The following instruction is issued to the Contractor as per the Contract Agreement. Proceeding with work in accordance with these instructions indicates the Contractor's
acknowledgment that there will be no change in the Contract Price and Contract Time. If the Contractor believes that this instruction affects the Contract Price or Contract Time, the
Contractor shall promptly notify the Prime Consultant.
• Sprinkler head locations adjusted to suit ACT panels and match quantity in Mechanical Drawings.
• E1 egg crate grille locations adjusted to match locations in Mechanical Drawings.
Details added for drywall bulkhead termination at offices to allow for reveal and consistent edge of gypsum.
https://publicdesign.rform.ca/documents/supplementalInstructions/221643 1/3
6/20/24, 4:59 PM Supplemental Instruction
https://publicdesign.rform.ca/documents/supplementalInstructions/221643 2/3
6/20/24, 4:59 PM Supplemental Instruction
https://publicdesign.rform.ca/documents/supplementalInstructions/221643 3/3
Copyright reserved. This design and drawing is the exclusive property
of WMW Public Architecture and Communication Inc. and cannot be
used for any purpose without the written consent of the Architect.
This drawing is not to be used for construction until issued for that
purpose by the Architect. Prior to commencement of the Work the
Contractor shall verify all dimensions, datums and levels to identify
any errors and omissions; ascertain any discrepancies between this
drawing and the full Contract Documents; and, bring these items to
the attention of the Architect for clarification.
ISSUES + REVISIONS
NO DATE DESCRIPTION
A Nov 03, 2020 Issued for SD Report
B Mar 24, 2021 Issued for Class B Costing
D Mar 31, 2021 Issued for DD
F June 15, 2021 Issued for 50% CD
G Sep 03, 2021 Issued for 75% CD
H Sep 30, 2021 Issued for Class A Costing
I June 01, 2022 Issued for BP Application (not issued)
J Oct 31, 2022 Issued for 95%CD
K Jan 26, 2023 Issued for BP Application
L Feb 02, 2023 Issued for Tender
M Feb 13, 2023 Issued for Tender Addendum TP-02
N April 19, 2023 IFT to IFC
O April 20, 2023 Issued for Construction
P Aug 08, 2023 CO-001 : Revised for BP
1 2
1 EEE Apr 15, 2024 RFI-226 Acoustic ceiling at structural
A3.02 A3.02 blocking
A3.01
GGG Apr 18, 2024 RFI-190 Branch Box Locations
III May 1, 2024 RFI-235 Dimensions for F1A Lights
NNN June 6, 2024 CD-005 L2 Revised Ducts and Grilles
FRR NOTES
1 HR FRR
RCP legend
TTT
4877 WAP
1500
Occupancy sensor
1' 1000
Sprinkler head
2" steel rigging pipe duct - see mech speaker
1 Smoke detector
610
typ. typ.
EQ EQ
EQ EQ EQ EQ Suspended eyelet
1829
speaker speaker
EQ
NOTE: Refer to electrical drawings for lighting
count and layout
duct - see mech duct - see mech duct - see mech duct - see mech NOTE: 2 per eyelets per suspended luminaire
+ diffusers in Quiet and Nap Rooms
2" steel rigging pipe
EQ EQ EQ EQ
speaker speaker NOTE: All Globe light elevations are given to
speaker speaker
2438
EQ
speaker
2" steel rigging pipe 2438
296
620 TTT
2 2438 C6c
TTT
391 EQ EQ 3378
1830
2 2
A4.11 C6x C6x A4.10
TTT 2720 1090 C6x 2720
1 1050 2000 2000 1050
297
A3.04 2720
typ. typ. typ.
C6c C6c TTT
EQ EQ EQ EQ
2438 2438 Strada lights centered in purlin bay,
EQ EQ EQ EQ
TTT typ.
1687
3 518 2148
584
750
EQ EQ 2873 6100
97594
TTT
1528
EQ, typ
EQ EQ
P3a 94193
98421 typ.
98716
752
3 94196 96461 99548 97671 99540 98966 97639 98966 98716 94196 96461
A7.01 LT 3
LT
603
LT LT
510
LT LT LT LT LT LT LT LT LT LT LT LT A7.09
419 LT LT LT
EQ EQ
C6x 97594
EQ, typ
99247 1000 1000 1873 1525 1525 1348 1706 320 286
1932
2 2720
96461
LT LT LT LT LT LT LT LT LT LT 97594
584
A3.03
98386 98386 97594 99247
4
2149 1525 1435 2166 1525 2111 1000 2373 1525 2111
5
483 615
FC 2-9
MCU MCU
1 813 380
A3.03 1495 FRANCES STREET
VANCOUVER BC V5L 1Z1
TEL 604 738 4323
3 WWW.PUBLICDESIGN.CA
6 A5.10
Capilano University
7 ECCE
C:\Users\jayleen\Documents\2015 CapU Childcare Post IFT_jayleenD4QHC.rvt
Reference RCP - L2
2024-06-20 4:26:30 PM
SHEET
A1.11
Copyright reserved. This design and drawing is the exclusive property
of WMW Public Architecture and Communication Inc. and cannot be
used for any purpose without the written consent of the Architect.
This drawing is not to be used for construction until issued for that
purpose by the Architect. Prior to commencement of the Work the
Contractor shall verify all dimensions, datums and levels to identify
any errors and omissions; ascertain any discrepancies between this
drawing and the full Contract Documents; and, bring these items to
the attention of the Architect for clarification.
ISSUES + REVISIONS
NO DATE DESCRIPTION
DD Dec 07, 2023 PCO-014 : Revised Doors + Millwork
FF Jan 16, 2024 SI-005 : Acoustic Panel + Millwork Details
5 5 II Feb 08, 2024 RFI-135 : Fire Protection Design Conflicts
NNN June 6, 2024 CD-005 L2 Revised Ducts and Grilles
QQQ May 28, 2023 RFI-247 S3A Light Fixtures in Kitchen
Areas
TTT June 20, 2024 SI-041 L2 ACT Ceilings and Bulkhead
Details
MWW2.0H, beyond
WDPn, beyond
align
R3a R3a
Ducts - see mechanial Ducts - see mechanial tile trim
TL1.W1
RECPT - see elec MWCT
300 300
Ø Ø
S/A S/A
MWB, varies
Cut tectum on site as
350 350 required to align w/ WDPn
Ø Ø bulkhead
O/A O/A
P4a
MCU/Branch Box
at Office 201
3g
ap
bet
we
en
gw
b and
C6c pur
lin
Required service
access space
FC 2-9 at Office 215
Align u/s of gwb ceiling with Min 25mm thk acoustic blanket
u/s of glulam beam at wall insulation below and adjacent to
MCU/branch box. Insulation not
required at Office 200.
C6c
Drywall access panel Min 25mm thk acoustic
+/- 1700 blanket insulation
Co
nsi
ste
w/ nt
oth
e ro
ffic
es
Keep ceiling height as tight to
fan coil as possible
RES
102
Consistent in all offices Consistent in all offices Consistent in all offices RES
Level 1 90500
3 Section detail - Faculty Office 200 +201 bulkhead 5 Section detail - Faculty Office 214 + 215 bulkhead 2 Section detail - MWB to kitchen wall P4a or P4b, typ.
1 / A1.04 1 : 10 1 / A1.04 1 : 10 2 / A3.04 1:5
VDU9
P4a
Level 2 94662
shim VDU
backing
2055 Purcell Way, North Vancouver, BC
Blocking above Blocking above F1a
Continuous framing,
beam wall Floor finish
102
finished per FC2
254
Electrical conduit -
Glulam Beam see elec
Junction box - see elec Level 1 90500 PROJECT CODE
Sprinkler branch line -
Purlin - see structural 2015
see mech
SCALE
Align edge of bulkhead Align edge of bulkhead C6b As indicated
to f.o. beam to f.o. P4a wall below
Sprinkler escucheon -
Blocking, PTblk Blocking, PTblk see mech
Linear light fixture,
flush with acoustic
panel - see elec
450-600 450-600
6 Plan Detail - Office bulkhead reveal adjacent to beam 7 Plan Detail - Office bulkhead reveal adjacent to P4a 4 Section detail - C6b connection to F1c head, aligned to u/s of 1 Section detail - F1 to VDU9, VDU9 at top edge
light fixture - see mech SHEET
1 / A1.11 1 : 10 1 / A1.11 1 : 10 1 / A3.01 1 : 10 4 / A4.18 1:5
A5.32