDITS =================================

> WCEI-23: 11 FINDINGS, 11 CLOSED AND 0 OPEN


> PCI-23: 61 FINDINGS, 61 CLOSED AND 0 OPEN
> 4TH QRT QSI-23: 50 FINDINGS, 50 CLOSED AND 0 OPEN.
> 1ST RHSEI-2024: 43 FINDINGS, 43 CLOSED AND 0 OPEN.
> 1ST QRT QSI-24: 75 FINDINGS, 75 CLOSED AND 0 OPEN.
> LPCR-2024: 38 FINDINGS, 38 CLOSED AND 0 OPEN.

============ RENTAL TOOLS ====================

> RECEIVED NOV 12" SHOCK SUB SN# SHTL1200-0002 ON 6/4/24 AT 19:00.
> RECEIVED NOV 9-1/2" HMJ SN# 381-95099 ON 6/4/24 AT 19:00.

============ WELLSITE CONTRACTOR EQUIPMENT =====================

> NONE

======= ===== WATER CONSERVATION IMPLEMENTED INITIATIVES ==========

> REDUCED WATER PITS: YES


> DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: YES

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWYH-1353 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 05/12/2024 - 08/06/2024
Report ID: OPERLMTDMRREP

> CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION: YES

============ RIG VISITS ======================

- N/A

==========================================

NEXT WELL: HWYH-1306


DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
67 PCF 0 6.6 API 0 0 Volts 3.81 9.7 900
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 94 34 0 11 / 16 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 11 6 10 / 12 10 240 0
59
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 6.4 API 0 0 Volts 2.35 9.4 37,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 90 29 0 8 / 11 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 14 10 7/8 5 280 0
57

BCTRN BARITE BARITE BENT CAUST MRBL-M IDCAP D


MUD 1 ( 5GL ) 5 ( MTON ) 3 ( 5000L ) 3 ( 2500L ) 24 ( 50LBP ) 1 ( 2200L ) 12 ( 50LB )
TREATMENT NACL PALFLC STARCH XC
8 ( 2200L ) 72 ( 50LB ) 42 ( 50LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
6 4,221 5,295 DP Av DC Av Bit HHP 55 90 435 22 VAR
Pressure GPM Jet Vel 51.32 56.55 N/A I-Row O-Row DC Location Bearings
1,200 950 324 1 1 WT A E
BIT DATA
Serial Number Type Jets TFA
7500192 ES14V 3 x 18 / 1 x 16 / 0.942
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A 255 255 255 7,500 Shock Sub Serial # Shock Sub Hrs
DRILL STRING 14
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/06/2024 N/A SEASONAL N/A SEASONAL 778 PRE TOUR MEETING

Company VAR ZPC GOS WDV RIG SMI MJH RIG NOJ DFE RIG ARM MI2 OTH ARM CAM BCM

Category BITS CSR CTRG DV RIG DFMS SEC SEC JST OTHR OTHR OTHR SCS VAC WSC WHES PCS
PERSONNEL
1 4 16 1 45 2 8 2 0 1 1 1 4 1 2 1 4
Total
AND SERVICES No. of Persons
94
INFORMATION
Personnel on Loc. Hrs. 7 24 24 24 24 24 24 24 0 24 24 24 24 24 24 24 15

Operating Hours. 3 20 0 20 0 24 0 0 3 0 0 12 0 10 24 0 0

Standby/Tankers Others Others Others


TRUCKS/BOATS
AB-5519 RIG AMBULANCE RIG BUS COASTER SANAD PICK UP CAR

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NIBN-10 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 01/08/2024 - 09/18/2024
Report ID: OPERLMTDMRREP

SND-3003 @ NIBN-10 Limited Morning Report for 06/18/2024


Objective : (EVALUATE THE Foreman(s)SHOMAN, ATEF HAMED / OWOYEMI, OLUFUNSO
D&WO Morning Report (Service Providers View) Charge #: HYDROCARBON POTENTIAL IN Engineer IBRAHIM, YASSER KHOLAIF SABRA
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved ACROSS ARAB D, UNAYZAH Manager ALKHALDI, HAMAD AZZAM
SND-3003 (75-22040-0010)
A1, UNAYZAH A2 AND SARAH THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: RESERVOIRS)
(0500-0500) Saudi Aramco Well 8821677712 798 5779638 8805055
Date: Tuesday 06/18/2024 NIBN-10 (0) NIBN_10_0 CONTRACTOR /CLERK VSA T
5779643

Last 24 hr operations Next 24 hr plan


WIPER TRIP, CIRC, POOH 5.7/8" DRLG BHA FOR OPEN HOLE LOGS. POOH 5.7/8" DRLG BHA, RIH OPEN HOLE LOGS.
Location Next Location
305 KM DHG, 41KM F/ HRDH-KHARKHIR ROAD, TURN LEFT & DRIVE 37.5 KM ON TINAT ROAD, 47 KM SKID ROAD. *RIG MAINTENANCE*
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
18,571 Size 14720 14720 Size 13,993 15,647 15,647 Top
Formations Comments
9 5/8 7 Depth
KFDA 14,320 113' DEEP
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) BKDC 14,830 97' DEEP
18571 (Date) 100 0 305 KMLS 14,860
148.4 (01/21/2024@1800 ) UNYZ 14,960 60' DEEP
UNZA 15,020 104' DEEP
UNA2 15,105 39' DEEP
UBCU 15,450 133' DEEP
PUZU 15,990 47' DEEP
TWLF 16,040 43' DEEP
SHRR 16,570 14' DEEP
QUSB 17,065 60' SHALLOW
MQSB 17,280
SRHR 17,985 124' DEEP
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

CIRCULATED AND CONDITIONED MUD TO HOMOGENIZE MUD WT IN/OUT: 108


0500 - 0630 1.5 0 5 7/8 N DRLG CIRC MPMP RIG 18571 18571
PCF.
*100% CIRCULATION.
0630 - 0900 2.5 0 5 7/8 N DRLG CIRC MPMP RIG 18571 18571
EXTENDED FLOW CHECK-WELL STATIC MEANWHILE ROTATING STRING 10RPM.

POOH FREELY ACROSS OPEN HOLE W/ 5-7/8" DRLG ASSY TO 7" LINER SHOE.
0900 - 1330 4.5 0 5 7/8 N DRLG ST STDP ARM 18571 18571 18571 15647 > HOLE IN GOOD CONDITION
> FLOW CHECK AFTER POOH 5 STDS, WELL STATIC.
> MONITOR WELL THRU TRIP TANK & TRIP SHEET.
1330 - 1430 1 0 5 7/8 N DRLG CIRC MPMP RIG 18571 18571
EXTENDED FLOW CHECK@ CSG SHOE- WELL STATIC.

RIH BACK TO BOTTOM FREELY W/5.7/8" BHA. WASHED DOWN LAST STAND.
1430 - 1800 3.5 0 5 7/8 N DRLG ST STDP ARM 18571 18571 15647 18571
> FILLED STRING EVERY 20STDS
> HOLE IN GOOD CONDITION

PUMPED 30 BBLS HVP. CIRCULATED HOLE CLEAN AND CONDITIONED MUD WT


1800 - 2200 4 0 5 7/8 N DRLG CIRC MPMP RIG 18571 18571
IN/OUT TO 108 PCF.-100% FULL RETURN.
>MAX TRIP GAS: 11.9%
2200 - 2315 1.25 0 5 7/8 N DRLG CIRC MPMP RIG 18571 18571
EXTENDED FLOW CHECK-WELL STATIC
2315 - 0030 1.25 0 5 7/8 N DRLG CIRC MPMP RIG 18571 18571
SPOTTED ON BOTTOM 108PCF LOGGING-GO PILL.
0030 - 0115 0.75 0 5 7/8 N DRLG SURV MS SCD 18571 18571
DROPPED SCIENTFIC GYRO MULTI SURVEY.

POOH FREELY ACROSS OPEN HOLE W/ 5-7/8" DRLG ASSY TO 7" LINER SHOE FOR
OPEN HOLE LOGS.
0115 - 0415 3 0 5 7/8 N DRLG TO STDP RIG 18571 18571 18571 15647
> HOLE IN GOOD CONDITION
> FLOW CHECK AFTER POOH 5 STDS, WELL STATIC.
> MONITOR WELL THRU TRIP TANK & TRIP SHEET.
0415 - 0459 0.75 0 5 7/8 N DRLG CIRC MPMP RIG 18571 18571
EXTENDED FLOW CHECK @ CSG SHOE- WELL STATIC.
Foreman Remarks

THE OBJECTIVE OF NIBN-10 IS TO EVALUATE HYDROCARBON POTENTIAL ACROSS ARAB D, UNAYZAH A1, UNAYZAH A2 AND SARAH RESERVOIRS. HANIFA,
UPPER FADHILI, LOWER FADHILI, JILH DOLOMITE AND BASAL KHUFF CLASTICS ARE SECONDARY TARGETS.
THE WELL IS LOCATED 6.7 KM SOUTHEAST OF DWZH-2, 7 KM SOUTHWEST OF NIBN-2, 9 KM SOUTHWEST OF NIBN-8.
=============================CASING SETTING DEPTHS===================================
> PLANNED 30" CASING SET AT 1,135 FT (50' INTO RUS) / ACTUAL: 1,240 FT
> PLANNED 24" CASING SET AT 3,225 FT (50' INTO LAMS) / ACTUAL: 3,240 FT
> PLANNED 18-5/8" CASING SET AT 7,336 FT, (50' INTO MID TAMMAMA) / ACTUAL: 7,470 FT
> PLANNED 13-3/8" CASING SET AT 11,654 FT, (30' INTO BASE JELH) / ACTUAL: 11,768 FT
> PLANNED 9-5/8" CASING SET AT 14,607 FT MD, (400' INTO KFDA) / ACTUAL:14,720 FT
> PLANNED 7" LINER SET AT 15,517 FT MD, (200' INTO UBCU) / ACTUAL: 15,647 FT
> PLANNED 4-1/2" LINER SET AT 18,571 FT MD, (586' INTO SARAH) / ACTUAL: XXXX FT.
=============================ARAMCO POB & VISITORS =================================
> ARAMCO CLERK HOUSSAIN IBRAHIM #7330199 ON LOCATION SINCE 01/29/2023.
=============================DUMP TRUCKS & VACUUMS, SRVS COMPANY=====================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NIBN-10 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 01/08/2024 - 09/18/2024
Report ID: OPERLMTDMRREP

> 3 VACUUM TANKERS # 3691 BRA/2724 ZRA/1687 JAA, AS PER DRSS#1004326905 MONTH OF JUNE 01/2024.
> 1 SPRAY WATER TANKER# 5754 ZRA, AS PER DRSS#1004295309 MONTH OF MAY 01/2024.
=============================RENTAL TOOLS==========================================
> 100 BBL 20% VDA ACID ON THE RIG SINCE 03/19/2024.
> NOV COOLING MUD SYSTEM ON THE RIG SINCE 04/14/2024.
> ARAMCO MGL UNIT ON THE RIG SINCE 4/26/2024.
> 4-3/4" H-JAR SN#34142602
=============================LOGGING=====================================
> 8.1/2" SECTION LOGGING OPERATIONS RUN#1 & RUN#2: TOTAL 27 HRS.
> 8.1/2" SECTION LOGG PRESSURE POINTS: TOTAL 39 HR.
> 8.1/2" SECTION TPL SAMPLING OPERATIONS: TOTAL 238 HRS.
> 8.1/2" SECTION SIDE WALL CORING LOG: TOTAL 50 HRS.
> 8.1/2" SECTION IMAGE LOG: TOTAL 14.5 HRS.
> 7" LINER CBL LOG: TOTAL 18.5 HRS.
>> TOTAL LOGGING TIME INCLUDING WIPER TRIPS: 585 HRS / 24.3 DAYS.
======================JOURNEY MANAGEMENT PLAN ===========================
> CREATE JOURNEY MANAGEMENT PLAN BEFORE LEAVING COMPANY BASE.
> ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER / CAR SURVIVAL KIT.
> DISTANCE FROM DAMMAM TO RIG: 305 KM DHG, 41KM F/ HRDH-KHARKHIR ROAD, TURN LEFT 37.5 KM ON TINAT ROAD, AND "SKID ROAD 47 KM".
> SKID ROAD & LOCATION HAS NO MOBILE SIGNAL, CALL RIG FOREMAN (013-5779638) OR RIG CONTRACTOR (013-8805055) BEFORE ENTERING SKID ROAD.
> NEAREST ARAMCO FACILITY: TINAT GAS PLANT 70 KM.
=============================NEXT LOCATION=========================================
>NEXT LOCATION: NIBN-12 ( NEED LITTLE MODIFICATION - SKID ROAD NEED MAINTENANCE ).
=================================================================================

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
108 PCF 1 0 API 56 625 Volts 6.17 0 241,135
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
145 1.4 HTHP 15 21 0 11 / 18 OBM 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 46 29 9 / 11 0 0 1
69
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
108 PCF 1 0 API 56 640 Volts 6.17 0 241,135
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
145 1.4 HTHP 15 22 0 11 / 17 OBM 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 44 29 9 / 11 0 0 0.8
65

MUD CAOH2 CACO3-50 CACO3-25 CACO3-5 S-SMUL S-PMUL


TREATMENT 6 ( 55LB ) 12 ( 55LB ) 12 ( 55LB ) 12 ( 55LB ) 1 ( 55GL ) 1 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
11 18,057 18,571 DP Av DC Av Bit HHP 15 110 M425 5.875 SEC
Pressure GPM Jet Vel 1,666.32 594.65 40 I-Row O-Row DC Location Bearings
4,350 290 139 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
14167826 EM65D 3 x 15 / 2 x 10 / 0.671
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 43 402 405 400 6,000 79
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 5.875 1 5.875 0.67 3-1/2 REG 14167826
2 Near Bit Roller Reamer RIG 5.875 1 4.75 2.25 6.67 NC38 NC38 43 3 POINT 21718
3 Drillcollar RIG 4.75 1 4.75 2.25 31.13 NC38 NC38 43 SPRL TALLY
4 String Reamer RIG 5.875 1 5.875 1.062 6.29 NC38 NC38 43 21739
DRILL STRING 5 Drillcollar RIG 4.75 1 4.75 2.25 30.85 NC38 NC38 43 SPRL TALLY
6 String Reamer RIG 5.875 1 5.875 1 5.98 NC38 NC38 46 21701
7 Drillcollar RIG 4.75 21 4.75 2.25 640.83 NC38 NC38 43 SPRL TALLY
8 Hydro-Mechanical Jar NOJ 4.75 1 4.75 2.25 29.12 3-1/2 IF 3-1/2 IF 46 341426-02
9 Drillcollar RIG 4.75 2 4.75 2.25 61.03 NC38 NC38 43 SPRL TALLY
10 Crossover RIG 4.812 1 4.813 2.563 2.69 XT39 NC38 46 3003010
11 Heavy Weight Drillpipe (HWDP) RIG 4 15 4 2.562 455.46 XT39 XT39 28.38 CONV TALLY
12 Drillpipe RIG 4 132 4 3.34 4,163.7 XT39 XT39 14 XD105 PREMIUM TALLY
13 Crossover RIG 6.75 1 6.75 2.563 2.23 XT54 XT39 27 98416337-12
14 Drillpipe RIG 5.5 1 5.5 4.67 31.5 XT54 XT54 24.7 XD105 PREMIUM TALLY

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/13/2024 N/A NORTH TO N/A GOOD 2,391 DAILY.

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR NIBN-10 EXPLORATION DRILLING BI-3300
Print Date: 06/18/2024 06:21 01/08/2024 - 09/18/2024
Report ID: OPERLMTDMRREP

SOUTH

Company SEC SWK RIG EMC MJH SCD NOJ BR1 SGR ARN ARM NRT OTH OTH ARM HWP

Category BITS CTRG RIG DFMS SEC ISS JST MLS MLS OTHR OTHR RENT RENT VAC WSC LPS
PERSONNEL
0 16 47 2 5 2 0 0 5 4 1 4 0 3 2 9
Total
AND SERVICES No. of Persons
100
INFORMATION
Personnel on Loc. Hrs. 0 24 24 24 24 24 0 0 24 24 24 24 0 24 24 24

Operating Hours. 0 0 24 24 0 4.5 0 0 24 24 12 24 0 10 24 0

Standby/Tankers Others Others


TRUCKS/BOATS
AMBULANCE CAR RIG BUS RIG PICK UP CAR

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 300 170 25 2650

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR BRRI-1101 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/29/2024 - 07/08/2024
Report ID: OPERLMTDMRREP

SNF036 @ BRRI-1101 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Objective : (SINGLE LATERAL Foreman(s)OSMAN, AHMED FAISSAL
Rig Charge #: PWI ACROSS HDRY) Engineer ALRUSHAID, FAWAZ RAAD
Copyright 2024 Saudi Aramco. All Rights Reserved SNF036 (66-23024-1101) Manager ALSAFI, YOUSEF MOHAMMAD
Daily OffShore
Wellbores: THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well
8821677712 158 673-7441 /CLERK VSA T
Date: Tuesday 06/18/2024 BRRI-1101 (1) BRRI_1101_1
829-3854 / 678-4596

Last 24 hr operations Next 24 hr plan


DRILLED 6-1/8" HOLE SECTION TO WELL "T.D". CHC. SHORT WIPER TRIP. SHORT WIPER TRIP. CHC. POOH W/ 6-1/8" SLB RSS-MWD-LWD BHA ON 5.5" DP.
Location Next Location
BRRI-1101 BRRI-1101
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
21,060 Size 9435 7055 Size 8,934 14,087 8,847 Top
Formations Comments
9 5/8 7 Depth
HITH 9,355 7008' TVD
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) PAAS 10,001 7415' TVD
20525 (Date) 100 535 102 BPAS 10,011 7421' TVD
103.8 (03/06/2024@0830 ) ABAR 10,039 7439' TVD
AB 10,092 7471' TVD
AC 10,251 7561' TVD
ABCR 10,312 7593' TVD
JUBL 10,995 7915' TVD
HNIF 11,785 8256' TVD
HNH 12,581 8568' TVD
HDRR 13,778 8837' TVD
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0500 - 1200 7 1 6 1/8 N DRLG D RSS SDM 20525 20740
DRILLED 6-1/8" HOLE W/ SLB RSS-MWD-LWD BHA.

1200 - 1230 0.5 1 6 1/8 N DRLG PJSM NA ARM 20740 20740 HELD SAFETY STAND DOWN MEETING. DISCUSSED HEAT INDEX SAFETY
CONTROLS, DISCUSSED HSE ALERTS.
1230 - 2100 8.5 1 6 1/8 N DRLG D RSS SDM 20740 21060
DRILLED 6-1/8" HOLE W/ SLB RSS-MWD-LWD BHA TO WELL "T.D"
2100 - 0000 3 1 6 1/8 N DRLG CIRC MPMP RIG 21060 21060
PUMPED SWEEPS, CHC "3 FULL CYCLES" AND CONDITIONED MUD.

0000 - 0030 0.5 1 6 1/8 N DRLG PJSM NA ARM 21060 21060 HELD SAFETY STAND DOWN MEETING. DISCUSSED HEAT INDEX SAFETY
CONTROLS, DISCUSSED HSE ALERTS.
0030 - 0430 4 1 6 1/8 N DRLG CIRC MPMP RIG 21060 21060
PUMPED SWEEPS, CHC "3 FULL CYCLES" AND CONDITIONED MUD.
0430 - 0445 0.25 1 6 1/8 N DRLG CIRC MPMP RIG 21060 21060
FLOW CHECK, WELL STATIC.
0445 - 0459 0.25 1 6 1/8 N DRLG ST STDP RIG 21060 21060 21060 20650
POOH W/ 6-1/8" SLB RSS-MWD-LWD BHA ON 5.5" DP FOR SHORT WIPER TRIP.
Foreman Remarks

BRRI-1101 WILL BE DRILLED AS OIL POWER WATER INJECTOR HORIZONTAL WELL TO 21,055' MD/9,001' TVD, WILL BE COMPLETED ACROSS HADRIYA RESERVOIR.
================================CURRENT LOCATION DATA=======================================
- RIG POSITION: BRRI-1100/1109 PF LAT: 27DEG 08.20' N & LONG: 049 DEG 41.15' E. RIG HEADING: 330 DEG.
- WATER DEPTH: 41 FT, AIR GAP: 46.5', RKB TO MSL: 120.57' & RKB TO SEA BED: 161.58'.
- LEG PENETRATIONS: BOW 5.2', PORT 3.9' & STBD 4.6'.
==============================CASING POINTS PLANNEDACTUAL====================================
- 32" CP AT 242' [+/-82' FT TVD BELOW SEA BED].
- PLANNED 24" CSG AT 560' [DMM FM].
- PLANNED 18-5/8" CSG AT 973' [50' TVD INTO RUS].
- PLANNED 13-3/8" CSG AT 4,041' [50' TVD ABOVE PAMU].
- PLANNED 9-5/8" CSG AT 9,385' [30' TVD INTO HITH].
- PLANNED 8-1/2' PILOT HOLE L-0: 12,922 [120' MD IN BUFR].
- PLANNED 7'' LINER L-1 AT 14,107' [WELL TE 90 DEGREE INCLINATION] [27 TVD IN HADRIYA].
- PLANNED 6-1/8" L-1 TD AT 21,055' [WELL TD 90 DEGREE INCLINATION] [27 TVD IN HADRIYA].
======================================SAFETY===============================================
- DRILLS: NEAR MISS SLS REF.NO.#7167936
- SECONDARY EMERGENCY DRILLS H2S, MANDOWN, FIRE AND ABANDON SHIP DRILLS ON 06/08/2024.
====================================RENTALTOOLS=============================================
- SLB 4.75" JAR S/N: 98858J ONBOARD SINCE 06/05/2024.
====================================SKIP & SHIP==============================================
- TOTAL SKIPS ON LOCATION:
- EMPTY SKIPS ON RIG: 15/ FULL SKIPS ON RIG: 0
- EMPTY SKIPS ON BOAT: 0/ FULL SKIPS ON BOAT: 38
- SKIPS BACKLOADED IN LAST 24 HRS: 4
- SKIPS USED TO DATE: 327
===================================PERSONNEL====================================================
ARAMCO FOREMAN SEAN P. ROUSE ID# 728420 ON RIG ARO-3002 AT RT ANCHORAGE SINCE 06/17/2024.
ARAMCO MAT EXP ABDULLAH ALJUAID ID# 820924 ONBOARD SINCE 06/11/2024.
SESS DRILLPIPE PROTECTOR ENGINEER & EQUIP ON LOCATION SINCE 05/30/2024.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
1 20,537 90.38 27.12 99 8,958 1633.64 3749.36 13,417.99 1.45
DAILY SURVEY 1 20,631 91.07 26.7 94 8,957 1659.18 3762.33 13,490.6 0.86
1 20,728 91.52 27.09 97 8,955 1685.55 3775.7 13,565.77 0.61
1 20,823 91.48 26.32 95 8,952 1711.41 3788.7 13,639.46 0.81

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR BRRI-1101 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/29/2024 - 07/08/2024
Report ID: OPERLMTDMRREP

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
1 20,922 90.48 26.03 99 8,951 1738.48 3802.01 13,715.96 1.05
1 21,060 91 26.5 138 8,949 1776.2 3820.63 13,823.23 0.51

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 2 2.6 API 3 0 Volts 2.96 9.8 31,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
140 11.6 HTHP 87 24 0 10 / 13 NCPOL 2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 22 10 10 / 12 2.5 300 11.2
51

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 2 2.6 API 3 0 Volts 2.96 9.6 31,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 139 11.4 HTHP 87 22 0 11 / 14 NCPOL 2.1
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 22 10 11 / 13 2.5 280 11
50

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
74 PCF 2 2.5 API 3 0 Volts 2.96 9.8 31,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
140 11.4 HTHP 87 23 0 10 / 15 NCPOL 2.1
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 22 10 10 / 12 2.5 300 10.8
50

CAUST SODASH HYSTAR-P H2S-SCAV-L MRBL-M BCTRN NACL


MUD 6 ( 50LBP ) 6 ( 100LB ) 45 ( 50LB ) 2 ( 55GL ) 1 ( 2200L ) 6 ( 5GL ) 3 ( 2200L )
TREATMENT CACO3-25 CACO3-50 CACO3-5 ECO-LUBE BORE GUARD
25 ( 50LB ) 25 ( 50LB ) 25 ( 50LB ) 6 ( 55GL ) 4 ( 55GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
11 14,100 21,060 DP Av DC Av Bit HHP 12 140 M332 6.125 REED
Pressure GPM Jet Vel 978.29 N/A 64 I-Row O-Row DC Location Bearings
4,500 290 207 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
S308886 TK63M1A 3 x 14 / 0.451
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 56 161 245 100 16 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit REED 6.125 1 0.61 S308886
2 RSS SDM 4.75 1 4.75 23.3 NC 38 3-1/2" REG 47 15931134
3 Logging While Drilling (LWD) SDM 4.75 1 4.75 18.45 NC38 NC38 25.4 NTS-33247
4 Logging While Drilling (LWD) SDM 4.75 1 4.75 16.27 NC38 NC38 40 NTS-SA-3902
5 Logging While Drilling (LWD) SDM 4.75 1 4.75 19.07 NC38 NC38 25.4 OFS-9842
DRILL STRING 6 Measurement While Drilling (MWD) SDM 4.75 1 4.75 33.79 NC38 NC38 50 TOTAE302050
7 Logging While Drilling (LWD) SDM 4.75 1 4.75 20.21 NC38 NC38 20 15673377
8 Logging While Drilling (LWD) SDM 4.75 1 4.75 23.36 NC38 NC38 54.94 6214
9 FIlter Sub SDM 4.75 1 4.656 2 30.96 NC38 NC38 44 MNM53604-02
10 Crossover RIG 5 1 5 2.25 3.02 NC38 XT39 43 ZHR20221206
11 Heavy Weight Drillpipe (HWDP) RIG 4 3 4 2.562 93.86 XT39 XT39 26.24 CONV RIG
12 Hydraulic Jar SJS 4.75 1 4.75 2.25 29.07 3-1/2" IF 3-1/2" IF 1,050 98858J
13 Heavy Weight Drillpipe (HWDP) RIG 4 6 4 2.562 184.12 XT39 XT39 26.24 CONV RIG
14 Drillpipe RIG 4 363 4 3.34 11,442.22 XT39 XT39 14 G105 PREMIUM
15 Crossover RIG 6.625 1 6.625 2.563 2.63 XT39 XT54 28 H5-199
16 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 CYX105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/05/2024 TOURLY 10-12 KNTS 3-4 SEASONAL 1,478 TOURLY
NW

Company GOS NCT BC HCO MAX HCO SDM RIG BDF OES NFT SWL ARM HCM MSL FMC MI3 ARM SAM FME

PERSONNEL Category CTRG COIL PSSC PSSC PSSC ICE DPDS RIG DFMS DFMS FILT LPS OTHR PCS SLS PRS WMS WSC WBCS WHES
Total
AND SERVICES
12 1 1 1 1 3 3 51 1 1 1 3 1 1 3 6 4 1 1 1 97
INFORMATION No. of Persons

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR BRRI-1101 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:21 02/29/2024 - 07/08/2024
Report ID: OPERLMTDMRREP

Operating Hours. 0 0 0 0 0 0 24 24 12 12 0 0 12 0 0 0 24 12 0 0

Standby/Tankers Others
TRUCKS/BOATS
HADI-24 POSH IMPALA

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2522 2063 2066 5976 0 4283

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-674 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/18/2024 - 07/23/2024
Report ID: OPERLMTDMRREP

SNT-025 @ SFNY-674 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK THE Foreman(s)ALDHUBAYI, FAISAL FAHAD / KRAWCHUK, VINCENT
D&WO Morning Report (Service Providers View) Charge #: WELL ACROSS SFNY Engineer ABUZAID, KHALED WALEED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-23013-0674) RESERVOIR) Manager ALRUWAILI, MOHAMMED NAZAL
SNT-025
Daily OffShore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216212 81372 3786445 3786446
Date: Tuesday 06/18/2024 SFNY-674 (0) SFNY_674_0 CONTRACTOR /CLERK VSA T
3786447

Last 24 hr operations Next 24 hr plan


R/D ON SFNY-673, SKID RIG TO WELL SFNY-674, GENERAL R/U OPERATION. COMMENCE OPERATION ON SFNY-674. BULLHEAD TBG, S/LINE DRIFTS RUN & PUNCH TBG WITH
DPU, BULLHEAD, SET BARRIERS, CHC, SET BPV, N/D TREE & BONNET, N/U BOPE.
Location Next Location
SFNY-666/675 SFNY-672
Current Depth (ft) Liner TOL MD TVD Formation Tops
9,524 Last Csg Size MD TVD Size 5,857 6,687 5,290 Top
9 5/8 6128 5200 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
9524 (Date) 100 0 252
0 (06/18/2024@0459 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0800 3 0 PRE N RM RM NA RIG 9572 9572
PREPARE FOR SKIDDING, RE-ARRANGE MAIN DECK AND CATWALK.
0800 - 1000 2 0 PRE N RM RM NA RIG 9572 9572
SKID RIG FLOOR OVER SFNY-674. ADJUST CATWALK.

HPJSM:
- RE-ARRANGE SIMOPS DECK TO WELL SFNY-674.
- SKID CANTILEVER & SUBSTRUCTURE TO WELL CENTER SFNY-674.
1000 - 1500 5 0 PRE N RM RM NA RIG 9572 9572
- INSTALL HANDRAILS & SECURE SAME.
- SECURE ACCESS TO PLATFORM.
- RE-ARRANGE CANTILEVER SPACE.
- R/U E-KILL LINE.

CONNECT LOW & HIGH PRESSURE SERVICE LINES. R/UP GOSP LINE MANUAL
VALVE, DSA, 3 WAY BLOCK & CO-FLEX HOSE. CONNECT CO-FLEX HOSE FROM
1500 - 0030 9.5 0 PRE N RM RM NA RIG 9572 9572
CHOKE MANIFOLD TO TEST MANIFOLD. R/U AL-MANSOORI STORAGE TANK W/
LINES & P/T LINES TO 70 PSI.
- CHECK CCA 18-5/8"/ 24",13-3/8"/ 18-5/8", 9-5/8"/ 13-3/8", ALL CCA: 0 PSI.
0030 - 0100 0.5 0 PRE N RM RU NA RIG 9572 9572
P/T TBG SPOOL MANUAL VALVE 300 PSI/ 1000 PSI - OK.

P/U & M/U 4-1/2" SLB RISER.


- R/U SLB SL LUBRICATOR & BOP. P/T SAME TO 2000 PSI.
0100 - 0459 4 0 PRE N RM OTH NA SLL 9572 9572
- P/T SURFACE LINES & E-KILL LINE TO 300/2500 PSI FOR 10 MINS. OK.
- P/T TCA TO 1000 PSI. GOOD TEST.
- P/T BONNET SEALS TO 1200 PSI, OK.
0459 - 0459 0 0 PRE S OT COMM NA RIG 9572 9572
COMMENCE WELL SFYN-674 OPERATION ON 18TH JUNE 2024 @ 05:00 HRS.
Workover Objectives
Foreman Remarks

* NO ANCHORING ON STARBOARD SIDE AT THIS LOCATION.


* RIG HEADING 330 DEG.
* WATER DEPTH: 54 FEET.
=========================================================
** ODF TO TUBING SPOOL DIST = 54'
** RIG FLOOR TO TBG SPL DIST = 80.16' . ODF CORRECTION= -26.16'
====================ARAMCO PERSONNEL======================
** RIG CLERK : AHMED AMEEN MOHAMED FAROOK ID#8518460 ARRIVED ON JAN-26-2024.
=========================================================
** CURRENT LOCATION: SFNY 672, 666/675 PF
** CURRENT WELL SFNY-674.
** PLUGS IN SFNY WELLS 668, 669, 671.

** 3 WELLS TO WORK OVER ON CURRENT PLATFORM SFNY 672 / SFNY 673 / SFNY 674- DECOMPLETION, SIDE TRACKS AND ESP INSTALLATION.
** SFNY-672 & SFNY-673 COMPLETED & OPERATION SUSPENDED FOR FLOW BACK.
=========================================================
** NEXT PLATFORM SFNY-243/ 248, 4 WELLS.
** SEABED SURVEY / CRM-SR 8800022213 SFNY 243 248 PDS CP SUBMITTED ON MAY 22, 2024.
** BOREHOLE DATA SHARED WITH DRLG CONTRACTOR ON JUNE 8, 2024
=========================================================
** DPS SUBMITTED 22 OBSERVATIONS IN SLS.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
MUD DATA 65 PCF 0 0 API 0 0 Volts 0 9.5 38,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SFNY-674 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/18/2024 - 07/23/2024
Report ID: OPERLMTDMRREP

0 0 HTHP 100 0 0 0/0 NACL 0


Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 400 0
26

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 0 API 0 0 Volts 0 9.5 38,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 NACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 400 0
26

MUD NACL XC CAUST


TREATMENT 3 ( 2200L ) 7 ( 25KG ) 4 ( 55LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A 8 KTS, SW 1 FT 34C, VIS 04 3,982 TOURLY
NM

Company KSC GOS INC RIG EMC ARN HSL SLL SCP ITS ARM MWT

Category ALS CTRG PSSC RIG DFMS OTHR SLS SLS PSSC PRS WSC WTSE
PERSONNEL
3 12 1 49 1 1 1 3 1 2 2 1
Total
AND SERVICES No. of Persons
77
INFORMATION
Personnel on Loc. Hrs. 24 24 4 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 24 12 12 4 0 0 0 24 3

Standby/Tankers
TRUCKS/BOATS
POSH ORIBI

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
0 1616 917 1040 0 1990

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABQQ-382 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:21 06/18/2024 - 07/28/2024
Report ID: OPERLMTDMRREP

SP-101 @ ABQQ-382 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK THE Foreman(s)TANTAWY, MOHAMED HUSSEIN / ALYAMI, BADER AHMED
D&WO Morning Report (Service Providers View) Rig Charge #: WELL IN ARAB-D/ HANIFA Engineer AVILA ROMERO, MIGUEL AUGUSTO
Copyright 2024 Saudi Aramco. All Rights Reserved SP-101 (71-24050-0382) RESERVOIR) Manager HAJRI, ASKAR SAUD
Daily Onshore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 11444 5726636 /CLERK VSA
Date: Tuesday 06/18/2024 ABQQ-382 (0) ABQQ_382_0 T
5725567

Last 24 hr operations Next 24 hr plan


RIG DOWN ON ABQQ-490, RIG MOVE TO ABQQ-382. RIG DOWN ON ABQQ-490, RIG MOVE TO ABQQ-382.
Location Next Location
65 KM FROM DHAHRAN MAIN GATE. ABQQ-173
Current Depth (ft) Liner TOL MD TVD Formation Tops
6,924 Last Csg Size MD TVD Size 2,002 6,447 6,447 Top
9 5/8 3921 3921 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
6924 (Date) 0 0 65
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD RIG MOVE SAFETY MEETING WITH ALL PERSONNEL. DISCUSSED CRANE
SAFETY REQUIREMENTS, USING DESIGNATED MOVE ROUTE, SPEED LIMITS,
SECURING LOADS, PPE, WORKING AT HEIGHTS AND REVIEW RIG MOVE GAME
PLAN.

- R/D ON ABQQ-490 : 20 %.
0500 - 0459 24 0 PRE N RM RM NA RIG 0 0 - R/M TO ABQQ-382: 10 %.
- R/U ON ABQQ-382: 5 %.

>> ABQQ-490 IS SECURED WITH TRSSV, WHP = 0 PSI..


>> ABQQ-382 IS SECURED BY PRODUCTION WITH 2.813" PX PLUG @ 6145' & 4-
1/2" MONOLOCK PLUG AT 200', WHP = 0 PSI.

>> SUSPEND CRITICAL AND TANDEM LIFT OPERATION AT NIGHT.


Workover Objectives
Foreman Remarks

==================================== SAFETY ====================================


>> HELD RIG SAFETY MEETING WITH ALL PERSONNEL.
==============================================================================
>> GOR=810 SCF/STB (ARAB-D), 30 PPM RER=658 M, 100 PPM RER=326 M, 1/2 LEL RER=100 M, H2S%=2.25%.
========================== NEXT WELLS SCHEDULE UPDATE ============================
>> ABQQ-454: KOM DONE ON 05/28/2024, STRIP OUT 0%, LOCATION 0%.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A NORMAL N/A SEASONAL 2,930 N/A

Company GOS RIG GDF ARM ARM

Category CTRG RIG DFMS OTHR WSC


PERSONNEL
16 60 1 1 2
Total
AND SERVICES No. of Persons
80
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24

Operating Hours. 0 12 12 12 12

Standby/Tankers Others Others


TRUCKS/BOATS
AB-6510 SP AMBULANCE 3 RAW WATER TANKERS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A 700

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 1 of 1


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KRSN-38 WORKOVER-6 BI-60
Print Date: 06/18/2024 06:22 04/29/2024 - 07/09/2024
Report ID: OPERLMTDMRREP

SP-103 @ KRSN-38 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK THE YOAKEM, MICHAEL / MONAQIL, ABDULRAHMAN TALAL / ALZAID, ZAID
Foreman(s)
WELL INTO ARAB-D JAMAL
D&WO Morning Report (Service Providers View) Rig Charge #: RESERVOIR) Engineer ALOTAIBI, MOHAMMED SALMAN
Copyright 2024 Saudi Aramco. All Rights Reserved SP-103 (71-24015-0038) Manager SAUD, MAHER IBRAHIM
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores:
8821677711 526 0136791892 0136791890
Date: Tuesday 06/18/2024 KRSN-38 (0-5) KRSN_38_7
FAX VSAT CONTRACTOR /CLERK VSA T
8806516 0136791891

Last 24 hr operations Next 24 hr plan


SLICK LINE WORK, SET PACKER, SPACE OUT TBG, MU TBG HGR, FINAL DRIFT, DISPL, LAND TBG SLICK LINE, RETRV PLUG, BULLHEAD TBG W/INHIBITED WATER, SET BPV & SECURE WELLHEAD,
HGR, SET BPV, N/D BOP, N/U TREE. RIG RELEASED TO FDHL-10, R/D ON KRSN-38, R/M & R/U ON FDHL-10.
Location Next Location
135 KM FROM DAHRAN MAIN GATE FDHL-10
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
13,200 Size 5132 5141 Size 4,783 8,800 6,977 Top
Formations Comments
9 5/8 4 1/2 Depth
5175' MD / 5162' TVD (56' FT
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) BUWB 5,162
DEEPER)
13200 (Date) 100 0 136 5481' MD / 5461' TVD (9' FT
45.3 (05/03/2024@2130 ) YAMM 5,461
DEEPER)
5726' MD / 5682' TVD (5' FT
SULY 5,682
DEEPER)
MNFR 6,117 6419' MD / 6117' TVD
HITH 6,208 6632' MD / 6208' TVD
7628' MD / 6655' TVD (6'
ABAR 6,655
SHALLOWER)
7821' MD / 6739' TVD (6'
ABBR 6,739
DEEPER)
8329' MD / 6924' TVD (7'
BACR 6,924
DEEPER)
8589' MD / 6973' TVD (5'
ABDR 6,973
DEEPER)
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM, R/U NESR SLICK LINE AND PRESSURE TESTED LUBRICATOR TO 2000 PSI.
>> RUN WITH 3.5" MOMOLOCK & SET SAME AT 4618'.
>> RUN & SET PRONG.
0500 - 0900 4 0-5 EOW C COMP CIRC MPMP RIG 13200 13200 >> PT HALL MONOLOCK TO 1000 PSI -OK.
>> RIH WITH HALL CATCHER AND SET ABOVE MONOLOCK.
>> R/D SLICK LINE.
>> TOTAL (3 RUNS).
>> MONTIORED WELL THRU TRIP TANK, STATIC LOSSES 5 BPH.

SET 7" VHR PKR AS PER HALLIBURTON INSTRUCTION WITH PRESSURE UP TBG
SLOWLY TO 2000 PSI IN INCREMENTS OF 500 PSI. HOLD PRESSURE FOR 5
MINUTES, SLACKED OFF 40 KLB ON THE PACKER , INCREASED THE PRESSURE TO
0900 - 1000 1 0-5 EOW C COMP SET PKR HCO 13200 13200 4585 4585
3500 PSI AND HOLD FOR 15 MINUTES. BLED OFF PRESSURE, PULLED 10 KLBS
OVER STRING WT AND CONFIRMED PACKER SET.
>> PKR @ 4585', END OF TBG @ 4796.5'
>> PUT STRING IN LANDING MODE WITH COMPRESSION 15 KIBS.

1000 - 1030 0.5 0-5 EOW C COMP PTST PKR RIG 13200 13200 CLOSED ANNULAR & P/T TCA TO 1000 PSI WITH 80 PCF BRINE FOR 10 MIN WITH
TBG OPEN, OK. BLED OFF PRESS & OPENED ANNULAR.

SHEARED OUT SEAL ASSY FROM PBR WITH PRESSURE UP ON TBG TO 2000 PSI
1030 - 1100 0.5 0-5 EOW C COMP OTH SEAL HCO 13200 13200
AND PU TO 40 KLB OVER STRING WEIGHT AS PER HALLIBURTON INSTRUCTION.
BLED OFF TUBING TO ZERO.

1100 - 1130 0.5 0-5 EOW C COMP PTST PKR RIG 13200 13200 CLOSED ANNULAR & P/T TCA TO 1000 PSI WITH 80 PCF BRINE FOR 10 MIN WITH
TBG OPEN, OK. BLED OFF PRESSURE & OPENED ANNULAR.

STUNG OUT SEAL ASSY FROM PBR, POH & L/D 2 X JTS 7" TBG + 1 X 7" PUP JOINT
1130 - 1300 1.5 0-5 EOW C COMP HT TBG RIG 13200 13200
FOR SPACE OUT.
>> MONITOR WELL ON TRIP TANK, WELL STATIC.

M/U REQUIRED 2 X 7" 26# L-80 NEW VAM GRE LINED PUP JOINTS + DOUBLE PIN
SUB: 7'' 26# L-80 NEW VAM GRE LINE + 1 X 7" 26# L-80-13CR LC R-3 TUBING
1300 - 1430 1.5 0-5 EOW C COMP HT TBG RIG 13200 13200 JOINT BELOW HANGER.
MAKE UP NEW 13 " X 7" FMC TUBING HANGER AND LANDING JOINT WITH FOSV.
OBSERVED WELL FOR 30 MIN, STATIC.
>> OBSERVED WELL FOR 30 MIN, WELL STATIC.

RIG UP NESR SLICKLINE AND PRESSURE TESTED LUBRICATOR TO 2000 PSI. RUN
1430 - 1530 1 0-5 EOW C COMP DTU DRFT NSL 13200 13200
6.13" DRIFT TAG DOUBLE BOX X.O) POH. R/D SLICK LINE.
>> OBSERVED WELL FOR 30 MIN, WELL STATIC.

SLACKED OFF UNTIL 5' ABOVE PBR AND DISPLACED TBG & TCA TO WATER
1530 - 1930 4 0-5 EOW C COMP CIRC MPMP RIG 13200 13200
INHIBITED WITH B-1400 AT 3 BPM.
>> OBSERVED WELL FOR 30 MIN, WELL STATIC.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KRSN-38 WORKOVER-6 BI-60
Print Date: 06/18/2024 06:22 04/29/2024 - 07/09/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

DRAINED BOP, LOWERED TBG SLOWLY & STUNG WITH SEAL ASSY INTO PBR,
1930 - 2030 1 0-5 EOW C WH HT TBGHR RIG 13200 13200
LANDED TBG HGR WITH 4' SPACE OUT. SCREWED-IN LOCK DOWN PINS IN TBG
SPOOL.

2030 - 2100 0.5 0-5 EOW C COMP PTST PKR RIG 13200 13200 PT TCA WITH TBG OPEN TO 1,000 PSI AND PT TUBING WITH TCA OPEN TO 1000
PSI SEPARATELY WITH WATER INHIBITED WITH B-1400 FOR 10 MIN, OK.
2100 - 2200 1 0-5 EOW C WH SET BPV RIG 13200 13200
REMOVED LANDING JT & SET BPV IN THE TUBING HANGER.
2200 - 0100 3 0-5 EOW C BOP ND BOP RIG 13200 13200
HPJSM. N/D 13-5/8" 5M CLASS-A BOP & RELATED EQUIPMENTS.
0100 - 0300 2 0-5 EOW C WH NU WH RIG 13200 13200
N/U NEW CIW 7" X 13" 3M ROTATING TBG BONNET.

0300 - 0459 2 0-5 EOW C WH NU TREE RIG 13200 13200 N/U NEW FMC 7" 3M OFFSHORE TREE. ORIENTED VALVES TO ORIGINAL
DIRECTION OPERATING VALVE TO NORTH & WING VALVE TO EAST.
Workover Objectives
Foreman Remarks

===========================PERSONAL ON BOARD===============
>> MATERIAL EXPEDITOR ALIBRAHIM, MOAYAD ID #8212187 ON LOCATION SINCE 17 JUNE 2024.
>> ARAMCO FCT ALSHOIALI, KHALID ID #818216 ON LOCATION SINCE 17 JUNE 2024.
===========================WELL DATA ===============================
>> WL ODF CORRECTION = -8.5 FT.
>> TOW @ 4995', BOW @ 5005', ACROSS BASE OF BIYADH FORMATION.
=======- =================== STAGING AREAS ============================
KRSN-38 WELL, LOCATED STAGING AREA:
- #1 (5.2 KM SW OF LOCATION, COORDINATES: 27.231002, 49.224988).
- #2 (5.4 KM NE OF LOCATION, COORDINATES: 27.169638, 49.170038).
========================= WATER TRUCK SUPPLY ON LOCATION==========================
>> AL ASKAR RAW WATER TANKER #6893 TRA ON LOCATION 01-MARCH-23.
>> AL ASKAR RAW WATER TANKER #3951 ZRA ON LOCATION 01-MARCH-23.
>> AL ASKAR RAW WATER TANKER #1834 RRA ON LOCATION 01-MARCH-23.
===========================EMERGENCY EQUIPMENT ON LOCATION ================
>> SINOPEC TWO 55-SEATER BUS W/TWO DRIVERS FOR 24 HR COVERAGE.
>> RTPD. EMR PORTABLE WALKIE TALKIE DEVICE IN ARAMCO FOREMAN OFFICE.
===========================EQUIPMENTS & RENTAL TOOLS=======================
>> RAWABI 04 STATIONS H2S MONITORING SYSTEM ON LOCATION SINCE 3/27/2024.
===========================NEXT LOCATION READINESS: ========================
>> FDHL-10 KOM HELD ON 5/23/2023, LOCATION READINESS: 100% FIELD SERVICE, 100% WELLSITE.
>> FDHL-605 KOM HELD ON 4/28/024, LOCATION READINESS: 0% FIELD SERVICE, 0% WELLSITE.
>> KRSN-100 KOM HELD ON3/13/2023, LOCATION READINESS: 0% FIELD SERVICE, 0% WELLSITE.
====================DRILLS, ORBITS & SAFETY TOPICS: ===============================
>> DRILLS:
>> HELD UP DAILY COMMUNICATION PROTOCOL WITH KRSN GAS WELL FOREMAN AS PER ERP.
==================DAILY CONSUMPTION===========================
>> DAILY DIESEL CONSUMPTION FOR ENGINES (RIG+CAMP): 39 BBLS & CUMULATIVE FOR MONTH OF JUNE 2024 =740 BBLS.
>> DAILY POTABLE WATER CONSUMPTION FOR (RIG+CAMP): 220 BBLS & CUMULATIVE FOR MONTH OF JUNE 2024= 3740 BBLS.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0-5 13,200 80.8 15.06 0 7,105 2078.99 477.34 6,998.3 0.01

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 0 API 0 0 Volts 0 9 245,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
32
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF 0 0 API 0 0 Volts 0 10 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 WATER 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
27

MUD SLIK-5-DR BCTRN O-3670R HEC ECCO-TEMP


TREATMENT 1 ( 55GL ) 6 ( 5GL ) 4 ( 55GL ) 2 ( 50LB ) 3 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/08/2024 AS PER NORMAL N/A SEASONAL 6,489 PJSM / PRE-TOUR
SCHEDULE

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KRSN-38 WORKOVER-6 BI-60
Print Date: 06/18/2024 06:22 04/29/2024 - 07/09/2024
Report ID: OPERLMTDMRREP

Company HCB OSC TGC HCO NC1 RIG GDF ASH RUE ARM NSL ARM

Category BRCR CSR CTRG PSSC PSSC RIG DFMS FLD H2S OTHR SLS WSC
PERSONNEL
1 3 14 2 4 62 1 4 1 2 4 3
Total
AND SERVICES No. of Persons
101
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 24 3 0 16 16 24 12 0 12 12 5 24

Standby/Tankers Others Others Others Others


TRUCKS/BOATS
PICK UP DH7509 52 PASSENGER BUS AT RIG SIT
46 PASSENGER BUS AT CAMPSITE
3 X RAW WATER TRUCK GASOLINE - 72 BBLS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
0 220 415 N/A N/A 950

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MAINTENANCE BI-RM
Print Date: 06/18/2024 06:22 05/29/2019 - 06/19/2024
Report ID: OPERLMTDMRREP

SP-105 @ *RIG MAINTENANCE* Limited Morning Report for 06/18/2024


Objective : (RIG Foreman(s)DHAFEERI, YOUSIF MONAZEL
D&WO Morning Report (Service Providers View) Rig MAINTENANCE. ) Engineer ALHELAL, MOHAMMED ALI
Copyright 2024 Saudi Aramco. All Rights Reserved Charge #: Manager KHALDI, FALAH ALI
SP-105
()
Daily THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well +882167771 2248 5763184 /CLERK VSA
Wellbores:
Date: Tuesday 06/18/2024 *RIG MAINTENANCE* T
0135779621

Last 24 hr operations Next 24 hr plan


CONT. RIG MAINTINANCE, & CLOSE DAILY FINDINGS. CONT. RIG MAINTINANCE, & CLOSE DAILY FINDINGS.
Location Next Location
140 KM AFTER RAFHA, TAKE RIGHT 32 KM BLACK TOP, TAKE RIGHT SKID ROAD 2 KM. MRUZ-801
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date)
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD DAILY SAFET PRE-TOUR MEETING:


- DOECD TEAM ON LOCATION FOR CONDUCTING PRE-COMMENCEMENT
INSPECTION.. COMPLATED.
- WORKING ON PRE-COMMENCEMENT INSPECTION CHECKLIST & CLOSE DAILY
FINDINGS.

PRE-COMMENCE INSPECTION PCI AUDIT TOTAL OPEN ITEMS: 124


CLOSED ITEMS: 87
OPEN ITEMS: 37
PRIORITY#1 OPEN:0 CLOSE:11 TOTAL:11, 100%
PRIORITY#2 OPEN:36 CLOSE:75 TOTAL:111, 68 %
0500 - 0459 24 PRE M MAIN OTH NA RIG
PRIORITY#3 OPEN:1 CLOSE:1 TOTAL:2, 50 %

WCEL TOTAL OPEN ITEMS:


CLOSED ITEMS: 11
OPEN ITEMS: 01
PRIORITY#2 OPEN:1 CLOSE:11 TOTAL:12, 92%

- WAIT ON SINOPEC MATERIALS TO CLOSE ITEMS.

- STORAGE RAW WATER ,TEST VALVE FOR LEAKAGE, ALL OK. & MIXING SPUD
MUD.
-CONDUCTED 2ND H2S DRILL.. RESPONSE OK.
Foreman Remarks

OBJECTIVE:
THE OBJECTIVE OF DRILLING MRUZ-801 IS TO BE USED AS DRILLING WATER SUPPLY WELL SUPPORTING EXPLORATORY CONVENTIONAL WELL MRUZ-1.
THE WELL WILL BE COMPLETED WITH 7" SCREEN LINER SPACED ACROSS WASIA AQUIFER SAND.
===
NEAREST HOSPITAL FOR EMERGENCY CONTACT:
- ARAR MEDICAL COMPLEX (TOTAL: 138 KM)
- ARAR MEDICAL CENTER (PHONE NUMBER: 0146624004).
=====
NEXT LOCATION:
- WELL NAME: N/A
- REQUEST DATE: N/A
- LOCATION READINESS: NOT READY
=====
WELL DESIGN:
- 24" CSG. @ +/- 120' RKB (100' BGL).
- 18-5/8" CSG. @ +/- 520' RKB (500' BGL).
- 13-3/8" CSG. @ +/- 1,420' RKB (1400' BGL).
- 7" PRE-PERFORATED ( 8-1/2 HOLE SECTION) @ +/- 2,720' RKB (2700' BGL).
===
- ELEVATION FROM RIG FLOOR TO GROUND LEVEL: 20 FT.
- CUSTOMIZE MUD LOGGING SERVICES IS REQUIRED IN THIS WELL FROM SURFACE TO TD.
- ZDL/CN/GR/RESISTIVITY LOGGING RUN IS REQUIRED.
===
RIG LOCATION: DRIVE 140 KM AFTER RAFHA, TURN RIGHT, DRIVE 32 KM ON BLACKTOP, TURN RIGHT, SKIDROAD 2 KM FOLLOW SIGN BOARDS.
===
SAFETY: WORK AT HEIGHT , HAZARDS & RISKS, AND CONTROL MEASURES SHARED WITH CREW.

DRILLS:
-CONDUCTED 2ND H2S DRILL.. RESPONSE OK.
STOP CARDS: 6
=====
RENTAL TOOLS:

===
SERVICE COMPANY:

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MAINTENANCE BI-RM
Print Date: 06/18/2024 06:22 05/29/2019 - 06/19/2024
Report ID: OPERLMTDMRREP

=====
ARAMCO:

ARAMCO CLERK AZARUDEEN PAKKIR #8642780 ON LOCATION 12/10/2023.


=====
- CONDUCTED A DAILY COMMUNICATION CHECK WITH DHAHRAN DRILLING ECC BY PHONE @ 15:00 (NO SIGNAL).
======
ARAMCO SERVICE COMPANY:

-MUD LOGGERS ARRIVED AT LOCATION ON 06/15/2024 (@21:00 )


=====

SINOPEC TANKERS, HEAVY EQUIPMENT & VEHICLES ON LOCATION:


- 8 RAW WATER TANKERS & 1 SWEET WATER TANKER.
- 1 SINOPEC 4X4 AMBULANCE CAR.
- 1 SINOPEC PICK-UP CAR.
=====
-DAILY NUMBER OF TRIPS =0 TRIPS; TOTAL NUMBER OF TRIPS = 0TRIPS
- DAILY DISTANCE = 0 X (2 X XX KM) = 0 KM, TOTAL DISTANCE =0 KM
- DAILY VOLUME = 0 M3; TOTAL VOLUME =0 M3
- DAILY VOLUME =0 GAL; TOTAL VOLUME =0 GAL
=========
DRILLING WASTE MANAGEMENT TILL 4539 FT (RKB):
- FLUID: DAILY=0 M3 / TOTAL=0 M3
- CUTTING: DAILY=0 M3 / TOTAL=0 M3
===
MUD PIT RECYCLED WATER VOLUME (M3):
- DAILY RECYCLED WATER VOLUME: 0 M3.
- TOTAL RECYCLED WATER VOLUME: 0 M3.
===
DIESEL CONSUMPTION:
-DAILY ARAMCO DIESEL CONSUMPTION: 0 BBL. TOTAL ARAMCO DIESEL CONSUMPTION: 0 BBL.
-DAILY SINOPEC DIESEL CONSUMPTION: 10 BBL. TOTAL SINOPEC DIESEL CONSUMPTION:220 BBL.
-TOTAL DAILY CONSUMPTION: 10 BBL. TOTAL DIESEL CONSUMPTION: 220 BBL.

==
VACUUM TANKERS
-DAILY TRIPS:0 / TOTAL TRIPS: 45
-DAILY TRIPS:0 /TOTAL TRIPS: 4, TRUCK PLATE NO: 4401 JSA
-DAILY TRIPS:0/TOTAL TRIPS: 4, TRUCK PLATE NO: 4402 JSA
-DAILY TRIPS:0 /TOTAL TRIPS:4, TRUCK PLATE NO: 4403 JSA
-DAILY TRIPS:0/TOTAL TRIPS: 4, TRUCK PLATE NO: 4404 JSA
-DAILY TRIPS:0 /TOTAL TRIPS: 5, TRUCK PLATE NO: 5336 NBA
-DAILY TRIPS:0 /TOTAL TRIPS: 5, TRUCK PLATE NO: 6804 UJA
-DAILY TRIPS:0 /TOTAL TRIPS: 5, TRUCK PLATE NO: 1029 LDA
-DAILY TRIPS:0 /TOTAL TRIPS: 6, TRUCK PLATE NO: 6874 UJA
-DAILY TRIPS:0/TOTAL TRIPS:2, TRUCK PLATE NO: 3983 LJA
-DAILY TRIPS:0/TOTAL TRIPS:2, TRUCK PLATE NO: 6371 NDA
-DAILY TRIPS:0/TOTAL TRIPS:2, TRUCK PLATE NO: 2317 LDA
-DAILY TRIPS:0/TOTAL TRIPS:2, TRUCK PLATE NO: 5337 NBA
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 3,146 DAILY MEETING

Company SCC RIG OES HMS RIG ARM ARM

Category CTRG RIG DFMS MLS OTHR OTHR WSC


PERSONNEL
11 42 1 2 20 1 1
Total
AND SERVICES No. of Persons
78
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24

Operating Hours. 0 24 12 12 12 12 24

Standby/Tankers Others Others


TRUCKS/BOATS
AB-5298 SINOPEC PICK UP CAR SINOPEC AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 170 N/A N/A 1130

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3557 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 06/10/2024 - 07/10/2024
Report ID: OPERLMTDMRREP

SP-106 @ UTMN-3557 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (WSW) Foreman(s)GOUDA, ALAA RAGAB
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-24057-3557) Engineer ALMUBAYEDH, ABDULLA SALEH
SP-106
Manager KHALDI, FALAH ALI
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: THURAYA RIG FORMAN VSAT OTHER VSAT
Date: Tuesday 06/18/2024 UTMN-3557 (0) UTMN_3557_0 +882167771 1173 572-7452 572-0378

Last 24 hr operations Next 24 hr plan


N/U 30" BOP, RIH WITH 28" BHA, COC, HYDRO TEST 30" CSG, DRILL 28" HOLE. DRILL 28" HOLE.
Location Next Location
UTMN-3557 ABQQ-990
Current Depth (ft) Liner TOL MD TVD Formation Tops
180 Last Csg Size MD TVD Size Top
30 100 100 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
100 (Date) 100 80 156
3.7 (06/14/2024@1200 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 0630 1.5 0 34 N BOP NU BNIP RIG 100 100 0 65
N/U BELL NIPPLE & CONNECTED FLOW LINE.
0630 - 0800 1.5 0 34 N DRLG TI BHA RIG 100 100 0 65
HPJSM, P/U, M/U & RIH W/ 28" BHA, TAGGED TOC @ 65' RKB.

0800 - 1230 4.5 0 34 N DRLG DC KELLY RIG 100 100 65 90 COC WITH MUD F/ 65' TO TO 90' RKB (10 ABOVE 30" CSG SHOE)..100 % CIRC
RETURN.
1230 - 1300 0.5 0 34 N DRLG CIRC MPMP RIG 100 100
SWEPT HOLE WITH 30 BBLS HVP, CHC, HYDRO TEST 30" CSG-OK.

DISPLACED HOLE WITH 65 PCF SPUD MUD.


1300 - 1330 0.5 0 34 N DRLG CIRC MPMP RIG 100 100
* CLEAN DITCHES LINE FROM CEMENT, DUMP SAND TRAP TANK & CLEAN SHALE
SHAKERS
1330 - 1430 1 0 34 N DRLG DC KELLY RIG 100 100 90 100
CONT. COC WITH 65 PCF SPUD MUD TO 100' RKB.

ROTARY DRILL 28" HOLE WITH 65 PCF SPUD MUD. 100% CIRC. RETURN.
1430 - 0459 14.5 0 28 N DRLG D KELLY RIG 100 180 - SWEEP HOLE W/ 2 * 50 HVP EVERY CONNECTION.
- WASH UP & REAM DOWN TWICE EVERY CONNECTION.
** HARD FORMATION
Foreman Remarks

THE FOLLOWING IS THE RECOMMENDED DRILLING PROGRAM FOR UTMN-3557, WHICH WILL BE DRILLED AS WATER-WATER SUPPLY IN
UTMN, UTMN-3557 WILL BE USED AS DRILLING WATER SUPPLY WELL SUPPORTING GAS DEVELOPMENT WELL UTMN-725 REPLACEMENT.
THE WELL WILL BE COMPLETED WITH 800 FT OF 7" SCREEN ACROSS WASI AQUIFER.
===== WELL DESIGN =====
THE FOLLOWING IS THE RECOMMENDED WELL DESIGN:
* 34'' HOLE: SET 30'' CSG @ 100' RKB (80' BGL).
* 28'' HOLE: SET 24'' CSG @ 610' RKB (590' BGL,+/-20 FT INTO RUS).
* 22'' HOLE: SET 18-5/8'' CSG @ 1580' RKB (1560' BGL,+/- 10 FT INTO ARUM)
* 17' HOLE: SET 13-3/8'' CSG @ 2050' RKB (2030' BGL, +/-20 FT INTO WASI).
* 12-1/4" HOLE: 9-5/8" LINER @2570 RKB (2550' BGL, +/- 30 FT INTO SFNY)
* 8-1/2" HOLE: 7" SCREEN @ 3370' RKB (3350' BGL, +/- 800FT OF 7" SCREEN).
RIG HEIGHT: 20'.
===== NEAREST HOSPITAL =====
FOR EMERGENCY & CONTACT: KING FAHD HOUFUF HOSPITAL PHONE: 0135354444.
===== NEXT LOCATION =====
* WELL NAME: ABQQ-990.
* REQUEST DATE: N/A.
* LOCATION READINESS: N/A.
=====
* CUSTOMIZE MUDLOGGING SERVICES ARE REQUIRED IN THIS WELL FROM SURFACE TO TD.
* RUN ZDL/CN/GR, AND RESISTIVITY LOGS FROM TOTAL DEPTH TO 100 FT ABOVE THE 9-5/8" LINER SHOE. CONTINUE CN/GR TO
SURFACE.
* DROP GYRO WILL BE AT WELL TD.
===== RIG LOCATION=====
===== ECC CALL =====
* CONDUCTED A DAILY COMMUNICATION CHECK WITH DHAHRAN DRILLING ECC BY PHONE @ 15:00.
===== DAILY SAFETY MEETING =====
HELD DAILY SAFETY MEETING WITH RIG CREW:
* BE AWARE OF PINCH POINTS HAZARDS.
* PRECAUTIONARY MEASURES FOR HOT WORK JOB.
* SHARED WITH ALL CREW ON SWA APPLICATION.
* INSPECT LIFTING GEAR BEFORE USE
* SIMILLITINEOUS OPERATION ARE PROHIBITED.
* GOOD HAND OVER TO EACH POSITION.
* SHARED THE NEAR MISS #7232892.
* DISCUSSED & SHARED ABOUT THE FALL PROTECTION AWARENESS.
DRILLS: H2S MUSTER, PIT, BOP TRIP & ACCUMULATOR DRILLS
STOP CARDS:8
==== SERVICE COMPANY ====
* OES MUD ENGINEER ARRIVED LOCATION ON 4/4/2024 @16:00 HR'S.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3557 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 06/10/2024 - 07/10/2024
Report ID: OPERLMTDMRREP

* 2 MUD LOGGER RAWABI AND UNIT ARRIVED LOCATION ON 06/14/2024@11:30 AM.


* 3 TAQA CREW AND UNIT ARRIVED LOCATION ON 06/14/2024@18:00 HR'S.
===== ARAMCO =====
* ARAMCO CLERK MOHAMED AMEERUL ID #8643547 ARRIVED ON LOCATION ON 1/13/2024.
* ARAMCO FCT GHAZI AL SHAMMARY ID#783679 ARRIVED LOCATION ON 6/11/2024.
===== RENTAL TOOLS ON LOCATION =====
** OILSERVE 12" SHOCK SUB (SN# ST-1200-0054) ON LOCATION FROM 06/13/2024 @ 17:00 HR'S.
1ST P/U @ 06/14/2024 @ @21:00 HR'S & L/D ON 06/16/2024@10:30 HR'S.
2ND RUN 12'' SHOCK SUB M/U ON 06/17/2024@07:00
===== SINOPEC TANKERS, HEAVY EQUIPMENT & VEHICLES ON LOCATION =====
* 1 SWEET WATER TANKER.
* 8 RAW WATER TANKERS.
* 1 SINOPEC 4X4 AMBULANCE CAR.
* 1 SINOPEC PICK-UP CAR.
* 1 CRANE.
* 1 FORKLIFT.
===== WASTE MANAGEMENT KPI: =====
* DRILLING WASTE CUTTINGS: DAILY:2 M3 / TOTAL= 16 M3.
* DRILLING WASTE FLUIDS: DAILY= 22 M3 /TOTAL= 46 M3.
* REUSED WATER: DAILY= 0 M3 / TOTAL= 0
=======WATER TRIPS =====
THE WATER SOURCE: UTMN - 926 (STRAIGHT DISTANCE: 3.27 ; ROUND TRIP: 6.54 KM).
* DAILY NUMBER OF TRIPS= 0 TRIPS, TOTAL= 22 TRIPS.
* DAILY KM= 0 KM, TOTAL=143.9 KM.
* DAILY VOLUME= 0 M3, TOTAL=704 M3.
- FROM ARAMCO WATER SOURCE PRODUCTION LINE:
DAILY VOLUME=20 M3, TOTAL= 172 M3.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 16 API 0 0 Volts 2.97 9.5 500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
80 0 HTHP 97 30 0 15 / 32 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 7 3 17 / 20 25 200 0
60
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 16 API 0 0 Volts 2.97 9.5 500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
80 0 HTHP 97 30 0 15 / 32 SPUD 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 2 7 3 17 / 20 25 200 0
60

CAUST ENVIROTHIN SODASH DUOVIS-NS BCTRN BENT BFIBRE-SF


MUD 3 ( 50LB ) 3 ( 50LB ) 2 ( 100LB ) 15 ( 55LB ) 1 ( 5GLD ) 4 ( 2500L ) 25 ( 25LB )
TREATMENT MILLPLUG MICA-FINE
25 ( 55LB ) 25 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
2 100 180 DP Av DC Av Bit HHP 20 70 435 28 SEC
Pressure GPM Jet Vel 14.53 15.32 30 I-Row O-Row DC Location Bearings
250 450 122 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
839315 EBXT12S 3 x 18 / 1 x 24 / 1.187
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 17 350 50 50 2,000 Shock Sub Serial # Shock Sub Hrs
147
Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 28 1 1.81 0.6 839315
2 Near Bit Roller Reamer RIG 28 1 28 3 8.04 7 5/8 REG 7 5/8 REG 300 3 POINT 28
DRILL STRING
3 Shock Sub TO1 8.25 1 8.25 2.938 10.79 6 5/8 REG 6 5/8 REG 300 SPRL ST5-1200-80
4 Drillcollar RIG 9.5 3 9.5 2.813 30.49 7 5/8 REG 7 5/8 REG 300 SPRL
5 String Reamer RIG 28 1 28 2.875 7.93 7-5/8" REG 7-5/8" REG 300 76117
6 Drillcollar RIG 9.5 2 9.5 2.813 60.58 7 5/8 REG 7 5/8 REG 300 SPRL 109-0066
7 Crossover RIG 9 1 9 2.875 1.75 6 5/8 REG 7 5/8 REG 300 2333
8 Drillcollar RIG 8 10 8 2.813 296.97 6 5/8 REG 6 5/8 REG 200 SPRL
9 Crossover RIG 8 1 8 3.75 2.58 6 5/8 REG NC50 50 2002201
10 Heavy Weight Drillpipe (HWDP) RIG 5 6 5 3 179.41 NC50 NC50 50.14 CONV
11 Drillpipe RIG 5 1 5 4.276 31 NC50 NC50 19.5 G105 PREMIUM

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3557 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 06/10/2024 - 07/10/2024
Report ID: OPERLMTDMRREP

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A NO NO HOT 4,990 N/A

Company RIG OES RO1 RIG ARM SJC ARM SCC

Category RIG DFMS MLS OTHR OTHR PCS WSC CTRG


PERSONNEL
38 1 2 18 2 3 1 12
Total
AND SERVICES No. of Persons
77
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24

Operating Hours. 24 12 24 12 12 0 24 0

Standby/Tankers Others Others


TRUCKS/BOATS
AB-5450 AMBULANCE PICK UP

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 214 139 162 1700

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
BATTERY OF VSAT NEED TO BE CHANGED.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3568 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 05/20/2024 - 06/28/2024
Report ID: OPERLMTDMRREP

SP-107 @ UTMN-3568 Limited Morning Report for 06/18/2024


Objective : (WATER SOURCE) SUBAIE, SHABEEB ABDULLAH / ALMAKHAYITAH, ABDULLATIF
Foreman(s)
D&WO Morning Report (Service Providers View) ABDULAZIZ
Rig Charge #: Engineer ALHAJRI, ABDULLAH MOHAMMAD
Copyright 2024 Saudi Aramco. All Rights Reserved SP-107 (66-23057-3568) Manager KHALDI, FALAH ALI
Daily Onshore
Wellbores: THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well
+882167771 4211 013378-182 8 /CLERK VSA
Date: Tuesday 06/18/2024 UTMN-3568 (0) UTMN_3568_0
T
013378-182 9

Last 24 hr operations Next 24 hr plan


TOP JOB, WOC, N/D BOP. WH WORK, N/U BOP, PT, RIH W/ 12-1/4" BHA, COC COC, DRILL 12-1/4" HOLE SECTION
Location Next Location
UTMN-3568 JLDI-882
Current Depth (ft) Liner TOL MD TVD Formation Tops
1,580 Last Csg Size MD TVD Size Top
13 3/8 1579 1579 Formations Comments
Depth
DMMM 565
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UMER 890
1580 (Date) 0 0 170 NARM 1,565
19.5 (05/27/2024@2230 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

*PERFORMED TOP JOB:


0500 - 0530 0.5 0 17 N CSG TOP CSG HCM 1580 1580
CONT PUMPED 80 BBLS CMT SLURRY CLASS-G (118 PCF, 384 SX) W/ 2% CACL2.
* HAD GOOD CMT RETURN AT SURFACE.

0530 - 1130 6 0 17 N CSG WOC CSG RIG 1580 1580 WAIT ON CEMENT.
* PREPARE 12-1/4" BHA.

1130 - 1230 1 0 17 N WH OTH NA RIG 1580 1580 HPJSM,DISCONNECT FLOW LINE, HANG BOP & DRAIN CSG & ROUGH CUT 13-3/8"
CSG & L/D CUT OFF JT

HPJSM,N/D BELL NIPPLE,N/D 21 1/4"-2M ANNULAR ,21-1/4"-2M MUD


1230 - 1500 2.5 0 17 N BOP ND DVRT RIG 1580 1580
CROSS,DISCONNECT HCR VALVES & CUT 18- 5/8" X 21-1/4"WELDING NECK
FLANGE.

1500 - 1700 2 0 17 N WH OTH NA RIG 1580 1580 FINAL CUT & DRESS 13 3/8" CSG, WELD 1" THICK STEEL PLATE RING TO SEAL 13
3/8" X 18 5/8" ANNULUS & WELD 13 3/8" X 13 5/8" WELD NECK FLANGE.

HPJSM. N/U 13-5/8" X 21-1/4" ADAPTER FALNGE, 21 1/4"-2M ANNULAR BOP & 21
1700 - 2000 3 0 17 N BOP NU DVRT RIG 1580 1580 1/4"-2M MUD CROSS, 2 X 7 1/6"-2M HCR VALVES WITH 2 X 8" INVASION LINES,2"
KILL LINE ,N/U BELL NIPPLE & CONNECTED FLOW LINE & FUNCTION TESTED 21
1/4"ANNULAR BOP & 2 X 7 1/6"-2M HCR, OK.

2000 - 2100 1 0 17 N BOP BOPT DVRT RIG 1580 1580 HPJSM, P/U & M/U 13 3/8" CUP TESTER, P/T BOPE F/ 300-1500 PSI. OK.L/D SAME.

2100 - 0000 3 0 17 N DRLG TI BHA RIG 1580 1580 0 1495


HPJSM, P/U & RIH W/12 1/4" BHA & TAGGED TOP OF CMT @ 1495'RKB.

0000 - 0330 3.5 0 17 N DRLG DFS KELLY RIG 1580 1580 1495 1570 P/U KELLY AND CLEAN OUT CMT AND FLOAT COLLAR W/ WATER TO 1570
'RKB.(10' ABOVE 13-3/8" CSG SHOE).

0330 - 0430 1 0 17 N DRLG CIRC MPMP RIG 1580 1580 SWEPT HOLE WITH 50 BBLS HVP, CHC, P/T 13-3/8" CSG TO 500 PSI W/ WATER-
OK.
0430 - 0459 0.5 0 17 N DRLG CIRC MPMP RIG 1580 1580
DISPLACED HOLE WITH 72 PCF INHIBITED PHPA MUD.
Foreman Remarks

OBJECTIVE:
UTMN-3568, WHICH WILL BE DRILLED AS WATER-WATER SUPPLY IN UTMN. THE WELL IS LOCATED 0.502 KM N64E OF UTMN-1870 AND 0.596 KM S23E OF UTMN-512.
UTMN-3570 WILL BE USED AS DRILLING WATER SUPPLY WELL SUPPORTING GAS DEVELOPMENT WELL UTMN-924 REPLACEMENT.
* THE WELL IS NOT FLLOWING.
==================
* RIG LOCATION: FROM DHAHRAN +/- 170 KM ON DHA-HARADH HIGHWAY TURN RIGHT 07 KM SKID ROAD.
==================
NEAREST HOSPITAL FOR EMERGENCY & CONTACT: KING FAHAD HOSPITAL HOFUF 80 KM
CONTACT: 013-5750000
=================
NEXT LOCATION
- WELL NAME: JLDI-882
- REQUEST DATE: N/A
- LOCATION READINESS: NOT READY
================
WELL DESIGN
* 34" HOLE: SET 30" CSG @120' RKB.
* 28" HOLE: SET 24" CSG @700' RKB.575' AS RCC
* 22'' HOLE: SET 18-5/8'' CSG @ 960' RKB 914' AS RCC
* 17'' HOLE: SET 13-3/8'' CSG @ 1590' RKB
* 12 1/4" HOLE: SET 9 5/8'' LINER @ 2720' RKB.
* 8.5" HOLE: SET 7" SCREENS @ 3420' RKB (WELL TD).

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3568 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 05/20/2024 - 06/28/2024
Report ID: OPERLMTDMRREP

==================
** ELEVATION FROM RIG FLOOR TO GROUND LEVEL: 20 FT.
* WELLINK DATA TRANSMISSION SERVICE WILL BE USED FOR THIS WELL TO PICK UP CSG POINTS AND FORMATION TOPS BY RCC TEAM.
* CUSTOMIZE MUD LOGGING SERVICES REQUIRED IN THIS WELL.
* OH LOGGING ZDL/CN/GR LOGS REQUIRED IN THIS WELL.
==========================
SAFETY:
NIPPLE DOWN/UP-BOP JOB SAFETY PRECAUTIONS, BEWARE OF PINCH POINT, DROPS AND LINE OF FIRE, STATIC CURRENT SAFETY AWARENESS SESSION.

SAFETY DRILL: FIRE FIGHTING DRILL, FIRE PUMP DRILL AND MUSTER POINT DRILL
STOP CARD : 14
===========
ARAMCO:
* CONDUCATED DAILY RADIO COMMUNICATION CHECK W/ DHAHRAN DRILLING ECC AT @15:00 HRS.
- AL-HAMMAD CLERK# BILAL AHMED # 8642781 ON LOCATION ON 1/13/2024.
===========
RENTAL TOOLS:
* RECEIVED 12" OILSERV SHOCK SUB S/N: ST-1100-0010 ON LOCATION 6/10/2024 AT 19:00 HRS.
* RECEIVED 9-1/2 JAR SN:HMJ-950-0022 @ 19:00 6/10/2024
**RECEIVED 8-1/2 JAR SN:HMJ-850-0008 ON 6/17/2024 AT 18:00 HRS.
1ST RUN: P/U ON 06/17/2024 @22:00.
=================
SERVICE COMPANY:
- START TRANSFERRING DATA ON 05/28/2024.
- OES MUD ENGINEER ON LOCATION ON 01/06/2024 @ 17:40 HRS.
- AL MANSORI H2S TECHNICIAN ON LOCATION ON 05/24/2024 @ 8:00 HRS.
- GEOLOG CREW AND UNIT ON LOCATION 05/26/2024 @ 18:00 HRS.
- HES CMT ON LOCATION ON 06/16/2024 @ 12:00 HRS
==============
SINOPEC RAW WATER TANKERS DATA:
=============
WATER SOURCE: UTMN-926 STRIGHT LINE 12.5 KM (ONE SIDE)
- DAILY NUMBER OF TRIPS = 5 , TOTAL TRIPS = 265
- DAILY KM = 125 , TOTAL KM = 6625
- DAILY VOLUME = 42000 GAL, TOTAL VOLUME = 2226000 GAL.
============
ARAMCO RAW WATER TANKERS DATA: RECEIVED ON 06/14/2024 @ 21:30. RELEASED ON 06/17/2024 @ 17:00
WATER SOURCE: UTMN-926 STRIGHT LINE 12.5 KM (ONE SIDE)
- DAILY NUMBER OF TRIPS = 0 TOTAL TRIPS = 25
- DAILY KM = 0 , TOTAL KM = 625
- DAILY VOLUME = 0 GAL, TOTAL VOLUME = 210000 GAL.
===================
WASTE MANAGEMENT KPI:
- DRILLING WASTE CUTTINGS: DAILY= 0 M3 / TOTAL= 39.77 M3.
- REUSED WATER: DAILY= 0 M3 / TOTAL =333 M3
- DUMPING WATER= 62.07 M3 TOTAL= 307.57 M3
===================
- SINOPEC WATER TANKERS & VEHICLES ON LOCATION:
- 1 SWEET WATER TANKERS.
- 12 SINOPEC RAW WATER TANKERS.
- 1 4X4 AMBULANCE CAR.
- 1 PICK-UP CAR.
==================
DIESEL:
ARAMCO DAILY DIESEL CONSUMPTION: 6 REMAINING: = 49 BBL
SINOPEC DIESEL CONSUMPTION: 7 BBL REMAINING: 31 BBL
TOTAL DAILY CONSUMPTION = 13 BBL, REMAINING: 80 BBL
====================
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
72 PCF 0 6 API 0 0 Volts 0 10 65,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 96 23 0 10 / 12 INPHPA 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 12 4 12 / 15 10 200 0
63
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
72 PCF 0 6 API 0 0 Volts 0 10 65,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 96 24 0 11 / 13 INPHPA 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 12 4 12 / 15 10 200 0
65

DUOVIS-NS CAUST NACL HYSTAR-P BARITE CACL2-80 GRAV18-26


MUD 17 ( 55LB ) 5 ( 50LBP ) 28 ( 2200L ) 54 ( 55LB ) 1 ( 5000L ) 22 ( 50KG ) 16 ( 55LB )
TREATMENT BENT
2 ( 2500L )

BIT DATA Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR UTMN-3568 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 05/20/2024 - 06/28/2024
Report ID: OPERLMTDMRREP

5RR 1,580 1,580 DP Av DC Av Bit HHP 10 60 M223 12.25 HTC


Pressure GPM Jet Vel 111.71 170.37 78 I-Row O-Row DC Location Bearings
820 570 177 N/A N/A N/A N/A N/A
Serial Number Type Jets TFA
7912326 DD506XV1 6 x 15 / 1.035
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID SizeLength Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 12.25 1 12.25 1.02 6-5/8 7912326
2 Near Bit Roller Reamer RIG 12.25 1 12.25 2.75 6.16 6 5/8 REG 6 5/8 REG 149 3 POINT 2017009
DRILL STRING 3 Drillcollar RIG 8.25 1 8.25 3 30.63 6 5/8 REG 6 5/8 REG 149 SPRL 3020504B-15
4 Roller Reamer RIG 12.25 1 8.5 3 6.17 6 5/8 REG 6 5/8 REG 149 3 POINT 2017009
5 Drillcollar RIG 8.25 10 8.25 3 303.79 6 5/8 REG 6 5/8 REG 149 SPRL
6 Hydro-Mechanical Jar OJR 8 1 8 2.81 18.77 6-5/8" REG 6-5/8" REG 2,200 HMJ-8500008
7 Drillcollar RIG 8.25 2 8.25 3 60.32 6 5/8 REG 6 5/8 REG 149 SPRL
8 Crossover RIG 8.25 1 8.25 2.875 1.78 NC50 6 5/8 REG 149 1051
9 Heavy Weight Drillpipe (HWDP) RIG 5 6 5 3.063 181.55 NC50 NC50 45.2 CONV
10 Drillpipe RIG 5 67 5 4.276 2,112.16 NC50 NC50 19.5 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/17/2024 N/A NORMAL N/A HOT 6,452 PRE-TOUR

Company SCC RIG OES MH2 RO1 RIG ARM HCM ARM

Category CTRG RIG DFMS H2S MLS OTHR OTHR PCS WSC
PERSONNEL
12 48 1 1 2 14 1 3 2
Total
AND SERVICES No. of Persons
84
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 3 24

Operating Hours. 0 24 12 12 12 12 12 1 12

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 80 45 115 1600

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MSBA-3 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 05/28/2024 - 11/29/2024
Report ID: OPERLMTDMRREP

SP-110 @ MSBA-3 Limited Morning Report for 06/18/2024


Objective : (CO2 EVAL/DEL) Foreman(s)MHALLA, FARID
D&WO Morning Report (Service Providers View) Charge #: Engineer FASSAM, KHALED ADEL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Manager ABADA, YASSINE
SP-110 (66-24834-0003)
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 8821677713 751 0135779600 0135779693
Date: Tuesday 06/18/2024 MSBA-3 (0) MSBA_3_0 CONTRACTOR /CLERK VSA T
0135779694

Last 24 hr operations Next 24 hr plan


CONT PU 12" CO ASSY , CO DV TOOLS , CONT RIH , CO CMT F-EQPTS TO 20FT ABOVE SHOE , PT CONT PU 12" CO ASSY , DRILLING 12" SECTION
CSG , CONT CO SHOE ,CIR & PRFORM FIT DROP GYRO & POOH , PU 12" DRLG ASSY
Location Next Location
MSBA-3 MSBA-5
Current Depth (ft) Liner TOL MD TVD Formation Tops
3,503 Last Csg Size MD TVD Size Top
13 3/8 3497 3497 Formations Comments
Depth
DMMM 400 NOT IN PROGNOSIS.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 810 29 FT DEEPER.
3503 (Date) 100 10 456 UMER 1,162 AS PER DRLG PROGRAM
15.7 (06/02/2024@1200 ) ARUM 2,610 AS PER DRLG PROGRAM
LAMS 3,435 54 FT SHALOWER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT PU & MU 12" CLEAN OUT BHA AS FOLLOWING: 12" NEW MILLED TOOTH BIT
TYPE GFVHC SN# RV1197, BIT SUB WITH FLOAT VALVE, 8" OILSERV SHOCK TOOL
0500 - 0615 1.25 0 16 N DRLG HT BHA RIG 3503 3503
, 12 JTS OF 8 1/4" DC'S, 8 1/2" OIL SERV JAR 3 X 8 1/4" DC'S, X-OVER & 3 JTS OF
5" HWDP
- PICK UP 6 JTS 8 1/4" D'S FROM RACKS

WASH DOWN TILL TAG CEMENT @ 595 FT , CLEAN OUT CEMENT & DVT
0615 - 0945 3.5 0 16 N DRLG DFS TDS RIG 3503 3503 575 700 CLOSING/OPENING PLUGS TO 700 FT ( DV DEPTH : 666 FT )
- SWEEP HOLE AND WORK ACROSS DV TOOL MULTIPLE TIME AND CONFIRM FREE
PASS

HELD STAND DOWN MEETING WITH ALL PERSONNEL ON RIG, DISCUSSED PTW
0945 - 1015 0.5 0 16 N DRLG PJSM NA RIG 3503 3503
PROCEDURE AND IMPLEMENTATION , SWA & IMPORTANCE OF HEAT STRESS
MANAGMENT

1015 - 1400 3.75 0 16 N DRLG LDP SPDP RIG 3503 3503 700 3300 RIH 12" CO ASSY WITH PICK UP 30 JTS 5" DP'S
- FLUSH AND DRIFT ALL PICKED UP DP'S

1400 - 1715 3.25 0 16 N DRLG DFS TDS RIG 3503 3503 3300 3475 WASH DOWN TILL TAG CEMENT AT 3279 FT, CLEAN OUT CEMENT, BAFFLE
ADAPTER, CMT, F-COLLAR & CMT @ 3475 FT (+/- 20 FT ABOVE F-SHOE)

1715 - 1830 1.25 0 16 N DRLG CIRC MPMP RIG 3503 3503 CIRC. TILL SHAKER CLEAN & PT CSG TO 490 PSI (EMW : 85 PCF ) FOR 15 MINTS,
OK.
1830 - 1900 0.5 0 16 N DRLG DFS TDS RIG 3503 3503 3475 3503
CONT CLEAN OUT REMAINING CMT, F-SHOE @ RAT HOLE TO 3503 FT
1900 - 1930 0.5 0 12 N DRLG D TDS RIG 3503 3513
DRILL 10 FT NEW FORMATION RATE HOLE @ 3513F T

1930 - 2115 1.75 0 12 N DRLG CIRC MPMP RIG 3513 3513 DISPLACE HOLE TO FRESH 66 PCF INHIBITED NACL POLYMER MUD & CIRCULATE
TILL MUD HOMOGINIZED

2115 - 2145 0.5 0 12 N DRLG OTH NA HCM 3513 3513 AT THE SHOE PERFORM FIT WITH HALL CEMENT UNIT @ 460 PSI ( 85 EMW ) FOR
15 MIN -OK -

POOH 12" CLERAN OUT ASSY TO TOP OF BHA @ 763 FT


2145 - 2345 2 0 12 N DRLG TO SPDP RIG 3513 3513 3513 763
- FLOW CHECK - WELL STATIC
- DROP OPTIMUM GYRO TOOL
2345 - 0045 1 0 12 N DRLG HT BHA RIG 3513 3513
RACK BACK 3 STND 5" HWDP'S , 1 STND 8 1/4" DC'S & LD OILSERV 8 1/4" HM-JAR

PICK UP & TEST SINOPEC 8 1/4" PBL , RECOVRED OPERATING BALLS & LAY DOWN
0045 - 0215 1.5 0 12 N DRLG HT BHA RIG 3513 3513
SAME
- PBL OPENED @ 50 PSI & CLOSED @ 2500 PSI

HELD STAND DOWN MEETING WITH ALL PERSONNEL ON RIG, DISCUSSED PTW
0215 - 0245 0.5 0 12 N DRLG PJSM NA RIG 3513 3513
PROCEDURE AND IMPLEMENTATION , SWA & IMPORTANCE OF HEAT STRESS
MANAGMENT

CONT POOH AND RACK BACK 3 STAND 8 1/4" DC'S , LD 8" SHOCK TOOL, BIT SUB &
0245 - 0400 1.25 0 12 N DRLG HT BHA RIG 3513 3513
BIT
- RETRIVED OPTIMUM GYRO

HPJSM, PU & MU 12" BHI MOTOR GR/MWD DRILLING BHA AS FOLLOWS :


...ONGOING @RT.
0400 - 0459 1 0 12 N DRLG HT BHA BHI 3513 3513
- 12" NEW PDC BIT (TYPE: MM76DH S/N: 14127564 NOZZLE: 7 X 15), MOTOR,12"
RIG STRR, MWD, RIG 8 1/4" SHORT DC, 12" RIG STRR, FLOAT SUB , 2 X NM FILTER
SUB, 8 1/4" PBL, 15 JTS 8 1/4" DC'S , OILSERV 8 1/4" DRILLING JAR, 3 JTS X 8

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MSBA-3 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 05/28/2024 - 11/29/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
1/4" DC'S , X OVER , 9 JTS X 5" HWDP'S
- MONITOR THE WELL TO TRIP TANK.
Foreman Remarks

MSBA-3 IS AN EXPLORATION VERTICAL EVALUATION WELL FOR CO2 SEQUESTRATION PROJECT. THE PRIMARY OBJECTIVE OF THE WELL IS TO EVALUATE CAP ROCK INTEGRITY, RESERVOIR
QUALITY AND CAPACITY FOR THE 3 RESERVOIRS FOR CO2 SEQUESTRATION: SFNY, KHFJ & BYDH FOR A FUTURE CCUS PROJECT. EXTENSIVE LOGGING AND CORING PROGRAM IS PLANNED FOR
TARGET RESERVOIRS. EACH TARGET RESERVOIR WILL BE SUBJECTED TO INJECTION AND TESTING WITH CO2 TO EVALUATE RESERVOIR STORAGE POTENTIAL .
* THE TOTAL DEPTH IS 7,840'.
* CHDST CO2 / WATER ACROSS 3 TARGET RESERVOIRS.
================= SAFETY=========================================
* RIG OUT OF RADIO COVERAGE.
================= VISITS ==================================

=================ARAMCO PERSONNEL================================
* ARAMCO ME AHMED ALWARTHAN ID#814734 ON LOCATION SINCE 06/05/2024.
* ARAMCO DOE&CD FCC EMAD A. SAYED ID# 8335923 ON LOCATION SINCE 06/16/24 FOR THIRD PARTY INSPECTION.
* ARAMCO DOE&CD FCC TURKI ALHAMIDI ID# 795007 ON LOCATION SINCE 06/16/24 FOR THIRD PARTY INSPECTION.

=================SERVICE COMPANY, RENTAL TOOLS & OTHERS ===============


* 01 SCOMI MUD ENGINEER ON LOCATION SINCE 04/15/2024.
* 01 WATER HAULING TANKERS ASSIGNED
* HALLIBURTON MUD LOGGING UNIT AND CREW ON LOCATION SINCE 05/30/2024.
* 12" OILSERV SHOCK SUB SN: ST-1200-0048 ON LOCATION SINCE 06/08/2024.
* 8-1/2" OILSERV HMJ ON LOCATION SINCE 06/08/2024.

============== DRILLING FLUID RECYCLING ===============================


* TOTAL MUD RECIEVED: 00 BBLS * TOTAD MUD SHIPPED: 00 BBLS

==============WELL DESIGN ==========================================


* DRILLED 28" HOLE, 24" CONDUCTOR @ 120' MD/TVD.
* DRILLED 22" HOLE, 18-5/8" CSG @ 830' MD/TVD (30' INTO RUS FM).
* DRILLED 16" HOLE, 13-3/8" CSG @ 3,497' MD/TVD (68' INTO LAMS).
* PLANNED 12" HOLE, 9-5/8" CSG @ 5,270' MD/TVD (53' INTO AHMD).
* PLANNED 8-3/8" HOLE, 7" LINER @ 7,840' MD/TVD (302' INTO BUWB FM).
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
66 PCF 2 4 API 0 0 Volts 1.02 9.8 32,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 15.8 HTHP 97 21 0 8 / 13 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 19 3 8/9 2.5 280 0
48
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
66 PCF 2 4 API 0 0 Volts 1.02 10 32,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 15.6 HTHP 97 20 0 9 / 14 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 20 3 9 / 10 2.5 280 0
53

BCTRN CACO3-25 CACO3-50 BENT CAUST CITRICACID MRBL-M


MUD 10 ( 100LB ) 150 ( 50LB ) 30 ( 50LB ) 4 ( 2500L ) 9 ( 50LB ) 7 ( 100LB ) 7 ( 2200L )
TREATMENT PACLV NEWDRLPLUS BICB NACL XC SODASH
150 ( 50LB ) 15 ( 50LB ) 17 ( 55LB ) 24 ( 2200L ) 7 ( 50LB ) 9 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
4 3,503 3,513 DP Av DC Av Bit HHP 35 80 217 12 SMT
Pressure GPM Jet Vel 102.98 161.38 0 I-Row O-Row DC Location Bearings
860 500 N/A 1 1 WT A E
BIT DATA
Serial Number Type Jets TFA
RV1197 GFVHC POOH Reason N/A
Gauge Other
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 62
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
DRILL STRING 0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 12 1 1.05 RV1197
2 Bit Sub RIG 8.25 1 8.25 2.813 2.99 6 5/8 REG 6 5/8 REG 158 200601

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MSBA-3 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 05/28/2024 - 11/29/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
3 Shock Sub OJR 9.5 1 9.5 3 13.57 7-5/8" REG 7-5/8" REG 2,500 CW770875
4 Drillcollar RIG 8.25 12 8.25 3 358.86 6 5/8 REG 6 5/8 REG 158 SPRL
5 Hydro-Mechanical Jar OJR 8.5 1 8.5 18.79 158 HMJ-8500010
6 Drillcollar RIG 8.25 3 8.25 3 89.33 6 5/8 REG 6 5/8 REG 158 SPRL
7 Crossover RIG 8.25 1 8.25 2.875 2.58 NC50 6 5/8 REG 158 181003
8 Heavy Weight Drillpipe (HWDP) RIG 5 9 5 3 276.05 NC50 NC50 50.14 CONV
9 Drillpipe RIG 5 1 5 4.276 30 NC50 NC50 19.5 XD105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/17/2024 06/17/2024 SEASONAL N/A NORMAL 1,102 PTSM

Company TGC BHI RIG GDF OGS HMS RIG ARM HCM ARM

Category CTRG DPDS RIG DFMS ISS MLS OTHR OTHR PCS WSC
PERSONNEL
14 2 57 2 1 4 11 3 2 1
Total
AND SERVICES No. of Persons
97
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 1 24 24 7 24 0 24 0 24

Standby/Tankers Others
TRUCKS/BOATS
RT-4533 AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 638 114 51 800

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
* NO EMERGENCY RADIO COVERAGE IN THIS AREA.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MAINTENANCE BI-RM
Print Date: 06/18/2024 06:22 10/22/2015 - 06/30/2024
Report ID: OPERLMTDMRREP

SP-120 @ *RIG MAINTENANCE* Limited Morning Report for 06/18/2024


Objective : (RIG Foreman(s)ALMUTAIRI, SAUD DHAIFALLAH
MAINTENANCE) Engineer ALSHAMI, HAMED AHMED
D&WO Morning Report (Service Providers View) Manager GARNI, ABDULLAH SALEH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved Charge #: THURAYA RIG FORMAN VSAT CONTRACTOR
SP-120
() /CLERK VSA
Daily 0088216777 13756 013-379-52 22
(0500-0500) Saudi Aramco Well T
Wellbores:
Date: Tuesday 06/18/2024 *RIG MAINTENANCE* 013-379-52 23
CONTRACTOR /CLERK VSA T
013-379-52 21

Last 24 hr operations Next 24 hr plan


PERFORM RIG MAINTENANCE. PERFORM RIG MAINTENANCE.
Location Next Location
MNIF-452 HABA-822
Current Depth (ft) Liner TOL MD TVD Formation Tops
0 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
0 (Date)
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0500 - 1145 6.75 PRE M MAIN OTH NA RIG
RIG MAINTENANCE IN PROGRESS.

HOLD STAND DOWN MEETING WITH BOTH RIG CREWS TO DISCUSS STOP WORK
1145 - 1215 0.5 PRE M MAIN PJSM NA RIG
AUTHORITY, HAZARDS RELATED TO SAND BLASTING, WEAR PROPER PPE FOR THE
TASK, HIGHLIGHTED HEAT STRESS HAZARDS, SAFETY CULTURE IMPROVEMENT.

RIG MAINTENANCE ONGOING :

1- SAND BLASTING:

- SAND BLASTING MAST PARTS ONGOING (PROGRESS 75%)


- SAND BLASTING SUBSTRUCTURE PARTS ONGOING (PROGRESS 95%)

2- INSPECTION ON LOCATION PROGRESS:

- CAT IV FOR MAST ONGOING (PROGRESS 60%).


- CAT IV FOR SUBSTRUCTURE ONGOING (PROGRESS 70%).
- CAT III INSPECTION AND GENERAL MAINTENANCE FOR TDS (PROGRESS 80%).
- CAT III FOR TRAVELING BLOCK - COMPLETED.
- CAT III FOR CROW BLOCK - COMPLETED.
- CAT III FOR DEADLINE ANCHOR - COMPLETED.

3- INSPECTION PROGRESS FOR RIG EQUIPMENT SENT TO SINOPEC YARD:


1215 - 0459 16.75 PRE M MAIN OTH NA RIG
- CAT III FOR DRAWWORKS (PROGRESS 90%).
- CAT IV FOR MUD PUMPS (PROGRESS 65%).
- CAT IV FOR MONKEYBOARD (PROGRESS 55%).
- CAT IV FOR POWER TONG (PROGRESS 90%).

4 - OTHER:

- CHANGE RIG FLOOR WITH ANTI-SLIP STEEL PLATES (PROGRESS 60%).


- CHANGE AC IN SCR ROOM - COMPLETED.
- REPLACE VALVES ON MUD SYSTEM AS NEEDED - COMPLETED
- REPLACE RUBBER CONNECTION ON AGITATOR - COMPLETED.
- INSPECT ALL DRILLING TOOLS AND HANDLING TOOLS - NOT STARTED
- REPLACE ALL THE HIGH-PRESSURE LINES WITH NEW ONES - NOT STARTED

- R/D : 100%, R/M: 100 % & R/U: 25%.


- RIG RELEASED FROM MNIF-452 ON 29-MAY-2023 AT 17:00 HRS.
- DAYS SINCE RIG RELEASE : 19.5
Foreman Remarks

PERFORM RIG MAINTENANCE AS PER SCHEDULE.

HABA-822 COORDINATES:
LAT: 27.4117275
LONG: 47.0723976

--------------------------------------------ARAMCO PERSONNEL, RENTAL TOOLS & OTHERS-------------------------------------------------------------------


* ARAMCO FCT ALI ASIRI # 279035 ON LOCATION SINCE 06/10/2024.

DAILY SURVEY
MUD DATA
MUD

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR MAINTENANCE BI-RM
Print Date: 06/18/2024 06:22 10/22/2015 - 06/30/2024
Report ID: OPERLMTDMRREP

TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 1,493 N/A

Company RIG RIG RIG RIG ARM ARM

Category CTRG RIG MED OTHR OTHR WSC


PERSONNEL
15 55 1 27 1 1
Total
AND SERVICES No. of Persons
100
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24

Operating Hours. 0 24 24 24 24 24

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 981 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SUBN-10 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 03/14/2024 - 10/28/2024
Report ID: OPERLMTDMRREP

SP-121 @ SUBN-10 Limited Morning Report for 06/18/2024


Objective : (TRI-LATERAL Foreman(s)MERAH, MOHAMED
D&WO Morning Report (Service Providers View) Charge #: EVALUATION / OIL PRODUCER Engineer ANS, MUHAMMAD AHMED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23031-0010) - TARGETING ARBA Manager ABADA, YASSINE
SP-121
RESERVOIR) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: +882167771 3971 0136731703 0138805588
Date: Tuesday 06/18/2024 SUBN-10 (1) SUBN_10_1 CONTRACTOR /CLERK VSA T
0136731702

Last 24 hr operations Next 24 hr plan


CONT. P/U & RIH 8-1/2" SPS RSS/LWD, RELOG F/ 10,346 MD, SPS RSS/LWD DRILL 8-1/2 (L-1) CONT. SPS RSS/LWD DRILL 8-1/2 (L-1) HOLE TO L.P @ 11,650' MD/ 9,086' TVD, CHC, PERFORM
HOLE SECTION. WIPER TRIP.
Location Next Location
361 KM FROM DMG SUBN-810
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
10,790 Size 5872 5872 Size 5,872 8,152 8,151 Top
Formations Comments
9 5/8 9 5/8 Depth
BYDH 6,351 28' SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) BUWB 7,738 1' SHALLOWER
10420 (Date) 100 370 361 SULY 8,177 1 FT DEEPER
88.7 (03/21/2024@0900 ) MNFR 8,440 5' SHALLOWER
HITH 8,769 3' SHALLOWER
ABAR 9,055 4 FT DEEPER
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

CONT. P/UP & M/UP 8-1/2" SPS RSS/LWD AS FOLLOWS: NEW 6 3/4 WFD PBL SUB
0500 - 0545 0.75 1 8 1/2 N DRLG HT BHA RIG 10420 10420 (SN:HYD675SBP79MB), 1 STDS OF 5" HWDP, NEW 6-1/2" NAPESCO D-JAR ( SN:
HJAR-650-224 & 2 JNS OF 5" HWDP)
- MONITOR WELL THROUGH TRIP TANK.

CONT. RIH SPS 8-1/2" RSS/LWD DIR. ASSY. ON 5" D/P'S TO 4,100'.
0545 - 0745 2 1 8 1/2 N DRLG TI STDP RIG 10420 10420 340 4100
- FILL STRING EVERY 20 STDS.
- MONITOR WELL THROUGH TRIP TANK.
0745 - 0815 0.5 1 8 1/2 N DRLG CIRC MPMP RIG 10420 10420
MIDWAY FUNCTION TEST SPS 8-1/2" RSS DIR ASSY @ 550 GPM, 2,300 PSI-OK.

CONT. RIH SPS 8-1/2" RSS/LWD DIR. ASSY. ON 5" D/P'S TO TOW @ 6,650'.
0815 - 0945 1.5 1 8 1/2 N DRLG TI STDP RIG 10420 10420 4000 6650
- FILL STRING EVERY 20 STDS.
- MONITOR WELL THROUGH TRIP TANK.

HELD STAND DOWN MEETING WITH ALL PERSONNEL ON RIG & DISCUSSED ABOUT
0945 - 1015 0.5 1 8 1/2 N DRLG PJSM NA RIG 10420 10420
SWA, PROPER HAND/BODY PLACEMENT, INCH POINTS PREVENTION, HEAT
STRESS AND HOT WEATHER HAZARDS.

CONT. RUN IN OPEN HOLE W/ SPS 8-1/2" RSS/LWD DIR. ASSY. ON 5" D/P FROM
TOW @ 6,650' TO 10,346'.
1015 - 1345 3.5 1 8 1/2 N DRLG TI STDP RIG 10420 10420 6650 10346
- RUN IN OPEN HOLE FREELY.
- FILL STRING EVERY 20 STDS.
- MONITOR WELL THROUGH TRIP TANK.

1345 - 1500 1.25 1 8 1/2 N DRLG LOG LWD SPS 10420 10420 10346 10420 CONT RIH W/ 8-1/2" SPS MM/LWD ON 5" DP WITH RELOG INTERVAL F/10,346' TO
BTM @ 10,420' AS PER GOC.

1500 - 2330 8.5 1 8 1/2 N DRLG D RSS SPS 10420 10625 SPS DRILL 8-1/2" HOLE (L-1) WITH RSS/LWD, 73 PCF OBM & 100% CIRC.TO
10,625'.

HELD STAND DOWN MEETING WITH ALL PERSONNEL ON RIG & DISCUSSED ABOUT
2330 - 0000 0.5 1 8 1/2 N DRLG PJSM NA RIG 10625 10625
SWA, PROPER HAND/BODY PLACEMENT, INCH POINTS PREVENTION, HEAT
STRESS AND HOT WEATHER HAZARDS.

SPS DRILL 8-1/2" HOLE (L-1) WITH RSS/LWD, 73 PCF OBM & 100%
CIRC...ONGOING @RT.

- DRILL OFF 3 MINS EVERY STD DRILLED.


0000 - 0459 5 1 8 1/2 N DRLG D RSS SPS 10625 10790
- WASH UP/REAM DOWN SINGLE EVERY STD DRILLED.
- WASH UP / REAM DOWN FULL STD EVERY 3 STD'S DRILLED.
- SWEEP HOLE WITH 30 BBLS HI VIS PILL EVERY 2 STD DRILLED.

DRILLING PARAMETERS: 24-28 KLB'S WOB,130 RPM, 590 GPM, 3,400 PSI.
Foreman Remarks

SUBN-10 WILL BE DRILLED AS A TRI-LATERAL EVALUATION / OIL PRODUCER WELL TARGETTING ARBA RESERVOIR, A VERTICAL PILOT HOLE WILL BE DRILLED TO BASE OF ARAB-B RESERVOIR AT
+/-9,185 FT, ARAB-A AND ARAB-B RESERVOIRS WILL BE EVALUATED WITH PRESERVED CORES AND OPEN HOLE LOGS, PILOT HOLE WILL BE P & A, WELL WILL BE SIDETRACKED FROM BYDH IN 9-
5/8" CASING,THREE CASED HOLE LATERALS WILL BE DRILLED ACROSS ARAB-A RESERVOIR WITH TOTAL RESERVOIR CONTACT OF 15,000 FT. ALL LATERALS WILL BE STIMULATED, THE WELL
WILL BE COMPLETED WITH SMART COMPLETIONS & FLOWED BACK WITH RIG ON LOCATION.
============================ ERP ===================================
* GOR: 160 SCF/STB, H2S: 1.26%, 30 PPM RER: 400 M,100 PPM RER: 200 M, 1/2 LFL: 120 M.
* RIG OUT OF RADIO COVERAGE.
========================== WATER SOURCES ==========================
* WATER WELL SUPPLY : SUBN-809 (800 M FROM SUBN-10).
========================== SAFETY ==========================

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SUBN-10 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 03/14/2024 - 10/28/2024
Report ID: OPERLMTDMRREP

* REPORTED OBSERVATIONS IN SLS: 10.


* DISCUSSED HSE ALERT: NONE.
* REPORTED NM IN SLS:
* DRILLS: 2 X TRIP DRILL.
==================== WELL DESIGN ==========================
* 34" HOLE, 30" CONDUCTOR @ 123' MD/TVD. (COMPLETED)
* 28" HOLE, 24" CSG @ 1,192' MD/TVD (36' INSIDE RUS FM) (COMPLETED).
* 22" HOLE, 18-5/8" CSG @ 3,661' MD/TVD (50 INSIDE ARUMA FM) (COMPLETED)
* 16" HOLE, 13-3/8" CSG @ 6,175' MD/TVD (70 FT/TVD BEFORE SHUB FM) (COMPLETED).
* 12-1/4" HOLE, 9-5/8" LINER/TIE BACK CSG @ 8,152' MD/TVD (30' ABOVE SULAY FM) (COMPLETED).
* 8-1/2" PILOT HOLE T/9,346' MD/TVD ( 50 FT INSIDE BABR) (COMPLETED).
* P&A 8-1/2" PILOT HOLE WITH CEMENT, TOC @ 7,850' (300' INSIDE 9-5/8" CSG) (COMPLETED).
* 9-5/8" CASED HOLE SIDE TRACK T.O.W @ 6,650' B.O.W @ 6,664' (COMPLETED).
* 8-1/2" L-1 HOLE, 7" LINER @ 13,061 FT/MD - 9,059 FT/TVD (ARAB-A RESERVOIR).
* 6-1/8" L-1 HOLE TD @ 17,075' FT/MD - 9,074 FT/TVD.
* L-1-1 SIDE TRACK T.O.W @ 11,500' B.O.W @ 11,513'
* 6-1/8" L-1-1 HOLE TD @ 17,144 FT/MD - 9,040 FT/TVD.
* L-1-2 SIDE TRACK T.O.W @ 10,870' B.O.W @ 10,883'
* 6-1/8" L-1-2 HOLE TD @ 16,231 FT/MD - 9,006 FT/TVD.
======================= ARAMCO PERSONNEL ========================
* MATERIAL EXPEDITOR FAISAL ALDOLIGAN#8529969 ON LOCATION SINCE 06/17/2024.
* ARAMCO PDP MR MOHAMMED ALARFAJ #794715 ON LOCATION SINCE 06/17/2024.
=================SERVICE COMPANY, RENTAL TOOLS & OTHERS ===============
* EMEC MUD ENGINEER ON LOCATION.
* SLB CLOSED LOOP SYSTEM ON LOCATION SINCE 03/18/2024 @ 17:00.
* NAPESCO 6-1/2" D.JAR SN: HMJ-650-0012 ON LOCATION SINCE 05/24/2024.
* NAPESCO 6-1/2" D.JAR SN: HJAR-650-224 ON LOCATION SINCE 06/15/2024 @ 4:00.
=======================WELL SITE EQUIPMENT =========================
* AL-MADEED VACUUM TANKER (DRSS# 1004305346 ) PLATE#6916 KBA (1167), 8437 JDA (1197), 1335 RDA (1164) ON LOCATION SINCE 05/17/2024.
================================WINDOW DATA =====================
- TOW @ 6,650' - BOW @ 6,664'
========================DIRECTIONAL DATA ==========================
- 6-3/4" SPS RSS ICRUISE (SN: IC6174) WITH 8.25" PAD + 7.5" STABILIZER AND 8.735" STABILIZER) - SPS LWD.
- SENSORS TO BIT OFFSET: INCLINATION (6.48'), AT BIT GAMMA RY (10.73'), LWD GAMMA RY (37.62'), ECD (42.96'), DIRECTIONAL (45.21'), RESISTIVITY (55.65'), DENSITY (81.02'), POROSITY
(93.94'), SONIC (114.8).
=========================DIRECTIONAL===================
* WELL TRAJECTORY SHOW: 0.5' RIGHT & 4' ABOVE OF SUBN-10 L-1, PLAN-07.1
============================DAILY DIESEL ===========================
* ENGINES DIESEL CONSUMPTION (RIG+CAMP) FOR THE WELL SUBN-10 (DAILY: 61/ TOTAL: 4,028 BBLS).
============================DRILLING FLUID RECYCLING ===========================
* TOTAL MUD RECEIVED: 0 BBLS. TOTAL MUD SHIPPED: 0 BBLS.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
1 10,512 79.12 227.25 9,035 -544.29 -561.46 2,565.54 1.48
DAILY SURVEY
1 10,607 81.93 227.39 95 9,050 -563.65 -582.45 2,659.2 2.95
1 10,701 83.58 227.9 94 9,062 -582.8 -603.45 2,752.41 1.84

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 0.5 0 API 67 1,254 Volts 4.44 0 42,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
140 1 HTHP 14 23 0.1 16 / 22 OBM 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 17 19 13 / 14 0 0 1
67
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 0.5 0 API 67 1,200 Volts 4.44 0 42,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 1.4 HTHP 14 20 0.1 14 / 19 OBM 0.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 18 19 11 / 12 0 0 1.4
64

MUD CARBOTROL CACO3-25 STELSL50 CACO3-50 SLTX CAOH2


TREATMENT 12 ( 50LB ) 10 ( 50LB ) 10 ( 50LB ) 15 ( 50LB ) 10 ( 50LB ) 10 ( 50KG )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
14 7,027 10,420 DP Av DC Av Bit HHP 24 130 M422 8.5 REED
Pressure GPM Jet Vel 306.05 N/A 0 I-Row O-Row DC Location Bearings
3,400 590 N/A 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
S305545 SKH616M3D POOH Reason N/A
Gauge Other
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A 226 247 206 16 72
DRILL STRING
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR SUBN-10 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 03/14/2024 - 10/28/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit REED 1 0.83 S305545
2 RSS SPS 6.75 1 6.75 26.45 NC50 4-1/2" REG 90 13396245
3 Non Magnetic Drill Collar ( NMDC ) SPS 6.75 1 6.75 2.813 9.21 NC50 NC50 99 SPRL 90766217
4 Logging While Drilling (LWD) SPS 6.75 1 6.812 1.82 9.15 HAL50 HAL50 91.57 1345270
5 Logging While Drilling (LWD) SPS 6.75 1 6.75 16.01 114 13452570
6 Logging While Drilling (LWD) SPS 6.75 1 6.75 1.795 10.1 NC50 HAL50 85.25 13963215
7 Logging While Drilling (LWD) SPS 6.75 1 6.75 16.12 104.33 1111036
8 Stabilizer SPS 6.75 1 6.75 3.125 1 NC50 NC50 95.82 111103066
9 Logging While Drilling (LWD) SPS 6.75 1 6.75 11.75 102.71 11461492
10 Stabilizer SPS 6.75 1 6.75 3.125 2 NC50 NC50 95.82 1525018
11 Stabilizer SPS 6.75 1 6.75 3.125 20.15 NC50 NC50 95.82 11796261
12 Stabilizer SPS 6.75 1 6.75 3.125 6.9 NC50 NC50 95.82 11175755
13 Logging While Drilling (LWD) SPS 6.75 1 6.75 3.125 10.21 NC50 NC50 95.82 13057565
14 Screen sub SPS 6.75 1 6.75 2.75 6.48 NC50 NC50 101.71 113777120
15 Float Sub SPS 6.75 1 6.75 2.75 2 NC50 NC50 101.71 13397694
16 PBL (Multiple Activation By Pass) WWB 6.75 1 6.75 2.813 7.96 NC50 NC50 90 675BP79MB
17 Heavy Weight Drillpipe (HWDP) RIG 5 3 5 3 93 NC50 NC50 50.14 CONV
18 Hydro-Mechanical Jar NPC 6.5 1 6.5 28.95 63 HJDA-650224
19 Heavy Weight Drillpipe (HWDP) RIG 5 2 5 3 61 NC50 NC50 50.14 CONV
20 Drillpipe RIG 5 300 5 4.276 3,000 NC50 NC50 19.5 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/07/2024 06/07/2024 NORMAL N/A SEASONAL 3,084 PRE-TOUR

Company GOS SPS RIG EMC RIG ARM MI2 MI3 ARM MSD OCT

Category CTRG DPDS RIG DFMS OTHR OTHR SCS WMS WSC CSR PCS
PERSONNEL
13 4 52 1 11 1 1 4 1 5 4
Total
AND SERVICES No. of Persons
97
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 12 12

Operating Hours. 0 24 24 24 12 12 12 12 24 0 0

Standby/Tankers Others
TRUCKS/BOATS
B-801 RIG AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 N/A 161 187 24 3800

Instrumentation Other Reporter


REPAIR ASAP Computer, Communication & V-Sat Issues
.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KRSN-329 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:22 04/30/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

SP-122 @ KRSN-329 Limited Morning Report for 06/18/2024


Objective : (TO P&A DUE TO Foreman(s)KHELLO, ABDALLA HASSAN / HARTHI, HANI MASAAD
D&WO Morning Report (Service Providers View) Rig Charge #: LOW SUCCESS PERCENTAGE Engineer SOSA ORTEGA, JULIO CESAR
Copyright 2024 Saudi Aramco. All Rights Reserved SP-122 (61-22015-0329) AND HIGH COST FOR FUTURE Manager SHUBBAR, GHASSAN DHIYA
Daily Onshore WORKOVER OPTIONS. ) THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: +882167771 2817 013 572 36 15 /CLERK VSA
Date: Tuesday 06/18/2024 KRSN-329 (0) KRSN_329_0 T
013 572 45 17

Last 24 hr operations Next 24 hr plan


FIN'D POOH, M/U & RIH W/ 8-3/8" C/O ASSY TO 1,600', CON'T WOC, GENTLY TAG TOC, C/O 30' N/U SHOOTING NIPPLE, RIH W/ HALL W/L CSG GUN, PERFORATE INTERVAL 2000' - 2010', POOH,
CMT, CHC, P/T CMT PLUG, SPOT HVP, POOH TO SURFACE, L/D C/O ASSY. PERFORM INJECTIVITY TEST, PERFORM CMT PLUG.
Location Next Location
KRSN-323 (136 KM FROM DMG) KRSN-320
Current Depth (ft) Liner TOL MD TVD Formation Tops
2,400 Last Csg Size MD TVD Size Top
9 5/8 10936 10698 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
3220 (Date) 100 0 136
41.6 (05/07/2024@1500 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

CONT'D POOH W/ 4" OPEN END FIBER GLASS CMT STINGER T/ SURFACE, L/D
0500 - 0530 0.5 0 POST N CT ST STDP RIG 11710 11710 98 0 SAME.
> R/D 4" FIBER GLASS HANDLING TOOLS.
> MONITORED WELL ON TRIP TANK- OK.

HPJSM, P/U, M/U & RIH W/ 8-3/8" C/O ASSY T/ 783'.


> BHA: 8-3/8" RR PDC BIT+B.S W/ FLOAT+3 STDS 6-1/2" DC+XO+8-3/8" STRG
0530 - 0715 1.75 0 POST N PA ST SPDP RIG 11710 11710 0 783 MILL+XO+3 STDS 5-1/2" HWDP+6-1/2" D.JAR+2 STDS 5-1/2" HWDP.
> BIT DATA: PDC (SN# 13862290 )
> P/U 6-1/2" NOV DRILLING JAR @ 07:00 (S/N: 474-651442-00).
> MONITORED WELL ON TRIP TANK- OK.

CONT'D RIH W/ 8-3/8" C/O ASSY ON 5-1/2" DP T/ 1,600' (+/- 580' ABOVE
0715 - 0800 0.75 0 POST N CT ST STDP RIG 11710 11710 783 1600 EXPECTED TOC)
> FILL STRING & BREAK CIRC EVERY 1,500'.
> MONITORED WELL ON TRIP TANK- OK.

0800 - 2100 13 0 POST N CT WO NA SCM 11710 11710 WOC AS PER SLB UCA.
> MONITORED WELL ON TRIP TANK- OK.

CONT'D RIH W/ 8-3/8" C/O ASSY ON 5-1/2" DP & WASH DOWN TILL SOFT TAG TOC
2100 - 2245 1.75 0 POST N CT RW BIT RIG 11710 11710 1600 2180
AT 2,311', CONT'D WASH DOWN TILL HAD HARD TAG TOC W/8 KLB AT 2,380',
D/O 20 FT CMT TO 2,400'.
2245 - 2345 1 0 POST N CT CIRC MPMP RIG 11710 11710
PUMPED 50 BBL HVP & CIRC HOLE TILL SHAKERS CLEANED.
2345 - 0000 0.25 0 POST N CT CIRC MPMP RIG 11710 11710
TAG TOC W/ 10 KLBS S/O WT WITHOUT PUMP - OK.
0000 - 0015 0.25 0 POST N CT WCNT NA RIG 11710 11710
FLOW CHECK - WELL STATIC.

HPJSM, M/U TIW VALVE & CIRC SUB, CONNECT SLB SURFACE LINES, FLUSH, P/T
TO 300/2,000 PSI, HOLD- OK.
SLB +VE TEST 9-5/8" CSG & CMT PLUG T/ 500 PSI W/ 73 PCF WBM, HOLD
0015 - 0045 0.5 0 POST N CT WCNT NA RIG 11710 11710
PRESSURE FOR 15 MIN- GOOD TEST, BLEED OFF PRESSURE T/ 0 PSI, OPENED
BOP.
> PUMPED VOLUME = RETURNED VOLUME = 0.5 BBL.
R/D SURFACE LINES.

0045 - 0115 0.5 0 POST N PA CIRC MPMP RIG 11710 11710 SPOT 26 BBL 125 PCF HVP, POOH TO 2000 FT.
> EXPECTED TOP OF HVP AT 2030' (20 FT BELOW PERFORATION).
0115 - 0130 0.25 0 POST N PA WCNT NA RIG 11710 11710
FLOW CHECK - WELL STATIC.

PUMPED SLUG, POOH W/ 8-3/8" C/O ASSY ON 5-1/2" DP T/ 1,254' (5 STDS


0130 - 0215 0.75 0 POST N CT ST STDP RIG 11710 11710 2600 1254
BEFORE BHA).
> MONITORED WELL ON TRIP TANK- OK.
0215 - 0230 0.25 0 POST N CT WCNT NA RIG 11710 11710
FLOW CHECK - WELL STATIC.

0230 - 0245 0.25 0 POST N CT ST STDP RIG 11710 11710 1254 783 CONT'D POOH W/ 8-3/8" C/O ASSY ON 5-1/2" DP T/ TOP OF BHA AT 783'.
> MONITORED WELL ON TRIP TANK- OK.
0245 - 0300 0.25 0 POST N CT WCNT NA RIG 11710 11710
FLOW CHECK - WELL STATIC.

HANDLE BHA: CONT'D POOH W/ 8-3/8" C/O ASSY T/ SURFACE.


0300 - 0430 1.5 0 POST N CT HT BHA RIG 11710 11710 > L/D 6-1/2" NOV D.JAR @ 03:15.
> L/D 8-3/8" BIT, CHECKED SAME- FULL GAUGE.
> MONITORED WELL ON TRIP TANK- OK.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KRSN-329 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:22 04/30/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
0430 - 0459 0.5 0 POST N BOP ND BNIP RIG 11710 11710
HPJSM, N/D BELL NIPPLE & N/U SHOOTING NIPPLE .... ONGOING.
Workover Objectives
Foreman Remarks

>> DRILLS:
>> DISCUSSED DAILY SAFETY MEETING. HSE ALERT 71-24 TRIP AND FALL INCIDENT.
>> DAILY OBB: 10.
>> NEAR MISS: NONE.
==========================================MISCELLANEOUS & NEXT WELLS =================================
>> NEXT WELL: KRSN-320 IS 100% READY.
========================================CLOSED LOOP SYSTEM ==========================================
>> IMPLEMENTING CLOSED LOOP DRILLING PRACTICE.
>> NOT USING EITHER WATER PIT & WASTE PIT.
>> USING CMT PIT W/ PLASTIC LINER.
========================================ARAMCO PERSONNEL=======================================
>> MATERIAL EXPEDITER: MOHAMMED ALOTAIBI #8587951 ON LOCATION SINCE 06/05/2024.
>> MATERIAL EXPEDITER: ALWALEED ALGHAMDI #811523 ON LOCATION SINCE 06/17/2024.
>> FIELD COMPLIANCE TECH RAKAN AL KHADRAN #791544 SINCE 06/17/2024.
============================================OTHERS=============================================
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 0 0 API 0 0 Volts 4.71 9.4 12,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
110 0 HTHP 92 26 0 9 / 11 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 11 8 9 / 10 5 360 0
46
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
73 PCF 0 0 API 0 0 Volts 4.72 9.6 12,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
110 0 HTHP 92 24 0 8 / 10 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 12 8 8/9 5 360 0
45

MUD BARITE XC
TREATMENT 5 ( 5000L ) 6 ( 55LB )

BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 8.375 1 8.375 0.85 4-1/2" reg 13862290
2 Bit Sub RIG 6.25 1 6.25 2.875 2.24 4 1/2 REG NC50 0 19021294
3 Drillcollar RIG 6.5 9 6.5 2.813 276.59 NC50 NC50 0 SPRL
4 Crossover RIG 6.625 1 6.625 2.813 2.63 NC50 NC50 0 0
5 String Mill RIG 8.375 1 8.375 2.813 4.63 NC50 NC50 0 131026819
DRILL STRING
6 Crossover RIG 6.625 1 6.625 2.813 2.63 NC50 XT54 0 0
7 Heavy Weight Drillpipe (HWDP) RIG 5.5 9 5.5 3.25 276.72 XT54 XT54 52.51 CONV
8 Hydro-Mechanical Jar NOJ 6.5 1 6.5 2.75 33.05 XT54 XT54 1,300 474-651442
9 Heavy Weight Drillpipe (HWDP) RIG 5.5 6 5.5 3.25 184.42 XT54 XT54 55.24 CONV 0
10 Drillpipe RIG 5.5 193 5.5 4.67 1,224 5-1/2 FH 5-1/2 FH 24.7 G105 PREMIUM
11 Drillpipe RIG 5.5 88 5.5 4.67 2,447.62 XT54 XT54 24.7 HS3-125 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/14/2024 2/ WEEK NORMAL N/A SUMMER 1,808 2/ DAY

Company HCB TGC RIG EMC NOJ RIG ARM SCM OTH ARM

Category BRCR CTRG RIG DFMS JST OTHR OTHR PCS VAC WSC
PERSONNEL
1 13 50 1 0 12 3 3 3 2
Total
AND SERVICES No. of Persons
88
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 0 24 24 24 24 24

Operating Hours. 1 0 12 24 22 12 12 1 0 24

Standby/Tankers Others
TRUCKS/BOATS
aramco PICK UP/AB-5125 AMBULANCE

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
1000 200 477 309 49 2400

REPAIR ASAP Instrumentation Other Reporter

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR KRSN-329 WORKOVER-2 BI-90
Print Date: 06/18/2024 06:22 04/30/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-3563 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 05/29/2024 - 08/07/2024
Report ID: OPERLMTDMRREP

SP-123 @ HRDH-3563 Limited Morning Report for 06/18/2024


Objective : (SFNY WATER Foreman(s)DUHAYYIM, MOHAMMED THEEB / ALZAHRANI, ESAM ABDULQADER
D&WO Morning Report (Service Providers View) Charge #: WELL SUPPLY) Engineer ALSHAMI, HAMED AHMED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-23058-3563) Manager ABADA, YASSINE
SP-123
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: + 88 216 7 77 13 970 013 679 21 45 013 679 21 47
Date: Tuesday 06/18/2024 HRDH-3563 (0) HRDH_3563_0 CONTRACTOR /CLERK VSA T
013 679 21 46

Last 24 hr operations Next 24 hr plan


RUN & CMT 13-3/8" CSG, PERFORM TOP JOBS, WOC. CUT CSG, WELD 13-3/8" X 21-1/4" WELD NECK FLANGE, N/U & P/T 21-1/4" 2M DVRT, P/U, M/U &
RIH 12-1/4" DRLG BHA.
Location Next Location
HRDH-3563 MSBA-803
Current Depth (ft) Liner TOL MD TVD Formation Tops
1,775 Last Csg Size MD TVD Size Top
13 3/8 1770 1770 Formations Comments
Depth
RUS 135
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) UMER 220 25 FT SHALLOWER
1775 (Date) 0 0 256 ARUM 945 25 FT SHALLOWER
13.9 (06/04/2024@0700 ) AHMD 1,760 5 FT DEEPER
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM. R/U AL-GHAITH CSG RUNNING EQUIP, MANUAL SLIPS, POWER TONG &
0500 - 0630 1.5 0 17 N CSG HT PEL GOC 1775 1775
CRT.
- PUMPING 2 BBLS/MIN 80 PCF INHIBITED PHPA MUD CAP FROM BACK SIDE.

HOLD STAND DOWN MEETING WITH ALL CREWS ABOUT CURRENT RIG
0630 - 0700 0.5 0 17 N CSG PJSM CSG RIG 1775 1775
OPERATIONS. DISCUSS SWA, BODY PLACEMENT, JSA & PTW PROCEDURES.
- DISCUSSED SENIOR VP SAFE WORK PRACTICE LETTER WITH RIG CREW

HPJSM. P/U & M/U 13-3/8" CSG SHOE TRACK AS FOLLOWS: FS + 2 JT 13-3/8" CSG
(STC, #61, FBE-EPC & IPC) + FC + 2 JT 13-3/8" CSG (STC, J-55, #61, FBE-EPC &
0700 - 0930 2.5 0 17 N CSG RCSG CSTR GOC 1775 1775 0 160 IPC).
- HYDRO TEST FLOAT EQUIPMENT.
- THREAD LOCK THE 4 BTM JOINTS.
- PUMPING 2 BBLS/MIN 80 PCF INHIBITED PHPA MUD CAP FROM BACK SIDE.

RUN 13-3/8" CSG (STC, #61, FBE-EPC & IPC IN CASED HOLE TO 690 FT (24/45 JTS
0930 - 1230 3 0 17 N CSG RCSG CTRQ GOC 1775 1775 160 960 TOTAL).
- FILL UP CSG EVERY JT USING CRT TOOL.
- PUMPING 2 BBLS/MIN 80 PCF INHIBITED PHPA MUD CAP FROM BACK SIDE.

1230 - 1330 1 0 17 N CSG CIRC MPMP RIG 1775 1775 BREAK CIRC PRIOR TO ENTERING OPEN HOLE, MEANWHILE R/U SPIDER SLIPES.
- PUMPING 2 BBLS/MIN 80 PCF INHIBITED PHPA MUD CAP FROM BACK SIDE.

CONT. RUN 13-3/8" CSG (STC, #61, FBE-EPC & IPC IN OPEN HOLE TO 1743 FT
(44/45 JTS TOTAL).
1330 - 1600 2.5 0 17 N CSG RCSG CTRQ GOC 1775 1775 960 1743
- FILL UP CSG EVERY JT USING CRT TOOL.
- INSTALL 3 CMT BASKETS.
- PUMPING 2 BBLS/MIN 80 PCF INHIBITED PHPA MUD CAP FROM BACK SIDE.

1600 - 1700 1 0 17 N CSG CIRC MPMP RIG 1775 1775 M/U LAST JOINT. CONNECT CRT TOOL AND WASH DOWN TO AT 1,770 FT.
- PUMPING 2 BBLS/MIN 80 PCF INHIBITED PHPA MUD CAP FROM BACK SIDE.

1700 - 1900 2 0 17 N CSG CIRC MPMP RIG 1775 1775 CIRCULATE 2 CYCLES TO THE LCZ USING CRT TOOL.
- PUMPING 2 BBLS/MIN 80 PCF INHIBITED PHPA MUD CAP FROM BACK SIDE.

R/D AL-GHAITH CRT TOOL. R/U LONG BAILS, SIDE DOOR ELEVATOR, HALL
1900 - 2100 2 0 17 N CSG HT PEL GOC 1775 1775
CEMENT HEAD, AND SURFACE LINES, CONT. CIRCULATION.
- PUMPING 2 BBLS/MIN 80 PCF INHIBITED PHPA MUD CAP FROM BACK SIDE.

HOLD STAND DOWN MEETING WITH ALL CREWS ABOUT CURRENT RIG
2100 - 2130 0.5 0 17 N CSG PJSM CSG RIG 1775 1775
OPERATIONS. DISCUSS SWA, BODY PLACEMENT, JSA & PTW PROCEDURES.
- DISCUSSED SENIOR VP SAFE WORK PRACTICE LETTER WITH RIG CREW

HALL PERFORM CMT JOB AS FOLLOWS:


* FLUSH SURFACE LINE. P/T TEST SAME TO 300/3000 PSI.
* HALL PUMP 150 BBL OF FRESH WATER AS SPACER
* HALL MIX ON FLY AND PUMP 148 BBL (710 SX) OF 118 PCF CLASS "G" SLURRY.
* DROP WIPER PLUG.
PUMP DISPLACEMENT TOTAL 257 BBLS AS FOLLOW:
2130 - 2315 1.75 0 17 N CSG CMC CSG HCM 1775 1775 * HALL PUMP 10 BBLS (49 SX) OF 118 PCF CLASS "G" CMT SLURRY FOLLOWED BY
20 BBLS FRESH WATER AS SPACER.
* RIG PUMP 227 BBLS 65 PCF MUD.
* BUMP PLUG WITH 550 PSI, BLEED OFF PRESSURE, NO BACK FLOW, CONFIRM
FLOAT EQUIP ARE HOLDING.
* NO RETURNS DURING CMT JOB.
* CMT IN PLACE @ 23:05 HRS.
** CMT ADDITIVES: WG-17 (PH) 0.05 %BWOC, D-AIR 3000L 0.005 GPS.
2315 - 0045 1.5 0 17 N CSG TOP CSG HCM 1775 1775

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-3563 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 05/29/2024 - 08/07/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
PERFORM TOP JOB #1, HALL PUMP 25 BBLS (125 SX) 118 PCF CLASS "G" CEMENT
TREATED WITH 2% BWOC CACL2 SLURRY.
- HAD GOOD CMT AT SURFACE AND STEADY LEVEL.

WAIT ON CEMENT, MEANWHILE, R/D HALL CMT LINES, CLEAN CELLAR, N/D FLOW
0045 - 0459 4.25 0 17 N CSG WOC CSG RIG 1775 1775
LINE & PREPARE FOR LIFTING DIVERTER STACK. L/D REMAINING 18-5/8" CSG
HANDLING GEAR.
Foreman Remarks

HRDH-3563 WILL BE DRILLED AS A VERTICAL WATER SUPPLY WELL TARGETING THE BEST WASIA AQUIFER SAND WITH TOTAL DEPTH OF 2,800 FT MD / 2,800 FT-TVD.
THE WELL WILL BE COMPLETED WITH +/-780 FT OF 7" SCREEN SPACED ACROSS THE BEST WASIA AQUIFER SAND..
==============WELL DESIGN ===============================================
* COMPLETED 28" HOLE, 24" CSG @ 170' MD/TVD (135 FT TVD BGL).
* COMPLETED 22" HOLE, 18-5/8" CSG @ 965' MD/TVD (20 FT TVD INTO ARUM).
* COMPLETED 17" HOLE, 13-3/8" CSG @ 1,770' MD/TVD (10 FT TVD INTO AHMD).
* PLANNED 12-1/4" HOLE, 9-5/8" LINER @ 2,055' MD/TVD (20 FT TVD INTO SFNY).
* PLANNED 8-1/2" HOLE, 7" LINER WITH SCREENS TO 2,835' MD/TVD (ACROSS SFNY).
* ELEVATION FROM GROUND LEVEL TO RIG FLOOR 35'.
======================================== ERP =========================================================
* GOR: 0 SCF/STB, H2S: 0%, 30 PPM RER: N/A M,100 PPM RER: N/A M, RER 1/2 LOWER FLAMMABLE LIMIT: 0 M.
* WATER WELL HRDH-801, DISTANCE 0.5 KMS.
========================================SAFETY =======================================================
* PERFORM DAILY RADIO CHECK WITH DH ECC.
* NEAR MISS IN SLS: NONE.
* DRILLS: NONE.
* SAFETY ALERTS DISCUSSED: NONE.
============================ARAMCO PERSONNEL ON LOCATION==========================================
* HSE MICHAEL JAYME# 8195227 ON LOCATION SINCE 09/06/2024
* M/E RASHED ALDAHAMI #818643 ON LOCATION.
* ARAMCO FCT MUTLAQ ALMARRI #796662 ON LOCATION.
* ARAMCO PDP ABDULLAH ALQAHTANI #794751 ON LOCATION.
* ARAMCO PDP FAHAD ALHAMDAN #828026 ON LOCATION.
=====================================RIG VISIT========================================================

=================================SERVICE PERSONNEL & RENTALS=========================================


* 8 HAULING WATER TANKER ON LOCATION.
* 4 ALMADEED VACUUM TANKERS ON LOCATION.
* HALLIBURTON 20% VDA ACID (100 BBLS) TANKERS ON LOCATION.
* SLB MUD LOGGING CREW ON LOCATION SINCE 6/2/2024 AT 17:00 HRS.
* TAQA 12" SHOCK SUB SN: ST5-1200-127 ON LOCATION SINCE 6/3/24.
* TAQA 9" JAR SN: DJ6-900-051 ON LOCATION SINCE 6/6/24.
* TAQA 8" JAR SN: DJ10-800-43 ON LOCATION SINCE 6/18/24.
* HALL CEMENTING CREW ON LOCATION SINCE 6/4/24 AT 15:00 HRS.
* ALGHAITH TRS ON LOCATION SINCE 6/16/24 AT 05:00 HRS.
==========================================DRILLING FLUID RECYCLING======================================
* TOTAL MUD RECEIVED: 0 BBLS TOTAL MUD SHIPPED: 0 BBLS
========================================= NEXT LOCATION ==============================================
* NEXT WELL: MSBA-803.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 4 API 0 0 Volts 0 9.5 150,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 94 32 0 17 / 24 INPHHVG 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 13 6 15 / 20 0 280 0
90
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
80 PCF 0 4 API 0 0 Volts 0 9.5 150,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 94 32 0 17 / 24 INPHHVG 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 13 6 15 / 20 0 280 0
90

CAUST SODASH UTG-XG MAX-GUARD BENT S-PHPA-S BARITE


MUD 50 ( 50LBP ) 2 ( 100LB ) 40 ( 55LB ) 8 ( 55GL ) 4 ( 2500L ) 35 ( 50LB ) 20 ( 5000L )
TREATMENT NACL
60 ( 2200L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/06/2024 N/A NORMAL N/A SEASONAL 2,933 PRE-TOUR

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-3563 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 05/29/2024 - 08/07/2024
Report ID: OPERLMTDMRREP

Company TGC RIG OES MJH SGR ARM HCM OTH ARM GOC

Category CTRG RIG DFMS SEC MLS OTHR PCS VAC WSC CSR
PERSONNEL
16 67 2 8 2 5 2 4 2 4
Total
AND SERVICES No. of Persons
112
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 12 24 12 12 2 24 24 12

Standby/Tankers
TRUCKS/BOATS
pick up b806

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 606 119 137 2800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABHD-144 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:22 06/09/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

SP-124 @ ABHD-144 Limited Morning Report for 06/18/2024


Objective : (ESP: REPAIR OR Foreman(s)IBRAHIM, MOHAMED IBRAHIM / RAZA, MUHAMMAD SHAHZAD
D&WO Morning Report (Service Providers View) Rig Charge #: CHANGE OF ELECTRIC SUB- Engineer ALGHAMDI, MOHAMMED SALEH
Copyright 2024 Saudi Aramco. All Rights Reserved SP-124 (61-24014-0144) MERSIBLE PUMP) Manager SAUD, MAHER IBRAHIM
Daily Onshore THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 11006 378-8324 /CLERK VSA
Date: Tuesday 06/18/2024 ABHD-144 (0) ABHD_144_0 T
378-8328

Last 24 hr operations Next 24 hr plan


CONT POH & L/D OLD COMPLETION AND ESP, RIH S/L AC-DC. CONTINUE RIH AC-DC ,M/U & RIH BAKER NEW ESP COMPLETION, DRIFT , MU TRSSSV , MU TBG
HGR ABD SPLICE CABLE
Location Next Location
170 KM FROM DH MAIN GATE AB-3 JLDI-720
Current Depth (ft) Liner TOL MD TVD Formation Tops
16,241 Last Csg Size MD TVD Size 9,555 11,027 Top
9 5/8 10064 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
16241 (Date) 0 0 160
3.7 (06/14/2024@1200 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM. POH W/ BAKER ESP ON X 4-1/2" TBG & LAYDOWN SAME.


0500 - 1300 8 0 POST N DCOM RPCS SPCOM RIG 16241 16241 4000 220
>> MONITORE THE WELL AT TRIP TANK , LOSSES 30 BPH
>> OBSERVED TUBING OVERTORQUED
1300 - 1315 0.25 0 POST N DCOM CIRC MPMP RIG 16241 16241
FLUSHED TUBING WITH 63 PCF VIS BRINE ABOVE PTP.

1315 - 1345 0.5 0 POST N DCOM OTH NA RIG 16241 16241 F/C BEFORE L/D ESP COMPLETION, +/- 25 BPH LOSSES, MEANWHILE SERVICE TDS.

CONT'D POH & L/D PTP & PUNCHED JOINT, 9-5/8" ESP ELEPAK PAKER, 2 X 2 X 4-
1/2" NV TBG , 4-1/2" R-NPL ASSY , L/D ESP PUMP & Y-TOOL
>> PACKER ELEMENT SEAL GOOD, ALL SLIPS IN PLACE.
>> BAKER RECORD READING BELOW HANGER : PH-PH: 5.3 OHM BALANCE / P-G :
3.81 GOHM.
1345 - 2100 7.25 0 POST N DCOM OTH NA BAL 16241 16241 >> BAKER CREW CHECKED READING IN PENETRATOR OF PACKER : ABVOE PKR :
PH-PH = 1.7 OHMS BALANCE / P-G = 19.7 GOHM , BELOW PKR : PH-PH = 1.7 OHM
BALANCE , P-G = 23.4 GOHMS.
>> ALL CLAMPS RECOVERED.
>>PUMP SHAFT STUCK
>> MOTOR, SEAL : FREE ROTATION.
>> MONITOR THE WELL AT TRIP TANK, +/- 25 BPH LOSSES.
2100 - 2200 1 0 POST N BOP OTH BOP RIG 16241 16241
HPJSM, P/U & M/U JETTING SUB, JET BOP, L/D JETTING SUB.

2200 - 2345 1.75 0 POST N BOP NU SNIP RIG 16241 16241 HPJSM , N/D BILL NPL , N/U SHOOTING NPL
>> MONITORETHE WELL THRU CH. LINE , LOSSES +/- 20 BPH
2345 - 0130 1.75 0 POST N DCOM PTST LUB NSL 16241 16241
R/U NESR S/L LUB , PT WITH 1000 PSI .

NESR S/L RIH WITH 8.5" AC-DC TO 6600 FT MONITRED W/ BAKER ESP / PACKER
ENG... INC@RPT.
0130 - 0459 3.5 0 POST N DCOM DTU DRFT NSL 16241 16241
>> RIH WITH CONTROLLED SPEED.
>> MONITORETHE WELL THRU CH. LINE , LOSSES +/- 18 BPH

Workover Objectives
Foreman Remarks

ODF : 43 FT
CDF : 33.25 FT
CORRECTION : 9.75 FT
====================ERP EQUIPMENT & CONTINGENCY PLAN=====================
- 55 MEN CAPACITY EVACUATION BUS ON STANDBY AT RIG SITE LOCATION (CHECKED DAILY).
- 30 MEN CAPACITY EVACUATION BUS (CHECKED DAILY) ON STANDBY AT MAIN CAMP
- STAGING AREA #1 LOCATED 3KM WEST OF RIG ON BLACKTOP N 27.333414 E 48.968290
- STAGING AREA #2 LOCATED 2 KM EAST OF RIG ON BLACKTOP N 29.322211 E 49.004181
=======================RENTAL & OTHER EQUIPMENT=========================
- 3 X CUC RAW WATER TANKERS ON LOCATION SINCE 30-APRIL-2024.
- 3 X UTECORP RAW WATER TANKERS ON LOCATION SINCE 13-JUNE-2024.
=======================PERSONNEL =====================================
- BANDER ALJOHANI #8424238 MATERIAL EXPEDITOR ON LOCATION SINCE 6/3/2024.
- FALEH HADI MATERIAL EXPEDITOR ON LOCATION SINCE 6/17/2024.
======================DRILLSITE STATUS=================================
- DRILL SITE ACCOMODATE SINGLE WELL , ALL PRODUCTION LINES DEPRESSRIZED AND BARRICADED BEFORE RIG MOVE.
- FENCE REMOVED AT EAST AND WEST SIDE TO FIT RIG LAY OUT
===========================NEXT WELLS SEQUENCE ==============================
-JLDI -720, 721, 722, 723, 724 (DS-3) :KOM HELD ON 14 MAR 24 ( PMT : 50 % , WELL SITE : 50%)
-JLDI -780, 781, 782, 783, 784 (DS-9): KOM HELD ON 14 MAR 24 ( PMT : 50 % , WELL SITE : 50%)

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ABHD-144 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:22 06/09/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

=============================SAFETY DATA===================================
- RECORDED 15 OBB.
========================RIG ON LOCATION SUPPORT==============================
- NONE
=========================DIESEL CONSUMPTION================================
DIESEL CONSUMPTION FOR ENGINES (RIG + CAMP) = DAILY: 41.5 BBL / CUMULATIVE : 245.23 BBLS

DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF N/A N/A API 0 Volts 0 9.5 24,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 N/A HTHP 99 N/A N/A N/A / NACL N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A N/A 1 / 0 200 N/A
45
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
63 PCF N/A N/A API 0 Volts 0 9.5 24,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 N/A HTHP 99 N/A N/A N/A / NACL N/A
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) N/A N/A 1 / 0 200 N/A
45

MUD CAUST DUOVIS-NS NACL


TREATMENT 2 ( 50LBP ) 9 ( 50LB ) 6 ( 2200L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/16/2024 N/A NORMAL N/A HOT 3,546 TOURLY

Company OSC BAL TGC RIG OES ARN HSL NSL ARM

Category CSR ALS CTRG RIG DFMS OTHR SLS SLS WSC
PERSONNEL
2 9 13 65 1 2 1 3 2
Total
AND SERVICES No. of Persons
98
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Operating Hours. 15 16 0 24 12 12 12 8 24

Standby/Tankers Others Others Others Others


TRUCKS/BOATS
PICK UP DH7518 1 X RIG SP-124 AMBULANCE 6 X RAW WATER TRUCK gasolin : 145 CAMP DIESEL: 289 BBLS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
0 120 151 N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR FZRN-215 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:22 06/13/2024 - 08/02/2024
Report ID: OPERLMTDMRREP

SP-125 @ FZRN-215 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK Foreman(s)ZAHRAN, NASSER HASSAN / ALJOHANI, ADEL ABDULLAH
D&WO Morning Report (Service Providers View) Charge #: WELL) Engineer NGO, TUAN ANH
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24055-0215) Manager HAJRI, ASKAR SAUD
SP-125
Daily Onshore THURAYA RIG FORMAN VSAT MOBILE
(0500-0500) Saudi Aramco Well Wellbores: 8821677713 963 013-577-11 60 053 610 47 36 RIG MAN AGER
Date: Tuesday 06/18/2024 FZRN-215 (0) FZRN_215_0 CONTRACTOR /CLERK VSA T
013-577-11 07

Last 24 hr operations Next 24 hr plan


R/D ON ANDR-505, R/M & R/U ON FZRN-215. R/U ON FZRN-215.
Location Next Location
123 KM FROM DHAHRAN MAIN GATE HRDH-1603
Current Depth (ft) Liner TOL MD TVD Formation Tops
7,645 Last Csg Size MD TVD Size 3,025 7,183 7,183 Top
9 5/8 4872 4872 Formations Comments
7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
7645 (Date) 0 95
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HPJSM, WITH ALL INVOLVED RIG MOVE PARTIES:

- R/D ON ANDR-505 ...... 95%.


0500 - 1800 13 0 PRE M RM RM NA RIG 7645 7645 - R/M TO FZRN-215 ....... 95 %.
- R/U ON FZRN-215 ....... 40 %.

>> WELL FZRN-215 IS SECURED W/7" SIM-PLUG @ 3100', BY GDMC S/L AND SLB 7"
SIM PLUG WITH JUNK CATCHER ON TOP ON 06/13/2024.
1800 - 0459 11 0 PRE M SUSP OTH NA RIG 7645 7645
SUSPEND CRITICAL AND TANDEM LIFT OPERATION AT NIGHT.
Workover Objectives
Foreman Remarks

>> ODF CORRECTION: -7'.


>> GOR = 548 SCF/BBL, H2S CONC. = 2.28%.
>> HELD DAILY SAFETY MEETING WITH ALL PERSONNEL ON LOCATION.
================== PERSONNEL ON BOARD =================================
- ARAMCO MATERIAL EXPEDITOR ABDELRAHMAN OTAIBI #8437547 ON LOCATION SINCE 06/09/2024.
================NEXT WELLS SCHEDULE UPDATED=========================
- HRDH-1603 :- DRILLING NEW WELL.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A NORMAL N/A SEASONAL 3,127 R/M

Company ABE RIG EMC RIG ARM OTH ARM

Category CTRG RIG DFMS OTHR OTHR VAC WSC


PERSONNEL
16 49 1 9 1 3 2
Total
AND SERVICES No. of Persons
81
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 12 10 12

Standby/Tankers Others Others Others


TRUCKS/BOATS
DH-7522 SP AMBULANCE 3 RAW WATER TANKERS DIESEL FOR COMPLETION: 70 BBLS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A 6 2 400

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 1 of 1


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-68 WORKOVER-7 BI-90
Print Date: 06/18/2024 06:22 05/05/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

SP-154 @ ANDR-68 Limited Morning Report for 06/18/2024


Objective : (RE-COMPLETE Foreman(s)TILAKA, KEVIN CHRISTOPHER / CHATTHA, USMAN ZULFIQAR
D&WO Morning Report (Service Providers View) Charge #: THE WELL WITH NEW Engineer ALKHOWAILDI, MOHAMMED AHMED / ALEID, ABDULRAHMAN FAHAD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (61-24056-0068) COMPLETION STRING) Manager SAAD, SAAD RASHED
SP-154
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088-216-7 77-13969 013-577-43 51 013-577-43 55 / CLERK
Date: Tuesday 06/18/2024 ANDR-68 (0) ANDR_68_0 MOBILE
050-945-39 52/ RIG MA NAGER

Last 24 hr operations Next 24 hr plan


R/U ON ANDR-68, COMPLETE PRE-SPUD CHECK LIST, CIRC THRU TBG PUNCH, F/C, SET & P/T P/T BOP, R/U NESR S/L, P/T PCE & RIH TO RTRV PX PLUG, BH, DE-COMPLETE THE WELL.
BPV, N/D X-MASS TREE & TBG BNT, N/U BOP & RELATED EQPT.
Location Next Location
123 KM F/ DH MAIN GATE 11 KM SW GOSP-4 6KM NORTH GOSP-6 ANDR-253
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
11,272 Size 5466 5466 Size 3,791 7,377 7,377 Top
Formations Comments
7 4 1/2 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
11272 (Date) 0 123
6.9 (06/17/2024@1400 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HOLD DAILY SAFETY MEETING WITH RIG CREW & 3RD PARTY PERSONNEL.

> RIG MOVE ACTIVIIES:


- FUNCTION TEST TDS, DRAWWORKS & MUD PUMPS.
- CONECT STAND PIPE & P/T SURFACE LINES.
- P/T BOP ON TEST STUMP AS PER ARAMCO PROCEDURES.
- R/U & P/T FLARE LINE.
0500 - 1400 9 0 PRE N RM RU NA RIG 0 0 - CALIBRATE & FUNCTION TEST H2S & LEL ALARMS.
- FUNCTION TEST ESD FROM RIG FLOOR & TP OFFICE, OK.
- COMPLETE ARAMCO PRE-SPUD CHECKLIST.

> R/D: 100 %, R/M: 100 %, R/U: 100%.

=========================================================
- SIWHP = 0 PSI, TCA = 0 PSI, CCA = 0 PSI.
- WELL SECURED BY 2-7/8" PX PLUG @ 6235'.
1400 - 1400 0 0 PRE S OT COMM NA RIG 11272 11272
COMMENCE OPERATIONS ON ANDR-68 ON 17TH JUNE 2024 @ 1400 HRS.
1400 - 1430 0.5 0 POST N DCOM PJSM NA RIG 11272 11272
HOLD PRE-SPUD SAFETY MEETING WITH ALL INVOLVED PERSONNEL.

MARK WELLHEAD ORIENTATION, WING VALVE FACING EAST (MUD PUMPS) &
OPERATOR VALVES FACING NORTH (OFFICES).
- DISTANCE TO GROUND LEVEL, MASTER VALVE= 3.5 FT, WING VALVE= 4.9 FT
AND CROWN VALVE= 6.3 FT.
1430 - 1530 1 0 POST N DCOM OTH NA RIG 11272 11272
- DISTANCE FROM RIG FLOOR TO GROUND: 35.1'.
- INSTALL PRESSURE GAUGES 7'' X 9''CCA: 0 PSI, 9"X 13" CCA: 0 PSI, WHP: 0 PSI,
& TCA: 0 PSI.
- WELL SECURED BY 2-7/8" PX PLUG @ 6235'.
- ODF CORRECTION : -23 FT.
1530 - 1600 0.5 0 POST N DCOM SDR1 NA RIG 11272 11272
CONDUCT PRE-SPUD H2S DRILL, GOOD RESPONSE FROM ALL PERSONNEL.

HPJSM, INSTALL PUMP-IN FLANGES ON WING VALVE & TCA, R/U SURFACE HARD
1600 - 1730 1.5 0 POST N DCOM OTH NA RIG 11272 11272
LINES TO WING VALVE & TCA VALVE, P/T LINES TO 2000 PSI AGAINST X-MASS
TREE VALVES & CHOKE MANIFOLD, HOLD.

1730 - 1900 1.5 0 POST N DCOM CIRC MPMP RIG 11272 11272 HPJSM, CIRC. HOLE THRU PUNCH @ 6220' WITH 83 PCF VISCOUS BRINE, TAKE
RETURNS THRU CHOKE MANIFOLD AND MGS, UNTIL MUD WT IN/OUT 83 PCF.
1900 - 1930 0.5 0 POST N DCOM CIRC MPMP RIG 11272 11272
FLOW CHECK, WELL STATIC.

1930 - 2015 0.75 0 POST N WH SET BPV RIG 11272 11272 HPJSM, SET 4-1/2'' BPV & P/T FROM BACKSIDE THROUGH PUNCH WITH 83 PCF
VISCOUS BRINE TO 500 PSI, HOLD.
2015 - 2115 1 0 POST N DCOM OTH NA RIG 11272 11272
HPJSM , R/D CHICKSAN LINES & KILL MANIFOLD.
2115 - 2300 1.75 0 POST N DCOM OTH NA RIG 11272 11272
HPJSM, DIG CELLAR 2 FT FROM LANDING BASE, CHECK FOR BOP SUPPORT, OK.

HPJSM, N/D OLD CIW 4-1/16" 3M X-TREE & OLD 11" X 4" TBG BNT, CLEAN &
2300 - 0100 2 0 POST N WH ND TREE RIG 11272 11272
CHECK HANGER THREADS, 4-1/2'' NVAM.
- RETRACT & RE-TIGHTEN LOCK-DOWN SCREWS, OK.
0100 - 0330 2.5 0 POST N BOP NU BOP RIG 11272 11272
HPJSM, N/U 13-5/8" CLASS "A" 5M BOPE STACK & RELATED LINES.
0330 - 0430 1 0 POST N BOP NU BNIP RIG 11272 11272
N/U BELL NIPPLE AND FLOW LINE, INSTALL V-DOOR.
0430 - 0459 0.5 0 POST N BOP BOP RBOP RIG 11272 11272
FUNCTION TEST BOP.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR ANDR-68 WORKOVER-7 BI-90
Print Date: 06/18/2024 06:22 05/05/2024 - 07/05/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
Workover Objectives
Foreman Remarks

>> ODF = -23 FT

--------------------------------------------------------------SAFETY -------------------------------------------------------------------------------------
>> HELD DAILY SAFETY/ OPERATIONAL MEETINGS WITH ALL INVOLVED PERSONNEL.

--------------------------------------------------------------PERSONNEL --------------------------------------------------------------------------------
>> ARAMCO MATERIAL EXPEDITOR KHALID ALMAKRAMI # 814820 ON LOCATION.

-------------------------------------------------------- RENTAL TOOLS ----------------------------------------------------------------------------------


>> 3 EA RAW WATER TANKER ON LOCATION.
----------------------------------------------- CLOSED LOOP SYSTEM ----------------------------------------------------------------------------------
>> 4 SIDE CUTTING BIN UTILIZED FOR CLOSED LOOP SYSTEM PROVIDED BY RIG.
------------------------------------------------- NEXT LOCATION ----------------------------------------------------------------------------------------
>> ANDR-253 (BI-90), KOM DONE ON 04/09/2024, 100% STRIP OUT & 0% LOCATION READINESS.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
83 PCF 0 0 API 0 0 Volts 0 9.6 279,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 100 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
42
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
83 PCF 0 0 API 0 0 Volts 0 9.5 279,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 100 0 0 0/0 CACL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 0 0
43

MUD CACL2-80 HEC CAOH2


TREATMENT 142 ( 2200L ) 15 ( 55LB ) 3 ( 55LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A N/A N/A N/A 2,916 PRE SPUD MEETING

Company TGC RIG EMC RIG ARM OTH ARM NSL FMC INW

Category CTRG RIG DFMS OTHR OTHR VAC WSC SLS CSR BRCR
PERSONNEL
15 59 1 4 1 3 2 3 3 1
Total
AND SERVICES No. of Persons
92
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 12 12 24

Operating Hours. 0 24 12 24 12 12 24 6 0 0

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A N/A N/A N/A N/A

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWTH-57 WORKOVER-10 BI-60
Print Date: 06/18/2024 06:22 06/17/2024 - 08/05/2024
Report ID: OPERLMTDMRREP

SP-160 @ HWTH-57 Limited Morning Report for 06/18/2024


Objective : (SIDETRACK DUAL Foreman(s)SUQOUR, ABDULSAMAD MUBARAK
D&WO Morning Report (Service Providers View) Charge #: LATERAL ACROSS UNZA) Engineer ALYOUSIF, ABDULLAH ALI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (71-24065-0057) Manager LAHLAH, AZZEDINE
SP-160
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 8821677712 584 574-6415 5746418
Date: Tuesday 06/18/2024 HWTH-57 (0) HWTH_57_0 CONTRACTOR /CLERK VSA T
574-6417

Last 24 hr operations Next 24 hr plan


R/D ON HWTH-105, MOVE & R/UP ON HWTH-57. R/D ON HWTH-105, MOVE & R/UP ON HWTH-57.
Location Next Location
500 KM FROM DHAHRAN MAIN GATE. UMJF-13
Current Depth (ft) Liner TOL MD TVD Formation Tops
8,358 Last Csg Size MD TVD Size Top
Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
8358 (Date) 0 500
0 (@ )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

HELD PRE-RIG MOVE SAFETY MEETING WITH RIG CREW, TRUCK PUSHERS,
DRIVERS. DISCUSSED POTENTIAL HAZARDS WHILE RIG MOVE OPERATIONS,
0500 - 0530 0.5 0 PRE N RM PJSM NA RIG 8358 8358
DISCUSSED WORKING AT HEIGHT PROPER PROCEDURE. USE WORK PERMIT FOR
EACH HEAVY LIFTING, ELECTRICAL & SIMILAR OPERATION, STOP WORK
AUTHORITY. VERIFIED ALL CERTIFICATIONS PRIOR TO STARTING RIG MOVE.
0530 - 0700 1.5 0 PRE N RM RD NA RIG 8358 8358
PREPARE MAST FOR LOWERING OPERATION.
0700 - 0800 1 0 PRE N RM RD NA RIG 8358 8358
HPJSM, LOWERED MAST SAFELY.

GENERAL RIG DOWN OPERATION ON HWTH-105.


- UNPIN MAST AND DISCONECT FROM SUB BASE.
- DISCONECT MONKY BOARD.
0800 - 1430 6.5 0 PRE N RM RD NA RIG 8358 8358
- DISCONECT "A" FRAM.
- R/D DRAWWORK.
- R/D RATORY TABLE.
- DRILLER CABIN

LOAD AND MOVE BELOW RIG EQUIPMENT TO NEW LOCATION AT HWTH-57.


- SHALE SHAKER AND MUD TANKS.
- MAST.
- POOR BOY.
- TOOL BOX.
1430 - 1800 3.5 0 PRE N RM RM NA RIG 8358 8358 - CATWALK.
- CABLE BOX.
- KOOMY UNIT.
- CEMENT TANK.
- CHEMICALS.
- MUD PUMP.
- SPOT AND CONNECTED MUD TANKS.

SUSPEND RIG MOVE CRITICAL OPERATIONS & WAIT FOR DAYLIGHT.


- INSPECTED THIRD PARTY EQUIPMENT AND CHECK ALL CERTIFICATES.
- THIRD PARTY MOVER (SINOPEC) PROVIDE:-
- (02 TRACK PUSHER), (02 CERTIFIED RIGGER1), (6 CRANE), (2 FORKLIFT) AND (14
LOW BED TRUCK).
- RIG DOWN AT HWTH-105: 50%
1800 - 0459 11 0 PRE N SUSP OTH NA RIG 8358 8358
- RIG MOVE TO HWTH-57: 45% (INCLUDING PRE-MOVE LOADS)
- RIG UP AT HWTH-57: 10%
- PRE MOVE: 58 LOADS.
- TODAY MOVED LOADS: 20 LOAD
- TOTAL MOVED LOADS: 96 LOAD
- RIG MOVE DISTANCE: 15 KM.
- DAYS SINCE RIG RELEASED = 2 DAYS.
Workover Objectives
Foreman Remarks

ODF CORRECTION: .
KPI - TRIPPING KPI: 18 STD/HR VS NONE STD/HR FOR TODAY.
=========================================
JOURNEY MANAGEMENT PLAN:
- PRIOR ENTERING THE SKID ROAD CALL YOUR COMPANY BASE, FILL YOUR VEHICLE WITH FUEL.
- CALL RIG SP-160 AT ((013-5746415 - 013-574-6417- (0133417924 EXT.101)) PRIOR ENTERING THE SKID ROAD, PROVIDE NAME OF COMPANY, NUMBER OF PERSONNEL, COLOR OF VEHICLE
AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL.
- ALL VEHICLES SHOULD HAVE A SUPPLY OF DRINKING WATER/CAR SURVIVAL KIT.
- DISTANCE FROM DAMMAM TO RIG: 500 KM.
- CAR MAINTENANCE IS SCHEDULED ON AUGUST 18TH, 2024.
=======

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HWTH-57 WORKOVER-10 BI-60
Print Date: 06/18/2024 06:22 06/17/2024 - 08/05/2024
Report ID: OPERLMTDMRREP

RER: 100 PPM (0 M), 30 PPM (0 M), 1/2 LFL (60 M).
GOR UNAIZA RESERVOIR: 28 SCF/STB & H2S: 0.0 %.
=======
HSE :
- SAFETY: PRE-TOUR SAFETY MEETINGS (2), PRE-JOB SAFETY MEETINGS (10), SAFETY ALERTS (0).
- STOP CARDS(10), PTW 5, JSA:(5), NEAR MISS (0).
- DRILLS: PIT DRILL (0),TRIP DRILL(0) H2S DRILL (0),FUNCTION TEST FIRE PUMP (0).

=======
POB:
- USMAN ASHRAF RIG CLERK (ID#8060267), ON LOCATION SINCE 10/08/2023.
=======
AUDIT:
- LPCR DONE ON 1/23/2024 BY ARAMCO TEAM
- RHSEI: MARCH 07, 2024: TOTAL 40 ITEMS: CLOSED (40), OPEN (0).
- QSI : MAY 29 , 2024 :TOTAL 33 ITEMS: CLOSED (31), OPEN (02).
- WCI : MARCH 07 , 2024: TOTAL 06 ITEMS: CLOSED (6), OPEN (0).
=======
WATER DATA:
- RECEIVED: 0 BBLS, CONSUMED: 0 BBLS, STOCK: 0 BBLS.
=======
RENTAL TOOLS:
- 2 X FRACK TANKS ON LOCATION SINCE 05/14/2024.
- 100 BBL OF HALL 20% VDA ACID VDA ON LOCATION SINCE 05/21/2024@ 17:00.
============
NEXT WELLS:
- UMJF-13 KOM HELD ON 05/20/2024, STRIP-OUT 100%, LOCATION 0%.
=======
SERVICE COMPANIES ON LOCATION:
- 2 X OES MUD ENG SINCE 05/12/2024.
- 1 SPRINT OPERATOR SINCE 05/14/2024.
- 03 NESR OP SINCE 06/10/2024.
- 01 INTERWELL OP SINCE 06/10/2024.
=======
OFF-LINE WORK SECURE WELL HWTH-57.
RIG UP NESR SLICK LINE, PRESSURE TEST LUBRICATOR TO 2000 PSI, OK :
- RIH WITH 2.87 GC TO 600 FT.
- RIH 3-1/2" INTERWELL PLUG & SET SAME @ 500 FT.
- P/T 3-1/2" ME-PLUG TO 1000 PSI- HOLD.
- R/D NESR S/L TOOLS.
=======
ARAMCO VEHICLE SERVICE DETAILS:
- ARAMCO CAR DOOR NUMBER AB-0750 SERVICED ON 06/17/2024, NEXT SERVICE DUE 08/18/2024.
DAILY SURVEY
MUD DATA
MUD
TREATMENT
BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
N/A N/A NORMAL N/A HOT 1,994 RIG MOVE

Company INW RIG OES RIG ARM NSL ARM

Category BRCR RIG DFMS OTHR OTHR SLS WSC


PERSONNEL
1 50 2 26 1 3 1
Total
AND SERVICES No. of Persons
84
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24

Operating Hours. 0 0 0 0 12 0 24

Standby/Tankers
TRUCKS/BOATS
AB0750

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 395 120 N/A N/A 1000

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-363 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 03/29/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

SP-161 @ HRDH-363 Limited Morning Report for 06/18/2024


Objective : (DRILLED AS OIL- Foreman(s)ALNUJYADI, YOUSEF SAAD / AURANGZAIB, MUHAMMAD
D&WO Morning Report (Service Providers View) Charge #: PRODUCER IN HRDH) Engineer BAGHDADY, WALEED MOHAMED
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-22058-0363) Manager SAIARI, WALEED AAMER
SP-161
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12581 5784029 578-4074
Date: Tuesday 06/18/2024 HRDH-363 (0) HRDH_363_0 CONTRACTOR /CLERK VSA T
578-4128

Last 24 hr operations Next 24 hr plan


CONT PERORM WIPER TRIP, CHC, POOH TO SURFACE & L/D REAMING BHA RUN 4.5" BAKER LOWR COMPLETION.
Location Next Location
0.691 KM N70W OF HRDH-211 AND 0.721 KM S35E PF HRDH-186 YBRN-2
Current Depth (ft) Liner TOL MD TVD Formation Tops
14,197 Last Csg Size MD TVD Size 4,303 8,883 6,252 Top
9 5/8 4610 4610 Formations Comments
7 Depth
LAMS 1,360
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) AHMD 1,860
14197 (Date) 0 0 236 SFNY 2,225
44.2 (05/05/2024@0100 ) SHUB 2,950
BYDR 3,270
MDTM 4,200
SULY 4,671
HITH 5,303
ABAR 5,767
ARBB 5,826
ABBR 5,894
ARBC 5,915
ABCR 5,999
ARBD 6,137
PADS 6,245
BPDS 6,250
ABD1 6,274
AD2A 6,296
2A05 6,303
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

0500 - 0700 2 0 6 1/8 N CT ST STDP RIG 14197 14197 10610 8883 POOH WITH W/ 6-1/8" SLICK REAMING BHA TO 7" LINER SHOE AT 8,883
- TRIP TANK RUNNING ALL TIME WITH MUD CAP.

HELD STAND-UP MEETING WITH CREW, REVIEWED & DISCUSSED:


0700 - 0730 0.5 0 6 1/8 N CT PJSM STRG RIG 14197 14197 - FIRE WATCH AND LOCK OUT TAG OUT
- SHARE HSE ALERT 72-24
- SNAKE BITE & SCORPION STING INCIDENTS

CONT RIH 6-1/8" SLICK REAMING BHA ON DP TO BOTTOM.


0730 - 1300 5.5 0 6 1/8 N CT ST STDP RIG 14197 14197 8883 14197
- HOLE IN GOOD CONDITION.
- TRIP TANK RUNNING ALL TIME WITH MUD CAP.

SWEPT HOLE TWO TIMES 10/10 BBLS LO-VIS/HI-WT PILL & CHC, SPOT 200 BBL
1300 - 1530 2.5 0 6 1/8 N CT CIRC MPMP RIG 14197 14197
CASING GO PILL ON BTM.
- KEEP TRIP TANK RUNNING ALL TIME WITH MUD CAP.

POOH FREELY WITH 6-1/8" SLICK REAMING BHA ON ELEVATOR TO 7" LINER @
1530 - 2200 6.5 0 6 1/8 N CT ST STDP RIG 14197 14197 14197 8883 8,883'.
- HOLE IN GOOD CONDITION.
- TRIP TANK RUNNING ALL TIME WITH MUD CAP.

CONT POOH WITH 6-1/8" SLICK REAMING BHA IN CASED HOLE TO TOP OF BHA
2200 - 0200 4 0 6 1/8 N CT TO STDP RIG 14197 14197 8883 680
AT 680 FT
- TRIP TANK RUNNING ALL TIME WITH MUD CAP.

HELD STAND-UP MEETING WITH CREW, REVIEWED & DISCUSSED:


0200 - 0230 0.5 0 6 1/8 N CT PJSM STRG RIG 14197 14197 - FIRE WATCH AND LOCK OUT TAG OUT
- SHARE HSE ALERT 72-24
- SNAKE BITE & SCORPION STING INCIDENTS

POOH & L/D 6-1/8" REAMING BHA.


0230 - 0430 2 0 6 1/8 N CT HT BHA RIG 14197 14197
- TRIP TANK RUNNING ALL TIME WITH MUD CAP.
- L/D NOV JAR SN: 380-47164.
0430 - 0459 0.5 0 6 1/8 C WH RTRV WBSH RIG 14197 14197
RETRIEVE WEAR WH WEAR BUSING & FLUSH MUD PUMP SURFACE LINE.
Foreman Remarks

WELL OBJECTIVE :
THIS WELL WILL BE DRILLED AS OIL-PRODUCER IN HRDH.
====== ERP ======
- NO POPULATED AREAS ARE ENCLOUDED BY THE 30PPM RADIUS.
- 1/2 LFL = 174 M, 100 PPM = 340 M, 30 PPM =575 M.
- GOR AT RESERVOIR = 485 SCF/STB & H2S: 0.83%.
- STAGING AREA #1:(4.42205 N, 49.05755 E), 660 M SW OF HRDH-363, STAGING AREA#2: (24.43010 N, 49.05845 E), 655 M OF NW HRDH-363

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-363 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 03/29/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

====== JOURNEY MANAGEMENT PLAN ======


- RIG LOCATION: DISTANCE FROM DHAHRAN TO RIG IS (236 KM), NEAREST CITY IS HRDH.
- PRIOR MOVE TO THE RIG AND ENTER THE SKID ROAD CALL YOUR COMPANY BASE.
- CALL RIG SP-161 AT (013-5784029 -013- 5784128) PRIOR ENTERING THE SKID ROAD: PROVIDE YOUR COMPANY'S NAME, NUMBER OF PERSONNEL, VEHICLE AND EMERGENCY CONTACT
NUMBER OF BASE PERSONNEL.
- ALL VEHICLES SHOULD BE 4X4, EQUIPPED WITH SURVIVAL KIT, FUEL SHOULD BE SUFFICIENT TO REACH THE RIG, PROVIDE SUFFICIENT WATER AND FOOD.
- ALL VEHICLES SHOULD FOLLOW APPROVED ROAD WITH NO SHORT CUT AND FOLLOW DRIVING SPEED LIMIT.
====== PERSONNEL ON BOARD ===== =========================================================
- BAKER MUD ADVISOR HASSAN IDRIS ID# 8485685 ON LOCATION SINCE 6/13/2024.
- ARAMCO CLERK FAHAD ALZAHRANI ID 820942 ON LOCATION SINCE 6/15/2024.
============================================================================================
SAFETY TOPIC: DISCUSS FIRE WATCH AND LOCK OUT TAG OUT SHARE HSE ALERT 72-24 - SNAKE BITE & SCORPION STING INCIDENTS
PTW-5 JSA-5 PJSM-5 PRE TOUR SAFETY MEETINGS -2 WEEKLY SAFETY MEETING-1
SAFETY DRILLS:5
FIRE DRILL (FD):0, MAN DOWN INJURY DRILL (MDD): 1, VERTICAL RESCUE DRILL (VRD): 0, MAN LOST-SEARCH/RESCUE DRILL (MLSRD): 0, CONFINED SPACE RESCUE DRILL (CSRD):0, HYDROGEN
SULFIDE H2S RELEASE EMERGENCY DRILL (H2S-RED):1, H2S RESCUE DRILL (H2S-RD):1, PIT DRILL (PD):2, TRIP DRILL (TD):0, ACCUMULATOR DRILL/TEST (ADT):0, ANNUAL EMERGENCY DRILL
(APED & ASED): 0, OIL SPILL EQUIPMENT CLEAN-UP DRILL (OSECD):0, RIG POST-MOVE FIRE WATER SYSTEM HYDRO-TEST AND FLUSH: 0, RIG POST-MOVE FIRE WATER SYSTEM EQUIPMENT
FUNCTION TEST:0, BOP FUNCTION TEST:0FIRE PUMP FUNCTION TEST:0 PRIMARY DRILL:0 STOP WORK AUTHORITY DRILL:0
=========DIRECTIONAL ========

=====================
JAR & SHOCK SUB & RENTAL TOOLS:
- NOV 4-3/4" JAR SN: 380-47164 ON LOCATION SINCE 5/29/2024.
=====================
WATER CONSERVATION IMPLEMENTED INITIATIVES:
- REDUCED WATER PITS: N
- DIRECT WATER LINE-UP TO MUD WATER TANK SYSTEMS: N
- CLS-CUTTINGS DRYER SYSTEM IMPLEMENTATION: N
========================WASTE MANIFEST==========

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 14,197 91.6 231 0 6,338 -2010.17 -1396.96 8,031.2 0.79

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
83 PCF 0 0 API 0 0 Volts 10.29 9.8 121,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 83 21 0 9 / 11 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 12 17 8/9 0 440 0
52
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
83 PCF 0 0 API 0 0 Volts 10.29 9.8 121,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 83 21 0 9 / 11 MUDCAP 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 12 17 8/9 0 440 0
52

MUD CAUST ODCA125 XC MRBL-F NACL


TREATMENT 6 ( 50LBP ) 8 ( 55GL ) 25 ( 55LB ) 40 ( 2200L ) 36 ( 2200L )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
7RR 8,886 14,197 DP Av DC Av Bit HHP N/A N/A M332 6.125 REED
Pressure GPM Jet Vel N/A N/A N/A I-Row O-Row DC Location Bearings
N/A N/A N/A 1 1 CT S X
BIT DATA
Serial Number Type Jets TFA
S300594 TK63M1A 3 x 14 / 0.451
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y N/A N/A N/A N/A N/A 7
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/03/2024 6/4/2024 NORMAL NA HOT 3,543 ELECTRICAL SHOCK

Company GOC TGC RIG GDF BLH RIG ARM ARM BDF

PERSONNEL Category CSR CTRG RIG DFMS LHES OTHR OTHR WSC DFMS
Total
AND SERVICES
3 15 51 2 2 13 1 2 1 90
INFORMATION No. of Persons

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-363 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 03/29/2024 - 06/24/2024
Report ID: OPERLMTDMRREP

Operating Hours. 0 0 12 12 0 12 12 12 1

Standby/Tankers
TRUCKS/BOATS
DH4876

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
2000 100 500 24 14 1150

Instrumentation Other
OK OK Reporter
REPAIR ASAP
Computer, Communication & V-Sat Issues
OK.

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HABA-14 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 05/20/2024 - 11/28/2024
Report ID: OPERLMTDMRREP

SP-165 @ HABA-14 Limited Morning Report for 06/18/2024


Objective : (CO2 CO2 Foreman(s)BOUSSALEM, HAROUNE
D&WO Morning Report (Service Providers View) Charge #: EVAL/DEL) Engineer ZAKI, MOHAMMED JAFER
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (66-24021-0014) Manager ABADA, YASSINE
SP-165
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12613 6794128 679-4129
Date: Tuesday 06/18/2024 HABA-14 (0) HABA_14_0 CONTRACTOR /CLERK VSA T
679-4128

Last 24 hr operations Next 24 hr plan


CON. N/U 13-5/8" 5M CLASS A BOP STACK, P/TEST, L/D DRILL STRING PIPES FOR INSPECTION, CONT. C/O CMT & DV, CHC, RIH & TAG CMT, C/O SHOE TRACK TO 20' ABOVE SHOE, CHC, P/T
P/U & RIH CO BHA, CO CMT. CASING, POOH, P/U 12-1/4" STRING MILL, RIH TO DRESS DV, CHC, POOH.
Location Next Location
311 KM FROM DMG. HABA-15
Current Depth (ft) Liner TOL MD TVD Formation Tops
4,106 Last Csg Size MD TVD Size Top
13 3/8 4098 4098 Formations Comments
Depth
LAMS 2,390 272 FT SHALLOWER.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SFNY 2,745 337 FT SHALLOWER.
4106 (Date) 100 0 311 SHUB 4,036 147 FT SHALLOWER.
25.8 (05/23/2024@0900 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

N/U 13-5/8"-5M CLASS "A" BOP STACK.


- BOP CONFIGURATION: 13-5/8" 5M X 13-5/8" 10M ADAPTOR FLANGE, 13-5/8" 5M
0500 - 0900 4 0 16 N BOP NU BOP RIG 4106 4106 SPACER SPOOL, 13-5/8" 5M SINGLE RAM BOP, 13-5/8" 5M MUD CROSS, 13-5/8" 5M
BLING SHEAR RAMS, 13-5/8" 5M VBR , 13-5/8" 5M ANULAR BOP.
- INSTALL BELL NIPPLE & CONNECT FLOW LINE.
- FUNCTION TEST RAMS MANUAL LOCK.

0900 - 0930 0.5 0 16 N DRLG RR TDS RIG 4106 4106 SERVICE TDS & CHECK DROP OBJECTS.
- MONITOR WELL ON TRIP TANK & TRIP SHEET , WELL STATIC.

HELD STAND DOWN MEETING WITH ALL PERSONNEL ON RIG. DISCUSSED CURRENT
0930 - 1000 0.5 0 16 N DRLG PJSM NA RIG 4106 4106 DRILLING OPERATIONS, SWA, PROPER HAND/BODY PLACEMENT, PINCH POINTS
PREVENTION, HOUSEKEEPING, PROPER MECHANICAL/ELECTRICAL ISOLATION,
SAFE USE OF PRESSURE WASHER, REVIEW SAFETY ALERTS & LIFESAVING RULES

1000 - 1100 1 0 16 N BOP BOPT BOP RIG 4106 4106 HPJSM, P/U & MU 13-3/8" CUP TYPE TESTER ASSY TAILED WITH 5 STDS OF 5"
HWDP, RIH & SET SAME INSIDE 13-3/8" CSG @ 90 FT.

P/T BOPE W/ CUP TESTER VBR BOP, WELL HEAD VALVES, EMERGENCY KILL LINE
1100 - 1130 0.5 0 16 N BOP BOP BOP RIG 4106 4106 VALVES, 300 PSI LOW / 5,000 PSI HIGH.
- HOLD EACH TEST FOR 10 MIN- OK.
- HOOK LOAD: 430K.LBS.

HPJSM, POOH L/D CUP TESTER ASSY. M/U FMC 13-5/8" TEST PLUG ASSY, RIH, SET
1130 - 1230 1 0 16 N BOP OTH BOP RIG 4106 4106
SAME.
- OPEN WELL HEAD 2-1/16" WING VALVE.

HPSM, P/T 13-5/8" 5M CLASS "A" BOP STACK AS FOLLOWED:


- TEST# 1: P/T ANNULAR PREVENTOR, PRIMARY/SECONDARY CHECK VALVES,
CHOKE MANIFOLD VALVES #20, #21, #22, #23, #24 & HYD IBOP TO 300/3,400
PSI.
- TEST# 2: P/T TOP RAMS, PRIMARY/SECONDARY KILL LINE CHECK VALVES,
CHOKE MANIFOLD VALVES #20, #21, #22, #23, #24 & TDS MANUAL IBOP (LWCV)
TO 300/5,000 PSI.
- TEST# 3: P/T TOP RAMS, KILL LINE VALVE #4, CHOKE LINE VALVE #5
EMERGENCY KILL LINE VALVE #1 & FOSV TO 300/5,000 PSI.
- TEST# 4: P/T BTM RAMS & EMERGENCY KILL LINE VALVE #2 TO 300/5,000 PSI.
- DISCONNECT DP FROM TEST PLUG & PULL DP.
1230 - 1530 3 0 16 N BOP BOPT BOP RIG 4106 4106
- CONNECT TEST UNIT TO CHOKE MANIFOLD & FLUSH BOP TILL GET GOOD
RETURN.
- TEST# 5: PT SHEAR/BLIND RAMS, KILL LINE MANUAL VALVES #1, #2, SWACO
CHOKES & MANUAL CHOKE TO 300/5,000 PSI.
* ALL P/T WERE CHARTED, WITNESSED BY ARAMCO FOREMAN.
* ALL P/T 10 MINUTES FOR LO/HI PRESSURE.
- OFFLINE PT SECONDARY KILL LINE AGAINST MANUAL VALVE #2 TO 300/5,000
PSI.
- OFFLINE PT PRIMARY KILL LINE TO STAND PIPE MANIFOLD AGAINST MANUAL
VALVE #3 TO 300/5,000 PSI FOR 10 MIN.
- OFFLINE PT MAIN & BACK UP FOSV AND INSIDE IBOP TO 300/5,000 PSI ON
CHARTS.

HPJSM, PERFORM ACCUMULATOR DRILL BY CLOSING ANNULAR, TPR, BTM RAMS,


1530 - 1600 0.5 0 16 N BOP BOPT BOP RIG 4106 4106 RE-OPEN BTM RAMS TO SIMULATE BLIND RAMS AND OPEN CHOKE LINE HCR.
- FINAL ACCUMULATOR PRESSURE 2,180 PSI & ALL RESPONSE TIME WITHIN LIMIT.
- RECHARGE ACCUMULATOR F/ 2,180 PSI T/3,000 PSI IN 1 MIN AND 7 SECONDS.
1600 - 1700 1 0 16 N BOP OTH BOP RIG 4106 4106
HPJSM, POOH L/D FMC TEST PLUG ASSY.
1700 - 1745 0.75 0 16 N WH SET WBSH RIG 4106 4106

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HABA-14 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 05/20/2024 - 11/28/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End
HPJSM, P/U 13-5/8" FMC WEAR BUSHING RUNNING TOOL, RIH SET FMC WEAR
BUSSING, POOH L/D RUNNING TOOL.
- CLEAR AND HOUSE KEEPING RIG FLOOR.

HPJSM, LAY DOWN 09 JTS 9-1/2" DC, 3 JTS 8-1/4" DC, 3JTS 6-5/8" HWDP & 16
1745 - 2200 4.25 0 16 N DRLG HT STRG RIG 4106 4106
JTS 5" HWDP FOR INSPECTION TO RPLACE THEM BY INSPECTED ONE.
- MONITOR WELL VIA TRIP TANK.

HELD STAND DOWN MEETING WITH ALL PERSONNEL ON RIG. DISCUSSED CURRENT
2200 - 2230 0.5 0 16 N DRLG PJSM NA RIG 4106 4106 DRILLING OPERATIONS, SWA, PROPER HAND/BODY PLACEMENT, PINCH POINTS
PREVENTION, HOUSEKEEPING, PROPER MECHANICAL/ELECTRICAL ISOLATION,
SAFE USE OF PRESSURE WASHER, REVIEW SAFETY ALERTS & LIFESAVING RULES

HPJSM, P/U & M/U 12-1/4" CLEAN OUT BHA AS FOLLOWING: 12-1/4" NEW MILLED
TOOTH BIT TYPE QH4S SN: 839383, BIT SUB WITH FLOAT VALVE, 12 JTS OF 8-
2230 - 0330 5 0 16 N DRLG HT BHA RIG 4106 4106
1/4" D/C, 8" JAR, 2 X 8-1/4" D/C, X/O,15 JTS 5" HWDP @ 890'.
- P/UP FROM PIPE RACK 14 LTS 8-1/4" , 3 JTS 6 5/8" HWDP & 15 JTS 5" DP.
- MONITOR WELL VIA TRIP TANK.

RIH WITH 12-1/4" C/O BHA ON 5 " DP TILL TAGGED CEMENT @ 2,130' (60' ABOVE
0330 - 0445 1.25 0 16 N DRLG TI STDP RIG 4106 4106 890 2130
DVT).
- MONITOR WELL VIA TRIP TANK.
0445 - 0459 0.25 0 16 N DRLG DFS TDS RIG 4106 4106 2122 2180
D/O CMT WITH 70 PCF NACL POLYMER MUD TO 2,180'...ONGOING.
Foreman Remarks

HABA-14 WILL BE DRILLED AS A VERTICAL EVALUATION WELL FOR CO2 SEQUESTRATION PROJECT TO A TOTAL FOOTAGE OF 8840 FT.
THE PRIMARY OBJECTIVE OF THE WELL TO REDUCE THE STRUCTURAL UNCERTAINTY AND TO EVALUATE THE SALINITY OF 7
RESERVOIRS FOR CO2 SEQUESTRATION: BYDH, SULY, ARBA, ABRB, ARBC, ARBD AND HNIF AS WELL AS CHARACTERIZE RESERVOIR AND SEAL
POTENTIAL.THE TESTING PROGRAM WILL BE SUPPLEMENTED.
- WATER WELL: HABA-821 (0.5 KM).

============================ ERP ===================================


* GOR: 150 SCF/STB, H2S: 0.13%, 30 PPM RER: 450 M,100 PPM RER: 100 M, HANIFA RESERVOIR 1/2 LFL: 120 M.
* RIG OUT OF RADIO COVERAGE.

======================== WELL DESIGN =========================


* DRILLED 34" HOLE, 30" CSG @ 120'.
* 28" HOLE, 24" CSG @ 450' (50' INTO RUS).
* 22" HOLE, 18-5/8" CSG @ 2,500' (100 FT INTO LAMS).
* 16" HOLE, 13-3/8" CSG PLANNED @ 4233' (50 FT INTO SHUB).
* 12" HOLE, 9-5/8" CSG PLANNED @ 6,640' (50 FT INTO HITH).
* 8-3/8" HOLE, 7" CSG PLANNED @ 8,840 (300' INTO BUHR).

=========================== SAFETY ==========================


* REPORTED OBSERVATIONS IN SLS: 10.
* REPORTED NM IN SLS: NONE.
* HSE ALERTS: NONE.
* DRILLS: 1X TRIP DRILL.

======================== ARAMCO PERSONNEL ========================


* ME TURKI ALDHAFEERI #8530515 ON LOCATION SINCE 06/09/2024.

====================== DRILLING FLUID RECYCLING ======================


* TOTAL MUD RECEIVED: N/A.
* TOTAL MUD SHIPPED: N/A.

========================== RIG VISIT ==============================


* N/A.
=================SERVICE COMPANY, RENTAL TOOLS & OTHERS ===============
* OES MUD ENGINEER.
* SLB CLOSED LOOP SYSTEM ON LOCATION SINCE 05/22/2024.
* 3 X GECAT VACUUM TANKERS ON LOCATION.
* GHEENA DUMP TRUCK ON LOCATION SINCE 06/05/2023 @ 08:00.
* OILSERV 8" DRLG JAR 6-5/8" REG CONNECTION S/N: HMJ-800-0029 ON 06/09/2024 @08:00.
* SINOPEC 9-1/2" PBL SUB S/N WES950BP255 ON LOCATION SINCE 05/27/2024 @ 20:30, RELEASED ON 06/15/2024.
* SINOPEC 8-1/4" PBL SUB S/N SBM825BP267 ON LOCATION SINCE 06/16/2024 @ 12:00.
* FMC WELL HEAD ENGINEER ON LOCATION SINCE 06/13/2024 @ 15:00, LEFT ON 06/17/2024 @ 18:00.

========================== NEXT LOCATION ==========================


* HABA-15
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 4,106 0.83 156.75 0 4,106 -0.79 1.02 4.23 0

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 3.3 API 0 0 Volts 4.68 9.5 110,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA
125 0 HTHP 91 27 0 9 / 18 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC)

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HABA-14 DEVELOPMENT DRILLING BI-60
Print Date: 06/18/2024 06:22 05/20/2024 - 11/28/2024
Report ID: OPERLMTDMRREP

69 1 14 9 11 / 13 7 280 0

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
70 PCF 0 3.2 API 0 0 Volts 4.68 9 110,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
125 0 HTHP 91 26 0 9 / 17 NCPOL 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 14 9 10 / 12 7 280 0
67

MUD
TREATMENT
BIT DATA
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SEC 12.25 1 1.4 7-5/8" REG 839383
2 Bit Sub RIG 8.125 1 8.125 2.875 3 6 5/8 REG 6 5/8 REG 216 2016018
3 Drillcollar RIG 8.25 12 8.25 2.813 302.39 6 5/8 REG 6 5/8 REG 160 SPRL
DRILL STRING 4 Hydro-Mechanical Jar OJR 8 1 8 17.77 160 HMJ800-0022
5 Drillcollar RIG 8.25 2 8.25 2.813 60.95 6 5/8 REG 6 5/8 REG 160 SPRL
6 Crossover RIG 8.25 1 8.25 2.813 2.6 6 5/8 REG NC50 160 20092195
7 Heavy Weight Drillpipe (HWDP) RIG 5 15 5 3 456.77 NC50 NC50 42.7 CONV
8 Drillpipe RIG 5 0 5 4.276 0 NC50 NC50 19.5 G105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/17/2024 N/A MOPRURATE NA SEAZONAL 2,911 PRETOURE

Company TGC WDS RIG OES SGR RIG ARM OTH MI3 ARM FME

Category CTRG DPDS RIG DFMS MLS OTHR OTHR VAC WMS WSC WHES
PERSONNEL
15 2 56 2 4 12 1 3 4 1 1
Total
AND SERVICES No. of Persons
101
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 13

Operating Hours. 0 0 24 24 24 0 24 24 24 24 4

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 546 N/A N/A 4000

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1403 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:22 03/07/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

SP-167 @ HRDH-1403 Limited Morning Report for 06/18/2024


Objective : (SMART JIMINIAN JR, ALEXANDER RENE / ELZAWAWY, MOHAMED
Foreman(s)
D&WO Morning Report (Service Providers View) COMPLETION REPLACEMENT.) ABDELRAHMAN
Rig Charge #: Engineer AKBAR, KITOS GEMINI
Copyright 2024 Saudi Aramco. All Rights Reserved SP-167 (72-24058-1403) Manager SAAD, SAAD RASHED
Daily Onshore
Wellbores: THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well
0088-216-7 77-13755 +13 576-32 77 /CLERK VSA
Date: Tuesday 06/18/2024 HRDH-1403 (0) HRDH_1403_0
T
+13 576-32 55

Last 24 hr operations Next 24 hr plan


POOH & L/D SUPER MAGNET ASSY, P/U & RIH W/ RAWABI ITCO SPEAR FISHING ASSY, ENGAGED POOH WITH FISH & L/D HALL 9-5/8" PKR, R/U & P/T NESR S/L PCE, RIH & SET INTERWELL PTP,
SAME, POOH WITH PKR & TAIL PIPE. POOH & L/D 4-1/2" TBG, M/U & RIH RAWABI C/O ASSY.
Location Next Location
261 KM FROM DHAHRAN MAIN GATE. HRDH-84
Current Depth (ft) Last Csg MD TVD Liner TOL MD TVD Formation Tops
17,253 Size 7112 7112 Size 6,593 13,303 6,593 Top
Formations Comments
9 5/8 7 Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
17253 (Date) 0 0 261
45.8 (05/03/2024@0800 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

FLOW CHECK AT TOP OF BHA.


0500 - 0530 0.5 0 POST N CT CIRC MPMP RIG 11600 11600
- STATIC LOSSES WHILE FLOW CHECK : 2 BPH.

HPJSM, POOH & L/D RAWABI C/O ASSY


0530 - 0830 3 0 POST N CT HT BHA RIG 11600 11600
- MONITOR WELL ON TRIP TANK, 19 BPH LOSSES.
- COLLECTED 3 KG OF METAL SWARF FROM MAGNETS.

HPJSM, P/U & M/U RAWABI FISHING SPEAR ASSY : 4-1/4" RAWABI TAPER MILL,
XO, 4-1/32" RAWABI SPEAR, 2 EA XO, 6-1/4" BUMPER SUB, 2 EA XO, BIT SUB W/
0830 - 1130 3 0 POST N FISH HT BHA RIG 11600 11600
FLOAT VLV, 6-1/4" RAWABI SUPER FISHING JAR, XO, 12 X 4" HWDP, XO, RAWABI
6-1/4" INTENSIFIER, 15 X 4" HWDP TO 871 FT.
- MONITOR WELL ON TRIP TANK, 25 BPH LOSSES.

RIH W/ 4-1/32" RAWABI FISHING SPEAR ASSY. ON 4" DP AT CONTROLLED SPEED


1130 - 1400 2.5 0 POST N FISH ST STDP RIG 11600 11600 871 6155 WASH DOWN LAST TWO STANDS TILL TAG TOP OF FISH @ 6373 FT.
- FILL UP STRING EVERY 15 STDS.
- MONITOR WELL ON TRIP TANK, 44 BPH LOSSES.
1400 - 1500 1 0 POST N FISH CIRC MPMP RIG 11600 11600
CUMMULATIVE TIME FOR FILL UP STRING & BREAK CIRC.
1500 - 1530 0.5 0 POST N FISH OTH NA RAC 11600 11600
HPJSM, RECORDED P/U & S/O WT, FREE TQ & SET MILLING PARAMETERS.

STARTED MILL DOWN & CLEAR JUNK INSIDE THE TOF FROM 6373' TO 6380'.
1530 - 1700 1.5 0 POST N MILL MILL MILL RAC 11600 11600 6373 6380
ENGAGED GRAPPEL INSIDE FISH, WORK FISH FREE WITH OVER PULL AND GET 25K
ADDED STRING WEIGHT AS A POSITIVE INDICATION FOR RETRIEVING THE FISH.

1700 - 1730 0.5 0 POST N FISH ST STDP RIG 11600 11600 6380 6200 POOH W/4-1/32" RAWABI FISHING SPEAR ASSY WITH OVER PULL AT CONTROLLED
SPEED, RACK BACK 2 STDS.

1730 - 2000 2.5 0 POST N FISH CIRC MPMP RIG 11600 11600 HPJSM, CLOSE BOP, BULLEAD ANNULUS W/ 450 BBLS OF 83 PCF VISCOUS BRINE
@ 3.5 BPM/400 PSI.
2000 - 2030 0.5 0 POST N FISH CIRC MPMP RIG 11600 11600
FLOW CHECK, STATIC LOSSES WHILE FLOW CHECK : 4 BPH.

POOH 5 STD. X 4" D/P W/ 4-1/32" RAWABI FISHING SPEAR ASSY ON 4" D/P AT
2030 - 2230 2 0 POST N FISH ST STDP RIG 11600 11600 6200 5550 CONTROLLED SPEED.
- KEEP FILLING BACKSIDE W/ 83 PCF CACL2 VISCOUS BRINE 60 BPH.

2230 - 2300 0.5 0 POST N FISH CIRC MPMP RIG 11600 11600
FLOW CHECK, TOTAL LOSSES.

POOH W/4-1/32" RAWABI FISHING SPEAR ASSY AT CONTROLLED SPEED TO 3000


2300 - 0130 2.5 0 POST N FISH ST STDP RIG 11600 11600 5550 3000 FT.
- KEEP FILLING BACKSIDE W/ 83 PCF CACL2 VISCOUS BRINE 60 BPH.

0130 - 0330 2 0 POST N FISH CIRC MPMP RIG 11600 11600 HPJSM, CLOSE BOP, BULLEAD ANNULUS W/ 450 BBLS OF 83 PCF VISCOUS BRINE
@ 5 BPM/270 PSI. (HALF WAY ON PULL OUT).
0330 - 0400 0.5 0 POST N FISH CIRC MPMP RIG 11600 11600
FLOW CHECK, WELL ON TOTAL LOSSES.

POOH W/4-1/32" RAWABI FISHING SPEAR ASSY AT CONTROLLED SPEED TO TOP


0400 - 0459 1 0 POST N FISH ST STDP RIG 11600 11600 3000 1500
OF BHA......INC@RT.
- KEEP FILLING BACKSIDE W/ 83 PCF CACL2 VISCOUS BRINE 60 BPH.
Workover Objectives

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HRDH-1403 WORKOVER-1 BI-60
Print Date: 06/18/2024 06:22 03/07/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

Foreman Remarks

> ODF : - 9 FT.


====================================SAFETY===============================================
> HELD TOURLY SAFETY MEETINGS WITH BOTH RIG CREWS.
=================================== PERSONNEL=============================================
> ARAMCO MATERIAL EXPEDITOR ABDULLA ALQAHTANI # 818644 ON LOCATION SINCE 05/16/2024.
=========================CLOSED LOOP SYSTEM================================================
> IMPLEMENTING CLOSED LOOP SYSTEM (RE-ENTRY TYPE), (RIG PROVIDED 4-SIDE BIN), WATER PIT IS USED.
=============================TRUCKS VAC, WATER & GARBAGE=====================================
>14 RAW WATER TANKER ON LOCATION.
>100 BBLS 15% HCL SLB ACID TANK ON LOCATION FROM 29 APRIL.
=============================RIG VISITS====================================================
> NONE.
============================RENTAL TOOLS & EQUIP ============================================
> 2 X 500 BBLS STORAGE TANKERS FOR CLOSED LOOP SYSTEM PROVIDED BY SGS ON LOCATION SINCE 05/05/2024.
> 6-1/2" TAQA HM JAR SN : DJ6-650-536 ON LOCATION SINCE 06/01/2024.
> 4-3/4" TAQA HM JAR SN : DJ6-500-448 ON LOCATION SINCE 06/01/2024.
===============================NEXT LOCATION ==============================================
> HRDH-84 KOM HELD ON 4/4/2024 STRIPPING OUT 100% & LOCATION READINESS 50% (WELL SECURE 4/24/24).
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
83 PCF 0 0 API 0 0 Volts 0 9.8 277,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 83 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 17 0/0 0 0 0
50
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
83 PCF 0 0 API 0 0 Volts 0 9.6 277,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 83 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 17 0/0 0 0 0
52

MUD CAOH2 CACL2-80 XC BCTRN ECCO-TEMP


TREATMENT 6 ( 50LB ) 8 ( 2200L ) 8 ( 50LB ) 5 ( 5GLD ) 5 ( 50LB )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/15/2024 AS NORMAL N/A SESONAL 954 TOURLY
REQUIRED

Company TGC HCO RIG SMI RAC HUD RIG ARM GOC OTH ARM SG2 NSL INW

Category CTRG ICE RIG DFMS WMFE MPD OTHR OTHR PRS VAC WSC WTSE SLS BRCR
PERSONNEL
16 2 58 1 1 3 5 1 1 14 2 1 3 1
Total
AND SERVICES No. of Persons
109
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 12 12

Operating Hours. 0 6 24 12 12 0 12 12 0 6 24 0 0 0

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 0 58 N/A 800

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-944 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:22 06/09/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

SP-229 @ QTIF-944 Limited Morning Report for 06/18/2024


D&WO Morning Report (Service Providers View) Charge #: Objective : (COMPLETE THE Foreman(s)ALOTAIBI, NADER JAZI / ALGURASHI, MOSTAFA ALI
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (61-24012-0944) WELL AS TUBING-LESS Engineer BALHARETH, TURKI MOHAMMED / GHUWAINEM, HIND MAJED
SP-229
DEVIATED CASDED HOLE WASIA Manager BUDAIR, SAAD MOHAMMAD
Daily Onshore
Wellbores: WATER SUPPLY WELL WITH 7"
(0500-0500) Saudi Aramco Well RIG FORMAN VSAT CONTRACTOR /CLERK VSA T
TREE ASSEMBLY)
Date: Tuesday 06/18/2024 QTIF-944 (0) QTIF_944_0 013-673-57 30 013-673-27 43

Last 24 hr operations Next 24 hr plan


POOH LINER RUNNING TOOL, RIH POLISH MILL ASSLY, P/UP 3-1/2" DP & RACK ON DERRICK WHILE CON'D POH L/D 5" DP/HWD, RUN & CEMENT 7" TIE-BACK LINER, HANG UP BOP, SET CSG SLIPS,
WOC, RIH W/POLISH MILL ASSLY & POLISH 7" TOL TBR. POOH L/D 5" DP/HWDP. CHANGE OUT BOPE RAMS, P/T BOP, RIH 6-1/8" C/O ASSY, C/O CMT & FAS-DRILL
Location Next Location
68 KM FROM DMG QTIF-786
Current Depth (ft) Liner TOL MD TVD Formation Tops
4,966 Last Csg Size MD TVD Size Top
9 5/8 4966 4620 Formations Comments
Depth

Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM)
4966 (Date) 100 0 55
5 (06/12/2024@2300 )
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

0500 - 0530 0.5 0 EOW N CSG TO STDP RIG 4966 4966 1300 0 HPJSM. POOH W/ SLB LINER SETTING TOOL.
>> MONITOR WELL ON TRIP TANK, STATIC.

0530 - 0630 1 0 EOW N CSG HT PEL RIG 4966 4966 L/D SLB LINER SETTING TOOL - TOOLS IN GOOD CONDITION.
>> MONITOR WELL ON TRIP TANK, STATIC.
0630 - 0800 1.5 0 EOW N CT CIRC MPMP RIG 4966 4966
P/U AND M/U JETTING SUB. JET & FLASH BOP STACK

0800 - 0900 1 0 EOW N CT HT BHA RIG 4966 4966 P/U, M/U & RIH SLB POLISH MILL & BIT SUB WITH FLOAT.
>> MONITOR WELL ON TRIP TANK, STATIC.

0900 - 1100 2 0 EOW N CT TI SPHDP RIG 4966 4966 0 825 RIH PLISH MILL ASSY ON 5" HWDP TO 825.
>> MONITOR WELL ON TRIP TANK, STATIC.
1100 - 1130 0.5 0 EOW N CT CIRC MPMP RIG 4966 4966
ACCUMULATIVE TIME TO FILL UP STRING WHILE RIH.

HPJSM. P/UP & M/UP 3-1/2" DP IN MOUSE HOLE & RACK SAME ON DERRICK WHILE
1130 - 2130 10 0 EOW N CT LDP SPDP RIG 4966 4966 0 3300 WOC.
>> TOTAL 100 JOINTS OF 3-1/2" DP & 12 JOINTS OF 3-/12" HWDP PICKED UP.
>> MONITOR WELL ON TRIP TANK - STATIC.

2130 - 2300 1.5 0 EOW N CT TI SPHDP RIG 4966 4966 825 1557 RIH POLISH MILL ASSY ON 5" HWDP TO 1557.
>> MONITOR WELL ON TRIP TANK, STATIC.

2300 - 2330 0.5 0 EOW N CT TI STDP RIG 4966 4966 1557 1983 RIH POLISH MILL ASSY ON 5" DP TO TOL AT 1983 FT.
>> MONITOR WELL ON TRIP TANK, STATIC.
2330 - 0030 1 0 EOW N CT CIRC MPMP RIG 4966 4966
ACCUMULATIVE TIME TO FILL UP STRING WHILE RIH.

0030 - 0130 1 0 EOW N CT CIRC MPMP RIG 4966 4966 HPJSM, M/U KELLY WASH DOWN TO TOL @ 1983', SLB SERVICE HAND DRESS &
POLISH 7" LINER PBR, RECIPROCATE STRING UP & DOWN SEVERAL TIMES.

SWEEP HOLE W/ 30 BBLS H.VIS PILL & CHC.


0130 - 0400 2.5 0 EOW N CT CIRC MPMP RIG 4966 4966
>> FLOW CHECK, WELL STATIC.
>> P/T TOL AT 500 PSI - GOOD TEST.

0400 - 0459 1 0 EOW N CT LDP SPDP RIG 4966 4966 1997 1200 POH WITH POLISH MILL ASSY & L/D EXCESS 5" DP/HWDP.....INC @ RT...
>> MONITOR WELL ON TRIP TANK, STATIC.
Workover Objectives
Foreman Remarks

> ODF TO CH= 29'


> RIG FLOOR SP-229 TO CH= 24'
> CORRECTION = 5'
============================ ADJACENT WELLS STATUS =========================
>> NO SIMOPS OPERATION ON SITE P-7B, ( 7 WELLS ADJACENT WELLS).
>> QTIF-944, WATER SUPPLY, WASI RESERVOIR, - WO ONGOING
>> QTIF-885, WATER SUPPLY, WASI RESERVOIR, SHUT-IN. - WO COMPLETED
>> QTIF-884, WATER SUPPLY, WASI RESERVOIR, SHUT-IN. - WO COMPLETED
>> QTIF-887, WATER SUPPLY, WASI RESERVOIR, SHUT-IN. - WO COMPLETED
>> QTIF-943, WATER SUPPLY, WASI RESERVOIR, SHUT-IN.
>> QTIF-886, WATER SUPPLY, WASI RESERVOIR, SHUT-IN.
>> QTIF-888, WATER SUPPLY, WASI RESERVOIR, SHUT-IN.
>> HEADER LINE DE-PRESSURIZED TO ZERO, ALL X-TREE VLV ARE CLOSED.
>> ALL UPSTREAM LINES, HEADER LINES SECURED & BARRICADED.
>> QTIF-62 IS THE RELIEF WELL AND IS LOCATED (N 2964747.98 , E 396037.75 ).
===============================SAFETY====================================
>> HELD DAILY SAFETY MEETING WITH ALL CONCERNED PERSONNEL & PJSM AS REQUIRED.
>> OBB: REPORTED IN SAFE LIFE SYSTEM: 20 X OBB'S.

Saudi Aramco: Confidential Page 1 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR QTIF-944 WORKOVER-1 BI-90
Print Date: 06/18/2024 06:22 06/09/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

>> DRILLS :1X H2S


==============================ARAMCO POB=================================
- MOHAMMED ALKHALIFAH #821399 MATERIAL EXPEDITOR ON LOCATION SINCE JUNE 10TH, 24
============================DIESEL CONSUMPTION=======================
>> DIESEL CONSUMPTION FOR ENGINES (RIG + CAMP) = (DAILY: 24.88 BBL/CUMMULATIVE FOR CURRENT WELL: 183.09 BBLS).
============================= TRUCKS VAC, WATER & GARBAGE =====================
>> 3 RAW WATER TANKER ON LOCATION
>> 2 VACCUM TANKER ON LOCATION.

===============================RENTAL TOOLS & EQUIP ==========================


- WFD 24 JTS 5" HWDP (DRSS# 1004267345) ON LOCATION FROM 4-APR-24
- WFD 5" DRILL PIPE ELEVATOR SN# 879584 (DRSS# 1004267345) ON LOCATION FROM 4 APR-2024.
- WFD 10 FT PUP JTS 5" DRILL PIPE SN# 1364713 (DRSS# 1004267345) ON LOCATION FROM 4 APR-2024.
- WFD 5 FT PUP JTS 5" DRILL PIPE SN# 1364690 (DRSS# 1004267345) ON LOCATION FROM 4 APR-2024.
- WFD 5" DRILL PIPE SLIPS SN# S-1295477 (DRSS# 1004269940) ON LOCATION FROM 5 APR-2024.
- SLB 4-3/4" DRILLING JAR SN#02130K (DRSS# 3000140561) ON LOCATION SINCE 12 JUNE-2024.
- WFD VERTICAL FLARE STACK ON LOCATION SINCE 06/12/2024 AS PER RA REVISION # 1 DUE TO LOCATION LIMITATION AND ELECTRICAL POWER LINE.
===============================-NEXT LOCATIONS ==============================
>> QTIF-786 KOM HELD ON 12/07/2023, STRIP OUT 100% & LOCATION 80%.
>> QTIF-788 KOM HELD ON 12/07/2023, STRIP OUT 90% & LOCATION 40%.
>> QTIF-106 KOM HELD ON 05/29/2024, STRIP OUT 0% & LOCATION 0%.
DAILY SURVEY
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
76 PCF 0 0 API 0 0 Volts 0 9.5 160,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 98 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 2 0/0 0 0 0
30
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
76 PCF 0 0 API 0 0 Volts 0 10 160,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
120 0 HTHP 98 0 0 0/0 WBM-CAC 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 2 0/0 0 0 0
30

MUD CACL2-80
TREATMENT 6 ( 2200L )

BIT DATA
DRILL STRING Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/15/2024 AS PER NORMAL N/A SEASONAL 4,168 PJSM / PRE-TOUR
SCHEDULE

Company OTH RIG OES ASH RUE SLH BCM OTH ARM WWW

Category CTRG RIG DFMS FLD H2S LHES PCS VAC WSC WTSE
PERSONNEL
16 53 1 3 1 1 4 2 2 1
Total
AND SERVICES No. of Persons
84
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 12 12 12 24 0 0 24 0

Standby/Tankers Others Others Others


TRUCKS/BOATS
PICK UP DH-7484 1 X RIG SP-229 AMBULANCE GASOLINE-70 BBLS CAMP DIESEL: 76 BBLS

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 92 21 108 900

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 2 of 2


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HMYM-512602 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 06/01/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

SP-257 @ HMYM-512602 Limited Morning Report for 06/18/2024


Objective : (PART OF Foreman(s)ALIYEV, AYAZ RASIM OGLU / ALSALEEM, AHMED KHALIFAH
D&WO Morning Report (Service Providers View) Rig Charge #: HORIZONTAL DEVELOPMENT Engineer LE, VIET QUOC / ALHAJRI, NORAH MOHAMMED
Copyright 2024 Saudi Aramco. All Rights Reserved SP-257 (87-24710-8131) DRILLING IN JAFURAH Manager BIN LEBDAH, SALMAN FAISAL
Daily Onshore BASIN.) THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well Wellbores: 0088216777 12813 572-6641 /CLERK VSA
Date: Tuesday 06/18/2024 HMYM-512602 (0) HMYM_512602_0 T
572-8166

Last 24 hr operations Next 24 hr plan


POOH & LD 8-1/2" SLB BHA. RETRIEVE WB, JET WELLHEAD,RU BAKER 5-1/2" CSG RUNNING EQUIP W/CRT, DUMMY RUN FMH, RUN 5-1/2"
CSG, 1ST DRIFT, RUN 5-1/2" CSG, LAND FMH, 2ND DRIFT RUN.
Location Next Location
TAKE HALF MOON ROAD, TURN RIGHT THROUGH BRIDGE TOWARD HUFFUF THEN TURN LEFT THROUGH 22KM SKID ROAD. HMYM-512612
Current Depth (ft) Liner TOL MD TVD Formation Tops
18,637 Last Csg Size MD TVD Size Top
9 5/8 7439 7439 Formations Comments
Depth
DMMM 444 5' SHALLOW
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 743 7' DEEP
18637 (Date) 100 0 96 UMER 1,231 3' DEEP
15.2 (06/03/2024@0100 ) ARUM 2,404 10' DEEP
LAMS 2,481 2' DEEP
AHMD 5,004 1 SHALLOW
SFNY 5,663 6' DEEP
SHUB 6,158 4' SHALLOW
BYDH 6,498 10' DEEP
MDTM 7,401 8' DEEP
SULY 7,893 3' DEEP
HITH 8,392 6' DEEP
ABAR 8,835 4' SHALLOW
ABBR 8,941 1 DEEP
ABCR 9,028 3' SHALLOW
ABDR 9,203 0
JUBL 9,357 4' DEEP
JBSR 10,005 4' DEEP
HNIF 10,254 7' DEEP
HNFA 10,311 9'DEEP
HNFB 10,340 10' DEEP
HNFC 10,388 12' DEEP
HNFD 10,414 13' DEEP
TQMA 10,438 17' DEEP
TQMB 10,453 16' DEEP
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End
0500 - 0530 0.5 0 8 1/2 N DRLG TO STDP RIG 18637 18637 18050 17760
POOH WITH 8-1/2" NEOSTEER BHA ON 5-1/2" DP IN OPEN HOLE.
0530 - 0545 0.25 0 8 1/2 N DRLG CIRC MPMP RIG 18637 18637
FLOW CHECK (STATIC).

0545 - 1300 7.25 0 8 1/2 N DRLG TO STDP RIG 18637 18637 17760 11480 POOH WITH 8-1/2" NEOSTEER BHA ON 5-1/2" DP IN OPEN HOLE.
* BACKREAM INTERVAL = 16448'-16336'.
1300 - 1330 0.5 0 8 1/2 N DRLG CIRC MPMP RIG 18637 18637
CIRCULATE HOLE CLEAN AT LANDING POINT.
1330 - 1345 0.25 0 8 1/2 N DRLG CIRC MPMP RIG 18637 18637
FLOW CHECK (STATIC).

1345 - 1630 2.75 0 8 1/2 N DRLG TO STDP RIG 18637 18637 11480 9457 POOH WITH 8-1/2" NEOSTEER BHA ON 5-1/2" DP IN OPEN HOLE.
* BACKREAM INTERVAL = 10609'-10525'.
1630 - 1745 1.25 0 8 1/2 N DRLG BR STRG RIG 18637 18637 9457 9200
PRECAUTIONARY BACKREAMING PER PROGRAM TO ABOVE ARAB-D.

1745 - 2300 5.25 0 8 1/2 N DRLG BR STRG RIG 18637 18637 9200 7400 BACKREAM OUT OF HOLE WITH 8-1/2" SLB NEOSTEER RSS BHA ON 5-1/2" DP IN
VERTICAL SECTION.

2300 - 2330 0.5 0 8 1/2 N DRLG CIRC MPMP RIG 18637 18637 FLOW CHECK (STATIC).
> PUMP SLUG.
2330 - 0245 3.25 0 8 1/2 N DRLG TO STDP RIG 18637 18637 7400 420
POOH W/ 8-1/2" NEOSTEER BHA ON 5-1/2" DP IN 9-5/8" CSG.
0245 - 0300 0.25 0 8 1/2 N DRLG CIRC MPMP RIG 18637 18637
FLOW CHECK (STATIC).

0300 - 0345 0.75 0 8 1/2 N DRLG TO STHDP RIG 18637 18637 420 116 TOOH W/ 8-1/2" NEOSTEER BHA ON 5-1/2" HWDP IN 9-5/8" CSG.
> L/D DRILLING JAR.
0345 - 0430 0.75 0 8 1/2 N DRLG HT BHA SDM 18637 18637
L/D 8-1/2" SLB BHA, MWD/RSS ,THRUSTER, PBL SUB & BIT.
0430 - 0459 0.5 0 EOW C WH RTRV WBSH IWS 18637 18637
PJSM, M/U CIW WBRT & RETRIEVE WEAR BUSHING.
Foreman Remarks

HMYM-512602 IS THE 3RD SLOT ON HMYM-5126 PAD TO BE DRILLED BY RIG SP-257 AS A HORIZONTAL DEVELOPMENT TIGHT GAS WELL
TARGETING TUWAIQ MOUNTAIN SOURCE ROCKS RESERVOIR B (TQMB) BELOW THE HIGH GR ZONE. THE WELL IS PLANNED TO LAND AT +/- 21
FT. INSIDE TQMA FORMATION AND DRILL TO TD OF 18,470 FT. (MD)/ 10,490 FT. (TVD) WITH A TOTAL LATERAL LENGTH OF +/- 7,142 FT AT

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HMYM-512602 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 06/01/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

347 DEGREE AZIMUTH. THE WELL WILL BE COMPLETED WITH 5 1/2'' CEMENTED LONG STRING MONO-BORE COMPLETION. THE TOTAL
PLANNED DURATION FROM SPUD TO RIG RELEASE IS 19 DAYS.
================================================================================================
**JOURNEY MANAGEMENT**
PRIOR TO SKID ROAD ALL MUST CALL ARAMCO CLERK @ 013-572-8166.
PROVIDE NAME OF COMPANY, NUMBER OF PERSONNEL, COLOR OF VEHICLE & EMERGENCY CONTACT.
NIGHT DRIVING IS NOT RECOMMENDED & SPECIAL PRECAUTIONS MUST BE FOLLOWED.
=========================================================================================
DIRECTION TO HMYM-5126 PAD:
1-TRAVEL 70KM FROM HOFUF TOWARDS HMYM AND TURN RIGHT AT HMYM SKID ROAD.
2-FROM BLACKTOP TRAVEL TO 10 KM ODOMETER READING.
3-TAKE RIGHT AT RIG SIGN TO RIG LOCATION.
=========================================================================================
MATERIAL EXPIDITOR HAMED ALOTAIBI # 8606816 ON LOCATION SINCE 06/05/2024.
ARAMCO PDP MOHAMMED A ALDHAFEERI # 8641799 ON LOCATION SINCE 06/06/2024.
ARAMCO MATERIAL EXPEDITOR BASEL DHFIRI # 8553614 ON LOCATION SINCE 06/12/2024.
ARAMCO PDP ALOTAIBI, FAISAL N #828254 ON LOCATION SINCE 06/13/2024.
=========================================================================================
>1 X WATER SPRAYER TANKER.
>UR WCO FLOW METER SN# 09231978 INSTALLED.
> WATER SERVICES INCLUDING PUMPS AND FLEXIBLE HOSES PROVIDED BY UR WCO&PED SERVICES (COMPLETIONS) FROM FWP-5 FRAC POND. FWP-5 FILLED FROM MULTIPLE WATER WELLS.
=========================================================================================
NEXT CASING POINT : 5-1/2'' @ +/- 18582 FT MD , (10441 FT TVD).
=========================================================================================
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 18,637 90 347 0 10,425 2441.35 -740.46 8,369.98 1.06

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
105 PCF 1 0 API 55 670 Volts 12.2 0 37,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 3.6 HTHP 13 22 0 13 / 16 OBM 1.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 24 32 10 / 12 0 0 5.6
60
MUD DATA
Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
105 PCF 1 0 API 55 695 Volts 12.2 0 37,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
100 3.6 HTHP 13 21 0 13 / 16 OBM 1.6
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 24 32 10 / 12 0 0 5.8
60

MUD BARITE DURATONE KDP-82


TREATMENT 15 ( 5000L ) 28 ( 50LB ) 2 ( 5GL )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
5 7,458 18,637 DP Av DC Av Bit HHP 50 180 M423 8.5 SMT
Pressure GPM Jet Vel 291.79 N/A 316 I-Row O-Row DC Location Bearings
4,000 500 297 1 1 WT G X
BIT DATA
Serial Number Type Jets TFA
SM3572 MDSI516PIPC 5 x 9 / 3 x 10 / 0.541
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 73 220 240 230 25,000 0
DRILL STRING Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/09/2024 N/A NORMAL NA SEASONAL 1,413 2 X PRETOUR

Company TGC SDM RIG BAR SNS RIG ARM SJC OTH ARM CRW CAM QEM BCR

Category CTRG DPDS RIG DFMS H2S OTHR OTHR PCS VAC WSC WBCS WHES SLS CSR
PERSONNEL
14 2 59 7 1 3 4 3 1 3 1 2 3 4
Total
AND SERVICES No. of Persons
107
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 12 12 12 0 11 24 0 0 0 0

Standby/Tankers
TRUCKS/BOATS
N/A

BULK Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HMYM-512602 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 06/01/2024 - 06/23/2024
Report ID: OPERLMTDMRREP

N/A N/A 441 305 79 3600

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HZEM-182014 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 05/31/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

SP-258 @ HZEM-182014 Limited Morning Report for 06/18/2024


Objective : (GAS Foreman(s)HALZA, AHMED RASHED / TRIFI, ABDELKADER
D&WO Morning Report (Service Providers View) Charge #: UNCONVENTIONAL/DEVELOPMENT) Engineer LE, VIET QUOC
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (87-24541-8117) Manager JAHDALI, OMAR HAMEED
SP-258
Daily Onshore THURAYA RIG FORMAN VSAT RIG FORMAN VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 1066 577-9650 577-9651
Date: Tuesday 06/18/2024 HZEM-182014 (0) HZEM_182014_0 CONTRACTOR /CLERK VSA T
577-9671

Last 24 hr operations Next 24 hr plan


RSS DRILL 8.5" CURVE & LATERAL SECTIONS. RSS DRILL 8.5" LATERAL SECTION, CHC.
Location Next Location
166 KM F/DMG. FROM HOFUF 68 KM ON SALWA RD, TURN RIGHT FOR 33 KMS ON B/T, TURN RIGHT FOR 40 KM SKID HZEM-182002
Current Depth (ft) Liner TOL MD TVD Formation Tops
14,354 Last Csg Size MD TVD Size Top
9 5/8 7637 7637 Formations Comments
Depth
DMMM 741 4 FT SHALLOWER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 1,013 3 FT SHALLOWER
11357 (Date) 97 2,997 166 UMER 1,402 1 FT SHALLOWER
16.9 (06/01/2024@0700 ) ARUM 2,663 1 FT DEEPER.
LAMS 3,245 4 FT SHALLOWER.
AHMS 4,830 6 FT DEEPER
SFNY 5,595 1 FT SHALLOWER
SHUB 6,298 1 FT DEEPER
BYDH 6,633 2 FT SHALLOWER
MDTM 7,588 3 FT DEEPER
SULY 8,131 AS PER PROGNOSIS.
HITH 8,695 6 FT DEEPER
ABAR 9,151 3 FT SHALLOWER
ABBR 9,261 3 FT SHALLOWER
ABCR 9,342 5 FT SHALLOWER
ABDR 9,526 3 FT SHALLOWER
JUBL 9,687 1 FT SHALLOWER
JBSR 10,507 3 FT SHALLOWER
HNIF 10,614 9 FT SHALLOWER
HNFA 10,643 9 FT SHALLOWER
HNFB 10,662 9 FT SHALLOWER
HNFC 10,712 10 FT SHALLOWER
HNFD 10,740 8 FT SHALLOWER
TQMA 10,745 12 FT SHALLOWER
TQMB 10,756 13 FT SHALLOWER
Major Resp. Hole depth Event depth
(From - To) Hrs Lateral Phase Cat. Action Object Summary of Operations
OP Co Start End Start End

SLB NEOSTEER DRILL 8-1/2" CURVE SECTION WITH 90 PCF OBM AND 95%
CIRCULATION.
0500 - 0630 1.5 0 8 1/2 N DRLG D RSS SDM 11357 11470 > DOWNLINK AS REQUIRED.
> PUMP DRILL AND SEAL EVERY STAND.
> AT DEPTH 11,460' LOSSES INCREASED FROM 32 BBL/HR TO 250 BBL/HR AT
480 GPM & 180 BBL/HR AT 400 GPM.

0630 - 0815 1.75 0 8 1/2 N DRLG TO STDP RIG 11470 11470 11470 10785 POH WITH 8-1/2" RSS BHA IN OPEN HOLE ON ELEVATOR
PUMP 1 BPM 90 PCF OBM AS MUD CAP DOWN ANNULUS.

CHC AND EVALUATE DYNAMIC LOSSES. 65 BBL/HR.


0815 - 0845 0.5 0 8 1/2 N DRLG CIRC MPMP RIG 11470 11470
> DECISION MADE TO RESUME DRILLING.

0845 - 0930 0.75 0 8 1/2 N DRLG TI STDP RIG 11470 11470 10785 11470 RIH WITH 8-1/2" RSS BHA IN OPEN HOLE ON ELEVATOR TO BOTTOM. REAM
DOWN LAST STAND.
0930 - 1030 1 0 8 1/2 N DRLG CIRC MPMP RIG 11470 11470
SLB DD PERFORMED DOWNLINK.

SLB NEOSTEER DRILL 8-1/2" CURVE SECTION WITH (90-91) PCF OBM AND 93-95
% CIRCULATION. FLOW RATE : 480 GPM.
1030 - 1330 3 0 8 1/2 N DRLG D RSS SDM 11470 11684
> DOWNLINK AS REQUIRED.
> PUMP DRILL AND SEAL EVERY STAND.
> LP AT 11,684' MD, 10,765.66' TVD.

SLB NEOSTEER DRILL 8-1/2" LATERAL SECTION WITH 91 PCF OBM AND 93-95 %
CIRCULATION. FLOW RATE : 420 GPM.
1330 - 2345 10.25 0 8 1/2 N DRLG D RSS SDM 11684 13480
> DOWNLINK AS REQUIRED.
> PUMP DRILL AND SEAL EVERY STAND.

2345 - 0015 0.5 0 8 1/2 N DRLG RR TDS RIG 13480 13480


SERVICE TDS.

SLB NEOSTEER DRILL 8-1/2" LATERAL SECTION WITH 91 PCF OBM AND 95-97 %
0015 - 0459 4.75 0 8 1/2 N DRLG D RSS SDM 13480 14354 CIRCULATION. FLOW RATE : 420 GPM.
> DOWNLINK AS REQUIRED.
> PUMP DRILL AND SEAL EVERY STAND.
Foreman Remarks

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HZEM-182014 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 05/31/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

WELL OBJECTIVE:HZEM-182014 IS THE 2ND SLOT ON PAD HZEM-1820 TO BE DRILLED BY RIG SP-258 AS A HORIZONTAL DEVELOPMENT TIGHT GAS WELL
TARGETING TUWAIQ MOUNTAIN SOURCE ROCKS RERSERVOIR B (TQMB) BELOW THE HIGH GR ZONE. THE WELL IS PLANNED TO LAND AT
+/- 17 FT. INSIDE TQMA FORMTION AND DRILL TO TD OF 18,463 FT. (MD)/ 10,746 FT. (TVD) WITH A TOTAL LATERAL LENGTH OF 6,831
FT AT 167 DEGREE AZIMUTH. THE WELL WILL BE COMPLETED WITH 5-1/2" CEMENTED LONG STRING MONO-BORE COMPLETION. THE
TOTAL PLANNED DURATION FROM SPUD TO RIG RELEASE IS 20 DAYS.
================================================================
JOURNEY MANAGEMENT:
CALL SP-258 RIG MANAGER OFFICE AT 013-867-6865 OR ARAMCO OFFICE AT 013-577-9650 PRIOR TO TURNING OFF MAIN BLACK TOP ROAD.PROVIDE RIG OFFICE,NAME OF THE
COMPANY,NUMBER OF PERSONNEL,COLOR OF VEHICLE AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL.NIGHT DRIVE IS NOT RECOMMENDED.
================================================================
>> ARAMCO MATERIAL EXPEDITOR ALI ALKHALDI # 8611077 ON LOCATION SINCE 06/15/2024.
>> ARAMCO MATERIAL EXPEDITOR KHALAF #8505683 ON LOCATION SINCE 06/6/2024.
>> ARAMCO FOREMAN SAMUEL OLUWAFEMI #902054 ON LOCATION SINCE 05/22/2024.
================================ WATER CONSUMPTION PROVIDED BY ALG WATER TANK ====================================
> WATER SERVICES INCLUDING PUMPS AND FLEXIBLE HOSES PROVIDED BY ALG 80K BBL WATER TANK. ALG TANK IS FILLED FROM WATER WELLS HZEM-807/HZEM-845
================================================================
CASING POINTS :
PLANNED ACTUAL

- 24" CSG : 575' 575'


- 18-5/8'' CSG : 1045' 1,061'
- 13-3/8" CSG : 5010' 4,883'
- 9-5/8" CSG : 7696' 7,637'
- 5-1/2" CSG : 18416'
================================================================
DRILLS:2X PIT DRILL
NEAR MISS : 2X SLS 7236785, 7236803
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 11,397 81.94 147.73 91 10,746 -229.76 223.17 1,050.84 5.66
0 11,492 84.62 151.66 95 10,757 -254.58 237.67 1,142.64 4.98
0 11,589 87.43 155.73 97 10,764 -281.01 250.74 1,235.6 5.09
0 11,681 90.1 160.35 92 10,766 -307 261.21 1,322.48 5.8
0 11,772 90.17 163.95 91 10,765 -333.4 269.72 1,406.95 3.96
0 11,864 90.08 166.52 92 10,765 -360.51 276.86 1,491.32 2.8
0 11,957 90.31 166.17 93 10,765 -388.06 283.55 1,576.82 0.45
0 12,044 90.55 166.74 87 10,764 -413.84 289.76 1,657.47 0.71
0 12,129 90.41 167.89 85 10,763 -439.11 295.45 1,736.4 1.36
0 12,221 90.85 167.58 92 10,762 -466.51 301.41 1,822.21 0.59
0 12,315 90.92 168.02 94 10,761 -494.51 307.46 1,910.44 0.47
0 12,395 90.82 168.23 80 10,760 -518.37 312.48 1,985.79 0.29
0 12,491 90.69 167.9 96 10,758 -547 318.53 2,076.71 0.37
0 12,593 90.72 167.2 102 10,757 -577.35 325.23 2,174.06 0.69
DAILY SURVEY
0 12,664 90.02 166.62 71 10,757 -598.43 330.13 2,242.3 1.28
0 12,766 90.27 167.43 102 10,756 -628.72 337.11 2,340.55 0.83
0 12,903 90.6 167.99 137 10,755 -669.52 346 2,472.59 0.47
0 13,029 90.41 167.58 126 10,754 -707.06 354.13 2,594.43 0.36
0 13,164 90.52 167.95 135 10,753 -747.27 362.85 2,725.41 0.29
0 13,258 90.31 167.05 94 10,753 -775.24 369.05 2,816.93 0.98
0 13,394 90.39 166.24 136 10,752 -815.57 378.62 2,950.04 0.6
0 13,534 90.37 165.06 140 10,751 -856.91 389.2 3,087.78 0.84
0 13,683 90.47 163.84 149 10,750 -900.66 401.37 3,235.07 0.82
0 13,801 90.95 164.84 118 10,748 -935.29 411.08 3,351.85 0.94
0 13,899 91.21 164.06 98 10,746 -964.06 419.09 3,448.86 0.84
0 13,998 90.28 164.24 99 10,745 -993.09 427.33 3,547 0.96
0 14,104 90.27 166.02 106 10,745 -1024.31 435.62 3,651.88 1.68
0 14,240 90.12 166.79 136 10,744 -1064.6 445.36 3,786.1 0.58
0 14,334 90.26 167.67 94 10,744 -1092.54 451.7 3,878.73 0.95

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
91 PCF 0.25 0 API 60.2 560 Volts 7.1 0 45,500
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
160 4 HTHP 18 17 0 8 / 10 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 14 21.8 8/9 0 22,400 0
49

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
91 PCF 0.25 0 API 60.4 480 Volts 6.7 0 45,000
MUD DATA
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
160 4.8 HTHP 18 15 0 7/9 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 12 21.6 7/8 0 22,400 0
46

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
90 PCF 0.25 0 API 61.7 620 Volts 6.9 0 46,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
150 4 HTHP 17 17 0 8 / 11 OBM 0

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HZEM-182014 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 05/31/2024 - 06/22/2024
Report ID: OPERLMTDMRREP

Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 13 21.3 8/9 0 22,400 0
49

BARITE GELTONE WELL-SEAL M STELSL400 MICA-FINE MRBL-M CAOH2


64 ( 5000L ) 161 ( 50LB ) 100 ( 55LB ) 100 ( 50LB ) 200 ( 50LB ) 4 ( 2200L ) 317 ( 25KG )
MUD DURATONE BAROFIBRS RM-63 BARITE SOURSCAV CACL2-80 INVERMUL
TREATMENT 440 ( 50LB ) 224 ( 25LB ) 2 ( 55GL ) 1,520 ( 100LB ) 24 ( 25KG ) 19 ( 2200L ) 21 ( 55GL )
EZ-MUL SOLFLKM
30 ( 55GL ) 100 ( 55LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
7 7,652 14,354 DP Av DC Av Bit HHP 35 170 M423 8.5 SMT
Pressure GPM Jet Vel 245.1 N/A 165 I-Row O-Row DC Location Bearings
1,840 420 250 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
SM3499 MDSI516PIPC 5 x 9 / 3 x 10 / 0.541
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 77.2 276 285 270 19,850 31.3
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 8.5 1 0.65 SM3499
2 RSS SDM 6.75 1 6.75 2.5 13.04 4-1/2" IF 4-1/2" REG 1 NP69023
3 Shock Sub CDS 6.75 1 6.75 2.25 20.56 4-1/2" IF 4-1/2" IF 1,450 MT6-675-044
4 Power & Communication Sub SDM 6.906 1 6.906 3.1 0.915 4 1/2 REG 5 1/2 FH 1 MNB57383-05
5 Saver Sub SDM 6.906 1 6.906 2.875 1.26 5 1/2 FH 5 1/2 FH 1 14007
DRILL STRING 6 Saver Sub SDM 6.906 1 6.906 2.875 1.16 5 1/2 FH 5 1/2 FH 1 NTS-34586
7 Measurement While Drilling (MWD) SDM 8 1 8 25.14 5-1/2" FH 5-1/2" FH 201 8306358
8 Saver Sub SDM 6.781 1 6.781 3 1.64 NC50 5 1/2 FH 1 GTF-5148-1-
9 Non Magnetic Drill Collar ( NMDC ) SDM 6.75 1 6.75 2.5 27.36 NC50 NC50 1 SPRL SDT15917
10 Float Sub SDM 7.125 1 7.125 2.875 2.98 NC50 NC50 1 OFS13618
11 Float Sub SDM 6.812 1 6.813 2.875 1.73 NC50 NC50 1 ITS341286
12 FIlter Sub SDM 6.812 1 6.813 2.75 5.91 NC50 NC50 1 675-1010
13 PBL (Multiple Activation By Pass) CRW 6.78 1 18.19 NC50 NC50 1 DVBA-0230
14 Crossover RIG 6.5 1 6.5 2.875 2.67 NC50 XT54 1 19102856
15 Heavy Weight Drillpipe (HWDP) RIG 5.5 3 5.5 3.25 91.43 XT54 XT54 52 CONV ON FILE
16 Hydro-Mechanical Jar NOJ 6.5 1 6.5 2.75 32.3 XT54 XT54 1,300 474-651676
17 Heavy Weight Drillpipe (HWDP) RIG 5.5 6 5.5 3.25 182.65 XT54 XT54 54 CONV ON FILE
18 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 XD105 PREMIUM ON FILE

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS
06/09/2024 N/A NORMAL N/A HOT 1,245 DAILY X 2

Company TGC SDM RIG BAR SNS RIG ARM SJC OTH OTH ARM CRW

Category CTRG DPDS RIG DFMS H2S OTHR OTHR PCS RENT VAC WSC WBCS
PERSONNEL
14 2 59 11 1 2 2 3 3 1 3 1
Total
AND SERVICES No. of Persons
102
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 24 24 24 12 12 12 0 12 10 24 12

Standby/Tankers
TRUCKS/BOATS
DH7560

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 307 108 65 4650

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HMYM-512414 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 05/26/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

SP-259 @ HMYM-512414 Limited Morning Report for 06/18/2024


Objective : (HORIZONTAL Foreman(s)NECIRI, MOHAMMED TAHAR / FRANKS, BRIAN EDWARD
D&WO Morning Report (Service Providers View) Charge #: DEVELOPMENT TIGHT GAS Engineer YIN, GUOQIANG / ALGHAMDI, AHMED JAMAL
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (87-24710-8133) WELL) Manager BIN LEBDAH, SALMAN FAISAL
SP-259
Daily Onshore THURAYA RIG FORMAN VSAT OTHER VSAT
(0500-0500) Saudi Aramco Well Wellbores: +882167771 2753 572-4207 572-5434
Date: Tuesday 06/18/2024 HMYM-512414 (0) HMYM_512414_0 CONTRACTOR /CLERK VSA T
572-6932

Last 24 hr operations Next 24 hr plan


CONTINUE FREEZE WELLHEAD SECTION, TEST FREEZE PLUG INTEGRITY, PUMP FW INTO CASING CONTINUE FREEZE WELLHEAD SECTION, TEST FREEZE PLUG INTEGRITY
Location Next Location
TAKE HALF MOON ROAD, TURN RIGHT THROUGH BRIDGE TOWARD KHUFFUF THEN TURN LEFT THROUGH 20KM SKID ROAD. HMYM-512402
Current Depth (ft) Liner TOL MD TVD Formation Tops
18,645 Last Csg Size MD TVD Size Top
9 5/8 7459 7459 Formations Comments
Depth
DMMM 451 2 FT SHALLOWER.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 750
18645 (Date) 100 0 97 UMER 1,261 2' DEEPER
21.5 (05/27/2024@1600 ) ARUM 2,585 1 FT DEEPER.
LAMS 2,655 2 FT DEEPER.
AHMD 5,000 1' DEEPER
SFNY 5,686 6 FT DEEPER.
SHUB 6,162 1' DEEPER
BYDH 6,510 8' DEEPER
MDTM 7,409
SULY 7,915 3' SHALLOWER
HITH 8,423 2' SHALLOWER
ABAR 8,861 1' DEEPER
ABBR 8,962 1' DEEPER
ABCR 9,054 2' DEEPER
ABDR 9,229 1' DEEPER
JUBL 9,392 5' DEEPER
JBSR 10,034 3' DEEPER
HNIF 10,280 8' DEEPER
HNFA 10,337 6' DEEPER
HNFB 10,363 6 FT DEEPER
HNFC 10,409 4' DEEPER
HNFD 10,433 5' DEEPER
TQMA 10,453 6 FT DEEPER
TQMB 10,470 7' DEEPER

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End

WILD WELL CONTROL (WWC) CREATED N2 CRYOGENIC FREEZE


PLUG TO ISOLATE 9-5/8" X 5 1/2'' TCA.
0500 - 0700 2 0 EOW C FISH OTH NA WWC 18645 18645 TF 934743
> GOOD INDICATION OF FREEZE PLUG FORMING.
> TEMPERATURE SENSOR READINGS: UPPER = 18 DEG F,
MIDDLE = -137 DEG F, LOWER = -42 DEG F.

HPJSM, PERFORM PRESSURE TEST AS FOLLOW:


> FREEZE PLUG INTEGRITY TEST FROM TCA SIDE TO 300
0700 - 0800 1 0 EOW C FISH OTH NA WWC 18645 18645 TF 934743
PSI/5MINS, HOLDING. PRESSURE TESTED UP TO 1000 PSI,
DROPPED TO 150 PSI ALL OF SUDDEN.

WWC CREATED N2 CRYOGENIC FREEZE PLUG TO ISOLATE 9-


5/8" X 5 1/2'' TCA.
0800 - 1100 3 0 EOW C FISH OTH NA WWC 18645 18645 TF 934743 > GOOD INDICATION OF FREEZE PLUG FORMING.
> TEMPERATURE SENSOR READINGS: UPPER = 19 DEG F,
MIDDLE = -140 DEG F, LOWER = -50 DEG F.
> SWAP N2 TANK

HPJSM, PERFORM PRESSURE TEST TCA AGAINST FREEZE PLUG


AS FOLLOW:
>LOW PRESSURE TESTED TO 300 PSI/5 MINS, HIGH PRESSURE
TESTED TO 1000 PSI/10MINS. - OK.
> MONITOR PRESSURES DURING FREEZE: TCA ABOVE ICE PLUG :
1100 - 1200 1 0 EOW C FISH OTH NA WWC 18645 18645 TF 934743 90 PSI, TBG: 0 PSI.
>FREEZE PLUG INTEGRITY TEST INSIDE CASING TO 350 PSI
DROPPED TO 150 PSI ALL OF SUDDENLY.
> TOTAL VOLUME PUMPED 3.8BBL, BLEED OFF, GOT 2.0 BBL
RETURN, 1.8 BBLS LEFT IN THE HOLE.
> OBSERVED 140 PSI IN TCA ON UNI HEAD.

1200 - 2100 9 0 EOW C FISH OTH NA WWC 18645 18645 TF 934743 WWC CONTINUE TO CREATE N2 CRYOGENIC FREEZE PLUG TO
ISOLATE 9-5/8" X 5 1/2'' TCA, 5-1/2" CASING.

HPJSM, PERFORM PRESSURE TEST CASING AGAINST FREEZE


2100 - 0000 3 0 EOW C FISH OTH NA WWC 18645 18645 TF 934743
PLUG AS FOLLOWS:
>LOW PRESSURE TESTED TO 270 PSI, PRESSURE DROPPED TO

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HMYM-512414 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 05/26/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End
170 PSI ALL OF SUDDEN. BLED OFF.
>ISOLATE AND TEST SURFACE LINES TO VERIFY PRESSURE
INTEGRITY.
>LOW PRESSURE TESTED TO 380 PSI, PRESSURE DROPPED TO
230 PSI ALL OF SUDDEN. BLED OFF THE PRESSURE FROM
CASING. OBSERVED SOME OIL FLOWER IN RETURNS.

RINSE AND FLUSH CMT TANK AND SURFACE LINES WITH FW.
PUMP 5 BBLS FW @ 0.4 BPM, 650 PSI MAX PRESSURE TAKING
OBM RETURNS THROUGH SIDE OUTLET.
> SHUT DOWN, WITH 600 PSI TRAPPED PRESSURE ON CMT
0000 - 0400 4 0 EOW C FISH OTH NA WWC 18645 18645 TF 934743 PUMP, BLEED OFF, 2.4 BBLS FW TO CMT TANK, SOME OIL
FLOWERING.
> OBSERVED 450 PSI ON TCA (ABOVE ANNULUAR ICE PLUG).

WWC CONTINUE TO CREATE N2 CRYOGENIC FREEZE PLUG TO


ISOLATE 9-5/8" X 5 1/2'' TCA, 5-1/2" CASING.
> MONITOR PRESSURES DURING FREEZE: TCA ABOVE ICE PLUG :
0400 - 0459 1 0 EOW C FISH OTH NA WWC 18645 18645 TF 934743
160 PSI, TBG: 0 PSI.
> TEMPERATURE SENSOR READINGS: UPPER = 23 DEG F,
MIDDLE = -100 DEG F, LOWER = -24 DEG F.
> DAILY/TOTAL N2 CONSUMPTION: 3125/6125 GAL.
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
13 Jun 2330 24 125.5 934743 TF FOT SLIPS ITS 16437 OBSERVED RESTRICTION WHILE RUNNING
CASING. NOTICED ONE OF THE 4 ITS FMS
SLIPS MISSING BELOW ROTARY. DRAINED
BOP STACK AND FOUND THE SLIPS BLOCK
IN WELLHEAD.
Foreman Remarks

HMYM-512414 IS THE 2ND SLOT ON PAD HMYM-5124 TO BE DRILLED BY RIG SP-259 AS A HORIZONTAL DEVELOPMENT TIGHT GAS WELL TARGETING TUWAIQ MOUNTAIN SOURCE ROCKS
RERSERVOIR B (TQMB) BELOW THE HIGH GR ZONE. THE WELL IS PLANNED TO LAND AT +/- 21 FT. INSIDE TQMA FORMTION AND DRILL TO TD OF 18,634 FT. (MD)/ 10,468FT. (TVD) WITH A
TOTAL LATERAL LENGTH OF 7,300 FT AT 167 DEGREE AZIMUTH. THE WELL WILL BE COMPLETED WITH 5-1/2" CEMENTED LONG STRING MONO-BORE COMPLETION. THE TOTAL PLANNED
DURATION FROM SPUD TO RIG RELEASE IS 19 DAYS.
=================================================================================================
WELL INFO:
-18-5/8'' CSG @ 803' MD/TVD (53 FT INTO RUS FMT).
-13-3/8" CSG @ 5050' MD/TVD (50 FT INTO AHMADI FMT).
- 9-5/8" CSG @ +/-7,459' MD/TVD (50 FT INTO MDTM FMT).
- KOP @ +/-9,400' MD/TVD.
- LP: 11,297' MD, 10,473' TVD.
- 5-1/2" LONG STRING @+/-18,599'MD.
- FINAL TD @ +/-18,645' MD / 10468' TVD.
=======================================LOCATION ===========================================================
DIRECTION TO HMYM-5124 PAD:
1-TRAVEL 70KM FROM HOFUF TOWARDS HMYM AND TURN RIGHT AT HMYM SKID ROAD.
2-FROM BLACK TOP TRAVEL TO ODOMETER READING 03 KM TO SP-259 RIG SIGN.
3-GO STRAIGHT AT RIG SIGN AND TRAVEL TO 10 KM ODOMETER READING.
4-TAKE LEFT AT RIG SIGN 17 KM ODOMETER READING.
5-GO STRAIGHT AT RIG SIGN 18 KM ODOMETER READING.
6-GO STRAIGHT AT RIG SIGN 19 KM ODOMETER READING.
7-TAKE LEFT AT RIG SIGN 20 KM TO RIG LOCATION ODOMETER READING.
======================================JOURNEY MANAGEMENT=================================
CALL SP-259 RIG OFFICE AT 013-572-4207 OR ARAMCO RIG CLERK AT 013-572-6930 PRIOR TO TURNING OFF MAIN ROAD.
PROVIDE RIG OFFICE- NAME OF COMPANY, NUMBER OF PERSONNEL, COLOR OF VEHICLE AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL. NIGHT DRIVING IS NOT RECOMMENDED.
======================================ARAMCO PERSONNEL==============================================
> ARAMCO MATERIAL EXPEDITOR MAJED ALJOHANI # 8610635 ON LOCATION SINCE 06/03/2024.
> ARAMCO MATERIAL EXPEDITOR ABDULAZIZ ALSHAMMARI #820761 ON LOCATION SINCE 06/05/2024.
> ARAMCO MATERIAL EXPEDITOR ABDULRAHMAN ALMESHARI #8677096 ON LOCATION SINCE 06/12/2024.
> ARAMCO CLERK MOHD TARIQ KHAN #8145081 ON LOCATION SINCE 06/07/2024, ( ON RIG SP-261).

======================================DAILY SAFETY REPORT =============================================


> NEAR MISS: 0
> DRILLS: 0
> SAFE ACT: 9, UNSAFE ACT: 12, UNSAFE CONDITION: 10, STOP WORK AUTHORITY: 2.
> LTI FREE DAYS:1386
MAST RAISING LINE CYCLES @ HMYM-512414: (5.5 CYCLES)
===============================================================================================
> DAILY DIESEL CONSUMPTION FOR RIG ENGINES: 31.44 BBLS /CAMP ENGINES: 5.34 BBLS / TOTAL: 1320.63 BBLS FOR HMYM-512414.
==================================================================================================
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
DAILY SURVEY
0 18,645 90.1 167.9 0 10,472 -2484.67 757.01 8,521.76 0.21

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
MUD DATA 96 PCF 1 0 API 59.5 590 Volts 15.6 0 38,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HMYM-512414 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 05/26/2024 - 06/25/2024
Report ID: OPERLMTDMRREP

0 4.6 HTHP 12.5 25 0 12 / 17 OBM 1.2


Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 23 28 10 / 12 0 16,000 4.8
52

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
96 PCF 1 0 API 59.5 600 Volts 15.6 0 38,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 4.6 HTHP 12.5 26 0 12 / 16 OBM 1.2
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 23 28 10 / 12 0 16,000 4.8
52

MUD
TREATMENT
Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
6RR 11,350 18,645 DP Av DC Av Bit HHP 50 170 M423 8.5 SMT
Pressure GPM Jet Vel 309.29 N/A 344 I-Row O-Row DC Location Bearings
3,200 530 315 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
SM3258 MDSI516PIPC 5 x 9 / 3 x 10 / 0.541
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 30 270 330 240 24 Shock Sub Serial # Shock Sub Hrs
DRILL STRING Mud Motor Serial # Mud Motor Hrs

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS 06/01/2024 N/A NORMAL N/A SEASONAL 1,385 2 PRETOUR SAFETY
MEETINGS

Company ITS WCR TGC SJT RIG BAR RAC SNS RIG ARM WWC SJC QEM OTH ARM CAM PW

Category CSR CSR CTRG COIL RIG DFMS WMFE H2S OTHR OTHR OTHR PCS SLS VAC WSC WHES CSR
PERSONNEL
2 2 17 2 52 11 2 1 11 4 4 12 3 3 2 2 5
Total
AND SERVICES No. of Persons
135
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 0 24 24 24 0 12 12 12 24 5 0 10 24 0 12

Standby/Tankers
TRUCKS/BOATS
N/A

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A N/A 565 626 84 3500

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HISN-361414 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 04/29/2024 - 07/04/2024
Report ID: OPERLMTDMRREP

SP-260 @ HISN-361414 Limited Morning Report for 06/18/2024


Objective : ( APPRAISAL Foreman(s)KADOUS, MOHAMED SALAH / ELNAGGAR, MOHAMED SHAWKI
D&WO Morning Report (Service Providers View) Charge #: (VERTICAL/HORIZONTAL) Engineer MUZZIO, JUAN
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (85-23043-7858) WELL TO TEST RESERVOIR Manager JAHDALI, OMAR HAMEED
SP-260
AND HC FLUID PROPERTIES THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
Wellbores: OF TQSR IN HISN AREA)
(0500-0500) Saudi Aramco Well 00882-1677 71-2138 5728415 5726472
Date: Tuesday 06/18/2024 HISN-361414 (0-1) HISN_361414_1 CONTRACTOR /CLERK VSA T
5746836

Last 24 hr operations Next 24 hr plan


RSS DRILL 8 1/2" CURVE HOLE SECTION. CHC. POOH & L/D SLB 8-1/2" RSS BHA. P/U & M/U SLB 8- M/U & RIH SLB 8-1/2" RSS & LWD BHA. SLB RSS DRILL 8 1/2" LATERAL HOLE SECTION.
1/2" RSS & LWD BHA.
Location Next Location
FROM HOFUF, TAKE 10 KM TO SALWA .TAKE RIGHT 40 KM TILL SKID RD 30 KM ON SKID ROAD TO HISN-361414. JNAB-220414
Current Depth (ft) Liner TOL MD TVD Formation Tops
11,886 Last Csg Size MD TVD Size Top
9 5/8 7764 7764 Formations Comments
Depth
DMMM 796 107 FT SHALLOWER.
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 1,023 46 FT SHALLOWER.
11420 (Date) 100 466 158 UMER 1,458 38 FT DEEPER.
29.6 (05/19/2024@1400 ) ARUM 2,702 10 FT SHALLOWER.
LAMS 3,419 186 FT DEEPER.
AHMD 5,050 6 FT SHALLOWER.
SFNY 5,678 70 FT DEEPER.
SHUB 6,366 1 FT DEEPER.
BYDH 6,742 4 FT DEEPER.
MDTM 7,729 107 FT DEEPER.
SULY 8,264 61 FT DEEPER.
HITH 8,775 6 FT SHALLOWER.
ARAB 9,238 55 FT DEEPER.
ABAR 9,322 72 FT DEEPER.
ABBR 9,420 50 FT DEEPER.
ABCR 9,567 43 FT DEEPER.
ARBD 9,738 63 FT DEEPER.
JUBL 9,893 5 FT SHALLOWER.
JBSR 10,672 5 FT SHALLOWER.
HNIF 10,777 5 FT SHALLOWER.
HNFA 10,817 6 FT SHALLOWER.
HNFB 10,839 4 FT SHALLOWER.
HNFC 10,884 5 FT SHALLOWER.
HNFD 10,909 2 FT SHALLOWER.
TQMA 10,914 3 FT SHALLOWER.
TQMB 10,933
TQMC 10,948 218 FT DEEPER.
UFDR 10,962 225 FT DEEPER.
LFDR 11,119 308 FT DEEPER.

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Lt Type Lt ID Summary of Operations
OP Co Start End Start End

SLB NEOSTEER DRILLED 8 1/2" CURVE HOLE SECTION W/ 92


PCF OBM. 100% RETURNS.
> WOB: 25-30 KLB, RPM: 120-140, TQ: 9-12 KLB.FT, FLOW
RATE: 550-500 GPM, SPP: 2,500 -2,800 PSI. AVERAGE ROP:
66.5 FT/HR.
> SLB CONTROLLED DRILLING PARAMETERS TO MITIGATE
0500 - 1200 7 0-1 8 1/2 N DRLG D RSS SDM 11420 11886
SHOCKS ON RSS & MWD.
> SLB DD SENT DOWNLINK AS REQUIRED.
> POSITION TO PLAN : 0.96' BELOW & 12.65 RIGHT & 12.68'
CT-CT.
> LP AT 11,737' MD & 10,939' TVD.
> LAST SAMPLE FORMATION LITHOLOGY; 100 % LIME STONE.
> MAX FORMATION GAS: 15 % AT 11838' MD & 10939' TVD.

1200 - 1330 1.5 0-1 8 1/2 N DRLG CIRC MPMP RIG 11886 11886 PUMPED TANDEM SWEEPS, CIRCULATED HOLE CLEAN.100%
RETURN.

1330 - 1400 0.5 0-1 8 1/2 N DRLG OTH NA RIG 11886 11886 PERFORMED FLOW CHECK, WELL STATIC.

1400 - 1500 1 0-1 8 1/2 N DRLG TO STDP RIG 11886 11886 11886 11383 POOH 5 STANDS WITH 8-1/2" SLB NEOSTEER BHA IN CURVE
SECTION ON ELEVATOR.
1500 - 1515 0.25 0-1 8 1/2 N DRLG OTH NA RIG 11886 11886
PERFORMED FLOW CHECK, WELL STATIC.

1515 - 1645 1.5 0-1 8 1/2 N DRLG BR STRG RIG 11886 11886 11383 11003 SOFT TO MEDIUM BACKREAMED WITH 8-1/2"SLB RSS BHA ON 5-
1/2" DP THRU TIGHT SPOT IN CURVE SECTION. 100% RETURN.

POOH WITH 8-1/2" SLB RSS BHA ON 5-1/2" DP ACROSS CURVE


1645 - 1930 2.75 0-1 8 1/2 N DRLG TO BHA RIG 11886 11886 11003 7764 & VERTICAL HOLE SECTION WITH CONTROLLED SPEED ON
ELEVATOR.
> BACK REAMED AS REQUIRED.
1930 - 2000 0.5 0-1 8 1/2 N DRLG OTH NA RIG 11886 11886

Saudi Aramco: Confidential Page 1 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HISN-361414 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 04/29/2024 - 07/04/2024
Report ID: OPERLMTDMRREP

Major Resp. Hole depth Event depth


(From - To) Hrs Lateral Phase Cat. Action Object Lt Type Lt ID Summary of Operations
OP Co Start End Start End
PERFORMED FLOW CHECK AT 9-5/8" SHOE, WELL STATIC.
2000 - 2015 0.25 0-1 8 1/2 N DRLG CIRC MPMP RIG 11886 11886
PUMPED SLUG.
2015 - 2330 3.25 0-1 8 1/2 N DRLG TO STDP RIG 11886 11886 7764 761
POOH WITH 8-1/2" SLB RSS BHA ON 5-1/2" IN CASED HOLE.
2330 - 0000 0.5 0-1 8 1/2 N DRLG OTH NA RIG 11886 11886
PERFORMED FLOW CHECK AT TOP OF BHA, WELL STATIC.

HPJSM, POOH & R/B 8-1/2" SLB RSS BHA.


0000 - 0230 2.5 0-1 8 1/2 N DRLG HT BHA RIG 11886 11886 > R/B 2 STANDS OF 5 1/2" HWDP.
> L/D 5 STANDS 5 1/2" HWDP. JAR, SLB DIRECTIONAL BHA &
SMITH BIT.

0230 - 0430 2 0-1 8 1/2 N DRLG RR TDS RIG 11886 11886 RR 934863 TROUBLESHOOTING TDS GRAPEL HYDRUALIC LEAKING,
REPLACED TDS GRAPEL WITH NEW ONE.

HPJSM, P/U & M/U SLB 8 1/2" NEOSTEER RSS & LWD BHA.
0430 - 0459 0.5 0-1 8 1/2 N DRLG HT BHA RIG 11886 11886
ONGOING AT REPORT TIME.

Lost Time Details


From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
18 Jun 0230 2 2 934863 RR FOT TDS RIG 0 OBSERVED HYDRAULIC LEAKING FROM TDS
GRAPEL.
Foreman Remarks

WELL OBJECTIVE:
HISN-361414 IS AN APPRAISAL (VERTICAL/HORIZONTAL) WELL LOCATED IN HISN BLOCK 3 WHERE IT FALLS IN THE WESTERN AREA OF JAFURAH BASIN. SPECIALIZED LOG AND ADVANCED
MUDLOG INFORMATION ARE PLANNED TO BE ACQUIRED AS PART OF THE UNCONVENTIONAL RESERVOIR CHARACTERIZATION. A 10,000' LATERAL SECTION WILL BE DRILLED AND COMPLETED
WITH MULTI-STAGE HYDRAULIC FRAC. THE PLANNED TD OFTHE VERTICAL PILOT HOLE WILL BE +/- 11,328 FT TVD/MD (250 FT TVD BELOW TOP OF THE LOWER FADHILI RESERVOIR. A SERIES
OF REQUIRED OPEN HOLE LOGGING WILL BE PERFORMED AT TD OF THE PILOT HOLE. AFTERWARDS, THE PILOT HOLE WILL BE PLUGGED AND ABANDONED FOLLOWED BY A SIDETRACK. THE 8-
1/2" HORIZONTAL SECTION IS PLANNED TO LAND AT +/- 24' TVD BELOW TOP OF TQMA ANDDRILLED TO TD OF 21,947 FT MD / 10,885 FT TVD WITH A TOTAL LATERAL LENGTH OF +/- 10,305
FT AT 167 DEGREE AZIMUTH AND 90DEGREE INCLINATION. THE WELL WILL BE COMPLETED WITH 5-1/2" CEMENTED LONG STRING MONO-BORE COMPLETION.
==========================================================================================================
WELL PLAN INFO :
- 24" CSG AT 743' MD/TDV
- 18-5/8'' CSG AT 1,125' MD/TVD [102 FT INTO RUS FORMATION].
- 13-3/8" CSG AT 5,100' MD/TVD [50 FT INTO AHMADI FORMATION].
- 9-5/8" CSG AT 7,764' MD/TVD [35 FT INTO MID THAMAMA FORMATION].
- KOP AT 9,865 FT & LANDING DEPTH AT MD: 11,737 FT, TVD: 10,939FT.
- FINAL TD AT +/-21,947' MD / 10,885' TVD.
==========================================================================================================
JOURNEY MANAGEMENT:
CALL SP-260 ARAMCO OFFICE AT 013-572-8415 PRIOR TO TURNING OFF MAIN BLACK TOP ROAD. PROVIDE RIG OFFICE,NAME OF THE COMPANY,NUMBER OF PERSONNEL,COLOR OF VEHICLE
AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL. NIGHT DRIVE IS NOT RECOMMENDED.
DIRECTION TO HISN-361414:
> TRAVEL 150 KM FROM DAMMAM TO HOFUF, THEN 10 KM FROM HAFUF TO SALWA RD (IN KING FAHD RD).
> TURN LEFT AND TRAVEL 20 KM IN SALWA HIWAY, TURN RIGHT BEFORE THE BRIDGE AND TRAVEL 10 KM IN BLACK TOP.
> TURN AT RIG SIGN BOARD AND TRAVEL 30 KM ON SKID ROAD TO HISN-361414. FOLLOW SIGN BOARDS.
==========================================================================================================
ARAMCO MATERIAL EXPEDITOR ESSA AL DHAFEERI #8553610 ON LOCATION SINCE 06/05/2024.
ARAMCO PDP FAISAL ALGHAMDI #786201 ARRIVED ON LOCATION ON 06/16/2024.
==========================================================================================================
DRILLS: NONE.
NEAR MISS: NONE.
STOP CARDS: 46.
SAFE ACT: 19, UNSAFE ACT: 27.
STOP WORK AUTHORITY: 01.
==========================================================================================================
KPI SECTION:NONE
==========================================================================================================
RENTAL TOOLS ON LOCATION:
- NOV HMJ SN#: 650-4666987. ARRIVED 5/30/2024 AT 9:00 PM. (RIH ON 5/30/2024 AT 23:00 & L/D ON 06/03/2024 AT 22:00). (RIH ON 06/13/2024 AT 19:30 & L/D ON 06/15/2024 AT 05:45
HR.
- NOV HMJ SN#: 474-651-676. ARRIVED 6/8/2024 AT 11:00 PM. RIH ON 06/15/2024 AT 09:45
- CORETRAX PBL SUB SN: DVSA4-1012/CC1A1118 ARRIVED ON 6/3/2024 AT 00:15.
==========================================================================================================
WELL SITE RENTAL TOOLS:
AL-SALOMI SPRAY TANKER : PLAT E: 5863-ZDA, DOOR#1125 ON LOCATION SINCE 06/05/2024 AT 10:00 AM.
AL-SALOMI DUMP TRUCK DRSS#1004332548 -TRIP #02 ON 6/7/2024.
==========================================================================================================
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0-1 11,497 84.88 162.66 92 10,927 -285.39 57.5 955.14 3.1
0-1 11,577 86.97 163.39 80 10,933 -308.65 64.6 1,034.58 2.77
DAILY SURVEY
0-1 11,669 88.02 165.81 92 10,937 -335.66 72.04 1,126.32 2.87
0-1 11,737 89.15 166.3 68 10,938 -355.77 77.03 1,194.26 1.81
0-1 11,831 89.77 166.38 94 10,939 -383.61 83.8 1,288.23 0.67

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
MUD DATA 92 PCF 2 0 API 59.5 600 Volts 8.7 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt

Saudi Aramco: Confidential Page 2 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HISN-361414 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 04/29/2024 - 07/04/2024
Report ID: OPERLMTDMRREP

0 3.4 HTHP 17.5 21 0 11 / 13 OBM 0


Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 24 23 10 / 12 0 0 0
50

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
92 PCF 2 0 API 59.5 600 Volts 8.7 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 3.4 HTHP 17.5 21 0 11 / 13 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 24 23 10 / 12 0 0 0
50

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
92 PCF 2 0 API 59.5 580 Volts 8.8 0 0
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 3.6 HTHP 17.5 22 0 12 / 14 OBM 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 24 23 11 / 12 0 0 0
52

MUD STELSEALFN STELSL50 MAXSHIELD INVERMUL CAOH2 DURATONE


TREATMENT 11 ( 50LB ) 11 ( 50LB ) 1 ( 55GL ) 4 ( 55GL ) 30 ( 55LB ) 4 ( 50LB )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
7 9,901 11,886 DP Av DC Av Bit HHP 30 120 M423 8.5 SMT
Pressure GPM Jet Vel 291.79 N/A 282 I-Row O-Row DC Location Bearings
2,800 500 297 1 1 WT A X
BIT DATA
Serial Number Type Jets TFA
SM3573 MDSI516PIPC 3 x 10 / 5 x 9 / 0.541
Gauge Other POOH Reason
0

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 40 291 310 280 12,000 0
Shock Sub Serial # Shock Sub Hrs Mud Motor Serial # Mud Motor Hrs
0

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit SMT 8.5 1 0.66 4"1/2 REG SM3559
2 RSS SDM 6.75 1 6.75 2.5 13.3 4-1/2" IF 4-1/2" REG 100 00826
3 Directional Sub SDM 6.75 1 6.75 2.813 1.38 NC50 NC50 80 786830
4 Saver Sub SDM 6.875 1 6.875 2.875 1.2 5 1/2 FH 5 1/2 FH 0.1 NTS-36714
5 Logging While Drilling (LWD) SDM 8.25 1 8.25 14.64 5 1/2" FH 157.58 H5940/2
6 Saver Sub SDM 6.844 1 6.844 3.188 1.19 5 1/2 FH 5 1/2 FH 0.1 NTS-39602
7 Measurement While Drilling (MWD) SDM 6.75 1 6.75 5.109 25.14 5 1/2"FH 5 1/2"FH 83 8306341
8 Saver Sub SDM 6.875 1 6.875 3.875 1.26 5 1/2 IF 5 1/2 IF 0.1 AOTC-N-0253
DRILL STRING
9 Saver Sub SDM 6.875 1 6.875 2.875 1.2 5 1/2 FH 5 1/2 FH 0.1 OFS-8274
10 Logging While Drilling (LWD) SDM 6.75 1 6.75 18.23 97.14 V7020
11 Saver Sub SDM 6.906 1 6.906 3 1.21 5 1/2 IF 5 1/2 FH 1.1 GTF-4549-17
12 Logging While Drilling (LWD) SDM 6.75 1 6.75 31.72 105.04 SN2
13 Saver Sub SDM 6.875 1 6.875 3 1.31 5 1/2 IF 5 1/2 FH 0.1 38950
14 Saver Sub SDM 6.875 1 6.875 3 0.86 5 1/2 IF 5 1/2 FH 0.1 OFS-7387
15 Stabilizer SDM 8.25 1 6.5 2.875 17.49 NC46 NC46 1.6 G6786
16 Saver Sub SDM 6.875 1 6.875 2.875 2.22 NC50 5 1/2 FH 0.2 NTS-38950
17 Non Magnetic Drill Collar ( NMDC ) SDM 6.75 1 6.75 2.813 30.79 NC50 NC50 3.1 SPRL RNTSDT13347
18 FIlter Sub SDM 6.781 1 6.781 2.75 8.11 NC50 NC50 0.8 MNB-54347-1
19 Crossover RIG 6.75 1 6.75 3.25 2.93 XT54 NC50 0.1 2019-11-5-7
20 Heavy Weight Drillpipe (HWDP) RIG 5.5 3 5.5 3.25 92.18 XT54 XT54 57.8 CONV RIG
21 Hydraulic Jar NOJ 6.5 1 6.5 2.75 33.25 XT54 XT54 1,510 434-651676
22 Heavy Weight Drillpipe (HWDP) RIG 5.5 3 5.5 3.25 90.52 XT54 XT54 57.8 CONV RIG
23 Drillpipe RIG 5.5 1 5.5 4.67 31 XT54 XT54 24.7 XD105 PREMIUM

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
06/13/2024 N/A SEASONAL NONE SEASONAL 1,247 2 PRE TOUR
MISCELLANEOUS
MEETING &
ARAMCO MEETING.

Company TGC SDM RIG BAR PW HMS RIG ARM OTH ARM CRW

PERSONNEL Category CTRG DPDS RIG DFMS ISPCT MLS OTHR OTHR VAC WSC WBCS
Total
AND SERVICES
15 3 70 11 4 12 2 2 1 2 1 123
INFORMATION No. of Persons

Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24 24

Saudi Aramco: Confidential Page 3 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HISN-361414 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 04/29/2024 - 07/04/2024
Report ID: OPERLMTDMRREP

Operating Hours. 0 24 24 24 24 24 24 12 12 24 24

Standby/Tankers
TRUCKS/BOATS
AB-7377

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
N/A 1000 350 166 48 1600

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 4 of 4


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR THRY-313614 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 05/27/2024 - 07/10/2024
Report ID: OPERLMTDMRREP

SP-261 @ THRY-313614 Limited Morning Report for 06/18/2024


Objective : (HORIZONTAL Foreman(s)TAKA, JASON J / AKOUIRADJEMOU, ADLENE
D&WO Morning Report (Service Providers View) PILOT TIGHT GAS WELL URDANETA CARBONELL, ESTEBAN DAVID / ALTUBAYYEB,
Rig Charge #: Engineer
TARGETING TUWAIQ MANSOUR TAWFIQ
Copyright 2024 Saudi Aramco. All Rights Reserved SP-261 (85-24743-8091) MOUNTAIN SOURCE ROCK Manager BIN LEBDAH, SALMAN FAISAL
Daily Onshore RESERVOIR B (TQMB))
Wellbores: THURAYA RIG FORMAN VSAT CONTRACTOR
(0500-0500) Saudi Aramco Well
+882167771 2577 013-572-48 23 /CLERK VSA
Date: Tuesday 06/18/2024 THRY-313614 (0) THRY_313614_0
T
013-572-64 45

Last 24 hr operations Next 24 hr plan


REPAIR TOP DRIVE, DRILL AHEAD 16" HOLE SECTION DRILL AHEAD TO 13-3/8" CP, CHC, POOH TO & RUN 13-3/8" CASING.
Location Next Location
120KM ON COASTAL ROAD FROM DAMMAM, 35KMS FROM UQAIR BRIDGE TOWARDS SALWA, TURN LEFT, 10KM SKID ROAD THRY-313612
Current Depth (ft) Liner TOL MD TVD Formation Tops
3,067 Last Csg Size MD TVD Size Top
18 5/8 795 795 Formations Comments
Depth
DMMM 437 +8
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) RUS 724 +38
966 (Date) 0 2,101 109 UMER 1,112 +46
3 (06/14/2024@2130 ) ARUM 2,384 +22

Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Lt Type Lt ID Summary of Operations
OP Co
Start End Start End
0500 - 1000 5 0 16 N MAIN RR TDS RIG 966 966 RR 934836
WAIT ON PARTS TO REPAIR TOP DRIVE.
1000 - 1230 2.5 0 16 N DRLG LDP SPDP RIG 966 966 0 30
M/U & RACK BACK STANDS OF DP IN MAST.

INSTALLED NEW MODULES IN VFD ROOM. FUNCTION TDS


1230 - 1300 0.5 0 16 N MAIN RR TDS RIG 966 966 RR 934836 MOTOR A AT 120 RPM - OK. FUNCTION TDS MOTOR B AT 120
RPM - OK. FUNCTON MOTORS IN TANDEM - OK. REAM DOWN TO
BOTTOM TO RESUME DRILLING.

DRILL AHEAD 16" SECTION WITH SLB PERFORMANCE MOTOR


1300 - 1400 1 0 16 N DRLG DMR HTMTR SDM 966 1100 USING 65 PCF LOW FILTRATE SPUD MUD & 100% CIRCULATION.
>TOTAL LOSSES OBERVED AT 1100'.
>PUMPED 1 BPM MUD CAP DOWN ANNULUS CONTINUOUSLY.

DRILL AHEAD 16" SECTION WITH SLB PERFORMANCE MOTOR


1400 - 1430 0.5 0 16 N DRLG DMR HTMTR SDM 1100 1185
WITH LIME TREATED WATER AND GEL SWEEPS & TOTAL LOSSES.
>PUMPING 1 BPM MUD CAP DOWN ANNULUS.

WHILE TRYING TO MAKE CONNECTION, FOUND SAVER SUB


THREADS DAMAGED AND BOX OF DP. L/D DAMAGED DP. POOH
1430 - 1700 2.5 0 16 N MAIN RR TDS RIG 1185 1185 RR 934853
TO SHOE. REPLACE SAVER SUB WITH NEW SPARE ON LOCATION.
RIH TO BOTTOM, RESUME DRILLING AHEAD.
>PUMPED 1 BPM MUD CAP DOWN ANNULUS.

DRILL AHEAD 16" SECTION WITH SLB PERFORMANCE MOTOR


1700 - 2200 5 0 16 N DRLG DMR HTMTR SDM 1185 2100
WITH LIME TREATED WATER AND GEL SWEEPS & TOTAL LOSSES.
>PUMPING 1 BPM MUD CAP DOWN ANNULUS.
2200 - 2230 0.5 0 16 N DRLG RR TDS RIG 2100 2100
RIG SERVICE

DRILL AHEAD 16" SECTION WITH SLB PERFORMANCE MOTOR


2230 - 0245 4.25 0 16 N DRLG DMR HTMTR SDM 2100 2820
WITH INHIBITED MOTF NACL POLYMER MUD.
>PUMPING 1 BPM MUD CAP DOWN ANNULUS.

CONTROL DRILL 16" SECTION WITH SLB PERFORMANCE MOTOR


WITH INHIBITED MOTF NACL POLYMER MUD DUE TO
0245 - 0459 2.25 0 16 N DRLG DCG HTMTR SDM 2820 3067
INCLINATION INCREASED TO 1.98 DEG
>PUMPING 1 BPM MUD CAP DOWN ANNULUS.
>LAST SURVEY AT 3023' = 1.23 DEG, AZI 160.05
Lost Time Details
From Hrs Cum. Hrs Lt Id Parent Lt Id Type Cause Object Resp Co Depth Lost Time Summary
17 Jun 0345 5.5 6.75 934836 RR FOT TDS RIG 966 WHILE INCREASING RPM AND TORQUE LIMIT
ON TOP DRIVE, TDS SHOWED FAULTS AND
SHUT DOWN.
18 Jun 1430 2.5 2.5 934853 RR FOT TDS RIG 1185 SAVER SUB THREADS DAMAGED ON TDS.
Foreman Remarks

THRY-313614 IS FIRST WELL IN THRY-3136 PAD TO BE DRILLED BY SP-261 AS A HORIZONTAL PILOT TIGHT GAS WELL TARGETING TUWAIQ MOUNTAIN SOURCE ROCK RESERVOIR B (TQMB)
BELOW THE HIGH GR ZONE. THE WELL IS PLANNED TO LAND AT +/- 19 FT. INSIDE TQMA FORMATION AND DRILL TO TD OF 21,133 FT. MD / 9,960 FT TVD WITH A TOTAL EFFECTIVE LATERAL
LENGTH OF 10,300 FT AT 167 DEGREE AZIMUTH. THE WELL WILL BE COMPLETED WITH 5-1/2" CEMENTED LONG STRING MONO-BORE COMPLETION.
==================================================================================================
JOURNEY MANAGEMENT:
CALL SP-261 RIG MANAGER OFFICE AT 013-805-0833 OR ARAMCO OFFICE AT 013-572-6445 PRIOR TO TURNING OFF MAIN BLACKTOP ROAD. PROVIDE RIG OFFICE- NAME OF COMPANY, NUMBER
OF PERSONNEL, COLOR OF VEHICLE AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL. NIGHT DRIVING IS NOT RECOMMENDED.
===========================================================================================================
ARAMCO CLERK MOHD TARIQ KHAN #8145081 ON LOCATION FROM 06/12/2024.

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR THRY-313614 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 05/27/2024 - 07/10/2024
Report ID: OPERLMTDMRREP

ARAMCO PDP ALYAMI, ABDULAZIZ MANA #8657464 ON LOCATION FROM 06/12/2024.


===========================================================================================================
THRY-313614 PLANNED CASING POINTS & DIRECTIONAL PLAN:

13-3/8" - 4671'
9-5/8" - 6999'
KOP = 8936'
EOB = 10,833' MD / 9960' TVD
WELL TD AT 21,133' MD /9,960' TVD.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 983 0.35 195.78 106 983 -1.47 -1.34 6.52 0.14
0 1,118 0.29 124.68 135 1,118 -1.65 -1.28 6.86 0.28
0 1,222 0.41 107.96 104 1,222 -1.73 -1.11 6.75 0.15
0 1,401 0.49 198.07 179 1,401 -2.01 -1 7.37 0.36
0 1,596 0.66 214.3 195 1,596 -2.54 -1.27 9.31 0.12
0 1,768 0.8 223.56 172 1,768 -3.05 -1.69 11.45 0.11
0 1,913 0.64 221.89 145 1,913 -3.46 -2.07 13.22 0.11
DAILY SURVEY 0 2,073 0.73 341.05 160 2,073 -3.37 -2.35 13.48 0.74
0 2,174 1.05 184.88 101 2,174 -3.46 -2.44 13.9 1.72
0 2,289 1.05 181.61 115 2,289 -4.11 -2.48 15.73 0.05
0 2,428 0.89 180.39 139 2,428 -4.82 -2.49 17.81 0.12
0 2,582 1.5 182.92 154 2,582 -5.8 -2.52 20.75 0.4
0 2,719 1.62 175.37 137 2,719 -6.94 -2.5 24.19 0.17
0 2,823 1.98 160.59 104 2,823 -7.9 -2.28 26.98 0.56
0 2,933 1.22 152.03 110 2,933 -8.76 -1.92 29.43 0.72
0 3,024 1.3 151.2 91 3,024 -9.3 -1.64 30.97 0.09

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
68 PCF 0 0 API 0 0 Volts 2.5 9.6 70,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 100 0 0 0/0 INPHHVG 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 0 0 0 0/0 0 600 0
29

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
65 PCF 0 3.4 API 0 0 Volts 2.5 9.5 8,800
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
MUD DATA 0 0 HTHP 97 25 0 12 / 15 INPHPA 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 13 3 11 / 14 10 600 0
60

Weight Cake HTHP Filtrate(WL) Oil Vol. % Elec. Stability % LGS PH CL PPM
85 PCF 0 3.8 API 0 0 Volts 8.2 9.6 120,000
FL Temp Filtrate(WL) Water Vol. % YP Sand Vol. % Gels Sec/Min Mud Type PPT Spurt
0 0 HTHP 89 28 0 10 / 13 INPHPA 0
Funnel Cake API PV Solids Vol. % 3/6 RPM MBT CA PPM PPT Total
Vis.(SEC) 1 15 11 9 / 11 0 600 0
60

BENT MAX-GUARD MRBL-M CAUST CLAYSYNC BRZN DEXT


MUD 5 ( 2500L ) 40 ( 55GL ) 30 ( 2200L ) 53 ( 25KG ) 100 ( 50LB ) 30 ( 25KG ) 570 ( 25KG )
TREATMENT CAOH2 NACL BARITE SODASH
120 ( 25KG ) 208 ( 2200L ) 45 ( 5000L ) 41 ( 50KG )

Bit Number MD In MD Out Run Footage Hours Average ROP WOB RPM IADC Size Manufacturer
2RR 795 3,067 DP Av DC Av Bit HHP 30 100 M323 16 HTC
Pressure GPM Jet Vel 103.14 126.72 349 I-Row O-Row DC Location Bearings
1,420 950 271 N/A N/A N/A N/A N/A
BIT DATA
Serial Number Type Jets TFA
7917626 DD607XV1 4 x 13 / 3 x 12 / 31.128
x 11 /
Gauge Other POOH Reason
N/A

Float BHA Hrs String Wt. Pick Up Slack Off Rot. Torque Jars Serial # Jars Hrs
Y 15.7 198 200 192 15,000 Shock Sub Serial # Shock Sub Hrs
Mud Motor Serial # Mud Motor Hrs
0
DRILL STRING
Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
1 Bit HTC 1 16 1.47 7-5/8" REG 7917626
2 Mud Motor SDM 11.25 1 11.25 31.17 220 B0058
3 Float Sub SDM 11.25 1 11.25 3 2.3 7 5/8 REG 7 5/8 REG 172 594707
4 Stabilizer SDM 16 1 9.5 3 5.2 7 5/8 REG 7 5/8 REG 220 1833

Saudi Aramco: Confidential Page 2 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR THRY-313614 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 05/27/2024 - 07/10/2024
Report ID: OPERLMTDMRREP

Order Component Provider Nominal Size # Joints OD Size ID Size Length Top Thread Bottom Thread Weight Grade Class Serial #
5 Saver Sub SDM 9.5 1 9.5 3.5 1.59 7 5/8 H90 7 5/8 REG 220 8679
6 Measurement While Drilling (MWD) SDM 9 1 9 24,394 159 G5976
7 Saver Sub SDM 9.5 1 9.5 3.5 1.47 7 5/8 H90 7 5/8 REG 220 06-03-5150
8 Float Sub SDM 9 1 9 3 1.73 7 5/8 REG 7 5/8 REG 220 341296
9 FIlter Sub SDM 9.5 1 9.5 4 7.26 7 5/8 REG 7 5/8 REG 220 950-1042
10 Stabilizer SDM 16 1 16 3 6.58 7 5/8 REG 7 5/8 REG 220 1063
11 Drillcollar RIG 9.5 3 9.5 3 91.27 7 5/8 REG 7 5/8 REG 220 SPRL FILE
12 Crossover RIG 9.5 1 9.5 3 2.53 7 5/8 REG 8 5/8 REG 220 1911-03
13 Drillcollar RIG 8.5 9 8.5 3 267.54 6 5/8 REG 6 5/8 REG 160 SPRL FILE
14 Crossover RIG 8.5 1 8.5 2.813 2.59 6 5/8 REG 6 5/8 FH 160 1911-02
15 Heavy Weight Drillpipe (HWDP) RIG 6.625 6 6.625 5 90.55 6-5/8FH 6-5/8FH 58.1 CONV FILE
16 Crossover RIG 6.625 1 6.625 3.625 3.06 XT54 XT54 120 1911-01
17 Heavy Weight Drillpipe (HWDP) RIG 5.5 15 5.5 3.25 456.94 XT54 XT54 54 CONV FILE
18 Drillpipe RIG 5.5 1 5.5 4.67 31.63 XT54 XT54 24.7 XD105 PREMIUM FILE

BOP Test BOP Drills Wind Sea Weather DSLTA Safety Meeting
MISCELLANEOUS N/A N/A CALM N/A SEASONAL 1,381 2 X DAILY & AS
REQUIRED

Company ITS TGC SDM RIG BAR RIG ARM SJC ARM CAM

Category CSR CTRG DPDS RIG DFMS OTHR OTHR PCS WSC WHES
PERSONNEL
3 15 2 57 12 11 2 3 2 2
Total
AND SERVICES No. of Persons
109
INFORMATION
Personnel on Loc. Hrs. 24 24 24 24 24 24 24 24 24 24

Operating Hours. 0 0 24 12 12 24 12 0 24 0

Standby/Tankers Others Others


TRUCKS/BOATS
N/A 1 X AL-FEC TANKERS Aramco Truck - C-255

Drill Wtr.-BBLS Pot Wtr.-BBLS Fuel- BBLS Barite- SX Bentonite- SX Cement G-SX
BULK
45000 1000 514 145 104 4050

Instrumentation Other Reporter


REPAIR ASAP
Computer, Communication & V-Sat Issues

Copyright 2024 Saudi Aramco. All Rights Reserved

Saudi Aramco: Confidential Page 3 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HMYM-512204 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 05/27/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

SP-262 @ HMYM-512204 Limited Morning Report for 06/18/2024


Objective : (SINGLE Foreman(s)BOUTINE, DJAMEL / SOULLI, ABDELGHANI
D&WO Morning Report (Service Providers View) Charge #: LATERAL Engineer ALMURAISEL, ABDULAZIZ TARIQ / ALGHAMDI, SAEED MOHAMMAD
Rig
Copyright 2024 Saudi Aramco. All Rights Reserved (87-24710-8040) UNCONVENTIONAL GAS Manager BIN LEBDAH, SALMAN FAISAL
SP-262
DEVELOPMENT WELL) THURAYA RIG FORMAN VSAT OTHER VSAT
Daily Onshore
(0500-0500) Saudi Aramco Well Wellbores: 8821677712 137 572-5393 572-6297
Date: Tuesday 06/18/2024 HMYM-512204 (0) HMYM_512204_0 CONTRACTOR /CLERK VSA T
572-5731

Last 24 hr operations Next 24 hr plan


ICRUISE SPERRY SUN RSS DRILL 8-1/2'' CURVE AND LATERAL SECTIONS. ICRUISE SPERRY SUN RSS DRILL 8-1/2'' LATERAL SECTION.
Location Next Location
TAKE HALF MOON ROAD, TURN RIGHT THROUGH BRIDGE TOWARD HUFFUF THEN TURN LEFT THROUGH 33 KM SKID ROAD HMYM-512214
Current Depth (ft) Liner TOL MD TVD Formation Tops
12,825 Last Csg Size MD TVD Size Top
9 5/8 7457 7457 Formations Comments
Depth
MDTM 7,430 20' DEEPER
Prev. Depth (ft) Days Since Spud/Comm Circ % Daily Footage (ft) Distance from DHA M/Gate (KM) SULY 7,950 11' DEEPER.
10040 (Date) 100 2,785 97 HITH 8,471 27' DEEPER.
11.1 (06/07/2024@0000 ) ABAR 8,885 3' DEEPER
ABBR 8,989 6' DEEPER
ABCR 9,080 7' DEEPER
ABDR 9,258 9' DEEPER
JUBL 9,412 4' DEEPER.
JBSR 10,057 6' DEEPER
HNIF 10,297 5; DEEPER
HNFA 10,353 2' DEEPER
HNFB 10,380 2' DEEPER
HNFC 10,426 1' DEEPER.
HNFD 10,451 3' DEEPER.
TQMA 10,469 3' DEEPER.
TQMB 10,484 1' DEEPER.
Event
Major Resp. Hole depth
(From - To) Hrs Lateral Phase Cat. Action Object depth Summary of Operations
OP Co
Start End Start End

SPERRY SUN RSS DRILL 8-1/2" CURVE SECTION W/ 85-92 PCF OBM & 100%
0500 - 1700 12 0 8 1/2 N DRLG D RSS SPS 10040 10950
CIRCULATION.
>RECORDED SPR AS REQUIRED.
1700 - 1730 0.5 0 8 1/2 N DRLG RR TDS RIG 10950 10950
TOP DRIVE SERVICE, GREASE WASH PIPE.

SPERRY SUN RSS DRILL 8-1/2" CURVE SECTION W/ 92 PCF OBM & 100%
1730 - 2130 4 0 8 1/2 N DRLG D RSS SPS 10950 11252
CIRCULATION.
>LP@11,252' MD/10,490' TVD.

SPERRY SUN RSS DRILL 8-1/2" LATERAL SECTION W/ 92-94 PCF OBM & 100%
2130 - 0459 7.5 0 8 1/2 N DRLG D RSS SPS 11252 12825 RETURN.
>POSITION TO PLAN: 5.4' ABOVE & 0.5' LEFT OF THE PLAN.
>RECORDED SPR AS REQUIRED.
Foreman Remarks

HMYM-512204 IS THE 1ST SLOT ON PAD HMYM-5122 TO BE DRILLED BY RIG SP-262 AS A HORIZONTAL DEVELOPMENT TIGHT GAS WELL TARGETING TUWAIQ MOUNTAIN SOURCE ROCKS
RERSERVOIR B (TQMB) BELOW THE HIGH GR ZONE. THE WELL IS PLANNED TO LAND AT +/-21 FT. INSIDE TQMA FORMTION AND DRILL TO TD OF 18,480 FT. (MD)/ 10,472 FT. (TVD) WITH A
TOTAL LATERAL LENGTH OF 7,248 FT AT 347 DEGREE AZIMUTH. THE WELL WILL BE COMPLETED WITH 5-1/2" CEMENTED LONG STRING MONO-BORE COMPLETION.
=================================================================
JOURNEY MANAGEMENT:
CALL SP-262 RIG MANAGER OFFICE AT 013-805-2398 OR ARAMCO OFFICE AT 013-572-5393 PRIOR TO TURNING OFF MAIN BLACKTOP ROAD.
PROVIDE RIG OFFICE- NAME OF COMPANY, NUMBER OF PERSONNEL, COLOR OF VEHICLE AND EMERGENCY CONTACT NUMBER OF BASE PERSONNEL. NIGHT DRIVING IS NOT RECOMMENDED.
===========================================================================================================
>ARAMCO MATERIAL EXPEDITOR GHANNAM ALDAJANI # 8668821 ON LOCATION SINCE 06/10/2024.
===========================================================================================================
>DIESEL CONSUMPTION FOR ENGINES (RIG+CAMP): DAILY 66 BBL, TOTAL 682 BBL FOR HMYM-512204.
===========================================================================================================
>DRILLS: NONE.
===========================================================================================================
WATER SERVICES INCLUDING PUMPS AND FLEXIBLE HOSES PROVIDED BY UR WCO&PED SERVICES (COMPLETIONS) FROM FWP-5 FRAC POND. FWP-5 FILLED FROM MULTIPLE WATER WELLS.
>DAILY WATER CONSUMPTION: 260640 GAL.
===========================================================================================================
>1X WATER SPRAYER TANKER.
===========================================================================================================
NEXT CASING: 5-1/2" @ +/-18,500'.
Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 10,048 38.26 17.56 92 10,000 70.12 13.44 234.23 5.77
0 10,142 43.57 17.64 94 10,071 88 19.11 295.44 5.64
0 10,239 49.57 16.67 97 10,137 108.51 25.43 365.64 6.23
0 10,333 53.27 15.76 94 10,196 130.01 31.68 439.03 4.01
DAILY SURVEY
0 10,428 57.32 14.33 95 10,250 153 37.85 517.09 4.44
0 10,522 60.93 12.6 94 10,298 176.91 43.57 597.75 4.14
0 10,616 64.4 10.61 94 10,342 201.83 48.68 681.17 4.15
0 10,709 67.37 7.95 93 10,380 227.36 52.84 765.83 4.13
0 10,805 71.66 4.19 96 10,413 254.61 55.73 855.11 5.78

Saudi Aramco: Confidential Page 1 of 3


LIMITED MORNING REPORT
Username: ALAAMRKR
Database: EPPR HMYM-512204 EXPLORATION DRILLING BI-1514
Print Date: 06/18/2024 06:22 05/27/2024 - 06/26/2024
Report ID: OPERLMTDMRREP

Lateral Survey MD Angle Azimuth CLength TVD N/S(-)Coordinate E/W(-)Coordinate Vertical Sec DLS
0 10,899 74.96 359.32 94 10,440 282.03 56.56 943.71 6.08
0 10,993 78.65 354.74 94 10,462 309.87 55.11 1,032.59 6.15
0 11,087 81.92 350.3 94 10,477 337.86 51.43 1,121.23 5.81
0 11,185 86.25 347.2 98 10,488 366.99 45.63 1,213.3 5.43
0 11,252 90 347.48 67 10,490 386.9 41.16 1,276.52 5.61
0 11,276 90.14 347.48 24 10,490 394.04 39.57