Model :- 18M TOWER FOR 4NOs.

10m3 PLASTIC TANK


Phase name Qty
Phase 1 5

17
2
47

391

438
Top View

438
438
0

391
380

438
380 11 46
0

CLT8

6
2
Front View

391

438
46

2
19
Bottom View

Rev Mark Revision Description Date

GENERAL NOTE:
1.) ALL DIMENSIONS AND LEVELS ARE TO BE VERIFIED ON SITE BY THE
CONTRACTOR BEFORE COMMENCING ANY WORK.
2.) THE STRUCTURAL DRAWINGS TO BE READ IN CONJUCTION WITH
ARCHITECTURAL & M.E DRAWINGS.
CLIENT/OWNER: PROJECT DESIGNATION:
Material list for 5 parts named 'GUARD RAIL SUPPORT' 3.) ALL STRUCTURAL TO BE GRADE S355
4.) ALL STEELWORK SHALL BE PRIMED WITH ONE COAT OF RED OXIDE
Mark Profile Grade Length Paint Area Mass PRIMER AT SHOP AND ONE COAT AFTER ERECTION.
CONSULTANT: PROPOSED ELEVATED H20 TANK SUPPORT FRAME
Cransfield Engineers
5.) ENDS OF HOLLOW SECTIONS SHALL BE BLANKED WITH 3MM THICK
PLATE
CLT8 CHS42.8*2.0 S235JR 438 0.1 0.9 6.) THE FABRICATOR SHALL CHECK ON SITE TO VERIFY ALL (Consulting Civil & Structural Engineers) ADDRESS/LOCATION: TITLE:
PO BOX 59401-000100
DIMENSIONS.
Total for 5 parts 2188 0.3 4.4 BOMET COUNTY
NAIROBI
Tekla structures

7.) APPROVAL OF SHOPDRAWINGS TO BE SOUGHT FROM THE GUARD RAIL SUPPORT


ENGINEER BEFORE COMMENCEMENT OF FABRICATION.

The part shown is required for the following assemblies:- Issued:


2 required for 2 'GUARD RAIL SUPPORT' marked HR6 Scale: 1:2 Workshop Drawing Rev
Revised:
3 required for 3 'GUARD RAIL SUPPORT' marked HR7 Drawn By: Date:28.08.2023 Checked by: Approved By: Project Number: 0719 W [CLT.8] 0