Professional Documents
Culture Documents
Revision Routine
Revision Routine
Revision Routine
1CS37169
Rev. ind.
G
Techn. Area / DCC Page
Revision Routine
M /& AA103 1 (6)
Revision Routine
Content
1 Introduction ...................................................................................................3
1.1 How to revise
2 Example..........................................................................................................4
3 Record of revisions.......................................................................................5
1 Introduction
This document describes how to revise a copy of the Operation and Maintenance
Documentation. It is of the utmost importance that a revision delivered by Siemens
Industrial Turbomachinery AB (SIT) is revised according to the instructions given in this
document.
2 Example
Revision Notice
Date
YYMMDD
Issued by Dept. Telephone
Project X Customer
Revision 1 – Project
Electronic documentation
Electronic copy Title Edition Date
1 Name 1 YYMMDD
For our records, please sign this acknowledgement and return it to:
Siemens Industrial Turbomachinery AB
Att: XXX, Technical Information Dept.
SE-612 83 FINSPONG
Sweden
Fax No: +46-122 XXXXX
Signed: Date:
3 Record of revisions
10
11
12
13
14
15
16
17
18
19
20
REVISION
Rev. Page (P) Description Date
ind. Chapt. (C) Dept. / Init.
A - Adjustment, Revision page added 040102 AQI/LL
B - Company name has changed to Siemens Industrial 050415 AQI/AR
Turbomachinery AB (SIT)
C P1 Author; company name/department changed to 051102
SIT/GPMT. GPMT/LFN
D P3 Final Documentation changed to Operating and 060707
Maintenance Documentation. GPMT/LFN
P4 Minor changes, example more generalized.
E - Change Doc. Des to 1A0701 all pages. 070508 GPMT/LL
Clarification of text, minor changes.
F P4 Electronic documentation placed first. Paper 070904
documentation (if applicable). CD-rom changed to GPTT/LFN
Electronic copy.
G - Ref. des. and Doc. des. removed (all pages). 071214
GPTT/LFN